Key Highlights Welding One X Brace to Wet Scrubber to support No 4 & 5 Stack with TANK to stable X frame Support Stack No 1 and No 2 from Furnace Vertical Single 8 inch I Beam support No 2 & 3 Horizontal Stack 20.0 ft long high heat refractory 5 4 3 2
Wire tie X frame to steel Bldg
1 Burner Chemical
Pr
High Pressure Sprayer on Top
Secondary Chamber Fan
Boiler Tank
Quench Tank
Primary Chamber Fan
Stairwell
Scale 1 Sq = 1.0 feet