archaeology embodied museum_final year bachelor

Page 1

site shelter at lenggong, perak

unit A see thoo jun hoe JEFF.


EDUCATION Diploma

B.A. Degree

UCSI University 2016 - 2020

UCSI University 2020 - 2022

Architecture

Architecture

WORKING EXPERIENCE

SKILLS

jeffrey see thoo jun hoe 17. 08. 1998 malaysian contact / jeffree37@yahoo.com

Computer

Hands on

adobe photoshop

sketching

adobe indesign

hand drafting

autodesk autocad

presentation design

sketch up

project managing

enscape

Crew Member March 2017 - October 2017

ARKILAB 2018 - GIBERT&TAN 2021 Assistant Architect Internship Sep 2018 - April 2019

EXTRA CURICULUM Community Architecture 2018 Programme Team April 2018 - May 2018

integrated design studio portfolio

Jelly & Frenz Eventz Asia


this project portfolio is to showcase the processes and progressive study works that relates to the archaeology site at Lenggong, Perak by understanding and aware of the outstanding universal value (OUV) site, as in respecting the site as a heritage origin of people. through numerous studies of the site, the primary issue of the site is that the connection of this heritage site has potential to garner a harmonious site but due to the on-site palm tree plantation, that drove the locals to disconnect from the true origin of their lands.


contents

p1

p2

p3


project 01a_inhabited ruins


the three senses tools _ vision sound - memory / immagination scent

elemental senses around us tell us about ones connection to a memory, these entity are tools that connects us from one memory to another. bringing continuity in our memories or even without strong meaning, imagination can run free on our minds that interact between space and time. keyword _ connectivity cotinuity imaginative

01_summary of the three topics _ juhani pallasmma


vision is tangible

sound is intangible

scent is intangible

silent is immaginative

direct and non reactive

indirect and reactive

indirect and non reactive

embracing solitude and self dialogue

continuity

01_elements of senses

connectivity


piecing the remains

open and close space

over-viewing the remains

01_architectural theory and site remains

protecting significant remains

protective and exposed


sea

history

landscape and pathways

culture

visual continuity of the sea

impenetrable fortress to create vertical plane with a narrow to a wide space blending the site topography

blending pathways to site

openness of the remains

02_site forces


+

= as the site remain has a distinctive scattered arrangement, by using this force it creates a strong connection between the remains and proposed intentions. interpretation of each individual towards the site will have a set of unique thoughts. by enforcing historical purposed of the site as a puzzle piece.

02_theory + site = concept


positive and negative spaces

piecing the ruins

chronological zoning

+

+

-

-

avoiding the ruins

03_site intervention language

parallel wall act as guidance

centralize ruins

zoning sequence


9

2

4 4 3 8

8

5

5

1

5

7

7

04_ground level plan

6

1. entrance from main road 2. viewing deck 3. visual stair to wall exhibit

4. wall exhibition 5. permeable mirror display 6. telescope folly structure

7. guidance parallel wall 8. main exhibit 9. sea structure


10

4 1

9

7

3

8

2

5

05_axonometric overall view

6


darker parts circulate through each parts of the intervention that interconnects each other by using zoning.

05_perspective axono


entrance to site

05_photomontages of models

pathway


in between ruines

parallel walls


arkxsite site shelter competition submission / teammates - ting kai lin & carlos chu - https://www.arkxsite.com/site-shelter-winners-soon


project 01b _ site research_lenggong valley topic_tools and artefact








project 02 _ urban building strategies


x0_site

lenggong valley

chosen site - cluster one


a_connection to cluster 2

a

b_center township

d

c_bridge connection

c b

d

x0_site_existing

d_adjecent of core site


e e_bridge connection extended

f_linkage zone to core zone

f

x0_site_existing


archaeology core zone

x0_site_existing_core area


accessibility

x0_site_issues

amenities

isolation


// piecing the past re-enactment timeline of the site, creating a chronological sequence of people evolving as the site changes and people from the past to the fut

hunting

nomadic x

river

x

money

x

mythical

x

place

x

historical

x

to

place return x0_site_journey story


existing journey

x10_masterplan_journey

a

b

c

historical

peeking in-between

river and land


bridging the converging points

the intention is to bridge the connection or convergence point of each selected parcel to create a site that serve the existing culture as priority.

x10_masterplan_piecing and seduction intention


mapping of linking to site

x0 > x10 > x100_site tangible mapping

initial parcel intervention

shading

in between space


convergence points

x0 > x10 > x100_site tangible mapping

core archaeology site

potential lots

map matrix connection


color spectrum by emotion

01_site_emotion mapping


the map derived from the activities and emotion of each potential site selection, by linking them to a central point axis, to create a complex from of movement operation, similar to a camera panning.

view through intervention

03_intervention_masterplan operation diagram no. 02


03_intervention_masterplan piecing and seduction no. 03


existing

x0 > x10 > x100_masterplan_element dissection

hotspots

connect

axis

zoning


existing

view

traces

peeking

extension

amplify river overview

x10_masterplan_concept mock up


views

mock up scattered

gallery cafe gallery + water

orchard

extension education

hiking

the provocation of historical journey of implementing gallery, to further draw in users from the site is by giving view into the archaeology site.

x10_masterplan_program & users

boating

extension to the existing site village thus, giving people a sense of local culture by implementing program to provoke the relationship.

scattered arrangement is inspired by the throwing of stone to the water, as it creates scattered rippling effect.


// axis line each line represents a partition and journey, that is extend and flow through revealing a complete site in a asymmetry circulation, it is ovelay by pit stops that amplifies the intention.

x10_masterplan_journey


“sub spine as finger joining the main spine”

“village extension”

“research hub”

“converge hub”

“off the grid” “support”

“viewing tower”

“education hub”

“mock up sites”

x10_masterplan of peeking + viewing activities

main spine


extension research center” “view towards cluster 2”

“a

rt

ef

ac

tr

es

ea

rc

h”

“gallery”

“resting” “river port”

“hike” “farming”

“port bay”

“markets”

x10_masterplan of central hub for river, village and archaeology activities


“river”

“river”

“river” “extend” “extend” “extend” “research extesion”

“village”

“gathering”

“landscape”

“fisherman” x10_masterplan of research activities

“farm”

“support”


axis walkway spine

x0 > x10 > x100_masterplan_element dissection

sub spine act as finger joining the main spine

off grid program + potential land


emphasize with viewing tower

x0 > x10 > x100_masterplan_element dissection

village extension


// abstract formation the contrast of organic and manmade

“hiking” contemplative

site community

“port” “off grid program”

gathering

“hub”

04_masterplan + potential site model

“spine as mediator”


the color coordinates the specific users at the site

04_masterplan circulation layering


04_masterplan + building strategies


1 2 3 4 5 6 7 8 9 10 11 12

13 14 15 16 17 18 19 20 21 22 23 24 25

artefact research center biofact research center bukit bunuh archaeology site gallery research contemplation hall landscape garden gathering hub artefact exhibition mock interactive site viewing tower orchard village extension hidden cafe

kota tampan archaeology site + viewing tower archaeology usm research center open green landscape accommodation for site users aquaponic farm research center impermanent mock up tent additional expansion of archaeology site water prayer pavilion fisherman community hall fisherman port river extension archaeology hall artefact pavilions

node 05

node 06

1

2

node 01

4

8

1

3

24 23

9

25

5

node 04

7 6

10

22 21

11 12

3

0 de

no

20

13

node 02

15 19 14 04_masterplan

16

17

18


S+

i

i + + i

S

+

+

S+

i

i

S+

S+

04_masterplan + building strategies


river water diversion system

extension artefact research center

fisherman port

water artefact gallery

viewing tower

water prayer pavillion + gathering space

connection of the fisherman ports, by following the contour of the river, by letting water flowing into the cage intervention creating a threshold, by informing the users the relationship between water and land.

x100_intervention_nodes 01

water canal to hub


viewing bridge to bukit bunuh

viewing bridge

main hub

connection to village gathering hub

hotspot is diverted into respected zoning with planes extended outwards to guide users into each designated activities that enforced the river water into the intervention creating a valley. it is then layered a viewing intervention to inform the archaeological site.

re

ve

al

x100_intervention_nodes 03


extending the existing village, to increase the interaction between design users to local users, to further increase both culture and socioeconomy of the site.

interactive village ochard farm + accomodation hidden cafe underground artefact gallery

existing village x100_intervention_nodes 03


view towards cluster two

research + gallery for immediate site

existing core site

research

existing village

camp

by focusing the intervention into the view of the existing forestry creating a seamless connection making it a low profile intervention that abide the vegetation land plots.

x100_intervention_nodes 05


project 03 _ site shelter


x1k

masterplan + building

x10k

intention user program activities + concept

x100k

building site moulding

x1000k

zoom sequence

building element.........proposal


surrounding satellite site connection points that dictate the program massing placement and development of activities for the new central point.

4 archaeology sites 1 open air sites research 30% gallery 20% hub 40% viewing 10%

core archaeology site

intervention points

x1k_masterplan + building


stops

river

pick up

bus stops

archaeological site site

spaces bus stops

village village

bus stops

urban to building connection

x1k_masterplan + building

transition of places orange - picked up points black - stops - intervention site - spaces - building


stops pick up point

research cluster 02

stops

gallery + viewing

recycle

stops

new centrality port

stops pick up point

research hub

x1k_masterplan + building

perak man

// new centrality by tapping in propose intervention sites program, creates a central connector that brings multiple urban program act as tool to garner the new site.


view

hub

public

local research

bus stops

arch gallery

orchard aquaponic farm

pedestrian route

contemplation river

water filtration

site

site function local context journey through site

x1k_masterplan + building


research

intervention

merge merge

intervention

port

comtemplative

viewing intervention

hub

intervention

x1k_mastereplan + building_sketch ideation

merge

intervention + building


research

0.9km

gallery

0.4km

lot 5385

port

hub

bridge

x1k_masterplan + building_site moulding

02 intervention extension


96m

site 3 acres

144m x 96m

x1k_masterplan + building_site moulding

02 complete masterplan

144m


vie

new axis

w s rd wa to c2

site

existing

x1k_masterplan + building_site transformation process 01

site

mould

adapt extend


scattered

deduct

x1k_masterplan + building_site transformation process 01

block formation


sub spine site

e

pin

ys

ar

im

sub spine

site

pr

site

existing spines

x1k_masterplan + building_site transformation process 02

new spines

merge


stops

pick up

pick up

site

point journey

x1k_masterplan + building_site transformation process 02

informing the site

connection to main spine


locals

x10k_users

visitor

researcher

locals reference picture from perak permaulture farm, visitor emphasize on archaeology artefacts, researcher study and resurface artefacts


urban intervention

building extension

gallery + lab artefact exhibition

ark chapel

contemplation

interactive lab

cleanse

thematic trail

ritual hall

open camp

retreat

accommodation

hub

market

fisherman port

farm

viewing decks

pavilion

theater square

view landscape water gallery

research research and documentation

x10k_programs_intervention to building program

education institute

camps


the intention is to create a seamless site that denotes

and demarcates, the presence of site archaeology, due to improper usage of this found artefacts scattered around in open sites.

?

!

!

? ?

?

?

!

?

?

the objectives is to identify open air sites and shelter or

frame as a piece art from the ancient civilization which they use as a tool for their means of survival.

the outcome will have a harmonious site that ties to

the propose urban context to garner complex activities to create awareness and respecting the heritage value or more specifically the outstanding universal value.

x10k_intention objecive aim outcome


urban intervention stops building linkage river extension intervention linkage

pick up points

x1k_masterplan + building_site program planning


the site

x0

x10

x100 x100k_building site moulding_site context


building strategy

site connection massing

river trial

researcher trial

ng

n

c ne

village + visitor

co

t

ion

w

ne

ng di

si as

m

il

bu

urban masterplan

x100k_building site moulding_massing form from intervention

x0


site journey parcel

river research

building open air gallery

contemplation parking

ochard

x100k_building site moulding_journey to building

x10


01

04

03 02

01 02

03

03 01

04 04

02

x100k_building site moulding_site journey sequence


01

02

04

02

01

03

03

04

x100k_building site moulding_site journey sequence


surrounding site massing

ing

t xis

connection to river intervention

e

il

tra

ch

ar

se

re

ng

wi

vie

entrance site artefact showcase chapel

e lag

rm

rd

fa

accommodation

retreat

a rch

o

il

nn

co

on

ti ec

v to

large scale site building massing

x100k_building site moulding_building massing

x100


enclosed landscape 1000 ms

open landscape is 33% of total proposal with enclosed landscape which is part of the building program space open landscape is includes propose garden and farm land.

open landscape 4000 ms

x100k_building site moulding_space distribution landscape

building mass 4070 ms


workshops 300 ms

archaeology lab 250 ms

meeting 120 ms

public presentation 100 ms

shops and information 100 ms

conservation facilities 400 ms

visitor

musuem and exhibition 720 ms

restaurant 320 ms

post harvest and storage 100 ms

archaeology contemplation 480 ms

storage

lounge 100 ms accomodation 350 ms

amenities 100 ms

community courtyard 200 ms

x100k_building site moulding_space distribution building mass

m&e

reception 30 ms

river mechanical system 50 ms

researcher

cafe 200 ms

river pavilion 150 ms

propose total build up area

4070 ms

museum + research + workshop 60% parking 20 pax

office

resting 20% accommodation 15% ancillary 05%


01

x100k_building site moulding_building layout progressive study

02

x100


03

x100k_building site moulding_building layout study

04

x1000


05

x100k_building site moulding_building layout study

x1000


06 building approach

open land

use foc r

ido

orr dc

x100k_building site moulding_building atmosphere study

visual pass through

focused entrance

x1000


07 floating roof sheltering the open air sites

cantilever roof

circulation corridor

sheltering the site

x100k_building site moulding_building atmosphere study

x1000


bukit bunuh

08

entrance

farm pan

kota tam acc

workshop om

x100k_building site moulding_building layout study

od

ati

on

x1000


09

x1000k_building element_building layout study

x1000


10

x1000k_building element_building layout study

x1000


11 translucency creates soft light that to give shimmer to solid surface

x1000k_building element_building facade study

x1000


12 movement of people inside the museum spaces movement of people walking through the displayed artefacts

x1000k_building element_building facade study

x1000


13 translucent creates lightness to a heavy building form

x1000k_building element_building mass study

x1000


bukit bunuh

re a se rch

river

ark site

mp

te

n co k.t research and gallery

surau

ion

t la

archaeology

community

town

routes connection

extrude mass path program

creating mass in between path

pathway and mass

main spaces overlap with existing path

existing artefact sites

building mass transformation


ark site 01

01 02 ark site 02

03

nodes; pick up points

nodes informal formal programs

main space

introduce river to site

farm + accomodation

public and private

building mass transformation


archaeology journey

accommodation journey

rch

n

e op arc

bukit bunuh site

e res

d

n ha

ite

ys

g elo

a air

farming journey

lab

cts

on

ne

sit

to es

fa rte

a

g

ka

lin

o et

pro

e

er

s po

t

ran

u sta

new river canal

tio

i ex

stin

e

mt

o gc

la mp

e

ac

p ns

e

arm

f

p sca

la

nd

building mass journey

pro

po

se

urb

an

hu

b


+

+

-

+

+

-

+

+

-

+

+ -

+ +

-

+

hierarchy

x100k_building site moulding_building mass highlight

-

+

-

+ +

positive and negative


horizontal building massing zoning


verticle lift splice out programs

open air archaeology sites

entrance

vertical massing zoning


open corridor light and dark display restaurant main contemplation entrance

exhibition entrance

conservation

exhibition

exhibition

workshop

evolution exhibition

building highlight massing zoning


8 10 12 7

9 6 5

1

2 13

4

11 key plan

14

existing mosque 1 parking 2 forest chapel 3 viewing tower 4 main entrance 5 forest open air artefact gallery 6 extension artefact gallery 7 research gallery 8 river pavilion 9 research pavilion 10 center hub 11 river tower 12 pump station 13 viewing tower 14


overall axonometric


highest floor

04

staircase to scf

03

staircase to ff

02

entrance

00

staircase to gf

01

SC

FF

GRD

UND exploded space layout


polycarbonate

translucent

opaque

building skin

mullion

lighting

beam structure precast concrete


geofact ranging from 1.83mil to 40,000 years ago metrorite - suevite

artefact ranging from 1.83mil to 40,000 years ago hand axe - pebble tool - flake tool - core tool - hammerstone

biofact ranging from 10,000 - 3,000 years ago full skeleton burial - scattered skeletal remains

museum display catalogue program contents


museum display scales program contents


boats and traps

spear

idols

mask

t

sumpi

orang asli museum display program contents

the prominent aboriginal origin that exists in the site, link back to the prehistoric civilization of perak. orang asli also known as the original people was regarded as a nomadic settlers and mostly live of hunting and gathering forest produces.


museum space + circulation


3

7

8 9

4 2a

200 section 2

1

5 6

220 plan site plan

entrance 1 parking 2 forest chapel 2a researcher trail to bukit bunuh 3 farm 4 farm extension 5 river canal 6 researcher entrance 7 open air artefact site 8 trail to urban river intervention 9


entrance 1 a stone garden 1a shop and ticket counter 2 /3 chapel ritual area 4 archaeology embodied 5 introduction arch gallery 6 temporary exhibition 7 to underground...

25 24

26

management 8 b lift lobby 9 cafe lab10 cafe 11 artefact sites garden 12

27 30 31

29

23

33

32

34

workshop exhibition13 workshop space 14 interactive workshop 15 water embodied pavilion 15a accommodation manage16 accommodation shed 17 lounge 17a aquaponic pond 18 farm 19 shed 20

21 21a

22

12

10a 11 4 5 8 6

9

10

14

7

13

3 2

20

15

1a 18

1

ground floor plan_sequence 01

17

central courtyard 21 d dining 21a kitchen 22 artefact garden 23 to first floor... loading bay 24 e conservation hall 25 artefact archive 26 archival exhibit 27 storage lab 29 arch lab 30 orang asli intro museum 31 orang asli artefacts 32 orang asli exhibition 33 conference 34

17a 19

c

16

15a


trail entrance


main entrance


main museum entrance


entrance journey


frontage view


spiritual embodied


introduction museum


introduction museum


introduction museum


central courtyard


temporary exhibition


stone garden


...from ground floor perak man burial display 1 evolution musuem 2 lift lobby 3 nature musuem 4 tool making sequence 5 stone tool making display 6 to first floor...

6

3 5 2

4

underground floor plan_sequence 02

1


underground museum


underground museum


underground museum circulation scene


...from underground a geology display 1 tools making display 2 to second floor... light corridor 3 video room 4 workshop exhibition 5 bukit bunuh lookout point 6 b archival sequence museum 7 lobby 8 gathering hall 9

6

...from ground floor restaurant lounge 10 reception lounge 11 amenities 12

9

8 7

10

11

12

2 3 4 1

5

13

first floor plan_sequence 03

c


stone tool making museum


connection corridor


lookout point


...from first floor light museum 1 texture museum 2 lift lobby 3 amenities 4 to ground floor...

1 2

second floor plan_sequence 04

3

4


light museum


dark museum


2

museum section

entrance - contemplation - museum - video room - workshop

4

8

16


2

longitude section

accommodation - lounge - temporary exhibition - museum - cafe - open site artefact - orang asli museum

4

8

16


1

2

3

4

5

1 contemplation - 2 museums - 3 connecting corridors - 4 central courtyard- 5 cafe - 6 garden

6


1

2

3

4

1 embodied garden - 2 courtyard - conservation entrance - lookout point - 3 laboratory - 4 orang asli museum - conference hall


hiking trail view


archaeology laboratory


orang asli garden exhibition


central courtyard


farm


01 model main axonometric view


02 model north elevation view


2

north elevation

4

8

16


03 model east elevation view


2

east elevation

4

8

16


04 model south elevation view


04 model west elevation view


05 building atmosphere (entrance to building)


06 building atmosphere (entirety view of open air site to exhibition and museum)


NOTES

DRAWING LIST GENERAL DRW NO.

DETAILS

DRAWING TITLE

SCALE

DRAWN BY

REVISION

DRW NO.

DRAWING TITLE

SCALE

DRAWN BY

REVISION

MARK

DATE

BY

REVISION

PROJECT TITLE

A 001

DRAWING LIST 1

NTS

JEFF

0

A 700

RETAINING WALL DETAIL

1:10 @ A3

JEFF

0

A 003

GENERAL NOTES 1

NTS

JEFF

0

A 701

STAIRCASE DETAIL

1:10 @ A3

JEFF

0

A 004

GENERAL NOTES 2

NTS

JEFF

0

A 702

FACADE SECTION DETAIL

1:10 @ A3

JEFF

0

A 005

LEGEND 1

NTS

JEFF

0

A 702a

AXONOMETRIC FACADE ASSEMBLY STUDY

NTS

JEFF

0

A 006

LEGEND 2

NTS

JEFF

0

A 702b

AXONOMETRIC FACADE ASSEMBLY

NTS

JEFF

0

A 702c

SECTION AXONOMETRIC FACADE ASSEMBLY

NTS

JEFF

0

A 703

SLIDING DOOR DETAIL

1:10 @ A3

JEFF

0

GA ARRANGEMENT

AR724_WORKING_DRAWING SETTING_OUT PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

OWNER

DRW NO. A 100

DRAWING TITLE SETTING OUT

SCALE

DRAWN BY

REVISION

A 704

SKYLIGHT DETAIL

1:10 @ A3

JEFF

0

VARIES @ A1

JEFF

0

A 705

WINDOW DETAIL

1:10 @ A3

JEFF

0

JEFF

0

A 706

SKYLIGHT LOUVER DETAIL

1:10 @ A3

JEFF

0

A 200

GA GROUND FLOOR PLAN

1:200 @ A1

A 201

GA ROOF PLAN

1:200 @ A1

JEFF

0

A 707

MUSEUM SECTION DETAIL

1:10 @ A3

JEFF

0

A 300

ELEVATION

1:200 @ A1

JEFF

0

A 707a

MUSEUM DISPLAY DETAIL

1:10 @ A3

JEFF

0

A 400

SECTION

1:200 @ A1

JEFF

0

A 708

DETAIL ACCOMMODATION LAYOUT TYPE 2PAX

VARIES @ A3

JEFF

0

A 500

CONSTRUCTION SKETCHES

JEFF

0

A 709

DETAIL ACCOMMODATION LAYOUT TYPE 1PAX

VARIES @ A3

JEFF

0

UCSI_UNIVERSITY

ARCHITECT

NTS

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

SERVICES DRW NO.

DRAWING TITLE

SCALE

DRAWN BY

REVISION

A 800

SANITARY SERVICES GFP

1:200 @ A1

JEFF

0

A 801

SANITARY SERVICES ROOF PLAN

1:200 @ A1

JEFF

0

A 801a

SANITARY SERVICES DETAIL LAYOUT

VARIES @ A1

JEFF

0

A 802

SANITARY SCHEMATIC DETAIL

NTS

JEFF

0

A 803

WATER SUPPLY GFP

NTS

JEFF

0

A803a

WATER SUPPLY DETAIL LAYOUT

VARIES @ A1

JEFF

0

A 804

FIRE FIGHTING SCHEMATIC GFP

1:200 @ A1

JEFF

0

A 804a

FIRE FIGHTING SCHEMATIC DETAIL LAYOUT

VARIES @ A1

JEFF

0

A 804b

FIRE FIGHTING SCHEMATIC DETAIL

JEFF

0

ARCHITECT

JEFF'S_ARCHITECT

ENGINEER CONSULTANT

NTS

JEFF'S_CONSULTANT

STATUS

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

AUG_2021

DRAWING TITLE

PRJ NO

DRAWING LIST

A0001 A001

DRAWING NO


NOTES

SCHEDULE OF ACCOMMODATION LEVEL

SPACE

AREA PER PERSON m²

NUMBER OF PEOPLE

AREA OF SPACE m²

NUMBER OF ROOM

GROUND FLOOR

ENTRANCE CONTEMPLATION PAVILION

10m²

6

5.6m x 8.2m = 46m²

0

4

SHOP

2m²

25

5.3m x 10m = 53m²

1

3.5

INTRODUCTION MUSEUM

10m²

18

1/2 x 26m x 14m = 182m²

0

4

ARCHAEOLOGY EMBODIED

10m²

19

13.4 x 14m = 187m²

1

4

SPIRITUAL COURTYARD

10m²

9

1/2 13m x 13m = 84.5m²

0

4

FARM STORAGE

5m²

3

5.5m x 2.7m = 15m²

0

4

OPEN AIR KITCHEN

10m²

5

2.3m x 9.7m = 22m²

0

4

DINING AREA

5m²

28

144m²

1

3

STONE PAVILION

10m²

2

4.175m x 2.5m = 10.5m²

0

4

EMBODIED SPACE

10m²

2

5m x 2.7m = 13.5m²

1

4

CONTEMPLATION ROOM

5m²

2

4.8m x 2m = 10m²

0

4

BUILDING HEIGHT m

MARK

DATE

BY

REVISION

PROJECT TITLE

WORKING_DRAWING GENERAL_ARRANGEMENT

OWNER

UCSI_UNIVERSITY CONSERVATION GALLERY 01

10m²

5

5.7m x 7.6m = 43m²

0

4

ARCHIVAL SEQUENCE GALLERY

10m²

6

5.6m x 8.2m = 46m²

0

4

CONSERVATION GALLERY 02

10m²

7

12.7m x 5m = 63m²

0

4

ARCHIVAL ROOM

5m²

4

5.6m x 3m = 17m²

0

4 ARCHITECT

LABORATORY STORAGE

5m²

3

2.5 x 6m = 15m²

0

4

ARCHEOLOGY LABORATORY

15m²

7

7.5m x 13.5m = 100m²

0

4

ORANG ASLI INTRO EXHIBITION

10m²

5

6m x 5m = 30m²

0

4

LOBBY

5m²

11

11m x 5m = 55m²

0

4

ORANG ASLI ELEMENT MUSEUM

5m²

6

6.6m x 4m = 27m²

0

4

ARCHAEOLOGY CONFERENCE

5m²

25

4m x 8m = 32m²

0

4

MUSEUM LOUNGE

20m²

4

67m²

0

4

TEMPORARY EXHIBITION

10m²

4

2.8m x 12m = 34m²

0

4

ADMIN

15m²

2

5.7m x 3.1m = 20m²

0

4

CAFE KITCHEN 01

15m²

25

5.6m x 8.2m = 46m²

0

4

CAFE SITTING AREA

5m²

11

4.8m x 11m = 53m²

0

4

WORKSHOP MUSEUM

10m²

6

1/2 x 26m x 14m = 182m²

0

4

WORKSHOP

3m²

28

13.4 x 14m = 187m²

0

4

WORKSHOP 02

3m²

28

8.5m x 18m = 84.5m²

0

4

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

ARCHITECT

JEFF'S_ARCHITECT

ENGINEER CONSULTANT

WATER ROCK PAVILION

15m²

3

5.6m x 7.4m = 42m²

0

4

ACCOMMODATION SERVICE

5m²

9

5.6m x 8.2m = 46m²

0

4

JEFF'S_CONSULTANT

STATUS

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

AUG_2021

DRAWING TITLE

PRJ NO

SCHEDULE OF_ACCOMMODATION

A0001 -

DRAWING NO


NOTES

JEFF'S ARCHITECTS CAD STANDARDS & SYMBOLS

JEFF'S ARCHITECTS CAD STANDARDS & SYMBOLS

JEFF'S ARCHITECTS CAD STANDARDS & SYMBOLS

LEADER

GRID LINE SYMBOLS

SLAB PENETRATIONS / OPENING DIRECTION

2 1686

3 1686

DIRECTION

1

SPEC & TEXT LEADER

SLAB PENETRATIONS / OPENING

1686

A FINISHES GRAPHICS CODES REVISION NOTATION

B

MARK

DATE

BY

REVISION

PROJECT TITLE

CF-01

CEILING FINISH

AR724_WORKING_DRAWING SETTING_OUT

WF-01

WALL FINISHES

PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

FF-01

FLOOR FINISHES

FR-01

FURNITURE, DOOR, SANITARY

EXTERIOR ELEVATION SYMBOL CLOUD FOR REVISE DRAWING

00

ELEVATION DESIGNATION WITH SHEET REFERENCE NUMBER

XXX

REV 01

BUILDING (MAIN) SECTION SYMBOLS

PROVIDE CODES TO ALL SPECIFIED FINISHES AND LIST DOWN ON THE TECHNICAL SHEET OR FINISHES SCHEDULE FOR EVERY PAGES.

ROOM IDENTIFICATION SYMBOL

00

OWNER

UCSI_UNIVERSITY

SECTION DESIGNATION WITH SHEET REFERENCE NUMBER

XXX

MAIN RECEPTION

ENLARGED AREA SYMBOLS

FFL ±44.52 SFL ±44.52

00

XXX

ROOM NAME

ROOM FINISH FLOOR LEVEL ROOM STRUCTURAL FLOOR LEVEL

ARCHITECT

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

DETAIL DESIGNATION WITH SHEET REFERENCE NUMBER

FLOOR HEIGHT SYMBOL

DRAWING TITLE

FFL ±00.000

FINISHED FLOOR LEVEL (SECTION)

SFL ±00.000

STRUCTURAL FLOOR LEVEL (SECTION)

FFL ±00.000 SFL ±00.000

FINISHED FLOOR LEVEL (SECTION) AND STRUCTURAL FLOOR LEVEL (SECTION)

ARCHITECT

Drawing Title Drawing No.

01

JEFF'S_ARCHITECT

ELEVATION 1 1:50@A3

DOOR & WINDOW NUMBER SYMBOL / WALL Drawing Scale

W-00

DIMENSION STYLE

ENGINEER CONSULTANT

W-00

JEFF'S_CONSULTANT

D-00

1500

1500

3000

3000 50dp

DROP / STEP & FALL SYMBOL

SETTING OUT POINT

SOP

SOP

FALL

SOP

FALL

SOP STATUS

SPOT ELEVATION IN METERS

EL. ± 00.000

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

AUG_2021

DRAWING TITLE

PRJ NO

SYMBOL

A0001 A004

DRAWING NO


NOTES

AGRICULTURE Kampung Banggol Batu

PROPOSED SITE LOT 5385 Jln Kampung Pulau Cheri, Kampung Luat, 33400 Lenggong, Perak

LOT 5385

LINE MARK

Kampung Banggol Batu

DATE

BY

REVISION

PROJECT TITLE

AR724_WORKING_DRAWING GENERAL_ARRANGEMENT

82°

Bukit Bunuh B4 B3

B2

B1

2825

82°

2881

PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

2044

D1

143°

6675

A2

7413

7350

D3

B7

A8

B6 B5

5° ROOF

R.C FLAT ROOF

4759

A12 C9

TEMPERED GLASS SKYLIGHT

5° ROOF

D5

5001

A11

12875

ALUMINUM LOUVER SKYLIGHT

R.C FLAT ROOF

C8

R.C FLAT ROOF

A10

4225

B9

5525

4853

D4

C3

Kampung Sena Halu

A9

7207

0

B1

5650

R.C FLAT ROOF

POLYCARBONATE ROOF

5° ROOF

C2

C10

5° ROOF

R.C FLAT ROOF 5° ROOF

OF

R.C FLAT ROOF

6801

3350

2525

R.C FLAT ROOF

8134

C1

Kampung Laut Kampung Baru Kota Tampan

5000

A1

SETBACK LINE

B8

D2

Sungai Perak

Kota Tampan

RO

R.C FLAT ROOF

C4 3824

C11

OWNER

POLYCARBONATE ROOF R.C FLAT ROOF

5° ROOF

UCSI_UNIVERSITY

3550

D6

C5 A3

A4

D7

3374

5900

OF

C6

5° ROOF

RO

R.C FLAT ROOF

5° ROOF

4551

R.C FLAT ROOF

A14

A15

2

13400

A7

B1

RO

D8

OF

A6

RC FLAT ROOF

C8

RC FLAT ROOF

D9

2800

AGRICULTURE

4800

3825

A5

F1

143°

11050

A7

C7

RO

143°

A7

OF

VOID

R.C FLAT ROOF

A13 OF

A17

5850

A18

4725

A19

9825

4350

A20 C12

RC FLAT ROOF

260

23

RO

OF

RO

RC FLAT ROOF 5° ROOF

5° ROOF

01 A400 TEMPERED GLASS SKYLIGHT

VOID

A12a

RC FLAT ROOF

C13

5° ROOF

5° ROOF

a

1

B1

RC FLAT ROOF

TEMPERED GLASS SKYLIGHT

A12b 3300

D9

TEMPERED GLASS SKYLIGHT

D9

5376

ARCHITECT

C14

b

4

1

A9

13

B

c

D9

B1

RC FLAT ROOF

B1

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

5

B1

2450

VOID

RC FLAT ROOF

RC FLAT ROOF

6008

1:25000

OF

01 A301

5497

Jalan Lenggong

01

KEY PLAN

3950

0

1095

A16

7510

VOID

RO

RC FLAT ROOF

5° ROOF

5° ROOF

B

RC FLAT ROOF

4392

0

D1

11a

5715

VOID

A9

RC FLAT ROOF OF

A7b A7c

A7d

1900

5056

A7e

4169

RO

OF

A7f

5300

4356

A7g

3100

C15

A7h

RO

6849

B8 A7a

RC FLAT ROOF 5° ROOF

RC FLAT ROOF

2044

5000

C16 C17

AGRICULTURE

RC FLAT ROOF 5° ROOF

RC FLAT ROOF

D1

FOREST CHAPEL

2

RC FLAT ROOF

D1

3400

RC FLAT ROOF 5° ROOF 5° ROOF

3

2241

5° ROOF

7

C18

PROPOSED SITE LOT 5385 Jln Kampung Pulau Cheri, Kampung Luat, 33400 Lenggong, Perak

B1

B5

6

127°

01 A300

8350

B5

B1

5650

RC FLAT ROOF

D1

OF

RO

4

R.C FLAT ROOF

7375

C1 5°

5800

OF

RO

143°

ARCHITECT

01 A401

C1

5

D1

JEFF'S_ARCHITECT

Bukit Bunuh ENGINEER CONSULTANT

JEFF'S_CONSULTANT

ADMIN PARKING PROPOSE FARM

D

Y AR

UN

LIN

Sungai Perak

E

MAIN PARKING

BO

AGRICULTURE

PROPOSE RIVER CANAL STATUS

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR

02

LOCATION PLAN NTS

03

SITE PLAN 1:500

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

SETTING_OUT

A0004 A100

DRAWING NO


MATERIAL SCHEDULE

NOTES

15MM THK TEMPERED GLASS WITH BLACK POWDERED COATED STEEL MULLION AND FRAME (TO ARCHITECTS DETAIL) 1200MM X 600MM AND 120MM THK PRECASE CONCRETE WALL PLATE TO BE FINISHED IN EXPOSED STATE 40MM THK x 500MM WIDTH OPAL COLORED POLYCARBOBATE PANELS RODECA TRANSLUCENT PC2540-4 WITH STEEL MULLIONS

B4 B3 B2

B1

500MM STONE SLAB WALL CLADDING WITH BUTT JOINS IN RANDOM PATTERN WITH SMOOTH FINISHED TEXTURE EXTERNALLY

5

282

TYPICAL 150MM CONCRETE WALL WITH REBAR STEEL REINFORCEMENT AND PROTECTIVE RAW COATING PAINTED FINISHED EXTERNALLY

1

288

NOTE : ALL REQUIREMENTS TO BE CLARIFIED BY ARCHITECT

4

204

CONSERVATION GALLERY 01

UNIQUE WALL MATERIAL LEGEND, THAT CORRESPOND TO WALL POSITION IN EACH SPACE.

FFL +1.000 OKU PARKING

D1 667

ARCHIVAL ROOM

5

FFL +1.000 LOADING BAY

D2

B8 0

500

A2

3

ARCHIVAL SEQUENCE GALLERY

741

FFL +1.000

7350

D3

B7

W.C AREA

B6

FFL +0.600

813

C1

B5

2525

4

C2

MARK

A8

0

253

4

322

0

A10

4225

A11

12875

P

FFL +0.000

200D

CONSERVATION GALLERY 02

D4 4851

5

552

C3

AR724_WORKING_DRAWING GENERAL_ARRANGEMENT

C9

2

498

B9

REVISION

FFL +1.600

200DP

FFL +1.000

BY

PROJECT TITLE

MALE W.C

FARM

DATE

A12

4759

100DP

B1

100DP

A9

7207

FEMALE W.C

PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

5650

A1

FFL +1.600

ARCHEOLOGY LABORATORY

200DP

ARCHAEOLOGY CONFERENCE

FFL +1.000

FFL +1.800

CONTEMPLATION ROOM SERVICE

FFL +0.000

C10

200DP

P

200D

600DP

ORANG ASLI INTRO EXHIBITION FFL +1.000

LABORATORY STORAGE

680

EMBODIED SPACE

LOBBY

ORANG ASLI ELEMENT MUSEUM

FFL +1.000

3350

C8

FFL +0.800

D5

5001

200DP

FRONT COURTYARD

FFL +1.000

FFL +1.000

1

C4

100DP STONE PAVILLION

CENTRAL COURTYARD

FFL +0.800

3824

C11

P

100D

FFL -1.000 200DP

DINING AREA

200DP

FFL +0.500

0

355

D6

200DP

C5

OPEN AIR KITCHEN

A3

FFL +0.800

A4

OWNER

D7

3374

5900

UCSI_UNIVERSITY

OPEN AIR ARCHAEOLOGY GARDEN

C6

FFL +0.000 FARM 500DP

4551

FFL +0.000

A14

RAMP DOWN 200DP

A15

11050

200DP

C11a

C7

2

13400

A5

A6

A7

D8

F1

B1

0

D9

280

C8

CAFE SITTING AREA

4800

3825

FFL +1.000

C11b

ARCHAEOLOGY EMBODIED

ARCHITECT

FFL +1.000

A13 SPIRITUAL COURTYARD

A16

7510

ELEMENTAL EXHIBITION

FFL +0.700

A17

5850

A18

4725

A19

9825

A20

4350

FFL +1.000

C12

100DP MALE W.C ADMIN

LIFT LOBBY

LIFT CORE

FFL +0.800

CAFE KITCHEN

FFL +1.000

FFL +1.000

3950

50

109

60 232 FFL +1.000

WORKSHOP FFL +1.000

02 A300

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

FEMALE W.C

01 A400

FFL +0.800

200DP

BIOFACT INTRODUCTION FFL +1.000

C13

WORKSHOP LOBBY FFL +1.000

FFL +1.000

ATRIUM FFL +1.000

TEMPORARY EXHIBITION

3300

D9

WORKSHOP MUSEUM

FFL +1.000

FFL +1.000

a

1a B1

A12b

5497

A12a

INTRODUCTION MUSEUM

6 537

b D9

C14

ARCHITECT

JEFF'S_ARCHITECT

SHOP FFL +1.000

4

517

B1

5

A9

3 B1

c

D9

1 B1

5

B1

0

245

FARM STORAGE MUSEUM LOUNGE

6008

FFL +0.600

WORKSHOP COURTYARD

2 439

0

B

JEFF'S_CONSULTANT

WORKSHOP 02

D1

FFL +1.400

FFL +1.200

A9 A7b A7c 1900

A7d

5675

5056

A7e

4169

A7f A7g

3100

A7h

9

4356

STORAGE

684

5300

1 D1

B8 A7a

ENGINEER CONSULTANT

FFL +0.000

11a

5

571

MEETING AREA

C15

FFL +1.400

ROCK GARDEN ACCOMMODATION TYPE 03 FFL +0.200

ACCOMMODATION TYPE 01 FFL +0.200

FFL +1.000

2

ACCOMMODATION SERVICE

2044

5000

C16

D1

3400

FFL +0.200

ACCOMMODATION TYPE 02

C17

ACCOMMODATION TYPE 04

FFL +0.200

3

2241

D1

FFL +0.200

7

C18

B1

b B1 6

B1

0

565

STATUS

CONCEPT_TENDER

01 A300

350

8

a

B1

D1

CHECKED BY

4

WATER ROCK PAVILION

ENTRANCE CONTEMPLATION PAVILION

FFL +0.800

FFL +0.000

BAKHTIAR_AMIR

5

737

D1 a 0

580

02 A400

b GA GROUND FLOOR PLAN 1:200

5

D1

D1

01

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

GA_PLAN

A0004 A200

DRAWING NO


NOTES

B4 B3 B2

B1

5

282

1 288

4

204

D1 5

667

D2

B8 0 500

A2

3

741

7350

D3

B7 A8

B6 5° ROOF

R.C FLAT ROOF

B9

5 552

4853

D4

MARK

DATE

BY

REVISION

AR724_WORKING_DRAWING GENERAL_ARRANGEMENT

ALUMINUM LOUVER SKYLIGHT

PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

TEMPERED GLASS SKYLIGHT

5° ROOF

D5

5001

A12 C9

R.C FLAT ROOF

C8

4759

0

R.C FLAT ROOF

R.C FLAT ROOF

A11

12875

B1

C2

C3

A10

4225

PROJECT TITLE

B5

5° ROOF

A9

7207

C10

5° ROOF

R.C FLAT ROOF 5° ROOF

3350

2525

POLYCARBONATE ROOF

4

R.C FLAT ROOF

813

C1

5650

A1

F

O RO

1

680

R.C FLAT ROOF

R.C FLAT ROOF

C4 3824

C11 POLYCARBONATE ROOF R.C FLAT ROOF

0

355

D6

5° ROOF

C5

A4

D7

3374

5900

A3

OWNER OF

C6

5° ROOF

RO

UCSI_UNIVERSITY

R.C FLAT ROOF

5° ROOF

4551

R.C FLAT ROOF

A14

A15

11050

A7

C7 A7

RO

B1

D8

A6

F1

OF

A5

2

13400

0

RC FLAT ROOF

D9

280

RC FLAT ROOF

C8

4800

3825

A7

OF

RO

RC FLAT ROOF

5° ROOF

VOID

R.C FLAT ROOF

ARCHITECT

A13 OF

A18

4725

A19

9825

4350

A20 C12

RC FLAT ROOF

60

RO

A17

5850

232

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

F

RO

OF

RC FLAT ROOF 5° ROOF

5° ROOF

01 A400 TEMPERED GLASS SKYLIGHT

VOID

A12a

RC FLAT ROOF

TEMPERED GLASS SKYLIGHT

A12b 3300

D9

5° ROOF

5° ROOF

a

1

B1

C13

RC FLAT ROOF

5497

01 A301

O RO

3950

50

109

A16

7510

VOID

TEMPERED GLASS SKYLIGHT

6

537

b D9

C14 4

1

A9

3 B1

c

D9

B1

RC FLAT ROOF

ARCHITECT

JEFF'S_ARCHITECT

B1

5

B1

0

245

VOID

RC FLAT ROOF

6008

RC FLAT ROOF

ENGINEER CONSULTANT

5° ROOF

VOID

2

A9

RC FLAT ROOF OF

A7b A7c

A7d

1900

5056

A7e

4169

RO

OF

A7f 4356

A7g

3100

C15

A7h

RO

9

5300

684

B8 A7a

JEFF'S_CONSULTANT

RC FLAT ROOF

439

0

D1

1a B1

5

571

RC FLAT ROOF 5° ROOF

RC FLAT ROOF

2

RC FLAT ROOF

2044

5000

C16

D1

3400

RC FLAT ROOF 5° ROOF 5° ROOF

RC FLAT ROOF 5° ROOF

RC FLAT ROOF

D1

C17

3

2241

5° ROOF

7

C18

B1

B5 6

B1

0

565

STATUS

CONCEPT_TENDER

01 A300

350

8

B5

RC FLAT ROOF

D1

OF

RO

4

CHECKED BY

BAKHTIAR_AMIR

R.C FLAT ROOF

737 5

C1 5° OF

RO

0

580

01 A401

1:200

5

D1

C1

01

GA GROUND FLOOR PLAN

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

ROOF_PLAN

A0004 A201

DRAWING NO


NOTES

B1a

B1b

A1

A5

A6

B1 B2

B3

B4

B5

B6

B7

B8

B9

B10

A8

A9

A10

A11

A12

ROOF LEVEL FFL +12.000 V

MARK

SECOND FLOOR LEVEL FFL +8.000 V

DATE

BY

REVISION

PROJECT TITLE

AR724_WORKING_DRAWING GENERAL_ARRANGEMENT

FIRST FLOOR LEVEL FFL +4.000 V

PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

GROUND LEVEL FFL +0.000 V

OWNER

UCSI_UNIVERSITY

01

NORTH ELEVATION 1:200

ARCHITECT

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

C1

C2

C3

C4

C5

C6

C7

C8

C11a

C11b

C12

C13

C14

C15

C16 C17 C18 ARCHITECT

ROOF LEVEL FFL +12.000 V

JEFF'S_ARCHITECT

SECOND FLOOR LEVEL FFL +8.000 V

ENGINEER CONSULTANT

JEFF'S_CONSULTANT FIRST FLOOR LEVEL FFL +4.000 V

GROUND LEVEL FFL +0.000 V

STATUS

02

EAST ELEVATION

CONCEPT_TENDER

1:200

CHECKED BY

BAKHTIAR_AMIR DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

ELEVATION

A0004 A300

DRAWING NO


NOTES

01 A707A

F1

01 A702

01 A704

D8

D9

D9a

A12a

A12b

A13

A16

A17

A18

A19

A20

72264 8448

3581

5299

13235

3300

6141

7510

5850

4725

9825

4350

ROOF LEVEL FFL +12.000 V

DARK ARTEFACT MUSEUM

LIGHT ARTEFACT MUSEUM LIFT LOBBY 04

SERVICE AREA

SECOND FLOOR LEVEL FFL +8.000 V

MARK

STONE GEOLOGY MUSEUM

STONE GEOLOGY MUSEUM

CORRIDOR

VIDEO ROOM ENTRANCE

LIFT LOBBY 03

FIRST FLOOR LEVEL FFL +4.000 V

01 A700 INTRODUCTION MUSEUM

BIOFACT INTRODUCTION CORRIDOR ATRIUM

LIFT LOBBY 02

BY

REVISION

AR724_WORKING_DRAWING GENERAL_ARRANGEMENT PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

WORKSHOP MUSEUM

TEMPORARY EXHIBITION

GROUND LEVEL FFL +0.000 V

DATE

PROJECT TITLE

ORANG ASLI MUSEUM

16 STEPS 300 TREAD 200 RISER

STONE TOOL MAKING CORRIDOR

STONE TOOL MAKING MUSEUM

LIFT LOBBY 01

EVOLUTION MUSEUM

UNDERGROUND LEVEL FFL -3.500 V

01 A701

01

OWNER

UCSI_UNIVERSITY

SECTION THROUGH MAIN MUSEUM 1:200

ARCHITECT

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

C14

C13

C12

C11b

C11a

C11

C10

C9

39447 5497

3950

5075

4750

11175

3350

5650

ROOF LEVEL FFL +12.000 V

ARCHITECT

JEFF'S_ARCHITECT 01 A706

DARK ARTEFACT MUSEUM

SECOND FLOOR LEVEL FFL +8.000 V

VIDEO ROOM

GATHERING HALL

ENGINEER CONSULTANT

JEFF'S_CONSULTANT

FIRST FLOOR LEVEL FFL +4.000 V

TEMPORARY EXHIBITION

CAFE KITCHEN

CAFE

ORANG ASLI EXHIBITION

OUTDOOR COURTYARD GROUND LEVEL FFL +0.000 V

OPEN AIR ARTEFACT COURTYARD

EVOLUTION MUSEUM UNDERGROUND LEVEL FFL -3.500 V

01 A707 STATUS

02

SECTION THROUGH MAIN ATRIUM

CONCEPT_TENDER

1:200

CHECKED BY

BAKHTIAR_AMIR DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

SECTION

A0004 A400

DRAWING NO


NOTES

1

3

4

MARK

DATE

BY

REVISION

PROJECT TITLE

9

PROJECT_02 DETAIL

10

OWNER

UCSI_UNIVERSITY

2

5 6 7

02 A700

ARCHITECT

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

8

ARCHITECT

JEFF'S_ARCHITECT

ENGINEER CONSULTANT

JEFF'S_CONSULTANT

02

01

RETAINING WALL SECTION 1:30

RETAINING WALL SECTION 1:10

1 150mm thk wall with 20mm plaster concrete finished 2 200mm thk concrete retaining wall with metal bar reinforcement (to engineers detail) 3 200mm thk concrete floor apron 4/6 20mm thk waterproofing layered (FPO membrane water proofing system - sikaproof A-08 5 200mm thk concrete floor slab with reinforcement steel rebar in contact with soil 7 80mm thk crushed gravel mix layer for concrete floor slab and beam to be laid on top 8 concrete retaining wall foundation to engineers detail 9 20mm thk rough textured concrete rendered with coloured to architects detail 10 30mm thk concrete screed laid on top of vapour barrier for water proofing

STATUS

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

AUG_2021

DRAWING TITLE

PRJ NO

RETAINING_WALL DETAIL

A0001 A700

DRAWING NO


NOTES

01

KEY SECTION NTS

MARK

DATE

BY

REVISION

13

12

11

10

9

8

7

6

5

4

3

2

1

1

1

1

PROJECT TITLE

STEPS 13 RISER 150 TREAD 300

UP

STAIRCASE TO UNDERGROUND MUSEUM

PROJECT_02 DETAIL

RAMP 3°

RAMP 3°

01

STAIRCASE AND RAMP DETAIL PLAN 1:75 OWNER

UCSI_UNIVERSITY

ARCHITECT

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

G.F. LEVEL FFL +0.000 V STEPS 13 RISER 150 TREAD 300

ARCHITECT

JEFF'S_ARCHITECT

RAMP 3° UNDERGROUND LEVEL FFL -3.350 V

ENGINEER CONSULTANT

JEFF'S_CONSULTANT

STATUS

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR

02

STAIRCASE AND RAMP SECTION DETAIL 1:75

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

AUG_2021

DRAWING TITLE

PRJ NO

STAIRCASE_AND_RAMP DETAIL

A0001 A701

DRAWING NO


NOTES

1 02 A702

2 3 4 S.F LEVEL FFL 9.100 V

MARK

DATE

BY

REVISION

PROJECT TITLE

PROJECT_02 DETAIL

5 6

OWNER

UCSI_UNIVERSITY

7

F.F LEVEL FFL 4.550 V

ARCHITECT

01 A703

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

8

ARCHITECT

JEFF'S_ARCHITECT G.F LEVEL FFL 0.000 V

9

ENGINEER CONSULTANT

JEFF'S_CONSULTANT

03 UNDERGROUND LEVEL FFL -3.350 V

01

OVERALL SECTION 1:75

02

FACADE SECTION DETAIL 1:20

FACADE SECTION DETAIL 1:5

1 parapet pre-finished metal flashing with dripo edge that extends 300mm away from parapet 2 200mm x 350mm concrete beam 3 facade component steel vertical bracket cover and closure plate for spandrels panel to be fixed on beam 4 100mm thk polycarbonate 5 steel bracket for aluminium spandrels panel 6 internal anchor, rectangular cut out for mounting bracket and anchor 7 support bracket for external facade polycarbonate panel 8 powdered coated aluminium profile mullions 9 5mm thk tempered glass

STATUS

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

AUG_2021

DRAWING TITLE

PRJ NO

FACADE DETAIL

A0001 A702

DRAWING NO


NOTES

40MM THK x 500MM WIDTH OPAL COLORED POLYCARBOBATE PANELS RODECA TRANSLUCENT PC2540-4

500

2000

500

W-01

2

2000

BLACK POWDERED COATED STEEL MULLIONS

MARK

TO BE MOUNTED ON TO CONCRETE WALL WITH WALL COMPRESSION BOLT TO MANUF DETAIL

DATE

BY

REVISION

PROJECT TITLE

CONSTRUCTION DETAIL

1

OWNER

UCSI_UNIVERSITY

ARCHITECT

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

NOTES

1

PANELS RODECA TRANSLUCENT PC2540-4

2

500

500

NOTES

facade axonometric

ARCHITECT

JEFF'S_ARCHITECT

W-01 W-01 20002000

BLACK POWDERED COATED STEEL MULLIONS BLACK POWDERED COATED STEEL MULLIONS

500

20002000

40MM THK x 500MM WIDTH OPAL COLORED POLYCARBOBATE 40MM THK x 500MM WIDTH OPAL PANELS RODECA TRANSLUCENT PC2540-4 COLORED POLYCARBOBATE

500

ENGINEER CONSULTANT

JEFF'S_CONSULTANT

3

MARK

TO BE MOUNTED ON TO CONCRETE WALL WITH WALL COMPRESSION BOLT TO MANUF TO BE MOUNTED ON TO CONCRETE WALL WITHDETAIL WALL

DATE

BY

REVISION

MARK DATE PROJECT TITLE

BY

REVISION

CONSTRUCTION CONSTRUCTION DETAIL DETAIL

COMPRESSION BOLT TO MANUF DETAIL

PROJECT TITLE

1 40mm thk x 500mm width opal colored polycarbonate panels (RODECA TRANSLUCENT PC2540-4) 2 black powdered coated steel mullion frame with panel clip to support polycarbonate panel, to manuf detail 3 to be mounted on to concrete wall with wall compression bolt , to manuf detail

STATUS

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR

OWNER

UCSI_UNIVERSITY UCSI_UNIVERSITY OWNER

facade elevation (nts) ARCHITECT ARCHITECT SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

FACADE AXONOMATRIC_STUDY

A0001 A702B

DRAWING NO


NOTES

02 A703

4 MARK

DATE

BY

REVISION

PROJECT TITLE

PROJECT_02 DETAIL

5

1

OWNER

UCSI_UNIVERSITY

2 6 ARCHITECT

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

7

3

8 ARCHITECT

JEFF'S_ARCHITECT

ENGINEER CONSULTANT

9

03 A703

02

SLIDING DOOR MECHANISM 1:5

JEFF'S_CONSULTANT

03

SLIDING DOOR MOUNTING 1:5

STATUS

CONCEPT_TENDER

CHECKED BY

1 facade component steel vertical bracket cover and closure plate for spandrels panel to be fixed on beam

01

SLIDING DOOR DETAIL 1:20

2 internal anchor, rectangular cut out for mounting bracket and anchor 3/7sliding door mechanism, steel roller mounted on top of sliding tracks 4 100mm thk white translucent polycarbonate 5 internal 5mm thk tempered glass 6 aluminium mullion profile

8 powdered coated steel bracket for sliding track mounting, fixed to concrete floor slab 9 200mm thk concrete floor slab with steel bar reinforcement to engineers detail

BAKHTIAR_AMIR DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

AUG_2021

DRAWING TITLE

PRJ NO

SLIDING_DOOR DETAIL

A0001 A703

DRAWING NO


NOTES

02 A703

02 A703

1 parapet pre-finished metal flashing with dripo edge that extends 300mm away from parapet 2 200mm thk concrete beam with steel bar reinforcement to engineers detail 3 20mm thk timber fascia board with painted finished externally 4 waterproofing layer (exposed system), exposed pvc fully adhered system - sika sarnafill G410-15L FELT 1.5mm thk 5 200mm thk rc flat roof at gentle fall of 4 degrees for water drainage

MARK

DATE

BY

REVISION

PROJECT TITLE

PROJECT_02 DETAIL

6 parapet pre-finished metal flashing with dripo edge that extends 300mm away from parapet 7 mullion frame for skylight, to be mounted on to extruded concrete beam 8 5mm thk tempered glass

01

OWNER

UCSI_UNIVERSITY

SKYLIGHT DETAIL SECTION 1:20

ARCHITECT

3

1

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

4

5

7

6

8

ARCHITECT

JEFF'S_ARCHITECT

2

ENGINEER CONSULTANT

JEFF'S_CONSULTANT

STATUS

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR

02

FLAT ROOF DETAIL 1:5

03

SKYLIGHT TO FLAT ROOF DETAIL 1:5

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

AUG_2021

DRAWING TITLE

PRJ NO

SKYLIGHT_TO FLAT_ROOF_DETAIL

A0001 A704

DRAWING NO


NOTES

NOTES

1

2

MARK

DATE

PROJECT TITLE

BY MARK

DATE

BY

REVISION

REVISION

PROJECT TITLE

PROJECT_02PROJECT_02 DETAIL DETAIL

3

OWNER

02 A705

OWNER

UCSI_UNIVERSITY UCSI_UNIVERSITY

02 A705

1 150mm thk concrete wall with raw concrete finished externally 2 10mm slit cut out out to fit tempered glass with waterproofing seal ARCHITECT

3 5mm thk tempered glass

ARCHITECT

SAYA MEMPERAKUISAYA BAHAWA MEMPERAKUI DETAIL-DETAIL BAHAWA DALAM DETAIL-DETAIL PELAN-PELAN DALAM ADALAH PELAN-PELAN MENURUT ADALAH MENURUT KEHENDAK-KEHENDAK, KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL UNDANG-UNDANG BANGUNAN SERAGAM KECIL BANGUNAN 1984 DANSERAGAM SAYA 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB SETUJU TERIMA PENUH TANGGUNGJAWAB DENGAN SEWARJANYA. PENUH DENGAN SEWARJANYA.

4 powdered coated million frame for tempered glass 5 metal flashing to be extended 10mm away from glass window 6 flashing edge for water proofing

4

ARCHITECT

ARCHITECT

JEFF'S_ARCHITECT JEFF'S_ARCHITECT

ENGINEER CONSULTANT

ENGINEER CONSULTANT

JEFF'S_CONSULTANT JEFF'S_CONSULTANT

5

01

WALL TO WALL WINDOW TO WINDOW SECTION SECTION 01 1:15 1:15

STATUS

STATUS

CONCEPT_TENDER CONCEPT_TENDER

6

CHECKED BY

CHECKED BY

BAKHTIAR_AMIR BAKHTIAR_AMIR DRAWN BY

02

WINDOW WINDOW DETAILDETAIL 02 1:5 1:5

DRAWN BY

DATE

DATE

AUG_2021 AUG_2021 SEE_THOO_JUN_HOE SEE_THOO_JUN_HOE 1001645328 1001645328 DRAWING TITLE

DRAWING TITLE

PRJ NO

PRJ NO DRAWING NO

DRAWING NO

WINDOW_DETAIL WINDOW_DETAILA0001 A705A0001 A705 01 01


NOTES

MARK

DATE

BY

REVISION

PROJECT TITLE

PROJECT_02 DETAIL

02 A706

OWNER

01

UCSI_UNIVERSITY

LOUVER SKYLIGHT DETAIL 1:20

1

ARCHITECT

2 3

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

1 5mm thk tempered glass 2 parapet prefinished metal flashing with dripo edge

4 5

that extends 300mm away from parapet 3 20mm thk timber fascia board with painted finished

ARCHITECT

JEFF'S_ARCHITECT

externally 4 200mm thk extruded concrete beam

7

5 5mm thk aluminium louvers with white powdered 6

coated finished

ENGINEER CONSULTANT

JEFF'S_CONSULTANT

6 frame mullion for louvers to be fixed on concrete beam 7 200mm thk rc flat roof at gentle fall of 4 degrees for water drainage waterproofing layer (exposed system), exposed pvc fully adhered system - sika sarnafill G410STATUS

15L FELT 1.5mm thk

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR

02

LOUVER SKYLIGHT MOUNTING MECHANISM 1:5

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

AUG_2021

DRAWING TITLE

PRJ NO

SKYLIGHT_LOUVER DETAIL

A0001 A706

DRAWING NO


NOTES

02 A707

MARK

DATE

BY

REVISION

PROJECT TITLE

PROJECT_02 DETAIL

OWNER

UCSI_UNIVERSITY

01

OVERALL UNDERGROUND MUSUEM SECTION 1:100 ARCHITECT

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

ARCHITECT

JEFF'S_ARCHITECT

1

1 concrete artefact display box sizes varries, typical size 500mm x 500mm x1000mm height

ENGINEER CONSULTANT

JEFF'S_CONSULTANT

STATUS

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR

02

UNDERGROUND ARTEFACT DISPLAY MUSUEM 1:40

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

AUG_2021

DRAWING TITLE

PRJ NO

MUSEUM SECTION

A0001 A707

DRAWING NO


D9

DARK ARTEFACT MUSEUM

01 A707A

6

MARK

STONE GEOLOGY MUSEUM

DATE

BY

REVISION

PROJECT TITLE

CONSTRUCTION DETAIL

01 A705

OWNER

02

KEY SECTION DETAIL NTS

5

ARCHITECT

1 200mm thk reinforced concrete slab with rebar steel, 4

UCSI_UNIVERSITY

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

to engineers detail 2

700mm deep concrete display top with smooth

concrete finished externally and stainless steel stone artefact prop holder, to architects detail 3

ARCHITECT

JEFF'S_ARCHITECT

3 stone artefact 4 150mm thk stone slab wall cladding with butt join in random pattern with smooth finished texture externally

2

5 void opening for natural daylight 6 polycarbonate facade (refer to drawing A702)

ENGINEER CONSULTANT

JEFF'S_CONSULTANT

1 STATUS

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR

01

STONE TOOL ARTEFACT DISPLAY MUSUEM 1:30

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

AUG_2021

DRAWING TITLE

PRJ NO

MUSEUM DISPLAY

A0001 A707A

DRAWING NO


NOTES

SPECIFICATION SYMBOL TO BE REFER TO GA PLAN FOR MORE INFORMATION

A7b A7a

1900

A7c

A7d

5675

5056

A7e

A7f

4169

5300

A7g

4356

3100

C15

MARK

3400

ACCOMMODATION TYPE 03 FFL +0.200

ACCOMMODATION TYPE 01

DATE

BY

REVISION

PROJECT TITLE

FFL +0.200

ACCOMMODATION SERVICE

CONSTRUCTION DETAIL

FFL +1.000

2044

C16 ACCOMMODATION TYPE 02 ACCOMMODATION TYPE 04

FFL +0.200

C17 2241

FFL +0.200

OWNER

UCSI_UNIVERSITY

C18

01

OVERALL ACCOMOATION LAYOUT BLOCKS 1:150 ARCHITECT

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

ARCHITECT

JEFF'S_ARCHITECT 5100

2400

FFL +0.200

ACCOMMODATION TYPE 02 2450

ACCOMMODATION TYPE 01

2800

1800

5450

FFL +0.200 ENGINEER CONSULTANT

1611

JEFF'S_CONSULTANT

2950 STATUS

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR

02

ACCOMMODATION 2PAX TYPE 01 1:50

03

ACCOMMODATION 2PAX TYPE 02 1:50

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

ACCOMMODATION LAYOUT_2PAX_TYPE

A0001 A708

DRAWING NO


NOTES

SPECIFICATION SYMBOL TO BE REFER TO GA PLAN FOR MORE INFORMATION

A7b A7a

1900

A7c

5675

A7d

A7e

5056

4169

A7f

5300

4356

A7g

3100

C15

MARK

3400

ACCOMMODATION TYPE 03

BY

REVISION

CONSTRUCTION DETAIL

FFL +0.200

ACCOMMODATION TYPE 01

DATE

PROJECT TITLE

FFL +0.200

ACCOMMODATION SERVICE FFL +1.000

2044

C16 ACCOMMODATION TYPE 02 ACCOMMODATION TYPE 04

FFL +0.200

C17 2241

FFL +0.200

OWNER

UCSI_UNIVERSITY

C18

01

OVERALL ACCOMOATION LAYOUT BLOCKS 1:150 ARCHITECT

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

ARCHITECT

JEFF'S_ARCHITECT 1800

2550

2900

3920

6300

FFL +0.200

ENGINEER CONSULTANT

JEFF'S_CONSULTANT

2011

1600

ACCOMMODATION TYPE 03 FFL +0.200

ACCOMMODATION TYPE 04

2000

STATUS

CONCEPT_TENDER

CHECKED BY

BAKHTIAR_AMIR

02

ACCOMMODATION 1PAX TYPE 01 1:50

03

ACCOMMODATION 1PAX TYPE 02 1:50

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

ACCOMMODATION LAYOUT_1PAX_TYPE

A0001 A709

DRAWING NO


NOTES

LEGEND 50mmØ HDPE PN12.5 SANITARY PIPE 25mmØ HDPE PN12.5 SANITARY PIPE 65mmØ HDPE PN16 VCP PIPE G.T

B3 DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM

B2

B1

GULLY TRAP (TO ARCHITECT DETAIL)

DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM

B4

PROPOSED MANHOLE (TO AUTHORITIES DETAIL)

5

282

1

288

4 G.T

204

CONSERVATION GALLERY 01 FFL +1.000 OKU PARKING G.T

D1 667

ARCHIVAL ROOM

5

FFL +1.000 LOADING BAY

G.T

B8

D2

A2

500

A1

0

DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM

7350 G.T

3

ARCHIVAL SEQUENCE GALLERY

G.T

741

FFL +1.000 G.T

B7

D3

B6 813

C1

B5

2525

4

W.C AREA

A9

7207

A10

4225

G.T

100DP

P

FFL +0.000

200D

CONSERVATION GALLERY 02

G.T

C9

D4 4851

552 5

C3

FEMALE W.C

REVISION

AR724_WORKING_DRAWING GENERAL_ARRANGEMENT

FFL +1.600

ARCHEOLOGY LABORATORY

200DP

ARCHAEOLOGY CONFERENCE

FFL +1.000 CONTEMPLATION ROOM

BY

PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

2

498

B9

G.T

DATE

FFL +1.600

200DP

FFL +1.000

MARK

PROJECT TITLE

MALE W.C

FARM

FFL +1.800

G.T

SERVICE

FRONT COURTYARD G.T

FFL +0.000

G.T

C10

200DP

P

200D

600DP

ORANG ASLI INTRO EXHIBITION

LOBBY

FFL +1.000

LABORATORY STORAGE

680

EMBODIED SPACE

G.T

ORANG ASLI ELEMENT MUSEUM

FFL +1.000

3350

C8

FFL +0.800

D5

5001

A12

4759

G.T

0

B1

100DP

200DP

A11

12875

4

322

G.T

W.C AREA

C2

A8

0

253

5650

G.T

FFL +1.000

FFL +1.000

1

C4

100DP STONE PAVILLION

CENTRAL COURTYARD

FFL +0.800

3824

C11

P

100D

FFL -1.000

200DP

DINING AREA

200DP

FFL +0.500 G.T

355

D6

200DP

G.T

0

C5

OPEN AIR KITCHEN

A3

FFL +0.800

OWNER

A4

D7

3374

5900

UCSI_UNIVERSITY

OPEN AIR ARCHAEOLOGY GARDEN

C6

FFL +0.000 FARM 500DP

G.T

4551

FFL +0.000

A14

RAMP DOWN 200DP

A15

11050

200DP

C11a

C7

2

13400

A7

G.T

D8

B1

F1

A6

0

D9

280

C8

CAFE SITTING AREA

4800

3825

A5

FFL +1.000

C11b

ARCHITECT

ARCHAEOLOGY EMBODIED FFL +1.000 G.T

A13 SPIRITUAL COURTYARD

7510

ELEMENTAL EXHIBITION

FFL +0.700

A16

G.T

A17

5850

G.T

A18

4725

A19

9825

4350

FFL +1.000

60

C12

100DP MALE W.C ADMIN

LIFT LOBBY

LIFT CORE

FFL +0.800

CAFE KITCHEN

FFL +1.000

FFL +1.000

3950

50

109

232

FFL +1.000

WORKSHOP FFL +1.000

02 A300

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

A20

FEMALE W.C

01 A400

FFL +0.800

200DP

BIOFACT INTRODUCTION FFL +1.000

C13

WORKSHOP LOBBY FFL +1.000

FFL +1.000

ATRIUM FFL +1.000

TEMPORARY EXHIBITION

3300

D9

WORKSHOP MUSEUM

FFL +1.000

FFL +1.000

a

1a B1

A12b

5497

A12a

INTRODUCTION MUSEUM

6

537

D9

C14

ARCHITECT

b

JEFF'S_ARCHITECT

SHOP FFL +1.000

4

5 517

1

A9

c D9

B1

3 B1

B1

5

B1

0

245

FARM STORAGE

ENGINEER CONSULTANT

MUSEUM LOUNGE

6008

FFL +0.600

WORKSHOP COURTYARD

2 439

0

B1

JEFF'S_CONSULTANT

WORKSHOP 02

D1

1a

5

571

FFL +1.400

FFL +1.200

A9 1900

A7d

5675

5056

A7e

4169

4356

A7g

STORAGE

3100

A7h

9 684

5300

A7f

1

A7b A7c

D1

B8 A7a

FFL +0.000

MEETING AREA

C15

FFL +1.400

ROCK GARDEN ACCOMMODATION TYPE 03 FFL +0.200

ACCOMMODATION TYPE 01 FFL +0.200

ACCOMMODATION SERVICE FFL +1.000

2044

5000

C16

2 D1

3400

FFL +0.200

G.T

ACCOMMODATION TYPE 02

C17

ACCOMMODATION TYPE 04

FFL +0.200

2241

FFL +0.200

3

G.T

D1

G.T

G.T

G.T

G.T

7

C18

B1

b

B1

6

B1

STATUS

0

565

CONCEPT_TENDER

01 A300

0

835

a

B1

CHECKED BY

4

D1 WATER ROCK PAVILION

ENTRANCE CONTEMPLATION PAVILION

FFL +0.800

FFL +0.000

BAKHTIAR_AMIR

5 737

D1 a 0 580

02 A400

GA GROUND FLOOR PLAN (SANITARY SERVICES) 1:200

5 D1

b D1

01

DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

GFP_PLAN SANITARY_SERVICES

A0004 A800

DRAWING NO


NOTES

LEGEND 50mmØ HDPE PN12.5 SANITARY PIPE 25mmØ HDPE PN12.5 SANITARY PIPE 65mmØ HDPE PN16 VCP PIPE G.T

B4 B3

B2

B1

GULLY TRAP (TO ARCHITECT DETAIL)

5

282

PROPOSED MANHOLE (TO AUTHORITIES DETAIL) 1

288 4

G.T

204

G.T

D1 5

667 G.T

B8

D2

A1

0 500

G.T

A2 G.T

3

741

G.T

7350 G.T

B7

D3

A8

B6 2525

R.C FLAT ROOF

POLYCARBONATE ROOF

B5

5° ROOF

A9

7207

A10

4225

A11

12875

A12

4759

MARK

G.T

0

REVISION

AR724_WORKING_DRAWING GENERAL_ARRANGEMENT

C9

D4 552

B9

G.T

5

R.C FLAT ROOF

5650

G.T

4853

BY

G.T

B1

C2

C3

DATE

PROJECT TITLE G.T

5° ROOF

4

R.C FLAT ROOF

813

C1

ALUMINUM LOUVER SKYLIGHT

R.C FLAT ROOF

PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

TEMPERED GLASS SKYLIGHT

G.T

G.T

5° ROOF

C10

5° ROOF

R.C FLAT ROOF 5° ROOF

G.T

F

R.C FLAT ROOF

680

3350

5001

G.T

D5

C8

R.C FLAT ROOF

O RO

1

R.C FLAT ROOF

C4 3824

C11 POLYCARBONATE ROOF R.C FLAT ROOF G.T

G.T

0

355

D6

5° ROOF

C5 A3

A4

D7

3374

5900

OWNER OF

C6

5° ROOF

R.C FLAT ROOF

5° ROOF

UCSI_UNIVERSITY

G.T

4551

R.C FLAT ROOF

RO

A14

A15

11050

A7

C7 5°

A7

RO

B1

G.T

D8

A6

F1

OF

A5

2

13400

0

RC FLAT ROOF

D9

280

RC FLAT ROOF

C8

4800

3825

A7

OF

RO

RC FLAT ROOF

5° ROOF

VOID

R.C FLAT ROOF G.T

A13

VOID

A16

7510

A17

5850

G.T

A18

4725

A19

9825

4350

ARCHITECT

A20

60

RO

232

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

OF

RO

OF

RC FLAT ROOF 5° ROOF

5° ROOF

01 A400 TEMPERED GLASS SKYLIGHT

VOID

A12a

RC FLAT ROOF

TEMPERED GLASS SKYLIGHT

A12b 3300

D9

5° ROOF

5° ROOF

a

1

B1

C13

RC FLAT ROOF

5497

01 A301

RO

3950

50

109

C12

RC FLAT ROOF

OF

G.T

TEMPERED GLASS SKYLIGHT

6 537

b D9

C14 ARCHITECT

JEFF'S_ARCHITECT

4

1

A9

3

B1

c

D9

B1

RC FLAT ROOF

B1

5

B1

0

245

VOID

RC FLAT ROOF

6008

RC FLAT ROOF

ENGINEER CONSULTANT

5° ROOF

D1

1a

5

0

B1

VOID

A9

RC FLAT ROOF

OF

B8

A7b A7c

A7d

1900

5056

A7e

4169

RO

OF

A7f 4356

A7g

3100

C15

A7h

RO

9

5300

684

A7a

JEFF'S_CONSULTANT

RC FLAT ROOF

2 439

571

RC FLAT ROOF 5° ROOF

5° ROOF

RC FLAT ROOF

2044

5000

G.T

RC FLAT ROOF

2241

5° ROOF

3

G.T

RC FLAT ROOF

5° ROOF

D1

C17 G.T

2

RC FLAT ROOF

C16

D1

3400

RC FLAT ROOF 5° ROOF

G.T

G.T

G.T

7

C18

B1

B5 6

B1

0

565

STATUS

01 A300

0

835

CONCEPT_TENDER

B5

RC FLAT ROOF

D1

OF

RO

4

CHECKED BY

BAKHTIAR_AMIR

R.C FLAT ROOF

5 737

C1 5° OF

RO

0 580

01 A401

ROOF PLAN (SANITARY SERVICES) 1:200

5

D1

C1

01

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

ROOF_PLAN SANITARY_SERVICES

A0004 A801

DRAWING NO


NOTES

A9

50mmØ HDPE PN12.5 SANITARY PIPE 25mmØ HDPE PN12.5 SANITARY PIPE

A7b A7c 1900

A7d

5675

A7e

5056

A7f

4169

65mmØ HDPE PN16 VCP PIPE

1 D1 A7g

4356

3100

A7h

9

5300

G.T

PROPOSED MANHOLE (TO AUTHORITIES DETAIL)

DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM

C15 3400

ACCOMMODATION TYPE 03 FFL +0.200

ACCOMMODATION TYPE 01 FFL +0.200

ACCOMMODATION SERVICE

A11

FFL +1.000

C16 2044

12875

A12

4759

G.T G.T

ACCOMMODATION TYPE 02

C17

G.T

ACCOMMODATION TYPE 04

FFL +0.200

FFL +0.200

G.T

G.T

C9

MALE W.C

G.T

FFL +1.600

200DP

C18

FEMALE W.C FFL +1.600

01

DATE

BY

REVISION

AR724_WORKING_DRAWING GENERAL_ARRANGEMENT PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

200DP

ARCHAEOLOGY CONFERENCE

MARK

PROJECT TITLE

5650

2241

G.T

GULLY TRAP (TO ARCHITECT DETAIL)

684

B8 A7a

LEGEND

2

B1

439

0 D1

1a

5

571

FFL +1.800

ACCOMODATION TYPICAL WC (SANITARY SERVICES)

SERVICE

1:100

C10 3350

G.T

B3 DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM

B2

B1

C11

DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM

B4

OWNER

UCSI_UNIVERSITY

5

282

G.T

G.T

1 288 4 G.T

204

CONSERVATION GALLERY 01

ARCHITECT

FFL +1.000 OKU PARKING G.T

D1

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

G.T

667

ARCHIVAL ROOM

5

FFL +1.000 LOADING BAY

G.T

B8

D2

A2

0

500

A1 7350 G.T

G.T

3

ARCHIVAL SEQUENCE GALLERY

G.T

741

FFL +1.000 G.T

B7

D3 B6 2525

4 813

C1

B5

W.C AREA

ARCHITECT

0

253

JEFF'S_ARCHITECT

4

322

0

B1

G.T

W.C AREA

C2

G.T

100DP FARM

P 00D

FFL +0.000

2

CONSERVATION GALLERY 02

G.T

ENGINEER CONSULTANT

D4

5 552

4851

FFL +1.000

B9

G.T

C3

2

498

JEFF'S_CONSULTANT G.T

ARCHEOLOGY LABORATORY FFL +1.000 CONTEMPLATION ROOM

G.T

C8

FFL +0.800

D5

FRONT COURTYARD G.T

FFL +0.000

G.T

DP

200

600DP

9825

LABORATORY STORAGE

C4

1 680

EMBODIED SPACE

STONE PAVILLION

CENTRAL COURTYARD

FFL +0.800

200DP

C12 MALE W.C

FFL +0.500

FFL +0.800 355

D6

0

WORKSHOP

3374

FFL +0.800

FEMALE W.C

A4

D7

C6

A3

FFL +1.000

OPEN AIR KITCHEN

5900

A20

4350

DP

DINING AREA

200DP

C5

A19

100

FFL -1.000 200DP

3824

FFL +1.000

3950

5001

200DP

FFL +0.800

C13

FARM 500DP

STATUS

CONCEPT_TENDER

4551

FFL +0.000

WORKSHOP MUSEUM

200DP

FFL +1.000 3825

13400

A6

A7

B

CHECKED BY

12

C14

D9

0 280

C8

BAKHTIAR_AMIR

D8

F1

A5

ARCHAEOLOGY EMBODIED FFL +1.000

02

LABOROTARY AND WC (SANITARY SERVICES) 1:100

5497

RAMP DOWN 200DP

C7

03

TYPICAL WC (SANITARY SERVICES) 1:100

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

GFP_PLAN SANITARY_SERVICES

A0004 A800A

DRAWING NO


MARK

DATE

BY

REVISION

PROJECT TITLE

PROJECT_02 DETAIL

OWNER

UCSI_UNIVERSITY

ARCHITECT

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

ARCHITECT

JEFF'S_ARCHITECT

DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM

B4 B3 2825

DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM

B2 2881

B1 2044

G.T

CONSERVATION GALLERY 01

ENGINEER CONSULTANT

FFL +1.000 OKU PARKING G.T

D1 ARCHIVAL ROOM

6675

FFL +1.000 LOADING BAY

G.T

B8

D2

A2

5000

A1

DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM

7350 G.T

G.T

ARCHIVAL SEQUENCE GALLERY

G.T

7413

FFL +1.000 G.T

D3

B7

B6

2530

A9

7207

A10

4225

A11

12875

2525

B5

W.C AREA

3224

4759

G.T

0

G.T

W.C AREA

C2

G.T

100DP

B1

100DP

C9

MALE W.C FARM G.T

200DP

CONSERVATION GALLERY 02

D4

5525

4851

4982

B9

G.T

FEMALE W.C FFL +1.600

ARCHEOLOGY LABORATORY

SERVICE

ORANG ASLI INTRO EXHIBITION

200DP

600DP

C10

LOBBY

FFL +1.000

LABORATORY STORAGE

G.T

ORANG ASLI ELEMENT MUSEUM

FFL +1.000

FFL +1.000

FFL +1.000

6801

EMBODIED SPACE

3350

5001

FFL +1.800

200DP

D5

G.T

200DP

ARCHAEOLOGY CONFERENCE

FFL +1.000

C8 G.T

FFL +0.000

FFL +1.600

200DP

FFL +1.000

G.T

CONTEMPLATION ROOM FFL +0.800

200DP

FRONT COURTYARD

C4

5650

FFL +0.000

C3

100DP STONE PAVILLION FFL +0.800

100DP

FFL -1.000

3824

DINING AREA FFL +0.500

G.T

OPEN AIR KITCHEN FFL +0.800

A4

D7

3374

5900

G.T

3550

D6

200DP

A3

C11

CENTRAL COURTYARD 200DP

200DP

C5

JEFF'S_CONSULTANT

A12

8134

C1

A8

OPEN AIR ARCHAEOLOGY GARDEN

C6

FFL +0.000 FARM 500DP

G.T

4551

FFL +0.000

A14

RAMP DOWN 200DP

A15

11050

200DP

C11a

C7

2

13400

A7

G.T

D8

B1

F1

A6

D9

2800

C8

CAFE SITTING AREA

4800

3825

A5

FFL +1.000

C11b

ARCHAEOLOGY EMBODIED FFL +1.000 G.T

A13 SPIRITUAL COURTYARD FFL +0.700

A16

7510

ELEMENTAL EXHIBITION

A17

5850

G.T

A18

4725

A19

9825

A20

4350

FFL +1.000

0

C12

100DP

0

ADMIN

LIFT LOBBY

FFL +1.000

FFL +1.000

MALE W.C FFL +0.800

LIFT CORE

CAFE KITCHEN FFL +1.000

3950

2326

1095

02 A300

G.T

WORKSHOP FFL +1.000 FEMALE W.C

01 A400

FFL +0.800

200DP

BIOFACT INTRODUCTION FFL +1.000

C13

WORKSHOP LOBBY FFL +1.000 ATRIUM FFL +1.000

TEMPORARY EXHIBITION

3300

D9

WORKSHOP MUSEUM

FFL +1.000

FFL +1.000

a

1a

A12b

5497

A12a

INTRODUCTION MUSEUM FFL +1.000

B1

5376

b D9

C14

SHOP FFL +1.000

4

5175

D9

A9

3

c

B1

FARM STORAGE FFL +0.600

B1

5

B1

2450

1

B1

6008

MUSEUM LOUNGE

WORKSHOP 02 FFL +1.400

D1

B1

WORKSHOP COURTYARD

4392

0

FFL +1.200

A9 1900

A7d 5675

A7e

A7f

5056

STORAGE

1

A7b A7c

D1

4169

5300

4356

A7g

3100

A7h

6849

B8 A7a

FFL +0.000

1a

5715

MEETING AREA

C15

FFL +1.400

ACCOMMODATION TYPE 03 FFL +0.200

ACCOMMODATION TYPE 01 FFL +0.200

FFL +1.000

2044

5000

STATUS

G.T

ACCOMMODATION TYPE 02

C17

ACCOMMODATION TYPE 04

FFL +0.200

3

2241

FFL +0.200

D1

G.T

2

ACCOMMODATION SERVICE

C16

G.T

D1

3400

ROCK GARDEN FFL +0.200

G.T

G.T

G.T

7

C18

B1

b

CONCEPT_TENDER

B1

6

B1

5650

01 A300

8350

a

B1

4 D1

WATER ROCK PAVILION

ENTRANCE CONTEMPLATION PAVILION

FFL +0.800

FFL +0.000

7375

D1a 5800

02 A400

5

D1

b

D1

DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM

CHECKED BY

BAKHTIAR_AMIR

01

SANITARY SCHEMATIC NTS

02

SELECTED SANITARY SERVICES LAYOUT NTS

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

SANITARY

A0001 A802

DRAWING NO


NOTES

LEGEND 50mmØ HDPE PN12.5 INCOMING PIPE 65mmØ HDPE PN16 DISTRIBUTOR PIPE STOP COCK OR GATE VALVE

FROM INCOMING PIPE

NOTE THAT ALL REQUIREMENTS ARE TO BE CLARIFIED BY THE ARCHITECT AND AUTHORITIES OF THE DISTRICT

WATER METER

B4

M B3 B2

B1

5

282

1

288 4

204

CONSERVATION GALLERY 01 FFL +1.000 OKU PARKING

D1 667

ARCHIVAL ROOM

5

FFL +1.000 LOADING BAY

D2

B8 0

500

A2

MARK

D3 813

2525

4

B5

A8

0

253

4

322

0

A9

7207

A10

4225

PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

C9

WATER METER

P

200D

CONSERVATION GALLERY 02

200DP

D4

2

498

B9

5 552

4851

FFL +1.000

C3

FEMALE W.C

ARCHEOLOGY LABORATORY

SERVICE

C10

200DP P

200D

600DP

ORANG ASLI INTRO EXHIBITION

LOBBY

FFL +1.000

LABORATORY STORAGE

680

EMBODIED SPACE

ORANG ASLI ELEMENT MUSEUM

FFL +1.000

FROM INCOMING PIPE

3350

D5

C8

FRONT COURTYARD FFL +0.000

M

FFL +1.800

CONTEMPLATION ROOM FFL +0.800

200DP

ARCHAEOLOGY CONFERENCE

FFL +1.000

5001

AR724_WORKING_DRAWING GENERAL_ARRANGEMENT

A12

4759

MALE W.C

FARM

200DP

A11

12875

100DP

B1

100DP

FFL +0.000

REVISION

PROJECT TITLE

B7 B6

FFL +0.600

C2

BY

741

FFL +1.000

W.C AREA

C1

DATE

3

ARCHIVAL SEQUENCE GALLERY

7350

5650

A1

FFL +1.000

FFL +1.000

1

C4

100DP STONE PAVILLION

CENTRAL COURTYARD

FFL +0.800

3824

C11

P

100D

FFL -1.000 200DP

DINING AREA

200DP

FFL +0.500

OWNER

0

355

D6

200DP

C5 3374

FFL +0.800

A4

D7

A3

UCSI_UNIVERSITY

OPEN AIR KITCHEN

5900

OPEN AIR ARCHAEOLOGY GARDEN

C6

FFL +0.000 FARM 500DP

4551

FFL +0.000

A14

RAMP DOWN 200DP

A15

11050

200DP

C11a

C7

2

13400

A7

D8

B1

F1

A6

CAFE SITTING AREA

4800

3825

A5

FFL +1.000

ARCHITECT

0

D9

280

C8

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

C11b

ARCHAEOLOGY EMBODIED FFL +1.000

A13 SPIRITUAL COURTYARD

A16

7510

ELEMENTAL EXHIBITION

FFL +0.700

A17

5850

A18

4725

A19

9825

A20

4350

FFL +1.000

0

C12

100DP MALE W.C ADMIN

LIFT LOBBY

FFL +1.000

LIFT CORE

CAFE KITCHEN

FFL +1.000

FFL +1.000

3950

50

109

6 232

WORKSHOP FFL +1.000

02 A300

FEMALE W.C

01 A400

200DP

BIOFACT INTRODUCTION FFL +1.000

C13

WORKSHOP LOBBY FFL +1.000

FFL +1.000

ATRIUM FFL +1.000

TEMPORARY EXHIBITION

3300

D9

WORKSHOP MUSEUM

FFL +1.000

FFL +1.000

ARCHITECT

a

1a B1

A12b

5497

A12a

INTRODUCTION MUSEUM

JEFF'S_ARCHITECT 537

b D9

C14

6

SHOP FFL +1.000

4

517

B1

5

A9

3 B1

c

D9

1 B1

5

B1

0

245

ENGINEER CONSULTANT

JEFF'S_CONSULTANT

FARM STORAGE MUSEUM LOUNGE

6008

FFL +0.600

WORKSHOP COURTYARD

439

A9 5056

A7e

4169

STORAGE

A7g

3100

A7h

MEETING AREA

C15

FFL +1.400

3400

ACCOMMODATION TYPE 03 ACCOMMODATION TYPE 01

2

2044

5000

C16

D1

M

9

4356

684

5300

A7f

1

A7d

5675

D1

A7b1900A7c

ACCOMMODATION SERVICE

FROM INCOMING PIPE

FFL +1.400

FFL +1.200

2

FFL +0.200

WATER METER

WORKSHOP 02

0

ROCK GARDEN

B

D1

B8 A7a

FFL +0.000

11a

5

571

ACCOMMODATION TYPE 02 ACCOMMODATION TYPE 04

3

2241

D1

C17

7

C18

B1

b

B1

STATUS

CONCEPT_TENDER 6

B1

0

565

01 A300

0

835

CHECKED BY

a

B1

BAKHTIAR_AMIR 4

D1 WATER ROCK PAVILION

ENTRANCE CONTEMPLATION PAVILION

FFL +0.800

FFL +0.000

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

5

737

D1 a 0

580

02 A400

GA GROUND FLOOR PLAN (SANITARY SERVICES) 1:200

5

D1

b

D1

01

DRAWING TITLE

PRJ NO

GFP_PLAN WATER_SUPPLY

A0004 A803

DRAWING NO


NOTES

c D9 LEGEND

FARM STORAGE MUSEUM LOUNGE

50mmØ HDPE PN12.5 INCOMING PIPE

6008

FFL +0.600

11a

5

571

A7b A7c 1900

A12

4759

NOTE THAT ALL REQUIREMENTS ARE TO BE CLARIFIED BY THE ARCHITECT AND AUTHORITIES OF THE DISTRICT

C9

MALE W.C

5675

WATER METER

FEMALE W.C

5650

5300

M

3400

200DP

ACCOMMODATION TYPE 01 SERVICE

C10

C16

MARK

FROM INCOMING PIPE

3350

2044

M

INCOMING PIPE

A11

A9

C15

WATER METER

FFL +0.200

STOP COCK OR GATE VALVE

B

B8 A7a ROCK GARDEN

65mmØ HDPE PN16 DISTRIBUTOR PIPE

ACCOMMODATION TYPE 02

C17

DATE

BY

REVISION

PROJECT TITLE

AR724_WORKING_DRAWING GENERAL_ARRANGEMENT PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

2241

C11

C18

OWNER

UCSI_UNIVERSITY

01 A300

01

ACCOMODATION TYPICAL WC (WATER SUPPLY) 1:100

D3

ARCHITECT

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

W.C AREA FFL +0.600

2525

4

813

C1 C2

100DP FARM FFL +0.000

CONSERVATION GALLERY 02

D4

FFL +1.000

4851

ARCHITECT

JEFF'S_ARCHITECT

C3

A19

CONTEMPLATION ROOM

A20

4350

C8

FFL +0.800

C12

FRONT COURTYARD

MALE W.C

FFL +0.000

600DP EMBODIED SPACE

C4

ENGINEER CONSULTANT

JEFF'S_CONSULTANT 3950

5001

200DP

FEMALE W.C

STONE PAVILLION

C13

FFL +0.800

3824

200DP 200DP

DINING AREA FFL +0.500

5497

200DP

C5

OPEN AIR KITCHEN

3374

5900

C6

A3

FFL +0.800

A4

C14 500DP

CHECKED BY

4551

FFL +0.000

STATUS

CONCEPT_TENDER

FARM

BAKHTIAR_AMIR 200DP

C7 3825

02

KITCHEN AND WC (WATER SUPPLY) 1:100

13400

03

TYPICAL WC (WATER SUPPLY) 1:100

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

GFP_PLAN WATER_SUPPLY

A0004 A803A

DRAWING NO


NOTES

LEGEND WATER SUPPLY FOR SPRINKLER UPRIGHT SPRINKLER HEAD-UL LISTED AND FM APPROVED HOSE REEL

B4 B3

B2

B1

CO2 FIRE EXTINGUISHER

5

282

NOTE THAT THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE OTHER MECHANICAL SERVICES DRAWINGS, ELECTRICAL ARCHITECTURAL, THE PROPOSED FIRE FIGHTING DESIGN IS BASED ON UBBL THE SPACES HIGHLIGHTED IN RED DASHED LINES ARE THE PRIORITY SPACES BASED ON UBBL FIRE FIGHTING PURPOSE GROUP

1

288

4

204

CONSERVATION GALLERY 01 FFL +1.000 OKU PARKING

D1 667

ARCHIVAL ROOM

5

FFL +1.000 LOADING BAY

D2

B8 500 0

A2

3

ARCHIVAL SEQUENCE GALLERY

741

FFL +1.000

7350

D3

W.C AREA

B6

FFL +0.600

2525

4 813

C1 C2

MARK

B7 B5

A8

TO WATER TANK WITH PUMP ACCESSORIES SCHEMATICS

0

253

4 322

0

A9

7207

A10

4225

A11

12875

A12

4759

C9

MALE W.C

FARM

P

200D

CONSERVATION GALLERY 02

REVISION

D4

2

498

5

552

B9

C3

PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

FFL +1.600

200DP

FFL +1.000

4851

BY

AR724_WORKING_DRAWING GENERAL_ARRANGEMENT

100DP

B1

100DP

FFL +0.000

DATE

PROJECT TITLE

FEMALE W.C

5650

A1

FFL +1.600

ARCHEOLOGY LABORATORY

200DP

ARCHAEOLOGY CONFERENCE FFL +1.800

CONTEMPLATION ROOM

FFL +0.000

C10

200DP

P

600DP

HR

200D

ORANG ASLI INTRO EXHIBITION

LOBBY

FFL +1.000

LABORATORY STORAGE

ORANG ASLI ELEMENT MUSEUM

FFL +1.000

FFL +1.000

1

680

EMBODIED SPACE

3350

TO WATER TANK WITH PUMP ACCESSORIES

FRONT COURTYARD

SERVICE

C8

FFL +0.800

D5

5001

200DP

C4

100DP STONE PAVILLION

CENTRAL COURTYARD

FFL +0.800

3824

C11

P

100D

FFL -1.000

200DP

DINING AREA

200DP

FFL +0.500

200DP

0

355

D6

HR

C5 3374

FFL +0.800

A4

UCSI_UNIVERSITY

D7

A3

OWNER

HR

OPEN AIR KITCHEN

5900

OPEN AIR ARCHAEOLOGY GARDEN

C6

FFL +0.000 FARM 500DP

4551

FFL +0.000

A14

RAMP DOWN 200DP

A15

11050

200DP

C11a

C7

2

13400

A5

A6

A7

D8

F1

B1

0

D9

280

C8

CAFE SITTING AREA

4800

3825

FFL +1.000

ARCHITECT

C11b

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

ARCHAEOLOGY EMBODIED FFL +1.000

A13 SPIRITUAL COURTYARD

A16

7510

ELEMENTAL EXHIBITION

FFL +0.700

A17

5850

A18

4725

A19

9825

A20

4350

FFL +1.000

0 326

MALE W.C ADMIN

LIFT LOBBY

FFL +1.000

LIFT CORE

FFL +0.800

CAFE KITCHEN

FFL +1.000

FFL +1.000

3950

50

109

C12

100DP

2

WORKSHOP FFL +1.000 FEMALE W.C FFL +0.800

200DP

BIOFACT INTRODUCTION FFL +1.000

C13

WORKSHOP LOBBY FFL +1.000

FFL +1.000

ATRIUM FFL +1.000

TEMPORARY EXHIBITION

3300

a D9

1a

B1

A12b

WORKSHOP MUSEUM

FFL +1.000

FFL +1.000

5497

A12a

INTRODUCTION MUSEUM

ARCHITECT

6

537

D9

C14

JEFF'S_ARCHITECT

b

SHOP FFL +1.000

4

517

B1

5

1

A9

3

B1

c

D9

B1

5

B1

0

245

ENGINEER CONSULTANT

FARM STORAGE

JEFF'S_CONSULTANT

MUSEUM LOUNGE

6008

FFL +0.600

WORKSHOP 02

D1

1a

5

0

B1

WORKSHOP COURTYARD

439

571

A9 A7d

5675

5056

A7e

4169

4356

A7g

STORAGE

3100

A7h

9 684

5300

A7f

1

1900

D1

A7b A7c

MEETING AREA

C15

FFL +1.400

ROCK GARDEN

HR

ACCOMMODATION TYPE 03 ACCOMMODATION TYPE 01

ACCOMMODATION SERVICE

2

D1

3400

FFL +0.200

FFL +1.400

FFL +1.200

2

B8 A7a

FFL +0.000

2044

5000

C16 C17

ACCOMMODATION TYPE 02

ACCOMMODATION TYPE 04

HR

3

2241

D1

TO WATER TANK WITH PUMP ACCESSORIES

7

C18

B1

b

B1

STATUS

6 B1

CONCEPT_TENDER

0

565

01 A300

0

835

a

B1

CHECKED BY

4 D1

BAKHTIAR_AMIR WATER ROCK PAVILION

ENTRANCE CONTEMPLATION PAVILION

FFL +0.800

FFL +0.000

5

737

D1 a 0

580

02 A400

GA GROUND FLOOR PLAN (FIRE FIGHTING) 1:200

5

D1

b

D1

01

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

GFP_PLAN FIRE_FIGHTING

A0004 A804

DRAWING NO


TO WATER TANK WITH PUMP ACCESSORIES

WATER SUPPLY FOR SPRINKLER

C8

UPRIGHT SPRINKLER HEAD-UL LISTED AND FM APPROVED HOSE REEL

600DP

CO2 FIRE EXTINGUISHER

EMBODIED SPACE

NOTE THAT THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE OTHER MECHANICAL SERVICES DRAWINGS, ELECTRICAL ARCHITECTURAL, THE PROPOSED FIRE FIGHTING DESIGN IS BASED ON UBBL THE SPACES HIGHLIGHTED IN RED DASHED LINES ARE THE PRIORITY SPACES BASED ON UBBL FIRE FIGHTING PURPOSE GROUP

STONE PAVILLION FFL +0.800 200DP

DINING AREA FFL +0.500

200DP HR

OPEN AIR KITCHEN

5900

FFL +0.800

A4

MARK

DATE

BY

REVISION

PROJECT TITLE

AR724_WORKING_DRAWING GENERAL_ARRANGEMENT

500DP

PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

3

741

200DP

B7

200DP

B6 3825

A5

A6

4

322

OWNER

UCSI_UNIVERSITY

A7

DP

200

B9

552

RESTAURANT FIRE FIGHTING SCHEMATIC

5

01

B5

13400

TO WATER TANK WITH PUMP ACCESSORIES SCHEMATICS

0

253

2

498

1:75 ARCHEOLOGY LABORATORY

ARCHITECT

FARM STORAGE

6008

D5

MUSEUM LOUNGE

FFL +0.600

FFL +0.000

HR

680 1

WORKSHOP COURTYARD

439

0

FFL +1.200

2

A9 5056

4169

A7g

3100

A7h

ARCHITECT

JEFF'S_ARCHITECT

9

4356

HR

684

5300

A7f

0 355

5675

A7e

D6

A7d

1

A7b1900A7c

DP

100

D1

B8 A7a

B1

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

LABORATORY STORAGE

D1

1a

5

571

200

DP

D7

C15 HR

ENGINEER CONSULTANT

ACCOMMODATION SERVICE

JEFF'S_CONSULTANT

2

D1

3400

ACCOMMODATION TYPE 03 ACCOMMODATION TYPE 01

03

2044

0 500

C16 C17

ACCOMMODATION TYPE 02

1:100

ACCOMMODATION TYPE 04

3

2241

D1

HR

LABORATORY FIRE FIGHTING SCHEMATIC

C18 STATUS

CONCEPT_TENDER 01 A300

CHECKED BY

BAKHTIAR_AMIR

02

ACCOMODATION FIRE FIGHTING SCHEMATIC 1:100

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

GFP_PLAN FIRE_FIGHTING

A0004 A804A

DRAWING NO


FROM INCOMING WATER SUPPLY

MARK

DATE

BY

REVISION

PROJECT TITLE

AR724_WORKING_DRAWING GENERAL_ARRANGEMENT PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.

50 GPM 7 BAR GROUND WATER TANK Ø110 CWS FROM UNDER

JOCKEY PUMP

OWNER

UCSI_UNIVERSITY FC

CV PG

PS

FC

500 GPM 7 BAR

FC

CV

PG

ELECTRIC ENGINE

ARCHITECT

PG PS

FC

500 GPM 7 BAR

FC

PG

CV

PG

DIESEL ENGINE

PG

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.

PS

FC ARCHITECT

JEFF'S_ARCHITECT

7 BAR PG ELECTRIC ENGINE

FC

ENGINEER CONSULTANT

CV

02

OS&Y OS&Y JOCKEY PUMP 50 GPM 7 BAR

TO SPRINKLERS

PUMP ACCESSORIES SCHEMATICS

JEFF'S_CONSULTANT

NTS

FC PG PS FC

CV OS&Y

OS&Y

FLOW METER STATUS

Ø75MM

CONCEPT_TENDER

CHECKED BY

01

PUMP ROOM DETAILS

BAKHTIAR_AMIR

NTS

DRAWN BY

DATE

SEE_THOO_JUN_HOE 1001645328

NOV_2021

DRAWING TITLE

PRJ NO

GFP_PLAN

A0004 A804A

DRAWING NO


p1a full project link : https://issuu.com/jeffreyseethoo/docs/task_1_site_shelter

p1b full project link : https://issuu.com/jeffreyseethoo/docs/tools_and_artefact_team_sharon

p2 full project link : https://issuu.com/jeffreyseethoo/docs/p2_urban_strategies_final

full project links


unit A sabe ms sharon_tutor mr james_studio master ar fira_co tutor mr yousef_co tutor ms esha_co tutor

final panelist ar anthea chen lim eu jin ts. sr khoo sui lai

credits


ucsi university degree in architecture bcrat end

2021


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.