site shelter at lenggong, perak
unit A see thoo jun hoe JEFF.
EDUCATION Diploma
B.A. Degree
UCSI University 2016 - 2020
UCSI University 2020 - 2022
Architecture
Architecture
WORKING EXPERIENCE
SKILLS
jeffrey see thoo jun hoe 17. 08. 1998 malaysian contact / jeffree37@yahoo.com
Computer
Hands on
adobe photoshop
sketching
adobe indesign
hand drafting
autodesk autocad
presentation design
sketch up
project managing
enscape
Crew Member March 2017 - October 2017
ARKILAB 2018 - GIBERT&TAN 2021 Assistant Architect Internship Sep 2018 - April 2019
EXTRA CURICULUM Community Architecture 2018 Programme Team April 2018 - May 2018
integrated design studio portfolio
Jelly & Frenz Eventz Asia
this project portfolio is to showcase the processes and progressive study works that relates to the archaeology site at Lenggong, Perak by understanding and aware of the outstanding universal value (OUV) site, as in respecting the site as a heritage origin of people. through numerous studies of the site, the primary issue of the site is that the connection of this heritage site has potential to garner a harmonious site but due to the on-site palm tree plantation, that drove the locals to disconnect from the true origin of their lands.
contents
p1
p2
p3
project 01a_inhabited ruins
the three senses tools _ vision sound - memory / immagination scent
elemental senses around us tell us about ones connection to a memory, these entity are tools that connects us from one memory to another. bringing continuity in our memories or even without strong meaning, imagination can run free on our minds that interact between space and time. keyword _ connectivity cotinuity imaginative
01_summary of the three topics _ juhani pallasmma
vision is tangible
sound is intangible
scent is intangible
silent is immaginative
direct and non reactive
indirect and reactive
indirect and non reactive
embracing solitude and self dialogue
continuity
01_elements of senses
connectivity
piecing the remains
open and close space
over-viewing the remains
01_architectural theory and site remains
protecting significant remains
protective and exposed
sea
history
landscape and pathways
culture
visual continuity of the sea
impenetrable fortress to create vertical plane with a narrow to a wide space blending the site topography
blending pathways to site
openness of the remains
02_site forces
+
= as the site remain has a distinctive scattered arrangement, by using this force it creates a strong connection between the remains and proposed intentions. interpretation of each individual towards the site will have a set of unique thoughts. by enforcing historical purposed of the site as a puzzle piece.
02_theory + site = concept
positive and negative spaces
piecing the ruins
chronological zoning
+
+
-
-
avoiding the ruins
03_site intervention language
parallel wall act as guidance
centralize ruins
zoning sequence
9
2
4 4 3 8
8
5
5
1
5
7
7
04_ground level plan
6
1. entrance from main road 2. viewing deck 3. visual stair to wall exhibit
4. wall exhibition 5. permeable mirror display 6. telescope folly structure
7. guidance parallel wall 8. main exhibit 9. sea structure
10
4 1
9
7
3
8
2
5
05_axonometric overall view
6
darker parts circulate through each parts of the intervention that interconnects each other by using zoning.
05_perspective axono
entrance to site
05_photomontages of models
pathway
in between ruines
parallel walls
arkxsite site shelter competition submission / teammates - ting kai lin & carlos chu - https://www.arkxsite.com/site-shelter-winners-soon
project 01b _ site research_lenggong valley topic_tools and artefact
project 02 _ urban building strategies
x0_site
lenggong valley
chosen site - cluster one
a_connection to cluster 2
a
b_center township
d
c_bridge connection
c b
d
x0_site_existing
d_adjecent of core site
e e_bridge connection extended
f_linkage zone to core zone
f
x0_site_existing
archaeology core zone
x0_site_existing_core area
accessibility
x0_site_issues
amenities
isolation
// piecing the past re-enactment timeline of the site, creating a chronological sequence of people evolving as the site changes and people from the past to the fut
hunting
nomadic x
river
x
money
x
mythical
x
place
x
historical
x
to
place return x0_site_journey story
existing journey
x10_masterplan_journey
a
b
c
historical
peeking in-between
river and land
bridging the converging points
the intention is to bridge the connection or convergence point of each selected parcel to create a site that serve the existing culture as priority.
x10_masterplan_piecing and seduction intention
mapping of linking to site
x0 > x10 > x100_site tangible mapping
initial parcel intervention
shading
in between space
convergence points
x0 > x10 > x100_site tangible mapping
core archaeology site
potential lots
map matrix connection
color spectrum by emotion
01_site_emotion mapping
the map derived from the activities and emotion of each potential site selection, by linking them to a central point axis, to create a complex from of movement operation, similar to a camera panning.
view through intervention
03_intervention_masterplan operation diagram no. 02
03_intervention_masterplan piecing and seduction no. 03
existing
x0 > x10 > x100_masterplan_element dissection
hotspots
connect
axis
zoning
existing
view
traces
peeking
extension
amplify river overview
x10_masterplan_concept mock up
views
mock up scattered
gallery cafe gallery + water
orchard
extension education
hiking
the provocation of historical journey of implementing gallery, to further draw in users from the site is by giving view into the archaeology site.
x10_masterplan_program & users
boating
extension to the existing site village thus, giving people a sense of local culture by implementing program to provoke the relationship.
scattered arrangement is inspired by the throwing of stone to the water, as it creates scattered rippling effect.
// axis line each line represents a partition and journey, that is extend and flow through revealing a complete site in a asymmetry circulation, it is ovelay by pit stops that amplifies the intention.
x10_masterplan_journey
“sub spine as finger joining the main spine”
“village extension”
“research hub”
“converge hub”
“off the grid” “support”
“viewing tower”
“education hub”
“mock up sites”
x10_masterplan of peeking + viewing activities
main spine
“
extension research center” “view towards cluster 2”
“a
rt
ef
ac
tr
es
ea
rc
h”
“gallery”
“resting” “river port”
“hike” “farming”
“port bay”
“markets”
x10_masterplan of central hub for river, village and archaeology activities
“river”
“river”
“river” “extend” “extend” “extend” “research extesion”
“village”
“gathering”
“landscape”
“fisherman” x10_masterplan of research activities
“farm”
“support”
axis walkway spine
x0 > x10 > x100_masterplan_element dissection
sub spine act as finger joining the main spine
off grid program + potential land
emphasize with viewing tower
x0 > x10 > x100_masterplan_element dissection
village extension
// abstract formation the contrast of organic and manmade
“hiking” contemplative
site community
“port” “off grid program”
gathering
“hub”
04_masterplan + potential site model
“spine as mediator”
the color coordinates the specific users at the site
04_masterplan circulation layering
04_masterplan + building strategies
1 2 3 4 5 6 7 8 9 10 11 12
13 14 15 16 17 18 19 20 21 22 23 24 25
artefact research center biofact research center bukit bunuh archaeology site gallery research contemplation hall landscape garden gathering hub artefact exhibition mock interactive site viewing tower orchard village extension hidden cafe
kota tampan archaeology site + viewing tower archaeology usm research center open green landscape accommodation for site users aquaponic farm research center impermanent mock up tent additional expansion of archaeology site water prayer pavilion fisherman community hall fisherman port river extension archaeology hall artefact pavilions
node 05
node 06
1
2
node 01
4
8
1
3
24 23
9
25
5
node 04
7 6
10
22 21
11 12
3
0 de
no
20
13
node 02
15 19 14 04_masterplan
16
17
18
S+
i
i + + i
S
+
+
S+
i
i
S+
S+
04_masterplan + building strategies
river water diversion system
extension artefact research center
fisherman port
water artefact gallery
viewing tower
water prayer pavillion + gathering space
connection of the fisherman ports, by following the contour of the river, by letting water flowing into the cage intervention creating a threshold, by informing the users the relationship between water and land.
x100_intervention_nodes 01
water canal to hub
viewing bridge to bukit bunuh
viewing bridge
main hub
connection to village gathering hub
hotspot is diverted into respected zoning with planes extended outwards to guide users into each designated activities that enforced the river water into the intervention creating a valley. it is then layered a viewing intervention to inform the archaeological site.
re
ve
al
x100_intervention_nodes 03
extending the existing village, to increase the interaction between design users to local users, to further increase both culture and socioeconomy of the site.
interactive village ochard farm + accomodation hidden cafe underground artefact gallery
existing village x100_intervention_nodes 03
view towards cluster two
research + gallery for immediate site
existing core site
research
existing village
camp
by focusing the intervention into the view of the existing forestry creating a seamless connection making it a low profile intervention that abide the vegetation land plots.
x100_intervention_nodes 05
project 03 _ site shelter
x1k
masterplan + building
x10k
intention user program activities + concept
x100k
building site moulding
x1000k
zoom sequence
building element.........proposal
surrounding satellite site connection points that dictate the program massing placement and development of activities for the new central point.
4 archaeology sites 1 open air sites research 30% gallery 20% hub 40% viewing 10%
core archaeology site
intervention points
x1k_masterplan + building
stops
river
pick up
bus stops
archaeological site site
spaces bus stops
village village
bus stops
urban to building connection
x1k_masterplan + building
transition of places orange - picked up points black - stops - intervention site - spaces - building
stops pick up point
research cluster 02
stops
gallery + viewing
recycle
stops
new centrality port
stops pick up point
research hub
x1k_masterplan + building
perak man
// new centrality by tapping in propose intervention sites program, creates a central connector that brings multiple urban program act as tool to garner the new site.
view
hub
public
local research
bus stops
arch gallery
orchard aquaponic farm
pedestrian route
contemplation river
water filtration
site
site function local context journey through site
x1k_masterplan + building
research
intervention
merge merge
intervention
port
comtemplative
viewing intervention
hub
intervention
x1k_mastereplan + building_sketch ideation
merge
intervention + building
research
0.9km
gallery
0.4km
lot 5385
port
hub
bridge
x1k_masterplan + building_site moulding
02 intervention extension
96m
site 3 acres
144m x 96m
x1k_masterplan + building_site moulding
02 complete masterplan
144m
vie
new axis
w s rd wa to c2
site
existing
x1k_masterplan + building_site transformation process 01
site
mould
adapt extend
scattered
deduct
x1k_masterplan + building_site transformation process 01
block formation
sub spine site
e
pin
ys
ar
im
sub spine
site
pr
site
existing spines
x1k_masterplan + building_site transformation process 02
new spines
merge
stops
pick up
pick up
site
point journey
x1k_masterplan + building_site transformation process 02
informing the site
connection to main spine
locals
x10k_users
visitor
researcher
locals reference picture from perak permaulture farm, visitor emphasize on archaeology artefacts, researcher study and resurface artefacts
urban intervention
building extension
gallery + lab artefact exhibition
ark chapel
contemplation
interactive lab
cleanse
thematic trail
ritual hall
open camp
retreat
accommodation
hub
market
fisherman port
farm
viewing decks
pavilion
theater square
view landscape water gallery
research research and documentation
x10k_programs_intervention to building program
education institute
camps
the intention is to create a seamless site that denotes
and demarcates, the presence of site archaeology, due to improper usage of this found artefacts scattered around in open sites.
?
!
!
? ?
?
?
!
?
?
the objectives is to identify open air sites and shelter or
frame as a piece art from the ancient civilization which they use as a tool for their means of survival.
the outcome will have a harmonious site that ties to
the propose urban context to garner complex activities to create awareness and respecting the heritage value or more specifically the outstanding universal value.
x10k_intention objecive aim outcome
urban intervention stops building linkage river extension intervention linkage
pick up points
x1k_masterplan + building_site program planning
the site
x0
x10
x100 x100k_building site moulding_site context
building strategy
site connection massing
river trial
researcher trial
ng
n
c ne
village + visitor
co
t
ion
w
ne
ng di
si as
m
il
bu
urban masterplan
x100k_building site moulding_massing form from intervention
x0
site journey parcel
river research
building open air gallery
contemplation parking
ochard
x100k_building site moulding_journey to building
x10
01
04
03 02
01 02
03
03 01
04 04
02
x100k_building site moulding_site journey sequence
01
02
04
02
01
03
03
04
x100k_building site moulding_site journey sequence
surrounding site massing
ing
t xis
connection to river intervention
e
il
tra
ch
ar
se
re
ng
wi
vie
entrance site artefact showcase chapel
e lag
rm
rd
fa
accommodation
retreat
a rch
o
il
nn
co
on
ti ec
v to
large scale site building massing
x100k_building site moulding_building massing
x100
enclosed landscape 1000 ms
open landscape is 33% of total proposal with enclosed landscape which is part of the building program space open landscape is includes propose garden and farm land.
open landscape 4000 ms
x100k_building site moulding_space distribution landscape
building mass 4070 ms
workshops 300 ms
archaeology lab 250 ms
meeting 120 ms
public presentation 100 ms
shops and information 100 ms
conservation facilities 400 ms
visitor
musuem and exhibition 720 ms
restaurant 320 ms
post harvest and storage 100 ms
archaeology contemplation 480 ms
storage
lounge 100 ms accomodation 350 ms
amenities 100 ms
community courtyard 200 ms
x100k_building site moulding_space distribution building mass
m&e
reception 30 ms
river mechanical system 50 ms
researcher
cafe 200 ms
river pavilion 150 ms
propose total build up area
4070 ms
museum + research + workshop 60% parking 20 pax
office
resting 20% accommodation 15% ancillary 05%
01
x100k_building site moulding_building layout progressive study
02
x100
03
x100k_building site moulding_building layout study
04
x1000
05
x100k_building site moulding_building layout study
x1000
06 building approach
open land
use foc r
ido
orr dc
x100k_building site moulding_building atmosphere study
visual pass through
focused entrance
x1000
07 floating roof sheltering the open air sites
cantilever roof
circulation corridor
sheltering the site
x100k_building site moulding_building atmosphere study
x1000
bukit bunuh
08
entrance
farm pan
kota tam acc
workshop om
x100k_building site moulding_building layout study
od
ati
on
x1000
09
x1000k_building element_building layout study
x1000
10
x1000k_building element_building layout study
x1000
11 translucency creates soft light that to give shimmer to solid surface
x1000k_building element_building facade study
x1000
12 movement of people inside the museum spaces movement of people walking through the displayed artefacts
x1000k_building element_building facade study
x1000
13 translucent creates lightness to a heavy building form
x1000k_building element_building mass study
x1000
bukit bunuh
re a se rch
river
ark site
mp
te
n co k.t research and gallery
surau
ion
t la
archaeology
community
town
routes connection
extrude mass path program
creating mass in between path
pathway and mass
main spaces overlap with existing path
existing artefact sites
building mass transformation
ark site 01
01 02 ark site 02
03
nodes; pick up points
nodes informal formal programs
main space
introduce river to site
farm + accomodation
public and private
building mass transformation
archaeology journey
accommodation journey
rch
n
e op arc
bukit bunuh site
e res
d
n ha
ite
ys
g elo
a air
farming journey
lab
cts
on
ne
sit
to es
fa rte
a
g
ka
lin
o et
pro
e
er
s po
t
ran
u sta
new river canal
tio
i ex
stin
e
mt
o gc
la mp
e
ac
p ns
e
arm
f
p sca
la
nd
building mass journey
pro
po
se
urb
an
hu
b
+
+
-
+
+
-
+
+
-
+
+ -
+ +
-
+
hierarchy
x100k_building site moulding_building mass highlight
-
+
-
+ +
positive and negative
horizontal building massing zoning
verticle lift splice out programs
open air archaeology sites
entrance
vertical massing zoning
open corridor light and dark display restaurant main contemplation entrance
exhibition entrance
conservation
exhibition
exhibition
workshop
evolution exhibition
building highlight massing zoning
8 10 12 7
9 6 5
1
2 13
4
11 key plan
14
existing mosque 1 parking 2 forest chapel 3 viewing tower 4 main entrance 5 forest open air artefact gallery 6 extension artefact gallery 7 research gallery 8 river pavilion 9 research pavilion 10 center hub 11 river tower 12 pump station 13 viewing tower 14
overall axonometric
highest floor
04
staircase to scf
03
staircase to ff
02
entrance
00
staircase to gf
01
SC
FF
GRD
UND exploded space layout
polycarbonate
translucent
opaque
building skin
mullion
lighting
beam structure precast concrete
geofact ranging from 1.83mil to 40,000 years ago metrorite - suevite
artefact ranging from 1.83mil to 40,000 years ago hand axe - pebble tool - flake tool - core tool - hammerstone
biofact ranging from 10,000 - 3,000 years ago full skeleton burial - scattered skeletal remains
museum display catalogue program contents
museum display scales program contents
boats and traps
spear
idols
mask
t
sumpi
orang asli museum display program contents
the prominent aboriginal origin that exists in the site, link back to the prehistoric civilization of perak. orang asli also known as the original people was regarded as a nomadic settlers and mostly live of hunting and gathering forest produces.
museum space + circulation
3
7
8 9
4 2a
200 section 2
1
5 6
220 plan site plan
entrance 1 parking 2 forest chapel 2a researcher trail to bukit bunuh 3 farm 4 farm extension 5 river canal 6 researcher entrance 7 open air artefact site 8 trail to urban river intervention 9
entrance 1 a stone garden 1a shop and ticket counter 2 /3 chapel ritual area 4 archaeology embodied 5 introduction arch gallery 6 temporary exhibition 7 to underground...
25 24
26
management 8 b lift lobby 9 cafe lab10 cafe 11 artefact sites garden 12
27 30 31
29
23
33
32
34
workshop exhibition13 workshop space 14 interactive workshop 15 water embodied pavilion 15a accommodation manage16 accommodation shed 17 lounge 17a aquaponic pond 18 farm 19 shed 20
21 21a
22
12
10a 11 4 5 8 6
9
10
14
7
13
3 2
20
15
1a 18
1
ground floor plan_sequence 01
17
central courtyard 21 d dining 21a kitchen 22 artefact garden 23 to first floor... loading bay 24 e conservation hall 25 artefact archive 26 archival exhibit 27 storage lab 29 arch lab 30 orang asli intro museum 31 orang asli artefacts 32 orang asli exhibition 33 conference 34
17a 19
c
16
15a
trail entrance
main entrance
main museum entrance
entrance journey
frontage view
spiritual embodied
introduction museum
introduction museum
introduction museum
central courtyard
temporary exhibition
stone garden
...from ground floor perak man burial display 1 evolution musuem 2 lift lobby 3 nature musuem 4 tool making sequence 5 stone tool making display 6 to first floor...
6
3 5 2
4
underground floor plan_sequence 02
1
underground museum
underground museum
underground museum circulation scene
...from underground a geology display 1 tools making display 2 to second floor... light corridor 3 video room 4 workshop exhibition 5 bukit bunuh lookout point 6 b archival sequence museum 7 lobby 8 gathering hall 9
6
...from ground floor restaurant lounge 10 reception lounge 11 amenities 12
9
8 7
10
11
12
2 3 4 1
5
13
first floor plan_sequence 03
c
stone tool making museum
connection corridor
lookout point
...from first floor light museum 1 texture museum 2 lift lobby 3 amenities 4 to ground floor...
1 2
second floor plan_sequence 04
3
4
light museum
dark museum
2
museum section
entrance - contemplation - museum - video room - workshop
4
8
16
2
longitude section
accommodation - lounge - temporary exhibition - museum - cafe - open site artefact - orang asli museum
4
8
16
1
2
3
4
5
1 contemplation - 2 museums - 3 connecting corridors - 4 central courtyard- 5 cafe - 6 garden
6
1
2
3
4
1 embodied garden - 2 courtyard - conservation entrance - lookout point - 3 laboratory - 4 orang asli museum - conference hall
hiking trail view
archaeology laboratory
orang asli garden exhibition
central courtyard
farm
01 model main axonometric view
02 model north elevation view
2
north elevation
4
8
16
03 model east elevation view
2
east elevation
4
8
16
04 model south elevation view
04 model west elevation view
05 building atmosphere (entrance to building)
06 building atmosphere (entirety view of open air site to exhibition and museum)
NOTES
DRAWING LIST GENERAL DRW NO.
DETAILS
DRAWING TITLE
SCALE
DRAWN BY
REVISION
DRW NO.
DRAWING TITLE
SCALE
DRAWN BY
REVISION
MARK
DATE
BY
REVISION
PROJECT TITLE
A 001
DRAWING LIST 1
NTS
JEFF
0
A 700
RETAINING WALL DETAIL
1:10 @ A3
JEFF
0
A 003
GENERAL NOTES 1
NTS
JEFF
0
A 701
STAIRCASE DETAIL
1:10 @ A3
JEFF
0
A 004
GENERAL NOTES 2
NTS
JEFF
0
A 702
FACADE SECTION DETAIL
1:10 @ A3
JEFF
0
A 005
LEGEND 1
NTS
JEFF
0
A 702a
AXONOMETRIC FACADE ASSEMBLY STUDY
NTS
JEFF
0
A 006
LEGEND 2
NTS
JEFF
0
A 702b
AXONOMETRIC FACADE ASSEMBLY
NTS
JEFF
0
A 702c
SECTION AXONOMETRIC FACADE ASSEMBLY
NTS
JEFF
0
A 703
SLIDING DOOR DETAIL
1:10 @ A3
JEFF
0
GA ARRANGEMENT
AR724_WORKING_DRAWING SETTING_OUT PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
OWNER
DRW NO. A 100
DRAWING TITLE SETTING OUT
SCALE
DRAWN BY
REVISION
A 704
SKYLIGHT DETAIL
1:10 @ A3
JEFF
0
VARIES @ A1
JEFF
0
A 705
WINDOW DETAIL
1:10 @ A3
JEFF
0
JEFF
0
A 706
SKYLIGHT LOUVER DETAIL
1:10 @ A3
JEFF
0
A 200
GA GROUND FLOOR PLAN
1:200 @ A1
A 201
GA ROOF PLAN
1:200 @ A1
JEFF
0
A 707
MUSEUM SECTION DETAIL
1:10 @ A3
JEFF
0
A 300
ELEVATION
1:200 @ A1
JEFF
0
A 707a
MUSEUM DISPLAY DETAIL
1:10 @ A3
JEFF
0
A 400
SECTION
1:200 @ A1
JEFF
0
A 708
DETAIL ACCOMMODATION LAYOUT TYPE 2PAX
VARIES @ A3
JEFF
0
A 500
CONSTRUCTION SKETCHES
JEFF
0
A 709
DETAIL ACCOMMODATION LAYOUT TYPE 1PAX
VARIES @ A3
JEFF
0
UCSI_UNIVERSITY
ARCHITECT
NTS
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
SERVICES DRW NO.
DRAWING TITLE
SCALE
DRAWN BY
REVISION
A 800
SANITARY SERVICES GFP
1:200 @ A1
JEFF
0
A 801
SANITARY SERVICES ROOF PLAN
1:200 @ A1
JEFF
0
A 801a
SANITARY SERVICES DETAIL LAYOUT
VARIES @ A1
JEFF
0
A 802
SANITARY SCHEMATIC DETAIL
NTS
JEFF
0
A 803
WATER SUPPLY GFP
NTS
JEFF
0
A803a
WATER SUPPLY DETAIL LAYOUT
VARIES @ A1
JEFF
0
A 804
FIRE FIGHTING SCHEMATIC GFP
1:200 @ A1
JEFF
0
A 804a
FIRE FIGHTING SCHEMATIC DETAIL LAYOUT
VARIES @ A1
JEFF
0
A 804b
FIRE FIGHTING SCHEMATIC DETAIL
JEFF
0
ARCHITECT
JEFF'S_ARCHITECT
ENGINEER CONSULTANT
NTS
JEFF'S_CONSULTANT
STATUS
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
AUG_2021
DRAWING TITLE
PRJ NO
DRAWING LIST
A0001 A001
DRAWING NO
NOTES
SCHEDULE OF ACCOMMODATION LEVEL
SPACE
AREA PER PERSON m²
NUMBER OF PEOPLE
AREA OF SPACE m²
NUMBER OF ROOM
GROUND FLOOR
ENTRANCE CONTEMPLATION PAVILION
10m²
6
5.6m x 8.2m = 46m²
0
4
SHOP
2m²
25
5.3m x 10m = 53m²
1
3.5
INTRODUCTION MUSEUM
10m²
18
1/2 x 26m x 14m = 182m²
0
4
ARCHAEOLOGY EMBODIED
10m²
19
13.4 x 14m = 187m²
1
4
SPIRITUAL COURTYARD
10m²
9
1/2 13m x 13m = 84.5m²
0
4
FARM STORAGE
5m²
3
5.5m x 2.7m = 15m²
0
4
OPEN AIR KITCHEN
10m²
5
2.3m x 9.7m = 22m²
0
4
DINING AREA
5m²
28
144m²
1
3
STONE PAVILION
10m²
2
4.175m x 2.5m = 10.5m²
0
4
EMBODIED SPACE
10m²
2
5m x 2.7m = 13.5m²
1
4
CONTEMPLATION ROOM
5m²
2
4.8m x 2m = 10m²
0
4
BUILDING HEIGHT m
MARK
DATE
BY
REVISION
PROJECT TITLE
WORKING_DRAWING GENERAL_ARRANGEMENT
OWNER
UCSI_UNIVERSITY CONSERVATION GALLERY 01
10m²
5
5.7m x 7.6m = 43m²
0
4
ARCHIVAL SEQUENCE GALLERY
10m²
6
5.6m x 8.2m = 46m²
0
4
CONSERVATION GALLERY 02
10m²
7
12.7m x 5m = 63m²
0
4
ARCHIVAL ROOM
5m²
4
5.6m x 3m = 17m²
0
4 ARCHITECT
LABORATORY STORAGE
5m²
3
2.5 x 6m = 15m²
0
4
ARCHEOLOGY LABORATORY
15m²
7
7.5m x 13.5m = 100m²
0
4
ORANG ASLI INTRO EXHIBITION
10m²
5
6m x 5m = 30m²
0
4
LOBBY
5m²
11
11m x 5m = 55m²
0
4
ORANG ASLI ELEMENT MUSEUM
5m²
6
6.6m x 4m = 27m²
0
4
ARCHAEOLOGY CONFERENCE
5m²
25
4m x 8m = 32m²
0
4
MUSEUM LOUNGE
20m²
4
67m²
0
4
TEMPORARY EXHIBITION
10m²
4
2.8m x 12m = 34m²
0
4
ADMIN
15m²
2
5.7m x 3.1m = 20m²
0
4
CAFE KITCHEN 01
15m²
25
5.6m x 8.2m = 46m²
0
4
CAFE SITTING AREA
5m²
11
4.8m x 11m = 53m²
0
4
WORKSHOP MUSEUM
10m²
6
1/2 x 26m x 14m = 182m²
0
4
WORKSHOP
3m²
28
13.4 x 14m = 187m²
0
4
WORKSHOP 02
3m²
28
8.5m x 18m = 84.5m²
0
4
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
ARCHITECT
JEFF'S_ARCHITECT
ENGINEER CONSULTANT
WATER ROCK PAVILION
15m²
3
5.6m x 7.4m = 42m²
0
4
ACCOMMODATION SERVICE
5m²
9
5.6m x 8.2m = 46m²
0
4
JEFF'S_CONSULTANT
STATUS
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
AUG_2021
DRAWING TITLE
PRJ NO
SCHEDULE OF_ACCOMMODATION
A0001 -
DRAWING NO
NOTES
JEFF'S ARCHITECTS CAD STANDARDS & SYMBOLS
JEFF'S ARCHITECTS CAD STANDARDS & SYMBOLS
JEFF'S ARCHITECTS CAD STANDARDS & SYMBOLS
LEADER
GRID LINE SYMBOLS
SLAB PENETRATIONS / OPENING DIRECTION
2 1686
3 1686
DIRECTION
1
SPEC & TEXT LEADER
SLAB PENETRATIONS / OPENING
1686
A FINISHES GRAPHICS CODES REVISION NOTATION
B
MARK
DATE
BY
REVISION
PROJECT TITLE
CF-01
CEILING FINISH
AR724_WORKING_DRAWING SETTING_OUT
WF-01
WALL FINISHES
PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
FF-01
FLOOR FINISHES
FR-01
FURNITURE, DOOR, SANITARY
EXTERIOR ELEVATION SYMBOL CLOUD FOR REVISE DRAWING
00
ELEVATION DESIGNATION WITH SHEET REFERENCE NUMBER
XXX
REV 01
BUILDING (MAIN) SECTION SYMBOLS
PROVIDE CODES TO ALL SPECIFIED FINISHES AND LIST DOWN ON THE TECHNICAL SHEET OR FINISHES SCHEDULE FOR EVERY PAGES.
ROOM IDENTIFICATION SYMBOL
00
OWNER
UCSI_UNIVERSITY
SECTION DESIGNATION WITH SHEET REFERENCE NUMBER
XXX
MAIN RECEPTION
ENLARGED AREA SYMBOLS
FFL ±44.52 SFL ±44.52
00
XXX
ROOM NAME
ROOM FINISH FLOOR LEVEL ROOM STRUCTURAL FLOOR LEVEL
ARCHITECT
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
DETAIL DESIGNATION WITH SHEET REFERENCE NUMBER
FLOOR HEIGHT SYMBOL
DRAWING TITLE
FFL ±00.000
FINISHED FLOOR LEVEL (SECTION)
SFL ±00.000
STRUCTURAL FLOOR LEVEL (SECTION)
FFL ±00.000 SFL ±00.000
FINISHED FLOOR LEVEL (SECTION) AND STRUCTURAL FLOOR LEVEL (SECTION)
ARCHITECT
Drawing Title Drawing No.
01
JEFF'S_ARCHITECT
ELEVATION 1 1:50@A3
DOOR & WINDOW NUMBER SYMBOL / WALL Drawing Scale
W-00
DIMENSION STYLE
ENGINEER CONSULTANT
W-00
JEFF'S_CONSULTANT
D-00
1500
1500
3000
3000 50dp
DROP / STEP & FALL SYMBOL
SETTING OUT POINT
SOP
SOP
FALL
SOP
FALL
SOP STATUS
SPOT ELEVATION IN METERS
EL. ± 00.000
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
AUG_2021
DRAWING TITLE
PRJ NO
SYMBOL
A0001 A004
DRAWING NO
NOTES
AGRICULTURE Kampung Banggol Batu
PROPOSED SITE LOT 5385 Jln Kampung Pulau Cheri, Kampung Luat, 33400 Lenggong, Perak
LOT 5385
LINE MARK
Kampung Banggol Batu
DATE
BY
REVISION
PROJECT TITLE
AR724_WORKING_DRAWING GENERAL_ARRANGEMENT
82°
Bukit Bunuh B4 B3
B2
B1
2825
82°
2881
PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
2044
D1
143°
6675
A2
7413
7350
D3
B7
A8
B6 B5
5° ROOF
R.C FLAT ROOF
4759
A12 C9
TEMPERED GLASS SKYLIGHT
5° ROOF
D5
5001
A11
12875
ALUMINUM LOUVER SKYLIGHT
R.C FLAT ROOF
C8
R.C FLAT ROOF
A10
4225
B9
5525
4853
D4
C3
Kampung Sena Halu
A9
7207
0
B1
5650
R.C FLAT ROOF
POLYCARBONATE ROOF
5° ROOF
C2
C10
5° ROOF
R.C FLAT ROOF 5° ROOF
OF
R.C FLAT ROOF
6801
3350
2525
R.C FLAT ROOF
8134
C1
Kampung Laut Kampung Baru Kota Tampan
5000
A1
SETBACK LINE
B8
D2
Sungai Perak
Kota Tampan
5°
RO
R.C FLAT ROOF
C4 3824
C11
OWNER
POLYCARBONATE ROOF R.C FLAT ROOF
5° ROOF
UCSI_UNIVERSITY
3550
D6
C5 A3
A4
D7
3374
5900
OF
5°
C6
5° ROOF
RO
R.C FLAT ROOF
5° ROOF
4551
R.C FLAT ROOF
A14
A15
2
13400
5°
A7
B1
RO
D8
OF
A6
RC FLAT ROOF
C8
RC FLAT ROOF
D9
2800
AGRICULTURE
4800
3825
A5
F1
143°
11050
A7
C7
RO
143°
A7
OF
5°
VOID
R.C FLAT ROOF
A13 OF
A17
5850
A18
4725
A19
9825
4350
A20 C12
RC FLAT ROOF
260
23
RO
OF
RO
RC FLAT ROOF 5° ROOF
5° ROOF
01 A400 TEMPERED GLASS SKYLIGHT
VOID
A12a
RC FLAT ROOF
C13
5° ROOF
5° ROOF
a
1
B1
RC FLAT ROOF
TEMPERED GLASS SKYLIGHT
A12b 3300
D9
TEMPERED GLASS SKYLIGHT
D9
5376
ARCHITECT
C14
b
4
1
A9
13
B
c
D9
B1
RC FLAT ROOF
B1
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
5
B1
2450
VOID
RC FLAT ROOF
RC FLAT ROOF
6008
1:25000
5°
OF
5°
01 A301
5497
Jalan Lenggong
01
KEY PLAN
3950
0
1095
5°
A16
7510
VOID
RO
RC FLAT ROOF
5° ROOF
5° ROOF
B
RC FLAT ROOF
4392
0
D1
11a
5715
VOID
A9
RC FLAT ROOF OF
5°
A7b A7c
A7d
1900
5056
A7e
4169
RO
OF
A7f
5300
5°
4356
A7g
3100
C15
A7h
RO
6849
B8 A7a
RC FLAT ROOF 5° ROOF
RC FLAT ROOF
2044
5000
C16 C17
AGRICULTURE
RC FLAT ROOF 5° ROOF
RC FLAT ROOF
D1
FOREST CHAPEL
2
RC FLAT ROOF
D1
3400
RC FLAT ROOF 5° ROOF 5° ROOF
3
2241
5° ROOF
7
C18
PROPOSED SITE LOT 5385 Jln Kampung Pulau Cheri, Kampung Luat, 33400 Lenggong, Perak
B1
B5
6
127°
01 A300
8350
B5
B1
5650
RC FLAT ROOF
D1
OF
5°
RO
4
R.C FLAT ROOF
7375
C1 5°
5800
OF
RO
143°
ARCHITECT
01 A401
C1
5
D1
JEFF'S_ARCHITECT
Bukit Bunuh ENGINEER CONSULTANT
JEFF'S_CONSULTANT
ADMIN PARKING PROPOSE FARM
D
Y AR
UN
LIN
Sungai Perak
E
MAIN PARKING
BO
AGRICULTURE
PROPOSE RIVER CANAL STATUS
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR
02
LOCATION PLAN NTS
03
SITE PLAN 1:500
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
SETTING_OUT
A0004 A100
DRAWING NO
MATERIAL SCHEDULE
NOTES
15MM THK TEMPERED GLASS WITH BLACK POWDERED COATED STEEL MULLION AND FRAME (TO ARCHITECTS DETAIL) 1200MM X 600MM AND 120MM THK PRECASE CONCRETE WALL PLATE TO BE FINISHED IN EXPOSED STATE 40MM THK x 500MM WIDTH OPAL COLORED POLYCARBOBATE PANELS RODECA TRANSLUCENT PC2540-4 WITH STEEL MULLIONS
B4 B3 B2
B1
500MM STONE SLAB WALL CLADDING WITH BUTT JOINS IN RANDOM PATTERN WITH SMOOTH FINISHED TEXTURE EXTERNALLY
5
282
TYPICAL 150MM CONCRETE WALL WITH REBAR STEEL REINFORCEMENT AND PROTECTIVE RAW COATING PAINTED FINISHED EXTERNALLY
1
288
NOTE : ALL REQUIREMENTS TO BE CLARIFIED BY ARCHITECT
4
204
CONSERVATION GALLERY 01
UNIQUE WALL MATERIAL LEGEND, THAT CORRESPOND TO WALL POSITION IN EACH SPACE.
FFL +1.000 OKU PARKING
D1 667
ARCHIVAL ROOM
5
FFL +1.000 LOADING BAY
D2
B8 0
500
A2
3
ARCHIVAL SEQUENCE GALLERY
741
FFL +1.000
7350
D3
B7
W.C AREA
B6
FFL +0.600
813
C1
B5
2525
4
C2
MARK
A8
0
253
4
322
0
A10
4225
A11
12875
P
FFL +0.000
200D
CONSERVATION GALLERY 02
D4 4851
5
552
C3
AR724_WORKING_DRAWING GENERAL_ARRANGEMENT
C9
2
498
B9
REVISION
FFL +1.600
200DP
FFL +1.000
BY
PROJECT TITLE
MALE W.C
FARM
DATE
A12
4759
100DP
B1
100DP
A9
7207
FEMALE W.C
PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
5650
A1
FFL +1.600
ARCHEOLOGY LABORATORY
200DP
ARCHAEOLOGY CONFERENCE
FFL +1.000
FFL +1.800
CONTEMPLATION ROOM SERVICE
FFL +0.000
C10
200DP
P
200D
600DP
ORANG ASLI INTRO EXHIBITION FFL +1.000
LABORATORY STORAGE
680
EMBODIED SPACE
LOBBY
ORANG ASLI ELEMENT MUSEUM
FFL +1.000
3350
C8
FFL +0.800
D5
5001
200DP
FRONT COURTYARD
FFL +1.000
FFL +1.000
1
C4
100DP STONE PAVILLION
CENTRAL COURTYARD
FFL +0.800
3824
C11
P
100D
FFL -1.000 200DP
DINING AREA
200DP
FFL +0.500
0
355
D6
200DP
C5
OPEN AIR KITCHEN
A3
FFL +0.800
A4
OWNER
D7
3374
5900
UCSI_UNIVERSITY
OPEN AIR ARCHAEOLOGY GARDEN
C6
FFL +0.000 FARM 500DP
4551
FFL +0.000
A14
RAMP DOWN 200DP
A15
11050
200DP
C11a
C7
2
13400
A5
A6
A7
D8
F1
B1
0
D9
280
C8
CAFE SITTING AREA
4800
3825
FFL +1.000
C11b
ARCHAEOLOGY EMBODIED
ARCHITECT
FFL +1.000
A13 SPIRITUAL COURTYARD
A16
7510
ELEMENTAL EXHIBITION
FFL +0.700
A17
5850
A18
4725
A19
9825
A20
4350
FFL +1.000
C12
100DP MALE W.C ADMIN
LIFT LOBBY
LIFT CORE
FFL +0.800
CAFE KITCHEN
FFL +1.000
FFL +1.000
3950
50
109
60 232 FFL +1.000
WORKSHOP FFL +1.000
02 A300
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
FEMALE W.C
01 A400
FFL +0.800
200DP
BIOFACT INTRODUCTION FFL +1.000
C13
WORKSHOP LOBBY FFL +1.000
FFL +1.000
ATRIUM FFL +1.000
TEMPORARY EXHIBITION
3300
D9
WORKSHOP MUSEUM
FFL +1.000
FFL +1.000
a
1a B1
A12b
5497
A12a
INTRODUCTION MUSEUM
6 537
b D9
C14
ARCHITECT
JEFF'S_ARCHITECT
SHOP FFL +1.000
4
517
B1
5
A9
3 B1
c
D9
1 B1
5
B1
0
245
FARM STORAGE MUSEUM LOUNGE
6008
FFL +0.600
WORKSHOP COURTYARD
2 439
0
B
JEFF'S_CONSULTANT
WORKSHOP 02
D1
FFL +1.400
FFL +1.200
A9 A7b A7c 1900
A7d
5675
5056
A7e
4169
A7f A7g
3100
A7h
9
4356
STORAGE
684
5300
1 D1
B8 A7a
ENGINEER CONSULTANT
FFL +0.000
11a
5
571
MEETING AREA
C15
FFL +1.400
ROCK GARDEN ACCOMMODATION TYPE 03 FFL +0.200
ACCOMMODATION TYPE 01 FFL +0.200
FFL +1.000
2
ACCOMMODATION SERVICE
2044
5000
C16
D1
3400
FFL +0.200
ACCOMMODATION TYPE 02
C17
ACCOMMODATION TYPE 04
FFL +0.200
3
2241
D1
FFL +0.200
7
C18
B1
b B1 6
B1
0
565
STATUS
CONCEPT_TENDER
01 A300
350
8
a
B1
D1
CHECKED BY
4
WATER ROCK PAVILION
ENTRANCE CONTEMPLATION PAVILION
FFL +0.800
FFL +0.000
BAKHTIAR_AMIR
5
737
D1 a 0
580
02 A400
b GA GROUND FLOOR PLAN 1:200
5
D1
D1
01
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
GA_PLAN
A0004 A200
DRAWING NO
NOTES
B4 B3 B2
B1
5
282
1 288
4
204
D1 5
667
D2
B8 0 500
A2
3
741
7350
D3
B7 A8
B6 5° ROOF
R.C FLAT ROOF
B9
5 552
4853
D4
MARK
DATE
BY
REVISION
AR724_WORKING_DRAWING GENERAL_ARRANGEMENT
ALUMINUM LOUVER SKYLIGHT
PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
TEMPERED GLASS SKYLIGHT
5° ROOF
D5
5001
A12 C9
R.C FLAT ROOF
C8
4759
0
R.C FLAT ROOF
R.C FLAT ROOF
A11
12875
B1
C2
C3
A10
4225
PROJECT TITLE
B5
5° ROOF
A9
7207
C10
5° ROOF
R.C FLAT ROOF 5° ROOF
3350
2525
POLYCARBONATE ROOF
4
R.C FLAT ROOF
813
C1
5650
A1
F
5°
O RO
1
680
R.C FLAT ROOF
R.C FLAT ROOF
C4 3824
C11 POLYCARBONATE ROOF R.C FLAT ROOF
0
355
D6
5° ROOF
C5
A4
D7
3374
5900
A3
OWNER OF
5°
C6
5° ROOF
RO
UCSI_UNIVERSITY
R.C FLAT ROOF
5° ROOF
4551
R.C FLAT ROOF
A14
A15
11050
A7
C7 A7
RO
B1
D8
A6
5°
F1
OF
A5
2
13400
0
RC FLAT ROOF
D9
280
RC FLAT ROOF
C8
4800
3825
A7
OF
5°
RO
RC FLAT ROOF
5° ROOF
VOID
R.C FLAT ROOF
ARCHITECT
A13 OF
A18
4725
A19
9825
4350
A20 C12
RC FLAT ROOF
60
RO
A17
5850
232
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
5°
F
5°
RO
OF
RC FLAT ROOF 5° ROOF
5° ROOF
01 A400 TEMPERED GLASS SKYLIGHT
VOID
A12a
RC FLAT ROOF
TEMPERED GLASS SKYLIGHT
A12b 3300
D9
5° ROOF
5° ROOF
a
1
B1
C13
RC FLAT ROOF
5497
01 A301
O RO
3950
50
109
5°
A16
7510
VOID
TEMPERED GLASS SKYLIGHT
6
537
b D9
C14 4
1
A9
3 B1
c
D9
B1
RC FLAT ROOF
ARCHITECT
JEFF'S_ARCHITECT
B1
5
B1
0
245
VOID
RC FLAT ROOF
6008
RC FLAT ROOF
ENGINEER CONSULTANT
5° ROOF
VOID
2
A9
RC FLAT ROOF OF
5°
A7b A7c
A7d
1900
5056
A7e
4169
RO
OF
A7f 4356
A7g
3100
C15
A7h
RO
9
5300
5°
684
B8 A7a
JEFF'S_CONSULTANT
RC FLAT ROOF
439
0
D1
1a B1
5
571
RC FLAT ROOF 5° ROOF
RC FLAT ROOF
2
RC FLAT ROOF
2044
5000
C16
D1
3400
RC FLAT ROOF 5° ROOF 5° ROOF
RC FLAT ROOF 5° ROOF
RC FLAT ROOF
D1
C17
3
2241
5° ROOF
7
C18
B1
B5 6
B1
0
565
STATUS
CONCEPT_TENDER
01 A300
350
8
B5
RC FLAT ROOF
D1
OF
5°
RO
4
CHECKED BY
BAKHTIAR_AMIR
R.C FLAT ROOF
737 5
C1 5° OF
RO
0
580
01 A401
1:200
5
D1
C1
01
GA GROUND FLOOR PLAN
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
ROOF_PLAN
A0004 A201
DRAWING NO
NOTES
B1a
B1b
A1
A5
A6
B1 B2
B3
B4
B5
B6
B7
B8
B9
B10
A8
A9
A10
A11
A12
ROOF LEVEL FFL +12.000 V
MARK
SECOND FLOOR LEVEL FFL +8.000 V
DATE
BY
REVISION
PROJECT TITLE
AR724_WORKING_DRAWING GENERAL_ARRANGEMENT
FIRST FLOOR LEVEL FFL +4.000 V
PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
GROUND LEVEL FFL +0.000 V
OWNER
UCSI_UNIVERSITY
01
NORTH ELEVATION 1:200
ARCHITECT
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
C1
C2
C3
C4
C5
C6
C7
C8
C11a
C11b
C12
C13
C14
C15
C16 C17 C18 ARCHITECT
ROOF LEVEL FFL +12.000 V
JEFF'S_ARCHITECT
SECOND FLOOR LEVEL FFL +8.000 V
ENGINEER CONSULTANT
JEFF'S_CONSULTANT FIRST FLOOR LEVEL FFL +4.000 V
GROUND LEVEL FFL +0.000 V
STATUS
02
EAST ELEVATION
CONCEPT_TENDER
1:200
CHECKED BY
BAKHTIAR_AMIR DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
ELEVATION
A0004 A300
DRAWING NO
NOTES
01 A707A
F1
01 A702
01 A704
D8
D9
D9a
A12a
A12b
A13
A16
A17
A18
A19
A20
72264 8448
3581
5299
13235
3300
6141
7510
5850
4725
9825
4350
ROOF LEVEL FFL +12.000 V
DARK ARTEFACT MUSEUM
LIGHT ARTEFACT MUSEUM LIFT LOBBY 04
SERVICE AREA
SECOND FLOOR LEVEL FFL +8.000 V
MARK
STONE GEOLOGY MUSEUM
STONE GEOLOGY MUSEUM
CORRIDOR
VIDEO ROOM ENTRANCE
LIFT LOBBY 03
FIRST FLOOR LEVEL FFL +4.000 V
01 A700 INTRODUCTION MUSEUM
BIOFACT INTRODUCTION CORRIDOR ATRIUM
LIFT LOBBY 02
BY
REVISION
AR724_WORKING_DRAWING GENERAL_ARRANGEMENT PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
WORKSHOP MUSEUM
TEMPORARY EXHIBITION
GROUND LEVEL FFL +0.000 V
DATE
PROJECT TITLE
ORANG ASLI MUSEUM
16 STEPS 300 TREAD 200 RISER
STONE TOOL MAKING CORRIDOR
STONE TOOL MAKING MUSEUM
LIFT LOBBY 01
EVOLUTION MUSEUM
UNDERGROUND LEVEL FFL -3.500 V
01 A701
01
OWNER
UCSI_UNIVERSITY
SECTION THROUGH MAIN MUSEUM 1:200
ARCHITECT
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
C14
C13
C12
C11b
C11a
C11
C10
C9
39447 5497
3950
5075
4750
11175
3350
5650
ROOF LEVEL FFL +12.000 V
ARCHITECT
JEFF'S_ARCHITECT 01 A706
DARK ARTEFACT MUSEUM
SECOND FLOOR LEVEL FFL +8.000 V
VIDEO ROOM
GATHERING HALL
ENGINEER CONSULTANT
JEFF'S_CONSULTANT
FIRST FLOOR LEVEL FFL +4.000 V
TEMPORARY EXHIBITION
CAFE KITCHEN
CAFE
ORANG ASLI EXHIBITION
OUTDOOR COURTYARD GROUND LEVEL FFL +0.000 V
OPEN AIR ARTEFACT COURTYARD
EVOLUTION MUSEUM UNDERGROUND LEVEL FFL -3.500 V
01 A707 STATUS
02
SECTION THROUGH MAIN ATRIUM
CONCEPT_TENDER
1:200
CHECKED BY
BAKHTIAR_AMIR DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
SECTION
A0004 A400
DRAWING NO
NOTES
1
3
4
MARK
DATE
BY
REVISION
PROJECT TITLE
9
PROJECT_02 DETAIL
10
OWNER
UCSI_UNIVERSITY
2
5 6 7
02 A700
ARCHITECT
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
8
ARCHITECT
JEFF'S_ARCHITECT
ENGINEER CONSULTANT
JEFF'S_CONSULTANT
02
01
RETAINING WALL SECTION 1:30
RETAINING WALL SECTION 1:10
1 150mm thk wall with 20mm plaster concrete finished 2 200mm thk concrete retaining wall with metal bar reinforcement (to engineers detail) 3 200mm thk concrete floor apron 4/6 20mm thk waterproofing layered (FPO membrane water proofing system - sikaproof A-08 5 200mm thk concrete floor slab with reinforcement steel rebar in contact with soil 7 80mm thk crushed gravel mix layer for concrete floor slab and beam to be laid on top 8 concrete retaining wall foundation to engineers detail 9 20mm thk rough textured concrete rendered with coloured to architects detail 10 30mm thk concrete screed laid on top of vapour barrier for water proofing
STATUS
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
AUG_2021
DRAWING TITLE
PRJ NO
RETAINING_WALL DETAIL
A0001 A700
DRAWING NO
NOTES
01
KEY SECTION NTS
MARK
DATE
BY
REVISION
13
12
11
10
9
8
7
6
5
4
3
2
1
1
1
1
PROJECT TITLE
STEPS 13 RISER 150 TREAD 300
UP
STAIRCASE TO UNDERGROUND MUSEUM
PROJECT_02 DETAIL
RAMP 3°
RAMP 3°
01
STAIRCASE AND RAMP DETAIL PLAN 1:75 OWNER
UCSI_UNIVERSITY
ARCHITECT
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
G.F. LEVEL FFL +0.000 V STEPS 13 RISER 150 TREAD 300
ARCHITECT
JEFF'S_ARCHITECT
RAMP 3° UNDERGROUND LEVEL FFL -3.350 V
ENGINEER CONSULTANT
JEFF'S_CONSULTANT
STATUS
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR
02
STAIRCASE AND RAMP SECTION DETAIL 1:75
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
AUG_2021
DRAWING TITLE
PRJ NO
STAIRCASE_AND_RAMP DETAIL
A0001 A701
DRAWING NO
NOTES
1 02 A702
2 3 4 S.F LEVEL FFL 9.100 V
MARK
DATE
BY
REVISION
PROJECT TITLE
PROJECT_02 DETAIL
5 6
OWNER
UCSI_UNIVERSITY
7
F.F LEVEL FFL 4.550 V
ARCHITECT
01 A703
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
8
ARCHITECT
JEFF'S_ARCHITECT G.F LEVEL FFL 0.000 V
9
ENGINEER CONSULTANT
JEFF'S_CONSULTANT
03 UNDERGROUND LEVEL FFL -3.350 V
01
OVERALL SECTION 1:75
02
FACADE SECTION DETAIL 1:20
FACADE SECTION DETAIL 1:5
1 parapet pre-finished metal flashing with dripo edge that extends 300mm away from parapet 2 200mm x 350mm concrete beam 3 facade component steel vertical bracket cover and closure plate for spandrels panel to be fixed on beam 4 100mm thk polycarbonate 5 steel bracket for aluminium spandrels panel 6 internal anchor, rectangular cut out for mounting bracket and anchor 7 support bracket for external facade polycarbonate panel 8 powdered coated aluminium profile mullions 9 5mm thk tempered glass
STATUS
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
AUG_2021
DRAWING TITLE
PRJ NO
FACADE DETAIL
A0001 A702
DRAWING NO
NOTES
40MM THK x 500MM WIDTH OPAL COLORED POLYCARBOBATE PANELS RODECA TRANSLUCENT PC2540-4
500
2000
500
W-01
2
2000
BLACK POWDERED COATED STEEL MULLIONS
MARK
TO BE MOUNTED ON TO CONCRETE WALL WITH WALL COMPRESSION BOLT TO MANUF DETAIL
DATE
BY
REVISION
PROJECT TITLE
CONSTRUCTION DETAIL
1
OWNER
UCSI_UNIVERSITY
ARCHITECT
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
NOTES
1
PANELS RODECA TRANSLUCENT PC2540-4
2
500
500
NOTES
facade axonometric
ARCHITECT
JEFF'S_ARCHITECT
W-01 W-01 20002000
BLACK POWDERED COATED STEEL MULLIONS BLACK POWDERED COATED STEEL MULLIONS
500
20002000
40MM THK x 500MM WIDTH OPAL COLORED POLYCARBOBATE 40MM THK x 500MM WIDTH OPAL PANELS RODECA TRANSLUCENT PC2540-4 COLORED POLYCARBOBATE
500
ENGINEER CONSULTANT
JEFF'S_CONSULTANT
3
MARK
TO BE MOUNTED ON TO CONCRETE WALL WITH WALL COMPRESSION BOLT TO MANUF TO BE MOUNTED ON TO CONCRETE WALL WITHDETAIL WALL
DATE
BY
REVISION
MARK DATE PROJECT TITLE
BY
REVISION
CONSTRUCTION CONSTRUCTION DETAIL DETAIL
COMPRESSION BOLT TO MANUF DETAIL
PROJECT TITLE
1 40mm thk x 500mm width opal colored polycarbonate panels (RODECA TRANSLUCENT PC2540-4) 2 black powdered coated steel mullion frame with panel clip to support polycarbonate panel, to manuf detail 3 to be mounted on to concrete wall with wall compression bolt , to manuf detail
STATUS
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR
OWNER
UCSI_UNIVERSITY UCSI_UNIVERSITY OWNER
facade elevation (nts) ARCHITECT ARCHITECT SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
FACADE AXONOMATRIC_STUDY
A0001 A702B
DRAWING NO
NOTES
02 A703
4 MARK
DATE
BY
REVISION
PROJECT TITLE
PROJECT_02 DETAIL
5
1
OWNER
UCSI_UNIVERSITY
2 6 ARCHITECT
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
7
3
8 ARCHITECT
JEFF'S_ARCHITECT
ENGINEER CONSULTANT
9
03 A703
02
SLIDING DOOR MECHANISM 1:5
JEFF'S_CONSULTANT
03
SLIDING DOOR MOUNTING 1:5
STATUS
CONCEPT_TENDER
CHECKED BY
1 facade component steel vertical bracket cover and closure plate for spandrels panel to be fixed on beam
01
SLIDING DOOR DETAIL 1:20
2 internal anchor, rectangular cut out for mounting bracket and anchor 3/7sliding door mechanism, steel roller mounted on top of sliding tracks 4 100mm thk white translucent polycarbonate 5 internal 5mm thk tempered glass 6 aluminium mullion profile
8 powdered coated steel bracket for sliding track mounting, fixed to concrete floor slab 9 200mm thk concrete floor slab with steel bar reinforcement to engineers detail
BAKHTIAR_AMIR DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
AUG_2021
DRAWING TITLE
PRJ NO
SLIDING_DOOR DETAIL
A0001 A703
DRAWING NO
NOTES
02 A703
02 A703
1 parapet pre-finished metal flashing with dripo edge that extends 300mm away from parapet 2 200mm thk concrete beam with steel bar reinforcement to engineers detail 3 20mm thk timber fascia board with painted finished externally 4 waterproofing layer (exposed system), exposed pvc fully adhered system - sika sarnafill G410-15L FELT 1.5mm thk 5 200mm thk rc flat roof at gentle fall of 4 degrees for water drainage
MARK
DATE
BY
REVISION
PROJECT TITLE
PROJECT_02 DETAIL
6 parapet pre-finished metal flashing with dripo edge that extends 300mm away from parapet 7 mullion frame for skylight, to be mounted on to extruded concrete beam 8 5mm thk tempered glass
01
OWNER
UCSI_UNIVERSITY
SKYLIGHT DETAIL SECTION 1:20
ARCHITECT
3
1
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
4
5
7
6
8
ARCHITECT
JEFF'S_ARCHITECT
2
ENGINEER CONSULTANT
JEFF'S_CONSULTANT
STATUS
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR
02
FLAT ROOF DETAIL 1:5
03
SKYLIGHT TO FLAT ROOF DETAIL 1:5
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
AUG_2021
DRAWING TITLE
PRJ NO
SKYLIGHT_TO FLAT_ROOF_DETAIL
A0001 A704
DRAWING NO
NOTES
NOTES
1
2
MARK
DATE
PROJECT TITLE
BY MARK
DATE
BY
REVISION
REVISION
PROJECT TITLE
PROJECT_02PROJECT_02 DETAIL DETAIL
3
OWNER
02 A705
OWNER
UCSI_UNIVERSITY UCSI_UNIVERSITY
02 A705
1 150mm thk concrete wall with raw concrete finished externally 2 10mm slit cut out out to fit tempered glass with waterproofing seal ARCHITECT
3 5mm thk tempered glass
ARCHITECT
SAYA MEMPERAKUISAYA BAHAWA MEMPERAKUI DETAIL-DETAIL BAHAWA DALAM DETAIL-DETAIL PELAN-PELAN DALAM ADALAH PELAN-PELAN MENURUT ADALAH MENURUT KEHENDAK-KEHENDAK, KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL UNDANG-UNDANG BANGUNAN SERAGAM KECIL BANGUNAN 1984 DANSERAGAM SAYA 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB SETUJU TERIMA PENUH TANGGUNGJAWAB DENGAN SEWARJANYA. PENUH DENGAN SEWARJANYA.
4 powdered coated million frame for tempered glass 5 metal flashing to be extended 10mm away from glass window 6 flashing edge for water proofing
4
ARCHITECT
ARCHITECT
JEFF'S_ARCHITECT JEFF'S_ARCHITECT
ENGINEER CONSULTANT
ENGINEER CONSULTANT
JEFF'S_CONSULTANT JEFF'S_CONSULTANT
5
01
WALL TO WALL WINDOW TO WINDOW SECTION SECTION 01 1:15 1:15
STATUS
STATUS
CONCEPT_TENDER CONCEPT_TENDER
6
CHECKED BY
CHECKED BY
BAKHTIAR_AMIR BAKHTIAR_AMIR DRAWN BY
02
WINDOW WINDOW DETAILDETAIL 02 1:5 1:5
DRAWN BY
DATE
DATE
AUG_2021 AUG_2021 SEE_THOO_JUN_HOE SEE_THOO_JUN_HOE 1001645328 1001645328 DRAWING TITLE
DRAWING TITLE
PRJ NO
PRJ NO DRAWING NO
DRAWING NO
WINDOW_DETAIL WINDOW_DETAILA0001 A705A0001 A705 01 01
NOTES
MARK
DATE
BY
REVISION
PROJECT TITLE
PROJECT_02 DETAIL
02 A706
OWNER
01
UCSI_UNIVERSITY
LOUVER SKYLIGHT DETAIL 1:20
1
ARCHITECT
2 3
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
1 5mm thk tempered glass 2 parapet prefinished metal flashing with dripo edge
4 5
that extends 300mm away from parapet 3 20mm thk timber fascia board with painted finished
ARCHITECT
JEFF'S_ARCHITECT
externally 4 200mm thk extruded concrete beam
7
5 5mm thk aluminium louvers with white powdered 6
coated finished
ENGINEER CONSULTANT
JEFF'S_CONSULTANT
6 frame mullion for louvers to be fixed on concrete beam 7 200mm thk rc flat roof at gentle fall of 4 degrees for water drainage waterproofing layer (exposed system), exposed pvc fully adhered system - sika sarnafill G410STATUS
15L FELT 1.5mm thk
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR
02
LOUVER SKYLIGHT MOUNTING MECHANISM 1:5
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
AUG_2021
DRAWING TITLE
PRJ NO
SKYLIGHT_LOUVER DETAIL
A0001 A706
DRAWING NO
NOTES
02 A707
MARK
DATE
BY
REVISION
PROJECT TITLE
PROJECT_02 DETAIL
OWNER
UCSI_UNIVERSITY
01
OVERALL UNDERGROUND MUSUEM SECTION 1:100 ARCHITECT
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
ARCHITECT
JEFF'S_ARCHITECT
1
1 concrete artefact display box sizes varries, typical size 500mm x 500mm x1000mm height
ENGINEER CONSULTANT
JEFF'S_CONSULTANT
STATUS
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR
02
UNDERGROUND ARTEFACT DISPLAY MUSUEM 1:40
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
AUG_2021
DRAWING TITLE
PRJ NO
MUSEUM SECTION
A0001 A707
DRAWING NO
D9
DARK ARTEFACT MUSEUM
01 A707A
6
MARK
STONE GEOLOGY MUSEUM
DATE
BY
REVISION
PROJECT TITLE
CONSTRUCTION DETAIL
01 A705
OWNER
02
KEY SECTION DETAIL NTS
5
ARCHITECT
1 200mm thk reinforced concrete slab with rebar steel, 4
UCSI_UNIVERSITY
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
to engineers detail 2
700mm deep concrete display top with smooth
concrete finished externally and stainless steel stone artefact prop holder, to architects detail 3
ARCHITECT
JEFF'S_ARCHITECT
3 stone artefact 4 150mm thk stone slab wall cladding with butt join in random pattern with smooth finished texture externally
2
5 void opening for natural daylight 6 polycarbonate facade (refer to drawing A702)
ENGINEER CONSULTANT
JEFF'S_CONSULTANT
1 STATUS
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR
01
STONE TOOL ARTEFACT DISPLAY MUSUEM 1:30
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
AUG_2021
DRAWING TITLE
PRJ NO
MUSEUM DISPLAY
A0001 A707A
DRAWING NO
NOTES
SPECIFICATION SYMBOL TO BE REFER TO GA PLAN FOR MORE INFORMATION
A7b A7a
1900
A7c
A7d
5675
5056
A7e
A7f
4169
5300
A7g
4356
3100
C15
MARK
3400
ACCOMMODATION TYPE 03 FFL +0.200
ACCOMMODATION TYPE 01
DATE
BY
REVISION
PROJECT TITLE
FFL +0.200
ACCOMMODATION SERVICE
CONSTRUCTION DETAIL
FFL +1.000
2044
C16 ACCOMMODATION TYPE 02 ACCOMMODATION TYPE 04
FFL +0.200
C17 2241
FFL +0.200
OWNER
UCSI_UNIVERSITY
C18
01
OVERALL ACCOMOATION LAYOUT BLOCKS 1:150 ARCHITECT
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
ARCHITECT
JEFF'S_ARCHITECT 5100
2400
FFL +0.200
ACCOMMODATION TYPE 02 2450
ACCOMMODATION TYPE 01
2800
1800
5450
FFL +0.200 ENGINEER CONSULTANT
1611
JEFF'S_CONSULTANT
2950 STATUS
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR
02
ACCOMMODATION 2PAX TYPE 01 1:50
03
ACCOMMODATION 2PAX TYPE 02 1:50
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
ACCOMMODATION LAYOUT_2PAX_TYPE
A0001 A708
DRAWING NO
NOTES
SPECIFICATION SYMBOL TO BE REFER TO GA PLAN FOR MORE INFORMATION
A7b A7a
1900
A7c
5675
A7d
A7e
5056
4169
A7f
5300
4356
A7g
3100
C15
MARK
3400
ACCOMMODATION TYPE 03
BY
REVISION
CONSTRUCTION DETAIL
FFL +0.200
ACCOMMODATION TYPE 01
DATE
PROJECT TITLE
FFL +0.200
ACCOMMODATION SERVICE FFL +1.000
2044
C16 ACCOMMODATION TYPE 02 ACCOMMODATION TYPE 04
FFL +0.200
C17 2241
FFL +0.200
OWNER
UCSI_UNIVERSITY
C18
01
OVERALL ACCOMOATION LAYOUT BLOCKS 1:150 ARCHITECT
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
ARCHITECT
JEFF'S_ARCHITECT 1800
2550
2900
3920
6300
FFL +0.200
ENGINEER CONSULTANT
JEFF'S_CONSULTANT
2011
1600
ACCOMMODATION TYPE 03 FFL +0.200
ACCOMMODATION TYPE 04
2000
STATUS
CONCEPT_TENDER
CHECKED BY
BAKHTIAR_AMIR
02
ACCOMMODATION 1PAX TYPE 01 1:50
03
ACCOMMODATION 1PAX TYPE 02 1:50
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
ACCOMMODATION LAYOUT_1PAX_TYPE
A0001 A709
DRAWING NO
NOTES
LEGEND 50mmØ HDPE PN12.5 SANITARY PIPE 25mmØ HDPE PN12.5 SANITARY PIPE 65mmØ HDPE PN16 VCP PIPE G.T
B3 DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM
B2
B1
GULLY TRAP (TO ARCHITECT DETAIL)
DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM
B4
PROPOSED MANHOLE (TO AUTHORITIES DETAIL)
5
282
1
288
4 G.T
204
CONSERVATION GALLERY 01 FFL +1.000 OKU PARKING G.T
D1 667
ARCHIVAL ROOM
5
FFL +1.000 LOADING BAY
G.T
B8
D2
A2
500
A1
0
DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM
7350 G.T
3
ARCHIVAL SEQUENCE GALLERY
G.T
741
FFL +1.000 G.T
B7
D3
B6 813
C1
B5
2525
4
W.C AREA
A9
7207
A10
4225
G.T
100DP
P
FFL +0.000
200D
CONSERVATION GALLERY 02
G.T
C9
D4 4851
552 5
C3
FEMALE W.C
REVISION
AR724_WORKING_DRAWING GENERAL_ARRANGEMENT
FFL +1.600
ARCHEOLOGY LABORATORY
200DP
ARCHAEOLOGY CONFERENCE
FFL +1.000 CONTEMPLATION ROOM
BY
PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
2
498
B9
G.T
DATE
FFL +1.600
200DP
FFL +1.000
MARK
PROJECT TITLE
MALE W.C
FARM
FFL +1.800
G.T
SERVICE
FRONT COURTYARD G.T
FFL +0.000
G.T
C10
200DP
P
200D
600DP
ORANG ASLI INTRO EXHIBITION
LOBBY
FFL +1.000
LABORATORY STORAGE
680
EMBODIED SPACE
G.T
ORANG ASLI ELEMENT MUSEUM
FFL +1.000
3350
C8
FFL +0.800
D5
5001
A12
4759
G.T
0
B1
100DP
200DP
A11
12875
4
322
G.T
W.C AREA
C2
A8
0
253
5650
G.T
FFL +1.000
FFL +1.000
1
C4
100DP STONE PAVILLION
CENTRAL COURTYARD
FFL +0.800
3824
C11
P
100D
FFL -1.000
200DP
DINING AREA
200DP
FFL +0.500 G.T
355
D6
200DP
G.T
0
C5
OPEN AIR KITCHEN
A3
FFL +0.800
OWNER
A4
D7
3374
5900
UCSI_UNIVERSITY
OPEN AIR ARCHAEOLOGY GARDEN
C6
FFL +0.000 FARM 500DP
G.T
4551
FFL +0.000
A14
RAMP DOWN 200DP
A15
11050
200DP
C11a
C7
2
13400
A7
G.T
D8
B1
F1
A6
0
D9
280
C8
CAFE SITTING AREA
4800
3825
A5
FFL +1.000
C11b
ARCHITECT
ARCHAEOLOGY EMBODIED FFL +1.000 G.T
A13 SPIRITUAL COURTYARD
7510
ELEMENTAL EXHIBITION
FFL +0.700
A16
G.T
A17
5850
G.T
A18
4725
A19
9825
4350
FFL +1.000
60
C12
100DP MALE W.C ADMIN
LIFT LOBBY
LIFT CORE
FFL +0.800
CAFE KITCHEN
FFL +1.000
FFL +1.000
3950
50
109
232
FFL +1.000
WORKSHOP FFL +1.000
02 A300
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
A20
FEMALE W.C
01 A400
FFL +0.800
200DP
BIOFACT INTRODUCTION FFL +1.000
C13
WORKSHOP LOBBY FFL +1.000
FFL +1.000
ATRIUM FFL +1.000
TEMPORARY EXHIBITION
3300
D9
WORKSHOP MUSEUM
FFL +1.000
FFL +1.000
a
1a B1
A12b
5497
A12a
INTRODUCTION MUSEUM
6
537
D9
C14
ARCHITECT
b
JEFF'S_ARCHITECT
SHOP FFL +1.000
4
5 517
1
A9
c D9
B1
3 B1
B1
5
B1
0
245
FARM STORAGE
ENGINEER CONSULTANT
MUSEUM LOUNGE
6008
FFL +0.600
WORKSHOP COURTYARD
2 439
0
B1
JEFF'S_CONSULTANT
WORKSHOP 02
D1
1a
5
571
FFL +1.400
FFL +1.200
A9 1900
A7d
5675
5056
A7e
4169
4356
A7g
STORAGE
3100
A7h
9 684
5300
A7f
1
A7b A7c
D1
B8 A7a
FFL +0.000
MEETING AREA
C15
FFL +1.400
ROCK GARDEN ACCOMMODATION TYPE 03 FFL +0.200
ACCOMMODATION TYPE 01 FFL +0.200
ACCOMMODATION SERVICE FFL +1.000
2044
5000
C16
2 D1
3400
FFL +0.200
G.T
ACCOMMODATION TYPE 02
C17
ACCOMMODATION TYPE 04
FFL +0.200
2241
FFL +0.200
3
G.T
D1
G.T
G.T
G.T
G.T
7
C18
B1
b
B1
6
B1
STATUS
0
565
CONCEPT_TENDER
01 A300
0
835
a
B1
CHECKED BY
4
D1 WATER ROCK PAVILION
ENTRANCE CONTEMPLATION PAVILION
FFL +0.800
FFL +0.000
BAKHTIAR_AMIR
5 737
D1 a 0 580
02 A400
GA GROUND FLOOR PLAN (SANITARY SERVICES) 1:200
5 D1
b D1
01
DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
GFP_PLAN SANITARY_SERVICES
A0004 A800
DRAWING NO
NOTES
LEGEND 50mmØ HDPE PN12.5 SANITARY PIPE 25mmØ HDPE PN12.5 SANITARY PIPE 65mmØ HDPE PN16 VCP PIPE G.T
B4 B3
B2
B1
GULLY TRAP (TO ARCHITECT DETAIL)
5
282
PROPOSED MANHOLE (TO AUTHORITIES DETAIL) 1
288 4
G.T
204
G.T
D1 5
667 G.T
B8
D2
A1
0 500
G.T
A2 G.T
3
741
G.T
7350 G.T
B7
D3
A8
B6 2525
R.C FLAT ROOF
POLYCARBONATE ROOF
B5
5° ROOF
A9
7207
A10
4225
A11
12875
A12
4759
MARK
G.T
0
REVISION
AR724_WORKING_DRAWING GENERAL_ARRANGEMENT
C9
D4 552
B9
G.T
5
R.C FLAT ROOF
5650
G.T
4853
BY
G.T
B1
C2
C3
DATE
PROJECT TITLE G.T
5° ROOF
4
R.C FLAT ROOF
813
C1
ALUMINUM LOUVER SKYLIGHT
R.C FLAT ROOF
PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
TEMPERED GLASS SKYLIGHT
G.T
G.T
5° ROOF
C10
5° ROOF
R.C FLAT ROOF 5° ROOF
G.T
F
R.C FLAT ROOF
680
3350
5001
G.T
D5
C8
R.C FLAT ROOF
5°
O RO
1
R.C FLAT ROOF
C4 3824
C11 POLYCARBONATE ROOF R.C FLAT ROOF G.T
G.T
0
355
D6
5° ROOF
C5 A3
A4
D7
3374
5900
OWNER OF
5°
C6
5° ROOF
R.C FLAT ROOF
5° ROOF
UCSI_UNIVERSITY
G.T
4551
R.C FLAT ROOF
RO
A14
A15
11050
A7
C7 5°
A7
RO
B1
G.T
D8
A6
F1
OF
A5
2
13400
0
RC FLAT ROOF
D9
280
RC FLAT ROOF
C8
4800
3825
A7
OF
5°
RO
RC FLAT ROOF
5° ROOF
VOID
R.C FLAT ROOF G.T
A13
VOID
A16
7510
A17
5850
G.T
A18
4725
A19
9825
4350
ARCHITECT
A20
60
RO
232
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
5°
OF
5°
RO
OF
RC FLAT ROOF 5° ROOF
5° ROOF
01 A400 TEMPERED GLASS SKYLIGHT
VOID
A12a
RC FLAT ROOF
TEMPERED GLASS SKYLIGHT
A12b 3300
D9
5° ROOF
5° ROOF
a
1
B1
C13
RC FLAT ROOF
5497
01 A301
RO
3950
50
109
C12
RC FLAT ROOF
OF
5°
G.T
TEMPERED GLASS SKYLIGHT
6 537
b D9
C14 ARCHITECT
JEFF'S_ARCHITECT
4
1
A9
3
B1
c
D9
B1
RC FLAT ROOF
B1
5
B1
0
245
VOID
RC FLAT ROOF
6008
RC FLAT ROOF
ENGINEER CONSULTANT
5° ROOF
D1
1a
5
0
B1
VOID
A9
RC FLAT ROOF
OF
5°
B8
A7b A7c
A7d
1900
5056
A7e
4169
RO
OF
A7f 4356
A7g
3100
C15
A7h
RO
9
5300
5°
684
A7a
JEFF'S_CONSULTANT
RC FLAT ROOF
2 439
571
RC FLAT ROOF 5° ROOF
5° ROOF
RC FLAT ROOF
2044
5000
G.T
RC FLAT ROOF
2241
5° ROOF
3
G.T
RC FLAT ROOF
5° ROOF
D1
C17 G.T
2
RC FLAT ROOF
C16
D1
3400
RC FLAT ROOF 5° ROOF
G.T
G.T
G.T
7
C18
B1
B5 6
B1
0
565
STATUS
01 A300
0
835
CONCEPT_TENDER
B5
RC FLAT ROOF
D1
OF
5°
RO
4
CHECKED BY
BAKHTIAR_AMIR
R.C FLAT ROOF
5 737
C1 5° OF
RO
0 580
01 A401
ROOF PLAN (SANITARY SERVICES) 1:200
5
D1
C1
01
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
ROOF_PLAN SANITARY_SERVICES
A0004 A801
DRAWING NO
NOTES
A9
50mmØ HDPE PN12.5 SANITARY PIPE 25mmØ HDPE PN12.5 SANITARY PIPE
A7b A7c 1900
A7d
5675
A7e
5056
A7f
4169
65mmØ HDPE PN16 VCP PIPE
1 D1 A7g
4356
3100
A7h
9
5300
G.T
PROPOSED MANHOLE (TO AUTHORITIES DETAIL)
DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM
C15 3400
ACCOMMODATION TYPE 03 FFL +0.200
ACCOMMODATION TYPE 01 FFL +0.200
ACCOMMODATION SERVICE
A11
FFL +1.000
C16 2044
12875
A12
4759
G.T G.T
ACCOMMODATION TYPE 02
C17
G.T
ACCOMMODATION TYPE 04
FFL +0.200
FFL +0.200
G.T
G.T
C9
MALE W.C
G.T
FFL +1.600
200DP
C18
FEMALE W.C FFL +1.600
01
DATE
BY
REVISION
AR724_WORKING_DRAWING GENERAL_ARRANGEMENT PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
200DP
ARCHAEOLOGY CONFERENCE
MARK
PROJECT TITLE
5650
2241
G.T
GULLY TRAP (TO ARCHITECT DETAIL)
684
B8 A7a
LEGEND
2
B1
439
0 D1
1a
5
571
FFL +1.800
ACCOMODATION TYPICAL WC (SANITARY SERVICES)
SERVICE
1:100
C10 3350
G.T
B3 DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM
B2
B1
C11
DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM
B4
OWNER
UCSI_UNIVERSITY
5
282
G.T
G.T
1 288 4 G.T
204
CONSERVATION GALLERY 01
ARCHITECT
FFL +1.000 OKU PARKING G.T
D1
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
G.T
667
ARCHIVAL ROOM
5
FFL +1.000 LOADING BAY
G.T
B8
D2
A2
0
500
A1 7350 G.T
G.T
3
ARCHIVAL SEQUENCE GALLERY
G.T
741
FFL +1.000 G.T
B7
D3 B6 2525
4 813
C1
B5
W.C AREA
ARCHITECT
0
253
JEFF'S_ARCHITECT
4
322
0
B1
G.T
W.C AREA
C2
G.T
100DP FARM
P 00D
FFL +0.000
2
CONSERVATION GALLERY 02
G.T
ENGINEER CONSULTANT
D4
5 552
4851
FFL +1.000
B9
G.T
C3
2
498
JEFF'S_CONSULTANT G.T
ARCHEOLOGY LABORATORY FFL +1.000 CONTEMPLATION ROOM
G.T
C8
FFL +0.800
D5
FRONT COURTYARD G.T
FFL +0.000
G.T
DP
200
600DP
9825
LABORATORY STORAGE
C4
1 680
EMBODIED SPACE
STONE PAVILLION
CENTRAL COURTYARD
FFL +0.800
200DP
C12 MALE W.C
FFL +0.500
FFL +0.800 355
D6
0
WORKSHOP
3374
FFL +0.800
FEMALE W.C
A4
D7
C6
A3
FFL +1.000
OPEN AIR KITCHEN
5900
A20
4350
DP
DINING AREA
200DP
C5
A19
100
FFL -1.000 200DP
3824
FFL +1.000
3950
5001
200DP
FFL +0.800
C13
FARM 500DP
STATUS
CONCEPT_TENDER
4551
FFL +0.000
WORKSHOP MUSEUM
200DP
FFL +1.000 3825
13400
A6
A7
B
CHECKED BY
12
C14
D9
0 280
C8
BAKHTIAR_AMIR
D8
F1
A5
ARCHAEOLOGY EMBODIED FFL +1.000
02
LABOROTARY AND WC (SANITARY SERVICES) 1:100
5497
RAMP DOWN 200DP
C7
03
TYPICAL WC (SANITARY SERVICES) 1:100
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
GFP_PLAN SANITARY_SERVICES
A0004 A800A
DRAWING NO
MARK
DATE
BY
REVISION
PROJECT TITLE
PROJECT_02 DETAIL
OWNER
UCSI_UNIVERSITY
ARCHITECT
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
ARCHITECT
JEFF'S_ARCHITECT
DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM
B4 B3 2825
DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM
B2 2881
B1 2044
G.T
CONSERVATION GALLERY 01
ENGINEER CONSULTANT
FFL +1.000 OKU PARKING G.T
D1 ARCHIVAL ROOM
6675
FFL +1.000 LOADING BAY
G.T
B8
D2
A2
5000
A1
DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM
7350 G.T
G.T
ARCHIVAL SEQUENCE GALLERY
G.T
7413
FFL +1.000 G.T
D3
B7
B6
2530
A9
7207
A10
4225
A11
12875
2525
B5
W.C AREA
3224
4759
G.T
0
G.T
W.C AREA
C2
G.T
100DP
B1
100DP
C9
MALE W.C FARM G.T
200DP
CONSERVATION GALLERY 02
D4
5525
4851
4982
B9
G.T
FEMALE W.C FFL +1.600
ARCHEOLOGY LABORATORY
SERVICE
ORANG ASLI INTRO EXHIBITION
200DP
600DP
C10
LOBBY
FFL +1.000
LABORATORY STORAGE
G.T
ORANG ASLI ELEMENT MUSEUM
FFL +1.000
FFL +1.000
FFL +1.000
6801
EMBODIED SPACE
3350
5001
FFL +1.800
200DP
D5
G.T
200DP
ARCHAEOLOGY CONFERENCE
FFL +1.000
C8 G.T
FFL +0.000
FFL +1.600
200DP
FFL +1.000
G.T
CONTEMPLATION ROOM FFL +0.800
200DP
FRONT COURTYARD
C4
5650
FFL +0.000
C3
100DP STONE PAVILLION FFL +0.800
100DP
FFL -1.000
3824
DINING AREA FFL +0.500
G.T
OPEN AIR KITCHEN FFL +0.800
A4
D7
3374
5900
G.T
3550
D6
200DP
A3
C11
CENTRAL COURTYARD 200DP
200DP
C5
JEFF'S_CONSULTANT
A12
8134
C1
A8
OPEN AIR ARCHAEOLOGY GARDEN
C6
FFL +0.000 FARM 500DP
G.T
4551
FFL +0.000
A14
RAMP DOWN 200DP
A15
11050
200DP
C11a
C7
2
13400
A7
G.T
D8
B1
F1
A6
D9
2800
C8
CAFE SITTING AREA
4800
3825
A5
FFL +1.000
C11b
ARCHAEOLOGY EMBODIED FFL +1.000 G.T
A13 SPIRITUAL COURTYARD FFL +0.700
A16
7510
ELEMENTAL EXHIBITION
A17
5850
G.T
A18
4725
A19
9825
A20
4350
FFL +1.000
0
C12
100DP
0
ADMIN
LIFT LOBBY
FFL +1.000
FFL +1.000
MALE W.C FFL +0.800
LIFT CORE
CAFE KITCHEN FFL +1.000
3950
2326
1095
02 A300
G.T
WORKSHOP FFL +1.000 FEMALE W.C
01 A400
FFL +0.800
200DP
BIOFACT INTRODUCTION FFL +1.000
C13
WORKSHOP LOBBY FFL +1.000 ATRIUM FFL +1.000
TEMPORARY EXHIBITION
3300
D9
WORKSHOP MUSEUM
FFL +1.000
FFL +1.000
a
1a
A12b
5497
A12a
INTRODUCTION MUSEUM FFL +1.000
B1
5376
b D9
C14
SHOP FFL +1.000
4
5175
D9
A9
3
c
B1
FARM STORAGE FFL +0.600
B1
5
B1
2450
1
B1
6008
MUSEUM LOUNGE
WORKSHOP 02 FFL +1.400
D1
B1
WORKSHOP COURTYARD
4392
0
FFL +1.200
A9 1900
A7d 5675
A7e
A7f
5056
STORAGE
1
A7b A7c
D1
4169
5300
4356
A7g
3100
A7h
6849
B8 A7a
FFL +0.000
1a
5715
MEETING AREA
C15
FFL +1.400
ACCOMMODATION TYPE 03 FFL +0.200
ACCOMMODATION TYPE 01 FFL +0.200
FFL +1.000
2044
5000
STATUS
G.T
ACCOMMODATION TYPE 02
C17
ACCOMMODATION TYPE 04
FFL +0.200
3
2241
FFL +0.200
D1
G.T
2
ACCOMMODATION SERVICE
C16
G.T
D1
3400
ROCK GARDEN FFL +0.200
G.T
G.T
G.T
7
C18
B1
b
CONCEPT_TENDER
B1
6
B1
5650
01 A300
8350
a
B1
4 D1
WATER ROCK PAVILION
ENTRANCE CONTEMPLATION PAVILION
FFL +0.800
FFL +0.000
7375
D1a 5800
02 A400
5
D1
b
D1
DISCHARGE TO THE NEAREST MAIN SANITARY SYSTEM
CHECKED BY
BAKHTIAR_AMIR
01
SANITARY SCHEMATIC NTS
02
SELECTED SANITARY SERVICES LAYOUT NTS
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
SANITARY
A0001 A802
DRAWING NO
NOTES
LEGEND 50mmØ HDPE PN12.5 INCOMING PIPE 65mmØ HDPE PN16 DISTRIBUTOR PIPE STOP COCK OR GATE VALVE
FROM INCOMING PIPE
NOTE THAT ALL REQUIREMENTS ARE TO BE CLARIFIED BY THE ARCHITECT AND AUTHORITIES OF THE DISTRICT
WATER METER
B4
M B3 B2
B1
5
282
1
288 4
204
CONSERVATION GALLERY 01 FFL +1.000 OKU PARKING
D1 667
ARCHIVAL ROOM
5
FFL +1.000 LOADING BAY
D2
B8 0
500
A2
MARK
D3 813
2525
4
B5
A8
0
253
4
322
0
A9
7207
A10
4225
PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
C9
WATER METER
P
200D
CONSERVATION GALLERY 02
200DP
D4
2
498
B9
5 552
4851
FFL +1.000
C3
FEMALE W.C
ARCHEOLOGY LABORATORY
SERVICE
C10
200DP P
200D
600DP
ORANG ASLI INTRO EXHIBITION
LOBBY
FFL +1.000
LABORATORY STORAGE
680
EMBODIED SPACE
ORANG ASLI ELEMENT MUSEUM
FFL +1.000
FROM INCOMING PIPE
3350
D5
C8
FRONT COURTYARD FFL +0.000
M
FFL +1.800
CONTEMPLATION ROOM FFL +0.800
200DP
ARCHAEOLOGY CONFERENCE
FFL +1.000
5001
AR724_WORKING_DRAWING GENERAL_ARRANGEMENT
A12
4759
MALE W.C
FARM
200DP
A11
12875
100DP
B1
100DP
FFL +0.000
REVISION
PROJECT TITLE
B7 B6
FFL +0.600
C2
BY
741
FFL +1.000
W.C AREA
C1
DATE
3
ARCHIVAL SEQUENCE GALLERY
7350
5650
A1
FFL +1.000
FFL +1.000
1
C4
100DP STONE PAVILLION
CENTRAL COURTYARD
FFL +0.800
3824
C11
P
100D
FFL -1.000 200DP
DINING AREA
200DP
FFL +0.500
OWNER
0
355
D6
200DP
C5 3374
FFL +0.800
A4
D7
A3
UCSI_UNIVERSITY
OPEN AIR KITCHEN
5900
OPEN AIR ARCHAEOLOGY GARDEN
C6
FFL +0.000 FARM 500DP
4551
FFL +0.000
A14
RAMP DOWN 200DP
A15
11050
200DP
C11a
C7
2
13400
A7
D8
B1
F1
A6
CAFE SITTING AREA
4800
3825
A5
FFL +1.000
ARCHITECT
0
D9
280
C8
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
C11b
ARCHAEOLOGY EMBODIED FFL +1.000
A13 SPIRITUAL COURTYARD
A16
7510
ELEMENTAL EXHIBITION
FFL +0.700
A17
5850
A18
4725
A19
9825
A20
4350
FFL +1.000
0
C12
100DP MALE W.C ADMIN
LIFT LOBBY
FFL +1.000
LIFT CORE
CAFE KITCHEN
FFL +1.000
FFL +1.000
3950
50
109
6 232
WORKSHOP FFL +1.000
02 A300
FEMALE W.C
01 A400
200DP
BIOFACT INTRODUCTION FFL +1.000
C13
WORKSHOP LOBBY FFL +1.000
FFL +1.000
ATRIUM FFL +1.000
TEMPORARY EXHIBITION
3300
D9
WORKSHOP MUSEUM
FFL +1.000
FFL +1.000
ARCHITECT
a
1a B1
A12b
5497
A12a
INTRODUCTION MUSEUM
JEFF'S_ARCHITECT 537
b D9
C14
6
SHOP FFL +1.000
4
517
B1
5
A9
3 B1
c
D9
1 B1
5
B1
0
245
ENGINEER CONSULTANT
JEFF'S_CONSULTANT
FARM STORAGE MUSEUM LOUNGE
6008
FFL +0.600
WORKSHOP COURTYARD
439
A9 5056
A7e
4169
STORAGE
A7g
3100
A7h
MEETING AREA
C15
FFL +1.400
3400
ACCOMMODATION TYPE 03 ACCOMMODATION TYPE 01
2
2044
5000
C16
D1
M
9
4356
684
5300
A7f
1
A7d
5675
D1
A7b1900A7c
ACCOMMODATION SERVICE
FROM INCOMING PIPE
FFL +1.400
FFL +1.200
2
FFL +0.200
WATER METER
WORKSHOP 02
0
ROCK GARDEN
B
D1
B8 A7a
FFL +0.000
11a
5
571
ACCOMMODATION TYPE 02 ACCOMMODATION TYPE 04
3
2241
D1
C17
7
C18
B1
b
B1
STATUS
CONCEPT_TENDER 6
B1
0
565
01 A300
0
835
CHECKED BY
a
B1
BAKHTIAR_AMIR 4
D1 WATER ROCK PAVILION
ENTRANCE CONTEMPLATION PAVILION
FFL +0.800
FFL +0.000
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
5
737
D1 a 0
580
02 A400
GA GROUND FLOOR PLAN (SANITARY SERVICES) 1:200
5
D1
b
D1
01
DRAWING TITLE
PRJ NO
GFP_PLAN WATER_SUPPLY
A0004 A803
DRAWING NO
NOTES
c D9 LEGEND
FARM STORAGE MUSEUM LOUNGE
50mmØ HDPE PN12.5 INCOMING PIPE
6008
FFL +0.600
11a
5
571
A7b A7c 1900
A12
4759
NOTE THAT ALL REQUIREMENTS ARE TO BE CLARIFIED BY THE ARCHITECT AND AUTHORITIES OF THE DISTRICT
C9
MALE W.C
5675
WATER METER
FEMALE W.C
5650
5300
M
3400
200DP
ACCOMMODATION TYPE 01 SERVICE
C10
C16
MARK
FROM INCOMING PIPE
3350
2044
M
INCOMING PIPE
A11
A9
C15
WATER METER
FFL +0.200
STOP COCK OR GATE VALVE
B
B8 A7a ROCK GARDEN
65mmØ HDPE PN16 DISTRIBUTOR PIPE
ACCOMMODATION TYPE 02
C17
DATE
BY
REVISION
PROJECT TITLE
AR724_WORKING_DRAWING GENERAL_ARRANGEMENT PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
2241
C11
C18
OWNER
UCSI_UNIVERSITY
01 A300
01
ACCOMODATION TYPICAL WC (WATER SUPPLY) 1:100
D3
ARCHITECT
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
W.C AREA FFL +0.600
2525
4
813
C1 C2
100DP FARM FFL +0.000
CONSERVATION GALLERY 02
D4
FFL +1.000
4851
ARCHITECT
JEFF'S_ARCHITECT
C3
A19
CONTEMPLATION ROOM
A20
4350
C8
FFL +0.800
C12
FRONT COURTYARD
MALE W.C
FFL +0.000
600DP EMBODIED SPACE
C4
ENGINEER CONSULTANT
JEFF'S_CONSULTANT 3950
5001
200DP
FEMALE W.C
STONE PAVILLION
C13
FFL +0.800
3824
200DP 200DP
DINING AREA FFL +0.500
5497
200DP
C5
OPEN AIR KITCHEN
3374
5900
C6
A3
FFL +0.800
A4
C14 500DP
CHECKED BY
4551
FFL +0.000
STATUS
CONCEPT_TENDER
FARM
BAKHTIAR_AMIR 200DP
C7 3825
02
KITCHEN AND WC (WATER SUPPLY) 1:100
13400
03
TYPICAL WC (WATER SUPPLY) 1:100
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
GFP_PLAN WATER_SUPPLY
A0004 A803A
DRAWING NO
NOTES
LEGEND WATER SUPPLY FOR SPRINKLER UPRIGHT SPRINKLER HEAD-UL LISTED AND FM APPROVED HOSE REEL
B4 B3
B2
B1
CO2 FIRE EXTINGUISHER
5
282
NOTE THAT THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE OTHER MECHANICAL SERVICES DRAWINGS, ELECTRICAL ARCHITECTURAL, THE PROPOSED FIRE FIGHTING DESIGN IS BASED ON UBBL THE SPACES HIGHLIGHTED IN RED DASHED LINES ARE THE PRIORITY SPACES BASED ON UBBL FIRE FIGHTING PURPOSE GROUP
1
288
4
204
CONSERVATION GALLERY 01 FFL +1.000 OKU PARKING
D1 667
ARCHIVAL ROOM
5
FFL +1.000 LOADING BAY
D2
B8 500 0
A2
3
ARCHIVAL SEQUENCE GALLERY
741
FFL +1.000
7350
D3
W.C AREA
B6
FFL +0.600
2525
4 813
C1 C2
MARK
B7 B5
A8
TO WATER TANK WITH PUMP ACCESSORIES SCHEMATICS
0
253
4 322
0
A9
7207
A10
4225
A11
12875
A12
4759
C9
MALE W.C
FARM
P
200D
CONSERVATION GALLERY 02
REVISION
D4
2
498
5
552
B9
C3
PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
FFL +1.600
200DP
FFL +1.000
4851
BY
AR724_WORKING_DRAWING GENERAL_ARRANGEMENT
100DP
B1
100DP
FFL +0.000
DATE
PROJECT TITLE
FEMALE W.C
5650
A1
FFL +1.600
ARCHEOLOGY LABORATORY
200DP
ARCHAEOLOGY CONFERENCE FFL +1.800
CONTEMPLATION ROOM
FFL +0.000
C10
200DP
P
600DP
HR
200D
ORANG ASLI INTRO EXHIBITION
LOBBY
FFL +1.000
LABORATORY STORAGE
ORANG ASLI ELEMENT MUSEUM
FFL +1.000
FFL +1.000
1
680
EMBODIED SPACE
3350
TO WATER TANK WITH PUMP ACCESSORIES
FRONT COURTYARD
SERVICE
C8
FFL +0.800
D5
5001
200DP
C4
100DP STONE PAVILLION
CENTRAL COURTYARD
FFL +0.800
3824
C11
P
100D
FFL -1.000
200DP
DINING AREA
200DP
FFL +0.500
200DP
0
355
D6
HR
C5 3374
FFL +0.800
A4
UCSI_UNIVERSITY
D7
A3
OWNER
HR
OPEN AIR KITCHEN
5900
OPEN AIR ARCHAEOLOGY GARDEN
C6
FFL +0.000 FARM 500DP
4551
FFL +0.000
A14
RAMP DOWN 200DP
A15
11050
200DP
C11a
C7
2
13400
A5
A6
A7
D8
F1
B1
0
D9
280
C8
CAFE SITTING AREA
4800
3825
FFL +1.000
ARCHITECT
C11b
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
ARCHAEOLOGY EMBODIED FFL +1.000
A13 SPIRITUAL COURTYARD
A16
7510
ELEMENTAL EXHIBITION
FFL +0.700
A17
5850
A18
4725
A19
9825
A20
4350
FFL +1.000
0 326
MALE W.C ADMIN
LIFT LOBBY
FFL +1.000
LIFT CORE
FFL +0.800
CAFE KITCHEN
FFL +1.000
FFL +1.000
3950
50
109
C12
100DP
2
WORKSHOP FFL +1.000 FEMALE W.C FFL +0.800
200DP
BIOFACT INTRODUCTION FFL +1.000
C13
WORKSHOP LOBBY FFL +1.000
FFL +1.000
ATRIUM FFL +1.000
TEMPORARY EXHIBITION
3300
a D9
1a
B1
A12b
WORKSHOP MUSEUM
FFL +1.000
FFL +1.000
5497
A12a
INTRODUCTION MUSEUM
ARCHITECT
6
537
D9
C14
JEFF'S_ARCHITECT
b
SHOP FFL +1.000
4
517
B1
5
1
A9
3
B1
c
D9
B1
5
B1
0
245
ENGINEER CONSULTANT
FARM STORAGE
JEFF'S_CONSULTANT
MUSEUM LOUNGE
6008
FFL +0.600
WORKSHOP 02
D1
1a
5
0
B1
WORKSHOP COURTYARD
439
571
A9 A7d
5675
5056
A7e
4169
4356
A7g
STORAGE
3100
A7h
9 684
5300
A7f
1
1900
D1
A7b A7c
MEETING AREA
C15
FFL +1.400
ROCK GARDEN
HR
ACCOMMODATION TYPE 03 ACCOMMODATION TYPE 01
ACCOMMODATION SERVICE
2
D1
3400
FFL +0.200
FFL +1.400
FFL +1.200
2
B8 A7a
FFL +0.000
2044
5000
C16 C17
ACCOMMODATION TYPE 02
ACCOMMODATION TYPE 04
HR
3
2241
D1
TO WATER TANK WITH PUMP ACCESSORIES
7
C18
B1
b
B1
STATUS
6 B1
CONCEPT_TENDER
0
565
01 A300
0
835
a
B1
CHECKED BY
4 D1
BAKHTIAR_AMIR WATER ROCK PAVILION
ENTRANCE CONTEMPLATION PAVILION
FFL +0.800
FFL +0.000
5
737
D1 a 0
580
02 A400
GA GROUND FLOOR PLAN (FIRE FIGHTING) 1:200
5
D1
b
D1
01
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
GFP_PLAN FIRE_FIGHTING
A0004 A804
DRAWING NO
TO WATER TANK WITH PUMP ACCESSORIES
WATER SUPPLY FOR SPRINKLER
C8
UPRIGHT SPRINKLER HEAD-UL LISTED AND FM APPROVED HOSE REEL
600DP
CO2 FIRE EXTINGUISHER
EMBODIED SPACE
NOTE THAT THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE OTHER MECHANICAL SERVICES DRAWINGS, ELECTRICAL ARCHITECTURAL, THE PROPOSED FIRE FIGHTING DESIGN IS BASED ON UBBL THE SPACES HIGHLIGHTED IN RED DASHED LINES ARE THE PRIORITY SPACES BASED ON UBBL FIRE FIGHTING PURPOSE GROUP
STONE PAVILLION FFL +0.800 200DP
DINING AREA FFL +0.500
200DP HR
OPEN AIR KITCHEN
5900
FFL +0.800
A4
MARK
DATE
BY
REVISION
PROJECT TITLE
AR724_WORKING_DRAWING GENERAL_ARRANGEMENT
500DP
PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
3
741
200DP
B7
200DP
B6 3825
A5
A6
4
322
OWNER
UCSI_UNIVERSITY
A7
DP
200
B9
552
RESTAURANT FIRE FIGHTING SCHEMATIC
5
01
B5
13400
TO WATER TANK WITH PUMP ACCESSORIES SCHEMATICS
0
253
2
498
1:75 ARCHEOLOGY LABORATORY
ARCHITECT
FARM STORAGE
6008
D5
MUSEUM LOUNGE
FFL +0.600
FFL +0.000
HR
680 1
WORKSHOP COURTYARD
439
0
FFL +1.200
2
A9 5056
4169
A7g
3100
A7h
ARCHITECT
JEFF'S_ARCHITECT
9
4356
HR
684
5300
A7f
0 355
5675
A7e
D6
A7d
1
A7b1900A7c
DP
100
D1
B8 A7a
B1
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
LABORATORY STORAGE
D1
1a
5
571
200
DP
D7
C15 HR
ENGINEER CONSULTANT
ACCOMMODATION SERVICE
JEFF'S_CONSULTANT
2
D1
3400
ACCOMMODATION TYPE 03 ACCOMMODATION TYPE 01
03
2044
0 500
C16 C17
ACCOMMODATION TYPE 02
1:100
ACCOMMODATION TYPE 04
3
2241
D1
HR
LABORATORY FIRE FIGHTING SCHEMATIC
C18 STATUS
CONCEPT_TENDER 01 A300
CHECKED BY
BAKHTIAR_AMIR
02
ACCOMODATION FIRE FIGHTING SCHEMATIC 1:100
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
GFP_PLAN FIRE_FIGHTING
A0004 A804A
DRAWING NO
FROM INCOMING WATER SUPPLY
MARK
DATE
BY
REVISION
PROJECT TITLE
AR724_WORKING_DRAWING GENERAL_ARRANGEMENT PROJECT DRAWING LAYOUT FORMAT AND FONT ARE TO BE CONSISTENT.
50 GPM 7 BAR GROUND WATER TANK Ø110 CWS FROM UNDER
JOCKEY PUMP
OWNER
UCSI_UNIVERSITY FC
CV PG
PS
FC
500 GPM 7 BAR
FC
CV
PG
ELECTRIC ENGINE
ARCHITECT
PG PS
FC
500 GPM 7 BAR
FC
PG
CV
PG
DIESEL ENGINE
PG
SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN-PELAN ADALAH MENURUT KEHENDAK-KEHENDAK, UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWARJANYA.
PS
FC ARCHITECT
JEFF'S_ARCHITECT
7 BAR PG ELECTRIC ENGINE
FC
ENGINEER CONSULTANT
CV
02
OS&Y OS&Y JOCKEY PUMP 50 GPM 7 BAR
TO SPRINKLERS
PUMP ACCESSORIES SCHEMATICS
JEFF'S_CONSULTANT
NTS
FC PG PS FC
CV OS&Y
OS&Y
FLOW METER STATUS
Ø75MM
CONCEPT_TENDER
CHECKED BY
01
PUMP ROOM DETAILS
BAKHTIAR_AMIR
NTS
DRAWN BY
DATE
SEE_THOO_JUN_HOE 1001645328
NOV_2021
DRAWING TITLE
PRJ NO
GFP_PLAN
A0004 A804A
DRAWING NO
p1a full project link : https://issuu.com/jeffreyseethoo/docs/task_1_site_shelter
p1b full project link : https://issuu.com/jeffreyseethoo/docs/tools_and_artefact_team_sharon
p2 full project link : https://issuu.com/jeffreyseethoo/docs/p2_urban_strategies_final
full project links
unit A sabe ms sharon_tutor mr james_studio master ar fira_co tutor mr yousef_co tutor ms esha_co tutor
final panelist ar anthea chen lim eu jin ts. sr khoo sui lai
credits
ucsi university degree in architecture bcrat end
2021