TAYLOR'S UNIVERSITY
DETAILING & WORKING DRAWINGS
E-PORTFOLIO NAME: JESSIE CHEN VERNERN STD ID: 0339153
IDS60804 SEM 4AUG2021
BACHELOR OF ARTS IN INTERIOR ARCHITECTURE (HONS)
CONTENTS
TABLE OF
1
ASSIGNMENT 3:
2
ASSIGNMENT 2:
3
ASSIGNMENT 1:
WORKING DRAWINGS & SYSTEM INTEGRATION PRECEDANT STUDIES: A BUREAU WORK FROM HOME: DOORS & WINDOWS
ASSIGNMENT
3
WORKING DRAWINGS & SYSTEM INTEGRATION
ION DUCT INTRO
THIS ASSIGNMENT REQUIRES ME TO PRODUCE A SERIES OF WORKING DRAWINGS INTEGRATE WITH THE COLLABORATIVE DESIGN MODULE, MULTIPLE LEARNING EXPERIENCE (MLE). THE SERIES OF TECHNICAL DRAWINGS ARE A COMPILATION OF MY PROPOSED OFFICE WHICH IS LOCATED AT LEVEL 2, TOWER A, JALAN TAYLOR'S, AND THE CLIENT IS LUNG FOUNDATION OF MALAYSIA. THIS PROJECT OBJECTIVE IS TO ENABLE US TO PRODUCE DOCUMENTS WITH AN INTEGRATION OF THE BUILDING SERVICES COMPONENTS BY WORKING TOGETHER IN THE DESIGN PROCESS AND IDENTIFY SOLUTIONS TO DESIGN NEEDS WITH INTERIOR DESIGN PROPOSAL OF APPROPRIATE BUILDING SCALE.
DRAWING LIST
NOTE:
PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE ITEM
DRAWING NO.
SHEET NAME
CURRENT REVISION
DATE
DESCRIPTION
ISSUED
1
DWG_DWD_JCVE_SOP_01
SETTING OUT PLAN
04
9.12.2021
ISSUED FOR CONSTRUCTION
NO
2
DWG_DWD_JCVE_FLP_02
FURNITURE LAYOUT PLAN
04
9.12.2021
ISSUED FOR CONSTRUCTION
NO
3
DWG_DWD_JCVE_SOA_03A
SCHEDULE OF ACCOMMODATION
03
9.12.2021
ISSUED FOR CONSTRUCTION
NO
4
DWG_DWD_JCVE_SOA_03B
SCHEDULE OF ACCOMMODATION
03
9.12.2021
ISSUED FOR CONSTRUCTION
NO
5
DWG_DWD_JCVE_FFP_04
FLOOR FINISHES PLAN
04
9.12.2021
ISSUED FOR CONSTRUCTION
NO
CHANGES
NO.
DATE
DESCRIPTION
CLIENT:
6
DWG_DWD_JCVE_FFE_05A
SCHEDULE OF FURNITURE, FIXTURES & EQUIPMENTS
7
DWG_DWD_JCVE_FFE_05B
SCHEDULE OF FURNITURE, FIXTURES & EQUIPMENTS
04
9.12.2021
ISSUED FOR CONSTRUCTION
NO
8
DWG_DWD_JCVE_FFE_05C
SCHEDULE OF FURNITURE, FIXTURES & EQUIPMENTS
04
9.12.2021
ISSUED FOR CONSTRUCTION
NO
04
9.12.2021
ISSUED FOR CONSTRUCTION
NO
9
DWG_DWD_JCVE_FFE_05D
SCHEDULE OF FURNITURE, FIXTURES & EQUIPMENTS
04
9.12.2021
ISSUED FOR CONSTRUCTION
NO
10
DWG_DWD_JCVE_FFE_05E
SCHEDULE OF FURNITURE, FIXTURES & EQUIPMENTS
04
9.12.2021
ISSUED FOR CONSTRUCTION
NO
LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
ARCHITECT: C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor INTERIOR DESIGN CONSULTANT:
11
DWG_DWD_JCVE_RCP_06
REFLECTED CEILING PLAN
04
9.12.2021
ISSUED FOR CONSTRUCTION
NO
12
DWG_DWD_JCVE_LEP_07
LIGHTING & ELECTRICAL PLAN
04
9.12.2021
ISSUED FOR CONSTRUCTION
NO
13
DWG_DWD_JCVE_SEC_08
SECTION A-A DRAWING
04
9.12.2021
ISSUED FOR CONSTRUCTION
NO
03
9.12.2021
ISSUED FOR CONSTRUCTION
NO
14
DWG_DWD_JCVE_BS1_09A
BESPOKE FURNITURE PLAN
15
DWG_DWD_JCVE_BS1_09B
BESPOKE FURNITURE ELEVATION
02
9.12.2021
ISSUED FOR CONSTRUCTION
NO
16
DWG_DWD_JCVE_BS1_09B
BESPOKE FURNITURE SECTION & DETAILS
04
9.12.2021
ISSUED FOR CONSTRUCTION
NO
17
DWG_DWD_JCVE_BOQ_010A
BILL OF QUANTITIES
02
9.12.2021
ISSUED FOR CONSTRUCTION
NO
PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR DRAWING LIST SCALE: N/A
DATE: 9 DEC 2021
CHECKED BY: MS. AZIAH
DRAWN BY: JESSIE CHEN VERNERN
DRAWING NO: N/A
REV. NO: 004
NOTE:
A2
A1
A4
A3
A5
NO.
B1
DATE
DESCRIPTION
3525MM(W) x 3000MM (H) FIXED CURTAIN WALL WITH ALUMINUM FINISH
CLIENT:
LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
CF-A
1067MM(W) x 2210MM (H) FIRE RATED SINGLE FLUSH DOOR
B2
200MM THK CONCRETE WALL IN PATTERNED WALLPAPER FINISH
CF-B
ARCHITECT: C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor
CF-D
A
CF-C
A
CF-C
INTERIOR DESIGN CONSULTANT:
MATTE CONCRETE FLOORING
CF-D
B3
PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor
CF-A
QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur
CF-F
CF-E
PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
B4 SYM
SOP 2F
2ND FLOOR SETTING OUT PLAN SCALE 1:100
DESCRIPTION
QTY
WALLS
SYM
DESCRIPTION
QTY
DESCRIPTION
QTY
2
1067MM (W) x 2210MM (H) FIRE RATED SINGLE FLUSH DOOR
2 2
CURVE SETTING FLOOR PLAN 200MM THK CONCRETE WALL
13
CF-A
PROPOSED CURVE FLOOR TYPE A
SYM DOOR
200MM THK REINFORCE CONCRETE WALL (FOR LIFT-SHEAR WALL)
7
CF-B
PROPOSED CURVE FLOOR TYPE B
1
915MM (W) x 2210MM (H) TIMBER FRAME SINGLE FLUSH DOOR
200MM THK BRICK WALL
4
CF-C
PROPOSED CURVE FLOOR TYPE C
2
760MM (W) x 2210MM (H) TIMBER FRAME SINGLE FLUSH DOOR
2
26
CF-D
PROPOSED CURVE FLOOR TYPE D
2
914MM (W) x 2210MM (H) TIMBER FRAME SINGLE FLUSH DOOR IN MATTE FINISH
2
NEW PROPOSED FLOOR LINE
-
CF-E
PROPOSED CURVE FLOOR TYPE E
1
702MM (W) x 2108MM (H) CUBICLE TOILET DOOR
4
BEESPOKE FURNITURE
1
CF-F
PROPOSED CURVE FLOOR TYPE F
1
2000MM (W) x 2134MM (H) ALUMINUM FRAME SLIDING DOOR
1
1800MM (W) x 2100MM (H) FIRE RATED DOUBLE DOOR
2
ALUMINUM FIXED CURTAIN WALL
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR SETTING OUT PLAN SCALE: 1:100
DATE: 9 DEC 2021
CHECKED BY:
DRAWN BY: JESSIE CHEN VERNERN
MS. AZIAH
DRAWING NO: DWG_DWD_JCVE_SOP_01
REV. NO: 005
NOTE:
A1
A2
A4
A3
A5
B1
NO. 3525MM(W) x 3000MM (H) FIXED CURTAIN WALL WITH ALUMINUM FINISH
Porcelain Tiles
Polished Concrete
7m2
2
5m
Carpet
Carpet
Carpet
Carpet
5.45m2
7.06m2
7.06m2
5.45m2
Porcelain Tiles
28m 2
Carpet
CLIENT:
16.53m 2 Carpet
Porcelain Tiles
12.13m
7m2
LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
2
Polished Concrete
B2
DATE
DESCRIPTION
1067MM(W) x 2210MM (H) FIRE RATED SINGLE FLUSH DOOR
5m2
Porcelain Tiles
5m2
ARCHITECT: Carpet
Matte Concrete
Polished Concrete
28.81m 2
25.43m
2
16.93m
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor
2
Matte Concrete
12.45m
2
Matte Concrete
6m2
22.23m
2
Polished Concrete
INTERIOR DESIGN CONSULTANT:
Matte Concrete
2
4m
10.71m
2
PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor
MATTE CONCRETE FLOORING Carpet
16.53m 2
6m2
B3
Polished Concrete
4m2
Carpet + Rubber Stud
300MM (D) x 750MM (H) ROUND STOOL IN METAL FINISH
2
10.90m
Rubber Stud
6.05m2
Porcelain Tiles
Rubber Stud
21.64m
7.05m2
Porcelain Tiles
2
15.38m
2
Polished Concrete
24m
2
QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
B4 SYM
DESCRIPTION
QTY
LOOSE FURNITURE
FLP 2F
2ND FLOOR FURNITURE LAYOUT PLAN PLAN SCALE 1:100
SYM
DESCRIPTION
QTY
1
PEBBLE CHAIR SERIES
ASCASO BIG DREAM PLUS COFFEE MACHINE
DESCRIPTION
QTY
BUILD-IN FURNITURE
LOOSE FURNITURE
HISENSE 140L SINGLE DOOR REFRIGERATOR RR158D4AWB
SYM
8
LED LIGHT BUTTON INTERACTIVE WALL
2
ORGANIC SHAPED RECEPTION TABLE
1
1
420MM (W) x 860MM (H) CUSHION OFFICE CHAIR
SAMSUNG CONVECTION MICROWAVE OVEN WITH HOT BLAST 35L
1
750MM (D) x 950MM (H) HIGH STAND BAR TABLE
3
LEVELED DISPLAY TABLE
1
LUXURY CERAMIC WASH BASIN
1
700MM (H) x 50MM THK ORGANIC SHAPED OAK WOOD TABLE
3
FLOATING SHELVE WITH BOARD
1
800MM (D) x 760MM (H) ROUND CONVERTIBLE SOFA CHAIR
3
SOUNDPROOF POD FOR ONE
300MM (D) x 750MM (H) ROUND STOOL IN METAL FINISH
7
MODULAR OFFICE DESK (CONVERTIBLE)
12
450MM (H) x 500MM (D) ROUND FABRIC STOOL IN BEIGE FINISH
DOPAH 8K ALR ULTRA THIN FIXED FRAME PROJECTION SCREEN 16:9
14
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR FURNITURE LAYOUT PLAN SCALE: 1:100
DATE: 9 DEC 2021
2
CHECKED BY:
SOUNDPROOF POD FOR TWO
2
MS. AZIAH
DRAWN BY: JESSIE CHEN VERNERN
FLOATING WALL SIDE DESK
1
7
PIPE STRUCTURE ACTIVITY AREA WITH BUILD-IN TABLES AND STOOLS
1
1
BUILD-IN WOOD CABINET WITH MARBLE COUNTERTOP
1
DRAWING NO: DWG_DWD_JCVE_FLP_02
REV. NO: 005
PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S
NOTE:
SCHEDULE OF ACCOMMODATION ITEMS
DESCRIPTION
AIR CONDITIONING
NO. OF OCCUPANTS
NO. OF ROOMS
AREA FOR 1 ROOM (m^2)
TOTAL AREA (m^2)
GROUND FLOOR A A1
PUBLIC SPACES FIRE STAIRCASE 1
-
10
1
24m2
24m2
A2
FIRE STAIRCASE 2
-
10
1
28m2
28m2
A3 A4
LIFT
-
4
LIFT LOBBY
10
A5
OKU TOILET FEMALE TOILET MALE TOILET
Y -
A6 A7 A8
-
1 2
2
2 1
6m 28.81m2
12m 28.81m2
1 1
5m2 7m2
5m2 7m2
1 1
2
2
7m
7m
2.93m2
2.93m2
RECEPTION
Y
2 10
Y Y Y
10 5 10
1 1 1
3.69m2
3.69m2
A10 A11
WAITING AREA INFORMATION AREA OBJECT 1- SENSE
2.41m2 3m2
2.41m2
A12 A13 A14
OBJECT 2- THE A.D.A.P.T OBJECT 3- QUILLGREENERY RESTING AREA
Y Y
10 10
1 1
3m2 3m2
3m2 3m2
Y
10
1
3m2
3m2
B B1
UTILITIES DRY RISER ROOM
-
3
1
4m2
B2
M&E ROOM REFUSE CHAMBER ROOM
-
3
1
4m2 4m2
-
3
1
5m2
5m2
A9
B3
NO.
CLIENT:
LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
3m2
4m2
ARCHITECT: C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor INTERIOR DESIGN CONSULTANT: PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor
MEZZANINE FLOOR A A1
PUBLIC SPACES FIRE STAIRCASE 1
-
10
1
24m2
A2
FIRE STAIRCASE 2
-
10
1
28m2
24m2 28m2
A3 A4
LIFT
-
4
LIFT LOBBY
10
6m2 28.81m2
12m2 28.81m2
A5 A6 A7 A8
OKU TOILET FEMALE TOILET MALE TOILET OBSERVATION DECK
Y -
2 1
2
1 1
5m2 7m2
5m2 7m2
-
1 1
7m2
7m2
Y
2 10
26.41m2
26.41m2
A9
INTERACTIVE BOOTH
Y
20
1
36.83m2
36.83m2
Y
10
1
48m2
48m2
B
WINDOW RESTING SEATS AREA UTILITIES
B1
DRY RISER ROOM
-
3
1
4m2
B2
M&E ROOM REFUSE CHAMBER ROOM
-
3
1
4m2 4m2
-
3
1
5m2
5m2
A10
B3
1
DATE
DESCRIPTION
2
4m2
QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR SCHEDULE OF ACCOMMODATION SCALE: N/A
DATE: 9 DEC 2021
CHECKED BY:
DRAWN BY: JESSIE CHEN VERNERN
MS. AZIAH
REV. NO: DRAWING NO: DWG_DWD_JCVE_SOA_03A 003
SUB TOTAL
381.89m2
PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S
NOTE:
SCHEDULE OF ACCOMMODATION ITEMS
DESCRIPTION
AIR CONDITIONING
NO. OF OCCUPANTS
NO. OF ROOMS
AREA FOR 1 ROOM (m^2)
TOTAL AREA (m^2)
-
10
1
24m2
24m2
2
2
2ND FLOOR A
PUBLIC SPACES
A1
FIRE STAIRCASE 1
NO.
A2
FIRE STAIRCASE 2
-
10
1
28m
28m
A3
LIFT
-
4
2
6m2
12m2
A4
LIFT LOBBY
Y
10
1
28.81m2
28.81m2
A5
OKU TOILET
-
1
1
2
5m
5m2
A6
FEMALE TOILET
-
2
1
7m2
7m2
A7
MALE TOILET
-
2
1
7m2
7m2
B
UTILITIES
B1
DRY RISER ROOM
-
3
1
4m2
4m2
B2
M&E ROOM
-
3
1
4m2
4m2
B3
REFUSE CHAMBER ROOM
-
3
1
5m2
5m2
B4
PUMP ROOM
-
3
1
5m2
5m2
C
OFFICE FACILITIES
C1
RECEPTION
Y
4
1
12.45m2
12.45m2
C2
LOUNGE
Y
6
2
16.53m2
33.06m2
C3
CYCLE OF ART
Y
2
1
7.05m2
7.05m2
C4
MERCHANT CORNER
Y
2
1
6.05m2
6.05m2
C5
SOLO POD
Y
1
2
5.45m2
10.90m2
C6
CONSULTATION POD
Y
2
2
7.06m2
14.12m2
C7
STANDING CONSULTATION
Y
6
1
12.13m2
12.13m2
C8
EVENT SPACE
Y
20
1
22.23m2
22.23m2
C9
ACTIVITY AREA
Y
10
1
21.64m2
21.64m2
C10
PANTRY
Y
10
1
15.38m2
15.38m2
C11
PRINTING + FILE STATION
Y
4
1
10.90m2
10.90m2
C12
WORK SPACE 1
Y
7
1
25.43m2
25.43m2
2
2
DATE
DESCRIPTION
CLIENT: LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
ARCHITECT: C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor INTERIOR DESIGN CONSULTANT:
C13
WORK SPACE 2
Y
3
1
10.71m
10.71m
C14
MEETING ROOM
Y
9
1
16.93m2
16.93m2
PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR SCHEDULE OF ACCOMMODATION SCALE: N/A
DATE: 9 DEC 2021
CHECKED BY:
DRAWN BY: JESSIE CHEN VERNERN
MS. AZIAH
C15 GRAND TOTAL
2
730.68m
REV. NO: DRAWING NO: DWG_DWD_JCVE_SOA_03B 003
A2
A1
A4
A3
NOTE:
A5
B1
NO.
3525MM(W) x 3000MM(H) FIXED CURTAIN WALL WITH ALUMINUM FINISH
DATE
DESCRIPTION
CLIENT: LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
B2 3MM THK BLUSH GRADIENT DESIGNER CARPET
A
ARCHITECT: C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor
A
INTERIOR DESIGN CONSULTANT: PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor
4.5MM THK WHITE RUBBER STUD FLOORING
B3
5MM THK HEXAGON SHAPED TILES IN WHITE MATTE FINISH
QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
B4
FFP 2F
2ND FLOOR FLOOR FINISHES PLAN SYM
SCALE 1:100
DESCRIPTION 10MM THK OAK WOOD FLOORING FOR STEPS
QTY
SYM
DESCRIPTION
QTY
8
POLISHED CONCRETE
7
200MM x 200MM x 5MM THK PATTERNED PORCELAIN TILES (PINK)
1
3MM THK SEMICIRCLE PATTERN BLUSH DESIGNER CARPET
8
200MM x 200MM x 5MM THK PATTERNED TILES IN MATTE FINISH (WHITE)
1
3MM THK BLUSH GRADIENT DESIGNER CARPET
2
5MM THK HEXAGON SHAPED TILES IN MATTE FINISH (WHITE)
1
4.5MM THK WHITE RUBBER STUD FLOORING
5
NET FLOORING
7
MATTE CONCRETE
3
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR, FLOOR FINISHES PLAN SCALE: 1:100
DATE: 9 DEC 2021
CHECKED BY:
DRAWN BY: JESSIE CHEN VERNERN
MS. AZIAH
DRAWING NO: DWG_DWD_JCVE_FFP_04
REV. NO: 004
PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S
NOTE:
SCHEDULE OF FURNITURE, FITTINGS & EQUIPMENTS (FF&E) FOR 2ND FLOOR OFFICE AREA ITEMS
IMAGE
CODING
DESC
AREA
QTY
REF.
BOX HILL FURNITURE 1
LF1
PEBBLE SERIES CHAIR
LOUNGE
2
LINK: HTTPS://SHOPBOXHILL.COM/ CONTACT : +1 (520) 351-0053
NO.
DATE
DESCRIPTION
CLIENT:
LUNG FOUNDATION OF MALAYSIA SUITE 3B-15-7, LEVEL 15, BLOCK 3B PLAZA SENTRAL, JALAN STESEN SENTRAL 5, 50470 KL
FURNITURE DIRECT SDN BHD 2
LF2
420MM (W) x 860MM (H) CUSHION OFFICE CHAIR
RECEPTION MEETING ROOM WORK SPACE 2
14
ADDRESS: NO.16-G, JALAN PJU 5/20B, THE STRAND, KOTA DAMANSARA, 47810 PETALING JAYA, SELANGOR.
ARCHITECT: C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,PUSAT PERDAGANGAN, DANA 1, JALAN PJU 1A/46, 47301 PJ, SELANGOR
CONTACT : +(603) 6151 6336
FURNITURE DIRECT SDN BHD 3
LF3
750MM (D) x 950MM (H) HIGH STAND BAR TABLE
STANDING CONSULTATION
3
ADDRESS: NO.16-G, JALAN PJU 5/20B, THE STRAND, KOTA DAMANSARA, 47810 PETALING JAYA, SELANGOR. CONTACT : +(603) 6151 6336
TEAKVOGUE MALAYSIA SDN BHD 4
LF4
700MM (H) x 50MM THK ORGANIC SHAPED OAK WOOD TABLE
WORK SPACE 1
3
ADDRESS: 9-1, BLOCK A, JALAN NOVA K U/5 K, SUBANG BESTARI, 40150 SHAH ALAM, SELANGOR CONTACT : +(603) 7831 2033
INTERIOR DESIGN CONSULTANT: PINS STUDIO SDN BHD D 3-3, PUSAT KOMERSIAL PARKLANE, JALAN SS 7/26, 47301 PETALING JAYA, SELANGOR QUANTITY SURVEYOR: PKT QUANTITY SURVEYOR MALAYSIA SDN BHD SUITE E-11-05, PLAZA MONT' KIARA, 2 JALAN KIARA, 50480 KL PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR SCHEDULE OF FURNITURE, FITTINGS & EQUIPMENTS
PARK WAH FURNITURE SDN BHD 5
LF5
800MM (D) x 760MM (H) ROUND CONVERTIBLE SOFA CHAIR
PRINTING/FILE STATION
3
ADDRESS: NO.5, JALAN SUTERA 1/5A, KAWASAN PERINDUSTRIAN BUKIT ANGKAT, KAJANG, SELANGOR, MALAYSIA CONTACT : +(603) 8741 6892
SCALE: N/A
DATE: 9 DEC 2021
CHECKED BY: MS. AZIAH
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: DWG_DWD_JCVE_FFE_05A 003
PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S
NOTE:
SCHEDULE OF FURNITURE, FITTINGS & EQUIPMENTS (FF&E) FOR 2ND FLOOR OFFICE AREA ITEMS
IMAGE
CODING
DESC
AREA
QTY
REF.
IKEA MALAYSIA SDN BHD 6
LF6
30MM (D) x 750MM (H) ROUND STOOL IN METAL FINISH
PANTRY
7
ADDRESS: 2, JALAN PJU 7/2, MUTIARA DAMANSARA, 47800 PETALING JAYA, SELANGOR CONTACT : +1 (520) 351-0053
NO.
DATE
DESCRIPTION
CLIENT:
LUNG FOUNDATION OF MALAYSIA SUITE 3B-15-7, LEVEL 15, BLOCK 3B PLAZA SENTRAL, JALAN STESEN SENTRAL 5, 50470 KL
TEAKVOGUE MALAYSIA SDN BHD 7
8
LF7
LF8
MODULAR OFFICE DESK (CONVERTIBLE)
450MM (H) x 500MM (D) ROUND FABRIC STOOL IN BEIGE FINISH
MEETING ROOM WORK SPACE 2
WORK SPACE 1
12
7
ADDRESS: 9-1, BLOCK A, JALAN NOVA K U/5 K, SUBANG BESTARI, 40150 SHAH ALAM, SELANGOR CONTACT : +(603) 7831 2033
9
LF14
1200MM (W) x 60MM (H) x 20MM THK ALUMINUM MIRROR IDEATION BOARD
2
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,PUSAT PERDAGANGAN, DANA 1, JALAN PJU 1A/46, 47301 PJ, SELANGOR
INTERIOR DESIGN CONSULTANT: PINS STUDIO SDN BHD D 3-3, PUSAT THE CARRTER COLLECTION KOMERSIAL PARKLANE, LINK:HTTPS://CARRTERCOLLECTION.COM/ JALAN SS 7/26, 47301 CONTACT : 1-800-615-9620 PETALING JAYA, SELANGOR
TEAKVOGUE MALAYSIA SDN BHD STANDING CONSULTATION MEETING ROOM
ARCHITECT:
ADDRESS: 9-1, BLOCK A, JALAN NOVA K U/5 K, SUBANG BESTARI, 40150 SHAH ALAM, SELANGOR CONTACT : +(603) 7831 2033
QUANTITY SURVEYOR: PKT QUANTITY SURVEYOR MALAYSIA SDN BHD SUITE E-11-05, PLAZA MONT' KIARA, 2 JALAN KIARA, 50480 KL PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR SCHEDULE OF FURNITURE, FITTINGS & EQUIPMENTS
10
N/A
OFFICE SOUND SYSTEM FEATURING CEILING SPEAKERS AND RACK MOUNT BLUETOOTH MIXER AMPLIFIER
PURE RESONANCE AUDIO ALL
1
SCALE: N/A
LINK:SALES@PURERESONANCEAUDIO.COM CHECKED BY: CONTACT : +(866) 676-7804 MS. AZIAH
DATE: 9 DEC 2021 DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: DWG_DWD_JCVE_FFE_05B 003
PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S
NOTE:
SCHEDULE OF FURNITURE, FITTINGS & EQUIPMENTS (FF&E) FOR 2ND FLOOR OFFICE AREA ITEMS
IMAGE
CODING
DESC
AREA
QTY
REF.
SENHENG ELECTRIC SDN BHD 11
LF10
HISENSE 140L SINGLE DOOR REFRIGERATOR RR158D4AWB
PANTRY
1
ADDRESS: NO.23-G, 25-G, 25-1 & 25-2, JALAN SS2/75, 47300 PETALING JAYA, SELANGOR CONTACT : + 6016 299 1398
NO.
DATE
DESCRIPTION
CLIENT:
12
LF11
ASCASO BIG DREAM PLUS COFFEE MACHINE
PANTRY
1
LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
ASCASO BARCELONA CO LINK: HTTPS://WWW.ASCASO.COM ARCHITECT:
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor
INTERIOR DESIGN CONSULTANT:
SENHENG ELECTRIC SDN BHD 13
LF12
SAMSUNG CONVECTION MICROWAVE OVEN WITH HOT BLAST 35L
PANTRY
1
PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor
ADDRESS: NO.23-G, 25-G, 25-1 & 25-2, JALAN SS2/75, 47300 PETALING JAYA, SELANGOR CONTACT : + 6016 299 1398
QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur
14
LF13 LUXURY CERAMIC WASH BASIN OVAL WHITE
PANTRY
1
FRUUGO MALAYSIA LINK: HTTPS://WWW.FRUUGO.MY
PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR SCHEDULE OF FURNITURE, FITTINGS & EQUIPMENTS
EUBIQ MALAYSIA SDN BHD 15
N/A
EUBIQ POWERTRACK SH1 WITH POWER ADAPTOR
ALL
8
ADDRESS: NO, 11, JALAN PJU 3/46, SUNWAY DAMANSARA TECHNOLOGY PARK, 47810 PETALING JAYA, SELANGOR CONTACT : + 603 7803 8088
SCALE: N/A
DATE: 9 DEC 2021
CHECKED BY: MS. AZIAH
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: DWG_DWD_JCVE_FFE_05C 003
PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S
NOTE:
SCHEDULE OF FURNITURE, FITTINGS & EQUIPMENTS (FF&E) 2ND FLOOR OFFICE AREA ITEMS
11
IMAGE
CODING
DESC
AREA
LF9
LUMOS AURO CINEMA SHORT THROW PROJECTOR
MEETING ROOM
QTY
REF.
LUMOS PROJECTORS 1
LINK: HTTPS://WWW.LUMOSPROJECTOR.MY/
NO.
DATE
DESCRIPTION
CLIENT: LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
DIGITAL MALL PJ 12
LF9
DOPAH 8K ALR ULTRA THIN FIXED FRAME PROJECTION SCREEN 16:9
MEETING ROOM WORK SPACE 2
1
ADDRESS: LOT. G-06, GROUND FLOOR, DIGITAL MALL, NO. 2, JALAN 14/20, SEKSYEN 14, 46100 PETALING JAYA, SELANGOR CONTACT : + 603 7968 3311
AITO FIREWORK SDN. BHD 13
CD CONVENTIONAL SPRINKLER HEAD CHROME FINISH 15MM
ALL
67
ARCHITECT: C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor INTERIOR DESIGN CONSULTANT: PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor
ADDRESS: NO 11, JALAN ALFA D U6/D, PUSAT PERDAGANGAN SUBANG PERMAI, 40150 SHAH ALAM, SELANGOR CONTACT : +(603) 7831 4791
14
APOLLO MULTI DETECTOR 58000-700MAR
EMERGENCY STAIRCASE LIFT LOBBY RECEPTION ACTIVITY SPACE EVENT SPACE STANDING CONSULTATION
QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur
AITO FIREWORK SDN. BHD 14
ADDRESS: NO 11, JALAN ALFA D U6/D, PUSAT PERDAGANGAN SUBANG PERMAI, 40150 SHAH ALAM, SELANGOR
CONTACT : +(603) 7831 4791 DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR SCHEDULE OF FURNITURE, FITTINGS & EQUIPMENTS SCALE: N/A
DATE: 9 DEC 2021
ADDRESS: NO 11, JALAN ALFA D U6/D, PUSAT PERDAGANGAN SUBANG PERMAI, 40150 SHAH ALAM, SELANGOR
CHECKED BY: MS. AZIAH
DRAWN BY: JESSIE CHEN VERNERN
CONTACT : +(603) 7831 4791
REV. NO: DRAWING NO: DWG_DWD_JCVE_FFE_05D 004
AITO FIREWORK SDN. BHD 15
EXIT SIGN RECESS MOUNT
EMERGENCY STAIRCASE
PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
2
PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S
NOTE:
SCHEDULE OF FURNITURE, FITTINGS & EQUIPMENTS (FF&E) 2ND FLOOR OFFICE AREA ITEMS
IMAGE
CODING
DESC
AREA
DAIKIN FCF-C SERIES R32 INVERTER
REFER L&EP
QTY
REF.
DAIKIN MALAYSIA 16
7
ADDRESS: 31-1, JALAN CECAWI 6/19A, SEKSYEN 6, KOTA DAMANSARA, 47810, PETALING JAYA, SELANGOR, MALAYSIA, 47810 PETALING JAYA CONTACT : + (603) 6140 1826
NO.
DATE
DESCRIPTION
CLIENT: LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
MITSUBISHI PETALING JAYA 17
MITSUBISHI VENTILATION FAN DUCT CEILING MOUNTED TYPE VD-10Z4T6
OKU TOILET FEMALE TOILET MALE TOILET
5
ADDRESS: NO. 2A-E, JALAN TEKNOLOGI 3/1, KOTA DAMANSARA, 47810 PETALING JAYA, SELANGOR CONTACT : + (603) 6151 6333
ARCHITECT: C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor
INTERIOR DESIGN CONSULTANT:
18
LEDMAXX 105627 2X FLOOR SOCKET, CHILD SAFETY ALUMINIUM
REFER L&EP
10
PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor
CONRAD ELECTRIC LINK: HTTPS://WWW.CONRAD.COM/
QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur
19
RETOUCH WHITE ULTRA RIMLESS SWITCH 13A 15A BIG ROCKER UNIVERSAL USB SWITCHED SOCKET 2 GANG NEON SIRIM
RETOUCH ELECTRICS REFER L&EP
4
ADDRESS: 44, JALAN TPK 2/6, TAMAN PERINDUSTRIAN KINRARA, 47100 PUCHONG, SELANGOR
PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
CONTACT : +(603) 8074 7301 DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR SCHEDULE OF FURNITURE, FITTINGS & EQUIPMENTS SCALE: N/A
DATE: 9 DEC 2021
CHECKED BY: MS. AZIAH
DRAWN BY: JESSIE CHEN VERNERN
RETOUCH ELECTRICS 20
RETOUCH E031W – ULTRA 3 GANG 1 WAY
REFER L&EP
31
ADDRESS: 44, JALAN TPK 2/6, TAMAN PERINDUSTRIAN KINRARA, 47100 PUCHONG, SELANGOR CONTACT : +(603) 8074 7301
REV. NO: DRAWING NO: DWG_DWD_JCVE_FFE_05E 004
A1
A2
A4
A3
NOTE:
A5
B1
DATE
DESCRIPTION
CLIENT:
LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
B2 ARCHITECT:
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor
A
A
INTERIOR DESIGN CONSULTANT: PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor
B3 QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
B4
SYM
DESCRIPTION
QTY
AC / VENTILATION
RCP 2F
SCALE 1:100
DESCRIPTION
QTY
FIRE SAFETY / ELECTRICAL
SYM
DESCRIPTION
QTY
SYM
DESCRIPTION
QTY
PENDANT LIGHTS
DOWNLIGHTS
CASSETTE AIRCON (CEILING)
7
WATER SPRINKLE
67
28 W DOWNLIGHT- WHITE
67
NEW PENDANT LIGHT- RECEPTION
12
MECHANICAL VENTILATION
5
SMOKE ALARM
14
12 W ADJUSTABLE DOWNLIGHT
14
NEW PENDANT LIGHT- WALL-PANTRY
11
NEW PENDANT LIGHT- CYCLE OF ART
19
EXIT SIGN ( KELUAR )
2
12.5MM THK PLASTERBOARD CEILING
D/B BOX
1
2OMM THK WOOD SUSPENDED CEILING
POWER SWITCH
31
CEILING TYPE
2ND FLOOR REFLECTED CEILING PLAN
SYM
NOTE: ALL LIGHTING POSITION AND HT FROM FLOOR LEVEL TO BE ADVISED BY LIGHTING SPECIALIST
SPOTLIGHT
7 W ADJUSTABLE SPOTLIGHT
23
LIGHT STRIPS 18 W ADJUSTABLE LIGHTSTRIPS
14
NEW PENDANT LIGHT- POD AREA
8
NEW PENDANT LIGHT- EVENT HALL
6
NEW PENDANT LIGHT- SITTING AREA
3
NEW PENDANT LIGHT- MEETING AREA
14
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR REFLECTED CEILING PLAN SCALE: 1:100
DATE: 9 DEC 2021
CHECKED BY:
DRAWN BY: JESSIE CHEN VERNERN
MS. AZIAH
DRAWING NO: DWG_DWD_JCVE_RCP_06
REV. NO: 004
A2
A1
A4
A3
NOTE:
A5
DATE
DESCRIPTION
B1
CLIENT:
LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
B2 ARCHITECT:
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor
A
A
INTERIOR DESIGN CONSULTANT: PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor
B3 QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
B4 NOTE: ALL LIGHTING POSITION AND HT FROM FLOOR LEVEL TO BE ADVISED BY LIGHTING SPECIALIST
SYM
DESCRIPTION EUBIQ POWER TRACK
QTY 5
AC / VENTILATION
LEP 2F
CASSETTE AIRCON (CEILING)
7
MECHANICAL VENTILATION
5
SYM
DESCRIPTION
QTY
FIRE SAFETY / ELECTRICAL
SYM
DESCRIPTION
QTY
SYM
DESCRIPTION
QTY
PENDANT LIGHTS
DOWNLIGHTS
WATER SPRINKLE
67
28 W DOWNLIGHT- WHITE
67
NEW PENDANT LIGHT- RECEPTION
12
SMOKE ALARM
14
12 W ADJUSTABLE DOWNLIGHT
14
NEW PENDANT LIGHT- WALL-PANTRY
11
NEW PENDANT LIGHT- CYCLE OF ART
19
EXIT SIGN ( KELUAR )
2
D/B BOX
1
2ND FLOOR LIGHTING AND ELECTRICAL PLAN
POWER SWITCH
31
SCALE 1:100
WALL POWER SOCKET 500MM ABOVE FLOOR LEVEL FLOOR POWER SOCKET
4
10
SPOTLIGHT 7 W ADJUSTABLE SPOTLIGHT
23
STRIP LINES
NEW PENDANT LIGHT- POD AREA
8
NEW PENDANT LIGHT- EVENT HALL
6
18 W ADJUSTABLE LIGHTSTRIPS
14
NEW PENDANT LIGHT- SITTING AREA
3
ELECTRICAL WIRE LOOPING
31
NEW PENDANT LIGHT- MEETING AREA
14
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR LIGHTING AND ELECTRICAL PLAN SCALE: 1:100
DATE: 9 DEC 2021
CHECKED BY:
DRAWN BY: JESSIE CHEN VERNERN
MS. AZIAH
DRAWING NO: DWG_DWD_JCVE_LEP_07
REV. NO: 004
A1
LVL 5
A2
A3
A4
NOTE:
A5
400MM THK CONCRETE FLAT ROOF WITH WATERPROOF COVERING
24000 DATE
DESCRIPTION
730 MM(L) X 750 MM(H) X 367MM(W) SKIRTED ONE-PIECE DUAL FLUSH 3/4.8L TOILET WITH CLASS 5 FLUSHING TECHNOLOGY
LVL 4 20000
CLIENT: LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
ALUMINUM FRAMED WIRE MESH GREEN WALL
ARCHITECT:
LVL 3
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor
16000
5650MM(L) x 2500MM(H) x 50MM THK LED LIGHT BUTTON INTERACTIVE WALL
INTERIOR DESIGN CONSULTANT:
LVL 2
PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor
PEBBLE CHAIR SERIES
12000
CONCRETE DECK WITH METAL STRUCTURE IN MATTE FINISH
CURTAIN WALLS
LVL 1
150MM THK CONCRETE FLOORING WITH PATTERNED PORCELAIN TILES FINISH
8000
PRECAST CONCRETE WALL WITH SMOOTH PLASTER FINISH
QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur
PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
MF 4000 400MM THK CONCRETE COLUMN STRUCTURE
GF 0
FFL
SEC 2F
SECTION A-A SCALE 1:75
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE BUILDING TOWER A SECTION DRAWING SCALE: 1:75
DATE: 9 DEC 2021
CHECKED BY: MS. AZIAH
DRAWN BY: JESSIE CHEN VERNERN
DRAWING NO: DWG_DWD_JCVE_SEC_08
REV. NO: 004
NOTE:
DATE
DESCRIPTION
X CLIENT:
LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
TYPE 20 STEEL PIPE FITTINGS - SIDE OUTLET ELBOWS 20MM(D)
BEIGE FABRIC CYLINDER CUSHION WITH STAINLESS STEEL WHITE STAND
ARCHITECT: C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor
INTERIOR DESIGN CONSULTANT: PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor
QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
X 200MM x 200MM x 5MM THK PATTERNED PORCELAIN TILES (OFF WHITE)
BF7 LP
20MM(D) ALUMINUM STAINLESS STEEL METAL PIPE WITH BLUSH PINK POWDER COATING FINISH
ACTIVITY SPACE LAYOUT PLAN SCALE 1:25
TYPE 25 T-PIPE CONNECTOR 20MM(D)
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR BESPOKE FURNITURE PLAN SCALE: 1:25
DATE: 9 DEC 2021
CHECKED BY:
DRAWN BY: JESSIE CHEN VERNERN
MS. AZIAH
REV. NO: DRAWING NO: DWG_DWD_JCVE_BSP_09A 003
NOTE:
DATE
DESCRIPTION
CLIENT: LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
ARCHITECT: C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor INTERIOR DESIGN CONSULTANT: PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
2FL
20MM(D) ALUMINUM STAINLESS STEEL METAL PIPE WITH BLUSH PINK POWDER COATING FINISH
BF7 ELV
ACTIVITY SPACE ELEVATION SCALE 1:25
BEIGE FABRIC CYLINDER CUSHION WITH STAINLESS STEEL WHITE STAND
114.8MM (D) X 90MM THK ROUND BASE FLANGE
ROUNDED CORNER RECTANGLE TINTED GLASS & TEMPERED GLASS DIVIDER WITH PINK POWDER COATING FRAME FINISH
445MM HEIGHT DECKING
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR BESPOKE FURNITURE PLAN SCALE: 1:25
DATE: 9 DEC 2021
CHECKED BY:
DRAWN BY: JESSIE CHEN VERNERN
MS. AZIAH
REV. NO: DRAWING NO: DWG_DWD_JCVE_BSP_09B 003
NOTE:
20MM(D) ALUMINUM STAINLESS STEEL METAL PIPE WITH BLUSH PINK POWDER COATING FINISH
DATE
DESCRIPTION
TYPE 20 STEEL PIPE FITTINGS - SIDE OUTLET ELBOWS 20MM(D) 20MM HEXAGON SELF-TAPPING SCREW 20MM(D) ALUMINUM STAINLESS STEEL METAL PIPE WITH BLUSH PINK POWDER COATING FINISH
CLIENT: PLANT POD HOLDER
DETAIL A
LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
SELF WATERING PIPE
ROUNDED CORNER RECTANGLE TINTED GLASS & TEMPERED GLASS DIVIDER WITH PINK POWDER COATING FRAME FINISH
ARCHITECT:
DET A
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor
DETAIL A SCALE 1:5
INTERIOR DESIGN CONSULTANT: PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor 20MM(D) ALUMINUM STAINLESS STEEL METAL PIPE WITH BLUSH PINK POWDER COATING FINISH
BEIGE FABRIC CYLINDER CUSHION WITH STAINLESS STEEL WHITE STAND
19MM HEXAGON SELF-TAPPING SCREW
DETAIL B
114.8MM (D) X 90MM THK ROUND BASE FLANGE
455MM (H) METAL STRUCTURE DECK STAND
QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR BESPOKE FURNITURE SECTION & DETAILS
2FL
SEC BF7
SECTION X-X SCALE 1:25
DET B
DETAIL B SCALE 1:5
SCALE: AS LABELED
DATE: 9 DEC 2021
CHECKED BY:
DRAWN BY: JESSIE CHEN VERNERN
MS. AZIAH
REV. NO: DRAWING NO: DWG_DWD_JCVE_BSP_09B 004
LUNG FOUNDATION OF MALAYSIA LUNG FOUNDATION OF MALAYSIA SUITE 3B-15-7, LEVEL 15, BLOCK 3B PLAZA SENTRAL, JALAN STESEN SENTRAL 5, 50470 KUALA LUMPUR
ATTENTION PROPOSED INTERIOR RENOVATION WORKS FOR 2ND FLOOR LUNG FOUNDATION OF MALAYSIA OFFICE
PCF 1 SL 1
WC 1
SL 2 WF 1 MS 1
HB
W2
NB 1
GT 1
TD 1
ST 1
CS 1
MS 2
N MC
PT 1
NOTE: LUNG FOUNDATION OF MALAYSIA
LUNG FOUNDATION OF MALAYSIA
BILLS OF QUANTITIES
BILLS OF QUANTITIES
LUNG FOUNDATION OF MALAYSIA
QUOTATION
LUNG FOUNDATION OF MALAYSIA
QUOTATION
SUITE 3B-15-7, LEVEL 15, BLOCK 3B PLAZA SENTRAL, JALAN STESEN SENTRAL 5, 50470 KUALA LUMPUR
DATE : 22 NOVEMBER 2021 QUOTE NO: DWG_DWD_JCVE_BQ_010 TERMS : CASH / CHEQUE
SUITE 3B-15-7, LEVEL 15, BLOCK 3B PLAZA SENTRAL, JALAN STESEN SENTRAL 5, 50470 KUALA LUMPUR
DATE : 22 NOVEMBER 2021 QUOTE NO: DWG_DWD_JCVE_BQ_010 TERMS : CASH / CHEQUE
ATTENTION PROPOSED INTERIOR RENOVATION WORKS FOR 2ND FLOOR LUNG FOUNDATION OF MALAYSIA OFFICE
NO. A
DESCRIPTION
QTY
UNIT
RATE (RM)
ATTENTION PROPOSED INTERIOR RENOVATION WORKS FOR 2ND FLOOR LUNG FOUNDATION OF MALAYSIA OFFICE
TOTAL (RM)
CEILING WORKS
PCF 1
SUSPENDED PLASTER CEILING
WC 1
OAK WOOD CEILING PANELS WITH COVE LIGHTING
To supply material and labour SELECTED SUSPENDED PLASTER CEILING IN WHITE PAINT FINISH
NO. H
1
nos
95
95
MC
DESCRIPTION
QTY
UNIT
RATE (RM)
1
nos
100
NO.
DATE
DESCRIPTION
TOTAL (RM)
FLOOR TILING WORKS
MATTE CONCRETE DECK FLOORING To supply material and labour SELECTED MATTE CONCRETE DECK FLOORING
100
CLIENT:
B
To supply material and labour SELECTED OAK WOOD CEILING PANELS WITH COVE LIGHTING
nos
1000
1000
1
nos
108
108
1
nos
150
150
TOTAL:
COVE LIGHTING LIGHT STRIPS
SL 2
SURFACE LIGHT PANEL FOR OAK WOOD CEILING
To supply material and labour SELECTED 12.3W GRADIENT STRIP LIGHTS FOR COVE LIGHTING
To supply material and labour SELECTED SURFACE LIGHT WITH COLOUR CHANGING MODE
WALL FINISH WORKS
TERMS & CONDITION 1. 2. 3. 4.
5. WF 1
CONCRETE WALL IN WHITE PAINT FINISH & WATERPROOF PATTERNED WALLPAPER To supply material and labour SELECTED CONCRETE WALL IN WHITE PAINT FINISH AND WATERPROOF BEIGE ORGANIC PATTERNED WALLPAPER
D
W2
E
MS 1
MS 2
F
GT 1
1
nos
127
127
CURTAIN WALL / WINDOW ALUMINUM FIXED CURTAIN WALL To supply material and labour SELECTED 5700MM(W) X 3000MM(H) ALUMINUM FRAME FIXED CURTAIN WALL
1
nos
500
500
BESPOKE FURNITURE- METAL STRUCTURAL WORKS METAL PIPING STRUCTURE FOR BESPOKE FURNITURE To supply material and labour SELECTED 20MM(D) ALUMINUM STAINLESS STEEL METAL PIPE WITH BLUSH PINK POWDER COATING FINISH
METAL PIPING STAND FOR BESPOKE FURNITURE SITTING To supply material and labour SELECTED 50MM(D) ALUMINUM STAINLESS STEEL METAL PIPE WITH WHITE POWDER COATING FINISH
1
nos
500
500
3
nos
30
90
BESPOKE FURNITURE- DIVIDER CUSTOMIZE MULTIPURPOSE 2-IN-1 TEMPERED GLASS TABLE & IDEATION BOARD
2
nos
650
ROUNDED CORNER RECTANGLE TINTED GLASS & TEMPERED GLASS DIVIDER
6.
5
nos
500
2500
G
ROUNDED CORNER RECTANGLE NOTICE BOARD DIVIDER To supply material and labour SELECTED ROUNDED CORNER RECTANGLE STAINLESS STEEL NOTICE BOARD WITH CORK BOARD AND ROSE GOLD POWDER COATING FINISH
5
nos
300
1500
2
nos
30
60
3
nos
50
150
16
nos
10
1600
BESPOKE FURNITURE- TABLE / CHAIR / EQUIPMENTS
ST 1
SIDE TABLE
CS 1
STAND STOOL CUSHION
HB
H PT 1
N
To supply material and labour SELECTED PARTICLE BOARD SIDE TABLE IN WHITE PAINT FINISH
To supply material and labour SELECTED BEIGE CYLINDER FABRIC CUSHION
HANGING HAND BAR To supply material and labour SELECTED WOOD HANGING HAND BAR WITH ROPE
8.
Termination of Service PINS STUDIO Company has the right to terminate or suspend All works/Services, upon written notice, if the Client falls to make payment or default in accordance with the mentioned terms and conditions - Termination shall be without prejudice to any and all other rights and remedies of PINS STUDIO Company and Client shall remain liable for all - Within five (5) working days of termination of our service for any reason, PINS STUDIO Company shall submit to Client an itemized invoice for any fees or expenses accrued under this quotation. The client, upon payment of accrued amounts so invoiced, shall thereafter have no further liability or obligations to PINS STUDIO Company whatsoever for any further fees or expenses arising hereunder. Project Time Frame & Fees for extra service Reasonable time frame for drawings are to be discussed & agreed by both party PINS STUDIO Company Estimated time frame for entire project's frame inclusive of revision period will be a maximum of TWO (2) MONTHS starts from date of appointment. If project exceed estimated time frame, an additional minimum fee of RM150 per month will be charge, as consultation fees only, excluded reimbursement claim & site visit charges. Subject to the project & remaining job-scope.
To supply material and labour SELECTED 200MM X 200MM X 5MM THK PATTERNED TILES
NET FLOORING (TRAMPOLINE) To supply material and labour SELECTED NET FLOORING WITH METAL GRADE SAFETY FRAME WITH COLOUR FINISH
9.
10. Site Visit. Inspection & Traveling - Site visit or inspection services that requires PINS STUDIO Company to travel by air (overseas, Sabah & Sarawak) are subject to claim all 11. Acknowledgement of Quoted Fees, Terms & Conditions - Upon receiving payment according to the percentage stated above will acknowledge that you have read & agreed on our scope of design/works/services,fees,terms & conditions. This quotation shall be treated as a contract legally binding once being signed. - English language/wordings shall prevail and be used as contract terms shall any discrepancies arise due to translations. ISSUED BY : PINS STUDIO SDN BHD
FLOOR TILING WORKS PATTERNED PORCELAIN TILES
- Services/works shall commence upon receipt of payment of each phase except for final phase. Time frame of work that has been agreed by both - All outstanding amounts must be paid within ten (10) working days after the handover of site (exclude V.O. period). Shall there be any delay of the handover site, payment must still be made within (10) working days of the originally contemplated handover date confirmed by the Client & PINS STUDIO Interior Company - PINS STUDIO Company do not hold any responsibilities in delay of work from the agreed Time frame that is resulted by payment issues. - Payment not made within above mentioned period will carry interest at the rate of 2% per month (30 days) until full payment is made. - Cheque should be crossed A/C Payee & Made Payable to PINS STUDIO Company. - PINS STUDIO Company shall not in any circumstances or for any reason whatsoever be liable for any losses, damages, cost, expenses including, without limitation, direct, indirect, special or consequential damages or economic losses arising from any such failure to perform Design/Works/Service Disclaimer PINS STUDIO Company cannot be held responsible for designs/works/service that may later be undesirable or cause inconvenience. The Client understands that all designer/contractor interprets the Client's requirements and wishes. however, any design/works that are not done according to agreed as per quoted shall be rectified accordingly by PINS STUDIO Company. Project Access - Client will provide PINS STUDIO Company with access to the project and all information that may be required to complete the project. - Failure to do so by the Client provides PINS STUDIO Company the right to terminate service ( with a written notice ) and collect outstanding balances.
To supply material and labour SELECTED ROUNDED CORNER RECTANGLE TINTED GLASS & TEMPERED GLASS DIVIDER WITH PINK POWDER COATING FRAME FINISH
NB 1
Validity: 14 days Period of completed : 60 days (refer of down payment upon comfirmation of order) All Dimension subject to Final site measurement. Variation Order : Any alteration not specified in the quotation will be issued under variation order follow with an invoice Variation order ( VO ). Payment Terms: Percentage - THE CONTRACT SUM RM 30% = RM Stage I Upon confirmation of project/service 20% = RM Stage I Progress Claim (Installation of fixtures & fittings) 20% = RM Stage III Progress Claim (Completion of fixtures & fittings) - 11001 10% = RM Stage V final payment full completion of all works)
7.
1300
To supply material and labour SELECTED MULTIPURPOSE 2-IN-1 TEMPERED GLASS TABLE & IDEATION BOARD WITH BLUSH PINK POWDER COATING FRAME FINISH
TD 1
LUNG FOUNDATION OF MALAYSIA Suite 3B-15-7, Level 15, Block 3B Plaza Sentral, Jalan Stesen Sentral 5, 50470 Kuala Lumpur
11920
CEILING LIGHT WORKS
SL 1
C
1
ACKNOWLEDGE & AGREED BY
ARCHITECT: C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G,Pusat Perdagangan, Dana 1, Jalan PJU 1A/46, 47301 Petaling Jaya, Selangor INTERIOR DESIGN CONSULTANT: PINS Studio SDN BHD D 3-3, Pusat Komersial Parklane, Jalan SS 7/26, 47301 Petaling Jaya, Selangor QUANTITY SURVEYOR: PKT Quantity Surveyor Malaysia SDN BHD Suite E-11-05, Plaza Mont' Kiara, 2 Jalan Kiara, 50480 Kuala Lumpur PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS FOR LUNG FOUNDATION OF MALAYSIA OFFICE AT JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
DRAWING TITLE: LUNG FOUNDATION OF MALAYSIA OFFICE 2ND FLOOR BILL OF QUANTITIES SCALE: N/A
DATE: 9 DEC 2021
CHECKED BY:
DRAWN BY: JESSIE CHEN VERNERN
MS. AZIAH 20
nos
100
2000
7
nos
20
140
DIRECTOR
OCEAN CHU ER XUAN 010304050678
DRAWING NO: DWG_DWD_JCVE_BQ_010
REV. NO: 002
REFLECTION FOR THIS PROJECT, I APPLIED AN OPEN PLAN CONCEPT WHICH ALLOWS BETTER WORKFLOW IN THE OFFICE AS IT IS EASIER FOR THE WORKERS TO INTERACT WITH ONE ANOTHER AND THIS CONCEPT IS ALSO COSTEFFECTIVE AS OPEN OFFICES ARE MORE COST-EFFECTIVE THAN TRADITIONAL CUBICLES OR PRIVATE OFFICES. WITH LESS OVERHEAD, YOU CAN ENSURE EACH EMPLOYEE HAS THE NECESSARY SPACE AND EQUIPMENT TO CONDUCT BUSINESS AS THERE'S NO NEED TO BUY LARGE INDIVIDUAL DESKS AND CUBICLE WALLS. THE OVERALL MATERIALS USED FOR FLOORS ARE MAINLY CONCRETE, PORCELAIN TILES, AND WOOD, THESE FEW MATERIALS ARE EASY TO CLEAN & MAINTAIN. SOME AREAS ALSO USED CARPETS SUCH AS MEETING AREA & EVENT SPACE AS THEY WORKED AS A SOUND ABSORBER WHICH CAN REDUCE WALKING NOISE AND IMPROVE THE ACOUSTIC OF THE OFFICE. FOR WALLS, THE MATERIAL USED IS CONCRETE & WALLPAPER AS IT IS EASY TO MAINTAIN AND CLEAN.
FOR THIS PROJECT, WE ARE ALSO REQUIRED TO APPLY OUR KNOWLEDGE OF UBBL AND/OR FIRE REQUIREMENTS THROUGHOUT THE DESIGN PROCESS. THERE ARE A FEW UBBL AND/OR FIRE REQUIREMENTS I APPLIED IN MY PROJECT. FIRSTLY, UBBL SECTION 166- EMERGENCY EXIT ( ALTERNATIVE EXITS ), THIS IS THE PRIMARY CONCEPT FOR SAFE EVACUATION. EVERY FLOOR SPACE SHALL BE PROVIDED WITH AT LEAST TWO EXITS ON THE BASIS THAT IF ONE EXIT IS INOPERABLE, THE OTHER EXIT CAN SERVE THE FUNCTION. SO, MY OFFICE-LEVEL CONSISTS OF 2 ENTRANCES/EXITS WHICH BOTH WORKS AS AN EMERGENCY EXITS. THIS ‘DESIGNING FOR REDUNDANCY’ PRINCIPLE APPLIES TO ALL ASPECTS OF EVACUATION. SECONDLY, UBBL SECTION 228- SPRINKLER SYSTEM, SPRINKLERS SYSTEMS SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH MS1910. THIRD, I ALSO APPLIED UBBL SECTION 172- EMERGENCY EXIT SIGNS. EXITS AND ACCESS SHALL BE MARKED BY READILY VISIBLE SIGNS AND SHALL NOT BE OBSCURED BY ANY DECORATIONS, FURNITURE, OR OTHER EQUIPMENT. EVERY EXIT DOOR IN MY OFFICE HAS THE WORD "KELUAR OR EXIT" IN PLAINLY LEGIBLE LETTERS NOT LESS THAN 150MM HIGH WITH THE PRINCIPAL STROKES OF LETTERS NOT LESS THAN 18MM WIDE. THESE FEW UBBL ARE A FEW NECESSARY LAWS THAT I APPLIED FOR FIRE SAFETY MEASURES FOR MY CLIENT.
BESIDES THAT, WHEN PLANNING MY OFFICE, I ALSO APPLIED SOME GREEN DESIGN SUSTAINABLE CONCEPTS TO ENSURE THE OFFICE IS AN ENERGY-EFFICIENT OFFICE & A COMFORTABLE SPACE TO WORK IN FOR MY CLIENT. I INCORPORATED SOME INDOOR PLANTATIONS AS INDOOR PLANTS CAN SIGNIFICANTLY REDUCE BOTH VOCS AND CARBON DIOXIDE FROM THE AIR, MEANING CLEANER, GREENER, HAPPIER, AND MORE PRODUCTIVE OFFICE. IT PROVIDES BETTER INDOOR AIR QUALITY. IN ADDITION, FOR ENERGY & ELECTRIC SAVING, I APPLIED ALTERNATE LOOPING FOR THE CEILING LIGHTS TO REDUCE THE USAGE OF ELECTRICITY. SOME LED LIGHTINGS ARE ALSO ADJUSTABLE SO MY CLIENT CAN TUNE DOWN THE LIGHTING OR OFF IT WHEN IT IS UNNECESSARY.
THIS PROJECT WAS A GREAT EXPERIENCE FOR ME TO PRACTICE AND IMPROVE MY TECHNICAL SKILLS WHILE ALSO APPLYING MY UNDERSTANDING OF SUSTAINABLE DESIGN CONCEPTS & UBBL.
ASSIGNMENT
2
PRECEDANT STUDIES: A BUREAU
ION DUCT INTRO
IN ASSIGNMENT 2, WE ARE REQUIRED TO SOURCE EXISTING PRECEDENT STUDIES RELATED TO OFFICE DESIGN/COWORKING SPACE, RECOGNIZE THE LAYOUT TO EXTRACT THE SCHEDULE OF ACCOMMODATION (SOA) AND FF&E OF THE PRECEDENT STUDY. THEN, WE ARE NEEDED TO UNDERSTAND THE LAYOUT DESIGN IN RELATION TO UBBL AND/OR FIRE REQUIREMENTS AND PRODUCE A SET OF AS-BUILT DRAWINGS INCLUDING PLAN, INTERNAL ELEVATION, SECTION, SOA, FF&E, AND ANALYSIS RELATED TO UBBL AND MATERIALS APPLICATION BASED ON THE SELECTED PRECEDENT STUDY.
TABLE CONTENT NO.
DRAWING TITLE
DRAWING NO.
PAGE NO.
1
PRECEDENT STUDIES
-
3
2
WILLIAM LEA TAG OFFICE FURNITURE LAYOUT PLAN
MHW_DWD_JCVE_FLP_01
4
3
SCHEDULE OF ACCOMMODATION (SOA)
MHW_DWD_JCVE_SOA_02
5
4
WILLIAM LEA TAG OFFICE SECTION ( E-E )
MHW_DWD_JCVE_SC_02
6
5
BESPOKE PLAN AND ELEVATION
MHW_DWD_JCVE_BS1_03A
7
6
BESPOKE SECTION AND DETAILS
MHW_DWD_JCVE_BS1_03B
8
7
DOORS AND WINDOW SCHEDULE
MHW_DWD_JCVE_DWS_04
9
8
SCHEDULE OF FINISHES
MHW_DWD_JCVE_SOF_05
10-22
9
UBBL DIAGRAM IN PLAN (INFOGRAPHIC)
MHW_DWD_JCVE_UBBL_06
23-28
10
UBBL INDIVIDUAL ANALYSIS REPORT (250WORDS)
MHW_DWD_JCVE_UBBL_07
29
PANTRY SITTING
SITTING PLATFORM
(EATING/RESTING CO-SPACE)
(TALKS & INFORMAL MEETINGS)
BEAN BURO LAYERED FRAMED
CONCEPT
AREA: 668.9019 FT²
DISPLAY SHELVE
PANTRY
SITTING AREA
PLAN
PINK= WORK TABLES BLUE= MEETING AREA/ COLLAB YELLOW= CHILL AREA GREEN= TOILET
For this concept, I really like how lines and tubes able to compliment the space and to make the whole space both serious and youthful and playful at the same time. I also wanted a space which enables my client to move around freely and work wherever they want as they are an association and research team so spaces for discussion and studying is very important.
MOODBOARD
MAIN MATERIALS
IDEATION DESK (DOODLE WALL)
BOARD ROOM (ENCLOSED MEETING AREA)
PHONE BOOTH (PRIVATE ROOM)
NOTE:
A3
A2
A1
A4
A5
A6
A7
A8
A9 A10
A11
A12
NO.
DATE
DESCRIPTION
CLIENT:
B1
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
Carpet
Carpet
7.21m2
32.15m2
Carpet 22.13m2
1500MM(H) X 1100MM(W) X 100MM THK BISON PANEL PARTITION WALL IN WASHABLE WHITE PAINT FINISH
B2 Carpet
Carpet
29.87m2
B3
E
30.25m2
ARCHITECT:
E
Concrete 4.32m2
Carpet 19.03m2
B4
Carpet 17m2
Carpet 7.61m2
Carpet
Carpet
19.98m2
11.49m2
B5
INTERIOR DESIGN CONSULTANT:
Carpet 2
1.87m
Carpet
1.2MM THK BROWN NEEDLE PUNCH OFFICE CARPET
Carpet
15.82m2
BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
9.38m2
B6
Concrete 44.79m2
Carpet 7.28m2
B7
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
Carpet 9.75m2
Carpet 19.73m2
QUANTITY SURVEYOR:
Carpet 6.55m2
B8
BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
Polished Concrete 24.11m2
B9 950MM (W) X 2200MM(H) FITTING OAK WOOD FLUSH SWING DOOR
Porcelain Tiles 6.58m2
B10
Concrete 10.81m2
Concrete 10.81m2
8.72m2
4.33m2
B11 Porcelain Tiles 6.58m2 3.04m2
B12
4.25m2
POLISHED CONCRETE FINISH
PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE DRAWING TITLE:
FLP 7F
7TH FLOOR FURNITURE LAYOUT PLAN SCALE 1:150
WILLIAMS LEA TAG OFFICE 7TH FLOOR FURNITURE LAYOUT PLAN SCALE: 1:150
DATE: 8 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
DRAWING NO: MHW_DWD_JCVE_FLP_01
REV. NO: 004
NOTE:
NO.
DATE
DESCRIPTION
CLIENT: WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR SCHEDULE OF ACCOMMODATION SCALE: AS SHOWN
DATE: 10 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
DRAWING NO: MHW_DWD_JCVE_SOA_02
REV. NO: 002
NOTE:
NO.
DATE
DESCRIPTION
CLIENT: WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
A1
A2
A3
A4
A5
A6
A7
A8
A9 A10
A11
A12
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
CL
FFL
QUANTITY SURVEYOR: 1120MM x 400MM x 50MM THK WOOD PANEL BOARD SHELVE
SC E-E
SECTION E-E SCALE 1:100
100MM THK CONCRETE SLAB IN POWDER PAINT COATING FINISH
4725MM x 2100MM x 50MM THK ALUMINUM FRAME WINDOW WITH TEMPERED GLASS
BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
SUSPENDED CEILING IN WHITE PAINT FINISH
PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR FURNITURE SECTION E-E SCALE: 1:100
DATE: 8 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
DRAWING NO: MHW_DWD_JCVE_SC_02
REV. NO: 004
NOTE:
CL
NO.
DATE
DESCRIPTION
OPEN
CLIENT: WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
100MM BISON PANEL PARTITION WALL STICKER IN SELF-ADHESIVE WOOD GRAIN FINISH
360MM (L) x 320MM (H) x 50MM THK ALUMINUM FIXED WINDOW IN BLACK PAINT POLISHED FINISH WITH TEMPERED GLASS
390MM (L) x 320MM (W) x 60MM THK COLORED COTTON FABRIC CUSHION
FFL
PS ELE
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
PLATFORM SITTING ELEVATION SCALE 1:25
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
4410MM (L) x 380MM (W) x 290MM (H) PINE WOOD BOARD PLATFORM SITTING
0.5MM THK SELF ADHESIVE PINE WOOD STICKER FINISH
PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE DRAWING TITLE: PLATFORM SITTING ELEVATION AND PLAN DRAWING
PS B1
PLATFORM SITTING LAYOUT PLAN SCALE 1:25
SCALE: 1:25
DATE: 10 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_BS1_03A 002
NOTE:
NO.
100MM BISON PANEL PARTITION WALL STICKER IN SELF-ADHESIVE WOOD GRAIN FINISH
390MM (L) x 320MM (W) x 60MM THK COLORED COTTON FABRIC CUSHION M6 x 60MM HEXAGON SOCKET SCREW WITH BARREL NUTS
CLIENT:
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
19MM HEXAGON SELF-TAPPING SCREW
360MM (L) x 320MM (H) x 50MM THK ALUMINUM FIXED WINDOW IN BLACK PAINT POLISHED FINISH WITH TEMPERED GLASS
390MM (L) x 320MM (W) x 60MM THK COLORED COTTON FABRIC CUSHION
DETAIL A
390MM (L) x 420MM (W) x 40MM THK PINE WOOD BOARD PLATFORM SITTING IN MATTE FINISH
0.5MM THK SELF ADHESIVE PINE WOOD STICKER
0.5MM THK SELF ADHESIVE PINE WOOD STICKER
DET DETAIL A A SCALE 1:5
M6 x 60MM HEXAGON SOCKET SCREW WITH BARREL NUTS
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
0.5MM THK SELF ADHESIVE PINE WOOD STICKER
19MM HEXAGON SELF-TAPPING SCREW MORTISE AND TENON JOINERY
FFL
DATE
DESCRIPTION
PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DETAIL B DRAWING TITLE: PLATFORM SITTING SECTION AND DETAIL DRAWINGS
SC 1
SECTION 1 SCALE 1:10
DET DETAIL B B SCALE 1:5
SCALE: AS SHOWN
DATE: 10 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_BS1_03B 002
NOTE:
WINDOW & DOOR SCHEDULE
NO.
DATE
DESCRIPTION
CLIENT: FFL
FFL
WINDOW NO.
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
FFL
WD1
WD2
WD3
TYPE
CURTAIN WALL
FIXED DOUBLE GLAZED WINDOW
FIXED DOUBLE GLAZED WINDOW
FRAME
4725MM (L) X 2300MM (W) X 50MM (THK) ALUMINUM FRAME IN BRUSHED FINISH
4000MM X 2100MM X 90MM (THK.) ALUMINUM FRAME IN BRUSHED FINISH
3600MM X 100MM X 90MM (THK.) ALUMINUM FRAME IN BRUSHED FINISH
LEAF
730MM X 2200MM X 6MM (THK) CLEAR TEMPERED GLASS
730MM X 2200MM X 6MM (THK) CLEAR TEMPERED GLASS
730MM X 2200MM X 6MM (THK) CLEAR TEMPERED GLASS
HINGES
N/A
N/A
N/A
LOCK, BOLTS
N/A
N/A
N/A
STOP, PULLS
N/A
N/A
N/A
BOARDROOM, OPEN PLAN 2 & MEETING ROOM
MEETING ROOM
MEETING ROOM
ARCHITECT:
DESCRIPTION
IRONMONGERY
LOCATION
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
FFL
DOOR NO.
DESCRIPTION
FFL
FFL
D4
D3
D7
TYPE
DOUBLE GLASS SWING DOOR
SINGLE FLUSH DOOR
SINGLE FIRE SAFETY DOOR
FRAME
N/A
950MM x 2200MM x 50MM THK TIMBER FRAME
950MM x 2200MM x 50MM THK TIMBER FRAME
PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE DRAWING TITLE:
IRONMONGERY
LEAF
1800MM x 2100MM x 12MM THK TEMPERED GLASS
30MM THK PLYWOOD PANEL C/W GLASS VIEW PANEL
46MM THK DOOR SHUTTER C/W MILD SHEET WITH IN FILL INSULATION MATERIAL
HINGES
STAINLESS STEEL HEAVY DUTY HINGE
STAINLESS STEEL HEAVY DUTY HINGE
STAINLESS STEEL HEAVY DUTY HINGE
LOCK, BOLTS
ONE POINT SAFETY LOCK
N/A
STAINLESS STEEL LOCKING TOUGUE
STOP, PULLS
STAINLESS STEEL SQUARE HANDLE
N/A
HEAVY DUTY PUSH BAR C/W ALARM SYSTEM
MAIN ENTRANCE
MEETING ROOM 3
EMERGENCY EXIT STAIR
LOCATION
WILLIAMS LEA TAG OFFICE DOOR AND WINDOW SCHEDULE SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_DWS_04 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT:
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR SCHEDULE OF FINISHES SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_SOF_05A 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT:
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR SCHEDULE OF FINISHES SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_SOF_05B 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT:
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR SCHEDULE OF FINISHES SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_SOF_05C 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT:
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR SCHEDULE OF FINISHES SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_SOF_05D 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT:
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR SCHEDULE OF FINISHES SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_SOF_05E 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT:
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR SCHEDULE OF FINISHES SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_SOF_05F 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT:
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR SCHEDULE OF FINISHES SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_SOF_05G 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT:
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR SCHEDULE OF FINISHES SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_SOF_05H 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT:
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR SCHEDULE OF FINISHES SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_SOF_05I 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT:
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR SCHEDULE OF FINISHES SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_SOF_05J 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT:
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR SCHEDULE OF FINISHES SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_SOF_05K 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT:
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR SCHEDULE OF FINISHES SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_SOF_05L 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT: WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR UBBL DIAGRAM PLAN (INFOGRAPHIC) SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
DRAWING NO: REV. NO: MHW_DWD_JCVE_UBBL_06A 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT: WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR UBBL DIAGRAM PLAN (INFOGRAPHIC) SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
DRAWING NO: REV. NO: MHW_DWD_JCVE_UBBL_06B 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT: WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR UBBL DIAGRAM PLAN (INFOGRAPHIC) SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
DRAWING NO: REV. NO: MHW_DWD_JCVE_UBBL_06C 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT: WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR UBBL DIAGRAM PLAN (INFOGRAPHIC) SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
DRAWING NO: REV. NO: MHW_DWD_JCVE_UBBL_06D 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT: WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR UBBL DIAGRAM PLAN (INFOGRAPHIC) SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
DRAWING NO: REV. NO: MHW_DWD_JCVE_UBBL_06E 003
NOTE:
NO.
DATE
DESCRIPTION
CLIENT: WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE
DRAWING TITLE: WILLIAMS LEA TAG OFFICE 7TH FLOOR UBBL DIAGRAM PLAN (INFOGRAPHIC) SCALE: AS SHOWN
DATE: 11 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
DRAWING NO: REV. NO: MHW_DWD_JCVE_UBBL_06F 003
NOTE:
NO.
DATE
DESCRIPTION
UBBL ANALYSIS REPORT
CLIENT: EMERGENCY EXIT ( ALTERNATIVE EXITS ) According to UBBL section 166 :
Based on the given floor plan of William Lea Tag office, we are able to identify 2 emergency exits, one is located on the left bottom of the plan and the other one is on the right. According to UBBL section 166, this is the minimum requirement for a safe evacuation. It is stated that every floor should provide at least two exits on the basis that if one exit is inoperable, the other exit can serve as a backup. In this case, this office is built following this UBBL section law, as we could see that besides there are 2 emergency stairs for every floor throughout the building, the office itself have around 3 exits, one is the main entrance & exit for the office and 1 exit is on the left and 1 on the right which is only a few steps away from the emergency exit which is convenient for fire safety steps and enable people to evacuate the building as quick as possible as both sides of the emergency stairs are operable and it also reduces human traffic during fire evacuations. All emergency staircase is designed in a way that it standardize throughout the whole building so that 2 stairs can accommodate for the whole office building for other floors too during an emergency. Fire safety appliances are also installed throughout the pathway to the stairs, a few examples are a sprinkling system, and also hose reel, etc. This emergency staircase also works as an emergency stairs for firefighters to access the building when a fire is taken place.
WILLIAMS LEA TAG 7/F, East Town Building, 41 Lockhart Rd, Wan Chai, Hong Kong
ARCHITECT:
THEEAE ARCHITECTURE & DESIGN 8/F, Zung Fu Industrial Building, Rm.811~812, 1067 King's Rd, Quarry Bay, Hong Kong
INTERIOR DESIGN CONSULTANT: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F
EMERGENCY EXIT SIGNS (KELUAR OR EXIT ) According to UBBL section 172
As we could observe that there are 2 emergency exits and also 3 doors to access the William Lea Tag office. All the doors throughout the building consist of an Emergency exit sign which is written "EXIT alongside with 出口 which means exit door in Chinese as this office is located in Hong Kong. So, this office is built according to the requirement of the UBBL section 172 as it is stated under this section that emergency exits and access should be marked by readily visible signs and shall not be blocked by any other decorations, furniture, or other equipment. Besides, every exit sign should have the word "KELUAR or EXIT " in plainly legible letters not less than 150mm high with the principal strokes of letters not less than 18mm wide. The lights of the Exit sign should be visible too so that people could easily locate where are the exits when all lights are out or when there is fire. Usually, the color of the word will be green with white lightings and background for clarity. Furthermore, in detail and after observing all the emergency doors exit, I noticed a few things, one is some doors do not have an emergency exit sign above despite it being an emergency exit ( which did not follow the requirement of UBBL). The other issue is that the emergency door materials is not entirely fire-rated materials and different type of doors are used throughout which is not consistent. The emergency doors used in this office building consist of 2 kinds, firstly is the aluminum frame swing door with just normal translucent tempered glass while the other emergency door which is directly leading to the main emergency stairs is using a proper fire-rated door.
QUANTITY SURVEYOR: BEAN BURO Hong Kong, Wong Chuk Hang, Heung Yip Rd, 41 Unit 901-904, 9/F PROJECT NAME: PROPOSED INTERIOR RENOVATION WORKS OF WILLIAM LEA TAG OFFICE AT 7/F, EAST TOWN BUILDING, 41 LOCKHART RD, WAN CHAI, HONG KONG FOR WILLIAM LEA TAG OFFICE DRAWING TITLE: WILLIAMS LEA TAG OFFICE UBBL ANALYSIS SCALE: N/A
DATE: 10 OCT 2021
CHECKED BY: MS NORJI
DRAWN BY: JESSIE CHEN VERNERN
REV. NO: DRAWING NO: MHW_DWD_JCVE_UBBL_07 001
REFLECTION FOR PROJECT 2, I LEARNED THAT IT IS IMPORTANT TO FOLLOW THE UBBL & FIRE SAFETY REGULATIONS WHEN PLANNING OUT A SPACE. I ALSO LEARNED A LOT OF DESIGN, SPACES LAYOUT, & DETAILING, WHEN LOOKING FOR PRECEDENT STUDIES. I GET TO OBSERVE AND UNDERSTAND HOW DIFFERENT ARCHITECTS PRODUCE THE OFFICE PLAN. BESIDES THAT, I HAD THE OPPORTUNITY TO WORK AS A GROUP FOR THIS PROJECT AND IMPROVE MY TECHNICAL ABILITY BY LEARNING FROM MY FRIENDS AS WE PRODUCE THE DRAWINGS TOGETHER & EXCHANGE OUR UNDERSTANDING DURING DISCUSSION.
ASSIGNMENT
1
WORK FROM HOME: DOORS & WINDOWS
ION DUCT INTRO
THIS ASSIGNMENT REQUIRES US TO SELECT A ‘WORKING SPACE’ WITHIN THE COMPOUND I.E., STUDY AREA, BEDROOM, WORKING AREA WHICH HAVE AN OPENING EITHER A DOOR OR A WINDOW WITHIN THE PARAMETER THEN MEASURE THE ACTUAL SIZE OF THE SPACE AND THE OPENINGS AND CONVERT IT TO 2D DRAWINGS COMPLETE WITH SPECIFICATION, SCHEDULE OF FINISHES OF THE AREA INCLUDING FLOOR, WALL, AND CEILING AS WELL AS A DOOR OR A WINDOW SCHEDULE WHICH SEEN IN THE AREA.
THE DRAWINGS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
B SEC
W2
W2
W1
JESSIE CHEN VERNERN 40, JALAN SEPAH PUTERI 5/24, KOTA DAMANSARA, 47810 PETALING JAYA, SELANGOR.
BF1
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G, PUSAT PERDAGANGAN DANA 1, JALAN PJU 1A/46, 47301 PETALING JAYA, SELANGOR
BEDROOM
PINS DESIGN STUDIO SDN BHD
BW1
F1
D 3-3, PUSAT KOMERSIAL PARKLANE, JALAN SS 7/26, 47301 PETALING JAYA, SELANGOR
PKT QUANTITY SURVEYOR MALAYSIA SDN BHD
A
A
SEC
SEC
SUITE E-11-05 & E-11-06, PLAZA MONT' KIARA, 2, JALAN KIARA, MONT KIARA, 50480 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
BF1 W1
B
W2
SEC
F1
ASSIGNMENT 1: WORK FROM HOME + DOOR & WINDOWS
WORKSPACE FLOOR PLAN AND LEGEND
BW1
01
WORKSPACE FLOOR PLAN SCALE 1 : 25
1:25 10 SEPT 2021
MS NOR AZIAH HASSAN
JESSIE CHEN VERNERN
WP_DWD_JCVE_FP_04
04
THE DRAWINGS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
JESSIE CHEN VERNERN 40, JALAN SEPAH PUTERI 5/24, KOTA DAMANSARA, 47810 PETALING JAYA, SELANGOR.
GAP BETWEEN CEILING 150MM THK BRICK WALL WITH PURPLE PAINT FINISH
C1
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G, PUSAT PERDAGANGAN DANA 1, JALAN PJU 1A/46, 47301 PETALING JAYA, SELANGOR
W1
12MM THK PLASTER CEILING WITH WHITE PAINT FINISH PINS DESIGN STUDIO SDN BHD
D 3-3, PUSAT KOMERSIAL PARKLANE, JALAN SS 7/26, 47301 PETALING JAYA, SELANGOR
BW1
50MM THK ALUMINUM FRAME WINDOW WITH MAROON PAINT FINISH C/W TEMPERED GLASS
PKT QUANTITY SURVEYOR MALAYSIA SDN BHD
SUITE E-11-05 & E-11-06, PLAZA MONT' KIARA, 2, JALAN KIARA, MONT KIARA, 50480 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
F1
FFL
02
SECTION A-A SCALE 1 : 25
600MM X 600MM X 20MM THK BEIGE MARBLE EFFECT PORCELAIN TILES WITH POLISHED FINISH
ASSIGNMENT 1: WORK FROM HOME + DOOR & WINDOWS
SECTION DRAWING A-A
1:25 10 SEPT 2021
MS NOR AZIAH HASSAN
JESSIE CHEN VERNERN
WP_DWD_JCVE_SA_04
04
THE DRAWINGS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
JESSIE CHEN VERNERN 40, JALAN SEPAH PUTERI 5/24, KOTA DAMANSARA, 47810 PETALING JAYA, SELANGOR.
GAP BETWEEN CEILING
C1 12MM THK PLASTER CEILING WITH WHITE PAINT FINISH
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G, PUSAT PERDAGANGAN DANA 1, JALAN PJU 1A/46, 47301 PETALING JAYA, SELANGOR
DETAIL 1 PINS DESIGN STUDIO SDN BHD
BW1
DETAIL 2
150MM THK BRICK WALL WITH PURPLE PAINT FINISH
D 3-3, PUSAT KOMERSIAL PARKLANE, JALAN SS 7/26, 47301 PETALING JAYA, SELANGOR
W1 PKT QUANTITY SURVEYOR MALAYSIA SDN BHD
W2
SUITE E-11-05 & E-11-06, PLAZA MONT' KIARA, 2, JALAN KIARA, MONT KIARA, 50480 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
F1
FFL
03
SECTION B-B SCALE 1 : 25
600MM X 600MM X 20MM THK BEIGE MARBLE EFFECT PORCELAIN TILES WITH POLISHED FINISH
ASSIGNMENT 1: WORK FROM HOME + DOOR & WINDOWS
SECTION DRAWING B-B
1:25 10 SEPT 2021
MS NOR AZIAH HASSAN
JESSIE CHEN VERNERN
WP_DWD_JCVE_SB_02
02
THE DRAWINGS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
50MM THK MID ALLUMINIUM FRAME WITH HANDLE 10MM THK TEPMPERED GLASS
INSIDE
JESSIE CHEN VERNERN 40, JALAN SEPAH PUTERI 5/24, KOTA DAMANSARA, 47810 PETALING JAYA, SELANGOR.
50MM THK OUTER ALUMINUM FRAME 150MM THK BRICKWALL WITH PURPLE PAINT FINISH
DETAIL 3
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G, PUSAT PERDAGANGAN DANA 1, JALAN PJU 1A/46, 47301 PETALING JAYA, SELANGOR
PINS DESIGN STUDIO SDN BHD
D 3-3, PUSAT KOMERSIAL PARKLANE, JALAN SS 7/26, 47301 PETALING JAYA, SELANGOR
PKT QUANTITY SURVEYOR MALAYSIA SDN BHD
SWING PATH
SUITE E-11-05 & E-11-06, PLAZA MONT' KIARA, 2, JALAN KIARA, MONT KIARA, 50480 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
ASSIGNMENT 1: WORK FROM HOME + DOOR & WINDOWS
OUTSIDE
04
WINDOW PLAN
WINDOW 1 PLAN SCALE 1 : 10 1:10 10 SEPT 2021
MS NOR AZIAH HASSAN
JESSIE CHEN VERNERN
WP_DWD_JCVE_W1P_02
02
THE DRAWINGS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
OUTSIDE
INSIDE JESSIE CHEN VERNERN
150MM THK PLASTERED BRICK WALL WITH PURPLE PAINT FINISH 19MM SELF DRILLING SCREW
40, JALAN SEPAH PUTERI 5/24, KOTA DAMANSARA, 47810 PETALING JAYA, SELANGOR.
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G, PUSAT PERDAGANGAN DANA 1, JALAN PJU 1A/46, 47301 PETALING JAYA, SELANGOR
41MM BRACKET ANCHORED TO WALL
PINS DESIGN STUDIO SDN BHD
D 3-3, PUSAT KOMERSIAL PARKLANE, JALAN SS 7/26, 47301 PETALING JAYA, SELANGOR
12MM WEATHER STRIP GASKET PKT QUANTITY SURVEYOR MALAYSIA SDN BHD
50MM THK ALUMINUM INNER FRAME 10MM THK "U" SHAPE GASKET 10MM THK TEPMPERED GLASS
05
WINDOW DETAIL 1 SCALE 1 : 2
SUITE E-11-05 & E-11-06, PLAZA MONT' KIARA, 2, JALAN KIARA, MONT KIARA, 50480 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
ASSIGNMENT 1: WORK FROM HOME + DOOR & WINDOWS
WINDOW DETAILS DRAWING 1
1:2 11 SEPT 2021
MS NOR AZIAH HASSAN
JESSIE CHEN VERNERN
WP_DWD_JCVE_WD1_02
02
THE DRAWINGS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
OUTSIDE
INSIDE 10MM THK "U" SHAPE GASKET
JESSIE CHEN VERNERN 40, JALAN SEPAH PUTERI 5/24, KOTA DAMANSARA, 47810 PETALING JAYA, SELANGOR.
C'ARCH ARCHITECTURE & DESIGN SDN BHD
INNER ALUMINUM FRAME
D5-1-G, PUSAT PERDAGANGAN DANA 1, JALAN PJU 1A/46, 47301 PETALING JAYA, SELANGOR
12MM WEATHER STRIP GASKET
PINS DESIGN STUDIO SDN BHD
D 3-3, PUSAT KOMERSIAL PARKLANE, JALAN SS 7/26, 47301 PETALING JAYA, SELANGOR
10MM THK TEPMPERED GLASS PKT QUANTITY SURVEYOR MALAYSIA SDN BHD
SUITE E-11-05 & E-11-06, PLAZA MONT' KIARA, 2, JALAN KIARA, MONT KIARA, 50480 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
ASSIGNMENT 1: WORK FROM HOME + DOOR & WINDOWS
WINDOW DETAILS DRAWING 2
06
WINDOW DETAIL 2 SCALE 1 : 2 1:2 11 SEPT 2021
MS NOR AZIAH HASSAN
JESSIE CHEN VERNERN
WP_DWD_JCVE_WD2_02
02
THE DRAWINGS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
150MM THK PLASTERED BRICKWALL WITH PURPLE PAINT FINISH 10MM THK TEPMPERED GLASS
JESSIE CHEN VERNERN 40, JALAN SEPAH PUTERI 5/24, KOTA DAMANSARA, 47810 PETALING JAYA, SELANGOR.
INSIDE 50MM THK OUTER ALUMINUM FRAME
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G, PUSAT PERDAGANGAN DANA 1, JALAN PJU 1A/46, 47301 PETALING JAYA, SELANGOR
5MM THK WEATHER STRIP GASKET
PINS DESIGN STUDIO SDN BHD
D 3-3, PUSAT KOMERSIAL PARKLANE, JALAN SS 7/26, 47301 PETALING JAYA, SELANGOR
BRACKET ANCHORED TO WALL PKT QUANTITY SURVEYOR MALAYSIA SDN BHD
19MM SELF DRILLING SCREW
OUTSIDE
SUITE E-11-05 & E-11-06, PLAZA MONT' KIARA, 2, JALAN KIARA, MONT KIARA, 50480 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
ASSIGNMENT 1: WORK FROM HOME + DOOR & WINDOWS
WINDOW DETAILS DRAWING 3
07
WINDOW DETAIL 3 SCALE 1 : 2
1:2 11 SEPT 2021
MS NOR AZIAH HASSAN
JESSIE CHEN VERNERN
WP_DWD_JCVE_WD3_02
02
WINDOW SCHEDULE
THE DRAWINGS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
JESSIE CHEN VERNERN 40, JALAN SEPAH PUTERI 5/24, KOTA DAMANSARA, 47810 PETALING JAYA, SELANGOR.
C'ARCH ARCHITECTURE & DESIGN SDN BHD D5-1-G, PUSAT PERDAGANGAN DANA 1, JALAN PJU 1A/46, 47301 PETALING JAYA, SELANGOR
PINS DESIGN STUDIO SDN BHD
FFL
OPENING NO.
W1
LOCATION
BEDROOM
TYPE DESCRIPTION
D 3-3, PUSAT KOMERSIAL PARKLANE, JALAN SS 7/26, 47301 PETALING JAYA, SELANGOR
FRAME
DOUBLE PANEL CASEMENT SWING WINDOW 1200MM (W) X 1500MM (H) X 50MM THK ALUMINUM FRAME
LEAF
10MM THK TEMPERED GLASS
HINGE
STEEL
PKT QUANTITY SURVEYOR MALAYSIA SDN BHD
SUITE E-11-05 & E-11-06, PLAZA MONT' KIARA, 2, JALAN KIARA, MONT KIARA, 50480 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
ASSIGNMENT 1: WORK FROM HOME + DOOR & WINDOWS
WINDOW SCHEDULE
1:20 11 SEPT 2021
IRONMONGERY
LOCK/BOLTS STOP/PULLS
ONE POINT SAFETY LOCK
MS NOR AZIAH HASSAN
JESSIE CHEN VERNERN
STAINLESS STEEL WP_DWD_JCVE_WS_04
04
THE DRAWINGS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
DESCRIPTION
CODE
SUPPLIER CONTACT
AREA
REMARK JESSIE CHEN VERNERN
FLOOR FINISHES
F1
600MM X 600MM X 20MM THK BEIGE MARBLE EFFECT PORCELAIN TILES WITH POLISHED FINISH
40, JALAN SEPAH PUTERI 5/24, KOTA DAMANSARA, 47810 PETALING JAYA, SELANGOR.
SUPER CERAMIC TILES AND DESIGN SDN.BHD. LOT 1, PERSIARAN SUNGAI BULOH, TAMAN SAINS SELANGOR 1, KOTA DAMANSARA, 47810 PETALING JAYA, SELANGOR TEL NO: 03-6141 2828 E-MAIL: SUPERCERAMICKD@GMAIL.COM
C'ARCH ARCHITECTURE & DESIGN SDN BHD
BEDROOM, WORKSPACE
D5-1-G, PUSAT PERDAGANGAN DANA 1, JALAN PJU 1A/46, 47301 PETALING JAYA, SELANGOR
WALL FINISHES PINS DESIGN STUDIO SDN BHD
MR. PAINT SHOP
BW1
150MM THK BRICK WALL WITH PURPLE PAINT FINISH
NO. 57, JALAN MAWAR 15, OFF JALAN KUARI, 56100 CHERAS, KUALA LUMPUR TEL NO: (603) 4292-9229 E-MAIL: MRPAINT@MRPAINTSHOP.COM.MY
BEDROOM, WORKSPACE D 3-3, PUSAT KOMERSIAL PARKLANE, JALAN SS 7/26, 47301 PETALING JAYA, SELANGOR
CEILING FINISHES
C1
12MM THK PLASTER CEILING WITH WHITE PAINT FINISH FLAT CEILING
PKT QUANTITY SURVEYOR MALAYSIA SDN BHD
MR. PAINT SHOP NO. 57, JALAN MAWAR 15, OFF JALAN KUARI, 56100 CHERAS, KUALA LUMPUR TEL NO: (603) 4292-9229 E-MAIL: MRPAINT@MRPAINTSHOP.COM.MY
BEDROOM, WORKSPACE
SUITE E-11-05 & E-11-06, PLAZA MONT' KIARA, 2, JALAN KIARA, MONT KIARA, 50480 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
ASSIGNMENT 1: WORK FROM HOME + DOOR & WINDOWS
WINDOW FINISHES SCHEDULE OF FINISHES
VINCA
W1
1200MM(W) X 1500MM(H) X 50MM THK ALUMINUM FRAME
NO.31, JALAN LAYANG-LAYANG 5, BANDAR PUCHONG JAYA, 47100 PUCHONG, SELANGOR. TEL NO: 03-58823131 E-MAIL: INFO@VINCATROPICALE.COM
BEDROOM, WORKSPACE
1:30 12 SEPT 2021
MS NOR AZIAH HASSAN
JESSIE CHEN VERNERN
WP_DWD_JCVE_SOF_02
02
REFLECTION FOR THIS PROJECT, I'VE COMPILED A SERIES OF SIMPLE TECHNICAL DRAWINGS OF MY SELECTED WORKSPACE IN AN A3 FORMAT AND I LEARNED HOW TO LOOK AT DETAILS FROM THE DOORS AND WINDOWS OPENING ALONGSIDE WITH DETAILED SPECIFICATIONS WITH DIMENSIONS AND MATERIAL FINISHES. THIS PROJECT WAS AN OPPORTUNITY FOR ME TO WORK ON MY TECNICAL DRAWING SKILLS WHEN PRODUCING THE PLANS, SECTIONS & DETAILINGS.
-THANK YOU-