Ø Car Park o Incorporated Precast Concrete Panels and components which were laid and set on site o Used for storage purposes
Victoria Street Site – ICON Constructions -‐ Multiple Building Commercial Project -‐ Apartment/Work Buildings -‐ 3 Cranes Operating On Site ⇒ Heavier Structure (Prefabricated Concrete) ⇒ Lightweight Structure (Steel/Timber Framework) § Although a lightweight structure, the building had alterations in footings and foundations due to added levels/floors on the building. o Steel reinforcing beam incorporated § Loads need to be adequately distributed down through the structure to ensure quality assurance (ultimately so the structure doesn’t fail)
ü A Temporary column which acts as further reinforcement and holds loads ü Concrete chamfered edges for aesthetic and OH + S purposes
All Images sourced: Tony Duong, 2013
ENVS10003 Constructing Environments A03 – Final Journal Submission
641144 Josh Davis
§
The Apartment Balconies must undergo a great deal of waterproofing, thus the construction of waterproof membranes are needed.
Layers include: I. Waterproof Membrane II. Application of Screed III. Membrane IV. Concrete Slab (Drain already cut out) & Coating V. Tiling ⇒ Certain areas need acoustic and waterproof membranes ⇒ A living room area may incorporate acoustic membranes in order to reduce leakage of noise downwards to other apartments •
•
•
In relation to Week 7’s ‘E-‐ learning’ the primary purpose of a roof is to a sheltering element to enclose internal spaces. The temporary walkway through the site, incorporates corrugated iron on a moderate roof pitch that sits on purlins and distribute their loads through the columns and wall systems. Primary Structure – Timber framework
A bathroom incorporates a double membrane on the flooring and waterproofing takes place on walling areas where water may affect the RATE OF AGEING of a structure.
All Images sourced: Tony Duong, 2013
ENVS10003 Constructing Environments A03 – Final Journal Submission
641144 Josh Davis
ENVS10003 Constructing Environments A03 – Final Journal Submission
641144 Josh Davis
References: Ching, F., 2008. Building Construction Illustrated. 4th Edition. Wiley & Sons, Inc.,
ENVS10003 Constructing Environments A03 – Final Journal Submission
641144 Josh Davis
§
The large fans incorporated into the car park are used for purposes mentioned in ‘Vignette 6’ such as HEALTH impacts of Construction. o Simply put, it reduces toxicity by removing fumes from cars
v Span between concrete wall systems v Concrete slab floor system [Depth of floor system = Relates to span + Strength of Concrete] v Loads transferred through wall systems from above forces
§
The diagonal supports are temporary reinforcement to ensure the wall systems remain erect throughout its construction process
⇒ Swimming Pool Prefabricated Steel Framing ⇒ Primary Structure incorporates Galvanized Steel (used to stop rust), and Steel. ⇒ The structure incorporated columns, roofing joists and foundations o As per ‘Vignette 6’ material selection must considers the LIFE CYCLE of the swimming pool. All Images sourced: Tony Duong, 2013