ENVS10003 Constructing Environments A03 – Final Journal Submission Week 7 Journal
641144 Josh Davis
Ø Car Park o Incorporated Precast Concrete Panels and components which were laid and set on site o Used for storage purposes
Victoria Street Site – ICON Constructions -‐ Multiple Building Commercial Project -‐ Apartment/Work Buildings -‐ 3 Cranes Operating On Site ⇒ Heavier Structure (Prefabricated Concrete) ⇒ Lightweight Structure (Steel/Timber Framework) § Although a lightweight structure, the building had alterations in footings and foundations due to added levels/floors on the building. o Steel reinforcing beam incorporated § Loads need to be adequately distributed down through the structure to ensure quality assurance (ultimately so the structure doesn’t fail)
ü A Temporary column which acts as further reinforcement and holds loads ü Concrete chamfered edges for aesthetic and OH + S purposes
All Images sourced: Tony Duong, 2013