Donor floor.

Name: Brad Giha Role: Sr. Project Manager Did you know? Brad has

Executive Summary

managed over $37 million worth of Grifolfs projects over the past 4 years.

I can’t believe it has been 4 months since we started this project! The time has truly flown by. This project is shaping up very nicely as we get towards the end. Over the past few weeks we have had a number of activities reach completion. The first was the drywall finishing and painting, followed closely by the acoustical ceiling grid and all of the lighting. At the same time, our HVAC partner completed all of his duct runs and dropped in his diffusers. After finishing the ceiling; Hilario Luevano with H&M Construction installed all of the cabinets and countertops as well as the rigid wall protection. We were also able to complete the epoxy floors. As we come enter this final stretch, every thing is looking good. The HVAC and Plumbers with Gunther’s are setting fixtures and getting all the finishes set. Our Electrical and Low Voltage contractors are also installing devices and configuring the lighting and security systems. Our next tasks will be the Forbo flooring, glass, door frames and door installation.

Meet Your Field Manager!

Welcome to On Location!

Brad Giha, Senior Project Manager bradg@elzinga-volkers.com

Name: Jon Hegwer Role: Field Manager Did you know? John has completed over $180,000,000 worth of construction projects during his 39 years in the industry?

Tony’s visit to the site.

alive365 safetymatters

Reception.

www.elzinga-volkers.com www.elzinga-volkers.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.