Building Together | UMRC July 2018

Page 1

BUILDING TOGETHER United Methodist Retirement Communities | Chelsea

ISSUE

09 July 2018

AERIAL VIEW OF THE PROJECT SITE KRESGE SKILLED NURSING

PROJECT MANAGEMENT UPDATE

Matt Wintjes Assistant Project Manager

July was crunch time for the construction team as the Benson office building was slotted for completion. Coordination was in full swing aligning all outstanding items to ensure the finished product was ready to welcome its new occupants. With the steel framing complete at the Kresge Addition, crews have shifted inside the building to begin framing each new resident room and common area. Throughout this phase, all parties will be able to coordinate locations of mechanical, electrical and plumbing fixtures to ensure the finishing touches are installed as designed. I’m sure all of you are curious as to why the McMullen Wellness Center was covered with plastic tarp. With all the chemicals a pool atmosphere commonly presents, the entire structure that is exposed to these elements is susceptible to corrosion. Therefore, Clark Brother’s Painting is assigned with the task of applying an intermediate and finish coating of a specialty Tnemec paint and primer. This paint product will need to be applied to all of the structural steel framing and decking that will be exposed. This intricate process of blasting and applying each coat will ensure this building will hold its aesthetic appeal for many years to come. Once again, all of the obstacles and inconveniences that construction can present haven’t gone unnoticed and we’d like to thank you for your continued cooperation and for being a joy to work with! Matt Wintjes, Assistant Project Manager MattW@elzinga-volkers.com

www.elzinga-volkers.com www.elzinga-volkers.com


Building Together | Construction Update Newsletter UMRC - Chelsea, MI - July 2018

KRESGE EXPANSION & RENOVATIONS | UP NEXT

The addition of the Kresge building is moving at full speed ahead! The setting of structural steel has been completed, along with the roofing of both the east and west wings. Currently, the structures MEP (mechanical, electrical, plumbing) rough-ins and interior framing are in process. The Kresge building will soon see the roofing and framing of the center wing, the completion of exterior masonry, and the beginning of hanging drywall.

BENSON OFFICE BUILDING | UP NEXT

The Benson Office Building is nearly complete! The third and fourth floors were turned over to the UMRC team earlier this month, and they are currently enjoying their newly renovated office space. Punch list items have been addressed on the first and second floors of the building. The exterior masonry has been painted and is in the process of being sealed. New furniture is scheduled to arrive within the week, and the remainder of the UMRC team will soon be moved in!

BENSON OFFICE BUILDING

MCMULLEN WELLNESS & AQUATIC CENTER | UP NEXT

The new McMullen Wellness and Aquatic Center is beginning to be roughed-in! The structure has received its intermediate coat of paint and miscellaneous steel work is wrapping up. The completion of the structural steel work has allowed for masons to begin laying CMU’s at the future elevator shaft, stairway, and vestibule. Within the coming weeks, the Wellness Center will undergo concrete pours, interior framing, and MEP rough-ins. Additionally, new roof curbs and HVAC units will be installed, and the laying of CMU’s will continue along the perimeter wall.

MCMULLEN WELLNESS & AQUATIC CENTER

TEAM SPOTLIGHT

Led by foreman Garret Kruse, Allied Electric has proven themselves to be a key player at UMRC. Simultaneously completing work on all three projects onsite, employees of Allied Electric help keep the jobsite safe.

Who’s Who On Site

TRACK THE PROJECT’S PROGRESS AS THE VIEW TAKES SHAPE! 12/17

01/18

02/18

03/18

04/18

ABATEMENT & DEMO

05/18

06/18

07/18

STAFF RELOCATION

RENOVATION OF NORTH WING

FOUNDATIONS

FOUNDATIONS

08/18

09/18

10/18

TRIPPLETT DEMO

EXTERIOR SHELL

EXTERIOR SHELL

11/18

FINAL INSPECTION & CLEANING

INTERIOR FINISHES

POOL CONSTRUCTION

INTERIOR FINISHES

RENOVATIONS (THROUGH 12/2019)

BENSON OFFICE BUILDING

KRESGE EXPANSION

MCMULLEN WELLNESS CENTER

KRESGE RENOVATIONS

www.elzinga-volkers.com