Building Together Canterbury on the Lake - Facility Addition & Renovations

Framing on the West side of the Memory Care looking into the Memory Garden

Gypsum lids and smoke walls being hung

Monthly Funny

PM Summary Taking Shape! Over the past month we have hit a few big milestones. One of the most impactful milestones is the completion of the roof and attic fire protection in the Memory Care Addition. This has allowed the drywall crew to start hanging the drywall “lid� that attaches to the trusses. This drywall is not the finished surface in the corridors and bathrooms, but it provides a break between the cold attic and the warm space below. Having this drywall installed allows us to install all ductwork, electrical, plumbing, and low voltage that is concealed in the finished building with an acoustical ceiling system. Another big milestone is the completion of the majority of siding and brick on the Memory Care Addition. The connector and bridge are slowly taking shape with a lot of effort going into coordinating and installing all the details that tie to the new structures to the existing. In the Health Care Center, Phase 5 was successfully turned over and Phase 6 has begun. The Rehab addition is just about ready for drywall, which is a great milestone on this small but complex addition.

2016-2017 Michigan Contractor of the Year 2016-2017 WINNER Elzinga & Volkers, Inc.

Best regards, Joe Novakoski, P.E. Vice President of Operations / Senior Project Manager joenova@elzinga-volkers.com

2016-2017 WINNER Elzinga & Volkers, Inc.


.

SAFETY Memory Care/Connector Matters Hearing Protection

Building Together | Canterbury On The Lake Facility Addition & Renovations | July 2017

Looking Ahead

We all enjoy listening to our favorite songs on the radio, watching our favorite TV shows, and participating in great conversations with the people around us, right? With this in mind, we should certainly protect our hearing while we are on noisy construction sites because once the damage is done, it can be long-lasting or even permanent!

Bill Carfagno, Field Manager BCarfagno@elzinga-volkers.com | 573-247-9766

Memory Care/Connector Project Happenings » » » » »

Gypsum lids and smoke walls are being hung MEP rough-in’s continue to make progress throughout Exterior wall insulation is beginning this month Aluminum windows and door frames are being set Memory Garden drainage and final grading will be complete with concrete to follow » Steel at the Connector will be painted and set

Ear Safety, like all aspects of safety, is aimed at keeping ourselves and our senses safe from danger and/or permanent damage while on the jobsite. In the past, many workers did not want to wear hearing protection because they were afraid that they would miss a warning call from above or the sound of a generator kicking in. Today, there are many different styles of hearing protection available. In fact, it is so sophisticated that workers can a select a noise canceling hearing protection device that cancels or blocks dangerous background noise, but still allows face-toface conversations. It’s important to remember that even with all the great hearing protection choices available, the most important aspect of ear safety is just being aware of the risk before you start any work.

Memory Care/Connector

Owner Occupancy Owners FFE Building Finishes Phase 9

AUG

SEP

OCT

NOV

DEC

Major Milestones

Building / Core and Shell

Phase 1

JAN DEC

Final section of concrete poured on the East side of the Memory Care

2016

2017

FEB

MAR

APR

MAY

JUN

JUL

Gypsum Lids

Sitework / Building Pad

Page 2 2016-2017 WINNER Elzinga & Volkers, Inc.


Building Together | Canterbury On The Lake Facility Addition & Renovations | July 2017

TEAM Health Care Renovation SPOTLIGHT Who’s Who On Site Looking Ahead

Welcome Bill Carfagno, "BC"

Anthony Pipitone, Field Manager AnthonyP@elzinga-volkers.com | 586-265-1410

Upcoming Renovation Project Happenings In the upcoming weeks, the Rehab Addition will be installing insulation, drywall, and cabinets. Phase 6 has begun! The resident rooms will include new walk-in showers with wall mounted bench seats.

Please welcome Bill Carfagno (BC) to the Canterbury on the Lake project team! BC has been with E&V nearly 20 years and has worked on a variety of projects within Michigan and around the country. He is taking over the role as Field Manager for the Memory Care/Connector portion of the project. In his spare time, BC likes to spend time working on his farm and all the time he can get with his 11 grand children. Please say hello to BC as you see him around the jobsite!

Health Care Renovations

Phase 9

Phase 9 - Completion

OCT

NOV

DEC

Major Milestones

Phase 4

JUL

Phase 5

JUN

Phase 6

Phases 7 and 8

MAY

AUG

SEP

Memory Garden

Phase 3

Rehab Addition

Memory Care corridor

Phase 1

JAN

2017

FEB

MAR

APR

Phase 1

Page 3 2016-2017 WINNER Elzinga & Volkers, Inc.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.