Hope Church - Building Living Hope - August 2016

Page 1

ISSUE

05

Construction Update Newsletter

SEPTEMBER 2016

Building Living Hope Hope Church - Renovations & Additions

Final coat of asphalt paving

The drop-off canopy is 100% complete!

New concrete floor in the chapel

SITE FUN FACT!

Executive Summary Transformational Project Progress Another exciting month of progress has occurred on this transformational project. The drop-off canopy is now 100% complete and looks wonderful. In the chapel area, the roof and brick have been installed. This “drying in� of the building allowed us to pour the concrete floor in the space. Hidden under this floor are heating pipes for the hallway to the youth area, a hearing aid loop for the Chapel and a web of electrical power conduits. In the church office, demolition is complete and the new walls are roughed in. You can already see dramatic changes in the Gathering Area as demolition has been completed to make way for new HVAC, electrical and finishes. Another large item we completed over the past month was the installation of a new fire protection water main, which had to run all the way the north side of 10th Street. As soon as this was complete, the road was patched and at the same time, the final coat of asphalt paving was installed on the parking lot. Thanks to everyone for their patience as we continuously change your routes to different areas of the building!

The existing entry doors from 11th Street are not original to the building. However, the new doors will simulate the original doors as seen in historic photographs.

Best regards,

Joe Novakoski, P.E. Vice President | joenova@elzinga-volkers.com