Saint Mary's Mercy Health Ninth Floor Renovation February Newsletter

Page 1

Inside Scoop

Construction Update Newsletter February 2018

Mercy Health Saint Mary’s - Ninth Floor Renovation

Siding removal and new window installation

www.elzinga-volkers.com www.elzinga-volkers.com


Inside Scoop - Construction Update Newsletter Mercy Health Saint Mary’s - Ninth Floor Renovation - February 2018

Steel Column Install

Phase 2 Wall Framing

Column Demo Shoring

PM Update

And we’re back! Did you miss the Inside Scoop? It has been a while since our last update but the silver lining is that I’ve got a lot more content to share! The past few months have been exciting to say to the least. In December the construction crews put their final touches on Phase 1. Following that, the local building officials, state fire marshal and state health inspector each granted occupancy to the space without issue. Over the holiday season, the user group took a several week opportunity to prep and train within the unit. Working alongside them, our technology friends managed to dial in all the intricate computer and control systems. Finally, at the beginning of January, the first patients were welcomed on to the unit. The first baby was born January 9th, 2018 with many more to coming in the following months and years. As a member of the project team, it is amazing to think of the impact that this unit brings to the community. I mean, come on! New people being added to the planet? How exciting is that! I’m sure that to the amazing OB staff, this is just a “normal” occurrence, but I think I speak for everyone when I say that what these incredible people do is anything but “normal”. In addition to caring for patients, the MHSM staff has patiently tolerated us working along their sides as we have been drilling, cutting, carting, screwing, grinding, and sanding for months. From all of us on the construction team, I’d like to say thanks! Moving forward, we are off and running on Phase 2. As you might remember from the phasing discussion in a previous edition of Inside Scoop, Phase 2 is the smallest phase by square footage for the entire 9th floor renovation. It does, however, pack a punch for its size. Similar to Phase 1, it has the same number of structural columns that must be removed, an electrical room to relocate, main utilities to re-route and the same number of through floor shafts to re-build without the benefit of a wide-open unoccupied NICU to work in beneath us. As such, we will be working closely with the 8th floor staff over the next few months to sequentially shut down rooms in order to complete our through-floor mechanical work. Up on 9, we’re pleased to report that demo is now complete and wall framing crews are already giving shape to the future post-partum rooms. Rooms that, I might add, will happily host the newest members of our planet in the months to come! Brett Lesiewicz Project Manager brettl@elzinga-volkers.com

Track the Project’s Progress as the View Takes Shape!

Phase 1

Phase 2

Phase 3A

Phase 3B

www.elzinga-volkers.com www.elzinga-volkers.com


Inside Scoop - Construction Update Newsletter Mercy Health Saint Mary’s - Ninth Floor Renovation - February 2018

Upcoming Milestones • Through floor mechanical and plumbing rough-ins • Wall framing

Phase 2 Demolition

• Wall prep • New piping for med gas and water

This month’s Trade Contractor Spotlight goes to Precision Commercial Flooring. Starting right after demo, Precision scarifies (grinds down) the existing concrete floors. After this is complete, they will level the floor with two coats of prep material, providing a smooth finish which aids wall layout. Additional leveling material is later added once drywall is complete. This extensive prep work and attention to detail during installation provides a beautiful and high quality finished product. Keep it up, Precision!

Temporary Wall for Construction - Construction Site Side and Hospital Corridor Side

www.elzinga-volkers.com www.elzinga-volkers.com


Phase 1 Final Photography

Inside Scoop - Construction Update Newsletter Mercy Health Saint Mary’s - Ninth Floor Renovation - February 2018

Patient Room

Patient Room

Triage Room

Patient Toilet Room

Greeting Desk

Family Waiting Room

www.elzinga-volkers.com www.elzinga-volkers.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.