CMT Water Quality Update Harvesting Operations are underway. The Harvesting team, consisting of one Harvester and one skimming team, started in the East Marina during the end of July and the beginning of August. Harvesting Operations run from 8:30 to 3:30. They will continue to do Pile Pick-ups everyday Thursday from 8:30-11:00. Please visit tkpoa. com and/or keysweedsmanagement.org for the most up-to-date Harvesting schedule.

your animals swim or drink the water, staying away from the algae and scum, keeping children away etc. Please note, HAB occurrences followed by these warnings are typically seen this time of year in the Keys Lagoons and you will continue to see the signage during the month of August.

As in typical years past, the TKPOA AIS Team has taken monthly water samples due to requirements for an existing LFA permit. The results from the July sampling indicated that there are toxic algae present which triggered the WQ Team to put up “Caution” signage around the LFA Site #26 area (Traverse, Slalom, and Christie) on July 18. These signs warn against letting

The UV-C contractor has completed the first round of treatment on all the “UV-C Only” sites - Sites 22, 23 and 24. As the turbidity curtains will remain installed until late August, the UV-C contractor and the TKPOA WQ team are working together to find a solution on getting the UV-C boat to enter the Restricted Area A. Once it enters the area, the boat will treat the “combo” sites (UV-C and herbicide) to complete the total UV-C treatment of the CMT Project. On July 11th, 2022 pursuant to California Civil Code Section 4360 (d), the Board of Directors adopted by Board Motion the following: Emergency Rule Keys Breeze

|

AUGUST 2022

|

29


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.