Volvo Ocean Race Pavilion

Page 1

GROUP 3.03 staff:

Gloria Herranz Katia Vรกzquez ร ngela Trujillo

SCS singular construction systems 2014-15 ARCHITECTURE /// universidad de alicante


0_INDEX


1_IDEA


Group 3.03

1_Idea

Volvo Ocean Race Pavilion

Location of the pavilion Alicante

Setting plans e. 1/10000

Emplacement plans e. 1/500

EDIFICIO SAFIMAVI

14.63

14.63

13.95

PGOU

PLANEAMIENTO MUNICIPAL VIGENTE PGOU + CÓDIGO DE CALIFICACIÓN DEL SUELO

This ground belongs to the primary transport system 05 0

100

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vázquez

4


Group 3.03

1_Idea

Volvo Ocean Race Pavilion Setting plans e. 1/10000

Location of the pavilion Abu Dhabi Emplacement plans e. 1/500

13.95

14.63

14.63

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

5


Group 3.03

1_Idea

Volvo Ocean Race Pavilion Setting plans e. 1/10000

Location of the pavilion Auckland Emplacement plans e. 1/500

13.95

14.63

14.63

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

6


Group 3.03

1_Idea

Volvo Ocean Race Pavilion Setting plans e. 1/10000

Location of the pavilion Newport Emplacement plans e. 1/500

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

7


Group 3.03

1_Idea

Volvo Ocean Race Pavilion Setting plans e. 1/10000

Location of the pavilion Lorient Emplacement plans e. 1/500

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

8


Group 3.03

1_Idea

Volvo Ocean Race Pavilion Setting plans e. 1/10000

Location of the pavilion Gothemburg Emplacement plans e. 1/500

14.63

14.63

13.95

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

9


Group 3.03

1_Idea

Distribution plants

C8

Volvo Ocean Race Pavilion

0 C1 C8 ’

44 2.

Measured plants and modulation e.1/100

C5’

C4’ C5

C4

A1’

C1

C1

76 4.

A1

5. 94

0’ C1 A4 ’ A4

[0.68]

[2.44]

[0.68]

[5.94]

[2.44]

[2.44]

0.68

2.24

0.69

5.74

2.24

2.24

13 .8 8 2. 00

14.63

4.80

C7

5. 94

C8 ’ ’ C7

88 0. 27 1.

1.54

18

[12.20]

56

2.

1.54

9.66

49

1.49

1.58

1.

14.63

1.23

200 400 245

Shed time (days) Transport time (days) Workplace time (days) Disassembly time (days)

3.

2.77

Usable oor area (m2) Built-up area (m2) Occupation area (m2)

Deposit dimensions (m)v Capacity (l) Autonomy (days)

1.49 .4

1. 03

1.49

C8

[2.44]

2.18

2.09

0.23

1.50

3.01

’ A3

A2’

C9

A2’

C2’ A2

C9

C2’ A2

A3

1.44

C2

4 7 3 14

Consumo (kwh/day) Solar planels area (m2) Number of sonal panels (ud) Solar panels dimensions (m)

9 .1 12

C2

3.73

DATA 20’ Containers (5’94m) 40’ Containers (12’20m) Others Total containers

09

1. C2

0.

1.56

90

A2

1 1.25

2. 44

[2.44]

C7

2.

[2.44]

C8

12

0

00

A5

4.

C7

C1

9. 44

A3 C9

2.

C9

A4

3. 56

C5’ - A2’

C4’ C5 - A2

C4

A1’

C1

C1

[2.44]

A3

A1

44

4.80

4.80 80

’ C7

05 3. 05 3.

[2.44]

2.13

9 .1

[2.44]

12

[5.94]

0 C1

1.56

3

[0.69]

1.54

.6

[2.44]

1.54

14

[0.69]

1.50

C6’ 1.49

A4

18 1.

C6’ 1.44

A3

C6

0’ C1 A4

06 3.

C3’ C6

C5

C3

89 0.

C3’ C6

C4

36

87

1.55

A1

2.

0.

C3

C1

44 2.

C3

A1

Singular Constructive Sistems 2014/2015

C9

Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vázquez

10


Group 3.03

1_Idea

Volvo Ocean Race Pavilion

Distribution plants Distribution ideation and main surfaces e.1/100 Main oor

Lounge Surface_15m²

First oor

PROGRAM Main hall Shop Volvo corridor Exposition room Kid’s area Yard

AREA (m2) 11 45 25 35 20 5

Conference room Bathrooms Bar Lounge Terrace

29 20 13 15 108

Shop Surface_45m²

Kid’s Area Surface_20m²

Conference Room Surface_29m²

Volvo exposition Surface_25m²

Yard

C2

Surface_35m²

A2 A1

C1

A1

C4

Baths Hall

C5

C3

Surface_20m²

A3

C6

Surface_11m²

Terrace Alicante Ex.

Surface_108m²

C1 A4 C9

Surface_13m²

C7

Kitchen

0

A5

C8

Surface_35m²

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vázquez

11


Group 3.03

1_Idea

Volvo Ocean Race Pavilion

Elevations Main elevation e.1/50

2.48

3.21

2.63

2.92

13.99

20.80

F1

I1

CODE F1_T F1_WS

ELEMENT Triangles Conecting element

MATERIAL Marine plywood Wvood

F1_HH F1_HR

Hanging hook Horizontal rails

Aluminium Aluminium

F1_AW

Auxiliar wooden stud

Wood

I2

FINISHING Black Aquamarine painting None Aquamarine painting Aquamarine painting

CODE F2_C F2_G F2_TB F2_NP

ELEMENT Carpentry Glass Thermal break Join

MATERIAL Aluminium Glass Polyamide Neoprene

FINISHING Anodized None None None

CODE I1_WS I1_PF I1_RW I1_SS I1_SC I1_MP I1_WF

ELEMENT Stud Isolation Isolation Stud Canal Finishing suport Finishing

F2

MATERIAL Wood PU foamv Rockwood Steel Steel Marine plywood boards Marine plywood nishing

FINISHING None None None None None None White

CODE I2_PS I2_AM I2_PYL I2_SS I2_SC I2_RW I2_PF I2_WS

ELEMENT Porcelain tile Adhesive Finishing suport Stud Canal Isolation Isolation Stud

MATERIAL Porcelain stoneware Advhesive morter PYL Steel Steel Rockwood PU foam Wood

FINISHING Polished None None None None None None None

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

12


Group 3.03

1_Idea

Volvo Ocean Race Pavilion

Elevations Side elevation e.1/50 20.80

2.34

3.21

1.00

2.92

14.74

20.80

CODE F1_T F1_WS

ELEMENT Triangles Conecting element

MATERIAL Marine plywood Wvood

F1_HH F1_HR

Hanging hook Horizontal rails

Aluminium Aluminium

F1_AW

Auxiliar wooden stud

Wood

FINISHING Black Aquamarine painting None Aquamarine painting Aquamarine painting

CODE F2_C F2_G F2_TB F2_NP

ELEMENT Carpentry Glass Thermal break Join

MATERIAL Aluminium Glass Polyamide Neoprene

FINISHING Anodized None None None

CODE I1_WS I1_PF I1_RW I1_SS I1_SC I1_MP I1_WF

ELEMENT Stud Isolation Isolation Stud Canal Finishing suport Finishing

MATERIAL Wood PU foamv Rockwood Steel Steel Marine plywood boards Marine plywood nishing

FINISHING None None None None None None White

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

13


Group 3.03

1_Idea

Volvo Ocean Race Pavilion

Elevations Glass facade elevation 1 e.1/50 20.20

10.42

2.92

2.62

3.21

9.89

14.68

F1

I2

CODE F1_T F1_WS

ELEMENT Triangles Conecting element

MATERIAL Marine plywood Wvood

F1_HH F1_HR

Hanging hook Horizontal rails

Aluminium Aluminium

F1_AW

Auxiliar wooden stud

Wood

I1

FINISHING Black Aquamarine painting None Aquamarine painting Aquamarine painting

CODE F2_C F2_G F2_TB F2_NP

F2

ELEMENT Carpentry Glass Thermal break Join

MATERIAL Aluminium Glass Polyamide Neoprene

FINISHING Anodized None None None

CODE I1_WS I1_PF I1_RW I1_SS I1_SC I1_MP I1_WF

ELEMENT Stud Isolation Isolation Stud Canal Finishing suport Finishing

MATERIAL Wood PU foamv Rockwood Steel Steel Marine plywood boards Marine plywood nishing

FINISHING None None None None None None White

CODE I2_PS I2_AM I2_PYL I2_SS I2_SC I2_RW I2_PF I2_WS

ELEMENT Porcelain tile Adhesive Finishing suport Stud Canal Isolation Isolation Stud

MATERIAL Porcelain stoneware Advhesive morter PYL Steel Steel Rockwood PU foam Wood

FINISHING Polished None None None None None None None

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

14


Group 3.03

1_Idea

Volvo Ocean Race Pavilion

Elevations Glass facade elevation 2 e.1/50 20.31

9.89

2.92

2.63

3.21

10.42

14.71

F1

I1

CODE F1_T F1_WS

ELEMENT Triangles Conecting element

MATERIAL Marine plywood Wvood

F1_HH F1_HR

Hanging hook Horizontal rails

Aluminium Aluminium

F1_AW

Auxiliar wooden stud

Wood

FINISHING Black Aquamarine painting None Aquamarine painting Aquamarine painting

F2

CODE F2_C F2_G F2_TB F2_NP

ELEMENT Carpentry Glass Thermal break Join

MATERIAL Aluminium Glass Polyamide Neoprene

FINISHING Anodized None None None

I1

I2

CODE I1_WS I1_PF I1_RW I1_SS I1_SC I1_MP I1_WF

ELEMENT Stud Isolation Isolation Stud Canal Finishing suport Finishing

MATERIAL Wood PU foamv Rockwood Steel Steel Marine plywood boards Marine plywood nishing

FINISHING None None None None None None White

CODE I2_PS I2_AM I2_PYL I2_SS I2_SC I2_RW I2_PF I2_WS

ELEMENT Porcelain tile Adhesive Finishing suport Stud Canal Isolation Isolation Stud

MATERIAL Porcelain stoneware Advhesive morter PYL Steel Steel Rockwood PU foam Wood

FINISHING Polished None None None None None None None

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

15


Group 3.03

Volvo Ocean Race Pavilion

1_Idea

Axonometriy Front view

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

16


Group 3.03

Volvo Ocean Race Pavilion

1_Idea

Axonometry Back view

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

17


1_Idea

Group 3.03

Volvo Ocean Race Pavilion

Ideation Drawings

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

18


2_I+CT


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion

Structure Main structure (the container) Basic structure - the container

Columns

Floor small beams

Floor beams

A4

Cutted containers

A2

A3 A5

. 9

. 6

.

. 6 . 0 A1 A1

.

9

6 90.

0.6 Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

20


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion

Structure Secondary structure (reinforcements) and auxiliar structures (slots) Reinforcement columns and beams (for windows)

Transmition of the loads trhough the reinforcements

Auxiliar slots Main floor

First floor

Cutted containers

Cables for cantilevers

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

21


Group 3.03

2_I+CT

Structure

C5’

C4’ C5

Fundations and types of unions

C4

A1’

C1

C1

A1

Volvo Ocean Race Pavilion

14.63 [0.68]

[2.44]

[0.68]

[5.94]

[2.44]

[2.44]

0.68

2.24

0.69

5.74

2.24

2.24

C2 2.09

[2.44]

C2

C2’ A2

A2’

A2’

We use twistlocks “cola de gaviota” to solve the fundations. For the stairs we use an articulated joint (rótula) to absorve the move ments.

Joints between containers

9.66

14.63

[12.20]

C2’ A2

Fundations

We use regular twistlocks between containers in horizontal joints when the containers are parallels to each othe

C3

r

[2.44]

C3

C3’ C6 [2.44]

2.13

[2.44]

C3’ C6

C6’

C6’

[2.44]

C5’ - A2’

[2.44]

C4’ C5 - A2

[5.94]

C4

[0.69]

A1’

[2.44]

C1

C1

A1

[0.69]

Auxiliar structures and removed columns Steel plates with screws are used in this kind of situation to make more rigid the unions but temporal so it can be dismantled Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vázquez

.

22


Group 3.03

Volvo Ocean Race Pavilion

2_I+CT

Structure General view

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

23


Group 3.03

Volvo Ocean Race Pavilion

2_I+CT

Facilities Distribution of the solar panels

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

24


Group 3.03

Volvo Ocean Race Pavilion

2_I+CT

Plans Main floor vertical section e. 1/40

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent

E: 1/40

Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

25


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion

Plans Detail situation e. 1/20

Detail 1.

Detail 2.

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

26


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion

Plans Detail situation e. 1/20

Detail 3.

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

27


Group 3.03

Volvo Ocean Race Pavilion

2_I+CT

Plans First floor vertical secction e. 1/40

Singular Constructive Sistems 2014/2015 E: 1/40

Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

28


Group 3.03

Volvo Ocean Race Pavilion

2_I+CT

Plans Detail situation e. 1/20

Detail 1.

Detail 2.

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

29


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion

Plans Detais

Detail 2.

Detail 1.

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

30


Group 3.03

Volvo Ocean Race Pavilion

E: 1/75

2_I+CT

Plans First floor general section e. 1/75

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

31


Group 3.03

Volvo Ocean Race Pavilion

2_I+CT

Plans Detail situation e. 1/20

Detail 2

Detail 1

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

32


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion

Plans Details

Detail 2

Detail 1

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

33


Group 3.03

Volvo Ocean Race Pavilion

2_I+CT

Plans Main floor general section e. 1/75

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent

E: 1/75

Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

34


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion

Plans Details situation e.1/20

Detail 2

Detail 1 Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

35


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion

Plans Details situation e.1/20

Detail 3

Detail 5

Detail 4 Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

36


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion

Plans Details situation e. 1/20

Detail 6

Detail

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

37


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion Detail 1

Detail 2

Detail 3

Plans Details Detail 4

Detail 5

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

38


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion

Plans Details

Detail 6

Detail 7

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

39


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion

External envelopes Main floor e. 1/5

F2_Glass facade 1.50

7.00

9.00

1.30

F1_AW I1_WF I1_MP I1_WS

F1_HH

I1_SS I1_RW

F1_HR

CODE F1_T F1_WS F1_HH F1_HR F1_AW I1_WS I1_PF I1_RW I1_SS I1_SC I1_MP

ELEMENT Triangles Conecting element Hanging hook Horizontal rails Auxiliar wooden stud Stud Isolation Isolation Stud Canal Finishing suport

I1_WF

Finishing

CODE F2_C F2_G F2_TB F2_NP

ELEMENT Carpentry Glass Thermal break Join

F1_WS I1_PF F1_T

MATERIAL Marine plywood Wood Aluminium Aluminium Wood Wood PU foam Rockwood Steel Steel Marine plywood boards Marine plywood nishing

FINISHING Black painting None None None None None None None None None None

DIMENSION (cm) 59x49 6x1,5 4x7x0,4 3x7 3x1 5x7 5x9 5x9 120x230

THICKNES (cm) 1,5 0,4 0,2 10 9 0,3 0,3 1,3

White painted

(30/20/10)x230

0,3

MATERIAL Aluminium Glass Polyamide Neoprene

FINISHING Anodized None None None

UNITS

F1-I1_Opaque facade

8.00

15.00 12.00

1.00

5.70

F2_NP

F2_G

DIMENSION (cm) 7x10,4 1x1,5

THICKNES (cm) 0,0015 0,6 -

UNITS

F2_TB F2_C

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

40


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion F1-I2_Outdoor rooms

1.50

External envelopes First floor e. 1/5

1.30

F1_AW

F1_HH

I3_WF

CODE F1_T F1_WS F1_HH F1_HR F1_AW

ELEMENT Triangles Conecting element Hanging hook Horizontal rails Auxiliar wooden stud

CODE I3_WS I3_MP I3_WF

ELEMENT Stud Finishing suport Finishing

MATERIAL Marine plywood Wood Aluminium Aluminium Wood

FINISHING Black painting None None None None

DIMENSION (cm) 59x49 6x1,5 4x7x0,4 3x7 3x1

THICKNES (cm) 1,5 0,4 0,2 -

UNITS

FINISHING None None White painted

DIMENSION (cm) 7x10,4 120x230 30/20/10

THICKNES (cm) 0,015 1,3 0,3

UNITS

I3_MP F1_HR

I3_WS

F1_WS

F1_T

F1-I1’_Bathrooms

F1_AW

1.50

7.00

9.00

1.10

I2_PS I2_PYL

F1_HH

I2_RW

F1_WS I2_PF F1_T

CODE F1_T F1_WS F1_HH F1_HR F1_AW

ELEMENT Triangles Conecting element Hanging hook Horizontal rails Auxiliar wooden stud

MATERIAL Marine plywood Wood Aluminium Aluminium Wood

FINISHING Black painting None None None None

DIMENSION (cm) 59x49 6x1,5 4x7x0,4 3x7 3x1

THICKNES (cm) 1,5 0,4 0,2 -

UNITS

CODE I2_PS I2_AM I2_PYL I2_SS I2_SC I2_RW I2_PF I2_WS

ELEMENT Porcelain tile Adhesive Finishing suport Stud Canal Isolation Isolation Stud

MATERIAL Porcelain stoneware Adhesive morter PYL Steel Steel Rockwood PU foam Wood

FINISHING (mm) Polished None None None None None None None

DIMENSION (cm) 44,3x44,3x1 9x5 5x9 0,5X0,7

THINCKNES (cm) 1,1 1 10 0,3 0,3 9 10 -

UNITS

I2_WS I2_SS

F1_HR

MATERIAL Marine plywood Marine plywood boards ing

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vázquez

41


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion S1_Inside floor

Horizontals e.1/5

5.00 1.70

2.00 0.91

19.09

S1_MP

External envelopes

S1_XPS

S1_WS

S1_MP

CODE S1_MP

ELEMENT Suport

MATERIAL Wood

FINISHING None

DIMENSION (cm) 100X150

THICKNES (cm) 1

S1_WS S1_XPS S1_MP

Stud Isolation Suport

Wood XPS Marine Plywood boards

None None None

7x10,4 100X150 100X150

0,015 5 1

S1_WF

Finishing

None

100x150

1,8

UNITS

S1_WF

S2_Outside floor S2_AW

S2_SP

CODE S2_SP S2_AW

S2_WP

10.25

MATERIAL Steel Marine plywood boards Solid Wood planks

FINISHING Galvanized None

DIMENSION (cm) 7x10,4 5x5

THICKNES (cm) 0,015 -

S2_WP

ELEMENT P P sujeccion Finishing

None

232x100

0,03

CODE T1_PU T1_THP

ELEMENT Isolation Heating system

MATERIAL Pu foarm

FINISHING None

DIMENSION (cm) -

THICKNES (cm) 4

T1_A

P sujeccion Finishing

Aluminium

none

3x3

-

Aluminium

Silver

232x100

2,8

UNITS

1.78 2.46

7.00

T1_False ceilings T1_PU

3.95

23.00

T1_THP

T1_BA

UNITS

T1_BA

2.00 2.80

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

42


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion

IKEA Axonometry All components DIMENSION (cm) 59x49

THICKN ES (cm) 1,5

980

6x1,5

-

590

4x7x0,4

0,4

1140

3x7x300

0,2

530

3x1

-

240

7x10,4 1x1,5 5x7 5x9 5x9 120x230

0,015 0,6 10 9 0,3 0,3 1,3

19 57 19 19 136 108 136 224 124

0,3

295

Polished None None None None None None None None None

(30/20/10)x2 30 44,3x44,3x1 9x5 5x9 0,5X0,7 7x10,4 120x230

1,1 1 10 0,3 0,3 9 10 0,15 1,3

195 26 32 56 26 50 52 38

Black

30/20/10

0,3

38

None

100X150

2

840

None None None

7x10,4 100X150 100X150

5 5 1,6

1860 1452 840

None

100x150

0,3

840

None None

100x5 35x7

0,15 2

353 616

None

10x150/100

0,3

1062

CODE

ELEMENT

MATERIAL

FINISHING

F1_T

Marine plywood Wood

F1_HH

Triangles Conecting element Hanging hook

F1_HR

Horizontal rails

Aluminium

Black Aquamarine painting None Aquamarine painting Aquamarine painting Anodized None None None None None None None None None

F1_WS

F2_C F2_G F2_TB F2_NP I1_WS I1_PF I1_RW I1_SS I1_SC I1_MP

Auxiliar wooden stud Carpentry Glass Thermal break Join Stud Isolation Isolation Stud Canal Finishing suport

I1_WF

Finishing

I2_PS I2_AM I2_PYL I2_SS I2_SC I2_RW I2_PF vI2_WS I3_WS I3_MP

Porcelain tile Adhesive Finishing suport Stud Canal Isolation Isolation Stud Stud Finishing suport

I3_WF

Finishing

S1_MP

Suport

S1_WS S1_XPS S1_MP

Stud Isolation Suport

S1_WF

Finishing

S2_SP S2_AW

Pro les Pro les for sujeccion Finishing

F1_AW

S2_WP

Aluminium

Wood Aluminium Glass Polyamide Neoprene Wood PU foam Rockwood Steel Steel Marine plywood boards Marine plywood nishing Porcelain stoneware Adhesive morter PYL Steel Steel Rockwood PU foam Wood Marine plywood Marine plywood boards Marine Plywood nishing Marine Plywood oor boards Wood XPS Marine Plywood oor boards Marine plywood nishing Steel Marine plywood boards Solid Wood planks

White

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

UNITS

43


3_CONSTRUCTION


Group 3.03

3_Construction

Volvo Ocean Race Pavilion

Made in shed F1_Opaque facade

0

2.0

59.00

51.00

7.10

1.00

1.00

3.80

3.00

1.50

1.50

1.70

4.10 66.90

10

0

10

20

30

40

50

60

70

80

90

100

[F1_AW] [F1_HH]

[MEASURES IN CM]

[F1_HR]

[F1_WS]

[F1_T]

Union of horizontal rails to auxiliar wooden studs. E: 1/2

CODE F1_T F1_WS F1_HH F1_HR F1_AW

ELEMENT Triangles Conecting element Hanging hook Horizontal rails Auxiliar wooden stud

MATERIAL Marine plywood Wvood Aluminium Aluminium Wood

FINISHING Black Aquamarine painting None Aquamarine painting Aquamarine painting

DIMENSION (cm) 59x49 6x1,5 4x7x0,4 3x7x300 3x1

THICKNES (cm) 1,5 0,4 0,2 -

Union of triangles, conecting elements and hanging hooks. E: 1/2

UNITS 980 590 1140 530 240

[F1_T] [F1_AW] [F1_HR] [F1_WS]

[F1_HR] [F1_HH] [F1_WS] [F1_T]

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

45


Group 3.03

3_Construction

Volvo Ocean Race Pavilion

Made in shed F1_Opaque facade Type of carpentry. E: 1/5

Main door. E: 1/5 7.00

3.00

This component is a window that cant be open and it has the junquillo inside to give the possibility to change the glass if this breaks.

7.00

8.00

2.00

[F2_C] [F2_TB] [F2_NP]

5.70 1.00

240.00

To this carpentry (with glasses), we add a perimeter joint of neoprene which is going to facilitate its movements in transport and once put on site.

[F2_G]

[F2_G] [F2_TB] [F2_NP] [F2_C] For the main entrance of the pavilion, we put a sliding glass door with two leaves.

[MEASURES IN CM]

[MEASURES IN CM]

1.30

1.00

CODE

ELEMENT

MATERIAL

FINISHING

F2_C F2_G F2_TB F2_NP

Carpentry Glass Thermal break Join

Aluminium Glass Polyamide Neoprene

Anodized None None None

DIMENSION (cm) 7x10,4 1x1,5

THICKNES (cm) 0,0015 0,6 -

UNITS

Simple door. E: 1/5 4.00

7.00

5.00

1.00

[F2_G]

Screen printing A

11.00

130.00

[F2_TB]

10 20 30 40 50 60 70 80 90 100

[MEASURES IN CM]

[F2_NP]

[F2_C]

[F2_C]

11.00

10 0

24.00

140.00

[F2_G]

[MEASURES IN CM]

8.00

Screen printing B

CODE F2_C F2_G F2_TB F2_NP

ELEMENT Carpentry Glass Thermal break Join

MATERIAL Aluminium Glass Polyamide Neoprene

FINISHING Anodized None None None

DIMENSION (cm) 7x10,4 1x1,5

THICKNES (cm) 0,15 0,6 -

UNITS

1.00

For the doors between exterior and interiors rooms [F2_NP] inside the pavilion, we use a single double-leaf door.

CODE

ELEMENT

MATERIAL

FINISHING

F2_C F2_G F2_TB F2_NP

Carpentry Glass Thermal break Join

Aluminium Glass Polyamide Neoprene

Anodized None None None

DIMENSION (cm) 7x10,4 1x1,5

THICKNES (cm) 0,0015 0,6 -

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

UNITS

46


Group 3.03

3_Construction

Volvo Ocean Race Pavilion

Made in shed I1_I2_I3_Interior finishings I1_Interior finishing

5.00

5.00

9.00

[I1_PF]

[I1_SS]

Union of container’s sheet and wood studs. E: 1/5

5.00

[I2_PF] [I2_RW]

[I2_WS] [I2_SS]

I2_Interior bathrooms finishing

[I2_AM]

247.00

[I2_PS]

I1_SS I1_WS

I1_MP I1_WF

I1_PF I1_RW

I1_SS I1_WS

I1_MP I1_WF

5.00

I1_PF I1_RW

30.00

20.00

20.00

20.00

10.00

7.00

1.50

1.50

[I1_SC] [I1_WF]

0.65 0

10

20

30

40

50

CODE I1_WS I1_PF I1_RW I1_SS I1_SC I1_MP

ELEMENT Stud Isolation Isolation Stud Canal Finishing suport

I1_WF

Finishing

I2_PS

Porcelain tile

I2_AM

Adhesive

I2_PYL I2_SS I2_SC I2_RW I2_PF I2_WS

Finishing suport Stud Canal Isolation Isolation Stud

MATERIAL Porcelain stoneware Adhesive morter PYL Steel Steel Rockwood PU foam Wood

FINISHING (mm)

DIMENSION (cm)

THINCKNES (cm)

Polished

44,3x44,3x1

1,1

None

-

1

None None None None None None

9x5 5x9 0,5X0,7

10 0,3 0,3 9 10 -

UNITS

3.20

1.30 10

ELEMENT

Union of container’s sheet, wood studs and canals. E: 1/5

0.30

115.70

CODE

60

70

80

90

100

[I1_RW] [I1_MP] [I1_WS]

[I3_WS]

MATERIAL Wood PU foam Rockwood Steel Steel Marine plywood boards Marine plywood

I3_Outdoors finishing

[I3_MP]

[MEASURES IN CM]

FINISHING None None None None None None

DIMENSION (cm) 5x7 5x9 5x9 120x230

THICKNES (cm) 10 9 0,3 0,3 1,3

White painted

(30/20/10)x230

0,3

[I3_WF]

UNITS

I1_WS I1_SS I1_SC I1_MP I1_WF

I1_WS I1_SS

I1_MP I1_WF

CODE I3_WS I3_MP I3_WF

ELEMENT Stud Finishing suport Finishing

MATERIAL Marine plywood Marine plywood boards

THICKNES (cm) 0,015 1,3 0,3

UNITS

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vázquez

47


Group 3.03

3_Construction

Volvo Ocean Race Pavilion

Made in shed

2.00

5.00

0.3

1.70

S1_Indoor pavement

5.00

100.00

150.00

[S1_WF] [S1_MP] [S1_XPS] [S1_MP] [S1_WS]

10

0

10

20

30

40

50

60

70

80

90

100

[MEASURES IN CM]

Main section. E: 1/5

CODE S1_MP

ELEMENT Suport

MATERIAL Wood

FINISHING None

DIMENSION (cm) 100x150

THICKNES (cm) 1

S1_WS S1_XPS S1_MP

Stud Isolation Suport

Wood XPS

None None None

5x5 100x150 100x150

0,015 5 1

S1_WF

Finishing

None

100x150

1,8

boards Marine plywood

Main section. E: 1/2

UNITS

[S1_WS][S1_XPS][S1_MP][S1_MP][S1_WF]

[S1_MP][S1_XPS][S1_WS] [F1_WF]

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

48


Group 3.03

3_Construction

Volvo Ocean Race Pavilion

Made in shed S2_Outdoor pavement

150.00

9.00

1.80

2.50

100.00

7.00

7.00

1.00

7.00

[S2_WP] 10.00

[S2_AW] [S2_SP] 64.50

10

0

10

20

30

64.50

40

50

60

70

80

90

Corner meeting. E: 1/5

100 [MEASURES IN CM]

CODE S2_SP S2_AW S2_WP

ELEMENT

Finishing

MATERIAL Steel

FINISHING None

DIMENSION (cm) 9x7

THICKNES (cm) 0.5

Marine plywood boards Solid Wood planks

None None

7x2,50 10x150

-

UNITS

[S2_AW]

[S2_SP] [S2_WP]

[S2_WP]

[S2_SP]

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

49


Group 3.03

3_Construction

Volvo Ocean Race Pavilion 1/ cut and remove parts of the container, and remmove some pillars

2/ weld reinforcements

3/ painting

9/ apply the neoprene perimetran join t

15/ put the glass

16/ put the strip

17/ put the Ls to instal the false ceilings

Shed Storyboard 4/ connect facilities

5/ screw the wood Stud

11/ screw the omegas

12/ rotate the container and put the perimetral joint to instal the glass

18/ put the electric instalations at false ceilin g

18/ put the Radiant ceiling instalation at false ceiling

6/ apply pu foam at walls and ceilings, then clean the studs.

7/screw the canal and the metalic stu d

18/ prepare to the transport

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

50


Group 3.03

2_I+CT

Volvo Ocean Race Pavilion Modules

Made in shed 3D Modules

Main Floor

First Floor

A1

C7

C8

C2

C1 A1

A2

A4

A5

C9

C10

C4

C3

C5

C6 A3

Envelops of the first floor F1

F1

I1 F1

I2 F1

I2

S1

F1

F1

I1 I1 I1

F1

S1

I1

S2 F1

F1

F1

I1

I1

S1

I1

F1

F1

S1

I2

F1

I1

I2

S1

I1

I1 F1 F1

S2

I1

Envelops of the main floor F1 I1

F1 I1

F1

F1 F1 I1

F1

F1

I1

F2 S2

S1

F2

S2

I1

F1

F1

S1 S1

F2

F2 S1

F2

F2 S1

S2

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

51


Group 3.03

Volvo Ocean Race Pavilion

3_Construction

Shed Volvo corridor container

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

52


Group 3.03

Volvo Ocean Race Pavilion

3_Construction

Shed Storyboard Volvo corridor container

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

53


Group 3.03

3_Construction

Volvo Ocean Race Pavilion

Transportv Storyboard

2/ post containers that will be used for the transport

3/ reassembles the removable pillars

4/protect the containers who needs reinforcement to transport them, with sheet of wood

5/put the containers on a truck

6/ bring them to the port

7/ place the containers at the ship

8/ transport

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

54


Group 3.03

3_Construction

Volvo Ocean Race Pavilion 1/ stress the work area and storage 2/ draw the foundations on the area ground

15/ put container C7, gravity makes 16/ put container C8 the rest

Workplace Storyboard 4/ connect the container with the foundations

7/ apply container A2

10/ apply container C5 into C4

11/ apply container C6 into C3

12/ Fix auciliar container A3 into C6 & C5

17/ put container C9 and 10

18/ put auxiliar containers A4 & A5

19/place secondar y structure

14/ Put imprmeable layer

22/ place the base structure

Singular Constructive Sistems 2014/2015 Teachers// Miguel Salvador Landman - Cesar Daniel Sirvent Students// Gloria Herranz - Angela Trujillo - Katia Vรกzquez

55


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.