Details sections a a and b b a1 2015 a a

Page 1

4

7

6 12

5

14

13 3

2

1.Eaves beam 2.Fascia and soffits 3.Gutter and brackets 4.Breather membrane 5.Air seal 6.Internal closer flashing 7.Air seal-Butyle DIA rubber sealant 8.Random Stone wall 9.Cavity sock/Cavi 60 MWR cavicheck fire integrity stop 10. 11.blockwork 12.Fasteners @500mm centers 13.Fasteners 14.Continuous galvanised MS shear connector

16

7 11 12

8

9

10 14

15

13

9

1

8

1.Lintle ST-k90 Keystone group 2.Bi-folding door Head 3.Blockwork 4.Brickwork 5.weep holes/Beak weep 6.Cavity Insulation 7.Verge flashing 8.Gutter system 9.Support 'Z' purlin for9.Support soffit flashing 'Z' purlin for soffit flashing 10.Outrigger steel'z' section of purlin 10.Outrigger steel'z' section of purlin fixed via cleats back to roof purlins 11.Top sheet 12.Thermal insulation 13.Internal finish 14.Vapour control layer 15.liner sheet

Parapet eaves 1.Parapet coping 2.Membrane over parapet 3.PIR Insulation board 4.Kingspan Top deck 5.Joint filler 6.Sealant joint 7.Panels fixed with fasteners 8.Sealant joints 9.Benchmark fastener

1 2

3 5 6 7

10 9 4

10

11

12

10.Cable suspension system 11.Breather membrane 12.Karrier panel 13.Continuous galvanised shear connector 14.Fasteners 15.Northlight angled window Head

HEAD DETAIL

15 16

13

6 4

14

11

1 5

2

3

14

13

1

12 3

4

5

2

6

7 11

10

1.Apron Flashing 2.Vapour control layer 3.Flashing support 4.Gutter system 5.Top sheet 6.Halter clips 7.Vapour control layer 8.Liner sheet 9.Thermal insulation 10.Verge inner trim flashings 11.Internal flashings 12.Verge flashings 13.Brick closers 14.Northlight window sill 15.Full fill Cavity insulation 16.Lintle ST-k 90 Keystone group 17.Bi- folding door head 18.Weep holes/Beakweep

Modular Roof Light Upvc M2v Kerb Direct to roof with electrically operated vent , triple skin Polycarbonate dome and standard security fixings. 1

2

3

4 5

6 7

1.Tounge and groove softwood 2.Screed topping 3.Bison plank/hollow plank floor 4.Insulation Rockwool flexi min 50mm 5.Timber battens 6.Resiliant bars/ Hush bars 7.Plaster board/Gyprox fire line 8.Steel I beam

8

9

8

15

16 18

18

Project: Devils Kitchen climbing Hostel cwm idwal Wales Final year Project Architectural Technology Southampton Solent University

Scale: 1:20 Drawing Title: Detail sections A-A Drawn By: Kei Little

Date: 01:05:2015 Ref: 2015/4/5

Email: k.little@gmx.co.uk Student No.Q09852344 1/5/2015


Turn static files into dynamic content formats.