 MD Aviation Administration  MD State Highway Administration Awarded Prime contracts to a small business for the first time in history to Mimarch.

Mimarch won a regional IDIQ contract for MidAtlantic States with MIDLANT Naval Facilities. Additionally, Mimarch won a contract with the Department of Justice Federal Bureau of Prisons for the Mid-Atlantic Region

Mimarch welcomed several new employees and expanded our services: Julia Dougherty, EGD - Environ. Graphic Design Walter Metius, AIA, LEED AP Project Director Cyrus Mechanic, PE - Transit/ Structural Engineer Colleen Foley - Jr. Graphic Designer

2010 - 2012 (ONGOING) 1998 - 2000 1992

2000 - 2005

 MD General Services Administration  U.S. Veterans Administration  University of Maryland, College Park  Prince George’s County Department of Public Works Awarded contracts to Mimarch for the first time

2009 - 2010

THINGS TO COME

PROJECT HIGHLIGHTS

2010

Mimarch completed prestigious projects  Animal Services Facility,  Federal High Frequency  Communication Center  Federal Law Enforcement Training Center

2011 - 2013

MTA Baltimore Red Line, Montgomery County Corridor City Transit Line, DC Metro Orange Blue Line, M&T Stadium Ravens Concession Stand


SEE WHAT OUR PRESTIGIOUS CLIENTS... and what they HAVE TO SAY ABOUT OUR EXCEPTIONAL SERVICES... Some of our MAJOR Corporate CLIENTS include:

Some of our MAJOR FEDERAL AND PUBLIC CLIENTS include:


Mimar Architects & Engineers, Inc. •   

 

 


What We Do


Redline & Transit Experience Redline Planning & Public Outreach (2010-2012)

 

All 19 Stations General Planning

Security Square Mall Station Planning & TOD Planning

Highland Town/ Greek Town Station, Master Planning, and TOD Planning Redline (2012-Present)

 

Preliminary Design

Schematic Design

Design Development

35% Design and 65% Design

Corridor City Transit (5 Stations & TOD) On-Call Contracts A/E Services

Orange/Blue Line

 

16 Stations Rehabilitation/ EGD Silver Line Phase I & Phase II

//

Silver Spring Transit Center

Multi-Modal Station and 100% Design



Architects/ Designers Kal I. Bhatti, AIA Principal – In - Charge

Gregory Ninow, AIA PM, Director of Architecture

Rui Ponte, AIA, LEED AP Project Manager

Walter Metius, AIA, LEED AP Quality Control Manager

Lawrence Tarbell, AIA, LEED AP Project Architect

Matthew Bloye, RA Project Architect

Vern McKissick, AIA, CEFP, ARA, LEED Director of Education

Richard Karcher, AIA Education Design Studio Manager

Engineers/ IT/ Planners Cyrus Mechanic, PE Engineering Head

Sindy Dai Structural Engineer

Justin Bell, PE Civil Engineer

Arinze Chiejina, PE Civil Engineer

Brian Cleary IT Specialist

Chandan Jayakuma Planner

Graphics & Production Julia Dougherty, SEGD Graphic Design Head

Coleen Foley Graphic Designer

Victor Chao Production Manager

Mike Carnes CADD Manager

Mike Secrist Rendering Specialist

Ronald Haritan CADD Technician

Client Relations/ Administration

Lynn Knight, B.Arch Marketing/ BD Manager

Peter Brooks Public Relations

Beverly Frimpong Executive Assistant

Anya Benkabbou Human Resources Manager

Han Leng, CPA Finance Manager

Sotonye Taribo Project Designer


Senior Planner/Senior Architect (2)

Planners (3)

Contract Documents (All Stations)

General Planning

Highland Town/Greek Town Security Mall Station Advisory Committee

Architects(3) 

Contract Documents (All Stations)

Rendering Artist (1) 

Renderings and Visual Effects (All Station)

Structure Engineers (3)

Civil Engineers/Environmental 

Water Resources /Storm-water Management (3)

Environmental Graphic Design (1)

The Redline staff will be an easy transition to the Purple Line as Redline concludes


Principal – In – Charge 

M. Arch Urban Design

CE: Harvard School of

Design, since 1998 

Over 30 years experience

Licensed: MD, VA, DC, PA, WV, GA, MN, FL, NJ, Guam

Past Experience: URS, DDG, Bechtel, HLM Design

Extensive experience in

inter- disciplinary coordination, team development and problem solving 

Award winning experience


Director of Engineering/ Structural 

M.S., 1985, Civil/Structural Engineering, University of Pittsburgh, Pennsylvania

Extensive experience in all aspects of structural engineering including bridges, tunnels, highway and transit, maintenance buildings, sanitary water and wastewater treatment facilities, two to three story steel, concrete and timber commercial buildings

Project Manager of many projects requiring design inspection, analysis and rating preparation of rehabilitation plans, scour remediation, construction cost estimate, bridge posting, and rehabilitation recommendations.


building on the momentum of a proven partnership


Experience with the Maryland Transit Administration

 

- Metropolitan Grove Station (CCT Line) Montgomery County, MD Baltimore Red Line Corridor Transit Study

Bus Stop Sign Design - 8,000 bus stop locations

On-Call Engineering Design for Transit Projects, Central Light Rail Line Second Track, Baltimore, MD

Baltimore Metro – Multiple cycles of BiAnnual Inspection Program Light Rail Structures Inspection, MTA, Baltimore, MD

On-Call Quality Control Reviews  Langley Station  Quick Bus  Main Bus


SELECTED PROJECT

2010-2012 2012-Present  Partnered with Parsons Brinckerhoff and RKK  Study includes physical and operational elements which apply to BRT and LRT  Provided services for schematic phase for pre-design, development of construction documents and specs  Responsibilities also included construction documents review for completeness, coordination, constructability and compliance with all applicable codes





Project Architect  

Experience: 14 years Education: University of Maryland University College, M Sc. /MBA Technology Management-Project Management - 2012

Civil Engineer   

Experience: 10 years Experience Education: University of Maryland, College Park, MD Skills: MicrostationV8 & Inroads, ArcGIS/ArcMAP, AutoCAD

3D Modelling Specialist  

Experience: 24 years Education:1991/Art Institute of Pittsburgh Associates Degree, Interior Design

Structural Engineer  

Experience: 7 years Education: Bachelor’s degree in bridge engineering, Tongji University, Shanghai, China


Civil Engineer  

Experience: 17 years Education: BS Civil Engineering/ Purdue University

Civil Engineer   

Sr. Environmental Graphic Designer  

Experience: 27 years Education: Bachelor of Fine Arts in Graphic Design/ University of the Arts Philadelphia

Experience: 8 years Education: BS Civil Engineering/ West Virginia University Institute of Technology Master of Business Administration/ George Washington University

Environmental Graphic Designer  

Experience: 2 years Education2010, BFA. Graphic Design - Salisbury University, Salisbury, MD


Planner  

Experience: 11 years Education: Master of Architecture, University of Oregon(2001-2002) Excellent design and graphic communication (free hand/computer) skills; Microstation, AutoCAD

Landscape Designer  

Urban Planner  

Experience: 9 years Education: University of Miami- FL, Master of Architecture in Suburb and Town Design/2003 Specialization: Master Planning and Community based design including Transit Oriented Development

Experience: 8 years Education: M. L. Arch/2002/Landscape Architecture University of Minnesota, Twin Cities Skills: Site measurement, site analysis, Landscape Master plans, grading plans, Lighting plans


SELECTED PROJECT

Maryland Transit Administration  Extends approximately 14-16 form Metropolitan Grove Station Clarksburg, MD to Shady Grove in Rockville, MD  Thirteen to fifteen stations  Bus Rapid Transit (BRT) or Light Rail (LRT) transitway  Cost-effectiveness of $19 and $9 respectively  Project included study of three stations: o Metropolitan Grove o King Farm o Crown Farm


Maryland Transit Administration



Maryland Transit Administration A work in progress‌


Including transit oriented developments


Maryland Transportation Authority 

MdTA Contract AE 796, 2010 Hands On Inspection - Box Girders (Interior) at I95/ Russell St.

MdTA Contract AE 796, 2010 Hands On Inspection – Box Girders (Interior) at I95/ Russell St. – Inspection Team Leader/project Manager

MdTA Contract No. AE 2345-000-002/6. Monitoring of Fatigue Cracks in Steel Box Girders


Washington Metropolitan Area Transit Authority (WMATA)

Washington Metro System Section E-4, Georgia Avenue-Petworth Station design and Tunnels, Washington, DC

WMATA Rail Work Equipment Rehabilitation and Expansion for Blow Pits Building, Shady Grove, and West Falls Church, Alexandra, VA

On-Call Engineering design for a variety of assignments including inspection and preparation of joist documents for rehabilitation of 15 station platforms, 5 parking garages, 12 bridges, miles of tunnels, and retaining walls

Washington Metropolitan Area Transit Authority (WMATA) under an open-end General Architectural and Engineering Services Contract (GAESC)


SELECTED PROJECT

Washington Metropolitan Area Transit Authority (WMATA)  Rehab of 16 Stations (Stadium Armory to National Airport)  Design/Build services  Design and construction for the upgrade of the suspended ceiling tile system

 Wayfinding and signage rehabilitation  Upgrade and enlargement of the current kiosks  5 year project was phased to accommodate the time constraints of fully operation Rail system


City of Baltimore, Lead task manager/Project manager in charge of 3.8 miles extension of the Gwynns Falls Trail system.

I-68 over US 220, Maryland State Highway Administration (MSHA), Cumberland, MD

Rehabilitation of the K Street, Massachusetts Avenue, and H Street, N.W. Bridges over the Center Leg Freeway and electrical-mechanical rehabilitation of the Air-Rights Tunnel for District of Columbia Department of Public Works (DCDPW)

Mount Street Replacement Bridge, Baltimore City DPW, MD

I-95 Roadway Access Improvements to Philadelphia International Airport, City of Philadelphia, Division of Aviation, Philadelphia, PA

Truss Bridge Load Ratings for Champaign, Adams and Highland Counties, Ohio.

Market Street Elevated Reconstruction Project, SEPTA


Public Private Partnership

SELECTED PROJECT

Maryland Transit Administration  Transit Oriented Development  Const. Cost $200 million

 Prime: PB America  Lead Architect: ZGF Arch  Architect, CD, Specs  Project included a Transit facility for Metro station, buses, retail and three hi-rise buildings with six public levels


Experience with the Maryland Port Administration

 Cruise Ship Terminal, Baltimore, MD – Conversion of a warehouse into a Cruise Ship Terminal  215,000 SF Maryland Port Cargo Shed, Baltimore, MD  Baltimore World Trade Center, Baltimore, MD  Cruise Ship Terminal Roof Replacement


Experience with the Maryland Transportation Administration  Maryland Transportation Authority (MdTA) Toll Facilities - 78 Booths renovation & assessment – Phase I & II  Henry Nice Memorial Bridge toll booths and Police Administrative Facility  Fort McHenry Tunnel Ventilation Building  Disaster Recovery Center/Regional Computer BackUp Facility  Quarantine Road Weigh Station/Inspection  Facility and Interchange Building  FMT Lighting Systems Inspections (North of Tunnel to Delaware Line)  Fort McHenry Tunnel Maintenance Facility  Salt Barn at I-895, Baltimore, MD  I-95 Overpass Bridge Flagpole Lighting, Baltimore City, MD  MdTA Building 300 Renovations Study, Design  and Construction Management, Baltimore, MD  Harbor Tunnel HVAC and Controls, Baltimore, MD  Perryville Truck Rest Area


Experience with the Maryland State Highway Administration

 SHA Offices La Plata, and Marlboro Maintenance Facility – Roof Replacement  SHA Frederick District Office - HVAC Renovation and Life Safety Upgrades  SHA five (5) Salt Barn Design, Architectural, Civil, Electrical, Mechanical, Geotechnical  Constructability Reviews, Cost Estimates  7 Facilities HVAC System and Life Safety Upgrades  On-call Services for the Maryland State Highway Administration four District Office and Maintenance Facility: o Princess Anne Office/Maintenance Facility o Golden Ring Office / Maintenance Facility o Salisbury District Office / Maintenance Facility o Keysers Ridge District Office/Maintenance Facility


Experience with Maryland Aviation Administration  BWI Curbside Expansion & skywalks  BWI Southwest Airline Concourse Retail Concessions  BWI Mac Office building/ warehouse  BWI Main Terminal Renovations  BWI Hourly Garage  BWI Bus Maintenance Facility  BWI Customer Service Building  AB Terminal Triturator Building  BWI S. Terminal Baggage Srvc, Offices  MAA Homeowners Assistance program  United Delta, NW, Continental, Southwest Airlines  Ronald Reagan National and  Washington Dulles International  Airports - On-Call A/E services  Boston-Logan International Airport  Rescue and Fire Fighting Building


SELECTED PROJECT

Department of Transportation Complex  State of the Art Hi-tech New 24 Hour Facility  5,000 Square Feet  Const. Cost $1,200,000  Prime: MIMAR Architects Civil: Century Eng. Structure: Century Eng.  MEP: Century Eng.

Project was great success; MIMARCH was awarded numerous contracts after the completion of this project.


SELECTED PROJECT

Prince George’s County, Redevelopment Authority

SUITLAND MANOR DEVELOPMENT

   

Master Plan Concept 33 Acres Development Const. Cost $800,000,000 Concept and Vision: MIMAR Architects Marketing: Jones Lang LaSalle


SELECTED PROJECT

Maryland Aviation Administration  Terminals A, B, C, D Food Courts and Retail and Concession Space  140,000 Square Feet  Prime: RTKL Associates  Production Architect: MIMAR Architects Structure, MEP: RTKL Associates


SELECTED PROJECT

Maryland Aviation Administration  Const. Cost $166, 000, 000  Prime: URS Corporation  Partial Architectural: MIMAR Architects Cost $ 42,000,000  Civil, Structure, MEP URS Corporation


SELECTED PROJECT

Baltimore/ Washington International Airport    

Mall approach to car rental 50,000 Square Feet Prime: Michael Baker Associates Support Architect: MIMAR Architects

 Engineers: Michael Baker Assoc


MAI’s Environmental Graphic Design building on the momentum of a proven partnership


Senior Environmental Graphic Designer  B.A. of Fine Arts in Graphic Design  Society of Environmental Graphic Design

 26 years of experience in signage and way finding  Past experience with RTKL, Apple Design  Wide variety of graphic identity and marketing communications programs for public and private clients  Projects include identity programs, & way finding systems for parks, campus and institutional sites, transportation sites, mixed-used developments & residential communities  Well versed with the development process and coordinating identities between the printed materials & the built environment


 MTA Maryland Bus Stop Sign Design  Metro Orange/Blue Line Sign Rehabilitation  WMATA Silver Line  TTA Light Rail  Durham Station Bus Station  PANYNJ Port Authority Bus Terminal  Continental C3, Newark Liberty International Airport  Wilkes-Barre/Scranton International Airport  Winnipeg International Airport  Atlanta Hartsfield International Airport  Myrtle Beach International Airport  Panama City International Airport  Raleigh Durham International Airport  Franklin Park Conservatory Signage  Flat Iron Bar Graphic Identity, Signage


SELECTED PROJECT

WMATA  Providing wayfinding and signage services to WMATA for rehabilitation of signs at the orange/blue line.  New vault wall signs are being installed that include end destination names and station ahead lists to aid in wayfinding  Developed sign demolition plans and new sign installation  Other signs are being revised using updated sign design guidelines  Revising signs for 16 stations along the orange/blue metro line


SELECTED PROJECT

Washington Metropolitan Area Transit Authority (WMATA)  Const. Cost $1,700,000  Phase 1: perform calculations and evaluate the shop drawings  Phase 2: Signage services  Key personnel: Julia Dougherty, Leila Erdogan, Colleen Foley


SELECTED PROJECT

 New terminal on top of a mountain  Developed complementary sign types for the roadway, parking garage and terminal using simple bands of warm gray  The typeface gives the airport a clean yet dynamic character  The identity for the ticketing and the baggage claim entries was a photographic image printed on perforated vinyl and applied to the glass transom over the doors


SELECTED PROJECT

Maryland Transit Administration  Developing high image signs to be used downtown to catch attention  High recognition Bus Stop sign concepts  Over 200 Bus Stop Signs



Turn static files into dynamic content formats.