FAC I L I T I E S M A S T E R P L A N
CHICO UNIFIED SCHOOL DISTRICT AUGUST 23, 2023
D
T F RA
ACKNOWLEDGMENTS CHICO USD SCHOOL PRINCIPALS
CHICO USD DISTRICT LEADERSHIP
STEERING COMMITTEE
ELEMENTARY SCHOOLS MIKE ALLEN, CHAPMAN ELEMENTARY SCHOOL SHANON PAYNE, CITRUS ELEMENTARY SCHOOL COURTNY CONNELLY, EMMA WILSON ELEMENTARY SCHOOL EMILY MULLINS, HOOKER OAK ELEMENTARY SCHOOL KRISTEN SCHROCK, LITTLE CHICO CREEK ELEMENTARY SCHOOL SHAWNEESE HEATH, MARIGOLD ELEMENTARY SCHOOL CHRIS WEAVER, MCMANUS ELEMENTARY SCHOOL KELLIE STEINBACH, NEAL DOW ELEMENTARY SCHOOL HEATHER SUFUENTES, PARKVIEW ELEMENTARY SCHOOL JO ANN BETTENCOURT, ROSEDALE ELEMENTARY SCHOOL BRUCE BESNARD, SHASTA ELEMENTARY SCHOOL KIMBERLY RODGERS, SIERRA VIEW ELEMENTARY SCHOOL
KELLY STALEY, SUPERINTENDENT JAY MARCHANT, ASSISTANT SUPERINTENDENT, EDUCATIONAL SERVICES JIM HANLON, ASSISTANT SUPERINTENDENT, HUMAN RESOURCES JACLYN KRUGER, ASSISSTANT SUPERINTENDENT, BUSINESS SERVICES JULIA KISTLE, FACILITIES & CONSTRUCTION DIRECTOR VINCE ENSERRO, NUTRITION SERVICES DIRECTOR MARIA CAMPOS, FACILITIES PLANNER/ CONSTRUCTION SUPERVISOR JOHN VINCENT, DIRECTOR, INFORMATION TECHNOLOGY TED SULLIVAN, DIRECTOR, ELEMENTARY EDUCATION JOHN SHEPHERD, DIRECTOR, SECONDARY EDUCATION TINA KEENE, STATE & FEDERAL PROGRAMS DIRECTOR
KENDRA ALLEN, STUDENT MIKE ALLEN, PRINCIPAL, CHAPMAN ELEMENTARY PEDRO CALDERA, PRINCIPAL, CHICO JR HIGH MARIA CAMPOS, Chico USD CAITLIN DALBY, Chico USD BOARD TIM HALEY, IEP2, MASTER PLAN CONSULTANT ALICIA HARRISON, PARENT AISLINN HENDERSON, PARENT DR.KATHLEEN KAISER, GRANDPARENT BRANDON KESSLER, VICE PRINCIPAL, CHICO HIGH SCHOOL JULIA M. KISTLE, Chico USD LAURA KNAUSS, LIONAKIS, PRINCIPAL-IN-CHARGE JACLYN KRUGER, Chico USD DAVID MCKAY, PRINCIPAL, BIDWELL JR HIGH JAY MARCHANT, Chico USD ANDREW MOLL, PRINCIPAL, FAIRVIEW HIGH EILEEN ROBINSON, Chico USD BOARD JULIA ROGOFF, PARENT, SPED KRISTEN SCHROCK, PRINCIPAL, LITTLE CHICO CREEK ELEMENTARY
JUNIOR HIGH SCHOOLS DAVID MCKAY, BIDWELL JUNIOR HIGH SCHOOL PEDRO CALDERA, CHICO JUNIOR HIGH SCHOOL JESSICA KAMPH, MARSH JUNIOR HIGH SCHOOL HIGH SCHOOLS DOUGLAS WILLIAMS, CHICO HIGH SCHOOL ANDREW MOLL, FAIR VIEW HIGH SCHOOL DAMON WHITTAKER, PLEASANT VALLEY HIGH SCHOOL ALTERNATIVE SCHOOLS ANDREW MOLL, ACADEMY FOR CHANGE RHONDA ODLUM, OAK BRIDGE ACADEMY ANDREW MOLL, OAKDALE
BOARD OF EDUCATION CAITLIN DALBY, BOARD PRESIDENT - AT LARGE REBECCA KONKLIN, BOARD MEMBER - TRUSTEE AREA 1 TOM LANDO, BOARD MEMBER - TRUSTEE AREA 4 EILEEN ROBINSON, BOARD MEMBER, TRUSTEE AREA 5 MATT TENNIS, BOARD CLERK, AT LARGE
ARCHITECTURAL/ENGINEERING TEAM LIONAKIS THE ENGINEERING ENTERPRISE, ELECTRICAL CAPITAL ENGINEERING, MECHANICAL ROLLS ANDERSON & ROLLS CIVIL ENGINEERS, CIVIL SIERRA WEST, COST ESTIMATING
CHICO USD SCHOOL SITE AND COMMUNITY PARTICIPATION
Chico Unified School District would like to thank the school community and all of the District staff and leadership who offered their time, comments and overall vision for this 2023 update to the District-wide Facilities Master Plan.
JOHN SHEPHERD, Chico USD KELLY STALEY, Chico USD HEATHER SUFUENTES, PRINCIPAL, PARKVIEW ELEMENTARY TED SULLIVAN, Chico USD
CONTENTS MISSION STATEMENT:
The mission of the Chico Unified School District, a partnership of students, staff, families and community, is to ensure all students achieve high levels of academic and personal success, contribute to their community and confidently participate in a changing global society by engaging in quality educational programs that address diverse student needs and promote learning throughout life.
1. EXECUTIVE SUMMARY. . . . . . . . . . . . . . . . . . . . . . . . . 1
5. ELEMENTARY SCHOOLS. . . . . . . . . . . . . . . . . . . . . . . 19
Process. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Guiding Principles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Conclusions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Implementation Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Chapman Elementary School. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Citrus Elementary School. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 Emma Wilson Elementary School. . . . . . . . . . . . . . . . . . . . . . . . . . . 32 Hooker Oak Elementary School. . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 Little Chico Creek Elementary School. . . . . . . . . . . . . . . . . . . . . . . 44 Marigold Elementary School. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50 McManus Elementary School . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55 Neal Dow Elementary School. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61 Parkview Elementary School. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66 Rosedale Elementary School. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72 Shasta Elementary School. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78 Sierra View Elementary Schools. . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
2. DEMOGRAPHICS, ENROLLMENT ANALYSIS, AND CAPACITY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Demographic Projections & Capacity. . . . . . . . . . . . . . . . . . . . . . . . .9 Elementary Schools: Demographic Impacts. . . . . . . . . . . . . . . . . . . 10
3. CONDITION ASSESSMENTS . . . . . . . . . . . . . . . . . . . 11 Condition Assessment: Summary. . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Site Inventory - Elementary Schools. . . . . . . . . . . . . . . . . . . . . . . . . 13 Condition Assessment: Photos. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
4. STAKEHOLDER ENGAGEMENT. . . . . . . . . . . . . . . . . 15 Stakeholder Engagement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Community Meetings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Stakeholder Engagement Surveys. . . . . . . . . . . . . . . . . . . . . . . . . . . 18
6. JUNIOR HIGH SCHOOLS. . . . . . . . . . . . . . . . . . . . . . 90 Bidwell Junior High School. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91 Chico Junior High School. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97 Marsh Junior High School . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103
7. SENIOR HIGH SCHOOLS. . . . . . . . . . . . . . . . . . . . 109 Chico High School. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110 Fair View High School. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 118 Pleasant Valley High School. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 124
8. OTHER DISTRICT FACILITIES. . . . . . . . . . . . . . . . . 130 Canyon View High School . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131 Henshaw Guynn Elementary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132 Oak Bridge Academy. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133 District Administrative Office. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 134 District Corporation Yard. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 135
9. IMPLEMENTATION AND COST MODELING. . . 136 10. APPENDICES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 138 Appendix 1: Condition Assessment. . . . . . . . . . . . . . . . . . . . . . . . 139 Appendix 2: Cost Model. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 229 Appendix 3: Structural Report. . . . . . . . . . . . . . . . . . . . . . . . . . . . 235
BACK TO CONTENTS
SECTION 1. EXECUTIVE SUMMARY
1
BACK TO CONTENTS
PROCESS
Wh
• Facili�es Inventory • Condi�on Assessment
w e w ant o d
Needs Assessment
Priori�es
Implementa�on
• Stakeholder Input • Demographics • Educa�onal Specifica�ons
•
What d
d? e e /n
Engagement
Wh a t
The District adopted five guiding principles for the 2023 Facilities Master Plan. Those principles are outlined on the following page and served to assess the priorities that are part of the proposed implementation plan.
• Data Collec�on
• Vision: Alterna�ves • Priori�es • Budget Modeling
ke? k li
Additionally, the 2023 FMP is informed by the work completed by the District since the adoption of the 2014 plan. Fueled by local general obligation (GO) bonds, the District was able to address the needs of many of its schools. Community input throughout this process suggested a desire to move more quickly, addressing the needs of school equity and conditions, but also recognizing the cost of prolonged construction, both in actual dollars and disruption to occupied campuses. This feedback provided an avenue for a discussion, at the elementary schools, of replacing schools rather than transforming them via multi-phased renovation.
we h o d a at
that l o o oes
The District has made significant progress on the goals established in the Implementation Plan outlined in the prior FMPs. These projects have been guided by District Educational Specifications that were also developed as part of those prior FMPs, and were influential in evaluating the adequacy of existing facilities during the condition assessment phase. Equally important was the physical condition of the facilities, identifying the significant cost of deferred maintenance that comes with aging facilities.
In order to assess the existing conditions, the master plan process relied on the following key information in order to guide the recommendations:
? ve
Chico USD developed a District-wide Facilities Master Plan (FMP) in 2014 to ensure that the learning environments throughout the District were supporting the District’s mission and educational goals. Subsequently, that FMP was updated in 2016, and again in 2019. These prior Facilities Master Plans were focused on addressing growth in the District - growth generated by new housing, the addition of students displaced by the Camp Fire and full-day and transitional kindergarten programs. However, current demographics have changed for Chico USD, with a trend away from growth and toward a stable or flattening enrollment, depending upon location within the District and/or grade level.
WHAT DO WE HAVE?
Key to successful master plans is finding the correct balance between critical needs identified in the condition assessments, a guiding vision for the future of the campuses, and a viable implementation strategy.
Core Group Steering Commi�ee Principals and District-level Specialists Community and Site-Based Outreach The Facilities Master Planning process engaged stakeholders throughout the process, both virtually and in-person.
2
• •
A data collection phase includes gathering available data, specifically: building plans, and classroom assignments/scheduling An existing site inventory identifies the use for all spaces on campus. A condition assessment of the campus buildings and grounds was accomplished with site visits by the design and engineering team, which helped determine the areas of greatest need.
WHAT DO WE WANT & NEED? The master planning process received demographic information that informed the needs assessment for the District. Additionally, stakeholders were engaged at multiple levels to give input on the desires and wants of the community. This guided the development of the facilities master plan. • •
• •
Electronic surveys of the community, staff and students In-person meetings with a Steering Committee representing a diverse cross-section of the District - students, community members/parents, District administrators and faculty Town Hall style meetings, both in-person and virtually Engagement of the Board of Education at various levels
WHAT DOES THAT LOOK LIKE? And finally, the facilities master plans creates a vision for each campus. Including an implementation “road map” to convey potential impacts of working on occupied school campuses.. The District made clear to all stakeholders engaged in the process that their current and available funds would not achieve the goals of the master plan, but that this long-term vision would guide their project decisions when opportunity, and funding, was presented.
BACK TO CONTENTS
GUIDING PRINCIPLES To guide the prioritization process, the design team utilized the following guiding principles that would allow a consistent and equitable approach to planning decisions. These guiding principles informed the recommendations of the facilities master plan.
1. RIGHTSIZING
4. SPECIAL EDUCATION (SPED)
Specifically addressing the elementary school capacity concerns, rightsizing acknowledges the significant excess capacity that currently exists in the District. Many options were discussed, including school consolidation or downsizing, and the opportunity that the excess capacity provided for interim housing during complex construction projects or as a location for other district programs. This guiding principle prompted a “model capacity” adoption - small, mid-sized and large - for the District’s elementary schools
Throughout the country, the special education population is growing at unprecedented levels. Due to specific requirements and design guidelines developed as part of the District’s educational specifications, and the unpredictability of the population, planning for SPED is a difficult facilities issue and often leads to these learners being placed in inadequate surplus spaces. The FMP identifies specific targets, per campus, for planning purposes.
5. SAFETY & SECURITY 2. KEEPING COMMITMENTS Chico USD has been working through employing safety and security measures - controlled entry, fencing and gates, for example, throughout the District. They have also established criteria for new or renovated building hardware, etc. The FMP seeks to address, as campuses are modernized, key planning issues around safety and security such as parking and drop-off safety, administration location and controlled points of entry.
Stakeholders at all levels recognized the need to understand and articulate any proposed changes to the District’s implementation plan, keeping commitments to the school sites that have been waiting for the opportunity for significant improvements. These commitments have been predominantly at the elementary school level, at least in the near term implementation schedule, and remain the priority, contingent on funding availability. The implementation plan is shared on page 6.
3. PLANNING FOR TRANSITIONAL KINDERGARTEN (TK) Transitional Kindergarten, as a new grade level, has significant impact on facilities as requirements for the youngest learners include larger spaces (similar to traditional Kindergarten), but also ideally proximate to parent parking spaces and age appropriate outdoor learning spaces and equipment. The District has determined that a “capture rate” of 65% of the Kindergarten population is an appropriate expectation for student enrollment. Additionally, they have established a 24:1 student-to-teacher ratio.
Transitional Kindergarten, like Kindergarten, requires larger learning environments and differentiated outdoor play spaces.
3
BACK TO CONTENTS
CONCLUSIONS The previous Facilities Master Plans included a multi-phased implementation of the goals set forth in the plans. Like the 2019 FMP, this update also has a focus on the elementary schools as the immediate next phases of improvement. The FMP identified, through the demographic information from King Consulting, that there exists surplus capacity at the elementary schools, as well as at the Junior High School and High School levels, for the long term. The significance at the elementary school level, however, is key as the surplus capacity is equivalent to an entire mid-sized school. A summary of those elementary projections is shown here, along with the proposed model capacity as developed as part of the 2023 FMP; a more detailed discussion of districtwide demographics is included in Section 2. The following recommendation, specific to the elementary schools are important next steps, and are specifically addressed as they represent the highest priority projects in the FMP.
- Prioritize a renovation of Citrus ES based on the condition assessment findings. The historic school is overdue for renovation. Additionally, this site would be “rightsized” to 320 students, allowing pressure for student support program space to be addressed. - Apply model capacity to all elementary schools. Model capacity begins with the assumptions for TK/K and ensures a consistent “cohort” can be housed at each school. The model capacities are shown here. - Replace four schools: Parkview, Rosedale, Chapman and Sierra View. These schools, when originally built, were prototypical and therefore have similar needs that were identified during the condition assessment, requirements that will likely push renovation costs close to the cost of replacement when phasing implications and mandated code upgrades are considered. This will also provide the opportunity for these schools to adequately address TK/K planning, SPED planning as well as the new model capacities. - The remaining schools are either newly renovated or will have small requirements such as the addition of TK classroom(s). - Assume that Shasta ES will not house a TK program due to site size and enrollment pressures in grades K-5.
ENROLLMENT ELEMENTARY SCHOOLS
22-23
23-24
24-25
25-26
26-27
27-28
28-29
29-30
MODEL TARGET CAPACITY
SURPLUS CAPACITY
Chapman
300
304
301
288
292
286
281
280
320
40
Citrus
341
355
357
374
379
362
366
364
320
(44)
Emma Wilson
565
552
549
554
541
531
551
553
672
119
Hooker Oak
291
283
275
268
262
265
264
265
320
55
Little Chico
431
429
436
452
467
467
480
493
496
3
Marigold
570
610
639
654
650
641
652
660
672
12
McManus
415
406
407
419
419
413
424
425
672
247
Neal Dow
335
348
363
353
365
359
363
364
320
(44)
Parkview
406
438
462
463
456
476
470
470
496
26
Rosedale
543
549
560
569
568
567
570
571
672
101
Shasta
647
648
673
698
709
682
674
665
496
(169)
Sierra View
456
443
443
439
440
448
441
438
496
58
Elementary School Totals
5,300
5,365
5,465
5,531
5,548
5,497
5,536
5,548
5,952
261
The master plans for both junior and senior high schools remain similar to those identified in the 2019 FMP. However, the 2023 FMP provides discussion on interim housing requirements and other actions that may be required to “make ready” the sites for the renovation plans. Minor modifications to the Athletics master plans for both high schools resulted from the engagement of key stakeholders. Major renovation at junior and senior high schools are anticipated in later phases; another update to the FMP is likely prior to that time. 4
BACK TO CONTENTS
MODEL CAPACITY: ELEMENTARY The model capacity discussion was a result of a detailed discussion regarding the Kindergarten and new Transitional Kindergarten demographic needs. Evaluation of the existing schools identified a potential misalignment between the number of Kindergarten students served and classrooms provided for grades 1-5. These model capacities align these numbers. The Loading Standards shown are Chico USD’s target loading standards. The numbers are conservative and represent desired averages by grade level so that facilities needs are met. The result is a model capacity for a smaller campus, with smaller demographic projections, a mid-size and a large campus. The Special Education department at the District level identified a need for 2 mild/moderate special education classrooms at each Elementary Campus. Eight sites will require two moderate/ severe special education classrooms. Those rooms are not shown in the model capacity, but the rooms are identified in the master plans for the following elementary school sites: •
Chapman ES
•
Emma Wilson ES
•
Little Chico Creek ES
•
McManus ES
•
Neal Dow ES
•
Parkview ES
•
Shasta ES
•
Sierra View ES
The elementary schools include two "flexible" or "flex" rooms to accommodate a variety of programs - art, music, science - or other site-specific needs, ideally larger than traditional classrooms. The plan includes one "surplus" classroom to address a potential grade-level "bubble" that may occur; identified as an unloaded classroom space. The assumption is that new campuses will adequately respond to the needs for student support services in permanent, specifc facilities and classrooms will not be required to meet those needs.
CONCLUSIONS
Model Capacity 1: SMALL 320 Students GRADE TK K 1 2 3 4 5 SPED Flex
# 1 2 2 2 2 1.5 1.5 2 2
TOTAL
17
LOADING 24 24 24 24 24 28 28 10 0
TOTAL 24 48 48 48 48 42 42 20 0 320
Model Capacity 2: MID-SIZE 496 Students GRADE TK K 1 2 3 4 5 SPED Flex
# 2 3 3 3 3 2.5 2.5 2 2
TOTAL
23
LOADING 24 24 24 24 24 28 28 10 0
TOTAL 48 72 72 72 72 70 70 20 0 496
Model Capacity 3: LARGE 672 Students GRADE TK K 1 2 3 4 5 SPED Flex
# 3 4 4 4 4 3.5 3.5 2 2
TOTAL
28
LOADING 24 24 24 24 24 28 28 10 0
TOTAL 72 96 96 96 96 98 98 20 0 672
5
BACK TO CONTENTS
IMPLEMENTATION PLAN The implementation plan shown below has guided the use of facilities funding between 2013 and 2023. Understanding future phases will require a reliable source of funding - local general obligation bonds, state school facilities funding, and/or development fees - the implementation plan has been revised to acknowledge the shifting priorities of transitional kindergarten, demographic changes and guiding principles. Of particular note is the identification of some smaller projects addressing restroom upgrades, safety and security improvements, as well as the Citrus Elementary School renovation, aligning remaining local bond funds with priority projects that can be accomplished within those remaining funds. Start 12/11/13
Phase II - Jr Highs Conversion to 6-8
Phase 1 - Quick Start Projects 11/11/13 - 4/3/15 ADA Priority List Site Work Only (Phase IV and after) 1/6/14 - 4/3/15 Enhanced School Safety and Security Measures
Phase III - Elementary School Capacity and Modernizations 6/1/16 - 10/5/20 Emma Wilson 4/29/18 - 4/15/20 Loma Vista-Marigold 6/1/16 - 10/5/20
Shasta 6/1/16 - 7/6/19
Technology Infrastructure for Common Core 1/6/14 - 4/3/15
Neal Dow 11/30/16 - 4/15/20
Energy Efficiency and Alternative Energy Projects (Prop 39 and Solar) 11/11/13 - 3/6/15
Athletic Fields - Phase 1 at CHS & PVHS 11/30/16 - 7/30/18
Bidwell (Priority Mods+Technology, Site Improvements, Security) 1/6/14 - 11/27/15 Chico Jr High (Priority MODs + Science, Site Improvements, Technology, Security) 1/6/14 - 7/19/16 Marsh Jr High Security 1/6/14 - 7/14/16 Marsh Jr High Improvements 10/6/13 - 7/15/16 6
Phase IV - Elementary / High School Capacity and Modernizations 4/29/19 - 6/1/25
Phase V - Elementary Modernizations 2024 - 2032
Phase VII - High School and Junior High School Modernizations (2040-2048)
Phase VI - Elementary & High School Modernizations (2032-2040)
Phase VIII - District Support Improvements
Sierra View PV High School Priority Mod/CTE 5/2020 - 5/2023
Fair View Site
Chico High School CTE Program 11/29/19 - 8/1/21
Hooker Oak Modernization Chico High School MOD & Athletic Master Plan Projects
McManus 8/25/23 - 8/25/25 FV High School Restrooms 6/2023 - 9/2023
Rosedale Chapman Parkview
Safety and Security Projects Restroom Renovation Projects
Current Status of Implementation Plan
Bidwell Jr. High School Marsh Jr. High School Chico Jr. High School
Citrus - Modernization Transitional Kindergarten Implementation Emma Wilson, Little Chico Creek, Marigold
PV High School MOD & Athletic Master Plan Projects
ALL 2024+ PROJECTS RELIANT ON FUTURE FUNDING SOURCES
BACK TO CONTENTS
SECTION 2 . DEMOGRAPHICS, ENROLLMENT ANALYSIS, AND CAPACITY
7
BACK TO CONTENTS
OVERVIEW Chico Unified School District currently operates 12 elementary schools, 3 junior high schools, 2 comprehensive high schools and 1 alternative high school. Additional facilities include 2 charter schools that operate on District-owned property, a District Office and a Corporation Yard. Additionally, the District owns vacant property for a future high school and a future elementary school.
Shasta ES 99
John A. McManus ES
The District contracted with King Consulting to update demographic analysis for the District in parallel to the early due diligence of the FMP. Their full report can be found as an appendix to this document, but excerpted portions are noted in this section in support of the recommendations of the FMP. Stakeholders found this information especially compelling in addressing rightsizing, transitional kindergarten spaces as well as the impacts of special education growth. Additionally, stakeholders identified the need for learning spaces at the elementary level beyond those “loaded” for student capacity to address the Arts, as well as other core student support programs. At the junior and high school level, target capacities include the ability for educators to use their assigned classrooms for “prep” periods. This assumption is impactful at the high schools where block scheduling is utilized and classrooms spaces are utilized for instruction for less minutes per day. The following loading standards were adopted by the District for facilities planning purposes.
Pleasant Valley HS
99
Bidwell Jr HS Fair View HS
Marigold ES
Hooker Oak ES
Sierra View ES 99
Neal Dow ES
Citrus ES
Parkview ES 32
Chico Jr HS
Marsh Jr HS 32 32
Emma Wilson ES
Little Chico Creek ES
32 99
Chico Sr HS
32
Chapman ES Rosedale ES
Loading Standards
8
Grade Levels
Target Capacity
TK-3
1:24
4-6
1:28
7-12
1:33
Special Education Day Class - Type 1 Special Education Day Class - Type 2 Special Education Day Class - Type 3
1:10 1:10
99
The locations of the Elementary, Junior High, and Senior High Schools included in this master plan
LEGEND Elementary Schools Junior High Schools
1:10
Senior High Schools
BACK TO CONTENTS
DEMOGRAPHIC PROJECTIONS & CAPACITY TARGET CAPACITY
SURPLUS CAPACITY
When comparing FMP projected capacity at each site with enrollment projections, provided by King Consulting, surplus capacity is shown at all grade levels. The capacity alignment is based on the 2029/30 projections and recognize a range of alignment of more than 10% over/under capacity.
22-23
23-24
24-25
25-26
26-27
27-28
28-29
29-30
Chapman
300
304
301
288
292
286
281
280
320
40
Citrus
341
355
357
374
379
362
366
364
320
(44)
Emma Wilson
565
552
549
554
541
531
551
553
672
119
Hooker Oak
291
283
275
268
262
265
264
265
320
55
Little Chico
431
429
436
452
467
467
480
493
496
3
Marigold
570
610
639
654
650
641
652
660
672
12
McManus
415
406
407
419
419
413
424
425
672
247
Neal Dow
335
348
363
353
365
359
363
364
320
132
Parkview
406
438
462
463
456
476
470
470
496
26
Rosedale
543
549
560
569
568
567
570
571
672
101
Shasta
647
648
673
698
709
682
674
665
496
(169)
Sierra View
456
443
443
439
440
448
441
438
496
58
Elementary School Totals
5,300
5,365
5,465
5,531
5,548
5,497
5,536
5,548
5,952
793
Bidwell
990
993
980
994
978
1,017
1,001
1,012
1,050
38
Chico
928
980
959
939
924
960
944
955
1,098
143
Marsh
732
742
726
754
747
772
759
771
1,011
240
LEGEND
Jr. High School Totals
2,650
2,715
2,665
2,688
2,649
2,749
2,704
2,738
3,159
421
Under Capacity
Chico
1,906
1,979
1,979
1,984
2,056
2,048
2,059
2,061
2,095
34
Over Capacity
Pleasant Valley
1,841
1,883
1,939
1,932
1,994
1,985
2,001
1,997
2,246
249
High School Totals
3,747
3,862
3,918
3,916
4,050
4,032
4,060
4,058
4,341
283
Operating surplus capacity has implications for school districts beyond initial capital investments as these spaces require resources for maintenance - cleaning, heating and air conditioning, grounds maintenance, etc. - that has long term impacts on operational costs. The guiding principle of Rightsizing recognizes this fact. The addition or expansion of both transitional kindergarten and special education spaces is included in the target capacity numbers and the projections. Without these requirements, the enrollment and capacity alignment would be further exaggerated.
Enrollment Aligns with Capacity
The demographic projections from King Consulting are shown above, projected through 2030. At all levels, surplus capacity is indicated and predicted. The target capacity has been adjusted for each school based on the proposed master plans that are presented later in the Facilities Master Plan.
9
ELEMENTARY SCHOOLS: DEMOGRAPHIC IMPACTS
7
22
9
5
4
14
5
SCHOOL OF ATTENDANCE
7
6
1
8
300
2
3
3
341
EMMA WILSON
2
31
480
7
5
24
2
1
7
4
563
LITTLE CHICO CREEK
13
18
10
326
8
18
10
7
7
8
6
431
MARIGOLD
6
19
24
10
387
57
10
26
18
10
567
MCMANUS
4
16
21
7
7
325
10
3
15
7
415
NEAL DOW
11
17
31
15
15
37
191
1
6
7
5
336
PARKVIEW
17
29
33
45
10
21
23
169
13
39
7
406
SHASTA
3
4
21
3
6
9
43
2
554
2
SIERRA VIEW
16
20
33
21
25
26
24
9
29
247
6
456
HOOKER OAK
16
44
45
9
20
64
42
11
18
16
6
291
Rosedale
57
81
100
52
52
64
37
29
29
28
14
543
OAK BRIDGE ACADEMY
3
2
1
4
1
2
1
1
2
1
18
TOTAL RESIDING
348
579
839
511
547
683
407
713
371
77
5314
% IN-MIGRATION
36%
19.40% 14.70% 24.40% 31.70% 21.70% 43.20% 58.40% 14.40% 45.80%
% OUT-MIGRATION
44.80% 52.50% 42.80% 36.20% 29.30% 52.40% 53.10% 29.30% 22.30% 33.40%
NET MIGRATION BETWEEN ATTENDANCE AREAS
10
TOTAL ATTENDING
NEAL DOW
7
22
OTHER DISTRICTS
MCMANUS
18
275
SIERRA VIEW
MARIGOLD
23
8
SHASTA
LITTLE CHICO CREEK
192
CITRUS
PARKVIEW
EMMA WILSON
Chapman
CHAPMAN
CITRUS
SCHOOL OF RESIDENCE
20
-114
-134
-21
83
-145
4
239
200
-18
647
125
TOTAL GEOCODED STUDENTS ATTENDING
300
341
563
431
567
415
336
406
647
456
TOTAL RESIDENTS ATTENDING
192
275
480
326
387
325
191
169
554
247
TOTAL NON-RESIDENTS ATTENDING
108
66
83
105
180
90
145
237
93
209
PLANNING IMPACTS OF “CHOICE” MODEL
DENSITY DISCUSSION
Chico Unified School District is proud of its ability to meet the needs of families by providing school choice. While boundaries generally exist, transferring between school boundaries is allowed. Because of this, projecting enrollment can be difficult. With that in mind, King Consulting provided an assessment of elementary school choice and the impacts on enrollment projections in anticipating that choice. The chart above outlines the number of students that currently reside in each attendance boundary, the number of students that attend that school from within the boundary, from outside the boundary (in-migration), and the number that leave the boundary to attend another school of their choice (out-migration). Please note that Hooker Oak ES, Rosedale ES and Oak Bridge Academy (charter) are non-boundary schools. Stakeholders found this information to be helpful, noting that the model capacities have the ability to define capacity and ultimately control transfer requests to schools that may be exceeding that model capacity.
In addressing the surplus capacity, the FMP examined the campus capacity versus enrollment indentifying those that align (green), are over capacity by more than 10% (yellow) or under capacity by more than 10% (red). The map above suggests a cluster of schools that are significantly under their desired capacity, suggesting these schools may be a focus of identifying schools for "repurposing" for other District uses and/or a location for interim student housing during renovation or replacement of other schools in the District. Ultimately, this consideration was rejected; interin housing will be a significant factor in the facilities program.
LEGEND Under Capacity Over Capacity Enrollment Aligns with Capacity
SECTION 3. CONDITION ASSESSMENTS
11
Marigold McManus Neal Dow Emma Wilson Little Chico Creek Shasta Chapman Parkview Rosedale Sierra View Citrus Hooker Oak Jr. High Schools Bidwell Chico Jr Marsh High Schools Chico Pleasant Valley Fair View
Plumbing Restrooms
Mechanical
Low Voltage
Electrical
Building Security
Building Interior
Building Exterior
Site - Security
Site - Other
The condition assessment process examined all District facilities, evaluating the site against 10 key areas as shown in the matrix. The matrix is a summary of the entire campus; a more detailed summary, building by building, is part of the campus specific portion of the FMP. A more detailed summary, by building system, is part of the Appendix. The process included site walk(s) and drawing review by electrical and mechanical engineers, civil engineers as well as the architectural team. - Site ADA: access compliance issues at the site level including playgrounds, parking areas, etc. - Site - Other: includes items such asphalt and concrete paving deficiencies, landscape and play areas. - Site Security: includes items such as site fencing and gates, parking and drop-off areas. - Building Exterior: Doors and windows, roof quality, painting, etc. - Building Interior: Interior finish materials (paint, celings, for example), accessibility issues of restrooms, casework, doors, etc. - Building Security: Single-point-of-entry, access control hardware - Electrical: Power adequacy, electric lighting - Low Voltage: Data adequacy; fire alarm, clock and speaker - Mechanical: Heating, Ventilating and Air Conditioning systems - Plumbing (restrooms): Quality and level of renovation required to achieve accessibility. Educational adequacy, or a comparison to the standards established in the educational specifications, will be addressed in the individual master plans, by site.
LEGEND <10% Replacement Value 10% < 50% Replacement Value 50% < 75% Replacement Value 75% < 100% Replacement Value
12
Site - ADA
Elementary Schools
CONDITION ASSESSMENT: SUMMARY
The scale against these systems were measured is replacement value as noted below. When addressing building systems, or overall campus condition, “orange” and “red” systems, buildings or campuses prompt the need to assess whether full replacement is a best value alternative.
This chart provides a side-by-side comparison of the existing elementary school facilities, their current capacity and the model capacity as developed in the FMP. For the schools yet to be modernized/replaced, any inequities can be addressed in the programming and planning of those facilities to align with the District's Educational Specifications. For the schools in the District considered "completed" with the exception of small modifications for transitional kindergarten, attention should be given to the impact of undersized core facilities - administration, libraries and multi-purpose spaces - that impact school operations and equity. Those spaces are highlighted in (RED). ELEMENTARY
CHAPMAN
CITRUS
EMMA WILSON
HOOKER OAK
LITTLE CHICO CREEK
MARIGOLD
2
1
1
2
MCMANUS
SITE INVENTORY ELEMENTARY SCHOOLS NEAL DOW
PARKVIEW
ROSEDALE
1
1
1
SHASTA
SIERRA VIEW
Loaded Transitional Kindergarten
1
Kindergarten
2
2
3
2
4
3
3
2
2
4
4
3
First Grade
1
2
4
2
3
4
3
3
2
4
5
3
Second Grade
2
3
4
3
3
4
3
2
3
4
4
4
Third Grade
2
3
3
2
3
3
3
3
3
4
5
4
Fourth Grade
2
2
3
2
3
3
3
2
3
3
4
3
Fifth Grade
2
2
3
2
3
3
3
2
3
3
4
4
SPED
3
2
2
2
2
3
2
Total
15
16
24
17
19
29
23
14
20
37
18
23
Non-Loaded ART
1
Music
1
1 2
Science | Project Based Learning 1
Resource
1
1
1
1
1
1
1 1
1
1
Accelerated Learners 1
ELD | Intervention
2
1
Computer 1
After School Program Preschool
1
Title 1
1
Reading
1
2
15 1
1
2
1 1
1
Learning Center Other
1
9 Charter
1 (SEL)
1 (RTL groups)
PORTABLE
1 (Opportunity)
1 (Portable)
Support (SF) Library Space*
979
979
1713
996
2420
1713
1177
3331
979
1734
1127
943
Administration/Student Services
1930
4739
3804
2573
2485
8980
5913
3682
3134
3101
3331
3156
Cafeteria/Multi-Purpose Space
2191
2183
6714
4417
5199
6714
2452
6496
1954
2196
3713
2238
Kitchen
812
415
1296
565
556
1296
467
1047
448
567
521
579
Gymnasium/Locker Rooms
Technology Room
960 SF
1. Title 5 of the California Code of Regulations outlines library space at 2.5 SF/student. Undersized library spaces are shown in (RED). 2. Title 5 also indicates 1,350 SF for Kindergarten spaces inclusive of restroom and support spaces. Campuses with undersized Kindergartens show the number of undersized Kindergartens in (RED). The District has established a size for elementary school multi-purpose spaces of 6 SF/Students. Undersized multi-purpose spaces are shown in (RED)
LEGEND Proposed Replacement Campus Proposed Light/Moderate Modernization Completed Campus 13
CONDITION ASSESSMENT: PHOTOS Shown below are several photos to represent recurring conditions seen at multiple campuses. More detailed conditions of each individual campus are covered later in the Facilities Master Plan.
Ponding of water around site. More adequate drainage needed Repair to leaks and finish damages from leaks
Accessibility upgrades for sinks and restrooms Roofs in need of replair. Finish upgrades are needed
Upgrades to older equipment such as drinking fountains
14
Door hardware in need of replacemen for security, technology, and/or replacement
Cracked Asphalt at parking and play areas
SECTION 4. STAKEHOLDER ENGAGEMENT
15
STAKEHOLDER ENGAGEMENT The stakeholder engagement process is essential to a Facilities Master Plan (FMP) that represents the needs of the community. Key data that was presented to stakeholders includes: Prior FMP findings and progress, overall demographics and enrollment capacity, current and projected, as well as findings of the condition assessment. Engagement occurred at multiple levels as described below, intended to include the greatest nulber of stakeholders. The 2019 FMP was used as a starting point for these discussions. In addition, electronic surveys of both staff and students were conducted. The summary of those results are shown on the following page.
COMMUNITY AND SITE-BASED OUTREACH Community meetings were held at each high school and junior high schools. The Junior High School meetings included "feeder" elementary schools. At these meetings, the district facilities team and facilities master planning team presented the process for master planning as well as the Guiding Principles established for the FMP update. Following that, break-out sessions were held, by school, to hear directly from site and community representatives. Attendees were asked to leave their thoughts via post-it notes on a site map of the campus. A second community meeting to present the draft FMP was held in Fall 2023 prior to presentation for approval. In addition, community input was received at several meetings of the Board of Education. That feedback influenced the direction of the final FMP.
PRINCIPALS AND DISTRICT-LEVEL SPECIALISTS All Principals participated in individual site walks with the design team. This was an opportunity to see the campus and hear directly from the Principals as to the issues that affect their campus community, day-to-day. This occurred prior to any community or site-based outreach and helped frame future conversations. Principals garnered input from site staff for the discussion.
STEERING COMMITTEE
CORE GROUP
The Steering Committee included District administration, site Principals from representative school sites, as well as community members/ parents, students and members of the Board of Education.
The Core Group, made up of District cabinet members, met continually throughout the facilities master planning process to guide the process and to prepare for various workshops and presentations to the Board of Education.
In addition to the site Principals, District-level staff were engaged for Food Service, Transportation, Information Technology, Maintenance & Operations, and Special Education services. These informed site-specific as well as district wide facilities.
Core Group Steering Commi�ee Principals and District-level Specialists Community and Site-Based Outreach
16
COMMUNITY MEETINGS
Presentations of the background and process of the masterplan
Group breakouts to gather and discuss feedback
Posters of initial site assessments to discuss and leave notes
The student voice was important to the planning process
Elementary school participants gathered at Chico Junior High
Rosedale Community participation
17
STAKEHOLDER ENGAGEMENT SURVEYS
Student Engagement Results Elementary Priorities All-Schools by Grades 4-5
The stakeholder engagement process included outreach, via electronic survey, to both staff and students. Key findings per school are included in the school-specific sections of the document. A summary is provided here and represent both recently renovated schools as well as those that were not. Students at both the elementary and high school level identified restrooms as their key concern. Students were evenly divided between technology needs, classroom upgrades and outdoor play/athletic facilities. Students were asked about their highest facilities needs, but also about school-site safety and security. Perimeter fencing and single-point-of-entry improvements, as well as access control upgrades (cameras, etc.) were prioritized. The District has been moving through these improvements District-wide.
Junior High School (Combined) Priorities from Students 6-8 Grades
LEGEND Restroom/Locker Rooms Safety & Security (Drop-off zones, perimeter fencing, entry, etc.) Classroom/Lab Upgrades Exterior Renovations/Repair Technology Improvements Physical Education/Athletic Facilities Portable Removal Playground Equipment
18
High School (Combined) Priorities from Students 9-12 Grades
Faculty Engagement Results
SECTION 5. ELEMENTARY SCHOOLS
19
CHAPMAN ELEMENTARY SCHOOL
FAST FACTS: •
Originally built: 1953, Renovated: 1989
•
2022/2023 Enrollment: 286 Students
•
Site = 9.77 Acres
•
Buildings = 33,669 SF (Permanent) | 5,515 SF (Portables)
•
160 Parking Spaces
•
39% of Classrooms are in Portable Classroom Buildings
•
Recommended permanent capacity: 320
The Chapman Elementary School site currently houses both the Chapman Elementary School and the Sherwood Montessori Charter School. The campus is one of several originally built in 1953 that the FMP recommends for full replacement at a model capacity of 320 students. Recent improvements to parking and drop-off areas are expected to remain. Consideration should be given to the Sherwood Charter program at the time of implementation. A key concern of the current arrangement is the shared "core facilities" of multi-purpose and food service facilities. For purposes of the FMP, the Charter school is not accommodated. The replacement of Chapman Elementary will require interim housing or a complex, phased implementation. Discussions regarding an interim campus location were also discussed if the District can identify an appropriate location.
Entry and multipurpose at Chapman Elementary School.
20
CHAPMAN ELEMENTARY SCHOOL
EXISTING SITE INVENTORY SHERWOOD
AVE ELAND
C
B
A
CLEV
The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
D INVENTORY SCHOOL BUILDINGS
E G
160 Spaces
F
H
I K
AREA
LOADED CR
NON-LOADED
A Sherwood Classrooms
6,264 SF
4
B Sherwood Classrooms
2,304 SF
2
C Sherwood Classrooms
3,840 SF
2
D Classrooms & Library
8,064 SF
4
E Classrooms
5,268 SF
3
F Multi Purpose & Admin
5,353 SF
G Restrooms
1,509 SF
H Classrooms
5,439 SF
4
I Kindergarten
3,823 SF
2
2
K Portable Classrooms
5,280 SF
2
3
Total
47,145 SF
17
1
area includes covered spaces at 50%
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Library / Media
Sherwood Facilities
Overhead Shade Structure
21
CONDITION ASSESSMENT
22
Accessibility upgrades required
Ongoing deferred maintenance
Aging and undersized core facilities
Aging food service facilities
Door hardware for accessibility
Aging casework and finishes
CHAPMAN ELEMENTARY SCHOOL
CONDITION ASSESSMENT UPDATE
SHERWOOD AVE VELAND
C
B
A
CLE
KEY FINDINGS CHAPMAN ES
NOTES
• • 1. Site - ADA
D
2. Site - Other 3. Site - Security
E
4. Building - Exterior
G F
COST PER SF
• • •
Hardcourts are in poor conditions PV canopies over portions of parking lot
•
Single-point-of-entry to Administration building
•
Exterior finish upgrades - cement plaster, wood siding, metal sash wall, etc. Roof drainage systems needed Window and door replacements
• • • •
H
5. Building - Interior
•
Floor finish upgrades Accessibility needs at sink areas - ADA compliance Door hardware replacements
6. Fire Alarm
• •
Doesn't meet any current code requirements Older Silent Knight 5207 FACP
•
Lighting controls do not meet current energy code requirements Old electrical gear (60+ yrs.) and all panelboards are full, no spare breakers
•
I
7. Electrical
8. Low Voltage/Security
K
Flatwork at building doors exceed ADA slopes Numerous walkways along buildings exceed ADA slopes ADA symbols in parking stalls do not meet standards
9. Mechanical
10. Plumbing/Restrooms
• •
No intrusion alarm system on campus MDF located in Library - not in dedicated room with cooling
•
Poor air distribution (2) Supply Air Grille and single point return
• • •
Entry doors not compliant (width/threshold) Non-compliant ADA clear space at interior Suggest new gas distrubution replacement with new HVAC units
Note: please see appendix for detailed consultant reports
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN CHAPMAN ELEMENTARY SCHOOL
23
PROPOSED MASTER PLAN The site diagram is intended to summarize the program and a potential "test fit" on the elementary school site. Important concerns include the creation of a "single-point-of-entry" adjacency to the parking and drop-off areas as well as a designated area for the K/TK complex. The project will benefit from an inclusive engagement process for the design of the new elementary school campus. The model program for 320 students is summarized below. The Chapman site was identified as a location for a Moderate/Severe Special Education program and related facilities. Model Capacity 3: SMALL 320 Students
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
24
CHAPMAN ELEMENTARY SCHOOL
GRADE TK K 1 2 3 4 5 SPED Flex Bubble
# 1 2 2 2 2 1.5 1.5 2 2 1
TOTAL
17
LOADING 24 24 24 24 24 28 28 10 0 0
TOTAL 24 48 48 48 48 42 42 20 0 0 320
PHASING SCHOOL BUILDINGS
C
B Sherwood Classrooms
B
C Sherwood Classrooms
A
E G H
D
K
A Sherwood Classrooms
D Classrooms & Library E Classrooms F Multi Purpose & Admin G Restrooms H Classrooms
F
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at Chapman Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here. For example, identification of an alternative interim housing option may eliminate the need for building temporary housing, reducing costs and streamlining schedule.
I
I Kindergarten K Portable Classrooms
LEGEND New Building Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished
LIBRARY TK/K ADMIN
CLASSROOM BUILDING
TEMPORARY INTERIM HOUSING
MULTIPURPOSE
PHASE 1
PHASE 2
PHASE 3
BUILD INTERIM TEMPORARY HOUSING & DEMOLISH EXISTING
BUILD PERMANENT CAMPUS ON OCCUPIED SITE
REMOVE TEMPORARY HOUSING AND COMPLETE SITE
CHAPMAN ELEMENTARY SCHOOL
25
CITRUS ELEMENTARY SCHOOL
FAST FACTS: •
Originally built: 1937, Renovated 1998
•
2022/2023 Enrollment: 342 Students
•
Site = 4.09 Acres
•
Buildings = 31,872 SF (Permanent) | 2,880 SF (Portables)
•
0 Parking Spaces
•
14% of Classrooms are in Portable Classroom Buildings
•
Recommended permanent capacity: 320
The Citrus Elementary School is a beloved campus in the heart of Chico Unified School District. The campus, originally built in 1937, is slated for a moderate renovation at a model capacity of 320 students. To accomplish this model capacity, the campus will only require the addition of a transitional kindergarten (TK) building. Key considerations from the site-based engagement process included: • Improvements for controlled, single-point-of-entry • Pick-up and drop-off improvements • Need for additonal space for student support services • The addition of gender-inclusive restrooms • The site has a sewer/water easement through it which could impact future improvements The renovation of Citrus Elementary will require interim housing or a phased implementation over multiple summers as the renovation cannot be accomplished with students present.
Entry and multipurpose at Chapman Elementary School.
26
CITRUS ELEMENTARY SCHOOL
EXISTING SITE INVENTORY B
VE A h 4t A
The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classroom, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
F
E C
G
GROSS AREAS
S RU
CIT
D
SCHOOL BUILDINGS
AREA
E AV
LOADED CR
NON-LOADED
A Classrooms
10,525 SF
9
1
B Kindergarten
4,678 SF
2
C Admin
7,397 SF
C Multi Purpose
4,730 SF
2
D Classrooms and Library
8,370 SF
4
E Portable Classrooms
920 SF
1
F Student Store
960 SF
G Portable Pre K Classroom
1,440 SF
1
Total
39,021 SF
19
1
2
area includes covered spaces at 50%
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Overhead Shade Structure
Library / Media
CITRUS ELEMENTARY SCHOOL
27
CONDITION ASSESSMENT
28
Classroom storage and full interior finishes renovation
Multi-purpose room renovation and storage improvements
ADA compliance upgrades
Sink area improvement for ADA accessability
CITRUS ELEMENTARY SCHOOL
Interior finish upgrades and replacements
Student restroom upgrades
CONDITION ASSESSMENT B
VE A h 4t A
UPDATE
KEY FINDINGS
F CITRUS ES
COST PER SF
NOTES
• 1. Site - ADA
E
C
2. Site - Other 3. Site - Security 4. Building - Exterior
S RU
CIT
D
E AV
5. Building - Interior
• • • •
No parking lot on site Student Drop-off is along curbside Playground paving is cracked
•
Campus has single-point-of-entry, but doesn't lead to Administration
• •
Roof draining needs (no gutter/downspouts) Single-pane windows at some areas of campus
•
Accessibility needs at sink areas - not ADA compliant Acoustical 2x4 ceiling tile damage Interior flooring replacements
• • •
6. Fire Alarm
• •
7. Electrical
• •
8. Low Voltage/Security
• • •
9. Mechanical • 10. Plumbing/Restrooms
Walkways along Building B, C, and D do not meet ADA standards Off-site perimeter sidewalks are old and need replacement
•
Silent Knight 6820EVS control panel (added to serve addition of portables) is consistent with current district standards Remainder of campus is not compliant with current code Most existing panels on campus are old and past their servicable life Lots of surface raceways in classrooms No intrusion alarm system in use. Cameras throughout the campus. No access controls. New PA system installed 2023 Gas fired furnaces located in attics and closets are 20+ yrs. old and need replacement Multiple Outdoor Condensing Units located in Chainlink Yards. +20 years old. Needs replacement Plumbing equipment and fixtures from original construction ADA upgrades to core restrooms are 10-12 yrs. old
Note: please see appendix for detailed consultant reports
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN CITRUS ELEMENTARY SCHOOL
29
4
PROPOSED MASTER PLAN
B
VE th A
A
OVERVIEW The proposal includes a light to moderate renovation of existing facilities, and the addition of a transitional kindergarten as needed to meet the model capacity goals of 320 students.
F
The site is not planned for growth as its site size and existing building footprint is that of a small school. However, there are key improvements that should be part of the renovation, including a renovation/expansion of administration and student services to provide single-point-of-entry and space for student support services that are currently occupying inadequate spaces.
E
C
S RU
CIT E AV
Additionally, some off street parking and drop-off locations have been added to the masterplan. And an inaccessible basement level exists; consideration should be given to potential use as storage facilites.
D
Model Capacity 3: SMALL 320 Students
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
30
CITRUS ELEMENTARY SCHOOL
GRADE TK K 1 2 3 4 5 SPED Flex Bubble
# 1 2 2 2 2 1.5 1.5 2 2 1
TOTAL
17
LOADING 24 24 24 24 24 28 28 10 0 0
TOTAL 24 48 48 48 48 42 42 20 0 0 320
PHASING SCHOOL BUILDINGS
A Classrooms B Kindergarten C Admin C Multi Purpose D Classrooms and Library E Portable Classrooms F Student Store G Portable Pre K Classroom
F
E
B A C
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at Citrus Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.
D
LEGEND New Building Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished
MODERNIZATIONS OF EXISTING BLDGS
PHASE 1
INTERIM HOUSING
REMOVE INTERIM HOUSING
ADD PARKING AND DROP-OFF
PHASE 2
PHASE 3
BUIILD INTERIM HOUSING
RENOVATE EXISTING BUILDINGS
SITE UPGRADES AND REMOVE INTERIM HOUSING
Use existing field to build interim housing for the school for future modernizations.
Modernize existing buildings while classes use interim housing.
Removal of interim housing and construction of site improvements, including a new drop off on 4th Ave and parking on Citrus Ave.
CITRUS ELEMENTARY SCHOOL
31
EMMA WILSON ELEMENTARY SCHOOL
FAST FACTS: •
Originally built: 1993, Renovated: 1998
•
2022/2023 Enrollment: 589 Students
•
Site = 13.31 Acres
•
Buildings = 49,825 SF (Permanent) | 3,098 SF (Portables)
•
87 Parking Spaces
•
9% of Classrooms are in Portable Classroom Buildings
•
Reccommended permanent capacity: 672
Emma Wilson Elementary School, constructed in 1993, is a newer school in the Chiso USD. It does have several portable classrooms on campus which the master plan proposes to remove. While the school is currently less than 600 students, it is proposed as a "large" model capacity for 672 students, intended to absorb any growth on the west side of the District. As a "large" campus, it will require two additonal rooms for the TK/K program, and likely an expansion of the supporting playground. Information received from site-based and community input identified the following concerns: • • • • •
Undersized multi-purpose building, especially for the larger capacity Replacement of portable buildings which currently house SPED programs should be prioritized Lack of adaptive PE playgrounds The addition of gender-inclusive restrooms Maintenance needs including roof repairs and fencing expansion
Emma Wilson Elementary School.
32
EMMA WILSON ELEMENTARY SCHOOL
EXISTING SITE INVENTORY The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms. GROSS AREAS SCHOOL BUILDINGS
J E
D
F
L
79 Spaces
C
H
A
B
G
AREA
LOADED CR
NON-LOADED
6
3
A Admin and Library
8,938 6,992 SF
B Classrooms
12,932 9,888 SF
C Multi Purpose
7,786 5,751 SF
D Classrooms
1,920 1,992 SF
2
E Classrooms
4,608 4,800 SF
4
F Classrooms
1,920 1,992 SF
2
G Classrooms
12,932 9,888 SF
8
H Kindergarten
4,271 2,816 SF
2
J Portable Classrooms
2,880 3,098 SF
3
L Kindergarten
13,049 5,705 SF
3
Total
71,239 52,923 SF
30
3
area includes covered spaces at 50%
8 Spac
es
W 8th AVE
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Overhead Shade Structure
Library / Media
EMMA WILSON ELEMENTARY SCHOOL
33
CONDITION ASSESSMENT
34
Classroom storage and interior finish upgrades
Acoustical Ceiling Tile replacement
Admin reception desk renovations and interior finishes upgrades
Student restroom upgrades
EMMA WILSON ELEMENTARY SCHOOL
Multi-purpose daylighting improvements
Casework and sink improvements for ADA compliance
CONDITION ASSESSMENT UPDATE
KEY FINDINGS EMMA WILSON ES
COST PER SF
NOTES
• 1. Site - ADA
• •
2. Site - Other 3. Site - Security 4. Building - Exterior
J
5. Building - Interior
E
D
F
L
•
H
A
7. Electrical
Does not have one point of entry directly into the Admin office.
•
Exterior finishes are in good condition
•
Sink areas in some spaces are not ADA compliant Interior flooring needs to be upgraded and replaced
• •
Silent Knight 6820EVS control panel was added during the Kinder Wing addition, which includes code required voice notification. The remainder of the campus is not compliant with current code, and is primarily a manual system and not addressible.
•
Gear is approximately 30 years old but generally in good condition.
•
Vista intrusion alarm system consisting of door contacts and motion sensors is in use but requires some re-programming. Cameras throughout the campus. No access controls.
•
Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy. Existing ductwork is all original and in good condition.
8. Low Voltage/Security
B
G
9. Mechanical
• •
W 8th AVE 10. Plumbing/Restrooms
South vehicle parking area should be crack and slurry sealed Playground equipment (not shaded)
•
6. Fire Alarm
C
Some walkways along Buildings A, B and G do not meet ADA requirements 2 drop off areas both need accessible loading zone
• •
Plumbing Equipment is from original construction and ready for replacement.. Single occupancy toilet - not ADA Restroom finishes need updates and replacements
Note: please see appendix for detailed consultant reports LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN EMMA WILSON ELEMENTARY SCHOOL
35
PROPOSED MASTER PLAN OVERVIEW The vision for the Emma Wilson elementary school improvements includes the following:
F
L
79 Spaces
C
H
A
G
B
8 Spac
es
W 8th AVE
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
36
EMMA WILSON ELEMENTARY SCHOOL
Two new rooms for expansion of the TK/K program
•
New multi-purpose room to meet the larger capacity of school
•
Reclaim existing multi-purpose for the moderate/severe Special Education program as well as a flex space for music or art
•
Future modernization of remaining campus buildings when eligible
•
Removal of portable buildings
Model Capacity 3: LARGE 672 Students
E
D
•
GRADE TK K 1 2 3 4 Bubble 5 SPED SPED (Mod/ Severe) Flex
# 3 4 4 4 4 3 2 3 2
LOADING 24 24 24 24 24 28 28 28 10
TOTAL 72 96 96 96 96 84 56 84 20
2 3
10 0
20 0
TOTAL
34
720
PHASING SCHOOL BUILDINGS
A Admin and Library B Classrooms C Multi Purpose
J
F
E D
L
D Classrooms
H
E Classrooms F Classrooms G Classrooms
G
H Kindergarten
A
J Portable Classrooms L Kindergarten
B C
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at Emma Wilson Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here. LEGEND New Building Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished
NEW MULTI-PURPOSE BUILDING
NEW KINDER CLASSROOMS
RENOVATION OF EXISTING MP BUILDING
PHASE 1
PHASE 2
NEW MULTI-PURPOSE AND KINDER CLASSROOMS
REMOVAL OF PORTABLES
For Phase 1, the existing MP, which is undersized, will be replaced with a new building at the Northeast of the campus. It will have a kitchen and stage that can double as a music classroom. The stage inside can also open to an exterior stage. A covered eating area is at the east of the building. The existing MP would be heavily modernized at this stage as well to make space for a new SPED building.
Phase 2 will include the modernization of the original MP at Bldg C into a dedicated SPED building. When the building is renovated, the existing portables can be removed or relocated. The SPED building will have space for 4 classrooms that each have restrooms, workrooms, and sensory rooms, shared between groups of two classrooms. There will also be space for two offices or storage rooms if needed.
EMMA WILSON ELEMENTARY SCHOOL
37
HOOKER OAK ELEMENTARY SCHOOL
FAST FACTS: •
Originally built: 1949, Renovated: 2006
•
2022/2023 Enrollment: 304 Students
•
Site = 6.75 Acres
•
Buildings = 36,130 SF (Permanent) | 4,800 SF (Portables)
•
27 Parking Spaces
•
30% of Classrooms are in Portable Classroom Buildings
•
Reccommended permanent capacity: 320
The Hooker Oak Elementary School is a non-boundaried campus in the heart of Chico Unified School District. The campus, originally built in 1949, is slated for a moderate renovation at a model capacity of 320 students. To accomplish this model capacity, the campus will require the replacement of existing portable buildings with three TK/K classrooms. Key considerations from the site-based engagement process included: • • •
Improvements to security with controlled, single-point-of-entry at the administration area Parking improvements The addition of gender-inclusive restrooms
The renovation of Hooker Oak Elementary will require interim housing or a phased implementation over multiple summers as the renovation cannot be accomplished with students present. Previous renovations added acoustical ceilings, for example which if removed would reveal the clerestory windows above.
Entry and multipurpose at Hooker Oak Elementary School.
38
HOOKER OAK ELEMENTARY SCHOOL
EXISTING SITE INVENTORY
E AV AN
R
E3
M ER
2
VE DA
SH
ces
pa 1S
GROSS AREAS
A
SCHOOL BUILDINGS
B
C
E c Spa
AREA
LOADED CR
A Classrooms
8,623 SF
5
B Classrooms
8,233 SF
4
C Classrooms and Library
7,903 SF
3
D Classroom and Student Services
2,400 SF
E Multi Pupose and Admin
12,225 SF
1
F Portable Classroom
960 SF
1
G Portable Classrooms
1,920 SF
2
H Portable Classrooms
1,920 SF
2
Total
42,265 SF
18
NON-LOADED
1 1
2
area includes covered spaces at 50%
VE SA
TU
BU
AR
es
6
The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
D G F
H
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Overhead Shade Structure
Library / Media
HOOKER OAK ELEMENTARY SCHOOL
39
CONDITION ASSESSMENT
40
Exterior water fountain replacement
Student restroom ADA upgrades and renovations
Exterior paint and window replacement needed
Restroom upgrades needed for ADA compliance
HOOKER OAK ELEMENTARY SCHOOL
Classroom interior finish improvements and upgrades
Campus portable classrooms
CONDITION ASSESSMENT Sp
E AV AN
M ER
R
E3
UPDATE
KEY FINDINGS
SH
21
VE A D
s ace
HOOKER OAK ES
1. Site - ADA
2. Site - Other
A
COST PER SF
NOTES
•
Slurry seal, replace striping and pavement markings and signs
•
A shared bus / parent drop-off area is provided, not ADA compliant. Hardcourt paving is in poor condition Manual lettering message sign provided.
• • •
The campus is secured with a fence around the campus. There are multiple access into the main building from the street, no direct access into Admin.
• • •
Window trims are in poor condition Fascias are wood and in poor condition Door thresholds are not ADA compliant
•
Existing VCT flooring is worn and needs replacement Sinks are non ADA compliant
3. Site - Security
B
4. Building - Exterior
5. Building - Interior
C
E
•
ces
6. Fire Alarm
•
VE SA
D
Very old gear (60 years or older) observed throughout campus. All panelboards are full, no spare breakers, and limited branch circuiting to support modern instructional requirements. Some of the wiring is exposed with cloth sheathing, which is not code compliant.
•
No intrusion alarm system in use. Cameras throughout the campus. No access controls. Older Bogen Multicom 2000 in MDF room, not per current standards.
7. Electrical
G F
8. Low Voltage/Security
H
• •
9. Mechanical
•
• 10. Plumbing/Restrooms
LEGEND
Older Silent Knight 5208 FACP with pull stations, did not observe smoke detectors, there may be some pull stations. Does not meet current code requirements. A Wheelock voice system was added on to accommodate addition of portables.
•
TU
BU
AR
pa
6S
•
Roof mounted AC-Units 16-20 years old NOT installed per code. Too close to edge of roof for service. Duct distribution is approx. 20 years old.
Plumbing Fixtures are from original construction and need full replacement to meet ADA requirements.
Note: please see appendix for detailed consultant reports
Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN HOOKER OAK ELEMENTARY SCHOOL
41
PROPOSED MASTER PLAN OVERVIEW The improvements to Hooker Oak Elementary School predominantly include renovation of the existing campus for a capacity of 320 students. Specific improvements include:
E AV D R
SH
E3
E AV AN
M ER
A
•
The removal of existing portables
•
Replacement of existing TK/K Classrooms with permanent construction. Related improvements include parking and drop-off specifically for that complex and playground improvements.
•
Renovation of exisiting buildings, including an expansion to the administration portion of the building.
B Model Capacity 3: SMALL 320 Students
C E
VE SA
TU
BU
AR KINDER PLAY AREA
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
42
HOOKER OAK ELEMENTARY SCHOOL
GRADE TK K 1 2 3 4 5 SPED Flex Bubble
# 1 2 2 2 2 1.5 1.5 2 2 1
TOTAL
17
LOADING 24 24 24 24 24 28 28 10 0 0
TOTAL 24 48 48 48 48 42 42 20 0 0 320
PHASING SCHOOL BUILDINGS
A Classrooms
A
B Classrooms
B
C Classrooms and Library
E
C G
D Classroom and Student Services E Multi Pupose and Admin
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at Hooker Oak Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.
F Portable Classroom G Portable Classrooms
LEGEND
H Portable Classrooms
D
New Building
H
Lightly Modernized Building Heavily Modernized Building
F
Building to be Relocated or Demolished
NEW TK/K CLASSROOMS
INTERIM HOUSING
PHASE 1
PHASE 2
PHASE 3
BUILD INTERIM HOUSING
REMOVE EXISTING PORTABLES
BUILD TK/K CLASSROOMS AND REMOVE INTERIM HOUSINGPORTABLES
HOOKER OAK ELEMENTARY SCHOOL
43
LITTLE CHICO CREEK ELEMENTARY SCHOOL
FAST FACTS: •
Originally built: 1991
•
2022/2023 Enrollment: 451 Total Students
•
Site = 13.4 Acres
•
Buildings = 44,523 SF (Permanent)
•
102 Parking Spaces
•
0% of Classrooms are in Portable Classroom Buildings
•
Reccommended permanent capacity: 496
Little Chico Creek Elementary School is a newer campus in Chico USD. The campus, originally built in 1991, is expected to house a model capacity of 496 students. To accomplush this model capacity, the campus will require the addition of TK/K classrooms. Key considerations from the site-based engagement process included: • • •
Security Improvements to the administration area The additon of gender-inclusive restrooms Ongoing maintenance issues include onsite flooding, a chiller system that has ongoing maintenenace problems as well as a desire for new carpet.
Future renovation of bulding, when eligible, will require either a phased approach or interim housing.
Campus Quad at Little Chico Creek Elementary School.
44
LITTLE CHICO CREEK ELEMENTARY SCHOOL
EXISTING SITE INVENTORY The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
28
GROSS AREAS
Sp
SCHOOL BUILDINGS
s
ace
F
16 Spaces
AMANDA WAY
I E B
G
H
J K
C L M N
A
AREA
LOADED CR
NON-LOADED
1
A Multi Purpose
8,696 7,327 SF
B Admin
4,377 3,006 SF
C Library
5,672 3,978 SF
D Classrooms
4,389 3,006 SF
2
E Kindergarten
2,766 2,250 SF
2
F Kindergarten and Classrooms
6,158 5,503 SF
4
G Classrooms
2,766 2,250 SF
2
H Classrooms
2,353 1,920 SF
2
I Classrooms
2,218 1,920 SF
2
J Classrooms
2,218 1,920 SF
2
K Classrooms
2,353 1,920 SF
2
L Classrooms
2,766 2,250 SF
M Classrooms
5,784 5,023 SF
4
N Classrooms
2,766 2,250 SF
2
Total
55,286 44,523 SF
24
2
3
area includes covered spaces at 50%
D 58 Spaces
HARTFORD DR LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Overhead Shade Structure
Library / Media
LITTLE CHICO CREEK ELEMENTARY SCHOOL
45
CONDITION ASSESSMENT
46
Interior lighting needs and upgrades
Casework and sink replacements for ADA compliance
Student drop-off asphalt upgrades
Administration work stations
LITTLE CHICO CREEK ELEMENTARY SCHOOL
Typical classroom - storage needs
Current campus Library condition
CONDITION ASSESSMENT UPDATE
KEY FINDINGS LITTLE CHICO CREEK ES
COST PER SF
NOTES
• • 1. Site - ADA 2. Site - Other 3. Site - Security
F
4. Building - Exterior
AMANDA WAY
I E
G
B
C
H
J
5. Building - Interior
•
Other site amenities are in good condition.
•
Administration renovation for safety and security - single-point-of-entry
• •
Door thresholds are not ADA compliant Roof drainage and exterior finishes are in good condition
• • •
Sinks are not ADA compliant Damaged VCT in Multi-purpose building Kitchen is restricted on space and storage
•
Most of campus is on the Edwards 6632 FACP, which is monitored by a newer Silent Knight 5208 panel. Most of the campus includes old horns, pull stations, and is not compliant with current code.
•
Most existing panels on campus are older but in servicable condition. Surface raceways in classrooms.
•
Existing intrusion alarm system is older but still in use. Cameras throughout the campus. No access controls. The campus has been upgraded to Valcom IP, which is consistent with current district standards.
K 6. Fire Alarm
L
7. Electrical
M
•
N 8. Low Voltage/Security
A
D
9. Mechanical
10. Plumbing/Restrooms
HARTFORD DR
Some walkways along buildings do not meet ADA slopes Striping and pavement markings are fading and should be re-applied, some signage and pavement markings do not comply with ADA standards
•
Distribution Pumps are at the end of life and in need of replacement.
•
Plumbing Equipment is mostly from the original construction and is at the end of life. Student restrooms typically do not have ADA compliant thresholds.
•
Note: please see appendix for detailed consultant reports
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN LITTLE CHICO CREEK ELEMENTARY SCHOOL
47
PROPOSED MASTER PLAN OVERVIEW The improvements to Little Chico Creek Elementary School are intended to meet the mid-size or 496 student model capacity. This site was also identified to house two rooms for the moderate/severe SPED program. Specific improvements include:
AMANDA WAY
F
E
G
B
C
I
J
H
K
M
D
HARTFORD DR
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
LITTLE CHICO CREEK ELEMENTARY SCHOOL
•
Reclaiming existing spaces for moderate/severe special education program. This may require adding restrooms to those rooms
•
Renovation of existing buildings when eligible
•
Improvements to administration for safety and security
Model Capacity 3: MID-SIZE 496 Students
N
48
Expansion of TK/K Classrooms with permanent construction to meet model capacity goals. Related improvements include parking and drop-off specifically for that complex and playground improvements
Existing buildings will allow 4 "flex" classrooms rather than the 2 that are a part of the model capacity.
L
A
•
GRADE TK K 1 2 3 4 Grade Bubble 5 SPED SPED (Mod/ Severe) Flex Surplus Flex
# 2 3 3 3 3 2
LOADING 24 24 24 24 24 28
TOTAL 48 72 72 72 72 56
2 2 2
28 28 10
56 56 20
2 2
10 0
20 0
2
0
0
TOTAL
28
544
PHASING SCHOOL BUILDINGS
A Multi Purpose
J
B Admin
I
C Library D Classrooms
G
E Kindergarten
F
F Kindergarten and Classrooms
K H L C M
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at Little Chico Creek Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.
G Classrooms H Classrooms I Classrooms J Classrooms K Classrooms L Classrooms
E
N
B
D
A
LEGEND New Building Lightly Modernized Building
M Classrooms
Heavily Modernized Building
N Classrooms
Building to be Relocated or Demolished
PHASE 1
HEAVIER MODERNIZATIONS ON ADMIN PORTION
NEW TK/K CONSTRUCTION AND MODERNIZE ADMINISTRATION/STUDENT SERVICES/SPED
PHASE 2 MODERNIZE EXISTING BUILDINGS
LITTLE CHICO CREEK ELEMENTARY SCHOOL
49
MARIGOLD ELEMENTARY SCHOOL
FAST FACTS: •
Originally Built: 1961, Renovated 2003, 2018
•
2022/2023 Enrollment: 830 Students
•
Site = 11.61 Acres
•
Buildings = 67,012 SF (Permanent)
•
186 Parking Spaces
•
0% of Classrooms are in Portable Classroom Buildings
•
Recommended permanent capacity: 672
Marigold Elementary School is a recently renovated campus in Chico USD. The campus was previously two schools - Loma Vista ES, focusing on special education students and Marigold ES, a traditional elementary school. The campus is now combined into a single school, Marigold ES, but still includes the special education facility. To accomplish this model capacity, the campus will require the additon of 4 additonal classrooms (SPED and Flex Rooms) and a TK classroom. Additonally, the Moderate/ Severe SPED program is expected to move to another location.
Entry and multipurpose at Marigold Elementary School.
50
MARIGOLD ELEMENTARY SCHOOL
EXISTING SITE INVENTORY C/D Level 2
EAST AVE
B 31 Spaces
C
The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms. GROSS AREAS SCHOOL BUILDINGS
MARIGOLD AVE
A
A Admin and Kindergarten
D
K
AREA
LOADED CR
NON-LOADED
4,516 SF 3,815
2
B Classrooms
4,200 SF 4,525
4
C Library and Classrooms
13,874 SF 11,951
7
1
D Classrooms
7,908 SF 7,975
7
1
K Kindergarten
5,554 SF 5,560
4
G Multi Purpose
13,776 SF 13,828
LOMA VISTA SPED/Classrooms
28,075 SF 33,155
13
Total
77,903 SF 80,809
37
G LOMA VISTA
State Preschool and SPED Preschool
2
area includes covered spaces at 50%
57 Spaces
98 Spaces LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Overhead Shade Structure
Library / Media
MARIGOLD ELEMENTARY SCHOOL
51
CONDITION ASSESSMENT
52
Typical classroom interior
Classroom casework and sink areas
Student drop-off/pick-up & entry point
Campus Library interior
MARIGOLD ELEMENTARY SCHOOL
Hardscape courts and playground
Restroom finishes and fixtures
CONDITION ASSESSMENT C/D Level 2
EAST AVE
UPDATE
KEY FINDINGS
B MARIGOLD ES
1. Site - ADA
MARIGOLD AVE
•
3. Site - Security
• •
Fully fenced campus perimeter Single-point-of-entry to administration area
•
New campus; exterior finishes are in good condition
5. Building - Interior
• •
Interior finishes are in good condition Casework and sinks are ADA compliant
6. Fire Alarm
•
New campus; system meets current code
•
New campus; electrical system is in good condition
•
New campus; system is in good condition and meets code
•
New campus; mechanical systems are in good condition
• •
Restrooms are ADA compliant Plumbing and fixtures are new
7. Electrical
LOMA VISTA
Main parking lot is new with ADA parking & drop-off
•
4. Building - Exterior
G
•
2. Site - Other
D
K
NOTES
Playground, hardcourt, and play structures are all new No marquee sign
C A
COST PER SF
8. Low Voltage/Security 9. Mechanical 10. Plumbing/Restrooms
Note: please see appendix for detailed consultant reports
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN MARIGOLD ELEMENTARY SCHOOL
53
PROPOSED MASTER PLAN
C/D Level 2
EAST AVE
OVERVIEW As a newly renovated school, the condition assessment and program needs indicate very little change is required. However, in order to meet the agreed-upon 672 student model capacity, some additonal spaces may be required. These improvements may occur in the future, when capacity needs warrant the additions. The master plan includes:
B
C
MARIGOLD AVE
A
D
The addition of a TK classroom
•
Reclaiming the moderate/severe Special Education space as a Kindergarten classroom
•
The addition of Flex Classrooms
•
The addition of mild/moderate SPED classrooms for integration into the campus
K It is assumed that the former Loma Vista building will continue as a SPED/ PreSchool program center.
G LOMA VISTA
State Preschool and SPED Preschool
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
54
•
MARIGOLD ELEMENTARY SCHOOL
Model Capacity 3: LARGE 672 Students GRADE TK K 1 2 3 4 4/5 Bubble 5 SPED Flex
# 3 4 4 4 4 3.5 1 3.5 2 2
TOTAL
31
LOADING 24 24 24 24 24 28 28 28 10 0
TOTAL 72 96 96 96 96 98 28 98 20 0 700
MCMANUS ELEMENTARY SCHOOL
FAST FACTS: •
Originally built: 1947, Renovated: 2023
•
2022/2023 Enrollment: 415 Students
•
Site = 7.83 Acres
•
Buildings = 27,802 SF (Permanent) | 13,786 SF (Portables)
•
57 Parking Spaces
•
41% of Classrooms are in Portable Classroom Buildings
•
Recommended permanent capacity: 672
The renovation and new constructionat the campus for McManus Elementary School is currently under construction. The expansion of the campus is intended to accommodate growth in the north of the Chico Unified School District.
Classroom and Library at McManus Elementary School.
MCMANUS ELEMENTARY SCHOOL
55
EXISTING SITE INVENTORY
N
The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
46 Spaces
GROSS AREAS
L SCHOOL BUILDINGS
J
O
F
G
A Admin and Multi Purpose
M T
E D
C
11 Spaces
B
A
EAST AVE
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Library / Media
56
MCMANUS ELEMENTARY SCHOOL
Overhead Shade Structure
NORTH AVE
K
AREA
LOADED CR
NON-LOADED
5,149 SF 5,804
B Classrooms
2,225 SF 2,955
2
C Classrooms
10.373 8,022 SF
7
D Classrooms
10,357 8,035 SF
6
E Restrooms
513 SF 384
F Library
1,307 SF 1,791
G Portable Classrooms & Services
3,840 SF 3,216
1
J Kindergarten
1,140 SF 1,072
1
K Portable SPED
2,977 SF 2,880
2
L Portable Classrooms
992 SF 960
2
M Classroom
1,027 960 SF
1
N Portables
3,081 SF 2,880
O Restrooms
384 SF 480
T Portables
2,896 SF 1,920
Total
41,588 SF 46,993
3
1 3 22
7
area includes covered spaces at 50%
CONDITION ASSESSMENT
No shade structure over playground
ADA path of travel improvements to pavement and landscape
Multi-purpose room expansion and storage needs
ADA-compliant improvements to sink areas
Core restroom ADA compliance upgrades
Library desk and casework replacement
MCMANUS ELEMENTARY SCHOOL
57
CONDITION ASSESSMENT A full condition assessment was not conducted of McManus Elementary school as plans for its replacement were in process. Given that much of the campus was housed in portable classrooms, they are shown in "red" as recommended for replacement.
N
L J
O
F
G
M T
E D
C
A
B EAST AVE
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN 58
MCMANUS ELEMENTARY SCHOOL
NORTH AVE
K
PROPOSED MASTER PLAN OVERVIEW A deep modernization of existing buildings and the addition of new buildings is currently underway at McManus Elementary School. The FMP identified the McManus campus as a model capacity of 672 students, however, planning for the campus began before the model capacities were established, so future considerations to add "flex" classrooms might be a consideration. As the site is not expected to meet that capacity by 2029/2030, proposed grade-level classrooms can act as "flex" classrooms until that time.
NORTH AVE
The site has also been identified as a site for a moderate/severe program; relocation of that program is possible if capacity demands it in the future. Model Capacity 3: LARGE 672 Students GRADE TK K 1 2 3 4 4/5 Bubble 5 SPED Flex
# 3 4 4 4 4 3.5 1 3.5 2 2
TOTAL
31
LOADING 24 24 24 24 24 28 28 28 10 0
TOTAL 72 96 96 96 96 98 28 98 20 0 700
EAST AVE Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
MCMANUS ELEMENTARY SCHOOL
59
PHASING SCHOOL BUILDINGS
A Admin and Multi Purpose B Classrooms C Classrooms D Classrooms E Restrooms F Library G Portable Classrooms & Services J Kindergarten K Portable SPED L Portable Classrooms
J M T G D C B A
N L K O E F
M Classroom
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at McManus Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.
LEGEND New Building
N Portables
Lightly Modernized Building
O Restrooms
Heavily Modernized Building
T Portables
Building to be Relocated or Demolished
PORTABLES TO BE REPLACED/REMOVED
NEW KINDER BUILDINGS
NEW MULTI-PURPOSE BUILDING
60
NEW ADMIN
NEW CLASSROOM BUILDING
PHASE 1
PHASE 2
PHASE 3
RELOCATE/REMOVE PORTABLES
NEW CONSTRUCTION
DEMOLISH EXISTING AND SITEWORK
Demolition of some existing portables for future new construction.
Several new buildings, including a new Admin, MP, Classroom, and 2 new kinder buildings. Also includes the modernizations of existing buildings to remain including changes to the former MP to be made into a library and for the former library to be made into a new staff lounge.
Demolition of remaining portables and construction of site improvements. A new drop off and expanded parking in place of the former portables and parking lot.
MCMANUS ELEMENTARY SCHOOL
NEAL DOW ELEMENTARY SCHOOL
FAST FACTS: •
Originally built: 1965, Renovated 1987, 2019
•
2022/2023 Enrollment: 308 Students
•
Site = 7.3 Acres
•
Buildings = 49,305 SF (Permanent)
•
44 Parking Spaces
•
0% of Classrooms are in Portable Classroom Buildings
•
Recommended permanent capacity: 320
Neal Dow Elementary School is one of the newly renovated campuses in Chico USD slated for a model capacity of 320 students. It is not anticipated for any changes in this FMP, except to replace the front parking lot and anything else as required to address the agreed-upon model capacities, identifying spaces for "flex" rooms, special education and in the case of Neal Dow, two rooms for the moderate/severe special education program.
Front entry and drop-off at Neal Dow Elementary School
NEAL DOW ELEMENTARY SCHOOL
61
EXISTING SITE INVENTORY
E
H 5T
E AV
The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
D
O W
C
N
B
IN
G
AV E D
GROSS AREAS
A 44 Spaces
E
SCHOOL BUILDINGS
AREA
LOADED CR
NON-LOADED
A Admin and Classrooms
17,491 SF 23,185
8
2
B SPED
2,598 SF 4,787
2
C Library and Kindergarten
10,455 15,030 SF
4
D Classrooms
4,134 SF 5,252
3
E Classrooms
3,348 SF 4,369
2
1
F Multi Purpose
11,280 SF 13,145
Total
49,305 65,768 SF
19
3
N
EA
L
F
D
O W
AV E
area includes covered spaces at 50%
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Library / Media
62
NEAL DOW ELEMENTARY SCHOOL
Overhead Shade Structure
CONDITION ASSESSMENT
School needs a new parking lot
Typical classroom teaching wall and interior finishes
Restroom plumbing and fixtures are new and ADA compliant
Campus quad shaded structure
Library interior
Multi-purpose exterior
NEAL DOW ELEMENTARY SCHOOL
63
CONDITION ASSESSMENT H
T E5
E AV
UPDATE
D
KEY FINDINGS
O W
C
N
B
IN
NEAL DOW ES
G
AV E D
1. Site - ADA 2. Site - Other
A
3. Site - Security
E
4. Building - Exterior
COST PER SF
NOTES
•
New campus - ADA compliance up to code
•
Drop off and parking area needs replacement
•
Renovated fencing with single point of entry directly into the Admin office.
•
Renovated exterior finishes and improvements are in good condition No improvements needed
• •
5. Building - Interior
• •
Renovated campus - system is up to standard No automatic fire sprinkler system found in Library and Kinder classrooms
7. Electrical
•
Renovated campus - no improvements needed
8. Low Voltage/Security
•
Renovated campus - no improvements needed
• •
Renovated Air Distribution, good condition. Renovated roof mounted AC-units installed in 2019
•
Original water heater needs replacement
6. Fire Alarm
N
EA
L
F
D
O W
AV E
•
Renovated interior finishes and improvements are in good condition No improvements needed
9. Mechanical 10. Plumbing/Restrooms
Note: please see appendix for detailed consultant reports
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN 64
NEAL DOW ELEMENTARY SCHOOL
PROPOSED MASTER PLAN OVERVIEW
E
H 5T
E AV
A deep modernization of existing buildings and the addition of new buildings was recently completed at Neal Dow Elementary School. The FMP identifies the Neal Dow campus as a model capacity of 320 students. Applying the model capacity to the renovated campus, two surplus or "unassigned" spaces will be available.
D
O W
C
N
B
IN
G
AV E D
The site has also been identified as a site for a moderate/severe special education program.
A E
Model Capacity 3: SMALL 320 Students
N
EA
L
F
D
O W
AV E
GRADE TK K 1 2 3 4 5 SPED Flex 4/5 Bubble SPED (Mod/ Severe) Unassigned
# 1 2 2 2 2 1.5 1.5 2 2 1
LOADING 24 24 24 24 24 28 28 10 0 0
TOTAL 24 48 48 48 48 42 42 20 0 0
2 2
0 0
0 0
TOTAL
21
320
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
65
PARKVIEW ELEMENTARY SCHOOL
FAST FACTS: •
Originally built: 1954, Renovated: 2000
•
2022/2023 Enrollment: 384 Students
•
Site = 7.72 Acres
•
Buildings = 32,934 SF (Permanent) | 1,440 SF (Portables)
•
49 Parking Spaces
•
16% of Classrooms are in Portable Classroom Buildings
•
Recommended permanent capacity: 496
Parkview Elementary School has been identified as a replacement campus, with model capacity of 496 students. Through the FMP process, alternatives were identified to house students through complex phasing or replacement of existing campuses: • •
•
In order to accelerate construction, identify an offsite location for students to temporarily relocate Design the implementation of the project to construct around existing buildings, where possible, building on field/hardcourt spaces in order to avoid existing buildings. This strategy accelerates construction. Phase the implementation, understanding that disruption at the existing campus could take two school years to complete.
While design of the campus will occur at a later time, the FMP indicates that much of the new campus can be constructed on unoccupied land, with the exception of the Multi-purpose building, which will require removal of the exisitng building. Phasing plans are shown as part of this section.
Front entry at Parkview Elementary
66
PARKVIEW ELEMENTARY SCHOOL
EXISTING SITE INVENTORY The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms. GROSS AREAS
E
N
SCHOOL BUILDINGS
A Kindergarten
F
H
L
I J
D
G
C B
es
A
35
K M E
TH
c pa
S
ST
8
AREA
LOADED CR
2,061 SF
NON-LOADED
2
B Reading Interventions
960 SF
C Portable Classrooms
1,920 SF
2
D Portable Classroom
960 SF
1
E Classrooms
6,264 SF
4
F Classrooms and Library
8,064 SF
4
G Admin
2,264 SF
H Classrooms
5,109 SF
I Restrooms
1,589 SF
J Classrooms
5,580 SF
K Multi Purpose
3,467 SF
L Restrooms
460 SF
M Preschool
1,440 SF
1
N Portable
1,440 SF
1
Total
43,422 SF
2
4 4
21
4
area includes covered spaces at 50%
14 Spaces
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Overhead Shade Structure
Library / Media
PARKVIEW ELEMENTARY SCHOOL
67
CONDITION ASSESSMENT
68
Restroom plumbing fixture replacement needs and ADA compliance
Exterior soffit and fascia replacement
Multi-purpose room interior finish upgrades
ADA path of travel improvements
PARKVIEW ELEMENTARY SCHOOL
Door hardware upgrades and restroom renovations needed
ADA compliant accessibility improvements to sink areas
CONDITION ASSESSMENT UPDATE
KEY FINDINGS PARKVIEW ES
1. Site - ADA
COST PER SF
NOTES
•
Walkways along Buildings F, G, H J and K do not meet ADA standards
• •
Hardcourts are in poor condition. Playground equipment new but does not have shade structures. Inner campus has non-compliant path of travel cross-slope conditions, door landings and thresholds - remove and replace.
•
E
N
2. Site - Other 3. Site - Security
F
H
L
4. Building - Exterior
I J
D
5. Building - Interior
G
C B
A
•
No single-point-of-entry to Admin
•
Soffits & Fascias have dry-rot and in poor condition - needs replacement Most roofs do not have proper draining and downspouts
• • • •
Door hardware are non-ADA compliant Damaged 2x4 Acoustic Ceiling Tile system Interior finishes need replacement
•
Silent Knight 6820EVS control panel (added to serve addition of portables) is consistent with current district standards, but the remainder of the campus includes old horns, pull stations, and is not compliant with current code.
•
Most existing panels on campus are older but in servicable condition. Surface raceways in classrooms.
6. Fire Alarm
K
7. Electrical
M
H
E
8T
ST
• •
Existing intrusion alarm system is older but still in use. Cameras throughout the campus. No access controls.
•
Ceiling Exhaust Fans are original and in need of replacement. Existing Gas Fired AC-Units are at the end of life and need to be replaced
8. Low Voltage/Security
9. Mechanical 10. Plumbing/Restrooms
• • •
Original Plumbing Fixtures need replacement Sinks are not ADA-complaint
Note: please see appendix for detailed consultant reports
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN PARKVIEW ELEMENTARY SCHOOL
69
PROPOSED MASTER PLAN OVERVIEW It is expected that Parkview Elementary can be constructed on available land outside the footprint of the existing buildings, with the exception of the mulit-purpose building. Future design efforts may identify other opportunities to limit the impacts of phasing on the project, as the design process will include community and stakeholder engagement that will be influential. In additon to the new campus, it is expected that pick-up and drop-off areas will be expanded and improved. The campus will also be the location for two rooms for the moderate/severe special education program based on the model capacity of 496 students.
Model Capacity 3: MID-SIZE 496 Students
H
E
8T
ST
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
70
PARKVIEW ELEMENTARY SCHOOL
GRADE TK K 1 2 3 4 5 SPED Flex Bubble SPED (Mod/ Severe)
# 2 3 3 3 3 2.5 2.5 2 2 1
LOADING 24 24 24 24 24 28 28 10 0 0
TOTAL 48 72 72 72 72 70 70 20 0 0
2
0
0
TOTAL
26
496
PHASING SCHOOL BUILDINGS
A Kindergarten B Reading Interventions C Portable Classrooms D Portable Classroom E Classrooms
EXISTING CAMPUS
H F E N
The following images represent one scenario for phasing and implementation of the improvements anticipated at Parkview Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.
F Classrooms and Library G Admin H Classrooms I Restrooms
L
I
D
J
J Classrooms
LEGEND
K
New Building
L Restrooms
M
Lightly Modernized Building
M Preschool
G
Heavily Modernized Building
K Multi Purpose
N Portable
C B
A
NEW CLASSROOMS
NEW KINDER
NEW LIBRARY
NEW ADMIN
Building to be Relocated or Demolished
NEW HARDCOURT AND PLAY AREAS
NEW MULTI-PURPOSE
NEW DROP-OFF / PARKING
PHASE 1
PHASE 2
PHASE 3
NEW CONSTRUCTION
DEMOLISH EXISTING BUILDINGS AND SITE WORK
BUILD MULTI-PURPOSE BUILDING
Several new buildings constructed on the existing field to not interfere with current school
Demolish existing campus buildings, now that they are housed in the new construction.
Build new MP building over former classroom building. Site improvements including new hardcourts and drop-off/parking. PARKVIEW ELEMENTARY SCHOOL
71
ROSEDALE ELEMENTARY SCHOOL
FAST FACTS: •
Originally built: 1953, Renovated: 2003
•
2022/2023 Enrollment: 524 Students
•
Site = 10.79 Acres
•
Buildings = 35,835 SF (Permanent) | 2,834 SF (Portables)
•
58 Parking Spaces
•
28% of Classrooms are in Portable Classroom Buildings
•
Recommended permanent capacity: 672
Rosedale Elementary School has been identified as a replacement campus, with model capacity of 672 students. The school is a non-boundaried school with a dual-immersion language program. Through the FMP process, alternatives were identified to house students through complex phasing or replacement of existing campuses: • •
•
In order to accelerate construction, identify an offsite location for students to temporarily relocate Design the implementation of the project to construct around existing buildings, where possible, building on field/hardcourt spaces in order to avoid existing buildings. This strategy accelerates construction. Phase the implementation, understanding that disruption at the existing campus could take two school years to complete.
While design of the campus will occur at a later time, the FMP indicates that the new campus can be constructed on unoccupied land, with the exception of the solar canopies, which will require relocation. Phasing plans are shown as part of this section.
Entry and student drop-off at Rosedale Elementary
72
ROSEDALE ELEMENTARY SCHOOL
EXISTING SITE INVENTORY OAK PA R
K AVE
The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
31 Spaces 12 Spaces
GROSS AREAS
AK O
K
SCHOOL BUILDINGS
ST
A
I
J
15 Spaces
B H
C D
AREA
LOADED CR
A Multi Purpose and Admin
6,351 SF
B Kindergarten
3,638 SF
C Student Services
960 SF
D Kindergarten
960 SF
E Student Services
960 SF
F Classrooms
3,264 SF
3
G Classrooms
4,224 SF
4
H Classrooms and Library
11,295 SF
6
I Classrooms
6,440 SF
4
J Restrooms
1,503 SF
K Classrooms
6,435 SF
5
Total
46,028 SF
25
NON-LOADED
2 1
area includes covered spaces at 50%
G
F
E
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Overhead Shade Structure
Library / Media
ROSEDALE ELEMENTARY SCHOOL
73
CONDITION ASSESSMENT
74
Multi-purpose interior finish renovations and storage improvements
Water fountain upgrades
Landscape improvements and hardcourt repavement
ADA path of travel upgrades to pavement and thin metal doors
ROSEDALE ELEMENTARY SCHOOL
ADA accessability improvements
Campus library electrical improvements
CONDITION ASSESSMENT OAK PA R
K AVE
UPDATE
KEY FINDINGS ROSEDALE ES
COST PER SF
NOTES
•
Campus has ADA path of travel issues throughout entire campus, door thresholds, cross slopes, raised concrete stoops, etc.
•
A/C paving in poor condition throughout parking lot Hardcourt paving is in poor condition. Bike rack is not fenced in - open to campus
1. Site - ADA
AK O
K
2. Site - Other
•
ST
J
3. Site - Security
B H
• •
C
4. Building - Exterior
• •
5. Building - Interior
• • •
Damaged 2x4 acoustic ceiling tile system New hardware for interior and exterior doors Replace interior finishes
•
Very old Faraday 7800 manual system is monitored by an old Silent Knight 5208. Mostly pull stations on campus, does not meet current code requirements.
•
Old gear in custodial room 60+ years old long past servicable life, many existing panels on campus are similar vintage. Lots of surface raceways in classrooms.
•
No intrusion alarm system in use. Cameras throughout the campus. No access controls.
• •
A/C-Units approx. 7-8 years old. Original air distribution suggest a deep cleaning with any planned modernization project.
•
Original plumbing fixtures need replacement in all restrooms New water heater installation
6. Fire Alarm
D 7. Electrical
G
F
E
There is single point of access to the Admin. office. Campus is secured with fencing all around. Roof drainage - no gutter / downspouts to grade at all buildings Soffit- plywood, dry rot Roofing - built-up
A
I
• •
8. Low Voltage/Security
9. Mechanical
10. Plumbing/Restrooms
•
Note: please see appendix for detailed consultant reports
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN ROSEDALE ELEMENTARY SCHOOL
75
PROPOSED MASTER PLAN OVERVIEW
OAK PA R
K AVE
It is expected that Rosedale Elementary School can be constructed on available land outside the footprint of the existing buildings, eliminating the need for interim housing. Future design efforts may change this assumption, as the design process will include community and stakeholder engagement that will be influential. In addition to the new campus, it is expected that pick-up and drop-off areas will be expanded and improved to meet the needs of the new larger campus, identified for design to a model capacity of 672 students.
AK O ST
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
76
ROSEDALE ELEMENTARY SCHOOL
Model Capacity 3: LARGE 672 Students GRADE TK K 1 2 3 4 5 SPED Flex Bubble
# 3 4 4 4 4 3.5 3.5 2 2 1
TOTAL
31
LOADING 24 24 24 24 24 28 28 10 0 0
TOTAL 72 96 96 96 96 98 98 20 0 0 672
PHASING SCHOOL BUILDINGS
A Multi Purpose and Admin
A
B Kindergarten
K
C Student Services
J
B C D H E
D Kindergarten E Student Services F Classrooms G Classrooms H Classrooms and Library
I G
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at Rosedale Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.
F LEGEND
I Classrooms J Restrooms
New Building
K Classrooms
Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished
PHASE 1
PHASE 2
NEW CONSTRUCTION
DEMOLISH EXISTING BUILDINGS AND SITE WORK
New Buildings to be built on the existing field to not interfere with the existing school during construction.
Former school buildings demolished to leave area open for new hardcourt and field. Relocation of existing solar canopies to this area.
ROSEDALE ELEMENTARY SCHOOL
77
SHASTA ELEMENTARY SCHOOL
FAST FACTS: •
Originally built: 1964, Renovated: 2006, 2018
•
2022/2023 Enrollment: 620 Students
•
Site = 6.95 Acres
•
Buildings = 48,265 SF (Permanent)
•
65 Parking Spaces
•
0% of Classrooms are in Portable Classroom Buildings
•
Recommended permanent capacity: 672
Shasta Elementary School was recently updated and is not scheduled for any near term improvements. It is one of the most impacted campuses in the District, operating on one of the smaller sites within the District. The introduction of transitional kindergarten opened a conversation about the site enrollment. the Board of Education directed the master plan team to not plan for TK implementation at Shasta Elementary School. Additionally, issues that were part of the site and district engagement included: •
• •
Undersized Multi-Purpose building. A new building was not proposed as part of the facilities master plan. Future consideration of this issue may be needed. Moderate/Severe special education is anticipated for this site. The addition of gender-inclusive restrooms
One consideration may be to relocate the moderate/severe program to another site, allowing expansion of the multi-purpose room into the adjacent classroom spaces.
Front entry at Shasta Elementary School
78
SHASTA ELEMENTARY SCHOOL
T
C RA
ces
pa 7S
4
LEO
EXISTING SITE INVENTORY K1 The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
A M
C
K2
GROSS AREAS SCHOOL BUILDINGS
A Admin and Classrooms
B
D
E
AREA
LOADED CR
5,376 SF
3
B Library and Classrooms
8,292 SF
4
C Classrooms
10,328 SF
4
D Classrooms
6,079 SF
5
E Classrooms
7,943 SF
7
K1 Kindergarten
2,918 SF
2
K2 Kindergarten
4,934 SF
3
M Multi Purpose
11,924 SF
2
Total
57,795 SF
30
NON-LOADED
1
1
area includes covered spaces at 50%
E
AD
AN
PL
ES es
c pa
S 18
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Overhead Shade Structure
Library / Media
SHASTA ELEMENTARY SCHOOL
79
CONDITION ASSESSMENT
80
Daylighting and storage improvements
ADA and casework upgrades in classrooms
Classroom storage improvements
Student restroom interior finish renovations
SHASTA ELEMENTARY SCHOOL
Window treatment needs for security purposes
Kindergarten classroom interior upgrades
CONDITION ASSESSMENT
T
C RA
K1
LEO
UPDATE
KEY FINDINGS SHASTA ES
A
COST PER SF
NOTES
•
M 1. Site - ADA
C
K2 2. Site - Other 3. Site - Security
B
D 4. Building - Exterior
5. Building - Interior
E
• • •
Parking, drop-off, and irrigation are new Existing play structure looks adequate, no shade structure
• •
Perimeter fencing around campus is new Single-point-of-entry to Admin
• •
All buildings but; B, C, & MP are new Standing seam metal roofing is adequate on existing buildings. Repaint exterior in some areas
• • •
Space functions are adequate Existing MP and restrooms need interior repainting
•
Campus has been upgraded to district standard Silent Knight 6820EVS, completely upgraded except for duct detectors.
•
Existing panels on campus are mix of relatively new and in servicable condition, and older are past their servicable life.
•
Existing Ademco intrusion alarm system is installed but not in use. Cameras throughout the campus. No access controls at existing bldgs
•
Poor air distribution in old buildings - needs replacement Existing Gas-Fired A/C units are 20 years old and need replacing
6. Fire Alarm
7. Electrical
ES AD
AN
PL
8. Low Voltage/Security
E
9. Mechanical
• •
10. Plumbing/Restrooms
Walkways along Buildings B, C and MP do not meet ADA standards ADA parking pavement markings do not meet standards
•
Sinks are not ADA compliant in existing buildings Old restrooms need new plumbing fixtures
Note: please see appendix for detailed consultant reports
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN SHASTA ELEMENTARY SCHOOL
81
PROPOSED MASTER PLAN T
C RA
OVERVIEW
K1
LEO
The FMP for Shasta Elementary represents no change in the existing capacity. At model capacity it will serve 600 students.
A
Model Capacity 3: LARGE 672 Students
M
C
K2
B
D
E
E
AD
AN
PL
ES Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
82
SHASTA ELEMENTARY SCHOOL
GRADE K 1 2 3 4 5 SPED Flex Bubble SPED (Mod/ Severe)
# 4 4 4 4 3.5 3.5 2 2 1
LOADING 24 24 24 24 28 28 10 0 0
TOTAL 96 96 96 96 98 98 20 0 0
2
0
0
TOTAL
30
600
PHASING SCHOOL BUILDINGS
A Admin and Classrooms B Library and Classrooms C Classrooms D Classrooms E Classrooms K1 Kindergarten
A C B
K1 K2 D
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at Shasta Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.
M
LEGEND
K2 Kindergarten M Multi Purpose
New Building
E
Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished
LIGHT MODERNIZATIONS ON BLDGS B, C, AND M
PHASE 1
COMPLETE
LIGHT MODERNIZATIONS
MODERNIZATIONS COMPLETE
SHASTA ELEMENTARY SCHOOL
83
SIERRA VIEW ELEMENTARY SCHOOLS
FAST FACTS: •
Originally built: 1954, Renovated: 1998
•
2022/2023 Enrollment: 450 Students
•
Site = 9 Acres
•
Buildings = 37,715 SF Permanent
•
31 Parking Spaces (not including unstriped lot)
•
20% of Classrooms are in Portable Classroom Buildings
•
Recommended pemanent capacity: 496
Sierra View Elementary School has been identified as a replacement campus, with model capacity of 496 students. Through the FMP process, alternatives were identified to house students through complex phasing or replacement of existing campuses: • •
•
In order to accelerate construction, identify and offsite location for students to temporarily relocate Design the implementation of the project to construct around exisitng buildings, where possible, building on field/hardcourt spaces in order to avoid exisitng buildings. This strategy accelerates construction. Phase the implementation, understanding that disruption at the existing campus could take two school years to complete.
While design of the campus will occur at a later time, the FMP indicates that much of the new campus can be constructed on unoccupied land, with the exception of the Multi-purpose and library building, which will require removal of the existing building. Phasing plans are shown as part of this section.
Campus courtyard at Sierra View Elementary School
84
SIERRA VIEW ELEMENTARY SCHOOL
EXISTING SITE INVENTORY The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
M
B
D
AD
A
RO
N
EA VE
GROSS AREAS SCHOOL BUILDINGS
C
F
I
E H 31 Spaces
I G
J
K
M
L
AV E
LOADED CR
A Portable Classrooms
960 SF
1
B Classrooms
5,322 SF
4
C Library
1,297 SF
D Restrooms
1,577 SF
E Portable Student Services
960 SF
F Classrooms
6,380 SF
G Multi Purpose and Admin
5,184 SF
H Classrooms
5,322 SF
3
I Portable Classrooms
1,920 SF
2
J Restrooms
1,537 SF
K Classrooms
5,322 SF
4
L Kindergarten
3,619 SF
2
M Portable Classrooms and Service
2,880 SF
3
N Portable Student Service
960 SF
Total
43,627 SF
NON-LOADED
4
23
1
1
area includes covered spaces at 50%
HO O
KE
R
O AK
N
AREA
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Overhead Shade Structure
Library / Media
SIERRA VIEW ELEMENTARY SCHOOL
85
CONDITION ASSESSMENT
86
Multi-purpose room upgrades needed
Casework replacement and ADA upgrades
Campus front entry
Student restroom interior finish upgrades
Exterior finishes need repair or replacement
Classroom clerestory and window treatment upgrades
SIERRA VIEW ELEMENTARY SCHOOL
CONDITION ASSESSMENT UPDATE
KEY FINDINGS SIERRA VIEW ES
M
A
D
AD
B
RO
•
N
EA VE
1. Site - ADA • • 2. Site - Other
I
3. Site - Security
H
• •
I K
5. Building - Interior
• • • •
Non-efficient space layout in Admin Damanged ACT system in some areas Lots of exposed conduits and raceways Floor finish replacement
• •
No automatic fire sprinkler system found Silent Knight 5207 manual system, does not meet current code requirements. Complete upgrade required.
•
Most existing panels on campus are older and either nearing or past their servicable life Receptacle for IDF in MPR is shared with other receptacles in the space, which leads to nuisance trips.
AV E O AK R
7. Electrical • 8. Low Voltage/Security
KE HO O
Some areas have new ornamental fencing with gates at front entry Existing chain link fencing mostly worn - lacks ADA compliant gates, clearances, etc.
•
•
9. Mechanical
10. Plumbing/Restrooms
LEGEND
Bike rack is not fenced in - open to campus Front landscape is worn and needs improvements A/C paving is poor throughout parking lot
4. Building - Exterior
6. Fire Alarm
L
Non ADA compliant parking stalls, drop-off areas, no ramp at drop-off, striping, signage. Campus has ADA path of travel issues throughout entire campus, door thresholds, cross slopes, raised concrete in front of doors, etc.
Roof replacements: tar & gravel, wood fascia, roof drainage, etc. Replace and repair cement plaster
G
M
• •
E
J
NOTES
•
C
F
COST PER SF
•
Bogen Multi-com 2000 is located in principal's office, does not meet current district standards. No intrusion alarm on campus.
•
A percentage of AC-units have reached the end of their service life - needs replacement
•
Plumbing fixtures and sinks are from original construction Non-ADA compliant toilets and fixtures in some areas.
•
Note: please see appendix for detailed consultant reports
Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN SIERRA VIEW ELEMENTARY SCHOOL
87
PROPOSED MASTER PLAN OVERVIEW It is expected that Sierra View Elementary can be constructed on available land outside the footprint of the exisitng buildings, with the exception of the multi-purpose building and library. Future design efforts may identify other opportunities to limit the impacts of phasing on the project, as the design process will include community and stakeholder engagement that will be influential. In additon to the new campus, it is expected that pick-up and drop-off areas will be expanded and improved. The campus will also be the location for two rooms for the moderate/ severe special education program based on the model capacity of 496 students.
M
AD
RO
N
EA VE
HO O
KE
R
O AK
AV E
Model Capacity 3: MID-SIZE 496 Students
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
88
SIERRA VIEW ELEMENTARY SCHOOL
Grade TK K 1 2 3 4 5 SPED Flex Bubble SPED
# 2 3 3 3 3 2.5 2.5 2 2 1
Loading 24 24 24 24 24 28 28 10 0 0
Total 48 72 72 72 72 70 70 20 0 0
2
0
0
(Mod/ Severe) TOTAL
26
496
PHASING SCHOOL BUILDINGS
A Portable Classrooms B Classrooms C Library D Restrooms E Portable Student Services F Classrooms G Multi Purpose and Admin H Classrooms I Portable Classrooms
B A D I I
J Restrooms K Classrooms L Kindergarten
C E G F L K
J M
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at Sierra View Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.
N Portable Student Service
New Building Lightly Modernized Building Heavily Modernized Building
H
M Portable Classrooms and Service
LEGEND
Building to be Relocated or Demolished
NEW MULTI-PURPOSE BUILDING & OUTDOOR AMPHITHEATER
NEW ADMIN NEW KINDER
NEW CLASSROOMS
NEW LIBRARY
PHASE 1
PHASE 2
PHASE 3
NEW CONSTRUCTION
DEMOLISH EXISTING AND SITE WORK
BUILD LIBRARY AND MULTI-PURPOSE BUILDING
SIERRA VIEW ELEMENTARY SCHOOL
89
SECTION 6. JUNIOR HIGH SCHOOLS
90
BIDWELL JUNIOR HIGH SCHOOL
FAST FACTS: •
Originally built 1954, Renovated: 1966, 2015
•
2022/2023 Enrollment: 975 Students
•
Site = 19 Acres
•
Buildings = 79,189 SF (Permanent)
•
102 Parking Spaces
•
0% of Classrooms are in Portable Classroom Buildings
•
Recommended capacity: 1,251
Bidwell Junior High School received moderate renovation of some buildings in 2015. The remaining campus will require renovation, replacement or repurposing of exisitng spaces. Specific feedback received by the site-based committee included: • • • • • •
Relocation of the Band Room to reclaim existing space for Physical Education use. Need for an outdoor amphitheater/gathering space with shade. Renovation of remaining spaces; specifically for the classrooms. Improvement to lab spaces - Sciences, Art and Career Technical spaces. Improvements to meet the needs of Special Education; maintaining access to garden spaces. The addition of gender-inclusive restrooms
The capacity of 1,251 with no significant changes should exceed the projected enrollment of less than 1,000
Entry at Bidwell Junior High School.
BIDWELL JUNIOR HIGH SCHOOL
91
EXISTING SITE INVENTORY
E 20 Spaces
H B
C
D
F
The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
I A
GROSS AREAS
J
NORTH AVE
K
58 Spaces
L
S
SCHOOL BUILDINGS
AREA
A Admin and Multi Purpose
15,566 SF
LOADED CR
B Library
3,923 SF
C Classrooms
19,558 SF
7
D Classrooms
21,929 SF
13
E Storage
1,440 SF
F Labs
6,010 SF
H Greenhouse
704 SF
I Labs and Classrooms
6,077 SF
5
J Music and PE
3,420 SF
1
K Locker Rooms
6,668 SF
L Gym
8,818 SF
S Storage
1,243 SF
Total
102,834 SF
NON-LOADED
1 1
4
30
2
area includes covered spaces at 50%
34 Spaces
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Library / Media
92
BIDWELL JUNIOR HIGH SCHOOL
Overhead Shade Structure
CONDITION ASSESSMENT
example of restroom in need of new finishes and other improvements
Site drainage and pooling issues
exterior finishes in need of repair
cracking asphalt in need of repair
possible ADA issues that need to be resolved
science/art/culinary labs that needs improvement
BIDWELL JUNIOR HIGH SCHOOL
93
CONDITION ASSESSMENT
E H B
C
D
UPDATE
KEY FINDINGS BIDWELL JUNIOR HS
F
1. Site - ADA
I A
2. Site - Other
J
3. Site - Security
K
4. Building - Exterior
COST PER SF
NOTES
•
Most walkways are ADA compliant
• •
Parking lot has extensive cracking Basketball paving needs to be crack and slurry sealed
•
Site has perimeter fencing - mix of chain-link and decorative metal fencing
• • •
Roof fascias are wood and need repair Exterior repainting required Some window aluminum sashes needs replacement
•
Existing wood floors need refinishing on some existing buildings Replacement and upgrades to interior finishes Exposed ductwork needs painting where needed
NORTH AVE
• 5. Building - Interior
L
• •
A new Silent Knights 6820EVS panel was added at room 305A, and serves the Admin and MP Building. The remainder of the campus is old Simplex manual system which does not meet current code requirements.
•
Many existing panels on campus are very old and obselete, i.e. 50-60 years old. Admin and MP Building were modernized but some old gear was not replaced. Lots of surface raceway in classrooms. Most classrooms have not been modernized and therefore power/receptacles are limited.
6. Fire Alarm
S
• • 7. Electrical • 8. Low Voltage/Security
• • • •
9. Mechanical •
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN 94
BIDWELL JUNIOR HIGH SCHOOL
• 10. Plumbing/Restrooms
•
Two separate existing intrusion alarm systems on campus are both functional. Cameras throughout the campus. No access controls. Boiler Room has an old abandoned Boiler that needs to be removed. Several roof mounted AC-Units, +20 years, need replacement. Concentric supply/return air diffuser in center of most classrooms is noisy and has poor circulation. Replace all with new 4 diffuser layout. Kitchen restroom doesn't meet ADA compliance Older Gas Fired Water Heater, approx. 20 years old needs to be replaced. Plumbing Equipment is from original construction.
Note: please see appendix for detailed consultant reports
PROPOSED MASTER PLAN
E H
B
C
D
A
F
J
OVERVIEW The main focus of this proposed plan is to provide more adequate spaces to the arts and sciences with 2 new buildings at the back of campus. As our phasing diagrams show, this can be achieved with very little disruption to the normal school year. There will also allow be an opportunity for improved SPED spaces, utilizing former labs that would be housed in the new building. Other necessary improvements will be made to the existing buildings on campus where they are needed.
PROGRAM CAPACITY & FAST FACTS - JUNIOR HIGH SCHOOLS BIDWELL
NORTH AVE
K
CURRENT ENROLLMENT
975 Students
Site
19 Acres
Building Area
79,189 Square Feet
Parking Spaces
102
Percentage of Classrooms in Portable Buildings 0%
L
S
JUNIOR HS Loaded
BIDWELL EXISTING
PROPOSED
LOADING
General Classrooms
24
26
-
-
Music
1
1
-
-
Science Lab
7
7
-
-
Art
1
1
-
-
Audio/Production
-
-
-
-
Culinary Arts
1
1
-
-
Clothing
1
1
-
-
Sub-total
35
37
33:1
1221
SPED
3
3
10:1
30
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
Total
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
TOTAL
1,251
Support (SF) Library Space
1928
Administration/Student Services
5371
Gymnasium/Locker Rooms
9465
Cafeteria/Multi-Purpose Space
4132
Kitchen
1123
BIDWELL JUNIOR HIGH SCHOOL
95
PHASING SCHOOL BUILDINGS
A Admin and Multi Purpose B Library
E
C Classrooms
F
D Classrooms
D
E Storage F Labs H Greenhouse I Labs and Classrooms J Music and PE K Locker Rooms
H I
B
K
C A
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at Bidwell Junior High School. It is expected that a participatory design process may yield a revised approach within the parameters established here.
LEGEND New Building Lightly Modernized Building
L
J
Heavily Modernized Building
L Gym
Building to be Relocated or Demolished
S Storage
NEW SCIENCE AND ART BUILDINGS
DEMOLISH EXISTING LAB BUILDING.
MODERNIZATIONS TO EXISTING BUILDINGS C, D, AND F
MODERNIZATIONS TO EXISTING KITCHEN AND GYM BUILDINGS
96
PHASE 1
PHASE 2
PHASE 3
NEW CONSTRUCTION
MODERNIZATIONS
SITE WORK
Phase 1 includes the construction of new buildings at the northeast corner of campus including 7 new science labs and labs for Music and Culinary Arts as well as all needed support spaces for those programs.
Phase 2 would include renovations to the other buildings. The classroom buildings C, D, and F will include modernizations to classrooms to meet district standards, as well as renovations to reclaim space for programs and administrative/student support spaces. The kitchen area in bldg A will receive some light modernizations and the band room in building J will be reused as a mat room for PE. The locker rooms in bldg J will also receive some light modernization as needed.
Phase 3 will include improvements to the site as the demolished buildings will make room for expanded student outdoor spaces.
BIDWELL JUNIOR HIGH SCHOOL
CHICO JUNIOR HIGH SCHOOL
FAST FACTS: •
Originally built: 1953, Renovated: 1957
•
2022/2023 Enrollment: 892 Students
•
Site = 16.2 Acres
•
Buildings = 92,026 SF (Permanent)
•
85 Parking Spaces
•
0% of Classrooms are in Portable Classroom Buildings
•
Recommended capacity: 1.139
Chico Junior High School is the oldest school in the District, serving the community since 1953. Recent renovations have addressed several key issues, however, the following priorities were established during the planning process. • • • • •
Near term renovation of the locker rooms. High priority renovation of Administration and Student Services which require additional space and improved security. Modernizations of remaining buildings. Artificial turf fields to alleviate gopher problems. The addition of gender-inclusive restrooms
The capacity of 1,139 with no significant changes should exceed the projected enrollment of less than 1,000
Gym at Chico Junior High School.
CHICO JUNIOR HIGH SCHOOL
97
EXISTING SITE INVENTORY The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
W
G
GROSS AREAS
F 36 Spaces
SCHOOL BUILDINGS
J
E
H
I L
OL
M
ER
ND
EA
D
E AV R
C
N
B
O
A
49 Spaces
P
AREA
LOADED CR
A Admin and Library
8,346 SF
B Classrooms
7,398 SF
5
C Classrooms
7,398 SF
6
D Classrooms
7,398 SF
5
E Gym
13,306 SF
F Locker Rooms
8,342 SF
G Storage
800 SF
H Music Rooms
5,597 SF
2
I Shops
5,568 SF
2
J Storage
1,650 SF
L Classrooms
6,533 SF
3
M Classrooms
6,533 SF
5
N Classrooms
6,533 SF
4
O Classrooms
6,533 SF
5
P Multi Purpose
11,476 SF
R Science Labs
8,290 SF
W Storage
960 SF
Total
117,830 SF
NON-LOADED
1 1
3 40
2
area includes covered spaces at 50%
MEMORIAL WAY
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Library / Media
98
CHICO JUNIOR HIGH SCHOOL
Overhead Shade Structure
CONDITION ASSESSMENT
Door hardware in need of updates
Repainting and/or replacing finishes in some places
Interior finish upgrades and replacement
ADA upgrades needed in some restrooms
Door threshold upgrades
ADA updates needed at some drinking fountains
CHICO JUNIOR HIGH SCHOOL
99
CONDITION ASSESSMENT W
UPDATE
KEY FINDINGS CHICO JUNIOR HS
1. Site - ADA
G
2. Site - Other
F 3. Site - Security
J
E
H
COST PER SF
NOTES
•
Several walkways do not meet ADA standards
•
Asphalt parking on east side of school has lots of cracking and should be replaced
•
Decorative & Chain-Link fencing around the perimeter of the school. Single point of entry at front of school but does not enter directly into Admin.
• • • •
I L
4. Building - Exterior
•
D
M
C
N
B
O
• •
ER
ND
EA
OL
•
5. Building - Interior
•
E AV
A
P
The fire alarm system consists of a Silent Knight 5820XL-EVS at the admin wing with emergency voice. System is up to code.
•
Many existing panels are original to the campus and past servicable life. Unlockable panel observed in a recently modernized student's restroom. Breakers serving classrooms and staff rooms can be turned off by students.
6. Fire Alarm
7. Electrical
• • •
8. Low Voltage/Security •
MEMORIAL WAY 9. Mechanical
• •
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN 100
10. Plumbing/Restrooms
CHICO JUNIOR HIGH SCHOOL
Acoustic ceiling tile system requires replacement or repainting Interior walls need painting Several spaces are not ADA compliant (sink areas, classroom space, etc.) New floor finishes required
•
•
R
Built up roof and covered walkways need replacement Fascia requires repair/repaint Several door landings and thresholds are not ADA compliant Exterior painting needed
•
Clock system is obselete American Time with Simplex system and does not meet current district standards. High priority item. Existing Ademco intrusion alarm system, new system at Admin and Science wing, but not consistent throughout the campus. Some AC-Units are old and at the end of servicable life. Needs replacement Roof Mounted Makeup Air Units in need of replacement. Single-occupancy toilet rooms are not ADA compliant Gas distribution on roof is in ok condition suggest full replacement.
Note: please see appendix for detailed consultant reports
PROPOSED MASTER PLAN OVERVIEW W
No new construction is proposed for Chico Junior High. The campus has adequate capacity and proposed changes are modernization to existing space.
G
PROGRAM CAPACITY & FAST FACTS - JUNIOR HIGH SCHOOLS CHICO JR
F J E
H
I L
OL EA
D
CURRENT ENROLLMENT
892 Students
Site
16.2 Acres
Building Area
92,026 Square Feet
Parking Spaces
85
Percentage of Classrooms in Portable Buildings 0%
M
ND
JUNIOR HS
N
ER
C
E AV
LOCATION FOR INTERIM HOUSING
B R
O
A
P
Loaded
CHICO JR EXISTING
PROPOSED
LOADING
General Classrooms
22
22
-
-
Music
2
2
-
-
Science Lab
6
6
-
-
Art
1
1
-
-
Audio/Production
-
-
-
-
Culinary Arts
-
-
-
-
Welding/Shop
2
2
-
-
Sub-total
33
33
33:1
1089
SPED
5
5
10:1
50
Total
MEMORIAL WAY Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
TOTAL
1,139
Support (SF) Library Space
2056
Administration/Student Services
3947
Gymnasium/Locker Rooms
12674
Cafeteria/Multi-Purpose Space
4676
Kitchen
1131
Library / Media Overhead Shade Structure
CHICO JUNIOR HIGH SCHOOL
101
PHASING J
SCHOOL BUILDINGS
A Admin and Library B Classrooms
I
L
C Classrooms
H
M
G W
N O
D Classrooms E Gym F Locker Rooms G Storage
P
F
H Music Rooms
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at Chico Junior High School. It is expected that a participatory design process may yield a revised approach within the parameters established here.
I Shops
E
J Storage L Classrooms
LEGEND
D C B
M Classrooms N Classrooms O Classrooms P Multi Purpose R Science Labs
A
Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished
R
W Storage
PRIORITY RENOVATION OF EXISTING LOCKER ROOMS
New Building
MODERNIZATION OF REMAINING BUILDINGS
PHASE 1 MODERNIZATIONS Initial focus should be made on the highest priority areas, including the Locker rooms and the entrance for security upgrades. The main classroom building, outside of areas with recent upgrades, would also need to be renovated.
LIGHTER RENOVATIONS AT GYM AND MULTI PURPOSE LOCATION FOR INTERIM HOUSING 102
CHICO JUNIOR HIGH SCHOOL
MODERNIZATION OF EXISTING ENTRANCE FOR SECURITY
MARSH JUNIOR HIGH SCHOOL
FAST FACTS: •
Originally built: 1993, Renovated: 2004
•
2022/2023 Enrollment: 748 Total Students
•
Site = 19.98 Acres
•
Buildings = 77,816 SF (Permanent) | 13,065 SF (Portables)
•
212 Parking Spaces
•
23% of Classrooms are in Portable Classroom Buildings
•
Recommended capacity: 1,076
Marsh Junior High School is the newest junior high school in the District and has recently received significant new additions. The campus has adequate capacity well beyond its projected enrollment of slightly below 800 students. The following areas were identified: • • •
Renovation of administration building for improved security. Consideration for removal of portable classrooms beyond those needed for projected capacity. The addition of gender-inclusive restrooms
The capacity of 1,076 with no significant changes should exceed the projected enrollment of less than 800
Multipurpose at Marsh Junior High School.
MARSH JUNIOR HIGH SCHOOL
103
EXISTING SITE INVENTORY 72 Spaces
T RD BODL
HUM
J
D
C
B
E
A
P
The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
GROSS AREAS SCHOOL BUILDINGS
L S
M
s
pace
15 S
G
AREA
LOADED CR
A Admin
6,924 SF
B Classrooms
7,351 SF
5
C Classrooms
7,351 SF
5
D Classrooms
7,873 SF
6
E Classrooms and Art Labs
7,828 SF
4
G Gym and Lockers
22,174 SF
1
J Portable
3,844 SF
L Library
9,522 SF
M Multi Purpose and Music
18,358 SF
1
P Portable Classrooms
7,667 SF
8
NON-LOADED
1
S Science Labs
10,525 SF
4
Total
109,418 SF
34
1
area includes covered spaces at 50%
NO TRE
125 Spaces
DA M
EB
LVD
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Library / Media
104
MARSH JUNIOR HIGH SCHOOL
Overhead Shade Structure
CONDITION ASSESSMENT
Some finishes in need of replacement
Replacement of portables with more permanent structures per enrollment
Restrooms in good condition
New MP and kitchen in good condition
Library in good condition
Classrooms in good condition
MARSH JUNIOR HIGH SCHOOL
105
CONDITION ASSESSMENT J
T RD BODL
HUM
UPDATE
KEY FINDINGS
D
C
MARSH JUNIOR HS
COST PER SF
NOTES
•
B
E
A
P
L
1. Site - ADA
•
Vehicle parking areas and asphalt areas near Buildings G, H and O have cracking, install crack and slurry seal Drop-off needs an accessible loading zone
2. Site - Other
•
Recent improvements made to drainagw
• •
Fencing is adequate. Single point of entry is in place, directly into Admin.
•
Roof drainage and covered walkways require painting Exterior wall painting needed in some areas
3. Site - Security
S
4. Building - Exterior
M
• • •
5. Building - Interior
G
• •
Silent Knight 5820XL with voice add-on serves the Gym, MP Building, and Science wing. The remainder of the campus is fed by Edwards FACP. The two systems should be consolidated so that everything is via the Silent Knight panel.
•
Some gear (transformers and panels) located at building exterior rather than in dedicated electrical rooms. In general all switchgear is in servicable condition.
•
Valcom IP Clock/PA system is adequate, but does not exactly meet current district standards. Intrusion alarm system is functional. Cameras throughout the campus. No access controls.
6. Fire Alarm
7. Electrical
•
NO TRE
8. Low Voltage/Security •
DA M
EB
LVD
• 9. Mechanical
LEGEND <10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN 106
10. Plumbing/Restrooms
Good Condition
MARSH JUNIOR HIGH SCHOOL
Casework/sink areas need updates and are not ADA compliant Floor finishes: (carpet, VCT, tile) need to be replaced Acoustic ceiling tile needs to be replaced where needed
• •
Mechanical systems consist of split-system w/ Gas Fired Furnaces and outdoor Condensing units. Approx. 24 years old and nearing the end of life. Outdoor refrigerant piping is in poor condition. Suggest replacement of indoor/ outdoor section within 4-5 years. complete with refrigerant piping. Hole in the ceiling in BLDG L restroom Single-occupancy door isn't ADA compliant in BLDG L restroom
Note: please see appendix for detailed consultant reports
PROPOSED MASTER PLAN OVERVIEW Marsh Junior High School is a newer campus and has recently received significant additions. Due to declining enrollment, the existing portables (Building P) do not currently require replacement with permanent facilities. To meet the projected enrollment, however, the FMP does not suggest elimination of the portable buildings.
D
R ODLT B M U H
D
C
B
E
A
Future growth may warrant replacement of those facilities either in the current location or in the alternate location shown on prior master plans. Near-term renovation is not anticipated Marsh Junior High School.
L
PROGRAM CAPACITY & FAST FACTS - JUNIOR HIGH SCHOOLS
S
MARSH
M
G
CURRENT ENROLLMENT
748 Students
Site
19.98 Acres
Building Area
90,881 Square Feet
Parking Spaces
212
Percentage of Classrooms in Portable Buildings
23%
JUNIOR HS Loaded
NO TRE
DA M
EB
LVD
MARSH EXISTING
PROPOSED
LOADING
General Classrooms
23
25
-
-
Music
2
2
-
-
Science Lab
5
5
-
-
Art
1
1
-
-
Audio/Production
-
-
-
-
Culinary Arts
1
1
-
-
Welding/Shop
-
-
-
-
Sub-total
32
34
33:1
1,122
SPED
2
2
10:1
20
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
Total
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
TOTAL
1,142
Support (SF) Library Space
3095
Administration/Student Services
7884
Gymnasium/Locker Rooms
9635
Cafeteria/Multi-Purpose Space
9694
Kitchen
1127
MARSH JUNIOR HIGH SCHOOL
107
PHASING SCHOOL BUILDINGS
A Admin B Classrooms C Classrooms D Classrooms E Classrooms and Art Labs G Gym and Lockers
E D C B A
J P M
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at Marsh Junior High School. It is expected that a participatory design process may yield a revised approach within the parameters established here.
J Portable M Multi Purpose and Music
S
P Portable Classrooms
L
S Science Labs
MODERNIZATIONS OF EXISTING BLDGS
New Building
G
L Library
LEGEND Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished
USE PORTABLES FOR INTERIM HOUSING.
CONSTRUCTION OF NEW CLASSROOM BLDG
REMOVE EXISTING PORTABLE BUILDINGS
RELOCATE SOLAR PANELS.
108
PHASE 1
PHASE 2
PHASE 3
MODERNIZATIONS
NEW CONSTRUCTION
REMOVE PORTABLES
Light modernizations made where needed to buildings B&C, D, E, L, and G. Use of Portables for interim housing as needed. Relocation of south solar panels for future classroom building.
Construct a new classroom building on site of former solar panels.
Demolish or relocate existing portables at buildings J and P.
MARSH JUNIOR HIGH SCHOOL
SECTION 7. SENIOR HIGH SCHOOLS
109
CHICO HIGH SCHOOL
FAST FACTS: •
Originally built: 1943, Renovated: 2010
•
2022/2023 Enrollment: 1913 Students
•
Site = 38.94 Acres
•
Buildings = 220,469 Square Feet
•
520 Parking Spaces
•
0% of Classrooms are in Portable Classroom Buildings
•
Recommended permanent capacity: 2,084
Chico High School is projected to reach a maximum enrollment of just under 2,100 students. Community meetings as well as site-based meetings with administration and athletic director produced the following priorities: • • • • • • • •
Expansion and improvement of CTE Education (IT, Floral, Sports Medicine, Art, etc.) Future removal of portables that currently house Inspire Charter School New small theater, drama space Reclaim existing drama space for student services expansion More classroom and suitable outdoor space to accommodate expanding Special Education population Updates needed to Science and Arts spaces as well as Main building improvements Minor improvements to athletic facilities The addition of gender-inclusive restrooms
Admin and Classroom Building at Chico Secior High School.
110
CHICO HIGH SCHOOL
EXISTING SITE INVENTORY The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
J/K - LEVEL 2 K J
S
GROSS AREAS
C
AG H
IT
L A
G INSPIRE
FL
LINCOLN CENTER
A - LEVEL 2 F B
SCHOOL BUILDINGS
AREA
LOADED CR
A Admin & Classrooms (2 Levels)
35,705 SF
14
AG Shops and Greenhouses
9,913 SF
5
B Classrooms
11,555 SF
9
C Classrooms
11,555 SF
9
F Art Labs
7,266 SF
5
FL Fitness Lab
5,849 SF
G Gym and Locker Rooms
34,054 SF
H Music and Labs
11,453 SF
IT Labs and Shops
11,018 SF
5
J Classrooms (2 Levels)
16,186 SF
12
K Classrooms (2 Levels)
16,186 SF
9
L Library
16,185 SF
1
LC Gym and Cafeteria
21,686 SF
S Science Labs
8,425 SF
SA Student Store
728 SF
ST Stadium Buildings
2,240 SF
NON-LOADED
5
5
Sub total
217,014 SF
79
INSPIRE Charter School
33,120 SF
23
2
Total
250,134 SF
102
2
area includes covered spaces at 50%
SACRAMENTO AVE
34 Spaces
ESPLANADE
255 Spaces
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Overhead Shade Structure
27 Spaces
Library / Media
CHICO HIGH SCHOOL
111
CONDITION ASSESSMENT
112
ADA accessibility counter height at reception desk required
Interior finish upgrades/replacement required
Replace acoustic ceiling tile systems where needed
Ceiling damage - requires repair/replacement
CHICO HIGH SCHOOL
Roof drainage improvements for puddling at covered walkways
Equipment upgrades/replacement required
CONDITION ASSESSMENT UPDATE
KEY FINDINGS
J/K - LEVEL 2 K J
CHICO HS
S
COST PER SF
NOTES
•
Some walkways along Buildings B, C, D, G and IT do not meet ADA standards, there are quite a few raised walkways due to tree roots
•
Student parking area along West Sacramento Avenue is in poor condition and should be repaved, onsite pavement west of Building G should be crack and slurry sealed
•
Perimeter of site has chain link and decorative metal fencing. No single point of entry into Admin
1. Site - ADA
C 2. Site - Other
AG
3. Site - Security
H
IT
• • •
L
4. Building - Exterior
• •
A
• 5. Building - Interior
G FL
INSPIRE
LINCOLN CENTER
•
Fire alarm system is primarily EST IRC3, though there is also a Silent Knight 5820XL on campus. Voice was added on for the Stadium Only. Systems should be consolidated, for a campus this size a new 6820-EVS should be provided. High priority item.
•
Most of the existing gear on campus (buildings Admin/B/C/D) is as old as the MSB and past its servicable life. In older wings panels are located in classrooms, corridors, custodial closets or outside of classrooms instead of dedicated electrical rooms. Electrical equipment located in basement of gym that has experienced flooding.
6. Fire Alarm
B
7. Electrical
• •
Multiple (6-8) separate intrusion alarm systems (Ademco) on campus, consider consolidating. Cameras throughout the campus. No access controls.
•
Majority of AC-Units are past their servicable life
•
Several multi-compartment restrooms require ADA accessibility upgrades Plumbing Fixtures are from original construction are in ok condition. Replacement should be considered with any modernization project
8. Low Voltage/Security 9. Mechanical
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
EXISTING SITE PLAN
• 10. Plumbing/Restrooms
Majority of interior floor finishes need replacement Acoustic ceiling tile systems require replacement as needed Casework/Sink areas are non ADA compliant
•
A - LEVEL 2 F
Roofing needs repair/replacement on some older buildings Several door landings/thresholds are non ADA compliant Window metal sashes require replacement
Note: please see appendix for detailed consultant reports CHICO HIGH SCHOOL
113
PROPOSED MASTER PLAN OVERVIEW Chico Senior High School had recent additions; however remaining buildings are in need of renovation. Highest priority renovations include the main building (A, B, C) and the Career Technical Education building (IT), as well as the Science building (S) and Art building (F). However, renovation of those spaces is anticipated to be significant. Likely near or beyond the cost of replacement. Additions for the agricultural CTE program would be part of the campus expansion, along with a new Theater and 8 new classrooms. A future page suggests a new expectation for classroom needs, recognizing the impacts of block scheduling on classroom counts.
J/K - LEVEL 2 K J
S C
AG H
IT
L
CTE
A
G FL
LINCOLN CENTER
A - LEVEL 2 F
THEATER
B
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
114
CHICO HIGH SCHOOL
PROPOSED MASTER PLAN ATHLETICS TURF FIELD DESIRED
SHOT PUT
FIELD HOUSE
PRACTICE SOCCER FIELD UPGRADE AND EXPAND TO MINIMUM FIVE TENNIS COURTS
PROPOSED POLE VAULT AREA
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
CHICO HIGH SCHOOL
115
PHASING SCHOOL BUILDINGS
A Admin & Classrooms (2 Levels) AG Shops and Greenhouses B Classrooms C Classrooms F Art Labs
S H K J IT AG
C A B
EXISTING CAMPUS
L The following images represent one scenario for phasing and F implementation of the improvements anticipated at Chico High School. It is expected that a participatory design process may yield a revised
FL Fitness Lab
LC approach within the parameters established here. G FL
G Gym and Locker Rooms H Music and Labs IT Labs and Shops J Classrooms (2 Levels)
LEGEND
INSPIRE CAMPUS
K Classrooms (2 Levels) L Library
New Building Lightly Modernized Building
LC Gym and Cafeteria
Heavily Modernized Building
S Science Labs
Building to be Relocated or Demolished
SA Student Store ST Stadium Buildings
MODERNIZE BLDGS IT, H, S, & F
MODERNIZE BLDGS A,B, & C
DEMOLISH EXISTING SECTION OF BLDG H
USE FORMER PORTABLES LAND TO BUILD NEW THEATRE AND CTE BLDGS
RELOCATE INSPIRE ACADEMY
116
PHASE 1
PHASE 2
PHASE 3
MODERNIZATIONS
DEMOLITION/RELOCATION
NEW CONSTRUCTION
After relocating the Inspire Academy off-campus, modernizations will be made to bldgs A, B, C, IT, H, S, & F
The east wing of bldg H will be demolished and the portables will be demolished/relocated so the land can be used for future construction.
The final phase uses the former location of portables to build a new CTE building as
CHICO HIGH SCHOOL
well as a new Theater and 8 classrooms.
PROGRAM CAPACITY Chico High School is anticipated to have no more than 2,061 students between now and 2030. It currently has 80 classrooms considered "loaded" spaces. While the District's recommended loading standard is 33:1; which would create a capacity of over 2,640 students, block-style scheduling, where teachers remain in their assigned classrooms during their designated "prep" period imapct school capacity significantly. For a model capacity of approximately 2,100 students, at a loading capacity of 33:1, approximately 63 classrooms would be required. The State of California's School Facilities program would load a high school at 27:1, requiring approximately 78 classrooms exclusive of physical education spaces. This model roughly equates to one prep period in a 6 period traditional schedule, or just over 80 percent utilization. Accommodating a block schedule, with 75% utilization, would mandate a loading standard of just over 24:1. All of these assumptions exclude the student capacity that non-loaded physical education facilities removes from the classroom loading, providing a conservative approach that allows for inconsistent loading of classrooms (i.e. smaller class sizes that may occur in specialty programs) as well as imperfect student enrollment. For purposes of this facilities master plan, we have adjusted the high school loading standard to 24:1 exclusive of unloaded physical education spaces such as the gymnasium and weight room, but inclusive of those classroom spaces used for physical education direct instruction classes such as health. This conservative approach recongnizes the District's desire to allow in-room preparation for teachers as well as closer alignment with current conditions at Chico High School or roughly 86 classrooms. We would recommend a comprehensive programming process at the time of campus renovation to confirm these assumptions at Chico High School, as the current count of 80 classrooms requires a number of roving teachers that do not use existing classrooms during their assigned prep periods. Other strategies exist to manage teacher preparation time.
PROGRAM CAPACITY & FAST FACTS - HIGH SCHOOLS CHICO HS
SENIOR HS
GROSS AREAS SCHOOL BUILDINGS
AREA
A Admin & Classrooms (2 Levels)
35,705 SF
CURRENT ENROLLMENT 1913 Students
AG Shops and Greenhouses
9,913 SF
Site
38.94 Acres
B Classrooms
11,555 SF
9
Building Area
220,469 Square Feet
C Classrooms
11,555 SF
9
Parking Spaces
520
F Art Labs
7,266 SF
FL Fitness Lab
5,849 SF
G Gym and Locker Rooms
34,054 SF
Percentage of Classrooms in Portable Buildings 0%
LOADED CR
LAB
SPED
14 5
5
Loaded
CHICO HS Existing
Proposed
Loading
Total
General Classrooms
53
63
-
-
Music | Drama
2
3
-
-
Science Lab
8
8
-
-
Art
5
5
-
-
CTE Labs
5
7
-
-
Sub Total
73
86
24:1
2,064
SPED
2
2
10:1
20
2
2
-
-
Library Space
4466
-
-
-
H Music and Labs
4,819 SF
2
IT Labs and Shops
11,018 SF
5
J Classrooms (2 Levels)
16,186 SF
7
K Classrooms (2 Levels)
16,186 SF
9
L Library
16,185 SF
LC Gym and Cafeteria
21,686 SF
S Science Labs
8,425 SF
Administration/Student Services
15087
-
-
-
SA Student Store
728 SF
Gymnasium/Locker Rooms
32749
-
-
-
ST Storage
2,240 SF
Cafeteria/Multi-Purpose Space
5686
-
-
-
Sub total
210,380 SF
Kitchen
652
-
-
-
Non-Loaded 3
2
Computer Support (SF)
5
55
B1 CTE
4,300 SF
C1 Theater
13,200 SF
C2 Classrooms (2 Levels)
13,200 SF
8
Total
241,080 SF
63
18
2
2
20
2
CHICO HIGH SCHOOL
117
FAIR VIEW HIGH SCHOOL
FAST FACTS: •
Originally built: 1962
•
2022/2023 Enrollment: 165 Students
•
Site = 7 Acres
•
Buildings = 24,465 SF (Permanent) | 12,964 SF (Portables)
•
66 Parking Spaces
•
39% of Classrooms are in Portable Classroom Buildings
•
Recommended permanent capacity: 459 Students
The Fair View High School campus is home to Fair View High School, The Center for Alternative Learning (CAL) junior school as well as the Academy for Change (AFC) community day school and Oakdale (K-12 Independent Study). The campus is a former elementary school, the same prototype as several of the schools slated for replacement in this FMP. Site observation and feedback from the site administration recognized the need for significant renovation; the FMP is recommending replacement to meet the needs of alternative education. An alternative would be to relocate all programs to a more suitable location.
Entry and multipurpose at Fair View High School.
118
FAIR VIEW HIGH SCHOOL
EXISTING SITE INVENTORY 32 Spaces
The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
VE A A
M
NA A P
K H
GROSS AREAS
I
J
SCHOOL BUILDINGS
G
E
F
D C
34 Spaces
T L
B
A
AREA
A Student Services
1,408 SF
B Student Services
1,258 SF
C Classrooms
5,082 SF
D Restrooms
1,374 SF
E Classrooms
5,336 SF
F Multi Purpose and Admin
5,444 SF
G Classrooms
5,787 SF
H Restrooms
1,344 SF
I Classrooms
1,920 SF
J PE Classroom
1,966 SF
K Oakdale Office
960 SF
L Student Services
960 SF
T Shop and Classroom
2,714 SF
LOADED CR
NON-LOADED
4 4 4 3
2
M Academy for Change
6,240 SF
6
Total
41,794 SF
23
area includes covered spaces at 50%
M
VE A T
S
EA
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Overhead Shade Structure
Library / Media
FAIR VIEW HIGH SCHOOL
119
CONDITION ASSESSMENT
120
Interior finish upgrades in classrooms
Shop classroom in adequate condition
Restroom finish upgrades required
Door thresholds and landings ADA improvements required
FAIR VIEW HIGH SCHOOL
ADA compliant upgrades to drinking fountains
Door upgrades for ADA compliance
CONDITION ASSESSMENT UPDATE
KEY FINDINGS
VE A A
AM
FAIRVIEW HS
N PA
K H
COST PER SF
NOTES
•
Walkways along Buildings B, C, D, G, H, I, J and the parking area do not meet ADA standards, numerous door thresholds do not meet ADA standards
•
Crack and slurry seal required in parking areas Replace all walkways at entry doors to classrooms and restrooms.
1. Site - ADA
I
2. Site - Other
J
3. Site - Security
G
• •
No single-point-of-entry to Admin space on campus
•
Exterior paint upgrades required around campus Roof drainage/downspouts require replacement Door hardware upgrades/replacement needed in some areas
•
E
4. Building - Exterior
F
D
• • •
C
5. Building - Interior
T L
B
•
PG&E service is in a dedicated enclosure behind school with 1600A GE Spectra Series MSB, 120/208V, approx. 25-30 years old, servicable condition. There is room for additional breakers.
•
Four separate intrusion alarm systems (Vista) on campus, consider consolidating. Cameras throughout the campus. No access controls.
•
Bogen Multi-com 2000 does not meet current district standards. Clock system is very old, probably original to the campus. High priority.
•
Roof mounted AC-Units +30 years.Units are at end of life and need replacement within the next 2-5 years. Portables appear to be Wall Mounted Heat Pumps from the original construction. +25 years old and need replacement.
6. Fire Alarm
A 7. Electrical
M
VE A T
S
EA
8. Low Voltage/Security
• 9. Mechanical • •
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
10. Plumbing/Restrooms
Full interior finish upgrade/replacement in all buildings except new shop bldg Casework/Sink Areas do not meet ADA requirements and need upgrades/ replacements
Plumbing Fixtures in ok condition. Need updating. Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project
Note: please see appendix for detailed consultant reports
EXISTING SITE PLAN FAIR VIEW HIGH SCHOOL
121
PROPOSED MASTER PLAN OVERVIEW The Fair View site is slated for replacement. Academy for Change, with relatively new buildings, will remain as well the existing Shop building. Special consideration should be given to the unique needs of the separate alternative campuses.
LEVEL 2
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
122
FAIR VIEW HIGH SCHOOL
PHASING SCHOOL BUILDINGS
J
F
I
C
D Restrooms
K
E Classrooms
H
L The following images represent one scenario for phasing and B implementation of the improvements anticipated at Fairview High School.
A Student Services B Student Services C Classrooms
F Multi Purpose and Admin G Classrooms H Restrooms I Classrooms J PE Classroom K Oakdale Office
G E D
A
EXISTING CAMPUS It is expected that a participatory design process may yield a revised approach within the parameters established here.
M LEGEND
T
L Student Services
New Building
T Shop and Classroom
Lightly Modernized Building
M Academy for Change
Heavily Modernized Building Building to be Relocated or Demolished
PHASE 1
PHASE 2
PHASE 3
NEW CONSTRUCTION
DEMOLISH EXISTING CAMPUS
SITE WORK
Build new Admin, MP, Library, and 2-story Classroom buildings on the field of the school to not interfere with the existing campus
Demolition of existing campus buildings, excluding the newer shop building and Academy for change campus.
Utilize former campus space to make field and expanded parking lot.
FAIR VIEW HIGH SCHOOL
123
PLEASANT VALLEY HIGH SCHOOL
FAST FACTS: •
Originally built: 1966, Renovated: 2010
•
2022/2023 Enrollment: 1775 Students
•
Site = 36.57 Acres
•
Buildings = 206,318 SF (Permanent)
•
479 Parking Spaces
•
0% of Classrooms are in Portable Classroom Buildings
•
Recommended permanent capacity: 2,208 Students
Pleasant Valley High School is projected to reach a maximum enrollment of just under 2,000 students. Community meetings as well as site-based meetings with administration and athletic director produced the following priorities. • • • • • • •
Renovation of Building B Replacement of the weight and mat room with a new building to incude those functions and a fitness lab New field house Renovation of gymnasium, adding a connecting lobby space Renovation of locker rooms Minor improvements to athletic facilities The addition of gender-inclusive restrooms
Entry and dining and culinary arts space at Pleasant Valley High School.
124
PLEASANT VALLEY HIGH SCHOOL
EXISTING SITE INVENTORY
EAST AVE Z
M
L
V
The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.
C
A
GROSS AREAS
G
T
P
O
F
MARIGOLD AVE
H
W
D
B
E X
U
S
K R
Y
Y - LEVEL 2
SCHOOL BUILDINGS
AREA
LOADED CR
A Classrooms
14,103 SF
6
B Classrooms
14,080 SF
9
C Classrooms
14, 080 SF
6
D Labs
14,080 SF
5
E Shops
8,992 SF
5
F Locker Rooms
7,514 SF
G East Gym
11,801 SF
H West Gym
12,054 SF
K PE Mat Rooms
2,400 SF
L Library
21,291 SF
2
M Classrooms
22,536 SF
11
O Classrooms
5,760 SF
5
P Classrooms
4,480 SF
4
R PE Weight Room
2,400 SF
S Classrooms
25,920 SF
T Student Store
896 SF
U Storage
3,642 SF
V Admin
10,467 SF
W Center for the Arts
19,830 SF
X Locker Rooms
1,920 SF
Y Classrooms
57,448 SF
NON-LOADED
8
24
Z Cafeteria and Labs
16,600 SF
4
Total
289,774 SF
89
area includes covered spaces at 50%
LEGEND Administration / Student Services
Classroom
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
Overhead Shade Structure
Library / Media
PLEASANT VALLEY HIGH SCHOOL
125
CONDITION ASSESSMENT
126
Fascia repair/repaint improvements required
Acoustic ceiling tile system replacement where needed
Casework and storage upgrades to science labs
Floor finish upgrades needed
PLEASANT VALLEY HIGH SCHOOL
Exterior drainage improvements required to prevent puddling
Locker Room shower upgrades required
CONDITION ASSESSMENT
EAST AVE Z
M
L
UPDATE
KEY FINDINGS PLEASANT VALLEY HS
V
C
A
1. Site - ADA
COST PER SF
NOTES
•
Several onsite pathways do not meet ADA code
•
Relatively new drop off area and accessible parking. Part of parking lot has received a slurry coat. Vehicle parking area and asphalt area east of stadium are cracked and should be crack and slurry sealed
•
W
G
T F
2. Site - Other
D
B
MARIGOLD AVE
H
P
O
3. Site - Security
U
Fencing at perimeter of campus with a single point of entry to Admin Bldg
•
Some door landings and thresholds are not ADA compliant Roof Fascia needs repair or replacement in some areas Soffits require repair/repaint where needed
• 4. Building - Exterior
• •
E X
•
5. Building - Interior
S
• • •
Campuswide fire alarm upgrade to Silent Knight 6820EVS completed within the past year
•
Older gear in many of the existing buildings that haven't been renovated (and in some that have had recent 'light' renovations) nearing end of servicable life.
•
Valcom IP Clock/PA system is adequate meets current district standards. No intrusion alarm on campus except at the school store. Security cameras throughout the campus.
6. Fire Alarm
K 7. Electrical
R
• 8. Low Voltage/Security • 9. Mechanical
Y
• 10. Plumbing/Restrooms
LEGEND Good Condition
<10% Replacement Value
Heavy Modernization
50%<75% Replacement Value
Light Renovation
10%<50% Replacement Value
Replacement Preferred
75%<100% Replacement Value
• •
Y - LEVEL 2
Acoustic ceiling tile system - replace as needed Interior walls need repainting as needed Floor finishes require full replacement in some buildings
Distribution was originally constructed when AC-Units were added. Building F: All equipment is approx. 28 years old and at it's end of life. Plumbing Fixtures are in suitable condition. Need updating. Multi Compartment bathroom - Non ADA floor slopes to drain, does not appear to have an accessible toilet stall in some older bldgs
Note: please see appendix for detailed consultant reports
EXISTING SITE PLAN PLEASANT VALLEY HIGH SCHOOL
127
PROPOSED MASTER PLAN
EAST AVE Z
M
L
C
A
H
W
Pleasant Valley High School has had recent additons, renovations and improvements. Remaining buildings to be renovated include Building B, locker rooms, student store and the main gymnasium which has identified structural deficiences (see appendix for report). The renovation would ideally include a new lobby addition connecting the two gymnasium spaces. New construction anticipates a future field house as well as a replacement of the weight and mat room, also including a fitness lab. Consideration should be given to combining these two buildings into a single athletics building.
D
B
G
T
P
O
F
MARIGOLD AVE
V
OVERVIEW
E X
U
ATHLETICS NEW TENNIS COURT
S
RELOCATED SHOT PUT
K R
Y
Y - LEVEL 2
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEGEND Administration / Student Services
Classroom
Modernized Building
Multi-Purpose / Food Service
Restrooms / Storage / Mechanical
New Building
Library / Media Overhead Shade Structure
128
PLEASANT VALLEY HIGH SCHOOL
POLE VAULT
LIGHTS FOR BASEBALL FIELD
PRACTICE FILED BACKSTOP
PHASING SCHOOL BUILDINGS
A Classrooms B Classrooms C Classrooms D Labs E Shops F Locker Rooms G East Gym
L A G Z H
M C B C E P
H West Gym K PE Mat Rooms L Library M Classrooms O Classrooms P Classrooms R PE Weight Room S Classrooms
V W F X K
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at Pleasant Valley High School. It is expected that a participatory design process may yield a revised approach within the parameters established here.
Y S O
LEGEND New Building Lightly Modernized Building
T Student Store
Heavily Modernized Building
U Storage
Building to be Relocated or Demolished
V Admin W Center for the Arts X Locker Rooms Y Classrooms Z Cafeteria and Labs
PHASE 1
PHASE 2
PHASE 3
MODERNIZATIONS
DEMOLITION
NEW CONSTRUCTION AND SITE WORK
Modernizations and addition to West Gym, bldg H. Modernizations to locker rooms in bldg F and classroom bldg B.
Removal of Mat and weight rooms, bldgs K & R, to build new facility.
Construction of Field house and new fitness lab to replace existing mat and weight rooms. Construction of other site amenities for athletics. PLEASANT VALLEY HIGH SCHOOL
129
SECTION 8. OTHER DISTRICT FACILITIES
130
CANYON VIEW HIGH SCHOOL
WEBSTER DR
Canyon View High School The District owns approximately 50 acres for a future high school campus. The need for the development of the site as a new high school is not anticipated within the horizon of the current demographic projections through 2030. Future updates to the Facilities Master Plan should review the need for the new high school in context of updated projections.
H K
D A INSPIRE CAMPUS
L
B
E
J
C
K
FREMONT ST
NOTRE DAME BLVD (BEYOND)
G
F
Legend for Future High School A B C D E F G H J K L
Administration, Library Industrial Arts, Home Ec, Woodworking Multi Purpose, Music Student Activity Center Student Center Gym, Weight Room Locker Room Classrooms Classrooms Classrooms Maintenance
RALEY BLVD
131
HENSHAW GUYNN ELEMENTARY The 13.02 acre Henshaw Guynn Site is currently owned by the District and reserved for when a new elementary school is needed. At this time, the demographic projections do not support the building of a new elementary school. When the need for the new elementary school is confirmed a full site planning process can be completed to create a final vision for this site in accordance with the needs of the education program.
132
OAK BRIDGE ACADEMY The District owns property in a former office complex. The property currently houses the Oak Bridge Academy and a small number of District offices. There is an existing building that is currently leased to a tenant, but is available for future needs of the District. Recent renovations at the occupied building were made to support educational programs for Oak Bridge Academy.
DISTRICT OWNED, CURRENTLY LEASED OUT
133
DISTRICT ADMINISTRATIVE OFFICE The District Office is located in a re-purposed elementary school that was built in the 1930s and in a relocatable building placed on the site for the District meetings. The main facility has aging electrical, mechanical, and technology systems. The District's main technology center is located at the northeast end of the main building. There was very little done to the facility to convert it to a district office from an elementary school. The main building has a large central corridor; the building's structural system will limit its long-term viability. To change the facility to match future needs would be difficult, due to those limitations. The existing facilities occupy a very large site, where the southeast section of the site remains a community playfield. Renovation of this facility or relocation of District administration is not anticipated until a future phase of the Facilities Master Plan.
134
DISTRICT CORPORATION YARD FUTURE CENTRAL KITCHEN LOCATION
The District's Corporation yard is a campus of permanent and portable buildings housing maintenance and operations, transportation and nutrition services for the District. While permanent facilities would likely improve the corporation yard, replacement of existing facilities was considered outside of the scope and schedule of this Facilities Master Plan as the District prioritizes spending on school campuses. A solar array is also part of the corporation yard.
A long-term goal for the District is the development of a central kitchen providing consolidated food preparation. While the vision for that project is also outside the planning horizon of the Facilities Master Plan, it is highlighted here to demonstrate that the corporation yard property is large enough to accommodate this vision. At the time of that implementation, it is recommended that the District develop a master plan for the site to adequately address site vehicular/bus circulation and parking, delivery access as well as any displacement of existing portable or storage buildings on the property.
135
SECTION 9. IMPLEMENTATION AND COST MODELING
136
IMPLEMENTATION PLAN To support funding of future facilities needs in the District, the implementation plan has been repeated here with the addition of Order of Magnitude costs for future phases. It should be noted that assumptions were made for the scope, schedule and secondary impacts such as interim housing requirements. Those details are provided in the appendix. Escalation is a significant impact, estimated at 4% per year, but the opinions of cost are also shown in current dollars as well for comparison. Additionally, contingency of 10% was added to each project to allow for changing assumptions, and District "soft costs" of 25% were included in order to provide for expenditures required of the District beyond construction. The total program implementation, or "needs" of the District are estimated through Phase 7 at just under one billion dollars. District support facilities improvements are not included as they are anticipated well beyond the year 2048. It is important that the implementation plan is reliant on available funding either in the form of Local General Obligation Bonds, State School Facilities Funding and District Developer fees. Phase IV will be completed using remaining funds from the District's current General Obligation bond and related resources. Start 12/11/13
Phase II - Jr Highs Conversion to 6-8
Phase 1 - Quick Start Projects 11/11/13 - 4/3/15 ADA Priority List Site Work Only (Phase IV and after) 1/6/14 - 4/3/15 Enhanced School Safety and Security Measures
Phase III - Elementary School Capacity and Modernizations 6/1/16 - 10/5/20
Athletic Fields - Phase 1 at CHS & PVHS 11/30/16 - 7/30/18
Bidwell (Priority Mods+Technology, Site Improvements, Security) 1/6/14 - 11/27/15
Phase VIII - District Support Improvements
Sierra View PV High School Priority Mod/CTE 5/2020 - 5/2023
Fair View Site
Chico High School CTE Program 11/29/19 - 8/1/21
Hooker Oak Modernization
McManus 8/25/23 - 8/25/25 FV High School Restrooms 6/2023 - 9/2023 Citrus Modernization Transitional Kindergarten Implementation Emma Wilson, Little Chico Creek, Marigold
Chico Jr High (Priority MODs + Science, Site Improvements, Technology, Security) 1/6/14 - 7/19/16
Safety and Security Projects
Marsh Jr High Security 1/6/14 - 7/14/16
Restroom Renovation Projects
Marsh Jr High Improvements 10/6/13 - 7/15/16
Phase VII - High School and Junior High School Modernizations (2040-2048)
Phase VI - Elementary & High School Modernizations (2032-2040)
Loma Vista-Marigold 6/1/16 - 10/5/20
Neal Dow 11/30/16 - 4/15/20
Energy Efficiency and Alternative Energy Projects (Prop 39 and Solar) 11/11/13 - 3/6/15
Phase V - Elementary Modernizations 2024 - 2032
Emma Wilson 4/29/18 - 4/15/20
Shasta 6/1/16 - 7/6/19
Technology Infrastructure for Common Core 1/6/14 - 4/3/15
Phase IV - Elementary / High School Capacity and Modernizations 4/29/19 - 6/1/25
Current Status of Implementation Plan
PV High School MOD & Athletic Master Plan Projects
Chico High School MOD & Athletic Master Plan Projects
Bidwell Jr. High School
$222.8 Million (current) $347.8 Million (escalated)
Chico Jr. High School
Rosedale
Marsh Jr. High School
$183.4 Million (current) $330.0 Million (escalated)
Chapman Parkview $203.2 Million (current) $230.0 Million (escalated)
ALL 2024+ PROJECTS RELIANT ON FUTURE FUNDING SOURCES
137
SECTION 10. APPENDICES
138
APPENDIX 1: CONDITION ASSESSMENT HOW TO USE THESE TABLES: SITE CONDITIONS COST PER SF MEDIUMHIGH MEDIUM LOW HIGH
CAMPUS SITE SCOPE
A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
Drop-off areas for bus and parents, neither have ADA accessible drop-off compliance.
EXTERIOR SITE AMENITIES
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.
LED Marquee, flag pole, Playground equipment (not shaded), hardcourts are in poor condition, PV canopies over portion of parking lot. New Kinder playstructure . Small chain link fenced bike rack area.
A/E - Architect/Engineer Comment A: Architect M: Mechanical C: Civil Engineer P: Plumbing E: Electrical S: Structural
SITE CONDITION ASSESSMENT
General condition given per category/building
Description of what conditions were looked for for each scope category
Comments on current condition of scope by Architect or Engineer
Good Condition Light Renovation Heavy Modernization Replacement Preferred
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A CLASSROOMS
BUILDING D CLASSROOMS / LIBRARY
BUILDING F MULTI-PURPOSE
BUILDING G RESTROOMS
BUILDING H CLASSROOMS
BLDG COLOR ASSESSMENT 39,453
SQUARE FOOTAGE
A BUILDING EXTERIOR
4,044
Condition - materials, Exterior skin -cem plaster, NO repair / replace, painting, windows windows, etc. Soffit- T&G, some dry rot Roofing - tar and gravel Doors wood in HM frames Windows - single pane, metal sash Roof drainage - no gutter / downspouts to grade
5,376
14,343
1,027
See Bldg F
Exterior skin - cem plaster,wood Exterior skin - cement plaster Exterior skin - cement plaster Same as D siding & mtl. sash wall/wdw sys. @ side Roofing - assumed tar & gravel-Rplace Roofing - assumed tar & gravelelevation Exterior wood doors Replace Soffit- T&G, some dry rot- Replace Windows- single glazed metal sashExterior wood doors to playground Roofing - tar and gravel-Replace Replace giant gas meter in the way - Replace Doors wood in HM frames door & frames Windows - single pane, metal sashReplace Roof drainage - no gutter / downspouts to grade
139
CHAPMAN ELEMENTARY SITE CONDITIONS A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
Drop-off areas for bus and parents, neither have ADA accessible drop-off compliance.
EXTERIOR SITE AMENITIES
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access
LED Marquee, flag pole, Playground equipment (not shaded), hardcourts are in poor condition, PV canopies over portion of parking lot. New Kinder playstructure . Small chain link fenced bike rack area. Single point of entry to Bldg. where Admin. is located., campus is fenced
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Flatwork at building doors exceeds ADA slopes. Numberous walkways along buildings exceed ADA slopes.
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Asphalt in basketball area and south of Building H is cracking and needs to be replaced. Remainder of onsite asphalt and asphalt in parking area has some cracks and should be crack and slury sealed.
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
140
COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
P ALL
CHAPMAN ELEMENTARY
Areas that pond, drain inlets, retention needed, etc. Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
SITE CONDITION ASSESSMENT
ADA symbols in parking stall do not meet standards
Replace all walkways at entry doors to classrooms and restrooms. No known issues Sewer under Building C has clogging issues (possibly a piece of rebar was driven thru the pipe during construction causing an obstruction?) Difficult cleaning/ snaking of pipe. All existing sewer pipes are original and should be replaced. There is little to no drainage system on east side of campus which causes ponding. Storm drainage is needed. 3/4 domestic water piping in courtyard is failing and needs to be replaced.
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
ADA Compliant Hydration Station found in hallways, New Condition. Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A CLASSROOMS
BUILDING D CLASSROOMS / LIBRARY
BUILDING E CLASSROOMS
BUILDING F MULTI-PURPOSE
BUILDING G RESTROOMS
BUILDING H CLASSROOMS
BLDG COLOR ASSESSMENT 39,453
SQUARE FOOTAGE
A BUILDING EXTERIOR
A BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A
5,376
Condition - materials, Exterior skin -cem plaster, NO repair / replace, painting, windows windows, etc. Soffit- T&G, some dry rot Roofing - tar and gravel Doors wood in HM frames Windows - single pane, metal sash Roof drainage - no gutter / downspouts to grade Condition - finishes (floor, wall, ceiling) casework, shades, etc.
A
4,044
Exterior skin - cem plaster,wood Same as D siding & mtl. sash wall/wdw sys. @ side elevation Soffit- T&G, some dry rot- Replace Roofing - tar and gravel-Replace Doors wood in HM frames Windows - single pane, metal sashReplace Roof drainage - no gutter / downspouts to grade Door Hardware: knobs, nonDoor Hardware: Lever, non-compliant Door Hardware: Lever, non-compliant compliant threshold threshold threshold Flooring: VAT in Classrms; carpet in Flooring: VCT Flooring: VCT Library Walls: Walls: Walls: tackable & wd. operable Ceiling: 2x4 susp. Acous, pendant Ceiling: 2x4 susp. Acous, 2x4 partition flourescent flourescent Ceiling: 2x4 susp. Acous, 2x4 Sink: Not ADA compliant flourescent Sink: Not ADA compliant
Fixtures, accessories, ADA compliant, finishes, etc. MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
See Bldg F
14,343
1,027
See Bldg F
Exterior skin - cement plaster Exterior skin - cement plaster Same as D Roofing - assumed tar & gravel-Rplace Roofing - assumed tar & gravelExterior wood doors Replace Windows- single glazed metal sashExterior wood doors to playground Replace giant gas meter in the way - Replace door & frames
Door Hardware: push/pull, noncompliant threshold Flooring: tile, non-compliant flr slope Walls:4' tile wainscot & gyp bd Ceiling: gyp. bd., surf. Mtd. flourescent -Replace Sink: wall lavatories
Same as E
Entry doors not compliant (width & threshold) non-compliant ADA clear space at interior, ,m
DSA EB-3 / EB- 4, Door threshold not DSA EB-3 / EB- 4 ADA compliant- remove & replace walkway
DSA EB-3 / EB- 4, Door threshold not DSA EB-3 / EB- 4, Insuifficient landing DSA EB-3 / EB- 4, Door threshold not DSA EB-3 / EB- 4, Door threshold not ADA compliant- remove & replace clearance at exit door. ADA compliant- remove & replace ADA compliant- remove & replace walkway walkway walkway
CHAPMAN ELEMENTARY
141
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING J CLASSROOMS
BUILDING B, C, K, L PORTABLES
MISC
BLDG COLOR ASSESSMENT 39,453
SQUARE FOOTAGE BUILDING EXTERIOR
A
BUILDING INTERIOR
A
RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A A
2,745
11,918
Condition - materials, repair / replace, painting, windows, etc. Condition - finishes (floor, wall, ceiling) casework, shades, etc. Fixtures, accessories, ADA compliant, finishes, etc. MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
DSA EB-3 / EB- 4, Door threshold not ADA compliant- remove & replace walkway
BUILDING CONDITIONS - ELECTRICAL (MISC)
142
BUILDING SCOPE
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
E
INTENT OF SCOPE MISC FOR PRICING Data infrastructure (i.e. PG&E electrical service in parking lot, MSB and PV equipment in fenced enclosure in parking lot. 120/208V 1600A Siemens MSB is 10GB) Carrier, location, ~30 years old, servicable condition but approaching end of servicable life (up to 50 years). 1600A should be sufficient for a campus this size of space size. Much older Zinsco MSB in same yard is not servicable and missing deadfront. Existing system, code Older Silent Knight 5207 FACP, did not observe smoke detectors, there may be some pull stations. Does not meet any current code compliant , replace vs requirements, high priority item. retrofit, Voice Evac, etc. System, headend, type Older Bogen Multicom 2000 in a large rack in someone's office, not per current standards. Old clocks. (i.e. VOIP), replace vs retrofit
Types of systems, No intrusion alarm system in use. Cameras throughout the campus. No access controls. hardware, CCTV, opening contacts, etc. Rooms and panels, code Very old gear (60 years or older) observed in custodial closet. Many existing panels on campus are similar age. All panelboards are full, ELECTRICAL E compliant, receptacles, no spare breakers. Individual circuits are overloaded, up to 19 duplex receptacles on a single circuit is CEC violation. 3-phase feeder to SYSTEMS circuiting, etc. portables is miissing a phase leg, district has 'worked around' to make it work. Lots of surface raceways in classrooms. Fixture types and Most interior lighting consists of older luminaires with T8 fluorescent lamps. Some LED exit signs observed, and 'bugeye' emergency LIGHTING conditions, efficiency, lights that are no longer maintained. Ceiling mounted motion sensors, where present, have been 'bypassed'. Lighting controls do not E AND LIGHTING controls, life safety / meet any current energy code requirements. Exterior lighting consists of LED parking lot lights and CFL wallpacks, many of which were CONTROLS egress (Int/Ext) on during the daytime. IDF locations, sizes, MDF is located in the library, it is not in a dedicated room with cooling. New fiber has been routed through the campus. Horizontal infrastructure, cabling, # cabling is a combination of CAT5E and CAT6. Limited upgrades have been completed. Pathway for low voltage systems is primarily E TECHNOLOGY data drops per space, routed overhead on canopies as there is not sufficient UG pathway. Classrooms have WAPs. SYSTEMS etc. Classroom technology, Most classrooms have a flat panel display. presentation spaces; E AUDIVISUAL i.e. conf rooms, library, SYSTEMS CHAPMAN ELEMENTARY MPR, etc. E
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
M/P
M/P
M/P
M/P PLUMBING EQUIPMENT REVIEW FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
INTENT OF SCOPE BUILDING A BUILDING D BUILDING E BUILDING F FOR PRICING CLASSROOMS CLASSROOMS / LIBRARY CLASSROOMS MULTI-PURPOSE Exterior Equipment - This building has (4) Older Lennox This building has (5) newer Johnson This building has (4) newer Johnson This building has (2) newer Johnson Rooftop, wall mounted Roof Mounted AC-Units that are at Controls Roof Mounted Ac-Units. Controls Roof Mounted Ac-Units. Controls Roof Mounted AC-Units. BARD, etc. - condition the end of life. Fixed Minimum OSA. Newer installation with 8 years of life Newer installation with 8 years of life Newer installation with approx. 8 No Relief Air. left. left. years of life left. SYSTEM TYPE, Boilers, Poor Air Distribution (2) Supply Air Poor Air Distribution (2) Supply Air Poor Air Distribution (2) Supply Air Kitchen Hood is original and is VRF, Pumps, Ducts, Grille and single point returm. Ceilings Grille and single point returm. Ceilings Grille and single point returm. Ceilings coupled to Roof Mounted Reznor w/ diffusers, split systems, stained. stained. stained. Evaporative Cooler Section. In need exhaust fans, etc. of replacement, now. EMCS Type of Combination of Delta and Johnson Combination of Delta and Johnson Combination of Delta and Johnson Combination of Delta and Johnson system, web based / Controls Controls Controls Controls Programmable T-Stat? Plumbing Fixtures, Sinks are CW only and original Sinks are CW only and original Sinks are CW only and original Plumbing Fixture are from original Restrooms, sinks, construction. drinking fountains / bottle fillers, etc. Gas, condnesation Gas Distribution is in ok condition. Gas Distribution is in ok condition. Gas Distribution is in ok condition. Original Water Heater at Kitchen in piping, water heaters, Suggest complete replacement with Suggest complete replacement with Suggest complete replacement with need of replacement, now. Kitchen service sinks, hose bibbs, the installation of new HVAC Units. the installation of new HVAC Units. the installation of new HVAC Units. Plumbing Fixture appear to be gas regaultors (seismic from original construction. One braced) Newer Johnson AC-Unit serving Administration Area.Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units. Does AFS exist, location, No Automatic Fire Sprinkler Systems No Automatic Fire Sprinkler Systems No Automatic Fire Sprinkler Systems No Automatic Fire Sprinkler Systems code compliant, etc. found. found. found. found.
BUILDING G BUILDING H RESTROOMS CLASSROOMS Singel Exhaust Fans serving both Core This building has (4) newer Johnson Restrooms. Controls Roof Mounted Ac-Units. Newer installation with 8 years of life left. Exhaust Ducting only. Original Poor Air Distribution (2) Supply Air Construction Grille and single point returm. Ceilings stained. Fans are switch with lights
Combination of Delta and Johnson Controls
Sinks are CW only and original
Sinks are CW only and original
Plumbing Fixture are from original construction.
Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
EB-3, EB-4 triggers, etc.
CHAPMAN ELEMENTARY
143
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
144
A/E M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
INTENT OF SCOPE BUILDING B, C, K, L MISC FOR PRICING PORTABLES Exterior Equipment - Portables appear to be Wall Mounted Rooftop, wall mounted Heat Pumps from the original BARD, etc. - condition construction. SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of Stand alone Programmable T-Stat's. system, web based / Programmable T-Stat? Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc. Gas, condnesation ADA Compliant Hydration Station piping, water heaters, found in hallways, New Condition. service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, code compliant, etc. EB-3, EB-4 triggers, etc.
CHAPMAN ELEMENTARY
CITRUS ELEMENTARY SITE CONDITIONS COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
No Parking lot is provided for campus and all drop off is at curbside.
EXTERIOR SITE AMENITIES
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access
Flagpole is surrounded by trees, old hand set lettering marquee, Playground paving is cracked, no trash enclosure is provided, fenced bike rack area
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Onsite walkways along Buildings B, a portion of Building C and Building D to not meeting ADA standards, the offsite sidewalks along West Fourth Avenue and Citrus Avenue are old and should be replaced
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
The playground asphalt and very damaged and should be replaced
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
P ALL
Areas that pond, drain inlets, retention needed, etc. Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
SITE CONDITION ASSESSMENT
Campus is secured with fence all around site. Main entrance is a single point of entry, but not directly into Admin.,
The storm drain pipes in the quad area are old, clogged and do not function well and should be replaced City sewer main is located on site and is old and needs to be replaced, sewer pipes serving the existing houses east of the site are located on the school site - they are starting to fail, onsite school sewer pipes are old and starting to fail, all sewer pipes should be replaced, an irrigation valve between Building C and Citrus Avenue is too small and should be replaced
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
Gas Meter in good condition, Needs Earthquakee valve. Gas Distribution in good condition. (mostly in attic spaces). Remove old Boiler from Basement. Capture Storage space.
CITRUS ELEMENTARY
145
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A CLASSROOMS
BUILDING B KINDERGARTEN CLASSROOMS
BUILDING C ADMIN / CRS / MPR
BUILDING D CLASSROOMS LIBRARY
BUILDING E, F PORTABLES
BLDG COLOR ASSESSMENT 34,752
SQUARE FOOTAGE
A BUILDING EXTERIOR
A BUILDING INTERIOR A RESTROOMS
23,053
2,483
See building A
5,376
Condition - materials, Exterior skin - cement plaster repair / replace, painting, Soffit- wood windows, etc. Roofing - comp. shingle Doors: wood in HM frames Windows - single pane, wood windows Roof drainage - gutter w/ downspouts to grade Condition - finishes Doors - knob hardware (floor, wall, ceiling) Flooring - carpet / VCT casework, shades, etc. Walls: gyp. bd. Ceilings: 2 x 4 susp acous Lighting: 2x4 flourescent Sinks not ADA compliant
Exterior skin - plaster Soffit- mtl deck Roofing - built-up Doors: alum in alum frames Windows - alum storefront Roof drainage - no gutter / downspouts to grade
Same as Bldg A
Doors - knob hardware Flooring - carpet / VCT Walls: tackable. Ceilings: 2 x 4 susp acous Lighting: surf mtd flourescent Sinks not ADA compliant
Same as Bldg A
Fixtures, accessories, Classroom sinks non-compliant ADA compliant, finishes, Staff toilets non-compliant etc. Boys floor slope non-compliant
Sink non-compliant Toilet rooms non-compliant
Nurse toilet not compliant
Exterior skin - cement plaster Soffit- metal deck Roofing - built-up Fascia - metal Doors: alum in alum frames Windows - alum storefront Roof drainage - no gutter / downspouts to grade Doors: knob hardware Flooring: VCT Walls: gyp bd / markerboards; wood operable partition Ceilings: 2x4 susp acous-some damage Lighting: pendant flour Sinks not ADA compliant Sinks non-compliant
MPR, Libraries, Kitchens, Science, etc. A SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
146
A
ADA, Fire Life Safety, Structural - Must Do Items
CITRUS ELEMENTARY
DSA EB-3 / EB- 4, Required exits at the ends of corridor are nonaccessible
DSA EB-3 / EB- 4
MPR has in-wall tables, all finishes are worn, refrigerators & freezer located along back wall due to small are of Kitchen; stage is not accessible Kitchen has worn VCT flooring, inadequate space for all equipment. DSA EB-3 / EB- 4, Required exits at the ends of corridor are nonaccessible
DSA EB-3 / EB- 4
3,840
BUILDING CONDITIONS - ELECTRICAL (MISC) BUILDING SCOPE
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
PG&E electrical service in fenced exterior enclosure, 120/208V 1200A Cutler Hammer MSB is ~30 years old, servicable condition but approaching end of servicable life (up to 50 years). Yard includes unused HVAC equipment that should be removed to allow proper service of gear. 1200A may not be sufficient for future campus renovations if all-electric. Existing system, code compliant , Silent Knight 6820EVS control panel (added to serve addition of portables) is consistent with current district standards, but the replace vs retrofit, Voice Evac, etc. remainder of the campus includes old horns, pull stations, and is not compliant with current code.
E
System, headend, type (i.e. VOIP), Very old simplex system is beyond its servicable life and may not be properly funcitonal. replace vs retrofit
ELECTRICAL SYSTEMS LIGHTING AND LIGHTING CONTROLS
E E E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
INTENT OF SCOPE FOR PRICING Data infrastructure (i.e. 10GB) Carrier, location, size of space
Types of systems, hardware, CCTV, opening contacts, etc.
MISC
No intrusion alarm system in use. Cameras throughout the campus. No access controls.
Rooms and panels, code Most existing panels on campus are old and past their servicable life. Some fused gear 50+ years old observed in basement. Lots of compliant, receptacles, circuiting, surface raceways in classrooms. etc. Fixture types and conditions, Most interior lighting consists of older luminaires with T8 fluorescent lamps. Some LED exit signs observed, and 'bugeye' emergency efficiency, controls, life safety / lights that are no longer maintained. Lighting controls do not meet any current energy code requirements. There is no parking lot egress (Int/Ext) lighting (not really a parking lot). Exterior lighting consists of old CFL or HID wallpacks. IDF locations, sizes, infrastructure, MDF is located in teacher's lounge, it is not in a dedicated room with cooling. New fiber has been routed through the campus. cabling, # data drops per space, Horizontal cabling is a combination of CAT5E and CAT6. Limited upgrades have been completed. Pathway for low voltage systems is etc. primarily routed through ample attic space; some UG pathway. Classrooms have WAPs. Classroom technology, Most classrooms have a flat panel display. presentation spaces; i.e. conf rooms, library, MPR, etc.
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
INTENT OF SCOPE BUILDING A FOR PRICING CLASSROOMS Exterior Equipment - Multiple Outdoor Condensing Units Rooftop, wall mounted located in Chainlink Yards. +20 years BARD, etc. - condition old. Needs replacement.
BUILDING B KINDERGARTEN CLASSROOMS Multiple Outdoor Condensing Units located in Chainlink Yards. +20 years old. Needs replacement.
BUILDING C BUILDING D ADMIN / CRS / MPR CLASSROOMS LIBRARY MP and Kitchen served by Roof Roof mounted AC-Units (5)10 years mounted AC-Units (3) 8-10 years old. old with concentric SA/RD diffuser (noisey). SYSTEM TYPE, Boilers, Gas Fired Furnaces located in attic. Gas Fired Furnaces located in closets. MP and Kitchen served by Roof Classrooms / Libray served by Roof VRF, Pumps, Ducts, +20 years ols and needs replacement. +20 years ols and needs replacement. mounted AC-Units (3) 8-10 years mounted AC-Units (5)10 years old. diffusers, split systems, Good access to roof.OSA Hood on old with concentric SA/RD diffuser exhaust fans, etc. roof on courtyard side. (noisey). EMCS Type of Alerton Controls Alerton Controls Alerton Controls Alerton Controls system, web based / Programmable T-Stat? Plumbing Fixtures, ADA upgrade have been completed ADA upgrade have been completed ADA upgrade have been completed Plumbing Fixture are from original Restrooms, sinks, in the core Restrooms, Approximately in the core Restrooms, Approximately in the core Restrooms, Approximately construction. drinking fountains / 10-12 years ago. 10-12 years ago. 10-12 years ago. bottle fillers, etc. Gas, condnesation 10 year old gas fired Water Heater. Plumbing equipment is from the Plumbing equipment is from the Plumbing equipment is from the piping, water heaters, Ok condition. original construction. original construction. original construction. service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, No Automatic Fire Sprinkler Systems No Automatic Fire Sprinkler Systems No Automatic Fire Sprinkler Systems No Automatic Fire Sprinkler Systems code compliant, etc. found. found. found. found.
BUILDING E, F PORTABLES
Portables appear to be Wall Mounted Heat Pumps from the original construction. Stand alone Programmable T-Stat's. Plumbing Fixture are from original construction. Plumbing equipment is from the original construction.
No Automatic Fire Sprinkler Systems found.
EB-3, EB-4 triggers, etc.
CITRUS ELEMENTARY
147
EMMA WILSON ELEMENTARY SITE CONDITIONS A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
Drop off & parking area appears adequate. 2 drop off areas both need accessible loading zone
EXTERIOR SITE AMENITIES
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access
LED Marquee, flag pole & concrete monument sign. Playground equipment (not shaded), hardcourts, and,PV shade structure,. New Kinder play area hardcourt, shade structures & playstructure (shaded) New fencing with entry gates at various points. Does not have one point of entry directly into the Admin office.
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Some walkways along Buildings A, B and G do not meet ADA requirements
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
South vehicle parking area should be crack and slurry sealed
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
148
COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
P ALL
EMMA WILSON ELEMENTARY
SITE CONDITION ASSESSMENT
No comment
Areas that pond, drain inlets, retention needed, etc.
Poor drainage in quad area north of Building C and additional drainage needed, the vehicle parking area east of Buildings H and L floods during heavy storms, flooding of West 8th Avenue often occurs at the same time and it is suspected the issue could involve the city's drainage system
Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
The irrigation system has water hammer issues due to the connection to the CARD well, sewer pipes north of Building C have clogging issues and should be replaced
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
Gas Meter in good condition, Needs Earthquakee valve. Gas Distribution in good condition. (mostly in attic spaces). Constructed in 1993.
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A ADMIN / LIBRARY
BUILDING B CLASSROOMS
BUILDING C MULTI-PURPOSE
BUILDING D CLASSROOM
BUILDING E CLASSROOM
BUILDING F CLASSROOMS
BLDG COLOR ASSESSMENT 52,922
SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
BUILDING INTERIOR
A RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A
A
6,992
9,888
5,751
1,992
Condition - materials, Roof - Standing mtl seam. built up Roof - Standing mtl seam. built up Roof - Standing mtl seam. built up Roof - Standing mtl seam. built up repair / replace, painting, roof - replace with single ply roof - replace with single ply roof - replace with single ply roof - replace with single ply windows, etc. Roof Fascia - metal - paint Roof Fascia - metal - paint Roof Fascia - metal - paint Roof Fascia - metal - paint Roof Drains - Gutter & DS to SD Roof Drains - Gutter & DS to SD Roof Drains - Gutter & DS to SD Roof Drains - Gutter & DS to SD paint paint paint paint Soffit - cement plaster - paint Soffit - cement plaster - paint Soffit - cement plaster - paint Soffit - cement plaster - paint Walls - CMU Walls - CMU Walls - CMU Walls - T1-11 Door Landing - ADA Door Landing - ADA Door Landing - ADA Door Landing - ADA Door Threshold - ADA Door Threshold - ADA Door Threshold - ADA Door Threshold - ADA Doors/Frm/Hdwr - HM DR & FRM . Doors/Frm/Hdwr - HM DR & FRM . Doors/Frm/Hdwr - HM DR & FRM . Doors/Frm/Hdwr - HM DR & FRM . Lever handle, pulls & PH Lever handle, pulls & PH Lever handle, pulls & PH Lever handle, pulls Card Access - required Card Access - required Card Access - required Card Access - required Windows - HM Windows - HM Windows - HM Windows - Aluminum Sash Other - N/A Other - N/A Other - N/A Other - N/A Condition - finishes Space - Admin function is adeuate Space - Classroom function is Space - MP function is adeuate in Space - Classroom function is (floor, wall, ceiling) in existg space. Library is adequate in adeuate in existg space. existg space. adeuate in existg space. casework, shades, etc. existing space Walls - Gyp Bd, marker board & tack Walls - CMU, Gyp Bd, acoustical tile Walls - Gyp Bd, marker board & tack Walls - Gyp Bd, & tack board board - adequate - adequate board - adequate adequate Int Door/Frm/Hdwr - HM Frm & Int Door/Frm/Hdwr - HM Frm & Int Door/Frm/Hdwr - N/A Int Door/Frm/Hdwr - HM Frm & Wd Dr. Pulls, & Lever handle Wd Dr. Pulls, Lever handle, & PH. Flooring - carpet tile & VCT Wd Dr. Pulls, & Lever handle Flooring - carpet, VCT, sht Vinyl, & Bathroom Wd doors should be replace & update Flooring - carpet, VCT, sht Vinyl, & tile - replace & update replaced with HM Ceiling - 2x4 ACT replace tiles as tile - replace & update Ceiling - 2x4 ACT replace tiles as Flooring - VCT, sht Vinyl, & tile needed Ceiling - 1x1 accoustic, 2x4 ACT needed & Gyp Bd - paint replace & update Casework/Sink - Sink not ADA replace tiles as needed & Gyp Bd Casework/Sink - ADA Ceiling - 2x4 ACT replace tiles as Space Planning - N/A paint Space Planning - N/A needed & Gyp Bd - paint Other - N/A Casework/Sink - Sink not ADA Other - N/A Casework/Sink - ADA Space Planning - N/A Space Planning - N/A Other - N/A Other - N/A Fixtures, accessories, Multi Compartment bathroom - ADA Multi Compartment bathroom - ADA Multi Compartment bathroom - ADA ADA compliant, finishes, but needs update but needs update but needs update. Ceiling needs repair. etc. Single occupancy toilet - not ADA Drinking Fountain must be replaced Kithchen replace sheet vinyl floor with epoxy, hand washing sink Not ADA MPR, Libraries, Kitchens, Library space is adequate Science, etc.
4,800
1,992
Roof - Standing mtl seam. built up roof - replace with single ply Roof Fascia - metal - paint Roof Drains - Gutter & DS to SD paint Soffit - cement plaster - paint Walls - T1-11 Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - HM DR & FRM . Lever handle Card Access - required Windows - Aluminum Sash Other - N/A Space - Classroom function is adeuate in existg space. Walls - Gyp Bd, marker board & tack board - adequate Int Door/Frm/Hdwr - N/A Flooring - carpet tile & VCT replace & update Ceiling - 2x4 ACT replace tiles as needed Casework/Sink - Sink not ADA Space Planning - N/A Other - N/A
Roof - Standing mtl seam. built up roof - replace with single ply Roof Fascia - metal - paint Roof Drains - Gutter & DS to SD paint Soffit - cement plaster - paint Walls - T1-11 Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - HM DR & FRM . Lever handle Card Access - required Windows - Aluminum Sash Other - N/A Space - Classroom function is adeuate in existg space. Walls - Gyp Bd, marker board & tack board - adequate Int Door/Frm/Hdwr - N/A Flooring - carpet tile, VCT, tile replace & update Ceiling - 2x4 ACT replace tiles as needed Casework/Sink - Sink not ADA Space Planning - N/A Other - N/A
MP has a stage with chair lift and movable wall Kitchen function is adequate in existing space
ADA, Fire Life Safety, Structural - Must Do Items
EMMA WILSON ELEMENTARY
149
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING G KINDER CLASSROOMS
BUILDING H OLD KINDER CLASSROOMS
BUILDING J PORTABLES
BUILDING L KINDER CLASSROOMS
BLDG COLOR ASSESSMENT 9,888
SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
BUILDING INTERIOR A
Condition - materials, Roof - Standing mtl seam. built up roof - replace with repair / replace, painting, single ply windows, etc. Roof Fascia - metal - paint Roof Drains - Gutter & DS to SD - paint Soffit - cement plaster - paint Walls - CMU Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - HM DR & FRM . Lever handle Card Access - required Windows - HM Other - N/A Condition - finishes Space - Classroom function is adeuate in existg space. (floor, wall, ceiling) Walls - Gyp Bd, marker board & tack board - adequate casework, shades, etc. Int Door/Frm/Hdwr - HM Frm & Wd Dr. Pulls, & Lever handle Flooring - carpet, VCT, sht Vinyl, & tile - replace & update Ceiling - 2x4 ACT replace tiles as needed & Gyp Bd paint Casework/Sink - Sink not ADA Space Planning - N/A Other - N/A Fixtures, accessories, Multi Compartment bathroom - ADA but needs ADA compliant, finishes, update. Floor mounted grab bar needs to be removed. etc. Ceiling needs repair.
2,816
3,098
5,705
Roof - Standing mtl seam. built up roof - replace with To be Removed single ply Roof Fascia - metal - paint Roof Drains - Gutter & DS to SD - paint Soffit - cement plaster - paint Walls - CMU Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - HM DR & FRM . Lever handle Card Access - required Windows - HM Other - N/A Space - Classroom function is adeuate in existg space. To be Removed Walls - Gyp Bd, marker board & tack board - adequate Int Door/Frm/Hdwr - HM Frm & Wd Dr. Pulls, & Lever handle Flooring - carpet, VCT, sht Vinyl - replace & update Ceiling - 2x4 ACT replace tiles as needed & Gyp Bd paint Casework/Sink - Sink not ADA Space Planning - N/A Other - N/A
Roof - Standing Mtg Seam - new Roof Fascia - Metal - new Roof Drains - Gutter & DS to SD - new Soffit - metal deck & Wd beams - new Walls - CMU - new Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr -HM Frm & Dr. Lever handle, pulls & PH - new Card Access - installed Windows - Alumn storefront - new Other - N/A Space - Classrooms are adequate Walls - Gyp Bd, marker board & tack board - new Int Door/Frm/Hdwr - HM Frm & Wd Dr, PH, pulls, & Lever handle - new Flooring - carpet, sht Vinyl & epoxy - new Ceiling - 2x4 ACT & Gyp Bd - new Casework/Sink - ADA - new Space Planning - N/A Other - N/A
Single occupancy toilet - not ADA
Single occupancy toilets - ADA - new Class Sink - ADA -new
RESTROOMS
BUILDING CONDITIONS - ELECTRICAL (MISC) INTENT OF SCOPE FOR MISC PRICING Data infrastructure (i.e. 10GB) PG&E electrical service in securt exterior enclosure, 277/480V 1000A GE MSB is ~ years old and in servicable condition. 500kVA xfmr and 1600A 120/208V switchboard and PV equipment also in enclosure. E UTILITY MPOE/MDG Carrier, location, size of space Service is adequate for campus this size, last analysis prior to kinder wing addition peak demand was 151kW (under 200A). Campus has large PV array backfeeding the MSB. Existing system, code compliant , Silent Knight 6820EVS control panel was added during the Kinder Wing addition, which includes code required voice notification. The remainder of the campus is not compliant with current code, and is primarily E FIRE ALARM SYSTEM replace vs retrofit, Voice Evac, etc. a manual system and not addressible. CLOCK / INTERCOM / System, headend, type (i.e. VOIP), Clock/PA system is Valcom and meets current district standards for elementary schools. E SPEAKER replace vs retrofit ACCESS / INTRUSION systems, hardware, CCTV, Vista intrusion alarm system consisting of door contacts and motion sensors is in use but requires some re-programming. Cameras throughout the campus. No access controls. E Types of / SECURITY opening contacts, etc. Rooms and panels, code Gear is approximately 30 years old but generally in good condition. E compliant, receptacles, circuiting, ELECTRICAL SYSTEMS etc. Fixture types and conditions, With exception of new Kinder Wing, most interior lighting consists of older luminaires with T8 fluorescent lamps. Many parabolic luminaires which do not provide good lighting. Lighting controls in these areas do not LIGHTING AND E efficiency, controls, life safety / meet any current energy code requirements. There is no parking lot lighting (not really a parking lot). Exterior lighting consists of LED parking lot lighting and old CFL or HID wallpacks. LIGHTING CONTROLS egress (Int/Ext) IDF locations, sizes, infrastructure, For the most part adequate throughout campus. MDF is located in electrical room, it is adequate except there is no cooling. New fiber has been routed through the campus. Horizontal cabling is a combination of TECHNOLOGY E cabling, # data drops per space, CAT6 and CAT6A. THere is some UG pathway for low voltage systems. Classrooms have WAPs. SYSTEMS etc. Classroom technology, AV in most classrooms does not meet current district standards of flat panel display. E presentation spaces; i.e. conf AUDIVISUAL SYSTEMS rooms, library, MPR, etc. EMMA WILSON ELEMENTARY BUILDING SCOPE
150
A/E
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
A/E M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
INTENT OF SCOPE BUILDING A FOR PRICING ADMIN / LIBRARY Exterior Equipment - Roof Mounted AC Units, Approx. 7-8 Rooftop, wall mounted years old. Estimated 8 years of life BARD, etc. - condition expectancy. SYSTEM TYPE, Boilers, Existing ductwork is all original and in VRF, Pumps, Ducts, good condition. diffusers, split systems, exhaust fans, etc. EMCS Type of Johnson Controls system, web based / Programmable T-Stat? Plumbing Fixtures, Plumbing Fixtures are from original Restrooms, sinks, construction and in good condition. drinking fountains / bottle fillers, etc. Gas, condnesation Plumbing Equipment is from piping, water heaters, original construction and ready for service sinks, hose bibbs, replacement.. gas regaultors (seismic braced) Does AFS exist, location, No Automatic Fire Sprinkler Systems code compliant, etc. found.
BUILDING B CLASSROOMS Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy. Existing ductwork is all original and in good condition.
BUILDING C MULTI-PURPOSE Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy. Existing ductwork is all original and in good condition.
BUILDING D CLASSROOM Portables appear to be Wall Mounted Heat Pumps from the original construction. Portables appear to be Wall Mounted Heat Pumps from the original construction.
BUILDING E CLASSROOM Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy. Existing ductwork is all original and in good condition.
BUILDING F CLASSROOMS Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy. Existing ductwork is all original and in good condition.
Johnson Controls
Johnson Controls
Johson Controls
Johnson Controls
Johnson Controls
Plumbing Fixtures are from original construction and in good condition.
Plumbing Fixtures are from original construction and in good condition.
Plumbing Fixtures are from original construction and in good condition.
Plumbing Fixtures are from original construction and in good condition.
Plumbing Fixtures are from original construction and in good condition.
Plumbing Equipment is from original construction and ready for replacement..
Plumbing Equipment is from original construction and ready for replacement..
Plumbing Equipment is from original construction and ready for replacement..
Plumbing Equipment is from original construction and ready for replacement..
Plumbing Equipment is from original construction and ready for replacement..
No Automatic Fire Sprinkler Systems found.
FS are present in Kitchen Area and support Spaces. From original construction.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
EB-3, EB-4 triggers, etc.
EMMA WILSON ELEMENTARY
151
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
152
A/E M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
INTENT OF SCOPE BUILDING G FOR PRICING KINDER CLASSROOMS Exterior Equipment - Roof Mounted AC Units, Approx. 7-8 Rooftop, wall mounted years old. Estimated 8 years of life BARD, etc. - condition expectancy. SYSTEM TYPE, Boilers, Existing ductwork is all original and in VRF, Pumps, Ducts, good condition. diffusers, split systems, exhaust fans, etc. EMCS Type of Johnson Controls system, web based / Programmable T-Stat? Plumbing Fixtures, Plumbing Fixtures are from original Restrooms, sinks, construction and in good condition. drinking fountains / bottle fillers, etc. Gas, condnesation Plumbing Equipment is from piping, water heaters, original construction and ready for service sinks, hose bibbs, replacement.. gas regaultors (seismic braced) Does AFS exist, location, No Automatic Fire Sprinkler Systems code compliant, etc. found. EB-3, EB-4 triggers, etc.
EMMA WILSON ELEMENTARY
BUILDING H KINDER CLASSROOMS Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy. Existing ductwork is all original and in good condition.
BUILDING J PORTABLES Portables appear to be Wall Mounted Heat Pumps from the original construction. Existing ductwork is all original and in good condition.
BUILDING L KINDER CLASSROOMS Portables appear to be Wall Mounted Heat Pumps from the original construction. Existing ductwork is all original and in good condition.
Johnson Controls
Stand alone Programmable T-Stat's.
Stand alone Programmable T-Stat's.
Plumbing Fixtures are from original construction and in good condition.
Plumbing Fixtures are from original construction and in good condition.
Plumbing Fixtures are from original construction and in good condition.
Plumbing Equipment is from original construction and ready for replacement..
Plumbing Equipment is from original construction and ready for replacement..
Plumbing Equipment is from original construction and ready for replacement..
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
MARIGOLD ELEMENTARY SITE CONDITIONS COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
Main parking lot is new with ADA parking & drop off
EXTERIOR SITE AMENITIES
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access
Play ground, hardcourt and play structures are new. Flag pole and monument sign are new. No marquee sign. New CMU trash enclosure
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
New campus
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
New campus
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
P
SITE CONDITION ASSESSMENT
Campus perimeter is fully fenced with and the campus has a single point of access through the Administration office.
New campus
New campus
Areas that pond, drain inlets, retention needed, etc.
New campus
Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
New campus
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
ALL
MARIGOLD ELEMENTARY
153
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A ADMIN / MULTI-PURPOSE New Building 2018
BUILDING B KINDER CLASSROOMS (E) Bldg w/ Deep Mod 2018
BUILDING C CLASSROOMS (E) Bldg w/ Deep Mod 2018
BUILDING D CLASSROOMS (E) Bldg w/ Deep Mod & Addition 2018
BUILDING E LCASSROOMS / MEDIA CNETER New Building 2018
13,776
5,554
4,516
4,200
10,891
Condition - materials, Roof - Single ply - new Roof - Asphalt shingle - new repair / replace, painting, Roof Fascia - N/A Roof Fascia - Wood windows, etc. Roof Drains - Roof Drain to DS to Roof Drains - Gutters to DS to SD SD - new - new Soffit - fiber cement soffit panel - new Soffit -Nichiha - T&G Walls - Nichiha & CMU block - new Walls - CMU block Door Landing - ADA ok Door Landing - ADA ok Door Threshold - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr - HM Frm & alumn Doors/Frm/Hdwr -HM Dr & Frm. Storefront. PH, pull, Lever handle PH, pull, Lever handle - new new Card Access - installed Card Access - installed Windows - Alumn storefront - new Windows - Alumn storefront - new Other - N/A Other - N/A
Roof - Asphalt shingle - new Roof Fascia - Wood Roof Drains - Gutters to DS to SD - new Soffit -Nichiha - T&G Walls - CMU block Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr -Aluminum Storefront Dr & HM Dr & Frm. PH, pull, Lever handle - new Card Access - installed Windows - Alumn storefront - new Other - N/A
Roof - Asphalt shingle - new Roof Fascia - Wood Roof Drains - Gutters to DS to SD - new Soffit -Nichiha - T&G Walls - CMU block Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr -Aluminum Storefront Dr & HM Dr & Frm. PH, pull, Lever handle - new Card Access - installed Windows - Alumn storefront - new Other - N/A
Roof - Single Ply - new Roof Fascia - N/A Roof Drains - Roof drains to DS to SD - new Soffit -Nichiha - fiber cement soffit panel - new Walls - Nichiha - new Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr -Aluminum Storefront Dr & HM Dr & Frm. PH, pull, Lever handle - new Card Access - installed Windows - Alumn storefront - new Other - N/A
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
Space - Function is adeuate in existg space Walls - Gyp Bd, Tack board, Magnetic marker laminate board, tile - new Int Door/Frm/Hdwr - HM Frm & Wd. Lever handle - new Flooring - Carpet tile, Vinyl tile, Epoxy - new Ceiling - 2x4 ACT, Gyp Bd - new Casework/Sink - ADA ok, new Space Planning - N/A Other - N/A
Space - Function is adeuate in existg Space - Function is adeuate in existg Space - Function is adeuate in existg space space space Walls - Gyp Bd, Tack board, Magnetic Walls - Gyp Bd, Tack board, Magnetic Walls - Gyp Bd, Tack board, Magnetic marker laminate board, tile - new marker laminate board, tile - new marker laminate board, tile - new Int Door/Frm/Hdwr - HM Frm & Wd. Int Door/Frm/Hdwr - HM Frm & Wd. Int Door/Frm/Hdwr - HM Frm & Wd. Lever handle - new Lever handle - new Lever handle - new Flooring - Carpet tile, Vinyl tile, Flooring - Carpet tile, Vinyl tile, Flooring - Carpet tile, Vinyl tile, Epoxy - new Epoxy - new Epoxy - new Ceiling - 2x4 ACT, Gyp Bd - new Ceiling - 2x4 ACT, Gyp Bd - new Ceiling - 2x4 ACT, Gyp Bd - new Casework/Sink - ADA ok, new Casework/Sink - ADA ok, new Casework/Sink - ADA ok, new Space Planning - N/A Space Planning - N/A Space Planning - N/A Other - N/A Other - N/A Other - N/A
Single Occup toilets room - ADA ok - new
Single Occup toilets room - ADA ok - new
BLDG COLOR ASSESSMENT 38937
SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
154
A A A
Space - Function is adeuate in existg space Walls - Gyp Bd, Tack board, Magnetic marker laminate board, tile - new Int Door/Frm/Hdwr - HM Frm & Wd. Lever handle - new Flooring - Carpet tile, Sht vinyl, Vinyl tile, Tile, Epoxy - new Ceiling - 2x4 ACT, Gyp Bd, Exposed deck- new Casework/Sink - ADA ok, new Space Planning - N/A Other - N/A
Fixtures, accessories, Single Occup toilets room , Multi ADA compliant, finishes, Compartment bathroom - ADA ok etc. - new MPR, Libraries, Kitchens, MP with accessible stage - new Science, etc. Kitchen & Servery - new ADA, Fire Life Safety, Structural - Must Do Items
MARIGOLD ELEMENTARY
Has separate enclosed play area with play structure
Single Occup toilets room , Multi Compartment bathroom - ADA ok - new Library - new
HOOKER OAK ELEMENTARY SITE CONDITIONS COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
A shared bus / parent drop-off area is provided, not ADA compliant. No trash enclosure is provided
EXTERIOR SITE AMENITIES
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access
Hardcourt paving is in poor condition, Kinder play structure is shaded, no bike racks were found, flag pole is provided, manual lettering message sign provided.
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Some walkways along Buildings A, C and E with slopes exceeding standards, pedestrian ramp and curb ramp along 3rd Avenue exceeding standards
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Vehicle parking area should be crack and slurry sealed, asphalt play area is cracked and should be replaced
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
P ALL
Areas that pond, drain inlets, retention needed, etc. Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
SITE CONDITION ASSESSMENT
The campus is secured with a fence around the campus. There are multiple access into the main building from the street, no direct access into Admin.
Slurry seal, replace striping and pavement markings and signs
The storm drain connection from onsite to offsite is located along Arbutus Avenue, it has continual maintenance issues and is difficult to access and should be modified/replaced, there is poor drainage between Buildings B and C and a new drainage system should be installed All onsite water pipes are old and should be replaced
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
Gas Meter in good condition, Needs Earthquakee valve. Gas Distribution piping is in poor condition and need full replacement. Located on roof, and not secured per code. Original 1948 construction. Remove old Boiler from Basement. Capture Storage Space of approx. 1200 sf..
HOOKER OAK ELEMENTARY
155
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A CLASSROOMS
BUILDING B CLASSROOMS
BUILDING C CLASSROOMS / LIBRARY
BUILDING E ADMIN / MPR / KINDER CR
BUILDING D, F, G, H PORTABLES
BLDG COLOR ASSESSMENT 40,930
SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
5,652
see building A
Condition - materials, Exterior skin - cem plaster Same as A repair / replace, painting, Soffit- cement plaster windows, etc. Fascias - wood, poor condition Roofing - composition shingle Doors -wd. doors in wd. Frames, knob hardware, no ADA compliant threshold Windows - single pane, metal sash w/ wood trim, poor condition Roof drainage - gutter / downspouts to grade
Same as A
Same as A
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
Flooring - VAT, Abate & Replace Walls - cement plaster & plywd. Ceiling -1x1 acous tile Lighting - pendant hung flourescent Sinks- not ADA compliant
Flooring - VCT, worn, Replace Walls - concrete Ceiling -2x4 susp acous tile panels Lighting - 2x4 Flourescent lay-in Door Hardware - old panic barReplace
Library is classroom size, undersized, tables and chairs do not have sufficient space, all hard surfaces, VCT flooring, plaster walls, 1x1 ceiling acous. tile
MP- stage not ADA accessible, in-wall tables Kitchen- very tight, poor access to servery and queue to servery into corridor or from back doorineffecient layout. DSA EB-3 / EB- 4, Admin office small & non-accessible
BUILDING INTERIOR RESTROOMS
A
28,617
Flooring - VCT, worn, Replace Walls - concrete Ceiling -2x4 acous tile Lighting - 2x4 lay-in flourescent Sinks- not ADA compliant
see building A
Same as A
Fixtures, accessories, Restrooms are fairly large, finishes ADA compliant, finishes, need refresh, sufficient area for any etc. ADA upgrades necessary. MPR, Libraries, Kitchens, Science, etc.
Same as A
ADA, Fire Life Safety, Structural - Must Do Items
DSA EB-3 / EB- 4
A SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
156
A
HOOKER OAK ELEMENTARY
DSA EB-3 / EB- 4
DSA EB-3 / EB- 4
6,661
BUILDING CONDITIONS - ELECTRICAL (MISC) BUILDING SCOPE
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
PG&E electrical service feeds ancient gear with multiple meters, located in a basement. None of the gear is servicable, and presents a worker safety issue due to lack of code required clearance. A separate ~30yo 1000A 277/480V service for HVAC is installed at exterior, in servicable but poor condition. Existing system, code compliant , Older Silent Knight 5208 FACP with pull stations, did not observe smoke detectors, there may be some pull stations. Does not meet replace vs retrofit, Voice Evac, etc. any current code requirements. A Wheelock voice system was added on to accommodate addition of portables.
E
System, headend, type (i.e. VOIP), Older Bogen Multicom 2000 in MDF room, not per current standards. Old clocks. replace vs retrofit
ELECTRICAL SYSTEMS LIGHTING AND LIGHTING CONTROLS
E E E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
INTENT OF SCOPE FOR PRICING Data infrastructure (i.e. 10GB) Carrier, location, size of space
Types of systems, hardware, CCTV, opening contacts, etc.
MISC
No intrusion alarm system in use. Cameras throughout the campus. No access controls.
Rooms and panels, code Very old gear (60 years or older) observed throughout campus. All panelboards are full, no spare breakers, and limited branch compliant, receptacles, circuiting, circuiting to support modern instructional requirements. Some of the wiring is exposed with cloth sheathing, which has not been code etc. compliant in a very long time. Lots of surface raceways in classrooms. Fixture types and conditions, Most interior lighting consists of older luminaires with T8 fluorescent lamps. In general most spaces are underlit to the point of being efficiency, controls, life safety / unsafe. Lighting controls do not meet any current energy code requirements. Exterior lighting consists of LED parking lot lights and egress (Int/Ext) CFL wallpacks. IDF locations, sizes, infrastructure, Newer MDF has been located in storage room; not a dedicated space, no cooling. Somne recent upgrades to cabling. IDF cabinets are cabling, # data drops per space, located in classrooms, which is not ideal. Pathway is routed through attic space, but concrete walls make routing extremely difficult. etc. Classroom technology, Most classrooms have a flat panel display. presentation spaces; i.e. conf rooms, library, MPR, etc.
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
A/E M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
INTENT OF SCOPE BUILDING A FOR PRICING CLASSROOMS Exterior Equipment Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, Duct distribution is approx. 20 years VRF, Pumps, Ducts, old. Classrooms diffusers, split systems, exhaust fans, etc. EMCS Type of Delta Controls. Needs updating. system, web based / Programmable T-Stat? Plumbing Fixtures, Plumbing Fixture are from original Restrooms, sinks, construction and needs to be drinking fountains / replaced and update to beet ADA bottle fillers, etc. requirements. Gas, condnesation Plumbing equipment is from the piping, water heaters, original construction and needs service sinks, hose bibbs, full replacement. Hallway Drinking gas regaultors (seismic Fountains are approx. 8 years old. braced) Does AFS exist, location, No Automatic Fire Sprinkler Systems code compliant, etc. found.
BUILDING B CLASSROOMS
BUILDING C CLASSROOMS / LIBRARY
BUILDING E ADMIN / MPR / KINDER CR
BUILDING D, F, G PORTABLES
Duct distribution is approx. 20 years old. Classrooms
Duct distribution is approx. 10 years old. Classrooms
Duct distribution is approx. 20 years old. Classrooms
duct distribution is from original construction.
Delta Controls. Needs updating.
Delta Controls. Needs updating.
Delta Controls. Needs updating.
Stand alone Programmable T-Stat
Plumbing Fixture are from original construction and needs to be replaced and update to beet ADA requirements. Plumbing equipment is from the original construction and needs full replacement.
Plumbing Fixture are from original construction and needs to be replaced and update to beet ADA requirements. Plumbing equipment is from the original construction and needs full replacement.
Plumbing Fixture are from original construction and needs to be replaced and update to beet ADA requirements. Plumbing equipment is from the original construction and needs full replacement.
Plumbing Fixture are from original construction.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
Plumbing equipment is from original construction.
HOOKER OAK ELEMENTARY
157
LITTLE CHICO CREEK ELEMENTARY SCHOOL SITE CONDITIONS CAMPUS SITE SCOPE
A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
EXTERIOR SITE AMENITIES
A
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
158
A
P
COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
SITE CONDITION ASSESSMENT
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Some walkways along buildings do not meet ADA slopes
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Vehicle areas should be crack and slurry sealed.
Areas that pond, drain inlets, retention needed, etc. Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
Striping and pavement markings are fading and should be re-applied, some signage and pavement markings do not comply with standards
No known issues The irrigation system along Amanda Way was damaged and has been abandoned and needs to be replaced.
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
ALL
LITTLE CHICO CREEK ELEMENTARY SCHOOL
Gas Meter is located in the exterior equipment yard and in good condition. The Mechanical System is a two-pipe Heating / Cooling System. Commonly know as a Changeover System.
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A MULTI-PURPOSE
BUILDING B ADMINISTRATION
BUILDING C LIBRARY
BUILDING D SPED CLASSROOMS
BUILDING E CLASSROOMS
BUILDING F KINDER CLASSROOMS
BLDG COLOR ASSESSMENT 44,523
SQUARE FOOTAGE
7,327
3,006
3,978
3,006
2,250
5,503
Condition - materials, Same as Bldg. F repair / replace, painting, windows, etc.
Same as Bldg. F
Same as Bldg. F
Same as Bldg. F
Same as Bldg. F
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
Doors - Lever hardware Flooring - Carpet Walls: Gyp. bd. Ceilings: 1x1 acous. tile Lighting: 2x4 surf. Mounted flour. Nurse: VCT flooring, sink is not ADA compliant, toilet room is ADA compliant.
Same as Bldg. F
Same as Bldg. F
Same as Bldg. F
Ext. Finish: Cement Plaster with tile wainscot Doors: Hollow metal doors and frames Thresholds: Not ADA compliant Roofing: Composite shingle Roof Drainage: Gutter with pipe downspout connected to storm drain Doors - Lever hardware Flooring - Carpet / VCT Walls: Tackable panels Ceilings: 2x4 acous. tile Lighting: 2x4 flour lay-in
Nurse and Staff toilet rms appear ADA compliant.
Student restrooms typically do not have ADA compliant threshold. Restroom interiors are tile floor and walls in good condition. Fixtures are generally compliant with ADA.
A BUILDING EXTERIOR
A BUILDING INTERIOR
Doors - Lever hardware Flooring - damged VCT Walls: Acous. Panels & gyp. bd., in-wall tables Ceilings: 1 x1 acous. tile Lighting:uplight flour. Sinks not ADA compliant Refrigerator and service carts stored along walls, no room in Kitchen for storage.
A
Fixtures, accessories, ADA compliant, finishes, etc.
SPECIALITY SPACES REVIEW
A
MPR, Libraries, Kitchens, Kitchen sht vinyl flooring worn Science, etc.
DSA CODE COMPLIANCE ITEMS
A
ADA, Fire Life Safety, Structural - Must Do Items
RESTROOMS
Student restrooms in classrooms are ADA compliant.
Stage is not accessible. Drinking fountains not ADA compliant.
LITTLE CHICO CREEK ELEMENTARY SCHOOL
159
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BLDG COLOR ASSESSMENT SQUARE FOOTAGE BUILDING EXTERIOR
BUILDING G CLASSROOMS
2,250
A
Condition - materials, Same as Bldg. F repair / replace, painting, windows, etc. Condition - finishes Same as Bldg. F (floor, wall, ceiling) casework, shades, etc.
A
Fixtures, accessories, ADA compliant, finishes, etc.
A
BUILDING L CLASSROOMS
BUILDING M CLASSROOMS
BUILDING N CLASSROOMS
2,250
5,023
2,250
Same as Bldg. F
Same as Bldg. F
Same as Bldg. F
Same as Bldg. F
Same as Bldg. F
Same as Bldg. F
BUILDING INTERIOR
RESTROOMS DSA CODE COMPLIANCE ITEMS
A
Student restrooms typically do not have ADA compliant threshold. Restroom interiors are tile floor and walls in good condition. Fixtures are generally compliant with ADA.
ADA, Fire Life Safety, Structural - Must Do Items
Extreme cross slope in the path of travel between Bldgs. G, H, L and K
BUILDING CONDITIONS - ELECTRICAL (MISC) BUILDING SCOPE
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
ELECTRICAL SYSTEMS LIGHTING AND LIGHTING CONTROLS
160
E
INTENT OF SCOPE FOR MISC PRICING Data infrastructure (i.e. 10GB) PG&E electrical service in exterior yard with dumpsters, HVAC equipment, etc. 277/480V 1600A Cutler Hammer MSB is ~25-30 Carrier, location, size of space years old, servicable condition (and has been serviced recently). MSB is adequately sized for a campus of this size, and is backfed by a PV system, PVs are installed on the roof. Existing system, code compliant Most of campus is on the Edwards 6632 FACP, which is monitored by a newer Silent Knight 5208 panel. Most of the campus includes , replace vs retrofit, Voice Evac, old horns, pull stations, and is not compliant with current code. No voice. etc. System, headend, type (i.e. The campus has been upgraded to Valcom IP, which is consistent with current district standards. VOIP), replace vs retrofit
E
Types of systems, hardware, CCTV, opening contacts, etc.
E E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
Existing intrusion alarm system is older but still in use. Cameras throughout the campus. No access controls.
Rooms and panels, code Most existing panels on campus are older but in servicable condition. Surface raceways in classrooms. compliant, receptacles, circuiting, etc. Fixture types and conditions, Most interior lighting consists of luminaires with T8 fluorescent lamps. Pendant lighting in classrooms. Lighting controls do not meet efficiency, controls, life safety / any current energy code requirements. Exterior lighting consists of LED parking lot lights and CFL wallpacks. egress (Int/Ext) IDF locations, sizes, MDF is located in library, it is not in a dedicated room with cooling. New fiber has been routed through the campus. Horizontal infrastructure, cabling, # data cabling is CAT6 and relatively new. Pathway between buildings is 'daisy chained' which is not good for connecting to central MDF. drops per space, etc. Classrooms have WAPs. Classroom technology, Most classrooms have a flat panel display or projector. presentation spaces; i.e. conf rooms, library, MPR, etc.
LITTLE CHICO CREEK ELEMENTARY SCHOOL
BUILDINGS H, I, J, K PERM MODULAR/ PORTABLES
7680
Ext. Finish: Cement Plaster with tile wainscot Doors: Hollow metal doors and frames Thresholds: Not ADA compliant Roofing: Composite shingle Roof Drainage: Gutter with pipe downspout connected to storm drain Doors - Lever hardware Flooring - carpet / VCT Walls: Tackable panels Ceilings: 2 x 4 susp acous Lighting: 2x4 flourescent Sinks not ADA compliant
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P
M/P
M/P
S
INTENT OF SCOPE BUILDING A BUILDING B BUILDING C BUILDING D BUILDING E BUILDING F FOR PRICING MULTI-PURPOSE ADMINISTRATION LIBRARY SPED CLASSROOMS CLASSROOMS KINDER CLASSROOMS Exterior Equipment - The Interior Servel Air Handling Units The Interior Servel Air Handling Units The Interior Servel Air Handling Units The Interior Servel Air Handling Units The Interior Servel Air Handling Units The Interior Servel Air Handling Units Rooftop, wall mounted are original to the construction and are original to the construction and are original to the construction and are original to the construction and are original to the construction and are original to the construction and BARD, etc. - condition are expected to last appro. 8-10 years are expected to last appro. 8-10 years are expected to last appro. 8-10 years are expected to last appro. 8-10 years are expected to last appro. 8-10 years are expected to last appro. 8-10 years with a recommendation to have the with a recommendation to have the with a recommendation to have the with a recommendation to have the with a recommendation to have the with a recommendation to have the coils cleaned now. coils cleaned now. coils cleaned now. coils cleaned now. coils cleaned now. coils cleaned now. SYSTEM TYPE, Boilers, The Main componest of this two The Main componest of this two The Main componest of this two The Main componest of this two The Main componest of this two The Main componest of this two VRF, Pumps, Ducts, pipe system are Boilers, Chiller, and pipe system are Boilers, Chiller, and pipe system are Boilers, Chiller, and pipe system are Boilers, Chiller, and pipe system are Boilers, Chiller, and pipe system are Boilers, Chiller, and diffusers, split systems, Cooling Towres have recently been Cooling Towres have recently been Cooling Towres have recently been Cooling Towres have recently been Cooling Towres have recently been Cooling Towres have recently been exhaust fans, etc. replaced and in good condition. replaced and in good condition. replaced and in good condition. replaced and in good condition. replaced and in good condition. replaced and in good condition. Distribution Pumps are at the end of Distribution Pumps are at the end of Distribution Pumps are at the end of Distribution Pumps are at the end of Distribution Pumps are at the end of Distribution Pumps are at the end of life and in need of replacement. life and in need of replacement. life and in need of replacement. life and in need of replacement. life and in need of replacement. life and in need of replacement. EMCS Type of Johnson Control w/ Delta Johnson Control w/ Delta Johnson Control w/ Delta Johnson Control w/ Delta Johnson Control w/ Delta Johnson Control w/ Delta system, web based / Communication Module - Good Communication Module - Good Communication Module - Good Communication Module - Good Communication Module - Good Communication Module - Good Programmable T-Stat? Condition. Condition. Condition. Condition. Condition. Condition. Plumbing Fixtures, Plumbing Fixtures are of the original Plumbing Fixtures are of the original Plumbing Fixtures are of the original Plumbing Fixtures are of the original Plumbing Fixtures are of the original Plumbing Fixtures are of the original Restrooms, sinks, construction and in good condition. construction and in good condition. construction and in good condition. construction and in good condition. construction and in good condition. construction and in good condition. drinking fountains / bottle fillers, etc. Gas, condnesation Plumbing Equipment is mostly from Water Heater in Adminstration has Plumbing Equipment is mostly from Plumbing Equipment is mostly from Plumbing Equipment is mostly from Plumbing Equipment is mostly from piping, water heaters, the original construction and is at the recently been replaced. the original construction and is at the the original construction and is at the the original construction and is at the the original construction and is at the service sinks, hose bibbs, end of life. end of life. end of life. end of life. end of life. gas regaultors (seismic braced) Does AFS exist, location, code compliant, etc. EB-3, EB-4 triggers, etc.
LITTLE CHICO CREEK ELEMENTARY SCHOOL
161
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)
162
BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P
M/P
M/P
S
INTENT OF SCOPE BUILDING G BUILDING L BUILDING M BUILDING N BUILDINGS H, I, J, K FOR PRICING CLASSROOMS CLASSROOMS CLASSROOMS CLASSROOMS PERM MODULAR/ PORTABLES Exterior Equipment - The Interior Servel Air Handling Units The Interior Servel Air Handling Units The Interior Servel Air Handling Units The Interior Servel Air Handling Units Wall Mounted Heat Pumps in good Rooftop, wall mounted are original to the construction and are original to the construction and are original to the construction and are original to the construction and conditions BARD, etc. - condition are expected to last appro. 8-10 years are expected to last appro. 8-10 years are expected to last appro. 8-10 years are expected to last appro. 8-10 years with a recommendation to have the with a recommendation to have the with a recommendation to have the with a recommendation to have the coils cleaned now. coils cleaned now. coils cleaned now. coils cleaned now. SYSTEM TYPE, Boilers, The Main componest of this two The Main componest of this two The Main componest of this two The Main componest of this two VRF, Pumps, Ducts, pipe system are Boilers, Chiller, and pipe system are Boilers, Chiller, and pipe system are Boilers, Chiller, and pipe system are Boilers, Chiller, and diffusers, split systems, Cooling Towres have recently been Cooling Towres have recently been Cooling Towres have recently been Cooling Towres have recently been exhaust fans, etc. replaced and in good condition. replaced and in good condition. replaced and in good condition. replaced and in good condition. Distribution Pumps are at the end of Distribution Pumps are at the end of Distribution Pumps are at the end of Distribution Pumps are at the end of life and in need of replacement. life and in need of replacement. life and in need of replacement. life and in need of replacement. EMCS Type of Johnson Control w/ Delta Johnson Control w/ Delta Johnson Control w/ Delta Johnson Control w/ Delta Stand alone Programmable T-Stat's. system, web based / Communication Module - Good Communication Module - Good Communication Module - Good Communication Module - Good Programmable T-Stat? Condition. Condition. Condition. Condition. Plumbing Fixtures, Plumbing Fixtures are of the original Plumbing Fixtures are of the original Plumbing Fixtures are of the original Plumbing Fixtures are of the original Plumbing Fixture is mostly from the Restrooms, sinks, construction and in good condition. construction and in good condition. construction and in good condition. construction and in good condition. original construction and is in ok drinking fountains / condition. bottle fillers, etc. Gas, condnesation Plumbing Equipment is mostly from Plumbing Equipment is mostly from Plumbing Equipment is mostly from Plumbing Equipment is mostly from Plumbing Equipment is mostly from piping, water heaters, the original construction and is at the the original construction and is at the the original construction and is at the the original construction and is at the the original construction and is in ok service sinks, hose bibbs, end of life. end of life. end of life. end of life. condition. gas regaultors (seismic braced) Does AFS exist, location, code compliant, etc. EB-3, EB-4 triggers, etc.
LITTLE CHICO CREEK ELEMENTARY SCHOOL
MCMANUS ELEMENTARY SCHOOL
Campus and building currently undergoing modernization. New construction in progress and all existing buildings to remain to be upgraded
MCMANUS ELEMENTARY SCHOOL
163
NEAL DOW ELEMENTARY SCHOOL SITE CONDITIONS A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
New drop off, parking area appears to need a slurry coat.
EXTERIOR SITE AMENITIES
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access
New LED Marquee, flag pole, playground equipment (not shaded), hardcourts, and shade structure,& PV shade structure.
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
new campus
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
new campus
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
164
COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
P
SITE CONDITION ASSESSMENT
New fencing with one point of entry directly into the Admin office.
new campus
new campus
Areas that pond, drain inlets, retention needed, etc.
new campus
Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
new campus
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
ALL
NEAL DOW ELEMENTARY SCHOOL
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BLDG COLOR ASSESSMENT 49,305
SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
BUILDING INTERIOR A RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A
New Modernization
New Modernization
BUILDING C LIBRARY / KINDER CLASSROOMS New Modernization
17,491
2,598
10,455
4,134
3,348
Roof - Single ply - new Roof Fascia - (E) metal - new paint Roof Drains - Gutter & DS to SD new paint Soffit - metal deck & Wd beams new paint Walls - (E) conc. - portions new paint Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - Aluminum storefront Lever handle, pulls & PH new Card Access - installed Windows - Alumn storefront - new Other - N/A Space - Library & classrooms are adequate in existing space - newly modernized Walls - Gyp Bd, marker laminent & tack board - new Int Door/Frm/Hdwr - HM Frm & Wd Dr, PH, pulls, & Lever handle new Flooring - carpet, sht Vinyl & epoxy - new Ceiling - 2x4 ACT & Gyp Bd - new Casework/Sink - ADA - new Space Planning - N/A Other - N/A
Roof - Standing seam mtl - new Roof Fascia - mtl - new Roof Drains - Gutter & DS to SD new Soffit - Fiber cement - new Walls - Fiber cement & CMU - new Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - Aluminum storefront & HM DR & FRM - new. Lever handle - new Card Access - installed Windows - Alumn storefront - new Other - N/A
Roof - Standing seam mtl - new Roof Fascia - mtl - new Roof Drains - Gutter & DS to SD new Soffit - Fiber cement - new Walls - Fiber cement & CMU - new Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - Aluminum storefront & HM DR & FRM - new. Lever handle - new Card Access - installed Windows - Alumn storefront - new Other - N/A
Single occupancy toilet - ADA - new Class Sink - ADA -new
Multi Compartment bathroom - ADA -new Single occupancy toilet - ADA - new Class Sink - ADA -new
BUILDING A ADMIN / CLASSROOMS
BUILDING B KINDER CLASSROOMS
Condition - materials, Roof - Single ply - new Roof - Single ply - new repair / replace, painting, Roof Fascia - (E) metal - new paint Roof Fascia - (E) metal - new paint windows, etc. Roof Drains - Gutter & DS to SD Roof Drains - Gutter & DS to SD new paint new paint Soffit - metal deck & Wd beams Soffit - metal deck & Wd beams new paint new paint Walls - (E) conc - portions new paint Walls - (E) conc. - portions new paint Door Landing - ADA Door Landing - ADA Door Threshold - ADA Door Threshold - ADA Doors/Frm/Hdwr - Aluminum Doors/Frm/Hdwr - Aluminum storefront & HM DR & FRM - new. storefront Lever handle, pulls & PH Lever handle, pulls & PH - new new Card Access - installed Card Access - installed Windows - Alumn storefront - new Windows - Alumn storefront - new Other - N/A Other - N/A Condition - finishes Space - Admin function is adeuate in Space - classrooms are adequate in (floor, wall, ceiling) existg space, classrooms are adequate existing space - newly modernized casework, shades, etc. in existing space - newly modernized Walls - Gyp Bd, marker laminent & Walls - Gyp Bd, marker laminent & tack board - new tack board - new Int Door/Frm/Hdwr - HM Frm & Int Door/Frm/Hdwr - HM Frm & Wd Dr, PH, pulls, & Lever handle Wd Dr, PH, pulls, & Lever handle new new Flooring - sht Vinyl & epoxy - new Flooring - carpet & sht Vinyl, epoxy Ceiling - 1x1 accoustical tile & Gyp - new Bd - new Ceiling - 2x2, 2x4 ACT & Gyp Bd Casework/Sink - ADA - new new Space Planning - N/A Casework/Sink - ADA - new Other - N/A Space Planning - N/A Other - N/A Fixtures, accessories, Multi Compartment bathroom - ADA Single occupancy toilet - ADA - new ADA compliant, finishes, -new Class Sink - ADA -new etc. Single occupancy toilet - ADA - new Class Sink - ADA -new MPR, Libraries, Kitchens, Science, etc.
New Library modernization
BUILDING D CLASSROOMS
BUILDING E CLASSROOMS
BUILDING F MULTI-PURPOSE
New Building
New Building
New Building 11,280
Roof - Standing seam mtl & Single Ply - new Roof Fascia - mtl - new Roof Drains - Gutter & DS to SD new Soffit - Fiber cement - new Walls - Fiber cement & CMU - new Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - Aluminum storefront & HM DR & FRM - new. Lever handle - new Card Access - installed Windows - Alumn storefront - new Other - N/A Space - classrooms are adequate Space - classrooms are adequate and Space - function is adeuate in existg and functional functional space, classrooms are adequate Walls - Gyp Bd, marker laminent & Walls - Gyp Bd, marker laminent & Walls - Gyp Bd, marker laminent & tack board - new tack board - new tack board - new Int Door/Frm/Hdwr - PH & Lever Int Door/Frm/Hdwr - PH & Lever Int Door/Frm/Hdwr - PH & Lever handle - new handle - new handle - new Flooring - carpet & sht Vinyl, epoxy Flooring - carpet & sht Vinyl, epoxy Flooring - sht Vinyl & epoxy - new - new - new Ceiling - 2x4 ACT & Gyp Bd - new Ceiling - 2x4 ACT & Gyp Bd - new Ceiling - 2x4 ACT & Gyp Bd - new Casework/Sink - N/A Casework/Sink - ADA - new Casework/Sink - ADA - new Space Planning - N/A Space Planning - N/A Space Planning - N/A Other - N/A Other - N/A Other - N/A
Multi Compartment bathroom - ADA -new Single occupancy toilet - ADA - new New MP with wall in tables, full kitchen, accessible stage, and multi Compartment bathrooms
ADA, Fire Life Safety, Structural - Must Do Items
NEAL DOW ELEMENTARY SCHOOL
165
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
166
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
BUILDING C BUILDING D LIBRARY / KINDER CLASSCLASSROOMS ROOMS Exterior Equipment - New Roof Mounted AC-Units New Roof Mounted AC-Units New Roof Mounted AC-Units New Building Rooftop, wall mounted replaced in approx. 2019 (4 years replaced in approx. 2019 (4 years replaced in approx. 2019 (4 years BARD, etc. - condition old). Full Air Side economizer. old). Full Air Side economizer. old). Full Air Side economizer. SYSTEM TYPE, Boilers, New Air Distribution, good condition. New Air Distribution, good condition. New Air Distribution, good condition. New Building VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of Alerton Controls. Good Condition. Alerton Controls. Good Condition. Alerton Controls. Good Condition. Alerton Controls. Good Condition. system, web based / Programmable T-Stat? Plumbing Fixtures, Recent Modernization, however, Recent Modernization Recent Modernization New Building Restrooms, sinks, Building A Core Restrooms are drinking fountains / original and need ADA updates. bottle fillers, etc. Gas, condnesation Original WH needs replacement. Recent Modernization Recent Modernization New Building piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, FS in Corridors No Automatic Fire Sprinkler Systems No Automatic Fire Sprinkler Systems New Building code compliant, etc. found. found. INTENT OF SCOPE FOR PRICING
EB-3, EB-4 triggers, etc.
NEAL DOW ELEMENTARY SCHOOL
BUILDING A ADMIN / CLASSROOMS
BUILDING B KINDER CLASSROOMS
BUILDING E CLASSROOMS
BUILDING F MULTI-PURPOSE
New Building
New Building
New Building
New Building
Alerton Controls. Good Condition.
Alerton Controls. Good Condition.
New Building
New Building
New Building
New Building
New Building
New Building
PARKVIEW ELEMENTARY SCHOOL SITE CONDITIONS CAMPUS SITE SCOPE
A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.
EXTERIOR SITE AMENITIES SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
P
Fencing, gates, hardware / access
COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
SITE CONDITION ASSESSMENT Parking lot paving cracking, fair condition. Drop-off does have ADA compliant drop-off area. Inner campus has non-compliant path of travel cross-slope conditions, door landings and thresholds - remove and replace. Site has a flag pole. Does not have a marquee of any type. Hardcourts are in poor condition. Playground equipment new but does not have shade structures. Site drinking fountains not ADA compliant. Lunch shelter is provided outside MP bldg. There is no trash enclosure Campus is secured by fencing. Entry to Admin is by camera and electronic access at gate, however, no single point of entry thru Admin, full access to campus once entry allowed.
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Walkways along Buildings F, G, H J and K do not meet ADA standards
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Vehicle parking/travel areas and onsite asphalt is cracked, install crack and slurry seals
Areas that pond, drain inlets, retention needed, etc. Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
No comment ADA compliant parking stalls are provided.
No known issues All water and sewer piping is old and should be replaced
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
Gas Meter is in fair condition. Consider installaing an Earthquake Valve. Site gas distribution is in need if replacement. +35 years old.
ALL
PARKVIEW ELEMENTARY SCHOOL
167
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A KINDER CLASSROOMS
BUILDING E CLASSROOMS
BUILDING F CLASSROOMS / LIBRARY
BUILDING G ADMINISTRATION
BUILDING H CLASSROOMS
BUILDING I RESTROOMS
BLDG COLOR ASSESSMENT 34,373
SQUARE FOOTAGE
A BUILDING EXTERIOR
2,810
Condition - materials, Exterior skin - cem plaster repair / replace, painting, Soffit- plywood, some dry rot windows, etc. Fascias - wood, poor condition Roofing - tar and gravel Doors -wd. doors in wd. Frames, no ADA compliant threshold Windows - single pane, metal sash Roof drainage - no gutter / downspouts to grade Condition - finishes (floor, wall, ceiling) casework, shades, etc.
BUILDING INTERIOR A
A
MPR, Libraries, Kitchens, Science, etc.
A
ADA, Fire Life Safety, Structural - Must Do Items
5,376
10,833
see building G
1,102
Same as F
Exterior skin - plaster & mtl. sash wall/wdw sys. @ side elevation Soffit- mtl decking, glu-lam beam detioration @ ends Roofing -built-up Doors-Alum. In Alum. Frames, no ADA compliant thresholds Windows - Aluminum Roof drainage - no gutter / downspouts to grade Wood folding partition between classrooms Sinks- not ADA compliant Flooring - carpet Lighting - surface mtd. flourescent
Exterior skin - cem plaster Soffit- plywood, some dry rot Fascias - wood, poor condition Roofing - tar and gravel Doors wood in HM frames Windows - single pane, metal sash Roof drainage - no gutter / downspouts to grade
Exterior skin - plaster,wood siding & mtl. sash wall/wdw sys. @ side elevation Soffit- plywood, some dry rot Fascias - wood, poor condition Roofing - tar and gravel Doors wood in HM frames Windows - single pane, metal sash Roof drainage - no gutter / downspouts to grade Wood doors VCT / Carpet flooring 2x4 ACT clg - damaged tiles painted clerestory Vinyl tack panels / markerboards black out curtains lot of exposed conduit, raceways Sinks- not ADA compliant
Exterior skin - plaster,wood siding & mtl. sash wall/wdw sys. @ side elevation Soffit- plywood, some dry rot Roofing - tar and gravel Doors wood in HM frames Windows - single pane, metal sash Roof drainage - no gutter / downspouts to grade
Boys - Floor mounted urinals, sloped tile flooring, not ADA compliant Girls - not ADA compliant
Staff Toilet rms Lever door hardware Flooring - sht. vinyl- Replace Walls - gyp. bd. with FRP Lighting - recessed can light Non-accessble spaces, knob hardware, non-accessible sinks,
DSA EB-3 / EB- 4
DSA EB-3 / EB- 4
Door Hardware- Lever, noncompliant threshold Flooring- VCT Walls - gyp. bd. Ceiling- 2x4 susp. Acous, 2x4 flourescent
A
Fixtures, accessories, ADA compliant, finishes, etc.
4,044
RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
168
PARKVIEW ELEMENTARY SCHOOL
DSA EB-3 / EB- 4
DSA EB-3 / EB- 4
Floors- VCT Walls - gyp bd. Ceilings - 1 x1 applied acous tiles in corridor, gyp. bd. in offices8
Doors: wood w/ push/pull hardware Flooring: tile, slope issues Walls: tile wainscot/gyp bd Ceilings: gyp. bd. Lighting: 2x4 flourescent
Non-accessible entry and back door, tile finishes w/ floor slopes
DSA EB-3 / EB- 4, Non-compliant thresholds/ramps @ doors
DSA EB-3 / EB- 4
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE BLDG COLOR ASSESSMENT SQUARE FOOTAGE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING J CLASSROOMS
see building G
A
Condition - materials, Same as H repair / replace, painting, windows, etc.
A
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
BUILDING EXTERIOR
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A A
Same as H
Fixtures, accessories, ADA compliant, finishes, etc. MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
Same as H
BUILDING K MULTI-PURPOSE
3,001
BUILDING B, C, D, M PORTABLES
7206
Exterior skin - cem plaster Soffit- plywood, some dry rot Roofing - tar and gravel Doors - mtl sash doors in mtl sash frames Windows - single pane, metal sash Roof drainage - no gutter / downspouts to grade Flooring - VCT Walls - Plywood Ceiling - gyp. bd. w/ acous tile panels Lighting - surf mounted Flourescent Door Hardware - knob @ Kitchen
Non-accessible stage, in-wall tables, interior is worn Kitchen - VCT flooring, gyp bd. walls and ceiling, pendant globe fixtures DSA EB-3 / EB- 4
BUILDING CONDITIONS - ELECTRICAL (MISC) BUILDING SCOPE
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
ELECTRICAL SYSTEMS LIGHTING AND LIGHTING CONTROLS
INTENT OF SCOPE FOR MISC PRICING Data infrastructure (i.e. 10GB) PG&E electrical service in fenced enclosure on north side of campus. 120/208V 1200A Zinsco MSB is 50+ years old and not in Carrier, location, size of space servicable condition, potential safety hazard. 1200A may not be sufficient for future campus renovations if all-electric. No solar.
E
Existing system, code Silent Knight 6820EVS control panel (added to serve addition of portables) is consistent with current district standards, but the compliant , replace vs retrofit, remainder of the campus includes old horns, pull stations, and is not compliant with current code. Voice Evac, etc. System, headend, type (i.e. Older Bogen Multicom 2000 in a large rack, not per current standards. Old clocks. VOIP), replace vs retrofit
E
Types of systems, hardware, Existing intrusion alarm system is older but still in use. Cameras throughout the campus. No access controls. CCTV, opening contacts, etc.
E E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
Rooms and panels, code Most existing panels on campus are older but in servicable condition. Surface raceways in classrooms. compliant, receptacles, circuiting, etc. Fixture types and conditions, Most interior lighting consists of luminaires with T8 fluorescent lamps. Lighting controls do not meet any current energy code efficiency, controls, life safety / requirements. Some LED exit signs observed, and 'bugeye' emergency lights that are no longer maintained. Exterior lighting consists of egress (Int/Ext) LED parking lot lights and CFL wallpacks. IDF locations, sizes, MDF is relatively new, located in work room, it is not in a dedicated room with cooling. New fiber has been routed through the infrastructure, cabling, # data campus. Horizontal cabling is a combination of CAT5E and CAT6.. Classrooms have WAPs. drops per space, etc. Classroom technology, Most classrooms have a flat panel display or projector. presentation spaces; i.e. conf rooms, library, MPR, etc. PARKVIEW ELEMENTARY SCHOOL
169
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
170
A/E M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
INTENT OF SCOPE BUILDING A FOR PRICING KINDER CLASSROOMS Exterior Equipment Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, Air Distribution is in ok condition. VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of Delta Controls/Alerton system, web based / Programmable T-Stat? Plumbing Fixtures, Original Plumbing Fixtures needs Restrooms, sinks, replacement drinking fountains / bottle fillers, etc. Gas, condnesation Plumbing Equipment is mostly from piping, water heaters, the original construction and is at the service sinks, hose bibbs, end of life. gas regaultors (seismic braced) Does AFS exist, location, No Automatic Fire Sprinkler Systems code compliant, etc. found. EB-3, EB-4 triggers, etc.
PARKVIEW ELEMENTARY SCHOOL
BUILDING E CLASSROOMS
BUILDING F CLASSROOMS / LIBRARY
BUILDING G ADMINISTRATION
BUILDING H CLASSROOMS
BUILDING I RESTROOMS
Air Distribution is in ok condition.
Air Distribution is in ok condition.
Air Distribution is in ok condition.
Air Distribution is in ok condition.
Air Distribution is in ok condition.
Delta Controls/Alerton
Delta Controls/Alerton
Delta Controls/Alerton
Delta Controls/Alerton
Delta Controls/Alerton
Original Plumbing Fixtures needs replacement
Original Plumbing Fixtures needs replacement
Original Plumbing Fixtures needs replacement
Original Plumbing Fixtures needs replacement
Original Plumbing Fixtures needs replacement
Plumbing Equipment is mostly from Plumbing Equipment is mostly from Plumbing Equipment is mostly from Plumbing Equipment is mostly from Plumbing Equipment is mostly from the original construction and is at the the original construction and is at the the original construction and is at the the original construction and is at the the original construction and is at the end of life. end of life. end of life. end of life. end of life. No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
A/E M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
INTENT OF SCOPE BUILDING J FOR PRICING CLASSROOMS Exterior Equipment - Existing Gas Fired AC-Units are at the Rooftop, wall mounted end of life and need to be replaced. BARD, etc. - condition SYSTEM TYPE, Boilers, Air Distribution is in ok condition. VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of Delta Controls/Alerton system, web based / Programmable T-Stat? Plumbing Fixtures, Original Plumbing Fixtures needs Restrooms, sinks, replacement drinking fountains / bottle fillers, etc. Gas, condnesation Plumbing Equipment is mostly from piping, water heaters, the original construction and is at the service sinks, hose bibbs, end of life. gas regaultors (seismic braced) Does AFS exist, location, No Automatic Fire Sprinkler Systems code compliant, etc. found.
BUILDING K BUILDING B, C, D, M MULTI-PURPOSE PORTABLES Existing Gas Fired AC-Units are at the Portables appear to be Wall Mounted end of life and need to be replaced. Heat Pumps from the original construction. Air Distribution is in ok condition. Air Distribution is in ok condition.
Delta Controls/Alerton
Stand alone Programmable T-Stat's.
Original Plumbing Fixtures needs replacement
Original Plumbing Fixture, ok condition.
Water Heater has recently been replaced and in good condition. All other equipment is mostly from the original construction and is at the end of life. No Automatic Fire Sprinkler Systems found.
Original Plumbing Equipment, Ok condition.
No Automatic Fire Sprinkler Systems found.
EB-3, EB-4 triggers, etc.
PARKVIEW ELEMENTARY SCHOOL
171
ROSEDALE ELEMENTARY SCHOOL SITE CONDITIONS A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
A/C paving in poor condition throughout parking lot Campus has ADA POT issues throughout entire campus, door thresholds, cross slopes, raised concrete stoops, etc.
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.
Hardcourt paving is in poor condition. Bike rack is not fenced in - open to campus No trash enclosure is provided. Lunch areas have PV canopy shade structure. Play structures are not shaded. LED marquee and monument sign is provided. Flag pole is provided There is single point of access to the Admin. office. Campus is secured with fencing all around.
A EXTERIOR SITE AMENITIES SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
172
COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
P
Fencing, gates, hardware / access
SITE CONDITION ASSESSMENT
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Walkways along Buildings A, C, D, H, I and K do not meet ADA requirements, some walkway along Oak Park Avenue parking area do not meet ADA requirements
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Vehicle areas along Oak Park Avenue need crack and slurry seal, vehicle area along Oak Street is alligator cracked and needs new paving, portions of onsite asphalt are cracked and portions should be crack and slurry sealed and portions replaced.
Areas that pond, drain inlets, retention needed, etc. Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
ALL
ROSEDALE ELEMENTARY SCHOOL
No comment.
Replace all walkways at entry doors to classrooms and restrooms Localized flooding occurs between Buildings A and B and north of Buildings E, F and G and a drainage system should be installed Both the sewer and water system are old and failing and should be replaced
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
BUILDING A ADMIN / MPR / CLASSROOMS
INTENT OF SCOPE FOR PRICING
BUILDING B KINDER CLASSROOMS
BUILDING H LIBRARY/CLASSROOM
BUILDING I CLASSROOMS
BUILDING J RESTROOMS
BUILDING K CLASSROOMS
BLDG COLOR ASSESSMENT 38,668
SQUARE FOOTAGE
A BUILDING EXTERIOR
16,474
Condition - materials, Exterior skin - cement plaster repair / replace, painting, Soffit- metal deck windows, etc. Roofing - built-up Fascia - 1x wood Doors - wood doors/wood frames Windows -metal sash Roof drainage - no gutter / downspouts to grade Condition - finishes (floor, wall, ceiling) casework, shades, etc.
A
Doors: lever hardware Flooring: VCT Walls: masonite in Office; gyp. bd. Ceilings: 1 x 1 acous adered tile Lighting: surf. Mounted & pendant flourescent
2,745
8,015
Exterior skin - cement plaster & mtl sash window/wall @ back elevation Soffit- plywood, dry rot Roofing - built-up Fascia - 1x wood Doors - HM in HM frames; mtl sash door @ back elevation Roof drainage - no gutter / downspouts to grade Doors:knob hardware Flooring: VCT Walls: plywd / markerboards; Ceilings: 2x4 susp acous - damaged tiles Lighting: 2x4 flourescent
Exterior skin - cement plaster Same as K Soffit- metal deck Roofing - built-up Fascia - metal Doors: alum in alum frames, knob hardware Windows - alum storefront Roof drainage - no gutter / downspouts to grade Doors: lever hardware Same as K Flooring: VCT Walls: plywd / markerboards; tackable in Library Ceilings: 2x4 susp acous - damaged tiles Lighting: 2x4 flourescent
BUILDING INTERIOR
see building A
Fixtures, accessories, ADA compliant, finishes, etc.
see building A
Exterior skin - cement plaster Roofing - assumed tar & gravel Exterior wood doors to playground giant gas meter in the way
Exterior skin - plaster,wood siding & mtl. sash wall/wdw sys. @ back elevation Soffit- plywood, some dry rot Roofing - tar and gravel Doors: wood in HM frames Windows - single pane, metal sash Roof drainage - no gutter / downspouts to grade Doors: lever hardware Flooring: VCT Walls: plywd / markerboards black out curtains lot of exposed conduit, raceways Ceilings: 2x4 susp acous - damaged tiles, painted clerestory Lighting: 2x4 flourescent
Doors: wood w/ push/pull hardware Flooring: tile, slope issues Walls: tile wainscot/gyp bd Ceilings: gyp. bd. Lighting: 2x4 flourescent
A
MPR, Libraries, Kitchens, Door threshold not ADA compliantScience, etc. remove & replace walkway
Door threshold not ADA compliantremove & replace walkway
Door threshold not ADA compliantremove & replace walkway
Door threshold not ADA compliantremove & replace walkway
Sinks: wall hung lavatory, possible compliance Toilets: Compliant Urinals: Non-compliant, floor fixtures Non ADA Compliant - fixtures, doors, walls, floor slope, etc. Door threshold not ADA compliant- Door threshold not ADA compliantremove & replace walkway remove & replace walkway
A
ADA, Fire Life Safety, Structural - Must Do Items
DSA EB-3 / EB- 4
DSA EB-3 / EB- 4
DSA EB-3 / EB- 4
DSA EB-3 / EB- 4
A RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
1,102
DSA EB-3 / EB- 4
DSA EB-3 / EB- 4+-
ROSEDALE ELEMENTARY SCHOOL
173
BUILDING CONDITIONS - ELECTRICAL (MISC) BUILDING SCOPE
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
PG&E electrical service in fenced dedicated exterior enclosure, 277/480V 800A Cutler Hammer MSB is ~25-30 years old, and in servicable condition. Yard includes PV equipment that backfeeds MSB. 800A may not be sufficient for future campus renovations if all-electric. Existing system, code compliant , Very old Faraday 7800 manual system is monitored by an old Silent Knight 5208. Mostly pull stations on campus, does not meet any replace vs retrofit, Voice Evac, etc. current code requirements.
E
System, headend, type (i.e. VOIP), Very old simplex system retrofit with Bogen control modules has been patched together and is not compliant with current district replace vs retrofit standards.
E
Types of systems, hardware, CCTV, No intrusion alarm system in use. Cameras throughout the campus. No access controls. opening contacts, etc.
E
Rooms and panels, code compliant, Old gear in custodial room 60+ years old long past servicable life, many existing panels on campus are similar vintage. Lots of surface receptacles, circuiting, etc. raceways in classrooms.
ELECTRICAL SYSTEMS LIGHTING AND LIGHTING CONTROLS
E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
INTENT OF SCOPE FOR PRICING Data infrastructure (i.e. 10GB) Carrier, location, size of space
MISC
Fixture types and conditions, Most interior lighting consists of older luminaires with T8 fluorescent lamps. Some LED exit signs observed, and 'bugeye' emergency efficiency, controls, life safety / lights that are no longer maintained. Lighting controls do not meet any current energy code requirements. There is no parking lot egress (Int/Ext) lighting (not really a parking lot). Exterior lighting consists of old CFL or HID wallpacks. IDF locations, sizes, infrastructure, MDF is located in library, it is not in a dedicated room with cooling. New fiber has been routed through the campus. Horizontal cabling, # data drops per space, etc. cabling is a combination of CAT5E and CAT6. Pathway for low voltage systems is primarily routed overhead, limited UG pathway. Classrooms have WAPs. IDFs in classrooms is not ideal. Classroom technology, presentation Most classrooms have a flat panel display. spaces; i.e. conf rooms, library, MPR, etc.
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
174
M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
BUILDING A ADMIN / MPR / CLASSROOMS Exterior Equipment - New Roof Mounted AC-Units (York) Rooftop, wall mounted good condition. Approx. 3 years old. BARD, etc. - condition Kitchen has Evaporative Cooler and older MUA Unit, both in need of replacement. SYSTEM TYPE, Boilers, New Air Distribution. Good VRF, Pumps, Ducts, Conditioin. diffusers, split systems, exhaust fans, etc. EMCS Type of Delta Controls / Alerton system, web based / Programmable T-Stat? Plumbing Fixtures, Original Plumbing Fixtures needs Restrooms, sinks, replacement drinking fountains / bottle fillers, etc. Gas, condnesation New Water Heater install approx. 2 piping, water heaters, years ago. service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, No Automatic Fire Sprinkler Systems code compliant, etc. found. INTENT OF SCOPE FOR PRICING
ROSEDALE ELEMENTARY SCHOOL
BUILDING B KINDER CLASSROOMS
BUILDING H LIBRARY/CLASSROOM
BUILDING I CLASSROOMS
BUILDING J RESTROOMS
BUILDING K CLASSROOMS
Rooftop AC-Units approx. 7-8 years old.
Rooftop AC-Units approx. 7-8 years old.
Rooftop AC-Units approx. 7-8 years old.
Ceiling exhaust fans are part of the original construction.
Rooftop AC-Units approx. 7-8 years old.
Original Air Distribution. Suggest duct cleaning with any planned modernization project
Original Air Distribution. Suggest duct cleaning with any planned modernization project
Original Air Distribution. Suggest duct cleaning with any planned modernization project
Original Air Distribution. Suggest duct cleaning with any planned modernization project
Original Air Distribution. Suggest duct cleaning with any planned modernization project
Delta Controls / Alerton
Delta Controls / Alerton
Delta Controls / Alerton
Delta Controls / Alerton
Delta Controls / Alerton
Original Plumbing Fixtures needs replacement
Original Plumbing Fixtures needs replacement
Original Plumbing Fixtures needs replacement
Original Plumbing Fixtures needs replacement
Original Plumbing Fixtures needs replacement
Plumbing equipment is from the original construction and needs full replacement.
Plumbing equipment is from the original construction and needs full replacement.
Plumbing equipment is from the original construction and needs full replacement.
Plumbing equipment is from the original construction and needs full replacement.
Plumbing equipment is from the original construction and needs full replacement.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
SHASTA ELEMENTARY SCHOOL SITE CONDITIONS COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
parking, drop off, landscaping, & irrigation new
EXTERIOR SITE AMENITIES
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access
kinder play area hardcourt, shade structures & playstructure is new & shaded (E) play ground area had new slurry seal, re-striped basketball court & four square, etc. (E) Play structure looks adequate (no shade)
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Walkways along Buildings B, C and MP do not meet ADA standards
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Vehicle area along the Esplanade and onsite asphalt area west of basketball court should be crack and slurry sealed
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
P
Areas that pond, drain inlets, retention needed, etc.
SITE CONDITION ASSESSMENT
Fencing and gates are new Single point of access into Admin
Pavement markings do not meet standards
On windy rain days rainwater blows into the south side of Building K
Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
Gas Distribution in good condition.
ALL
SHASTA ELEMENTARY SCHOOL
175
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BLDG COLOR ASSESSMENT 48265
SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
BUILDING A ADMIN/CLASSROOMS NEW BLDG 5,447
Condition - materials, Roof - Standing seam mtl - new repair / replace, painting, Roof Fascia - fiber cement - new windows, etc. Roof Drains - Gutter & DS to SD new Soffit - Fiber cement - new Walls - Fiber cement & cement plaster - new Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - Aluminum storefront & HM DR & FRM - new. Lever handle - new Card Access - installed Windows - Alumn storefront - new Other - N/A Condition - finishes Space - function is adeuate in existg (floor, wall, ceiling) space, classrooms are adequate in casework, shades, etc. existing space Walls - Gyp Bd, marker laminent & tack board - new Int Door/Frm/Hdwr - storefront Door, PH & Lever handle - new Flooring - carpet & sht Vinyl, epoxy - new Ceiling - 2x4 ACT & Gyp Bd - new Casework/Sink - ADA - new Space Planning - N/A Other - N/A
BUILDING INTERIOR A
Fixtures, accessories, Single occupancy toilet - ADA - new ADA compliant, finishes, Class Sink - ADA -new etc.
A
MPR, Libraries, Kitchens, Science, etc.
RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
176
A
ADA, Fire Life Safety, Structural - Must Do Items
SHASTA ELEMENTARY SCHOOL
BUILDING B LIBRARY/CLASSROOMS
BUILDING C CLASSROOMS
5,712
7,131
Roof - Standing seam mtl - adquate Roof Fascia - Metal -paint Roof Drains - Gutter & DS to SD repaint Soffit - Metal deck -repaint, Wd beams - repair as needed & repaint Walls - CMU block - repaint Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - HM DR & FRM repaint. Lever handle Card Access - required Windows - Alumn sash - adequate Other - N/A
Roof - Standing seam mtl - adquate Roof Fascia - Metal -paint Roof Drains - Gutter & DS to SD repaint Soffit - Metal deck -repaint, Wd beams - repair as needed & repaint Walls - CMU block - repaint Door Landing - ADA Door Threshold - Some not ADA Doors/Frm/Hdwr - HM DR & FRM repaint. Lever handle Card Access - required Windows - Alumn sash - adequate Other - N/A
BUILDING D CLASSROOMS NEW BLDG
BUILDING E CLASSROOMS NEW BLDG
BUILDING K1 KINDER NEW BLDG
6,042
7,890
2,900
Roof - Standing seam mtl - new Roof Fascia - fiber cement - new Roof Drains - Gutter & DS to SD new Soffit - Fiber cement - new Walls - Fiber cement & cement plaster - new Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - Aluminum storefront & HM DR & FRM - new. Lever handle - new Card Access - installed Windows - Alumn storefront - new Other - N/A Space - function is adeuate in existg space, classrooms are adequate in existing space Walls - Gyp Bd, marker laminent & tack board - new Int Door/Frm/Hdwr - storefront Door, PH & Lever handle - new Flooring - carpet & sht Vinyl, epoxy - new Ceiling - 2x4 ACT & Gyp Bd - new Casework/Sink - ADA - new Space Planning - N/A Other - N/A
Roof - Standing seam mtl - new Roof Fascia - fiber cement - new Roof Drains - Gutter & DS to SD new Soffit - Fiber cement - new Walls - Fiber cement & cement plaster - new Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - Aluminum storefront & HM DR & FRM - new. Lever handle - new Card Access - installed Windows - Alumn storefront - new Other - N/A Space - function is adeuate in existg space, classrooms are adequate in existing space Walls - Gyp Bd, marker laminent & tack board - new Int Door/Frm/Hdwr - storefront Door, PH & Lever handle - new Flooring - carpet & sht Vinyl, epoxy - new Ceiling - 2x4 ACT & Gyp Bd - new Casework/Sink - ADA - new Space Planning - N/A Other - N/A
Roof - Standing seam mtl - new Roof Fascia - fiber cement - new Roof Drains - Gutter & DS to SD new Soffit - Fiber cement - new Walls - Fiber cement & cement plaster - new Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - Aluminum storefront & HM DR & FRM - new. Lever handle - new Card Access - installed Windows - Alumn storefront - new Other - N/A Space - Library function is adeuate in Space - Library function is adeuate in Space - function is adeuate in existg existg space, classrooms are adequate existg space, classrooms are adequate space, classrooms are adequate in in existing space in existing space existing space Walls - Gyp Bd & CMU - repaint. Walls - Gyp Bd & CMU - repaint. Walls - Gyp Bd, marker laminent & tack board. tack board. tack board - new Int Door/Frm/Hdwr - HM Frm, Wd Int Door/Frm/Hdwr - HM Frm, Wd Int Door/Frm/Hdwr - storefront Door. lever handle Door. lever handle Door, PH & Lever handle - new Flooring - VCT, carpet, ASB VAT, sht Flooring - VCT, carpet, ASB VAT, sht Flooring - carpet & sht Vinyl, epoxy Vinyl, tile, epoxy - (replace/repair/ Vinyl, tile, epoxy - (replace/repair/ - new adequate) adequate) Ceiling - 2x4 ACT & Gyp Bd - new Ceiling - 2x4 ACT at Classrooms Ceiling - 2x4 ACT at Classrooms Casework/Sink - ADA - new replace tiles, Gyp Bd at bathrooms replace tiles, Gyp Bd at bathrooms Space Planning - N/A - repaint - repaint Other - N/A Casework/Sink - Most is dated Casework/Sink - Most is dated replace. Sink - Not ADA replace. Sink - Not ADA Space Planning - special needs Space Planning - N/A therapy space seems tight Other - N/A Other - N/A Multi Compartment bathroom - Non Multi Compartment bathroom Class Sink - ADA -new ADA fixtures, needs an update Door layout not ADA, needs an update Shelving - wall to wall book shelves Seems tight but adequate Circulation Desk - seems small but is adequate
Multi Compartment bathroom - ADA Multi Compartment bathroom - ADA -new -new Single occupancy toilet - ADA - new Single occupancy toilet - ADA - new Class Sink - ADA -new Class Sink - ADA -new
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING NEW BLDG
BLDG COLOR ASSESSMENT SQUARE FOOTAGE
4,908
A
BUILDING EXTERIOR
A BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
BUILDING MP MULTI-PURPOSE/ CLASSROOMS
BUILDING K2 KINDER
A A A
Condition - materials, Roof - Standing seam mtl - new repair / replace, painting, Roof Fascia - fiber cement - new windows, etc. Roof Drains - Gutter & DS to SD - new Soffit - Fiber cement - new Walls - Fiber cement & cement plaster - new Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - Aluminum storefront & HM DR & FRM - new. Lever handle - new Card Access - installed Windows - Alumn storefront - new Other - N/A Condition - finishes Space - function is adeuate in existg space, classrooms are adequate in existing space (floor, wall, ceiling) Walls - Gyp Bd, marker laminent & tack board - new casework, shades, etc. Int Door/Frm/Hdwr - storefront Door, PH & Lever handle - new Flooring - carpet & sht Vinyl, epoxy - new Ceiling - 2x4 ACT & Gyp Bd - new Casework/Sink - ADA - new Space Planning - N/A Other - N/A Fixtures, accessories, Multi Compartment bathroom - ADA -new ADA compliant, finishes, Single occupancy toilet - ADA - new etc. Class Sink - ADA -new MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
8,235 Roof - Standing seam mtl - adquate Roof Fascia - Metal -paint Roof Drains - DS to SD - repaint Soffit - Metal deck -repaint, Wd beams - repaint Walls - CMU block repaint Door Landing - not ADA Door Threshold - not ADA Doors/Frm/Hdwr - HM DR & FRM - repaint. PH & Lever handle Card Access - required Windows - Alumn sash - adequate Other - N/A Space - Function is not adeuate in existg space, needs stage Walls - Gyp Bd - repaint Int Door/Frm/Hdwr - HM Frm & DR - repaint, with lever handle Flooring - VCT - replace, epoxy at kitchen - adequate Ceiling - Gyp Bd - repaint, 1x1 glue on tile - adequate Casework/Sink - Kitchen hand sink - Not ADA, Casework is adequate Space Planning - Function is not adeuate in existg space, needs stage Other - Non accessible riser stage, drop down screen, OH projector kitchen hand sink - Not ADA No permanent stage Riser stage not accessible
SHASTA ELEMENTARY SCHOOL
177
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
A/E M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
INTENT OF SCOPE BUILDING A FOR PRICING ADMIN/CLASSROOMS Exterior Equipment Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, New Building VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of Alerton system, web based / Programmable T-Stat? Plumbing Fixtures, New Building Restrooms, sinks, drinking fountains / bottle fillers, etc. Gas, condnesation New Building piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, New Building code compliant, etc.
BUILDING B LIBRARY/CLASSROOMS
BUILDING C CLASSROOMS
BUILDING D CLASSROOMS
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
ELECTRICAL SYSTEMS LIGHTING AND LIGHTING CONTROLS
Poor Air Distribution needs replacement
New Building
New Building
New Building
Alerton
Alerton
Alerton
Alerton
Alerton
Original Plumbing Fixture needs replacement
Original Plumbing Fixture needs replacement
New Building
New Building
New Building
Original Plumbing Equipment needs replacement. Classroom Sinks are ADA Compliant.
Original Plumbing Equipment needs replacement
New Building
New Building
New Building
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
New Building
New Building
New Building
EB-3, EB-4 triggers, etc.
178
E
INTENT OF SCOPE FOR PRICING Data infrastructure (i.e. 10GB) Carrier, location, size of space Existing system, code compliant , replace vs retrofit, Voice Evac, etc. System, headend, type (i.e. VOIP), replace vs retrofit
E
Types of systems, hardware, Existing Ademco intrusion alarm system is installed but not in use. Cameras throughout the campus. No access controls. CCTV, opening contacts, etc.
E E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
MISC PG&E electrical service in exterior yard in secrued enclosure, 120/208V 1600A MSB is ~25-30 years old, servicable condition. The original much older Zinsco MSB was not removed when MSB was upgraded, this is a maintenance issue and potential safety issue. Campus has been upgraded to district standard Silent Knight 6820EVS, completely upgraded except for duct detectors. The campus has been upgraded to Valcom IP, which is consistent with current district standards.
Rooms and panels, code Existing panels on campus are mix of relatively new and in servicable condition, and older and past servicable life. compliant, receptacles, circuiting, etc. Fixture types and conditions, In renovated classroom and admin wings, lighting has been upgraded to LED with dimming controls. MPR is older fluorescent lighting. efficiency, controls, life safety Wattstopper panel controls exterior lighting except at the MPR. Building mounted CFL wallpacks were on during the day. / egress (Int/Ext) IDF locations, sizes, MDF is located in staff room and does not have dedicated cooling, so overheating is a regular problem. Remainder or IT system has infrastructure, cabling, # data been recently upgraded. There is a usable underground pathway system between buildings. Classrooms have WAPs. drops per space, etc. Classroom technology, Classrooms have a flat panel display. presentation spaces; i.e. conf rooms, library, MPR, etc.
SHASTA ELEMENTARY SCHOOL
BUILDING K1 KINDER
Poor Air Distribution needs replacement
BUILDING CONDITIONS - ELECTRICAL (MISC) BUILDING SCOPE
BUILDING E CLASSROOMS
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
INTENT OF SCOPE FOR PRICING
BUILDING K2 KINDER
Exterior Equipment - New Building Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, New Building VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of Alerton system, web based / Programmable T-Stat? Plumbing Fixtures, New Building Restrooms, sinks, drinking fountains / bottle fillers, etc. Gas, condnesation New Building piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, New Building code compliant, etc.
BUILDING MP MULTI-PURPOSE/ CLASSROOMS Existing Gas Fired AC-Units are approx. 20 years old and are in need of replacement. (4 total). Poor Air Distribution needs replacement Stand Alone Programmable Thermostat's Recent Modernization, however, Building A Core Restrooms are original and need ADA updates. New Water Heater at Kitchen. Good Condition. Staff RR has new IWH.
No Automatic Fire Sprinkler Systems found.
EB-3, EB-4 triggers, etc.
SHASTA ELEMENTARY SCHOOL
179
SIERRA VIEW ELEMENTARY SCHOOL SITE CONDITIONS CAMPUS SITE SCOPE
EXTERIOR SITE ASSESSMENT
A/E
A
A
INTENT OF SCOPE FOR PRICING Parking lots, drop-off, landscape / irrigation
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.
EXTERIOR SITE AMENITIES SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING
A C C C
CONCRETE PAVING/ WALLS/CURBS
C
STORM DRAINAGE
C
U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING
P
Fencing, gates, hardware / access
SITE CONDITION ASSESSMENT A/C paving in poor condition throughout parking lot Blind spot coming out of parking lot with landscaped fence Landscape is worn at front of school, lot's of barren areas Campus has ADA POT issues throughout entire campus, door thresholds, cross slopes, raised concrete stoops, etc. Bike racks is not fenced in - open to campus New PV covered dining canopy structure Quad area is nicely landscaped, seating A/C hardcourt paving is worn, needs new striping for games No trash enclosure - located at front of school Some benches, new metal and worn wood - front of campus and scattered throughout the campus Fairly new play equipment, fiber bark is a mess - not contained well Kinder play - no separation from rest of campus Some areas have new ornamental fencing wih gates at front entry Mostly worn chain link fencing - lacks ADA compliant gates, clearances, etc.
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Campus has ADA POT issues throughout entire campus, door thresholds, cross slopes, raised concrete stoops, etc. Lot of portables with old ramps
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Parking lot is alligatoring in a number of locations, poor condition, replace paving in vehicle area, crack and slurry seal onsite pavement, there is an existing gravel area east of the vehicle parking area that should be paved
Areas that pond, drain inlets, retention needed, etc. Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
Non ADA compliant parking stalls, drop-off areas, no ramp at drop-off, striping, signage
Replace all walkways at entry doors to classrooms and restrooms. Rain water leaders just dump into quad areas, no direct drainage Existing domestic water piping is failing and should be replaced, existing gas piping is failing and should be replaced
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
ALL MISC SITE OBSERVATIONS 180
COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
SIERRA VIEW ELEMENTARY SCHOOL
Admin front door is behind security fence Campus frontage looks tired; barren landscape, needs painting, portable stuck in front (does have beautiful large tree) Large mural is main focal point on MPR, large unsightly HVAC units on roof Large open area at front of campus proposed for more parking - can redesign Interior quads have no direct egress, many doors are locked with chains/padlocks Lot of portables, unsightly ramps, etc. Irrigation pump house at front of school
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING B CLASSROOMS
BUILDING C LIBRARY
BUILDING G ADMIN
BUILDING F CLASSROOMS
BUILDING G MULTI-PURPOSE
BUILDING H CLASSROOMS
BLDG COLOR ASSESSMENT 37,715
SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
1,296
4,374
14,014
Condition - materials, Roof - tar & gravel-Replace Modular / portable building repair / replace, painting, Roof Fascia - Wood-Replace l windows, etc. Roof Drains - Roof drains w/ downspouts-replace Soffit - (replace/repair) cement plaster, wd T&G, metl deck, plywd, fiber cement Walls - (replace/repair/paint) cement plaster, fiber cement, brick, cmu block, corrugated mtl, plywd siding
Same as Building K
Exterior wood doors (behind fencing) Exterior wood doors (behind fencing) Same as Building K single pane glazing single pane glazing cement plaster cement plaster cmu block cmu block
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
1x1 Glue-on clg tiles Clerestory and exposed ducts - no drop clg ASB (VAT) flooring Plywood wall finish Wood doors
Admin - not efficient space layout Check-in rollup counter door VCT flooring ACT clg
Carpet 1x1 Glue-on clg tiles minimal windows (clerestory)
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A A
Fixtures, accessories, ADA compliant, finishes, etc. MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
see bldg G admin
see bldg G admin
VCT flooring glue on clg tiles o/ plaster blackout drapes make shift stage (risers) drop down screen / oh proj
Non ADA Compliant toilets, nurse toilet / sink Library with adjacent workroom wall to wall book shelves
in-wall tables Kitchen very old
Non ADA sink in workroom
Non ADA - stage, tables, hardware, DF, etc.
IDF, elect panels in library
MDF cabinet in MPR
SIERRA VIEW ELEMENTARY SCHOOL
181
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE BLDG COLOR ASSESSMENT SQUARE FOOTAGE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING J AND D RESTROOMS
2204
A
Condition - materials, repair Exterior wood doors to playground - giant / replace, painting, windows, gas meter in the way etc.
BUILDING EXTERIOR
A
Condition - finishes (floor, Ceramic floor tile wall, ceiling) casework, Ceramic wall tile up to 5' shades, etc. Gypsum ceiling w/ covered skylight
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A A
Fixtures, accessories, ADA compliant, finishes, etc. MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
BUILDING K CLASSROOMS
182
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
ELECTRICAL SYSTEMS LIGHTING AND LIGHTING CONTROLS
E
1,237
10529
Exterior skin - plaster, brick/cmu Roofing - tar and gravel Doors wood in HM frames Windows - single pane, metal sash Roof drainage - no gutter / downspouts. Entire back wall stl sash construction, replace Wood doors VCT / Carpet flooring 2x4 ACT clg - damaged tiles painted clerestory Vinyl tack panels / markerboards black out curtains lot of exposed conduit, raceways
Exterior skin - plaster, brick/cmu Roofing - tar and gravel Doors wood in HM frames Windows - single pane, metal sash Roof drainage - no gutter / downspouts
Portable CR - Not Reviewed
Portable CRs not reviewed
Wood doors VCT / Carpet flooring 2x4 ACT clg - damaged tiles Vinyl tack panels / markerboards black out curtains lot of exposed conduit, raceways Non ADA compliant toilets, sinks, casework
Non ADA sinks, thresholds, hardware
Non ADA sinks, thresholds, hardware, casework
E
INTENT OF SCOPE MISC FOR PRICING Data infrastructure (i.e. PG&E electrical service in exterior yard 120/208V 2500A Cutler Hammer MSB is ~25-30 years old, missing deadfront panels, some 10GB) Carrier, location, size exposed wiring, and in need of service/refurbish. MSB is adequately sized for a campus of this size, and is backfed by a PV system, of space PVs are installed on shade structure. Old Square D MSB remains in use, over 60 years old, located in custodial closet and beyone its servicable life. Existing system, code Silent Knight 5207 manual system, does not meet any current code requirements, complete upgrade required. compliant , replace vs retrofit, Voice Evac, etc. System, headend, type (i.e. Bogen Multi-com 2000 is located in principal's office, does not meet current district standards. VOIP), replace vs retrofit
E
Types of systems, hardware, No intrusion alarm on campus. Cameras throughout the campus. No access controls. CCTV, opening contacts, etc.
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
E
Rooms and panels, code Most existing panels on campus are older and either nearing or past their servicablelife. Surface raceways in classrooms. Receptacle for compliant, receptacles, IDF in MPR is shared with other receptacles in the space, which leads to nuisance trips. Lots of surface raceway in classrooms. circuiting, etc. Fixture types and conditions, Most interior lighting consists of luminaires with T8 fluorescent lamps. Bugeyes and exit lights for EM lighting. Lighting controls do not efficiency, controls, life safety meet any current energy code requirements. Exterior lighting consists of LED parking lot lights and CFL wallpacks. Exterior wallpacks / egress (Int/Ext) on during the day. IDF locations, sizes, MDF is located high on a wall in the MPR, difficult to service, it is not in a dedicated room with cooling. New fiber has been routed infrastructure, cabling, # data through the campus. Horizontal cabling is CAT6 and relatively new. Pathway between buildings consists primarily of exposed conduit. drops per space, etc. Classrooms have WAPs. Classroom technology, Most classrooms have a flat panel display or projector. MPR has projector. presentation spaces; i.e. conf rooms, library, MPR, etc.
SIERRA VIEW ELEMENTARY SCHOOL
BUILDING A, E, I, M PORTABLES
2,692
BUILDING CONDITIONS - ELECTRICAL (MISC) BUILDING SCOPE
BUILDING N SPECIAL ED CLASSROOM
see bldg G admin
Non ADA Compliant - fixtures, doors, walls, floor slope, etc. Old boiler room used for PE Storage Non ADA DF on exterior
BUILDING L KINDER CLASSROOMS
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
A/E
M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
INTENT OF SCOPE FOR PRICING
BUILDING B CLASSROOMS
This building has (4) Older Roof Mounted AC-Units that are at the end of life. Fixed Minimum OSA. No Relief Air. Did not have access to the interior of Existing Ductwork, good condition. this building.
This building has (2) Older Roof Mounted AC-Units that are at the end of life. Fixed Minimum OSA. Relief Air Hood Present. Existing Ductwork, good condition.
Combination of Delta and Johnson Controls
Combination of Delta and Johnson Controls
Combination of Delta and Johnson Controls
BUILDING G ADMIN/ MULTI-PURPOSE This building has (4) Older Roof Mounted AC-Units that are at the end of life. Fixed Minimum OSA. Relief Air Hood Present. Kitchen Hood is original and is coupled to Roof Mounted Reznor w/ Evaporative Cooler Section. In need of replacement, now. Combination of Delta and Johnson Controls
Plumbing Fixture are from original construction.
Sinks are CW only and original
Plumbing Fixture are from original construction.
Plumbing Fixture are from original construction.
Sinks are CW only and original
Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
Original Water Heater at Kitchen in need of replacement, now. Kitchen Plumbing Fixture appear to be from original construction. One Newer Johnson AC-Unit serving Administration Area. No Automatic Fire Sprinkler Systems found.
BUILDING L KINDER CLASSROOMS This building has (2) Older Roof Mounted AC-Units that are at the end of life. Fixed Minimum OSA. Relief Air Hood Present. Existing Ductwork, good condition.
BUILDING N SPECIAL ED CLASSROOM
BUILDING C LIBRARY
Exterior Equipment - This building has (4) Older Roof Rooftop, wall mounted Mounted AC-Units that are at the BARD, etc. - condition end of life. Fixed Minimum OSA. No Relief Air. SYSTEM TYPE, Boilers, Existing Ductwork, good condition. VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of Combination of Delta and Johnson system, web based / Controls Programmable T-Stat? Plumbing Fixtures, Sinks are CW only and original Restrooms, sinks, drinking fountains / bottle fillers, etc. Gas, condnesation Gas Distribution is in ok condition. piping, water heaters, Suggest complete replacement with service sinks, hose bibbs, the installation of new HVAC Units. gas regaultors (seismic braced)
Did not have access to the interio of this building.
Does AFS exist, location, No Automatic Fire Sprinkler Systems code compliant, etc. found.
BUILDING F CLASSROOMS
BUILDING G ADMIN
BUILDING H CLASSROOMS This building has (4) Older Roof Mounted AC-Units that are at the end of life. Fixed Minimum OSA. Relief Air Hood Present. Existing Ductwork, good condition.
Combination of Delta and Johnson Controls
No Automatic Fire Sprinkler Systems found.
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
INTENT OF SCOPE BUILDING J AND D BUILDING K FOR PRICING RESTROOMS CLASSROOMS Exterior Equipment - Singel Exhaust Fans serving both Core This building has (4) Older Roof Rooftop, wall mounted Restrooms. Mounted AC-Units that are at the BARD, etc. - condition end of life. Fixed Minimum OSA. No Relief Air. SYSTEM TYPE, Boilers, Exhaust Ducting only. Original Existing Ductwork, good condition. VRF, Pumps, Ducts, Construction diffusers, split systems, exhaust fans, etc. EMCS Type of Fans are switch with lights Combination of Delta and Johnson system, web based / Controls Programmable T-Stat? Plumbing Fixtures, Sinks are CW only and original Sinks are CW only and original Restrooms, sinks, drinking fountains / bottle fillers, etc. Gas, condnesation Gas Distribution is in ok condition. Gas Distribution is in ok condition. piping, water heaters, Suggest complete replacement with Suggest complete replacement with service sinks, hose bibbs, the installation of new HVAC Units. the installation of new HVAC Units. gas regaultors (seismic braced) Does AFS exist, location, No Automatic Fire Sprinkler Systems No Automatic Fire Sprinkler Systems code compliant, etc. found. found.
Combination of Delta and Johnson Controls Sinks are CW only and original
BUILDING A, E, I, M PORTABLES Portables appear to be Wall Mounted Heat Pumps from the original construction.
Stand alone Programmable T-Stat's. Portable CR - Not Reviewed
Portable CRs not reviewed
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units. No Automatic Fire Sprinkler Systems found.
SIERRA VIEW ELEMENTARY SCHOOL
183
BIDWELL JUNIOR HIGH SCHOOL SITE CONDITIONS A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
Drop off at front of shool is relatively new with loading zone. Parking lot has extensive cracking.
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.
(E) marquee sign - adequate bike enclosure looks adequate, Trash enclosure CL - adequate flag pole (interior to site), shade structures with PVs relatively new hardcourts have a large amount of cracking. The site has existing perimeter fencing, a mix of CL and decorative Metal at frontage Single point of entry to Admin Office
EXTERIOR SITE AMENITIES SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
184
COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
P
Fencing, gates, hardware / access
SITE CONDITION ASSESSMENT
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
A few walkways that do not meeting ADA standards
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Asphalt areas along North Avenue, the north side of the campus, the paved onsite road along the east side of the campus are all in poor condition and should be re-paved, the basketball paving should be crack and slurry sealed
Areas that pond, drain inlets, retention needed, etc. Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
No comment
The drainage system near the basketball courts is clogged and needs to be flushed out No known issues
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
ALL
BIDWELL JUNIOR HIGH SCHOOL
80% of Gas Site distribution piping is in poor condition and needds replacement It was noted that the grease interceptor connected sewer mains are clogging most likely due to lack of suffiecent slope.
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A ADMIN / MPR
BUILDING B LIBRARY
BUILDING C CLASSROOMS
BUILDING F CLASSROOMS
BUILDING D CLASSROOMS
BUILDING I CLASSROOMS
BLDG COLOR ASSESSMENT 79058
SQUARE FOOTAGE
A
BUILDING EXTERIOR
Condition - materials, Roof - (E) TPO repair / replace, painting, Roof Fascia - Wood -repair windows, etc. Roof Drains - Gutter & DS to surface - adequate Soffit - Cement plaster - repaint Walls - Cement plaster -repaint Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr - HM Dr & Frm. Alumn Dr & Frm. PH/Lever handles adequate Card Access - required Windows - Alumn sash - adequate Condition - finishes (floor, wall, ceiling) casework, shades, etc.
A
BUILDING INTERIOR A RESTROOMS
SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A
A
11,937
3,401
30,106
Roof - (E) TPO Roof Fascia - Wood -repair Roof Drains - Gutter & DS to SD adequate Soffit - Cement plaster - repaint Walls - Cement plaster -repaint Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr - HM Dr & Frm. PH/Lever handles - adequate Card Access - required Windows - Alumn sash - replace
Roof - (E) TPO Roof - (E) TPO Roof Fascia - Wood -repair Roof Fascia - Wood -repair Roof Drains - Gutter & DS to SD Roof Drains - Gutter & DS to surface - adequate - adequate Soffit - Cement plaster - repaint Soffit - Cement plaster - repaint Walls - Cement plaster -repaint Walls - Cement plaster -repaint Door Landing - ADA ok Door Landing - ADA ok Door Threshold - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr - HM Dr & Frm. Doors/Frm/Hdwr - HM Dr & Frm. Lever handles - adequate knob handles - replace Card Access - required Card Access - required Windows - Alumn sash - replace Windows - Alumn sash - replace
Space - Function is adequate in existg Space - Function is adequate in existg space space Walls - Gyp Bd, Accoustic panels, tile Walls - Gyp Bd, tack board - adequate adequate Int Door/Frm/Hdwr - HM Frm/HM Int Door/Frm/Hdwr - HM Frm/ & WD Door. PH/Lever handle / knobs HM & WD Door. PH/Lever handle - replace adequate Flooring - Sheet vinyl, carpet, tile Flooring - vinyl tile, carpet - adequate replace Ceiling - 2x4 ACT, Gyp Bd, 1x1 glued Ceiling - 2x4 ACT, Gyp Bd, 1x1 glued on acoustic tile, Exposed duct, ceiling on acoustic tile, Exposed duct - refans- replace and repaint as needed paint as needed Casework/sink - ADA ok Casework/Sink - ADA ok Space Planning - ok Space Planning - ok Other - N/A Other - N/A Fixtures, accessories, Admin toilets - ADA ok ADA compliant, finishes, Kitchen toilet - not ADA needs etc. update MP gang bathroom - ADA ok MPR, Libraries, Kitchens, Kitchen needs update to floor and Library modernized in 2015 in Science, etc. celing adequate condition Shelving - wall to wall book shelves (update/ adequate/new) Circulation Desk - adequate ADA, Fire Life Safety, EB-3 & EB-4 Structural - Must Do Items
Combined w/ bldg C
5,740
5,740
Roof - (E) TPO Roof Fascia - Wood -repair Roof Drains - Gutter & DS to surface - adequate Soffit - Cement plaster - repaint Walls - Cement plaster -repaint Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr - HM Dr & Frm. Lever/pull handles - adequate Card Access - required Windows - Alumn sash - replace
Roof - (E) TPO Roof Fascia - steel Roof Drains - Gutter & DS to SD adequate Soffit - Cement plaster - repaint Walls - Cement plaster -repaint Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr - HM Dr & Frm. Lever/pull handles - adequate Card Access - required Windows - Alumn sash - replace
Space - Function is adequate in Space - Function is adequate in existg Space - Function is adequate in existg Space - Function is adequate in existg existg space space space space Walls - Gyp Bd, tack board Walls - Gyp Bd, tack board Walls - Gyp Bd, tack board Walls - Gyp Bd, tack board adequate adequate adequate adequate Int Door/Frm/Hdwr - HM Frm/ Int Door/Frm/Hdwr - HM Frm/HM Int Door/Frm/Hdwr - HM Frm/HM Int Door/Frm/Hdwr - HM Frm/HM HM - adequate. - adequate. - adequate. - adequate. Lever handle - adequate Lever handle - adequate Lever handle - adequate Lever handle - adequate Flooring - vinyl tile, tile - replace Flooring - vinyl tile, tile - replace Flooring - vinyl tile, tile - replace Flooring - vinyl tile, tile - replace Ceiling - 2x4 ACT, Gyp Bd, 1x1 Ceiling - 2x4 ACT, Gyp Bd, 1x1 glue Ceiling - 2x4 ACT, Gyp Bd, 1x1 glue Ceiling - 2x4 ACT, Gyp Bd, 1x1 glue glue on acoustic tile, Exposed duct, on acoustic tile, Exposed mechanical, - on acoustic tile, Exposed mechanical, - on acoustic tile - replace and repaint - replace and repaint as needed replace and repaint as needed replace and repaint as needed as needed Casework/sink - ADA ok Casework/sink - ADA ok Casework/sink - ADA ok Casework/sink - looks ok ADA, Space Planning - ok Space Planning - ok Space Planning - ok casework needs updating Other - N/A Other - N/A Other - N/A Space Planning - ok Other - N/A gang bathooms - ADA ok, gang bathooms - ADA ok, updated updated interior interior DF - ADA ok
EB-3 & EB-4
Some Science Classrroms
Science Classrooms - looks in good shape
Home economics - casework could use updating
EB-3 & EB-4
EB-3 & EB-4
EB-3 & EB-4
BIDWELL JUNIOR HIGH SCHOOL
185
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE BLDG COLOR ASSESSMENT SQUARE FOOTAGE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING J CLASSROOMS
BUILDING K SHOWER & LOCKER
3,420
A BUILDING EXTERIOR
A BUILDING INTERIOR
Condition - materials, Roof - (E) TPO | Roof Fascia - Wood -repair repair / replace, painting, Roof Drains - Gutter & DS to SD - adequate | Soffit - Cement plaster windows, etc. repaint Walls - Cement plaster -repaint | Door Landing - not ADA Door Threshold - ADA ok | Doors/Frm/Hdwr - HM Dr & Frm. Lever/pull handles - adequate | Card Access - required Windows - Alumn sash - replace Condition - finishes Space - Function is adequate in existg space | Walls - Gyp Bd, tack board (floor, wall, ceiling) - adequate casework, shades, etc. Int Door/Frm/Hdwr - HM Frm/HM - adequate. | Lever handle - adequate Flooring - vinyl tile, tile - replace | Ceiling - 2x4 ACT, Gyp Bd, 1x1 glue on acoustic tile - replace and repaint as needed | Casework/sink - sink not ADA, casework needs updating Space Planning - ok
Fixtures, accessories, ADA compliant, finishes, RESTROOMS etc. SPECIALITY MPR, Libraries, Kitchens, Band room - practice room not ADA accessible A SPACES REVIEW Science, etc. Climbing wall looks recently instlled BUILDING CONDITIONS ELECTRICAL DSA CODE ADA, Fire Life Safety, EB-3 & EB-4(MISC) COMPLIANCE A Structural - Must Do ITEMS Items BUILDING INTENT OF SCOPE FOR A/E SCOPE PRICING
186
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
ELECTRICAL SYSTEMS LIGHTING AND LIGHTING CONTROLS
E
6,668
8,818
Roof - (E) TPO | Roof Fascia - steel Roof Drains - Gutter & DS to SD - adequate | Soffit - metal deck- repaint Walls - concrete -repaint | Door Landing - not ADA Door Threshold - ADA ok | Doors/Frm/Hdwr - HM Dr & Frm. PH/Lever/pull handles - adequate | Card Access - required Windows - Alumn sash - replace
Roof - (E) TPO | Roof Fascia - steel Roof Drains - Gutter & DS to SD - adequate | Soffit - metal deck- repaint Walls - concrete -repaint | Door Landing - ADA ok Door Threshold - ADA ok | Doors/Frm/Hdwr - HM Dr & Frm. PH/Lever/pull handles - adequate | Card Access - required Windows - Alumn sash - replace
Space - Function is adequate in existg space | Walls - Gyp Bd, tile & concrete - adequate Int Door/Frm/Hdwr - HM Frm/HM - adequate. | PH/Lever handle adequate Flooring - concete & tile | Ceiling - exposed metal deck - repaint as needed Casework/sink - none | Space Planning - rethink showers for privacy
Space - Function is adequate in existg space | Walls - Gyp Bd & concrete - adequate Int Door/Frm/Hdwr - HM Frm/HM - adequate. | PH/Lever handle adequate Flooring - refinnished wood floors | Ceiling - exposed duct and 1x1 acoustic tile - repaint as needed Casework/sink - none Space Planning - ok DF ADA ok Bleachers have ADA companion seating
DF ADA ok | Bathroom ADA ok, update interior Locker ADA bench in place | Shower ADA bench in place, could use an update
A
EB-3 & EB-4 MISC
Data infrastructure (i.e. 10GB) PG&E transformer with exposed terminals is located in dedicated room. This transformer is at least 60-70 years old. Bus duct feed to Carrier, location, size of space MSB in adjacent room. Cutler Hammer MSB is 1600A, 277/480V, and approx. 25 years old. Adequate capacity for a campus this size.
E
Existing system, code A new Silent Knights 6820EVS panel was added at room 305A, and serves the Admin and MP Building. The remainder of the campus compliant , replace vs retrofit, is old Simplex manual system which meets no current code requirements. Voice Evac, etc. System, headend, type (i.e. Bogen Multi-com 2000 does not meet current district standards. Clock system is very old, probably original to the campus. High VOIP), replace vs retrofit priority.
E
Types of systems, hardware, Two separate existing intrusion alarm systems on campus are both functional. Cameras throughout the campus. No access controls. CCTV, opening contacts, etc.
E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
Rooms and panels, code Many existing panels on campus are very old and obselete, i.e. 50-60 years old. Admin and MP Building were modernized but not all compliant, receptacles, old gear was not replaced. Lots of surface raceway in classrooms. Most classrooms have not been modernized and therefore limited circuiting, etc. power/receptacles. Fixture types and conditions, New LED lighting and nLight controls at Admin and MP Building. Remainder of campus is old fluorescent lighting and controls do not efficiency, controls, life safety / meet current code requirements. Exterior corridors that are main walkways for students are very dark during the day. LED parking lot egress (Int/Ext) lighting and canopy lighting was installed in recent prop 13 project but was poorly done. IDF locations, sizes, MDF is located in room 305A, and meets all of the campus needs, is in a dedicated room with cooling. New fiber has been routed infrastructure, cabling, # data through the campus. Natural gas generator backs up the MDF has exposed gaslines that are subject to potential damage. Horizontal drops per space, etc. cabling is a combination of new CAT6 and 6A, and older CAT5E. Some IDFs located in classrooms which is not ideal. Classrooms have WAPs. Classroom technology, Most classrooms have a flat panel display or projector. presentation spaces; i.e. conf rooms, library, MPR, etc.
BIDWELL JUNIOR HIGH SCHOOL
BUILDING L GYM
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE PLUMBING EQUIPMENT REVIEW FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
A/E M/P
M/P
INTENT OF SCOPE FOR PRICING Exterior Equipment Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.
BUILDING A ADMIN / MPR
BUILDING B LIBRARY
BUILDING C CLASSROOMS
BUILDING D CLASSROOMS
BUILDING F CLASSROOMS
BUILDING I CLASSROOMS
New VRF System install at Admin in 2019. MP has new Roofmounted AC-Unit with full economizer. Boiler Room has an old abandoned Boiler that needs to be removed. Mix of Systems. Mostly Alerton
MP has new Roofmounted AC-Unit with new air distribution.
Poor Air distribution with concentric SA/R diffuser in center of classroom (noisy) most classrooms. Replace all with new 4 diffuser layout.
Poor Air distribution with concentric SA/R diffuser in center of classroom (noisy) most classrooms. Replace all with new 4 diffuser layout.
Poor Air distribution with concentric SA/R diffuser in center of classroom (noisy) most classrooms. Replace all with new 4 diffuser layout.
Poor Air distribution with concentric SA/R diffuser in center of classroom (noisy) most classrooms. Replace all with new 4 diffuser layout.
Alerton
Mix of Systems. Mostly Alerton
Mix of Systems. Mostly Alerton
Mix of Systems. Mostly Alerton
Mix of Systems. Mostly Alerton
Plumbing Fixtures are from original construction. Plumbing Equipment is from original construction.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Equipment is from original construction.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Equipment is from original construction.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Equipment is from original construction.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Equipment is from original construction.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
EMCS Type of system, web based / Programmable T-Stat? Plumbing Fixtures, Plumbing Fixtures are from original Restrooms, sinks, construction and in ok condition. M/P drinking fountains / Replacement should be considered bottle fillers, etc. with any modernization project Gas, condnesation Older Gas Fired Water Heater, piping, water heaters, approx. 20 years old needs to be M/P service sinks, hose bibbs, replaced. gas regaultors (seismic braced) Does AFS exist, location, No Automatic Fire Sprinkler Systems M/P code compliant, etc. found.
M/P
S
EB-3, EB-4 triggers, etc.
BIDWELL JUNIOR HIGH SCHOOL
187
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
188
A/E M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
INTENT OF SCOPE BUILDING J FOR PRICING CLASSROOMS Exterior Equipment Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, Ductwork in ok condition. VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of Alerton system, web based / Programmable T-Stat? Plumbing Fixtures, Plumbing Fixtures are from original Restrooms, sinks, construction and in ok condition. drinking fountains / Replacement should be considered bottle fillers, etc. with any modernization project Gas, condnesation Plumbing Equipment is from original piping, water heaters, construction. service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, No Automatic Fire Sprinkler Systems code compliant, etc. found. EB-3, EB-4 triggers, etc.
BIDWELL JUNIOR HIGH SCHOOL
BUILDING K SHOWER & LOCKER
BUILDING L GYM
BUILDING E & G PORTABLES
Ductwork in ok condition.
New Ground Mounted Ac-Units install with full Airside Economizers.
Distribution is original construction.
(2) STORAGE UNITS BEHIND GYM Portables appear to be Wall Mounted Heat Pumps from the original construction. Distribution is original construction.
Alerton
New Alerton
Stand alone Programmable T-Stat's.
Stand alone Programmable T-Stat's.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Locker Rooms Domestic Hot Water System has been replaced with new Lochinvar Boiler and Storage Tank. Good Condition.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project
Plumbing Fixtures are from original construction and in ok condition.
Plumbing Fixtures are from original construction and in ok condition.
Plumbing Equipment is from original construction.
Plumbing Equipment is from original construction.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
CHICO JR HIGH SCHOOL SITE CONDITIONS COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
Relatively new parking and drop off loop at west end of campus
EXTERIOR SITE AMENITIES
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access
Hardcourts look recently striped, bike enclosure is adequate, flag & monument sign pole at main entry, marquee at drop off area.
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Numberous door areas do not meet ADA standards, some walkways do not meet ADA standards
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Asphalt vehicle area on east side of school has lots of cracking and should be replaced
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
P ALL
SITE CONDITION ASSESSMENT
Decorative & CL at perimeter of school. Single point of entry at front of school but does not enter directly into Admin.
Parking stalls look new
Areas that pond, drain inlets, retention needed, etc.
The areas east of the main building consistantly flood and drainage facilities should be installed, the area between Buildings E and F has poor surface drainage, the quad area north of Building R has poor surface drainage
Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
Irrigation piping in long courtyards is failing and should be replaced, the grease interceptor between Building P and Memorial Way is missing/not functioning resulting in lots of clogging in these pipes
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units. It was noted the site kitchen Grease Trap has clogging issues. Boiler Room Mechanical components need to be demo'd.
CHICO JR HIGH SCHOOL
189
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A ADMIN / LIBRARY
BUILDING B CLASSROOMS
BUILDING C CLASSROOMS
BUILDING D CLASSROOMS
BUILDING E GYM
BUILDING F SHOWER & LOCKER
BLDG COLOR ASSESSMENT 92,026
SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
190
A
A
A
65,539
Condition - materials, Roof - Built up including covered repair / replace, painting, walkway - replace windows, etc. Roof Fascia - Wood - replace/repaint Roof Drains - Gutter & DS to surface - repaint/replair some Soffit - Cement plaster - repaint Walls - Cement plaster & CMU adequate Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr - HM Frm & Dr / alumn. PH/Lever handle/Knob replace Card Access - required Windows - Single glazing, Mtl sash replace Other - N/A Condition - finishes Space - is not adeuate in existg space, (floor, wall, ceiling) limited existing building casework, shades, etc. Walls - Gyp Bd & FRP - repaint / replace Int Door/Frm/Hdwr - HM Frm & Dr/ Wd Frm & Door. Lever handle/ Knob - replace Flooring - VCT, carpet, Sht vinyl replace Ceiling - 2x4 ACT, Gyp Bd, 1x1 glue on tile - replace & repaint as needed Casework/sink - replace, Not ADA Space Planning - Not addequate space for program Other - N/A
See bldg A
See bldg A
See bldg A
Roof - Built up including covered Roof - Built up roof & TPO at Roof - Built up including covered walkway - replace covered walkway walkway - replace Roof Fascia - Wood - replace/repaint Roof Fascia - Wood - replace/repaint Roof Fascia - Wood - replace/repaint Roof Drains - Gutter & DS to surface Roof Drains - Gutter & DS to surface Roof Drains - Gutter & DS to surface - repaint/replair some - repair/repaint - repaint Soffit - Cement plaster & T&G at ext. Soffit -Cement plaster & T&G at ext. Soffit - Cement plaster & T&G at ext. covered walks- repaint covered walks- repaint covered walks- repaint Walls - cement plaster & wood siding Walls - cement plaster & wood siding Walls - cement plaster & wood siding - repaint - repaint - repaint Door Landing - not ADA Door Landing - not ADA Door Landing - not ADA Door Threshold - not ADA Door Threshold - not ADA Door Threshold - not ADA Doors/Frm/Hdwr - HM Frm & Dr. Doors/Frm/Hdwr - HM Frm & Dr. Doors/Frm/Hdwr - HM Frm & Dr. Lever Lever Lever Card Access - required Card Access - required Card Access - required Windows - Single glazing, Mtl sash Windows - Single glazing, Mtl sash Windows - Single glazing, Mtl sash replace replace replace Other - N/A Other - N/A Other - N/A Space - is adeuate in existg space, Space - is adeuate in existg space, Space - is adeuate in existg space limited existing building. Some rooms limited existing building. Some rooms accessible with numerous isolation units are not with numerous isolation units are not Walls - Gyp Bd & tack panel ADA accessible ADA accessible repaint / replace Walls - Gyp Bd & tack panel Walls - Gyp Bd & tack panel Int Door/Frm/Hdwr - HM Frm & repaint / replace repaint / replace Dr. Lever handle - replace Int Door/Frm/Hdwr - HM Frm & Int Door/Frm/Hdwr - HM Frm & Flooring - VCT - replace Dr. Lever handle - replace Dr. Lever handle - replace Ceiling - 2x4 ACT - replace & Flooring - VCT - replace Flooring - VCT - replace repaint as needed Ceiling - 2x4 ACT - replace & Ceiling - 2x4 ACT - replace & Casework/Sink - not ADA repaint as needed repaint as needed Space Planning - N/A Casework - adequate Casework- adequate Other - N/A Space Planning - some spaces Nnt Space Planning - N/A addequate space for program Other - N/A rooms with isolation units Other - N/A
Fixtures, accessories, single Occup toilets room - Not ADA compliant, finishes, ADA etc. MPR, Libraries, Kitchens, Shelving - wall to wall book shelves Science, etc. adequate Circulation Desk - replace ADA, Fire Life Safety, Structural - Must Do Items
CHICO JR HIGH SCHOOL
EB-3 & EB-4
9,028
8,015
Roof - Standing metal seam & TPO at Roof - Built up roof including covered walkway - adequate covered walkway - replace. Roof Fascia - Wood - replace/repaint Roof Fascia - Wood - replace/repaint Roof Drains - Gutter & DS to surface Roof Drains - Gutter & DS to surface - repaint - repaint Soffit - Cement plaster & T&G at ext. Soffit - plywd & T&G at ext. covered covered walks- repaint walks- repaint Walls - cement plaster & CMU Walls - cement plaster - repaint repaint Door Landing - no ADA Door Landing - ADA ok Door Threshold - not ADA Door Threshold - not ADA Doors/Frm/Hdwr - HM Frm & Dr. Doors/Frm/Hdwr - HM Frm & Dr. Lever , PH, Pulls - replace as needed Lever , PH, Pulls - replace as needed Card Access - required Card Access - required Windows - metal sash - replace Windows - None Other - N/A Other - N/A Space - is adeuate in existg space Walls - Gyp Bd & tile - repaint Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle/, knobs - replace Flooring - wood, concrete, & tile adequate Ceiling - plaster, 1x1 acoustic panels, gyp - replace & repaint as needed Casework/Sink -none Space Planning - N/A Other - N/A
Space - is adeuate in existg space Walls - Gyp Bd & tile - repaint Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle/, knobs - replace Flooring - concrete, & tile -replace/ update Ceiling - gyp bd - repaint Casework/Sink -none Space Planning - N/A Other - N/A
Multi Compartment bathroom - ADA Multi Compartment bathroom - ADA ok ok Staff toilet & shower - No ADA Bleachers seem relatively new, back DF - not ADA boards and score board - adequate Showers - no ADA Locker bench - No ADA EB-3 & EB-4
EB-3 & EB-4
EB-3 & EB-4
EB-3 & EB-4
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING G STORAGE
BUILDING H BAND & CHOIR
BUILDING I WOOD SHOP
BUILDING J BOILER
BUILDING L CLASSROOMS
BUILDING M CLASSROOMS
BLDG COLOR ASSESSMENT 1,102
See bldg A
See bldg A
1,655
Condition - materials, No Access repair / replace, painting, windows, etc.
Roof - TPO at roof including coverd walkway Roof Fascia - Wood - replace/repaint Roof Drains - Gutter & DS to surface - repaint Soffit - cement plaster & T&G at ext. covered walks- repaint Walls - cement plaster - repaint Door Landing - no ADA Door Threshold - not ADA Doors/Frm/Hdwr - HM Frm & Dr. Lever , PH, Pulls - replace as needed Card Access - required Windows - metal sash - replace Other - N/A
Roof - TPO at roof including coverd walkway Roof Fascia - Wood - replace/repaint Roof Drains - Gutter & DS to surface - repaint Soffit - cement plaster & T&G at ext. covered walks- repaint Walls - cement plaster - repaint Door Landing - no ADA Door Threshold - not ADA Doors/Frm/Hdwr - HM Frm & Dr. Lever , WD Dr&Frm - replace. PH, Pulls - replace as needed Card Access - required Windows - metal sash - replace Other - N/A
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
Space - is adeuate in existg space Walls - Gyp Bd & 1x1 accoutic tilerepaint Int Door/Frm/Hdwr - HM Frm & Dr., Wd dr & Frame - Not ADA knobs - replace Flooring - VCT -replace/update Ceiling - 1x1 acoustic tile - repaint/ replace as needed Casework/Sink -none Space Planning - N/A Other - N/A DF - not ADA
Space - is adeuate in existg space Walls - Gyp Bd & 1x1 accoutic tilerepaint Int Door/Frm/Hdwr - HM Frm & Dr., Wd dr & Frame - Not ADA knobs - replace Flooring - VCT -replace/update Ceiling - gyp bd & 1x1 acoustic tile - repaint/replace as needed Casework/Sink -none Space Planning - N/A Other - N/A
Roof - built up Roof - TPO at roof including coverd Roof Fascia - N/A walkway Roof Drains - Gutter & DS to surface Roof Fascia - Wood - replace/repaint - repaint Roof Drains - Gutter & DS to surface Soffit - N/A - repaint Walls - concrete w/ cement plaster - Soffit - Cement plaster & T&G at ext. repaint covered walks- repaint Door Landing - no ADA Walls - cement plaster & wood siding Door Threshold - not ADA - repaint Doors/Frm/Hdwr - WD Frm & Dr. Door Landing - not ADA knobs - replace Door Threshold - not ADA Card Access - required Doors/Frm/Hdwr - HM Frm & Dr. Windows - metal sash - replace Lever Other - N/A Card Access - required Windows - Single glazing, Mtl sash replace Other - N/A Space -used for storage Space - is adeuate in existg space Walls - concrete - repaint Walls - Gyp Bd & tack boardInt Door/Frm/Hdwr - WD Frm & repaint Dr., Int Door/Frm/Hdwr - HM Frm & knobs - replace Dr., Wd dr & Frame - Not ADA Flooring - concrete knobs - replace Ceiling - concrete - repaint Flooring - VCT-replace. Epoxy - new Casework/Sink -none Ceiling - gyp bd & 2x4 ACT Space Planning - N/A repaint / replace as needed Other - N/A Casework/Sink -non ADA in labs Space Planning - N/A Other - N/A Single occupancy toilet - not ADA
SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A A
Fixtures, accessories, ADA compliant, finishes, etc. MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
Choir Room - tiered risers needs ADA companion area Practice rooms - doors are not ADA EB-3 & EB-4
EB-3 & EB-4
See bldg A
See bldg A Roof - Built up Roof. TPO at coverd walkway Roof Fascia - Wood - replace/repaint Roof Drains - Gutter & DS to surface - repaint Soffit - Cement plaster & T&G at ext. covered walks- repaint Walls - cement plaster & wood siding - repaint Door Landing - not ADA Door Threshold - not ADA Doors/Frm/Hdwr - HM Frm & Dr. Lever Card Access - required Windows - Single glazing, Mtl sash replace Other - N/A Space - is adeuate in existg space Walls - Gyp Bd & tack boardrepaint Int Door/Frm/Hdwr - HM Frm & Dr. lever handle Flooring - VCT-replace. Ceiling - gyp bd & 2x4 ACT repaint/replace as needed Casework/Sink -non ADA Space Planning - N/A Other - N/A
Science Labs
Science Labs
EB-3 & EB-4
EB-3 & EB-4
CHICO JR HIGH SCHOOL
191
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING N CLASSROOMS
BUILDING O CLASSROOMS
BUILDING P MULTI-PURPOSE
BUILDING Q COVERE CORRIDOR
BUILDING R SCIENCE LABS
BLDG COLOR ASSESSMENT See bldg A
SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
BUILDING INTERIOR A RESTROOMS
SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
192
A
A
Condition - materials, Roof - Built up Roof. TPO at coverd repair / replace, painting, walkway windows, etc. Roof Fascia - Wood - replace/repaint Roof Drains - Gutter & DS to surface - repaint Soffit - Cement plaster & T&G at ext. covered walks- repaint Walls - cement plaster & wood siding - repaint Door Landing - not ADA Door Threshold - not ADA Doors/Frm/Hdwr - HM Frm & Dr. Lever, PH & pull. Card Access - required Windows - Single glazing, Mtl sash replace Other - N/A Condition - finishes Space - is adeuate in existg space (floor, wall, ceiling) Walls - Gyp Bd & tack boardcasework, shades, etc. repaint Int Door/Frm/Hdwr - HM Frm & Dr. lever handle Flooring - VCT-replace. Epoxy - new Ceiling - gyp bd & 2x4 ACT repaint/replace as needed Casework/Sink -non ADA Space Planning - N/A Other - N/A Fixtures, accessories, ADA compliant, finishes, etc.
See bldg A
See bldg A
See bldg A
Roof - Built up Roof. TPO at coverd walkway Roof Fascia - Wood - replace/repaint Roof Drains - Gutter & DS to surface - repaint Soffit - Cement plaster & T&G at ext. covered walks- repaint Walls - cement plaster & wood siding - repaint Door Landing - not ADA Door Threshold - not ADA Doors/Frm/Hdwr - HM Frm & Dr. Lever, PH & pull. Card Access - required Windows - Single glazing, Mtl sash replace Other - N/A Space - is adeuate in existg space Walls - Gyp Bd & tack boardrepaint Int Door/Frm/Hdwr - HM Frm & Dr. lever handle Flooring - VCT, carpet, tile, sheet vinyl - replace. Epoxy - new Ceiling - gyp bd & plaster - repaint Casework/Sink -non ADA Space Planning - N/A Other - N/A
Roof - Built up Roof - replace Roof Fascia - Wood - replace/repaint Roof Drains - Gutter & DS to surface - repaint Soffit - Cement plaster - repaint Walls - cement plaster & wood siding - repaint Door Landing - not ADA Door Threshold - not ADA Doors/Frm/Hdwr - HM Frm & Dr. Lever, PH & pull. Card Access - required Windows - Single glazing, Mtl sash replace Other - N/A
Roof - Built up Roof - replace Roof - Built up Roof - replace Roof Fascia - Wood - replace/repaint Roof Fascia - N/A Roof Drains - Gutter & DS to surface Roof Drains - Roof drains - repaint Soffit - cement plaster Soffit - Cement plaster - repaint Walls - cement plaster - repaint as Walls - cement plaster & wood siding needed - repaint Door Landing - ADA ok Door Landing - not ADA Door Threshold - ADA ok Door Threshold - not ADA Doors/Frm/Hdwr - HM Frm & Dr. PH Doors/Frm/Hdwr - HM Frm & Dr. PH & pull. & pull. Card Access - required Card Access - required Windows - aluminum sash Windows - Single glazing, Mtl sash Other - N/A replace Other - N/A
Space - is adeuate in existg space Walls - Gyp Bd - repaint Int Door/Frm/Hdwr - HM Frm & Dr. lever handle, PH, pull, knobs - replace Flooring - VCT-replace. Epoxy - new Ceiling - gyp bd & 2x4 ACT repaint/replace as needed Casework/Sink -non ADA Space Planning - N/A Other - N/A
Space - is adeuate in existg space Walls - Gyp Bd & tack boards repaint Int Door/Frm/Hdwr - HM Frm & Dr. lever handle, PH, pull, knobs - replace Flooring - VCT-replace. Ceiling - gyp bd / plaster - repaint Casework/Sink -none Space Planning - N/A Other - N/A
Multi Compartment bathroom - not ADA Single occupancy toilet - ADA ok newly modernized Stage - not accessible - no chair lift Nurses Office - update Staff Lounge - update Kitchen - floor recent updated. Equipment & hood look up to date EB-3 & EB-4
EB-3 & EB-4
MPR, Libraries, Kitchens, Maker Space Science, etc.
ADA, Fire Life Safety, Structural - Must Do Items
EB-3 & EB-4
EB-3 & EB-4
5,656
Space - is adeuate in existg space Walls - Gyp Bd & tack boards repaint Int Door/Frm/Hdwr - HM Frm & Dr. lever handle, PH, pull Flooring - epoxy Ceiling - 2x4 ACT Casework/Sink -not ADA in prep room Space Planning - N/A Other - N/A Multi Compartment bathroom - ADA Single occupancy toilet - ADA ok ok newly modernized Single occupancy toilet - ADA ok newly modernized Science building - relatively new 2015
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
A/E M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
INTENT OF SCOPE BUILDING A FOR PRICING ADMIN/LIBRARY Exterior Equipment Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, Distribution is original construction VRF, Pumps, Ducts, when AC-Units were added. diffusers, split systems, exhaust fans, etc. EMCS Type of Johnson Controls Installaion by Shasta system, web based / Control Company. Programmable T-Stat? Plumbing Fixtures, Plumbing Fixtures in ok condition. Restrooms, sinks, Needs updating. drinking fountains / bottle fillers, etc. Gas, condnesation Gas distribution on roof is in piping, water heaters, ok condition. Suggest complete service sinks, hose bibbs, replacement with the installation of gas regaultors (seismic new HVAC Units. braced) Does AFS exist, location, No Automatic Fire Sprinkler Systems code compliant, etc. found.
BUILDING B CLASSROOMS
BUILDING C CLASSROOMS
BUILDING D CLASSROOMS
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
BUILDING E GYM
BUILDING F SHOWER & LOCKER
Ducting is in ok condition.
Ducting is in ok condition.
Johnson Controls Installaion by Shasta Johnson Controls Installaion by Shasta Johnson Controls Installaion by Shasta Johnson Controls Installaion by Shasta Johnson Controls Installaion by Shasta Control Company. Control Company. Control Company. Control Company. Control Company. Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures in ok condition. Needs updating.
Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
BUILDING H CLASSROOMS
BUILDING I WOOD SHOP
BUILDING J BOILER
BUILDING L CLASSROOMS
BUILDING M CLASSROOMS
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
A/E M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
INTENT OF SCOPE BUILDING G FOR PRICING STORAGE Exterior Equipment Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, Did not Access VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of Did not Access system, web based / Programmable T-Stat? Plumbing Fixtures, Did not Access Restrooms, sinks, drinking fountains / bottle fillers, etc. Gas, condnesation Did not Access piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, Did not Access code compliant, etc.
Did not Access
Distribution is original construction when AC-Units were added.
Johnson Controls Installaion by Shasta Johnson Controls Installaion by Shasta Johnson Controls Installaion by Shasta Did not Access Control Company. Control Company. Control Company.
Johnson Controls Installaion by Shasta Control Company.
Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures in ok condition. Needs updating.
Did not Access
hall gang bathrooms recent mod
Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
Did not Access
Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
Did not Access
No Automatic Fire Sprinkler Systems found.
CHICO JR HIGH SCHOOL
193
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
A/E M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
INTENT OF SCOPE BUILDING N FOR PRICING CLASSROOMS Exterior Equipment Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, Distribution is original construction VRF, Pumps, Ducts, when AC-Units were added. diffusers, split systems, exhaust fans, etc. EMCS Type of Johnson Controls Installaion by Shasta system, web based / Control Company. Programmable T-Stat? Plumbing Fixtures, hall gang bathrooms recent mod Restrooms, sinks, drinking fountains / bottle fillers, etc. Gas, condnesation Gas Distribution is in ok condition. piping, water heaters, Suggest complete replacement with service sinks, hose bibbs, the installation of new HVAC Units. gas regaultors (seismic braced) Does AFS exist, location, No Automatic Fire Sprinkler Systems code compliant, etc. found.
BUILDING O CLASSROOMS
BUILDING P MULTI-PURPOSE
BUILDING Q COVERE CORRIDOR
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added. Approx. 12 years old.
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
ELECTRICAL SYSTEMS LIGHTING AND LIGHTING CONTROLS
hall gang bathrooms recent mod
hall gang bathrooms recent mod
Plumbing Fixtures in ok condition. Needs updating.
no scope.
New Plumbing
Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.
no scope.
New Gas Distribution and New Plumbing WH, etc.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
No Automatic Fire Sprinkler Systems found.
no scope.
New FS System.
194
E
E
Types of systems, hardware, Existing Ademco intrusion alarm system, new system at Admin and Science wing, but not consistent throughout the campus. CCTV, opening contacts, etc.
E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
Rooms and panels, code Many existing panels are original to the campus and past servicable life. Panels are located in classrooms and custodial space instead of compliant, receptacles, dedicated electrical rooms. One old panel observed in a recently modernized student's restroom, unlockable, where breakers serviing circuiting, etc. classrooms and staff rooms can be turned off by students. Gear in Science wing is new. Fixture types and conditions, Most interior lighting consists of luminaires with T8 fluorescent lamps, gymnasium building and new science wing have been upgraded efficiency, controls, life safety to LED.. Most exterior lighting has been upgraded to LED. / egress (Int/Ext) IDF locations, sizes, IT has been recently upgraded with new fiber, with Cat6 or better horizontal cabling. Pathway is exposed conduit on roof of the main infrastructure, cabling, # corridor. Classrooms have WAPs. data drops per space, etc. Classroom technology, Most classrooms have a flat panel display or projector. presentation spaces; i.e. conf rooms, library, MPR, etc.
CHICO JR HIGH SCHOOL
Good Air Distribution,
Johnson Controls Installaion by Shasta Control Company.
INTENT OF SCOPE MISC FOR PRICING Data infrastructure (i.e. There are three PG&E services on campus, one at the new science wing, and two at the north end of campus; one feeds a 1200A 10GB) Carrier, location, size 277/480V Cutler Hammer MSB approx. 30 years old for HVAC equipment, and the other feeds a 1600A 120/208V switchboard of space located in a storage room. The latter is completely inaccessible due to storage completely blocking the gear. Existing system, code The fire alarm system consists of a Silent Knight 5820XL-EVS at the admin wing with emergency voice. System is up to code. compliant , replace vs retrofit, Voice Evac, etc. System, headend, type (i.e. Clock system is obselete American Time with Simplex system and does not meet current district standards. High priority item. VOIP), replace vs retrofit
E
no scope.
BUILDING W POOL STORAGE
Johnson Controls Installaion by Shasta Johnson Controls Installaion by Shasta Johnson Controls Installaion by Shasta no scope. Control Company. Control Company. Control Company.
BUILDING CONDITIONS - ELECTRICAL (MISC) BUILDING SCOPE
BUILDING R SCIENCE LABS
MARSH JUNIOR HIGH SCHOOL SITE CONDITIONS COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
Parking and landscaping are adequate. Drop Off needs an accessible loading zone. Admin parking is adquate
EXTERIOR SITE AMENITIES
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access
Concrete monument sign, Marquee, and flag pole are adequate . Hard court is in adequate condition
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Vehicle parking areas and asphalt areas near Buildings G, H and O have cracking, install crack and slurry seal, replace asphalt in basketball court area
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Site has areas of poor grading and drainage, ground water rises to surface in various locations
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
P
SITE CONDITION ASSESSMENT
Fencing is adequate. Single point of entry is in place, directly into Admin.
None known.
Areas that pond, drain inlets, retention needed, etc. Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
ALL
MARSH JR HIGH SCHOOL
195
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A ADMIN
BUILDING B CLASSROOMS
BUILDING C CLASSROOMS
BUILDING D SCIENCE / INDUSTRIAL TECHNOLOGY
BUILDING I LIBRARY
BUILDING L GYM
BLDG COLOR ASSESSMENT 90,881
SQUARE FOOTAGE
A
5,827
11,846
6,518
8,458
7,345
17,555
Condition - materials, Roof - Asphalt Shingle - adquate repair / replace, painting, Roof Fascia - Wood with mtl flashing windows, etc. - repaint Roof Drains - Gutter & DS to SD repaint Soffit - minimal Cement plaster at entry - repaint Walls - Cement plaster - repaint Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - HM Frm & Door. Lever handle Card Access - required Windows - Alumn sash Other - N/A
Roof - Asphalt Shingle - adquate Roof Fascia - Wood with mtl flashing - repaint Roof Drains - Gutter & DS to SD repaint Soffit - N/A Covered Walkway - repaint Walls - Cement plaster - repaint Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - HM Frm & Door. Lever handle Card Access - required Windows - Alumn sash Other - N/A
Roof - Asphalt Shingle - adquate Roof Fascia - Wood with mtl flashing - repaint Roof Drains - Gutter & DS to SD repaint Soffit - N/A Covered Walkway - repaint Walls - Cement plaster - repaint Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - HM Frm & Door. Lever handle Card Access - required Windows - Alumn sash Other - N/A
Roof - Asphalt Shingle - adquate Roof Fascia - Wood with mtl flashing - repaint Roof Drains - Gutter & DS to SD repaint Soffit - N/A Covered Walkway - repaint Walls - Cement plaster - repaint Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - HM Frm & Door. Lever handle Card Access - required Windows - Alumn sash Other - N/A
Roof - Asphalt Shingle - adquate. Built up roof. Roof Fascia - Wood with mtl flashing - repaint Roof Drains - Gutter & DS to SD repaint Soffit - N/A Covered Walkway - repaint Walls - Cement plaster - repaint Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - HM Frm & Door. Lever handle Card Access - required Windows - Alumn sash Other - N/A
Roof - Asphalt Shingle - adquate. Built up roof. Roof Fascia - Wood with mtl flashing - repaint Roof Drains - Gutter & DS to SD repaint Soffit - N/A Covered Walkway - repaint Walls - CMU & Cement plaster repaint Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - HM Frm & Door. Lever handle Card Access - required Windows - Alumn sash Other - N/A
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
Space - Classrooms functions are adeuate in existg space Walls - Gyp Bd, marker board & tack board- adequate Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle Flooring - VCT & sheet vinyl update Ceiling - 2x4 ACT replace tiles as needed, Gyp Bd Casework/Sink - casework - update. sink not ADA Space Planning - N/A Other - N/A
Space - Classrooms functions are adeuate in existg space Walls - Gyp Bd, marker board & tack board- adequate Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle Flooring - VCT & sheet vinyl update Ceiling - 2x4 ACT replace tiles as needed, Gyp Bd Casework/Sink - sink not ADA Space Planning - N/A Other - N/A
Space - Classrooms functions are adeuate in existg space Walls - Gyp Bd, marker board & tack board- adequate Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle Flooring - VCT, sheet vinyl & LVT update Ceiling - 1x1 glue on tile & 2x4 ACT replace tiles as needed, Gyp Bd Casework/Sink - casework if in bad shape. sink not ADA Space Planning - N/A Other - N/A
Space - Library & Computer Lab functions are adeuate in existg space Walls - Gyp Bd, marker board & tack board- adequate Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle, pull, & PH. Flooring - Carpet, VCT & epoxy update Ceiling - Wd T&G, 1x1 glue on tile,& 2x4 ACT replace tiles as needed, Gyp Bd Casework/Sink - Sink not ADA Space Planning - N/A Other - N/A
Space - Gym functions are adeuate in existg space Walls - Gyp Bd, - adequate Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle, pull, & PH. Flooring - Carpet, VCT & tile update Ceiling - metal deck, 2x4 ACT replace tiles as needed, 1x1 glue on tile. Gyp Bd - repair & repaint Casework/Sink - Sink not ADA Space Planning - N/A Other - N/A
single Occup toilets room - ADA
single Occup toilets room - ADA
Multi Compartment bathroom - ADA Multi Compartment bathroom - ADA new update update. Hole in ceiling Single Occup toilets room - door Single Occup toilets room - ADA does not have 18 on push side ADA Locker rooms & staff offices adequate
BUILDING EXTERIOR
A
Space - Function is adeuate in existg space Walls - Gyp Bd & tack boardadequate Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle Flooring - VCT, carpet, Sht vinyl replace Ceiling - 2x4 ACT replace tiles as needed, Gyp Bd, 1x1 glue on tile Casework/Sink - sink not ADA Space Planning - N/A Other - N/A
BUILDING INTERIOR A
Fixtures, accessories, single Occup toilets room - ADA, ADA compliant, finishes, update etc.
A
MPR, Libraries, Kitchens, Science, etc.
A
ADA, Fire Life Safety, Structural - Must Do Items
RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
196
MARSH JR HIGH SCHOOL
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
BLDG COLOR ASSESSMENT SQUARE FOOTAGE
INTENT OF SCOPE FOR PRICING
BUILDING M SCIENCE
6,546
BUILDING P STUDENT ACTIVITY CENTER
13,721
Condition - materials, Roof - Asphalt Shingle, single ply, & standing seam Roof - Single ply - new | Roof Fascia - mtl panel - new repair / replace, painting, polycarbonate panels. - new | Roof Fascia - Wood with Roof Drains - roof drains to SD - new | Soffit - metal windows, etc. mtl flashing - new deck & metal panel - new | Covered Walkway - new Roof Drains - Gutter & DS to SD - new | Soffit - N/A Walls - Cement plaster, tile, corrugated metal - new A Covered Walkway - new | Walls - Cement plaster - new Door Landing - ADA | Door Threshold - ADA Door Landing - ADA | Door Threshold - ADA Doors/Frm/Hdwr - Alumin storefront. Lever handle, pull, Doors/Frm/Hdwr - Alumin storefront. Lever handle, pull, and PH. - new BUILDING and PH. - new | Card Access - required Card Access - required | Windows - Alumn storefront EXTERIOR Windows - Alumn sash | Other - N/A Other - N/A Condition - finishes Space -science classroom functions are adeuate in new Space -MP & classroom functions are adeuate in new (floor, wall, ceiling) space space casework, shades, etc. Walls - Gyp Bd, glass marker panels, tack board, acoustic Walls - Gyp Bd, glass marker panels, tack board, acoustic panels - new panels - new Int Door/Frm/Hdwr HM Frm & wd Dr. Lever handle.Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle. A new Flooring - carpet tile, epoxy & concrete - new Flooring - epoxy & concrete - new | Ceiling - 2x4 ACT Ceiling - 2x4 ACT & Gyp Bd - new | Casework/Sink & Gyp Bd - new - ADA BUILDING Casework/Sink - ADA | Space Planning - N/A Space Planning - N/A | Other - N/A INTERIOR Other - N/A Fixtures, accessories, Multi Compartment bathroom - ADA new BUILDING CONDITIONS - ELECTRICAL (MISC) A ADA compliant, finishes, Single Occup toilets room - ADA - new RESTROOMS etc. BUILDING INTENT OF SCOPE A/E MISC SCOPE FOR PRICING
E
Data infrastructure (i.e. 10GB) Carrier, location, size of space Existing system, code compliant , replace vs retrofit, Voice Evac, etc. System, headend, type (i.e. VOIP), replace vs retrofit
E
Types of systems, hardware, Intrusion alarm system is functional. Cameras throughout the campus. No access controls. CCTV, opening contacts, etc.
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
ELECTRICAL SYSTEMS LIGHTING AND LIGHTING CONTROLS
E E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
BUILDING E MODULAR
BUILDING F, G, H, O PORTABLES
4,036
9,029
To be Removed
To be Removed
To be Removed
To be Removed
PG&E electrical service in secure exterior enclosure with solar equipment, 2000A 277/480V Murray MSB is ~20 years old and in good condition and adequately sized for a campus of this size. Silent Knight 5820XL with voice add-on serves the Gym, MP Building, and Science wing. The remainder of the campus is fed by Edwards FACP. The two systems should be consolidated so that everything is via the Silent Knight panel. Valcom IP Clock/PA system is adequate, but does not exactly meet current district standards.
Rooms and panels, code Some gear (transformers and panels) located at building exterior rather than in dedicated electrical rooms. In general all switchgear is compliant, receptacles, in servicable condition. circuiting, etc. Fixture types and conditions, With exception of MP Building, most interior lighting is T8 fluorescent, many parabolic style fixtures which are especially inefficient. efficiency, controls, life safety Exterior lighting consists of LED parking lot lights, remainder of exterior lighting has not been upgraded. / egress (Int/Ext) IDF locations, sizes, MDF is in dedicated room with cooling. IT has been recently upgraded with new fiber, with Cat6 or better horizontal cabling. Some infrastructure, cabling, # data of the existing underground pathway is daisy chained between buildings which is not ideal. Classrooms have WAPs. drops per space, etc. Classroom technology, Most classrooms have a flat panel display or projector. MPR has projector. presentation spaces; i.e. conf rooms, library, MPR, etc. MARSH JR HIGH SCHOOL
197
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING Exterior Equipment Rooftop, wall mounted BARD, etc. - condition
M/P EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS
M/P
SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of system, web based / Programmable T-Stat? Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.
Alerton Controls
Alerton Controls
Alerton Controls
Alerton Controls
Plumbing Fixtures are from original construction and in ok condition. New ADA requirements should be considered with any modernization project. Plumbing Equipment is of the original construction and in good condition.
Plumbing Fixtures are from original construction and in ok condition. New ADA requirements should be considered with any modernization project. Plumbing Equipment is of the original construction and in good condition.
Plumbing Fixtures are from original construction and in ok condition. New ADA requirements should be considered with any modernization project. Plumbing Equipment is of the original construction and in good condition.
Plumbing Fixtures are from original construction and in ok condition. New ADA requirements should be considered with any modernization project. Plumbing Equipment is of the original construction and in good condition.
Plumbing Fixtures are from original construction and in ok condition. New ADA requirements should be considered with any modernization project. Plumbing Equipment is of the original construction and in good condition.
Plumbing Fixtures are from original construction and in ok condition. New ADA requirements should be considered with any modernization project. Plumbing Equipment is of the original construction and in good condition.
None found
None found
None found
None found
PLUMBING EQUIPMENT REVIEW
Gas, condnesation piping, water heaters, M/P service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, None found M/P code compliant, etc. EB-3, EB-4 triggers, etc.
MARSH JR HIGH SCHOOL
BUILDING C CLASSROOMS
Alerton Controls
M/P
S
BUILDING B CLASSROOMS
Alerton Controls
PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
198
M/P
BUILDING D BUILDING I BUILDING L SCIENCE / INDUSTRIAL TECHLIBRARY GYM NOLOGY Mechanical systems consist of splitMechanical systems consist of splitMechanical systems consist of splitMechanical systems consist of splitMechanical systems consist of splitMechanical systems consist of Carrier system w/Gas Fired Furnaces and system w/Gas Fired Furnaces and system w/Gas Fired Furnaces and system w/Gas Fired Furnaces and system w/Gas Fired Furnaces and Roof Mounted AC-Units. Approx. 20 outdoor Condensing units. Approx. outdoor Condensing units. Approx. outdoor Condensing units. Approx. outdoor Condensing units. Approx. outdoor Condensing units. Approx. years old and nearing the end of life. 24 years old and nearing the end of 24 years old and nearing the end of 24 years old and nearing the end of 24 years old and nearing the end of 24 years old and nearing the end of Outdoor refrigerant piping is in poor life. Outdoor refrigerant piping is in life. Outdoor refrigerant piping is in life. Outdoor refrigerant piping is in life. Outdoor refrigerant piping is in life. Outdoor refrigerant piping is in condition. Suggest replacement of poor condition. Suggest replacement poor condition. Suggest replacement poor condition. Suggest replacement poor condition. Suggest replacement poor condition. Suggest replacement indoor/out section within 4-5 years. of indoor/out section within 4-5 years. of indoor/out section within 4-5 years. of indoor/out section within 4-5 years. of indoor/out section within 4-5 years. of indoor/out section within 4-5 years. complete with refrigerant piping. complete with refrigerant piping. complete with refrigerant piping. complete with refrigerant piping. complete with refrigerant piping. complete with refrigerant piping. Air distribution is original construction Air distribution is original construction Air distribution is original construction Air distribution is original construction Air distribution is original construction Air distribution is original construction when AC-Units were added and in when AC-Units were added and in when AC-Units were added and in when AC-Units were added and in when AC-Units were added and in when AC-Units were added and in good condition. good condition. good condition. good condition. good condition. good condition. BUILDING A ADMIN
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
A/E M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
INTENT OF SCOPE BUILDING M FOR PRICING SCIENCE Exterior Equipment - New Building Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, New Building VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of New Building system, web based / Programmable T-Stat? Plumbing Fixtures, New Building Restrooms, sinks, drinking fountains / bottle fillers, etc. Gas, condnesation New Building piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, New Building code compliant, etc.
BUILDING P STUDENT ACTIVITY CENTER New Building New Building
BUILDING E, F, G, H, O BUILDING E, F, G, H, O PORTABLES PORTABLES Portables appear to be Wall Mounted Portables appear to be Wall Mounted Heat Pumps from the original Heat Pumps from the original construction. construction. Air distribution is original construction Air distribution is original construction when AC-Units were added. when AC-Units were added.
New Building
Stand alone Programmable T-Stat's.
Stand alone Programmable T-Stat's.
New Building
Plumbing Equipment is of the original Plumbing Equipment is of the original construction and in good condition. construction and in good condition.
New Building
Plumbing Equipment is of the original Plumbing Equipment is of the original construction and in good condition. construction and in good condition.
New Building
None found
None found
EB-3, EB-4 triggers, etc.
MARSH JR HIGH SCHOOL
199
CHICO SENIOR HIGH SCHOOL SITE CONDITIONS A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
(3) Existg parking lot to the. PV shade over 1 parking lot. Drop off pull out along north side of campus.
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.
monument sign & flag pole at front of campus, no visible marquee minimal hard court no visible exterior baketball courts New stadium PV shade structure at Parking lot Perimeter of site has chain link and decorative metal fencing. Existing fencing at front of school is climbable No single point of entry into Admin Some walkways along Buildings B, C, D, G and T do not meet ADA standards, there are quite a few raised walkways due to trees
EXTERIOR SITE AMENITIES SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
200
COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
P ALL
CHICO SR HIGH SCHOOL
Fencing, gates, hardware / access Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc. Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair Areas that pond, drain inlets, retention needed, etc. Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
SITE CONDITION ASSESSMENT
No comment Student parking area along West Sacramento Avenue are in poor condition and should be repaved, onsite pavement west of Building G should be crack and slurry sealed The concrete plaza west of Building B should be rebuilt to better comply with ADA standards The quad area north of Building M has flooding issues and needs additional drainage, flooding occurs between Building G and Inspire and additional drainage is needed, flooding occurs on the south side of Building C and additional drainage is needed All domestic water piping is failing and should be replaced, there is frequent sewer clogging near Building D - more cleanouts are needed
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
The site has underground Gas Distribution Issues due to age and condition. It is estimated that approx. 30% of the U.G. Gas piping needs replacemeny within the nex 2-5 years. EMCS U.G. wiring and conduit are at end of life. Approx. 50% of the wiring and conduit is in need of replacement within the next 2-5 years.
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A ADMIN/CLASSROOMS
BUILDING AG CLASSROOMS (AGRICULTURE)
BUILDING B CLASSROOMS
BUILDING C CLASSROOMS
BUILDING D CLASSROOMS (MUSIC)
BUILDING F CLASSROOMS (ART)
BLDG COLOR ASSESSMENT 220,469
SQUARE FOOTAGE
A
BUILDING EXTERIOR
25562
13,516
19024
19024
9,973
7,062
Roof - Built up roof - replace Roof Fascia - Cement Plaster repaint Roof Drains - Gutter & DS to SD repair/repaint as needed. Soffit - Cement plaster - repaint Walls - concrete & gyp bd Door Landing - some not ADA Door Threshold - some not ADA Doors/Frm/Hdwr -HM Frm.& Dr. Lever &PH - replace as needed Card Access - required Windows - Alumn sash Other -N/A
Roof - TPO Roof Fascia - Cement Plaster repaint Roof Drains - Gutter & DS to SD repair/repaint as needed. Soffit - Cement plaster - repaint Walls - Brick & Cement Plaster Door Landing - some not ADA Door Threshold - some not ADA Doors/Frm/Hdwr - Alumn Frm.& HM Dr. PH, Pull, Lever &Knob - replace as needed Card Access - required Windows - Alumn sash Other -N/A
Roof - TPO Roof Fascia - Cement Plaster repaint Roof Drains - Gutter & DS to SD repair/repaint as needed. Soffit - Cement plaster - repaint Walls - Brick & Cement Plaster Door Landing - some not ADA Door Threshold - some not ADA Doors/Frm/Hdwr - Alumn Frm.& HM Dr. PH, Pull, Lever &Knob - replace as needed Card Access - required Windows - Alumn sash Other -N/A
Roof - tar & gravel - replace Roof Fascia - Cement Plaster repaint Roof Drains - Gutter & DS to SD repair/repaint as needed. Soffit - Cement plaster - repaint Walls - Brick & Cement Plaster Door Landing - not ADA Door Threshold - some not ADA Doors/Frm/Hdwr - HM Frm.& Dr. Lever handles Card Access - required Windows - metal sash - replace Other -N/A
Roof - Built up roof - replace Roof Fascia - Cement Plaster repaint Roof Drains - Gutter & DS to SD repair/repaint as needed. Soffit - Cement plaster - repaint Walls - Cement Plaster Door Landing - not ADA Door Threshold - some not ADA Doors/Frm/Hdwr - Aluminum Frm.& HM Dr. Lever handles Card Access - required Windows - aluminum sash - replace Other -N/A
Space - Function seems adeuate in Space - Function seems adeuate in existg space existg space but needs updating Walls - Gyp Bd, Brick, tile - update/ Walls - Gyp Bd, concrete, FRP repaint as needed update/repaint as needed Int Door/Frm/Hdwr - HM Frm, Wd/ Int Door/Frm/Hdwr - HM Frm, & HM Dr. Lever/Pull. Knobs - replace Dr. Lever, Pull, PH - replace Flooring - VCT, carpet, Sht vinyl, Tile, Flooring - VCT, epoxy, Concrete Concrete - replace as needed replace as needed Ceiling - 2x4 ACT, Gyp Bd, 1x1 glue Ceiling - Exposed wood deck on tile replace as needed Casework/Sink Casework/Sink - Not ADA Space Planning - N/A Space Planning - N/A Other - N/A Other - N/A
Space - Function seems adeuate in existg space Walls - Gyp Bd, tack board, marker laminate, tile - update/repaint as needed Int Door/Frm/Hdwr - WD Frm, Wd Dr. PH,Lever,Pull, Knobs - replace as needed Flooring - VCT, carpet, Sht vinyl, Tile, Concrete - replace as needed Ceiling - 2x4 ACT, Gyp Bd - replace as needed Casework/Sink - N/A Space Planning - N/A Other - N/A
Space - Function seems adeuate in existg space Walls - Gyp Bd, tack board, marker laminate, tile - update/repaint as needed Int Door/Frm/Hdwr - WD Frm, Wd Dr. PH,Lever,Pull, Knobs - replace as needed Flooring - VCT, carpet, Sht vinyl, Tile, Concrete - replace as needed Ceiling - 2x4 ACT, Gyp Bd - replace as needed Casework/Sink - N/A Space Planning - N/A Other - N/A
Space - Function seems adeuate in existg space Walls - Gyp Bd, wood panel, marker, tile - update/repaint as needed Int Door/Frm/Hdwr - WD Frm, Wd Dr. PH,Lever,Pull - replace as needed Flooring - VCT, Sht vinyl, Tile, Concrete - replace as needed Ceiling - 1x1 acoustic, Gyp Bd replace as needed Casework/Sink - N/A Space Planning - N/A Other - N/A
Space - Function does not seems adeuate in existg space Walls - Gyp Bd, marker - update/ repaint as needed Int Door/Frm/Hdwr - WD Frm, Wd Dr. PH,Lever,Pull - replace as needed Flooring - VCT, Concrete - replace as needed Ceiling - 2x4 ACT, Gyp Bd - replace as needed Casework/Sink - not ADA Space Planning - N/A Other - N/A
Multi Compartment bathroom ADA ok, looks recently updated
Multi Compartment bathroom - not ADA
Multi Compartment bathroom - not ADA , updated
Condition - materials, Roof - Built up roof - replace, saw repair / replace, painting, ponding on roof windows, etc. Roof Fascia - Cement Plaster repaint Roof Drains -Roof Drain to DS to SD - repair/repaint as needed. Soffit - Cement plaster - repaint Walls - brick Door Landing - some not ADA Door Threshold - some not ADA Doors/Frm/Hdwr - alumn Frm.& Dr. , Mtl Dr. Lever &Knob - replace as needed Card Access - required Windows - Alumn sash Other -N/A Condition - finishes (floor, wall, ceiling) casework, shades, etc.
A
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A A
Fixtures, accessories, Multi Compartment bathroom - Not ADA compliant, finishes, ADA needs update etc. MPR, Libraries, Kitchens, Stairwell at elevator handrails are not Science, etc. code compliant ADA, Fire Life Safety, Structural - Must Do Items
EB-3 & EB-4
Single Occupancy Toilet - ADA ok, looks recently updated Circular Hand washing station is not ADA
Band and Chior rooms nice size
Art Classrooms
Band and Chior practice rooms not ADA
CHICO SR HIGH SCHOOL
201
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING H CLASSROOMS (HOME EC.)
BUILDING G GYM & LOCKER ROOMS
BUILDING IT INDUSTRIAL TECHNOLOGY
BUILDING J CLASSROOMS
BUILDING K CLASSROOMS
BLDG COLOR ASSESSMENT See bldg D
11,267
16212
16942
11,558
Condition - materials, Roof - tar & gravel - replace repair / replace, painting, Roof Fascia - Cement Plaster windows, etc. repaint Roof Drains - Gutter & DS to SD repair/repaint as needed. Soffit - Cement plaster - repaint Walls - Brick & Cement Plaster Door Landing - not ADA Door Threshold - some not ADA Doors/Frm/Hdwr - HM Frm.& Dr. Lever handles Card Access - required Windows - metal sash - replace Other -N/A
Roof - tar & gravel - replace Roof Fascia - N/A Roof Drains - Scupper & DS to SD repair/repaint as needed. Soffit - N/A Walls - Brick & Cement Plaster Door Landing - not ADA Door Threshold - some not ADA Doors/Frm/Hdwr - HM Frm.& Dr. Lever handles Card Access - required Windows - metal sash - replace Other -N/A
Roof - Single Ply Roof Roof Fascia - cement plaster - paint Roof Drains - Roof Drains to SD repair/repaint as needed. Soffit -Cement plaster - paint Walls - Brick & Cement Plaster Door Landing - not ADA Door Threshold - some not ADA Doors/Frm/Hdwr - HM Frm.& Dr. Lever handles Card Access - required Windows - aluminum curtain wall & aluminum sash Other -N/A
Roof - Single Ply Roof Roof Fascia - cement plaster - paint Roof Drains - Roof Drains to SD repair/repaint as needed. Soffit -Cement plaster - paint Walls - Brick & Cement Plaster Door Landing - not ADA Door Threshold - some not ADA Doors/Frm/Hdwr - HM Frm.& Dr. Lever handles Card Access - required Windows - aluminum curtain wall & aluminum sash Other -N/A
Roof - Tar & Gravel at roof and covered walkway - replace Roof Fascia - Cement Plaster repaint Roof Drains - Gutter & DS to SD repair/repaint as needed. Soffit - Cement plaster - repaint Walls - brick Door Landing - some not ADA Door Threshold - some not ADA Doors/Frm/Hdwr - Alumn Frm.& Dr. PH & Pull - replace as needed Card Access - required Windows - Alumn sash Other -N/A
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
Space - Some function do not seems adeuate in existg space Walls - CMU, Gyp Bd, tack board, laminate, tile - update/repaint as needed Int Door/Frm/Hdwr - HM Frm, Wd Dr. ,Lever Handles - replace as needed Flooring - VCT, Tile, Concrete replace as needed Ceiling - 2x4 ACT, Gyp Bd, 1x1 acoustic tile - replace & repair as needed Casework/Sink - no ADA Space Planning - N/A Other - N/A
Space - function seems adeuate in existg space Walls - Gyp Bd, tack board, tile update/repaint as needed Int Door/Frm/Hdwr - HM Frm, Wd Dr. ,Lever Handles - replace as needed Flooring - VCT, Tile, Concrete replace as needed Ceiling - 2x4 ACT, Gyp Bd, 1x1 acoustic tile - replace & repair as needed Casework/Sink - no ADA Space Planning - N/A Other - N/A
Space - function seems adeuate in existg space Walls - Gyp Bd, tack board, tile update/repaint as needed Int Door/Frm/Hdwr - HM Frm, Wd Dr. ,Lever Handles - replace as needed Flooring - VCT, Tile, Concrete replace as needed Ceiling - 2x4 ACT, Gyp Bd, 1x1 acoustic tile - replace & repair as needed Casework/Sink - no ADA Space Planning - N/A Other - N/A
Space - Function seems adeuate in existg space Walls - Gyp Bd & tile -paint as needed Int Door/Frm/Hdwr - WD Frm, Wd Dr. Lever handles & Knobs - replace as needed Flooring - VCT, carpe tile , tile replace as needed Ceiling - 2x4 ACT, Gyp Bd - replace as needed Casework/Sink - not ADA Space Planning - N/A Other - N/A
SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
202
A A A
Fixtures, accessories, ADA compliant, finishes, etc. MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
CHICO SR HIGH SCHOOL
Space - Function seems adeuate in existg space Walls - Gyp Bd, tack board, marker laminate, tile - update/repaint as needed Int Door/Frm/Hdwr - WD Frm, Wd Dr. PH,Lever,Pull, Knobs - replace as needed Flooring - VCT, carpet, Sht vinyl, Tile, Concrete - replace as needed Ceiling - 2x4 ACT, Gyp Bd - replace as needed Casework/Sink - no ADA Space Planning - N/A Other - N/A
Multi Compartment bathroom - not ADA
BUILDING L LIBRARY & THEATER CLASSROOMS
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING M LINCOLN HALL
BUILDING N FITNESS LAB
BUILDING S CLASSROOMS
BUILDING SA ASSOCIATED STUDENTS BUILDING
BUILDING ST STORAGE
BLDG COLOR ASSESSMENT 19,250
840
2,699
Condition - materials, Roof - Single Ply Roof - Single Ply Roof - Built up roof - replace repair / replace, painting, Roof Fascia - N/A Roof Fascia - N/A Roof Fascia - Cement Plaster windows, etc. Roof Drains - Scupper & DS to SD - Roof Drains - Roof Drain to SD repaint repair/repaint as needed. repair/repaint as needed. Roof Drains - Gutter & DS to SD Soffit - N/A Soffit - N/A repair/repaint as needed. Walls -Concrete & metal panels Walls -CMU, cement plaster Soffit - Cement plaster - repaint Door Landing - ADA ok Door Landing - ADA ok Walls - Brick & Cement Plaster Door Threshold - ADA ok Door Threshold - ADA ok Door Landing - not ADA Doors/Frm/Hdwr - Alumin Storefront, Doors/Frm/Hdwr - Alumin Storefront, Door Threshold - some not ADA PH, pulls. PH, pulls. Doors/Frm/Hdwr - Aluminum Frm.& Card Access - required Card Access - required HM Dr. Lever handles Windows - metal sash - replace Windows - translucent wall & Card Access - required Other -N/A storefront Windows - aluminum sash - replace Other -N/A Other -N/A
Roof - Metal roof Roof Fascia - Cement Plaster repaint Roof Drains - Gutter & DS to SD repair/repaint as needed. Soffit - Cement plaster - repaint Walls - Brick & Cement Plaster Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr - HM Frm & Dr. Lever handle Card Access - required Windows - aluminum sash - replace Other -N/A
No access
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
Space - Function seems adeuate in existg space Walls - Gyp Bd - update/repaint as needed Int Door/Frm/Hdwr - N/A Flooring - Carpet - replace as needed Ceiling -Gyp Bd - repaint as needed Casework/Sink - not ADA Space Planning - N/A Other - N/A
SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A A
Space - Some function adeuate in existg space Walls - CMU, conc & gyp Int Door/Frm/Hdwr - HM Frm, Wd Dr. ,Lever Handles - replace as needed Flooring - epoxy Ceiling - acoustadeck, Gyp Bd Casework/Sink - ADA ok Space Planning - N/A Other - N/A
5,404
Space - Some function adeuate in existg space Walls - CMU, conc & gyp Int Door/Frm/Hdwr - HM Frm, Wd Dr. ,Lever Handles - replace as needed Flooring - epoxy Ceiling - acoustadeck, Gyp Bd Casework/Sink - ADA ok Space Planning - N/A Other - N/A
7,965
Space - Function does not seems adeuate in existg space Walls - Gyp Bd, marker - update/ repaint as needed Int Door/Frm/Hdwr - WD Frm, Wd Dr. PH,Lever,Pull - replace as needed Flooring - VAT, VCT - replace as needed Ceiling - 2x4 ACT, Gyp Bd - replace as needed Casework/Sink - not ADA Space Planning - N/A Other - N/A
Fixtures, accessories, ADA compliant, finishes, etc. MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
CHICO SR HIGH SCHOOL
203
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE PLUMBING EQUIPMENT REVIEW
M/P
M/P
M/P
M/P
INTENT OF SCOPE BUILDING A FOR PRICING ADMIN/CLASSROOMS Exterior Equipment - (11) Trane Packaged Units are + 30 Rooftop, wall mounted years old and need replacement. BARD, etc. - condition Additionally (3) Large Seasons-4 Multi-Zones approx. 20 years old and have approx. 5-8 years of life left. SYSTEM TYPE, Boilers, Distribution is original construction VRF, Pumps, Ducts, when AC-Units were added. diffusers, split systems, exhaust fans, etc. EMCS Type of The buildings have a mix of Alerton system, web based / and Delta Energy Management Programmable T-Stat? Systems. Plumbing Fixtures, Plumbing Fixtures are from original Restrooms, sinks, construction and in ok condition. drinking fountains / Replacement should be considered bottle fillers, etc. with any modernization project Gas, condnesation Older Gas Fired Water Heater, piping, water heaters, approx. 20 years old needs to be service sinks, hose bibbs, replaced. gas regaultors (seismic braced)
BUILDING AG CLASSROOMS (AGRICULTURE) (5) Trane Packaged AC-Units +25 years old and at end of life.
BUILDING B CLASSROOMS (4) Bryant & (5) Trane Packaged ACUnits +25 years old and end of life.
BUILDING C CLASSROOMS (24) Trane Packaged AC-Units +25 years old and end of life.
BUILDING D CLASSROOMS (MUSIC) (7) Carrier Packaged AC-Units + 25 years old and at end of life.
BUILDING F CLASSROOMS (ART) (5) Trane Packaged AC-Units +25 years old and end of life.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
The buildings have a mix of Alerton and Delta Energy Management Systems. Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Equipment is from original construction.
The buildings have a mix of Alerton and Delta Energy Management Systems. Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Equipment is from original construction.
The buildings have a mix of Alerton and Delta Energy Management Systems. Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Equipment is from original construction.
The buildings have a mix of Alerton and Delta Energy Management Systems. Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Equipment is from original construction.
The buildings have a mix of Alerton and Delta Energy Management Systems. Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Equipment is from original construction.
BUILDING IT INDUSTRIAL TECHNOLOGY
BUILDING J CLASSROOMS
BUILDING K CLASSROOMS
BUILDING L LIBRARY & THEATER CLASSROOMS (2) Season's - 4 Multi-Zones +20 years old, 5-8 years of life left.
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
204
M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
INTENT OF SCOPE FOR PRICING
BUILDING G GYM & LOCKER ROOMS
Exterior Equipment - (4) Carrier Packaged AC-Units Rooftop, wall mounted +10years old and (4) Mini-split BARD, etc. - condition Systems serving Coaches Offices. (1) Split System serving Dance, new. SYSTEM TYPE, Boilers, Distribution is original construction VRF, Pumps, Ducts, when AC-Units were added. diffusers, split systems, exhaust fans, etc. EMCS Type of The buildings have a mix of Alerton system, web based / and Delta Energy Management Programmable T-Stat? Systems. Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc. Gas, condnesation Plumbing Fixtures are from original piping, water heaters, construction and in ok condition. service sinks, hose bibbs, Replacement should be considered gas regaultors (seismic with any modernization project braced) Does AFS exist, location, Not reviewed. code compliant, etc.
CHICO SR HIGH SCHOOL
BUILDING H CLASSROOMS (HOME EC.) Not reviewed.
(6) Packaged AC-Units 15-20 years old nearing end of life.
Not reviewed.
Not reviewed.
Not reviewed.
Distribution is original construction when AC-Units were added.
Not reviewed.
Not reviewed.
Distribution is original construction when AC-Units were added.
Not reviewed.
The buildings have a mix of Alerton and Delta Energy Management Systems.
Not reviewed.
Not reviewed.
The buildings have a mix of Alerton and Delta Energy Management Systems.
Not reviewed.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project
Not reviewed.
Not reviewed.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project
Not reviewed.
Plumbing Equipment is from original construction.
Not reviewed.
Not reviewed.
Plumbing Equipment is from original construction.
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
INTENT OF SCOPE FOR PRICING
BUILDING M LINCOLN HALL
Exterior Equipment - Not reviewed. Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, Not reviewed. VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of Not reviewed. system, web based / Programmable T-Stat? Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc. Gas, condnesation Not reviewed. piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, Not reviewed. code compliant, etc.
BUILDING N FITNESS LAB
BUILDING S CLASSROOMS
BUILDING SA BUILDING ST ASSOCIATED STUDENTS BUILDSTORAGE ING Not reviewed. Not reviewed.
Not reviewed.
(7) Carrier Packaged AC-Units +25years old, at end of life.
Not reviewed.
Distribution is original construction when AC-Units were added.
Not reviewed.
Not reviewed.
Not reviewed.
The buildings have a mix of Alerton and Delta Energy Management Systems.
Not reviewed.
Not reviewed.
Not reviewed.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project
Not reviewed.
Not reviewed.
Not reviewed.
Plumbing Equipment is from original construction.
Not reviewed.
Not reviewed.
BUILDING CONDITIONS - ELECTRICAL (MISC) BUILDING SCOPE
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
ELECTRICAL SYSTEMS LIGHTING AND LIGHTING CONTROLS
E
INTENT OF SCOPE FOR MISC PRICING Data infrastructure (i.e. PG&E service at the NE corner of campus is not in a secure enclosure. The 3000A 277/480V MSB is 50+ years has a pump handl main 10GB) Carrier, location, size switch and fused switches for distribution, it is long past its servicable life. PV system interconnected at the MSB. Site pullboxes that of space require access have been buried; this requires on site-investigation and correction. Existing system, code Fire alarm system is primarily EST IRC-3, thought there is also a Silent Knight 5820XL on campus. Voice was added on for the Stadium Only. compliant , replace vs retrofit, Systems should be consolidated, for a campus this size a new 6820-EVS should be provided. High priority item. Voice Evac, etc. System, headend, type (i.e. Valcom IP Clock/PA system is adequate meets current district standards. VOIP), replace vs retrofit
E
Types of systems, hardware, Multiple (6-8) separate intrusion alarm systems (Ademco) on campus, consider consolidating. Cameras throughout the campus. No access CCTV, opening contacts, etc. controls.
E
E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
Rooms and panels, code compliant, receptacles, circuiting, etc.
Most of the existing gear on campus (buildings Admin/B/C/D) is as old as the MSB and past its servicable life; newer gear in good condition at J/K and Lincoln Center (MP and Cafeteria) In older wings panels are located in classrooms, corridors, custodial closets or outside of classrooms instead of dedicated electrical rooms. Gear in Gym building storage room observed without code required working clearance. Electrical equipment located in basement of gym that has experienced flooding. Fixture types and conditions, Lighting in J/K is newer and good condition but not LED. Lighting in lincoln Hall is LED. Older wings have not been renovated, lighting is efficiency, controls, life safety primarily T8 fluorescent and even some incadescent. Inverter in gym has been bypassed and is non functional (life-safety code issue). Some / egress (Int/Ext) but not all exterior lighting has been upgraded to LED, PV canopies in parking lot have T8 lighting; exterior lighting controlled by BMS. IDF locations, sizes, MDF is in dedicated room with conditioning but not dedicated cooling. IT has been recently upgraded with new fiber. Horizontal cabling is infrastructure, cabling, # data a mix of CAT5E, CAT6 and CAT6A. Pullboxes part of the existing underground pathway have been buried and no longer accessible. No drops per space, etc. data at baseball and softball fields. Classrooms have WAPs. Classroom technology, Most classrooms have a flat panel display or projector. presentation spaces; i.e. conf rooms, library, MPR, etc. CHICO SR HIGH SCHOOL
205
PLEASANT VALLEY HIGH SCHOOL SITE CONDITIONS A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
Relatively new drop off area and accessible parking. Part of parking lot has received a slurry coat.
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.
"Marquee Flag pole at Admin Hard court looks ok New stadium PV shade structures in Parking lot" Fencing at perimeter of campus with a single point of entry to Admin Bldg
EXTERIOR SITE AMENITIES SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
206
COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
P
Fencing, gates, hardware / access
SITE CONDITION ASSESSMENT
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Some onsite pathways do not meet ADA standards
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Vehicle parking area and asphalt area east of stadium are cracked and should be crack and slurry sealed
Areas that pond, drain inlets, retention needed, etc. Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
ALL
PLEASANT VALLEY HIGH SCHOOL
Storm drain pipes in vicinity of Buildings B, C, D, P and O are clogged and need to be replaced, campus has frequent flooding in this area that flows between Buildings B and O and south of Building G and east of Building F and thru asphalt area toward stadium, the roof between Buildings O and P is open and allows rain between the buildings and to collect in the recessed foundation area and a drainage system is needed to collect this water The sewer pipes in the vicinity of Buildings H, V and W have clogging issues and should be replaced or slip lined, there are underground hose bibs that are failing and need to be replaced
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A CLASSROOMS MEDICAL
BUILDING V ADMINISTRATION
BUILDING B CLASSROOMS
BUILDING C CLASSROOMS
BUILDING D CLASSROOMS
BUILDING E INDUSTRIAL ARTS
BLDG COLOR ASSESSMENT 206,318
SQUARE FOOTAGE
A
BUILDING EXTERIOR
8,415
8,281
8,289
8,742
Condition - materials, Roof - Standing mtl seam - new repair / replace, painting, Roof Fascia -Cement Plaster - new windows, etc. Roof Drains - Gutter & DS to SD new Soffit - Cement plaster -new Walls - Cement plaster, Corrugated mtl - new Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr - HM Frm & Dr, alumn storefront. PH/Lever handle/ Pull - new Card Access - required Windows -Storefront - new Other - N/A
Roof - asphalt shingle - new Roof Fascia - Wood - newly painted Roof Drains - Gutter & DS to SD new Soffit - Cement plaster - paint Walls - Cement plaster - newly painted Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr - HM Frm & Dr. PH/Lever handle/Pull - newly painted Card Access - required Windows -Alumin sash Other - N/A
Roof - asphalt shingle - replace Roof Fascia - Wood - replace/ paint as needed Roof Drains - Gutter & DS to SD repair as needed Soffit - Cement plaster - paint & repair as needed Walls - Cement plaster - paint Door Landing - not ADA Door Threshold - no ADA Doors/Frm/Hdwr - HM Frm & Dr. Knobs - replace Card Access - required Windows -Alumin sash Other - N/A
Roof - asphalt shingle - replace Roof Fascia - Wood - replace/ paint as needed Roof Drains - Gutter & DS to SD repair as needed Soffit - Cement plaster - paint & repair as needed Walls - Cement plaster - paint Door Landing - not ADA Door Threshold - no ADA Doors/Frm/Hdwr - HM Frm & Dr. Lever, Knobs - replace Card Access - required Windows -Alumin sash Other - N/A
Roof - asphalt shingle - new Roof - asphalt shingle & single ply Roof Fascia - Wood - newly painted - new Roof Drains - Gutter & DS to SD Roof Fascia - N/A new Roof Drains - Roof Drain to DS to Soffit - Cement plaster - paint SD - new Walls - Cement plaster - paint Soffit - N/A Door Landing - ADA ok Walls - CMU, corrugated metal, Door Threshold - ADA ok cement plaster Doors/Frm/Hdwr - HM Frm & Dr. Door Landing - ADA ok PH/Lever handle/Pull Door Threshold - ADA ok Card Access - some installed, required Doors/Frm/Hdwr - HM Frm & Dr. at others PH/Lever handle/Pull Windows -Alumin sash Card Access - installed Other - N/A Windows -Alumin sash Other - N/A
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
Space - Function is adeuate in existg space Walls - Gyp Bd, Tack board - paint as needed Int Door/Frm/Hdwr - HM Frm & Dr. PH/Lever handle Flooring - Carpet tile, Sht vinyl, VCT replace as needed Ceiling - 2x4 ACT, Gyp Bd - replace as needed Casework/Sink - no ADA Space Planning - N/A Other - N/A
Space - Function is adeuate in existg space Walls - Gyp Bd, Tack board - paint as needed Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle & Knobs Replace Flooring - Carpet tile & VAT - replace as needed Ceiling - 1x1 and 1x2 acoustic tile replace as needed Casework/Sink - no ADA Space Planning - N/A Other - Movable wall doesn't seem used.
Space - Function is adeuate in existg space Walls - Gyp Bd, Tack board - paint as needed Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle & Knobs Replace Flooring - Sheet Vinyl, epoxy, Carpet tile & VAT, tile - replace as needed Ceiling - 1x1 acoustic tile, 2x4 ACT, gyp bd - replace as needed Casework/Sink - ADA ok Space Planning - N/A Other - N/A
Space - Function is adeuate in existg space Walls - Gyp Bd, Tack board - paint as needed Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle & Knobs Replace Flooring - Sheet Vinyl, epoxy, Carpet tile & VAT, tile - replace as needed Ceiling - 1x1 acoustic tile, 2x4 ACT, gyp bd - replace as needed Casework/Sink - ADA ok Space Planning - N/A Other - N/A
A
7,173
Space - Function is adeuate in existg space Walls - Gyp Bd, Tack board, FRP - new Int Door/Frm/Hdwr - HM Frm & Dr. PH/Lever handle - new Flooring - Carpet tile, Sht vinyl, Vinyl Tile, Epoxy - new Ceiling - 2x4 ACT, Gyp Bd - new Casework/Sink - ADA ok Space Planning - N/A Other - N/A
BUILDING INTERIOR A
Fixtures, accessories, single Occup toilets room - ADA ok ADA compliant, finishes, etc.
A
MPR, Libraries, Kitchens, Science, etc.
A
ADA, Fire Life Safety, Structural - Must Do Items
RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
10,266
Space - Function is adeuate in existg space Walls - Gyp Bd Int Door/Frm/Hdwr - HM Frm & Dr. Lever Handle Flooring - Sheet Vinyl & concrete Ceiling - exposed & 2x4 ACT Casework/Sink - ADA ok Space Planning - N/A Other - N/A
Multi Compartment bathroom - Non ADA floor slopes to drain, does not appear to have an accessible toilet stall. Art classroom received some updates
PLEASANT VALLEY HIGH SCHOOL
207
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING F LOCKER ROOM
BUILDING G EAST GYM
BUILDING H WEST GYM
BUILDING K WEIGHT ROOM
BUILDING L LIBRARY
BUILDING M CLASSROOMS
BLDG COLOR ASSESSMENT 5,502
SQUARE FOOTAGE
A
5,953
11,212
2,609
Roof - asphalt shingle Roof - Asphalt shingle at manzard Roof - Standing Metal Seam Roof Roof Fascia - Wood - paint roof & single ply Roof Fascia - Mtl Roof Drains - Roof drain to DS to SD Roof Fascia - Wood - repair & paint Roof Drains -Gutter to DS to SD Soffit - Cement Plaster - paint as needed Soffit -N/A Walls - cement plaster over concrete Roof Drains - Roof drain to DS to SD Walls - Corrugated Mtl Door Landing - no ADA Soffit - Cement Plaster - paint Door Landing - no ADA Door Threshold - no ADA Walls - cement plaster over concrete Door Threshold - no ADA Doors/Frm/Hdwr - HM Frm & Dr. Door Landing -ADA ok Doors/Frm/Hdwr - HM Frm & Dr. PH/Lever handle Door Threshold - ADA ok Door PH.Pull Card Access - required Doors/Frm/Hdwr - HM Frm & Dr. Card Access - required Windows -N/A PH/Lever handle Windows -N/A Other - N/A Card Access - required Other - N/A Windows -N/A Other - N/A
Roof - Asphalt shingle at manzard Roof - asphalt shingle roof & single ply Roof Fascia - Wood - replace/ paint Roof Fascia - Wood - replace/ paint as needed as needed Roof Drains - Roof Drian to DS to Roof Drains - Roof Drain & DS to SD SD - repair as needed - repair as needed Soffit - Cement plaster - paint & Soffit - Cement plaster - paint & repair as needed, saw leaks in soffit repair as needed Walls - Cement plaster - paint Walls - Cement plaster - paint Door Landing - ADA ok Door Landing - ADA ok Door Threshold - no ADA Door Threshold - ADA ok Doors/Frm/Hdwr - HM Frm & Dr. Doors/Frm/Hdwr - HM Frm & Dr. Lever Handles Lever, PH, Pull Card Access - required Card Access - required Windows -Alumin sash Windows -HM Other - N/A Other - N/A
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
Space - Function is adeuate in existg space Walls - Concrete, pads Int Door/Frm/Hdwr - N/A Flooring - Wood Ceiling - 1x1 acoustic panels Casework/Sink - N/A Space Planning - N/A Other - N/A
Space - Function is adeuate in existg space Walls - gyp bd & tack board - paint as needed Int Door/Frm/Hdwr - - HM Frm & Wd Dr. Lever Handle & pulls Flooring - Carpet tile & VCT, tile replace as needed Ceiling - 1x1 acoustic tile, 2x4 ACT, gyp bd - replace as needed Casework/Sink - no ADA Space Planning - N/A Other - N/A
A
Space - Function is adeuate in existg space Walls - Gyp Bd & tile Int Door/Frm/Hdwr - HM Frm & Dr. Lever Handle Flooring - Sheet Vinyl, tile, & concrete Ceiling - Gyp Bd & 2x4 ACT Casework/Sink - N/A Space Planning - N/A Other - N/A
Space - Function is adeuate in existg space Walls - Concrete, pads Int Door/Frm/Hdwr - N/A Flooring - Wood Ceiling - Exposed wd deck Casework/Sink - N/A Space Planning - N/A Other - N/A
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
208
A A
13,960
Condition - materials, Roof - asphalt shingle repair / replace, painting, Roof Fascia - Wood -paint windows, etc. Roof Drains - Gutter & DS to SD Soffit - Cement plaster - paint Walls - Cement plaster - paint Door Landing - no ADA Door Threshold - ADA ok Doors/Frm/Hdwr - HM Frm & Dr. PH/Lever handle/Pull Card Access - required Windows - N/A Other - N/A
BUILDING EXTERIOR
A
14,452
Fixtures, accessories, Multi Compartment bathroom - ADA ADA compliant, finishes, looks ok, but needs updating etc. Did not see an accessible shower. MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
PLEASANT VALLEY HIGH SCHOOL
Did not see an accessible bench in the locker room.
No access
Space - Function is adeuate in existg space Walls - Gyp Bd, Tack board - paint as needed Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle Flooring - VCT Ceiling - 2x4 ACT, gyp bd - replace as needed Casework/Sink - no ADA Space Planning - N/A Other - N/A
Multi Compartment bathroom - ADA DF - not ADA looks ok, but needs updating
Didn't see companion seats at bleachers
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING R PE MAT ROOM
BUILDING S (ALSO KNOWN AS N) CLASSROOMS
BUILDING T STUDENT CENTER
BUILDING U MAINTENANCE SHED
BUILDING W CENTER FOR THE ARTS
BUILDING Y CLASSROOMS
BLDG COLOR ASSESSMENT 2,785
16,685
1,276
1,231
7,173
42,164
Condition - materials, Roof - Standing Metal Seam Roof repair / replace, painting, Roof Fascia - Mtl windows, etc. Roof Drains -Gutter to DS to SD Soffit -N/A Walls - Corrugated Mtl Door Landing - no ADA Door Threshold - no ADA Doors/Frm/Hdwr - HM Frm & Dr. Door PH.Pull Card Access - required Windows -N/A Other - N/A
Roof - Asphalt shingle at manzard roof & single ply Roof Fascia - Wood - replace/ paint as needed Roof Drains - Roof Drian to DS to SD - repair as needed Soffit - Cement plaster - paint & repair as needed Walls - Cement plaster - paint Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr - HM Frm & Dr. Lever Handles, PH, Pull Card Access - required Windows -Alumin sash Other - N/A
Roof - Built up roof - replace Roof Fascia - N/A Roof Drains - Roof Drian to DS to SD - repair as needed Soffit - Cement plaster - paint & repair as needed, saw leaks in soffit Walls - Cement plaster - paint Door Landing - no ADA Door Threshold - no ADA Doors/Frm/Hdwr - HM Frm & Dr. Lever Handles Card Access - required Windows - N/A Other - N/A
Roof - Metal roof Roof Fascia - N/A Roof Drains - none Soffit - N/A Walls - corrugated metal Door Landing - no ADA Door Threshold - no ADA Doors/Frm/Hdwr -Corrugated metal doors Card Access - N/A Windows - N/A Other - N/A
Roof - Standing metal seam at manzard & single ply Roof Fascia - metal Roof Drains - Roof Drian to DS to SD - repair as needed Soffit - Cement plaster - paint Walls - Cement plaster over CMUpaint Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr - Aluminum storefront Dr. PH & pulls Card Access - required Windows -Alumin storefront Other - N/A
Roof - Standing metal seam at manzard & single ply Roof Fascia - metal Roof Drains - Roof Drian to DS to SD Soffit - Cement plaster - paint Walls - Cement plaster & corrugated metal Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr - Aluminum storefront Dr. PH & pulls Card Access - required Windows -Alumin storefront Other - N/A
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
Space - Function is adeuate in existg No access space Walls - Gyp Bd, Tack board - paint as needed Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle Flooring - VCT & Tile Ceiling - 2x4 ACT, gyp bd - replace as needed Casework/Sink - no ADA Space Planning - N/A Other - N/A
No access
Space - Function is adeuate in existg Space - Function is adeuate in existg space space Walls - Gyp Bd- paint as needed Walls - Gyp Bd, tack board, tile Int Door/Frm/Hdwr - HM Frm & Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle , pulls, PH Dr. Lever Handle , pulls, PH Flooring - Carpet, concrete, tile , sheet Flooring - Carpet, concrete, tile , sheet vinyl vinyl Ceiling - 2x4 ACT, gyp bd, acoustic Ceiling - 2x4 ACT, gyp bd, acoustic clouds- replace as needed clouds- replace as needed Casework/Sink - N/A Casework/Sink - ADA ok Space Planning - N/A Space Planning - N/A Other - N/A Other - N/A
SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A A
Fixtures, accessories, ADA compliant, finishes, etc. MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
No access
Science Classroom are in good shape but missing an ADA sink
Multi Compartment bathroom - ADA Multi Compartment bathroom - ADA looks ok ok Choir & Band room Area outside doors does not allow for level landing
PLEASANT VALLEY HIGH SCHOOL
209
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BLDG COLOR ASSESSMENT SQUARE FOOTAGE
16,675
A BUILDING EXTERIOR
A BUILDING INTERIOR RESTROOMS
BUILDING Z CAFETERIA / CULINARY
A
Condition - materials, Roof - Standing metal seam at manzard & single ply | Roof Fascia - metal repair / replace, painting, Roof Drains - Roof Drian to DS to SD - repair as needed | Soffit - metal panel windows, etc. Walls - Cement plaster & corrugated metal Door Landing - ADA ok |Door Threshold - ADA ok | Doors/Frm/Hdwr - Aluminum storefront Dr. PH & pulls Card Access - installed | Windows -Alumin storefront Other - N/A Condition - finishes Space - Function is adeuate in existg space (floor, wall, ceiling) Walls - Gyp Bd, FRP, Tile casework, shades, etc. Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle , pulls, PH Flooring - Epoxy, concrete, tile , sheet vinyl | Ceiling - 2x4 ACT, gyp bd, acoustic clouds below exposed deck Casework/Sink - N/A | Space Planning - N/A Other - N/A Fixtures, accessories, Multi Compartment bathroom - ADA lok ADA compliant, finishes, etc.
BUILDINGS O, P MODULAR
11177 Roof - Asphalt at manzard & single ply | Roof Fascia - Wood Roof Drains - Roof Drian to DS to SD - repair as needed | Soffit - plywood - paint Walls - Cement plaster - paint Door Landing - ADA ok | Door Threshold - not ADA | Doors/Frm/Hdwr - HM Frm & Dr.Lever handle Card Access - required | Windows -Alumin sash Other - N/A Space - Function is adeuate in existg space Walls - Gyp Bd, Tack board - paint as needed Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle Flooring - VCT | Ceiling - 2x4 ACT - replace as needed Casework/Sink - N/A | Space Planning - N/A Other - N/A
BUILDING CONDITIONS - ELECTRICAL (MISC)
210
BUILDING SCOPE
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
E
ELECTRICAL SYSTEMS
E
LIGHTING AND LIGHTING CONTROLS
E
E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
INTENT OF SCOPE MISC FOR PRICING Data infrastructure (i.e. PG&E service is central to the campus in secure enclosure with existing 4000A 277/480V main switchboard, GE Spectra series about 10GB) Carrier, location, 30 years old. MSB is in servicable condition but underground conduit pathway is limited an lots of exposed conduit and no way to size of space route new feeders from the MSB for new work. Numerous disconnects attached to the MSB presumably for bus taps. PV system interconnected at the MSB. Existing system, code Campuswide fire alarm upgrade to Silent Knight 6820EVS completed within the past year. compliant , replace vs retrofit, Voice Evac, etc. System, headend, type Valcom IP Clock/PA system is adequate meets current district standards. (i.e. VOIP), replace vs retrofit Types of systems, No intrusion alarm on campus except at the school store. Security cameras throughout the campus. No access control system. hardware, CCTV, opening contacts, etc. Rooms and panels, code Older gear in many of the existing buildings that haven't been renovated (and in some that have had recent 'light' renovations) nearing compliant, receptacles, end of servicable life. In many cases gear is in attic space that is not easily accessible or adequately lit. circuiting, etc. Fixture types and Many of the existing buildings that haven't been renovated include old T8 fluorescent lighting and limited controls, which do not meet conditions, efficiency, current energy code requirements. New buildings and recent renovations have LED lighting, some have nLight controls and others controls, life safety / Cooper Wavelinx. LED parking lot lighting. egress (Int/Ext) IDF locations, sizes, MDF is located at Building L, IT has been recently upgraded with new fiber and horizontal cabling. Undeground pathway is adequate. infrastructure, cabling, # No data at baseball and softball fields. Classrooms have WAPs. data drops per space, etc. Classroom technology, Most classrooms have a flat panel display or projector. presentation spaces; i.e. conf rooms, library, MPR, etc.
PLEASANT VALLEY HIGH SCHOOL
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
INTENT OF SCOPE FOR PRICING
BUILDING V ADMINISTRATION
Exterior Equipment - Not reviewed. Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, Not reviewed. VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of Not reviewed. system, web based / Programmable T-Stat? Plumbing Fixtures, Not reviewed. Restrooms, sinks, drinking fountains / bottle fillers, etc. Gas, condnesation Not reviewed. piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, Not reviewed. code compliant, etc.
BUILDING A CLASSROOMS MEDICAL Newly Renovated w/ Trane Split Systems.
(9) Lennox Packaged AC-Units +30 years old and at end of life.
Newly Renovated w/ Trane Split Systems.
Newly Renovated w/ Trane Split Systems.
Not reviewed.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Not reviewed.
The campus has a mix of both Alerton and Johnson Controls Good condition. Plumbing Fixtures in ok condition. Needs updating.
The campus has a mix of both Alerton and Johnson Controls Good condition. Plumbing Fixtures in ok condition. Needs updating.
The campus has a mix of both Alerton and Johnson Controls Good condition. Plumbing Fixtures in ok condition. Needs updating.
The campus has a mix of both Alerton and Johnson Controls Good condition. Plumbing Fixtures in ok condition. Needs updating.
Not reviewed.
Plumbing Equipment is from original construction.
Plumbing Equipment is from original construction.
Plumbing Equipment is from original construction.
Plumbing Equipment is from original construction.
BUILDING B CLASSROOMS
BUILDING C CLASSROOMS
BUILDING D CLASSROOMS
BUILDING E INDUSTRIAL ARTS
Not reviewed.
Not reviewed.
Not reviewed.
EB-3, EB-4 triggers, etc.
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
INTENT OF SCOPE BUILDING F BUILDING G FOR PRICING GYM & LOCKER ROOM GYM & LOCKER ROOM Exterior Equipment - (20 Carrier & (2) Lennox Packaged (2) Carrier Packaged AC-Units 8 Rooftop, wall mounted AC-Units serving main spaces. (4) years old. BARD, etc. - condition Split Systems serving offices. All equipment is approx. 28 years old and at it's end of life. SYSTEM TYPE, Boilers, Distribution is original construction Distribution is original construction VRF, Pumps, Ducts, when AC-Units were added. when AC-Units were added. diffusers, split systems, exhaust fans, etc. EMCS Type of The campus has a mix of both The campus has a mix of both system, web based / Alerton and Johnson Controls Good Alerton and Johnson Controls Good Programmable T-Stat? condition. condition. Plumbing Fixtures, Plumbing Fixtures in ok condition. Plumbing Fixtures in ok condition. Restrooms, sinks, Needs updating. Needs updating. drinking fountains / bottle fillers, etc. Gas, condnesation Plumbing Equipment is from original Plumbing Equipment is from original piping, water heaters, construction. construction. service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, code compliant, etc.
BUILDING H WEST GYM (4) Carrier Packaged AC-Units 8 years old.
BUILDING K WEIGHT ROOM (3) recently installed Split System Units. Good condition
BUILDING L BUILDING M LIBRARY CLASSROOMS (12) Carrier Packaged AC-Units + 20 (13) Carrier Packaged AC-Units + 20 years old and nearing the end of life. years old and nearing the end of life.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
The campus has a mix of both Alerton and Johnson Controls Good condition. Plumbing Fixtures in ok condition. Needs updating.
The campus has a mix of both Alerton and Johnson Controls Good condition. Plumbing Fixtures in ok condition. Needs updating.
The campus has a mix of both Alerton and Johnson Controls Good condition. Plumbing Fixtures in ok condition. Needs updating.
The campus has a mix of both Alerton and Johnson Controls Good condition. Plumbing Fixtures in ok condition. Needs updating.
Plumbing Equipment is from original construction.
Plumbing Equipment is from original construction.
Plumbing Equipment is from original construction.
Plumbing Equipment is from original construction.
PLEASANT VALLEY HIGH SCHOOL
211
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE PLUMBING EQUIPMENT REVIEW FIRE SPRINKLER SYSYTEM
A/E M/P
M/P
M/P
INTENT OF SCOPE FOR PRICING Exterior Equipment Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of system, web based / Programmable T-Stat?
BUILDING R BUILDING S BUILDING T BUILDING U PE MAT ROOM CLASSROOMS STUDENT CENTER MAINTENANCE SHED Bard Heat Pumps, approx. 8 years old. (11) Carrier Packaged AC-Units + 20 Bard Heat Pumps, approx. 8 years old. Not reviewed. Good condition. years old and nearing the end of life. Good condition.
BUILDING W CENTER FOR THE ARTS Packaged AAON Roof Top AC-Units, Approx. 18 years old.
BUILDING Y CLASSROOMS Not reviewed.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Not reviewed.
Distribution is original construction when AC-Units were added.
Not reviewed.
The campus has a mix of both Alerton and Johnson Controls Good condition.
The campus has a mix of both Alerton and Johnson Controls Good condition.
The campus has a mix of both Alerton and Johnson Controls Good condition.
Not reviewed.
The campus has a mix of both Alerton and Johnson Controls Good condition.
Not reviewed.
Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures in ok condition. Needs updating.
Not reviewed.
Plumbing Fixtures in ok condition. Needs updating.
Not reviewed.
Plumbing Equipment is from original construction.
Plumbing Equipment is from original construction.
Not reviewed.
Plumbing Equipment is from original construction.
Not reviewed.
Plumbing Fixtures, Plumbing Fixtures in ok condition. Restrooms, sinks, Needs updating. M/P drinking fountains / bottle fillers, etc. Gas, condnesation Plumbing Equipment is from original piping, water heaters, construction. M/P service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, M/P code compliant, etc.
Not reviewed.
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE PLUMBING EQUIPMENT REVIEW FIRE SPRINKLER SYSYTEM
212
A/E M/P
M/P
M/P
INTENT OF SCOPE BUILDING Z FOR PRICING CULINARY / MULTI-PURPOSE Exterior Equipment - Not reviewed. Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, Not reviewed. VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of Not reviewed. system, web based / Programmable T-Stat?
Plumbing Fixtures, Not reviewed. Restrooms, sinks, M/P drinking fountains / bottle fillers, etc. Gas, condnesation Not reviewed. piping, water heaters, M/P service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, Not reviewed. M/P code compliant, etc.
PLEASANT VALLEY HIGH SCHOOL
BUILDINGS O, P MODULAR
BUILDINGS X PORTABLES
Distribution is original construction when AC-Units were added.
Distribution is original construction when AC-Units were added.
Stand alone Programmable T-Stat's.
Stand alone Programmable T-Stat's.
Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures in ok condition. Needs updating.
Not reviewed.
FAIR VIEW HIGH SCHOOL SITE CONDITIONS CAMPUS SITE SCOPE
A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
EXTERIOR SITE AMENITIES
A
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
P
COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
SITE CONDITION ASSESSMENT
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Walkways along Buildings B, C, D, G, H, I, J and the parking area do not meet ADA standards, numberous door areas do not meet ADA standards
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Crack and slurry seal parking areas
Areas that pond, drain inlets, retention needed, etc. Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
No comment
Replace all walkways at entry doors to classrooms and restrooms. No known issues An existing water tank and well are abandoned and should be removed, there is no irrigation at Building N and the edge of pavement in this area and it should be added, there is a private irrigation pipe under the sidewalk along East Avenue that should be relocated
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
Gas Distribution on roofs looks to be in good condition. System has seismic piping expansion joints and piping hold-downs.
ALL
FAIR VIEW HIGH SCHOOL
213
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING B IN SCHOOL SUSPENSION
BUILDING C CLASSROOMS
BUILDING D RESTROOMS
BUILDING E CLASSROOMS
BUILDING F MUTI-PURPOSE
BUILDING G CLASSROOMS
BLDG COLOR ASSESSMENT 31,109
SQUARE FOOTAGE
A
RESTROOMS
214
4,246
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
Doors: wood w/ push/pull hardwareReplace Flooring: tile, slope issues- Correct Walls: tile wainscot/gyp bd Ceilings: gyp. bd. Lighting: 2x4 flourescent
Doors: wood w/ old bar panic hardware- Replace Flooring: VAT-Abate & Replace Walls: gyp bd w/ in-wall tables Ceilings: 1 x 1 acous tile Lighting: 2x4 surface mounted flourescent
Same as C
ADA, Fire Life Safety, Structural - Must Do Items
FAIR VIEW HIGH SCHOOL
Same as C
Possible non-compliant ADA floor slopes, entry and back doors not ADA compliant in width, landing and threshold
A
A
5,466
Same as C
MPR, Libraries, Kitchens, Science, etc.
SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
4,253
Exterior skin - cement plaster Roofing - assumed tar & gravelReplace Exterior wood doors to playground - giant gas meter in the way- Replace doors and frames
Fixtures, accessories, ADA compliant, finishes, etc.
Exterior skin - plaster,wood siding & mtl. sash wall/wdw sys. @ back elevation-Replace Soffit- plywood, some dry rot Roofing - tar and gravel- Replace Doors: wood in HM frames w/ knob hardware- Replace Back door- alum. in alum. frame, knob hardware & conc. stoop landing - not ADA compliant Windows - single pane, metal sashReplace Roof drainage - no gutter / downspouts to grade Doors: knob hardware Doors: knob hardware Flooring: VAT - Abatement reqd. Flooring: VAT - Abatement reqd. Walls: plywood Walls: cement plaster Ceilings: cement plaster, lot of lot of exposed conduit, raceways exposed conduit, raceways Ceilings: cement plaster Lighting: dbl pendant hung flourescent Lighting: 1x4 flourescent Sink not ADA compliant Sink not ADA compliant
1,027
Exterior skin - cement plaster Same as C Roofing - assumed tar & gravelReplace Exterior wood doors to playground giant gas meter in the way
BUILDING INTERIOR A
4,270
Condition - materials, Exterior skin -cement plaster repair / replace, painting, Soffit- cement plaster windows, etc. Roofing - tar and gravel- Replace Doors:hollow metal in HM frames w/ knob hardware- Replace - noncompliant ADA landing & threshold at door Windows - alum. storefront - single glazed Roof drainage - no gutter / downspouts to grade
BUILDING EXTERIOR
A
1,270
DSA EB-3 / EB- 4, Door threshold not DSA EB-3 / EB- 4 ADA compliant- remove & replace walkway
MP does not have a stage Kitchen Doors: wood w/ knob hardwareReplace Flooring: VAT-Abate & Replace Walls: gyp bd Ceilings: 1 x 1 acous tile Lighting: 1x4 pendant hung flourescent, lot of exposed conduit and wiremold DSA EB-3 / EB- 4, Door threshold not DSA EB-3 / EB- 4 ADA compliant- remove & replace walkway
DSA EB-3 / EB- 4, Door threshold not ADA compliant- remove & replace walkway
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING J COMPUTER LAB & OFFICE
BUILDING N CONSTRUCTION TECH SHOP
BLDG COLOR ASSESSMENT 1,224
SQUARE FOOTAGE BUILDING EXTERIOR
A
BUILDING INTERIOR
A
RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A A
Condition - materials, Old portable building repair / replace, painting, windows, etc. Condition - finishes (floor, wall, ceiling) casework, shades, etc. Fixtures, accessories, ADA compliant, finishes, etc. MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
2,708 New building New building
DSA EB-3 / EB- 4
BUILDING CONDITIONS - ELECTRICAL (MISC) BUILDING SCOPE
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
E
ELECTRICAL SYSTEMS
E
LIGHTING AND LIGHTING CONTROLS
E
E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
INTENT OF SCOPE MISC FOR PRICING Data infrastructure (i.e. PG&E service is in dedicated enclosure behind school with 1600A GE Spectra Series MSB, 120/208V, approx. 25-30 years old, 10GB) Carrier, location, servicable condition. There is room for additional breakers. size of space Existing system, code Silent Knight 5820XL without voice evacuation. System is fully automatic and has been upgraded, but prior to voice requirement. compliant , replace vs retrofit, Voice Evac, etc. System, headend, type Bogen Multi-com 2000 does not meet current district standards. Clock system is very old, probably original to the campus. High (i.e. VOIP), replace vs priority. retrofit Types of systems, Four separate intrusion alarm systems (Vista) on campus, consider consolidating. Cameras throughout the campus. No access hardware, CCTV, controls. opening contacts, etc. Rooms and panels, code Panelboards located at roof level are essentially unservicable due to location. Many panels observed may be 60+ years old and compliant, receptacles, obselete. Lots of exposed conduit routed on sided of buildings. Wiremold used in classrooms. circuiting, etc. Fixture types and Interior lighting consists of troffers with T8 lamps, old pendants with T5 lamps, LED exit lights and old bug-eye emergency lights. No conditions, efficiency, automatic lighting controls. LED parking lot lighting, remainder of exterior lightign on buildings is old CFL and incandescent. controls, life safety / egress (Int/Ext) IDF locations, sizes, MDF is in dedicated room with conditioning but not dedicated cooling. IT has had some upgrades, with new fiber and mostly new infrastructure, cabling, # CAT 6/6A horizontal cabling. Much of the conduit infrastructure is surface mounted conduit on buildings and overfllled. Some IDF data drops per space, cabinets are in classrooms. Classrooms have WAPs. etc. Classroom technology, Most classrooms have a flat panel display. presentation spaces; i.e. conf rooms, library, MPR, etc. FAIR VIEW HIGH SCHOOL
215
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM EXISTING SEISMIC CONCERNS
M/P S
INTENT OF SCOPE BUILDING B FOR PRICING IN SCHOOL SUSPENSION Exterior Equipment - BDP Roof mounted AC-Units +30 Rooftop, wall mounted years.Units are at end of life and need BARD, etc. - condition replacement within the next 2-5 years.. SYSTEM TYPE, Boilers, Distribution is original construction VRF, Pumps, Ducts, when AC-Units were added. diffusers, split systems, exhaust fans, etc. EMCS Type of Johnson Controls Needs updating system, web based / Programmable T-Stat? Plumbing Fixtures, Plumbing Fixtures are from original Restrooms, sinks, construction and in ok condition. drinking fountains / Replacement should be considered bottle fillers, etc. with any modernization project Gas, condnesation Plumbing Fixtures in ok condition. piping, water heaters, Needs updating. service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, None found code compliant, etc.
BUILDING C BUILDING D CLASSROOMS RESTROOMS (4) BDP Roof mounted AC-Units (2) Original Roof Mounted Exhaust +30 years.Units are at end of life and Fans. Need replacement need replacement within the next 2-5 years.. Distribution is original construction Distribution is original construction when AC-Units were added. when AC-Units were added.
BUILDING E BUILDING F BUILDING G CLASSROOMS MUTI-PURPOSE CLASSROOMS (5) BDP Roof mounted AC-Units (2) BDP Roof mounted AC-Units (5) BDP Roof mounted AC-Units +30 years.Units are at end of life and +30 years.Units are at end of life and +30 years.Units are at end of life and need replacement within the next 2-5 need replacement within the next 2-5 need replacement within the next 2-5 years.. years.. years.. Distribution is original construction Distribution is original construction Distribution is original construction when AC-Units were added. when AC-Units were added. when AC-Units were added.
Johnson Controls Needs updating
Johnson Controls Needs updating
Johnson Controls Needs updating
Johnson Controls Needs updating
Johnson Controls Needs updating
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Gas Fired Hot Water Heater, +20 years old. Needs replacement.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Fixtures in ok condition. Needs updating.
None found
None found
None found
None found
None found
BUILDING N CONSTRUCTION TECH SHOP New Roof Mounted Reznor MAU with Evaporative Cooling. +20 years old. New Shop Dust Collector, 5 years old. Distribution is original construction when AC-Units were added.
BUILDING A, H, I, K, L, M, N PORTABLES Portables appear to be Wall Mounted Heat Pumps from the original construction. +25 years old and need replacement. Distribution is original construction when AC-Units were added.
BUILDING A, H, I, K, L, M, N PORTABLES Portables appear to be Wall Mounted Heat Pumps from the original construction.
Johnson Controls Needs updating
Stand alone Programmable T-Stat's.
Stand alone Programmable T-Stat's.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project Plumbing Fixtures in ok condition. Needs updating.
Fully Fully Fire Sprinklered.
None found
None found
EB-3, EB-4 triggers, etc.
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
216
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
INTENT OF SCOPE BUILDING J FOR PRICING COMPUTER LAB & OFFICE Exterior Equipment - Interior Mounted Trane Split System. Rooftop, wall mounted 8-10 years old. Server room need BARD, etc. - condition new dedicated Mini-Split. SYSTEM TYPE, Boilers, Distribution is original construction VRF, Pumps, Ducts, when AC-Units were added. diffusers, split systems, exhaust fans, etc. EMCS Type of Johnson Controls Needs updating system, web based / Programmable T-Stat? Plumbing Fixtures, Plumbing Fixtures are from original Restrooms, sinks, construction and in ok condition. drinking fountains / Replacement should be considered bottle fillers, etc. with any modernization project Gas, condnesation Plumbing Fixtures in ok condition. piping, water heaters, Needs updating. service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, None found code compliant, etc.
FAIR VIEW HIGH SCHOOL
Distribution is original construction when AC-Units were added.
OAK BRIDGE ACADEMY SITE CONDITIONS COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
In a business park - does not have drop-off. Does havve accessible parking space
EXTERIOR SITE AMENITIES
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access
In a business park - does not have hardcourt, play structure, flag pole, bike lockers, or marquee sign. Has a garden at the rear of building.
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Some onsite pathways and ramps do not comply with ADA requirements
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Some areas of alligator cracking and other cracks. Replacement of cracked pavement areas.
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
P ALL
SITE CONDITION ASSESSMENT
No fencing at rear side of building for garden area. There is a single point of access in the Administration.
Areas do not meet slope requirements
Areas that pond, drain inlets, retention needed, etc.
No known issues
Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
No known issues
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
Commerical Site No provision in Mechanical systems for Code required Outside Air.
OAK BRIDGE ACADEMY
217
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
BUILDING A
BUILDING B
BLDG COLOR ASSESSMENT SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
BUILDING INTERIOR RESTROOMS
A
Condition - materials, repair / Roof - asphalt shingle - adequate replace, painting, windows, etc. Roof Fascia - Wood - repaint as needed Roof Drains - Gutter & DS to Grade - repaint as needed Soffit - Wd T&G - as needed Walls - Cement plaster, & CMU block - repaint as needed Door Landing - not ADA Door Threshold - not ADA Doors/Frm/Hdwr -alumn storefront Dr. Push & PUll adequate Card Access - required Windows - Aluminum storefront - adequate Other - N/A Condition - finishes (floor, wall, Space - is adeuate in existg space ceiling) casework, shades, etc. Walls - Gyp Bd, tack board, marker board & tile - repaint as needed Int Door/Frm/Hdwr - Wd Frm & Door. Lever handle adequate Flooring - sheet carpet & Sht vinyl - replace as needed Ceiling - 2x4 ACT & Gyp Bd - replace as needed Casework/Sink - Not ADA Space Planning - very efficient use of space - lots of staff desk stations Other - N/A Fixtures, accessories, ADA single Occup toilets room - may not be ADA compliant, finishes, etc.
Roof - asphalt shingle - adequate Roof Fascia - Wood - repaint as needed Roof Drains - Gutter & DS to Grade - repaint as needed Soffit - Wd T&G - as needed Walls - Cement plaster, & CMU block - repaint as needed Door Landing - not ADA Door Threshold - not ADA Doors/Frm/Hdwr -alumn storefront Dr. Push & PUll adequate Card Access - required Windows - Aluminum storefront - adequate Other - N/A Space - is adeuate in existg space Walls - Gyp Bd & tile - repaint as needed Int Door/Frm/Hdwr - Wd Frm & Door. Lever handle adequate Flooring - sheet carpet & Sht vinyl - replace as needed Ceiling - 2x4 ACT & Gyp Bd - replace as needed Casework/Sink - Not ADA Space Planning - A maze of offices and staff desk stations Other - N/A single Occup toilets room - not be ADA DF - not ADA
BUILDING CONDITIONS - ELECTRICAL (MISC)
E
INTENT OF SCOPE FOR PRICING Data infrastructure (i.e. 10GB) Carrier, location, size of space
E
Existing system, code compliant , replace vs retrofit, Voice Evac, etc.
CLOCK / INTERCOM / SPEAKER SYSTEM
E
System, headend, type (i.e. VOIP), replace vs retrofit
ACCESS / INTRUSION / SECURITY
E
Types of systems, hardware, CCTV, Time clock in electrical closet controls exterior lighting. No automatic interior controls, manual switches only. Very opening contacts, etc. few LED lights, primarily T8 fluorescent and even some incandescent lamps. LED exit lights with bug-eyes.
ELECTRICAL SYSTEMS LIGHTING AND LIGHTING CONTROLS
E
Rooms and panels, code compliant, No functional fire alarm system observed, some smoke detectors may be 'stand alone'. High priority. receptacles, circuiting, etc.
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
BUILDING SCOPE
UTILITY MPOE/MDG FIRE ALARM SYSTEM
218
A/E
E
MISC 5 separate meters feed 5 100A panels located in undersized electrical room. There is no light in the electrical room. There is not code required working clearance in front of the gear. 5 separate meters should be consolidated into a single service. Sub-panels in each separate 'suite'. Gear is by Zinsco and not servicable. Romex in accessible ceiling space in inappropriate for commercial construction. MC Cable above ceiling not installed or supported per code. Recpetacles near sinks with no GFCI protection. Surface raceway.
Fixture types and conditions, No clock/PA system observed. efficiency, controls, life safety / egress (Int/Ext) IDF locations, sizes, infrastructure, System is installed, but not clear if it is functional or being used. Security cameras obseverd. No access control system. cabling, # data drops per space, etc. Classroom technology, presentation MPOE is a very small closet with no light and no working clearance. Wiring is not installed in a workmanlike manner spaces; i.e. conf rooms, library, MPR, nor is it labeled. Some WAPs and interior IT upgrades observers, could not find the IDF in this building. etc.
OAK BRIDGE ACADEMY
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE
A/E
EXTERIOR EQUIPMENT ASSESSMENT
M/P
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
INTENT OF SCOPE MISC FOR PRICING Exterior Equipment - The exterior equipment consist of Rooftop, wall mounted ground mounted condensing units. BARD, etc. - condition These units vary in age and the majority are +18 years or older. SYSTEM TYPE, Boilers, The Interior Equipment consist of VRF, Pumps, Ducts, attic mounted gas fired split systems diffusers, split systems, with Cooling Coils. It should be noted exhaust fans, etc. that on all systems no provisions have been made for fresh outside air. Adding OSA will require larger units than those currently installed. EMCS Type of Zoning was originally completed per system, web based / exposure E,W,N, etc.Programmable Programmable T-Stat? stats and Intermatic Timeclocks are the only EMCS system availbal. Plumbing Fixtures, Plumbing Fixtures are from original Restrooms, sinks, construction. drinking fountains / bottle fillers, etc. Gas, condnesation 3-4 Electric How Water Heaters piping, water heaters, are located in the attic spaces. They service sinks, hose bibbs, appear to be 6-8 years old. gas regaultors (seismic braced) Does AFS exist, location, None found code compliant, etc.
CORPORATE YARD SITE CONDITIONS CAMPUS SITE SCOPE
A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
EXTERIOR SITE AMENITIES
A
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
P
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access
COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
SITE CONDITION ASSESSMENT Asphalt area for parking is not in good condition, seems tight on parking near faclity office & M&O portables, cars parked in areas that are not parking spaces.
The propterty seems to be fully fenced one main entrance to the site but does not have a single poiint of entry for the site, may not be a requirement.
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Portions of path of travel near Building K do not meet slope requirements.
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Asphalt very cracked near the entry to the site.
ADA flatwork stall near Building J does not meet slope requirements.
Areas that pond, drain inlets, retention needed, etc.
No known issues.
Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
No known issues.
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
ALL
CORPORATE YARD
219
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
BUILDING A WAREHOUSE, SHOP, BUS REPAIR, & NOW NUTRITIONAL SERVICES OFFFICE
A/E
INTENT OF SCOPE FOR PRICING
A
Condition - materials, Roof - Metal roof - shop areas repair / replace, painting, could use insulation windows, etc. Roof Fascia - Metal Roof Drains - Gutter & DS to SD repaint as needed Soffit - N/A Walls - corrugated metal - repaint as needed Door Landing - not ADA Door Threshold - not ADA Doors/Frm/Hdwr Mtl Frm with HM Door. Lever handle & Knobs - replace Card Access -required Windows - Alumn sash Other - N/A Condition - finishes (floor, wall, ceiling) casework, shades, etc.
BUILDING B LAUNDRY, BREAKROOM
BUILDING C GROUNDS STORAGE
BUILDING D STORAGE
BUILDING E PAINT SHOP
BUILDING F PLANS ROOM
Roof - Metal roof Roof Fascia - N/A Roof Drains - No Gutter & DS Soffit - N/A Walls - Corrugated metal Door Landing - no ADA Door Threshold - ADA ok Doors/Frm/Hdwr - Wd Frm & Fiberglass Door. Knob - replace Card Access -required Windows - Aluminum sash Other - N/A
Roof - Metal roof Roof Fascia - N/A Roof Drains - No Gutter & DS Soffit - N/A Walls - Corrugated metal Door Landing - no ADA Door Threshold - no ADA Doors/Frm/Hdwr - Mtl Frm & Door. Knob - replace Card Access -required Windows - wood sash, some are boarded Other - N/A
Roof - Metal roof Roof Fascia - Wood Roof Drains - No Gutter & DS Soffit - N/A Walls - Corrugated metal Door Landing - no ADA Door Threshold - no ADA Doors/Frm/Hdwr - Wd frm & dr. lever handle Card Access -required Windows - Aluminum sash Other - storage door for pesticide is deteriorated - replace
Roof - Metal roof Roof Fascia - N/A Roof Drains - No Gutter & DS Soffit - N/A Walls - Corrugated metal Door Landing - no ADA Door Threshold - no ADA Doors/Frm/Hdwr - Mtl Frm & Door. Knob - replace Card Access -required Windows - Alumn sash Other - N/A
Roof - Metal roof Roof Fascia - wood Roof Drains - No Gutter & DS Soffit - plywood Walls - T1-11 - repaint as needed Door Landing -ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr HM Frm & Door. Knob - replace Card Access -required Windows - Alumn sash Other - N/A
Space -Space size is adequate Walls - gyp bd - paint as needed Int Door/Frm/Hdwr - Wd frm & Dr. Knobs - replace Flooring - concrete - add a flooring Ceiling - gyp bd - repaint as needed Casework/Sink - no ADA Space Planning - N/A Other -
Space -Space size is adequate Walls - gyp bd - paint as needed Int Door/Frm/Hdwr - N/A Flooring - concrete Ceiling - plywd - repaint as needed Casework/Sink - N/A Space Planning - N/A Other - Space coud use some clean up.
Space -Space size is adequate Walls - metal Int Door/Frm/Hdwr - N/A Flooring - concrete Casework/Sink - N/A Space Planning - N/A Other - N/A
Space -Space size is adequate Walls - gyp bd - paint as needed Int Door/Frm/Hdwr - N/A Flooring - concrete Ceiling - plywd - repaint as needed Casework/Sink - N/A Space Planning - installing additional shelving to organize materials could open floor area. Other - Space coud use some clean up.
Space - Function is adeuate in existg space, has been used for meetings, could use meeting table and chairs. Walls - tack panels & white board Int Door/Frm/Hdwr - N/A Flooring - VCT - replace as needed Ceiling - 2x4 ACT - replace as needed Casework/Sink - N/A Space Planning - N/A Other - N/A
BLDG COLOR ASSESSMENT SQUARE FOOTAGE
BUILDING EXTERIOR
A
BUILDING INTERIOR
A RESTROOMS
A SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
220
A
Space - Function is adeuate in existg space, limited existing building. Walls - metal and gyp bd - shop areas could use insulation Int Door/Frm/Hdwr - Wood Frm & Wd Door. Lever handle. Knob replace Flooring - VCT, Sht vinyl, concrete replace as needed Ceiling - Gyp Bd & Metal roof deck - repaint as needed Casework/Sink - not ADA Space Planning - N/A Other - N/A
Fixtures, accessories, single Occup toilets room-many ADA compliant, finishes, are not ADA accessible, new toilets etc. rooms in the nutrician office are not ADA compliant. Bus repair area has various toilet faclities that are not ADA accessible. MPR, Libraries, Kitchens, Bldg houses bus repair - some repair/ Washer, dryer & utility sink. Science, etc. replacement needed for lifts, Carpenters shop, Nutritional service equipment and dry good storage, other supplies, it serves as a receiving area. Also newly tenant improvement for Nutricianal Service offices. ADA, Fire Life Safety, Mezanine at Bus Barn and Warehouse Structural - Must Do areas are not accessible. Items
CORPORATE YARD
Tire Storage
BUILDING CONDITIONS - ARCHITECTURAL BUILDING SCOPE
A/E
BUILDING G MAINTENANCE & OPERATIONS OFFICE MOVED OUT, FACILITIES WILL EXPAND INTO THIS SPACE
BUILDING H FACILITIES OFFICE
BUILDING I RESTROOMS
BUIDING J/K M&O, WAS NUTRITION SERVICES OFFICE
BUILDING L BAKERY
BUILDING M PORTABLE
Condition - materials, Roof - Metal roof repair / replace, painting, Roof Fascia - wood windows, etc. Roof Drains - No Gutter & DS Soffit - plywood Walls - T1-11 - repaint as needed Door Landing -ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr Wd Frm with fiberglass Door. Knob - replace Card Access -required Windows - Alumn sash Other - floor in 2 rear offices degraded to the point of failure.
Roof - Metal roof Roof Fascia - wood Roof Drains - Gutter & DS to grade Soffit - plywood Walls - T1-11 - repaint as needed Door Landing -ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr HM frm & Dr. Knob - replace Card Access -required Windows - Alumn sash Other - N/A
Roof - Metal roof Roof Fascia - wood Roof Drains - Gutter & DS to grade Soffit - plywood Walls - T1-11 - repaint as needed Door Landing -ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr HM frm & Dr. Lever Handles Card Access -N/A Windows - Alumn sash Other - N/A
Roof - Metal roof Roof Fascia - Wood Roof Drains - No Gutter & DS to grade Soffit - N/A Walls - Corrugated metal - repaint as needed Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr metal frm & Dr. Lever handle. Card Access -N/A Windows - Aluminum Sash Other - N/A
Roof - Asphalt shingle roof Roof Fascia - Wood Roof Drains - No Gutter & DS to grade Soffit - N/A Walls - Corrugated metal - repaint as needed Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr metal frm & Dr. Lever handle. Card Access -N/A Windows - Aluminum Sash Other - N/A
Roof - Metal roof Roof Fascia - wood Roof Drains - Gutter & DS to grade Soffit - plywood Walls - T1-11 - repaint as needed Door Landing - no ADA. ramp not ADA compliant Door Threshold - ADA ok Doors/Frm/Hdwr HM frm & Dr. Lever Handles Card Access -N/A Windows - Alumn sash Other - N/A
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
Space - Function is adeuate in existg space Walls - gyp bd - paint as needed Int Door/Frm/Hdwr - N/A Flooring - sheet vinyl - replace as needed Ceiling - gyp bd - paint as needed Casework/Sink - no ADA Space Planning - N/A Other - N/A
Space - Function is adeuate in existg space Walls - tack panels & gyp bd - paint as needed Int Door/Frm/Hdwr - Wd frame & doors. Lever handles. Flooring - VCT & Sht carpetreplace as needed Ceiling - 2x4 ACT - replace as needed Casework/Sink - N/A Space Planning - N/A Other - N/A
Space - Function is adeuate in existg space Walls - gyp bd - new Int Door/Frm/Hdwr - Wd frame & Dr. Lever Handles - new Flooring - sheet vinyl - new Ceiling - 2x4 ACT - new Casework/Sink - No ADA Space Planning - N/A Other - N/A
Space - Function is adeuate in existg space Walls - gyp bd & FRP Int Door/Frm/Hdwr - N/A Flooring - concrete Ceiling - gyyp bd Casework/Sink - N/A Space Planning - N/A Other - N/A
No access
INTENT OF SCOPE FOR PRICING
BLDG COLOR ASSESSMENT SQUARE FOOTAGE
A
BUILDING EXTERIOR
A
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A A
Space - Function is adeuate in existg space, M&O was moving out of this space. Portable is slated to house Facilities offices Walls - tack panels & gyp bd - paint as needed Int Door/Frm/Hdwr - Wd frame & doors. Lever handles. Flooring - VCT & Sht carpetreplace as needed Ceiling - 2x4 ACT - replace as needed Casework/Sink - N/A Space Planning - N/A Other - N/A
Fixtures, accessories, ADA compliant, finishes, etc. MPR, Libraries, Kitchens, floor in 2 rear offices degraded Science, etc. to the point of failure, repairs are needed. ADA, Fire Life Safety, Structural - Must Do Items
Furniture Storage Stairs at each end only access is through the Facility Portable
Newly renovated for M&O offices.
CORPORATE YARD
221
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
BUILDING P STORAGE
BUILDING Q BS19 STORAGE
TRANSPORTATION PORTABLE
TOILET PORTABLE
PORTABLE 24 M&O CONFERENCE & TRAINING ROOM
Condition - materials, Roof - Metal roof repair / replace, painting, Roof Fascia - wood windows, etc. Roof Drains - Gutter & DS to grade Soffit - plywood Walls - T1-11 - repaint as needed Door Landing -ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr HM frm & Dr. Lever Handles Card Access -required Windows - Alumn sash Other - N/A
Roof - Metal roof Roof Fascia - none Roof Drains - No Gutter & DS Soffit - N/A Walls - corrugated metal - repaint as needed Door Landing - no ADA Door Threshold - ADA ok Doors/Frm/Hdwr metal frm & Dr. Knob - replace Card Access -N/A Windows - Alumn sash Other - N/A
Roof - Metal roof Roof Fascia - none Roof Drains - Gutter & DS to grade Soffit - N/A Walls - corrugated metal - repaint as needed Door Landing - No ADA Door Threshold - No ADA Doors/Frm/Hdwr metal frm & Dr. Knob - replace Card Access -N/A Windows - Aluminum Sash Other - N/A
Roof - Metal roof Roof Fascia - Wood Roof Drains - Gutter & DS to grade Soffit - N/A Walls - T1-11 - repaint as needed Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr metal frm & Dr. Lever handle. Card Access -N/A Windows - Aluminum Sash Other - N/A
Roof - Metal roof Roof Fascia - none Roof Drains - Gutter & DS to grade Soffit - N/A Walls - T1-11 - repaint as needed Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr Wd frm & HM Dr. Knob - replace Card Access -N/A Windows - aluminum sash Other - N/A
Roof - Metal roof Roof Fascia - none Roof Drains - Gutter & DS to grade Soffit - N/A Walls - T1-11 - repaint as needed Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr metal frm & Dr. Lever handle. Card Access -N/A Windows - Aluminum Sash Other - N/A
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
No access
Space - Function is adeuate in existg space Walls - gyp bd - paint as needed Int Door/Frm/Hdwr - Wd frame & Dr. Lever Handles Flooring - VCT - replace as needed Ceiling - 2x4 ACT - replace as needed Casework/Sink - No ADA Space Planning - N/A Other - N/A
Space - Function is adeuate in existg space Walls - gyp bd - paint as needed Int Door/Frm/Hdwr - Wd frame & Dr. Flooring - epoxy Ceiling - Gyp bd - repaint as needed Casework/Sink - no ADA Space Planning - N/A Other - N/A
Space - Function is adeuate in existg space Walls - marker board & gyp bd paint as needed Int Door/Frm/Hdwr - N/A Flooring - VCT - replace as needed Ceiling - 2x4 ACT - replace as needed Casework/Sink - N/A Space Planning - N/A Other - N/A
INTENT OF SCOPE FOR PRICING
BUILDING N FILTER BARN
BLDG COLOR ASSESSMENT SQUARE FOOTAGE
A
BUILDING EXTERIOR
No access
A
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
222
A A A
Fixtures, accessories, ADA compliant, finishes, etc. MPR, Libraries, Kitchens, Filter Barn Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
CORPORATE YARD
Multi Compartment bathroom - ADA ok Custodial Supplies Ramp looks ADA accessible
Ramp looks ADA accessible
Ramp looks ADA accessible
BUILDING CONDITIONS - ELECTRICAL (MISC)
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
A/E
INTENT OF SCOPE FOR PRICING
PORTABLE 25 TRANSPORTATION TRAINING & BREAK ROOM
ORANGE TRAILER
BLDG COLOR ASSESSMENT SQUARE FOOTAGE
A
BUILDING EXTERIOR
Condition - materials, Roof - Metal roof repair / replace, painting, Roof Fascia - none windows, etc. Roof Drains - Gutter & DS to grade Soffit - N/A Walls - T1-11 - repaint as needed Door Landing - ADA ok Door Threshold - ADA ok Doors/Frm/Hdwr metal frm & Dr. Lever handle. Card Access -N/A Windows - Aluminum Sash Other - N/A
Roof - Metal roof Roof Fascia - N/A Roof Drains - No Gutter & DS Soffit - N/A Walls - Corrugated metal Door Landing - no ADA Door Threshold - no ADA Doors/Frm/Hdwr - Mtl Frm & Door. Knob - replace Card Access - N/A Windows - wood sash Other - N/A
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
No Access
A
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A A
Space - Function is adeuate in existg space Walls - marker board & gyp bd paint as needed Int Door/Frm/Hdwr - Wd frm & Door. Levery Handle. Flooring - VCT - replace as needed Ceiling - 2x4 ACT - replace as needed Casework/Sink - No ADA Space Planning - N/A Other - N/A
Fixtures, accessories, ADA compliant, finishes, etc. MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
BUILDING SCOPE
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
E
ELECTRICAL SYSTEMS
E
LIGHTING AND LIGHTING CONTROLS
E
E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
INTENT OF SCOPE MISC FOR PRICING Data infrastructure (i.e. Two main PG&E electrical services, #1 is 120/208V 800A, about 40 yrs old but decent 10GB) Carrier, location, condition. Serves bakery, bus charging stations, new portables. At capacity. #2 is old size of space Zinsco board, not servicable, 600A 120/240V, 60 yrs old with solar backfeed. Large solar array. Existing system, code Panels in bakery are inaccessible due to the way users store their equipment. Gear has compliant , replace vs no room for additional breakers, which has lead to bus taps to separate disconnects. retrofit, Voice Evac, etc. System, headend, type Typical portable buildings. (i.e. VOIP), replace vs retrofit Types of systems, Some LED area ligths. Many building mounted exterior lights are HID and CFL. Food hardware, CCTV, preps areas are grossly underlit, approximately 15 footcandles where 50 is required by opening contacts, etc. code. Very little LED indoors, mostly T8 fluorescent with manual controls only. Rooms and panels, code Manual system, not many components. Fire suppression at bakery is stand alone. No compliant, receptacles, students, so not necessarily a high priority. circuiting, etc. Fixture types and No clock/PA system observed (or required) conditions, efficiency, controls, life safety / egress (Int/Ext) IDF locations, sizes, Ademco intrusion alarm. Security cameras obseverd. No access control system. infrastructure, cabling, # data drops per space, etc. Classroom technology, MDF near facilities offices, IDFs located in portables. presentation spaces; i.e. conf rooms, library, MPR, etc.
Mechanical supplies Ramp looks ADA accessible
No ADA Access
CORPORATE YARD
223
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE
A/E
M/P
EXTERIOR EQUIPMENT ASSESSMENT
INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE PLUMBING EQUIPMENT REVIEW FIRE SPRINKLER SYSYTEM
224
M/P
INTENT OF SCOPE FOR PRICING Exterior Equipment Rooftop, wall mounted BARD, etc. - condition
SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.
BUILDING A WAREHOUSE, SHOP, BUS REBUILDING B BUILDING C BUILDING D BUILDING E BUILDING F PAIR, & NOW NUTRITIONAL LAUNDRY, BREAKROOM GROUNDS STORAGE STORAGE PAINT SHOP PLANS ROOM SERVICES OFFFICE The Mechanic Shop on the West End (1) Outdoor Condensing Unit approx. Storage Only, No Mechanical Systems Storage Only, No Mechanical Systems This space has a horizontal gas fired This building has a roof mounted ACof the building has Cooling provided 18 years old. furnace, approx. 30 years old. Unit approx. 6-8 years old. (Installed by wall mounted (2) Evaporative too close to edge of roof per code. Cooling Units. (New EC was on site ready to replace one of the (2) existing. No Mechanical Equipment on building roof. The remaining spaces have interior Small Gas fired Split System with Storage Only, No Mechanical Systems Storage Only, No Mechanical Systems Small interior paint booth 8x12 with Some roof mounted duct in ok gas fired Unit Units which approx. Condensing Unit, approximately 22 single exhaust system, 30 years old. condition. +30 years old. (10) system total. years old. There are (2) mini splits sering small office spaces that are +20 years old. One small vertica heat pump serve the Carpenter Office/Shop. No EMCS present. All buildings are on No EMCS present. All buildings are on No EMCS present. All buildings are on No EMCS present. All buildings are on No EMCS present. All buildings are on No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. Programmable T-Stat's and Timeclocks. Programmable T-Stat's and Timeclocks. Programmable T-Stat's and Timeclocks. Programmable T-Stat's and Timeclocks. Programmable T-Stat's and Timeclocks.
EMCS Type of system, web based / Programmable T-Stat? Plumbing Fixtures, All Plumbing Fixtures are from the Restrooms, sinks, original building construction. M/P drinking fountains / bottle fillers, etc. Gas, condnesation All Plumbing Equipment is from the piping, water heaters, original building construction. M/P service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, No Fire Sprinklers M/P code compliant, etc.
M/P
CORPORATE YARD
All Plumbing Fixtures are from the original building construction.
All Plumbing Fixtures are from the original building construction.
All Plumbing Fixtures are from the original building construction.
All Plumbing Fixtures are from the original building construction.
All Plumbing Equipment is from the original building construction.
Existing Emergency Eye Was and Shower, good condition.Does not have tempered water supply as required by today's code. All Plumbing Equipment is from the original building construction.
All Plumbing Equipment is from the original building construction.
All Plumbing Equipment is from the original building construction.
No Fire Sprinklers
No Fire Sprinklers
No Fire Sprinklers
No Fire Sprinklers
No Fire Sprinklers
All Plumbing Equipment is from the original building construction.
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE
A/E
BUILDING G MAINTENANCE & OPERATIONS INTENT OF SCOPE OFFICE MOVED OUT, FACILIFOR PRICING TIES WILL EXPAND INTO THIS SPACE Exterior Equipment - Portables have Wall Mounted Bard Rooftop, wall mounted Heat Pumps from the original BARD, etc. - condition construction. Good Condition.
BUILDING H FACILITIES OFFICE Portables have Wall Mounted Bard Heat Pumps from the original construction. Good Condition.
BUILDING I RESTROOMS Exhaust Fan Only no conditioing.
M/P EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
BUIDING J/K M&O, WAS NUTRITION SERVICES OFFICE Small Split System at Exterior.
BUILDING L BAKERY
BUILDING M PORTABLE
The Bakery space is currently served Portables have Wall Mounted Bard by (3) large Gas Fired Reznor Heating Heat Pumps from the original and Ventilating Units. All (3) are +30 construction. Good Condition. years old and past their useful life. All units should be replaced. In Addition the interior space could be well served by a 5 ton Split System for times when the Hood/MAU are not in operation. Minimal ducting for the Make Air Single wall return and ducted supply Units, (ok condition) air in ceiling. Typical distribution.
SYSTEM TYPE, Boilers, Single wall return and ducted supply Single wall return and ducted supply Single Register. Fan Coil on wall. VRF, Pumps, Ducts, air in ceiling. Typical distribution. air in ceiling. Typical distribution. diffusers, split systems, exhaust fans, etc. EMCS Type of No EMCS present. All buildings are on No EMCS present. All buildings are on No EMCS present. All buildings are on No EMCS present. All buildings are on No EMCS present. All buildings are on No EMCS present. All buildings are on system, web based / Programmable T-Stat's and Timeclocks. Programmable T-Stat's and Timeclocks. Programmable T-Stat's and Timeclocks. Programmable T-Stat's and Timeclocks. Programmable T-Stat's and Timeclocks. Programmable T-Stat's and Timeclocks. Programmable T-Stat? Plumbing Fixtures, All Plumbing Fixtures are from the All Plumbing Fixtures are from the All Plumbing Fixtures are from the All Plumbing Fixtures are from the All Plumbing Fixtures are from the No Plumbing Restrooms, sinks, original building construction. original building construction. original building construction. original building construction. original building construction. drinking fountains / bottle fillers, etc. Gas, condnesation All Plumbing Equipment is from the All Plumbing Equipment is from the All Plumbing Equipment is from the All Plumbing Equipment is from the All Plumbing Equipment is from the No Plumbing piping, water heaters, original building construction. original building construction. original building construction. original building construction. original building construction. service sinks, hose bibbs, gas regaultors (seismic braced) No Fire Sprinklers No Fire Sprinklers No Fire Sprinklers No Fire Sprinklers No Fire Sprinklers Does AFS exist, location, No Fire Sprinklers code compliant, etc.
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED) BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
A/E M/P
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
INTENT OF SCOPE BUILDING N BUILDING P BUILDING Q FOR PRICING FILTER BARN STORAGE BS19 STORAGE Exterior Equipment - Storage Only, No Mechanical Systems Storage Only, No Mechanical Systems Storage Only, No Mechanical Systems Rooftop, wall mounted BARD, etc. - condition SYSTEM TYPE, Boilers, Storage Only, No Mechanical Systems Storage Only, No Mechanical Systems Storage Only, No Mechanical Systems VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of No EMCS present. All buildings are on No EMCS present. All buildings are on No EMCS present. All buildings are on system, web based / Programmable T-Stat's and Timeclocks. Programmable T-Stat's and Timeclocks. Programmable T-Stat's and Timeclocks. Programmable T-Stat? Plumbing Fixtures, No Plumbing No Plumbing No Plumbing Restrooms, sinks, drinking fountains / bottle fillers, etc. Gas, condnesation No Plumbing No Plumbing No Plumbing piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, No Fire Sprinklers No Fire Sprinklers No Fire Sprinklers code compliant, etc. CORPORATE YARD
225
DISTRICT ADMINISTRATION OFFICE SITE CONDITIONS A/E
INTENT OF SCOPE FOR PRICING
EXTERIOR SITE ASSESSMENT
A
Parking lots, drop-off, landscape / irrigation
Site is an old school if it were to house a school it does not have a drop-off.
EXTERIOR SITE AMENITIES
A
Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. Fencing, gates, hardware / access
Site is an old school if it were to house a school it does not have a hardcourt, playstructure, bike locker, or marquee.
Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Code compliant, striping, signage, ramps, etc.
Path of travel near Building C exceeds ADA slope requirements.
Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. Replace vs. repair
Some localized pavement settling and alligator cracking to be replaced. Remainder of asphalt to be crack and slurry sealed.
SECURITY ADA PATH OF TRAVEL ADA PARKING STALLS ASPHALT PAVING CONCRETE PAVING/ WALLS/CURBS STORM DRAINAGE U/G UTILITY LINES FIRE TRUCK ACCESS AGENCY ISSUES
A C C C C C C C C
SITE ELECTRICAL UPGRADE
E
SITE LIGHTING & CONTROLS
E
SITE PLUMBING MISC SITE OBSERVATIONS
226
COST PER SF HIGH MEDIUMMEDIUM LOW HIGH
CAMPUS SITE SCOPE
P
SITE CONDITION ASSESSMENT
Chain link fence occurs at field but not at parking making the facility open to the public. There is an entry from the sidewalk on E 7th St, but it is not a single point of entry.
Portions of the parking stalls exceed ADA slope requirements.
Areas that pond, drain inlets, retention needed, etc.
No known issues.
Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. Current path compliant, gates, etc. - min 20' wide
No known issues.
City, County, Fire Access, etc. Existing MSB - size, condition, upgrade needed, etc. Fixture types and conditions, efficiency, controls, life safety / egress Gas service, ADA drinking fountains, etc.
ALL
DISTRICT ADMINISTRATION OFFICE
Site gas distribution is in good condition. Approx. 22 years old.
BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED) BUILDING SCOPE
BUILDING A MAIN BUILDING
BUILDING B PORTABLE PSYCHOLOGISTS' OFFICES
A/E
INTENT OF SCOPE FOR PRICING
BUILDING C CONFERENE ROOM BLDG
A
Condition - materials, Roof - asphalt shingle at manzard roof Roof - Standing Metal Seam Roof Roof - asphalt shingle at manzard roof repair / replace, painting, & built up roof - adequate - adequate &single ply roof - adequate windows, etc. Roof Fascia - Wood - repaint as Roof Fascia - Wood - repaint as Roof Fascia - Wood - repaint as needed needed needed Roof Drains - Gutter & DS to Grade Roof Drains - Gutter to DS to Grade Roof Drains - Roof Drian to DS to - repaint as needed - repaint as needed Grade - repaint as needed Soffit - cement plaster - paint as Soffit - Plywood - paint as necessary Soffit - plywd - paint as needed needed Walls - T1-11 - repaint as needed Walls - Wd board and batten Walls - Cement plaste - repaint as Door Landing - ADA ok repaint as needed needed Door Threshold - ADA ok Door Landing - ADA ok Door Landing - ADA ok Doors/Frm/Hdwr - HM Frm & Dr. Door Threshold - ADA ok Door Threshold - ADA ok Lever handles - adequate Doors/Frm/Hdwr - Aluminum Doors/Frm/Hdwr - Wd Frm & Dr. Card Access - required Storefront and Wd Frm & Dr. Lever Push & PUll - adequate Windows - Aluminum sash - adequate handles, Push & PUll - adequate Card Access - required Other - N/A Card Access - required Windows - Aluminum sash - adequate Windows - Aluminum sash - adequate Other - N/A Other - N/A
BLDG COLOR ASSESSMENT SQUARE FOOTAGE
BUILDING EXTERIOR
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
A
BUILDING INTERIOR RESTROOMS SPECIALITY SPACES REVIEW DSA CODE COMPLIANCE ITEMS
A A A
Space - is adeuate in existg space Space - is adeuate in existg space Walls - Gyp Bd, tack board, marker Walls - Gyp Bd, tack board - repaint board & tile - repaint as needed as needed Int Door/Frm/Hdwr - Wd Frm & Int Door/Frm/Hdwr - HM Frm & Door. Lever handle - adequate Door. Lever handle - adequate Flooring - Carpet tile, VCT, tile & Sht Flooring - Carpet tile - replace as vinyl - replace as needed needed Ceiling - 2x2 ACT, 2x4 ACT & Gyp Ceiling - 2x4 ACT - replace as Bd - replace as needed needed Casework/Sink - N/A Casework/Sink - N/A Space Planning - very efficient use of Space Planning - N/A space - lots of staff desk stations Other - N/A Other - N/A
Fixtures, accessories, Multi Compartment bathroom ADA compliant, finishes, Womens is Not ADA etc. MPR, Libraries, Kitchens, Science, etc. ADA, Fire Life Safety, Structural - Must Do Items
Exit ram at rar of building looks ok, secondary exit with stairs is not accessible.
Space - is adeuate in existg space Walls - Gyp Bd, tack board, marker board - repaint as needed Int Door/Frm/Hdwr - Wd Frm & Door. Lever handle - adequate Flooring - Carpet tile, VCT, tile & Sht vinyl - replace as needed Ceiling - 2x2 ACT & Gyp Bd replace as needed Casework/Sink - No ADA Space Planning - N/A Other - N/A
Single accomidation toilet room - Not ADA
ADA ramp - ok
DISTRICT ADMINISTRATION OFFICE
227
BUILDING CONDITIONS - ELECTRICAL (MISC) BUILDING SCOPE
A/E
UTILITY MPOE/ MDG
E
FIRE ALARM SYSTEM CLOCK / INTERCOM / SPEAKER SYSTEM ACCESS / INTRUSION / SECURITY
E
E
ELECTRICAL SYSTEMS
E
LIGHTING AND LIGHTING CONTROLS
E
E
TECHNOLOGY SYSTEMS
E
AUDIVISUAL SYSTEMS
E
INTENT OF SCOPE MISC FOR PRICING Data infrastructure (i.e. Main metered switchboard located in basement, Zinsco board is in good condition but well past its servicable life. Relatively undersized 10GB) Carrier, location, for the facility. Separate PG&E service located outside behind building, the 200A main breaker is not secured; anyone could walk off the size of space street and turn off power to the main district servers. Another separate service for the portable used for special needs. Existing system, code Lots of very old load centers, some Zinsco, located in hallways, offices. Panels in the MDF are backed up by a large UPS in the room, compliant , replace vs and generator located behind building, next to the 2nd PG&E service. Conference room is an old modular building with a very old retrofit, Voice Evac, etc. (60+ years) 400A panel. System, headend, type Some older wiring in attic. In general not sufficient available branch circuit power. (i.e. VOIP), replace vs retrofit Types of systems, Time clock in electrical closet controls exterior lighting. No automatic interior controls, manual switches only. Very few LED lights, hardware, CCTV, primarily T8 fluorescent and even some incandescent lamps. LED exit lights with bug-eyes. opening contacts, etc. Rooms and panels, code Fire suppresion system at the server rack. FA system is old and manual only. compliant, receptacles, circuiting, etc. Fixture types and No clock/PA system observed. conditions, efficiency, controls, life safety / egress (Int/Ext) IDF locations, sizes, Unclear is intrusion alarm is in use. Security cameras obseverd. No access control system. infrastructure, cabling, # data drops per space, etc. Classroom technology, District MDF is located here, in a dedicated room with cooling. Seems adequate. WAPS and data outlets observed, but not sure if presentation spaces; meets current district standards. i.e. conf rooms, library, MPR, etc.
BUILDING CONDITIONS - MECHANICAL/PLUMBING BUILDING SCOPE EXTERIOR EQUIPMENT ASSESSMENT INTERIOR EQUIPMENT ASESSMENT ENERGY MANAGEMENT SYSTEMS PLUMBING FIXTURE REVIEW - ADA COMPLIANCE
228
A/E
INTENT OF SCOPE FOR PRICING
M/P
Exterior Equipment Rooftop, wall mounted BARD, etc. - condition
M/P
M/P
M/P
PLUMBING EQUIPMENT REVIEW
M/P
FIRE SPRINKLER SYSYTEM
M/P
BUILDING B PORTABLE PSYCHOLOGISTS' OFFICES (5) Lennox Roof mounted AC-Units Portables appear to be Wall Mounted +22 years.Units are at end of life and Heat Pumps from the original need replacement within the next 5-7 construction. 10 years old. years.. Distribution is original construction Distribution is original construction when AC-Units were added. when AC-Units were added. Concealed above layin ceiling. Concealed above layin ceiling. BUILDING A MAIN BUILDING
SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. EMCS Type of Alerton Controls system, web based / Programmable T-Stat? Plumbing Fixtures, Plumbing Fixtures in ok condition. Restrooms, sinks, Needs updating. Minor ADA fixtures drinking fountains / have been replaced approx. 15 years bottle fillers, etc. ago. Gas, condnesation Plumbing Equipment is from older piping, water heaters, modernization project. service sinks, hose bibbs, gas regaultors (seismic braced) Does AFS exist, location, None found code compliant, etc.
DISTRICT ADMINISTRATION OFFICE
BUILDING C CONFERENE ROOM BLDG Portable has split system Heat Pumps. 10 years old. Distribution is original construction when AC-Units were added. Concealed above layin ceiling.
Stand alone Programmable T-Stat's.
Stand alone Programmable T-Stat's.
Plumbing Fixtures in ok condition. Needs updating.
Plumbing Fixtures in ok condition. Needs updating.
Plumbing Equipment is from original construction.
Plumbing Equipment is from original construction.
None found
None found
APPENDIX 2: COST MODEL HOW TO USE THESE TABLES: The cost model is intended to develop an Order of Magnitude opinion of probable cost for the entirety of the Facilities Master Plan. These matrices demonstrate the assumptions for each of the projects as well as some broader program level costs:
- Project assumptions are generally assigned unit costs per square foot - low, moderate and high unit costs depending upon the type of project, the scope of the modernization, etc. - Project assumptions include "per acre" numbers to account for scope such as utility/infrastructure needs, accessibility challenges, etc. - There are some "lump sum" assumptions for areas such as interim housing. - We have included a contingency on each project to account for the high level of the assumptions and the unknowns of each project. - The District "soft costs" have been included at 25%. These soft costs include design fees, inspection fees and other costs associated beyond construction. - Escalation is an important part of the FMP assumptions. It is included at 4% per year. It is significant, especially in distance projects. Escalation can be variable; this represents an average, and is not shown as a compounded escalation, which could increase costs further.
229
COST ESTIMATE DETAIL SUMMARY Chico Unified School District Facilities Master Plan Budget Model
230
Summary Phases 4 - 7 2023 Dollars With Escalation
Phase 4 Remaining Funds
66,390,000
68,403,000
Phase 5
203,222,250
230,057,960
Phase 6
222,887,500
347,800,750
Phase 7
183,356,250
330,041,250
Sub-Total
675,856,000
976,302,960
PHASE IV CHICO UNIFIED SCHOOL DISTRICT FACILITIES MASTER PLAN BUDGET MODEL
REMAINING BOND FUNDS 2023 PHASE IV COMPLETION: CITRUS, TK, SAFETY AND SECURITY AND RESTROOMS ASSUMED ESCALATION 4% annually
CONSTRUCTION COSTS - 2023 VALUES Quantity
Unit Cost
WITH CONTINGENCY SOFT COSTS ESCALATION (10%) (ESTIMATED AT 25%)
TOTAL PROJECT
Sub Total 13,988,000
1,398,800
3,846,700
19,233,500
2,500,000 300 1,250,000
13,450,000 2,500,000 7,200,000 3,750,000
9,516,000
951,600
2,616,900
13,084,500
6,750 SF 3 Acres
800 1,250,000
9,150,000 5,400,000 3,750,000
4%
1 LS
10,000,000
10,000,000
10,400,000
1,040,000
2,860,000
14,300,000
4%
1 LS
4,000,000
4,000,000
4,160,000
416,000
1,144,000
5,720,000
SUB-TOTAL
36,600,000
38,064,000
CONTINGENCY (10%) SOFT COSTS (ESTIMATED AT 25%) SUB-TOTAL PROJECT - PHASE IV
3,660,000 10,065,000 50,325,000
3,806,400 10,467,600 52,338,000
16,065,000 4,650,000 6,575,000 4,840,000
16,065,000
-
-
16,065,000
66,390,000
68,403,000
CITRUS ELEMENTARY SCHOOL DEVELOP INTERIM HOUSING NEW CONSTRUCTION SITE DEVELOPMENT | DEMOLITION
4%
TK IMPLEMENTATION: NEW CONSTRUCTION AT EMMA WILSON, LCC, MARIGOLD (5 ROOMS) SITE DEVELOPMENT | DEMOLITION
4%
RESTROOM UPGRADES - ALLOWANCES SECURITY UPGRADES - ALLOWANCES
PORTION OF SOFT COSTS FOR PHASE V (10%) CHAPMAN ROSEDALE PARKVIEW TOTAL PROJECT - PHASE IV
1 LS 24,000 SF 3 Acres
0% 46,500,000 $ 65,750,000 $ 48,400,000
$
10% 10% 10%
231
PHASE V CHICO UNIFIED SCHOOL DISTRICT FACILITIES MASTER PLAN BUDGET MODEL
ASSUMED BOND ISSUE 2024 PHASE V: REPLACEMENT CAMPUSES AT CHAPMAN, ROSEDALE AND PARKVIEW WITH ESCALATION
CONTINGENCY (10%)
SOFT COSTS (ESTIMATED AT 25%)
52,080,000
5,208,000
8,593,200
65,881,200
6,000,000 800 1,250,000
46,500,000 6,000,000 28,000,000 12,500,000
73,640,000
7,364,000
12,150,600
93,154,600
800 1,250,000
65,750,000 52,000,000 13,750,000
56,144,000
5,614,400
9,263,760
71,022,160
800 1,250,000
48,400,000 38,400,000 10,000,000
SUB-TOTAL
160,650,000
181,864,000
CONTINGENCY (10%) SOFT COSTS (ESTIMATED AT 15%; 10% WAS COMPLETED IN PH IV) TOTAL PROJECT - PHASE V
16,065,000 26,507,250 203,222,250
18,186,400 30,007,560 230,057,960
ASSUMED ESCALATION 4% annually
232
BY PROJECT
CHAPMAN ELEMENTARY: 320 STUDENTS (JULY 2026 MID-POINT) DEVELOP INTERIM HOUSING NEW CONSTRUCTION SITE DEVELOPMENT | DEMOLITION
12%
ROSEDALE ELEMENTARY: 672 STUDENTS (JULY 2026 MID-POINT) NEW CONSTRUCTION SITE DEVELOPMENT | DEMOLITION
12%
PARKVIEW ELEMENTARY: 496 STUDENTS (JULY 2028 MID-POINT) NEW CONSTRUCTION SITE DEVELOPMENT | DEMOLITION
16%
CONSTRUCTION COSTS - 2023 VALUES Quantity
1 LS 35,000 SF 10 Acres
65,000 SF 11 Acres
48,000 SF 8 Acres
Unit Cost
TOTAL PROJECT
Sub Total
PHASE VI CHICO UNIFIED SCHOOL DISTRICT FACILITIES MASTER PLAN BUDGET MODEL
ASSUMED BOND ISSUE 2032 PHASE VI: REPLACEMENT CAMPUSES AT SIERRA VIEW, FAIR VIEW. MOD AT HOOKER OAK, CHICO HS
BY PROJECT
WITH ESCALATION
CONTINGENCY (10%)
SOFT COSTS (ESTIMATED AT 25%)
69,510,000
6,951,000
19,115,250
95,576,250
800 1,250,000
49,650,000 38,400,000 11,250,000
51,450,000
5,145,000
14,148,750
70,743,750
800 1,250,000
36,750,000 28,000,000 8,750,000
19,950,000
1,995,000
5,486,250
27,431,250
800 300 1,250,000
14,250,000 3,200,000 10,500,000 3,750,000
112,036,000
11,203,600
30,809,900
154,049,500
1,000 800 900 400 350 250 800 1,250,000
75,700,000 10,000,000 4,800,000 28,800,000 14,000,000 2,100,000 1,750,000 8,000,000 6,250,000
SUB-TOTAL
162,100,000
252,946,000
CONTINGENCY (10%) SOFT COSTS (ESTIMATED AT 25%) TOTAL PROJECT - PHASE VI
16,210,000 44,577,500 222,887,500
25,294,600 69,560,150 347,800,750
ASSUMED ESCALATION 4% annually SIERRA VIEW ELEMENTARY: 496 STUDENTS (JULY 2034 MID-POINT) NEW CONSTRUCTION SITE DEVELOPMENT | DEMOLITION
40%
FAIR VIEW HIGH SCHOOL: 320 STUDENTS (JULY 2034 MID-POINT) NEW CONSTRUCTION SITE DEVELOPMENT | DEMOLITION
40%
HOOKER OAK ELEMENTARY: 320 STUDENTS (JULY 2034 MID-POINT) NEW CONSTRUCTION RENOVATION SITE DEVELOPMENT | DEMOLITION
40%
CHICO HIGH SCHOOL (JULY 2036 MID-POINT) BLACK BOX THEATER AND SUPPORTING SPACES
48%
CTE BUILDING (AG) NEW SCIENCE | CLASSROOM BUILDING RENOVATION OF A, B, C RENOVATION OF L RENOVATION OF F ATHLETICS FIELD HOUSE SITE DEVELOPMENT | DEMOLITION (INC. ATHLETICS)
CONSTRUCTION COSTS - 2023 VALUES Quantity
48,000 SF 9 Acres
35,000 SF 7 Acres
4,000 SF 35,000 SF 3 Acres
10,000 SF 6,000 SF 32,000 SF 35,000 SF 6,000 SF 7,000 SF 10,000 SF 5 Acres
Unit Cost
TOTAL PROJECT
Sub Total
233
PHASE VII CHICO UNIFIED SCHOOL DISTRICT FACILITIES MASTER PLAN BUDGET MODEL
ASSUMED BOND ISSUE 2040 PHASE VII: PLEASANT VALLEY MOD/ATHLETICS, JUNIOR HIGH SCHOOL MODERNIZATIONS ASSUMED ESCALATION 4% annually
234
CONSTRUCTION COSTS - 2023 VALUES Quantity
Unit Cost
BY PROJECT
WITH CONTINGENCY ESCALATION (10%)
SOFT COSTS (ESTIMATED AT 25%)
TOTAL PROJECT
Sub Total
250 1,000
33,500,000 2,050,000 11,200,000
1,000 800 1,250,000
6,000,000 8,000,000 6,250,000 52,830,000
5,283,000
14,528,250
72,641,250
800 400 1,250,000
29,350,000 9,600,000 16,000,000 3,750,000
58,950,000
5,895,000
16,211,250
81,056,250
5,000,000 400 1,250,000
32,750,000 5,000,000 24,000,000 3,750,000
67,950,000
6,795,000
18,686,250
93,431,250
5,000,000 400 1,250,000
37,750,000 5,000,000 24,000,000 8,750,000
SUB-TOTAL
133,350,000
240,030,000
CONTINGENCY (10%) SOFT COSTS (ESTIMATED AT 25%) TOTAL PROJECT - PHASE VII
13,335,000 36,671,250 183,356,250
24,003,000 66,008,250 330,041,250
PLEASANT VALLEY HIGH SCHOOL (JULY 2042 MID-POINT) BUILDING B RENOVATION (LIGHT) WEST GYMNASIUM RENOVATION OR REPLACEMENT GYMNASIUM LOBBY EXPANSION ATHLETICS FIELD HOUSE SITE DEVELOPMENT | DEMOLITION (INC. ATHLETICS)
80%
BIDWELL JUNIOR HIGH SCHOOL (JULY 2042 MID-POINT) NEW CONSTRUCTION RENOVATION SITE DEVELOPMENT | DEMOLITION
80%
CHICO JUNIOR HIGH SCHOOL (JULY 2024 MID-POINT) INTERIM HOUSING FOR MODERNIZATION RENOVATION SITE DEVELOPMENT | DEMOLITION
80%
MARSH JUNIOR HIGH SCHOOL (JULY 2042 MID-POINT) INTERIM HOUSING FOR MODERNIZATION RENOVATION SITE DEVELOPMENT | DEMOLITION
80%
8,200 SF 11,200 SF 6,000 SF 10,000 SF 5 Acres
12,000 SF 40,000 SF 3 Acres
1 60,000 3
1 60,000 7
LS SF Acres
LS SF Acres
60,300,000
6,030,000
16,582,500
82,912,500
APPENDIX 3: STRUCTURAL REPORT APPENDIX 3: STRUCTURAL SCHEMATIC DESIGN REPORT
235
236
237
(E) CONC PILASTER, TYP EACH GRID LINE AT EXTERIOR WALLS (E) 6" CONC WALL PANELS W/ NO FOOTING BELOW TYP
(E) 4'-3" X 4'-3" X 1'-2" DEEP PAD FOOTING W/ (7) #5 EA WAY AT BOT, TYP AT ALL CONC PILASTERS
238
239
240
241
ARCHITECTURE ENGINEERING PLANNING INTERIORS GRAPHICS
242