CUSD Master Plan Book

Page 1

CHICO UNIFIED SCHOOL DISTRICT

NOVEMBER 16, 2023

FACILITIES MASTER PLAN

ACKNOWLEDGMENTS

CHICO USD SCHOOL PRINCIPALS

ELEMENTARY SCHOOLS

MIKE ALLEN, CHAPMAN ELEMENTARY SCHOOL

SHANON PAYNE CITRUS ELEMENTARY SCHOOL

COURTNY CONNELLY, EMMA WILSON ELEMENTARY SCHOOL

EMILY MULLINS HOOKER OAK ELEMENTARY SCHOOL

KRISTEN SCHROCK, LITTLE CHICO CREEK ELEMENTARY SCHOOL

SHAWNEESE HEATH, MARIGOLD ELEMENTARY SCHOOL

CHRIS WEAVER, MCMANUS ELEMENTARY SCHOOL

KELLIE STEINBACH NEAL DOW ELEMENTARY SCHOOL

HEATHER SUFUENTES, PARKVIEW ELEMENTARY SCHOOL

JO ANN BETTENCOURT, ROSEDALE ELEMENTARY SCHOOL

BRUCE BESNARD, SHASTA ELEMENTARY SCHOOL

KIMBERLY RODGERS, SIERRA VIEW ELEMENTARY SCHOOL

JUNIOR HIGH SCHOOLS

DAVID MCKAY BIDWELL JUNIOR HIGH SCHOOL

PEDRO CALDERA, CHICO JUNIOR HIGH SCHOOL

JESSICA KAMPH, MARSH JUNIOR HIGH SCHOOL

HIGH SCHOOLS

DOUGLAS WILLIAMS CHICO HIGH SCHOOL

ANDREW MOLL, FAIR VIEW HIGH SCHOOL

DAMON WHITTAKER, PLEASANT VALLEY HIGH SCHOOL

ALTERNATIVE SCHOOLS

ANDREW MOLL, ACADEMY FOR CHANGE

RHONDA ODLUM, OAK BRIDGE ACADEMY

ANDREW MOLL, OAKDALE

CHICO USD DISTRICT LEADERSHIP

KELLY STALEY, SUPERINTENDENT

JAY MARCHANT, ASSISTANT SUPERINTENDENT, EDUCATIONAL SERVICES

JIM HANLON, ASSISTANT SUPERINTENDENT, HUMAN RESOURCES

JACLYN KRUGER, ASSISSTANT SUPERINTENDENT, BUSINESS SERVICES

JULIA KISTLE, FACILITIES & CONSTRUCTION DIRECTOR

VINCE ENSERRO, NUTRITION SERVICES DIRECTOR

MARIA CAMPOS, FACILITIES PLANNER/ CONSTRUCTION SUPERVISOR

JOHN VINCENT, DIRECTOR, INFORMATION TECHNOLOGY

TED SULLIVAN, DIRECTOR, ELEMENTARY EDUCATION

JOHN SHEPHERD, DIRECTOR, SECONDARY EDUCATION

TINA KEENE, STATE & FEDERAL PROGRAMS DIRECTOR

BOARD OF EDUCATION

CAITLIN DALBY BOARD PRESIDENT - AT LARGE

REBECCA KONKLIN, BOARD MEMBER - TRUSTEE AREA 1

TOM LANDO, BOARD MEMBER - TRUSTEE AREA 4

EILEEN ROBINSON, BOARD MEMBER, TRUSTEE AREA 5

MATT TENNIS, BOARD CLERK, AT LARGE

ARCHITECTURAL/ENGINEERING TEAM

LIONAKIS

THE ENGINEERING ENTERPRISE, ELECTRICAL

CAPITAL ENGINEERING, MECHANICAL

ROLLS ANDERSON & ROLLS CIVIL ENGINEERS, CIVIL

SIERRA WEST, COST ESTIMATING

CHICO USD SCHOOL SITE AND COMMUNITY PARTICIPATION

Chico Unified School District would like to thank the school community and all of the District staff and leadership who offered their time, comments and overall vision for this 2023 update to the District-wide Facilities Master Plan.

STEERING COMMITTEE

KENDRA ALLEN STUDENT

MIKE ALLEN, PRINCIPAL, CHAPMAN ELEMENTARY

PEDRO CALDERA, PRINCIPAL, CHICO JR HIGH

MARIA CAMPOS, Chico USD

CAITLIN DALBY Chico USD BOARD

TIM HALEY, IEP2, MASTER PLAN CONSULTANT

ALICIA HARRISON, PARENT

AISLINN HENDERSON, PARENT

DR.KATHLEEN KAISER GRANDPARENT

BRANDON KESSLER VICE PRINCIPAL, CHICO HIGH SCHOOL

JULIA M. KISTLE, Chico USD

LAURA KNAUSS, LIONAKIS, PRINCIPAL-IN-CHARGE

JACLYN KRUGER, Chico USD

DAVID MCKAY, PRINCIPAL, BIDWELL JR HIGH

JAY MARCHANT, Chico USD

ANDREW MOLL, PRINCIPAL, FAIRVIEW HIGH

EILEEN ROBINSON, Chico USD BOARD

JULIA ROGOFF, PARENT, SPED

KRISTEN SCHROCK, PRINCIPAL, LITTLE CHICO CREEK ELEMENTARY

JOHN SHEPHERD, Chico USD

KELLY STALEY, Chico USD

HEATHER SUFUENTES, PRINCIPAL, PARKVIEW ELEMENTARY

TED SULLIVAN, Chico USD

MISSION STATEMENT: The mission of the Chico Unified School District, a partnership of students, staff, families and community, is to ensure all students achieve high levels of academic and personal success, contribute to their community and confidently participate in a changing global society by engaging in quality educational programs that address diverse student needs and promote learning throughout life. 5. ELEMENTARY SCHOOLS ...................... 19 Chapman Elementary School 20 Citrus Elementary School 26 Emma Wilson Elementary School .......................... 32 Hooker Oak Elementary School 38 Little Chico Creek Elementary School ...................... 44 Marigold Elementary School 50 McManus Elementary School ............................. 55 Neal Dow Elementary School 61 Parkview Elementary School 66 Rosedale Elementary School .............................. 72 Shasta Elementary School 78 Sierra View Elementary Schools ........................... 84 6. JUNIOR HIGH SCHOOLS ..................... 90 Bidwell Junior High School 91 Chico Junior High School ................................. 97 Marsh Junior High School ............................... 103 7. SENIOR HIGH SCHOOLS .................... 109 Chico High School 110 Fair View High School .................................. 118 Pleasant Valley High School 124 8. OTHER DISTRICT FACILITIES ................. 130 Canyon View High School .............................. 131 Henshaw Guynn Elementary 132 Oak Bridge Academy 133 District Administrative Office ............................ 134 District Corporation Yard 135 9. IMPLEMENTATION AND COST MODELING ... 136 10. APPENDICES .............................. 138 Appendix 1: Condition Assessment ....................... 139 Appendix 2: Cost Model 229 Appendix 3: Structural Report ........................... 235 1. EXECUTIVE SUMMARY ........................ 1 Process .................................................. 2 Guiding Principles 3 Conclusions .............................................. 4 Implementation Plan 6 2. DEMOGRAPHICS, ENROLLMENT ANALYSIS, AND CAPACITY ...................................... 7 Overview 8 Demographic Projections & Capacity. . . . . . . . . . . . . . . . . . 9 Elementary Schools: Demographic Impacts 10 3. CONDITION ASSESSMENTS 11 Condition Assessment: Summary 12 Site Inventory - Elementary Schools........................ 13 Condition Assessment: Photos 14 4. STAKEHOLDER ENGAGEMENT ................ 15 Stakeholder Engagement ................................. 16 Community Meetings 17 Stakeholder Engagement Surveys .......................... 18
CONTENTS

1. EXECUTIVE SUMMARY SECTION

1 BACK TO CONTENTS

Chico USD developed a District-wide Facilities Master Plan (FMP) in 2014 to ensure that the learning environments throughout the District were supporting the District’s mission and educational goals. Subsequently, that FMP was updated in 2016, and again in 2019. These prior Facilities Master Plans were focused on addressing growth in the District - growth generated by new housing, the addition of students displaced by the Camp Fire and full-day and transitional kindergarten programs. However, current demographics have changed for Chico USD, with a trend away from growth and toward a stable or flattening enrollment, depending upon location within the District and/or grade level.

The District has made significant progress on the goals established in the Implementation Plan outlined in the prior FMPs. These projects have been guided by District Educational Specifications that were also developed as part of those prior FMPs, and were influential in evaluating the adequacy of existing facilities during the condition assessment phase. Equally important was the physical condition of the facilities, identifying the significant cost of deferred maintenance that comes with aging facilities.

Additionally, the 2023 FMP is informed by the work completed by the District since the adoption of the 2014 plan. Fueled by local general obligation (GO) bonds, the District was able to address the needs of many of its schools. Community input throughout this process suggested a desire to move more quickly, addressing the needs of school equity and conditions, but also recognizing the cost of prolonged construction, both in actual dollars and disruption to occupied campuses. This feedback provided an avenue for a discussion, at the elementary schools, of replacing schools rather than transforming them via multi-phased renovation.

The District adopted five guiding principles for the 2023 Facilities Master Plan. Those principles are outlined on the following page and served to assess the priorities that are part of the proposed implementation plan.

• Stakeholder Input

• Demographics

• Educa�onal Specifica�ons

• Vision: Alterna�ves

• Priori�es

WHAT DO WE HAVE?

In order to assess the existing conditions, the master plan process relied on the following key information in order to guide the recommendations:

• A data collection phase includes gathering available data, specifically: building plans, and classroom assignments/scheduling

• An existing site inventory identifies the use for all spaces on campus.

• A condition assessment of the campus buildings and grounds was accomplished with site visits by the design and engineering team, which helped determine the areas of greatest need.

Key to successful master plans is finding the correct balance between critical needs identified in the condition assessments, a guiding vision for the future of the campuses, and a viable implementation strategy. The Facilities Master Planning process engaged stakeholders throughout the process, both virtually and in-person.

WHAT DO WE WANT & NEED?

The master planning process received demographic information that informed the needs assessment for the District. Additionally, stakeholders were engaged at multiple levels to give input on the desires and wants of the community. This guided the development of the facilities master plan.

• Electronic surveys of the community, staff and students

• In-person meetings with a Steering Committee representing a diverse cross-section of the District - students, community members/parents, District administrators and faculty

• Town Hall style meetings, both in-person and virtually

• Engagement of the Board of Education at various levels

WHAT DOES THAT LOOK LIKE?

And finally, the facilities master plans creates a vision for each campus. Including an implementation “road map” to convey potential impacts of working on occupied school campuses.. The District made clear to all stakeholders engaged in the process that their current and available funds would not achieve the goals of the master plan, but that this long-term vision would guide their project decisions when opportunity, and funding, was presented.

odtahW w e want/need? Whatdoes t h a t ?ekilkool Needs Assessment Implementa�on
Priori�es
PROCESS
Engagement
• Data Collec�on
• Facili�es Inventory
• Condi�on Assessment
v
Group Principals and District-level Specialists Steering Commi�ee Community and Site-Based Outreach
• Budget Modeling Whatdo we ha
e?
Core
2 BACK TO CONTENTS

GUIDING PRINCIPLES

To guide the prioritization process, the design team utilized the following guiding principles that would allow a consistent and equitable approach to planning decisions. These guiding principles informed the recommendations of the facilities master plan.

1. RIGHTSIZING

Specifically addressing the elementary school capacity concerns, rightsizing acknowledges the significant excess capacity that currently exists in the District. Many options were discussed, including school consolidation or downsizing, and the opportunity that the excess capacity provided for interim housing during complex construction projects or as a location for other district programs. This guiding principle prompted a “model capacity” adoption - small, mid-sized and large - for the District’s elementary schools

2. KEEPING COMMITMENTS

Stakeholders at all levels recognized the need to understand and articulate any proposed changes to the District’s implementation plan, keeping commitments to the school sites that have been waiting for the opportunity for significant improvements. These commitments have been predominantly at the elementary school level, at least in the near term implementation schedule, and remain the priority, contingent on funding availability. The implementation plan is shared on page 6.

3. PLANNING FOR TRANSITIONAL KINDERGARTEN (TK)

Transitional Kindergarten, as a new grade level, has significant impact on facilities as requirements for the youngest learners include larger spaces (similar to traditional Kindergarten), but also ideally proximate to parent parking spaces and age appropriate outdoor learning spaces and equipment. The District has determined that a “capture rate” of 65% of the Kindergarten population is an appropriate expectation for student enrollment. Additionally, they have established a 24:1 student-to-teacher ratio.

Transitional Kindergarten, like Kindergarten, requires larger learning environments and differentiated outdoor play spaces.

4. SPECIAL EDUCATION (SPED)

Throughout the country, the special education population is growing at unprecedented levels. Due to specific requirements and design guidelines developed as part of the District’s educational specifications, and the unpredictability of the population, planning for SPED is a difficult facilities issue and often leads to these learners being placed in inadequate surplus spaces. The FMP identifies specific targets, per campus, for planning purposes.

5. SAFETY & SECURITY

Chico USD has been working through employing safety and security measures - controlled entry, fencing and gates, for example, throughout the District. They have also established criteria for new or renovated building hardware, etc. The FMP seeks to address, as campuses are modernized, key planning issues around safety and security such as parking and drop-off safety, administration location and controlled points of entry.

3 BACK TO CONTENTS

CONCLUSIONS

The previous Facilities Master Plans included a multi-phased implementation of the goals set forth in the plans. Like the 2019 FMP, this update also has a focus on the elementary schools as the immediate next phases of improvement. The FMP identified, through the demographic information from King Consulting, that there exists surplus capacity at the elementary schools, as well as at the Junior High School and High School levels, for the long term. The significance at the elementary school level, however, is key as the surplus capacity is equivalent to an entire mid-sized school. A summary of those elementary projections is shown here, along with the proposed model capacity as developed as part of the 2023 FMP; a more detailed discussion of districtwide demographics is included in Section 2. The following recommendation, specific to the elementary schools are important next steps, and are specifically addressed as they represent the highest priority projects in the FMP.

- Prioritize a renovation of Citrus ES based on the condition assessment findings. The historic school is overdue for renovation. Additionally, this site would be “rightsized” to 320 students, allowing pressure for student support program space to be addressed.

- Apply model capacity to all elementary schools. Model capacity begins with the assumptions for TK/K and ensures a consistent “cohort” can be housed at each school. The model capacities are shown here.

- Replace four schools: Parkview, Rosedale, Chapman and Sierra View. These schools, when originally built, were prototypical and therefore have similar needs that were identified during the condition assessment, requirements that will likely push renovation costs close to the cost of replacement when phasing implications and mandated code upgrades are considered. This will also provide the opportunity for these schools to adequately address TK/K planning, SPED planning as well as the new model capacities.

- The remaining schools are either newly renovated or will have small requirements such as the addition of TK classroom(s).

- Assume that Shasta ES will not house a TK program due to site size and enrollment pressures in grades K-5.

ENROLLMENT

The master plans for both junior and senior high schools remain similar to those identified in the 2019 FMP. However, the 2023 FMP provides discussion on interim housing requirements and other actions that may be required to “make ready” the sites for the renovation plans. Minor modifications to the Athletics master plans for both high schools resulted from the engagement of key stakeholders. Major renovation at junior and senior high schools are anticipated in later phases; another update to the FMP is likely prior to that time.

ELEMENTARY SCHOOLS 22-23 23-24 24-25 25-26 26-27 27-28 28-29 29-30 MODEL TARGET CAPACITY SURPLUS CAPACITY Chapman 300 304 301 288 292 286 281 280 320 40 Citrus 341 355 357 374 379 362 366 364 320 (44) Emma Wilson 565 552 549 554 541 531 551 553 672 119 Hooker Oak 291 283 275 268 262 265 264 265 320 55 Little Chico 431 429 436 452 467 467 480 493 496 3 Marigold 570 610 639 654 650 641 652 660 672 12 McManus 415 406 407 419 419 413 424 425 672 247 Neal Dow 335 348 363 353 365 359 363 364 320 (44) Parkview 406 438 462 463 456 476 470 470 496 26 Rosedale 543 549 560 569 568 567 570 571 672 101 Shasta 647 648 673 698 709 682 674 665 496 (169) Sierra View 456 443 443 439 440 448 441 438 496 58 Elementary School Totals 5,300 5,365 5,465 5,531 5,548 5,497 5,536 5,548 5,952 261 4 BACK TO CONTENTS

MODEL CAPACITY: ELEMENTARY

The model capacity discussion was a result of a detailed discussion regarding the Kindergarten and new Transitional Kindergarten demographic needs. Evaluation of the existing schools identified a potential misalignment between the number of Kindergarten students served and classrooms provided for grades 1-5. These model capacities align these numbers.

The Loading Standards shown are Chico USD’s target loading standards. The numbers are conservative and represent desired averages by grade level so that facilities needs are met. The result is a model capacity for a smaller campus, with smaller demographic projections, a mid-size and a large campus.

The Special Education department at the District level identified a need for 2 mild/moderate special education classrooms at each Elementary Campus. Eight sites will require two moderate/ severe special education classrooms. Those rooms are not shown in the model capacity, but the rooms are identified in the master plans for the following elementary school sites:

• Chapman ES

• Emma Wilson ES

• Little Chico Creek ES

• McManus ES

• Neal Dow ES

• Parkview ES

• Shasta ES

• Sierra View ES

The elementary schools include two "flexible" or "flex" rooms to accommodate a variety of programs - art, music, science - or other site-specific needs, ideally larger than traditional classrooms. The plan includes one "surplus" classroom to address a potential grade-level "bubble" that may occur; identified as an unloaded classroom space. The assumption is that new campuses will adequately respond to the needs for student support services in permanent, specifc facilities and classrooms will not be required to meet those needs.

GRADE # LOADING TOTAL TK 1 24 24 K 2 24 48 1 2 24 48 2 2 24 48 3 2 24 48 4 1.5 28 42 5 1.5 28 42 SPED 2 10 20 Flex 2 0 0 TOTAL 17 320 GRADE # LOADING TOTAL TK 2 24 48 K 3 24 72 1 3 24 72 2 3 24 72 3 3 24 72 4 2.5 28 70 5 2.5 28 70 SPED 2 10 20 Flex 2 0 0 TOTAL 23 496 GRADE # LOADING TOTAL TK 3 24 72 K 4 24 96 1 4 24 96 2 4 24 96 3 4 24 96 4 3.5 28 98 5 3.5 28 98 SPED 2 10 20 Flex 2 0 0 TOTAL 28 672
Model Capacity 1: SMALL 320 Students Model Capacity 2: MID-SIZE 496 Students Model Capacity 3: LARGE 672 Students
5 BACK TO CONTENTS
CONCLUSIONS

IMPLEMENTATION PLAN

The implementation plan shown below has guided the use of facilities funding between 2013 and 2023. Understanding future phases will require a reliable source of funding - local general obligation bonds, state school facilities funding, and/or development fees - the implementation plan has been revised to acknowledge the shifting priorities of transitional kindergarten, demographic changes and guiding principles. Of particular note is the identification of some smaller projects addressing restroom upgrades, safety and security improvements, as well as the Citrus Elementary School renovation, aligning remaining local bond funds with priority projects that can be accomplished within those remaining funds.

Start 12/11/13

Phase 1 - Quick Start Projects

Phase II - Jr Highs Conversion to 6-8

Phase III - Elementary School Capacity and Modernizations 6/1/16 - 10/5/20

ADA Priority ListSite Work Only (Phase IV and after)

Enhanced School Safety and Security Measures

Loma Vista-Marigold

6/1/16 - 10/5/20

Shasta

6/1/16 - 7/6/19

Neal Dow

11/30/16 - 4/15/20

Athletic Fields - Phase 1 at CHS & PVHS

- 7/30/18

Bidwell (Priority Mods+Technology, Site Improvements, Security)

1/6/14 - 11/27/15

Chico Jr High (Priority MODs + Science, Site Improvements, Technology, Security)

1/6/14 - 7/19/16

Marsh Jr High Security

1/6/14 - 7/14/16

Marsh Jr High Improvements

10/6/13 - 7/15/16

Phase IV - Elementary / High School Capacity and Modernizations

4/29/19 - 6/1/25

- 5/2023

Chico High School CTE Program 11/29/19 - 8/1/21

Phase V - Elementary Modernizations 2024 - 2032

Phase VI - Elementary & High School Modernizations (2032-2040)

Sierra View Fair View Site

Hooker Oak Modernization

Chico High School MOD & Athletic Master Plan Projects

Phase VII - High School and Junior High School Modernizations (2040-2048)

Phase VIII - District Support Improvements

PV High School MOD & Athletic Master Plan Projects

Bidwell Jr. High School

Marsh Jr. High School

Chico Jr. High School

Transitional Kindergarten Implementation

Emma Wilson, Little Chico Creek, Marigold

Safety and Security Projects

Restroom

Renovation Projects

Rosedale

Chapman

Parkview

Status of Implementation Plan ALL 2024+ PROJECTS RELIANT ON FUTURE FUNDING SOURCES
11/11/13 - 4/3/15 Current
1/6/14
Infrastructure
1/6/14
4/3/15
Projects (Prop
Solar) 11/11/13 - 3/6/15 Emma Wilson 4/29/18 - 4/15/20 McManus 8/25/23 - 8/25/25 FV High School Restrooms 6/2023 - 9/2023 Citrus - Modernization PV High School Priority Mod/CTE 5/2020
- 4/3/15 Technology
for Common Core
-
Energy Efficiency and Alternative Energy
39 and
11/30/16
6 BACK TO CONTENTS

2 . DEMOGRAPHICS, ENROLLMENT ANALYSIS, AND CAPACITY

SECTION 7 BACK TO CONTENTS

OVERVIEW

Chico Unified School District currently operates 12 elementary schools, 3 junior high schools, 2 comprehensive high schools and 1 alternative high school. Additional facilities include 2 charter schools that operate on District-owned property, a District Office and a Corporation Yard. Additionally, the District owns vacant property for a future high school and a future elementary school.

The District contracted with King Consulting to update demographic analysis for the District in parallel to the early due diligence of the FMP. Their full report can be found as an appendix to this document, but excerpted portions are noted in this section in support of the recommendations of the FMP. Stakeholders found this information especially compelling in addressing rightsizing, transitional kindergarten spaces as well as the impacts of special education growth. Additionally, stakeholders identified the need for learning spaces at the elementary level beyond those “loaded” for student capacity to address the Arts, as well as other core student support programs.

At the junior and high school level, target capacities include the ability for educators to use their assigned classrooms for “prep” periods. This assumption is impactful at the high schools where block scheduling is utilized and classrooms spaces are utilized for instruction for less minutes per day. The following loading standards were adopted by the District for facilities planning purposes.

4-6 1:28 7-12 1:33 Special Education Day Class - Type 1 1:10 Special Education Day Class - Type 2 1:10 Special Education Day Class - Type 3 1:10 TK-3 1:24 Grade Levels Target Capacity Loading Standards The locations of the Elementary, Junior High, and Senior High Schools included in this master plan
Elementary Schools Junior High Schools Senior High Schools LEGEND 99 99 99 99 99 32 32 32 32 32
Dow ES
Oak ES Citrus ES
Wilson ES
ES Shasta ES
Neal
Hooker
Emma
Rosedale
A. McManus ES Marigold ES Sierra View ES Parkview ES
Chico Creek ES Chapman ES Bidwell Jr HS Chico Jr HS Marsh Jr HS Fair View HS Chico Sr HS Pleasant Valley HS 8 BACK TO CONTENTS
John
Little

The demographic projections from King Consulting are shown above, projected through 2030. At all levels, surplus capacity is indicated and predicted. The target capacity has been adjusted for each school based on the proposed master plans that are presented later in the Facilities Master Plan.

DEMOGRAPHIC PROJECTIONS & CAPACITY

When comparing FMP projected capacity at each site with enrollment projections, provided by King Consulting, surplus capacity is shown at all grade levels. The capacity alignment is based on the 2029/30 projections and recognize a range of alignment of more than 10% over/under capacity.

Operating surplus capacity has implications for school districts beyond initial capital investments as these spaces require resources for maintenance - cleaning, heating and air conditioning, grounds maintenance, etc. - that has long term impacts on operational costs. The guiding principle of Rightsizing recognizes this fact.

The addition or expansion of both transitional kindergarten and special education spaces is included in the target capacity numbers and the projections. Without these requirements, the enrollment and capacity alignment would be further exaggerated.

LEGEND

22-23 23-24 24-25 25-26 26-27 27-28 28-29 29-30 TARGET CAPACITY SURPLUS CAPACITY Chapman 300 304 301 288 292 286 281 280 320 40 Citrus 341 355 357 374 379 362 366 364 320 (44) Emma Wilson 565 552 549 554 541 531 551 553 672 119 Hooker Oak 291 283 275 268 262 265 264 265 320 55 Little Chico 431 429 436 452 467 467 480 493 496 3 Marigold 570 610 639 654 650 641 652 660 672 12 McManus 415 406 407 419 419 413 424 425 672 247 Neal Dow 335 348 363 353 365 359 363 364 320 132 Parkview 406 438 462 463 456 476 470 470 496 26 Rosedale 543 549 560 569 568 567 570 571 672 101 Shasta 647 648 673 698 709 682 674 665 496 (169) Sierra View 456 443 443 439 440 448 441 438 496 58 Elementary School Totals 5,300 5,365 5,465 5,531 5,548 5,497 5,536 5,548 5,952 793 Bidwell 990 993 980 994 978 1,017 1,001 1,012 1,050 38 Chico 928 980 959 939 924 960 944 955 1,098 143 Marsh 732 742 726 754 747 772 759 771 1,011 240 Jr. High School Totals 2,650 2,715 2,665 2,688 2,649 2,749 2,704 2,738 3,159 421 Chico 1,906 1,979 1,979 1,984 2,056 2,048 2,059 2,061 2,095 34 Pleasant Valley 1,841 1,883 1,939 1,932 1,994 1,985 2,001 1,997 2,246 249 High School Totals 3,747 3,862 3,918 3,916 4,050 4,032 4,060 4,058 4,341 283
Under Capacity Over Capacity Enrollment Aligns with Capacity 9 BACK TO CONTENTS

PLANNING IMPACTS OF “CHOICE” MODEL

Chico Unified School District is proud of its ability to meet the needs of families by providing school choice. While boundaries generally exist, transferring between school boundaries is allowed. Because of this, projecting enrollment can be difficult. With that in mind, King Consulting provided an assessment of elementary school choice and the impacts on enrollment projections in anticipating that choice. The chart above outlines the number of students that currently reside in each attendance boundary, the number of students that attend that school from within the boundary, from outside the boundary (in-migration), and the number that leave the boundary to attend another school of their choice (out-migration). Please note that Hooker Oak ES, Rosedale ES and Oak Bridge Academy (charter) are non-boundary schools. Stakeholders found this information to be helpful, noting that the model capacities have the ability to define capacity and ultimately control transfer requests to schools that may be exceeding that model capacity.

ELEMENTARY SCHOOLS: DEMOGRAPHIC IMPACTS

DENSITY DISCUSSION

In addressing the surplus capacity, the FMP examined the campus capacity versus enrollment indentifying those that align (green), are over capacity by more than 10% (yellow) or under capacity by more than 10% (red). The map above suggests a cluster of schools that are significantly under their desired capacity, suggesting these schools may be a focus of identifying schools for "repurposing" for other District uses and/or a location for interim student housing during renovation or replacement of other schools in the District. Ultimately, this consideration was rejected; interin housing will be a significant factor in the facilities program.

LEGEND

Under Capacity

Over Capacity

Enrollment Aligns with Capacity

SCHOOL OF ATTENDANCE SCHOOL OF RESIDENCE CHAPMAN CITRUS EMMA WILSON LITTLE CHICO CREEK MARIGOLD MCMANUS NEAL DOW PARKVIEW SHASTA SIERRA VIEW OTHER DISTRICTS TOTAL ATTENDING Chapman 192 23 18 7 7 22 9 7 6 1 8 300 CITRUS 8 275 22 5 4 14 5 2 3 3 341 EMMA WILSON 2 31 480 7 5 24 2 1 7 4 563 LITTLE CHICO CREEK 13 18 10 326 8 18 10 7 7 8 6 431 MARIGOLD 6 19 24 10 387 57 10 26 18 10 567 MCMANUS 4 16 21 7 7 325 10 3 15 7 415 NEAL DOW 11 17 31 15 15 37 191 1 6 7 5 336 PARKVIEW 17 29 33 45 10 21 23 169 13 39 7 406 SHASTA 3 4 21 3 6 9 43 2 554 2 647 SIERRA VIEW 16 20 33 21 25 26 24 9 29 247 6 456 HOOKER OAK 16 44 45 9 20 64 42 11 18 16 6 291 Rosedale 57 81 100 52 52 64 37 29 29 28 14 543 OAK BRIDGE ACADEMY 3 2 1 4 1 2 1 1 2 1 18 TOTAL RESIDING 348 579 839 511 547 683 407 239 713 371 77 5314 % IN-MIGRATION 36% 19.40% 14.70% 24.40% 31.70% 21.70% 43.20% 58.40% 14.40% 45.80% % OUT-MIGRATION 44.80% 52.50% 42.80% 36.20% 29.30% 52.40% 53.10% 29.30% 22.30% 33.40% NET MIGRATION BETWEEN ATTENDANCE AREAS 20 -114 -134 -21 83 -145 4 200 -18 125 TOTAL GEOCODED STUDENTS ATTENDING 300 341 563 431 567 415 336 406 647 456 TOTAL RESIDENTS ATTENDING 192 275 480 326 387 325 191 169 554 247 TOTAL NON-RESIDENTS ATTENDING 108 66 83 105 180 90 145 237 93 209
10 BACK TO CONTENTS

3. CONDITION ASSESSMENTS SECTION

11 BACK TO CONTENTS

Marigold

McManus

Neal Dow

Emma Wilson

Little Chico Creek

Shasta

Chapman

Parkview

Rosedale

Sierra View

Citrus

Hooker Oak

Jr. High Schools

Bidwell

Chico Jr

Marsh High Schools

Chico

Pleasant Valley

Fair View

CONDITION ASSESSMENT:

SUMMARY

The condition assessment process examined all District facilities, evaluating the site against 10 key areas as shown in the matrix. The matrix is a summary of the entire campus; a more detailed summary, building by building, is part of the campus specific portion of the FMP. A more detailed summary, by building system, is part of the Appendix. The process included site walk(s) and drawing review by electrical and mechanical engineers, civil engineers as well as the architectural team.

- Site ADA: access compliance issues at the site level including playgrounds, parking areas, etc.

- Site - Other: includes items such asphalt and concrete paving deficiencies, landscape and play areas.

- Site Security: includes items such as site fencing and gates, parking and drop-off areas.

- Building Exterior: Doors and windows, roof quality, painting, etc.

- Building Interior: Interior finish materials (paint, celings, for example), accessibility issues of restrooms, casework, doors, etc.

- Building Security: Single-point-of-entry, access control hardware

- Electrical: Power adequacy, electric lighting

- Low Voltage: Data adequacy; fire alarm, clock and speaker

- Mechanical: Heating, Ventilating and Air Conditioning systems

- Plumbing (restrooms): Quality and level of renovation required to achieve accessibility.

Educational adequacy, or a comparison to the standards established in the educational specifications, will be addressed in the individual master plans, by site.

The scale against these systems were measured is replacement value as noted below. When addressing building systems, or overall campus condition, “orange” and “red” systems, buildings or campuses prompt the need to assess whether full replacement is a best value alternative.

<10% Replacement Value 50% < 75% Replacement Value 10% < 50% Replacement Value 75% < 100% Replacement Value Elementary Schools SiteADA SiteOther SiteSecurity Building Exterior Building Interior Building Security Electrical Low Voltage Mechanical Plumbing Restrooms
LEGEND
12 BACK TO CONTENTS

This chart provides a side-by-side comparison of the existing elementary school facilities, their current capacity and the model capacity as developed in the FMP. For the schools yet to be modernized/replaced, any inequities can be addressed in the programming and planning of those facilities to align with the District's Educational Specifications. For the schools in the District considered "completed" with the exception of small modifications for transitional kindergarten, attention should be given to the impact of undersized core facilities - administration, libraries and multi-purpose spaces - that impact school operations and equity. Those spaces are highlighted in (RED).

SITE INVENTORYELEMENTARY SCHOOLS

1. Title 5 of the California Code of Regulations outlines library space at 2.5 SF/student. Undersized library spaces are shown in (RED).

2. Title 5 also indicates 1,350 SF for Kindergarten spaces inclusive of restroom and support spaces. Campuses with undersized Kindergartens show the number of undersized Kindergartens in (RED)

The District has established a size for elementary school multi-purpose spaces of 6 SF/Students. Undersized multi-purpose spaces are shown in (RED)

LEGEND

ELEMENTARY CHAPMAN CITRUS EMMA WILSON HOOKER OAK LITTLE CHICO CREEK MARIGOLD MCMANUS NEAL DOW PARKVIEW ROSEDALE SHASTA SIERRA VIEW Loaded Transitional Kindergarten 1 2 1 1 2 1 1 1 Kindergarten 2 2 3 2 4 3 3 2 2 4 4 3 First Grade 1 2 4 2 3 4 3 3 2 4 5 3 Second Grade 2 3 4 3 3 4 3 2 3 4 4 4 Third Grade 2 3 3 2 3 3 3 3 3 4 5 4 Fourth Grade 2 2 3 2 3 3 3 2 3 3 4 3 Fifth Grade 2 2 3 2 3 3 3 2 3 3 4 4 SPED 3 2 2 2 2 3 2 Total 15 16 24 14 20 37 18 17 19 23 29 23 Non-Loaded ART Music 1 1 1 Science | Project Based Learning 2 1 Resource 1 1 1 1 1 1 1 1 1 1 Accelerated Learners ELD | Intervention 1 2 1 Computer After School Program 1 Preschool 1 2 15 1 1 Title 1 1 1 2 1 Reading 1 1 Learning Center 1 Other 9 Charter 1 (SEL) 1 (RTL groups) PORTABLE 1 (Opportunity) 1 (Portable) Support (SF) Library Space* 979 979 1713 996 2420 1713 1177 3331 979 1734 1127 943 Administration/Student Services 1930 4739 3804 2573 2485 8980 5913 3682 3134 3101 3331 3156 Gymnasium/Locker Rooms Cafeteria/Multi-Purpose Space 2191 2183 6714 4417 5199 6714 2452 6496 1954 2196 3713 2238 Kitchen 812 415 1296 565 556 1296 467 1047 448 567 521 579 Technology Room 960 SF
Proposed Replacement
Proposed
Completed Campus 13 BACK TO CONTENTS
Campus
Light/Moderate Modernization

CONDITION ASSESSMENT:

PHOTOS

Shown below are several photos to represent recurring conditions seen at multiple campuses. More detailed conditions of each individual campus are covered later in the Facilities Master Plan.

Roofs in need of replair. Ponding of water around site. More adequate drainage needed Repair to leaks and finish damages from leaks Finish upgrades are needed Door hardware in need of replacemen for security, technology, and/or replacement Upgrades to older equipment such as drinking fountains Accessibility upgrades for sinks and restrooms
14 BACK TO CONTENTS
Cracked Asphalt at parking and play areas

4 . STAKEHOLDER ENGAGEMENT SECTION

15 BACK TO CONTENTS

STAKEHOLDER ENGAGEMENT

The stakeholder engagement process is essential to a Facilities Master Plan (FMP) that represents the needs of the community. Key data that was presented to stakeholders includes: Prior FMP findings and progress, overall demographics and enrollment capacity, current and projected, as well as findings of the condition assessment. Engagement occurred at multiple levels as described below, intended to include the greatest nulber of stakeholders. The 2019 FMP was used as a starting point for these discussions.

In addition, electronic surveys of both staff and students were conducted. The summary of those results are shown on the following page.

COMMUNITY AND SITE-BASED OUTREACH

Community meetings were held at each high school and junior high schools. The Junior High School meetings included "feeder" elementary schools. At these meetings, the district facilities team and facilities master planning team presented the process for master planning as well as the Guiding Principles established for the FMP update.

Following that, break-out sessions were held, by school, to hear directly from site and community representatives. Attendees were asked to leave their thoughts via post-it notes on a site map of the campus.

A second community meeting to present the draft FMP was held in Fall 2023 prior to presentation for approval. In addition, community input was received at several meetings of the Board of Education. That feedback influenced the direction of the final FMP.

PRINCIPALS AND DISTRICT-LEVEL SPECIALISTS

All Principals participated in individual site walks with the design team. This was an opportunity to see the campus and hear directly from the Principals as to the issues that affect their campus community, day-to-day. This occurred prior to any community or site-based outreach and helped frame future conversations. Principals garnered input from site staff for the discussion.

In addition to the site Principals, District-level staff were engaged for Food Service, Transportation, Information Technology, Maintenance & Operations, and Special Education services. These informed site-specific as well as district wide facilities.

STEERING COMMITTEE

The Steering Committee included District administration, site Principals from representative school sites, as well as community members/ parents, students and members of the Board of Education.

CORE GROUP

The Core Group, made up of District cabinet members, met continually throughout the facilities master planning process to guide the process and to prepare for various workshops and presentations to the Board of Education.

Group Principals and District-level Specialists Steering Commi�ee Community and Site-Based Outreach Core
16 BACK TO CONTENTS
COMMUNITY MEETINGS
Group breakouts to gather and discuss feedback Posters of initial site assessments to discuss and leave notes Presentations of the background and process of the masterplan The student voice was important to the planning process Elementary school participants gathered at Chico Junior High
17 BACK TO CONTENTS
Rosedale Community participation

STAKEHOLDER ENGAGEMENT SURVEYS

The stakeholder engagement process included outreach, via electronic survey, to both staff and students. Key findings per school are included in the school-specific sections of the document. A summary is provided here and represent both recently renovated schools as well as those that were not.

Students at both the elementary and high school level identified restrooms as their key concern. Students were evenly divided between technology needs, classroom upgrades and outdoor play/athletic facilities.

Students were asked about their highest facilities needs, but also about school-site safety and security. Perimeter fencing and single-point-of-entry improvements, as well as access control upgrades (cameras, etc.) were prioritized. The District has been moving through these improvements District-wide.

Restroom/Locker Rooms

Safety & Security (Drop-off zones, perimeter fencing, entry, etc.)

Classroom/Lab Upgrades

Exterior Renovations/Repair

Technology Improvements

Physical Education/Athletic Facilities

Portable Removal

Playground Equipment

Elementary Priorities All-Schools by Grades 4-5 Junior High School (Combined) Priorities from Students 6-8 Grades
School (Combined) Priorities from Students 9-12 Grades
LEGEND High
Faculty Engagement Results
18 BACK TO CONTENTS
Student Engagement Results

5 . ELEMENTARY SCHOOLS SECTION

19 BACK TO CONTENTS

CHAPMAN ELEMENTARY SCHOOL

FAST FACTS:

• Originally built: 1953, Renovated: 1989

• 2022/2023 Enrollment: 286 Students

• Site = 9.77 Acres

• Buildings = 33,669 SF (Permanent) | 5,515 SF (Portables)

• 160 Parking Spaces

• 39% of Classrooms are in Portable Classroom Buildings

• Recommended permanent capacity: 320

The Chapman Elementary School site currently houses both the Chapman Elementary School and the Sherwood Montessori Charter School. The campus is one of several originally built in 1953 that the FMP recommends for full replacement at a model capacity of 320 students. Recent improvements to parking and drop-off areas are expected to remain.

Consideration should be given to the Sherwood Charter program at the time of implementation. A key concern of the current arrangement is the shared "core facilities" of multi-purpose and food service facilities. For purposes of the FMP, the Charter school is not accommodated.

The replacement of Chapman Elementary will require interim housing or a complex, phased implementation. Discussions regarding an interim campus location were also discussed if the District can identify an appropriate location.

Entry and multipurpose at Chapman Elementary School.
CHAPMAN ELEMENTARY SCHOOL
20 BACK TO CONTENTS

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

INVENTORY

160 Spaces

G

F

E

D

C

3

2 3

17 1

A B C SHERWOOD D E F G H I K CLEVELAND AVE
SCHOOL BUILDINGS AREA LOADED CR NON-LOADED A Sherwood Classrooms 6,264 SF 4
Sherwood Classrooms 2,304 SF 2
B
Sherwood Classrooms 3,840 SF 2
2
Classrooms & Library 8,064 SF
4
Classrooms 5,268 SF
Multi Purpose & Admin 5,353 SF
Restrooms 1,509 SF H Classrooms 5,439 SF
Kindergarten 3,823 SF
Portable Classrooms 5,280 SF
Total 47,145 SF
4 I
2 K
Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Sherwood Facilities Overhead Shade Structure area includes covered spaces at 50% 21 BACK TO CONTENTS

CONDITION ASSESSMENT

Accessibility upgrades required Aging food service facilities Ongoing deferred maintenance Aging and undersized core facilities Door hardware for accessibility
CHAPMAN ELEMENTARY SCHOOL 22 BACK TO CONTENTS
Aging casework and finishes

CONDITION ASSESSMENT UPDATE

• Flatwork at building doors exceed ADA slopes

• Numerous walkways along buildings exceed ADA slopes

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

5. Building - Interior

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• ADA symbols in parking stalls do not meet standards

• Hardcourts are in poor conditions

• PV canopies over portions of parking lot

• Single-point-of-entry to Administration building

• Exterior finish upgrades - cement plaster, wood siding, metal sash wall, etc.

• Roof drainage systems needed

• Window and door replacements

• Floor finish upgrades

• Accessibility needs at sink areas - ADA compliance

• Door hardware replacements

• Doesn't meet any current code requirements

• Older Silent Knight 5207 FACP

• Lighting controls do not meet current energy code requirements

• Old electrical gear (60+ yrs.) and all panelboards are full, no spare breakers

• No intrusion alarm system on campus

• MDF located in Library - not in dedicated room with cooling

• Poor air distribution (2) Supply Air Grille and single point return

• Entry doors not compliant (width/threshold)

• Non-compliant ADA clear space at interior

• Suggest new gas distrubution replacement with new HVAC units

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
A B C
D E F G H I K CLEVELAND AVE KEY
COST PER
SHERWOOD
FINDINGS CHAPMAN ES
SF NOTES
CHAPMAN ELEMENTARY SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value 23 BACK TO CONTENTS

PROPOSED MASTER PLAN

The site diagram is intended to summarize the program and a potential "test fit" on the elementary school site. Important concerns include the creation of a "single-point-of-entry" adjacency to the parking and drop-off areas as well as a designated area for the K/TK complex. The project will benefit from an inclusive engagement process for the design of the new elementary school campus.

The model program for 320 students is summarized below. The Chapman site was identified as a location for a Moderate/Severe Special Education program and related facilities.

CHAPMAN ELEMENTARY SCHOOL Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals. GRADE # LOADING TOTAL TK 1 24 24 K 2 24 48 1 2 24 48 2 2 24 48 3 2 24 48 4 1.5 28 42 5 1.5 28 42 SPED 2 10 20 Flex 2 0 0 Bubble 1 0 0 TOTAL 17 320 Model Capacity 3: SMALL 320 Students Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 24 BACK TO CONTENTS

PHASING

C Sherwood Classrooms

D Classrooms & Library

E Classrooms

F Multi Purpose & Admin

G Restrooms

H Classrooms Kindergarten

K Portable Classrooms

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Chapman Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

For example, identification of an alternative interim housing option may eliminate the need for building temporary housing, reducing costs and streamlining schedule.

New Building Lightly Modernized Building Heavily Modernized Building

Building to be Relocated or Demolished LEGEND

TEMPORARY INTERIM HOUSING

PHASE 1

BUILD INTERIM TEMPORARY HOUSING & DEMOLISH EXISTING

PHASE 2

CLASSROOM BUILDING

PHASE 3

BUILD PERMANENT CAMPUS ON OCCUPIED SITE

REMOVE TEMPORARY HOUSING AND COMPLETE SITE

A D F I G H K B C E CHAPMAN ELEMENTARY SCHOOL
ADMIN
TK/K LIBRARY
MULTIPURPOSE SCHOOL BUILDINGS
A Sherwood Classrooms
B Sherwood Classrooms
25 BACK TO CONTENTS

CITRUS ELEMENTARY SCHOOL

FAST FACTS:

• Originally built: 1937, Renovated 1998

• 2022/2023 Enrollment: 342 Students

• Site = 4.09 Acres

• Buildings = 31,872 SF (Permanent) | 2,880 SF (Portables)

• 0 Parking Spaces

• 14% of Classrooms are in Portable Classroom Buildings

• Recommended permanent capacity: 320

The Citrus Elementary School is a beloved campus in the heart of Chico Unified School District. The campus, originally built in 1937, is slated for a moderate renovation at a model capacity of 320 students. To accomplish this model capacity, the campus will only require the addition of a transitional kindergarten (TK) building.

Key considerations from the site-based engagement process included:

• Improvements for controlled, single-point-of-entry

• Pick-up and drop-off improvements

• Need for additonal space for student support services

• The addition of gender-inclusive restrooms

• The site has a sewer/water easement through it which could impact future improvements

The renovation of Citrus Elementary will require interim housing or a phased implementation over multiple summers as the renovation cannot be accomplished with students present.

Entry and multipurpose at Chapman Elementary School.
CITRUS ELEMENTARY SCHOOL
26 BACK TO CONTENTS

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classroom, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

AREAS

B Kindergarten 4,678 SF 2

C Admin 7,397 SF

C Multi Purpose 4,730 SF 2

D Classrooms and Library 8,370 SF 4

E Portable Classrooms 920 SF 1

F Student Store 960 SF 1

G

A B C F E G D CITRUS AVE
4thAVE
GROSS
SCHOOL BUILDINGS AREA LOADED CR NON-LOADED A Classrooms 10,525 SF 9 1
Total 39,021 SF 19 2
Portable Pre K Classroom 1,440 SF 1
CITRUS ELEMENTARY SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 27 BACK TO CONTENTS

CONDITION ASSESSMENT

Classroom storage and full interior finishes renovation ADA compliance upgrades Multi-purpose room renovation and storage improvements Interior finish upgrades and replacements Sink area improvement for ADA accessability
CITRUS ELEMENTARY SCHOOL 28 BACK TO CONTENTS
Student restroom upgrades

CONDITION ASSESSMENT KEYUPDATEFINDINGS

CITRUS ES COST PER SF NOTES

• Walkways along Building B, C, and D do not meet ADA standards

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

5. Building - Interior

• Off-site perimeter sidewalks are old and need replacement

• No parking lot on site

• Student Drop-off is along curbside

• Playground paving is cracked

• Campus has single-point-of-entry, but doesn't lead to Administration

• Roof draining needs (no gutter/downspouts)

• Single-pane windows at some areas of campus

• Accessibility needs at sink areas - not ADA compliant

• Acoustical 2x4 ceiling tile damage

• Interior flooring replacements

• Silent Knight 6820EVS control panel (added to serve addition of portables) is consistent with current district standards

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• Remainder of campus is not compliant with current code

• Most existing panels on campus are old and past their servicable life

• Lots of surface raceways in classrooms

• No intrusion alarm system in use. Cameras throughout the campus. No access controls.

• New PA system installed 2023

• Gas fired furnaces located in attics and closets are 20+ yrs. old and need replacement

• Multiple Outdoor Condensing Units located in Chainlink Yards. +20 years old. Needs replacement

• Plumbing equipment and fixtures from original construction

• ADA upgrades to core restrooms are 10-12 yrs. old

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
CITRUS ELEMENTARY SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value A B C F E D CITRUS AVE 4thAVE 29 BACK TO CONTENTS

PROPOSED MASTER PLAN

OVERVIEW

The proposal includes a light to moderate renovation of existing facilities, and the addition of a transitional kindergarten as needed to meet the model capacity goals of 320 students.

The site is not planned for growth as its site size and existing building footprint is that of a small school. However, there are key improvements that should be part of the renovation, including a renovation/expansion of administration and student services to provide single-point-of-entry and space for student support services that are currently occupying inadequate spaces.

Additionally, some off street parking and drop-off locations have been added to the masterplan. And an inaccessible basement level exists; consideration should be given to potential use as storage facilites.

CITRUS ELEMENTARY SCHOOL
the
capacity
GRADE # LOADING TOTAL TK 1 24 24 K 2 24 48 1 2 24 48 2 2 24 48 3 2 24 48 4 1.5 28 42 5 1.5 28 42 SPED 2 10 20 Flex 2 0 0 Bubble 1 0 0 TOTAL 17 320 Model Capacity 3: SMALL 320 Students A B C F E D CITRUS AVE 4thAVE Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 30 BACK TO CONTENTS
Room assignments are conceptual and meant to confirm that the site can meet
model
goals.

PHASING

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Citrus Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

PHASE 1

BUIILD INTERIM HOUSING

Use existing field to build interim housing for the school for future modernizations.

Modernize existing buildings while classes use interim housing.

Removal of interim housing and construction of site improvements, including a new drop off on 4th Ave and parking on Citrus Ave.

New Building Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished LEGEND A C D E F CITRUS ELEMENTARY SCHOOL
2
EXISTING BUILDINGS
3 SITE UPGRADES AND REMOVE INTERIM HOUSING B INTERIM HOUSING REMOVE INTERIM HOUSING
PHASE
RENOVATE
PHASE
ADD PARKING AND DROP-OFF SCHOOL BUILDINGS
Classrooms
Kindergarten
Admin
Multi Purpose
Classrooms and Library
Portable Classrooms
Student Store
Portable Pre K Classroom 31 BACK TO CONTENTS
MODERNIZATIONS OF EXISTING BLDGS
A
B
C
C
D
E
F
G

EMMA WILSON ELEMENTARY SCHOOL

FAST FACTS:

• Originally built: 1993, Renovated: 1998

• 2022/2023 Enrollment: 589 Students

• Site = 13.31 Acres

• Buildings = 49,825 SF (Permanent) | 3,098 SF (Portables)

• 87 Parking Spaces

• 9% of Classrooms are in Portable Classroom Buildings

• Reccommended permanent capacity: 672

Emma Wilson Elementary School, constructed in 1993, is a newer school in the Chiso USD. It does have several portable classrooms on campus which the master plan proposes to remove. While the school is currently less than 600 students, it is proposed as a "large" model capacity for 672 students, intended to absorb any growth on the west side of the District. As a "large" campus, it will require two additonal rooms for the TK/K program, and likely an expansion of the supporting playground.

Information received from site-based and community input identified the following concerns:

• Undersized multi-purpose building, especially for the larger capacity

• Replacement of portable buildings which currently house SPED programs should be prioritized

• Lack of adaptive PE playgrounds

• The addition of gender-inclusive restrooms

• Maintenance needs including roof repairs and fencing expansion

Emma Wilson Elementary School.
EMMA WILSON ELEMENTARY SCHOOL
32 BACK TO CONTENTS

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

A G B D F J E C H L W 8th AVE GROSS AREAS SCHOOL BUILDINGS AREA LOADED CR NON-LOADED A Admin and Library 6,992 SF
Classrooms 9,888 SF
Multi Purpose 5,751 SF
Classrooms 1,992 SF
Classrooms 4,800 SF
Classrooms 1,992 SF
Classrooms 9,888 SF
Kindergarten 2,816 SF
Portable Classrooms 3,098 SF
Kindergarten 5,705 SF
Total 52,923 SF
GROSS AREAS AREA NON-LOADED B Classrooms 12,932 3 C Multi Classrooms 12,932 Portable Classrooms Kindergarten 13,049 3
B
6 3 C
D
2 E
4 F
2 G
8 H
2 J
3 L
3
30 3
Spaces
Spaces EMMA WILSON ELEMENTARY SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 33 BACK TO CONTENTS
79
8

CONDITION ASSESSMENT

Classroom storage and interior finish upgrades Admin reception desk renovations and interior finishes upgrades Acoustical Ceiling Tile replacement Multi-purpose daylighting improvements Student restroom upgrades
EMMA WILSON ELEMENTARY SCHOOL 34 BACK TO CONTENTS
Casework and sink improvements for ADA compliance

CONDITION ASSESSMENT KEYUPDATEFINDINGS

EMMA

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

5. Building - Interior

• Some walkways along Buildings A, B and G do not meet ADA requirements

• 2 drop off areas both need accessible loading zone

• South vehicle parking area should be crack and slurry sealed

• Playground equipment (not shaded)

• Does not have one point of entry directly into the Admin office.

• Exterior finishes are in good condition

• Sink areas in some spaces are not ADA compliant

• Interior flooring needs to be upgraded and replaced

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• Silent Knight 6820EVS control panel was added during the Kinder Wing addition, which includes code required voice notification. The remainder of the campus is not compliant with current code, and is primarily a manual system and not addressible.

• Gear is approximately 30 years old but generally in good condition.

• Vista intrusion alarm system consisting of door contacts and motion sensors is in use but requires some re-programming. Cameras throughout the campus. No access controls.

• Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy.

• Existing ductwork is all original and in good condition.

• Plumbing Equipment is from original construction and ready for replacement..

• Single occupancy toilet - not ADA

• Restroom finishes need updates and replacements

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
WILSON ES COST PER SF NOTES
EMMA WILSON ELEMENTARY SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value A G B D F J E C H L W 8th AVE 35 BACK TO CONTENTS

PROPOSED MASTER PLAN

OVERVIEW

The vision for the Emma Wilson elementary school improvements includes the following:

• Two new rooms for expansion of the TK/K program

• New multi-purpose room to meet the larger capacity of school

• Reclaim existing multi-purpose for the moderate/severe Special Education program as well as a flex space for music or art

• Future modernization of remaining campus buildings when eligible

• Removal of portable buildings

EMMA WILSON ELEMENTARY SCHOOL A B C D E F H G L W 8th AVE 79 Spaces 8 Spaces Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals. GRADE # LOADING TOTAL TK 3 24 72 K 4 24 96 1 4 24 96 2 4 24 96 3 4 24 96 4 3 28 84 Bubble 2 28 56 5 3 28 84 SPED 2 10 20 SPED (Mod/ Severe) 2 10 20 Flex 3 0 0 TOTAL 34 720 Model Capacity 3: LARGE 672 Students Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 36 BACK TO CONTENTS

PHASING

A Admin and Library

B Classrooms

C Multi Purpose

D Classrooms

E Classrooms

F Classrooms

G Classrooms

H Kindergarten

J Portable Classrooms

L Kindergarten

RENOVATION OF EXISTING MP BUILDING

PHASE 1

NEW MULTI-PURPOSE AND KINDER CLASSROOMS

For Phase 1, the existing MP, which is undersized, will be replaced with a new building at the Northeast of the campus. It will have a kitchen and stage that can double as a music classroom. The stage inside can also open to an exterior stage. A covered eating area is at the east of the building. The existing MP would be heavily modernized at this stage as well to make space for a new SPED building.

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Emma Wilson Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

PHASE 2

REMOVAL OF PORTABLES

Phase 2 will include the modernization of the original MP at Bldg C into a dedicated SPED building. When the building is renovated, the existing portables can be removed or relocated. The SPED building will have space for 4 classrooms that each have restrooms, workrooms, and sensory rooms, shared between groups of two classrooms. There will also be space for two offices or storage rooms if needed.

New Building Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished LEGEND D C L H A G E J F EMMA WILSON ELEMENTARY SCHOOL B
NEW MULTI-PURPOSE BUILDING NEW KINDER CLASSROOMS SCHOOL BUILDINGS
37 BACK TO CONTENTS

HOOKER OAK ELEMENTARY SCHOOL

FAST FACTS:

• Originally built: 1949, Renovated: 2006

• 2022/2023 Enrollment: 304 Students

• Site = 6.75 Acres

• Buildings = 36,130 SF (Permanent) | 4,800 SF (Portables)

• 27 Parking Spaces

• 30% of Classrooms are in Portable Classroom Buildings

• Reccommended permanent capacity: 320

The Hooker Oak Elementary School is a non-boundaried campus in the heart of Chico Unified School District. The campus, originally built in 1949, is slated for a moderate renovation at a model capacity of 320 students. To accomplish this model capacity, the campus will require the replacement of existing portable buildings with three TK/K classrooms.

Key considerations from the site-based engagement process included:

• Improvements to security with controlled, single-point-of-entry at the administration area

• Parking improvements

• The addition of gender-inclusive restrooms

The renovation of Hooker Oak Elementary will require interim housing or a phased implementation over multiple summers as the renovation cannot be accomplished with students present. Previous renovations added acoustical ceilings, for example which if removed would reveal the clerestory windows above.

Entry and multipurpose at Hooker Oak Elementary School.
HOOKER OAK ELEMENTARY SCHOOL
38 BACK TO CONTENTS

6Spaces

21Spaces

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

C

D

A B C E D H F G E3RDAVE
ARBUTUSAVE
BUILDINGS AREA LOADED CR NON-LOADED
Classrooms 8,623 SF
Classrooms 8,233 SF
EXISTING SITE INVENTORY
SHERMANAVE
GROSS AREAS SCHOOL
A
5 B
4 1
Classrooms and
Library 7,903 SF 3
Classroom and
2,400 SF
Multi Pupose and Admin 12,225 SF
Portable Classroom 960 SF 1
Portable Classrooms 1,920 SF
Portable Classrooms 1,920 SF 2 Total 42,265 SF 18 2
Student Services
1 E
1 F
G
2 H
HOOKER OAK ELEMENTARY SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 39 BACK TO CONTENTS

CONDITION ASSESSMENT

Exterior water fountain replacement Exterior paint and window replacement needed Student restroom ADA upgrades and renovations Classroom interior finish improvements and upgrades Restroom upgrades needed for ADA compliance Campus portable classrooms HOOKER OAK ELEMENTARY SCHOOL 40 BACK TO CONTENTS

21Spaces

CONDITION ASSESSMENT KEYUPDATEFINDINGS

HOOKER OAK ES COST PER SF NOTES

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

5. Building - Interior

• Slurry seal, replace striping and pavement markings and signs

• A shared bus / parent drop-off area is provided, not ADA compliant.

• Hardcourt paving is in poor condition

• Manual lettering message sign provided.

• The campus is secured with a fence around the campus. There are multiple access into the main building from the street, no direct access into Admin.

• Window trims are in poor condition

• Fascias are wood and in poor condition

• Door thresholds are not ADA compliant

• Existing VCT flooring is worn and needs replacement

• Sinks are non ADA compliant

• Older Silent Knight 5208 FACP with pull stations, did not observe smoke detectors, there may be some pull stations. Does not meet current code requirements.

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• A Wheelock voice system was added on to accommodate addition of portables.

• Very old gear (60 years or older) observed throughout campus. All panelboards are full, no spare breakers, and limited branch circuiting to support modern instructional requirements. Some of the wiring is exposed with cloth sheathing, which is not code compliant.

• No intrusion alarm system in use. Cameras throughout the campus. No access controls.

• Older Bogen Multicom 2000 in MDF room, not per current standards.

• Roof mounted AC-Units 16-20 years old NOT installed per code. Too close to edge of roof for service.

• Duct distribution is approx. 20 years old.

• Plumbing Fixtures are from original construction and need full replacement to meet ADA requirements.

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
HOOKER OAK ELEMENTARY SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value A B C E D H F G
E3RDAVE SHERMANAVE ARBUTUSAVE6Spaces
41 BACK TO CONTENTS

PROPOSED MASTER PLAN

OVERVIEW

The improvements to Hooker Oak Elementary School predominantly include renovation of the existing campus for a capacity of 320 students.

Specific improvements include:

• The removal of existing portables

• Replacement of existing TK/K Classrooms with permanent construction. Related improvements include parking and drop-off specifically for that complex and playground improvements.

• Renovation of exisiting buildings, including an expansion to the administration portion of the building.

HOOKER OAK ELEMENTARY SCHOOL ARBUTUSAVE E3RDAVE KINDER PLAY AREA SHERMANAVE Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals. GRADE # LOADING TOTAL TK 1 24 24 K 2 24 48 1 2 24 48 2 2 24 48 3 2 24 48 4 1.5 28 42 5 1.5 28 42 SPED 2 10 20 Flex 2 0 0 Bubble 1 0 0 TOTAL 17 320 Model Capacity 3: SMALL 320 Students A B C E Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 42 BACK TO CONTENTS

PHASING

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Hooker Oak Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

BUILD INTERIM HOUSING

REMOVE EXISTING PORTABLES

PHASE 1
New
Lightly
Heavily
Building Building to be Relocated or Demolished LEGEND E D H F G C HOOKER OAK ELEMENTARY SCHOOL A B
Building
Modernized Building
Modernized
PHASE 2
PHASE 3
REMOVE
TK/K CLASSROOMS INTERIM HOUSING SCHOOL BUILDINGS A Classrooms
Classrooms
Classrooms and Library
Classroom and Student Services
Multi Pupose and Admin
Portable Classroom
Portable Classrooms
Portable Classrooms 43 BACK TO CONTENTS
BUILD TK/K CLASSROOMS AND
INTERIM HOUSINGPORTABLES NEW
B
C
D
E
F
G
H

LITTLE CHICO CREEK ELEMENTARY SCHOOL

FAST FACTS:

• Originally built: 1991

• 2022/2023 Enrollment: 451 Total Students

• Site = 13.4 Acres

• Buildings = 44,523 SF (Permanent)

• 102 Parking Spaces

• 0% of Classrooms are in Portable Classroom Buildings

• Reccommended permanent capacity: 496

Little Chico Creek Elementary School is a newer campus in Chico USD. The campus, originally built in 1991, is expected to house a model capacity of 496 students. To accomplush this model capacity, the campus will require the addition of TK/K classrooms.

Key considerations from the site-based engagement process included:

• Security Improvements to the administration area

• The additon of gender-inclusive restrooms

• Ongoing maintenance issues include onsite flooding, a chiller system that has ongoing maintenenace problems as well as a desire for new carpet.

Future renovation of bulding, when eligible, will require either a phased approach or interim housing.

Campus Quad at Little Chico Creek Elementary School.
LITTLE CHICO CREEK ELEMENTARY SCHOOL
44 BACK TO CONTENTS

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

F E G I J K H L M N D A C B AMANDA WAY HARTFORD DR GROSS AREAS SCHOOL BUILDINGS AREA LOADED CR NON-LOADED A Multi Purpose 7,327 SF B Admin 3,006 SF C Library 3,978 SF D Classrooms 3,006 SF 2 1 E Kindergarten 2,250 SF 2 F Kindergarten and Classrooms 5,503 SF 4 G Classrooms 2,250 SF 2 H Classrooms 1,920 SF 2 I Classrooms 1,920 SF 2 J Classrooms 1,920 SF 2 K Classrooms 1,920 SF 2 L Classrooms 2,250 SF 2 M Classrooms 5,023 SF 4 N Classrooms 2,250 SF 2 Total 44,523 SF 24 3 GROSS AREAS SCHOOL BUILDINGS AREA LOADED CR NON-LOADED A Multi Purpose 8,696 SF B Admin 4,377 SF Library 5,672 SF D 4,389 SF 1 Kindergarten 2,766 SF Kindergarten and Classrooms 2 K 2 L Classrooms 2 M Classrooms 5,784 SF 4 N Classrooms 2,766 SF 2 Total 55,286 SF
28Spaces 16 Spaces 58 Spaces LITTLE CHICO CREEK ELEMENTARY SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 45 BACK TO CONTENTS

CONDITION ASSESSMENT

Interior lighting needs and upgrades Student drop-off asphalt upgrades Casework and sink replacements for ADA compliance Typical classroom - storage needs Administration work stations
LITTLE CHICO CREEK ELEMENTARY SCHOOL 46 BACK TO CONTENTS
Current campus Library condition

CONDITION ASSESSMENT

KEYUPDATEFINDINGS

LITTLE CHICO CREEK ES COST PER SF NOTES

• Some walkways along buildings do not meet ADA slopes

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

5. Building - Interior

• Striping and pavement markings are fading and should be re-applied, some signage and pavement markings do not comply with ADA standards

• Other site amenities are in good condition.

• Administration renovation for safety and security - single-point-of-entry

• Door thresholds are not ADA compliant

• Roof drainage and exterior finishes are in good condition

• Sinks are not ADA compliant

• Damaged VCT in Multi-purpose building

• Kitchen is restricted on space and storage

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• Most of campus is on the Edwards 6632 FACP, which is monitored by a newer Silent Knight 5208 panel. Most of the campus includes old horns, pull stations, and is not compliant with current code.

• Most existing panels on campus are older but in servicable condition. Surface raceways in classrooms.

• Existing intrusion alarm system is older but still in use. Cameras throughout the campus. No access controls.

• The campus has been upgraded to Valcom IP, which is consistent with current district standards.

• Distribution Pumps are at the end of life and in need of replacement.

• Plumbing Equipment is mostly from the original construction and is at the end of life.

• Student restrooms typically do not have ADA compliant thresholds.

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
LITTLE CHICO CREEK ELEMENTARY SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value F E G I J K H L M N D A C B AMANDA WAY HARTFORD DR 47 BACK TO CONTENTS

PROPOSED MASTER PLAN

OVERVIEW

The improvements to Little Chico Creek Elementary School are intended to meet the mid-size or 496 student model capacity. This site was also identified to house two rooms for the moderate/severe SPED program. Specific improvements include:

• Expansion of TK/K Classrooms with permanent construction to meet model capacity goals. Related improvements include parking and drop-off specifically for that complex and playground improvements

• Reclaiming existing spaces for moderate/severe special education program. This may require adding restrooms to those rooms

• Renovation of existing buildings when eligible

• Improvements to administration for safety and security

Existing buildings will allow 4 "flex" classrooms rather than the 2 that are a part of the model capacity.

LITTLE CHICO CREEK ELEMENTARY SCHOOL
assignments are conceptual and meant to confirm that the site can meet the model capacity goals. GRADE # LOADING TOTAL TK 2 24 48 K 3 24 72 1 3 24 72 2 3 24 72 3 3 24 72 4 2 28 56 Grade Bubble 2 28 56 5 2 28 56 SPED 2 10 20 SPED (Mod/ Severe) 2 10 20 Flex 2 0 0 Surplus Flex 2 0 0 TOTAL 28 544 Model Capacity 3: MID-SIZE 496 Students F E G I J K H L M N D A C B AMANDA WAY HARTFORD DR Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 48 BACK TO CONTENTS
Room

PHASING

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Little Chico Creek Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

PHASE 1
NEW TK/K CONSTRUCTION AND MODERNIZE ADMINISTRATION/STUDENT SERVICES/SPED New Building Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished LEGEND J I G F E B A K H L C M D LITTLE CHICO CREEK ELEMENTARY SCHOOL PHASE 2 MODERNIZE EXISTING BUILDINGS N HEAVIER MODERNIZATIONS ON ADMIN PORTION SCHOOL BUILDINGS A Multi Purpose B Admin C Library D Classrooms E Kindergarten F Kindergarten and Classrooms G Classrooms H Classrooms I Classrooms J Classrooms K Classrooms L Classrooms M Classrooms N Classrooms 49 BACK TO CONTENTS

MARIGOLD ELEMENTARY SCHOOL

FAST FACTS:

• Originally Built: 1961, Renovated 2003, 2018

• 2022/2023 Enrollment: 830 Students

• Site = 11.61 Acres

• Buildings = 67,012 SF (Permanent)

• 186 Parking Spaces

• 0% of Classrooms are in Portable Classroom Buildings

• Recommended permanent capacity: 672

Marigold Elementary School is a recently renovated campus in Chico USD. The campus was previously two schools - Loma Vista ES, focusing on special education students and Marigold ES, a traditional elementary school. The campus is now combined into a single school, Marigold ES, but still includes the special education facility. To accomplish this model capacity, the campus will require the additon of 4 additonal classrooms (SPED and Flex Rooms) and a TK classroom. Additonally, the Moderate/ Severe SPED program is expected to move to another location.

and multipurpose
Entry
at Marigold Elementary School.
MARIGOLD ELEMENTARY SCHOOL
50 BACK TO CONTENTS

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms. 57

GROSS AREAS

SCHOOL BUILDINGS AREA LOADED CR NON-LOADED A Admin and Kindergarten 4,516 SF 2

B Classrooms 4,200 SF 4

C Library and Classrooms 13,874 SF 7 1

D Classrooms 7,908 SF 7 1

EAST AVE MARIGOLD AVE C/D Level 2 B C D A K G LOMA VISTA
Multi Purpose 13,776 SF LOMA VISTA SPED/Classrooms 28,075 SF
Total 77,903 SF 37 2
K Kindergarten 5,554 SF 4 G
13
Spaces
Spaces State Preschool and SPED Preschool MARIGOLD ELEMENTARY SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 51 BACK TO CONTENTS
31 Spaces 98

CONDITION ASSESSMENT

Typical classroom interior Student drop-off/pick-up & entry point Classroom casework and sink areas Hardscape courts and playground
MARIGOLD ELEMENTARY SCHOOL 52 BACK TO CONTENTS
Campus Library interior Restroom finishes and fixtures

CONDITION ASSESSMENT KEYUPDATEFINDINGS

MARIGOLD ES COST PER SF NOTES

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

5. Building - Interior

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• Main parking lot is new with ADA parking & drop-off

• Playground, hardcourt, and play structures are all new

• No marquee sign

• Fully fenced campus perimeter

• Single-point-of-entry to administration area

• New campus; exterior finishes are in good condition

• Interior finishes are in good condition

• Casework and sinks are ADA compliant

• New campus; system meets current code

• New campus; electrical system is in good condition

• New campus; system is in good condition and meets code

• New campus; mechanical systems are in good condition

• Restrooms are ADA compliant

• Plumbing and fixtures are new

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
MARIGOLD ELEMENTARY SCHOOL EAST AVE MARIGOLD AVE C/D Level 2 Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value B C D A K G LOMA VISTA 53 BACK TO CONTENTS

PROPOSED MASTER PLAN

OVERVIEW

As a newly renovated school, the condition assessment and program needs indicate very little change is required. However, in order to meet the agreed-upon 672 student model capacity, some additonal spaces may be required. These improvements may occur in the future, when capacity needs warrant the additions. The master plan includes:

• The addition of a TK classroom

• Reclaiming the moderate/severe Special Education space as a Kindergarten classroom

• The addition of Flex Classrooms

• The addition of mild/moderate SPED classrooms for integration into the campus

It is assumed that the former Loma Vista building will continue as a SPED/ PreSchool program center.

MARIGOLD ELEMENTARY SCHOOL
GRADE # LOADING TOTAL TK 3 24 72 K 4 24 96 1 4 24 96 2 4 24 96 3 4 24 96 4 3.5 28 98 4/5 Bubble 1 28 28 5 3.5 28 98 SPED 2 10 20 Flex 2 0 0 TOTAL 31 700 Model Capacity 3: LARGE 672 Students Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure EAST AVE MARIGOLD AVE C/D Level 2 B C D A K G LOMA VISTA State Preschool and SPED Preschool 54 BACK TO CONTENTS
Room
assignments are conceptual and meant to confirm that the site can meet the model capacity goals.

MCMANUS ELEMENTARY SCHOOL

FAST FACTS:

• Originally built: 1947, Renovated: 2023

• 2022/2023 Enrollment: 415 Students

• Site = 7.83 Acres

• Buildings = 27,802 SF (Permanent) | 13,786 SF (Portables)

• 57 Parking Spaces

• 41% of Classrooms are in Portable Classroom Buildings

• Recommended permanent capacity: 672

The renovation and new constructionat the campus for McManus Elementary School is currently under construction. The expansion of the campus is intended to accommodate growth in the north of the Chico Unified School District.

Classroom and Library at McManus Elementary School.
MCMANUS ELEMENTARY SCHOOL
55 BACK TO CONTENTS

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

N J M G T F E D C A B L K O EAST AVE NORTH AVE
SCHOOL BUILDINGS AREA LOADED CR NON-LOADED A Admin and Multi Purpose 5,149 SF B Classrooms 2,225 SF 2 C Classrooms 8,022 SF 7 D Classrooms 8,035 SF 6 E Restrooms 513 SF F Library 1,307 SF G Portable Classrooms & Services 3,840 SF 1 3 J Kindergarten 1,140 SF 1 K Portable SPED 2,977 SF 2 L Portable Classrooms 992 SF 2 M Classroom 1,027 SF 1 N Portables 3,081 SF 1 O Restrooms 384 SF T Portables 2,896 SF 3 Total 41,588 SF 22 7 10.373 SF 10,357 960 SF
GROSS AREAS
11 Spaces 46 Spaces MCMANUS ELEMENTARY SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 56 BACK TO CONTENTS

CONDITION ASSESSMENT

No shade structure over playground Multi-purpose room expansion and storage needs ADA path of travel improvements to pavement and landscape Core restroom ADA compliance upgrades ADA-compliant improvements to sink areas
MCMANUS ELEMENTARY SCHOOL 57 BACK TO CONTENTS
Library desk and casework replacement

CONDITION ASSESSMENT

A full condition assessment was not conducted of McManus Elementary school as plans for its replacement were in process. Given that much of the campus was housed in portable classrooms, they are shown in "red" as recommended for replacement.

EXISTING SITE PLAN
MCMANUS ELEMENTARY SCHOOL
Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value N J M G T F E D C A B L K O EAST AVE NORTH AVE 58 BACK TO CONTENTS

PROPOSED MASTER PLAN

OVERVIEW

A deep modernization of existing buildings and the addition of new buildings is currently underway at McManus Elementary School. The FMP identified the McManus campus as a model capacity of 672 students, however, planning for the campus began before the model capacities were established, so future considerations to add "flex" classrooms might be a consideration. As the site is not expected to meet that capacity by 2029/2030, proposed grade-level classrooms can act as "flex" classrooms until that time.

The site has also been identified as a site for a moderate/severe program; relocation of that program is possible if capacity demands it in the future.

MCMANUS ELEMENTARY SCHOOL EAST AVE NORTH AVE
GRADE # LOADING TOTAL TK 3 24 72 K 4 24 96 1 4 24 96 2 4 24 96 3 4 24 96 4 3.5 28 98 4/5 Bubble 1 28 28 5 3.5 28 98 SPED 2 10 20 Flex 2 0 0 TOTAL 31 700 Model Capacity 3: LARGE 672 Students Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 59 BACK TO CONTENTS
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.

PHASING

C

D

E

F

G

J

K

L

M

N

O

T

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at McManus Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

PHASE 1

RELOCATE/REMOVE PORTABLES

Demolition of some existing portables for future new construction.

PHASE

NEW CONSTRUCTION

Several new buildings, including a new Admin, MP, Classroom, and 2 new kinder buildings. Also includes the modernizations of existing buildings to remain including changes to the former MP to be made into a library and for the former library to be made into a new staff lounge.

DEMOLISH EXISTING AND SITEWORK

Demolition of remaining portables and construction of site improvements. A new drop off and expanded parking in place of the former portables and parking lot.

New Building Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished LEGEND K O E F C T B A L N D G M J MCMANUS ELEMENTARY SCHOOL
2
PHASE 3
KINDER BUILDINGS NEW CLASSROOM BUILDING NEW ADMIN NEW MULTI-PURPOSE BUILDING PORTABLES TO BE REPLACED/REMOVED SCHOOL BUILDINGS
Admin and Multi Purpose
Classrooms
NEW
A
B
Classrooms
Classrooms
Restrooms
Library
Portable Classrooms & Services
Kindergarten
Portable SPED
Portable Classrooms
Classroom
Portables
Restrooms
60 BACK TO CONTENTS
Portables

NEAL DOW ELEMENTARY SCHOOL

FAST FACTS:

• Originally built: 1965, Renovated 1987, 2019

• 2022/2023 Enrollment: 308 Students

• Site = 7.3 Acres

• Buildings = 49,305 SF (Permanent)

• 44 Parking Spaces

• 0% of Classrooms are in Portable Classroom Buildings

• Recommended permanent capacity: 320

Neal Dow Elementary School is one of the newly renovated campuses in Chico USD slated for a model capacity of 320 students. It is not anticipated for any changes in this FMP, except to replace the front parking lot and anything else as required to address the agreed-upon model capacities, identifying spaces for "flex" rooms, special education and in the case of Neal Dow, two rooms for the moderate/severe special education program.

Front entry and drop-off at Neal Dow Elementary School
NEAL DOW ELEMENTARY SCHOOL
61 BACK TO CONTENTS

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms. 44 Spaces

GROSS AREAS

GROSS AREAS

SCHOOL BUILDINGS AREA LOADED CR NON-LOADED

SCHOOL BUILDINGS AREA LOADED CR NON-LOADED

A Admin and Classrooms 17,491 SF 8 2

A Admin and Classrooms 23,185 SF 8 2

B SPED 2,598 SF 2

B SPED 4,787 SF 2

C Library and Kindergarten 10,455 SF 4

C Library and Kindergarten 15,030 SF 4

D Classrooms 4,134 SF 3

D Classrooms 5,252 SF 3

E Classrooms 3,348 SF 2 1

E Classrooms 4,369 SF 2 1

F Multi Purpose 11,280 SF Total 49,305 SF 19 3

F Multi Purpose 13,145 SF Total 65,768 SF 19 3

B C D A E F E5THAVE
EXISTING SITE INVENTORY
DOWNINGAVE NEALDOWAVE
NEAL DOW ELEMENTARY SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 62 BACK TO CONTENTS

CONDITION ASSESSMENT

School needs a new parking lot Restroom plumbing and fixtures are new and ADA compliant Typical classroom teaching wall and interior finishes Library interior Campus quad shaded structure Multi-purpose exterior NEAL DOW ELEMENTARY SCHOOL 63 BACK TO CONTENTS

CONDITION ASSESSMENT KEYUPDATEFINDINGS

NEAL

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

5. Building - Interior

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• New campus - ADA compliance up to code

• Drop off and parking area needs replacement

• Renovated fencing with single point of entry directly into the Admin office.

• Renovated exterior finishes and improvements are in good condition

• No improvements needed

• Renovated interior finishes and improvements are in good condition

• No improvements needed

• Renovated campus - system is up to standard

• No automatic fire sprinkler system found in Library and Kinder classrooms

• Renovated campus - no improvements needed

• Renovated campus - no improvements needed

• Renovated Air Distribution, good condition.

• Renovated roof mounted AC-units installed in 2019

• Original water heater needs replacement

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
DOW ES COST PER SF NOTES
NEAL DOW ELEMENTARY SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value B C D A E F E5THAVE
64 BACK TO CONTENTS
DOWNINGAVE NEALDOWAVE

PROPOSED MASTER PLAN

OVERVIEW

A deep modernization of existing buildings and the addition of new buildings was recently completed at Neal Dow Elementary School. The FMP identifies the Neal Dow campus as a model capacity of 320 students. Applying the model capacity to the renovated campus, two surplus or "unassigned" spaces will be available.

The site has also been identified as a site for a moderate/severe special education program.

Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals. GRADE # LOADING TOTAL TK 1 24 24 K 2 24 48 1 2 24 48 2 2 24 48 3 2 24 48 4 1.5 28 42 5 1.5 28 42 SPED 2 10 20 Flex 2 0 0 4/5 Bubble 1 0 0 SPED (Mod/ Severe) 2 0 0 Unassigned 2 0 0 TOTAL 21 320 Model Capacity 3: SMALL 320 Students B C D A E F E5THAVE DOWNINGAVE NEALDOWAVE Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 65 BACK TO CONTENTS

PARKVIEW ELEMENTARY SCHOOL

FAST FACTS:

• Originally built: 1954, Renovated: 2000

• 2022/2023 Enrollment: 384 Students

• Site = 7.72 Acres

• Buildings = 32,934 SF (Permanent) | 1,440 SF (Portables)

• 49 Parking Spaces

• 16% of Classrooms are in Portable Classroom Buildings

• Recommended permanent capacity: 496

Parkview Elementary School has been identified as a replacement campus, with model capacity of 496 students. Through the FMP process, alternatives were identified to house students through complex phasing or replacement of existing campuses:

• In order to accelerate construction, identify an offsite location for students to temporarily relocate

• Design the implementation of the project to construct around existing buildings, where possible, building on field/hardcourt spaces in order to avoid existing buildings. This strategy accelerates construction.

• Phase the implementation, understanding that disruption at the existing campus could take two school years to complete.

While design of the campus will occur at a later time, the FMP indicates that much of the new campus can be constructed on unoccupied land, with the exception of the Multi-purpose building, which will require removal of the exisitng building. Phasing plans are shown as part of this section.

Front entry at Parkview Elementary
PARKVIEW ELEMENTARY SCHOOL
66 BACK TO CONTENTS

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

GROSS AREAS

H

D

4 G

1

2

1

E N L D C B F H I G J K M A E8THST
BUILDINGS AREA LOADED CR NON-LOADED
Kindergarten 2,061 SF
SCHOOL
A
2
960 SF
1,920
B Reading Interventions
2 C Portable Classrooms
SF
960
Portable Classroom
SF
6,264
E Classrooms
SF 4
and
8,064 SF
Admin 2,264 SF
F Classrooms
Library
Classrooms 5,109 SF
Restrooms 1,589 SF
Classrooms 5,580 SF
3,467 SF
Restrooms 460 SF
Preschool 1,440 SF
Portable 1,440 SF
Total 43,422 SF
4 I
J
4 K Multi Purpose
L
M
1 N
21 4
14 Spaces 35Spaces PARKVIEW ELEMENTARY SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 67 BACK TO CONTENTS

CONDITION ASSESSMENT

plumbing fixture replacement needs and ADA compliance
room interior finish upgrades
soffit and fascia replacement
hardware upgrades and restroom renovations needed
path of travel improvements
compliant accessibility improvements to sink areas PARKVIEW ELEMENTARY SCHOOL 68 BACK TO CONTENTS
Restroom
Multi-purpose
Exterior
Door
ADA
ADA

CONDITION ASSESSMENT KEYUPDATEFINDINGS

1. Site - ADA

• Walkways along Buildings F, G, H J and K do not meet ADA standards

• Hardcourts are in poor condition.

• Playground equipment new but does not have shade structures.

2. Site - Other

3. Site - Security

4. Building - Exterior

5. Building - Interior

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• Inner campus has non-compliant path of travel cross-slope conditions, door landings and thresholds - remove and replace.

• No single-point-of-entry to Admin

• Soffits & Fascias have dry-rot and in poor condition - needs replacement

• Most roofs do not have proper draining and downspouts

• Door hardware are non-ADA compliant

• Damaged 2x4 Acoustic Ceiling Tile system

• Interior finishes need replacement

• Silent Knight 6820EVS control panel (added to serve addition of portables) is consistent with current district standards, but the remainder of the campus includes old horns, pull stations, and is not compliant with current code.

• Most existing panels on campus are older but in servicable condition.

• Surface raceways in classrooms.

• Existing intrusion alarm system is older but still in use. Cameras throughout the campus. No access controls.

• Ceiling Exhaust Fans are original and in need of replacement.

• Existing Gas Fired AC-Units are at the end of life and need to be replaced

• Original Plumbing Fixtures need replacement

• Sinks are not ADA-complaint

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
PARKVIEW ES COST PER SF NOTES
PARKVIEW ELEMENTARY SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value E N L D C B F H I G J K M A E8THST 69 BACK TO CONTENTS

PROPOSED MASTER PLAN

OVERVIEW

It is expected that Parkview Elementary can be constructed on available land outside the footprint of the existing buildings, with the exception of the mulit-purpose building. Future design efforts may identify other opportunities to limit the impacts of phasing on the project, as the design process will include community and stakeholder engagement that will be influential. In additon to the new campus, it is expected that pick-up and drop-off areas will be expanded and improved. The campus will also be the location for two rooms for the moderate/severe special education program based on the model capacity of 496 students.

PARKVIEW ELEMENTARY SCHOOL E8THST
GRADE # LOADING TOTAL TK 2 24 48 K 3 24 72 1 3 24 72 2 3 24 72 3 3 24 72 4 2.5 28 70 5 2.5 28 70 SPED 2 10 20 Flex 2 0 0 Bubble 1 0 0 SPED (Mod/ Severe) 2 0 0 TOTAL 26 496 Model Capacity 3: MID-SIZE 496 Students Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 70 BACK TO CONTENTS
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.

PHASING

A Kindergarten

B Reading Interventions

C Portable Classrooms

D Portable Classroom

E Classrooms

F Classrooms and Library

G Admin

H Classrooms

I Restrooms

J Classrooms

K Multi Purpose

L Restrooms

M Preschool

N Portable

PHASE 1

NEW CONSTRUCTION

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Parkview Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

Several new buildings constructed on the existing field to not interfere with current school New Building

Lightly Modernized Building

Heavily Modernized Building

Building to be Relocated or Demolished

PHASE 2

DEMOLISH EXISTING BUILDINGS AND SITE WORK

Demolish existing campus buildings, now that they are housed in the new construction.

BUILD MULTI-PURPOSE BUILDING

Build new MP building over former classroom building. Site improvements including new hardcourts and drop-off/parking. NEW

LEGEND D F I H M B C E PARKVIEW ELEMENTARY SCHOOL N K J A G L
PHASE 3
MULTI-PURPOSE NEW DROP-OFF / PARKING
HARDCOURT AND PLAY AREAS NEW ADMIN NEW CLASSROOMS NEW KINDER NEW LIBRARY
NEW
SCHOOL BUILDINGS
71 BACK TO CONTENTS

ROSEDALE ELEMENTARY SCHOOL

FAST FACTS:

• Originally built: 1953, Renovated: 2003

• 2022/2023 Enrollment: 524 Students

• Site = 10.79 Acres

• Buildings = 35,835 SF (Permanent) | 2,834 SF (Portables)

• 58 Parking Spaces

• 28% of Classrooms are in Portable Classroom Buildings

• Recommended permanent capacity: 672

Rosedale Elementary School has been identified as a replacement campus, with model capacity of 672 students. The school is a non-boundaried school with a dual-immersion language program. Through the FMP process, alternatives were identified to house students through complex phasing or replacement of existing campuses:

• In order to accelerate construction, identify an offsite location for students to temporarily relocate

• Design the implementation of the project to construct around existing buildings, where possible, building on field/hardcourt spaces in order to avoid existing buildings. This strategy accelerates construction.

• Phase the implementation, understanding that disruption at the existing campus could take two school years to complete.

While design of the campus will occur at a later time, the FMP indicates that the new campus can be constructed on unoccupied land, with the exception of the solar canopies, which will require relocation. Phasing plans are shown as part of this section.

Entry and student drop-off at Rosedale Elementary
ROSEDALE ELEMENTARY SCHOOL
72 BACK TO CONTENTS

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

GROSS AREAS

SCHOOL BUILDINGS AREA LOADED CR NON-LOADED

A Multi Purpose and Admin 6,351 SF

B Kindergarten 3,638 SF 2

C Student Services 960 SF

D Kindergarten 960 SF 1

E Student Services 960 SF

F Classrooms 3,264 SF 3

G Classrooms 4,224 SF 4

H Classrooms and Library 11,295 SF 6

I Classrooms 6,440 SF 4

J Restrooms 1,503 SF

K Classrooms 6,435 SF 5

Total 46,028 SF 25

G K J A I H B C D E F OAK PARK
AVE OAKST
15
12
31
ROSEDALE ELEMENTARY SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 73 BACK TO CONTENTS
Spaces
Spaces
Spaces

CONDITION ASSESSMENT

Landscape improvements and hardcourt repavement
of travel upgrades to pavement and thin metal doors Campus library electrical improvements ROSEDALE ELEMENTARY SCHOOL 74 BACK TO CONTENTS
Multi-purpose interior finish renovations and storage improvements
Water fountain upgrades ADA accessability improvements ADA path

CONDITION ASSESSMENT KEYUPDATEFINDINGS

ROSEDALE ES COST PER SF NOTES

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

5. Building - Interior

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• Campus has ADA path of travel issues throughout entire campus, door thresholds, cross slopes, raised concrete stoops, etc.

• A/C paving in poor condition throughout parking lot

• Hardcourt paving is in poor condition.

• Bike rack is not fenced in - open to campus

• There is single point of access to the Admin. office.

• Campus is secured with fencing all around.

• Roof drainage - no gutter / downspouts to grade at all buildings

• Soffit- plywood, dry rot

• Roofing - built-up

• Damaged 2x4 acoustic ceiling tile system

• New hardware for interior and exterior doors

• Replace interior finishes

• Very old Faraday 7800 manual system is monitored by an old Silent Knight 5208. Mostly pull stations on campus, does not meet current code requirements.

• Old gear in custodial room 60+ years old long past servicable life, many existing panels on campus are similar vintage. Lots of surface raceways in classrooms.

• No intrusion alarm system in use. Cameras throughout the campus. No access controls.

• A/C-Units approx. 7-8 years old.

• Original air distribution suggest a deep cleaning with any planned modernization project.

• Original plumbing fixtures need replacement in all restrooms

• New water heater installation

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
ROSEDALE ELEMENTARY SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value G K J A I H B C D E F OAK PARK AVE OAKST 75 BACK TO CONTENTS

OAK PARK AVE OAKST

PROPOSED MASTER PLAN

OVERVIEW

It is expected that Rosedale Elementary School can be constructed on available land outside the footprint of the existing buildings, eliminating the need for interim housing. Future design efforts may change this assumption, as the design process will include community and stakeholder engagement that will be influential. In addition to the new campus, it is expected that pick-up and drop-off areas will be expanded and improved to meet the needs of the new larger campus, identified for design to a model capacity of 672 students.

ROSEDALE ELEMENTARY SCHOOL
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals. GRADE # LOADING TOTAL TK 3 24 72 K 4 24 96 1 4 24 96 2 4 24 96 3 4 24 96 4 3.5 28 98 5 3.5 28 98 SPED 2 10 20 Flex 2 0 0 Bubble 1 0 0 TOTAL 31 672 Model Capacity 3: LARGE 672 Students Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 76 BACK TO CONTENTS

PHASING

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Rosedale Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

PHASE 1

NEW CONSTRUCTION

New Buildings to be built on the existing field to not interfere with the existing school during construction. New

PHASE 2

DEMOLISH EXISTING BUILDINGS AND SITE WORK

Former school buildings demolished to leave area open for new hardcourt and field. Relocation of existing solar canopies to this area.

Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished LEGEND K A J I G B C D H E F ROSEDALE ELEMENTARY SCHOOL
Building
SCHOOL BUILDINGS A Multi Purpose and Admin B Kindergarten C Student Services D Kindergarten E Student Services F Classrooms
Classrooms
Classrooms and
Classrooms
Restrooms
Classrooms 77 BACK TO CONTENTS
G
H
Library I
J
K

SHASTA ELEMENTARY SCHOOL

FAST FACTS:

• Originally built: 1964, Renovated: 2006, 2018

• 2022/2023 Enrollment: 620 Students

• Site = 6.95 Acres

• Buildings = 48,265 SF (Permanent)

• 65 Parking Spaces

• 0% of Classrooms are in Portable Classroom Buildings

• Recommended permanent capacity: 672

Shasta Elementary School was recently updated and is not scheduled for any near term improvements. It is one of the most impacted campuses in the District, operating on one of the smaller sites within the District. The introduction of transitional kindergarten opened a conversation about the site enrollment. the Board of Education directed the master plan team to not plan for TK implementation at Shasta Elementary School.

Additionally, issues that were part of the site and district engagement included:

• Undersized Multi-Purpose building. A new building was not proposed as part of the facilities master plan. Future consideration of this issue may be needed.

• Moderate/Severe special education is anticipated for this site.

• The addition of gender-inclusive restrooms

One consideration may be to relocate the moderate/severe program to another site, allowing expansion of the multi-purpose room into the adjacent classroom spaces.

Front entry at Shasta Elementary School
SHASTA ELEMENTARY SCHOOL
78 BACK TO CONTENTS

18Spaces

47Spaces

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

C Classrooms 10,328 SF 4 1

D Classrooms 6,079 SF 5

E Classrooms 7,943 SF 7

K1 Kindergarten 2,918 SF 2

K2 Kindergarten 4,934 SF 3

M Multi Purpose

2

M A K1 K2 D C B E
ESPLANADE
BUILDINGS AREA LOADED CR NON-LOADED A
and
5,376
LEORACT
GROSS AREAS SCHOOL
Admin
Classrooms
SF 3
B Library and Classrooms 8,292 SF 4
Total 57,795 SF 30 1
11,924 SF
SHASTA ELEMENTARY SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 79 BACK TO CONTENTS

CONDITION ASSESSMENT

and
in
for security purposes
restroom interior finish renovations
classroom interior upgrades SHASTA ELEMENTARY SCHOOL 80 BACK TO CONTENTS
Daylighting and storage improvements Classroom storage improvements ADA
casework upgrades
classrooms Window treatment needs
Student
Kindergarten

CONDITION ASSESSMENT KEYUPDATE FINDINGS

SHASTA ES COST PER SF NOTES

• Walkways along Buildings B, C and MP do not meet ADA standards

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

5. Building - Interior

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• ADA parking pavement markings do not meet standards

• Parking, drop-off, and irrigation are new

• Existing play structure looks adequate, no shade structure

• Perimeter fencing around campus is new

• Single-point-of-entry to Admin

• All buildings but; B, C, & MP are new

• Standing seam metal roofing is adequate on existing buildings.

• Repaint exterior in some areas

• Space functions are adequate

• Existing MP and restrooms need interior repainting

• Campus has been upgraded to district standard Silent Knight 6820EVS, completely upgraded except for duct detectors.

• Existing panels on campus are mix of relatively new and in servicable condition, and older are past their servicable life.

• Existing Ademco intrusion alarm system is installed but not in use. Cameras throughout the campus. No access controls at existing bldgs

• Poor air distribution in old buildings - needs replacement

• Existing Gas-Fired A/C units are 20 years old and need replacing

• Sinks are not ADA compliant in existing buildings

• Old restrooms need new plumbing fixtures

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
SHASTA ELEMENTARY SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value M A K1 K2 D C B E
ESPLANADE 81 BACK TO CONTENTS
LEORACT

PROPOSED MASTER PLAN

OVERVIEW

The FMP for Shasta Elementary represents no change in the existing capacity. At model capacity it will serve 600 students.

SHASTA ELEMENTARY SCHOOL
are
the
the
capacity
GRADE # LOADING TOTAL K 4 24 96 1 4 24 96 2 4 24 96 3 4 24 96 4 3.5 28 98 5 3.5 28 98 SPED 2 10 20 Flex 2 0 0 Bubble 1 0 0 SPED (Mod/ Severe) 2 0 0 TOTAL 30 600 Model Capacity 3: LARGE 672 Students M A K1 K2 D C B E Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 82 BACK TO CONTENTS
LEORACT ESPLANADE Room assignments
conceptual and meant to confirm that
site can meet
model
goals.

PHASING

SCHOOL BUILDINGS

A Admin and Classrooms

B Library and Classrooms

C Classrooms

D Classrooms

E Classrooms

K1 Kindergarten

K2 Kindergarten

M Multi Purpose

LIGHT MODERNIZATIONS ON BLDGS B, C, AND M

PHASE 1

LIGHT MODERNIZATIONS

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Shasta Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

New Building

Lightly Modernized Building

Heavily Modernized Building

Building to be Relocated or Demolished

COMPLETE MODERNIZATIONS COMPLETE

LEGEND A C B M E K1 K2 D SHASTA ELEMENTARY SCHOOL
83 BACK TO CONTENTS

SIERRA VIEW ELEMENTARY SCHOOLS

FAST FACTS:

• Originally built: 1954, Renovated: 1998

• 2022/2023 Enrollment: 450 Students

• Site = 9 Acres

• Buildings = 37,715 SF Permanent

• 31 Parking Spaces (not including unstriped lot)

• 20% of Classrooms are in Portable Classroom Buildings

• Recommended pemanent capacity: 496

Sierra View Elementary School has been identified as a replacement campus, with model capacity of 496 students. Through the FMP process, alternatives were identified to house students through complex phasing or replacement of existing campuses:

• In order to accelerate construction, identify and offsite location for students to temporarily relocate

• Design the implementation of the project to construct around exisitng buildings, where possible, building on field/hardcourt spaces in order to avoid exisitng buildings. This strategy accelerates construction.

• Phase the implementation, understanding that disruption at the existing campus could take two school years to complete.

While design of the campus will occur at a later time, the FMP indicates that much of the new campus can be constructed on unoccupied land, with the exception of the Multi-purpose and library building, which will require removal of the existing building. Phasing plans are shown as part of this section.

Campus courtyard at Sierra View Elementary School
SIERRA VIEW ELEMENTARY SCHOOL
84 BACK TO CONTENTS

31 Spaces

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

GROSS AREAS

SCHOOL BUILDINGS AREA LOADED CR NON-LOADED

A Portable Classrooms 960 SF 1

B Classrooms 5,322 SF 4

C Library 1,297 SF

D Restrooms 1,577 SF

E Portable Student Services 960 SF

F Classrooms 6,380 SF 4

G Multi Purpose and Admin 5,184 SF

H Classrooms 5,322 SF 3 1

I Portable Classrooms 1,920 SF 2

J Restrooms 1,537 SF

K Classrooms 5,322 SF 4

L Kindergarten 3,619 SF 2

M Portable Classrooms and Service 2,880 SF 3

N Portable Student Service 960 SF

Total 43,627 SF 23 1

B D I I J K H F A C E G L N M
HOOKEROAKAVE
MADRONEAVE
SIERRA VIEW ELEMENTARY SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 85 BACK TO CONTENTS

CONDITION ASSESSMENT

Multi-purpose room upgrades needed Student restroom interior finish upgrades Casework replacement and ADA upgrades Campus front entry Exterior finishes need repair or replacement
SIERRA VIEW ELEMENTARY SCHOOL 86 BACK TO CONTENTS
Classroom clerestory and window treatment upgrades

CONDITION ASSESSMENT KEYUPDATE FINDINGS

SIERRA VIEW ES COST PER SF NOTES

• Non ADA compliant parking stalls, drop-off areas, no ramp at drop-off, striping, signage.

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

5. Building - Interior

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• Campus has ADA path of travel issues throughout entire campus, door thresholds, cross slopes, raised concrete in front of doors, etc.

• Bike rack is not fenced in - open to campus

• Front landscape is worn and needs improvements

• A/C paving is poor throughout parking lot

• Some areas have new ornamental fencing with gates at front entry

• Existing chain link fencing mostly worn - lacks ADA compliant gates, clearances, etc.

• Roof replacements: tar & gravel, wood fascia, roof drainage, etc.

• Replace and repair cement plaster

• Non-efficient space layout in Admin

• Damanged ACT system in some areas

• Lots of exposed conduits and raceways

• Floor finish replacement

• No automatic fire sprinkler system found

• Silent Knight 5207 manual system, does not meet current code requirements. Complete upgrade required.

• Most existing panels on campus are older and either nearing or past their servicable life

• Receptacle for IDF in MPR is shared with other receptacles in the space, which leads to nuisance trips.

• Bogen Multi-com 2000 is located in principal's office, does not meet current district standards.

• No intrusion alarm on campus.

• A percentage of AC-units have reached the end of their service life - needs replacement

• Plumbing fixtures and sinks are from original construction

• Non-ADA compliant toilets and fixtures in some areas.

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
SIERRA VIEW ELEMENTARY SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value A D I I J K H F B C E G L M
87 BACK TO CONTENTS
MADRONEAVE HOOKEROAKAVE

MADRONEAVE HOOKEROAKAVE

PROPOSED MASTER PLAN OVERVIEW

It is expected that Sierra View Elementary can be constructed on available land outside the footprint of the exisitng buildings, with the exception of the multi-purpose building and library. Future design efforts may identify other opportunities to limit the impacts of phasing on the project, as the design process will include community and stakeholder engagement that will be influential. In additon to the new campus, it is expected that pick-up and drop-off areas will be expanded and improved. The campus will also be the location for two rooms for the moderate/ severe special education program based on the model capacity of 496 students.

SIERRA VIEW ELEMENTARY SCHOOL
Grade # Loading Total TK 2 24 48 K 3 24 72 1 3 24 72 2 3 24 72 3 3 24 72 4 2.5 28 70 5 2.5 28 70 SPED 2 10 20 Flex 2 0 0 Bubble 1 0 0 SPED (Mod/ Severe) 2 0 0 TOTAL 26 496 Model Capacity 3: MID-SIZE 496 Students Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 88 BACK TO CONTENTS
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.

PHASING

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Sierra View Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

SIERRA VIEW ELEMENTARY SCHOOL
1
PHASE
CONSTRUCTION
Building Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished LEGEND M C E G F L K H B A D I I J
2
EXISTING AND SITE WORK NEW KINDER NEW ADMIN NEW CLASSROOMS PHASE 3 BUILD LIBRARY AND MULTI-PURPOSE BUILDING NEW MULTI-PURPOSE BUILDING & OUTDOOR AMPHITHEATER NEW LIBRARY SCHOOL BUILDINGS A Portable Classrooms B Classrooms C Library D Restrooms E Portable Student Services F Classrooms G Multi Purpose and Admin H Classrooms Portable Classrooms Restrooms K Classrooms L Kindergarten M Portable Classrooms and Service N Portable Student Service 89 BACK TO CONTENTS
NEW
New
PHASE
DEMOLISH

6 . JUNIOR HIGH SCHOOLS SECTION

90 BACK TO CONTENTS

BIDWELL JUNIOR HIGH SCHOOL

FAST FACTS:

• Originally built 1954, Renovated: 1966, 2015

• 2022/2023 Enrollment: 975 Students

• Site = 19 Acres

• Buildings = 79,189 SF (Permanent)

• 102 Parking Spaces

• 0% of Classrooms are in Portable Classroom Buildings

• Recommended capacity: 1,251

Bidwell Junior High School received moderate renovation of some buildings in 2015. The remaining campus will require renovation, replacement or repurposing of exisitng spaces. Specific feedback received by the site-based committee included:

• Relocation of the Band Room to reclaim existing space for Physical Education use.

• Need for an outdoor amphitheater/gathering space with shade.

• Renovation of remaining spaces; specifically for the classrooms.

• Improvement to lab spaces - Sciences, Art and Career Technical spaces.

• Improvements to meet the needs of Special Education; maintaining access to garden spaces.

• The addition of gender-inclusive restrooms

The capacity of 1,251 with no significant changes should exceed the projected enrollment of less than 1,000

Entry at Bidwell Junior High School.
BIDWELL JUNIOR HIGH SCHOOL
91 BACK TO CONTENTS

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

B C D F E H I J K L S A NORTH AVE
SCHOOL BUILDINGS AREA LOADED CR NON-LOADED A Admin and Multi Purpose 15,566 SF
Library 3,923 SF 1 C Classrooms 19,558 SF 7
D Classrooms 21,929 SF 13
Storage 1,440 SF
Labs 6,010 SF
704 SF
GROSS AREAS
B
1
E
F
4 H Greenhouse
6,077 SF
3,420 SF
Locker Rooms 6,668 SF L Gym 8,818 SF S Storage 1,243 SF Total 102,834 SF 30 2
I Labs and Classrooms
5 J Music and PE
1 K
58 Spaces 34 Spaces 20 Spaces BIDWELL JUNIOR HIGH SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 92 BACK TO CONTENTS

CONDITION ASSESSMENT

possible ADA issues that need to be resolved

science/art/culinary labs that needs improvement

example of restroom in need of new finishes and other improvements cracking asphalt in need of repair Site drainage and pooling issues exterior finishes in need of repair
BIDWELL JUNIOR HIGH SCHOOL 93 BACK TO CONTENTS

CONDITION ASSESSMENT KEYUPDATE FINDINGS

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

• Most walkways are ADA compliant

• Parking lot has extensive cracking

• Basketball paving needs to be crack and slurry sealed

• Site has perimeter fencing - mix of chain-link and decorative metal fencing

• Roof fascias are wood and need repair

• Exterior repainting required

• Some window aluminum sashes needs replacement

• Existing wood floors need refinishing on some existing buildings

• Replacement and upgrades to interior finishes

5. Building - Interior

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

• Exposed ductwork needs painting where needed

• A new Silent Knights 6820EVS panel was added at room 305A, and serves the Admin and MP Building. The remainder of the campus is old Simplex manual system which does not meet current code requirements.

• Many existing panels on campus are very old and obselete, i.e. 50-60 years old.

• Admin and MP Building were modernized but some old gear was not replaced.

• Lots of surface raceway in classrooms. Most classrooms have not been modernized and therefore power/receptacles are limited.

• Two separate existing intrusion alarm systems on campus are both functional.

• Cameras throughout the campus. No access controls.

• Boiler Room has an old abandoned Boiler that needs to be removed.

• Several roof mounted AC-Units, +20 years, need replacement.

9. Mechanical

10. Plumbing/Restrooms

• Concentric supply/return air diffuser in center of most classrooms is noisy and has poor circulation. Replace all with new 4 diffuser layout.

• Kitchen restroom doesn't meet ADA compliance

• Older Gas Fired Water Heater, approx. 20 years old needs to be replaced.

• Plumbing Equipment is from original construction.

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
COST PER SF
BIDWELL JUNIOR HS
NOTES
BIDWELL JUNIOR HIGH SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value B C D F E H I J K L S A NORTH AVE 94 BACK TO CONTENTS

PROPOSED MASTER PLAN

OVERVIEW

The main focus of this proposed plan is to provide more adequate spaces to the arts and sciences with 2 new buildings at the back of campus. As our phasing diagrams show, this can be achieved with very little disruption to the normal school year. There will also allow be an opportunity for improved SPED spaces, utilizing former labs that would be housed in the new building. Other necessary improvements will be made to the existing buildings on campus where they are needed.

BIDWELL JUNIOR HIGH SCHOOL PROGRAM CAPACITY & FAST FACTS - JUNIOR HIGH SCHOOLS BIDWELL CURRENT ENROLLMENT 975 Students Site 19 Acres Building Area 79,189 Square Feet Parking Spaces 102 Percentage of Classrooms in Portable Buildings 0% JUNIOR HS BIDWELL Loaded EXISTING PROPOSED LOADING TOTAL General Classrooms 24 26 -Music 1 1 -Science Lab 7 7 -Art 1 1 -Audio/Production - - -Culinary Arts 1 1 -Clothing 1 1 -Sub-total 35 37 33:1 1221 SPED 3 3 10:1 30 Total 1,251 Support (SF) Library Space 1928 Administration/Student Services 5371 Gymnasium/Locker Rooms 9465 Cafeteria/Multi-Purpose Space 4132 Kitchen 1123 Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals. B C D F E H J K L S A NORTH AVE Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 95 BACK TO CONTENTS

PHASING

SCHOOL BUILDINGS

A Admin and Multi Purpose

B Library

C Classrooms

D Classrooms

E Storage

F Labs

H Greenhouse

I Labs and Classrooms

J Music and PE

K Locker Rooms

L Gym

S Storage

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Bidwell Junior High School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

New Building Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished LEGEND NEW SCIENCE AND ART BUILDINGS

MODERNIZATIONS TO EXISTING BUILDINGS C, D, AND F

PHASE 1

NEW CONSTRUCTION

Phase 1 includes the construction of new buildings at the northeast corner of campus including 7 new science labs and labs for Music and Culinary Arts as well as all needed support spaces for those programs.

DEMOLISH EXISTING LAB BUILDING.

PHASE 2

MODERNIZATIONS

MODERNIZATIONS TO EXISTING KITCHEN AND GYM BUILDINGS

PHASE 3

SITE WORK

Phase 2 would include renovations to the other buildings. The classroom buildings C, D, and F will include modernizations to classrooms to meet district standards, as well as renovations to reclaim space for programs and administrative/student support spaces. The kitchen area in bldg A will receive some light modernizations and the band room in building J will be reused as a mat room for PE. The locker rooms in bldg J will also receive some light modernization as needed.

Phase 3 will include improvements to the site as the demolished buildings will make room for expanded student outdoor spaces.

E F D B C A J H I K L BIDWELL JUNIOR HIGH SCHOOL
96 BACK TO CONTENTS

CHICO JUNIOR HIGH SCHOOL

FAST FACTS:

• Originally built: 1953, Renovated: 1957

• 2022/2023 Enrollment: 892 Students

• Site = 16.2 Acres

• Buildings = 92,026 SF (Permanent)

• 85 Parking Spaces

• 0% of Classrooms are in Portable Classroom Buildings

• Recommended capacity: 1.139

Chico Junior High School is the oldest school in the District, serving the community since 1953. Recent renovations have addressed several key issues, however, the following priorities were established during the planning process.

• Near term renovation of the locker rooms.

• High priority renovation of Administration and Student Services which require additional space and improved security.

• Modernizations of remaining buildings.

• Artificial turf fields to alleviate gopher problems.

• The addition of gender-inclusive restrooms

The capacity of 1,139 with no significant changes should exceed the projected enrollment of less than 1,000

Gym at Chico Junior High School.
CHICO JUNIOR HIGH SCHOOL
97 BACK TO CONTENTS

36 Spaces

MEMORIAL WAY

49 Spaces

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

GROSS AREAS

SCHOOL BUILDINGS AREA LOADED CR NON-LOADED

A Admin and Library 8,346 SF 1

B Classrooms 7,398 SF 5 1

C Classrooms 7,398 SF 6

D Classrooms 7,398 SF 5

E Gym 13,306 SF

F Locker Rooms 8,342 SF

G Storage 800 SF

H Music Rooms 5,597 SF 2

I Shops 5,568 SF 2

J Storage 1,650 SF

L Classrooms 6,533 SF 3

M Classrooms 6,533 SF 5

N Classrooms 6,533 SF 4

O Classrooms 6,533 SF 5

P Multi Purpose 11,476 SF

R Science Labs 8,290 SF 3

W Storage 960 SF Total 117,830 SF 40 2

W G F E H I J L M N O P A R B C D
OLEANDERAVE
CHICO JUNIOR HIGH SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 98 BACK TO CONTENTS

CONDITION ASSESSMENT

Door hardware in need of updates ADA upgrades needed in some restrooms Repainting and/or replacing finishes in some places Door threshold upgrades ADA updates needed at some drinking fountains CHICO JUNIOR HIGH SCHOOL Interior finish upgrades and replacement 99 BACK TO CONTENTS

CONDITION ASSESSMENT KEYUPDATE FINDINGS

CHICO JUNIOR HS COST PER SF NOTES

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

• Several walkways do not meet ADA standards

• Asphalt parking on east side of school has lots of cracking and should be replaced

• Decorative & Chain-Link fencing around the perimeter of the school.

• Single point of entry at front of school but does not enter directly into Admin.

• Built up roof and covered walkways need replacement

• Fascia requires repair/repaint

• Several door landings and thresholds are not ADA compliant

• Exterior painting needed

• Acoustic ceiling tile system requires replacement or repainting

• Interior walls need painting

• Several spaces are not ADA compliant (sink areas, classroom space, etc.)

5. Building - Interior

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• New floor finishes required

• The fire alarm system consists of a Silent Knight 5820XL-EVS at the admin wing with emergency voice. System is up to code.

• Many existing panels are original to the campus and past servicable life.

• Unlockable panel observed in a recently modernized student's restroom.

• Breakers serving classrooms and staff rooms can be turned off by students.

• Clock system is obselete American Time with Simplex system and does not meet current district standards. High priority item.

• Existing Ademco intrusion alarm system, new system at Admin and Science wing, but not consistent throughout the campus.

• Some AC-Units are old and at the end of servicable life. Needs replacement

• Roof Mounted Makeup Air Units in need of replacement.

• Single-occupancy toilet rooms are not ADA compliant

• Gas distribution on roof is in ok conditionsuggest full replacement.

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
CHICO JUNIOR HIGH SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value W G F E H I J L M N O P A R B C D
MEMORIAL WAY 100 BACK TO CONTENTS
OLEANDERAVE

PROPOSED MASTER PLAN

OVERVIEW

No new construction is proposed for Chico Junior High. The campus has adequate capacity and proposed changes are modernization to existing space.

CHICO JUNIOR HIGH SCHOOL PROGRAM CAPACITY & FAST FACTS - JUNIOR HIGH SCHOOLS CHICO JR CURRENT ENROLLMENT 892 Students Site 16.2 Acres Building Area 92,026 Square Feet Parking Spaces 85 Percentage of Classrooms in Portable Buildings 0% JUNIOR HS CHICO JR Loaded EXISTING PROPOSED LOADING TOTAL General Classrooms 22 22 -Music 2 2 -Science Lab 6 6 -Art 1 1 -Audio/Production - - -Culinary Arts - - -Welding/Shop 2 2 -Sub-total 33 33 33:1 1089 SPED 5 5 10:1 50 Total 1,139 Support (SF) Library Space 2056 Administration/Student Services 3947 Gymnasium/Locker Rooms 12674 Cafeteria/Multi-Purpose Space 4676 Kitchen 1131 Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals. LOCATION FOR INTERIM HOUSING W G F E H I J L M N O P A R B C D OLEANDERAVE MEMORIAL WAY Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 101 BACK TO CONTENTS

PHASING

SCHOOL BUILDINGS

A Admin and Library

B Classrooms

C Classrooms

D Classrooms

E Gym

F Locker Rooms

G Storage

H Music Rooms

I Shops

J Storage

L Classrooms

M Classrooms

N Classrooms

O Classrooms

P Multi Purpose

R Science Labs

W Storage

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Chico Junior High School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

New Building

Lightly Modernized Building

Heavily Modernized Building

Building to be Relocated or Demolished LEGEND

PRIORITY RENOVATION OF EXISTING LOCKER ROOMS

MODERNIZATION OF REMAINING BUILDINGS

LIGHTER RENOVATIONS AT GYM AND MULTI PURPOSE

LOCATION FOR INTERIM HOUSING

MODERNIZATION OF EXISTING ENTRANCE FOR SECURITY

PHASE 1

MODERNIZATIONS

Initial focus should be made on the highest priority areas, including the Locker rooms and the entrance for security upgrades. The main classroom building, outside of areas with recent upgrades, would also need to be renovated.

H G W F I J E D C B R L M N O P A CHICO JUNIOR HIGH SCHOOL
102 BACK TO CONTENTS

MARSH JUNIOR HIGH SCHOOL

FAST FACTS:

• Originally built: 1993, Renovated: 2004

• 2022/2023 Enrollment: 748 Total Students

• Site = 19.98 Acres

• Buildings = 77,816 SF (Permanent) | 13,065 SF (Portables)

• 212 Parking Spaces

• 23% of Classrooms are in Portable Classroom Buildings

• Recommended capacity: 1,076

Marsh Junior High School is the newest junior high school in the District and has recently received significant new additions. The campus has adequate capacity well beyond its projected enrollment of slightly below 800 students. The following areas were identified:

• Renovation of administration building for improved security.

• Consideration for removal of portable classrooms beyond those needed for projected capacity.

• The addition of gender-inclusive restrooms

The capacity of 1,076 with no significant changes should exceed the projected enrollment of less than 800

Multipurpose at Marsh Junior High School.

MARSH JUNIOR HIGH SCHOOL
103 BACK TO CONTENTS

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

GROSS AREAS

B

D

J P E D C B A L S M G HUMBODLT RD
NOTREDAMEBLVD
BUILDINGS AREA LOADED CR NON-LOADED
Admin 6,924 SF
SCHOOL
A
Classrooms 7,351 SF
Classrooms 7,351
5 C
SF 5
Classrooms 7,873
Classrooms and Art Labs 7,828 SF
Gym and Lockers 22,174 SF
J Portable 3,844 SF
Library 9,522 SF
Multi Purpose and Music 18,358 SF
P Portable Classrooms 7,667 SF
S Science Labs 10,525 SF
Total 109,418 SF 34 1
SF 6 E
4 G
1
L
1 M
1
8
4
72 Spaces 15 Spaces 125 Spaces MARSH JUNIOR HIGH SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 104 BACK TO CONTENTS

CONDITION ASSESSMENT

in
condition
and kitchen in good condition Classrooms in good condition MARSH JUNIOR HIGH SCHOOL 105 BACK TO CONTENTS
Some finishes in need of replacement Restrooms
good
Replacement of portables with more permanent structures per enrollment Library in good condition New MP

CONDITION ASSESSMENT KEYUPDATE FINDINGS

MARSH JUNIOR HS COST PER SF NOTES

• Vehicle parking areas and asphalt areas near Buildings G, H and O have cracking, install crack and slurry seal

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

• Drop-off needs an accessible loading zone

• Recent improvements made to drainagw

• Fencing is adequate.

• Single point of entry is in place, directly into Admin.

• Roof drainage and covered walkways require painting

• Exterior wall painting needed in some areas

• Casework/sink areas need updates and are not ADA compliant

• Floor finishes: (carpet, VCT, tile) need to be replaced

5. Building - Interior

6. Fire Alarm

7. Electrical

• Acoustic ceiling tile needs to be replaced where needed

• Silent Knight 5820XL with voice add-on serves the Gym, MP Building, and Science wing. The remainder of the campus is fed by Edwards FACP. The two systems should be consolidated so that everything is via the Silent Knight panel.

• Some gear (transformers and panels) located at building exterior rather than in dedicated electrical rooms. In general all switchgear is in servicable condition.

• Valcom IP Clock/PA system is adequate, but does not exactly meet current district standards.

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• Intrusion alarm system is functional. Cameras throughout the campus. No access controls.

• Mechanical systems consist of split-system w/ Gas Fired Furnaces and outdoor Condensing units. Approx. 24 years old and nearing the end of life.

• Outdoor refrigerant piping is in poor condition. Suggest replacement of indoor/ outdoor section within 4-5 years. complete with refrigerant piping.

• Hole in the ceiling in BLDG L restroom

• Single-occupancy door isn't ADA compliant in BLDG L restroom

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
MARSH JUNIOR HIGH SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value J P E D C B A L S M G HUMBODLT
106 BACK TO CONTENTS
RD NOTREDAMEBLVD

PROPOSED MASTER PLAN

OVERVIEW

Marsh Junior High School is a newer campus and has recently received significant additions. Due to declining enrollment, the existing portables (Building P) do not currently require replacement with permanent facilities. To meet the projected enrollment, however, the FMP does not suggest elimination of the portable buildings.

Future growth may warrant replacement of those facilities either in the current location or in the alternate location shown on prior master plans.

Near-term renovation is not anticipated Marsh Junior High School.

MARSH JUNIOR HIGH SCHOOL PROGRAM CAPACITY & FAST FACTS - JUNIOR HIGH SCHOOLS MARSH CURRENT ENROLLMENT 748 Students Site 19.98 Acres Building Area 90,881 Square Feet Parking Spaces 212 Percentage of Classrooms in Portable Buildings 23% JUNIOR HS MARSH Loaded EXISTING PROPOSED LOADING TOTAL General Classrooms 23 25 -Music 2 2 -Science Lab 5 5 -Art 1 1 -Audio/Production - - -Culinary Arts 1 1 -Welding/Shop - - -Sub-total 32 34 33:1 1,122 SPED 2 2 10:1 20 Total 1,142 Support (SF) Library Space 3095 Administration/Student Services 7884 Gymnasium/Locker Rooms 9635 Cafeteria/Multi-Purpose Space 9694 Kitchen 1127 Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals. E D C B A L S M G HUMBODLT RD NOTREDAMEBLVD Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 107 BACK TO CONTENTS

PHASING

A Admin

B Classrooms

C Classrooms

D Classrooms

E Classrooms and Art Labs

G Gym and Lockers

M Multi Purpose and Music

P Portable Classrooms

S Science Labs

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Marsh Junior High School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

New Building

Lightly Modernized Building

Heavily Modernized Building

Building to be Relocated or Demolished LEGEND

MODERNIZATIONS OF EXISTING BLDGS

USE PORTABLES FOR INTERIM HOUSING.

RELOCATE SOLAR PANELS.

PHASE 1

MODERNIZATIONS

Light modernizations made where needed to buildings B&C, D, E, L, and G. Use of Portables for interim housing as needed. Relocation of south solar panels for future classroom building.

PHASE 2

NEW CONSTRUCTION

CONSTRUCTION OF NEW CLASSROOM BLDG
REMOVE EXISTING PORTABLE BUILDINGS
E D C B A S L J P M G MARSH JUNIOR HIGH SCHOOL
Construct a new classroom building on site of former solar panels. PHASE 3 REMOVE PORTABLES Demolish or relocate existing portables at buildings J and P. SCHOOL BUILDINGS
J Portable L Library
108 BACK TO CONTENTS

7. SENIOR HIGH SCHOOLS SECTION

109 BACK TO CONTENTS

CHICO HIGH SCHOOL

FAST FACTS:

• Originally built: 1943, Renovated: 2010

• 2022/2023 Enrollment: 1913 Students

• Site = 38.94 Acres

• Buildings = 220,469 Square Feet

• 520 Parking Spaces

• 0% of Classrooms are in Portable Classroom Buildings

• Recommended permanent capacity: 2,084

Chico High School is projected to reach a maximum enrollment of just under 2,100 students. Community meetings as well as site-based meetings with administration and athletic director produced the following priorities:

• Expansion and improvement of CTE Education (IT, Floral, Sports Medicine, Art, etc.)

• Future removal of portables that currently house Inspire Charter School

• New small theater, drama space

• Reclaim existing drama space for student services expansion

• More classroom and suitable outdoor space to accommodate expanding Special Education population

• Updates needed to Science and Arts spaces as well as Main building improvements

• Minor improvements to athletic facilities

• The addition of gender-inclusive restrooms

Admin and Classroom Building at Chico Secior High School.
CHICO HIGH SCHOOL
110 BACK TO CONTENTS

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

GROSS AREAS SCHOOL BUILDINGS AREA LOADED CR NON-LOADED A Admin & Classrooms (2 Levels) 35,705 SF 14 AG Shops and Greenhouses 9,913 SF 5 B Classrooms 11,555 SF 9 C Classrooms 11,555 SF 9 F Art Labs 7,266 SF 5 FL Fitness Lab 5,849 SF G Gym and Locker Rooms 34,054 SF H Music and Labs 11,453 SF 5 IT Labs and Shops 11,018 SF 5 J Classrooms (2 Levels) 16,186 SF 12 K Classrooms (2 Levels) 16,186 SF 9 L Library 16,185 SF 1 LC Gym and Cafeteria 21,686 SF S Science Labs 8,425 SF 5 SA Student Store 728 SF ST Stadium Buildings 2,240 SF Sub total 217,014 SF 79 INSPIRE Charter School 33,120 SF 23 2 Total 250,134 SF 102 2
C A B F LINCOLN CENTER IT G H J K S L AG INSPIRE FL 255 Spaces 27 Spaces 34 Spaces CHICO HIGH SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure ESPLANADE SACRAMENTO AVE J/K - LEVEL 2 A - LEVEL 2 area includes covered spaces at 50% 111 BACK TO CONTENTS

CONDITION ASSESSMENT

ADA accessibility counter height at reception desk required Replace acoustic ceiling tile systems where needed Interior finish upgrades/replacement required Roof drainage improvements for puddling at covered walkways Ceiling damage - requires repair/replacement Equipment upgrades/replacement required CHICO HIGH SCHOOL 112 BACK TO CONTENTS

CONDITION ASSESSMENT KEYUPDATE FINDINGS

CHICO HS COST PER SF NOTES

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

• Some walkways along Buildings B, C, D, G and IT do not meet ADA standards, there are quite a few raised walkways due to tree roots

• Student parking area along West Sacramento Avenue is in poor condition and should be repaved, onsite pavement west of Building G should be crack and slurry sealed

• Perimeter of site has chain link and decorative metal fencing.

• No single point of entry into Admin

• Roofing needs repair/replacement on some older buildings

• Several door landings/thresholds are non ADA compliant

• Window metal sashes require replacement

• Majority of interior floor finishes need replacement

• Acoustic ceiling tile systems require replacement as needed

5. Building - Interior

• Casework/Sink areas are non ADA compliant

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• Fire alarm system is primarily EST IRC3, though there is also a Silent Knight 5820XL on campus. Voice was added on for the Stadium Only. Systems should be consolidated, for a campus this size a new 6820-EVS should be provided. High priority item.

• Most of the existing gear on campus (buildings Admin/B/C/D) is as old as the MSB and past its servicable life. In older wings panels are located in classrooms, corridors, custodial closets or outside of classrooms instead of dedicated electrical rooms.

• Electrical equipment located in basement of gym that has experienced flooding.

• Multiple (6-8) separate intrusion alarm systems (Ademco) on campus, consider consolidating. Cameras throughout the campus. No access controls.

• Majority of AC-Units are past their servicable life

• Several multi-compartment restrooms require ADA accessibility upgrades

• Plumbing Fixtures are from original construction are in ok condition. Replacement should be considered with any modernization project

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
CHICO HIGH SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value C A B F LINCOLN CENTER IT G H J K S L AG INSPIRE FL J/K - LEVEL 2 A - LEVEL 2 113 BACK TO CONTENTS

PROPOSED MASTER PLAN

OVERVIEW

Chico Senior High School had recent additions; however remaining buildings are in need of renovation. Highest priority renovations include the main building (A, B, C) and the Career Technical Education building (IT), as well as the Science building (S) and Art building (F). However, renovation of those spaces is anticipated to be significant. Likely near or beyond the cost of replacement. Additions for the agricultural CTE program would be part of the campus expansion, along with a new Theater and 8 new classrooms. A future page suggests a new expectation for classroom needs, recognizing the impacts of block scheduling on classroom counts.

CHICO HIGH SCHOOL Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals. C A B F LINCOLN CENTER IT G H J K S L AG CTE THEATER FL J/K - LEVEL 2 A - LEVEL 2 Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 114 BACK TO CONTENTS
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals. UPGRADE AND EXPAND TO MINIMUM FIVE TENNIS COURTS PROPOSED POLE VAULT AREA FIELD HOUSE SHOT PUT PRACTICE SOCCER FIELD TURF FIELD DESIRED Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure CHICO HIGH SCHOOL 115 BACK TO CONTENTS
PROPOSED MASTER PLANATHLETICS

PHASING

A Admin & Classrooms (2 Levels)

AG Shops and Greenhouses

B Classrooms

C Classrooms

F Art Labs

FL Fitness Lab

G Gym and Locker Rooms

H Music and Labs

IT Labs and Shops

Classrooms (2 Levels)

K Classrooms (2 Levels)

L Library

LC Gym and Cafeteria

S Science Labs

SA Student Store

PHASE 1

MODERNIZATIONS

After relocating the Inspire Academy off-campus, modernizations will be made to bldgs A, B, C, IT, H, S, & F

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Chico High School.

It is expected that a participatory design process may yield a revised approach within the parameters established here.

New Building

Lightly Modernized Building

Heavily Modernized Building

Building to be Relocated or Demolished

PHASE 2

DEMOLITION/RELOCATION

The east wing of bldg H will be demolished and the portables will be demolished/relocated so the land can be used for future construction.

PHASE 3

NEW CONSTRUCTION

The final phase uses the former location of portables to build a new CTE building as well as a new Theater and 8 classrooms.

CHICO HIGH SCHOOL
LEGEND
BLDGS A,B, & C
EXISTING SECTION OF BLDG H MODERNIZE BLDGS IT, H, S, & F RELOCATE INSPIRE ACADEMY USE FORMER PORTABLES LAND TO BUILD NEW THEATRE AND CTE BLDGS
BUILDINGS
MODERNIZE
DEMOLISH
SCHOOL
C S H K J IT AG A B L F LC G FL INSPIRE CAMPUS 116 BACK TO CONTENTS
ST Stadium Buildings

PROGRAM CAPACITY

Chico High School is anticipated to have no more than 2,061 students between now and 2030. It currently has 80 classrooms considered "loaded" spaces. While the District's recommended loading standard is 33:1; which would create a capacity of over 2,640 students, block-style scheduling, where teachers remain in their assigned classrooms during their designated "prep" period imapct school capacity significantly.

For a model capacity of approximately 2,100 students, at a loading capacity of 33:1, approximately 63 classrooms would be required. The State of California's School Facilities program would load a high school at 27:1, requiring approximately 78 classrooms exclusive of physical education spaces. This model roughly equates to one prep period in a 6 period traditional schedule, or just over 80 percent utilization. Accommodating a block schedule, with 75% utilization, would mandate a loading standard of just over 24:1. All of these assumptions exclude the student capacity that non-loaded physical education facilities removes from the classroom loading, providing a conservative approach that allows for inconsistent loading of classrooms (i.e. smaller class sizes that may occur in specialty programs) as well as imperfect student enrollment.

For purposes of this facilities master plan, we have adjusted the high school loading standard to 24:1 exclusive of unloaded physical education spaces such as the gymnasium and weight room, but inclusive of those classroom spaces used for physical education direct instruction classes such as health. This conservative approach recongnizes the District's desire to allow in-room preparation for teachers as well as closer alignment with current conditions at Chico High School or roughly 86 classrooms. We would recommend a comprehensive programming process at the time of campus renovation to confirm these assumptions at Chico High School, as the current count of 80 classrooms requires a number of roving teachers that do not use existing classrooms during their assigned prep periods. Other strategies exist to manage teacher preparation time.

GROSS AREAS

PROGRAM CAPACITY
FACTS
HIGH SCHOOLS CHICO HS CURRENT ENROLLMENT 1913 Students Site 38.94 Acres Building Area 220,469 Square Feet Parking Spaces 520 Percentage of Classrooms in Portable Buildings 0% SENIOR HS CHICO HS Loaded Existing Proposed Loading Total General Classrooms 53 63 -Music | Drama 2 3 -Science Lab 8 8 -Art 5 5 -CTE Labs 5 7 -Sub Total 73 86 24:1 2,064 SPED 2 2 10:1 20 Non-Loaded Computer 2 2 -Support (SF) Library Space 4466 - -Administration/Student Services 15087 - -Gymnasium/Locker Rooms 32749 - -Cafeteria/Multi-Purpose Space 5686 - -Kitchen 652 - - -
& FAST
-
SCHOOL BUILDINGS AREA LOADED CR LAB SPED A Admin & Classrooms (2 Levels) 35,705 SF 14 AG Shops and Greenhouses 9,913 SF 5 B Classrooms 11,555 SF 9 C Classrooms 11,555 SF 9 F Art Labs 7,266 SF 5 FL Fitness Lab 5,849 SF G Gym and Locker Rooms 34,054 SF H Music and Labs 4,819 SF 2 IT Labs and Shops 11,018 SF 5 J Classrooms (2 Levels) 16,186 SF 7 3 2 K Classrooms (2 Levels) 16,186 SF 9 L Library 16,185 SF LC Gym and Cafeteria 21,686 SF S Science Labs 8,425 SF 5 SA Student Store 728 SF ST Storage 2,240 SF Sub total 210,380 SF 55 18 2 B1 CTE 4,300 SF 2 C1 Theater 13,200 SF C2 Classrooms (2 Levels) 13,200 SF 8 Total 241,080 SF 63 20 2 CHICO HIGH SCHOOL 117 BACK TO CONTENTS

FAIR VIEW HIGH SCHOOL

FAST FACTS:

• Originally built: 1962

• 2022/2023 Enrollment: 165 Students

• Site = 7 Acres

• Buildings = 24,465 SF (Permanent) | 12,964 SF (Portables)

• 66 Parking Spaces

• 39% of Classrooms are in Portable Classroom Buildings

• Recommended permanent capacity: 459 Students

The Fair View High School campus is home to Fair View High School, The Center for Alternative Learning (CAL) junior school as well as the Academy for Change (AFC) community day school and Oakdale (K-12 Independent Study). The campus is a former elementary school, the same prototype as several of the schools slated for replacement in this FMP. Site observation and feedback from the site administration recognized the need for significant renovation; the FMP is recommending replacement to meet the needs of alternative education. An alternative would be to relocate all programs to a more suitable location.

Entry and multipurpose at Fair View High School.
FAIR VIEW HIGH SCHOOL
118 BACK TO CONTENTS

32 Spaces 34 Spaces

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

GROSS AREAS

SCHOOL BUILDINGS AREA LOADED CR NON-LOADED

A Student Services 1,408 SF

B Student Services 1,258 SF

C Classrooms 5,082 SF 4

D Restrooms 1,374 SF

E Classrooms 5,336 SF 4

F Multi Purpose and Admin 5,444 SF

G Classrooms 5,787 SF 4

H Restrooms 1,344 SF

I Classrooms 1,920 SF 3

J PE Classroom 1,966 SF

K Oakdale Office 960 SF

L Student Services 960 SF

T Shop and Classroom 2,714 SF 2

M Academy for Change 6,240 SF 6

Total 41,794 SF 23

K H I J F G E C D T L B A M
EASTAVE
PANAMAAVE
FAIR VIEW HIGH SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% 119 BACK TO CONTENTS

CONDITION ASSESSMENT

Interior finish upgrades in classrooms Restroom finish upgrades required Shop classroom in adequate condition ADA compliant upgrades to drinking fountains Door thresholds and landings ADA improvements required Door upgrades for ADA compliance FAIR VIEW HIGH SCHOOL 120 BACK TO CONTENTS

CONDITION ASSESSMENT KEYUPDATE FINDINGS

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

• Walkways along Buildings B, C, D, G, H, I, J and the parking area do not meet ADA standards, numerous door thresholds do not meet ADA standards

• Crack and slurry seal required in parking areas

• Replace all walkways at entry doors to classrooms and restrooms.

• No single-point-of-entry to Admin space on campus

• Exterior paint upgrades required around campus

• Roof drainage/downspouts require replacement

• Door hardware upgrades/replacement needed in some areas

• Full interior finish upgrade/replacement in all buildings except new shop bldg

5. Building - Interior

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

• Casework/Sink Areas do not meet ADA requirements and need upgrades/ replacements

• PG&E service is in a dedicated enclosure behind school with 1600A GE Spectra Series MSB, 120/208V, approx. 25-30 years old, servicable condition. There is room for additional breakers.

• Four separate intrusion alarm systems (Vista) on campus, consider consolidating. Cameras throughout the campus. No access controls.

• Bogen Multi-com 2000 does not meet current district standards. Clock system is very old, probably original to the campus. High priority.

• Roof mounted AC-Units +30 years.Units are at end of life and need replacement within the next 2-5 years.

9. Mechanical

10. Plumbing/Restrooms

• Portables appear to be Wall Mounted Heat Pumps from the original construction. +25 years old and need replacement.

• Plumbing Fixtures in ok condition. Need updating.

• Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
FAIRVIEW HS COST PER SF NOTES
FAIR VIEW HIGH SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value K H I J F G E C D T L B A M
EASTAVE 121 BACK TO CONTENTS
PANAMAAVE

PROPOSED MASTER PLAN

OVERVIEW

The Fair View site is slated for replacement. Academy for Change, with relatively new buildings, will remain as well the existing Shop building. Special consideration should be given to the unique needs of the separate alternative campuses.

FAIR VIEW HIGH SCHOOL
2 Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure 122 BACK TO CONTENTS
Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals.
LEVEL

PHASING

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Fairview High School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

PHASE 1

NEW CONSTRUCTION

Build new Admin, MP, Library, and 2-story Classroom buildings on the field of the school to not interfere with the existing campus

DEMOLISH EXISTING CAMPUS

New Building Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished LEGEND FAIR VIEW HIGH SCHOOL
PHASE 2
3 SITE WORK
former campus space to make field
expanded
lot. SCHOOL BUILDINGS A Student Services B Student Services C Classrooms D Restrooms E Classrooms F Multi Purpose and Admin G Classrooms H Restrooms I Classrooms J PE Classroom K Oakdale Office L Student Services T Shop and Classroom M Academy for Change F J C I L K B H A G E D T M 123 BACK TO CONTENTS
Demolition of existing campus buildings, excluding the newer shop building and Academy for change campus. PHASE
Utilize
and
parking

PLEASANT VALLEY HIGH SCHOOL

FAST FACTS:

• Originally built: 1966, Renovated: 2010

• 2022/2023 Enrollment: 1775 Students

• Site = 36.57 Acres

• Buildings = 206,318 SF (Permanent)

• 479 Parking Spaces

• 0% of Classrooms are in Portable Classroom Buildings

• Recommended permanent capacity: 2,208 Students

Pleasant Valley High School is projected to reach a maximum enrollment of just under 2,000 students. Community meetings as well as site-based meetings with administration and athletic director produced the following priorities.

• Renovation of Building B

• Replacement of the weight and mat room with a new building to incude those functions and a fitness lab

• New field house

• Renovation of gymnasium, adding a connecting lobby space

• Renovation of locker rooms

• Minor improvements to athletic facilities

• The addition of gender-inclusive restrooms

Entry and dining and culinary arts space at Pleasant Valley High School.
PLEASANT VALLEY HIGH SCHOOL
124 BACK TO CONTENTS

EXISTING SITE INVENTORY

The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the left defines those uses at a fixed point in time and assigns the use of those spaces as classrooms, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms.

Z L M C A V W H G X F R K E Y D B P O T U S EAST AVE MARIGOLD
SCHOOL BUILDINGS AREA LOADED CR NON-LOADED A Classrooms 14,103 SF 6 B Classrooms 14,080 SF 9 C Classrooms 14, 080 SF 6 D Labs 14,080 SF 5 E Shops 8,992 SF 5 F Locker Rooms 7,514 SF G East Gym 11,801 SF H West Gym 12,054 SF K PE Mat Rooms 2,400 SF L Library 21,291 SF 2 M Classrooms 22,536 SF 11 O Classrooms 5,760 SF 5 P Classrooms 4,480 SF 4 R PE Weight Room 2,400 SF S Classrooms 25,920 SF 8 T Student Store 896 SF U Storage 3,642 SF V Admin 10,467 SF W Center for the Arts 19,830 SF
Locker Rooms 1,920 SF Y Classrooms 57,448 SF 24 Z Cafeteria and Labs 16,600 SF 4 Total 289,774 SF 89
AVE GROSS AREAS
X
PLEASANT VALLEY HIGH SCHOOL Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Overhead Shade Structure area includes covered spaces at 50% Y - LEVEL 2 125 BACK TO CONTENTS

CONDITION ASSESSMENT

Fascia repair/repaint improvements required Casework and storage upgrades to science labs Acoustic ceiling tile system replacement where needed Exterior drainage improvements required to prevent puddling Floor finish upgrades needed
PLEASANT VALLEY HIGH SCHOOL 126 BACK TO CONTENTS
Locker Room shower upgrades required

CONDITION ASSESSMENT KEYUPDATE FINDINGS

1. Site - ADA

2. Site - Other

3. Site - Security

4. Building - Exterior

• Several onsite pathways do not meet ADA code

• Relatively new drop off area and accessible parking. Part of parking lot has received a slurry coat.

• Vehicle parking area and asphalt area east of stadium are cracked and should be crack and slurry sealed

• Fencing at perimeter of campus with a single point of entry to Admin Bldg

• Some door landings and thresholds are not ADA compliant

• Roof Fascia needs repair or replacement in some areas

• Soffits require repair/repaint where needed

• Acoustic ceiling tile system - replace as needed

• Interior walls need repainting as needed

5. Building - Interior

6. Fire Alarm

7. Electrical

8. Low Voltage/Security

9. Mechanical

10. Plumbing/Restrooms

• Floor finishes require full replacement in some buildings

• Campuswide fire alarm upgrade to Silent Knight 6820EVS completed within the past year

• Older gear in many of the existing buildings that haven't been renovated (and in some that have had recent 'light' renovations) nearing end of servicable life.

• Valcom IP Clock/PA system is adequate meets current district standards.

• No intrusion alarm on campus except at the school store. Security cameras throughout the campus.

• Distribution was originally constructed when AC-Units were added.

• Building F: All equipment is approx. 28 years old and at it's end of life.

• Plumbing Fixtures are in suitable condition. Need updating.

• Multi Compartment bathroom - Non ADA floor slopes to drain, does not appear to have an accessible toilet stall in some older bldgs

Note: please see appendix for detailed consultant reports

EXISTING SITE PLAN
VALLEY HS COST PER SF
PLEASANT
NOTES
PLEASANT VALLEY HIGH SCHOOL Heavy Modernization Replacement Preferred LEGEND Good Condition Light Renovation <10% Replacement Value 10%<50% Replacement Value 50%<75% Replacement Value 75%<100% Replacement Value Z L M C A V W H G X F R K E D B P O T U S EAST AVE MARIGOLD AVE Y Y - LEVEL 2 127 BACK TO CONTENTS

PROPOSED MASTER PLAN

OVERVIEW

Pleasant Valley High School has had recent additons, renovations and improvements. Remaining buildings to be renovated include Building B, locker rooms, student store and the main gymnasium which has identified structural deficiences (see appendix for report). The renovation would ideally include a new lobby addition connecting the two gymnasium spaces. New construction anticipates a future field house as well as a replacement of the weight and mat room, also including a fitness lab. Consideration should be given to combining these two buildings into a single athletics building.

ATHLETICS

PLEASANT VALLEY HIGH SCHOOL Room assignments are conceptual and meant to confirm that the site can meet the model capacity goals. Z L M C A V W H G X F R K E D B P O T U S EAST AVE MARIGOLD AVE Administration / Student Services Multi-Purpose / Food Service Library / Media LEGEND Classroom Restrooms / Storage / Mechanical Modernized Building New Building Overhead Shade Structure NEW TENNIS COURT PRACTICE FILED BACKSTOP LIGHTS FOR BASEBALL FIELD RELOCATED SHOT PUT POLE VAULT Y Y - LEVEL 2 128 BACK TO CONTENTS

PHASING

EXISTING CAMPUS

The following images represent one scenario for phasing and implementation of the improvements anticipated at Pleasant Valley High School. It is expected that a participatory design process may yield a revised approach within the parameters established here.

MODERNIZATIONS

PHASE 1
Modernizations and addition to West Gym, bldg H. Modernizations to locker rooms in bldg F and classroom bldg B. New Building Lightly Modernized Building Heavily Modernized Building Building to be Relocated or Demolished LEGEND PLEASANT VALLEY HIGH SCHOOL PHASE 2 DEMOLITION Removal of Mat and weight rooms, bldgs K & R, to build new facility. PHASE 3 NEW CONSTRUCTION AND SITE WORK Construction of Field house and new fitness lab to replace existing mat and weight rooms. Construction of other site amenities for athletics. SCHOOL BUILDINGS A Classrooms B Classrooms C Classrooms D Labs E Shops F Locker Rooms G East Gym H West Gym K PE Mat Rooms L Library M Classrooms O Classrooms P Classrooms R PE Weight Room S Classrooms T Student Store U Storage V Admin W Center for the Arts X Locker Rooms Y Classrooms Z Cafeteria and Labs M L A G Z H V W F X K C B C E P O Y S 129 BACK TO CONTENTS

8 . OTHER DISTRICT FACILITIES SECTION

130 BACK TO CONTENTS

CANYON VIEW HIGH SCHOOL

Canyon View High School

The District owns approximately 50 acres for a future high school campus. The need for the development of the site as a new high school is not anticipated within the horizon of the current demographic projections through 2030. Future updates to the Facilities Master Plan should review the need for the new high school in context of updated projections.

Legend for Future High School A

Administration, Library

Industrial Arts, Home Ec, Woodworking

Multi Purpose, Music

Student Activity Center

Student Center

Gym, Weight Room

Locker Room

Classrooms

Classrooms

Classrooms

Maintenance

B C D E F G H J K L
FREMONT
WEBSTER
RALEY
NOTRE DAME BLVD (BEYOND) INSPIRE CAMPUS A B C D E H K J K F G L 131 BACK TO CONTENTS
ST
DR
BLVD

HENSHAW GUYNN ELEMENTARY

The 13.02 acre Henshaw Guynn Site is currently owned by the District and reserved for when a new elementary school is needed. At this time, the demographic projections do not support the building of a new elementary school. When the need for the new elementary school is confirmed a full site planning process can be completed to create a final vision for this site in accordance with the needs of the education program.

132 BACK TO CONTENTS

OAK BRIDGE ACADEMY

The District owns property in a former office complex. The property currently houses the Oak Bridge Academy and a small number of District offices. There is an existing building that is currently leased to a tenant, but is available for future needs of the District. Recent renovations at the occupied building were made to support educational programs for Oak Bridge Academy.

133 BACK TO CONTENTS
DISTRICT OWNED, CURRENTLY LEASED OUT

DISTRICT ADMINISTRATIVE OFFICE

The District Office is located in a re-purposed elementary school that was built in the 1930s and in a relocatable building placed on the site for the District meetings. The main facility has aging electrical, mechanical, and technology systems. The District's main technology center is located at the northeast end of the main building. There was very little done to the facility to convert it to a district office from an elementary school. The main building has a large central corridor; the building's structural system will limit its long-term viability. To change the facility to match future needs would be difficult, due to those limitations. The existing facilities occupy a very large site, where the southeast section of the site remains a community playfield.

Renovation of this facility or relocation of District administration is not anticipated until a future phase of the Facilities Master Plan.

134 BACK TO CONTENTS

DISTRICT CORPORATION YARD

FUTURE CENTRAL KITCHEN LOCATION

The District's Corporation yard is a campus of permanent and portable buildings housing maintenance and operations, transportation and nutrition services for the District. While permanent facilities would likely improve the corporation yard, replacement of existing facilities was considered outside of the scope and schedule of this Facilities Master Plan as the District prioritizes spending on school campuses. A solar array is also part of the corporation yard.

A long-term goal for the District is the development of a central kitchen providing consolidated food preparation. While the vision for that project is also outside the planning horizon of the Facilities Master Plan, it is highlighted here to demonstrate that the corporation yard property is large enough to accommodate this vision. At the time of that implementation, it is recommended that the District develop a master plan for the site to adequately address site vehicular/bus circulation and parking, delivery access as well as any displacement of existing portable or storage buildings on the property.

135 BACK TO CONTENTS

9. IMPLEMENTATION AND COST MODELING SECTION

136 BACK TO CONTENTS

IMPLEMENTATION PLAN

To support funding of future facilities needs in the District, the implementation plan has been repeated here with the addition of Order of Magnitude costs for future phases. It should be noted that assumptions were made for the scope, schedule and secondary impacts such as interim housing requirements. Those details are provided in the appendix. Escalation is a significant impact, estimated at 4% per year, but the opinions of cost are also shown in current dollars as well for comparison. Additionally, contingency of 10% was added to each project to allow for changing assumptions, and District "soft costs" of 25% were included in order to provide for expenditures required of the District beyond construction. The total program implementation, or "needs" of the District are estimated through Phase 7 at just under one billion dollars. District support facilities improvements are not included as they are anticipated well beyond the year 2048. It is important that the implementation plan is reliant on available funding either in the form of Local General Obligation Bonds, State School Facilities Funding and District Developer fees. Phase IV will be completed using remaining funds from the District's current General Obligation bond and related resources.

Start

12/11/13

Phase 1 - Quick Start Projects

11/11/13 - 4/3/15

ADA Priority ListSite Work Only (Phase IV and after)

1/6/14 - 4/3/15

Enhanced School Safety and Security Measures

Technology Infrastructure for Common Core

1/6/14 - 4/3/15

Energy Efficiency and Alternative Energy Projects (Prop 39 and Solar)

11/11/13 - 3/6/15

Phase II - Jr Highs Conversion to 6-8

Phase III - Elementary School Capacity and Modernizations

6/1/16 - 10/5/20

Emma Wilson

4/29/18 - 4/15/20

Loma Vista-Marigold

6/1/16 - 10/5/20

Shasta

6/1/16 - 7/6/19

Neal Dow

11/30/16 - 4/15/20

Athletic Fields - Phase 1 at CHS & PVHS

11/30/16 - 7/30/18

Bidwell (Priority Mods+Technology, Site Improvements, Security)

1/6/14 - 11/27/15

Chico Jr High (Priority MODs + Science, Site Improvements, Technology, Security)

1/6/14 - 7/19/16

Marsh Jr High Security

1/6/14 - 7/14/16

Marsh Jr High Improvements

10/6/13 - 7/15/16

Phase V - Elementary Modernizations 2024 - 2032

Phase VI - Elementary & High School Modernizations (2032-2040)

Sierra View

Fair View Site

Hooker Oak Modernization

Chico High School MOD & Athletic Master Plan Projects

$222.8 Million (current)

$347.8 Million (escalated)

Phase VII - High School and Junior High School Modernizations (2040-2048)

Phase VIII - District Support Improvements

PV High School MOD & Athletic Master Plan Projects

Bidwell Jr. High School

Marsh Jr. High School

Chico Jr. High School

Rosedale

Chapman

Parkview

$203.2 Million (current)

$230.0 Million (escalated)

ALL

$183.4 Million (current)

$330.0 Million (escalated)

Current Status of Implementation Plan McManus 8/25/23 - 8/25/25 FV High School Restrooms 6/2023 - 9/2023 Citrus Modernization PV High School Priority Mod/CTE 5/2020 - 5/2023
High School CTE Program 11/29/19 - 8/1/21
IV - Elementary / High School Capacity and Modernizations 4/29/19 - 6/1/25 Transitional Kindergarten Implementation Emma Wilson, Little Chico Creek, Marigold Safety and Security Projects Restroom Renovation Projects
Chico
Phase
2024+ PROJECTS RELIANT ON
FUTURE FUNDING SOURCES
137 BACK TO CONTENTS
.
SECTION 138 BACK TO CONTENTS
10
APPENDICES

APPENDIX 1: CONDITION ASSESSMENT

HOW TO USE THESE TABLES:

A/E - Architect/Engineer Comment

A: Architect

C: Civil Engineer

E: Electrical

M: Mechanical

P: Plumbing

S: Structural

Description of what conditions were looked for for each scope category

BUILDING CONDITIONS - ARCHITECTURAL

General condition given per category/building

Light Renovation

Heavy Modernization

Replacement Preferred Good Condition

Comments on current condition of scope by Architect or Engineer

A Condition - materials,

Exterior skin - cement plaster

Roofing - assumed tar & gravel-Rplace

Exterior wood doors

Windows- single glazed metal sashReplace

Exterior skin - cement plaster

Roofing - assumed tar & gravelReplace

Exterior wood doors to playgroundgiant gas meter in the way - Replace door & frames

Same as D

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING COST PER SF SITE CONDITION ASSESSMENT HIGH MEDIUMHIGH MEDIUM LOW EXTERIOR SITE ASSESSMENT A Parking lots, drop-off, landscape / irrigation Drop-off areas for bus and parents, neither have ADA accessible drop-off compliance. EXTERIOR SITE AMENITIES A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc. LED Marquee, flag pole, Playground equipment (not shaded), hardcourts are in poor condition, PV canopies over portion of parking lot. New Kinder playstructure Small chain link fenced bike rack area.
SITE CONDITIONS
BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A CLASSROOMS BUILDING D CLASSROOMS / LIBRARY BUILDING F MULTI-PURPOSE BUILDING G RESTROOMS BUILDING H CLASSROOMS BLDG
ASSESSMENT SQUARE FOOTAGE 39,453 4,044 5,376 14,343 1,027 See Bldg F BUILDING EXTERIOR
replace,
Roofing
frames
Roof
Roofing
COLOR
repair /
painting, windows, etc. Exterior skin -cem plaster, NO windows Soffit- T&G, some dry rot
- tar and gravel Doors wood in HM
Windows - single pane, metal sash
drainage - no gutter / downspouts to grade Exterior skin - cem plaster,wood siding & mtl. sash wall/wdw sys. @ side elevation Soffit- T&G, some dry rot- Replace
- tar and gravel-Replace Doors wood in HM frames Windows - single pane, metal sashReplace Roof drainage - no gutter / downspouts to grade
139 BACK TO CONTENTS

CHAPMAN ELEMENTARY

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

SITE CONDITION ASSESSMENT

Drop-off areas for bus and parents, neither have ADA accessible drop-off compliance.

LED Marquee, flag pole, Playground equipment (not shaded), hardcourts are in poor condition, PV canopies over portion of parking lot. New Kinder playstructure Small chain link fenced bike rack area.

Single point of entry to Bldg. where Admin. is located., campus is fenced

Flatwork at building doors exceeds ADA slopes. Numberous walkways along buildings exceed ADA slopes.

ADA symbols in parking stall do not meet standards

Asphalt in basketball area and south of Building H is cracking and needs to be replaced. Remainder of onsite asphalt and asphalt in parking area has some cracks and should be crack and slury sealed.

Replace all walkways at entry doors to classrooms and restrooms.

No known issues

Sewer under Building C has clogging issues (possibly a piece of rebar was driven thru the pipe during construction causing an obstruction?) Difficult cleaning/ snaking of pipe. All existing sewer pipes are original and should be replaced. There is little to no drainage system on east side of campus which causes ponding. Storm drainage is needed. 3/4 domestic water piping in courtyard is failing and needs to be replaced.

ADA Compliant Hydration Station found in hallways, New Condition.

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

CHAPMAN ELEMENTARY 140 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

BUILDING INTERIOR A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc.

DSA CODE

COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items

Door Hardware: Lever, non-compliant threshold

Flooring: VCT

Walls:

Ceiling: 2x4 susp. Acous, 2x4 flourescent

cem plaster,wood siding & mtl. sash wall/wdw sys. @ side elevation

Soffit- T&G, some dry rot- Replace Roofing - tar and gravel-Replace

Doors wood in HM frames Windows - single pane, metal sashReplace Roof drainage - no gutter / downspouts to grade

Door Hardware: knobs, noncompliant threshold

Flooring: VAT in Classrms; carpet in Library

Walls: tackable & wd. operable partition

Ceiling: 2x4 susp. Acous, 2x4 flourescent

Sink: Not ADA compliant

Door Hardware: Lever, non-compliant threshold

Flooring: VCT

Walls:

Ceiling: 2x4 susp. Acous, pendant flourescent

Sink: Not ADA compliant

Roofing - assumed tar & gravel-Rplace Exterior wood doors

Windows- single

Door Hardware: push/pull, noncompliant threshold

Flooring: tile, non-compliant flr slope

Walls:4' tile wainscot & gyp bd

Ceiling: gyp. bd., surf. Mtd. flourescent -Replace

Sink: wall lavatories

Entry doors not compliant (width & threshold) non-compliant ADA clear space at interior, ,m

Same as E

DSA EB-3 / EB- 4, Door threshold not ADA compliant- remove & replace walkway

DSA EB-3 / EB- 4

DSA EB-3 / EB- 4, Door threshold not ADA compliant- remove & replace walkway

DSA EB-3 / EB- 4, Insuifficient landing clearance at exit door.

DSA EB-3 / EB- 4, Door threshold not ADA compliant- remove & replace walkway

DSA EB-3 / EB- 4, Door threshold not ADA compliant- remove & replace walkway

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A CLASSROOMS BUILDING D CLASSROOMS / LIBRARY BUILDING E CLASSROOMS BUILDING F MULTI-PURPOSE BUILDING G RESTROOMS BUILDING H CLASSROOMS BLDG COLOR ASSESSMENT SQUARE FOOTAGE 39,453 4,044 5,376 See Bldg F 14,343 1,027 See Bldg F BUILDING EXTERIOR
Exterior
A Condition - materials, repair / replace, painting, windows, etc.
skin -cem plaster, NO windows Soffit- T&G, some dry rot Roofing - tar and gravel Doors wood in HM frames Windows - single pane, metal sash Roof drainage - no gutter / downspouts to grade Exterior skin -
as D
Same
Exterior skin - cement plaster
Roofing
Replace Exterior
door
Same as D
glazed metal sashReplace Exterior skin - cement plaster
- assumed tar & gravel-
wood doors to playgroundgiant gas meter in the way - Replace
& frames
CHAPMAN ELEMENTARY 141 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

BLDG COLOR ASSESSMENT

BUILDING J CLASSROOMS

BUILDING B, C, K, L PORTABLES MISC

SQUARE FOOTAGE 39,453 2,745 11,918

BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.

BUILDING INTERIOR A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc.

DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items

DSA EB-3 / EB- 4, Door threshold not ADA compliant- remove & replace walkway

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING MISC

UTILITY MPOE/ MDG E Data infrastructure (i.e. 10GB) Carrier, location, size of space

FIRE ALARM SYSTEM E

Existing system, code compliant , replace vs retrofit, Voice Evac, etc.

CLOCK / INTERCOM / SPEAKER SYSTEM E System, headend, type (i.e. VOIP), replace vs retrofit

ACCESS / INTRUSION / SECURITY E

ELECTRICAL SYSTEMS

LIGHTING AND LIGHTING CONTROLS

TECHNOLOGY SYSTEMS

Types of systems, hardware, CCTV, opening contacts, etc.

E Rooms and panels, code compliant, receptacles, circuiting, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

E

IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

AUDIVISUAL SYSTEMS

CHAPMAN ELEMENTARY

E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

PG&E electrical service in parking lot, MSB and PV equipment in fenced enclosure in parking lot. 120/208V 1600A Siemens MSB is ~30 years old, servicable condition but approaching end of servicable life (up to 50 years). 1600A should be sufficient for a campus this size. Much older Zinsco MSB in same yard is not servicable and missing deadfront.

Older Silent Knight 5207 FACP, did not observe smoke detectors, there may be some pull stations. Does not meet any current code requirements, high priority item.

Older Bogen Multicom 2000 in a large rack in someone's office, not per current standards. Old clocks.

No intrusion alarm system in use. Cameras throughout the campus. No access controls.

Very old gear (60 years or older) observed in custodial closet. Many existing panels on campus are similar age. All panelboards are full, no spare breakers. Individual circuits are overloaded, up to 19 duplex receptacles on a single circuit is CEC violation. 3-phase feeder to portables is miissing a phase leg, district has 'worked around' to make it work. Lots of surface raceways in classrooms.

Most interior lighting consists of older luminaires with T8 fluorescent lamps. Some LED exit signs observed, and 'bugeye' emergency lights that are no longer maintained. Ceiling mounted motion sensors, where present, have been 'bypassed'. Lighting controls do not meet any current energy code requirements. Exterior lighting consists of LED parking lot lights and CFL wallpacks, many of which were on during the daytime.

MDF is located in the library, it is not in a dedicated room with cooling. New fiber has been routed through the campus. Horizontal cabling is a combination of CAT5E and CAT6. Limited upgrades have been completed. Pathway for low voltage systems is primarily routed overhead on canopies as there is not sufficient UG pathway. Classrooms have WAPs.

Most classrooms have a flat panel display.

142 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING

BUILDING SCOPE A/E

EXTERIOR EQUIPMENT ASSESSMENT

INTERIOR EQUIPMENT ASESSMENT

ENERGY

M/P

INTENT OF SCOPE FOR PRICING

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

PLUMBING EQUIPMENT REVIEW

FIRE SPRINKLER SYSYTEM M/P

Does AFS exist, location, code compliant, etc.

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

BUILDING A CLASSROOMS

This building has (4) Older Lennox Roof Mounted AC-Units that are at the end of life. Fixed Minimum OSA. No Relief Air.

Poor Air Distribution (2) Supply Air Grille and single point returm. Ceilings stained.

BUILDING D CLASSROOMS / LIBRARY

This building has (5) newer Johnson Controls Roof Mounted Ac-Units.

Newer installation with 8 years of life left.

Poor Air Distribution (2) Supply Air Grille and single point returm. Ceilings stained.

BUILDING E CLASSROOMS

This building has (4) newer Johnson Controls Roof Mounted Ac-Units. Newer installation with 8 years of life left.

Poor Air Distribution (2) Supply Air Grille and single point returm. Ceilings stained.

BUILDING F MULTI-PURPOSE

This building has (2) newer Johnson Controls Roof Mounted AC-Units. Newer installation with approx. 8 years of life left.

Kitchen Hood is original and is coupled to Roof Mounted Reznor w/ Evaporative Cooler Section. In need of replacement, now.

BUILDING G RESTROOMS

Singel Exhaust Fans serving both Core Restrooms.

Exhaust Ducting only. Original Construction

BUILDING H CLASSROOMS

This building has (4) newer Johnson Controls Roof Mounted Ac-Units. Newer installation with 8 years of life left.

Sinks are CW only and original Sinks are CW only and original Sinks are CW only and original Plumbing Fixture are from original construction. Sinks are CW only and original Sinks are CW only and original

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Original Water Heater at Kitchen in need of replacement, now. Kitchen Plumbing Fixture appear to be from original construction. One Newer Johnson AC-Unit serving Administration Area.Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Plumbing Fixture are from original construction.

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

Poor Air
Distribution (2) Supply Air Grille and single point returm. Ceilings stained.
MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat? Combination of Delta and Johnson Controls Combination of Delta and Johnson Controls Combination of Delta and Johnson Controls Combination of Delta and Johnson Controls Fans are switch with lights Combination of Delta and Johnson Controls
CHAPMAN ELEMENTARY 143 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR EQUIPMENT ASSESSMENT M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

BUILDING B, C, K, L PORTABLES MISC

Portables appear to be Wall Mounted Heat Pumps from the original construction.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat? Stand alone Programmable T-Stat's.

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER SYSYTEM

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

M/P Does AFS exist, location, code compliant, etc.

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

ADA Compliant Hydration Station found in hallways, New Condition.

CHAPMAN ELEMENTARY 144 BACK TO CONTENTS

CITRUS ELEMENTARY

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

SITE LIGHTING & CONTROLS E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

SITE PLUMBING

MISC SITE OBSERVATIONS ALL

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

SITE CONDITION ASSESSMENT

No Parking lot is provided for campus and all drop off is at curbside.

Flagpole is surrounded by trees, old hand set lettering marquee, Playground paving is cracked, no trash enclosure is provided, fenced bike rack area

Campus is secured with fence all around site. Main entrance is a single point of entry, but not directly into Admin.,

Onsite walkways along Buildings B, a portion of Building C and Building D to not meeting ADA standards, the offsite sidewalks along West Fourth Avenue and Citrus Avenue are old and should be replaced

The playground asphalt and very damaged and should be replaced

The storm drain pipes in the quad area are old, clogged and do not function well and should be replaced

City sewer main is located on site and is old and needs to be replaced, sewer pipes serving the existing houses east of the site are located on the school site - they are starting to fail, onsite school sewer pipes are old and starting to fail, all sewer pipes should be replaced, an irrigation valve between Building C and Citrus Avenue is too small and should be replaced

Gas Meter in good condition, Needs Earthquakee valve. Gas Distribution in good condition. (mostly in attic spaces).

Remove old Boiler from Basement. Capture Storage space.

CITRUS ELEMENTARY 145 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

BUILDING

BUILDING INTERIOR

RESTROOMS

A Condition - materials, repair / replace, painting, windows, etc. Exterior skin - cement plaster Soffit- wood Roofing - comp. shingle

Doors: wood in HM frames

Windows - single pane, wood windows

Roof drainage - gutter w/ downspouts to grade

A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Doors - knob hardware

Flooring - carpet / VCT

Walls: gyp. bd.

Ceilings: 2 x 4 susp acous

Lighting: 2x4 flourescent

Sinks not ADA compliant

A Fixtures, accessories, ADA compliant, finishes, etc.

Classroom sinks non-compliant Staff toilets non-compliant Boys floor slope non-compliant

MPR, Libraries, Kitchens, Science, etc.

SPECIALITY SPACES REVIEW A

Exterior skin - plaster

Soffit- mtl deck

Roofing - built-up

Doors: alum in alum frames

Windows - alum storefront

Roof drainage - no gutter / downspouts to grade Same as Bldg A

Doors - knob hardware

Flooring - carpet / VCT

Walls: tackable.

Ceilings: 2 x 4 susp acous

Lighting: surf mtd flourescent

Sinks not ADA compliant

Sink non-compliant

Toilet rooms non-compliant

Same as Bldg A

Nurse toilet not compliant

MPR has in-wall tables, all finishes are worn, refrigerators & freezer located along back wall due to small are of Kitchen; stage is not accessible Kitchen has worn VCT flooring, inadequate space for all equipment. DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items DSA EB-3 / EB- 4, Required exits at the ends of corridor are nonaccessible DSA EB-3 / EB- 4

skin - cement plaster Soffit- metal deck Roofing - built-up Fascia - metal

Doors: alum in alum frames

Windows - alum storefront

Roof drainage - no gutter / downspouts to grade

Doors: knob hardware

Flooring: VCT

Walls: gyp bd / markerboards; wood operable partition

Ceilings: 2x4 susp acous-some damage

Lighting: pendant flour

Sinks not ADA compliant

Sinks non-compliant

BUILDING SCOPE
INTENT OF SCOPE FOR PRICING BUILDING A CLASSROOMS BUILDING B KINDERGARTEN CLASSROOMS BUILDING C ADMIN / CRS / MPR BUILDING D CLASSROOMS LIBRARY BUILDING E, F PORTABLES
ASSESSMENT SQUARE FOOTAGE 34,752 23,053 2,483 See building A 5,376 3,840
A/E
BLDG COLOR
EXTERIOR
Exterior
DSA EB-3 / EB- 4, Required exits at the ends of corridor are nonaccessible
DSA EB-3 / EB- 4
CITRUS ELEMENTARY 146 BACK TO CONTENTS

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

UTILITY MPOE/ MDG E Data infrastructure (i.e. 10GB) Carrier, location, size of space

MISC

PG&E electrical service in fenced exterior enclosure, 120/208V 1200A Cutler Hammer MSB is ~30 years old, servicable condition but approaching end of servicable life (up to 50 years). Yard includes unused HVAC equipment that should be removed to allow proper service of gear. 1200A may not be sufficient for future campus renovations if all-electric.

FIRE ALARM SYSTEM E Existing system, code compliant , replace vs retrofit, Voice Evac, etc. Silent Knight 6820EVS control panel (added to serve addition of portables) is consistent with current district standards, but the remainder of the campus includes old horns, pull stations, and is not compliant with current code.

CLOCK / INTERCOM / SPEAKER SYSTEM E System, headend, type (i.e. VOIP), replace vs retrofit

Very old simplex system is beyond its servicable life and may not be properly funcitonal.

ACCESS / INTRUSION / SECURITY E Types of systems, hardware, CCTV, opening contacts, etc. No intrusion alarm system in use. Cameras throughout the campus. No access controls.

ELECTRICAL SYSTEMS

E

Rooms and panels, code compliant, receptacles, circuiting, etc.

LIGHTING AND LIGHTING CONTROLS E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

TECHNOLOGY SYSTEMS E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

AUDIVISUAL SYSTEMS E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

Most existing panels on campus are old and past their servicable life. Some fused gear 50+ years old observed in basement. Lots of surface raceways in classrooms.

Most interior lighting consists of older luminaires with T8 fluorescent lamps. Some LED exit signs observed, and 'bugeye' emergency lights that are no longer maintained. Lighting controls do not meet any current energy code requirements. There is no parking lot lighting (not really a parking lot). Exterior lighting consists of old CFL or HID wallpacks.

MDF is located in teacher's lounge, it is not in a dedicated room with cooling. New fiber has been routed through the campus. Horizontal cabling is a combination of CAT5E and CAT6. Limited upgrades have been completed. Pathway for low voltage systems is primarily routed through ample attic space; some UG pathway. Classrooms have WAPs.

Most classrooms have a flat panel display.

BUILDING CONDITIONS - MECHANICAL/PLUMBING

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior

INTERIOR EQUIPMENT ASESSMENT M/P

BUILDING A CLASSROOMS

BUILDING B KINDERGARTEN CLASSROOMS

years old. Needs replacement.

BUILDING C ADMIN / CRS / MPR

MP and Kitchen served by Roof mounted AC-Units (3) 8-10 years old with concentric SA/RD diffuser (noisey).

located in closets. +20 years ols and needs replacement. MP and Kitchen served by Roof mounted AC-Units (3) 8-10 years old with concentric SA/RD diffuser (noisey).

BUILDING D CLASSROOMS LIBRARY

Roof mounted AC-Units (5)10 years old.

BUILDING E, F PORTABLES

Classrooms / Libray served by Roof mounted AC-Units (5)10 years old. Portables appear to be Wall Mounted Heat Pumps from the original construction.

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

ADA upgrade have been completed in the core Restrooms, Approximately 10-12 years ago.

wall mounted
condition Multiple Outdoor Condensing
located
Yards.
old. Needs replacement.
Condensing
located
EquipmentRooftop,
BARD, etc. -
Units
in Chainlink
+20 years
Multiple Outdoor
Units
in Chainlink Yards. +20
SYSTEM
Boilers,
Pumps, Ducts, diffusers, split systems, exhaust fans, etc. Gas Fired Furnaces located
+20 years ols and needs replacement. Good access to roof.OSA
on roof on courtyard side.
Fired Furnaces
TYPE,
VRF,
in attic.
Hood
Gas
Alerton
Alerton Controls Alerton Controls Alerton Controls Stand alone Programmable
ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?
Controls
T-Stat's.
ADA upgrade have been completed in the core Restrooms, Approximately 10-12 years ago. ADA upgrade have been completed in the core Restrooms, Approximately 10-12 years ago. Plumbing Fixture are from original construction. Plumbing Fixture are from original construction. PLUMBING EQUIPMENT REVIEW M/P
regaultors
10 year
Plumbing
Plumbing
is
Plumbing
is
the
Plumbing
is
the
SPRINKLER SYSYTEM M/P Does AFS exist, location, code compliant, etc. No Automatic Fire Sprinkler Systems
No Automatic Fire Sprinkler Systems
No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. EXISTING
S EB-3,
Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas
(seismic braced)
old gas fired Water Heater. Ok condition.
equipment is from the original construction.
equipment
from the original construction.
equipment
from
original construction.
equipment
from
original construction. FIRE
found.
found.
SEISMIC CONCERNS
EB-4 triggers, etc.
CITRUS ELEMENTARY 147 BACK TO CONTENTS

EMMA WILSON ELEMENTARY

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

Drop off & parking area appears adequate. 2 drop off areas both need accessible loading zone

SITE CONDITION ASSESSMENT

LED Marquee, flag pole & concrete monument sign. Playground equipment (not shaded), hardcourts, and,PV shade structure,. New Kinder play area hardcourt, shade structures & playstructure (shaded)

New fencing with entry gates at various points. Does not have one point of entry directly into the Admin office.

Some walkways along Buildings A, B and G do not meet ADA requirements

No comment

South vehicle parking area should be crack and slurry sealed

Poor drainage in quad area north of Building C and additional drainage needed, the vehicle parking area east of Buildings H and L floods during heavy storms, flooding of West 8th Avenue often occurs at the same time and it is suspected the issue could involve the city's drainage system

The irrigation system has water hammer issues due to the connection to the CARD well, sewer pipes north of Building C have clogging issues and should be replaced

Gas Meter in good condition, Needs Earthquakee valve.

Gas Distribution in good condition. (mostly in attic spaces).

Constructed in 1993.

EMMA WILSON ELEMENTARY 148 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.

Condition -

Roof - Standing mtl seam. built up roof - replace with single ply

Roof Fascia - metal - paint

Roof Drains - Gutter & DS to SDpaint

Soffit - cement plaster - paint

Walls - CMU

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM DR & FRM .

Lever handle, pulls & PH

Card Access - required

Windows - HM

Other - N/A

Walls - Gyp Bd, & tack boardadequate

Int Door/Frm/Hdwr - HM Frm & Wd Dr. Pulls, & Lever handle

Flooring - carpet, VCT, sht Vinyl, & tile - replace & update

Ceiling - 1x1 accoustic, 2x4 ACT replace tiles as needed & Gyp Bdpaint

Casework/Sink - Sink not ADA

Space Planning - N/A

Other - N/A

Fixtures, accessories, ADA compliant, finishes, etc.

Multi Compartment bathroom - ADA but needs update

A

RESTROOMS

SPECIALITY

SPACES REVIEW

DSA CODE

COMPLIANCE ITEMS

A MPR, Libraries, Kitchens, Science, etc.

A ADA, Fire Life Safety, Structural - Must Do Items

Single occupancy toilet - not ADA

Library space is adequate

Roof - Standing mtl seam. built up roof - replace with single ply

Roof Fascia - metal - paint

Roof Drains - Gutter & DS to SDpaint

Soffit - cement plaster - paint

Walls - CMU

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM DR & FRM

Lever handle, pulls & PH

Card Access - required

Windows - HM

Other - N/A

Space - Classroom function is adeuate in existg space.

Walls - Gyp Bd, marker board & tack board - adequate

Int Door/Frm/Hdwr - HM Frm & Wd Dr. Pulls, & Lever handle

Flooring - carpet, VCT, sht Vinyl, & tile - replace & update

Ceiling - 2x4 ACT replace tiles as needed & Gyp Bd - paint

Casework/Sink - ADA

Space Planning - N/A

Other - N/A

Multi Compartment bathroom - ADA but needs update

Roof - Standing mtl seam. built up

roof - replace with single ply

Roof Fascia - metal - paint

Roof Drains - Gutter & DS to SDpaint

Soffit - cement plaster - paint

Walls - CMU

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM DR & FRM

Lever handle, pulls & PH

Card Access - required

Windows - HM

Other - N/A

Space - MP function is adeuate in existg space.

Walls - CMU, Gyp Bd, acoustical tile - adequate

Int Door/Frm/Hdwr - HM Frm & Wd Dr. Pulls, Lever handle, & PH.

Bathroom Wd doors should be replaced with HM

Flooring - VCT, sht Vinyl, & tilereplace & update

Ceiling - 2x4 ACT replace tiles as needed & Gyp Bd - paint

Casework/Sink - ADA

Space Planning - N/A

Other - N/A

Multi Compartment bathroom - ADA but needs update. Ceiling needs repair.

Drinking Fountain must be replaced

Kithchen replace sheet vinyl floor with epoxy, hand washing sink Not ADA

MP has a stage with chair lift and movable wall

Kitchen function is adequate in existing space

Roof - Standing mtl seam. built up roof - replace with single ply

Roof Fascia - metal - paint

Roof Drains - Gutter & DS to SDpaint

Soffit - cement plaster - paint

Walls - T1-11

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM DR & FRM .

Lever handle, pulls

Card Access - required

Windows - Aluminum Sash

Other - N/A

Space - Classroom function is adeuate in existg space.

Walls - Gyp Bd, marker board & tack board - adequate

Int Door/Frm/Hdwr - N/A

Flooring - carpet tile & VCTreplace & update

Ceiling - 2x4 ACT replace tiles as needed

Casework/Sink - Sink not ADA

Space Planning - N/A

Other - N/A

Roof - Standing mtl seam. built up

roof - replace with single ply

Roof Fascia - metal - paint

Roof Drains - Gutter & DS to SDpaint

Soffit - cement plaster - paint

Walls - T1-11

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM DR & FRM

Lever handle

Card Access - required

Windows - Aluminum Sash

Other - N/A

Space - Classroom function is adeuate in existg space.

Walls - Gyp Bd, marker board & tack board - adequate

Int Door/Frm/Hdwr - N/A

Flooring - carpet tile & VCTreplace & update

Ceiling - 2x4 ACT replace tiles as needed

Casework/Sink - Sink not ADA

Space Planning - N/A

Other - N/A

Roof - Standing mtl seam. built up roof - replace with single ply

Roof Fascia - metal - paint

Roof Drains - Gutter & DS to SDpaint

Soffit - cement plaster - paint

Walls - T1-11

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM DR & FRM .

Lever handle

Card Access - required

Windows - Aluminum Sash

Other - N/A

Space - Classroom function is adeuate in existg space.

Walls - Gyp Bd, marker board & tack board - adequate

Int Door/Frm/Hdwr - N/A

Flooring - carpet tile, VCT, tilereplace & update

Ceiling - 2x4 ACT replace tiles as needed

Casework/Sink - Sink not ADA

Space Planning - N/A

Other - N/A

SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN / LIBRARY BUILDING B CLASSROOMS BUILDING C MULTI-PURPOSE BUILDING D CLASSROOM BUILDING E CLASSROOM BUILDING F CLASSROOMS BLDG COLOR ASSESSMENT SQUARE FOOTAGE 52,922 6,992 9,888 5,751 1,992 4,800 1,992
BUILDING
BUILDING INTERIOR A
finishes (floor, wall, ceiling) casework, shades, etc.
Space - Admin function is adeuate in existg space. Library is adequate in existing space
EMMA WILSON ELEMENTARY 149 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

A Condition - materials, repair / replace, painting, windows, etc.

Roof - Standing mtl seam. built up roof - replace with single ply

Roof Fascia - metal - paint

Roof Drains - Gutter & DS to SD - paint

Soffit - cement plaster - paint

Walls - CMU

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM DR & FRM . Lever handle

Card Access - required

BUILDING EXTERIOR

BUILDING INTERIOR A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

RESTROOMS A

Fixtures, accessories, ADA compliant, finishes, etc.

Windows - HM

Other - N/A

Space - Classroom function is adeuate in existg space.

Walls - Gyp Bd, marker board & tack board - adequate

Int Door/Frm/Hdwr - HM Frm & Wd Dr. Pulls, &

Lever handle

Flooring - carpet, VCT, sht Vinyl, & tile - replace & update

Ceiling - 2x4 ACT replace tiles as needed & Gyp Bdpaint

Casework/Sink - Sink not ADA

Space Planning - N/A

Other - N/A

Multi Compartment bathroom - ADA but needs update. Floor mounted grab bar needs to be removed. Ceiling needs repair.

Roof - Standing mtl seam. built up roof - replace with single ply

To be Removed

Roof Fascia - metal - paint

Roof Drains - Gutter & DS to SD - paint

Soffit - cement plaster - paint

Walls - CMU

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM DR & FRM Lever handle

Card Access - required

Windows - HM

Other - N/A

Space - Classroom function is adeuate in existg space.

To be Removed

Walls - Gyp Bd, marker board & tack board - adequate

Int Door/Frm/Hdwr - HM Frm & Wd Dr. Pulls, &

Lever handle

Flooring - carpet, VCT, sht Vinyl - replace & update

Ceiling - 2x4 ACT replace tiles as needed & Gyp Bdpaint

Casework/Sink - Sink not ADA

Space Planning - N/A

Other - N/A

Single occupancy toilet - not ADA

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

UTILITY MPOE/MDG E Data infrastructure (i.e. 10GB) Carrier, location, size of space

FIRE ALARM SYSTEM

CLOCK / INTERCOM / SPEAKER

ACCESS / INTRUSION / SECURITY

ELECTRICAL SYSTEMS

LIGHTING AND LIGHTING CONTROLS

TECHNOLOGY SYSTEMS

AUDIVISUAL SYSTEMS

Roof - Standing Mtg Seam - new

Roof Fascia - Metal - new

Roof Drains - Gutter & DS to SD - new

Soffit - metal deck & Wd beams - new

Walls - CMU - new

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr -HM Frm & Dr. Lever handle, pulls &

PH - new

Card Access - installed

Windows - Alumn storefront - new

Other - N/A

Space - Classrooms are adequate

Walls - Gyp Bd, marker board & tack board - new

Int Door/Frm/Hdwr - HM Frm & Wd Dr, PH, pulls, &

Lever handle - new

Flooring - carpet, sht Vinyl & epoxy - new

Ceiling - 2x4 ACT & Gyp Bd - new

Casework/Sink - ADA - new

Space Planning - N/A

Other - N/A

Single occupancy toilets - ADA - new Class Sink - ADA -new

MISC

PG&E electrical service in securt exterior enclosure, 277/480V 1000A GE MSB is ~ years old and in servicable condition. 500kVA xfmr and 1600A 120/208V switchboard and PV equipment also in enclosure. Service is adequate for campus this size, last analysis prior to kinder wing addition peak demand was 151kW (under 200A). Campus has large PV array backfeeding the MSB.

E Existing system, code compliant replace vs retrofit, Voice Evac, etc. Silent Knight 6820EVS control panel was added during the Kinder Wing addition, which includes code required voice notification. The remainder of the campus is not compliant with current code, and is primarily a manual system and not addressible.

E System, headend, type (i.e. VOIP), replace vs retrofit

E Types of systems, hardware, CCTV, opening contacts, etc.

E Rooms and panels, code compliant, receptacles, circuiting, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

Clock/PA system is Valcom and meets current district standards for elementary schools.

Vista intrusion alarm system consisting of door contacts and motion sensors is in use but requires some re-programming. Cameras throughout the campus. No access controls.

Gear is approximately 30 years old but generally in good condition.

With exception of new Kinder Wing, most interior lighting consists of older luminaires with T8 fluorescent lamps. Many parabolic luminaires which do not provide good lighting. Lighting controls in these areas do not meet any current energy code requirements. There is no parking lot lighting (not really a parking lot). Exterior lighting consists of LED parking lot lighting and old CFL or HID wallpacks.

For the most part adequate throughout campus. MDF is located in electrical room, it is adequate except there is no cooling. New fiber has been routed through the campus. Horizontal cabling is a combination of CAT6 and CAT6A. THere is some UG pathway for low voltage systems. Classrooms have WAPs.

AV in most classrooms does not meet current district standards of flat panel display.

SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING G KINDER CLASSROOMS BUILDING H OLD KINDER CLASSROOMS BUILDING J PORTABLES BUILDING L KINDER CLASSROOMS BLDG COLOR ASSESSMENT SQUARE FOOTAGE 9,888 2,816 3,098 5,705
BUILDING
EMMA WILSON ELEMENTARY 150 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR EQUIPMENT ASSESSMENT M/P

INTERIOR EQUIPMENT ASESSMENT

ENERGY MANAGEMENT SYSTEMS M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

BUILDING A ADMIN / LIBRARY

Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy.

Existing ductwork is all original and in good condition.

BUILDING B CLASSROOMS BUILDING C MULTI-PURPOSE

Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy.

Existing ductwork is all original and in good condition.

Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy.

Existing ductwork is all original and in good condition.

BUILDING D CLASSROOM

Portables appear to be Wall Mounted Heat Pumps from the original construction.

Portables appear to be Wall Mounted Heat Pumps from the original construction.

BUILDING E CLASSROOM BUILDING F CLASSROOMS

Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy.

Existing ductwork is all original and in good condition.

Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy.

Existing ductwork is all original and in good condition.

FIRE SPRINKLER SYSYTEM M/P

Does AFS exist, location, code compliant, etc.

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

FS are present in Kitchen Area and support Spaces. From original construction.

Plumbing Equipment is from original construction and ready for replacement..

Plumbing Equipment is from original construction and ready for replacement..

Plumbing Equipment is from original construction and ready for replacement..

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.
EMCS Type of system, web based / Programmable T-Stat? Johnson Controls Johnson Controls Johnson Controls Johson Controls Johnson Controls Johnson Controls
- ADA
M/P Plumbing
sinks, drinking fountains
bottle
Plumbing
in good condition. Plumbing
in good
Plumbing
Plumbing
from original construction and in good condition. Plumbing Fixtures are from original construction and in good condition.
M/P
PLUMBING FIXTURE REVIEW
COMPLIANCE
Fixtures, Restrooms,
/
fillers, etc. Plumbing Fixtures are from original construction and in good condition.
Fixtures are from original construction and
Fixtures are from original construction and
condition.
Fixtures are from original construction and in good condition.
Fixtures are
PLUMBING EQUIPMENT REVIEW
Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced) Plumbing Equipment is from original construction and ready for replacement.. Plumbing Equipment is from original construction and ready for replacement.. Plumbing Equipment is from original construction and ready for replacement..
EMMA WILSON ELEMENTARY 151 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR EQUIPMENT ASSESSMENT M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER SYSYTEM

M/P

EMCS Type of system, web based / Programmable T-Stat?

Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Does AFS exist, location, code compliant, etc.

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

BUILDING G KINDER CLASSROOMS

Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy.

Existing ductwork is all original and in good condition.

BUILDING H KINDER CLASSROOMS

Roof Mounted AC Units, Approx. 7-8 years old. Estimated 8 years of life expectancy.

Existing ductwork is all original and in good condition.

BUILDING J PORTABLES

Portables appear to be Wall Mounted Heat Pumps from the original construction.

Existing ductwork is all original and in good condition.

BUILDING L KINDER CLASSROOMS

Portables appear to be Wall Mounted Heat Pumps from the original construction.

Existing ductwork is all original and in good condition.

Johnson Controls Johnson Controls Stand alone Programmable T-Stat's. Stand alone Programmable T-Stat's.

Plumbing Fixtures are from original construction and in good condition.

Plumbing Fixtures are from original construction and in good condition.

Plumbing Fixtures are from original construction and in good condition.

Plumbing Fixtures are from original construction and in good condition.

Plumbing Equipment is from original construction and ready for replacement..

Plumbing Equipment is from original construction and ready for replacement..

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

Plumbing Equipment is from original construction and ready for replacement..

Plumbing Equipment is from original construction and ready for replacement..

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

EMMA WILSON ELEMENTARY 152 BACK TO CONTENTS

MARIGOLD ELEMENTARY

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

Main parking lot is new with ADA parking & drop off

SITE CONDITION ASSESSMENT

Play ground, hardcourt and play structures are new. Flag pole and monument sign are new. No marquee sign. New CMU trash enclosure

A Fencing, gates, hardware / access Campus perimeter is fully fenced with and the campus has a single point of access through the Administration office.

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

New campus

New campus

New campus

New campus

New campus

New campus

MARIGOLD ELEMENTARY 153 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

Roof - Asphalt shingle - new

Roof Fascia - Wood

Roof Drains - Gutters to DS to SD - new

Soffit - fiber cement soffit panel - new

Walls - Nichiha & CMU block - new

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Frm & alumn Storefront. PH, pull, Lever handlenew Card Access - installed

Soffit -Nichiha - T&G

Walls - CMU block

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr -HM Dr & Frm.

PH, pull, Lever handle - new

Card Access - installed

Windows - Alumn storefront - new

Other - N/A

Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Space - Function is adeuate in existg space

Walls - Gyp Bd, Tack board, Magnetic marker laminate board, tile - new Int Door/Frm/Hdwr - HM Frm & Wd. Lever handle - new Flooring - Carpet tile, Sht vinyl, Vinyl tile, Tile, Epoxy - new Ceiling - 2x4 ACT, Gyp Bd, Exposed deck- new Casework/Sink - ADA ok, new Space Planning - N/A

Other - N/A

Space - Function is adeuate in existg space

Walls - Gyp Bd, Tack board, Magnetic marker laminate board, tile - new Int Door/Frm/Hdwr - HM Frm & Wd. Lever handle - new Flooring - Carpet tile, Vinyl tile, Epoxy - new Ceiling - 2x4 ACT, Gyp Bd - new Casework/Sink - ADA ok, new Space Planning - N/A

Other - N/A

Roof - Asphalt shingle - new

Roof Fascia - Wood

Roof Drains - Gutters to DS to SD - new

Soffit -Nichiha - T&G

Walls - CMU block

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr -Aluminum

Storefront Dr & HM Dr & Frm. PH, pull, Lever handle - new

Card Access - installed

Windows - Alumn storefront - new

Other - N/A

Space - Function is adeuate in existg space

Walls - Gyp Bd, Tack board, Magnetic marker laminate board, tile - new Int Door/Frm/Hdwr - HM Frm & Wd.

Lever handle - new Flooring - Carpet tile, Vinyl tile, Epoxy - new Ceiling - 2x4 ACT, Gyp Bd - new Casework/Sink - ADA ok, new Space Planning - N/A

Other - N/A

Roof - Asphalt shingle - new

Roof Fascia - Wood

Roof Drains - Gutters to DS to SD - new

Soffit -Nichiha - T&G

Walls - CMU block

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr -Aluminum

Storefront Dr & HM Dr & Frm. PH, pull, Lever handle - new

Card Access - installed

Windows - Alumn storefront - new

Other - N/A

Space - Function is adeuate in existg space

Walls - Gyp Bd, Tack board, Magnetic marker laminate board, tile - new Int Door/Frm/Hdwr - HM Frm & Wd.

Lever handle - new Flooring - Carpet tile, Vinyl tile, Epoxy - new Ceiling - 2x4 ACT, Gyp Bd - new Casework/Sink - ADA ok, new Space Planning - N/A

Other - N/A

Roof - Single Ply - new

Roof Fascia - N/A

Roof Drains - Roof drains to DS to SD - new

Soffit -Nichiha - fiber cement soffit panel - new

Walls - Nichiha - new

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr -Aluminum

Storefront Dr & HM Dr & Frm. PH, pull, Lever handle - new

Card Access - installed

Windows - Alumn storefront - new

Other - N/A

Space - Function is adeuate in existg space

Walls - Gyp Bd, Tack board, Magnetic marker laminate board, tile - new Int Door/Frm/Hdwr - HM Frm & Wd.

Lever handle - new Flooring - Carpet tile, Vinyl tile, Epoxy - new

Ceiling - 2x4 ACT, Gyp Bd - new Casework/Sink - ADA ok, new Space Planning - N/A

Other - N/A

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN / MULTI-PURPOSE BUILDING B KINDER CLASSROOMS BUILDING C CLASSROOMS BUILDING D CLASSROOMS BUILDING E LCASSROOMS / MEDIA CNETER BLDG COLOR ASSESSMENT New Building 2018 (E) Bldg w/ Deep Mod 2018 (E) Bldg w/ Deep Mod 2018 (E) Bldg w/ Deep Mod & Addition 2018 New Building 2018 SQUARE FOOTAGE 38937 13,776 5,554 4,516 4,200 10,891 BUILDING EXTERIOR A Condition
- materials, repair / replace, painting, windows, etc. Roof - Single ply - new Roof Fascia - N/A Roof Drains - Roof Drain to DS to SD - new
Windows - Alumn storefront - new Other - N/A
BUILDING INTERIOR A
RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc. Single Occup toilets room Multi Compartment bathroom - ADA ok - new Single Occup toilets room - ADA ok - new Single Occup toilets room - ADA ok - new Single Occup toilets room , Multi Compartment bathroom - ADA ok - new SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc. MP with accessible stage - new Kitchen & Servery - new Has separate enclosed play area with play structure Library - new DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items
MARIGOLD ELEMENTARY 154 BACK TO CONTENTS

HOOKER OAK ELEMENTARY

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE E

SITE LIGHTING & CONTROLS E

SITE PLUMBING

MISC SITE OBSERVATIONS

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

Existing MSB - size, condition, upgrade needed, etc.

Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

SITE CONDITION ASSESSMENT

A shared bus / parent drop-off area is provided, not ADA compliant. No trash enclosure is provided

Hardcourt paving is in poor condition, Kinder play structure is shaded, no bike racks were found, flag pole is provided, manual lettering message sign provided.

The campus is secured with a fence around the campus. There are multiple access into the main building from the street, no direct access into Admin.

Some walkways along Buildings A, C and E with slopes exceeding standards, pedestrian ramp and curb ramp along 3rd Avenue exceeding standards

Slurry seal, replace striping and pavement markings and signs

Vehicle parking area should be crack and slurry sealed, asphalt play area is cracked and should be replaced

The storm drain connection from onsite to offsite is located along Arbutus Avenue, it has continual maintenance issues and is difficult to access and should be modified/replaced, there is poor drainage between Buildings B and C and a new drainage system should be installed

All onsite water pipes are old and should be replaced

Gas Meter in good condition, Needs Earthquakee valve.

Gas Distribution piping is in poor condition and need full replacement. Located on roof, and not secured per code.

ALL Original 1948 construction.

Remove old Boiler from Basement. Capture Storage Space of approx. 1200 sf..

HOOKER OAK ELEMENTARY 155 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

RESTROOMS

A Fixtures, accessories, ADA compliant, finishes, etc.

Restrooms are fairly large, finishes need refresh, sufficient area for any ADA upgrades necessary.

acous tile

Lighting - pendant hung flourescent Sinks- not ADA compliant

Flooring - VCT, worn, Replace Walls - concrete

Ceiling -2x4 susp acous tile panels

Lighting - 2x4 Flourescent lay-in

Door Hardware - old panic barReplace

Same as A

Library is classroom size, undersized, tables and chairs do not have sufficient space, all hard surfaces, VCT flooring, plaster walls, 1x1 ceiling acous. tile

MP- stage not ADA accessible, in-wall tables

Kitchen- very tight, poor access to servery and queue to servery into corridor or from back doorineffecient layout.

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A CLASSROOMS BUILDING B CLASSROOMS BUILDING C CLASSROOMS / LIBRARY BUILDING E ADMIN / MPR / KINDER CR BUILDING D, F, G, H PORTABLES BLDG COLOR ASSESSMENT SQUARE FOOTAGE 40,930 28,617 see building A 5,652 see building A 6,661 BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc. Exterior skin - cem plaster Soffit- cement plaster Fascias - wood, poor condition Roofing - composition shingle Doors -wd. doors in wd. Frames, knob hardware, no ADA compliant threshold Windows - single pane, metal sash w/ wood trim, poor condition Roof drainage - gutter / downspouts to grade Same as A Same as A Same as A BUILDING INTERIOR A Condition - finishes
wall, ceiling) casework, shades, etc.
Replace Walls - concrete Ceiling -2x4
tile Lighting - 2x4 lay-in flourescent Sinks- not ADA compliant
(floor,
Flooring - VCT, worn,
acous
Same as A Flooring - VAT, Abate & Replace Walls - cement plaster & plywd. Ceiling -1x1
SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc.
DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items DSA EB-3 / EB- 4 DSA EB-3 / EB- 4 DSA EB-3 / EB- 4 DSA EB-3 / EB- 4, Admin office small & non-accessible
HOOKER OAK ELEMENTARY 156 BACK TO CONTENTS

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

UTILITY MPOE/ MDG E

Data infrastructure (i.e. 10GB) Carrier, location, size of space

FIRE ALARM SYSTEM E Existing system, code compliant replace vs retrofit, Voice Evac, etc.

CLOCK / INTERCOM / SPEAKER SYSTEM E System, headend, type (i.e. VOIP), replace vs retrofit

MISC

PG&E electrical service feeds ancient gear with multiple meters, located in a basement. None of the gear is servicable, and presents a worker safety issue due to lack of code required clearance. A separate ~30yo 1000A 277/480V service for HVAC is installed at exterior, in servicable but poor condition.

Older Silent Knight 5208 FACP with pull stations, did not observe smoke detectors, there may be some pull stations. Does not meet any current code requirements. A Wheelock voice system was added on to accommodate addition of portables.

Older Bogen Multicom 2000 in MDF room, not per current standards. Old clocks.

ACCESS / INTRUSION / SECURITY E Types of systems, hardware, CCTV, opening contacts, etc. No intrusion alarm system in use. Cameras throughout the campus. No access controls.

ELECTRICAL SYSTEMS E Rooms and panels, code compliant, receptacles, circuiting, etc.

LIGHTING AND LIGHTING CONTROLS E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

TECHNOLOGY SYSTEMS E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

AUDIVISUAL SYSTEMS E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

Very old gear (60 years or older) observed throughout campus. All panelboards are full, no spare breakers, and limited branch circuiting to support modern instructional requirements. Some of the wiring is exposed with cloth sheathing, which has not been code compliant in a very long time. Lots of surface raceways in classrooms.

Most interior lighting consists of older luminaires with T8 fluorescent lamps. In general most spaces are underlit to the point of being unsafe. Lighting controls do not meet any current energy code requirements. Exterior lighting consists of LED parking lot lights and CFL wallpacks.

Newer MDF has been located in storage room; not a dedicated space, no cooling. Somne recent upgrades to cabling. IDF cabinets are located in classrooms, which is not ideal. Pathway is routed through attic space, but concrete walls make routing extremely difficult.

Most classrooms have a flat panel display.

BUILDING CONDITIONS - MECHANICAL/PLUMBING

BUILDING SCOPE A/E INTENT OF SCOPE FOR

ASSESSMENT M/P Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P

PLUMBING EQUIPMENT REVIEW M/P Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Plumbing equipment is from the original construction and needs full replacement. Hallway Drinking Fountains are approx. 8 years old.

Plumbing equipment is from the original construction and needs full replacement.

Plumbing equipment is from the original construction and needs full replacement. Plumbing equipment is from the original construction and needs full replacement. Plumbing equipment is from original construction.

HOOKER OAK ELEMENTARY
PRICING BUILDING A CLASSROOMS BUILDING B CLASSROOMS BUILDING C CLASSROOMS / LIBRARY BUILDING E ADMIN / MPR / KINDER CR BUILDING D, F, G PORTABLES EXTERIOR EQUIPMENT
SYSTEM
etc. Duct distribution is approx. 20 years old. Classrooms Duct distribution is approx. 20 years old. Classrooms Duct distribution is approx. 10 years old. Classrooms Duct distribution is approx. 20 years old. Classrooms duct distribution is from original construction.
TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans,
SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat? Delta Controls. Needs updating. Delta Controls. Needs updating. Delta Controls. Needs updating. Delta Controls. Needs updating. Stand alone Programmable T-Stat
Plumbing Fixtures,
sinks, drinking fountains
bottle fillers,
Plumbing Fixture are
be
and update to beet ADA
Plumbing Fixture are from original construction and needs to be replaced and update to beet ADA
Plumbing Fixture are from original construction and needs to be replaced and update to beet ADA
Plumbing Fixture are from
construction.
ENERGY MANAGEMENT
PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P
Restrooms,
/
etc.
from original construction and needs to
replaced and update to beet ADA requirements. Plumbing Fixture are from original construction and needs to be replaced
requirements.
requirements.
requirements.
original
SPRINKLER SYSYTEM
Does AFS exist,
No Automatic Fire Sprinkler Systems
No Automatic Fire Sprinkler Systems
No Automatic Fire Sprinkler Systems
No Automatic Fire Sprinkler Systems found.
Automatic Fire Sprinkler Systems found.
FIRE
M/P
location, code compliant, etc.
found.
found.
found.
No
157 BACK TO CONTENTS

LITTLE CHICO CREEK ELEMENTARY SCHOOL

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

SITE CONDITION ASSESSMENT

Some walkways along buildings do not meet ADA slopes

Striping and pavement markings are fading and should be re-applied, some signage and pavement markings do not comply with standards

Vehicle areas should be crack and slurry sealed.

No known issues

The irrigation system along Amanda Way was damaged and has been abandoned and needs to be replaced.

Gas Meter is located in the exterior equipment yard and in good condition.

The Mechanical System is a two-pipe Heating / Cooling System. Commonly know as a Changeover System.

LITTLE CHICO CREEK ELEMENTARY SCHOOL 158 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

Thresholds: Not ADA compliant Roofing: Composite shingle Roof Drainage: Gutter with pipe downspout connected to storm drain

RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc.

DSA CODE COMPLIANCE ITEMS

A ADA, Fire Life Safety, Structural - Must Do Items

Kitchen sht vinyl flooring worn

Stage is not accessible. Drinking fountains not ADA compliant.

Nurse and Staff toilet rms appear ADA compliant.

Student restrooms typically do not have ADA compliant threshold.

Restroom interiors are tile floor and walls in good condition.

Fixtures are generally compliant with ADA.

Student restrooms in classrooms are ADA compliant.

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A MULTI-PURPOSE BUILDING B ADMINISTRATION BUILDING C LIBRARY BUILDING D SPED CLASSROOMS BUILDING E CLASSROOMS BUILDING F KINDER CLASSROOMS BLDG COLOR ASSESSMENT SQUARE FOOTAGE 44,523 7,327 3,006 3,978 3,006 2,250 5,503 BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc. Same as Bldg. F Same as Bldg. F Same as Bldg. F Same as Bldg. F Same as Bldg. F Ext. Finish: Cement Plaster with tile wainscot
frames
INTERIOR A Condition - finishes (floor, wall, ceiling) casework, shades, etc. Doors - Lever hardware Flooring - damged VCT Walls: Acous. Panels & gyp. bd., in-wall tables Ceilings:
x1
tile Lighting:uplight
along walls, no room in Kitchen for storage.
- Lever hardware Flooring - Carpet Walls: Gyp. bd. Ceilings: 1x1 acous. tile Lighting: 2x4
not ADA compliant, toilet room is ADA compliant. Same as Bldg. F Same as Bldg. F Same as Bldg. F Doors - Lever hardware Flooring - Carpet / VCT Walls: Tackable panels Ceilings: 2x4 acous. tile Lighting: 2x4 flour lay-in
Doors: Hollow metal doors and
BUILDING
1
acous.
flour. Sinks not ADA compliant Refrigerator and service carts stored
Doors
surf. Mounted flour. Nurse: VCT flooring, sink is
LITTLE CHICO CREEK ELEMENTARY SCHOOL 159 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

Doors: Hollow metal doors and frames

Thresholds: Not ADA compliant

Roofing: Composite shingle

Roof Drainage: Gutter with pipe downspout connected to storm drain RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE

A/E

INTENT OF SCOPE FOR PRICING

UTILITY MPOE/ MDG E Data infrastructure (i.e. 10GB) Carrier, location, size of space

FIRE ALARM SYSTEM E Existing system, code compliant replace vs retrofit, Voice Evac, etc.

CLOCK / INTERCOM / SPEAKER SYSTEM E System, headend, type (i.e. VOIP), replace vs retrofit

ACCESS / INTRUSION / SECURITY E Types of systems, hardware, CCTV, opening contacts, etc.

ELECTRICAL SYSTEMS E Rooms and panels, code compliant, receptacles, circuiting, etc.

LIGHTING AND LIGHTING CONTROLS E

Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

TECHNOLOGY SYSTEMS E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

AUDIVISUAL SYSTEMS E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

Extreme cross slope in the path of travel between Bldgs. G, H, L and K

Student restrooms typically do not have ADA compliant threshold. Restroom interiors are tile floor and walls in good condition.

Fixtures are generally compliant with ADA.

Doors - Lever hardware

Flooring - carpet / VCT

Walls: Tackable panels

Ceilings: 2 x 4 susp acous

Lighting: 2x4 flourescent

Sinks not ADA compliant

MISC

PG&E electrical service in exterior yard with dumpsters, HVAC equipment, etc. 277/480V 1600A Cutler Hammer MSB is ~25-30 years old, servicable condition (and has been serviced recently). MSB is adequately sized for a campus of this size, and is backfed by a PV system, PVs are installed on the roof.

Most of campus is on the Edwards 6632 FACP, which is monitored by a newer Silent Knight 5208 panel. Most of the campus includes old horns, pull stations, and is not compliant with current code. No voice.

The campus has been upgraded to Valcom IP, which is consistent with current district standards.

Existing intrusion alarm system is older but still in use. Cameras throughout the campus. No access controls.

Most existing panels on campus are older but in servicable condition. Surface raceways in classrooms.

Most interior lighting consists of luminaires with T8 fluorescent lamps. Pendant lighting in classrooms. Lighting controls do not meet any current energy code requirements. Exterior lighting consists of LED parking lot lights and CFL wallpacks.

MDF is located in library, it is not in a dedicated room with cooling. New fiber has been routed through the campus. Horizontal cabling is CAT6 and relatively new. Pathway between buildings is 'daisy chained' which is not good for connecting to central MDF. Classrooms have WAPs.

Most classrooms have a flat panel display or projector.

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING G CLASSROOMS BUILDING L CLASSROOMS BUILDING M CLASSROOMS BUILDING N CLASSROOMS BUILDINGS H, I, J, K PERM MODULAR/ PORTABLES BLDG COLOR ASSESSMENT SQUARE FOOTAGE 2,250 2,250 5,023 2,250 7680 BUILDING EXTERIOR
Condition
windows, etc. Same as Bldg. F Same as Bldg. F Same as Bldg. F Same as Bldg. F BUILDING
A Condition - finishes (floor, wall, ceiling) casework, shades, etc. Same as Bldg. F Same as Bldg. F Same as Bldg. F Same as Bldg.
A
- materials, repair / replace, painting,
INTERIOR
F Ext. Finish: Cement Plaster with tile wainscot
LITTLE CHICO CREEK ELEMENTARY SCHOOL 160 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING

BUILDING A MULTI-PURPOSE

EXTERIOR EQUIPMENT ASSESSMENT

INTERIOR EQUIPMENT ASESSMENT

M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

The Interior Servel Air Handling Units are original to the construction and are expected to last appro. 8-10 years with a recommendation to have the coils cleaned now.

M/P

SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

The Main componest of this two pipe system are Boilers, Chiller, and Cooling Towres have recently been replaced and in good condition.

Distribution Pumps are at the end of life and in need of replacement.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P

Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW

FIRE SPRINKLER

M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

SYSYTEM M/P Does AFS exist, location, code compliant, etc.

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

Johnson Control w/ Delta Communication Module - Good Condition.

BUILDING B ADMINISTRATION

The Interior Servel Air Handling Units are original to the construction and are expected to last appro. 8-10 years with a recommendation to have the coils cleaned now.

The Main componest of this two pipe system are Boilers, Chiller, and Cooling Towres have recently been replaced and in good condition.

Distribution Pumps are at the end of life and in need of replacement.

Johnson Control w/ Delta Communication Module - Good Condition.

BUILDING C LIBRARY

The Interior Servel Air Handling Units are original to the construction and are expected to last appro. 8-10 years with a recommendation to have the coils cleaned now.

The Main componest of this two pipe system are Boilers, Chiller, and Cooling Towres have recently been replaced and in good condition.

Distribution Pumps are at the end of life and in need of replacement.

Johnson Control w/ Delta Communication Module - Good Condition.

BUILDING D SPED CLASSROOMS

The Interior Servel Air Handling Units are original to the construction and are expected to last appro. 8-10 years with a recommendation to have the coils cleaned now.

The Main componest of this two pipe system are Boilers, Chiller, and Cooling Towres have recently been replaced and in good condition.

Distribution Pumps are at the end of life and in need of replacement.

Johnson Control w/ Delta Communication Module - Good Condition.

BUILDING E CLASSROOMS

The Interior Servel Air Handling Units are original to the construction and are expected to last appro. 8-10 years with a recommendation to have the coils cleaned now.

The Main componest of this two pipe system are Boilers, Chiller, and Cooling Towres have recently been replaced and in good condition.

Distribution Pumps are at the end of life and in need of replacement.

Johnson Control w/ Delta Communication Module - Good Condition.

BUILDING F KINDER CLASSROOMS

The Interior Servel Air Handling Units are original to the construction and are expected to last appro. 8-10 years with a recommendation to have the coils cleaned now.

The Main componest of this two pipe system are Boilers, Chiller, and Cooling Towres have recently been replaced and in good condition.

Distribution Pumps are at the end of life and in need of replacement.

Johnson Control w/ Delta Communication Module - Good Condition.

Plumbing Fixtures are of the original construction and in good condition. Plumbing Fixtures are of the original construction and in good condition. Plumbing Fixtures are of the original construction and in good condition. Plumbing Fixtures are of the original construction and in good condition. Plumbing Fixtures are of the original construction and in good condition. Plumbing Fixtures are of the original construction and in good condition.

Plumbing Equipment is mostly from the original construction and is at the end of life.

Water Heater in Adminstration has recently been replaced.

Plumbing Equipment is mostly from the original construction and is at the end of life.

Plumbing Equipment is mostly from the original construction and is at the end of life.

Plumbing Equipment is mostly from the original construction and is at the end of life.

Plumbing Equipment is mostly from the original construction and is at the end of life.

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING
LITTLE CHICO CREEK ELEMENTARY SCHOOL 161 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING G CLASSROOMS BUILDING L CLASSROOMS BUILDING M CLASSROOMS BUILDING N CLASSROOMS

EXTERIOR EQUIPMENT ASSESSMENT

INTERIOR EQUIPMENT ASESSMENT

M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

The Interior Servel Air Handling Units are original to the construction and are expected to last appro. 8-10 years with a recommendation to have the coils cleaned now.

The Interior Servel Air Handling Units are original to the construction and are expected to last appro. 8-10 years with a recommendation to have the coils cleaned now.

The Interior Servel Air Handling Units are original to the construction and are expected to last appro. 8-10 years with a recommendation to have the coils cleaned now.

The Interior Servel Air Handling Units are original to the construction and are expected to last appro. 8-10 years with a recommendation to have the coils cleaned now.

BUILDINGS H, I, J, K PERM MODULAR/ PORTABLES

Wall Mounted Heat Pumps in good conditions

M/P

SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

The Main componest of this two pipe system are Boilers, Chiller, and Cooling Towres have recently been replaced and in good condition.

Distribution Pumps are at the end of life and in need of replacement.

The Main componest of this two pipe system are Boilers, Chiller, and Cooling Towres have recently been replaced and in good condition.

Distribution Pumps are at the end of life and in need of replacement.

The Main componest of this two pipe system are Boilers, Chiller, and Cooling Towres have recently been replaced and in good condition.

Distribution Pumps are at the end of life and in need of replacement.

The Main componest of this two pipe system are Boilers, Chiller, and Cooling Towres have recently been replaced and in good condition.

Distribution Pumps are at the end of life and in need of replacement.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P

Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

FIRE SPRINKLER SYSYTEM M/P Does AFS exist, location, code compliant, etc.

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

Plumbing Fixtures are of the original construction and in good condition.

Plumbing Fixtures are of the

Plumbing Equipment is mostly from the original construction and is at the end of life.

Plumbing Equipment is mostly from the original construction and is at the end of life.

Plumbing Equipment is mostly from the original construction and is at the end of life.

Plumbing Equipment is mostly from the original construction and is at the end of life.

Plumbing Equipment is mostly from the original construction and is in ok condition.

system, web based / Programmable T-Stat? Johnson Control w/ Delta Communication Module - Good Condition. Johnson Control w/ Delta Communication Module - Good Condition. Johnson Control w/ Delta Communication Module - Good Condition.
Control w/ Delta Communication Module - Good Condition.
alone Programmable T-Stat's.
Johnson
Stand
original construction and in good condition. Plumbing Fixtures are of the original construction and in good condition. Plumbing Fixtures are of the original construction and in good condition. Plumbing Fixture is mostly from the original construction and is in ok condition.
LITTLE CHICO CREEK ELEMENTARY SCHOOL 162 BACK TO CONTENTS

MCMANUS ELEMENTARY SCHOOL

Campus and building currently undergoing modernization.

New construction in progress and all existing buildings to remain to be upgraded

MCMANUS ELEMENTARY SCHOOL 163 BACK TO CONTENTS

NEAL DOW ELEMENTARY SCHOOL

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

New drop off, parking area appears to need a slurry coat.

SITE CONDITION ASSESSMENT

New LED Marquee, flag pole, playground equipment (not shaded), hardcourts, and shade structure,& PV shade structure.

New fencing with one point of entry directly into the Admin office.

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. new campus

C Code compliant, striping, signage, ramps, etc. new campus

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc. new campus

C Replace vs. repair new campus

C Areas that pond, drain inlets, retention needed, etc. new campus

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc. new campus

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

NEAL DOW ELEMENTARY SCHOOL 164 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

BUILDING INTERIOR A

Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Walls - (E) conc - portions new paint

Roof - Single ply - new

Roof Fascia - (E) metal - new paint

Roof Drains - Gutter & DS to SDnew paint

Soffit - metal deck & Wd beamsnew paint

Walls - (E) conc. - portions new paint

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - Aluminum

storefront Lever handle, pulls & PHnew

Card Access - installed

Windows - Alumn storefront - new Other - N/A

Space - Admin function is adeuate in existg space, classrooms are adequate in existing space - newly modernized Walls - Gyp Bd, marker laminent & tack board - new

Int Door/Frm/Hdwr - HM Frm & Wd Dr, PH, pulls, & Lever handlenew

Flooring - carpet & sht Vinyl, epoxy - new

Ceiling - 2x2, 2x4 ACT & Gyp Bdnew

Casework/Sink - ADA - new

Space Planning - N/A

Other - N/A

Space - classrooms are adequate in existing space - newly modernized

Walls - Gyp Bd, marker laminent & tack board - new

Int Door/Frm/Hdwr - HM Frm & Wd Dr, PH, pulls, & Lever handlenew

Flooring - sht Vinyl & epoxy - new

Ceiling - 1x1 accoustical tile & Gyp Bd - new

Casework/Sink - ADA - new

Space Planning - N/A

Other - N/A

Roof - Single ply - new

Roof Fascia - (E) metal - new paint

Roof Drains - Gutter & DS to SDnew paint

Soffit - metal deck & Wd beamsnew paint

Walls - (E) conc. - portions new paint

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - Aluminum

storefront Lever handle, pulls & PHnew

Card Access - installed

Windows - Alumn storefront - new Other - N/A

Space - Library & classrooms are adequate in existing space - newly modernized

Walls - Gyp Bd, marker laminent & tack board - new

Int Door/Frm/Hdwr - HM Frm & Wd Dr, PH, pulls, & Lever handlenew

Flooring - carpet, sht Vinyl & epoxy - new

Ceiling - 2x4 ACT & Gyp Bd - new

Casework/Sink - ADA - new Space Planning - N/A

Other - N/A

Roof - Standing seam mtl - new

Roof Fascia - mtl - new

Roof Drains - Gutter & DS to SDnew

Soffit - Fiber cement - new

Walls - Fiber cement & CMU - new

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - Aluminum

storefront & HM DR & FRM - new.

Lever handle - new

Card Access - installed

Windows - Alumn storefront - new

Other - N/A

Space - classrooms are adequate and functional

Walls - Gyp Bd, marker laminent & tack board - new

Int Door/Frm/Hdwr - PH & Lever handle - new

Flooring - carpet & sht Vinyl, epoxy - new

Ceiling - 2x4 ACT & Gyp Bd - new

Casework/Sink - ADA - new

Space Planning - N/A

Other - N/A

Roof - Standing seam mtl - new

Roof Fascia - mtl - new

Roof Drains - Gutter & DS to SDnew

Soffit - Fiber cement - new

Walls - Fiber cement & CMU - new

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - Aluminum

storefront & HM DR & FRM - new.

Lever handle - new

Card Access - installed

Windows - Alumn storefront - new

Other - N/A

Space - classrooms are adequate and functional

Walls - Gyp Bd, marker laminent & tack board - new

Int Door/Frm/Hdwr - PH & Lever handle - new

Flooring - carpet & sht Vinyl, epoxy - new

Ceiling - 2x4 ACT & Gyp Bd - new

Casework/Sink - ADA - new

Space Planning - N/A

Other - N/A

Roof - Standing seam mtl & Single Ply - new

Roof Fascia - mtl - new

Roof Drains - Gutter & DS to SDnew

Soffit - Fiber cement - new

Walls - Fiber cement & CMU - new

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - Aluminum

storefront & HM DR & FRM - new.

Lever handle - new

Card Access - installed

Windows - Alumn storefront - new

Other - N/A

Space - function is adeuate in existg space, classrooms are adequate

Walls - Gyp Bd, marker laminent & tack board - new Int Door/Frm/Hdwr - PH & Lever handle - new

Flooring - sht Vinyl & epoxy - new

Ceiling - 2x4 ACT & Gyp Bd - new

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN / CLASSROOMS BUILDING B KINDER CLASSROOMS BUILDING C LIBRARY / KINDER CLASSROOMS BUILDING D CLASSROOMS BUILDING E CLASSROOMS BUILDING F MULTI-PURPOSE BLDG COLOR ASSESSMENT New Modernization New Modernization New Modernization New Building New Building New Building SQUARE FOOTAGE 49,305 17,491 2,598 10,455 4,134 3,348 11,280 BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc. Roof
Roof Fascia - (E) metal - new
Roof Drains
& DS to SD
paint
- Single ply - new
paint
- Gutter
new
Soffit - metal deck & Wd beamsnew paint
Windows
Door Landing - ADA Door Threshold - ADA Doors/Frm/Hdwr - Aluminum storefront & HM DR & FRM - new. Lever handle, pulls & PH - new Card Access - installed
- Alumn storefront - new Other - N/A
RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc. Multi Compartment bathroom - ADA -new Single occupancy toilet - ADA - new Class Sink - ADA -new Single occupancy toilet - ADA - new Class Sink - ADA -new Single occupancy toilet - ADA - new Class Sink - ADA -new Multi Compartment bathroom - ADA -new Single occupancy toilet - ADA - new Class Sink - ADA -new Multi Compartment bathroom - ADA -new Single occupancy toilet - ADA - new SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc. New Library modernization New MP with wall in tables, full kitchen, accessible stage, and multi Compartment bathrooms DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items
NEAL DOW ELEMENTARY SCHOOL 165 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

BUILDING A ADMIN / CLASSROOMS

New Roof Mounted AC-Units replaced in approx. 2019 (4 years old). Full Air Side economizer.

BUILDING B KINDER CLASSROOMS

New Roof Mounted AC-Units replaced in approx. 2019 (4 years old). Full Air Side economizer.

BUILDING C

LIBRARY / KINDER CLASSROOMS

BUILDING D CLASSROOMS

BUILDING E CLASSROOMS

BUILDING F MULTI-PURPOSE

New Roof Mounted AC-Units replaced in approx. 2019 (4 years old). Full Air Side economizer. New Building New Building New Building

New Air Distribution, good condition. New Air Distribution, good condition. New Air Distribution, good condition. New Building New Building New Building

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat? Alerton Controls. Good Condition.

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER SYSYTEM M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Does AFS exist, location, code compliant, etc.

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

Recent Modernization, however, Building A Core Restrooms are original and need ADA updates. Recent Modernization

Original WH needs replacement. Recent Modernization Recent Modernization New Building New Building New Building

FS in Corridors No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. New Building New Building New Building

Alerton
Good Condition. Alerton
Good Condition. Alerton Controls. Good Condition. Alerton Controls. Good Condition. Alerton Controls. Good Condition.
Controls.
Controls.
Recent
New
New
New Building
Modernization
Building
Building
NEAL DOW ELEMENTARY SCHOOL 166 BACK TO CONTENTS

PARKVIEW ELEMENTARY SCHOOL

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

SITE CONDITION ASSESSMENT

Parking lot paving cracking, fair condition.

Drop-off does have ADA compliant drop-off area.

Inner campus has non-compliant path of travel cross-slope conditions, door landings and thresholds - remove and replace.

Site has a flag pole.

Does not have a marquee of any type.

Hardcourts are in poor condition.

Playground equipment new but does not have shade structures.

Site drinking fountains not ADA compliant.

Lunch shelter is provided outside MP bldg.

There is no trash enclosure

Campus is secured by fencing.

Entry to Admin is by camera and electronic access at gate, however, no single point of entry thru Admin, full access to campus once entry allowed.

Walkways along Buildings F, G, H J and K do not meet ADA standards

No comment

ADA compliant parking stalls are provided.

Vehicle parking/travel areas and onsite asphalt is cracked, install crack and slurry seals

No known issues

All water and sewer piping is old and should be replaced

Gas Meter is in fair condition. Consider installaing an Earthquake Valve. Site gas distribution is in need if replacement. +35 years old.

PARKVIEW ELEMENTARY SCHOOL 167 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

- cem plaster

Soffit- plywood, some dry rot

Fascias - wood, poor condition

Roofing - tar and gravel

Doors -wd. doors in wd. Frames, no ADA compliant threshold

Windows - single pane, metal sash

Roof drainage - no gutter / downspouts to grade

Same as F

Exterior skin - plaster & mtl. sash wall/wdw sys. @ side elevation

Soffit- mtl decking, glu-lam beam detioration @ ends

Roofing -built-up

Doors-Alum. In Alum. Frames, no ADA compliant thresholds

Windows - Aluminum Roof drainage - no gutter / downspouts to grade

Exterior skin - cem plaster

Soffit- plywood, some dry rot

Fascias - wood, poor condition

Roofing - tar and gravel

Doors wood in HM frames

Windows - single pane, metal sash

Roof drainage - no gutter / downspouts to grade

Exterior skin - plaster,wood siding & mtl. sash wall/wdw sys. @ side elevation

Soffit- plywood, some dry rot

Fascias - wood, poor condition

Roofing - tar and gravel

Doors wood in HM frames

Windows - single pane, metal sash

Roof drainage - no gutter / downspouts to grade

Exterior skin - plaster,wood siding & mtl. sash wall/wdw sys. @ side elevation

Soffit- plywood, some dry rot

Roofing - tar and gravel

Doors wood in HM frames

Windows - single pane, metal sash

Roof drainage - no gutter / downspouts to grade

BUILDING INTERIOR

(floor, wall, ceiling) casework, shades, etc.

A Condition - finishes

RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc.

Door Hardware- Lever, noncompliant threshold

Flooring- VCT

Walls - gyp. bd.

Ceiling- 2x4 susp. Acous, 2x4 flourescent

Wood folding partition between classrooms

Sinks- not ADA compliant

Flooring - carpet

Lighting - surface mtd. flourescent

Boys - Floor mounted urinals, sloped tile flooring, not ADA compliant

Girls - not ADA compliant

Floors- VCT

Walls - gyp bd.

Ceilings - 1 x1 applied acous tiles in corridor, gyp. bd. in offices8

Wood doors

VCT / Carpet flooring

2x4 ACT clg - damaged tiles painted clerestory

Vinyl tack panels / markerboards

black out curtains

lot of exposed conduit, raceways

Sinks- not ADA compliant

Staff Toilet rmsLever door hardware

Flooring - sht. vinyl- Replace Walls - gyp. bd. with FRP Lighting - recessed can light

Non-accessble spaces, knob hardware, non-accessible sinks,

Doors: wood w/ push/pull hardware

Flooring: tile, slope issues

Walls: tile wainscot/gyp bd

Ceilings: gyp. bd.

Lighting: 2x4 flourescent

Non-accessible entry and back door, tile finishes w/ floor slopes

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A KINDER CLASSROOMS BUILDING E CLASSROOMS BUILDING F CLASSROOMS / LIBRARY BUILDING G ADMINISTRATION BUILDING H CLASSROOMS BUILDING I RESTROOMS BLDG COLOR ASSESSMENT SQUARE FOOTAGE 34,373 2,810 4,044 5,376 10,833 see building G 1,102
BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc. Exterior skin
DSA
DSA EB-3
EB- 4 DSA EB-3 / EB- 4 DSA EB-3 / EB- 4 DSA EB-3 / EB- 4 DSA EB-3
EB- 4, Non-compliant
DSA EB-3
EB-
CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items
/
/
thresholds/ramps @ doors
/
4
PARKVIEW ELEMENTARY SCHOOL 168 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

BLDG COLOR ASSESSMENT

BUILDING J CLASSROOMS

BUILDING K MULTI-PURPOSE

SQUARE FOOTAGE see building G 3,001 7206

BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.

BUILDING INTERIOR A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc.

DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items

Same as H

Exterior skin - cem plaster

Soffit- plywood, some dry rot

Roofing - tar and gravel

Doors - mtl sash doors in mtl sash frames

Windows - single pane, metal sash

Roof drainage - no gutter / downspouts to grade

Same as H Flooring - VCT

Walls - Plywood

Ceiling - gyp. bd. w/ acous tile panels

Lighting - surf mounted Flourescent

Door Hardware - knob @ Kitchen

BUILDING B, C, D, M PORTABLES

Same as H

BUILDING CONDITIONS - ELECTRICAL (MISC)

Non-accessible stage, in-wall tables, interior is worn

Kitchen - VCT flooring, gyp bd. walls and ceiling, pendant globe fixtures

DSA EB-3 / EB- 4

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING MISC

UTILITY MPOE/ MDG E Data infrastructure (i.e. 10GB)

FIRE ALARM SYSTEM E

Carrier, location, size of space

Existing system, code compliant replace vs retrofit, Voice Evac, etc.

CLOCK / INTERCOM / SPEAKER SYSTEM E System, headend, type (i.e. VOIP), replace vs retrofit

ACCESS / INTRUSION / SECURITY E

Types of systems, hardware, CCTV, opening contacts, etc.

ELECTRICAL SYSTEMS E Rooms and panels, code compliant, receptacles, circuiting, etc.

LIGHTING AND LIGHTING CONTROLS E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

TECHNOLOGY SYSTEMS E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

AUDIVISUAL SYSTEMS E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

PG&E electrical service in fenced enclosure on north side of campus. 120/208V 1200A Zinsco MSB is 50+ years old and not in servicable condition, potential safety hazard. 1200A may not be sufficient for future campus renovations if all-electric. No solar.

Silent Knight 6820EVS control panel (added to serve addition of portables) is consistent with current district standards, but the remainder of the campus includes old horns, pull stations, and is not compliant with current code.

Older Bogen Multicom 2000 in a large rack, not per current standards. Old clocks.

Existing intrusion alarm system is older but still in use. Cameras throughout the campus. No access controls.

Most existing panels on campus are older but in servicable condition. Surface raceways in classrooms.

Most interior lighting consists of luminaires with T8 fluorescent lamps. Lighting controls do not meet any current energy code requirements. Some LED exit signs observed, and 'bugeye' emergency lights that are no longer maintained. Exterior lighting consists of LED parking lot lights and CFL wallpacks.

MDF is relatively new, located in work room, it is not in a dedicated room with cooling. New fiber has been routed through the campus. Horizontal cabling is a combination of CAT5E and CAT6.. Classrooms have WAPs.

Most classrooms have a flat panel display or projector.

PARKVIEW ELEMENTARY SCHOOL 169 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A KINDER CLASSROOMS BUILDING E CLASSROOMS BUILDING F CLASSROOMS / LIBRARY BUILDING G ADMINISTRATION BUILDING H CLASSROOMS BUILDING I RESTROOMS

EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

VRF, Pumps, Ducts,

EQUIPMENT ASESSMENT

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

Delta Controls/Alerton Delta Controls/Alerton Delta Controls/Alerton Delta Controls/Alerton Delta Controls/Alerton Delta Controls/Alerton
Plumbing Fixtures,
sinks,
Original Plumbing Fixtures needs replacement Original Plumbing Fixtures needs replacement Original Plumbing Fixtures needs replacement Original Plumbing Fixtures needs replacement Original Plumbing Fixtures needs replacement Original Plumbing Fixtures needs replacement
Gas, condnesation
sinks,
gas regaultors (seismic braced) Plumbing Equipment is mostly from the original construction and is at the end of life. Plumbing Equipment is mostly from the original construction and is at the end of life. Plumbing Equipment is mostly from the original construction and is at the end of life. Plumbing Equipment is mostly from the original construction and is at the end of life. Plumbing Equipment is mostly from the original construction and is at the end of life. Plumbing Equipment is mostly from the original construction and is at the end of life.
SPRINKLER
M/P Does AFS exist,
No Automatic Fire Sprinkler Systems
No Automatic Fire Sprinkler Systems
No Automatic Fire Sprinkler Systems
No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found.
INTERIOR
M/P SYSTEM TYPE, Boilers,
diffusers, split systems, exhaust fans, etc. Air Distribution is in ok condition. Air Distribution is in ok condition. Air Distribution is in ok condition. Air Distribution is in ok condition. Air Distribution is in ok condition. Air Distribution is in ok condition. ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?
PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P
Restrooms,
drinking fountains / bottle fillers, etc.
PLUMBING EQUIPMENT REVIEW M/P
piping, water heaters, service
hose bibbs,
FIRE
SYSYTEM
location, code compliant, etc.
found.
found.
found.
PARKVIEW ELEMENTARY SCHOOL 170 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR EQUIPMENT ASSESSMENT M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER SYSYTEM

M/P

EXISTING SEISMIC CONCERNS S

Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Does AFS exist, location, code compliant, etc.

EB-3, EB-4 triggers, etc.

BUILDING J CLASSROOMS

Existing Gas Fired AC-Units are at the end of life and need to be replaced.

BUILDING K MULTI-PURPOSE

Existing Gas Fired AC-Units are at the end of life and need to be replaced.

BUILDING B, C, D, M PORTABLES

Portables appear to be Wall Mounted Heat Pumps from the original construction.

Air Distribution is in ok condition. Air Distribution is in ok condition. Air Distribution is in ok condition.

Delta Controls/Alerton Delta Controls/Alerton Stand alone Programmable T-Stat's.

Original Plumbing Fixtures needs replacement

Plumbing Equipment is mostly from the original construction and is at the end of life.

Original Plumbing Fixtures needs replacement Original Plumbing Fixture, ok condition.

Water Heater has recently been replaced and in good condition. All other equipment is mostly from the original construction and is at the end of life.

Original Plumbing Equipment, Ok condition.

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

PARKVIEW ELEMENTARY SCHOOL 171 BACK TO CONTENTS

ROSEDALE ELEMENTARY SCHOOL

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

EXTERIOR SITE AMENITIES

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

A/C paving in poor condition throughout parking lot

SITE CONDITION ASSESSMENT

Campus has ADA POT issues throughout entire campus, door thresholds, cross slopes, raised concrete stoops, etc.

Hardcourt paving is in poor condition.

Bike rack is not fenced in - open to campus

No trash enclosure is provided.

Lunch areas have PV canopy shade structure.

Play structures are not shaded.

LED marquee and monument sign is provided.

Flag pole is provided SECURITY

C

A Fencing, gates, hardware / access

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

There is single point of access to the Admin. office.

Campus is secured with fencing all around.

Walkways along Buildings A, C, D, H, I and K do not meet ADA requirements, some walkway along Oak Park Avenue parking area do not meet ADA requirements

No comment.

Vehicle areas along Oak Park Avenue need crack and slurry seal, vehicle area along Oak Street is alligator cracked and needs new paving, portions of onsite asphalt are cracked and portions should be crack and slurry sealed and portions replaced.

Replace all walkways at entry doors to classrooms and restrooms

Localized flooding occurs between Buildings A and B and north of Buildings E, F and G and a drainage system should be installed

Both the sewer and water system are old and failing and should be replaced

ROSEDALE ELEMENTARY SCHOOL 172 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

BUILDING INTERIOR A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Fixtures, accessories, ADA compliant, finishes, etc.

RESTROOMS A

Windows -metal sash Roof drainage - no gutter / downspouts to grade

Doors: lever hardware

Flooring: VCT

Walls: masonite in Office; gyp. bd.

Ceilings: 1 x 1 acous adered tile

Lighting: surf. Mounted & pendant

flourescent

Exterior skin - cement plaster & mtl sash window/wall @ back elevation

Soffit- plywood, dry rot

Roofing - built-up

Fascia - 1x wood

Doors - HM in HM frames; mtl sash door @ back elevation

Roof drainage - no gutter / downspouts to grade

Doors:knob hardware

Flooring: VCT

Walls: plywd / markerboards;

Ceilings: 2x4 susp acous - damaged tiles

Lighting: 2x4 flourescent

Exterior skin - cement plaster

Soffit- metal deck

Roofing - built-up

Fascia - metal

Doors: alum in alum frames, knob hardware

Windows - alum storefront

Roof drainage - no gutter / downspouts to grade Same as K

Doors: lever hardware

Flooring: VCT

Walls: plywd / markerboards; tackable in Library

Ceilings: 2x4 susp acous - damaged tiles

Lighting: 2x4 flourescent

Same as K

Doors: wood w/ push/pull hardware

Flooring: tile, slope issues

Walls: tile wainscot/gyp bd

Ceilings: gyp. bd.

Lighting: 2x4 flourescent

Soffit- plywood, some dry rot

Roofing - tar and gravel

Doors: wood in HM frames

Windows - single pane, metal sash

Roof drainage - no gutter / downspouts to grade

Doors: lever hardware

Flooring: VCT

Walls: plywd / markerboards

black out curtains

lot of exposed conduit, raceways

Ceilings: 2x4 susp acous - damaged tiles, painted clerestory

Lighting: 2x4 flourescent

Sinks: wall hung lavatory, possible compliance

Toilets: Compliant

Urinals: Non-compliant, floor fixtures

Non ADA Compliant - fixtures, doors, walls, floor slope, etc.

Door threshold not ADA compliantremove & replace walkway Door threshold not ADA compliantremove & replace walkway

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN / MPR / CLASSROOMS BUILDING B KINDER CLASSROOMS BUILDING H LIBRARY/CLASSROOM BUILDING I CLASSROOMS BUILDING J RESTROOMS BUILDING K CLASSROOMS
ASSESSMENT SQUARE FOOTAGE 38,668 16,474 2,745 8,015 see building A 1,102 see building A BUILDING EXTERIOR
Exterior
BLDG COLOR
A Condition - materials, repair / replace, painting, windows, etc.
skin - cement plaster Soffit- metal deck Roofing - built-up Fascia - 1x wood
Doors - wood doors/wood frames
Exterior
skin - cement plaster Roofing - assumed tar & gravel Exterior wood doors to playgroundgiant gas meter in the way Exterior skin - plaster,wood siding & mtl. sash wall/wdw sys. @ back elevation
SPECIALITY SPACES REVIEW A MPR,
Science, etc.
replace walkway
Libraries, Kitchens,
Door threshold not ADA compliantremove &
Door threshold not ADA compliantremove & replace walkway Door threshold not ADA compliantremove & replace walkway
Door threshold not ADA compliantremove & replace walkway
DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items DSA EB-3 / EB- 4 DSA EB-3 / EB- 4 DSA EB-3 / EB- 4 DSA EB-3 / EB- 4 DSA EB-3 / EB- 4 DSA EB-3 / EB- 4+-
ROSEDALE ELEMENTARY SCHOOL 173 BACK TO CONTENTS

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING MISC

UTILITY MPOE/ MDG E

FIRE ALARM SYSTEM E

Data infrastructure (i.e. 10GB)

Carrier, location, size of space

Existing system, code compliant replace vs retrofit, Voice Evac, etc.

CLOCK / INTERCOM / SPEAKER SYSTEM E System, headend, type (i.e. VOIP), replace vs retrofit

ACCESS / INTRUSION / SECURITY E

Types of systems, hardware, CCTV, opening contacts, etc.

ELECTRICAL SYSTEMS E Rooms and panels, code compliant, receptacles, circuiting, etc.

LIGHTING AND LIGHTING CONTROLS E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

TECHNOLOGY SYSTEMS E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

AUDIVISUAL SYSTEMS E

Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

PG&E electrical service in fenced dedicated exterior enclosure, 277/480V 800A Cutler Hammer MSB is ~25-30 years old, and in servicable condition. Yard includes PV equipment that backfeeds MSB. 800A may not be sufficient for future campus renovations if all-electric.

Very old Faraday 7800 manual system is monitored by an old Silent Knight 5208. Mostly pull stations on campus, does not meet any current code requirements.

Very old simplex system retrofit with Bogen control modules has been patched together and is not compliant with current district standards.

No intrusion alarm system in use. Cameras throughout the campus. No access controls.

Old gear in custodial room 60+ years old long past servicable life, many existing panels on campus are similar vintage. Lots of surface raceways in classrooms.

Most interior lighting consists of older luminaires with T8 fluorescent lamps. Some LED exit signs observed, and 'bugeye' emergency lights that are no longer maintained. Lighting controls do not meet any current energy code requirements. There is no parking lot lighting (not really a parking lot). Exterior lighting consists of old CFL or HID wallpacks.

MDF is located in library, it is not in a dedicated room with cooling. New fiber has been routed through the campus. Horizontal cabling is a combination of CAT5E and CAT6. Pathway for low voltage systems is primarily routed overhead, limited UG pathway. Classrooms have WAPs. IDFs in classrooms is not ideal.

Most classrooms have a flat panel display.

BUILDING CONDITIONS - MECHANICAL/PLUMBING

Systems found.

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN / MPR / CLASSROOMS BUILDING B KINDER CLASSROOMS BUILDING H LIBRARY/CLASSROOM BUILDING I CLASSROOMS BUILDING J RESTROOMS BUILDING K CLASSROOMS EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior EquipmentRooftop, wall mounted BARD, etc. - condition New Roof Mounted AC-Units (York) good condition. Approx. 3 years old. Kitchen has Evaporative Cooler and older MUA Unit, both in need of replacement. Rooftop AC-Units approx. 7-8 years old. Rooftop AC-Units approx. 7-8 years old. Rooftop AC-Units approx. 7-8 years old. Ceiling exhaust fans are part of the original construction. Rooftop AC-Units approx. 7-8 years old. INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. New Air Distribution. Good Conditioin. Original Air Distribution. Suggest duct cleaning with any planned modernization project Original Air Distribution.
Original
ENERGY MANAGEMENT SYSTEMS
based / Programmable T-Stat? Delta Controls / Alerton Delta Controls / Alerton Delta Controls / Alerton Delta Controls / Alerton Delta Controls / Alerton Delta Controls / Alerton PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc. Original Plumbing Fixtures needs replacement Original Plumbing Fixtures needs replacement Original Plumbing Fixtures needs replacement Original Plumbing Fixtures needs replacement Original Plumbing Fixtures needs replacement Original Plumbing Fixtures needs replacement PLUMBING EQUIPMENT REVIEW M/P Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced) New Water Heater install approx. 2 years ago. Plumbing equipment is from the original construction and needs full replacement. Plumbing equipment is from the original construction and needs full replacement. Plumbing equipment is from the original construction and needs full replacement. Plumbing
is from the original construction and needs full
Plumbing
is from the
construction and needs full
Suggest duct cleaning with any planned modernization project Original Air Distribution. Suggest duct cleaning with any planned modernization project Original Air Distribution. Suggest duct cleaning with any planned modernization project
Air Distribution. Suggest duct cleaning with any planned modernization project
M/P EMCS Type of system, web
equipment
replacement.
equipment
original
replacement.
Does AFS exist,
No Automatic Fire Sprinkler Systems
No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems
Automatic Fire Sprinkler
FIRE SPRINKLER SYSYTEM M/P
location, code compliant, etc.
found.
found. No
ROSEDALE ELEMENTARY SCHOOL 174 BACK TO CONTENTS

SHASTA ELEMENTARY SCHOOL

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

Replace vs. repair

C

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

parking, drop off, landscaping, & irrigation new

SITE CONDITION ASSESSMENT

kinder play area hardcourt, shade structures & playstructure is new & shaded

(E) play ground area had new slurry seal, re-striped basketball court & four square, etc. (E) Play structure looks adequate (no shade)

Fencing and gates are new

Single point of access into Admin

Walkways along Buildings B, C and MP do not meet ADA standards

Pavement markings do not meet standards

Vehicle area along the Esplanade and onsite asphalt area west of basketball court should be crack and slurry sealed

On windy rain days rainwater blows into the south side of Building K

Gas Distribution in good condition.

SHASTA ELEMENTARY SCHOOL 175 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Soffit - Fiber cement - new

Walls - Fiber cement & cement plaster - new

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - Aluminum storefront & HM DR & FRM - new.

Lever handle - new Card Access - installed Windows - Alumn storefront - new Other - N/A

Space - function is adeuate in existg space, classrooms are adequate in existing space

Walls - Gyp Bd, marker laminent & tack board - new

Int Door/Frm/Hdwr - storefront

Door, PH & Lever handle - new

Flooring - carpet & sht Vinyl, epoxy - new

Ceiling - 2x4 ACT & Gyp Bd - new

Casework/Sink - ADA - new

Space Planning - N/A

Other - N/A

Roof - Standing seam mtl - adquate

Roof Fascia - Metal -paint

Roof Drains - Gutter & DS to SDrepaint

Soffit - Metal deck -repaint, Wd beams - repair as needed & repaint

Walls - CMU block - repaint

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM DR & FRMrepaint. Lever handle

Card Access - required

Windows - Alumn sash - adequate

Other - N/A

Space - Library function is adeuate in existg space, classrooms are adequate in existing space

Walls - Gyp Bd & CMU - repaint. tack board.

Int Door/Frm/Hdwr - HM Frm, Wd

Door. lever handle

Flooring - VCT, carpet, ASB VAT, sht

Vinyl, tile, epoxy - (replace/repair/ adequate)

Ceiling - 2x4 ACT at Classroomsreplace tiles, Gyp Bd at bathrooms - repaint

Casework/Sink - Most is datedreplace. Sink - Not ADA

Space Planning - special needs therapy space seems tight

Other - N/A

Roof - Standing seam mtl - adquate

Roof Fascia - Metal -paint

Roof Drains - Gutter & DS to SDrepaint

Soffit - Metal deck -repaint, Wd beams - repair as needed & repaint

Walls - CMU block - repaint

Door Landing - ADA

Door Threshold - Some not ADA

Doors/Frm/Hdwr - HM DR & FRMrepaint. Lever handle

Card Access - required

Windows - Alumn sash - adequate

Other - N/A

Space - Library function is adeuate in existg space, classrooms are adequate in existing space

Walls - Gyp Bd & CMU - repaint. tack board.

Int Door/Frm/Hdwr - HM Frm, Wd

Door. lever handle

Flooring - VCT, carpet, ASB VAT, sht

Vinyl, tile, epoxy - (replace/repair/ adequate)

Ceiling - 2x4 ACT at Classroomsreplace tiles, Gyp Bd at bathrooms - repaint

Casework/Sink - Most is datedreplace. Sink - Not ADA Space Planning - N/A

Other - N/A

Roof - Standing seam mtl - new

Roof Fascia - fiber cement - new

Roof Drains - Gutter & DS to SDnew

Soffit - Fiber cement - new

Walls - Fiber cement & cement plaster - new

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - Aluminum

storefront & HM DR & FRM - new.

Lever handle - new

Card Access - installed

Windows - Alumn storefront - new

Other - N/A

Space - function is adeuate in existg space, classrooms are adequate in existing space

Walls - Gyp Bd, marker laminent & tack board - new

Int Door/Frm/Hdwr - storefront

Door, PH & Lever handle - new

Flooring - carpet & sht Vinyl, epoxy - new

Ceiling - 2x4 ACT & Gyp Bd - new

Casework/Sink - ADA - new

Space Planning - N/A

Other - N/A

Roof - Standing seam mtl - new

Roof Fascia - fiber cement - new

Roof Drains - Gutter & DS to SDnew

Soffit - Fiber cement - new

Walls - Fiber cement & cement plaster - new

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - Aluminum

storefront & HM DR & FRM - new.

Lever handle - new

Card Access - installed

Windows - Alumn storefront - new

Other - N/A

Space - function is adeuate in existg

space, classrooms are adequate in existing space

Walls - Gyp Bd, marker laminent & tack board - new

Int Door/Frm/Hdwr - storefront

Door, PH & Lever handle - new

Flooring - carpet & sht Vinyl, epoxy - new

Ceiling - 2x4 ACT & Gyp Bd - new

Casework/Sink - ADA - new

Space Planning - N/A

Other - N/A

Roof - Standing seam mtl - new

Roof Fascia - fiber cement - new

Roof Drains - Gutter & DS to SDnew

Soffit - Fiber cement - new

Walls - Fiber cement & cement plaster - new

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - Aluminum

storefront & HM DR & FRM - new.

Lever handle - new

Card Access - installed

Windows - Alumn storefront - new

Other - N/A

Space - function is adeuate in existg space, classrooms are adequate in existing space

Walls - Gyp Bd, marker laminent & tack board - new

Int Door/Frm/Hdwr - storefront

Door, PH & Lever handle - new

Flooring - carpet & sht Vinyl, epoxy - new

Ceiling - 2x4 ACT & Gyp Bd - new Casework/Sink - ADA - new

Space Planning - N/A

Other - N/A

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN/CLASSROOMS BUILDING B LIBRARY/CLASSROOMS BUILDING C CLASSROOMS BUILDING D CLASSROOMS BUILDING E CLASSROOMS BUILDING K1 KINDER BLDG COLOR ASSESSMENT NEW BLDG NEW BLDG NEW BLDG NEW BLDG SQUARE FOOTAGE 48265 5,447 5,712 7,131 6,042 7,890 2,900 BUILDING EXTERIOR A
Condition - materials, repair / replace, painting, windows, etc. Roof - Standing seam mtl - new Roof Fascia - fiber cement - new Roof Drains - Gutter & DS to SDnew
BUILDING INTERIOR A
RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc. Single occupancy toilet - ADA - new Class Sink - ADA -new Multi Compartment bathroom - Non ADA fixtures, needs an update Multi Compartment bathroomDoor layout not ADA, needs an update Class Sink - ADA -new Multi Compartment bathroom - ADA -new Single occupancy toilet - ADA - new Class Sink - ADA -new Multi Compartment bathroom - ADA -new Single occupancy toilet - ADA - new Class Sink - ADA -new SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc. Shelving - wall to wall book shelvesSeems tight but adequate Circulation Desk - seems small but is adequate DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items
SHASTA ELEMENTARY SCHOOL 176 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

BLDG COLOR ASSESSMENT NEW BLDG

SQUARE FOOTAGE 4,908

Condition - materials, repair / replace, painting, windows, etc.

Roof - Standing seam mtl - new

Roof Fascia - fiber cement - new

Roof Drains - Gutter & DS to SD - new

Soffit - Fiber cement - new

BUILDING EXTERIOR A

BUILDING INTERIOR A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

RESTROOMS

SPECIALITY

SPACES REVIEW

DSA CODE

COMPLIANCE ITEMS

A Fixtures, accessories, ADA compliant, finishes, etc.

A MPR, Libraries, Kitchens, Science, etc.

A ADA, Fire Life Safety, Structural - Must Do Items

BUILDING K2 KINDER

Walls - Fiber cement & cement plaster - new

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - Aluminum storefront & HM DR & FRM - new. Lever handle - new

Card Access - installed

Windows - Alumn storefront - new

Other - N/A

Space - function is adeuate in existg space, classrooms are adequate in existing space

Walls - Gyp Bd, marker laminent & tack board - new

Int Door/Frm/Hdwr - storefront Door, PH & Lever handle - new

Flooring - carpet & sht Vinyl, epoxy - new

Ceiling - 2x4 ACT & Gyp Bd - new

Casework/Sink - ADA - new

Space Planning - N/A

Other - N/A

Multi Compartment bathroom - ADA -new Single occupancy toilet - ADA - new Class Sink - ADA -new

BUILDING MP MULTI-PURPOSE/ CLASSROOMS

8,235

Roof - Standing seam mtl - adquate

Roof Fascia - Metal -paint

Roof Drains - DS to SD - repaint

Soffit - Metal deck -repaint, Wd beams - repaint

Walls - CMU block repaint

Door Landing - not ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - HM DR & FRM - repaint. PH & Lever handle

Card Access - required

Windows - Alumn sash - adequate

Other - N/A

Space - Function is not adeuate in existg space, needs stage

Walls - Gyp Bd - repaint

Int Door/Frm/Hdwr - HM Frm & DR - repaint, with lever handle

Flooring - VCT - replace, epoxy at kitchen - adequate

Ceiling - Gyp Bd - repaint, 1x1 glue on tile - adequate

Casework/Sink - Kitchen hand sink - Not ADA, Casework is adequate

Space Planning - Function is not adeuate in existg space, needs stage

Other - Non accessible riser stage, drop down screen, OH projector

kitchen hand sink - Not ADA

No permanent stage

Riser stage not accessible

SHASTA ELEMENTARY SCHOOL 177 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING MISC

UTILITY MPOE/ MDG E

FIRE ALARM SYSTEM E

CLOCK / INTERCOM / SPEAKER SYSTEM E

Data infrastructure (i.e. 10GB) Carrier, location, size of space

Existing system, code compliant , replace vs retrofit, Voice Evac, etc.

System, headend, type (i.e. VOIP), replace vs retrofit

PG&E electrical service in exterior yard in secrued enclosure, 120/208V 1600A MSB is ~25-30 years old, servicable condition. The original much older Zinsco MSB was not removed when MSB was upgraded, this is a maintenance issue and potential safety issue.

Campus has been upgraded to district standard Silent Knight 6820EVS, completely upgraded except for duct detectors.

The campus has been upgraded to Valcom IP, which is consistent with current district standards.

ACCESS / INTRUSION / SECURITY E Types of systems, hardware, CCTV, opening contacts, etc.

ELECTRICAL SYSTEMS E Rooms and panels, code compliant, receptacles, circuiting, etc.

LIGHTING AND LIGHTING CONTROLS E

TECHNOLOGY SYSTEMS E

Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

AUDIVISUAL SYSTEMS E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

Existing Ademco intrusion alarm system is installed but not in use. Cameras throughout the campus. No access controls.

Existing panels on campus are mix of relatively new and in servicable condition, and older and past servicable life.

In renovated classroom and admin wings, lighting has been upgraded to LED with dimming controls. MPR is older fluorescent lighting. Wattstopper panel controls exterior lighting except at the MPR. Building mounted CFL wallpacks were on during the day.

MDF is located in staff room and does not have dedicated cooling, so overheating is a regular problem. Remainder or IT system has been recently upgraded. There is a usable underground pathway system between buildings. Classrooms have WAPs.

Classrooms have a flat panel display.

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN/CLASSROOMS BUILDING B LIBRARY/CLASSROOMS BUILDING C CLASSROOMS BUILDING D CLASSROOMS BUILDING E CLASSROOMS BUILDING K1 KINDER EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior Equipment
- condition INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. New Building Poor Air Distribution needs replacement Poor Air Distribution needs replacement New Building New Building New Building ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat? Alerton Alerton Alerton Alerton Alerton Alerton PLUMBING FIXTURE REVIEW - ADA
M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc. New Building Original Plumbing Fixture needs replacement Original Plumbing Fixture needs replacement New Building New Building New Building PLUMBING EQUIPMENT REVIEW M/P Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced) New Building Original Plumbing Equipment needs replacement. Classroom Sinks are ADA Compliant. Original Plumbing Equipment needs replacement New Building New Building New Building FIRE SPRINKLER SYSYTEM M/P Does AFS exist, location, code compliant, etc. New Building No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. New Building New Building New Building
Rooftop, wall mounted BARD, etc.
COMPLIANCE
SHASTA ELEMENTARY SCHOOL
178 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER

SYSYTEM M/P

EXISTING SEISMIC CONCERNS S

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Does AFS exist, location, code compliant, etc.

EB-3, EB-4 triggers, etc.

BUILDING K2 KINDER

New Building

New Building

Alerton

New Building

New Building

BUILDING MP

MULTI-PURPOSE/ CLASSROOMS

Existing Gas Fired AC-Units are approx. 20 years old and are in need of replacement. (4 total).

Poor Air Distribution needs replacement

Stand Alone Programmable Thermostat's

Recent Modernization, however, Building A Core Restrooms are original and need ADA updates.

New Water Heater at Kitchen. Good Condition. Staff RR has new IWH.

New Building

No Automatic Fire Sprinkler Systems found.

SHASTA ELEMENTARY SCHOOL 179 BACK TO CONTENTS

SIERRA VIEW ELEMENTARY SCHOOL

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

Parking lots, drop-off, landscape / irrigation

EXTERIOR SITE ASSESSMENT

A

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

A/C paving in poor condition throughout parking lot

Blind spot coming out of parking lot with landscaped fence

Landscape is worn at front of school, lot's of barren areas

SITE CONDITION ASSESSMENT

Campus has ADA POT issues throughout entire campus, door thresholds, cross slopes, raised concrete stoops, etc.

Bike racks is not fenced in - open to campus

New PV covered dining canopy structure

Quad area is nicely landscaped, seating

A/C hardcourt paving is worn, needs new striping for games

No trash enclosure - located at front of school

Some benches, new metal and worn wood - front of campus and scattered throughout the campus

Fairly new play equipment, fiber bark is a mess - not contained well

Kinder play - no separation from rest of campus

Some areas have new ornamental fencing wih gates at front entry

Mostly worn chain link fencing - lacks ADA compliant gates, clearances, etc.

Campus has ADA POT issues throughout entire campus, door thresholds, cross slopes, raised concrete stoops, etc.

Lot of portables with old ramps

Non ADA compliant parking stalls, drop-off areas, no ramp at drop-off, striping, signage

Parking lot is alligatoring in a number of locations, poor condition, replace paving in vehicle area, crack and slurry seal onsite pavement, there is an existing gravel area east of the vehicle parking area that should be paved

Replace all walkways at entry doors to classrooms and restrooms.

Rain water leaders just dump into quad areas, no direct drainage

Existing domestic water piping is failing and should be replaced, existing gas piping is failing and should be replaced

ALL

MISC SITE OBSERVATIONS

Admin front door is behind security fence

Campus frontage looks tired; barren landscape, needs painting, portable stuck in front (does have beautiful large tree)

Large mural is main focal point on MPR, large unsightly HVAC units on roof

Large open area at front of campus proposed for more parking - can redesign

Interior quads have no direct egress, many doors are locked with chains/padlocks

Lot of portables, unsightly ramps, etc.

Irrigation pump house at front of school

SIERRA VIEW ELEMENTARY SCHOOL 180 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING B CLASSROOMS BUILDING C LIBRARY BUILDING F CLASSROOMS BUILDING G ADMIN BUILDING G MULTI-PURPOSE BUILDING H CLASSROOMS BLDG COLOR ASSESSMENT SQUARE FOOTAGE 37,715 1,296 4,374 14,014 see bldg G admin see bldg G admin BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc. Roof - tar & gravel-Replace Roof Fascia - Wood-Replace l Roof Drains - Roof drains w/ downspouts-replace Soffit - (replace/repair) cement plaster, wd T&G, metl deck, plywd, fiber cement Walls - (replace/repair/paint) cement plaster, fiber cement, brick, cmu block, corrugated mtl, plywd siding Modular / portable building Same as Building K Exterior wood doors (behind fencing) single pane glazing cement plaster cmu block Exterior wood doors (behind fencing) single pane glazing cement plaster cmu block Same as Building K
Carpet 1x1 Glue-on clg tiles minimal windows (clerestory) 1x1 Glue-on clg tiles Clerestory and exposed ducts - no drop clg ASB (VAT) flooring Plywood wall finish Wood doors Admin - not efficient space layout Check-in rollup counter door VCT flooring ACT clg VCT flooring glue on clg tiles
plaster
BUILDING INTERIOR A Condition - finishes (floor, wall, ceiling) casework, shades, etc.
o/
blackout drapes make shift stage (risers) drop down screen / oh proj
RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc. Non ADA Compliant toilets, nurse toilet / sink SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc. Library with adjacent workroom wall to wall book shelves in-wall tables Kitchen very old DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items Non ADA sink in workroom Non ADA - stage, tables, hardware, DF, etc. IDF, elect panels in library MDF cabinet in MPR
SIERRA VIEW ELEMENTARY SCHOOL 181 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

Wood doors

VCT / Carpet flooring

2x4 ACT clg - damaged tiles painted clerestory

Vinyl tack panels / markerboards

black out curtains

lot of exposed conduit, raceways

RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc.

DSA CODE

COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items

Non ADA Compliant - fixtures, doors, walls, floor slope, etc.

Old boiler room used for PE Storage

Non ADA DF on exterior

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

UTILITY MPOE/ MDG E

FIRE ALARM SYSTEM E

Data infrastructure (i.e. 10GB) Carrier, location, size of space

Existing system, code compliant replace vs retrofit, Voice Evac, etc.

CLOCK / INTERCOM / SPEAKER SYSTEM E System, headend, type (i.e. VOIP), replace vs retrofit

ACCESS / INTRUSION / SECURITY E

Types of systems, hardware, CCTV, opening contacts, etc.

ELECTRICAL SYSTEMS E Rooms and panels, code compliant, receptacles, circuiting, etc.

LIGHTING AND LIGHTING CONTROLS E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

TECHNOLOGY SYSTEMS E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

AUDIVISUAL SYSTEMS E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

Non ADA sinks, thresholds, hardware

Wood doors

VCT / Carpet flooring

2x4 ACT clg - damaged tiles

Vinyl tack panels / markerboards

black out curtains

lot of exposed conduit, raceways

Non ADA compliant toilets, sinks, casework

Non ADA sinks, thresholds, hardware, casework

MISC

PG&E electrical service in exterior yard 120/208V 2500A Cutler Hammer MSB is ~25-30 years old, missing deadfront panels, some exposed wiring, and in need of service/refurbish. MSB is adequately sized for a campus of this size, and is backfed by a PV system, PVs are installed on shade structure. Old Square D MSB remains in use, over 60 years old, located in custodial closet and beyone its servicable life.

Silent Knight 5207 manual system, does not meet any current code requirements, complete upgrade required.

Bogen Multi-com 2000 is located in principal's office, does not meet current district standards.

No intrusion alarm on campus. Cameras throughout the campus. No access controls.

Most existing panels on campus are older and either nearing or past their servicablelife. Surface raceways in classrooms. Receptacle for IDF in MPR is shared with other receptacles in the space, which leads to nuisance trips. Lots of surface raceway in classrooms.

Most interior lighting consists of luminaires with T8 fluorescent lamps. Bugeyes and exit lights for EM lighting. Lighting controls do not meet any current energy code requirements. Exterior lighting consists of LED parking lot lights and CFL wallpacks. Exterior wallpacks on during the day.

MDF is located high on a wall in the MPR, difficult to service, it is not in a dedicated room with cooling. New fiber has been routed through the campus. Horizontal cabling is CAT6 and relatively new. Pathway between buildings consists primarily of exposed conduit. Classrooms have WAPs.

Most classrooms have a flat panel display or projector. MPR has projector.

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING J AND D RESTROOMS BUILDING K CLASSROOMS BUILDING L KINDER CLASSROOMS BUILDING N SPECIAL ED CLASSROOM BUILDING A, E, I, M PORTABLES BLDG COLOR ASSESSMENT SQUARE FOOTAGE 2204 see bldg G admin 2,692 1,237 10529 BUILDING EXTERIOR A Condition - materials,
/ replace, painting, windows, etc. Exterior
gas meter in the way Exterior
Roofing
Exterior
Roof
Portable CR - Not Reviewed Portable CRs not reviewed
repair
wood doors to playground - giant
skin - plaster, brick/cmu
- tar and gravel Doors wood in HM frames Windows - single pane, metal sash Roof drainage - no gutter / downspouts. Entire back wall stl sash construction, replace
skin - plaster, brick/cmu Roofing - tar and gravel Doors wood in HM frames Windows - single pane, metal sash
drainage - no gutter / downspouts
BUILDING INTERIOR A Condition - finishes (floor, wall, ceiling) casework, shades, etc. Ceramic floor tile Ceramic wall tile up to 5' Gypsum ceiling w/ covered skylight
SIERRA VIEW ELEMENTARY SCHOOL 182 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING

EXTERIOR EQUIPMENT ASSESSMENT

INTERIOR EQUIPMENT ASESSMENT

M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

This building has (4) Older Roof Mounted AC-Units that are at the end of life. Fixed Minimum OSA. No Relief Air.

Did not have access to the interio of this building.

This building has (4) Older Roof Mounted AC-Units that are at the end of life. Fixed Minimum OSA. No Relief Air.

This building has (2) Older Roof Mounted AC-Units that are at the end of life. Fixed Minimum OSA. Relief Air Hood Present.

This building has (4) Older Roof Mounted AC-Units that are at the end of life. Fixed Minimum OSA. Relief Air Hood Present.

Existing Ductwork, good condition. Did not have access to the interior of this building. Existing Ductwork, good condition. Existing Ductwork, good condition. Kitchen Hood is original and is coupled to Roof Mounted Reznor w/ Evaporative Cooler Section. In need of replacement, now.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat? Combination of

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

Sinks are CW only and original Plumbing Fixture are from original construction.

This building has (4) Older Roof Mounted AC-Units that are at the end of life. Fixed Minimum OSA. Relief Air Hood Present.

Existing Ductwork, good condition.

Sinks are CW only and original Plumbing Fixture are from original construction. Plumbing Fixture are from original construction. Sinks are CW only and original

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER SYSYTEM

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Original Water Heater at Kitchen in need of replacement, now. Kitchen Plumbing Fixture appear to be from original construction. One Newer Johnson AC-Unit serving Administration Area.

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P

Fixtures, Restrooms, sinks,

Singel Exhaust Fans serving both Core Restrooms.

This building has (4) Older Roof Mounted AC-Units that are at the end of life. Fixed Minimum OSA. No Relief Air.

This building has (2) Older Roof Mounted

Exhaust Ducting only. Original Construction Existing Ductwork, good condition. Existing Ductwork, good condition.

Fans are switch with lights Combination of Delta and Johnson Controls Combination of Delta and Johnson Controls

Gas Distribution is in ok condition.

Suggest complete replacement with the installation of new HVAC Units.

Gas Distribution is in ok condition.

Suggest complete replacement with the installation of new HVAC Units.

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Stand alone Programmable T-Stat's.

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

No Automatic Fire Sprinkler Systems found.

BUILDING B CLASSROOMS BUILDING C LIBRARY BUILDING F CLASSROOMS
ADMIN
ADMIN/ MULTI-PURPOSE BUILDING H CLASSROOMS
BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING
BUILDING G
BUILDING G
Delta and Johnson Controls Combination of Delta and Johnson Controls Combination of Delta and Johnson Controls Combination of Delta and Johnson Controls Combination of Delta and Johnson Controls Combination of Delta and Johnson Controls
M/P Does AFS exist, location, code compliant, etc. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found.
SIERRA VIEW ELEMENTARY SCHOOL
BUILDING K CLASSROOMS BUILDING L KINDER CLASSROOMS BUILDING N SPECIAL ED CLASSROOM BUILDING A, E, I, M PORTABLES
BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING J AND D RESTROOMS
AC-Units that are at the end of life. Fixed Minimum OSA. Relief Air Hood Present.
Heat Pumps
the original
Portables appear to be Wall Mounted
from
construction.
Plumbing
drinking fountains / bottle fillers, etc. Sinks are CW only and original Sinks are CW only and original Sinks are CW only and original Portable CR - Not Reviewed Portable CRs not reviewed PLUMBING EQUIPMENT REVIEW M/P Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)
SPRINKLER SYSYTEM
Does AFS exist, location, code
No Automatic Fire Sprinkler
No Automatic Fire Sprinkler Systems
No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found.
FIRE
M/P
compliant, etc.
Systems found.
found.
183 BACK TO CONTENTS

BIDWELL JUNIOR HIGH SCHOOL

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

SITE CONDITION ASSESSMENT

Drop off at front of shool is relatively new with loading zone. Parking lot has extensive cracking.

(E) marquee sign - adequate bike enclosure looks adequate, Trash enclosure CL - adequate flag pole (interior to site), shade structures with PVs relatively new hardcourts have a large amount of cracking.

The site has existing perimeter fencing, a mix of CL and decorative Metal at frontage Single point of entry to Admin Office

A few walkways that do not meeting ADA standards

No comment

Asphalt areas along North Avenue, the north side of the campus, the paved onsite road along the east side of the campus are all in poor condition and should be re-paved, the basketball paving should be crack and slurry sealed

The drainage system near the basketball courts is clogged and needs to be flushed out

No known issues

80% of Gas Site distribution piping is in poor condition and needds replacement

It was noted that the grease interceptor connected sewer mains are clogging most likely due to lack of suffiecent slope.

BIDWELL JUNIOR HIGH SCHOOL 184 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

BUILDING

A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Soffit - Cement plaster - repaint

Walls - Cement plaster -repaint

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Dr & Frm.

Alumn Dr & Frm.

handlesadequate

Card Access - required

Windows - Alumn sash - adequate

Space - Function is adequate in existg space

Walls - Gyp Bd, Accoustic panels, tile - adequate

Int Door/Frm/Hdwr - HM Frm/HM & WD Door. PH/Lever handle / knobs - replace

Flooring - Sheet vinyl, carpet, tilereplace

Ceiling - 2x4 ACT, Gyp Bd, 1x1 glued on acoustic tile, Exposed duct - repaint as needed

Casework/Sink - ADA ok

Space Planning - ok

Other - N/A

A Fixtures, accessories, ADA compliant, finishes, etc. Admin toilets - ADA ok

Kitchen toilet - not ADA needs update

Roof - (E) TPO

Roof Fascia - Wood -repair

Roof Drains - Gutter & DS to SDadequate

Soffit - Cement plaster - repaint

Walls - Cement plaster -repaint

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Dr & Frm.

PH/Lever handles - adequate

Card Access - required

Windows - Alumn sash - replace

Space - Function is adequate in existg space

Walls - Gyp Bd, tack boardadequate

Int Door/Frm/Hdwr - HM Frm/

HM & WD Door. PH/Lever handleadequate

Flooring - vinyl tile, carpet - adequate

Ceiling - 2x4 ACT, Gyp Bd, 1x1 glued on acoustic tile, Exposed duct, ceiling fans- replace and repaint as needed

Casework/sink - ADA ok

Space Planning - ok

Other - N/A

Roof - (E) TPO

Roof Fascia - Wood -repair

Roof Drains - Gutter & DS to SD

- adequate

Soffit - Cement plaster - repaint

Walls - Cement plaster -repaint

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Dr & Frm.

Lever handles - adequate

Card Access - required

Windows - Alumn sash - replace

Space - Function is adequate in existg space

Walls - Gyp Bd, tack boardadequate

Int Door/Frm/Hdwr - HM Frm/

HM - adequate.

Lever handle - adequate

Flooring - vinyl tile, tile - replace

Ceiling - 2x4 ACT, Gyp Bd, 1x1 glue on acoustic tile, Exposed duct, - replace and repaint as needed

Casework/sink - ADA ok

Space Planning - ok

Other - N/A

gang bathooms - ADA ok, updated interior

DF - ADA ok

Roof - (E) TPO

Roof Fascia - Wood -repair

Roof Drains - Gutter & DS to surface

- adequate

Soffit - Cement plaster - repaint

Walls - Cement plaster -repaint

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Dr & Frm.

knob handles - replace

Card Access - required

Windows - Alumn sash - replace

Space - Function is adequate in existg space

Walls - Gyp Bd, tack boardadequate

Int Door/Frm/Hdwr - HM Frm/HM - adequate.

Lever handle - adequate

Flooring - vinyl tile, tile - replace

Ceiling - 2x4 ACT, Gyp Bd, 1x1 glue on acoustic tile, Exposed mechanical,replace and repaint as needed

Casework/sink - ADA ok

Space Planning - ok

Other - N/A

gang bathooms - ADA ok, updated interior

Roof - (E) TPO

Roof Fascia - Wood -repair

Roof Drains - Gutter & DS to surface

- adequate

Soffit - Cement plaster - repaint

Walls - Cement plaster -repaint

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Dr & Frm.

Lever/pull handles - adequate

Card Access - required

Windows - Alumn sash - replace

Space - Function is adequate in existg space

Walls - Gyp Bd, tack boardadequate

Int Door/Frm/Hdwr - HM Frm/HM - adequate.

Lever handle - adequate

Flooring - vinyl tile, tile - replace

Ceiling - 2x4 ACT, Gyp Bd, 1x1 glue on acoustic tile, Exposed mechanical,replace and repaint as needed

Casework/sink - ADA ok

Space Planning - ok

Other - N/A

Roof - (E) TPO

Roof Fascia - steel

Roof Drains - Gutter & DS to SDadequate

Soffit - Cement plaster - repaint

Walls - Cement plaster -repaint

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Dr & Frm.

Lever/pull handles - adequate

Card Access - required

Windows - Alumn sash - replace

Space - Function is adequate in existg space

Walls - Gyp Bd, tack boardadequate

Int Door/Frm/Hdwr - HM Frm/HM - adequate.

Lever handle - adequate

Flooring - vinyl tile, tile - replace

Ceiling - 2x4 ACT, Gyp Bd, 1x1 glue on acoustic tile - replace and repaint as needed

Casework/sink - looks ok ADA, casework needs updating

Space Planning - ok

Other - N/A

RESTROOMS

SPECIALITY SPACES REVIEW

DSA CODE

COMPLIANCE ITEMS

MP gang bathroom - ADA ok

A MPR, Libraries, Kitchens, Science, etc. Kitchen needs update to floor and celing

A ADA, Fire Life Safety, Structural - Must Do Items

Library modernized in 2015 in adequate condition

Shelving - wall to wall book shelves

(update/ adequate/new)

Circulation Desk - adequate

Some Science Classrroms Science Classrooms - looks in good shape Home economics - casework could use updating

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN / MPR BUILDING B LIBRARY BUILDING C CLASSROOMS BUILDING D CLASSROOMS BUILDING F CLASSROOMS BUILDING I CLASSROOMS BLDG COLOR ASSESSMENT SQUARE FOOTAGE 79058 11,937 3,401 30,106 Combined w/ bldg C 5,740 5,740
EXTERIOR
Condition
materials, repair / replace, painting, windows, etc.
BUILDING
A
-
Roof - (E) TPO Roof Fascia - Wood -repair Roof Drains - Gutter & DS to surface - adequate
PH/Lever
INTERIOR
EB-4
EB-4 EB-3 & EB-4 EB-3 & EB-4 EB-3 & EB-4
EB-3 &
EB-3 &
BIDWELL JUNIOR HIGH SCHOOL 185 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

RESTROOMS

SPECIALITY SPACES REVIEW

A Fixtures, accessories, ADA compliant, finishes, etc.

Roof - (E) TPO | Roof Fascia - Wood -repair

Roof Drains - Gutter & DS to SD - adequate | Soffit - Cement plasterrepaint

Walls - Cement plaster -repaint | Door Landing - not ADA

Door Threshold - ADA ok | Doors/Frm/Hdwr - HM Dr & Frm.

Lever/pull handles - adequate | Card Access - required

Windows - Alumn sash - replace

Int Door/Frm/Hdwr - HM Frm/HM - adequate. | Lever handle - adequate

Flooring - vinyl tile, tile - replace | Ceiling - 2x4 ACT, Gyp Bd, 1x1 glue on acoustic tile - replace and repaint as needed Casework/sink - sink not ADA, casework needs updating Space Planning - ok

A MPR, Libraries, Kitchens, Science, etc. Band room - practice room not ADA accessible Climbing wall looks recently instlled

Roof - (E) TPO | Roof Fascia - steel

Roof Drains - Gutter & DS to SD - adequate | Soffit - metal deck- repaint

Walls - concrete -repaint | Door Landing - not ADA

Door Threshold - ADA ok | Doors/Frm/Hdwr - HM Dr & Frm.

PH/Lever/pull handles - adequate | Card Access - required

Windows - Alumn sash - replace

Space - Function is adequate in existg space | Walls - Gyp Bd, tile & concrete

- adequate

Int Door/Frm/Hdwr - HM Frm/HM - adequate. | PH/Lever handleadequate

Flooring - concete & tile | Ceiling - exposed metal deck - repaint as needed

Casework/sink - none

Space Planning - rethink showers for privacy

DF ADA ok | Bathroom ADA ok, update interior

Locker ADA bench in place | Shower ADA bench in place, could use an update

Roof - (E) TPO Roof Fascia - steel

Roof Drains - Gutter & DS to SD - adequate | Soffit - metal deck- repaint

Walls - concrete -repaint Door Landing - ADA ok

Door Threshold - ADA ok | Doors/Frm/Hdwr - HM Dr & Frm.

PH/Lever/pull handles - adequate | Card Access - required

Windows - Alumn sash - replace

Space - Function is adequate in existg space Walls - Gyp Bd & concrete

- adequate

Int Door/Frm/Hdwr - HM Frm/HM - adequate. | PH/Lever handleadequate

Flooring - refinnished wood floors | Ceiling - exposed duct and 1x1 acoustic tile - repaint as needed

Casework/sink - none

Space Planning - ok

DF ADA ok

Bleachers have ADA companion seating

DSA CODE

COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items

EB-3 & EB-4

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

UTILITY MPOE/ MDG E Data infrastructure (i.e. 10GB) Carrier, location, size of space

FIRE ALARM SYSTEM E

Existing system, code compliant replace vs retrofit, Voice Evac, etc.

CLOCK / INTERCOM / SPEAKER SYSTEM E System, headend, type (i.e. VOIP), replace vs retrofit

ACCESS / INTRUSION / SECURITY E Types of systems, hardware, CCTV, opening contacts, etc.

ELECTRICAL SYSTEMS E Rooms and panels, code compliant, receptacles, circuiting, etc.

LIGHTING AND LIGHTING CONTROLS

E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

TECHNOLOGY SYSTEMS

AUDIVISUAL SYSTEMS

E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

EB-3 & EB-4

MISC

PG&E transformer with exposed terminals is located in dedicated room. This transformer is at least 60-70 years old. Bus duct feed to MSB in adjacent room. Cutler Hammer MSB is 1600A, 277/480V, and approx. 25 years old. Adequate capacity for a campus this size.

A new Silent Knights 6820EVS panel was added at room 305A, and serves the Admin and MP Building. The remainder of the campus is old Simplex manual system which meets no current code requirements.

Bogen Multi-com 2000 does not meet current district standards. Clock system is very old, probably original to the campus. High priority.

Two separate existing intrusion alarm systems on campus are both functional. Cameras throughout the campus. No access controls.

Many existing panels on campus are very old and obselete, i.e. 50-60 years old. Admin and MP Building were modernized but not all old gear was not replaced. Lots of surface raceway in classrooms. Most classrooms have not been modernized and therefore limited power/receptacles.

New LED lighting and nLight controls at Admin and MP Building. Remainder of campus is old fluorescent lighting and controls do not meet current code requirements. Exterior corridors that are main walkways for students are very dark during the day. LED parking lot lighting and canopy lighting was installed in recent prop 13 project but was poorly done.

MDF is located in room 305A, and meets all of the campus needs, is in a dedicated room with cooling. New fiber has been routed through the campus. Natural gas generator backs up the MDF has exposed gaslines that are subject to potential damage. Horizontal cabling is a combination of new CAT6 and 6A, and older CAT5E. Some IDFs located in classrooms which is not ideal. Classrooms have WAPs.

Most classrooms have a flat panel display or projector.

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING J CLASSROOMS BUILDING K SHOWER & LOCKER BUILDING L GYM BLDG COLOR ASSESSMENT SQUARE FOOTAGE 3,420 6,668 8,818
EXTERIOR
BUILDING
A Condition - materials, repair / replace, painting, windows, etc.
INTERIOR A Condition - finishes (floor, wall, ceiling) casework, shades, etc.
tack
- adequate
BUILDING
Space - Function is adequate in existg space | Walls - Gyp Bd,
board
BIDWELL JUNIOR HIGH SCHOOL 186 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR EQUIPMENT ASSESSMENT M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P

PLUMBING FIXTURE

REVIEW - ADA COMPLIANCE M/P

PLUMBING EQUIPMENT

REVIEW M/P

FIRE SPRINKLER SYSYTEM

M/P

EMCS Type of system, web based / Programmable T-Stat?

Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Does AFS exist, location, code compliant, etc.

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

BUILDING A ADMIN / MPR

New VRF System install at Admin in 2019. MP has new Roofmounted AC-Unit with full economizer. Boiler Room has an old abandoned Boiler that needs to be removed.

MP has new Roofmounted AC-Unit with new air distribution.

Poor Air distribution with concentric SA/R diffuser in center of classroom (noisy) most classrooms. Replace all with new 4 diffuser layout.

Poor Air distribution with concentric SA/R diffuser in center of classroom (noisy) most classrooms. Replace all with new 4 diffuser layout.

Poor Air distribution with concentric SA/R diffuser in center of classroom (noisy) most classrooms. Replace all with new 4 diffuser layout.

Poor Air distribution with concentric SA/R diffuser in center of classroom (noisy) most classrooms. Replace all with new 4 diffuser layout.

Mix of Systems. Mostly Alerton Alerton

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Older Gas Fired Water Heater, approx. 20 years old needs to be replaced.

No Automatic Fire Sprinkler Systems found.

Plumbing Fixtures are from original construction.

Plumbing Equipment is from original construction.

Mix of Systems. Mostly Alerton Mix of Systems. Mostly Alerton Mix of Systems. Mostly Alerton Mix of Systems. Mostly Alerton

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Plumbing Equipment is from original construction.

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Plumbing Equipment is from original construction.

Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project

Plumbing Equipment is from original construction.

Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project

Plumbing Equipment is from original construction.

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

No Automatic Fire Sprinkler Systems found.

BUILDING B LIBRARY BUILDING C CLASSROOMS BUILDING D CLASSROOMS BUILDING F CLASSROOMS BUILDING I CLASSROOMS
BIDWELL JUNIOR HIGH SCHOOL 187 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING J CLASSROOMS BUILDING K SHOWER & LOCKER BUILDING L GYM

EXTERIOR EQUIPMENT ASSESSMENT M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER

Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

etc.

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

Portables appear to be Wall Mounted Heat Pumps from the original construction.

Ductwork in ok condition. Ductwork in ok condition. New Ground Mounted Ac-Units install with full Airside Economizers. Distribution is original construction. Distribution is original construction.

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Plumbing Equipment is from original construction.

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Locker Rooms Domestic Hot Water System has been replaced with new Lochinvar Boiler and Storage Tank. Good Condition.

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Plumbing Fixtures are from original construction and in ok condition.

Plumbing Fixtures are from original construction and in ok condition.

Plumbing Equipment is from original construction.

Plumbing Equipment is from original construction.

BUILDING E & G PORTABLES
(2) STORAGE UNITS BEHIND GYM
Alerton Alerton
Alerton
alone
alone
New
Stand
Programmable T-Stat's. Stand
Programmable T-Stat's.
SYSYTEM M/P Does AFS exist, location, code compliant,
No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found.
BIDWELL JUNIOR HIGH SCHOOL 188 BACK TO CONTENTS

CHICO JR HIGH SCHOOL

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

SITE CONDITION ASSESSMENT

Relatively new parking and drop off loop at west end of campus

Hardcourts look recently striped, bike enclosure is adequate, flag & monument sign pole at main entry, marquee at drop off area.

Decorative & CL at perimeter of school. Single point of entry at front of school but does not enter directly into Admin.

Numberous door areas do not meet ADA standards, some walkways do not meet ADA standards

Parking stalls look new

Asphalt vehicle area on east side of school has lots of cracking and should be replaced

The areas east of the main building consistantly flood and drainage facilities should be installed, the area between Buildings E and F has poor surface drainage, the quad area north of Building R has poor surface drainage

Irrigation piping in long courtyards is failing and should be replaced, the grease interceptor between Building P and Memorial Way is missing/not functioning resulting in lots of clogging in these pipes

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

It was noted the site kitchen Grease Trap has clogging issues. Boiler Room Mechanical components need to be demo'd.

CHICO JR HIGH SCHOOL 189 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Roof - Built up including covered walkway - replace

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repaint/replair some

Soffit - Cement plaster - repaint

Walls - Cement plaster & CMUadequate

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Frm & Dr / alumn. PH/Lever handle/Knobreplace

Card Access - required

Windows - Single glazing, Mtl sashreplace

Other - N/A

Space - is not adeuate in existg space, limited existing building

Walls - Gyp Bd & FRP - repaint / replace

Int Door/Frm/Hdwr - HM Frm &

Dr/ Wd Frm & Door. Lever handle/

Knob - replace

Flooring - VCT, carpet, Sht vinylreplace

Ceiling - 2x4 ACT, Gyp Bd, 1x1 glue on tile - replace & repaint as needed

Casework/sink - replace, Not ADA

Space Planning - Not addequate space for program

Other - N/A

Roof - Built up including covered walkway - replace

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repaint/replair some

Soffit - Cement plaster & T&G at ext. covered walks- repaint

Walls - cement plaster & wood siding - repaint

Door Landing - not ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Lever

Card Access - required

Windows - Single glazing, Mtl sashreplace

Other - N/A

Space - is adeuate in existg space, limited existing building. Some rooms with numerous isolation units are not ADA accessible

Walls - Gyp Bd & tack panelrepaint / replace

Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle - replace

Flooring - VCT - replace

Ceiling - 2x4 ACT - replace & repaint as needed

Casework - adequate

Space Planning - some spaces Nnt addequate space for programrooms with isolation units

Roof - Built up roof & TPO at covered walkway

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repair/repaint

Soffit -Cement plaster & T&G at ext. covered walks- repaint

Walls - cement plaster & wood siding - repaint

Door Landing - not ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - HM Frm & Dr. Lever

Card Access - required

Windows - Single glazing, Mtl sashreplace

Other - N/A

Space - is adeuate in existg space, limited existing building. Some rooms with numerous isolation units are not ADA accessible

Walls - Gyp Bd & tack panelrepaint / replace

Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle - replace

Flooring - VCT - replace

Ceiling - 2x4 ACT - replace & repaint as needed

Casework- adequate

Space Planning - N/A

Other - N/A

Roof - Built up including covered walkway - replace

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repaint

Soffit - Cement plaster & T&G at ext. covered walks- repaint

Walls - cement plaster & wood siding - repaint

Door Landing - not ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - HM Frm & Dr. Lever

Card Access - required

Windows - Single glazing, Mtl sashreplace

Other - N/A

Space - is adeuate in existg space accessible

Walls - Gyp Bd & tack panelrepaint / replace

Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle - replace

Flooring - VCT - replace

Ceiling - 2x4 ACT - replace & repaint as needed

Casework/Sink - not ADA

Space Planning - N/A

Other - N/A

Roof - Standing metal seam & TPO at covered walkway - adequate

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repaint

Soffit - Cement plaster & T&G at ext. covered walks- repaint

Walls - cement plaster & CMUrepaint

Door Landing - ADA ok

Door Threshold - not ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Lever PH, Pulls - replace as needed

Card Access - required

Windows - None

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd & tile - repaint

Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle/, knobs - replace

Flooring - wood, concrete, & tileadequate

Ceiling - plaster, 1x1 acoustic panels, gyp - replace & repaint as needed

Casework/Sink -none

Space Planning - N/A

Other - N/A

Roof - Built up roof including covered walkway - replace.

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repaint

Soffit - plywd & T&G at ext. covered walks- repaint

Walls - cement plaster - repaint

Door Landing - no ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Lever , PH, Pulls - replace as needed

Card Access - required

Windows - metal sash - replace

Other - N/A BUILDING INTERIOR A

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd & tile - repaint

Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle/, knobs - replace

Flooring - concrete, & tile -replace/ update

Ceiling - gyp bd - repaint

Casework/Sink -none

Space Planning - N/A

Other - N/A

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN / LIBRARY BUILDING B CLASSROOMS BUILDING C CLASSROOMS BUILDING D CLASSROOMS BUILDING E GYM BUILDING F SHOWER & LOCKER
SQUARE FOOTAGE 92,026 65,539 See bldg A See bldg A See bldg A 9,028 8,015
BLDG COLOR ASSESSMENT
BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.
RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc. single Occup toilets room - Not ADA Multi Compartment bathroom - ADA ok Multi Compartment bathroom - ADA ok Staff toilet & shower - No ADA SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc. Shelving - wall to wall book shelvesadequate Circulation Desk - replace Bleachers seem relatively new, back boards and score board - adequate DF - not ADA Showers - no ADA Locker bench - No ADA DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items EB-3 & EB-4 EB-3 & EB-4 EB-3 & EB-4 EB-3 & EB-4 EB-3 & EB-4
CHICO JR HIGH SCHOOL 190 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

A Condition - materials, repair / replace, painting, windows, etc.

No Access

Roof - TPO at roof including coverd walkway

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repaint

Soffit - cement plaster & T&G at ext. covered walks- repaint

Walls - cement plaster - repaint

Door Landing - no ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Lever PH, Pulls - replace as needed

Card Access - required

Windows - metal sash - replace

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd & 1x1 accoutic tilerepaint

Int Door/Frm/Hdwr - HM Frm & Dr., Wd dr & Frame - Not ADA knobs - replace

Flooring - VCT -replace/update

Ceiling - 1x1 acoustic tile - repaint/ replace as needed

Casework/Sink -none

Space Planning - N/A

Other - N/A

Roof - TPO at roof including coverd walkway

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repaint

Soffit - cement plaster & T&G at ext. covered walks- repaint

Walls - cement plaster - repaint

Door Landing - no ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Lever , WD Dr&Frm - replace. PH, Pulls - replace as needed

Card Access - required

Windows - metal sash - replace

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd & 1x1 accoutic tilerepaint

Int Door/Frm/Hdwr - HM Frm & Dr., Wd dr & Frame - Not ADA knobs - replace

Flooring - VCT -replace/update

Ceiling - gyp bd & 1x1 acoustic tile - repaint/replace as needed

Casework/Sink -none

Space Planning - N/A

Other - N/A

Roof - built up

Roof Fascia - N/A

Roof Drains - Gutter & DS to surface - repaint

Soffit - N/A

Walls - concrete w/ cement plasterrepaint

Door Landing - no ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - WD Frm & Dr.

knobs - replace

Card Access - required

Windows - metal sash - replace

Other - N/A

Space -used for storage

Walls - concrete - repaint

Int Door/Frm/Hdwr - WD Frm & Dr., knobs - replace

Flooring - concrete

Ceiling - concrete - repaint

Casework/Sink -none

Space Planning - N/A

Other - N/A

Roof - TPO at roof including coverd walkway

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repaint

Soffit - Cement plaster & T&G at ext. covered walks- repaint

Walls - cement plaster & wood siding - repaint

Door Landing - not ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Lever

Card Access - required

Windows - Single glazing, Mtl sashreplace

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd & tack boardrepaint

Int Door/Frm/Hdwr - HM Frm & Dr., Wd dr & Frame - Not ADA knobs - replace

Flooring - VCT-replace. Epoxy - new

Ceiling - gyp bd & 2x4 ACTrepaint / replace as needed

Casework/Sink -non ADA in labs

Space Planning - N/A

Other - N/A

Roof - Built up Roof. TPO at coverd walkway

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repaint

Soffit - Cement plaster & T&G at ext. covered walks- repaint

Walls - cement plaster & wood siding - repaint

Door Landing - not ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - HM Frm & Dr. Lever

Card Access - required

Windows - Single glazing, Mtl sashreplace

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd & tack boardrepaint

Int Door/Frm/Hdwr - HM Frm & Dr. lever handle

Flooring - VCT-replace. Ceiling - gyp bd & 2x4 ACTrepaint/replace as needed

Casework/Sink -non ADA

Space Planning - N/A

Other - N/A

OF
FOR
BUILDING G STORAGE
H BAND & CHOIR BUILDING I WOOD SHOP BUILDING J BOILER BUILDING L CLASSROOMS BUILDING M CLASSROOMS
1,102 See bldg A See bldg A 1,655 See bldg A See bldg A
BUILDING SCOPE A/E INTENT
SCOPE
PRICING
BUILDING
BLDG COLOR ASSESSMENT SQUARE FOOTAGE
BUILDING EXTERIOR
BUILDING INTERIOR A
Condition - finishes (floor, wall, ceiling) casework, shades, etc.
- not ADA Single occupancy toilet - not ADA
EB-3
EB-3
RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc. DF
SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc. Choir Room - tiered risers needs ADA companion area Practice rooms - doors are not ADA Science Labs Science Labs DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items EB-3 & EB-4
& EB-4 EB-3 & EB-4
& EB-4
CHICO JR HIGH SCHOOL 191 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

BLDG COLOR ASSESSMENT

SQUARE FOOTAGE

BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.

Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Roof - Built up Roof. TPO at coverd walkway

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repaint

Soffit - Cement plaster & T&G at ext. covered walks- repaint

Walls - cement plaster & wood siding - repaint

Door Landing - not ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Lever, PH & pull.

Card Access - required

Windows - Single glazing, Mtl sashreplace

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd & tack boardrepaint

Int Door/Frm/Hdwr - HM Frm & Dr. lever handle

Flooring - VCT-replace. Epoxy - new

Ceiling - gyp bd & 2x4 ACTrepaint/replace as needed

Casework/Sink -non ADA

Space Planning - N/A

RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

Other - N/A

Roof - Built up Roof. TPO at coverd walkway

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repaint

Soffit - Cement plaster & T&G at ext. covered walks- repaint

Walls - cement plaster & wood siding - repaint

Door Landing - not ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Lever, PH & pull.

Card Access - required

Windows - Single glazing, Mtl sashreplace

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd & tack boardrepaint

Int Door/Frm/Hdwr - HM Frm &

Dr. lever handle

Flooring - VCT, carpet, tile, sheet vinyl

- replace. Epoxy - new

Ceiling - gyp bd & plaster - repaint

Casework/Sink -non ADA

Space Planning - N/A

Other - N/A

Roof - Built up Roof - replace

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repaint

Soffit - Cement plaster - repaint

Walls - cement plaster & wood siding - repaint

Door Landing - not ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Lever, PH & pull.

Card Access - required

Windows - Single glazing, Mtl sashreplace

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd - repaint

Int Door/Frm/Hdwr - HM Frm & Dr.

lever handle, PH, pull, knobs - replace

Flooring - VCT-replace. Epoxy - new

Ceiling - gyp bd & 2x4 ACTrepaint/replace as needed

Casework/Sink -non ADA

Space Planning - N/A

Other - N/A

Multi Compartment bathroom - not ADA

Single occupancy toilet - ADA ok newly modernized

Roof - Built up Roof - replace

Roof Fascia - Wood - replace/repaint

Roof Drains - Gutter & DS to surface - repaint

Soffit - Cement plaster - repaint

Walls - cement plaster & wood siding - repaint

Door Landing - not ADA

Door Threshold - not ADA

Doors/Frm/Hdwr - HM Frm & Dr. PH & pull.

Card Access - required

Windows - Single glazing, Mtl sashreplace

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd & tack boardsrepaint

Int Door/Frm/Hdwr - HM Frm & Dr.

lever handle, PH, pull, knobs - replace

Flooring - VCT-replace.

Ceiling - gyp bd / plaster - repaint

Casework/Sink -none

Space Planning - N/A

Other - N/A

Multi Compartment bathroom - ADA ok newly modernized

Single occupancy toilet - ADA ok newly modernized

Roof - Built up Roof - replace

Roof Fascia - N/A

Roof Drains - Roof drains

Soffit - cement plaster

Walls - cement plaster - repaint as needed

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Frm & Dr. PH & pull.

Card Access - required

Windows - aluminum sash

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd & tack boardsrepaint

Int Door/Frm/Hdwr - HM Frm & Dr.

lever handle, PH, pull

Flooring - epoxy

Ceiling - 2x4 ACT

Casework/Sink -not ADA in prep room

Space Planning - N/A

Other - N/A

Single occupancy toilet - ADA ok

A MPR, Libraries, Kitchens, Science, etc. Maker Space

SPECIALITY

SPACES REVIEW

Stage - not accessible - no chair lift

Nurses Office - update

Staff Lounge - update

Kitchen - floor recent updated.

Equipment & hood look up to date

Science building - relatively new 2015

OF
FOR
BUILDING N CLASSROOMS BUILDING O CLASSROOMS BUILDING P MULTI-PURPOSE BUILDING Q COVERE CORRIDOR BUILDING R SCIENCE LABS
BUILDING SCOPE A/E INTENT
SCOPE
PRICING
See
A See bldg A See bldg A See bldg A 5,656
bldg
BUILDING INTERIOR A
& EB-4
EB-4
DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items EB-3 & EB-4 EB-3 & EB-4 EB-3
EB-3 &
192 BACK TO CONTENTS

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE

M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW

M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating.

Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units. FIRE SPRINKLER SYSYTEM M/P

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?

PLUMBING FIXTURE REVIEW - ADA

COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

BUILDING G STORAGE

BUILDING H CLASSROOMS

BUILDING I WOOD SHOP

BUILDING J BOILER

BUILDING L CLASSROOMS BUILDING M CLASSROOMS

PLUMBING

EQUIPMENT

REVIEW M/P

FIRE SPRINKLER SYSYTEM M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Does AFS exist, location, code compliant, etc.

Did not Access Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

Did not Access Johnson Controls Installaion by Shasta Control Company. Johnson Controls Installaion by Shasta Control Company.

Distribution is original construction when AC-Units were added.

Johnson Controls Installaion by Shasta Control Company.

Did not Access Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating.

Did not Access

Did not Access

Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found.

Gas distribution on roof is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

No Automatic Fire Sprinkler Systems found.

Did not Access Distribution is original construction when AC-Units were added.

Did not Access Johnson Controls Installaion by Shasta Control Company.

Did not Access hall gang bathrooms recent mod

Did not Access Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Did not Access No Automatic Fire Sprinkler Systems found.

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN/LIBRARY BUILDING B CLASSROOMS BUILDING C CLASSROOMS BUILDING D CLASSROOMS BUILDING E GYM BUILDING F SHOWER & LOCKER EXTERIOR
ASSESSMENT M/P Exterior
condition
M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. Distribution is original construction when AC-Units were added. Distribution is original construction when AC-Units were added. Distribution is original construction when AC-Units were added. Distribution is original construction when AC-Units were added. Ducting is in ok condition. Ducting is in ok condition.
EQUIPMENT
EquipmentRooftop, wall mounted BARD, etc. -
INTERIOR EQUIPMENT ASESSMENT
M/P EMCS Type of
Johnson Controls Installaion by Shasta Control Company. Johnson Controls Installaion by Shasta Control Company. Johnson Controls Installaion by Shasta Control Company. Johnson Controls Installaion by Shasta Control Company. Johnson Controls Installaion by Shasta Control Company. Johnson Controls Installaion by
ENERGY MANAGEMENT SYSTEMS
system, web based / Programmable T-Stat?
Shasta Control Company.
Plumbing
condition.
Plumbing Fixtures
ok condition.
Plumbing Fixtures in ok condition.
Plumbing Fixtures in ok condition.
Fixtures in ok
Needs updating.
in
Needs updating.
Needs updating.
Needs updating.
Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found.
Does AFS exist, location, code compliant, etc. No Automatic
CHICO JR HIGH SCHOOL
BUILDING CONDITIONS - MECHANICAL/PLUMBING
193 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?

Company.

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc. hall gang bathrooms recent mod hall gang bathrooms recent mod hall gang bathrooms recent mod Plumbing Fixtures in ok condition. Needs updating. no scope. New Plumbing

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER SYSYTEM M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units.

Gas Distribution is in ok condition. Suggest complete replacement with the installation of new HVAC Units. no scope. New Gas Distribution and New Plumbing WH, etc.

Does AFS exist, location, code compliant, etc. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. No Automatic Fire Sprinkler Systems found. no scope. New FS System.

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

UTILITY MPOE/ MDG E Data infrastructure (i.e. 10GB) Carrier, location, size of space

FIRE ALARM SYSTEM E

Existing system, code compliant , replace vs retrofit, Voice Evac, etc.

CLOCK / INTERCOM / SPEAKER SYSTEM E System, headend, type (i.e. VOIP), replace vs retrofit

MISC

There are three PG&E services on campus, one at the new science wing, and two at the north end of campus; one feeds a 1200A 277/480V Cutler Hammer MSB approx. 30 years old for HVAC equipment, and the other feeds a 1600A 120/208V switchboard located in a storage room. The latter is completely inaccessible due to storage completely blocking the gear.

The fire alarm system consists of a Silent Knight 5820XL-EVS at the admin wing with emergency voice. System is up to code.

Clock system is obselete American Time with Simplex system and does not meet current district standards. High priority item.

ACCESS / INTRUSION / SECURITY E Types of systems, hardware, CCTV, opening contacts, etc. Existing Ademco intrusion alarm system, new system at Admin and Science wing, but not consistent throughout the campus.

ELECTRICAL SYSTEMS E Rooms and panels, code compliant, receptacles, circuiting, etc.

LIGHTING AND LIGHTING CONTROLS

TECHNOLOGY SYSTEMS

AUDIVISUAL SYSTEMS

E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

Many existing panels are original to the campus and past servicable life. Panels are located in classrooms and custodial space instead of dedicated electrical rooms. One old panel observed in a recently modernized student's restroom, unlockable, where breakers serviing classrooms and staff rooms can be turned off by students. Gear in Science wing is new.

Most interior lighting consists of luminaires with T8 fluorescent lamps, gymnasium building and new science wing have been upgraded to LED.. Most exterior lighting has been upgraded to LED.

IT has been recently upgraded with new fiber, with Cat6 or better horizontal cabling. Pathway is exposed conduit on roof of the main corridor. Classrooms have WAPs.

Most classrooms have a flat panel display or projector.

CHICO JR HIGH SCHOOL
SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING N CLASSROOMS BUILDING O CLASSROOMS BUILDING P MULTI-PURPOSE BUILDING Q COVERE CORRIDOR BUILDING R SCIENCE LABS BUILDING W POOL STORAGE
BUILDING
systems, exhaust fans,
Distribution is original construction when AC-Units were added. Distribution is original construction when AC-Units were added. Distribution is original construction when AC-Units were added. Distribution is original construction when AC-Units were added. Approx. 12 years old. no scope. Good Air Distribution,
INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split
etc.
Johnson Controls Installaion by Shasta
Johnson Controls Installaion by Shasta
Johnson Controls Installaion by Shasta Control Company. Johnson Controls Installaion by Shasta Control Company. no scope. Johnson Controls Installaion by Shasta Control
Control Company.
Control Company.
194 BACK TO CONTENTS

MARSH JUNIOR HIGH SCHOOL

SITE CONDITIONS

EXTERIOR SITE AMENITIES

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

Concrete monument sign, Marquee, and flag pole are adequate Hard court is in adequate condition

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc. Vehicle parking areas and asphalt areas near Buildings G, H and O have cracking, install crack and slurry seal, replace asphalt in basketball court area

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

None known.

A/E
COST PER SF SITE CONDITION ASSESSMENT HIGH
MEDIUM LOW
Parking
CAMPUS SITE SCOPE
INTENT OF SCOPE FOR PRICING
MEDIUMHIGH
EXTERIOR SITE ASSESSMENT A Parking lots, drop-off, landscape / irrigation
and landscaping are adequate. Drop Off needs an accessible loading zone. Admin parking is adquate
SECURITY A Fencing, gates, hardware / access Fencing is adequate. Single point of entry is in place, directly into Admin.
grading
drainage,
to surface in various locations
Site has areas of poor
and
ground water rises
MARSH JR HIGH SCHOOL 195 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

Roof - Asphalt Shingle - adquate

Roof Fascia - Wood with mtl flashing - repaint

Roof Drains - Gutter & DS to SDrepaint

Soffit - minimal Cement plaster at entry - repaint

Walls - Cement plaster - repaint

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM Frm & Door.

Lever handle

Card Access - required

Windows - Alumn sash Other - N/A

Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Space - Function is adeuate in existg space

Walls - Gyp Bd & tack boardadequate

Int Door/Frm/Hdwr - HM Frm &

Dr. Lever handle

Flooring - VCT, carpet, Sht vinylreplace

Ceiling - 2x4 ACT replace tiles as needed, Gyp Bd, 1x1 glue on tile

Casework/Sink - sink not ADA

Space Planning - N/A

Other - N/A

Roof - Asphalt Shingle - adquate

Roof Fascia - Wood with mtl flashing - repaint

Roof Drains - Gutter & DS to SDrepaint

Soffit - N/A

Covered Walkway - repaint

Walls - Cement plaster - repaint

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM Frm & Door.

Lever handle

Card Access - required

Windows - Alumn sash

Other - N/A

Space - Classrooms functions are adeuate in existg space

Walls - Gyp Bd, marker board & tack board- adequate

Int Door/Frm/Hdwr - HM Frm &

Dr. Lever handle

Flooring - VCT & sheet vinylupdate

Ceiling - 2x4 ACT replace tiles as needed, Gyp Bd

Casework/Sink - casework - update. sink not ADA

Space Planning - N/A

Other - N/A

Roof - Asphalt Shingle - adquate

Roof Fascia - Wood with mtl flashing - repaint

Roof Drains - Gutter & DS to SDrepaint

Soffit - N/A

Covered Walkway - repaint

Walls - Cement plaster - repaint

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM Frm & Door.

Lever handle

Card Access - required

Windows - Alumn sash

Other - N/A

Space - Classrooms functions are adeuate in existg space

Walls - Gyp Bd, marker board & tack board- adequate

Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle

Flooring - VCT & sheet vinylupdate

Ceiling - 2x4 ACT replace tiles as needed, Gyp Bd

Casework/Sink - sink not ADA

Space Planning - N/A

Other - N/A

Roof - Asphalt Shingle - adquate

Roof Fascia - Wood with mtl flashing - repaint

Roof Drains - Gutter & DS to SDrepaint

Soffit - N/A

Covered Walkway - repaint

Walls - Cement plaster - repaint

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM Frm & Door.

Lever handle

Card Access - required

Windows - Alumn sash

Other - N/A

Roof - Asphalt Shingle - adquate. Built up roof.

Roof Fascia - Wood with mtl flashing - repaint

Roof Drains - Gutter & DS to SDrepaint

Soffit - N/A

Covered Walkway - repaint

Walls - Cement plaster - repaint

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM Frm & Door.

Lever handle

Card Access - required

Windows - Alumn sash

Other - N/A

Space - Classrooms functions are adeuate in existg space

Walls - Gyp Bd, marker board & tack board- adequate

Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle

Flooring - VCT, sheet vinyl & LVTupdate

Ceiling - 1x1 glue on tile & 2x4 ACT replace tiles as needed, Gyp Bd

Casework/Sink - casework if in bad shape. sink not ADA

Space Planning - N/A

Other - N/A

Space - Library & Computer Lab functions are adeuate in existg space

Walls - Gyp Bd, marker board & tack board- adequate

Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle, pull, & PH.

Flooring - Carpet, VCT & epoxyupdate

Ceiling - Wd T&G, 1x1 glue on tile,& 2x4 ACT replace tiles as needed, Gyp Bd

Casework/Sink - Sink not ADA

Space Planning - N/A

Other - N/A

Roof - Asphalt Shingle - adquate. Built up roof.

Roof Fascia - Wood with mtl flashing - repaint

Roof Drains - Gutter & DS to SDrepaint

Soffit - N/A

Covered Walkway - repaint

Walls - CMU & Cement plasterrepaint

Door Landing - ADA

Door Threshold - ADA

Doors/Frm/Hdwr - HM Frm & Door.

Lever handle

Card Access - required

Windows - Alumn sash

Other - N/A

Space - Gym functions are adeuate in existg space

Walls - Gyp Bd, - adequate

Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle, pull, & PH.

Flooring - Carpet, VCT & tileupdate

Ceiling - metal deck, 2x4 ACT replace tiles as needed, 1x1 glue on tile. Gyp Bd - repair & repaint

Casework/Sink - Sink not ADA Space Planning - N/A

Other - N/A

Multi Compartment bathroom - ADA update. Hole in ceiling

Single

Single Occup toilets room - ADA SPECIALITY

Locker rooms & staff officesadequate

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN BUILDING B CLASSROOMS BUILDING C CLASSROOMS BUILDING D SCIENCE / INDUSTRIAL TECHNOLOGY BUILDING I LIBRARY BUILDING L GYM BLDG COLOR ASSESSMENT SQUARE FOOTAGE 90,881 5,827 11,846 6,518 8,458 7,345 17,555
EXTERIOR
BUILDING
A Condition - materials, repair / replace, painting, windows, etc.
INTERIOR
BUILDING
A
RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc. single Occup toilets room - ADA,
single Occup toilets room - ADA single Occup toilets room - ADA Multi Compartment
ADA new
update
bathroom -
update
Occup toilets room - door does not have 18 on push side ADA
MPR,
SPACES REVIEW A
Libraries, Kitchens, Science, etc.
A
DSA CODE COMPLIANCE ITEMS
ADA, Fire Life Safety, Structural - Must Do Items
MARSH JR HIGH SCHOOL 196 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

BLDG COLOR ASSESSMENT

BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.

A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

BUILDING INTERIOR

BUILDING M SCIENCE

BUILDING P STUDENT ACTIVITY CENTER BUILDING E MODULAR

F,

Roof - Asphalt Shingle, single ply, & standing seam polycarbonate panels. - new | Roof Fascia - Wood with mtl flashing - new

Roof Drains - Gutter & DS to SD - new | Soffit - N/A

Covered Walkway - new | Walls - Cement plaster - new

Door Landing - ADA | Door Threshold - ADA

Doors/Frm/Hdwr - Alumin storefront. Lever handle, pull, and PH. - new | Card Access - required

Windows - Alumn sash | Other - N/A

Space -science classroom functions are adeuate in new space

Walls - Gyp Bd, glass marker panels, tack board, acoustic panels - new

Int Door/Frm/Hdwr - HM Frm & wd Dr. Lever handle.new

Flooring - epoxy & concrete - new | Ceiling - 2x4 ACT & Gyp Bd - new Casework/Sink - ADA | Space Planning - N/A

Other - N/A

Roof - Single ply - new | Roof Fascia - mtl panel - new

Roof Drains - roof drains to SD - new | Soffit - metal deck & metal panel - new | Covered Walkway - new Walls - Cement plaster, tile, corrugated metal - new

Door Landing - ADA | Door Threshold - ADA

Doors/Frm/Hdwr - Alumin storefront. Lever handle, pull, and PH. - new

Card Access - required | Windows - Alumn storefront

Other - N/A

Space -MP & classroom functions are adeuate in new space

Walls - Gyp Bd, glass marker panels, tack board, acoustic panels - new

Int Door/Frm/Hdwr - HM Frm & Dr. Lever handle.

Flooring - carpet tile, epoxy & concrete - new Ceiling - 2x4 ACT & Gyp Bd - new | Casework/Sink

- ADA

Space Planning - N/A Other - N/A To

BUILDING CONDITIONS - ELECTRICAL (MISC)

RESTROOMS

A Fixtures, accessories, ADA compliant, finishes, etc.

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

UTILITY MPOE/ MDG E

FIRE ALARM SYSTEM E

Data infrastructure (i.e. 10GB) Carrier, location, size of space

Existing system, code compliant , replace vs retrofit, Voice Evac, etc.

CLOCK / INTERCOM / SPEAKER SYSTEM E System, headend, type (i.e. VOIP), replace vs retrofit

Multi Compartment bathroom - ADA new Single Occup toilets room - ADA - new

MISC

PG&E electrical service in secure exterior enclosure with solar equipment, 2000A 277/480V Murray MSB is ~20 years old and in good condition and adequately sized for a campus of this size.

Silent Knight 5820XL with voice add-on serves the Gym, MP Building, and Science wing. The remainder of the campus is fed by Edwards FACP. The two systems should be consolidated so that everything is via the Silent Knight panel.

Valcom IP Clock/PA system is adequate, but does not exactly meet current district standards.

ACCESS / INTRUSION / SECURITY E Types of systems, hardware, CCTV, opening contacts, etc. Intrusion alarm system is functional. Cameras throughout the campus. No access controls.

ELECTRICAL SYSTEMS E Rooms and panels, code compliant, receptacles, circuiting, etc.

Some gear (transformers and panels) located at building exterior rather than in dedicated electrical rooms. In general all switchgear is in servicable condition.

LIGHTING AND LIGHTING CONTROLS E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

With exception of MP Building, most interior lighting is T8 fluorescent, many parabolic style fixtures which are especially inefficient. Exterior lighting consists of LED parking lot lights, remainder of exterior lighting has not been upgraded.

TECHNOLOGY SYSTEMS E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

MDF is in dedicated room with cooling. IT has been recently upgraded with new fiber, with Cat6 or better horizontal cabling. Some of the existing underground pathway is daisy chained between buildings which is not ideal. Classrooms have WAPs.

AUDIVISUAL SYSTEMS E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

Most classrooms have a flat panel display or projector. MPR has projector.

BUILDING
G, H, O PORTABLES
SQUARE FOOTAGE 6,546 13,721 4,036 9,029
To be
To be Removed
Removed
be
be Removed To
Removed
MARSH JR HIGH SCHOOL 197 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING

M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

EXTERIOR EQUIPMENT ASSESSMENT

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps,

ENERGY MANAGEMENT SYSTEMS

PLUMBING FIXTURE

REVIEW - ADA COMPLIANCE

M/P

Mechanical systems consist of splitsystem w/Gas Fired Furnaces and outdoor Condensing units. Approx. 24 years old and nearing the end of life. Outdoor refrigerant piping is in poor condition. Suggest replacement of indoor/out section within 4-5 years. complete with refrigerant piping.

Air distribution is original construction when AC-Units were added and in good condition.

Mechanical systems consist of splitsystem w/Gas Fired Furnaces and outdoor Condensing units. Approx. 24 years old and nearing the end of life. Outdoor refrigerant piping is in poor condition. Suggest replacement of indoor/out section within 4-5 years. complete with refrigerant piping.

Air distribution is original construction when AC-Units were added and in good condition.

Mechanical systems consist of splitsystem w/Gas Fired Furnaces and outdoor Condensing units. Approx. 24 years old and nearing the end of life. Outdoor refrigerant piping is in poor condition. Suggest replacement of indoor/out section within 4-5 years. complete with refrigerant piping.

Air distribution is original construction when AC-Units were added and in good condition.

Mechanical systems consist of splitsystem w/Gas Fired Furnaces and outdoor Condensing units. Approx. 24 years old and nearing the end of life. Outdoor refrigerant piping is in poor condition. Suggest replacement of indoor/out section within 4-5 years. complete with refrigerant piping.

Air distribution is original construction when AC-Units were added and in good condition.

Mechanical systems consist of splitsystem w/Gas Fired Furnaces and outdoor Condensing units. Approx. 24 years old and nearing the end of life. Outdoor refrigerant piping is in poor condition. Suggest replacement of indoor/out section within 4-5 years. complete with refrigerant piping.

Air distribution is original construction when AC-Units were added and in good condition.

Mechanical systems consist of Carrier Roof Mounted AC-Units. Approx. 20 years old and nearing the end of life. Outdoor refrigerant piping is in poor condition. Suggest replacement of indoor/out section within 4-5 years. complete with refrigerant piping.

Air distribution is original construction when AC-Units were added and in good condition.

PLUMBING EQUIPMENT

REVIEW

Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Plumbing Fixtures are from original construction and in ok condition.

New ADA requirements should be considered with any modernization project.

Plumbing Equipment is of the original construction and in good condition.

Plumbing Fixtures are from original construction and in ok condition.

New ADA requirements should be considered with any modernization project.

Plumbing Equipment is of the original construction and in good condition.

Plumbing Fixtures are from original construction and in ok condition.

New ADA requirements should be considered with any modernization project.

Plumbing Equipment is of the original construction and in good condition.

Plumbing Fixtures are from original construction and in ok condition.

New ADA requirements should be considered with any modernization project.

Plumbing Equipment is of the original construction and in good condition.

Plumbing Fixtures are from original construction and in ok condition.

New ADA requirements should be considered with any modernization project.

Plumbing Equipment is of the original construction and in good condition.

Plumbing Fixtures are from original construction and in ok condition.

New ADA requirements should be considered with any modernization project.

Plumbing Equipment is of the original construction and in good condition.

FIRE SPRINKLER SYSYTEM M/P

Does AFS exist, location, code compliant, etc.

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

None found

None found

None found

None found

None found

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN
BUILDING B CLASSROOMS BUILDING C CLASSROOMS
BUILDING D SCIENCE / INDUSTRIAL TECHNOLOGY
BUILDING I LIBRARY BUILDING L GYM
Ducts, diffusers, split systems, exhaust fans, etc.
M/P EMCS Type of system, web based / Programmable T-Stat? Alerton Controls Alerton Controls Alerton Controls Alerton Controls Alerton Controls Alerton Controls
MARSH JR HIGH SCHOOL 198 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR EQUIPMENT ASSESSMENT M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER SYSYTEM

M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Does AFS exist, location, code compliant, etc.

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

BUILDING M SCIENCE

New Building

New Building

New Building

New Building

New Building

New Building

BUILDING P STUDENT ACTIVITY CENTER

BUILDING E, F, G, H, O PORTABLES

New Building Portables appear to be Wall Mounted Heat Pumps from the original construction.

BUILDING E, F, G, H, O PORTABLES

Portables appear to be Wall Mounted Heat Pumps from the original construction.

New Building Air distribution is original construction when AC-Units were added. Air distribution is original construction when AC-Units were added.

New Building Stand alone Programmable T-Stat's. Stand alone Programmable T-Stat's.

New Building Plumbing Equipment is of the original construction and in good condition. Plumbing Equipment is of the original construction and in good condition.

New Building Plumbing Equipment is of the original construction and in good condition. Plumbing Equipment is of the original construction and in good condition.

New Building None found None found

MARSH JR HIGH SCHOOL 199 BACK TO CONTENTS

CHICO SENIOR HIGH SCHOOL

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

C

A Fencing, gates, hardware / access

Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

SITE ELECTRICAL UPGRADE E Existing MSB - size, condition, upgrade needed, etc.

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

SITE CONDITION ASSESSMENT

(3) Existg parking lot to the. PV shade over 1 parking lot.

Drop off pull out along north side of campus.

monument sign & flag pole at front of campus, no visible marquee

minimal hard court

no visible exterior baketball courts

New stadium

PV shade structure at Parking lot

Perimeter of site has chain link and decorative metal fencing.

Existing fencing at front of school is climbable

No single point of entry into Admin

Some walkways along Buildings B, C, D, G and T do not meet ADA standards, there are quite a few raised walkways due to trees

No comment

Student parking area along West Sacramento Avenue are in poor condition and should be repaved, onsite pavement west of Building G should be crack and slurry sealed

The concrete plaza west of Building B should be rebuilt to better comply with ADA standards

The quad area north of Building M has flooding issues and needs additional drainage, flooding occurs between Building G and Inspire and additional drainage is needed, flooding occurs on the south side of Building C and additional drainage is needed

All domestic water piping is failing and should be replaced, there is frequent sewer clogging near Building D - more cleanouts are needed

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

The site has underground Gas Distribution Issues due to age and condition. It is estimated that approx. 30% of the U.G. Gas piping needs replacemeny within the nex 2-5 years.

EMCS U.G. wiring and conduit are at end of life. Approx. 50% of the wiring and conduit is in need of replacement within the next 2-5 years.

CHICO SR HIGH SCHOOL 200 BACK TO CONTENTS

Condition - finishes

(floor, wall, ceiling)

casework, shades, etc.

Roof - Built up roof - replace, saw ponding on roof

Roof Fascia - Cement Plasterrepaint

Roof Drains -Roof Drain to DS to SD - repair/repaint as needed.

Soffit - Cement plaster - repaint

Walls - brick

Door Landing - some not ADA

Door Threshold - some not ADA

Doors/Frm/Hdwr - alumn Frm.& Dr.

, Mtl Dr. Lever &Knob - replace as needed

Card Access - required

Windows - Alumn sash

Other -N/A

Space - Function seems adeuate in existg space

Walls - Gyp Bd, Brick, tile - update/ repaint as needed

Int Door/Frm/Hdwr - HM Frm, Wd/

HM Dr. Lever/Pull. Knobs - replace

Flooring - VCT, carpet, Sht vinyl, Tile, Concrete - replace as needed

Ceiling - 2x4 ACT, Gyp Bd, 1x1 glue on tile replace as needed

Casework/Sink - Not ADA

Space Planning - N/A

Other - N/A

Roof - Built up roof - replace

Roof Fascia - Cement Plasterrepaint

Roof Drains - Gutter & DS to SDrepair/repaint as needed.

Soffit - Cement plaster - repaint

Walls - concrete & gyp bd

Door Landing - some not ADA

Door Threshold - some not ADA

Doors/Frm/Hdwr -HM Frm.& Dr.

Lever &PH - replace as needed

Card Access - required

Windows - Alumn sash

Other -N/A

Space - Function seems adeuate in existg space but needs updating

Walls - Gyp Bd, concrete, FRPupdate/repaint as needed

Int Door/Frm/Hdwr - HM Frm, &

Dr. Lever, Pull, PH - replace

Flooring - VCT, epoxy, Concretereplace as needed

Ceiling - Exposed wood deck

Casework/Sink -

Space Planning - N/A

Other - N/A

Roof - TPO

Roof Fascia - Cement Plasterrepaint

Roof Drains - Gutter & DS to SDrepair/repaint as needed.

Soffit - Cement plaster - repaint

Walls - Brick & Cement Plaster

Door Landing - some not ADA

Door Threshold - some not ADA

Doors/Frm/Hdwr - Alumn Frm.& HM

Dr. PH, Pull, Lever &Knob - replace as needed

Card Access - required

Windows - Alumn sash

Other -N/A

Space - Function seems adeuate in existg space

Walls - Gyp Bd, tack board, marker laminate, tile - update/repaint as needed

Int Door/Frm/Hdwr - WD Frm, Wd

Dr. PH,Lever,Pull, Knobs - replace as needed

Flooring - VCT, carpet, Sht vinyl, Tile, Concrete - replace as needed

Ceiling - 2x4 ACT, Gyp Bd - replace as needed

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

Roof - TPO

Roof Fascia - Cement Plasterrepaint

Roof Drains - Gutter & DS to SDrepair/repaint as needed.

Soffit - Cement plaster - repaint

Walls - Brick & Cement Plaster

Door Landing - some not ADA

Door Threshold - some not ADA

Doors/Frm/Hdwr - Alumn Frm.& HM

Dr. PH, Pull, Lever &Knob - replace as needed

Card Access - required

Windows - Alumn sash

Other -N/A

Space - Function seems adeuate in existg space

Walls - Gyp Bd, tack board, marker laminate, tile - update/repaint as needed

Int Door/Frm/Hdwr - WD Frm, Wd

Dr. PH,Lever,Pull, Knobs - replace as needed

Flooring - VCT, carpet, Sht vinyl, Tile, Concrete - replace as needed

Ceiling - 2x4 ACT, Gyp Bd - replace as needed

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

Roof - tar & gravel - replace

Roof Fascia - Cement Plasterrepaint

Roof Drains - Gutter & DS to SDrepair/repaint as needed.

Soffit - Cement plaster - repaint

Walls - Brick & Cement Plaster

Door Landing - not ADA

Door Threshold - some not ADA

Doors/Frm/Hdwr - HM Frm.& Dr.

Lever handles

Card Access - required

Windows - metal sash - replace

Other -N/A

Space - Function seems adeuate in existg space

Walls - Gyp Bd, wood panel, marker, tile - update/repaint as needed

Int Door/Frm/Hdwr - WD Frm, Wd

Dr. PH,Lever,Pull - replace as needed

Flooring - VCT, Sht vinyl, Tile, Concrete - replace as needed

Ceiling - 1x1 acoustic, Gyp Bdreplace as needed

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

Roof - Built up roof - replace

Roof Fascia - Cement Plasterrepaint

Roof Drains - Gutter & DS to SDrepair/repaint as needed.

Soffit - Cement plaster - repaint

Walls - Cement Plaster

Door Landing - not ADA

Door Threshold - some not ADA

Doors/Frm/Hdwr - Aluminum Frm.&

HM Dr. Lever handles

Card Access - required

Windows - aluminum sash - replace

Other -N/A

Space - Function does not seems adeuate in existg space

Walls - Gyp Bd, marker - update/ repaint as needed

Int Door/Frm/Hdwr - WD Frm, Wd

Dr. PH,Lever,Pull - replace as needed

Flooring - VCT, Concrete - replace as needed

Ceiling - 2x4 ACT, Gyp Bd - replace as needed

Casework/Sink - not ADA

Space Planning - N/A

Other - N/A

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN/CLASSROOMS BUILDING AG CLASSROOMS (AGRICULTURE) BUILDING B CLASSROOMS BUILDING C CLASSROOMS BUILDING D CLASSROOMS (MUSIC) BUILDING F CLASSROOMS (ART)
ASSESSMENT SQUARE FOOTAGE 220,469 25562 13,516 19024 19024 9,973 7,062
EXTERIOR
BLDG COLOR
BUILDING
A Condition - materials, repair / replace, painting, windows, etc.
BUILDING INTERIOR
A
RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc. Multi Compartment bathroom - Not ADA needs update Single Occupancy Toilet - ADA ok, looks recently updated Multi Compartment bathroomADA ok, looks recently updated Multi Compartment bathroom - not ADA Multi Compartment bathroom - not ADA updated SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc. Stairwell at elevator handrails are not code compliant Circular Hand washing station is not ADA Band and Chior rooms nice size Art Classrooms DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items EB-3 & EB-4 Band and Chior practice rooms not ADA
CHICO SR HIGH SCHOOL 201 BACK TO CONTENTS
BUILDING CONDITIONS - ARCHITECTURAL

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

Roof Drains - Gutter & DS to SDrepair/repaint as needed.

Soffit - Cement plaster - repaint

Walls - Brick & Cement Plaster

Door Landing - not ADA

Door Threshold - some not ADA Doors/Frm/Hdwr - HM Frm.& Dr. Lever handles

Card Access - required

Windows - metal sash - replace Other -N/A

Condition - finishes (floor, wall, ceiling)

casework, shades, etc.

Space - Function seems adeuate in existg space

Walls - Gyp Bd, tack board, marker laminate, tile - update/repaint as needed

Int Door/Frm/Hdwr - WD Frm, Wd

Dr. PH,Lever,Pull, Knobs - replace as needed

BUILDING INTERIOR A

RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc.

DSA CODE

COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items

Flooring - VCT, carpet, Sht vinyl, Tile, Concrete - replace as needed

Ceiling - 2x4 ACT, Gyp Bd - replace as needed

Casework/Sink - no ADA

Space Planning - N/A

Other - N/A

Roof - tar & gravel - replace

Roof Fascia - N/A

Roof Drains - Scupper & DS to SDrepair/repaint as needed.

Soffit - N/A

Walls - Brick & Cement Plaster

Door Landing - not ADA

Door Threshold - some not ADA

Doors/Frm/Hdwr - HM Frm.& Dr.

Lever handles

Card Access - required

Windows - metal sash - replace

Other -N/A

Space - Some function do not seems adeuate in existg space

Walls - CMU, Gyp Bd, tack board, laminate, tile - update/repaint as needed

Int Door/Frm/Hdwr - HM Frm, Wd Dr. ,Lever Handles - replace as needed

Flooring - VCT, Tile, Concretereplace as needed

Ceiling - 2x4 ACT, Gyp Bd, 1x1 acoustic tile - replace & repair as needed

Casework/Sink - no ADA

Space Planning - N/A

Other - N/A

Roof - Single Ply Roof

Roof Fascia - cement plaster - paint

Roof Drains - Roof Drains to SDrepair/repaint as needed.

Soffit -Cement plaster - paint

Walls - Brick & Cement Plaster

Door Landing - not ADA

Door Threshold - some not ADA

Doors/Frm/Hdwr - HM Frm.& Dr.

Lever handles

Card Access - required

Windows - aluminum curtain wall & aluminum sash

Other -N/A

Space - function seems adeuate in existg space

Walls - Gyp Bd, tack board, tileupdate/repaint as needed

Int Door/Frm/Hdwr - HM Frm, Wd Dr. ,Lever Handles - replace as needed

Flooring - VCT, Tile, Concretereplace as needed

Ceiling - 2x4 ACT, Gyp Bd, 1x1 acoustic tile - replace & repair as needed

Casework/Sink - no ADA

Space Planning - N/A

Other - N/A

Roof - Single Ply Roof

Roof Fascia - cement plaster - paint

Roof Drains - Roof Drains to SDrepair/repaint as needed.

Soffit -Cement plaster - paint

Walls - Brick & Cement Plaster

Door Landing - not ADA

Door Threshold - some not ADA

Doors/Frm/Hdwr - HM Frm.& Dr.

Lever handles

Card Access - required

Windows - aluminum curtain wall & aluminum sash

Other -N/A

Space - function seems adeuate in existg space

Walls - Gyp Bd, tack board, tileupdate/repaint as needed

Int Door/Frm/Hdwr - HM Frm, Wd Dr. ,Lever Handles - replace as needed

Flooring - VCT, Tile, Concretereplace as needed

Ceiling - 2x4 ACT, Gyp Bd, 1x1 acoustic tile - replace & repair as needed

Casework/Sink - no ADA

Space Planning - N/A

Other - N/A

Roof - Tar & Gravel at roof and covered walkway - replace

Roof Fascia - Cement Plasterrepaint

Roof Drains - Gutter & DS to SDrepair/repaint as needed.

Soffit - Cement plaster - repaint

Walls - brick

Door Landing - some not ADA

Door Threshold - some not ADA

Doors/Frm/Hdwr - Alumn Frm.& Dr.

PH & Pull - replace as needed

Card Access - required

Windows - Alumn sash

Other -N/A

Space - Function seems adeuate in existg space

Walls - Gyp Bd & tile -paint as needed

Int Door/Frm/Hdwr - WD Frm, Wd Dr. Lever handles & Knobs - replace as needed

Flooring - VCT, carpe tile , tilereplace as needed

Ceiling - 2x4 ACT, Gyp Bd - replace as needed

Casework/Sink - not ADA

Space Planning - N/A

Other - N/A

Multi Compartment bathroom - not ADA

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING G GYM & LOCKER ROOMS BUILDING H CLASSROOMS (HOME EC.) BUILDING IT INDUSTRIAL TECHNOLOGY BUILDING J CLASSROOMS BUILDING K CLASSROOMS BUILDING L LIBRARY & THEATER CLASSROOMS
COLOR ASSESSMENT SQUARE FOOTAGE See bldg D 11,267 16212 16942 11,558 BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.
Roof
BLDG
Roof - tar & gravel - replace
Fascia - Cement Plasterrepaint
CHICO SR HIGH SCHOOL 202 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc.

DSA CODE

COMPLIANCE ITEMS

A ADA, Fire Life Safety, Structural - Must Do Items

Soffit - N/A

Walls -Concrete & metal panels

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - Alumin Storefront, PH, pulls.

Card Access - required

Windows - metal sash - replace Other -N/A

Space - Some function adeuate in existg space

Walls - CMU, conc & gyp

Int Door/Frm/Hdwr - HM Frm, Wd Dr. ,Lever Handles - replace as needed

Flooring - epoxy

Ceiling - acoustadeck, Gyp Bd

Casework/Sink - ADA ok

Space Planning - N/A

Other - N/A

Roof - Single Ply Roof Fascia - N/A

Roof Drains - Roof Drain to SDrepair/repaint as needed.

Soffit - N/A

Walls -CMU, cement plaster

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - Alumin Storefront, PH, pulls.

Card Access - required

Windows - translucent wall & storefront

Other -N/A

Space - Some function adeuate in existg space

Walls - CMU, conc & gyp

Int Door/Frm/Hdwr - HM Frm, Wd Dr. ,Lever Handles - replace as needed

Flooring - epoxy

Ceiling - acoustadeck, Gyp Bd

Casework/Sink - ADA ok

Space Planning - N/A

Other - N/A

Roof - Built up roof - replace

Roof Fascia - Cement Plasterrepaint

Roof Drains - Gutter & DS to SDrepair/repaint as needed.

Soffit - Cement plaster - repaint

Walls - Brick & Cement Plaster

Door Landing - not ADA

Door Threshold - some not ADA

Doors/Frm/Hdwr - Aluminum Frm.&

HM Dr. Lever handles

Card Access - required

Windows - aluminum sash - replace

Other -N/A

Space - Function does not seems adeuate in existg space

Walls - Gyp Bd, marker - update/ repaint as needed

Int Door/Frm/Hdwr - WD Frm, Wd

Dr. PH,Lever,Pull - replace as needed

Flooring - VAT, VCT - replace as needed

Ceiling - 2x4 ACT, Gyp Bd - replace as needed

Casework/Sink - not ADA

Space Planning - N/A

Other - N/A

Roof - Metal roof

Roof Fascia - Cement Plasterrepaint

Roof Drains - Gutter & DS to SDrepair/repaint as needed.

Soffit - Cement plaster - repaint

Walls - Brick & Cement Plaster

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Frm & Dr.

Lever handle

Card Access - required

Windows - aluminum sash - replace

Other -N/A

Space - Function seems adeuate in existg space

Walls - Gyp Bd - update/repaint as needed

Int Door/Frm/Hdwr - N/A

Flooring - Carpet - replace as needed

Ceiling -Gyp Bd - repaint as needed

Casework/Sink - not ADA

Space Planning - N/A

Other - N/A

No access

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING M LINCOLN HALL BUILDING N FITNESS LAB BUILDING S CLASSROOMS BUILDING SA ASSOCIATED STUDENTS BUILDING BUILDING ST STORAGE BLDG COLOR ASSESSMENT SQUARE FOOTAGE 19,250 5,404 7,965 840 2,699
BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.
Roof - Single Ply Roof Fascia - N/A Roof Drains - Scupper & DS to SDrepair/repaint as needed.
BUILDING INTERIOR A
(floor, wall, ceiling) casework, shades, etc.
Condition - finishes
CHICO SR HIGH SCHOOL 203 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING

EXTERIOR EQUIPMENT ASSESSMENT

INTERIOR EQUIPMENT ASESSMENT

M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

(11) Trane Packaged Units are + 30 years old and need replacement. Additionally (3) Large Seasons-4 Multi-Zones approx. 20 years old and have approx. 5-8 years of life left.

(5) Trane Packaged AC-Units +25 years old and at end of life.

(4) Bryant & (5) Trane Packaged ACUnits +25 years old and end of life.

(24) Trane Packaged AC-Units +25 years old and end of life.

(7) Carrier Packaged AC-Units + 25 years old and at end of life.

(5) Trane Packaged AC-Units +25 years old and end of life.

M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P

PLUMBING FIXTURE

REVIEW - ADA COMPLIANCE M/P

PLUMBING EQUIPMENT REVIEW

M/P

EMCS Type of system, web based / Programmable T-Stat?

Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Distribution is original construction when AC-Units were added.

The buildings have a mix of Alerton and Delta Energy Management Systems.

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Older Gas Fired Water Heater, approx. 20 years old needs to be replaced.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

The buildings have a mix of Alerton and Delta Energy Management Systems.

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Plumbing Equipment is from original construction.

The buildings have a mix of Alerton and Delta Energy Management Systems.

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Plumbing Equipment is from original construction.

Distribution is original construction when AC-Units were added.

The buildings have a mix of Alerton and Delta Energy Management Systems.

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Plumbing Equipment is from original construction.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

The buildings have a mix of Alerton and Delta Energy Management Systems.

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Plumbing Equipment is from original construction.

The buildings have a mix of Alerton and Delta Energy Management Systems.

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Plumbing Equipment is from original construction.

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR EQUIPMENT ASSESSMENT M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER SYSYTEM M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Does AFS exist, location, code compliant, etc.

BUILDING G GYM & LOCKER ROOMS

(4) Carrier Packaged AC-Units +10years old and (4) Mini-split Systems serving Coaches Offices. (1) Split System serving Dance, new.

Distribution is original construction when AC-Units were added.

The buildings have a mix of Alerton and Delta Energy Management Systems.

BUILDING H CLASSROOMS (HOME EC.)

BUILDING IT INDUSTRIAL TECHNOLOGY

Not reviewed. (6) Packaged AC-Units 15-20 years old nearing end of life.

Not reviewed. Distribution is original construction when AC-Units were added.

Not reviewed. The buildings have a mix of Alerton and Delta Energy Management Systems.

BUILDING J CLASSROOMS

BUILDING K CLASSROOMS

BUILDING L LIBRARY & THEATER CLASSROOMS

Not reviewed. Not reviewed. (2) Season's - 4 Multi-Zones +20 years old, 5-8 years of life left.

Not reviewed. Not reviewed. Distribution is original construction when AC-Units were added.

Not reviewed. Not reviewed. The buildings have a mix of Alerton and Delta Energy Management Systems.

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Not reviewed. Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Not reviewed. Not reviewed. Plumbing Equipment is from original construction.

Not reviewed. Not reviewed. Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project

Not reviewed. Not reviewed. Plumbing Equipment is from original construction.

CLASSROOMS
CLASSROOMS
CLASSROOMS (MUSIC)
CLASSROOMS (ART)
BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A ADMIN/CLASSROOMS BUILDING AG CLASSROOMS (AGRICULTURE) BUILDING B
BUILDING C
BUILDING D
BUILDING F
CHICO SR HIGH SCHOOL 204 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT

Not reviewed. Not reviewed. (7) Carrier Packaged AC-Units +25years old, at end of life.

Not reviewed. Not reviewed.

M/P SYSTEM TYPE, Boilers,

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER SYSYTEM M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Does AFS exist, location, code compliant, etc.

Not reviewed. Not reviewed. The buildings have a mix of Alerton and Delta Energy Management Systems. Not reviewed. Not reviewed.

Not reviewed. Not reviewed. Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project

Not reviewed. Not reviewed. Plumbing Equipment is from original construction.

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

UTILITY MPOE/ MDG E

FIRE ALARM SYSTEM E

Data infrastructure (i.e. 10GB) Carrier, location, size of space

Existing system, code compliant , replace vs retrofit, Voice Evac, etc.

CLOCK / INTERCOM / SPEAKER SYSTEM E System, headend, type (i.e. VOIP), replace vs retrofit

MISC

Not reviewed. Not reviewed.

Not reviewed. Not reviewed.

PG&E service at the NE corner of campus is not in a secure enclosure. The 3000A 277/480V MSB is 50+ years has a pump handl main switch and fused switches for distribution, it is long past its servicable life. PV system interconnected at the MSB. Site pullboxes that require access have been buried; this requires on site-investigation and correction.

Fire alarm system is primarily EST IRC-3, thought there is also a Silent Knight 5820XL on campus. Voice was added on for the Stadium Only. Systems should be consolidated, for a campus this size a new 6820-EVS should be provided. High priority item.

Valcom IP Clock/PA system is adequate meets current district standards.

ACCESS / INTRUSION / SECURITY E Types of systems, hardware, CCTV, opening contacts, etc. Multiple (6-8) separate intrusion alarm systems (Ademco) on campus, consider consolidating. Cameras throughout the campus. No access controls.

ELECTRICAL SYSTEMS E

Rooms and panels, code compliant, receptacles, circuiting, etc.

Most of the existing gear on campus (buildings Admin/B/C/D) is as old as the MSB and past its servicable life; newer gear in good condition at J/K and Lincoln Center (MP and Cafeteria) In older wings panels are located in classrooms, corridors, custodial closets or outside of classrooms instead of dedicated electrical rooms. Gear in Gym building storage room observed without code required working clearance. Electrical equipment located in basement of gym that has experienced flooding.

LIGHTING AND LIGHTING CONTROLS E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

TECHNOLOGY SYSTEMS

AUDIVISUAL SYSTEMS

E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

Lighting in J/K is newer and good condition but not LED. Lighting in lincoln Hall is LED. Older wings have not been renovated, lighting is primarily T8 fluorescent and even some incadescent. Inverter in gym has been bypassed and is non functional (life-safety code issue). Some but not all exterior lighting has been upgraded to LED, PV canopies in parking lot have T8 lighting; exterior lighting controlled by BMS.

MDF is in dedicated room with conditioning but not dedicated cooling. IT has been recently upgraded with new fiber. Horizontal cabling is a mix of CAT5E, CAT6 and CAT6A. Pullboxes part of the existing underground pathway have been buried and no longer accessible. No data at baseball and softball fields. Classrooms have WAPs.

Most classrooms have a flat panel display or projector.

CHICO SR HIGH SCHOOL
BUILDING M LINCOLN HALL BUILDING N FITNESS LAB BUILDING S CLASSROOMS BUILDING SA ASSOCIATED STUDENTS BUILDING BUILDING ST STORAGE
BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING
VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. Not reviewed. Not reviewed. Distribution is original construction when AC-Units were added. Not reviewed. Not
M/P EMCS Type of system, web based
Programmable T-Stat?
reviewed. ENERGY MANAGEMENT SYSTEMS
/
205 BACK TO CONTENTS

PLEASANT VALLEY HIGH SCHOOL

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

MISC SITE OBSERVATIONS ALL

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

SITE CONDITION ASSESSMENT

Relatively new drop off area and accessible parking. Part of parking lot has received a slurry coat.

"Marquee

Flag pole at Admin

Hard court looks ok

New stadium

PV shade structures in Parking lot"

Fencing at perimeter of campus with a single point of entry to Admin Bldg

Some onsite pathways do not meet ADA standards

Vehicle parking area and asphalt area east of stadium are cracked and should be crack and slurry sealed

Storm drain pipes in vicinity of Buildings B, C, D, P and O are clogged and need to be replaced, campus has frequent flooding in this area that flows between Buildings B and O and south of Building G and east of Building F and thru asphalt area toward stadium, the roof between Buildings O and P is open and allows rain between the buildings and to collect in the recessed foundation area and a drainage system is needed to collect this water

The sewer pipes in the vicinity of Buildings H, V and W have clogging issues and should be replaced or slip lined, there are underground hose bibs that are failing and need to be replaced

PLEASANT VALLEY HIGH SCHOOL 206 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

Roof - Standing mtl seam - new Roof Fascia -Cement Plaster - new

Roof Drains - Gutter & DS to SDnew

Soffit - Cement plaster -new

Walls - Cement plaster, Corrugated mtl - new

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Frm & Dr, alumn storefront. PH/Lever handle/ Pull - new

Card Access - required

Windows -Storefront - new

Other - N/A

Int Door/Frm/Hdwr - HM Frm & Dr. PH/Lever handle - new

Flooring - Carpet tile, Sht vinyl, Vinyl Tile, Epoxy - new

Ceiling - 2x4 ACT, Gyp Bd - new

Casework/Sink - ADA ok

Space Planning - N/A

Other - N/A

Roof - asphalt shingle - new

Roof Fascia - Wood - newly painted

Roof Drains - Gutter & DS to SDnew

Soffit - Cement plaster - paint

Walls - Cement plaster - newly painted

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Frm & Dr.

PH/Lever handle/Pull - newly painted

Card Access - required

Windows -Alumin sash

Other - N/A

Space - Function is adeuate in existg space

Walls - Gyp Bd, Tack board - paint as needed

Int Door/Frm/Hdwr - HM Frm & Dr. PH/Lever handle

Flooring - Carpet tile, Sht vinyl, VCTreplace as needed

Ceiling - 2x4 ACT, Gyp Bd - replace as needed

Casework/Sink - no ADA

Space Planning - N/A

Other - N/A

Roof - asphalt shingle - replace

Roof Fascia - Wood - replace/ paint as needed

Roof Drains - Gutter & DS to SDrepair as needed

Soffit - Cement plaster - paint & repair as needed

Walls - Cement plaster - paint

Door Landing - not ADA

Door Threshold - no ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Knobs - replace

Card Access - required

Windows -Alumin sash

Other - N/A

Space - Function is adeuate in existg space

Walls - Gyp Bd, Tack board - paint as needed

Int Door/Frm/Hdwr - HM Frm

& Wd Dr. Lever Handle & KnobsReplace

Flooring - Carpet tile & VAT - replace as needed

Ceiling - 1x1 and 1x2 acoustic tilereplace as needed

Casework/Sink - no ADA

Space Planning - N/A

Other - Movable wall doesn't seem used.

Roof - asphalt shingle - replace

Roof Fascia - Wood - replace/ paint as needed

Roof Drains - Gutter & DS to SDrepair as needed

Soffit - Cement plaster - paint & repair as needed

Walls - Cement plaster - paint

Door Landing - not ADA

Door Threshold - no ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Lever, Knobs - replace

Card Access - required

Windows -Alumin sash

Other - N/A

Space - Function is adeuate in existg space

Walls - Gyp Bd, Tack board - paint as needed

Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle & KnobsReplace

Flooring - Sheet Vinyl, epoxy, Carpet tile & VAT, tile - replace as needed

Ceiling - 1x1 acoustic tile, 2x4 ACT, gyp bd - replace as needed

Casework/Sink - ADA ok

Space Planning - N/A

Other - N/A

Roof - asphalt shingle - new

Roof Fascia - Wood - newly painted

Roof Drains - Gutter & DS to SDnew

Soffit - Cement plaster - paint

Walls - Cement plaster - paint

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Frm & Dr.

PH/Lever handle/Pull

Card Access - some installed, required at others

Windows -Alumin sash

Other - N/A

Space - Function is adeuate in existg space

Walls - Gyp Bd, Tack board - paint as needed

Int Door/Frm/Hdwr - HM Frm

& Wd Dr. Lever Handle & KnobsReplace

Flooring - Sheet Vinyl, epoxy, Carpet tile & VAT, tile - replace as needed

Ceiling - 1x1 acoustic tile, 2x4 ACT, gyp bd - replace as needed

Casework/Sink - ADA ok

Space Planning - N/A

Other - N/A

Art classroom received some updates DSA

Roof - asphalt shingle & single ply - new

Roof Fascia - N/A

Roof Drains - Roof Drain to DS to SD - new

Soffit - N/A

Walls - CMU, corrugated metal, cement plaster

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Frm & Dr.

PH/Lever handle/Pull

Card Access - installed

Windows -Alumin sash

Other - N/A

Space - Function is adeuate in existg space

Walls - Gyp Bd

Int Door/Frm/Hdwr - HM Frm & Dr. Lever Handle

Flooring - Sheet Vinyl & concrete

Ceiling - exposed & 2x4 ACT

Casework/Sink - ADA ok

Space Planning - N/A

Other - N/A

OF
FOR PRICING BUILDING
ADMINISTRATION BUILDING A CLASSROOMS MEDICAL BUILDING B CLASSROOMS BUILDING C CLASSROOMS BUILDING D CLASSROOMS BUILDING E INDUSTRIAL ARTS BLDG COLOR ASSESSMENT SQUARE FOOTAGE 206,318 7,173 8,415 8,281 8,289 8,742 10,266
BUILDING SCOPE A/E INTENT
SCOPE
V
BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.
INTERIOR
Condition -
wall, ceiling) casework, shades,
BUILDING
A
finishes (floor,
etc.
space
Space - Function is adeuate in existg
Walls - Gyp Bd, Tack board, FRP - new
RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc. single Occup toilets room - ADA ok Multi Compartment bathroom - Non ADA floor slopes to drain, does not appear to have an accessible toilet stall. SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc.
CODE COMPLIANCE ITEMS A ADA, Fire Life
Structural - Must Do Items
Safety,
PLEASANT VALLEY HIGH SCHOOL 207 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.

Roof - asphalt shingle

Roof Fascia - Wood -paint

Roof Drains - Gutter & DS to SD

Soffit - Cement plaster - paint

Walls - Cement plaster - paint

Door Landing - no ADA

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Frm & Dr.

PH/Lever handle/Pull

Card Access - required

Windows - N/A

Other - N/A

Roof - asphalt shingle

Roof Fascia - Wood - paint

Roof Drains - Roof drain to DS to SD

Soffit - Cement Plaster - paint

Walls - cement plaster over concrete

Door Landing - no ADA

Door Threshold - no ADA

Doors/Frm/Hdwr - HM Frm & Dr.

PH/Lever handle

Card Access - required

Windows -N/A

Other - N/A

Roof - Asphalt shingle at manzard

roof & single ply

Roof Fascia - Wood - repair & paint as needed

Roof Drains - Roof drain to DS to SD

Soffit - Cement Plaster - paint

Walls - cement plaster over concrete

Door Landing -ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Frm & Dr.

PH/Lever handle

Card Access - required

Windows -N/A

Other - N/A

Space - Function is adeuate in existg space

Walls - Gyp Bd & tile

Int Door/Frm/Hdwr - HM Frm & Dr. Lever Handle

Flooring - Sheet Vinyl, tile, & concrete

Ceiling - Gyp Bd & 2x4 ACT

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

Space - Function is adeuate in existg space

Walls - Concrete, pads

Int Door/Frm/Hdwr - N/A

Flooring - Wood

Ceiling - 1x1 acoustic panels

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

Space - Function is adeuate in existg space

Walls - Concrete, pads

Int Door/Frm/Hdwr - N/A

Flooring - Wood

Ceiling - Exposed wd deck

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

Roof - Standing Metal Seam Roof

Roof Fascia - Mtl

Roof Drains -Gutter to DS to SD

Soffit -N/A

Walls - Corrugated Mtl

Door Landing - no ADA

Door Threshold - no ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Door PH.Pull

Card Access - required

Windows -N/A

Other - N/A

Roof - Asphalt shingle at manzard

roof & single ply

Roof Fascia - Wood - replace/ paint as needed

Roof Drains - Roof Drain & DS to SD

- repair as needed

Soffit - Cement plaster - paint & repair as needed

Walls - Cement plaster - paint

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Frm & Dr.

Lever, PH, Pull

Card Access - required

Windows -HM

Other - N/A

No access

Roof - asphalt shingle

Roof Fascia - Wood - replace/ paint as needed

Roof Drains - Roof Drian to DS to SD - repair as needed

Soffit - Cement plaster - paint & repair as needed, saw leaks in soffit

Walls - Cement plaster - paint

Door Landing - ADA ok

Door Threshold - no ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Lever Handles

Card Access - required

Windows -Alumin sash

Other - N/A

Space - Function is adeuate in existg space

Walls - gyp bd & tack board - paint as needed

Int Door/Frm/Hdwr - - HM Frm & Wd Dr. Lever Handle & pulls

Flooring - Carpet tile & VCT, tilereplace as needed

Ceiling - 1x1 acoustic tile, 2x4 ACT, gyp bd - replace as needed

Casework/Sink - no ADA

Space Planning - N/A

Other - N/A

Multi Compartment bathroom - ADA looks ok, but needs updating

Space - Function is adeuate in existg space

Walls - Gyp Bd, Tack board - paint as needed

Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle

Flooring - VCT

Ceiling - 2x4 ACT, gyp bd - replace as needed

Casework/Sink - no ADA

Space Planning - N/A

Other - N/A RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc. Multi Compartment bathroom - ADA looks ok, but needs updating Did not see an accessible shower.

DF - not ADA SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc.

DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items

Did not see an accessible bench in the locker room.

Didn't see companion seats at bleachers

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING F LOCKER ROOM BUILDING G EAST GYM BUILDING H WEST GYM BUILDING K WEIGHT ROOM BUILDING L LIBRARY BUILDING M CLASSROOMS
ASSESSMENT SQUARE FOOTAGE 5,502 5,953 11,212 2,609 14,452 13,960
BLDG COLOR
BUILDING INTERIOR
A Condition - finishes (floor, wall, ceiling) casework, shades, etc.
PLEASANT VALLEY HIGH SCHOOL 208 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

BUILDING R PE MAT ROOM BUILDING S (ALSO KNOWN AS N) CLASSROOMS BUILDING T STUDENT CENTER

Soffit -N/A

Walls - Corrugated Mtl

Door Landing - no ADA

Door Threshold - no ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Door PH.Pull

Card Access - required

Windows -N/A

Other - N/A

A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

No access

Roof - Asphalt shingle at manzard roof & single ply

Roof Fascia - Wood - replace/ paint as needed

Roof Drains - Roof Drian to DS to SD - repair as needed

Soffit - Cement plaster - paint & repair as needed

Walls - Cement plaster - paint

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Frm & Dr.

Lever Handles, PH, Pull

Card Access - required

Windows -Alumin sash

Other - N/A

Space - Function is adeuate in existg space

Walls - Gyp Bd, Tack board - paint as needed

Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle

Flooring - VCT & Tile

Ceiling - 2x4 ACT, gyp bd - replace as needed

Casework/Sink - no ADA Space Planning - N/A

Other - N/A

Roof - Built up roof - replace

Roof Fascia - N/A

Roof Drains - Roof Drian to DS to SD - repair as needed

Soffit - Cement plaster - paint & repair as needed, saw leaks in soffit

Walls - Cement plaster - paint

Door Landing - no ADA

Door Threshold - no ADA

Doors/Frm/Hdwr - HM Frm & Dr.

Lever Handles

Card Access - required

Windows - N/A

Other - N/A

U MAINTENANCE SHED

Roof - Metal roof

Roof Fascia - N/A

Roof Drains - none

Soffit - N/A

Walls - corrugated metal

Door Landing - no ADA

Door Threshold - no ADA

Doors/Frm/Hdwr -Corrugated metal

doors

Card Access - N/A

Windows - N/A

Other - N/A

W CENTER FOR THE ARTS

Roof - Standing metal seam at manzard & single ply

Roof Fascia - metal

Roof Drains - Roof Drian to DS to

SD - repair as needed

Soffit - Cement plaster - paint

Walls - Cement plaster over CMUpaint

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - Aluminum

storefront Dr. PH & pulls

Card Access - required

Windows -Alumin storefront

Other - N/A

Roof - Standing metal seam at manzard & single ply

Roof Fascia - metal

Roof Drains - Roof Drian to DS to SD

Soffit - Cement plaster - paint

Walls - Cement plaster & corrugated metal

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - Aluminum

storefront Dr. PH & pulls

Card Access - required

Windows -Alumin storefront

Other - N/A

No access

No access

Space - Function is adeuate in existg space Walls - Gyp Bd- paint as needed

Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle , pulls, PH

Flooring - Carpet, concrete, tile sheet

vinyl

Ceiling - 2x4 ACT, gyp bd, acoustic clouds- replace as needed

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

Space - Function is adeuate in existg space Walls - Gyp Bd, tack board, tile

Int Door/Frm/Hdwr - HM Frm & Dr. Lever Handle pulls, PH Flooring - Carpet, concrete, tile , sheet vinyl

Ceiling - 2x4 ACT, gyp bd, acoustic clouds- replace as needed

Casework/Sink - ADA ok

Space Planning - N/A

Other - N/A

BUILDING
BUILDING
ASSESSMENT SQUARE FOOTAGE 2,785 16,685 1,276 1,231 7,173 42,164
BUILDING
Y CLASSROOMS BLDG COLOR
BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc. Roof - Standing Metal Seam Roof Roof Fascia - Mtl Roof Drains -Gutter to DS to SD
BUILDING INTERIOR
RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc. Science Classroom are in good shape but missing
ADA sink Multi Compartment bathroom - ADA looks ok Multi Compartment bathroom - ADA ok SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc. Choir & Band room DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items
outside doors does not allow for level landing
an
Area
PLEASANT VALLEY HIGH SCHOOL 209 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

BUILDING EXTERIOR

BUILDING INTERIOR

A Condition - materials, repair / replace, painting, windows, etc.

Roof - Standing metal seam at manzard & single ply | Roof Fascia - metal

Roof Drains - Roof Drian to DS to SD - repair as needed | Soffit - metal panel Walls - Cement plaster & corrugated metal

A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Space - Function is adeuate in existg space

Walls - Gyp Bd, FRP, Tile

Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle , pulls, PH

Flooring - Epoxy, concrete, tile sheet vinyl Ceiling - 2x4 ACT, gyp bd, acoustic clouds below exposed deck

Casework/Sink - N/A | Space Planning - N/A

Other - N/A

RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

Multi Compartment bathroom - ADA lok

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

UTILITY MPOE/ MDG E

FIRE ALARM SYSTEM E

Data infrastructure (i.e. 10GB) Carrier, location, size of space

Existing system, code compliant , replace vs retrofit, Voice Evac, etc.

CLOCK / INTERCOM / SPEAKER SYSTEM E System, headend, type (i.e. VOIP), replace vs retrofit

ACCESS / INTRUSION / SECURITY E Types of systems, hardware, CCTV, opening contacts, etc.

ELECTRICAL SYSTEMS E

LIGHTING AND LIGHTING CONTROLS

Rooms and panels, code compliant, receptacles, circuiting, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

TECHNOLOGY SYSTEMS E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

AUDIVISUAL SYSTEMS

Roof - Asphalt at manzard & single ply | Roof Fascia - Wood

Roof Drains - Roof Drian to DS to SD - repair as needed | Soffit - plywood - paint

Walls - Cement plaster - paint

Door Landing - ADA ok | Door Threshold - not ADA | Doors/Frm/Hdwr - HM Frm & Dr.Lever handle

Card Access - required | Windows -Alumin sash

Other - N/A

Space - Function is adeuate in existg space

Walls - Gyp Bd, Tack board - paint as needed

Int Door/Frm/Hdwr - HM Frm & Wd Dr. Lever Handle

Flooring - VCT | Ceiling - 2x4 ACT - replace as needed

Casework/Sink - N/A | Space Planning - N/A

Other - N/A

MISC

PG&E service is central to the campus in secure enclosure with existing 4000A 277/480V main switchboard, GE Spectra series about 30 years old. MSB is in servicable condition but underground conduit pathway is limited an lots of exposed conduit and no way to route new feeders from the MSB for new work. Numerous disconnects attached to the MSB presumably for bus taps. PV system interconnected at the MSB.

Campuswide fire alarm upgrade to Silent Knight 6820EVS completed within the past year.

Valcom IP Clock/PA system is adequate meets current district standards.

No intrusion alarm on campus except at the school store. Security cameras throughout the campus. No access control system.

Older gear in many of the existing buildings that haven't been renovated (and in some that have had recent 'light' renovations) nearing end of servicable life. In many cases gear is in attic space that is not easily accessible or adequately lit.

Many of the existing buildings that haven't been renovated include old T8 fluorescent lighting and limited controls, which do not meet current energy code requirements. New buildings and recent renovations have LED lighting, some have nLight controls and others Cooper Wavelinx. LED parking lot lighting.

MDF is located at Building L, IT has been recently upgraded with new fiber and horizontal cabling. Undeground pathway is adequate. No data at baseball and softball fields. Classrooms have WAPs.

E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

Most classrooms have a flat panel display or projector.

SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING Z CAFETERIA / CULINARY BUILDINGS O, P MODULAR
ASSESSMENT SQUARE FOOTAGE 16,675
BUILDING
BLDG COLOR
11177
Door Landing - ADA ok |Door Threshold - ADA ok | Doors/Frm/Hdwr - Aluminum storefront Dr. PH & pulls
Card Access - installed | Windows -Alumin storefront Other - N/A
PLEASANT VALLEY HIGH SCHOOL 210 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING

EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

Not reviewed. Newly Renovated w/ Trane Split Systems. (9) Lennox Packaged AC-Units +30 years old and at end of life.

Not reviewed. Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW

FIRE SPRINKLER SYSYTEM

M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

M/P Does AFS exist, location, code compliant, etc.

EXISTING SEISMIC CONCERNS S

EB-3, EB-4 triggers, etc.

Not reviewed. The campus has a mix of both Alerton and Johnson Controls Good condition.

The campus has a mix of both Alerton and Johnson Controls Good condition.

Newly Renovated w/ Trane Split Systems.

Distribution is original construction when AC-Units were added.

The campus has a mix of both Alerton and Johnson Controls Good condition.

Newly Renovated

Distribution is original construction when AC-Units were added. Not reviewed.

The campus has a mix of both Alerton and Johnson Controls Good condition.

Not reviewed.

Not reviewed. Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating. Not reviewed.

Not reviewed. Plumbing Equipment is from original construction. Plumbing Equipment is from original construction. Plumbing Equipment is from original construction. Plumbing Equipment is from original construction. Not reviewed.

Not reviewed. Not reviewed.

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING F GYM & LOCKER ROOM

EXTERIOR EQUIPMENT ASSESSMENT M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

(20 Carrier & (2) Lennox Packaged AC-Units serving main spaces. (4) Split Systems serving offices. All equipment is approx. 28 years old and at it's end of life.

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P

PLUMBING

G GYM & LOCKER ROOM

(2) Carrier Packaged AC-Units 8 years old.

(4) Carrier Packaged AC-Units 8 years old.

(3) recently installed Split System Units. Good condition

(12) Carrier Packaged AC-Units + 20 years old and nearing the end of life.

(13) Carrier Packaged AC-Units + 20 years old and nearing the end of life.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

EMCS Type of system, web based / Programmable T-Stat?

FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic

The campus has a mix of both Alerton and Johnson Controls Good condition.

The campus has a mix of both Alerton and Johnson Controls Good condition.

The campus has a mix of both Alerton and Johnson Controls Good condition.

The campus has a mix of both Alerton and Johnson Controls Good condition.

The campus has a mix of both Alerton and Johnson Controls Good condition.

The campus has a mix of both Alerton and Johnson Controls Good condition.

Needs updating. Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating.

BUILDING
BUILDING
BUILDING
H WEST GYM BUILDING K WEIGHT ROOM BUILDING L LIBRARY
M CLASSROOMS
Plumbing
Plumbing
condition.
Plumbing
ok condition. Needs updating. Plumbing Fixtures in ok condition.
Fixtures in ok condition. Needs updating.
Fixtures in ok
Needs updating.
Fixtures in
braced) Plumbing Equipment is from original construction. Plumbing Equipment is from original construction. Plumbing Equipment is from original construction. Plumbing Equipment is from original construction. Plumbing Equipment is from original construction. Plumbing Equipment is from original construction. FIRE SPRINKLER SYSYTEM
M/P
exist,
Does AFS
location, code compliant, etc.
SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING V ADMINISTRATION BUILDING A CLASSROOMS MEDICAL BUILDING B CLASSROOMS BUILDING C CLASSROOMS BUILDING D CLASSROOMS BUILDING E INDUSTRIAL ARTS
BUILDING
w/ Trane Split Systems. Not reviewed.
INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.
PLEASANT VALLEY HIGH SCHOOL 211 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

EXTERIOR EQUIPMENT ASSESSMENT

INTERIOR EQUIPMENT ASESSMENT

M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER SYSYTEM M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Does AFS exist, location, code compliant, etc.

Bard Heat Pumps, approx. 8 years old. Good condition.

Distribution is original construction when AC-Units were added.

The campus has a mix of both Alerton and Johnson Controls Good condition.

(11) Carrier Packaged AC-Units + 20 years old and nearing the end of life. Bard Heat Pumps, approx. 8 years old. Good condition. Not reviewed. Packaged AAON Roof Top AC-Units, Approx. 18 years old. Not reviewed.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

The campus has a mix of both Alerton and Johnson Controls Good condition.

The campus has a mix of both Alerton and Johnson Controls Good condition.

Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating.

Not reviewed. Distribution is original construction when AC-Units were added. Not reviewed.

Not reviewed. The campus has a mix of both Alerton and Johnson Controls Good condition.

Not reviewed.

Not reviewed. Plumbing Fixtures in ok condition. Needs updating. Not reviewed.

Plumbing Equipment is from original construction. Plumbing Equipment is from original construction. Plumbing Equipment is from original construction. Not reviewed. Plumbing Equipment is from original construction. Not reviewed.

Not reviewed. Not reviewed.

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING Z CULINARY / MULTI-PURPOSE BUILDINGS O, P MODULAR BUILDINGS X PORTABLES

EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

Not reviewed.

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. Not reviewed. Distribution is original construction when AC-Units were added. Distribution is original construction when AC-Units were added.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat? Not reviewed. Stand alone Programmable T-Stat's. Stand alone Programmable T-Stat's.

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER SYSYTEM M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Does AFS exist, location, code compliant, etc.

Not reviewed. Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating.

Not reviewed.

Not reviewed.

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING R PE MAT ROOM BUILDING S CLASSROOMS BUILDING T STUDENT CENTER BUILDING U MAINTENANCE SHED BUILDING W CENTER FOR THE ARTS BUILDING Y CLASSROOMS
PLEASANT VALLEY HIGH SCHOOL 212 BACK TO CONTENTS

FAIR VIEW HIGH SCHOOL

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

SITE CONDITION ASSESSMENT

Walkways along Buildings B, C, D, G, H, I, J and the parking area do not meet ADA standards, numberous door areas do not meet ADA standards

No comment

Crack and slurry seal parking areas

Replace all walkways at entry doors to classrooms and restrooms.

No known issues

An existing water tank and well are abandoned and should be removed, there is no irrigation at Building N and the edge of pavement in this area and it should be added, there is a private irrigation pipe under the sidewalk along East Avenue that should be relocated

Gas Distribution on roofs looks to be in good condition. System has seismic piping expansion joints and piping hold-downs.

FAIR VIEW HIGH SCHOOL 213 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

A Condition - materials, repair / replace, painting, windows, etc.

Exterior skin -cement plaster

Soffit- cement plaster

Roofing - tar and gravel- Replace

Doors:hollow metal in HM frames w/ knob hardware- Replace - noncompliant ADA landing & threshold at door

Windows - alum. storefront - single glazed

Roof drainage - no gutter / downspouts to grade

BUILDING

BUILDING INTERIOR

RESTROOMS

A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Doors: knob hardware

Flooring: VAT - Abatement reqd.

Walls: plywood

Ceilings: cement plaster, lot of exposed conduit, raceways

Lighting: dbl pendant hung flourescent

Sink not ADA compliant

A Fixtures, accessories, ADA compliant, finishes, etc.

A MPR, Libraries, Kitchens, Science, etc.

SPECIALITY

SPACES REVIEW

Exterior skin - plaster,wood siding & mtl. sash wall/wdw sys. @ back elevation-Replace

Soffit- plywood, some dry rot

Roofing - tar and gravel- Replace

Doors: wood in HM frames w/ knob hardware- Replace

Back door- alum. in alum. frame, knob hardware & conc. stoop landing - not ADA compliant

Windows - single pane, metal sashReplace

Roof drainage - no gutter / downspouts to grade

Doors: knob hardware

Flooring: VAT - Abatement reqd.

Walls: cement plaster

lot of exposed conduit, raceways

Ceilings: cement plaster

Lighting: 1x4 flourescent

Sink not ADA compliant

Exterior skin - cement plaster

Roofing - assumed tar & gravelReplace

Exterior wood doors to playgroundgiant gas meter in the way

Same as C Exterior skin - cement plaster

Roofing - assumed tar & gravelReplace

Exterior wood doors to playground - giant gas meter in the way- Replace

doors and frames

Doors: wood w/ push/pull hardware-

Replace

Flooring: tile, slope issues- Correct

Walls: tile wainscot/gyp bd

Ceilings: gyp. bd.

Lighting: 2x4 flourescent

Possible non-compliant ADA floor slopes, entry and back doors not ADA compliant in width, landing and threshold

Same as C

Doors: wood w/ old bar panic hardware- Replace

Flooring: VAT-Abate & Replace

Walls: gyp bd w/ in-wall tables

Ceilings: 1 x 1 acous tile

Lighting: 2x4 surface mounted flourescent

Same as C

MP does not have a stage

Kitchen

Doors: wood w/ knob hardwareReplace

Flooring: VAT-Abate & Replace

Walls: gyp bd

Ceilings: 1 x 1 acous tile

Lighting: 1x4 pendant hung flourescent, lot of exposed conduit and wiremold DSA

Same as C

SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING B IN SCHOOL SUSPENSION BUILDING C CLASSROOMS BUILDING D RESTROOMS BUILDING E CLASSROOMS BUILDING F MUTI-PURPOSE BUILDING G CLASSROOMS BLDG COLOR ASSESSMENT SQUARE FOOTAGE 31,109 1,270 4,270 1,027 4,253 5,466 4,246
BUILDING
EXTERIOR
ADA,
EB-3 / EB- 4, Door threshold not ADA compliant-
EB-3 / EB- 4 DSA EB-3 / EB-
Door
ADA
EB-3
EB- 4 DSA EB-3
CODE COMPLIANCE ITEMS A
Fire Life Safety, Structural - Must Do Items DSA
remove & replace walkway DSA
4,
threshold not
compliant- remove & replace walkway DSA
/
/ EB- 4, Door threshold not ADA compliant- remove & replace walkway
FAIR VIEW HIGH SCHOOL 214 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING J COMPUTER LAB & OFFICE

BLDG COLOR ASSESSMENT

BUILDING N CONSTRUCTION TECH SHOP

SQUARE FOOTAGE 1,224 2,708

BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.

BUILDING INTERIOR A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc.

DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items

Old portable building New building

New building

DSA EB-3 / EB- 4

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING MISC

UTILITY MPOE/ MDG E Data infrastructure (i.e. 10GB) Carrier, location, size of space

FIRE ALARM SYSTEM E Existing system, code compliant , replace vs retrofit, Voice Evac, etc.

CLOCK / INTERCOM / SPEAKER SYSTEM E

ACCESS / INTRUSION / SECURITY

System, headend, type (i.e. VOIP), replace vs retrofit

E Types of systems, hardware, CCTV, opening contacts, etc.

ELECTRICAL SYSTEMS E Rooms and panels, code compliant, receptacles, circuiting, etc.

LIGHTING AND LIGHTING CONTROLS E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

E

TECHNOLOGY SYSTEMS

AUDIVISUAL SYSTEMS

E

IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

PG&E service is in dedicated enclosure behind school with 1600A GE Spectra Series MSB, 120/208V, approx. 25-30 years old, servicable condition. There is room for additional breakers.

Silent Knight 5820XL without voice evacuation. System is fully automatic and has been upgraded, but prior to voice requirement.

Bogen Multi-com 2000 does not meet current district standards. Clock system is very old, probably original to the campus. High priority.

Four separate intrusion alarm systems (Vista) on campus, consider consolidating. Cameras throughout the campus. No access controls.

Panelboards located at roof level are essentially unservicable due to location. Many panels observed may be 60+ years old and obselete. Lots of exposed conduit routed on sided of buildings. Wiremold used in classrooms.

Interior lighting consists of troffers with T8 lamps, old pendants with T5 lamps, LED exit lights and old bug-eye emergency lights. No automatic lighting controls. LED parking lot lighting, remainder of exterior lightign on buildings is old CFL and incandescent.

MDF is in dedicated room with conditioning but not dedicated cooling. IT has had some upgrades, with new fiber and mostly new CAT 6/6A horizontal cabling. Much of the conduit infrastructure is surface mounted conduit on buildings and overfllled. Some IDF cabinets are in classrooms. Classrooms have WAPs.

Most classrooms have a flat panel display.

FAIR VIEW HIGH SCHOOL 215 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING

EXTERIOR EQUIPMENT ASSESSMENT

M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

BDP Roof mounted AC-Units +30 years.Units are at end of life and need replacement within the next 2-5 years..

(4) BDP Roof mounted AC-Units +30 years.Units are at end of life and need replacement within the next 2-5 years..

(2) Original Roof Mounted Exhaust Fans. Need replacement

(5) BDP Roof mounted AC-Units +30 years.Units are at end of life and need replacement within the next 2-5 years..

(2) BDP Roof mounted AC-Units +30 years.Units are at end of life and need replacement within the next 2-5 years..

(5) BDP Roof mounted AC-Units +30 years.Units are at end of life and need replacement within the next 2-5 years..

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

FIRE SPRINKLER SYSYTEM M/P Does AFS exist, location, code compliant, etc.

EXISTING SEISMIC CONCERNS S EB-3, EB-4 triggers, etc.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project

Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating.

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR EQUIPMENT ASSESSMENT M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P EMCS

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P

PLUMBING EQUIPMENT REVIEW M/P

BUILDING J COMPUTER LAB & OFFICE

BUILDING N CONSTRUCTION TECH SHOP

Interior Mounted Trane Split System. 8-10 years old. Server room need new dedicated Mini-Split. New Roof Mounted Reznor MAU with Evaporative Cooling. +20 years old. New Shop Dust Collector, 5 years old.

Distribution is original construction when AC-Units were added.

Distribution is original construction when AC-Units were added.

BUILDING A, H, I, K, L, M, N PORTABLES

Portables appear to be Wall Mounted Heat Pumps from the original construction. +25 years old and need replacement.

Distribution is original construction when AC-Units were added.

Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project

Plumbing Fixtures in ok condition. Needs updating.

Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project

Plumbing Fixtures are from original construction and in ok condition. Replacement should be considered with any modernization project

Gas Fired Hot Water Heater, +20 years old. Needs replacement. Plumbing Fixtures in ok condition. Needs updating.

BUILDING A, H, I, K, L, M, N PORTABLES

Portables appear to be Wall Mounted Heat Pumps from the original construction.

Distribution is original construction when AC-Units were added.

Fixtures,

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Does AFS exist, location, code compliant, etc.

Replacement should be considered with any modernization project Plumbing Fixtures are from original construction and in ok condition.

Plumbing Fixtures are from original construction and in ok condition.

Plumbing Fixtures are from original construction and in ok condition.

Replacement should be considered with any modernization project

Replacement should be considered with any modernization project

Replacement should be considered with any modernization project

Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating. FIRE SPRINKLER SYSYTEM M/P

None found

BUILDING
IN SCHOOL SUSPENSION
CLASSROOMS
RESTROOMS
CLASSROOMS
MUTI-PURPOSE BUILDING
CLASSROOMS
BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING
B
BUILDING C
BUILDING D
BUILDING E
BUILDING F
G
Johnson Controls
updating Johnson Controls
Johnson Controls Needs updating Johnson Controls Needs updating Johnson Controls
updating Johnson Controls Needs
Needs
Needs updating
Needs
updating
None
None found None found None found None found None found
found
FAIR VIEW HIGH
SCHOOL
Johnson Controls Needs updating Johnson Controls Needs updating Stand alone Programmable T-Stat's. Stand alone Programmable T-Stat's.
Type of system, web based / Programmable T-Stat?
Plumbing
Restrooms, sinks, drinking fountains / bottle fillers, etc. Plumbing Fixtures are from original construction and in ok condition.
None found Fully Fully Fire Sprinklered. None found
216 BACK TO CONTENTS

OAK BRIDGE ACADEMY

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

COST PER SF SITE CONDITION ASSESSMENT HIGH MEDIUMHIGH MEDIUM LOW

In a business park - does not have drop-off. Does havve accessible parking space

In a business park - does not have hardcourt, play structure, flag pole, bike lockers, or marquee sign. Has a garden at the rear of building.

No fencing at rear side of building for garden area. There is a single point of access in the Administration.

Some onsite pathways and ramps do not comply with ADA requirements

Areas do not meet slope requirements

Some areas of alligator cracking and other cracks. Replacement of cracked pavement areas.

No known issues

No known issues

Commerical Site

No provision in Mechanical systems for Code required Outside Air.

OAK BRIDGE ACADEMY 217 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

BLDG COLOR ASSESSMENT

SQUARE FOOTAGE

BUILDING EXTERIOR

A Condition - materials, repair / replace, painting, windows, etc.

Roof - asphalt shingle - adequate

Roof Fascia - Wood - repaint as needed

Roof Drains - Gutter & DS to Grade - repaint as needed

Soffit - Wd T&G - as needed

Walls - Cement plaster, & CMU block - repaint as needed

Door Landing - not ADA

Door Threshold - not ADA

Doors/Frm/Hdwr -alumn storefront Dr. Push & PUlladequate

Card Access - required

Windows - Aluminum storefront - adequate

Other - N/A

A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Space - is adeuate in existg space

Walls - Gyp Bd, tack board, marker board & tile - repaint as needed

Int Door/Frm/Hdwr - Wd Frm & Door. Lever handleadequate

Flooring - sheet carpet & Sht vinyl - replace as needed

Ceiling - 2x4 ACT & Gyp Bd - replace as needed

Casework/Sink - Not ADA

Space Planning - very efficient use of space - lots of staff desk stations

Roof - asphalt shingle - adequate

Roof Fascia - Wood - repaint as needed

Roof Drains - Gutter & DS to Grade - repaint as needed

Soffit - Wd T&G - as needed

Walls - Cement plaster, & CMU block - repaint as needed

Door Landing - not ADA

Door Threshold - not ADA

Doors/Frm/Hdwr -alumn storefront Dr. Push & PUlladequate

Card Access - required

Windows - Aluminum storefront - adequate

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd & tile - repaint as needed

Int Door/Frm/Hdwr - Wd Frm & Door. Lever handleadequate

Flooring - sheet carpet & Sht vinyl - replace as needed

Ceiling - 2x4 ACT & Gyp Bd - replace as needed

Casework/Sink - Not ADA

Space Planning - A maze of offices and staff desk stations

Other - N/A

BUILDING INTERIOR

RESTROOMS

Other - N/A

A Fixtures, accessories, ADA compliant, finishes, etc. single Occup toilets room - may not be ADA single Occup toilets room - not be ADA DF - not ADA

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING MISC

E Data infrastructure (i.e. 10GB) Carrier, location, size of space

UTILITY MPOE/MDG

FIRE ALARM SYSTEM

CLOCK / INTERCOM / SPEAKER SYSTEM

ACCESS / INTRUSION / SECURITY

ELECTRICAL SYSTEMS

LIGHTING AND LIGHTING CONTROLS

TECHNOLOGY SYSTEMS

AUDIVISUAL SYSTEMS

E Existing system, code compliant , replace vs retrofit, Voice Evac, etc.

5 separate meters feed 5 100A panels located in undersized electrical room. There is no light in the electrical room. There is not code required working clearance in front of the gear. 5 separate meters should be consolidated into a single service.

Sub-panels in each separate 'suite'. Gear is by Zinsco and not servicable.

E System, headend, type (i.e. VOIP), replace vs retrofit Romex in accessible ceiling space in inappropriate for commercial construction. MC Cable above ceiling not installed or supported per code. Recpetacles near sinks with no GFCI protection. Surface raceway.

E Types of systems, hardware, CCTV, opening contacts, etc.

Time clock in electrical closet controls exterior lighting. No automatic interior controls, manual switches only. Very few LED lights, primarily T8 fluorescent and even some incandescent lamps. LED exit lights with bug-eyes.

E Rooms and panels, code compliant, receptacles, circuiting, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

No functional fire alarm system observed, some smoke detectors may be 'stand alone'. High priority.

No clock/PA system observed.

System is installed, but not clear if it is functional or being used. Security cameras obseverd. No access control system.

MPOE is a very small closet with no light and no working clearance. Wiring is not installed in a workmanlike manner nor is it labeled. Some WAPs and interior IT upgrades observers, could not find the IDF in this building.

BUILDING CONDITIONS - MECHANICAL/PLUMBING

BUILDING SCOPE

EXTERIOR EQUIPMENT ASSESSMENT

INTERIOR EQUIPMENT ASESSMENT

A/E INTENT OF SCOPE FOR PRICING MISC

M/P

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

ENERGY MANAGEMENT SYSTEMS M/P

PLUMBING FIXTURE

REVIEW - ADA COMPLIANCE M/P

PLUMBING EQUIPMENT REVIEW M/P

FIRE SPRINKLER SYSYTEM M/P

EMCS Type of system, web based / Programmable T-Stat?

Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Does AFS exist, location, code compliant, etc.

The exterior equipment consist of ground mounted condensing units. These units vary in age and the majority are +18 years or older.

The Interior Equipment consist of attic mounted gas fired split systems with Cooling Coils. It should be noted that on all systems no provisions have been made for fresh outside air. Adding OSA will require larger units than those currently installed.

Zoning was originally completed per exposure E,W,N, etc.Programmable stats and Intermatic Timeclocks are the only EMCS system availbal.

Plumbing Fixtures are from original construction.

3-4 Electric How Water Heaters are located in the attic spaces. They appear to be 6-8 years old.

None found

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING A BUILDING B
OAK BRIDGE ACADEMY
218 BACK TO CONTENTS

CORPORATE YARD

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

SITE CONDITION ASSESSMENT

Asphalt area for parking is not in good condition, seems tight on parking near faclity office & M&O portables, cars parked in areas that are not parking spaces.

The propterty seems to be fully fenced one main entrance to the site but does not have a single poiint of entry for the site, may not be a requirement.

Portions of path of travel near Building K do not meet slope requirements.

ADA flatwork stall near Building J does not meet slope requirements.

Asphalt very cracked near the entry to the site.

No known issues.

No known issues.

CORPORATE YARD 219 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

BLDG COLOR ASSESSMENT

SQUARE FOOTAGE

BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.

Condition - finishes (floor, wall, ceiling) casework, shades, etc.

BUILDING A WAREHOUSE, SHOP, BUS REPAIR, & NOW NUTRITIONAL SERVICES OFFFICE

Roof - Metal roof - shop areas could use insulation

Roof Fascia - Metal

Roof Drains - Gutter & DS to SDrepaint as needed

Soffit - N/A

Walls - corrugated metal - repaint as needed

Door Landing - not ADA

Door Threshold - not ADA

Doors/Frm/Hdwr Mtl Frm with HM

Door. Lever handle & Knobs - replace

Card Access -required

Windows - Alumn sash

Other - N/A

Space - Function is adeuate in existg space, limited existing building.

Walls - metal and gyp bd - shop areas could use insulation

Int Door/Frm/Hdwr - Wood Frm & Wd Door. Lever handle. Knobreplace

Flooring - VCT, Sht vinyl, concretereplace as needed

Ceiling - Gyp Bd & Metal roof deck - repaint as needed

Casework/Sink - not ADA

Space Planning - N/A

Other - N/A

BUILDING B LAUNDRY, BREAKROOM

Roof - Metal roof

Roof Fascia - N/A

Roof Drains - No Gutter & DS

Soffit - N/A

Walls - Corrugated metal

Door Landing - no ADA

Door Threshold - ADA ok

Doors/Frm/Hdwr - Wd Frm &

Fiberglass Door. Knob - replace

Card Access -required

Windows - Aluminum sash

Other - N/A

BUILDING C GROUNDS STORAGE

Roof - Metal roof

Roof Fascia - N/A

Roof Drains - No Gutter & DS

Soffit - N/A

Walls - Corrugated metal

Door Landing - no ADA

Door Threshold - no ADA

Doors/Frm/Hdwr - Mtl Frm & Door.

Knob - replace

Card Access -required

Windows - wood sash, some are boarded

Other - N/A

Space -Space size is adequate

Walls - gyp bd - paint as needed

Int Door/Frm/Hdwr - Wd frm & Dr.

Knobs - replace

Flooring - concrete - add a flooring

Ceiling - gyp bd - repaint as needed

Casework/Sink - no ADA

Space Planning - N/A

Other -

BUILDING D STORAGE

Roof - Metal roof

Roof Fascia - Wood

Roof Drains - No Gutter & DS

Soffit - N/A

Walls - Corrugated metal

Door Landing - no ADA

Door Threshold - no ADA

Doors/Frm/Hdwr - Wd frm & dr.

lever handle

Card Access -required

Windows - Aluminum sash

Other - storage door for pesticide is

deteriorated - replace

Space -Space size is adequate

Walls - gyp bd - paint as needed

Int Door/Frm/Hdwr - N/A

Flooring - concrete

Ceiling - plywd - repaint as needed

Casework/Sink - N/A

Space Planning - N/A

Other - Space coud use some clean up.

Space -Space size is adequate

Walls - metal

Int Door/Frm/Hdwr - N/A

Flooring - concrete

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

BUILDING E PAINT SHOP

Roof - Metal roof

Roof Fascia - N/A

Roof Drains - No Gutter & DS

Soffit - N/A

Walls - Corrugated metal

Door Landing - no ADA

Door Threshold - no ADA

Doors/Frm/Hdwr - Mtl Frm & Door.

Knob - replace

Card Access -required

Windows - Alumn sash

Other - N/A

BUILDING F PLANS ROOM

Roof - Metal roof

Roof Fascia - wood

Roof Drains - No Gutter & DS

Soffit - plywood

Walls - T1-11 - repaint as needed

Door Landing -ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr HM Frm & Door.

Knob - replace

Card Access -required

Windows - Alumn sash

Other - N/A

Space -Space size is adequate

Walls - gyp bd - paint as needed

Int Door/Frm/Hdwr - N/A

Flooring - concrete

Ceiling - plywd - repaint as needed

Casework/Sink - N/A

Space Planning - installing additional shelving to organize materials could open floor area.

Other - Space coud use some clean up.

Space - Function is adeuate in existg space, has been used for meetings, could use meeting table and chairs.

Walls - tack panels & white board

Int Door/Frm/Hdwr - N/A

Flooring - VCT - replace as needed

Ceiling - 2x4 ACT - replace as needed

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

A

RESTROOMS

Fixtures, accessories, ADA compliant, finishes, etc. single Occup toilets room-many are not ADA accessible, new toilets rooms in the nutrician office are not ADA compliant. Bus repair area has various toilet faclities that are not ADA accessible.

A MPR, Libraries, Kitchens, Science, etc.

SPECIALITY

SPACES REVIEW

DSA CODE

COMPLIANCE ITEMS

A ADA, Fire Life Safety, Structural - Must Do Items

Bldg houses bus repair - some repair/ replacement needed for lifts, Carpenters shop, Nutritional service equipment and dry good storage, other supplies, it serves as a receiving area. Also newly tenant improvement for Nutricianal Service offices. Washer, dryer & utility sink.

Mezanine at Bus Barn and Warehouse areas are not accessible.

Tire Storage

BUILDING INTERIOR A
CORPORATE YARD 220 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL

BUILDING G MAINTENANCE & OPERATIONS

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

OFFICE MOVED OUT, FACILITIES WILL EXPAND INTO THIS SPACE

BLDG COLOR ASSESSMENT

SQUARE FOOTAGE

BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.

Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Roof - Metal roof

Roof Fascia - wood

Roof Drains - No Gutter & DS

Soffit - plywood

Walls - T1-11 - repaint as needed

Door Landing -ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr Wd Frm with fiberglass Door. Knob - replace

Card Access -required

Windows - Alumn sash

Other - floor in 2 rear offices degraded to the point of failure.

Space - Function is adeuate in existg space, M&O was moving out of this space. Portable is slated to house

Facilities offices

Walls - tack panels & gyp bd - paint as needed

Int Door/Frm/Hdwr - Wd frame & doors. Lever handles.

Flooring - VCT & Sht carpetreplace as needed

Ceiling - 2x4 ACT - replace as needed

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc. floor in 2 rear offices degraded to the point of failure, repairs are needed.

BUILDING H FACILITIES OFFICE

Roof - Metal roof

Roof Fascia - wood

Roof Drains - Gutter & DS to grade

Soffit - plywood

Walls - T1-11 - repaint as needed

Door Landing -ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr HM frm & Dr.

Knob - replace

Card Access -required

Windows - Alumn sash

Other - N/A

Space - Function is adeuate in existg space

Walls - gyp bd - paint as needed

Int Door/Frm/Hdwr - N/A

Flooring - sheet vinyl - replace as needed

Ceiling - gyp bd - paint as needed

Casework/Sink - no ADA

Space Planning - N/A

Other - N/A

BUILDING I RESTROOMS

Roof - Metal roof

Roof Fascia - wood

Roof Drains - Gutter & DS to grade

Soffit - plywood

Walls - T1-11 - repaint as needed

Door Landing -ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr HM frm & Dr.

Lever Handles

Card Access -N/A

Windows - Alumn sash

Other - N/A

Space - Function is adeuate in existg space

Walls - tack panels & gyp bd - paint as needed

Int Door/Frm/Hdwr - Wd frame & doors. Lever handles.

Flooring - VCT & Sht carpetreplace as needed

Ceiling - 2x4 ACT - replace as needed

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

BUIDING J/K M&O, WAS NUTRITION SERVICES OFFICE

Roof - Metal roof

Roof Fascia - Wood

Roof Drains - No Gutter & DS to grade

Soffit - N/A

Walls - Corrugated metal - repaint as needed

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr metal frm & Dr.

Lever handle.

Card Access -N/A

Windows - Aluminum Sash

Other - N/A

Space - Function is adeuate in existg space

Walls - gyp bd - new

Int Door/Frm/Hdwr - Wd frame & Dr. Lever Handles - new

Flooring - sheet vinyl - new

Ceiling - 2x4 ACT - new

Casework/Sink - No ADA

Space Planning - N/A

Other - N/A

DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items Stairs at each end only access is through the Facility Portable Newly renovated for M&O offices.

BUILDING L BAKERY

BUILDING M PORTABLE

Roof - Asphalt shingle roof

Roof Fascia - Wood

Roof Drains - No Gutter & DS to grade

Soffit - N/A

Walls - Corrugated metal - repaint as needed

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr metal frm & Dr.

Lever handle.

Card Access -N/A

Windows - Aluminum Sash

Other - N/A

Space - Function is adeuate in existg space

Walls - gyp bd & FRP

Int Door/Frm/Hdwr - N/A

Flooring - concrete

Ceiling - gyyp bd

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

Roof - Metal roof

Roof Fascia - wood

Roof Drains - Gutter & DS to grade

Soffit - plywood

Walls - T1-11 - repaint as needed

Door Landing - no ADA. ramp not

ADA compliant

Door Threshold - ADA ok

Doors/Frm/Hdwr HM frm & Dr.

Lever Handles

Card Access -N/A

Windows - Alumn sash

Other - N/A

No access

Furniture Storage

CORPORATE YARD
BUILDING INTERIOR A
221 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

BLDG COLOR ASSESSMENT

SQUARE FOOTAGE

BUILDING EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.

Roof - Metal roof

Roof Fascia - wood

Roof Drains - Gutter & DS to grade

Soffit - plywood

Walls - T1-11 - repaint as needed

Door Landing -ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr HM frm & Dr.

Lever Handles

Card Access -required

Windows - Alumn sash

Other - N/A

Roof - Metal roof

Roof Fascia - none

Roof Drains - No Gutter & DS

Soffit - N/A

Walls - corrugated metal - repaint as needed

Door Landing - no ADA

Door Threshold - ADA ok

Doors/Frm/Hdwr metal frm & Dr.

Knob - replace

Card Access -N/A

Windows - Alumn sash

Other - N/A

Roof - Metal roof

Roof Fascia - none

Roof Drains - Gutter & DS to grade

Soffit - N/A

Walls - corrugated metal - repaint as needed

Door Landing - No ADA

Door Threshold - No ADA

Doors/Frm/Hdwr metal frm & Dr.

Knob - replace

Card Access -N/A

Windows - Aluminum Sash

Other - N/A

Roof - Metal roof

Roof Fascia - Wood

Roof Drains - Gutter & DS to grade

Soffit - N/A

Walls - T1-11 - repaint as needed

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr metal frm & Dr.

Lever handle.

Card Access -N/A

Windows - Aluminum Sash

Other - N/A

Space - Function is adeuate in existg space

Walls - gyp bd - paint as needed

Int Door/Frm/Hdwr - Wd frame & Dr. Lever Handles

Flooring - VCT - replace as needed

Ceiling - 2x4 ACT - replace as needed

Casework/Sink - No ADA

Space Planning - N/A

Other - N/A

Roof - Metal roof

Roof Fascia - none

Roof Drains - Gutter & DS to grade

Soffit - N/A

Walls - T1-11 - repaint as needed

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr Wd frm & HM Dr.

Knob - replace

Card Access -N/A

Windows - aluminum sash

Other - N/A

Space - Function is adeuate in existg space

Walls - gyp bd - paint as needed

Int Door/Frm/Hdwr - Wd frame & Dr.

Flooring - epoxy

Ceiling - Gyp bd - repaint as needed

Casework/Sink - no ADA

Space Planning - N/A

Other - N/A

Roof - Metal roof

Roof Fascia - none

Roof Drains - Gutter & DS to grade

Soffit - N/A

Walls - T1-11 - repaint as needed

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr metal frm & Dr. Lever handle.

Card Access -N/A

Windows - Aluminum Sash

Other - N/A

Space - Function is adeuate in existg space

Walls - marker board & gyp bdpaint as needed

Int Door/Frm/Hdwr - N/A

Flooring - VCT - replace as needed

Ceiling - 2x4 ACT - replace as needed

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

CORPORATE YARD
BUILDING N FILTER BARN BUILDING P STORAGE BUILDING Q BS19 STORAGE TRANSPORTATION PORTABLE TOILET PORTABLE PORTABLE 24 M&O CONFERENCE & TRAINING ROOM
BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING
BUILDING INTERIOR A Condition - finishes (floor, wall, ceiling) casework, shades, etc. No access No access
A Fixtures, accessories, ADA compliant, finishes, etc.
Compartment
ADA ok SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc. Filter Barn Custodial Supplies DSA CODE COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items Ramp looks ADA accessible Ramp looks ADA accessible Ramp looks ADA accessible
RESTROOMS
Multi
bathroom -
222 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

BUILDING

SCOPE A/E INTENT OF SCOPE FOR PRICING

BLDG COLOR

ASSESSMENT

SQUARE

FOOTAGE

BUILDING

EXTERIOR A Condition - materials, repair / replace, painting, windows, etc.

BUILDING INTERIOR A Condition - finishes (floor, wall, ceiling) casework, shades, etc.

RESTROOMS A Fixtures, accessories, ADA compliant, finishes, etc.

PORTABLE 25 TRANSPORTATION TRAINING & BREAK ROOM ORANGE TRAILER

Roof - Metal roof

Roof Fascia - none

Roof Drains - Gutter & DS to grade

Soffit - N/A

Walls - T1-11 - repaint as needed

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr metal frm & Dr.

Lever handle.

Card Access -N/A

Windows - Aluminum Sash

Other - N/A

Space - Function is adeuate in existg space

Walls - marker board & gyp bdpaint as needed

Int Door/Frm/Hdwr - Wd frm & Door. Levery Handle.

Flooring - VCT - replace as needed

Ceiling - 2x4 ACT - replace as needed

Casework/Sink - No ADA

Space Planning - N/A

Other - N/A

Roof - Metal roof

Roof Fascia - N/A

Roof Drains - No Gutter & DS

Soffit - N/A

Walls - Corrugated metal

Door Landing - no ADA

Door Threshold - no ADA

Doors/Frm/Hdwr - Mtl Frm & Door.

Knob - replace

Card Access - N/A

Windows - wood sash

Other - N/A

No Access

BUILDING CONDITIONS - ELECTRICAL (MISC)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING MISC

E

UTILITY MPOE/ MDG

FIRE ALARM SYSTEM

CLOCK / INTERCOM / SPEAKER SYSTEM

ACCESS / INTRUSION / SECURITY

ELECTRICAL SYSTEMS

LIGHTING AND LIGHTING CONTROLS

TECHNOLOGY SYSTEMS

AUDIVISUAL SYSTEMS

E

Data infrastructure (i.e. 10GB) Carrier, location, size of space

E Existing system, code compliant replace vs retrofit, Voice Evac, etc.

System, headend, type (i.e. VOIP), replace vs retrofit

E Types of systems, hardware, CCTV, opening contacts, etc.

E Rooms and panels, code compliant, receptacles, circuiting, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

E IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

E Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

Two main PG&E electrical services, #1 is 120/208V 800A, about 40 yrs old but decent condition. Serves bakery, bus charging stations, new portables. At capacity. #2 is old Zinsco board, not servicable, 600A 120/240V, 60 yrs old with solar backfeed. Large solar array.

Panels in bakery are inaccessible due to the way users store their equipment. Gear has no room for additional breakers, which has lead to bus taps to separate disconnects.

Typical portable buildings.

Some LED area ligths. Many building mounted exterior lights are HID and CFL. Food preps areas are grossly underlit, approximately 15 footcandles where 50 is required by code. Very little LED indoors, mostly T8 fluorescent with manual controls only.

Manual system, not many components. Fire suppression at bakery is stand alone. No students, so not necessarily a high priority.

No clock/PA system observed (or required)

Ademco intrusion alarm. Security cameras obseverd. No access control system.

MDF near facilities offices, IDFs located in portables.

SPECIALITY SPACES REVIEW A MPR, Libraries, Kitchens, Science, etc. Mechanical supplies

DSA CODE

COMPLIANCE ITEMS A ADA, Fire Life Safety, Structural - Must Do Items Ramp looks ADA accessible No ADA Access

CORPORATE YARD
223 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

EXTERIOR EQUIPMENT ASSESSMENT M/P

M/P

SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

INTERIOR EQUIPMENT

ASESSMENT

ENERGY MANAGEMENT SYSTEMS M/P

EMCS Type of system, web based / Programmable T-Stat?

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING EQUIPMENT REVIEW M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

BUILDING A WAREHOUSE, SHOP, BUS REPAIR, & NOW NUTRITIONAL SERVICES OFFFICE

The Mechanic Shop on the West End of the building has Cooling provided by wall mounted (2) Evaporative Cooling Units. (New EC was on site ready to replace one of the (2) existing. No Mechanical Equipment on building roof.

The remaining spaces have interior gas fired Unit Units which approx. +30 years old. (10) system total. There are (2) mini splits sering small office spaces that are +20 years old. One small vertica heat pump serve the Carpenter Office/Shop.

BUILDING B LAUNDRY, BREAKROOM

(1) Outdoor Condensing Unit approx. 18 years old.

Storage Only, No Mechanical Systems Storage Only, No Mechanical Systems This space has a horizontal gas fired furnace, approx. 30 years old.

This building has a roof mounted ACUnit approx. 6-8 years old. (Installed too close to edge of roof per code.

Small Gas fired Split System with Condensing Unit, approximately 22 years old.

Storage Only, No Mechanical Systems Storage Only, No Mechanical Systems Small interior paint booth 8x12 with single exhaust system, 30 years old.

Some roof mounted duct in ok condition.

No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks.

All Plumbing Fixtures are from the original building construction.

All Plumbing Equipment is from the original building construction.

All Plumbing Fixtures are from the original building construction.

All Plumbing Equipment is from the original building construction.

All Plumbing Fixtures are from the original building construction.

All Plumbing Equipment is from the original building construction.

All Plumbing Fixtures are from the original building construction.

All Plumbing Equipment is from the original building construction.

Existing Emergency Eye Was and Shower, good condition.Does not have tempered water supply as required by today's code.

All Plumbing Equipment is from the original building construction.

All Plumbing Fixtures are from the original building construction.

All Plumbing Equipment is from the original building construction.

FIRE SPRINKLER SYSYTEM M/P Does AFS exist, location, code compliant, etc. No Fire Sprinklers No Fire Sprinklers No Fire Sprinklers No Fire Sprinklers No Fire Sprinklers No Fire Sprinklers

CORPORATE YARD
SHOP
F PLANS ROOM
BUILDING C GROUNDS STORAGE BUILDING D STORAGE BUILDING E PAINT
BUILDING
224 BACK TO CONTENTS

BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING G MAINTENANCE & OPERATIONS OFFICE MOVED OUT, FACILITIES WILL EXPAND INTO THIS SPACE BUILDING H FACILITIES OFFICE BUILDING I RESTROOMS

Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

Portables have Wall Mounted Bard Heat Pumps from the original construction. Good Condition.

EXTERIOR EQUIPMENT ASSESSMENT M/P

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc. Single wall return and ducted supply air in ceiling. Typical distribution. Single wall return and ducted supply air in ceiling. Typical distribution.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat?

PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc.

PLUMBING

EQUIPMENT

REVIEW M/P

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

BUIDING J/K M&O, WAS NUTRITION SERVICES OFFICE

are +30 years old and past their useful life. All units should be replaced. In Addition the interior space could be well served by a 5 ton Split System for times when the Hood/MAU are not in operation.

Portables have Wall Mounted Bard Heat Pumps from the original construction. Good Condition.

Single Register. Fan Coil on wall. Minimal ducting for the Make Air Units, (ok condition) Single wall return and ducted supply air in ceiling. Typical distribution.

No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks.

All Plumbing Fixtures are from the original building construction.

All Plumbing Equipment is from the original building construction.

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING BUILDING N FILTER BARN

Rooftop,

All Plumbing Fixtures are from the original building construction.

All Plumbing Fixtures are from the original building construction.

All Plumbing Equipment is from the original building construction.

All Plumbing Equipment is from the original building construction.

BUILDING P STORAGE BUILDING Q BS19 STORAGE

All Plumbing Fixtures are from the original building construction.

All Plumbing Equipment is from the original building construction.

All Plumbing Fixtures are from the original building construction. No Plumbing

Storage Only, No Mechanical Systems Storage Only, No Mechanical Systems Storage Only, No Mechanical Systems ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat? No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. No EMCS present. All buildings are on Programmable T-Stat's and Timeclocks. PLUMBING FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms, sinks, drinking fountains / bottle fillers, etc. No Plumbing No Plumbing No Plumbing PLUMBING EQUIPMENT REVIEW M/P Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced) No Plumbing No Plumbing No Plumbing FIRE SPRINKLER SYSYTEM M/P Does AFS exist, location, code compliant, etc. No Fire Sprinklers No Fire Sprinklers No Fire Sprinklers
EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior Equipment -
wall mounted BARD, etc. - condition Storage Only, No Mechanical Systems Storage Only, No Mechanical Systems Storage Only, No Mechanical Systems INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.
BUILDING CONDITIONS - MECHANICAL/PLUMBING (CONTINUED)
BUILDING L BAKERY BUILDING M PORTABLE
Portables have Wall Mounted Bard Heat Pumps from the original construction. Good Condition. Exhaust Fan Only no conditioing. Small Split System at Exterior. The Bakery space is currently served by (3) large Gas Fired Reznor Heating and Ventilating Units. All (3)
All Plumbing Equipment is from the original building construction. No Plumbing
No
No Fire Sprinklers No Fire Sprinklers No Fire Sprinklers No Fire Sprinklers No Fire Sprinklers
FIRE SPRINKLER SYSYTEM M/P Does AFS exist, location, code compliant, etc.
Fire Sprinklers
CORPORATE YARD 225 BACK TO CONTENTS

DISTRICT ADMINISTRATION OFFICE

SITE CONDITIONS

CAMPUS SITE SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR SITE ASSESSMENT

EXTERIOR SITE AMENITIES

SECURITY

ADA PATH OF TRAVEL

ADA PARKING STALLS

ASPHALT PAVING

CONCRETE PAVING/ WALLS/CURBS

STORM DRAINAGE

U/G UTILITY LINES

FIRE TRUCK ACCESS

AGENCY ISSUES

SITE ELECTRICAL UPGRADE

SITE LIGHTING & CONTROLS

SITE PLUMBING

MISC SITE OBSERVATIONS

A Parking lots, drop-off, landscape / irrigation

A Playgrounds, hardcourts, shade structures, bike lockers, flag poles, marquee signs, etc.

A Fencing, gates, hardware / access

C Exceed 5% pathways, 2% cross slopes, door thresholds, stairs, ramps, etc.

C Code compliant, striping, signage, ramps, etc.

C Replace vs Repair, seal coat, restripe parking areas, hardcourts, etc.

C Replace vs. repair

C Areas that pond, drain inlets, retention needed, etc.

C Replace vs repair; i.e. clogged lines, low water pressure,no fire loop, etc.

C Current path compliant, gates, etc. - min 20' wide

C City, County, Fire Access, etc.

E Existing MSB - size, condition, upgrade needed, etc.

E Fixture types and conditions, efficiency, controls, life safety / egress

P Gas service, ADA drinking fountains, etc.

ALL

COST PER SF

HIGH MEDIUMHIGH MEDIUM LOW

SITE CONDITION ASSESSMENT

Site is an old school if it were to house a school it does not have a drop-off.

Site is an old school if it were to house a school it does not have a hardcourt, playstructure, bike locker, or marquee.

Chain link fence occurs at field but not at parking making the facility open to the public. There is an entry from the sidewalk on E 7th St, but it is not a single point of entry.

Path of travel near Building C exceeds ADA slope requirements.

Portions of the parking stalls exceed ADA slope requirements.

Some localized pavement settling and alligator cracking to be replaced. Remainder of asphalt to be crack and slurry sealed.

No known issues.

No known issues.

Site gas distribution is in good condition. Approx. 22 years old.

DISTRICT ADMINISTRATION OFFICE 226 BACK TO CONTENTS

BUILDING CONDITIONS - ARCHITECTURAL (CONTINUED)

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

BLDG COLOR ASSESSMENT

SQUARE FOOTAGE

BUILDING A MAIN BUILDING

BUILDING B

PORTABLE PSYCHOLOGISTS' OFFICES

BUILDING C

CONFERENE ROOM BLDG

BUILDING EXTERIOR A

Condition - materials, repair / replace, painting, windows, etc.

Roof - asphalt shingle at manzard roof & built up roof - adequate

Roof Fascia - Wood - repaint as needed

Roof Drains - Gutter & DS to Grade - repaint as needed

Soffit - cement plaster - paint as needed

Walls - Cement plaste - repaint as needed

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - Wd Frm & Dr.

Push & PUll - adequate

Card Access - required

Windows - Aluminum sash - adequate

Other - N/A

Condition - finishes (floor, wall, ceiling) casework, shades, etc.

Space - is adeuate in existg space

Walls - Gyp Bd, tack board, marker board & tile - repaint as needed

Int Door/Frm/Hdwr - Wd Frm &

Door. Lever handle - adequate

Flooring - Carpet tile, VCT, tile & Sht vinyl - replace as needed

Ceiling - 2x2 ACT, 2x4 ACT & Gyp Bd - replace as needed

Casework/Sink - N/A

Space Planning - very efficient use of space - lots of staff desk stations

Other - N/A

Roof - Standing Metal Seam Roof - adequate

Roof Fascia - Wood - repaint as needed

Roof Drains - Gutter to DS to Grade - repaint as needed

Soffit - Plywood - paint as necessary

Walls - T1-11 - repaint as needed

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - HM Frm & Dr.

Lever handles - adequate

Card Access - required

Windows - Aluminum sash - adequate

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd, tack board - repaint as needed

Int Door/Frm/Hdwr - HM Frm & Door. Lever handle - adequate

Flooring - Carpet tile - replace as needed

Ceiling - 2x4 ACT - replace as needed

Casework/Sink - N/A

Space Planning - N/A

Other - N/A

Roof - asphalt shingle at manzard roof &single ply roof - adequate

Roof Fascia - Wood - repaint as needed

Roof Drains - Roof Drian to DS to Grade - repaint as needed

Soffit - plywd - paint as needed

Walls - Wd board and battenrepaint as needed

Door Landing - ADA ok

Door Threshold - ADA ok

Doors/Frm/Hdwr - Aluminum

Storefront and Wd Frm & Dr. Lever handles, Push & PUll - adequate

Card Access - required

Windows - Aluminum sash - adequate

Other - N/A

Space - is adeuate in existg space

Walls - Gyp Bd, tack board, marker board - repaint as needed

Int Door/Frm/Hdwr - Wd Frm & Door. Lever handle - adequate

Flooring - Carpet tile, VCT, tile & Sht vinyl - replace as needed

Ceiling - 2x2 ACT & Gyp Bdreplace as needed

Casework/Sink - No ADA

Space Planning - N/A

Other - N/A

BUILDING INTERIOR A
Fixtures,
Multi Compartment
is Not ADA
accomidation
Not ADA SPECIALITY SPACES
MPR,
COMPLIANCE
ADA,
ADA
RESTROOMS A
accessories, ADA compliant, finishes, etc.
bathroomWomens
Single
toilet room -
REVIEW A
Libraries, Kitchens, Science, etc. DSA CODE
ITEMS A
Fire Life Safety, Structural - Must Do Items Exit ram at rar of building looks ok, secondary exit with stairs is not accessible.
ramp - ok
DISTRICT ADMINISTRATION OFFICE 227 BACK TO CONTENTS

BUILDING CONDITIONS - ELECTRICAL (MISC)

UTILITY MPOE/ MDG E Data infrastructure (i.e. 10GB) Carrier, location, size of space

FIRE ALARM SYSTEM E

CLOCK / INTERCOM / SPEAKER SYSTEM

Existing system, code compliant , replace vs retrofit, Voice Evac, etc.

E System, headend, type (i.e. VOIP), replace vs retrofit

ACCESS / INTRUSION / SECURITY E Types of systems, hardware, CCTV, opening contacts, etc.

ELECTRICAL SYSTEMS E Rooms and panels, code compliant, receptacles, circuiting, etc.

LIGHTING AND LIGHTING CONTROLS E

TECHNOLOGY SYSTEMS E

AUDIVISUAL SYSTEMS E

BUILDING

Fixture types and conditions, efficiency, controls, life safety / egress (Int/Ext)

IDF locations, sizes, infrastructure, cabling, # data drops per space, etc.

Classroom technology, presentation spaces; i.e. conf rooms, library, MPR, etc.

Main metered switchboard located in basement, Zinsco board is in good condition but well past its servicable life. Relatively undersized for the facility. Separate PG&E service located outside behind building, the 200A main breaker is not secured; anyone could walk off the street and turn off power to the main district servers. Another separate service for the portable used for special needs.

Lots of very old load centers, some Zinsco, located in hallways, offices. Panels in the MDF are backed up by a large UPS in the room, and generator located behind building, next to the 2nd PG&E service. Conference room is an old modular building with a very old (60+ years) 400A panel.

Some older wiring in attic. In general not sufficient available branch circuit power.

Time clock in electrical closet controls exterior lighting. No automatic interior controls, manual switches only. Very few LED lights, primarily T8 fluorescent and even some incandescent lamps. LED exit lights with bug-eyes.

Fire suppresion system at the server rack. FA system is old and manual only.

No clock/PA system observed.

Unclear is intrusion alarm is in use. Security cameras obseverd. No access control system.

District MDF is located here, in a dedicated room with cooling. Seems adequate. WAPS and data outlets observed, but not sure if meets current district standards.

CONDITIONS - MECHANICAL/PLUMBING

BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING

EXTERIOR EQUIPMENT ASSESSMENT M/P Exterior EquipmentRooftop, wall mounted BARD, etc. - condition

INTERIOR EQUIPMENT ASESSMENT M/P SYSTEM TYPE, Boilers, VRF, Pumps, Ducts, diffusers, split systems, exhaust fans, etc.

BUILDING A MAIN BUILDING

(5) Lennox Roof mounted AC-Units +22 years.Units are at end of life and need replacement within the next 5-7 years..

Distribution is original construction when AC-Units were added. Concealed above layin ceiling.

BUILDING B PORTABLE PSYCHOLOGISTS' OFFICES

Portables appear to be Wall Mounted Heat Pumps from the original construction. 10 years old.

Distribution is original construction when AC-Units were added. Concealed above layin ceiling.

BUILDING C CONFERENE ROOM BLDG

Portable has split system Heat Pumps. 10 years old.

Distribution is original construction when AC-Units were added. Concealed above layin ceiling.

ENERGY MANAGEMENT SYSTEMS M/P EMCS Type of system, web based / Programmable T-Stat? Alerton Controls Stand alone Programmable T-Stat's. Stand alone Programmable T-Stat's.

Gas, condnesation piping, water heaters, service sinks, hose bibbs, gas regaultors (seismic braced)

Plumbing Equipment is from older modernization project. Plumbing Equipment is from original construction. Plumbing Equipment is from original construction.

FIRE SPRINKLER SYSYTEM M/P

Does AFS exist, location, code compliant, etc.

None found

None found

None found

PLUMBING
sinks,
Plumbing
15 years
Plumbing Fixtures in ok condition. Needs updating. Plumbing Fixtures in ok condition. Needs updating.
FIXTURE REVIEW - ADA COMPLIANCE M/P Plumbing Fixtures, Restrooms,
drinking fountains / bottle fillers, etc.
Fixtures in ok condition. Needs updating. Minor ADA fixtures have been replaced approx.
ago.
PLUMBING EQUIPMENT REVIEW M/P
MISC
BUILDING SCOPE A/E INTENT OF SCOPE FOR PRICING
DISTRICT ADMINISTRATION OFFICE 228 BACK TO CONTENTS

APPENDIX 2: COST MODEL

HOW TO USE THESE TABLES:

The cost model is intended to develop an Order of Magnitude opinion of probable cost for the entirety of the Facilities Master Plan. These matrices demonstrate the assumptions for each of the projects as well as some broader program level costs:

- Project assumptions are generally assigned unit costs per square foot - low, moderate and high unit costs depending upon the type of project, the scope of the modernization, etc.

- Project assumptions include "per acre" numbers to account for scope such as utility/infrastructure needs, accessibility challenges, etc.

- There are some "lump sum" assumptions for areas such as interim housing.

- We have included a contingency on each project to account for the high level of the assumptions and the unknowns of each project.

- The District "soft costs" have been included at 25%. These soft costs include design fees, inspection fees and other costs associated beyond construction.

- Escalation is an important part of the FMP assumptions. It is included at 4% per year. It is significant, especially in distance projects. Escalation can be variable; this represents an average, and is not shown as a compounded escalation, which could increase costs further.

229 BACK TO CONTENTS

COST ESTIMATE DETAIL SUMMARY

Chico Unified School District Summary Facilities Master Plan Budget Model Phases 4 - 7 2023 Dollars With Escalation Phase 4 Remaining Funds 66,390,000 68,403,000 Phase 5 203,222,250 230,057,960 Phase 6 222,887,500 347,800,750 Phase 7 183,356,250 330,041,250 Sub-Total 675,856,000 976,302,960
230 BACK TO CONTENTS
UNIFIED SCHOOL DISTRICT
BOND FUNDS 2023
PHASE IV COMPLETION: CITRUS, TK, SAFETY AND SECURITY AND RESTROOMS ASSUMED ESCALATION CONSTRUCTION COSTS - 2023 VALUES WITH ESCALATION CONTINGENCY (10%) SOFT COSTS (ESTIMATED AT 25%) TOTAL PROJECT 4% annually Quantity Unit Cost Sub Total CITRUS ELEMENTARY SCHOOL 4% 13,450,000 13,988,000 1,398,800 3,846,700 19,233,500 DEVELOP INTERIM HOUSING 1 LS 2,500,000 2,500,000 NEW CONSTRUCTION 24,000 SF 300 7,200,000 SITE DEVELOPMENT | DEMOLITION 3 Acres 1,250,000 3,750,000 TK IMPLEMENTATION: 4% 9,150,000 9,516,000 951,600 2,616,900 13,084,500 NEW CONSTRUCTION AT EMMA WILSON, LCC, MARIGOLD (5 ROOMS) 6,750 SF 800 5,400,000 SITE DEVELOPMENT | DEMOLITION 3 Acres 1,250,000 3,750,000 RESTROOM UPGRADES - ALLOWANCES 4% 1 LS 10,000,000 10,000,000 10,400,000 1,040,000 2,860,000 14,300,000 SECURITY UPGRADES - ALLOWANCES 4% 1 LS 4,000,000 4,000,000 4,160,000 416,000 1,144,000 5,720,000 SUB-TOTAL 36,600,000 38,064,000 CONTINGENCY (10%) 3,660,000 3,806,400 SOFT COSTS (ESTIMATED AT 25%) 10,065,000 10,467,600 SUB-TOTAL PROJECT - PHASE IV 50,325,000 52,338,000 PORTION OF SOFT COSTS FOR PHASE V (10%) 0% 16,065,000 16,065,000 - - 16,065,000 CHAPMAN 46,500,000 $ 10% 4,650,000 ROSEDALE 65,750,000 $ 10% 6,575,000 PARKVIEW 48,400,000 $ 10% 4,840,000 TOTAL PROJECT - PHASE IV 66,390,000 68,403,000 PHASE IV 231 BACK TO CONTENTS
CHICO
REMAINING
FACILITIES MASTER PLAN BUDGET MODEL
CHICO UNIFIED SCHOOL DISTRICT ASSUMED BOND ISSUE 2024 FACILITIES MASTER PLAN BUDGET MODEL PHASE V: REPLACEMENT CAMPUSES AT CHAPMAN, ROSEDALE AND PARKVIEW BY PROJECT ASSUMED ESCALATION CONSTRUCTION COSTS - 2023 VALUES WITH ESCALATION CONTINGENCY (10%) SOFT COSTS (ESTIMATED AT 25%) TOTAL PROJECT 4% annually Quantity Unit Cost Sub Total CHAPMAN ELEMENTARY: 320 STUDENTS (JULY 2026 MID-POINT) 12% 46,500,000 52,080,000 5,208,000 8,593,200 65,881,200 DEVELOP INTERIM HOUSING 1 LS 6,000,000 6,000,000 NEW CONSTRUCTION 35,000 SF 800 28,000,000 SITE DEVELOPMENT | DEMOLITION 10 Acres 1,250,000 12,500,000 ROSEDALE ELEMENTARY: 672 STUDENTS (JULY 2026 MID-POINT) 12% 65,750,000 73,640,000 7,364,000 12,150,600 93,154,600 NEW CONSTRUCTION 65,000 SF 800 52,000,000 SITE DEVELOPMENT | DEMOLITION 11 Acres 1,250,000 13,750,000 PARKVIEW ELEMENTARY: 496 STUDENTS (JULY 2028 MID-POINT) 16% 48,400,000 56,144,000 5,614,400 9,263,760 71,022,160 NEW CONSTRUCTION 48,000 SF 800 38,400,000 SITE DEVELOPMENT | DEMOLITION 8 Acres 1,250,000 10,000,000 SUB-TOTAL 160,650,000 181,864,000 CONTINGENCY (10%) 16,065,000 18,186,400 SOFT COSTS (ESTIMATED AT 15%; 10% WAS COMPLETED IN PH IV) 26,507,250 30,007,560 TOTAL PROJECT - PHASE V 203,222,250 230,057,960 PHASE V 232 BACK TO CONTENTS
CHICO UNIFIED SCHOOL DISTRICT ASSUMED BOND ISSUE 2032 FACILITIES MASTER PLAN BUDGET MODEL PHASE VI: REPLACEMENT CAMPUSES AT SIERRA VIEW, FAIR VIEW. MOD AT HOOKER OAK, CHICO HS BY PROJECT ASSUMED ESCALATION CONSTRUCTION COSTS - 2023 VALUES WITH ESCALATION CONTINGENCY (10%) SOFT COSTS (ESTIMATED AT 25%) TOTAL PROJECT 4% annually Quantity Unit Cost Sub Total SIERRA VIEW ELEMENTARY: 496 STUDENTS (JULY 2034 MID-POINT) 40% 49,650,000 69,510,000 6,951,000 19,115,250 95,576,250 NEW CONSTRUCTION 48,000 SF 800 38,400,000 SITE DEVELOPMENT | DEMOLITION 9 Acres 1,250,000 11,250,000 FAIR VIEW HIGH SCHOOL: 320 STUDENTS (JULY 2034 MID-POINT) 40% 36,750,000 51,450,000 5,145,000 14,148,750 70,743,750 NEW CONSTRUCTION 35,000 SF 800 28,000,000 SITE DEVELOPMENT | DEMOLITION 7 Acres 1,250,000 8,750,000 HOOKER OAK ELEMENTARY: 320 STUDENTS (JULY 2034 MID-POINT) 40% 14,250,000 19,950,000 1,995,000 5,486,250 27,431,250 NEW CONSTRUCTION 4,000 SF 800 3,200,000 RENOVATION 35,000 SF 300 10,500,000 SITE DEVELOPMENT | DEMOLITION 3 Acres 1,250,000 3,750,000 CHICO HIGH SCHOOL (JULY 2036 MID-POINT) 48% 75,700,000 112,036,000 11,203,600 30,809,900 154,049,500 BLACK BOX THEATER AND SUPPORTING SPACES 10,000 SF 1,000 10,000,000 CTE BUILDING (AG) 6,000 SF 800 4,800,000 NEW SCIENCE | CLASSROOM BUILDING 32,000 SF 900 28,800,000 RENOVATION OF A, B, C 35,000 SF 400 14,000,000 RENOVATION OF L 6,000 SF 350 2,100,000 RENOVATION OF F 7,000 SF 250 1,750,000 ATHLETICS FIELD HOUSE 10,000 SF 800 8,000,000 SITE DEVELOPMENT | DEMOLITION (INC. ATHLETICS) 5 Acres 1,250,000 6,250,000 SUB-TOTAL 162,100,000 252,946,000 CONTINGENCY (10%) 16,210,000 25,294,600 SOFT COSTS (ESTIMATED AT 25%) 44,577,500 69,560,150 TOTAL PROJECT - PHASE VI 222,887,500 347,800,750
VI 233 BACK TO CONTENTS
PHASE
CHICO UNIFIED SCHOOL DISTRICT ASSUMED BOND ISSUE 2040 FACILITIES MASTER PLAN BUDGET MODEL PHASE VII: PLEASANT VALLEY MOD/ATHLETICS, JUNIOR HIGH SCHOOL MODERNIZATIONS BY PROJECT ASSUMED ESCALATION CONSTRUCTION COSTS - 2023 VALUES WITH ESCALATION CONTINGENCY (10%) SOFT COSTS (ESTIMATED AT 25%) TOTAL PROJECT 4% annually Quantity Unit Cost Sub Total PLEASANT VALLEY HIGH SCHOOL (JULY 2042 MID-POINT) 80% 33,500,000 60,300,000 6,030,000 16,582,500 82,912,500 BUILDING B RENOVATION (LIGHT) 8,200 SF 250 2,050,000 WEST GYMNASIUM RENOVATION OR REPLACEMENT 11,200 SF 1,000 11,200,000 GYMNASIUM LOBBY EXPANSION 6,000 SF 1,000 6,000,000 ATHLETICS FIELD HOUSE 10,000 SF 800 8,000,000 SITE DEVELOPMENT | DEMOLITION (INC. ATHLETICS) 5 Acres 1,250,000 6,250,000 BIDWELL JUNIOR HIGH SCHOOL (JULY 2042 MID-POINT) 80% 29,350,000 52,830,000 5,283,000 14,528,250 72,641,250 NEW CONSTRUCTION 12,000 SF 800 9,600,000 RENOVATION 40,000 SF 400 16,000,000 SITE DEVELOPMENT | DEMOLITION 3 Acres 1,250,000 3,750,000 CHICO JUNIOR HIGH SCHOOL (JULY 2024 MID-POINT) 80% 32,750,000 58,950,000 5,895,000 16,211,250 81,056,250 INTERIM HOUSING FOR MODERNIZATION 1 LS 5,000,000 5,000,000 RENOVATION 60,000 SF 400 24,000,000 SITE DEVELOPMENT | DEMOLITION 3 Acres 1,250,000 3,750,000 MARSH JUNIOR HIGH SCHOOL (JULY 2042 MID-POINT) 80% 37,750,000 67,950,000 6,795,000 18,686,250 93,431,250 INTERIM HOUSING FOR MODERNIZATION 1 LS 5,000,000 5,000,000 RENOVATION 60,000 SF 400 24,000,000 SITE DEVELOPMENT | DEMOLITION 7 Acres 1,250,000 8,750,000 SUB-TOTAL 133,350,000 240,030,000 CONTINGENCY (10%) 13,335,000 24,003,000 SOFT COSTS (ESTIMATED AT 25%) 36,671,250 66,008,250 TOTAL PROJECT - PHASE VII 183,356,250 330,041,250 PHASE VII 234 BACK TO CONTENTS
235 BACK TO CONTENTS
APPENDIX 3: STRUCTURAL SCHEMATIC DESIGN REPORT APPENDIX 3: STRUCTURAL REPORT
236 BACK TO CONTENTS
237 BACK TO CONTENTS
238 BACK TO CONTENTS
239 BACK TO CONTENTS
240 BACK TO CONTENTS
241 BACK TO CONTENTS

ARCHITECTURE ENGINEERING PLANNING INTERIORS GRAPHICS

242 BACK TO CONTENTS

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.