CONCEPTUAL MAQUETTE STUDIES

Page 1


This work is copyright. Apart from any use permitted under the Copyright Act 1968, no part may be reproduced by any process without the prior written permission of the user. Cover Image: Finished prototypes, Conceptual Maquette Studies, 2018.


1.1. PART A:

Construction period, 20th February - 22th February

1.1.1

1.1.2

1.1.3

1.1.4

Figure 1.1.1: Removing plaster from form box. Figure 1.1.2: Removing void formers. Figure 1.1.3: Marquette I with void formers (inc. broken pieces). Figure 1.1.4: Marquette I with void formers.

Fabrication Duration:

1.1. PART A

Construction period, 20th February - 22nd February

Creating volumes Mixing plaster with water Pouring plaster Plaster curing time Removing void formers Cleaning up

Comment and Observation: : 80 mins : 5 mins : 2 mins : 42 hours : 50 mins : 10 mins

The ratio of plaster to water estimated to be 1 to 1 ratio which might cuase the plaster piece to break easily. The curing time for the marqutte is 42 hours (approximately 2 days). The void volumes tend to float to the mixture surface and the end result is unpredictable.

Total production duration : 147 mins + 42 hrs curing time

44 hours 27 mins (include curing time)

Conceptual Maquette Studies / 1-2


1.1.5

1.1.6

1.1.7

1.1.8

This page is intentionally left blank

Figure 1.1.5: Finished Marquette I - front view. Figure 1.1.6: Finished Marquette I - side view. Figure 1.1.7: Finished Marquette I - top view. Figure 1.1.8: Finished Marquette I - perspective.


1.2. PART B:

Construction period, 20th February - 28th February

MARQUETTE

PLASTER

FOAM BOX

STYROFOAM MODEL

Construction process: PART A.1

PART A.2

PART A.4

Conceptual study using wireframe 20 minutes

3D modelling & producing assembling templates. 110 minutes

Print template. 5 minutes

Construct styrofoam model using hot wire cutter. 180 minutes

YES :(

PART B.1

PART B.2

PART D.1

PART D.2

PART E.1

Clean the interior of the foam box 5 minutes

Assemble the foam box together 5 minutes

Attach the styrofoam model to the foam box. 10 minutes

Pour the mixture into the foam box. 7 minutes

Does the Styrofoam model float away?

PART C.1

PART C.2

Measure the plaster and water using bucket(s) 5 minutes

Mix and stir gently till the plaster are completely dissolved

PART F.1

PART F.2

PART F.3

PART F.4

Tap the foam box allowing air bubble to escape 5 minutes

Remove Marquette from foam box 10 minutes

Apply acetone to Marquette to dissolve styrofoam 30 minutes

Allow the Marquette fully dry by elevating it 180 minutes

PART A.3

NO :)

Figure 1.2.0: Overall construction workflow of Marquette II.

Method(s) and materials: Plaster to water ratio Curing time (plaster) Styrofoam model joinery Solvent used Weight (kg)

Comment and Observation: : 4 to 3 : 23 hours : PVA glue (first attempt) + Screws (second attempt) : Acetone : 1.80 kg (first attempt) 1.61 kg (second attempt)

Fabrication Duration:

1.2. PART B

Construction period, 20th February - 28th February

Measuring stereotomic space: 30 mins Creating assembling module : 80 mins Cutting styrofoam model : 180 mins Mixing plaster with water : 5 mins Taping foam box : 2 mins Pouring plaster : 2 mins Plaster curing time : 23 hours Disolving styrofoam : 30 mins Cleaning up : 10 mins Total construction duration : 339 mins + 23 hrs curing time

• The ratio of plaster to water is four to three, the marquette are holding together stronger. • The quality of the solid styrofoam model for the first attempt is unprecise and rough causing the finished marquette to have an uneven, rougher texture. Furthermore the styrofoam model was floating around even though is secured with masking tape. • The styrofoam model is screwed to the foam box for second attempt to avoid floating around. • The styrofoam model is cut more precies and clean for the second attempt.

28 hours 39 mins (include curing time) Conceptual Maquette Studies / 2-2


1.2.1

1.2.2

1.2.3

1.2.4

Figure 1.2.1: Fire-isolated staircase - Advanced Engineering Building UQ Figure 1.2.2: Rough 3D modelling in Sketchup. Figure 1.2.3: Documentation in Revit. Figure 1.2.4: Producing assembling modules.

1.2.5

1.2.6

1.2.7

1.2.8

Figure 1.2.5: Cutting assembling module using Stanley knife. Figure 1.2.6: Placing plank perpendicular to the hot wire cutter. Figure 1.2.7: Secure plank on the hot wire cutter machine. Figure 1.2.8: Cutting styrofoam model using hot wire cutter.


1.2.9

1.2.10

1.2.13

1.2.14

1.2.11

1.2.12

1.2.15

1.2.16

Figure 1.2.9: Styrofoam module B - First Attempt. Figure 1.2.10: Styrofoam module A - First Attempt. Figure 1.2.11: Adding masking tape on the side of the foam box - First Attempt. Figure 1.2.12: Placing the styrofoam module into foam box - First Attempt.

Figure 1.2.13: Screw the styrofoam model to the foam box - Second Attempt. Figure 1.2.14: Insert Styrofoam module C into the foam box. Figure 1.2.15: Taping the foam box. Figure 1.2.16: Mixing four parts plaster and three parts water.


1.2.17

1.2.18

1.2.21

1.2.22

1.2.19

1.2.20

1.2.23

1.2.24

Figure 1.2.17: Pouring the mixture to the foam box. Figure 1.2.18: Adding weights onto of the foam box. Figure 1.2.19: Removing the weights. Figure 1.2.20: Unscrew the foam box.

Figure 1.2.21: Removing masking tape from the foam box. Figure 1.2.22: Removing large chunk of styrofoam using Stanley knife. Figure 1.2.23: Applying acetone to the styrofoam. Figure 1.2.24: Finished Marquette II - perspective.


1.3. PART C:

Construction period, 22nd February - 28th February

MARQUETTE

PLASTER

FOAM BOX

STYROFOAM MODEL

Construction process:

refer to figure 1.3.6

PART A.1

PART A.2

Conceptual study using wireframe 20 minutes

Construct styrofoam model using glue or nails. 110 minutes

PART B.1

PART B.2

PART D.1

PART D.2

PART E.1

Clean the interior of the foam box 5 minutes

Assemble the foam box together 5 minutes

Attach the styrofoam model to the foam box. 10 minutes

Pour the mixture into the foam box. 7 minutes

Does the Styrofoam model fall apart?

PART C.1

PART C.2

Measure the plaster and water using bucket(s) 5 minutes

Mix and stir gently till the plaster are completely dissolved

PART F.1

PART F.2

PART F.3

PART F.4

Tap the foam box allowing air bubble to escape 5 minutes

Remove Marquette from foam box 10 minutes

Apply acetone to Marquette to dissolve styrofoam 10 minutes

Allow the Marquette fully dry by elevating it 180 minutes

YES :(

NO :)

Figure 1.3.0: Overall construction workflow of Marquette III.

Method(s) and materials: Plaster to water ratio Curing time (plaster) Styrofoam model joinery Solvent used Weight (kg)

Comment and Observation: : 4 to 3 : 24 hours : PVA glue (first attempt) + Nails (second attempt) : Acetone : 4.73 kg (first attempt - two pour) 3.21 kg (second attempt - single pour)

Fabrication Duration:

1.3. PART C

Construction period, 22nd February - 28th February

Stereotomic study Create 3D cad model Cutting styrofoam model Mixing plaster with water Taping foam box Pouring plaster Plaster curing time Disolving styrofoam Cleaning up Total construction duration

: 20 mins : 10 mins : 100 mins : 5 mins : 2 mins : 5 mins : 23 hours : 10 mins : 15 mins : 167 mins + 23 hrs curing time

• Four parts of plaster and three parts of water are used, the plaster are holding together stronger. • It does requred secound pour of plaster. Regarding the first attempt, the styrofoam model seem to be broken apart while pouring the plaster (refer to figure 1.2.6). • Additional nails are used to further strengthen the styrofoam joints and attached to the foam box. • The styrofoam models are purposely design to be expose to surface so acetone can be easily applied to the styrofoam.

25 hours 47 mins (include curing time) Conceptual Maquette Studies / 3-2


1.3.1

1.3.2

1.3.3

1.3.4

Figure 1.3.1: Conceptual study from Marqutte I. Figure 1.3.2: Conceptual study from Marqutte I. Figure 1.3.3: Styrofoam model of abstract model. Figure 1.3.4: Styrofoam model of abstract model.

1.3.5

1.3.6

1.3.7

1.3.8

Figure 1.3.5: Fill gaps in the Styrofoam joints. Figure 1.3.6: Styrofoam model float to surface - First Attempt. Figure 1.3.7: Styrofoam model is screwed to the foam box - Second Attempt. Figure 1.3.8: Mixing four parts of plaster and three parts of water.


1.3.9

1.3.10

1.3.11

1.3.12

Figure 1.3.9: Pouring mixture into the foam box. Figure 1.3.10: Allow air bubble to escape by tapping the foam box. Figure 1.3.11: Elevated the foam box. Figure 1.3.12: Remove screws from foam box.

1.3.13

1.3.14

1.3.15

1.3.16

Figure 1.3.13: Remove Marquette III from foam box. Figure 1.3.14: Dry off Marquette III by elevating the plaster. Figure 1.3.15: Apply acetone to dissolve the Styrofoam model. Figure 1.3.16: Finished Marquette III.


notes:

A

B

C

D

E ABO V HANG OVER

B

C

D

1

1

1

CD303

CD302

CD301

THIS DRAWINGS IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE. ISSUE A B C

DATE 20 FEB 18 27 FEB 18 06 MAR 18

ISSUE PURPOSE / STATUS REV WORKSHOP 1- MARQUETTES WORKSHOP 2 - CASTING WORKSHOP 3 - INFORMAL PINUP

E ABOV

75 .00 °

10 5.0 0°

MID LEVEL LANDING

VOID TO BASEMENT WORKSHOP

+RL 2.016M

13 14 15 16 17 18 4

19

29

3

20

28

2

21

27

1

22

26

23 24 25

GROUND LEVEL LANDING

FIRST LEVEL LANDING

+RL 0.000M

+RL 4.200M

D0.1.2

D0.1.3

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia

D0.2.1

D0.2.2

project

BUILDING THE VOID STARTER EXERCISE - WEEK 1

client

MR. KIM BABER

Copyright by author. This drawing or parts therefore may not be reproduced for any purpose without the consent of author.

drawing title

001 CD101

GROUND LEVEL Scale: 1 : 50

002 CD101

FIRST LEVEL Scale: 1 : 50

FLOOR PLANS FIRE ISOLATED STAIRWELL

scale

1 : 50

s4351729

drawn

approved

project number

drawing number

issue

180101

CD101

LWW

C

ORIGINAL PAPER SIZE A3 - 420 x 297mm

PLOT FILE RECORD: I:\[ARCH7008] p1.rvt

ROOF

A

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION.


notes:

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION. THIS DRAWINGS IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE. DATE 20 FEB 18 27 FEB 18 06 MAR 18

ISSUE PURPOSE / STATUS REV WORKSHOP 1- MARQUETTES WORKSHOP 2 - CASTING WORKSHOP 3 - INFORMAL PINUP

200

FIRST LEVEL 4.200

4000

200

ISSUE A B C

2530

2016

STAIRCASE HEIGHT

1800

216

809

200

STAIR WITDH = 13 THREAD

300

GROUND LEVEL 0.000

SECTION A-A Scale: 1 : 50

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia project

BUILDING THE VOID STARTER EXERCISE - WEEK 1

client

MR. KIM BABER

Copyright by author. This drawing or parts therefore may not be reproduced for any purpose without the consent of author.

drawing title

BUILDING SECTION - SHEET 1

scale

1 : 50

s4351729

drawn

approved

project number

drawing number

issue

180101

CD301

LWW

C

ORIGINAL PAPER SIZE A3 - 420 x 297mm

PLOT FILE RECORD: I:\[ARCH7008] p1.rvt

1 CD301


notes:

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION. THIS DRAWINGS IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE. DATE 20 FEB 18 27 FEB 18 06 MAR 18

ISSUE PURPOSE / STATUS REV WORKSHOP 1- MARQUETTES WORKSHOP 2 - CASTING WORKSHOP 3 - INFORMAL PINUP

200

ISSUE A B C

3191

900

2760

900

1800

2825

200

2200

200

2184

900

FIRST LEVEL 4.200

300

GROUND LEVEL 0.000 1 CD302

SECTION B-B Scale: 1 : 50

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia project

BUILDING THE VOID STARTER EXERCISE - WEEK 1

client

MR. KIM BABER

Copyright by author. This drawing or parts therefore may not be reproduced for any purpose without the consent of author.

drawing title

BUILDING SECTION - SHEET 2

scale

1 : 50

Author

drawn

approved

project number

drawing number

issue

180101

Approver

CD302

C

ORIGINAL PAPER SIZE A3 - 420 x 297mm

PLOT FILE RECORD: I:\[ARCH7008] p1.rvt

2115


notes:

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION. THIS DRAWINGS IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE. ISSUE A B C

DATE 20 FEB 18 27 FEB 18 06 MAR 18

ISSUE PURPOSE / STATUS REV WORKSHOP 1- MARQUETTES WORKSHOP 2 - CASTING WORKSHOP 3 - INFORMAL PINUP

915

2400

2825

3100

1000

300

FIRST LEVEL 4.200

GROUND LEVEL 0.000

SECTION C-C Scale: 1 : 50

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia project

BUILDING THE VOID STARTER EXERCISE - WEEK 1

client

MR. KIM BABER

Copyright by author. This drawing or parts therefore may not be reproduced for any purpose without the consent of author.

drawing title

BUILDING SECTION - SHEET 3

scale

1 : 50

Author

drawn

approved

project number

drawing number

issue

180101

Approver

CD303

C

ORIGINAL PAPER SIZE A3 - 420 x 297mm

PLOT FILE RECORD: I:\[ARCH7008] p1.rvt

1 CD303


notes:

55

205 144

3

13

47

3

THIS DRAWINGS IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE. ISSUE A B C

DATE 20 FEB 18 27 FEB 18 06 MAR 18

ISSUE PURPOSE / STATUS REV WORKSHOP 1- MARQUETTES WORKSHOP 2 - CASTING WORKSHOP 3 - INFORMAL PINUP

97

97

12 11 11 12 12

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION.

85

*Thickness: 10mm

MODULE A1-R1 Scale: 1 : 2

3

001 CD401

51 2

8 8 17 8

50

248

10

189

R

205 131

33 1

68

*Thickness: 10mm

MODULE A1-L Scale: 1 : 2

50

5° 143.8

003 CD401

90

106

R

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia

56

project

BUILDING THE VOID

15

STARTER EXERCISE - WEEK 1

client

MR. KIM BABER

002 CD401

MODULE A1-R2 Scale: 1 : 2

drawing title

MODULE A1

scale 1:2

s4351729

drawn

approved

project number

drawing number

issue

180101

CD401

LWW

C

ORIGINAL PAPER SIZE A3 - 420 x 297mm

PLOT FILE RECORD: I:\[ARCH7008] p1.rvt

*Thickness: 10mm

Copyright by author. This drawing or parts therefore may not be reproduced for any purpose without the consent of author.


notes:

202 12 11 11 12 12

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION.

52 142

3

13

47

1

THIS DRAWINGS IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE. ISSUE PURPOSE / STATUS REV WORKSHOP 1- MARQUETTES WORKSHOP 2 - CASTING WORKSHOP 3 - INFORMAL PINUP

R

2

51

248

50 8 8 8 8 8

85

*Thickness: 10mm

MODULE A2-L1 Scale: 1 : 2

3

001 CD402

DATE 20 FEB 18 27 FEB 18 06 MAR 18

10

189

97

97

ISSUE A B C

*Thickness: 10mm

202 131

3

003 CD402

MODULE A2-R Scale: 1 : 2

1

68

106

90

50

5° 143.8

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia project

56

BUILDING THE VOID

*Thickness: 10mm

client

MR. KIM BABER

Copyright by author. This drawing or parts therefore may not be reproduced for any purpose without the consent of author.

drawing title

002 CD402

MODULE A2-L2 Scale: 1 : 2

MODULE A2

scale 1:2

s4351729

drawn

approved

project number

drawing number

issue

180101

CD402

Approver

C

ORIGINAL PAPER SIZE A3 - 420 x 297mm

PLOT FILE RECORD: I:\[ARCH7008] p1.rvt

15

STARTER EXERCISE - WEEK 1


notes:

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION.

202 69

59 130

13

3

8

ISSUE A B C

DATE 20 FEB 18 27 FEB 18 06 MAR 18

ISSUE PURPOSE / STATUS REV WORKSHOP 1- MARQUETTES WORKSHOP 2 - CASTING WORKSHOP 3 - INFORMAL PINUP

B

37

248

.15° 126

MODULE B1-R1 Scale: 1 : 2

85

001 CD403

2

*Thickness: 16mm

51

10

37

R

13

147

.15° 126

97

60

B

47

THIS DRAWINGS IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

133

90

106

1

3

B

3

130

*Thickness: 16mm 003 CD403

MODULE B1-L Scale: 1 : 2

R

15

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia project

BUILDING THE VOID

*Thickness: 16mm

STARTER EXERCISE - WEEK 1

client

MODULE B1-R2 Scale: 1 : 2

drawing title

MODULE B1

scale 1:2

Author

drawn

approved

project number

drawing number

issue

180101

LWW

CD403

C

ORIGINAL PAPER SIZE A3 - 420 x 297mm

PLOT FILE RECORD: I:\[ARCH7008] p1.rvt

002 CD403

MR. KIM BABER

Copyright by author. This drawing or parts therefore may not be reproduced for any purpose without the consent of author.


notes:

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION. THIS DRAWINGS IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

198 69

55

126

3

13

3

DATE 20 FEB 18 27 FEB 18 06 MAR 18

ISSUE PURPOSE / STATUS REV WORKSHOP 1- MARQUETTES WORKSHOP 2 - CASTING WORKSHOP 3 - INFORMAL PINUP

B

R

10

147

97

.15° 126

111

B

47

ISSUE A B C

MODULE B2-L1 Scale: 1 : 2 85

001 CD404

2

51

248

37

.15° 126 *Thickness: 16mm

126

3

3

129

B

003 CD404

MODULE B2-R Scale: 1 : 2

90

106

1

*Thickness: 16mm

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia project

15

BUILDING THE VOID STARTER EXERCISE - WEEK 1

002 CD404

MODULE B2-L2 Scale: 1 : 2

client

MR. KIM BABER

Copyright by author. This drawing or parts therefore may not be reproduced for any purpose without the consent of author.

drawing title

MODULE B2

scale 1:2

s4351729

drawn

approved

project number

drawing number

issue

180101

CD404

Approver

C

ORIGINAL PAPER SIZE A3 - 420 x 297mm

PLOT FILE RECORD: I:\[ARCH7008] p1.rvt

*Thickness: 16mm


notes:

198

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION.

87

12 11 11 12

149

3

13

47

36

THIS DRAWINGS IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE. ISSUE A B C

DATE 20 FEB 18 27 FEB 18 06 MAR 18

ISSUE PURPOSE / STATUS REV WORKSHOP 1- MARQUETTES WORKSHOP 2 - CASTING WORKSHOP 3 - INFORMAL PINUP

C

114

97

97

C

51

MODULE C1-R1 Scale: 1 : 2

143.8 5°

C

*Thickness: 104mm

140

1 CD405

MODULE C1-L Scale: 1 : 2

90

R

15

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia

47

198

148

3

project

BUILDING THE VOID STARTER EXERCISE - WEEK 1

client

MR. KIM BABER

*Thickness: 104mm 2 CD405

MODULE C1-R2 Scale: 1 : 2

Copyright by author. This drawing or parts therefore may not be reproduced for any purpose without the consent of author.

drawing title

MODULE C1

scale 1:2

s4351729

drawn

approved

project number

drawing number

issue

180101

CD405

Approver

C

ORIGINAL PAPER SIZE A3 - 420 x 297mm

PLOT FILE RECORD: I:\[ARCH7008] p1.rvt

1

85° 53.

3

85

3 CD405

2

*Thickness: 104mm

248

50

8 8 8 8

10

147

R


notes:

170 12 11 11 12

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION.

59 121

3

13

C

47

8

ISSUE A B C

C

DATE 20 FEB 18 27 FEB 18 06 MAR 18

ISSUE PURPOSE / STATUS REV WORKSHOP 1- MARQUETTES WORKSHOP 2 - CASTING WORKSHOP 3 - INFORMAL PINUP

97

R

51

MODULE C2-L1 Scale: 1 : 2

1

85° 53.

143.8 5°

C

3

34

85

1 CD406

2

*Thickness: 104mm

248

8 8 8

50

10

147

122

97

THIS DRAWINGS IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

*Thickness: 104mm

MODULE C2-R Scale: 1 : 2

15

90

140

3 CD406

47

120

3

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia project

BUILDING THE VOID

2 CD406

MODULE C2-L2 Scale: 1 : 2

*Thickness: 104mm

client

MR. KIM BABER

Copyright by author. This drawing or parts therefore may not be reproduced for any purpose without the consent of author.

drawing title

MODULE C2

scale 1:2

s4351729

drawn

approved

project number

drawing number

issue

180101

CD406

LWW

C

ORIGINAL PAPER SIZE A3 - 420 x 297mm

PLOT FILE RECORD: I:\[ARCH7008] p1.rvt

170

STARTER EXERCISE - WEEK 1


notes:

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION. THIS DRAWINGS IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE. ISSUE A B C

86 47

39

47

16 10

D

C

B

A

R 141

*Thickness: 12mm

MODULE D1-L Scale: 1 : 2

*Thickness: 12mm 1 CD407

MODULE D1-R Scale: 1 : 2

3 CD407

MODULE ELEVATION Scale: 1 : 2

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia project

BUILDING THE VOID STARTER EXERCISE - WEEK 1

client

MR. KIM BABER

Copyright by author. This drawing or parts therefore may not be reproduced for any purpose without the consent of author.

drawing title

MODULE D1 & ELEVATION

scale 1:2

s4351729

drawn

approved

project number

drawing number

issue

180101

CD407

LWW

C

ORIGINAL PAPER SIZE A3 - 420 x 297mm

PLOT FILE RECORD: I:\[ARCH7008] p1.rvt

141

248

248

107

D

107

104

ISSUE PURPOSE / STATUS REV WORKSHOP 1- MARQUETTES WORKSHOP 2 - CASTING WORKSHOP 3 - INFORMAL PINUP

36

D

2 CD407

12

83

DATE 20 FEB 18 27 FEB 18 06 MAR 18


notes:

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION. THIS DRAWINGS IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

CD502 003

ISSUE A B C

DATE 20 FEB 18 27 FEB 18 06 MAR 18

ISSUE PURPOSE / STATUS REV WORKSHOP 1- MARQUETTES WORKSHOP 2 - CASTING WORKSHOP 3 - INFORMAL PINUP

002 CD502

004 CD502

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia project

001 CD502

BUILDING THE VOID STARTER EXERCISE - WEEK 1

client

MR. KIM BABER

PERSPECTIVE VIEW Scale:

002 CD501

CONCEPTUAL MODEL PLAN Scale: 1 : 15

drawing title

CONCEPTUAL MODEL - PLAN

1 : 15

scale

s4351729

drawn

approved

project number

drawing number

issue

180101

CD501

LWW

C

ORIGINAL PAPER SIZE A3 - 420 x 297mm

PLOT FILE RECORD: I:\[ARCH7008] p1.rvt

001 CD501

Copyright by author. This drawing or parts therefore may not be reproduced for any purpose without the consent of author.


notes:

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION. THIS DRAWINGS IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE. ISSUE A B C

DATE 20 FEB 18 27 FEB 18 06 MAR 18

ISSUE PURPOSE / STATUS REV WORKSHOP 1- MARQUETTES WORKSHOP 2 - CASTING WORKSHOP 3 - INFORMAL PINUP

GROUND LEVEL 0.000 001 CD502

FRONT ELEVATION Scale: 1 : 20

002 CD502

SIDE ELEVATION 1 Scale: 1 : 20

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia

GROUND LEVEL 0.000

project

BUILDING THE VOID STARTER EXERCISE - WEEK 1

BACK ELEVATION Scale: 1 : 20

004 CD502

SIDE ELEVATION 2 Scale: 1 : 20

client

MR. KIM BABER

Copyright by author. This drawing or parts therefore may not be reproduced for any purpose without the consent of author.

drawing title

CONCEPTUAL MODEL - ELEVATIONS

scale

1 : 20

s4351729

drawn

approved

project number

drawing number

issue

180101

CD502

LWW

C

ORIGINAL PAPER SIZE A3 - 420 x 297mm

PLOT FILE RECORD: I:\[ARCH7008] p1.rvt

003 CD502


20

96

147

1

95

2

66

3

78

47

4

111

5

75

6

81

7

8

148

112

67

55

120

57

53

148

112

67

55

120

57

53

ELEVATION 1

20

78

1

2

3

84

4

5

6

7

8

104

102

100

93

81

72

72

104

102

100

93

81

72

72

ELEVATION 2

20

84

1

2

3

102

4

5

6

7

8

102

85

99

85

73

90

100

102

85

99

85

73

90

100

ELEVATION 3

20

102

1

2

96

3

147

4

95

5

66

6

47

7

8

111

75

81

ELEVATION 4 ISSUE A

DATE 20 FEB 18

ISSUE PURPOSE / STATUS WORKSHOP 1- MARQUETTES

B

27 FEB 18

WORKSHOP 2 - CASTING

C

06 MAR 18

WORKSHOP 3 - INFORMAL PINUP

PREP

REV

** RECORDS OF APPROVAL FOR THE LATEST PURPOSE OF ISSUE ARE NOTED IN THE PROJECT TIMELINE. PLOT FILE RECORD I:\[ARCH7008] p1.rvt

notes

team members

project

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAFTMEN SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. 5. REFER TO STRUCTURAL ENGINEERS AND FABRICATORS DRAWINGS FOR RELEVANT SPECIFICATION.

s4351729

BUILDING THE VOID

drawing title

CONCEPTUAL MODEL MODULE

STARTER EXERCISE - WEEK 1

+61 402 578 308 Zelman Cowen Building Studio 481, St. Lucia Brisbane Qld 4067 Australia

client

scale 1:2

s4351729

drawn

approved

Copyright by r-ki. This drawing or parts therefore may not be reoroduced for any purpose without the consent of r-ki.

project number

drawing number

issue

MR. KIM BABER

180101

CD503

LWW

C


End of the report. Thank you.

Copyright by author(s). This document or parts therefore may not be reproduced or published for any purpose without the consent of author (s).


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.