MĂŚlkeri tidende Tidsskrift for
mejeriindustrien
From 0 to 50 000 in 8 months March. Construction Construction of of the thenew new We got the order in March. was finished in finished October.inInstallation and testing plant in Holland was October. Installation of the processing equipment was completed a mere and testing of the processing equipment was in comsix weeks, so thesix first cheese becheese produced in be pleted in a mere weeks, so could the first could mid-November. produced in mid-November. were proven proven solutions and the the The prerequisites were specific demands. demands. In In this thishighly highlyadvanced advanced customer's specific
people run run production production of ofup upto to50 50000 000 plant, just five people year. Thanks Thanks to to the the high high degree degreeof of tonnes of cheese a year. Tetra PlantMaster. PlantMaster. automation via Tetra automation solutions solutionsmught mught Think how quickly our automation achieve maximum maxim um cheese production. production. enable you to achieve and find find out? out? Why not get in touch and
You're welcome to visit us at www.tetrapak.com/processing - or get in touch directly: info.processing@tetrapak.com
9 Tetra Pak,
and protects what's good are trademarks belonging to the Tetra Pak Group.
2. maj 2008 121. ĂĽrgang