Internship report

Page 56

LANDSCAPE

Chitwan riverfront park INFORMATION • Project Status = Design Phase • Client = Chitwan Municipality • Location = Chitwan Municipality • Design = Modern Approach INVOIVEMENT • Sketch up model • Lumion render • Building plan (toilet and viewing deck) CLIENT REQUIREMENT • Max. recreational Spaces • The river flow will be high during rainy season so no building structure near the river bank • Toilet design for all people • Vewing Deck

ACHIEVEMET • Landscaping ideas and design • Knowledge of softwares

56

Architectural practicum report Eris Maharjan (073/BAE/216)

chitwan river front park

cycle stand

existing statue

children play area

statue in park

PROJECT DESCRIPTION CONEPT • Flow of the river (not to onstruct river's natural flow as well as to protect the property as the river widens in rainy season) • Construction of dam at bank of river


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.