LANDSCAPE
Chitwan riverfront park INFORMATION • Project Status = Design Phase • Client = Chitwan Municipality • Location = Chitwan Municipality • Design = Modern Approach INVOIVEMENT • Sketch up model • Lumion render • Building plan (toilet and viewing deck) CLIENT REQUIREMENT • Max. recreational Spaces • The river flow will be high during rainy season so no building structure near the river bank • Toilet design for all people • Vewing Deck
ACHIEVEMET • Landscaping ideas and design • Knowledge of softwares
56
Architectural practicum report Eris Maharjan (073/BAE/216)
chitwan river front park
cycle stand
existing statue
children play area
statue in park
PROJECT DESCRIPTION CONEPT • Flow of the river (not to onstruct river's natural flow as well as to protect the property as the river widens in rainy season) • Construction of dam at bank of river