1 minute read

Figure 64

Next Article
6. Conclusions

6. Conclusions

3 - SUMP actions). However, according to SUMP guidelines, some information has been missing in the factsheets. For instance, information related to the implementation risks has not been addressed there, their priority levels, or implementation periods. As a result, the lack of these data Step 9 prepare for adoption and financing: PUMS has dedicated two subchapters to coverage). These chapters have shared estimation costs for each action separately, including a financial schedule, and listed many financing options for innovative measures. consulted to express their opinions on the solutions proposed by PUMS in a series of organized meetings with the municipality and stakeholders. In addition, for those who could not participate in the meetings, a structured form was available to collect the improvements request, which could be delivered by email or by hand (always during the meetings), and the participatory process results from this stage have been presented in

Figure 64.

Advertisement

Figure 64. Summary of participatory process . Source: Roma Servizi per la Mobilità (2019a)

This article is from: