SERVICES/UTILITIES
S T U D I O
E P S I L O N
PERSPECTIVES
CONSTRUCTION DETAIL SECTION
C A R L T O N
U N I O N
MARIO Y. RINALDY 917889 STUDIO LEADER: ROBERT POLGLASE STUDIO 06 SEMESTER 2 — 2019
DESIGN STRATEGIES
BIKE PARKING SHELTER
B
METAL PANELS
B VEGETATION
TOP PLATE C-SECTION
GROWTH MEDIUM FILTER MEMBRANE DRAINAGE LAYER ROOT BARRIER
FORM DIAGRAMS
TOP HAT TIMBER CLADDING
WATERPROOF MEMBRANE ROOF SUPPORT STRUCTURE SUSPENDED CEILING PLASTERBOARD CEILING
B
SERVICES
R
E ELT
SH second a function ry s
CHC
park
NIT
suburba
ne
U MM
MG-42 BOLT
ER
NT
E HC
ALT
E YH
TIMBER CLADDING FACADE
PERSPECTIVE 2
CO
urbane
SITE ZONING AND INTERFACES
ACCESS AND MAIN LINK
DYNAMIC VIEWS AND SETBACK
PROGRAMME CLUSTERS ARRANGEMENT
OUTDOOR COURTYARD AND STEPS FOR COMMUNAL ACTIVITIES AND INTERACTION
CONSULTATION ROOM GLASS WINDOW
TRANSITION BETWEEN URBAN AND LANDSCAPE
FUNCTION ROOM
BOOKSHELVES
AMPHITHEATRE
WINDOW FRAME
CAFE PATIENTS’ DECK WINDOWS IN CONSULATION ROOMS
ACTIVITIES AROUND COURTYARD
COMMUNITY'S PRIDE URBAN SQUARE
PROGRAMS ARRANGEMENT DIAGRAM
SUNLIGHT ACCESS TO COURTS
TIMBER FRAME WALL WITH PLASTERBOARD FINISH
TERRACE DECKS AND URBAN INTERFACE
STORAGE
SITE PLAN @1:500
FLOOR SLAB EDGE BEAM
SUSPENDED CEILING INSULATION PLASTERBOARD CEILING
TIMBER CLADDED CEILING
CONSULTATION ROOM WINDOW PANELS
BIO-BASED TILES
KITCHEN
POST-TENSIONED SLAB PERFORATED METAL CEILING
Terrace
GP & NURSE
GYM DECK
Offices
FLASHING TIMBER CEILING FINISH
AWNING WINDOW
PERSPECTIVE 3
WAITING AREA WITH OPEN VIEW TO INNER COURT FOR UNCONSTRAINED EXPERIENCE
PATIENTS’ DECK
Core
Mental Health
Gym
Terrace
Multi-therapy
FIRST FLOOR
Physiotherapy & Occupational Theraphy Supporting Facilities
C
Terrace Core
General Practicioner & Nurse
EM
ET
Y R E
RO
AD
EA
ST
STAFF DECK MEETING ROOMS
Inner Court
Pharmacy/ Local produce
m supers
ARCHIVES
= Core/Vertical Circulation = Social = Link = Main Circulation link
GREENHOUSE/ LOCAL PRODUCE DISABLED PARKING DROP OFF
LYTTON
STREET
10
OT
MENTAL HEALTH STAFF OFFICES OT
QUIET ROOM
1:50@A1
GROUP THERAPHY
PHARMACY
FIRST FLOOR PLAN IV TREATMENT
B
3
4
5
PERSPECTIVE 4 10
INNER COURT AS AN ACTIVITY SQUARE
B
SECOND FLOOR PLAN
DIETICIAN
1:200@A1 0 2 4
PRAYER ROOM
8
20
= Allied Health Clusters = Community Clusters = Supporting Facilities Clusters
1:500@A1 0
MEETING ROOM
0 1 2
= Community Clusters = Supporting Facilities Clusters
A
A
A
future tra
= Allied Health Clusters
Cafe
REINFORCED CONCRETE BORED PIERS
PHYSIOTHERAPHY
STREET
Core
A
LOCKERS & SHOWERS
NUTRIONIST
LYGON
Nutritionist & Dietician
A
AMPHITHEATRE
LEGEND:
GROUND FLOOR
TIMBER DECK TERRACE GROUND EDGE BEAM
GROUND SLAB
A
Physiotherapy & Occupational Theraphy
Courtyard
THERAPHY DECK
GYM
COURTYARD
Function Room Community rooms
PHARMACY
BIKE PARKING SHELTER UTILITIES AND SERVICES
Terrace
top
SECOND FLOOR
50
GROUND FLOOR PLAN
SECTION A-A
1:100@A1 B
0
5
@1:100
SECTION B-B @1:100
10
CONSTRUCTION DETAIL SECTION
PERSPECTIVE 5
CENTRAL LINK CORRIDOR BETWEEN THE TWO COURTS ALLOWS FOR SMOOTHEN THRESHOLD
LYGON STREET
PERSPECTIVE 1
LYGON STREET INTERFACE