LIGHTWEIGHT HOUSE FOUNDATION FREDERIKSHAVN, DENMARK – 2004 Sub base compensation TECHNICAL DATE OF THE PROJECT 1.400 m 3 Leca ® installed. Year of construction: 2004. Consulting Engineers: NIRAS A/S designed the geotechnical solution. Contractor: Bangsminde ApS in Frederikshavn. DENMARK maxitGroup AB, Box 415, SE-191 24 Sollentuna, Sweden Tel.: +46 (0)8 858 70 64 00, E-mail: info@maxit-group.com