Minh tran portfolio 2018

Page 1


GOOD DESIGN WILL DELIVER GOOD BUSINESS MIMANYstudio ARCHITECTURE

MIMA NYSTUDIO & Partner


MIMAnystudio ARCHITECTURE ROAD 11, TRAN TRONG CUNG STREET TOWER BRIDGE VIEW BLOCK B-612, DIST 7 HoChiMinh City 70000 Vietnam TEL +84 918182781 E:info@mimanystudio.com www.mimanystudio.com

MIMAARCHITECTURE RETAINS THE COPYRIGHT AND INTELLECTUAL PROPERTY RIGHTS IN RELATION TO ALL THE DESIGN, DRAWINGS, SCHEDULES AND OTHER MATERIALS PREPARED FOR THE PROJECT AND CONTAINED HEREIN. THIS DOCUMENT IS ISSUED FOR GUIDANCE ONLY. IT IS TO BE VIEWED WITH REGARD TO THE SPECIFIC PURPOSE OF THE ISSUE WHICH IS FOR PRELIMINARY FEASIBILITY PURPOSES ONLY. AS AN UNCONTROLLED DOCUMENT, MIMAARCHITECTURE ACCEPTS NO RESPONSIBILITY FOR ALTERATIONS BY PERSONS ONCE ISSUED. THE INFORMATION CONTAINED HEREIN IS BELIEVED TO BE CORRECT AT THE TIME OF PREPARATION HOWEVER IS NOT GUARANTEED. RECIPIENTS MUST RELY ON THEIR OWN ENQUIRIES TO SATISFY THEMSELVES IN ALL RESPECTS. MIMAARCHITECTURE ACCEPTS NO DAMAGES, LIABILITIES OR COSTS, INCLUDING LEGAL COSTS OF DEFENCE, ARISING FROM CHNGES MADE BY ANYONE OTHER THAN DUYTHANHARCHITECTURE OR FROM THE REUSE OF THE INFORMATION CONTAINED HEREIN WITHOUT PRIOR CONSENT OF MIMAARCHITECTURE. BY ACCEPTING AND UTILIZING FORM OF DESIGN, DRAWINGS, SCHEDULES OR OTHER MATERIALS PREPARED FOR THE PROJECT, THE RECIPIENT COVENANTS AND AGREES THAT ALL SUCH INFORMATION ARE THE SERVICES OF MIMAARCHITECTURE, WHO SHALL BE DEEMED TO BE THE AUTHOR AND SHALL RETAIN ALL COMMON LAW, STATUTORY LAND AND OTHER RIGHTS, INCLUDING COPYRIGHTS AND INTELLECTUAL PROPERTY RIGHTS AS DEFINED UNDER THE COPYRIGHT ACT 2000, OR OTHERWISE AT LAW

MIMA NYSTUDIO & Partner


CONTENT 1. INTRODUCTION FIRM DUYTHANHARCHITECTURE 2. CONTEXT RESEARCH 20 YEAR IN CASES PRESENT SOCIAL LIFE ECONOMIC TIME BEAHVE 3. WHY WE DO 4. STRATEGY 5. OUR EXPERIENCES 20 YEAR INTERNATIONAL FIRM DESIGN 6. FUTURE

MIMA NYSTUDIO & Partner


M28

1. INTRODUCTION MIMA ARCHITECTURE inherited the practice from its precedent MimA NY Studio in New York City, founded by Minh Tran and associates in 2004. MIMA is a human infrastructure of skilled craftsmen and architects who design and build the work directly. Gathered through time, this group shares an environment created from an iterative process, where ideas are explored through the production of large-scale mock-ups, models, material studies, sketches and drawings. Here projects are developed through careful consideration of place and a practice that draws from traditional skills, local building techniques, materials, and an ingenuity arising from limited resources. The essence of our work lies in the relationship between land and architecture, it requires coming to terms with the presence of the environment through the succession of seasons. Inspired by real life conditions, we observe the complexity of relationships within each project without any assumption or prejudice. Our attempt is to remain intuitive, and look for a space to initiate a dialogue. It is through this practice that the matter being observed naturally reveals itself. The endeavor is to show the genuine possibility in creating buildings that emerge through a process of collective dialog, a face-to-face sharing of knowledge through imagination, intimacy, and modesty. “Our immediate environment is a space that we subconsciously create and inhabit. We can make this space very familiar, or we can expose ourselves to unfamiliar elements that provoke our response and re-evaluation. There are many sources of inspiration: one only has to observe closely. It is possible to have set ideas of what architecture should be, but first we need to understand why things are a certain way.” - Minh Tran

MIMA NYSTUDIO & Partner


M28

2. CONTEXT

CONTEXT MARKET

AFTER 20 YEAR INTERNATIONAL DESIGN AND RESEARCH MARKET IN VIETNAM, I SAW ALL CLIENTS IN VIETNAM GOT WRONG ANSWER FOR WHAT THEY NEED FOR WHAT THEY PAID. ALL MOST SYSTEM EDUCATION IN VIETNAM ARE WRONG AND SO ALL CLIENT COMING TO ARCHITECTS AS SAME MISTAKE : WASTE TIME AND MONEY BECAUSE : 1. THEY NO IDEA WHAT IS GOING ON PROCESS DESIGN 2. THEY NO IDEA HOW IS ARCHITECTURE WORKS 3. NO IDEA FUNCTION AND UNDERSTAND THE MATERIAL AND CLIMATE 4. THEY START FROM WRONG QUESTION IN KNOWLEGDE AND THEY WILL GET WRONG ANSWER THIS EFFECTED ALL SYSTEM OF ARCHITECTURE : AND ALL URBAN HAD BAD SPACE FOR LIVING. THEY WASTE 50-75 % MONEY AND TIME FOR MISTAKE FROM BEGINNING . WHAT HAPPENED IF YOU GOT WRONG SPACE FOR LIVING : YOUR LIFE MORE COMMLICATED FOR BUSY THINGS AROUND. HOW TO SHOLVE THE PROBLEM : “THE ANSWER ARE : CHOSED THE RIGHT ARCHITECTURE FROM BEGINNING “

MIMA NYSTUDIO & Partner


M28

3. WHY WE DO

WHY WE DO – WHAT OUR AMBITION FOR COMING TO GOOD ARCHITECTS NOT EASY TO CLIENTS TODAY WE KNOW AND WE WOULD LIKE BRING TO YOU RIGHT ARCHITECTS BECAUSE RIGHT ARCHITECTS WILL DELIVER : 1. SAVE TIME FOR CLIENTS 50-70% 2. SAVE MONEY 30-40% 3. BRING GOOD ARCHITECTURE DESIGN TO YOUR LIFE 4. IN FUTURE WE WILL CREATIVE BETTER LIFE FOR ALL PEOPLE IN WORLD

MIMA NYSTUDIO & Partner


M28

3. WHY WE DO

WHY WE DO ?

PEOPLES WAS LIVING IN BAD ENVIROMENT AND SPACE MORE 45 YEAR THEY PAID SAME MONEY ON THE WORLD FOR THEIR LIVING IN HOUSE, URBAN, TAX .. BUT WHAT THEY GOT ? EVERY WAS WORST AND LESS VALUE. THE PROBLEMS ARE WE DO NOT FIND THE GOOD ARCHITECTS SERVICE FOR SOCIAL WE GOT MILLION ARCHITECTS, INVESTER THINKING FOR THEMSELVES MORE PUBLIC HUMAN IN CITY PAID SO MUCH AND GOT WRONG THING

MIMA NYSTUDIO & Partner


M28

4. STRATEGY

4. STRATEGY

FROM 2-3-5 YEAR OUR MISSION WILL COVER ALL MARKET VIETNAM REPLY ON IT SYSTEM ALL RIGHT DESIGN WITH BEAUTIFUL THING AND ECONOMIC DESIGN WILL DELIVER 50% TO PEOPLE IN URBAN WHEN THEY NEED . ALL PROJECTS FROM RIGHT CLIENT INVEST WILL BE COMBINE AS PARTNER FOR SAVE TIME AND MONEY . WE WOULD LIKE BRING RIGHT THING TO ALL PEOPLE WHO WILL BE LIVING TOGETHER AND CREATIVE GREAT COMMUNITY AREA IN VIETNAM

MIMA NYSTUDIO & Partner


M28

5.OUR EXPERIENCE 20 YEAR

5. EXPERIENCES

20 YEAR WITH MORE 1000 PROJECTS WAS BUILT AROUND ASIA AND VIETNAM AS RESIDENCES, HOUSING, EDUCATION, CONDOS, HOTEL, HOSPITILITY, MORE 2000 UNIT WAS BUILT, 12 SCHOOL, 12 HOTELS, 1000 HOUSE FOR VN AND CAMBODIA, AMERICAN

MIMA NYSTUDIO & Partner


M28

6.PLAN FUTURE 3-5-10 YEAR

6. OUR FUTURE

PROJECTS WILL CONTINUE AND DEVELOPMENT ALL SYSTEM WITH MULTI VERSION AND DELIVER OUR VISION FOR NEXT SCALE AND LEVEL AROUND THE WOLRD AS : INTERNATION STANDARD LAW-DESIGN BENEFIT FROM EACH COUNTRY EUROPE AND USA RESPOSIBITILY WITH COUNTRY ASIA : 3-5 YEAR 5-10 YEAR COVER ALL US AND EUROPE

MIMA NYSTUDIO & Partner


M28

6.PLAN FUTURE 3-5-10 YEAR

MIMA NYSTUDIO & Partner


M28

6.PLAN FUTURE 3-5-10 YEAR

MIMA NYSTUDIO & Partner


M28 M26

6.PLAN 3.1. TRADITIONAL FUTURE 3-5-10 + NATURE YEAR METAL

WATER

WOOD

MIMA NYSTUDIO & Partner

FIRE

EARTH


M28

7. EXPERIENCES PROJECTS

OUR EXPERIENCES 1996-2018 IN VIETNAM MIMANYstudio ARCHITECTURE

MIMA NYSTUDIO & Partner


M28

PROJECTS LIGHTING HOUSE

PROCESS OF THIS SAMLE URBAN HOUSE:MODERN TUBE HOUSE ONLY 2A4 CONTRACTOR CAN BUILT THIS HOUSE WITH 30K

MIMA NYSTUDIO & Partner


M28

PROJECTS LIGHTING HOUSE LIGHTING HOUSE HOUSE, TAN PHU DISTRICT, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

TAN PHU DISTRICT , HCMC

PRINCIPLE ARCHITECT:

MINH TRAN AND JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, HOANG TUAN ANH

AREA: STRUCTURE ENGINEER:

250 M2 (SITE:340M2 - 2FL) TIEN AN ENGINEERING

PROJECT YEAR:

2013

PROJECT SUMMARY: NATURE LIGHT

MINIMALIST DESIGN – SIMPLE AND STRONG FORM –

BENEFIT :

2..5 MONTH CONSTRUCTIONSOLD WITH STEEL AND BRICK WORK cost 30k

MIMA NYSTUDIO & Partner


M28

PROJECTS 81 VILLA

81 VILLA THAO DIEN, DISTRICT 2, HCMC

MIMA NYSTUDIO & Partner


M28

PROJECTS 81 VILLA 81 VILLA THAO DIEN, DISTRICT 2, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

THAO DIEN AREA, DISTRICT 3, HCMC

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, THINH PHAM

AREA:

450M2 ( SITE : 870M2 )

STRUCTURE ENGINEER:

KIEN LONG CONSTRUCTOR

PROJECT YEAR:

2013

PROJECT SUMMARY: STAFF–NATURE LIGHT

REDESIGN ARCHITECTURE– GOOD EFFICIENCE 250

BENEFIT :

6 MONTH CONSTRUCTION WITH 600K FOR 450M2 SAVE ENERGY FOR BUILDING - SOLD 3 MILLION

MIMA NYSTUDIO & Partner


M28

PROJECTS CAYE SERENO

CAYE SERENO HALONG BAY, QUANG NINH, LUX LIFE 64 VILLA =6HA

MIMA NYSTUDIO & Partner


M28

PROJECTS CAYE SERENO CAYE SERENO HALONG BAY, QUANG NINH

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

HALONG BAY, QUANG NINH, VIETNAM

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE, MK27

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, THINH PHAM

AREA:

6HA M2 ( 64 VILLAS)

STRUCTURE ENGINEER:

HALONG CONSTRUCTOR

PROJECT YEAR:

2014

PROJECT SUMMARY: STAFF–NATURE LIGHT

REDESIGN ARCHITECTURE– GOOD EFFICIENCE 250

BENEFIT :

SOLD 3 MILLION I VILLA

MIMA NYSTUDIO & Partner


M28

PROJECTS CAYE SERENO

LUXURY VILLAS CAYE SERENO 6HA , HA LONG BAY

MIMA NYSTUDIO & Partner


M28

PROJECTS MODERN TUBE

MODERN TUBE HOUSE, THAO DIEN , DISTRICT 2, HCMC 6Month Construction 175k MIMA NYSTUDIO & Partner


M28

PROJECTS MODERN TUBE MODERN TUBE HOUSE, THAO DIEN , DISTRICT 2, HCMC

ARCHITECT:

MIMANYSTUDIO + Partner

LOCATION: DISTRICT 2, HCMC

NGUYEN VAN HUONG STREET,6 ROAD, THAO DIEN AREA,

PRINCIPLE ARCHITECT:

MINH TRAN AND JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, HOANG TUAN ANH

AREA: STRUCTURE ENGINEER:

250 M2 (SITE:340M2 - 2FL) TIEN AN ENGINEERING

PROJECT YEAR:

2011

PROJECT SUMMARY: NATURE LIGHT

MINIMALIST DESIGN – SIMPLE AND STRONG FORM –

BENEFIT :

6 MONTH CONSTRUCTION WITH STEEL AND BRICK SOLD 2..2 MILLION USD

MIMA NYSTUDIO & Partner


M28

PROJECTS SKY HOUSE

INDUSTRY SKY HOUSE, BINH DUONG, 3.5MONTH CONSTRUCTION COST 60K

MIMA NYSTUDIO & Partner


M28

PROJECTS SKY HOUSE INDUSTRY SKY HOUSE, BINH DUONG, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

THU DUC DISTRIC , HCMC

PRINCIPLE ARCHITECT:

MINH TRAN AND JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, TUAN ANH

AREA: STRUCTURE ENGINEER:

220 M2 (SITE:90M2 - 2FL) TIEN AN ENGINEERING

PROJECT YEAR:

APRIL-2016

PROJECT SUMMARY: LIGHT, VENTILATION

LOFT DESIGN – SIMPLE AND STRONG FORM –NATURE

BENEFIT :

SAVE 50 TIME AND COST FOR CONSTRUCTION 2 MONTH CONSTRUCTION AND 60K

MIMA NYSTUDIO & Partner


M28

PROJECTS THI NGHE HOUSE

EXISTING

CONCEPT ( TROPICAL FACADEPROTECT HEAT AND ECONOMIC

THI NGHE HOUSE, BINH THANH DIST , 3.5MONTH CONSTRUCTION COST 60K

MIMA NYSTUDIO & Partner

COMPLETED


M28

PROJECTS THI NGHE HOUSE THI NGHE HOUSE, THAO DIEN , DISTRICT 2, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION: DISTRICT 2, HCMC

NGUYEN VAN HUONG STREET,6 ROAD, THAO DIEN AREA,

PRINCIPLE ARCHITECT:

MINH TRAN AND JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, HOANG TUAN ANH

AREA: STRUCTURE ENGINEER:

280 M2 (SITE:170M2 - 2FL) TIEN AN ENGINEERING

PROJECT YEAR:

2015

PROJECT SUMMARY: LIGHT

MODERN DESIGN – SIMPLE AND STRONG FORM –NATURE

BENEFIT :

3.5 MONTH CONSTRUCTION WITH STEEL AND BRICK COST 65K

MIMA NYSTUDIO & Partner


M28

PROJECTS VNWORK OFFICE

VIETNAMWORK HEAD SQUARETER, DISTRICT 3, HCMC, 3MONTH CONSTRUCTION 1200M2, COST 300,000

MIMA NYSTUDIO & Partner


M28

PROJECTS VNWORK OFFICE VIETNAMWORK HEAD SQUARETER, DISTRICT 3, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

130 SUONG NGUYET ANH STREET, DISTRICT 3, HCMC

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE

DESIGN TEAM: LUCAS(ARGENTINA)

MINH TRAN, JOSHUA LEVINE, PASCAL( SWISS),

AREA:

1200M2 ( SITE : 450M2 – 4.5FL )

STRUCTURE ENGINEER:

PRIME CONSTRUCTOR

PROJECT YEAR:

2007

PROJECT SUMMARY: STAFF–NATURE LIGHT

REDESIGN ARCHITECTURE– GOOD EFFICIENCE 250

BENEFIT :

3 MONTH CONSTRUCTION WITH 200K FOR 1200M2 SAVE ENERGY FOR BUILDING - SOLD 22 MILLION

MIMA NYSTUDIO & Partner


M28

PROJECTS MALIBU DN MALIBU DANANG

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

MALIBU DANANG

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE, ENRIC PARRY

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, ENRIC PARRY

AREA:

3 HA( 86 VILLA)

STRUCTURE ENGINEER:

AUR CONSTRUCTOR

PROJECT YEAR:

2010

PROJECT SUMMARY: STAFF–NATURE LIGHT

REDESIGN ARCHITECTURE– GOOD EFFICIENCE 250

BENEFIT :

SOLD ALL 2.2 MILLION FOR EACH VILLA

MIMA NYSTUDIO & Partner


M28

PROJECTS PARKLANDGREEN PARKLAND GREEN

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

DISTRICT 9, HCMC

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE

AREA:

6HA ( 128 VILLAS)

STRUCTURE ENGINEER:

ZEN CAP CONSTRUCTOR

PROJECT YEAR:

2012

PROJECT SUMMARY: STAFF–NATURE LIGHT

REDESIGN ARCHITECTURE– GOOD EFFICIENCE 250

BENEFIT :

SOLD OUT 2012

MIMA NYSTUDIO & Partner


M28

PROJECTS Q BAR Q BAR, DISTRICT 1, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

OPERA HCM, DISTRICT 1 , HCMC

PRINCIPLE ARCHITECT:

MINH TRAN AND JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE

AREA: STRUCTURE ENGINEER:

400 M2 ENGINEERING

PROJECT YEAR:

2004

PROJECT SUMMARY:

CONTEMPORARY–NATURE LIGHT

BENEFIT :

4 MONTH CONSTRUCTIONSOLD WITH STEEL AND BRICK WOOD WORK.

MIMA NYSTUDIO & Partner


M28

PROJECTS CHRIS FREUD 100/3 NGUYEN DINH CHIEU, MEKONG CAPITAL, DISTRICT 3, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

DISTRICT3 , HCMC

PRINCIPLE ARCHITECT:

MINH TRAN AND JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, HOANG TUAN ANH

AREA: STRUCTURE ENGINEER:

250 M2 TIEN AN ENGINEERING

PROJECT YEAR:

2008

PROJECT SUMMARY:

CONTEMPORARY CHINA–NATURE LIGHT

BENEFIT :

4 MONTH CONSTRUCTIONSOLD WITH STEEL AND BRICK WOOD WORK WITH 100K.

MIMA NYSTUDIO & Partner


M28

PROJECTS ILLY COFFEE ILLY COFFEE, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

NGO DUC KE STREET, HCMC

PRINCIPLE ARCHITECT:

MINH TRAN AND JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, HOANG TUAN ANH

AREA: STRUCTURE ENGINEER:

250M2 PRIME ENGINEERING

PROJECT YEAR:

2006

PROJECT SUMMARY:

SIMPLE AND FLEXIBLE–NATURE LIGHT

BENEFIT : 2.5 MONTH STEEL AND GLASS CONSTRUCTION-GOOD BUSINESS AND BEST HIGH END COFFEE IN VIENAM

MIMA NYSTUDIO & Partner


M28

PROJECTS KARAVANSARA

KARAVANSARA HOTEL – SIEMREAP-CAMBODIA

MIMA NYSTUDIO & Partner


M28

PROJECTS KARAVANSARA KARAVANSARA HOTEL – SIEMREAP-CAMBODIA

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION: CAMBODIA

665 ROAD 25, ARCHA SVA, WAT BO VILLAGE, SIEM REAP,

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE, BARNABY HEWITT

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, MS LAURE (FRENCH)

AREA:

940M2 ( SITE : 805M2 – 3 FL )

STRUCTURE ENGINEER:

THAI CONSTRUCTION

PROJECT YEAR:

2012

PROJECT SUMMARY: LIGHT

ARCHITECTURE– GOOD EFFICIENCE 12 ROOM–NATURE

BENEFIT : KHOME TRADITION WOOD REBUILT 1 WEEK WAS SAVE COST AND ENERGY FOR BUILDING-LOCAL MATERIAL –SOLD 3.7 MILLION

MIMA NYSTUDIO & Partner


M28

PROJECTS KARAVANSARA

KARAVANSARA APARTMENT – SIEMREAP-CAMBODIA

MIMA NYSTUDIO & Partner


M28

PROJECTS KARAVANSARA KARAVANSARA APARTMENT -SIEMREAP- CAMBODIA

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION: CAMBODIA

665 ROAD 25, ARCHA SVA, WAT BO VILLAGE, SIEM REAP,

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE, BARNABY HEWITT

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, MS LAURE (FRENCH)

AREA:

4440M2 ( SITE : 980M2 – 5 FL )

STRUCTURE ENGINEER:

THAI CONSTRUCTION

PROJECT YEAR:

2012

PROJECT SUMMARY: LIGHT

ARCHITECTURE– GOOD EFFICIENCE 12 ROOM–NATURE

BENEFIT : KHOME TRADITION WOOD REBUILT 1 WEEK WAS SAVE COST AND ENERGY FOR BUILDING-LOCAL MATERIAL –SOLD 3.7 MILLION

MIMA NYSTUDIO & Partner


M28

PROJECTS ILLY 2 ILLY RESTAURANT, DISTRICT 1, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

THAI VAN LUNG STREET, DISTRICT 1 , HCMC

PRINCIPLE ARCHITECT:

MINH TRAN AND JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE

AREA: STRUCTURE ENGINEER:

400 M2 ENGINEERING

PROJECT YEAR:

2007

PROJECT SUMMARY:

CONTEMPORARY–NATURE LIGHT

BENEFIT :

4 MONTH CONSTRUCTIONSOLD WITH STEEL AND BRICK WOOD WORK.

MIMA NYSTUDIO & Partner


M28

PROJECTS DRAGON BAR RED DRAGON RESTAURANT AND BAR,, DISTRICT 4, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

DISTRICT4 , HCMC

PRINCIPLE ARCHITECT:

MINH TRAN AND JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, HOANG TUAN ANH

AREA: STRUCTURE ENGINEER:

800 M2 ENGINEERING

PROJECT YEAR:

2008

PROJECT SUMMARY:

CONTEMPORARY –NATURE LIGHT

BENEFIT :

4 MONTH CONSTRUCTIONSOLD WITH STEEL AND BRICK WOOD WORK

MIMA NYSTUDIO & Partner


M28

PROJECTS JWT J W THOMPSON ADVERTISING OFFICE, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

DONG KHOI STREET, HCM

PRINCIPLE ARCHITECT:

MINH TRAN AND JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, HOANG TUAN ANH

AREA: STRUCTURE ENGINEER:

890 M2 MR THOMS BRIAN ENGINEERING

PROJECT YEAR:

2008

PROJECT SUMMARY:

LOFT DESIGN – SIMPLE AND FLEXIBLE–NATURE LIGHT

BENEFIT : 8 WEEK FOR 750 M2 CONSTRUCTION ON TOP BUILDING METROPOLITANCE GOOD , ALL FLOOR WAS BUILT BY STEEL . FAST CONSTRUCTION SAVE TIME AND MONEY FOR CLIENT

MIMA NYSTUDIO & Partner


M28

PROJECTS REAL OFFICE REAL ARCHITECTURE OFFICE, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

TU XUONG STREET, HCMC

PRINCIPLE ARCHITECT:

MINH TRAN AND JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, HOANG TUAN ANH

AREA: STRUCTURE ENGINEER:

250M2 PRIME ENGINEERING

PROJECT YEAR:

2009

PROJECT SUMMARY:

SIMPLE AND FLEXIBLE–NATURE LIGHT

BENEFIT : 10 WEEK STEEL AND GLASS CONSTRUCTION-GOOD BUSINESS AND BEST HIGH END COFFEE IN VIENAM

MIMA NYSTUDIO & Partner


M28

PROJECTS RISS SCHOOL

RENAISANCE INTERNATIONAL SCHOOL DISTRICT 7, HCMC MIMA NYSTUDIO & Partner


M28

PROJECTS RISS SCHOOL RENAISANCE INTERNATIONAL SCHOOL DISTRICT 7, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

NGUYEN THI THAP STREET, DISTRICT 7 , HCMC

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, THINH PHAM

AREA:

13400M2

STRUCTURE ENGINEER:

TIEN AN

PROJECT YEAR:

2010

PROJECT SUMMARY: NATURE LIGHT

ARCHITECTURE– GOOD EFFICIENCE 1200 STUDENTS–

BENEFIT : STEEL + GLASS + CONCRETE = 10 MONTHCONSTRUCTION WILL BE SAVE COST AND ENERGY FOR BUILDING –THE BEST PLACE FOR EDUCATION IN HCMC

MIMA NYSTUDIO & Partner


M28

PROJECTS WELL SPRING BT

WELL SPRING -TRUONG ANH NGU MUA XUAN, BINH THANH DISTRICT , HCMC MIMA NYSTUDIO & Partner


M28

PROJECTS WELL SPRING WELL SPRING -TRUONG ANH NGU MUA XUAN ,BINH THANH DISTRICT , HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION: HCMC

92 NGUYEN HUU CANH STREET, BINH THANH DISTRICT ,

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, THINH PHAM

AREA:

15600M2 ( SITE : 7919M2 – 1 BASE + 7 FL )

STRUCTURE ENGINEER:

SOURTHERN CIVIL

PROJECT YEAR:

2013

PROJECT SUMMARY: NATURE LIGHT

ARCHITECTURE– GOOD EFFICIENCE 1800 STUDENTS–

BENEFIT : STEEL + GLASS + CONCRETE = 150 DAY FOR CONSTRUCTION WILL BE SAVE COST AND ENERGY FOR BUILDING –THE BEST PLACE FOR EDUCATION IN HCMC

MIMA NYSTUDIO & Partner


M28

PROJECTS WELL SPRING HN

WELL SPRING -TRUONG ANH NGU MUA XUAN, HBT DISTRICT , HANOI MIMA NYSTUDIO & Partner


M28

PROJECTS WELL SPRING HN

WELL SPRING -TRUONG ANH NGU MUA XUAN, HBT DISTRICT , HANOI MIMA NYSTUDIO & Partner


M28

PROJECTS WELL SPRING HN WELL SPRING -TRUONG ANH NGU MUA XUAN ,HBT DISTRICT , HANOI

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

80 AI MO BO DE STREET, HBTDISTRICT , HANOI

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE,

AREA:

400000M2 ( SITE : 4HA+ 4 FL )

STRUCTURE ENGINEER:

SOURTHERN CIVIL

PROJECT YEAR:

2013

PROJECT SUMMARY: NATURE LIGHT

ARCHITECTURE– GOOD EFFICIENCE 1800 STUDENTS–

BENEFIT : STEEL + GLASS + CONCRETE = 150 DAY FOR CONSTRUCTION WILL BE SAVE COST AND ENERGY FOR BUILDING –THE BEST PLACE FOR EDUCATION IN HCMC

MIMA NYSTUDIO & Partner


M28

PROJECTS Y TÝ SCHOOL LAO CAI

EXISTING CLASSES-

DREAM – CULTURE-

ARCHITECTURE TRADITION-

MIMA NYSTUDIO & Partner

BEAUTI NATURE


M28

PROJECTS Y TÝ SCHOOL LAO CAI Y TY SCHOOL LAO CAI, VIETNAM

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

80 AI MO BO DE STREET, HBTDISTRICT , HANOI

PRINCIPLE ARCHITECT:

MINH TRAN.

DESIGN TEAM:

MINH TRAN.

AREA:

1200M2

STRUCTURE ENGINEER: PROJECT YEAR:

2015-PRESENT

PROJECT SUMMARY: NATURE LIGHT

ARCHITECTURE– GOOD EFFICIENCE 250 STUDENTS–

BENEFIT : STEEL + WOOD + CONCRETE = 4MONTH CONSTRUCTION WILL BE SAVE COST AND ENERGY FOR BUILDING –THE BEST PLACE FOR EDUCATION IN VIETNAM. COST INVEST 150K

MIMA NYSTUDIO & Partner


M28

PROJECTS Y TÝ SCHOOL LAO CAI

THOUSAND KIDS ON ROADS

SCHOOL HARD TO COME CONCEPT FOR SHIHANOOK WITH 500 PUPILS WHERE THEY CAN CHANGE THEIR LIFE

MIMA NYSTUDIO & Partner


M28

PROJECTS Y TÝ SCHOOL LAO CAI SHIHANOUK SCHOOL PHNOM PHENH, CAMBODIA

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

SHIHANOUK, PHNOM PHENH , CAMBODIA

PRINCIPLE ARCHITECT:

MINH TRAN.

DESIGN TEAM:

MINH TRAN.

AREA:

5000M2

STRUCTURE ENGINEER: PROJECT YEAR:

2015-PRESENT

PROJECT SUMMARY: NATURE LIGHT

ARCHITECTURE– GOOD EFFICIENCE 250 STUDENTS–

BENEFIT : STEEL + WOOD + CONCRETE = 6 MONTH CONSTRUCTION WILL BE SAVE COST AND ENERGY FOR BUILDING –THE BEST PLACE FOR EDUCATION IN VIETNAM. COST INVEST 350K

MIMA NYSTUDIO & Partner


M28

PROJECTS BRITISH COUNCIL BRITISH COUNCIL, HOANG HOA THAM STREET, HOAN KIEM DISTRICT , HANOI

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

HOANG HOA THAM STREET, HOAN KIEM DISTRICT , HANOI

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE, BARNABY HENWITT

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, BARNABY HEWITT

AREA:

1200M2 ( SITE : 600M2 – 2,5 FL )

STRUCTURE ENGINEER:

CONNEL WAGNER CIVIL ENGINEER

PROJECT YEAR:

2012

PROJECT SUMMARY: EFFICIENCE 1000

HIGH STANDARD ARCHITECTURE DESIGN– GOOD STUDENTS–NATURE LIGHT

BENEFIT : 3 MONTH CONSTRUCTION FOR 1200M2 =SAVE COST AND ENERGY FOR BUILDING –GOOD ENVIRONMENT EDUCATION

MIMA NYSTUDIO & Partner


M28

PROJECTS HOUSE & STUDIO MIMA HOME AND STUDIO , DISTRICT 7, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

NGUYEN THI THAP, ROAD 6, BCA AREA, DISTRICT 7, HCMC

PRINCIPLE ARCHITECT:

MINH TRAN

DESIGN TEAM:

MINH TRAN

AREA: STRUCTURE ENGINEER:

420M2 (SITE:862M2 - 2.5FL) LOCAL ENGINEER

PROJECT YEAR:

2016

PROJECT SUMMARY:

MODERN DESIGN – OPEN SPACE –NATURE LIGHT

BENEFIT : 4 MONTH CONSTRUCTION WITH 420M2 SAVE COST AND TIME FOR CLIENT 2MONTH AND 350K.

MIMA NYSTUDIO & Partner


M28

PROJECTS RIVERGARDEN RIVER GARDEN APARTMENT, DISTRICT 2, HCMC

ARCHITECT: LOCATION:

MIMANYSTUDIO & Partner NGUYEN VAN HUONG STREET, DISTRICT 2, HCMC

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE

DESIGN TEAM: DANIEL(USA)

MINH TRAN, JOSHUA LEVINE, MS OLIVIA( FRANCE),

AREA:

150000M2 ( SITE : 17000M2 - 2 BASE + 24FL)

STRUCTURE ENGINEER:

SOURTHERN CIVIL ENEGINEER

PROJECT YEAR:

2009

PROJECT SUMMARY:

ARCHITECTURE– GOOD EFFICIENCE–NATURE LIGHT

BENEFIT : USE LOCAL MATERIAL LOCAL BRICK WITH MAIN STRUCTURE IS STEEL WILL SAVE COST AND ENERGY , THE BEST EFFICIEN


M28

PROJECTS PARKLAND CONDOS PARKLAND APARTMENT, DISTRICT 2, HCMC

ARCHITECT: LOCATION:

MIMANYSTUDIO & Partner NGUYEN VAN HUONG STREET, DISTRICT 2, HCMC

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE

DESIGN TEAM: DANIEL(USA)

MINH TRAN, JOSHUA LEVINE, MS OLIVIA( FRANCE),

AREA:

189,500M2 ( SITE : 19980M2 - 2 BASE + 48FL)

STRUCTURE ENGINEER:

SOURTHERN CIVIL ENEGINEER

PROJECT YEAR:

2012

PROJECT SUMMARY:

ARCHITECTURE– GOOD EFFICIENCE–NATURE LIGHT

BENEFIT : USE LOCAL MATERIAL LOCAL BRICK WITH MAIN STRUCTURE IS STEEL WILL SAVE COST AND ENERGY , THE BEST EFFICIEN


M28

PROJECTS PENISUALA PENISUALA APARTMENT, DISTRICT 2, HCMC

ARCHITECT: LOCATION:

MIMANYSTUDIO & Partner NGUYEN VAN HUONG STREET, DISTRICT 2, HCMC

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE

DESIGN TEAM: DANIEL(USA)

MINH TRAN, JOSHUA LEVINE, MS OLIVIA( FRANCE),

AREA:

20,500M2 (2 BASE ++ 2 PODIUM+ 24 FL)

STRUCTURE ENGINEER:

SOURTHERN CIVIL ENEGINEER

PROJECT YEAR:

2011

PROJECT SUMMARY:

ARCHITECTURE– GOOD EFFICIENCE–NATURE LIGHT

BENEFIT : USE LOCAL MATERIAL LOCAL BRICK WITH MAIN STRUCTURE IS STEEL WILL SAVE COST AND ENERGY , THE BEST EFFICIEN


M28

PROJECTS GATE WAY RIVER SIDE APARTMENT, DISTRICT 2, HCMC

ARCHITECT: LOCATION:

MIMANYSTUDIO & Partner NGUYEN VAN TROI STREET, PN DISTRICT , HCMC

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE

DESIGN TEAM: DANIEL(USA)

MINH TRAN, JOSHUA LEVINE, MS OLIVIA( FRANCE),

AREA:

20,500M2 ( SITE : 1650M2 - 2 BASE + 19.5FL)

STRUCTURE ENGINEER:

SOURTHERN CIVIL ENEGINEER

PROJECT YEAR:

2011

PROJECT SUMMARY:

ARCHITECTURE– GOOD EFFICIENCE–NATURE LIGHT

BENEFIT : USE LOCAL MATERIAL LOCAL BRICK WITH MAIN STRUCTURE IS STEEL WILL SAVE COST AND ENERGY , THE BEST EFFICIEN


M28

PROJECTS VTV TOWER ADVERTISING OFFICE HEAD , DISTRICT 3, HCMC

ARCHITECT:

MIMANYSTUDIO & Partner

LOCATION:

33 PASTUER STREET, DISTRICT 3, HCMC

PRINCIPLE ARCHITECT:

MINH TRAN, JOSHUA LEVINE

DESIGN TEAM:

MINH TRAN, JOSHUA LEVINE, BAO CHIEM (USA)

AREA:

12000M2 ( SITE : 890M2 –2BASE + 16FL )

STRUCTURE ENGINEER:

TBA

PROJECT YEAR:

2009

PROJECT SUMMARY:

ARCHITECTURE– GOOD EFFICIENCE –NATURE LIGHT

BENEFIT : MAIN STRUCTURE ARE STEEL AND GLASS TIME SUGGESTION ARE 8 MONTH WILL BE SAVE COST AND ENERGY FOR BUILDING

MIMA NYSTUDIO & Partner


M28

STUDY BY TRAVEL

SALK INSTITUDE BIOLOGY STUDENT-SAN DIEGO KIMBELL ART MUSEUM DALLAS

TRAVEL WEST TO EASTERN USA

TEACHING YOUNG ARCHITECTS IN CAMOBODIA

FOUR FREDOM PARK IN NEW YORK

HARVARD UNIVERSITY-BOSTON CARPENTER VISUAL ART CENTER


M28

WORKED WITH FAMOUS ARCH

WORKED WITH FAMOUS ARCHITECTS ON THE WORLD – JAPAN – USA – AUSTRALIA – SPAIN – CHILE – BOSTON - NEWYORK


M28

AWARD AND VISIT STAR ARCH

AWARDS INTERNATIONAL FOR EDUCATION-TEACHING YOUNG ARCHITECTS “ HELP PEOPLE IN NORTH VIETNAM FOR EDUCATION DESIGN “ DO IT RIGHT “


THANK YOU

ROAD 11, TRAN TRONG CUNG STREET, DIST 7 HO CHI MINH NEW YORK Feb 2018 MIMA NYSTUDIO & Partner W:mimanystudio.com E:minhtran@mimanystudio.com M:+84 918182781


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.