Northwest Indiana TDD | South Hammond Public Presentation 1 (In-person/Virtual Hybrid)

Page 1

TRANSIT DEVELOPMENT DISTRICT PROPOSED DRAFT BOUNDARY

how you can interact during this meeting

09/13/2023
South Hammond public engagement session
website

TRANSIT DEVELOPMENT DISTRICT PROPOSED DRAFT BOUNDARY

South Hammond public engagement session

09/13/2023

INTRODUCTION 3

PLANNING ENTITIES

Northern Indiana Commuter

Transportation District

City of East Chicago

City of Gary

City of Hammond

City of Michigan City

City of Portage

City of South Bend

Town of Beverly Shores

Town of Chesterton

Town of Dyer

Town of Munster

Town of Ogden Dunes

Town of Porter

Regional Development Authority

CONSULTANT TEAM

4

ROLE Of ThE RDA

( Northwest Indiana Regional Development Authority )

Leading the Project Overall Project Steering Policy and Planning Guidance

Key steps that RDA will take working closely with each community

• Meet with communities to understand their goals and preferences for growth and development

• Engage with the public through meetings and hearings

• Collaborate with NICTD on parking and development topics

• Conduct community analysis to prepare preliminary and final transit development district (TDD) boundary

• Identify potential development and infrastructure opportunities

• Shepherd the TDD boundary through the state approval process

5
Chicago MSA Population (3rd Largest in USA) NW Indiana MSA Population (2nd Largest in Indiana) Private Investment New Jobs Economic Impact by 2046 * Projected 9,460,000 819,537 $2.3 BILLION* 6,000* $3+ BILLION* SOUTH SHORE DOUBLE TRACK Chicago South Bend Michigan City INDIANA INDIANA MICHIGAN ILLINOIS WEST LAKE EXTENSION A catalyst for growth and economic development
SIGNIfICANCE 6
ThE REGIONAL

ThE LINES AND STATIONS

West Lake Line Project

MICHIGAN

EAST CHICAGO

HAMMOND

MUNSTER

DYER

GARY

West Lake Line Project

Rail Extension 9 MILES

OGDEN

DUNES PORTER

BURNS

HARBOR

PORTAGE

CHESTERTON

BEVERLY SHORES

Estimated cost: $852 million

• 9-Mile extension of existing SSL service between Dyer and Hammond, includes four new stations, a maintenance and storage facility, refurbishment of 32 rail cars, and construction of 2,322 parking spaces.

• Construction Substantial Completion projected on May 28, 2025.

• Revenue Service Date projected on May 20, 2026.

65 80 94 94 94 90 90 35 20 41 Lake Michigan MICHIGAN CITY
ILLINOIS
INDIANA
7

[2]

Berywn Metra Station (BNSF Line) – 2008 +5% +37% 120K SF

5

Sources: ESRI, CoStar Analytics, and other publicly available databases.

The transit development districts around various suburban train stations in the Chicagoland area have seen significant improvement in real estate development activity since the development/ redevelopment of the station…

Growth Real Estate Value Change

Total

Growth Real Estate Value Change

Growth Real Estate Value Change

Total

Growth Real Estate Value Change Total New Construction

Growth Real Estate Value Change Total New Construction Maywood Metra Station (UP-W Line) – 2017 0% +5% 415K SF

Growth Real Estate Value Change Total New Construction

8 CHICAGO
CITY GARY DYER MUNSTER 3 1 6 4 2 Berywn Metra Station Maywood Metra Station Orland Park Metra Station Elmhurst Metra Station
Metra Station Highland Park Metra Station
Population
Population
Total
Population
MICHIGAN Population
Romeoville
1 2 3 4 5 6
New Construction Elmhurst Metra Station (UP-W Line) – 2006 +11% +40% 640K SF
New Construction Highland Park Metra Station (UP-N Line) – 2009 0% +43% 640K SF
New Construction Orland Park Metra Station (SWS Line) – 2007 +17% +37% 1.2M SF
Population
Population
Romeoville Metra Station (HC Line) – 2018 0% +3% 316K SF
[1] Population growth in the 1 mile radius between 2000 and 2020 (estimate). New construction and Real Estate value change are measured in a 1 mile radius between time of TOD reinvestment or construction to August 2020.
KPMG note the Romeoville Metra Station new construction data is measured by a 3-mile radius, unlike the other stations 1-mile radius measure due to its more rural location.

AGENDA

What we will discuss

1 Transit development district boundary basics

2 Transit development district boundary process

3 Hammond goals, unique qualities and current conditions

4 South Hammond Station DRAFT TDD boundary

9

How we will obtain public input

Website - www.nwitdd.com

Find video recording of meetings and Q+A responses, gallery materials, and ability to contact us

10

TRANSIT DEVELOPMENT DISTRICT BOUNDARY BASICS

what you should know

1

whAT IS A TDD?

Transit Development District

The main focus is on promoting Transit-Oriented Development.

Transit development districts provide economic tools and strategies to support local communities to implement high-quality transit-oriented development. The goal is to create a boundary calibrated specifically for each community based on analysis, areas of opportunity and the goals and visions of the community.

12
13
This isn't just a boundary. It complements the economic growth path of communities.

CLARIfyING ThE TDD

TDD IS...

A 1/2 mile (320 acre) special economic development district approved by the State Budget Committee

TDD IS NOT...

Zoning or comprehensive planning

A city or town-sponsored planning process

Eminent domain

An effort to realize economic development in Northwest Indiana communities

Formed by an analysis process that includes community-wide input, best practices and market analysis

A partnership with developer or realtor

A project designed to gentrify or to create low-income housing

NICTD South Shore Double Track or West Lake rail projects

14

S TATUTORy REqUIREMENTS

Transit development districts are contiguous boundaries drawn around station areas, and must be no more than 0.5 square miles (320 Acres) in area.

15

BOUNDARy PARAMETERS AND GEOGRAPhIC AREAS

Illustrative Example - Not an actual proposed boundary

16

S TATUTORy REqUIREMENTS

Transit development districts capture the incremental growth in local income and property tax revenue, for use in public investment related to the station area.

17

TDD REvENUE PARAMETERS

Revenue collected from the district –is spent in the district. Local community retains land use and zoning control.

18

TIf AND TDD TOGEThER

TDD Function

A TDD permits the capture of incremental property tax and local income tax revenues for the development of the area around the transit station

The incremental revenue that is captured can only be used within the same district

After the TDD expires, all of the TDD increment is transferred to the tax base

If a TDD and a TIF overlap, the split of the incremental revenues between the TDD and TIF are negotiated by the RDA and the RDC

19

S TATUTORy REqUIREMENTS

After consultation with local communities, two public hearings must be held before the RDA approves the TDD boundaries for review and approval by the State Budget Committee.

20

MEMORANDUM Of UNDERSTANDING (MOU)

How will an MOU take place?

An MOU within the TDD process functions much like a “developer agreement” in the negotiations between a municipality and a project developer as an investment is taking place.

An MOU will be between the NWI RDA and the municipality or municipalities over which the TDD extends

An MOU must have legal status to bind both the RDA and the unit of government to allow for debt obligations to be issued on the basis of the underlying revenues which it controls; and therefore, may be required to be passed by the legislative body of the municipality or county

21

TRANSIT DEVELOPMENT

BOUNDARY PROCESS how we’re arriving at the study area

2

TDD BOUNDARy PROCESS

23

TDD BOUNDARy PROCESS

24

DEfINING ThE TDD BOUNDARy

The criteria we are using

Quantitative

Station context | Utilities | Walkability/connectivity

Cultural or civic assets | Barriers to redevelopment

Buffers | Zoning restrictions

Qualitative Area Specific

Redevelopment potential | Community desires

Previous planning findings | Community vision

Future/planned projects | Understanding the needs of a historically underrepresented community

Site analysis | Location analysis | Legal analysis

Zoning/future land use | Potential property tax yield

Existing public debt obligations | Impact

25

AREA DEvELOPMENT OPPORTUNITy CRITERIA

Our area development opportunity criteria included the following...

Acreage (Developable acreage)

Future land use or planned use

Ownership (Public vs private, single vs. multiple)

Vacancy status (Occupied vs vacant lot/ building and notable condition)

Access / location / walkability

Conditions (Utilities, infrastructure, flood/ wetland, slope, brownfield issues, other)

TIF district / Opportunity Zone status

Comprehensive impact Proximity to station

Current use Zoning / allowable density / parking
26

PLACES wIThIN AND ADjACENT TO ThE BOUNDARy

REDEvELOP INfILL

PRESERvE STRENGThEN
ADAPTIvE REUSE
27

HAMMOND GOALS, UNIQUE QUALITIES AND CURRENT CONDITIONS understanding your community

3

COLLABORATION wITh ThE COMMUNITy

Understanding opportunities around the station

29
30

hAMMOND SOUTh ECONOMIC DEvELOPMENT GOALS

1 Supporting momentum tied to Downtown TOD and Revitalization

2 walkable and trail oriented development within walkshed of TDD boundary linked to Downtown TOD

3 Commercial focused development along major corridors

4 Protection of existing single-family neighborhoods

5 Activation of sites that could redevelop over time

31

NICTD STATION PLANNING

PLANNED SPACES

Surface parking

593 standard and 12 ADA spaces

Opening Year

Surface parking

980 standard and 20 ADA spaces

Horizon Year

32

UNDERSTANDING ExISTING CONDITIONS

Qualitative and Quantitative Analysis

33

SOUTH HAMMOND STATION DRAFT BOUNDARY

for community consideration

4

SOUTh hAMMOND CONTExT

35

S TATION AREA CONTExT

36
37
38
39
40
41
42
43

NOTE: Existing TIF Districts

Excluded From Boundary

44
45
46
47
This isn't just a boundary. It complements the economic growth path of communities.

PLACES wIThIN AND ADjACENT TO ThE BOUNDARy

REDEvELOP INfILL

PRESERvE STRENGThEN
ADAPTIvE REUSE
48

vISIT ThE TDD wEBSITE

also linked on the RDA’s main website

learn more and follow this process

1 vISIT INfORMATIONAL GALLERy

2 vISIT wEBSITE (www.NwITDD.com)

3 REfINING BOUNDARy wITh LOCAL OffICIALS

4 RDA BOARD PUBLIC hEARINGS

5 STATE BUDGET COMMITTEE REvIEw AND APPROvAL

NExT S TEPS 50
Q&A we appreciate your time and comments