Little Elm ISD

Page 12

NEW

Middle

OTHER COMPLETED PROJECTS: •

A/C, video scoreboard, turf replacement, track and field replacement, drainage corrections •

renovations - engineering & robotics, Health Sciences, school store, lecture hall, SPED classroom conversion; Baseball and Softball

alker and Strike Middle Schools are the two newest middle school campuses

fields replacements, covered

at Little Elm ISD. Both campuses opened in August 2020 and were built as a

result of the passage of the 2017 Bond Election. movable partitions, a library

THE COMMONS

bleachers, concessions building •

and makerspace.

Roof replacement at Brent, Chavez, Hackberry, Lakeside

with an outdoor deck, large science labs, engineering classrooms,

Little Elm High School: HVAC replacements, CTE area

SCHOOLS

W

Athletic Stadium: concessions

MS, Zellars •

Ballistic safety film at all buildings

The District has assembled a Long-Range Facilities Planning Committee responsible for analyzing Each multi-story campus overlooks the scenic view of Lake Lewisville and the beautiful landscape that surrounds each campus. The interior design encompasses 200,000 square feet and places a strong emphasis

and evaluating long-term facility needs

ONGOING PROJECTS 2021-2022: •

Multipurpose Indoor Facility

- currently under construction

based on growth, equity, and value.

behind LEHS and awaiting soil test

A recommendation will be made to

results prior to foundation work.

the Board of Trustees in the fall, and a

In mid-February of 2021, Jackson

vote will determine what next steps the

Construction started moving dirt

District will take.

and relocating storm drainage on

on collaboration and flexibility in

the indoor facility site.

education delivery.

Each building has large commons

Lakeside MS conversion project - the existing building will

areas that serve as the central space

become the future site for the

with all other areas converging around

administration building. Estimated

it to promote visibility and campus-wide

completion early spring of 2022.

interaction. The classrooms in the threestory academic wing have a mixture of 12

• LITTLE ELM ISD •

2020 - 2021

MAKERSPACE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.