renewable energy in Albania
clean energy from water for Albania.
ESSEGEI’s core business is the construction and management of small and medium-sized hydroelectric power plants. Its know-how comes from Alpiah, the holding in which there are, as well as ESSEGEI, companies with a significant experience in the hydroelectric field, from the plant design to the start-up. ESSEGEI has been operating in Albania since 2002 and is still one of the leading private electrical energy producers in the country in terms of produced energy. It is the manager of the most significant hydroelectric pool in Albania with 23 hydroelectric power plants with 31 MW of installed power.
strategy, innovation and skill.
ESSEGEI, thanks to Alpiah, is fully independent, from plant design to erection of power plants, including intakes; penstocks; valves; Pelton, Francis and Kaplan turbines as well as all the auxiliary control and management electrical systems. Key strategies for ESSEGEI development are investing in structure innovation, participating in strategic companies for its own productivity, continuous professional personnel training.
in Albania to continue to grow.
Thanks to the know-how and partnerships with Alpiah subsidiaries (Camuna Idroelettrica, Slingofer, Baruzzi HS, ESA Electromech), ESSEGEI has been able to complete one of the most significant revamping projects for Albania’s hydroelectric power plant pool. An ambitious project that involved 23 plants over 8 years, bringing the installed operating power from 4.8 MW to the current 30.8 MW and the annual production from 8,500,000 to 100,000,000 kWh. Hydroelectric power plants managed by ESSEGEI are automatic and interconnected with the company’s central server.
19 6 10
our power plants
17
13 2
Power (kW)
15 8
Smokthina
1
9,200
Arras
2
4,800
Barmash
3
830
Borsch
4
250
Bulqize
5
600
Dukagjin
6
640
Funares
7
1,920
Homesh
8
395
Kerpice
9
350
Lekbibaj
10
1,400
Leshnice
11
375
Lunik
12
200
Lure
13
750
Marjan 14
200
Muhur
15
250
Nikolice
16
700
Orgjost
17
1,200
Rajan 18
1,020
Shoshan
19
3,000
Treske 2 20
250
Ujanik 21
630
Velรงan 22
1,200
Zerqan 23
625
5 23
Tirana 12 7
22 9 21 14 16 20 1 18 3
4
11
our energy for Albania.
Installed power (kW)
Annual production (kWh)
30,800
4,850
Before
100,000,000
8,500,000
After
Before
After
our power plants Smokthina Before Installed power (kW) Type and numbers of turbines
9,200 Francis x 2
Control and management
Manual
Annual production (kWh)
4,500,000
After Installed power (kW) Type and numbers of turbines
9,200 Francis x 2
Control and management
Automatic
Annual production (kWh)
40,000,000
our power plants Arras Before Installed power (kW) Type and numbers of turbines
1,200 Pelton x 3
Control and management
Manual
Annual production (kWh)
1,250,000
After Installed power (kW)
4,800
Type and numbers of turbines
Pelton x 4
Control and management
Automatic
Annual production (kWh)
18,000,000
our power plants Funares Before Installed power (kW) Type and numbers of turbines
1,040 Pelton x 3
Control and management
Manual
Annual production (kWh)
60,000
After Installed power (kW)
1,920
Type and numbers of turbines
Pelton x 3
Control and management
Automatic
Annual production (kWh)
5,800,000
Lekbibaj Before Installed power (kW) Type and numbers of turbines
400 Francis x 2
Control and management
Manual
Annual production (kWh)
200,000
After Installed power (kW) Type and numbers of turbines
1,400 Francis x 2
Control and management
Automatic
Annual production (kWh)
6,000,000
our power plants Orgjost Before Installed power (kW) Type and numbers of turbines
400 Francis x 2
Control and management
Manual
Annual production (kWh)
180,000
After Installed power (kW) Type and numbers of turbines
1,200 Francis x 2
Control and management
Automatic
Annual production (kWh)
4,420,000
Velรงan Before Installed power (kW) Type and numbers of turbines
200 Pelton x 1
Control and management
Manual
Annual production (kWh)
0
After Installed power (kW) Type and numbers of turbines
1,200 Tyrgo x 1
Control and management
Automatic
Annual production (kWh)
2.200,000
our power plants Rajan Before Installed power (kW) Type and numbers of turbines
150 Francis x 2
Control and management
Manual
Annual production (kWh)
0
After Installed power (kW) Type and numbers of turbines
1,020 Francis x 2
Control and management
Automatic
Annual production (kWh)
3,200,000
Barmash Before Installed power (kW) Type and numbers of turbines
200 Francis x 1
Control and management
Manual
Annual production (kWh)
0
After Installed power (kW) Type and numbers of turbines
830 Francis x 2
Control and management
Automatic
Annual production (kWh)
2,000,000
our power plants Ujanik Before Installed power (kW) Type and numbers of turbines
220 Pelton x 1
Control and management
Manual
Annual production (kWh)
0
After Installed power (kW)
630
Type and numbers of turbines
Pelton x 1
Control and management
Automatic
Annual production (kWh)
1,600,000
our power plants Borsh
Before
After
250
250
Francis x 1
Francis x 1
Control and management
Manual
Automatic
Annual production (kWh)
300,000
1,200,000
Before
After
200
630
Pelton x 1
Pelton x 1
Control and management
Manual
Automatic
Annual production (kWh)
100,000
1,400,000
Before
After
640
640
Francis x 2
Francis x 2
Control and management
Manual
Automatic
Annual production (kWh)
1,000,000
1,950,000
Installed power (kW) Type and numbers of turbines
Bulqize Installed power (kW) Type and numbers of turbines
Dukagjin Installed power (kW) Type and numbers of turbines
Homesh
Before
After
150
395
Francis x 2
Francis x 2
Control and management
Manual
Automatic
Annual production (kWh)
50,000
800,000
Kerpice
Before
After
200
350
Francis x 2
Francis x 2
Control and management
Manual
Automatic
Annual production (kWh)
30,000
1,100,000
Leshnice
Before
After
Installed power (kW)
250
375
Pelton x 1
Pelton x 1 - Tyrgo x 1
Control and management
Manual
Automatic
Annual production (kWh)
0
750,000
Installed power (kW) Type and numbers of turbines
Installed power (kW) Type and numbers of turbines
Type and numbers of turbines
our power plants Lunik
Before
After
200
200
Francis x 1
Francis x 1
Control and management
Manual
Automatic
Annual production (kWh)
50,000
1,000,000
Lure
Before
After
400
750
Pelton x 1
Pelton x 1
Control and management
Manual
Automatic
Annual production (kWh)
0
800,000
Before
After
200
200
Pelton x 2
Pelton x 2
Control and management
Manual
Automatic
Annual production (kWh)
50,000
430,000
Installed power (kW) Type and numbers of turbines
Installed power (kW) Type and numbers of turbines
Marjan Installed power (kW) Type and numbers of turbines
Muhur
Before
After
200
250
Francis x 1
Francis x 1
Control and management
Manual
Automatic
Annual production (kWh)
0
1,000,000
Before
After
500
700
Pelton x 3
Pelton x 2
Control and management
Manual
Automatic
Annual production (kWh)
580,000
1,900,000
Shoshan
Before
After
Installed power (kW)
230
3.000
Francis x 1
Francis x 2
Control and management
Manual
Automatic
Annual production (kWh)
0
13,000,000
Installed power (kW) Type and numbers of turbines
Nikolice Installed power (kW) Type and numbers of turbines
Type and numbers of turbines
our power plants Treske 2
Before
After
160
250
Francis x 1
Francis x 1
Control and management
Manual
Automatic
Annual production (kWh)
0
900,000
Before
After
250
625
Pelton x 2
Pelton x 2
Control and management
Manual
Automatic
Annual production (kWh)
150,000
1,200,000
Installed power (kW) Type and numbers of turbines
Zerqan Installed power (kW) Type and numbers of turbines
ESSEGEI S.p.A. SocietĂ soggetta a direzione e coordinamento di ALPIAH s.r.l.
Head Office Via Creta, 31 25124 - Brescia Italy
Headquarters Pisogne (BS) - Italy Tel. (+39) 0364 883501 Tirana - Albania Tel. (+355) 42269292
www.essegei.eu