THIS PROJECT IS ABOUT TO DESIGN A STUDENT COMMUNITY CENTER WHICH IS PROMOTING THE STUDENT COME OVER TO INTERACT WITH EACH OTHER AND WORKS TPGETHER AT THE PLATEFORM.
C
O
N
T
E
N
T
WORKING DRAWING
CONSTUCTION METHOD
MATERIAL
SITE PLAN
STEEL GRIDSHELL STRUCTURAL FRAMING
BUILDING ENVELOPE & FINISHING
GROUND FLOOR PLAN
CASE STUDY – CHANGI AIRPORT
EFFECTIVENESS OF THE MATERIALS
FIRST FLOOR PLAN
LIGHT WEIGHT TIMBER FRAMING
METHOD STATEMENT
ROOF PLAN
PAD FOUNDATION
SOUTH ELEVATION
SCHEMATIC PLAN LAYOUT
NORTH ELEVATION
MASONRY WALL
WEST ELEVATION
CURTAIN WALL
EAST ELEVATION
GREEN ROOFING
SECTION X-X
CASE STUDY – NTU SCHOOL OF ART
CONCLUSION
GLASS ROOFING CASE STUDY – CHADSTONE SHOPPING CENTRE ZINC ROOFING
01 02 03
W O R K I N G
D R A W I N G
01
C O N S T R U C T I O N
M E T H O D
02
STRUCTURAL
FRAMING
STEEL GRIDSHELL STRUCTURAL FRAMING
STEEL
GRIDSHELL
FRAMING
ARE
CONSTRUCTION
STRUCTURAL
LIGHTWEIGHT USING
SHELL
ELEMENT. ADVANTAGE: HIGH DUCTILITY,LOW SELF WEIGHT, HIGH STRENGTH-TO-WEIGHT RATIO, QUICK
INSTALLATION
AND
NO
FORMWORK REQUIRED. CONSTRUCTION METHOD : THE CIRCULAR STRUCTURE IS NOT SET PRECISELY AT THE SITE, THE GLASS ROOF HAS A GEOMETRIC FORM. THE DOUBLE-CURVED STEEL FRAMEWORK WAS DELIVERED IN SEGMENTS AND JOIN TOGETHER ON SITE. TO AVOID APPLYING ANY SIDEWAYS LOAD , THE ROOF IS SUPPORTED TO SLIDING BEARINGS. THESE ALLOW THE STRUCTURE TO MOVE NATURALLY. THE GLASS AND STEEL ROOF IS MADE OF STEEL MEMBER CONNECTED AT NODES AND FLASS WINDOW PANELS AND MAKING UP WITH GLAZING. EACH OF A UNIQUE SHAPE BECAUSE OF THE UNDULATING NATURE OF THE ROOF.
CASE STUDY OF STEEL GRIDSHELL STRUCTURAL FRAMING JEWEL CHANGI AIRPORT, SINGAPORE.
THE GLASS, MANUFACTORED IN THE US, CAN TRANSMIT
CONSTRUCTION METHOD : A
CONTINUOUS
GRID
SHELL
THAT
LIGHT – FOR PLANT GROWTH – WHILE REDUCING HEAT GAIN
WEIGHTS 4000 TONNES, EQUIVALENT TO
TO ENSURE SUSTAINABLE COOLING OF THE INTERIOR.
THE WEIGHT OF ABOUT SIX AIRBUS 380
THE ENTIRE STUDY, ENGINEERING AND SHORTLISTING OF
PLANES
THE GLASS MATERIAL ALONE TOOK NEARLY 2 YEARS TO
THE ROOF SPANS AN AREA OF 23,410SQM.
COMPLETE.
STRUCTURAL
FRAMING
LIGHT TIMBER FRAME
LIGHT TIMBER FRAMING IS CHOSEN BECAUSE IT IS LIGHT AND SLLOW QUICK CONSTRUCTION WITH NO HEAVY TOOLS OR EQUIPMENT. THE MAIN TOOL IS A HANDHELD NAIL GUN. CONSTRUCTION METHOD : SET UP THE FOUNDATION, ERECT THE TIMBER COLUMN
AND THE R.CONCRETE SLAB PLATFORM. BUILD
ALL THE COLUMNS AND ERECT THE BEAMS
CONNECTED TO THE COLUMNS SIDE BY SIDE BY USING THE L BRACKET AND NAIL IT TOGETHER. THIS STRUCTURE WAS WITHOUT ANY ROOFING.
PAD
FOUNDATION
Reason of choosing pad foundation: Pad foundations is chosen as there is clay soil on site, it is a harder in nature. The soil condition is good enough to withstand the load of building without piercing into the hard strata. The pad footing is used because the soil bearing on the site is high. Pad footing is usually wider to increase surface area in contact with the soil to take the load of the structure. Pad foundation is a shallow foundation and a form of spread foundation formed by rectangular, square, or sometimes circular concrete ‘pads’ that support localised single-point loads such as structural columns, groups of columns or framed structures. This load is then spread by the pad to the bearing layer of soil or rock below. Pad foundations can also be used to support ground beams.
CONSTRUCTION METHOD OF PAD FOOTING
01
02
EXCAVATE TO 1.2M DEEP AND
PUT
COMPACT SOIL IN BOUDARY.
READJUST
SETTING OUT IS CARRIED OUT TO
ENSURE THE PAD FOOTING IS IN
DETERMINE POSITION OF PAD
THE CORRECT POSITION
UP
FORMWORK SETTING
04
03
OUT
AND TO
FILL IN WITH LEAN CONCRETE
LAT
THE
REINFORCEMENTS
AND PUT UP SPACER BLOCKS.
WHICH CONSIST OF THE MAIN
REBAR AND TRANSVERSE REBAR.
FOOTING, FOOTING IS MARKED TO THE REDUCED LEVEL
08
05
06
07
ERCT THE STEEL BAR TO FORM A
CAST GRADE 30 CRETE INSIDE THE
AFTER THE CONCRETE HAS SET,
CASTING OF GRADE 30 CRETE TO
STUMP BAR
FORMWORK
THE FORMWORK IS REMOVED
COLUMN STUMP. AFTER 3DAYS,
AND FORMWORK OF COLUMN
FORMWORKS
STUMP IS INSTALLED
FOLLOWED UP WITH BACKFILLING OF EARTH.
IS
DISMANTIED.
SOLID LIGHTWEIGHT FLOORING SYSTEM SOLID LIGHTWEIGHT FLOORING SYSTEM IS CHOSEN BECAUSE IT PROVIDES
THE FLOORING OF THE BUILDING IS FULLY FINISHED BY THE CEMENT
MORE EFFICIENT STRENGTH-TO-WEIGHT RATION IN CONCRETE FLOOR
EXCEPT WASHROOM. CEMENT COULD BE A GOOD CHOICE OF FLOOR
SYSTEM WHEN COMPARED TO OTHER CONVENTIONAL CONCRETE FLOOR
FINISHES FOR THIS BUILDING BEAUSE IT IS STIFFNESS, DURABILITY,
SYSTEM. THE REDUCED QUALITY OF CONCRETE AND STEEL REINFORCEMENT
DAMP RESISTANCE AND FIRE RESISTANCE. RAW MATERIALS LIKE CEMENT
OFFSETS THE MARGINALLY HIGHER COST OF LIGHTWEIGHT CONCRET FLOOR
FINISHING PLAN AN IMPORTANT ROLE IN THE PRODUCTION PROCESS TO
SYSTEM.
A GREAT EXTEND AS THE SUCCESS OF THE ECONOMY OF A COUNTRY IS DETERMIND BY THE AMOUNT OF NATURAL RESOURCES HELD BY A
SOLID LIGHTWEIGHT FLOORING SYSTEM IS CONSTRUCTED BY POURING
COUNTRY WITHIN ITS BORDERS.
LIGHTWEIGHT AGGREGATE CONCRETE INTO YHE FIXED FORMS OF COMCRETE
BELOW IS THE FLOORING DETAILS:-
SLAB. IT IS SUITABLE TO USE IN THE CONSTRUCTION OF MUTISTORY BUILDINGS LIKE THE CURRENT PROJECT.
CEMENT FINISHING
RC CONCRETE
DAMP PROOF MEMBRANE SANDBLINDING
HARDCORE
SUBSOIL
COLUMN
01 REINFORCE CONCRETE COLUMN
02 TIMBER POST
RC COUMNS ARE RIGID, RELATIVELY SLENDER STRUCTURAL MEMBERS
TIMBER COLUMN ARE USED IN THE TIMBER LIGHT WEIGHT STRUCTURE.
DESIGNED PRIMARY TO SUPPORT AXIAL COMPRESSIVE LOADS APPLIED
IT DOUESN’T NEED ANY FORMWORK, SO IT IS QUICK AND EASY
TO THE END OF THE MEMBER. THE RC COLUMN THAT IS BUILT IN OUR
INSTALLMENT. TIMBER POST NEED A STEEL PLATE TO CONNECT TO THE
SITE WAS BUILT ALONG WITH THE CONCRETE BEAM AND SLAB. ALL THE
FOUNDATION, AND THE CONNECTION CAN BE BOLT AND NUTS.
DIMENSION REFER TO ENGR’S DETAIL.
CONSTRUCTION METHOD OF RC COLUMN
01
02
03
GRID LINE WERE DRAW TO DETERMINED
COLUMN FORMWORK WERE LOCATED ON
STEEL
BAR
REINFORCEMENT
WHERE THE COLUMN WILL BE LOCATED.
TOP OF THE STARTER BAR
INSERTED TO THE FORMWORK.
WERE
STARTER BAR FROM THE SLAB WERE LEFT FOR COLUMN TO SLAB CONNECTION
05
06
AFTER TYING ALL THE BARS, CONCRETE
AFTER 3 DAYS, THE FORMWORK WERE
LONGITUDINAL BAR WERE TIES TO THE
WERE
STRIPPED OFF AND THE COLUMN WERE
START BAR BY USING WIRE.
FORMWORKS.
04
THE
COLUMN
REINFORCEMENT
POURED
INTO
THE
COLUMN
DONE.
CONSTRUCTION METHOD OF BEAM
01
02
03
STARTER BAR FROM THE COLUMN WERE
THE BEAM’S STEEL BAR WERE TIED TO THE
THEN
LEFT FOR COLUMN TO BEAM CONNECTION.
STARTER BAR.
SUPPORT THE STEEL BAR
04
CONCRETE WERE POURED INTO IT.
05
AFTER 3 DAYS, THE FORMWORK WERE STRIPPED OFF AND THE BEAMS WERE DONE.
FORMWORK
WERE
SET
SECTION
CONNECTION OF SLAB AND WALL
UP
TO
W A L L NON-LOAD BEARING WALLS WALL IS A STRUCTURE THAR DEFINIE AN AREA, CARRIES A LOAD AND PROVIDE
SHELTER
OR
SECURITY.
WALLS
ARE
VERTICAL
CONSTRUCTION OF A BUILDING THAT ENCLOSE, SEPARATE AND PROTECT ITS INTERIOR SPACES. THE BUILDING WALL I HAD CHOSEN IS NON-LOAD BEARING WALLS. NON-LOAD BEARING WALLS ARE ATTACHED TO COLUMNS AND BEAMS. THE LOAD WERE TRANSFERS THROUGH THE BEAMS AND COLUMN TO THE GROUND.
CONCRETE WALL
STONE WALL
CONCRETE IS REQUIRED
STONE
REINFORCE
CHOSEN
CRACK
TO AND
CONSUMING
DUE
AVOID TIME TO
MASONRY WALL
CAVITY WALL
IS
NOT
MOST OF THE WALL ON SITE
CAVITY
NOT
STELL SHEEL STRUCTURE WERE
BECAUSE
THE
WERE
WALL
CHOSEN BEVAUSE IT COST
USED CURTAIN WALL BECAUSE
NON-
HIGHER THAN STANDARD
IT’S
ONE BRICK THICK WALL.
ATTRACTIVENESS,
WALL
MASONRY
HEAVY WEIGHT AND TIME-
BECAUSE
COSUMING
COMBUSTIBLE,
ON
THE
FRAMEWORK, HOTTER AND
CONSTRUCTION SITE , IT
THERMAL
MORE COSTLY.
CRACK EASILY TOO.
CHEAPER.
IT
IS
INCREASE
MASS
AND
WALL
IS
CURTAIN WALL
APPEARANCE
EFFICIENCY RESISTANT.
AND
AND
THERMAL
FIRE
MASONRY
WALL
ZONE OF MASONRY WALL
TYPE OF BRICKS:
BRICK CHOSEN: CLAY BRICKS HIGHLY SUITABLE FOR THE SITE ENVIRONMENT, IT IS SOLID AND RESISTANT TO HEAT
&
CRACK.
HIGHLY ENVIRONMENT
IT
IS
AFFORABLE, FRIENDLY
AND HELPS TO MAINTAIN MASORY CONSISTS OF BUILDING STRUCTURE BY LAYIG INDIVIDUAL MASONRY UNIT. THE TERM MASONRY ALSO REFERS TO THE UNITS THEMSELVES. NORMALLY THE MASONRY UNIT ARE LAID WITH CEMENT MORTAR, WHICH BINDS THEM TOGETHER TO CRETE A STRUCTURE. MASINRY CONSTRUCTION CAN PROVIDE BEAUTIFUL WALL AND FLOORS AT ECONOMICAL PRICES. WHITE PLASTERING AND WHITE PAINTED ARE APPLIED ON THE WALL AS WELL.
THE ROOM TEMPERATURE.
LAYERING PROCESS OF BRICK WALL
01
02
04
05
FIRSTLY, MEASURE THE
ADD ¾ INCH ONTO THE
AFTER
THE
HOOK A LINE AT BOTH END
SPREADING THE MORTAR
LENGTH OF THE WALL.
LENGTH OF EACH BRICK
MARKING, START LAYERING
SO IT LINNES UP WITH THE
ON SIDES OF THE LAID
THEN PUT BRICK AT EACH
TO
THE
TOP OF THE BRICKS. THIS
BRICK.
END OF THE WALL.
MORTAR BETWEEN EACH
BRICKS.
OF THE BRICK. MAKE A
HEIGHT OF ALL BRICKS BY
MARK AR EVERY 10 INCH.
USING SPIRIT LEVEL.
MORTAR
ON
BOTH SIDES OF CLOSURE BRICKS.
THE
MAKING FIRST
07
06 SPREAD
COMPENSATE
03
LAY
BRICKS
POSITION.
LAYER
ENSURE
OF THE
CAN
THE
HORIZONTAL OF THE BRICKS.
10
09
08 INTO
ENSURE
AFTER LAYING THE HEADER
SPREAD
SIDE
BOTH END OF CLOSURE
POSITION. AFTER LAYIG
BRICK.
THE BRICKS, THE WALL
LAYTHE
OF
THE
BOND,
STRETCHER.
MORTAR
ON
LAYING
BRICKS
IN
MORTAR WERE SPREAD ON
WILL BE PLASTERED WITH
ENDS OF LAID BRICKS.
CEMENT PLASTERING.
C U R T A I N
W A L L
ZONE OF CURTAIN WALL
MATERIAL USED: TEMPERED GLAZING-TYPE GLASS & ALUMINIUM FRAMING GLAZING TYPE GLASS ARE USED BECAUSE THE USER ARE SAFE FROM UV
RAYS
INSIDE
THE
SPACE,
FURNITURE IS LESS SUSCEPTIBLE
TO
FADING
AND
ARTWORK
IS
PROTECTED FROM THE DAMAGING RAYS OF THE SUN.
CURTAIN WALL SYSTEM IS AT THE ZONE HIGHLIGHTED ABOVE. IT IS AN OUTER COVERING OF A BUILDING IN WHICH THE OUTER WALL ARE NONSTRUCTURAL, UTILIZED ONLY TO KEEP THE WEATHER OUT AND THE OCCUPANTS IN. IT ALLOW LIGHT PENEETRATE WITHIN THE BUILDING. THE CURTAIN WALL SYSTEM ARE DESIGNED WITH EXTRUDED ALUMINIUM FRAMING MEMBERS WITH THE TECHNIQUE OF STEEL GRID SHELL STRUCTURAL FRAMING CONCEPT.
GREEN
ROOFING
ZONE OF GREEN ROOFING GREEN ROOFING IS USED ON THE HIGHLIGHTED AREA. IT IS COMPLETELY COVERED WITH VEGETATION AND GROWING MEDIUM, PLANTED OVER A
WATERPROOFING MEMBRANE. IT ALSO INCLUDE TOO BARRIER, DRAINAGE AND IRRIGATION SYSTEM. GREEN ROOFING SERVED SEVERAL PURPOSE SUCH AS ABSORBING RAINWATER, PROVIDING INSULATION, INCREASING BENEVOLENCE AND DECREASING STREE OF THE PEOPLE AROUND THE ROOF BY PROVIDING A MORE AESTHETICALLY PLEASING LANDSCAPE, AND HELPING TO LOWER URBAN AIR TEMPERATURES AND MITIGATE THE HEAT ISLAND EFFECT.
SECTION OF GREEN ROOFING
CASE
STUDY
OF
GREEN
ROOFING
NANYANG TECHNOLOGICAL UNIVERSITY (NTU) SCHOOL OF SRT, DESIGN AND MEDIA (ADM) THE KEY FEATURE OF THE BUILDING DESIGN IS THE GREEN ROOF THAT SLOPE ALMOST AT A 45 DEGREE ANGLE. FORMED BY 2 SLOPING, TAPERING ACRS THAT INTERLOCK WITH A THIRD, SMALLER ARC, THE ROOF OF THE SCHOOL OF ART, DESIGN, AND MEDIA WAS CAST IN HEAVILY RIBBED, REINFORCED CONCRETE. BEYONG BEING AN AESTHETIC FEATURE THAT DOUBLES AS A SCENIC OUTDOOR COMMUNAL SPACE, THE GREEN ROOFS KEEP THE AMBIENT TEMPERATURE LOW AND REDUCE HEAT IN THE DAYTIME. GREEN ROOF:-
VERDANT TURFED ROOF BLENDS INTO THE LUSH GREENERY AND ENVRONMENT
-
TURFED LANDSCAPE AS SCENIC OUTDOOR COMMUNAL SPACE
-
GREEN ROOF LOWER BOTH TOOF TEMP. AND AMBIENT TEMPERATURE HENCE REDUCE HEAT GAIN TO THE AIR CONDITIONED BUILDING.
-
THE BUILDING IS ORIENTED WITH ITS FACADES FACING NORTH AND SOUTH TO MINIMIZE SOLAR GAIN
-
HIGH EFFICIENCY DISCHARGE LIGHTS ARE ADOPTED THROUGHOUT THE BUILDING
-
THE RAINWATER COLLECTION SYSTEM IS FITTED ON THE GREEN ROOF FOR IRRIGATION
-
THE RAIN SENSOR ARE INSTALLED ON THE GREEN ROOF TO AUTOMATE THE IRRIGATION PROCESS
-
THE CURVED BUILDING IS EMBRACING A COURTYARD WITH WATER FEATURES AND PLANTS.
THE GREEN ROOF AND HIGH PERFORMANCE GLASS AS WELL AS THE USE OF CARBON DIOXIDE SENSORS IN ITS AIR-HANDLING UNITS HELP TO REDUCE ENERGY USED AND MAINTAIN A HEALTHY INDOOR AIR QUALITY.
DOME
GLASS
ROOFING
ZONE OF GLASS ROOFING ROOF
GLAZING
TECHNIQUE
HAS
BECOME
COMMON
PLACE
IN
CONSTRUCTION AND INTERIOR OF HOUSE. IT IS BECAUSE IT IS A
TRANSLUCENT MATERIAL, GLASS ISAPPLIED IN SOME STRATEGIC POINTS TO MAKE THE ENVIRONMENTS FUNCTIONAL AND COZY. GLASS ROOFING IS ENERGY-SAVING, PROTECTION AGAINST UV RAYS, LOW MAINTAINANCE AND THE AMPLITUDE OF SPACE. TEMPERED GLAZE-TYPE GLASS IS CHOSEN TO USE.
CASE STUDY OF GLASS ROOFING CHADSTONE SHOPPING CENTRE, MELBOURNE. CHADSTONE INCLUDED CONSTRUCTION OF AN EXCEPTIONAL STEEL-AND-
GLASS ROOF WITH A TOTAL AREA OF 7,080SQM. TWO KEY FEATURES OF THE DESIGN ARE ITS OPEN STYLE, WITH A GALLERY-TYPE SECOND FLOOR, AND THE HIGH, DOME-LIKE GLASS ROOF THAT ALLOWS PLENTY OF DAYLIGHT TO REACH BOTH FLOORS. THE GLASS ROOF HAS TO FOLLOW THE LINE OF THE SHOPPING MALLS BELLOW AND SO THE RESULT IS A COMPLEX FREE-FORM GRIDSHELL WITH SPANS OF UP TO 44M.
CONSTRUCTION PROCESS
01
THE PREASSEMBLED FRAMES, MEASURING UP TO 18M LONG, WERE TRANSPORTED DIRECTLY TO THE BUILDING SITE AS OVERSIZE LOADS ON HGVs.
02
03
04
THE ACCURATELY FABRICATED STEEL STRUCTURE PREASSEMBLED BY SEELE WAS POSITIONED ON THE BUILDING SITE ACCORDING TO VERY TIGHT TOLERANCES.
LIFTING QUIPMENT SPECIALLY DESIGNED BY SEELE WAS THEN USED TO LIFT THE FRAMES DIRECTLY FROM THE VEHICLES AND INTO THE CORRECT POSITION.
ALL THE MEMBERS FOR THE 7,080SQM GRIDSHELL WERE DELIVERED TO THE PREASSEMBLY BY SEA IN 65 CONTAINERS.
ZINC
ROOFING
ZONE OF ZINC ROOFING
ZINC ROOFING HAS CHOSEN AT THE HIGHLIGHTED PART IN THE DIAGRAM. ZINC ROOFING MATERIAL OFFERS A NUMBER OF ENVIRONMENTAL BENEFITS INCLUDING:-
ZINC CONSUMES LESS ENERGY
-
RECYCLABLE MMATERIAL
-
LAST FOR YEARS
-
LIGHT IN WEIGHT
-
LOW TOXICITY LEVEL
-
MALLEABLE AND STURDY
-
CAN BE FORMED EASILY INTO VARIOUS SHAPES
ZINC IS A TYPE OF SUSTAINABLE PRODUCT THAT DOES LITTLE NO HARM ON THE ENVIRONMENT.
SECTION OF ZINC ROOFING
M A T E R I A L
03
BUILDING CEMENT FINISHING CEMENT
HAS
ENVELOPE
&
FINISHING
ZINC ROOFING
TIMBER FRAMING
ZINC CONSUMES LESS
TIMER IS LIGHT, CHEAP
ENERGY AND IT IS A
AND
DAMP
RECYCLABLE MATERIAL.
CONSTRUCTION
RESISTANCE AND FIRE
IT CAN LAST FOR YEARS,
NO HEAVY TOOLS OR
RESISTANCE.
MALLEABLE
EQUIPMENT. THE MAIN
STIFFNESS, DURABILITY,
CHEAP LASTING.
AND
IT
IS
LONG
STURDY
AND
ALLOW
QUICK
WITH
TOOL IS A HANDHELD NAIL GUN.
GREEN ROOFING
GLASS ROOFING
GREEN ROOFING ABLE
IT IS A TRANSLUCENT
TO ABSORB RAINWATER,
LIME
MATERIAL,
GLASS
PROVIDING INSULATION,
DURABLE FLEXIBLE AND
ISAPPLIED
SOME
AND
PERMABLE. IT IS LESS
STRATEGIC POINTS TO
STRESS OF THE PEOPLE
BRITTLE
MAKE
AROUND THE ROOFAND
PRONE TO BREAKAGE.
ENVIRONMENTS
MITIGATE
IT
FUNCTIONAL AND COZY.
MOULD FROM GROWING
DECREASING
THE
ISLAND EFFECT.
HEAT
IN
LIME PLASTER FINISHING
THE
CAN
PLASTER
AND
IS
LESS
PREVENTING
DUE TO HIGHER Ph.
METHOD
01
STATEMENT
STRUCTURAL FRAMING MATERIAL STAINLESS SHELL
STEEL
MANUFACTURE COMPANY CONTAINENTAL STEEL & TUBE
PROPERTIES ▪
CO.
MATERIAL SPECIFICATION
DOES NOT CORRODE STAIN
OR
▪
OXIDIZE
EASILY
ISO 2001: 2015 CERTIFIED DISTRIBUTOR OF STAINLESS STEEL IN GAUGES
▪
200SERIES, 301, 302, 303, 304, 309, 316, 408.
▪
FINISHES ANNEALED,
INCLUDED MATTE,
HOT
ROLLED,
REFLECTIVE
AND
MIRROR FINISH. ▪
VARIOUS FORM WORKED : SHAFT, SHELL, SHELVING,
TIMBER
KAMWO TIMBER INDISTRIES
•
SDN. BHD.
Kamwo Timber
DENSE BUT CONTAIN
•
LITTLE SILICA
HEAVY, YELLOW TO BROWN TIMBER OF THE GENUS SHOREA
•
EASY TO WORK
•
30-60 METRES HIGH
•
SAWS AND MACHINE
•
DENSITY OF 850-1,155KG/M3 AIR DRY
KNIVE REQUIRED
MAY
BE
02
FOUNDATION – FLOORING MATERIAL
COLUMN
MANUFACTURE COMPANY
REINFORCED
S.G. CONCRETE PRODUCT (M)
CONCRETE
SDN. BHD.
PROPERTIES • • •
HIGH
CONCRETE
MATERIAL SPECIFICATION FINISHING
•
SIRIM’S CERTIFICATION
QUALITY AND CONSISTENCY
•
MS ISO9001:2000
SUITABLE FOR EVERY TYPE OF
•
BS
8004:1986,
MEETING
CONSTRUCTION SOIL
REQUIREMENT OF JKR STANDARD
PRICE ARE CHEAP AND OFFER
CLASS 1 R.C FOUNDATION
MOST ECONOMICAL SOLUTION
•
FOR BUILDING FOUNDATION
CERTIFIED BY IKRAM QA SERVICES SDN BHD.
•
WIDE RANGE OF SIZE FROM 150MM TO 450MM SQUARES WITH VARIOUS
LOAD
CARRYING
CAPACITIES
STRATO CEMENT
SUZUKA®
•
SINGAPORE GREEN LABEL
•
EASY APPLICATION & TOUCH UP
TEXTURE COAT + 0.5L TOPCOAT
•
CRACK RESISTANT
(6-7SQM)
•
WASHABE, EASY MAINTENANCE
•
LOW VOC & ODOR
•
FORMALDEHYDE & LEAD FREE
•
DIY FRIENDLY
•
ANTI-CHALKING EFFLORESCENCE
-
-
2.5L
SET:
1L
PRIMER
+
1L
10L SET: 4L PRIMER + 4L TEXTURE COAT + 2L TOPCOAT (24-28SQM)
-
SCT-304 GRANITE GREY, SCT-306 CHHARCOAL
&
SILVER
GREY,
GREY,
SCT-301
SCT-305
IRON
GREY, SCT-302 NATURAL GREY & MORE
MATERIAL DAMP
PROOF
MANUFACTURE COMPANY CHEMIND
PROPERTIES •
MEMBRANE •
MATERIAL SPECIFICATION
HIGH ELONGATION AND TENSILE
MM
6125
STRENGTH
WATERPROOFING
LONG LIFE – PERMANENTLY
MEMBRANE
FLEXIBLE •
•
HIGH
STRENGTH
–
•
THICKNESS OF 6MM
•
M15,M 20, M28
HARD
WEARING •
NO BLISTERING OF COATING
•
CONTAIN
NO
TOXIC
OR
HAZARDOUS SUBSTANCES •
CAN BE APPLIED ON ZERO GRADIENT SUBSTRATES
SAND & AGGREGATE
KENCI MARKETING SDN. BHD.
•
LESS CONCRETE
•
SMOOTHER
TEXTURE
WITH
BETTER SHAPE •
DEMANDS LESS WATER
•
HIGH
PROBABILITY
ADULTERATION
OF
MONOLITHIC &
ROOFING
03
W A L L
S Y S T E M
MATERIAL BURNT CLAY BRICK
MANUFACTURE COMPANY AATHAWORLD
PROPERTIES • •
MATERIAL SPECIFICATION
MADE BY MOULD PRESSING,
•
DIMENSION: 215 X 102 X 70MM
BEING DRIED AND FIRED IN KILN
•
WEIGHT: 2.8KG PER PIECE
COLOUR CAN BE ADJUSTED
•
COLOURS: SUPER RED, CREAM,
THROUGH TREATMENT,
CHEMICAL MIXTURE
BROWN
AND
•
PER PALLET: 500 PIECES
AND
•
PREMIX OEM CEMENT MORTAR
PRODUCTION
•
DRYMIX MORTAR OEM
INTERNAL CONTENT.
CEMENT MORTAR
SIANG FATT SDN. BHD.
•
COST
SAVING,
WASTELESS
CLEAN
PROCESS •
SUSTAINABLE
PRODUCTION:
SUPPORTING SAFETY, HEALTH AND ENVIRONMENT
COOLMAX
TERREAL MALAYSIA SDN. BHD.
•
QUICK AND EASY SWITCH OVER
•
REDUCE HEAT GAIN DURING
•
CF1 FR (FRAL 1)
DAY, PERMIT HEAT DISSIPATION
•
ALUMINIUM
INSULATION
DURING THE NIGHT •
FOIL/FR
TIE
LAYER/FR WOVEN FABRIC
MAKE AC MUCH MORE ENERGY-
•
THICKNESS: 0.13+-MM
EFFICIENT
•
SPEICAL
FIRE
RETARDANT
MATERIAL (FRAL 1) •
ROLL SIZE: 1.25 (W) X 48M (L)
•
COVERAGE: 60 M2
04
R O O F I N G MATERIAL ZINC & METAL DECK
S Y S T E M MANUFACTURE COMPANY ROOFSEAL SDN. BHD.
PROPERTIES •
ROOFING SHEETS
FULL GREEN ROOF
MATERIAL SPECIFICATION
3 IN 1 SOLUTION FOR HEAT AND
•
SOUND INSULATION
SIKA MALAYSIA
ROOFSEAL DECK762 WITH PU
FOAM/METAL
•
ZINC CONSUMES LESS ENERGY
•
RECYCLABLE MMATERIAL
POLYURETHANE WITH THERMAL
•
LAST FOR YEARS
RESISTANCE OF 1.06M2 K/W
•
MALLEABLE AND STURDY
•
RESISTANT
SYSTEM
AGAINST
ORGANISMS
AND
MICRO-
MONOLITHIC,
•
ROOT
PENETRATION •
-
ON-LAMINATED
BONDED
THERMOPLASTIC SARNAFIL
G
MEMRRANE
MEMBRANE OFFER EXCELLENT AND
THICK
RIGID
MEMRRANCE
SYSTEMS •
WEATHERABILIITY
18MM
476-15 FOR
–
POLY
BALLASTED
ROOF WATERPROOFING •
FLL CERTIFICATION
•
2 PIECES OF GLASS SEPARATED
DIMENSION STABILITY
DOUBLE UNIT
GLAZING
KIEN SAFETY GLASS SDN. BHD.
•
REDUCTION OF AC COST
•
REDUCTION
OF
NOISE
BY AN AIRSPACE AND ALUMINIUM
PENETRATION •
PREVENTION
SPACER AROUND THE EDGES OF
DEW
•
CONDENSATION
•
REDUCTION TRANSMISSION
SPACER CONTAINS A DESICCANT (DRYING AGENT)
OF
UV
•
THICKNESS: 4MM
•
200MM CAVITY
“ CONCLUSION
IN CONCLUSION, THIS BUILDING IS MAINLY USE OF SUSTAINABLE EFFECTIVE
AND
COMFORT
MATERIAL
THROUGHOUT
THE
DOCUMENTATION OF THIS DESIGN PROJECT. RAW MATERIAL ARE USED TO PROVIDE ARCHITECTURAL EXPERIENCES IN THE SPACE. THE BUILDING’S USES AND FUNCTIONS DEFINE ITS FORM AND ITS IDENTITY. THE INTEGRATED DESIGN APPROACH, INVOLVING BOTH STRUCTURAL ENGINERRING AND ARCHITECTURAL CONCEPTION, HAS ALLOWED FOR THE STRUCTURE TO BE CONSCIOUSLY EXPRESSED. THE MATERIALS ARE UNFINISHED, SIMPLE AND NATURAL: SIGNS OF BASIC COMFORT AND DURABILITY.
R E F E R E N C E SAFDIE ARCHIRECTS published on December 28, 2017 retrieved from https://www.safdiearchitects.com/media/construction-updatestructural-framing-completed-at-jewel-changi-airport
Winter Sinying published on Jul 14, 2016 retrieved from https://www.slideshare.net/tehsying/bcon-64017017 Wilden How published on Jul 11, 2014 retrieved from https://www.slideshare.net/Welltan/building-construction36880123 Champion Services published on Jan 05, 2020 retrieved from https://www.championwindow.com/window-buyersguide/what-is-window-glazing/# Seele published on Feb 25, 2020 retrieved from https://seele.com/references/chadstone-shopping-centre
Jones Roofing published on Aug 2, 2013 retrieved from http://www.jonesroofing.com.au/benefits-disadvantageszinc-roofing Madeh Izat Hamakareem published on May 9, 2009 retrieved from https://theconstructor.org/building/lightweight-concretefloor-systems/27324/ Architecture Art Design published on Aug 20, 2009 retrieved from https://www.architectureartdesigns.com/glass-roofadvantages-and-ideas-for-inspiration/ Constructionor published on Jul 25, 2015 retrieved from https://constructionor.com/limeplaster/#:~:text=Advantages%20of%20lime%20plaster%3A,Lime%20plaster%20is&text=It%20is%20permeable%20and%20 allows,does%20not%20require%20expansion%20joints.
LAI
ZHI
ZHEN
1001747427 UCSI
UNIVERSITY AR323
T H A N K Y O U
BUILDING
CONSTRUCTION &
TECHNOLOGY
III