Portfolio Marina Diez

Page 1

PORTFOLIO

MARINA DIEZ


SHO RT PROFILE

GRADUATION S達o Paulo University Faculty for Architecture and Urbanism (FAU USP) since 2010 EXTRA COURSES Scenography, Artistic Residency, Aquarell, Architectural Drawing IDIOM Portuguese, English, German, French and Spanish EXPERIENCES Scientific Research, Social Work, Scout Member

TECHNOLOGY Adobe Creative Suite, AutoCAD, SketchUp, ArchiCAD, MS-Office

Marina Diez S達o Paulo - Brazil 0 4 . 0 5 . 1 9 9 0 +55

11

971-407-656

nina.diez@gmail.com

WORKING EXPERIENCE Layout Design, Assistant in master and doctor thesis, Assistant in Temporary Gallery - art Gallery in Cologne, Assistant in scenography in several short films. INTERESTS Drawing, Photography, Music, Travelling, Reading, Chess and Yoga


CONTENT 1.

object design

| a bottle pack

2.

geometric sculpture

3.

organic sculpture

4.

object design

7.

architecture

| land art

| laundry sink for emergency situations + industry | temporary food kiosk

10. social housing | “urban void� 15. public building | stadtarchiv siegen 20. urban infrastructure | local harbour 24. illustration project

SKETCHES CREDITS: Marina Diez COVER | windows from the city of Ouro Preto (Brazil), 2013 CONTENT | cityside urban utopic plan, 2015


OBJECT DESIGN | A BOTTKE PACK 2011 | 4TH semester | FAUUSP

The bottle pack project consists in developing a package for a specific bottle using simply a

A1

piece of paper, that should be structured

and hold the bottle only by its folds.

The developed shape covers and protects the bottle, but give a hint of what is inside. The unpacking (and repacking) intends to be an exciting contra clockwise movement, that reveals at once the bottle kept inside, without it having to be remove from a “inside of a box�.

PG

1


GEOMETRIC SCULPTURE | LAND ART 2014 | 10th semester | FAUUSP

In

contrast

with

the

organic

sculpture project, the geometric one was designed for being the less interfiring in the location where it would be placed, and it is planned for suiting any open space

(although it can also be placed indoor). The main intention is to the sculp-

ture to be used in any form as well.

The

leaning plan offers a

surface to be sitting on, lay, or climbed.

And

its sidewalls offer a

great backboard.

More

than just discussing aes-

thetic, the sculpture projects try

to discuss the space, the forms of interacting to them and even using them.

I

believe that elements

can lead big influences in a room/ space, and that is what

I

search

for with the two sculptures.

PG

2


ORGANIC SCULTURE 2014 | 10TH semester | FAUUSP

The

main objective of this organic

sculpture is to be more than a piece of art, but also furniture.

For this

reason the place for it was chosen first than its shape.

As

a site-spe-

cific the form, dimensions and the material were chosen.

The location is a building in the SĂŁo Paulo University that hosts the Centre for Brazilian Culture and its library. And although the architecture of the “Brasilianaâ€? building is really impressive, its wide spans and intensity of concrete, glass and metal creates a big void in the central area of this building.

Therefore

the organic sculpture

was created in order to contrast the straight lines of the perspective; to place a material that is as-

sociated with warm atmospheres; and to be used as a furniture (such

as a bench, a playground or simply a meeting point); that would con-

tribute to reverse the emptiness of this majestic scales, pretty common for the brazilian architecture

modernism, and bring more life, in-

vite people to stay longer, serve as a meeting spot and to reverse the

originals shapes of the building, without being aggressive to it.

PG

3


OBJECT DESIGN | LAUNDRY SINK FOR EMERGENCY SITUATIONS 2012 | 5th semester | FAUUSP GROUP WORK: Beatriz Lorenzi + Marina Diez

This

object design was developed for a spe-

cific case: by the time it was raining a lot in

Brazil,

and some countryside cities flooded

and the population had to be removed from their houses and they were living in improvised camps.

This

laundry sink is then developed to

be a solution for hygine in such an emergen-

cial situation. It is a way of washing clothes, or even food, more independently from the wa-

ter reservoir. It is also pretty easy to move, push and pull the wagon, since the wheels

are big enough, suitable for any kind of path.

PG

4


C

C

C

CUT

SIDE VIEW

0 cm details not in scale

TOP VIEW

50 cm PG

5


FRONT VIEW

0 cm details not in scale

VERTICAL CUT

BACK VIEW

50 cm PG

6


ARCHITECTURE + INDUSTRY | TEMPORARY FOOD KIOSK 2012 | 5TH semester | FAUUSP GROUP WORK: Marina Pizzotti + Marina Diez

Developed

to be a temporary food kiosk, with a functional plan and

easy to be built. It is an open but sheltered room, planned to be placed where there is a lack of food services due to the isolation parks, squares, stadiums, and other open spaces.

To

- such as

avoid being a

closed space placed in an open area, the walls were projected to be

in its majority windows that can be fully open, enlarging the space, and connecting it to the location.

The chosen material is based on the project concept of functionality, lightness and transparency. It consists in Polycarbonate modules, wrapped by an alluminium frame that brings each module stiffness and make the joints between each one, possible.

As

well as enabling a connected space with the out-

side, the fenestration can also be closed due to a bad weather, the

roof top prologued for more shelter, and even locked, by the end of each working day.

PG

7


C

CUT A

A

A 1

0m

5m

2 B

CUT C 0m

B

50m

the hatched surface is the mobile seal that can be opened in case of rain or any other reason for expanding the rooftop.

C

PLAN 0m

2,5m

CUT B 0m

5m

PG

8


EXPLODED VIEW

VIEW 2

VIEW 1 0m

0m

5m

5m

FURNITURE

4

PG

9


SOCIAL HOUSING | “URBAN VOID” 2012 | 6th semester | FAUUSP

Based on the purpose of choosing an empty space (or a not entirely solidificated construction), this social housing project was alligned with 2 other students projects in order to propose not only the communication between the 3 buildings, but also propose this important (and not existing) pedestrian conection through the center of São Paulo. This conection crosses the important commercial zone in the center of the city, starting in a higher path at the Santa Ifigênia quarter, place for eletronic devices, crossing safely the big highway, Avenida Prestes Maia, leading to also high-level street for utensils sales, Rua Florêncio de Abreu, and ending in the lower level at the popular fashion street Rua 25 de Março. The social housing block that is beeing shown is composed by 2 different vertical modules: the first one with 9 floors, 2 flats of 60m2 each floor (one with a north orientation, and the second, east-west orientation); the second block presents 12 floors, composed with 5 flats (north orientation), 2x 90m2 - 2x 75m2 - 1x 50m2. The groung floor is for the public and commercial use, including a 2 floors gallery. And the rooftop is a leisure area for the residents, with a garden, sports court and playground.

PG

10


RU

A

eA sV m. aPiaRES TE

S MAIA

IG

AD

EI

RO

U

S

ru

a

br

ig

A

2

ad

ei

ro

to b

ia

s

A

FLOR

PR

ES

TE

ÊNCIO

S

DE

MA

IA

ABRE

TO B

IA

av. p rest

B

BR

RUA CAPITAO-MOR JERONIMO LEITAO

A

B

AV E

NID

modulação estrutural

1

RUA

VIADUTO SANTA

EFIGÊNIA

OVERALL PLAN 0m

50m

PLAN 25m

0m

PG

11


60 m2

corredor

90 m2

75 m2

50 m2

abertura zenital

capit達o-mor jeronimo leit達o str.

60 m2

HOUSING TYPOLOGY 0m

25m

CUT A 50m

0m

PG

12


780m

770m

passarela de pedestres

737m

rua brigadeiro tobias

729m

av. prestes maia

street level

circulação da galeria + jardim

VIEW 1 0m

25m

VIEW 2 0m

25m

vertical circulation garage commercial public pavement

+ pedestrian bridge

leisure pavement sports pavement gallery PG

13


rua brigadeiro tobias

rua av. prestes maia

florĂŞncio de abreu

rua

25 de março

corte B 0m

25m


PUBLIC BUILDING | STADTARCHIV SIEGEN 2013 | Universität Siegen GROUP WORK: Antje Karsten + Marina Diez

A public building for the city’s historical archive in Siegen, Germany. Located at the higher part of the city, over the mountains, close to the city center’s heart (the Krönchen church), and other public buildings. The plan is at an inclinated terrain, 12m from the lower crossing street to the upper crossing street. And for this, a beautiful view for the lower city’s landscape and it’s beautiful sorrounding nature. The main concept is based in turning the archive in a major cultural facility. An open and inviting space: at the upper street level, a public square for the good weather days with this impressing landscape view; one level lower, a public library, and a restaurant; the second lowest level is destinated to the workers buros, and the archives; following the ramps, vertical circulation, the visitor is going to be led to the café, in the central position, after this, to the exhibition area, and the most important, to the lower street. The building is concepted by galleries, and the ramps that conncets the two marging streets. Its facade is considerably trasparent due to the landscape view, and the natural lightning (once its facade is oriented to the northeast, with no direct sunlight during the activities).

PG

15


é

r e S ta U r a n t l a g e r

räUMeU S w

.

anSicht der faSSade

b

S t r a ß e

u

b

garage entrance

l

M a r b u r g e r

K

ca U S t e lal U n g f

H

i

n

t

e

r

s

t

r

a

ß

e

m

h e k

A

liot

M i ta r b e i t e r i n n e n

H i n t e r s t r a ß e

S i e g b e r g s t r a ß e

playground S

i

e

g

b

e

r

g

s

t

r

a

ß

e

lagen Plan

500 OVERALL1 :VIEW 0m

50m

PLAN | LEVEL 275 0m

25m

a 1:250

längSSchinitt

PG

16


1

2

3

PLAN | LEVEL 272 0m 1. 2. 3.

public library cafĂŠ restaurant

2

3

1 5

1. 2. 3. 4. 5. 6.

25m

garage entrance restrooms meeting room principal room kitchen buro

4

6

7. gift shop 8. exhibition gallery 9. street entrance 10. technical area 11. studio 12. archive

11

10 7

8

9

13

14

12

15 16

PLAN | LEVEL 269 13. 14. 15. 16.

delivery room maintainence room

0m

25m

photography studio ware room PG

17


C

B A

B C

A

public square view, on the rooftop. Hinterstrasse street level

CUT A 0m

10m

CUT B 10m

0m

PG

18


CUT C 10m

0m

PG

19


URBAN INFRASTRUCTURE | LOCAL HARBOUR 2011 | 3th semester | FAUUSP GROUP WORK: Beatriz Lorenzi + Diana Nunes + Gustavo Oliveira + Marina Diez + Vitor Endo

An infrastructure building for the favela called “Cantinho do Céu” (heaven’s corner), close to the Billings dam, in the city of São Paulo. It consists in a simple idea, for this simple area: a public square with a panorama view at the rooftop/street level - offering such a leisure area even for those who won’t necessarilly go to the harbour; 4 meters below, the same idea of a public square persists, but sheltered, and surrounded by facilities such as restrooms, a café and the connection to the harbour. The harbourage is developed to offer the connection between the neighborhoods that surrounds the Billings dam by a pedestrian ferryboat. Leisure and sports were aswell assumed as activities of great importance, and planned to be included in the harbour’s main activities. Therefore kayaks, paddleboats, canoes, and others can be loaned.

PG

20


A

B

entrance

753m

1 A

B

PLAN | STREET LEVEL

ORVERALL PLAN 0m

25m

0m

25m

PG

21


administração garagem

de embar-

sanitários

depósito

cações

cozinha

bilheteria

749m

café

proj. ilum. zenital

749,8m varanda

753m 749m

ramp de acesso ao pier

747m

projeção do piso superior pier

VIEW 1 | EAST

PLAN | LAKE LEVEL 0m

12,5m

0m

12,5m

PG

22


753m 753m 749m

749m

749,8m 747m

747m

CUT A 0m

12,5m

CUT B 0m

12,5m

PG

23


ILLUSTRATION PROJECT

1

2012 china ink

2

2013 china ink

3

2013 china ink

4

2014 china ink

PG

24


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.