Portfolio Marina Diez

Page 1

PORTFOLIO Marina Diez


S H ORT PROFILE

MARINA DIEZ

S達o Paulo - Brazil 0 4 . 0 5 . 1 9 9 0 +55 11 971-407-656 nina.diez@gmail.com

GRADUATION S達o Paulo University Fakulty for Architecture and Urbanism (FAU USP) since 2010 EXTRA COURSES Scenography, Artistic Residency, Aquarell, Architectural Drawing

IDIOMS Portuguese, English, German, French and Spanish EXPERIENCES Scientific Research, Social Work, Scout Member TECHNOLOGY Adobe Creative Suite, AutoCAD, SketchUp, ArchiCAD, MS-Office

WORKING EXPERIENCE Layout Design, Assistant in master and doctor thesis, Assistant in Temporary Gallery - art Gallery in Cologne, Assistant in scenography in several short films. INTERESTS Drawing, Photography, Music, Travelling, Reading, Chess and Yoga


CONTENT PG

1

PG

3

A BOTTLE ORGANIC

PACK

SCULPTURE

PG

5

PG

7

PG

10

PG

11

COLL A G E l a u n d r y temporary F A R B E food kiosk IN SIEGEN C A L E N D A R sink

ILLUSTRATITION A R C H I T E C T U R E A P P I C O N EOMETRIC M OD U L A R G SCULPTURE PROJECT:

DESIGN

BRIDGE PG

2

PG

4

PG

6

TRAPPED SEA LIFE

PG

8

DESIGN

PG

12


A BOTTLE

PACK FAU USP | 2012 The bottle pack project consists in developing a package for a specific bottle using simply a A1 piece of paper, that should be structured and hold the bottle only by its folds. The developed shape covers and protects the bottle, but give a hint of what is inside. The unpacking (and repacking) intends to be an exciting contra clockwise movement, that reveals at once the bottle kept inside, without it having to be remove from a “inside of a box�.

PG

1


MODULAR BRIDGE FAU USP | 2012

GROUP WORK: MARINA DIEZ + VITOR ENDO

The objective of this project was creating a module that associated would be structured enough to close a span, using simply wood sticks and thread. The developed module assumes a pyramidal shape, and it is associated with the other modules is by joining two modules together without tying, as if it was a dovetail. Although the module is simple and in a normal shape, the bridge proved to be really strong, and being able to close really big spans.

PG

2


ORGANIC SC U LPTURE

FAU USP | 2014 The main objective of this organic sculpture is to be more than a piece of art, but also furniture. For this reason the place for it was chosen first than its shape. As a site-specific the form, dimensions and the material were chosen. The location is a building in the SĂŁo Paulo University that hosts the Centre for Brazilian Culture and its library. And although the architecture of the “Brasilianaâ€? building is really impressive, its wide spans and intensity of concrete, glass and metal creates a big void in the central area of this building. Therefore the organic sculpture was created in order to contrast the straight lines of the perspective; to place a material that is associated with warm atmospheres; and to be used as a furniture (such as a bench, a playground or simply a meeting point); that would contribute to reverse the emptiness of this majestic scales, pretty common for the brazilian architecture modernism, and bring more life, invite people to stay longer, serve as a meeting spot and to reverse the originals shapes of the building, without being aggressive to it. PG

3


GEOMETRIC

SCULPTURE

FAU USP | 2014 In contrast with the organic sculpture project, the geometric one was designed for being the less interfiring in the location where it would be placed, and it is planned for suiting any open space (although it can also be placed indoor). The main intention is to the sculpture to be used in any form as well. The leaning plan offers a surface to be sitting on, lay, or climbed. And its sidewalls offer a great backboard. More than just discussing aesthetic, the sculpture projects try to discuss the space, the forms of interacting to them and even using them. I believe that elements can lead big influences in a room/ space, and that is what I search for with the two sculptures. PG

4


photography

PROJECT:

F A R B E IN SIEGEN UNI SIEGEN | 2014 The first objective of this photograph series was to depicture the colours that I used to see in the city of Siegen during the time I spent there. Therefore no picture was perfectly focused. After printing the results, my instantly idea was to somehow join the pictures as of they compose a panorama (although the places photographed have nothing to do with each other). When creating this composition I even placed the shapes together creating even some perspectives and inventing some unreal architectural possibilities. Finally the created panorama even suggests a narrative, maybe by its colours, day passage or the crossing landscapes shown. The real panorama is sized in 0,15m x 3,20m PG

5


APP ICON

DESIGN

Sテグ PAULO - PRIVATE WORK | 2014 This icon was developed for a database organizer app, which is much less heavy than similar applications. This main characteristic was the information that the icon should translate. Therefore it was this diagram was created, as organizing piles. In addition to convince that the application is lighter than normal ones, the worldwide sign for lack of weight was used, the feather. And in the same way the blue colour was chosen. PG

6


COLLAGE CALENDAR

Abril

Março SÃO PAULO - PRIVATE WORK | 2015

25

26

27

28

1

30

31

1

2

3

4

5

This is a personal project, developed to be a present. The collages illustrate a story, which is told along the months during the year of 2015. The images are all taken from the Internet, and collated together through Photoshop.

2

3

4

5

6

7

8

6

7

8

9

10

11

12

9

10

11

12

13

14

15

13

14

15

16

17

18

19

16

17

18

19

20

21

22

20

21

22

23

24

25

26

25

26

27

28

29

27

28

29

30

1

2

3

The calendar grid was also designed by me, with the intention to be as clean as possible, and with enough space to write in the squares.

23

Quarta-feira

24

30

Quinta-feira

Sexta-feira

Sábado

Domingo

Terça-feira

Sábado

Quinta-feira

24

Terça-feira

Segunda-feira

Sexta-feira

Quarta-feira

23

Segunda-feira

Domingo

31

PG

7


ILL U S T R A T I T I O N

PROJECT: TRAPPED SEA LIFE

Sテグ PAULO - PRIVATE WORK | 2012 _ 2015 This is a personal project. There are several drawings that express the same motif, cloistered fishes. The drawings are made in China Ink, on paper, in the average size of a A5. The work is still in progress and it started in 2012. PG

8


SKETCHES

PRIVATE WORK | 2012 _ 2015 Those are some sketches that in my point of view (although not intentionally) have to do with the “trapped sea life� drawings, since all of them contain personified animals. The drawings are made in China Ink or Pastel, on paper, in the average size of a A5. PG

9


laundry

sink

for emergency situations C

C

C

FAU USP | 2013

GROUP WORK: BEATRIZ LORENZI + MARINA DIEZ

0

10

50cm

This object design was developed for a specific case: by the time it was raining a lot in Brazil, and some countryside cities flooded and the population had to be removed from their houses and they were living in improvised camps. This laundry sink is then developed to be a solution for hygine in such an emergencial situation. It is a way of washing clothes, or even food, more independently from the water reservoir. It is also pretty easy to move, push and pull the wagon, since the wheels are big enough, suitable for any kind of path. PG

10


temporary

food kiosk

FAU USP | 2013

GROUP WORK: BEATRIZ LORENZI + MARINA DIEZ + MARINA PIZZOTTI The Kiosk was developed to be a temporary stablishment that can be built and unbuilt and be placed in different locations. Therefore it was projected in a form of modules and pieces that can be simply joint, made of alluminium or polyurethane. The objective is to be an open but sheltered place where people are able to simply get the food to take away, or seat. Seals were also projected in order to close the kiosk when it is needed. PG

11


ARCHITECTURE

FAU USP | 2013

DESIGN

GROUP WORK: ANTJE KARSTENI + MARINA DIEZ

This architecture project is to plan a new building for the Stadtarchiv in Siegen. The ground plan is located prettz close to the old city centre that is in a higher level, over a hill. Due to this location, the ground plan has an impressive panorama view. Therefore it was intended to propose a building which promotes much more than only housing the archiv collection.

STADTARCHIV IN SIEGEN

LIBRARY ADMINISTRATION

CAFÉ GALLERY

RESTAURANT COLLECTION

SECTION

AA PG

12


A

A

PARKING ENTRANCE

H

i

n

t

e

r

s

t

r

a

ß

e

ENTRANCE

PLAYGROUND

S

i

e

g

b

e

r

g

s

t

r

a

ß

e

HINTERSTRAßE PLAN +275m A public space such as an open square was created in the Hinterstraße street leve, in order to invite concentrate people for different outside activities. In the first level the public library. A café was created in the centre of the building, and the ramps lay all around it. The ramps is not only the inside circulation but the transposition form one street level to the lower street level. And in the very last floor is the private one, where the administration offices and the collection rooms are placed. The building proposal is most of all to promote the different activities and to attract people.

0

LIBRARY

CAFÉ

25m

5

RESTAURANT

INTERMEDIATE PLAN +272m

ADMINISTRATION AREA

COLLECTION ROOMS GALLERY SIEGBERGERST. ENTRANCE

SIEGBERGERSTRAßE PLAN +269m PG

13


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.