March 31, 2016 Dear Friends, Where we are a bit late in getting this letter out this year we still hope you might enjoy looking through our year-end review brochure. 2015 provided us a good year, with modus improvement over the previous year. Our Board of Directors has grown to five with the addition of Mathew Zwack and Abel Natali. Jan Prindle stepped into a Vice President role in addition to everything else she does, with Mike Woods still running the site civil side of the field operation. Our project mix is tilted toward the heavy civil side these days, with a significant amount of aviation projects under way and in our backlog. Fortunately, we still have many on-going clients in the education, ecclesiastical, retail, municipal and industrial markets we serve. As is always the case, we owe our deep gratitude to our loyal clients, the design professionals and subcontractors with which we work, and our friends in the communities we serve. As we move forward, we are excited about some of the new team members we have brought on board in the recent year or so and believe them to provide additional depth and talent to expand our services. We believe these folks will enhance the value we bring to our clients. Our on-going partnerships and strategic alliances we have fostered in the recent years give even more future opportunity. We are better equipped than ever to handle the opportunities that are on the horizon, have the finest field staff with deep local resources to cover any construction need, and we have a great capacity in our project management ability and pre-construction services. Overall our company brings a unique balance of resources and service level at a market price point to provide an outstanding value proposition for our clients. 2016 brings with it many opportunities and challenges. I know together with your help we will overcome any obstacles and prosper in the years to come. Thank you all for all you have done for us through the years and we very much look forward to working together in 2016 and beyond. All the Best,
David Dale and the entire O-A-K team
January
• The Edgewater Drive Widening Phase II project in Port Charlotte began and will be widening a 1.9 mile two-lane roadway to a four-lane roadway and encompasses three bridges, four roundabouts, utilities and retention ponds.
Edgewater Drive / Midway Blvd. Roundabout
Edgewater Drive / Spring Lake Bridge
• The Waterman Broadcasting Studio Expansion & Renovation was completed. The building addition was used to house the new studio and newsroom facilities and the two-story lobby was renovated with new staircase and elevators. All the work was done while the facility was operational for 19 live shots every day. This project won a BIA Summit Award for Best Commercial Contractors Project in October.
Naples Municipal Airport Runway 14-32 - Naples • 5,000 feet of the Naples Municipal Airport Runway 14-32 was rehabilitated with the asphalt overlay done at night so as not to disrupt daily activity. The runway rehabilitation project was included in one phase of the airport’s master improvement plans.
February • Mobilization took place for the East Naples Middle School Thermal Storage Tank Replacement. O-A-K will replace the existing ice tanks with a 543,000 gallon, 3,000 ton water tank as well as underground piping encased in concrete. • Notice to Proceed was received from the Lee County MPO (Metropolitan Planning Organization) on the TIGER Grant project. This project will enhance bicyclist and pedestrian facilities in multiple locations across the county. East Naples Middle School Thermal Storage Tank
Rehabilitated Taxiways A & C at the Venice Municipal Airport
• Construction of a 7,220 Sq. Ft. Apron was completed at the LaBelle Municipal Airport. The project included retention ponds and new drainage.
• Mike Woods, General Superintendent of the Site Division, is named to the O-A-K Florida Board of Directors.
• Dave Dale, President of OAK Florida, talks construction with kindergartners from Meadow Park Elementary during their visit to the Edgewater Drive road improvement project site in Charlotte County.
May
March
• Owen-Ames-Kimball is listed in the top twenty among the ‘Top 50 Contractors’ in the eight county area of Southwest Florida by the ‘Business Observer’.
April
• O-A-K was awarded the Annual Construction Management Contract from Lee County Government. • Work starts on the Sam Galloway Ford Service Department Improvements.
• The 6-phase Rehabilitation project for the Venice Municipal Airport Taxiways A & C was completed and included reconstruction of taxiways, aprons, run-up pads, final marking and electrical work.
Mike Woods - Board Director
• Contracted through the City of Fort Myers and completed this month, the Carson / Clifford / Broadway / Promenade West Waterlines and Sewer Repair project is the first for the Tobler/OAK JV.
Carson / Clifford / Broadway / Promenade West Waterlines and Sewer Repair - Fort Myers
FGCU I-Hub Site - Fort Myers
June
• New Hope Presbyterian Church congregation members celebrate the groundbreaking of their new facility with O-A-K in attendance. The project is located on over 20 acres, with a new sanctuary (including state of the art audio visual package), Christian education building with roadwork and retention pond for site drainage.
July
• The Elkcam Boulevard Improvements Project, a joint project between Charlotte County Utilities and Charlotte County Public Works is completed. It included utility, storm drainage, pedestrian paths/ sidewalks and landscape elements as well as the Gertrude Avenue bridge. • The FGCU (Florida Gulf Coast University) I-Hub site development project is finished.
August
• Southwest Florida International Airport along with Construction Manager, Owen-Ames-Kimball and Engineer, Kimley-Horn & Assoc., were recognized by FDOT with the 2015 Best Commercial Service Airport Project of the Year Award for its Closed Circuit Television Upgrades. • The Naples Municipal Airport West Quad Pond drainage project is completed, The project included the construction of a 3 1/2 acre stormwater management pond, bridge, shelter/observation platform and other drainage components. The design incorporated the existing bike/walk path which is part of Naples extensive path system for residents.
West Quad Drainage Project Naples Municipal Airport
• O-A-K Employees raised the funds to “Toss The Boss” at the Over the Edge fund-raiser event for the Heights Foundation. President, Dave Dale and Superintendents, Scott Reynolds and Matthew Zwack repelled down the Hyatt Coconut Point Resort and Spa 20-story building.
November
• O-A-K employees attend the annual Page Field Aviation Day. Matthew Zwack, Scott Reynolds and Dave Dale go Over The Edge for the Heights Foundation • General Superintendent and Charlotte County Office Manger, Frank Bell, retires after over thirty years with the Owen-Ames-Kimball Company.
September
• The Ford Street Filter Marsh, another Tobler/OAK JV project, reached substantial completion. • O-A-K was awarded the Gulf Coast High School and Laurel Oak Elementary School new central chiller plant and water thermal storage tank project by the School District of Collier County.
October
• Work on the Pine Island Commercial Marina begins for Lee County. The new 24,000 Sq. Ft. boat storage facility will be constructed on a driven concrete piling foundation and be finished with a decorative EIFS (Exterior Insulation Finishing System) and stucco.
• The FIDS (Flight Information Display System) project is underway at the SW Florida International Airport.
December
• Mgr. of Accounting Services & HR, Jan Prindle, is appointed Vice President of the O-A-K Florida Board of Directors. • Multiple projects received through the General Contractor and Design Build Continuing Contracts awarded for the Collier County School Board are completed during the year and continue through 2016.
FIDS at SWFL International Airport
Retiree Frank Bell
Ford Stree Filter Marsh - Fort Myers
MISSION STATEMENT Since 1891, our mission has been, and remains today, to provide the finest professional construction services to meet our clients’ needs for quality construction. As an employee-owned firm, our goal is to assure our clients real value for their dollar at a profit sufficient to provide for the safety and well-being of our employees and to ensure the continued growth of the Company. We will commit to every job a team with skill, responsibility, and integrity that will blend the highest work ethic with today’s technologies.
FIFTEEN PERFORMANCE STEPS TO QUALITY© WORK A FULL DAY, EVERY DAY! TALK AND DELIVER QUALITY, ALWAYS! PLAN FOR PERFORMANCE! THINK AHEAD! GIVE CLEAR DIRECTIONS! MEET OR BEAT THE SCHEDULE! CONFIRM PERFORMANCE EXPECTATIONS! LET NO ONE SHORT THE REST OF THE TEAM! CHECK THE WORK! ALWAYS SOLVE THE PROBLEM! KEEP A CLEAN JOB AND A SAFE JOB! ALWAYS SEEK THE BETTER WAY! USE THE RIGHT TOOLS! IF IT’S NOT RIGHT, TAKE IT DOWN! DEMAND “NO PUNCHLIST” PERFORMANCE! TAKE RESPONSIBILITY AND PLACE RESPONSIBILITY!
IN REMEMBRANCE - PATRICK CONRAN
The O-A-K family lost one of it’s own this past year. Patrick Conran spent twenty years on the O-A-K team and will never be forgotten. He will live on in our hearts and our minds and his spirit will be with us forever. Patrick was an admirable example for all in the way he lived his life, full of smiles and laughter, always helping others and seeing the bright side of things. He will truly be missed.
O-A-K Southwest Florida Operations Headquarters
0615
6 CGC0
Owen-Ames-Kimball Company
Fort Myers
11941 F ai rw ay Lakes D r ive, Fo r t Mye r s , FL 3391 3-8 338 (239) 561 -41 41
Naples
5129 C ast el l o D r ive, S uite 2, N ap les , FL 341 03 (2 39) 596-0291
Punta Gorda
1877 Manzana Av e n u e, P u n t a Go r d a, FL 339 50 (9 4 1 ) 575-1 574
Email: oakfl@oakfl.com • Website: www.owen-ames-kimball.com @ OwenAmesKimball.FL