portfolio 2020
lavinia pennino selected works
MArch Architecture (RIBA Pt. 2)
contents academic 3
practice
Pitched Roof Details Key 01: Clay Roof tiles by Tudor Roof Tile Co. Colour ref in Spec: (H60.105) 02:Clay 'Mono Ridge' Ridge tiles by Tudor Roof Tile Co.Colour ref in Spec: (H60.105) 03:Clay 'Bonnet' Hip Tiles by Tudor Roof Tile Co. Colour ref in Spec: (H60.105) 04:Nilvent Breather membrane by Kingspan 05:100mm K7 Kooltherm Pitched Roof board between rafters by Kingspan 06:72.5mm K118 insulated plasterboard by Kingspan to ceiling (32.5mm over steels) with 3mm skim 07:DuPont™ AirGuard® vapour control layer 08:Ventilated Dry Ridge System by Marley 09:25mm Universal Eaves Ventilation System by Marley 10:Universal RidgeFast System by Marley 11:100mm Kingspan Kooltherm K108 Cavity Board insulation 12:Woodfire 'mixed' bricks by HG Matthews. 10mm Mortar joint to be Heritage Fine Lime 13: Kooltherm Cavity Closer by Kingspan (145+50 to cavity along Gridline 4) 14:Foamglas® perinsul HL 15:Sika® Sarnafil® G 410-15 EL adhered membrane. Top surface to be lead grey color (Sika colour no. 9500). Adhesive as per manufacturers recommendation. 16:Rytweep© Weep Holes by Rytons @ 450mm horizontal c/c. Color to be Clear, Ref: RYTWECL 17:Hyload Original DPC by IKO to Damp Proof Coursing and Cavity Trays 18:Guttercrest square aluminium rainwater pipe.Size 100x75mm. Heritage textured finish. Colour TBC by IAS 19:Guttercrest RWH 236 Aluminium Rainwater Hopper. Heritage textured finish. Colour TBC by IAS 20: 140mm 7.3kN AAC common blockwork (IW02) 21:Clay 'Universal Valley' tile by Tudor Roof Tiles. Colour ref in Spec: (H60.105) 22:Code 4 lead flashing 23:Code 5 lead sheet 24:Portland Stone. Profiles and dimensions as shown in drawing. 25:Lead roof standard wood rolls 45mm height 26:18mm marine grade plywood board 27:Sika® Sarnafil® Metal PVC. Top surface to be lead grey color (Sika colour no. 9500). 28:IW03 AAC common blockwork 100mm walls. 29:Ancon meshwork joint reinforcement every three courses.(Between brick and block wall courses) 30:30 mm thick Kingspan® Thermaroof TR27/LPCFM 31: Kooltherm Cavity Closer by Kingspan (140+50) 32:140mm Kingspan® Thermaroof TR27/LPCFM 33:18mm plywood 34:Guttercrest Moulded Ogee Guttering System. Size 200x150. Heritage textured finish. Colour TBC by IAS 35: 80mm Kingspan® Optim-R insulation board 36: Light hard sand mortar. To match external brickwork mortar color. 37: Clay 'Hog's Back Ridge' Ridge tiles by Tudor Roof Tile Co.Colour ref in Spec: (H60.105) 38: 150mm Kingspan® Thermabate Cavity Closer
150x50mm C24 rafters with insulation in between. As per SE details and specifications.
-
04
38 x 19 mm battens 150x50mm C24 rafters with insulation in between. As per SE details and specifications.
Fix nails
04
05
01 03
Urban dystopia, Industrial Utopia
34
34
1 (27)609
3
Bonnet Hip Tiles - Plan 1:5@A1 1:10@A3
(27)609
4
09 09 38
20 11 28
34
Longbourne House
03
36
12 16
Bonnet Hip Tiles - Section
5
1:5@A1 1:10@A3
(27)609
Hardwood cornice. Paint finish TBC
17
Typical cornice and gutter - Section 1:5@A1 1:10@A3
150x50mm C24 rafters with insulation in between. As per SE details and specifications.
-
personal
Sketchbook
NOTE: All fixings, flashings, roll overcloaks and any general lead detail and installation requirements to meet Lead Sheet Association standards
Timber batten for lead wood roll Fix nail
38 x 19 mm battens
04
25 08
38 x 19 mm battens
NOTE:
01
To be read in conjunction with SE drawing Nos 18.078.06 & 07
01 04
23
16
1742
Woodhatch
28
05
Hive
25
2 (27)609
Lead Hip Roll - Plan 1:5@A1 1:10@A3
Notes
4 (27)609
Lead Hip Roll - Section
6
1:5@A1 1:10@A3
(27)609
Horizontal Ridge Tiles - Section
-
1:5@A1 1:10@A3
-
Project title
Key
Longbourne House - Hampshire GU32 1AU
Do not scale from this drawing Architect to be informed of all discrepencies Contractor to check all dimensions on site This drawing is copyright ©
Drawn
Checked By
Status
Scale
MC
JM
Construction
Varies
Roof Key Plan
NTS
205 Wardour Street London W1F 8ZJ t: 020 7240 4844 studio@kirkwoodmclean.com www.kirkwoodmclean.com
Drawing title
C1
07.02.20
First Issue
MC
Hip and ridge details
Drawing number
1903(27)609
Revision
C1
Paintings, Drawings and Models
37
23
‘Urban dystopia, Industrial Utopia’: where city and industry co-live.
1
1
2
3
4
2
‘Urban Dystopia, Industrial Utopia’ : Concept models 1 - Linear 2 - Tower 3 - Clusters 4 - Dispersed 5 - Hybrid 5
3
Industrial: Sea - Packaging - Transport - Industry
Commercial: Industry delivers to shop
Deliver to Shop
Shop - Transport - Home
Local: Sea - Trasport - Home
“Urban Dystopia, Industrial Utopia: where city and industry co-live’, is an escape journey to the seaside in the heart of London. The proposal consists of several structures which together form a new hybrid vertical village in Cedar Way Industrial Estate. Each structure houses a different activity related to the fishing industry present on site and the idea is the one of being able to add structures when needed thanks to an affordable and easy-to-build modular ‘kit of parts’. Specific and targeted interventions on site could transform and save the future of industrial estates giving them a new life, using Urban Acupuncture, a socio-environmental theory which uses small-scale interventions to transform a larger urban context. The use of this building philosophy makes the most of unused or poorly used existing pockets of land on site, to bring valuable social assets to the area thus enhancing the relationship between industry and the city.
‘Urban Dystopia, Industrial Utopia’: The Pond
1
3
2
4
‘Urban Dystopia, Industrial Utopia’: Cabin Typologies 1 - Sushi Shop 2- Fish and Chips 3 - Workshop Cabin 4 - Sleep Cabin
‘Urban Dystopia, Industrial Utopia’: Modular Cabin Perspective Plan 1st Floor Village Plan
Technical Studies: ‘Constructing Simply’
‘Constructing Simply’ : Technical Design Study Timber frame stuctures Roof detail for self-ventlated cabin structure
‘Hive’
‘Hive’ is a SPA and aromatherapy centre and workshop space for natural candles production and remedies. The proposal comprises of therapy and activity rooms immersed into green spaces that deliver a calming atmosphere through the re-connection with nature. All activities in the facility are carried out through the use of natural beeswax candles made from beeswax collected from local producers of honey. All basic ingredients of production are grown on site or collected locally. The building is thought to be an oasis for the ‘stressed city dweller’, and oasis of health and wellbeing. Connection with nature and natural aromas are key to the functioning of the centre. The Hive includes three gardens and a public greenhouse where the user can be fully immersed into nature and take advantage from the fragrance and benefits of chamomile, mint and lavender. The structure of the building itself aims to establish a connection between space, user and experience. The use of wood for structure and cladding enhances the earthy and natural feel and provides a comforting and soothing environment. Rooms are either gardens themselves or are surrounded by courtyards that ‘introduce’ the user to nature before carrying out activities such as yoga or private therapy.
‘Hive’: Concept Collages - From left to right: Release, Sleep, Energy
10
10
6
6
15
10
UP UP
DOWN
11 12 10 8 7
7
7
6
4
5 13
6 UP
DOWN
DOWN
UP
10
DOWN
11 12 10
7 4
5
7 UP
DOWN
N
DOWN
DOWN
N
15
SCALE 1:200
8
First Floor 4 - Storage 5 - Delivery 6 - Changing Room 7- Private Therapy Room 8 - Counter
10 UP
FIRST FLOOR 4- Storage 5- Delivery 6- Changing Room 7- Private Therapy Room 8- Counter 7
10
N
DOWN
UP
14
SCALE 1:200
10
UP
FIRST FLOOR 4- Storage 5- Delivery 6- Changing Room 7- Private Therapy Room 8- Counter
10
9
Third Floor 10 - Workshop Space 11 - Workshop Storage 13 12 - Sauna 13 - Steam Room 14 - Shower Pods 15 - Mint Garden
14
N
UP
DOWN
10
DOWN
10
16
10
10
11
11
10
10 17
7
7 DOWN
7
10
UP
10
9
10
DOWN
N
DOWN
10
SECOND FLOOR 7- Private Therapy Room 9- Yoga Studio 10- Workshop Space 11- Workshops Store
11 10
N
16
SCALE 1:200
UP
10 DOWN
10
11 10
7
7 17 7
HIVE FACTORY - SPA
SecondFloor 7 - Private Therapy Room 9 - Yoga Studio 10 - Workshop Space 11 - Workshop Storage
HIVE FACTORY - SPA
DOWN
UP
HIVE
N
FACTORY - SPA
SCALE 1:200 SECOND FLOOR 7- Private Therapy Room 9- Yoga Studio 10- Workshop Space 11- Workshops Store
Fourth Floor 10 - Workshop Space 11 - Workshops Store 16 - Lavander Garden 17 - Chamomile Garden
HIVE FACTORY - SPA
DOWN
N
‘Hive’: Shower pods and courtyard introductory spaces
The proposal can be considered as a clean green lung for Kings Cross. With the introduction of such a large amount of plants, there would be major benefits in terms of quality of the air. Research has shown that greenery sensibly lowers the amount of polluted air that gets into a building, acting as a filter and absorbing the harmful particles dissolved in the air of London. Courtyards and indoors gardens enhance this aspect delivering a very clean environment suitable for treatments and therapies. The space includes of three main gardens: the mint garden, energising and rinvigorating, the chamomile garden, connected to the world of dreams and sleep, and the lavender garden, a stress relief space, calming and peaceful.
‘Hive - essence’: The Lavender Grden Wax studies - texture, light and shadow Plant studies - lavender, mint and chamomile
ROYAE VALE ROYALE
3
YORK WAY
1
2
UP
4
5
N UP
SCALE 1:200 GROUND FLOOR 1- Patio Entrance 2- Café - Shop - Showroom 3- Indoors Garden - Public Space 4- Storage 5- Delivery
Ground Floor 1 - Patio Entrance 2 - Café - Shop - Showroom 3 - Indoors Garden - Public Space 4- Storage 5- Delivery
‘Hive’: Top - Longitudinal section (mixed media), Bottom - Ground Floor Plan
NOTE: All fixings, flashings, roll overcloaks and any general lead detail and installation requirements to meet Lead Sheet Association standards
External Wall Details Key
C3
01: (F10.110) Woodfire "mixed HG Matthews. Mortar to be Fine Lime. 02: (F10.110R) Woodfire "mix bricks by HG Matthews. M Heritage Fine Lime. 03: (F10.111) Woodfire "lights HG Matthews. Mortar to be Fine Lime. (Brick columns, reveals, Quoins and plinth 04: (F10.111R) Woodfire "ligh bricks by HG Matthews. M Heritage Fine Lime. (Windo and Plinth above DPC) 05: (F10.112) Woodfire "darks MG Matthews. Mortar to be Fine Lime.(Window reveals below DPC) 06: (F10.112R) Woodfire "dar bricks by HG Matthews. M Heritage Fine Lime.(Windo and Plinth below DPC) 07: (F10.113) Woodfire "lights by HG Matthews. Mortar to Fine Lime. 08: (F10.113R) Woodfire "ligh cant bricks by HG Matthew be Heritage Fine Lime. 09: (F10.TBC) Brick - slips sp TBC. Durability rating F2. 10: (F30.160) air bricks TBC. 11: (F30.130) Rytweep© Wee Rytons @ 450mm horizont to be Clear, Ref: RYTWEC 12: (F10.335) IW01 Concrete blockwork.10N/mm2 Load walls. 13: (F10.360) IW02 ACC com blockwork 140mm walls. 14: (F10.361) IW03 AAC com blockwork 100mm walls. 15: (F30.155A) 100mm Kings Kooltherm K108 cavity boa 16: (F30.155B) 100mm Kings Kooltherm K108 cavity boa fitted to curve 17: (F30.155C) 75mm Kingsp K108 cavity board insulatio 18: (F30.160A) Telescopic un ventilator 19: (F30. 180) Kingspan Therm cavity closer 20: (F30.330A) DPC specifica 21: (J40.TBC) Cavity drain me specifications TBC 22:(P10.TBC) Foamglass flex barriers. Refer to SE's deta 23:(G10.TBC) 100x100x10 SH plate with anchor bolts to fo SE's details and specificati 24:(F30.270) Ancon meshwor reinforcement every three courses.(Between brick an courses) 25:(F30.TBC) Bricktor meshw reinforcement every three (Only between plinth brick 26:(F30.TBC) Movement joint filler TBC 27:(F30.TBC) Ancon PPS wa debonding sleeves, at 450 centres. 28:(F30.TBC) Ancon ST1 wal 225mm vertical centres. 29:(F30.TBC) Woodfire "lights Brick by HG Matthews. Mo Heritage Fine Lime. 30:(R10. 370A)RW2 Heritage Aluminium rainwater pipe b Powdercoated finish, colou 31:(F21.110A)Portland Stone dimensions as shown draw 32:(F10.TBC) Woodfire "mixe bricks by HG Matthews. M Heritage Fine Lime. 33:(TBC) Code 6 Lead roof on plywood and timber firrings 34:(TBC) Lead roof standard 45mm height. Refer to roo location 35:(TBC) Slot drainage TBC 36:(TBC) Damp Proofing Mem 37:(Z22.TBC) Sealant 38:(TBC) Hardwood cill TBC 39:(F30.TBC) 40mm Kingspa K108 Cavity Board 40:(TBC) Code 6 lead flashing 41:(TBC) 120mm Kingspan T TR27 LPC/FM insulation b 42:(H21.130A) Breather mem 43: (TBC) 45 mm thick Kingsp Thermaroof TR27/LPCFM 44: (TBC) DuPont™ AirGuard control layer 45: (TBC) Foamglas® perinsu
D
C3 Cill level 116.740
C3 Top coping 116.620
C3
Rooflight system TBC by IAS
20
C3 33
45 40
150 min
34
150 min
42
C3
Cavity closer to run all the way over the conservatory roof area
11
C3 40
24
43
Roof FL 116.285
230
Rooflight upstans structure in abeyance
FF FFL 116.115
45x45 timber fillet 44
FF SSL 115.995
41 Roof SSL 115.900
152 x 152 x 30 UC as per SE details and specifications with timber infills
C3 GF CFL 115.665
GF CFL 115.665
13
Timber joist hanger as per SE details and specifications
17 14
150 x 100 C24 flat roof joist as per SE details and specifications
24
250x150x6.3 RHS + 10mm BTM PLT as per SE details and specifications Lintel Soffit 115.285 GF CFL 115.265
1 (21)626
Conservatory Rooflight - Section
-
1:5@A1 1:10@A3
Notes
-
Practice Kirkwood Mclean Architects ‘Longbourne House’ RIBA Stage 4/5 (Design and Build)
Key
Do not scale from this drawing Architect to be informed of all discrepencies Contractor to check all dimensions on site This drawing is copyright ©
Project title
Longbourne House - Hampshire GU32 1AU
C3 C2
02.12.19 04.11.19
Levels updated, roof detail updated and note added Structure updated
MC MC
C1
01.11.19
First Issue
MC
Drawing title
External wall details - Conservatory Rooflight
Drawn
Checked By
Status
Scale
MC
JM
Construction
1:5 @A1 1:10 @A3
Drawing number
1903(21)626
Revision
C3
GF Key Plan NTS
205 Wardour Str London W1F 8ZJ t: 020 7240 4844 studio@kirkwood www.kirkwoodm
Partitions Details Key
16
16
16
15 15
70
12 12.5
15 15
70
18
15
19
51
18 12.5
3
15 15
150
18 15
3
01
01
09
01
16
02
11
16
02
16
10
16
12
12
11
12
02
16
CL
NOTE:
CL
To be read in conjunction with 1903(22)600
CL
42
Smoke Detector
Twin Directional Downlight
HD
Heat Detector
LED Strip Light
HD
Heat Detector Sounder Base
Lighting Outlet
5
Plastered-in Speaker
Bulkhead
BE
Tiling Zone
1
03
IWS 02
03
1:2@A1 1:4@A3
(22)600
IWS 03
04
1:2@A1 1:4@A3
(22)600
(22)600
06
IWS 05
1:2@A1 1:4@A3
IWS 06
(22)600
2
1:2@A1 1:4@A3
1075
420
CL
205
C2
EQ
C3
SM2 Medium Georgian Cornice w124 x h118mm
Single Boarded MR Plasterboard Finish
C
Security Shutter Control Box
CB: XX
Fixed Hatch
CLR
Centreline of Room
Note: To be read in conjunction with: MBL drawings and specifications Newlands specification for AV Absolute Security for security
EQ
725
C2
CLIENT SIGN - OFF COMMENTS
SIGNATURE
A
P
134 O/A 15 15
70
15 15
117 O/A
128 O/A
3
100
01
01
01
02
11
16
12
11
16
12.5 12.5
3
14 O/A 3 11
178 O/A
100
18
150
12.5 12.5
3
01
01
02
16
02
02
B
02
12
07
C
2425
CL
CO 2395
08
1315
16
ED.G.01 - B
01
3
3
EQ
18 15
1835
150
1140
216 O/A 3 15 15
C2
SM16 Large Georgian Cornice w145 x h138mm
865
STATUS
EQ
725
SM29 Grand Georgian Cornice w200 x h200mm
Fire-Rated Double Boarded Plasterboard Finish
B
Fancoil Unit
C1
Single Boarded Plasterboard Finish
A
Exposed Ventilation
1835
Bathrooms / Toilets / Cloackrooms
05
IWS 04
1:2@A1 1:4@A3
420
2455
02 (22)600
1105
CL
EW.G.01 - D
Full height tiling to shower walls only
400
06
WIFI Point PIR Recessed LV Control Head GENERAL
Concealed Ventilation
03
C2
IWS 01
Access panel to rear face of bulkhead (Centrepoint)
VENTILATION
ED.G.01 - A
03
13
05
04
06
04
390
03 13
1:2@A1 1:4@A3
Bass Enhancer
COMMUNICATION SERVICES
Bulkhead Fitting
AP 04
03
01
Flushmount Speaker
ACCESS
16
04
(22)600
Carbon Monoxide Detector, Smoke Head and Sounder
CO
SOUND
LED Tape Light
42
5
Aspirating Smoke Detector
SD
Access Hatch
05
Smoke Detector / Sounder
AS
Directional Downlight
LED Power Outlet
-C
01
01
FIRE SERVICES
Pendant Light with P 300x300 plywood pattress Downlight
425
01
01
LIGHTING
EW.G.01 - B
1 .0 .G
01
12.5 12.5
3
103 O/A
3
CEILING MOUNTED DEVICES
EW
01 16
51
3
-A
19
C2
B
1
15 15
3
3
A
.0
70
3
137 O/A
C2
01: 3mm Skim Coat 02: 12.5mm Soundblock Plasterboard 03: 70mm Gypframe C-stud 04: 50mm APR 1200 Insulation 05: 70mm Gypframe I-stud 06: 19mm Gyproc CoreBoard 07: 11mm Thistle Hardwall 08: 3mm Thistle MultiFinish 09: 12.5mm Glasroc TileBacker 10: 12mm Plywood 11: 15mm Soundblock MR Plasterboard 12: 18mm Plywood 13: G110 - 45mm Gypframe Retaining Channel 14: 100mm Kingspan Koolterm K7 Pitched Roof Board 15: 100x50mm timber studs 16: 15mm Soundblock Plasterboard
216 O/A
127 O/A
.G
15 15
98 O/A
EW
3
134 O/A
1525
04
04
03
03
14
14
15
15
1320
1320
1075
205 Wardour Street London W1F 8ZJ t: 020 7240 4844 studio@kirkwoodmclean.com www.kirkwoodmclean.com
Revision
Longbourne House - Hampshire GU32 1AU All fixtures location within joinery TBC by IAS Leave long cables for joinery fixtures. All items in PURPLE are within joinery. Finishing to be done with joinery.
(27)609
Typical cornice and gutter - Section 1:5@A1 1:10@A3
-A 1 .0 .G EW
AG M
1 EQ
TV
565
255 165135135
165
2
+450
EQ
Drawing Room G01
51.15 m2 2790 AAFL A
UFH
TV Screen
Fire Alarm Interface controlling door locks
RC
Samsung Room Controller
PA
Panic Alarm
Internal Sounder
MS
Movement Sensor
KP
Intruder Alarm Keypad
MAG
Magnetic Door Contact
C1
SM29 Grand Georgian Cornice w200 x h200mm
TRS
Tremble Sensor window mounted
SM16 Large Georgian Cornice w145 x h138mm
DL
Emergency Door Lock window mounted
C2
C3
SM2 Medium Georgian Cornice w124 x h118mm
Recessed Floor Box
To be read in conjunction with: MBL drawings and specifications Newlands specification for AV Absolute Security for security 1903(43)600 for typical services dimensions 1903(43)601 for typical setting out of devices CLIENT SIGN - OFF STATUS
COMMENTS
SIGNATURE
55
220 B
04
745
C
140
570 from blockwork
+1400
CL 01
EQ finished wall
To be read in conjunction with SE drawing Nos 18.078.06 & 07
EQ finished wall
635 from blockwork
NOTE:
+450
+1400
TRS
08
Thermostat
FAI
Note: All heights from FFL to center of the device/equipment
1010
Location provided within joinery
25
Underfloor Heating
TC
A
MAG
ED.G.01 - B
37
23
Switch Fuse In wall speakers
Power Outlet
FLOOR MOUNTED DEVICES
DL
04
01
Control Switch Plate 2 gang
SP
TV Backbox TV04 / TV07 / TV08
FB
140 +2100
+450
+1400
SO
CL
38 x 19 mm battens
2
Floor Spotlight
Plant Switch Fuse
2500
140
Fix nail
23
Touch Screen Control Control Switch Plate 1 gang
IS
300
EQ
2500
Location provided within joinery
Timber batten for lead wood roll 38 x 19 mm battens
Location provided within joinery
EQ
Quadplex TV/FM/ Satelite Outlet
1
SP
TV B
Pop Up TV Unit
KNX PANEL Fire Alarm Sounder
TSC
Wall Spotlight
Telephone/Data Dual Outlet
55
5
1:5@A1 1:10@A3
TV
Switch Fuse
+1400
Bonnet Hip Tiles - Section
150x50mm C24 rafters with insulation in between. As per SE details and specifications.
-
Shaver Outlet
Lighting Control
MAG
(27)609
4
SO
Lighting Outlet P
Location provided within joinery
DL
1:5@A1 1:10@A3
17
EQ
TRS
3
Bonnet Hip Tiles - Plan
Hardwood cornice. Paint finish TBC
EQ
MAG
16
TRS
Q
E EQ
KNX PANEL
Double Socket 13A
U Double USB socket 13A
EW.G.01 - D
12 34
MAG
Location provided within joinery
Double Socket 5A
Wall Light
CL
-C
28
03
CL
Distribution Board
Single Socket 5A
1
11
WALL MOUNTED DEVICES
.0
20
C1
S
38
205 Wardour Street London W1F 8ZJ t: 020 7240 4844 studio@kirkwoodmclean.com www.kirkwoodmclean.com
TR
09
1:25 @A1 1:50@A3
Revision
EW.G.01 - B
AG
09
Scale
B
Location provided within joinery
M
34 36
Construction
.G
01 03
Status
JM
1903(35)160
RCP - Ground Floor
LP
Checked By
LP
EW
04
05
First Issue
28.02.20
Drawn
Drawing number
Drawing title
A
01: Clay Roof tiles by Tudor Roof Tile Co. Colour ref in Spec: (H60.105) 02:Clay 'Mono Ridge' Ridge tiles by Tudor Roof Tile Co.Colour ref in Spec: (H60.105) 03:Clay 'Bonnet' Hip Tiles by Tudor Roof Tile Co. Colour ref in Spec: (H60.105) 04:Nilvent Breather membrane by Kingspan 05:100mm K7 Kooltherm Pitched Roof board between rafters by Kingspan 06:72.5mm K118 insulated plasterboard by Kingspan to ceiling (32.5mm over steels) with 3mm skim 07:DuPont™ AirGuard® vapour control layer 08:Ventilated Dry Ridge System by Marley 09:25mm Universal Eaves Ventilation System by Marley 10:Universal RidgeFast System by Marley 11:100mm Kingspan Kooltherm K108 Cavity Board insulation 12:Woodfire 'mixed' bricks by HG Matthews. 10mm Mortar joint to be Heritage Fine Lime 13: Kooltherm Cavity Closer by Kingspan (145+50 to cavity along Gridline 4) 14:Foamglas® perinsul HL 15:Sika® Sarnafil® G 410-15 EL adhered membrane. Top surface to be lead grey color (Sika colour no. 9500). Adhesive as per manufacturers recommendation. 16:Rytweep© Weep Holes by Rytons @ 450mm horizontal c/c. Color to be Clear, Ref: RYTWECL 17:Hyload Original DPC by IKO to Damp Proof Coursing and Cavity Trays 18:Guttercrest square aluminium rainwater pipe.Size 100x75mm. Heritage textured finish. Colour TBC by IAS 19:Guttercrest RWH 236 Aluminium Rainwater Hopper. Heritage textured finish. Colour TBC by IAS 20: 140mm 7.3kN AAC common blockwork (IW02) 21:Clay 'Universal Valley' tile by Tudor Roof Tiles. Colour ref in Spec: (H60.105) 22:Code 4 lead flashing 23:Code 5 lead sheet 24:Portland Stone. Profiles and dimensions as shown in drawing. 25:Lead roof standard wood rolls 45mm height 26:18mm marine grade plywood board 27:Sika® Sarnafil® Metal PVC. Top surface to be lead grey color (Sika colour no. 9500). 28:IW03 AAC common blockwork 100mm walls. 29:Ancon meshwork joint reinforcement every three courses.(Between brick and block wall courses) 30:30 mm thick Kingspan® Thermaroof TR27/LPCFM 31: Kooltherm Cavity Closer by Kingspan (140+50) 32:140mm Kingspan® Thermaroof TR27/LPCFM 33:18mm plywood 34:Guttercrest Moulded Ogee Guttering System. Size 200x150. Heritage textured finish. Colour TBC by IAS 35: 80mm Kingspan® Optim-R insulation board 36: Light hard sand mortar. To match external brickwork mortar color. 37: Clay 'Hog's Back Ridge' Ridge tiles by Tudor Roof Tile Co.Colour ref in Spec: (H60.105) 38: 150mm Kingspan® Thermabate Cavity Closer
38 x 19 mm battens 150x50mm C24 rafters with insulation in between. As per SE details and specifications.
34
830 250
Project title
Key
C1
150x50mm C24 rafters with insulation in between. As per SE details and specifications.
-
Fix nails
1
420
C2
1903(22)600
04
(27)609
Do not scale from this drawing Architect to be informed of all discrepencies Contractor to check all dimensions on site This drawing is copyright © Sheet in colour. Do not print in black & white. Do not photocopy.
EQ
1:2@A1 1:14@A3
Pitched Roof Details Key 3
Key Plan
+1400
Second Floor - Internal Wall Lining Types
-
EQ
LP
Scale
Construction
980
First Issue
Status
JM
S
03.02.20
Checked By
LP
TR
C1
Notes
Drawn
Drawing number
Drawing title
CL
NTS
EQ finished wall
LP
ID.G.01
EQ finished wall
Wall partitions types updated
G01 RCP
1:25@A1 1:50@A3
615 from blockwork
13.02.20
(35)160
+450 +450
NOTE: All fixings, flashings, roll overcloaks and any general lead detail and installation requirements to meet Lead Sheet Association standards
C2
1
WLS 01
1:2@A1 1:4@A3
605 from blockwork
Longbourne House - Hampshire GU32 1AU
(22)600
750
Blockwork wall location
Joinery backpanel
Bathrooms / Toilets / Cloackrooms
Project title
Key
Do not scale from this drawing Architect to be informed of all discrepencies Contractor to check all dimensions on site This drawing is copyright ©
12
IWLS 03
1:2@A1 1:4@A3
+1400
11 (22)600
2
IWLS 02
1:2@A1 1:4@A3
C1
+450 +450
(22)600
CL
ID.G.01 - A
SP
10
IWLS 01
1:2@A1 1:4@A3
CL
Refer to 1903(22) series blockwork setout plans for blockwork types
CL
420
+1100
09 (22)600
A
CL
+450
Notes
IWS 08
1:2@A1 1:4@A3
NOTE:
2790 AAFL
+450
08 (22)600
ID.G.02 - B
IWS 07
1:2@A1 1:4@A3
G01 51.15 m2 05
EW.G.01 - E
07 (22)600
C2
Drawing Room
03
140 2660
165135
16
1742
28
Horizontal Ridge Tiles - Section
-
1:5@A1 1:10@A3
-
Roof Key Plan
NTS
G01 Coordinated Services
TBC
1 (43)160
TBC
1:25@A1 1:50@A3
SPTC
45
1
360
+1100+1100
870
260 135
135165
+450 +450 +450
100
(27)609
ID.G.01
TBC BY IAS
6
1:5@A1 1:10@A3
TBC TBC TBC
Lead Hip Roll - Section
ID.G.01 - A
845
45 335
-
TBC
4 (27)609
+2500
45 360
MS
1:5@A1 1:10@A3
325 45
+2750
Lead Hip Roll - Plan
C1
TRS
2
255 120
MS
3 (27)609
ID.G.02 - B
MAG
Location provided within joinery
EW.G.01 - E
05 25
TSC
MS Notes
Project title
Key
Longbourne House - Hampshire GU32 1AU
Do not scale from this drawing Architect to be informed of all discrepencies Contractor to check all dimensions on site This drawing is copyright ©
Drawn
Checked By
Status
Scale
MC
JM
Construction
Varies
Notes
205 Wardour Street London W1F 8ZJ t: 020 7240 4844 studio@kirkwoodmclean.com www.kirkwoodmclean.com
Drawing title
C1
07.02.20
First Issue
MC
Hip and ridge details
Drawing number
1903(27)609
Revision
C1
‘Longbourne House’: Contruction detail drawings Top - Internal wall partitions types and buil-up Bottom - Hip and Ridge details for pitched roof
Do not scale from this drawing Architect to be informed of all discrepencies Contractor to check all dimensions on site This drawing is copyright © Sheet in colour. Do not print in black & white. Do not photocopy.
Project title
Key
Longbourne House - Hampshire GU32 1AU All fixtures within joinery TBC by IAS Leave long cables for joinery fixtures All items in PURPLE are within joinery. Finishing to be done with joinery. 28.02.20
First Issue
LP
Drawn
Checked By
Status
LP
JM
Contruction
Drawing number
Drawing title
C1
Key Plan
NTS
Coordinated Services - Ground Floor
1903(43)160
Scale
1:25 @A1 1:50@A3
205 Wardour Street London W1F 8ZJ t: 020 7240 4844 studio@kirkwoodmclean.com www.kirkwoodmclean.com
Revision
C1
‘Longbourne House’: Services for first fix Top - Coordinated Services (wall mounted and floor services, light, small power, fire and security) Bottom - RCP plans (ceiling mounted services, light, fire and security access panels and ventilation)
Woodhatch Lake and Pool is a private residential leisure facility in East Surrey. The project is in Stage 2 approaching Stage 3, Tender package is being issued. The proposal consists of an underground swimming pool with skylight from which it is possible to see the above lake/pond. Above some options fro the skylight design. On the cover and top of the page the final design chosen by the client.
Practice Kirkwood Mclean Architects ‘Woodhatch Lake and Pool’ RIBA Stage 2/3
Top- Underground pool views Bottom - Silhouette of skylight roof seen from above the lake Proposed Section and Perspective Section Model
Personal Work Sketchbook
‘Historical Beauty 1’ Fine Liner
‘Historical Beauty 2’ Collage
‘Voices’ Tempera and Marker
‘Hide and Seek’ Acrylic
Jacques Louis David Woman in a Turban 1794 Graphite
Giovanni Bellini Portrait of the Doge Leonardo Loredan Face detail Graphite
‘Chair 1’ Mixed Media
‘Chair 2’ Mixed Media
Personal Work Drawings Paintings and Models