Construction Document - West Hollywood Housing

Page 1

Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

WEST HOLLYWOOD HOUSING PETER HO

SANTA MONICA BLVD

SPAULDING AVE

USE: BUOLDING HEIGHT: SITE LOCATION:

MULTI FAMILY HOUSING 42'-0" 1047 N SPAULDING AVE W HOLLYWOOD, CA 90046

LEGAL DESCRIPTION APN: OCCUPANCY GROUP: TYPE OF CONSTRUCTION: ZONING:

5530015029 R-2 / S-1 VA R3B

SITE DATA LOT SIZE (ACRES): LOT SIZE (SF):

0.298 ACRES 13,000 SF

FOOTAGE DATA PROPOSED BUILDING AREA: 8,024 SF FLR1: 4,256SF FLR2: 3,742SF

CONSTRUCTION MANAGER MICHAEL FOX 3801 W. TEMPLE AVE. POMONA, CA 91768 MICHAELFOX@CPP.EDU STRUCTURAL ENGINEER GARY L MCGAVIN 3801 W TEMPLE AVE, POMONA, CA 91768 GMCGAVIN@CPP.EDU

STORIES: DWELLING UNITS:

MECHANICAL ENGINEER

4 ABOVE GRADE 12

HOFU WU 3801 W TEMPLE AVE, POMONA, CA 91768 HWU@CPP.EDU CODE ANALYST ANDREW J. THUL 3801 W TEMPLE AVE, POMONA, CA 91768 ATHUL@CPP.EDU

SYMBOLS LEGEND 1 A101

SIM 1

REVISION CLOUD & TAG

CALLOUT SYMBOL

1

SIM

SECTION SYMBOL

A101

STRUCTURE GRID HEAD

1

A101

Ref 1

NORTH ARROW

Ref

LEVEL ELEVATION HEAD

Ref

Ref 1

Name Elevation

BARRY MILOFSKY 3801 W TEMPLE AVE, POMONA, CA 91768 BARRY@M2A-ARCHITECTS.COM

PROPOSED PARKING AREA: 11,971 SF PARKING SPACES: 23

VICINITY MAP 12" = 1'-0"

0

CHUNYI HO 3400 POLY VISTA, POMONA, CA 91768 PETERHO0103@GMAIL.COM MAIN PROJECT MANAGER

FLR3: 3,798SF FLR4: 1,904SF

1

ELEVATION MARK

SHEET LIST

OWNER

PROPOSED LOT COVERAGE: 61.7%

INCREASE DENSITY SB1818 2 UNIT AFFORDABLE HOUSING 1

PROJECT CONSULTANTS

GOVERNING CODES 2016 CALIFORNIA RESIDENTIAL CODE 2016 CALIFORNIA BUILDING CODE 2016 CALIFORNIA ELECTRICAL CODE 2016 CALIFORNIA MECHANICAL CODE 2016 CALIFORNIA PLUMBING CODE 2016 CALIFORNIA ENERGY CODE 2016 CALIFORNIA ELEVATOR SAFETY ORDERS 2016 CALIFORNIA FIRE CODE 2000 WEST HOLLYWOOD MUNICIPAL CODE

Sheet Number G0.00 G0.01 G1.01 G1.02 G1.03 A1.01 A1.02 A1.11 A1.21 A1.22 A1.23 A1.24 A1.25 A2.01 A3.01 A3.02 A3.11 A4.01 A4.11 A4.31 A5.01 A6.01 A7.01 A8.01 A8.02 S1.01 S1.02 S2.01 S3.01 S3.02 E1.01 E1.11 E1.12 E1.21 M1.01 M1.02 M1.03 M1.04 P1.01 P1.02 P1.03 P1.04

Sheet Name TITLE SHEET GENERAL NOTES FIRE RESISTING RATING FIRE RESISTING RATING FIRE RESISTING RATING SITE PLAN LANDSCAPE PLAN FOUNDATION PLAN PARKING LEVEL PLAN FIRST FLOOR PLAN SECOND FLOOR PLAN THIRD FLOOR PLAN FORTH FLOOR & ROOF PLAN ELEVATIONS SECTION SECTION WALL SECTION UNIT PLAN INTERIOR ELEVATION ENLARGED WALL SECTION DETAILS DOORS & WINDOW SCHEDUAL REFLECTED CEILING PLAN VERTICAL CIRCULATION VERTICAL CIRCULATION DETAILS STACK STRUCTURE FRAMING FRAMING CORNER DETAIL 3D STRUCTURE DETAIL GRAVITATIONAL LOAD DIAGRAM LATERAL LOAD DIAGRAM LIGHTING DESIGN CONCEPT ELECTRICAL PLAN LIGHTING FIXTURE SEPSIFICATION UNIT LIGHTING RENDER R-VALUE ESTIMATION DUCT SIZING AC UNIT SELECTION HVAC CONCEPT DIAGRAM COLD & HOT WATER SEWER & VENT KITCHEN FIXTURE SPECIFICATION BATHROOM FIXTURE SPECIFICATION

ARC303 WEST HOLLYWOOD HOUSING

TITLE SHEET 2018/05/30 Peter Ho Barry Milofsky

G0.00 As indicated

30 May 2018 3:05:52 AM

PROJECT INFORMATION

VICINITY MAP


GENERAL NOTE

WEST HOLLYWOOD MUNICIPAL CODES

DETAILS

ADA

1. ALL WORK SHALL BE IN COMPLIANCE WITH ALL APPLICABLE LOCALBUILDING CODES AND REGULATIONS. CONTRACTOR SHALL BERESPONSIBLE FOR PERMITS APPLICABLE TO SPECIFIC TRADES ORSUBCONTRACTORS

HIGH-RISE TRAINING FOR OCCUPANTS REQUIRED (S 14.08.010:) ALL HIGH-RISE BUILDING OCCUPANTS SHALL BE INSTRUCTED ANNUALLY ON THE PROCEDURES TO BE FOLLOWED IN THE EVENT OF FIRE, EARTHQUAKE, OR OTHER EMERGENCY. DOCUMENTATION OF OCCUPANT INSTRUCTION SHALL BE MAINTAINED BY THE FIRE SAFETY DIRECTOR OF EACH HIGH-RISE BUILDING, AND SHALL BE AVAILABLE FOR INSPECTION BY THE FIRE MARSHAL. INSTRUCTION FOR ALL NEW OCCUPANTS SHALL OCCUR WITHIN FOURTEEN DAYS OF THEIR ASSUMING OCCUPANCY OF THE BUILDING.

EXTERIOR WALL OPENINGS (TABLE 705.8:) NORTH ELEVATION: 5 FT. TO LESS THAN 10 FT. = 25% OF WALL PROTECTED SOUTH ELEVATION: 5 FT. TO LESS THAN 10 FT. = 25% OF WALL PROTECTED WEST ELEVATION: 15 FT. TO LESS THAN 20 FT. = 75% OF WALL PROTECTED EAST ELEVATION: 25 FT. TO LESS THAN 30 FT. = NO LIMIT

ADA REQUIREMENTS: FOUND IN CHAPTER 11 A, RESIDENTIAL, AND FAIR HOUSING ACT ELEVATOR CONNECTS TO ALL FLOORS. ALL UNITS MUST BE ADA COMPATIBLE, ADA ADAPTABLE/ACCESSIBLE. AREAS REQUIRED: BATHROOMS, KITCHENS, DOORS, AND HALLWAYS.

GREEN BUILDING REQUIREMENTS (S 15.64.020:) ALL NEW PUBLIC BUILDINGS OR ADDITIONS TO PUBLIC BUILDINGS OF 10,000 SQUARE FEET OR MORE, OR PUBLIC BUILDING TENANT IMPROVEMENT AND MAJOR REMODEL PROJECTS 10,000 DQUARE FEET OR MORE, SHALL ACHIEVE THE LEED-CERTIFIED LEVEL AT A MINIMUM.

DOORS (S 1010.2:) EGRESS DOORS SHALL BE OF THE PIVOTED SIDE-HINGED SWINGING TYPE. EXCEPTION: DOORS WITHIN OR SERVING A SINGLE DWELLING UNIT IN GROUPS R-2 AND R-3.

3. ALL SUBCONTRACTORS TO THE GENERAL CONTRACTOR SHALLINSPECT THE SITE AND SHALL CONVEY ANY QUESTIONSREGARDING DESIGN INTENT AND S COPE OF WORK TO THEARCHITECT PRIOR TO SUBMITTING BID AND PRIOR TO COMMENCINGWORK. 4. CONTRACTOR SHALL COORDINATE THE WORK OF THE VARIOUSTRADES AND SUBCONTRACTORS AND SHALL BE RESPONSIBLE FORANY ACTS, OMISSIONS, OR ERRORS OF THE SUBCONTRACTORS ANDOF PERSONS DIRECTLY OR INDIRECTLY EMPLOYED BY THEM. 5. CONTRACTOR TO ASSUME SOLE RESPONSIBILITY FOR JOB SITECONDITIONS INCLUDING SAFETY OF PERSONS AND PROPERTY FORTHE DURATION OF THE PROJECT. 6. CONTRACTOR TO NOTIFY ARCHITECT IMMEDIATELY AND PRIOR TOORDERING OF ALL LONG LEAD ITEMS AND OF APPROXIMATEDELIVERY DATES.

RESIDENTIAL DENSITY IN R1 AND R2 ZONES (S 19.060.050:) FOR R-2 OCCUPANCY: 2 UNITS PER LOT OF LESS THAN 4,000 SQ. FT.; 3 UNITS PER LOT BETWEEN 4,000 SQ. FT. AND 7,999 SQ. FT.; 4 UNITS PER LOT BETWEEN 8,000 SQ. FT. AND 9,999 SQ. FT.; PLUS 1 ADDITIONAL UNIT PER LOT, FOR EACH 2,000 SQ. FT. OF FRACTION THEREOF IN EXCESS OF 9,999 SQ. FT. AFFORDABLE UNITS REQUIRED (S 19.22.030:) A. REQUIREMENT: INCLUSIONARY UNITS. IN THE QUANTITY AND OF THE QUALITY SPECIFIED IN SUBSECTIONS B AND D OF THIS SECTION. B. PROJECTS OF ELEVEN TO TWENTY UNITS: TWENTY PERCENT OF THE UNIT COUNT PROVIDED AS UNITS OF COMPARABLE SIZE AND FINISH QUALITY TO THE NONINCLUSIONARY UNITS, OR PROVIDED AS UNITS THAT ARE

11. THESE NOTES TO APPLY TO ALL DRAWINGS AND GOVERN UNLESSMORE SPECIFIC REQUIREMENTS ARE INDICATED APPLICABLE TOPARTICULAR DIVISION OF THE WORK. SEE SPECIFICATIONS ANDGENERAL NOTES IN THE SUBSECTIONS OF THESE DRAWINGS.

SPECIAL PROVISIONS (S 510.2:) A BUILDING SHALL BE CONSIDERED AS SEPERATE AND DISTINCT BUILDINGS FOR THE PURPOSE OF DETERMINING LIMITATIONS, CONTINUITY FOR FIRE WALLS, LIMITATION IN NUMBER OF STORIES, AND TYPE OF CONSTRUCTION WHERE ALL OF THE FOLLOWING CONDITIONS ARE MET: 1. THE BUILDING SEPERATED WITH A HORIZONTAL ASSEMBLY HAS A FIRE RESISTANCE RATING OF NOT LESS THAN 3 HOURS. 2. THE BUILDING BELOW THE HORIZONTAL ASSEMBLY IS NOT GREATER THAN ONE STORY ABOVE GRADE PLANE. 3. THE BUILDING BELOW THE HORIZONTAL ASSEMBLY IS OF TYPE A CONSTRUCTION. 4. SHAFT, STAIRWAY, RAMP, AND ESCALATOR ENCLOSURES THROUGH THE HORIZONTAL ASSEMBLY SHALL NOT HAVE LESS THAN A 2-HOUR FIRE RESISTANCE RATING WITH OPENING PROTECTIONS IN ACCORDING WITH SECTION 716.5

SET BACK SETBACKS FRONT: 25 FT. ALLOWED 25 FT. PROVIDED N SIDES: LEVELS

5 FT. ALLOWED + 3 FT. FOR UPPER

S SIDES: LEVELS

5 FT. ALLOWED + 1 FT. FOR UPPER

REAR:

15 FT. ALLOWED 15 FT. PROVIDED

8 FT. PROVIDED

6 FT. PROVIDED

RAMP (S 1012:) GARAGE RAMP IS NOT A RAMP: SLOPE <2% HANDRAILS (S 1014.2:) HANDRAILS HEIGHT, MEASURED ABOVE STAIR TREAD NOSING, OR FINISH SURFACE RAMP SLOPE, SHALL BE UNIFORM, NOT LESS THAN 34 INCHES AND NOT MORE THAN 38 INCHES. HANDRAIL HEIGHT OF ALTERNATING TREAD DEVICES AND SHIPS LADDERS, MEASURE ABOVE TREAD NOSINGS, SHALL BE UNIFORM, NOT LESS THAN 30 INCHES AND NOT MORE THAN 34 INCHES.

REVISIONS

GARAGES (S 405.3:) PARKING GARAGES ARE PROVIDED WITH AUTOMATIC SPRINKLER SYSTEMS WHERE THE LOWER STORY IS THE ONLY STORY THAT WOULD QUALIFY THE BUILDING AS AN UNDERGROUND BUILDING AND HAS AN AREA NOT GREAER THAN 1,500 SQ. FT. AND HAS AN OCCUPANT LOAD LESS THAN 10.

10. WHEN SPECIFIC FEATURE OF CONSTRUCTION ARE NOT FULLYSHOWN ON THE DRAWINGS OR CALLED FOR IN THE GENERALNOTES, THEIR CONSTRUCTION SHALL BE THE SAME CHARACTER ASSIMILAR CONDITIONS.

PROVISIONS

chunyiho@cpp.edu 012852359

EGRESS BALCONIES (S 1021 & S 1027.6:) OUTDOOR CORRIDORS COMPLY. SEPERATION BETWEEN OPEN STAIRS WITH EGRESS BALCONY IN BETWEEN: >50%.

9. DRAWINGS SCHEMATICALLY INDICATE NEW CONSTRUCTION. THECONTRACTOR SHOULD ANTICIPATE, BASED ON EXPERIENCE, AREASONABLE NUMBER OF ADJUSTMENTS TO BE NECESSARY TOMEET THE DESIGN OBJECTIVES AND SHOULD CONSIDER SUCHADJUSTMENTS AS INCLUDED IN THE SCOPE OF WORK.

14. SEE CONSTRUCTION SCHEDULE SHEET (A-800) FOR LIST OFABBREVIATIONS.

Chunyi Ho

CORRIDER WIDTHS (1 1020:) ALL CORRIDORS COMPLY.

8. IF ERRORS OR OMISSIONS ARE FOUND IN THE DRAWINGS, THEYSHALL BE BROUGHT TO THE ATTENTION TO THE ARCHITECTBEFORE PROCEEDING WITH THE WORK.

13. CONTRACTOR SHALL PROVIDE ADEQUATE WEATHER PROTECTIONFOR THE BUILDING AND ITS CONTENTS DURING THE COURSE OFWORK.

STAIRWAYS (S 1011.2:) STAIRWAYS SERVING OCCUPIED PORTIONS OF A BUILDING SHALL COMPLY WITH THE REQUIREMENTS OF SECTIONS 1011.2 THROUGH SECTION 1011.14. EXCEPTION: STAIRWAYS SERVING AN OCCUPANT LOAD OF LESS THAN 50 SHALL HAVE A WIDTH OF NOT LESS THAN 36 INCHES (913 MM.)

NON-ENCLOSED EXIST STAIRS (S 1019:) RESIDENTIAL NON-ENCLOSED EXIT STAIRS COMPLY.

7. ALL CONSTRUCTION MATERIALS AND SUPPLIES TO BE STORED,HANDLED AND INSTALLED ACCORDING TO MANUFACTURER'S’RECOMMENDATIONS

12. CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN ALLTEMPORARY BARRIERS AND GUARDS, AND TEMPORARY SHORINGAND BRACING AS REQUIRED BY ALL CITY AND STATE REGULATIONS.

LOCATION OF EXITS: STAIRS MUST BE LOCATED 1/2 THE DIAGONAL OF THE WORKABLE FLOOR.

ELEVATORS (S 405.4.3:) WHERE ELEVATORS ARE PROVIDED, EACH COMPARTMENT SHALL HAVE DIRECT ACCESS TO AN ELEVATOR. WHERE AN ELEVATOR SERVES MORE THAN ONE COMPARTMENT BY A SMOKE BARRIER IN ACCORDANCE WITH SECTION 709. DOORS SHALL BE GASKETED, HAVE DROP SILL AND BE AUTOMATIC-CLOSING BY SMOKE DETECTORS IN ACCORDANCE WITH SECTION 716.5.9.3.

ALLOWABLE HEIGHTS AND AREA MAX FLOOR AREA (TABLE 504.4:) Aa = [At + (NS * lf)] * Sa Aa: ALLOWABLE AREA At: TABULAR ALLOWABLE AREA FACTOR Ns: TABULAR ALLOWABLE AREA FACTOR (NON-SPRINKLER REGARDLESS OF WHETHER THE BUILDING IS SPRINKLED) lf: AREA FACTOR INCREASE DUE TO FRONTAGE Sa: FOR OTHER THAN GROUP A, E, H, I, L AND R OCCUPANCIES, HIGH-RISE BUILDINGS AND OTHER APPLICATIONS LISTED IN TABLE 504.4 REGULATED BY THE OFFICE OF THE STATE FIRE MARSHAL, ACTUAL NUMBER OF STORIES ABOVE GRADE PLANE (WITHOUT AREA INCREASE), NOT TO EXCEED FOUR. Aa = [36,000 + (36,000 * 0] * 1

= 36,000 SF

AREA OCCUPANCY R-2 (2016 CBC) CONSTRUCTION TYPE: MAXIMUM ALLOWABLE HEIGHT: ALLOWABLE AREA:

VA 4 STORIES, 60 FT. (TABLE 504.3) 36,000 SF (TABLE 504.4)

OCCUPANCY S-2: CONSTRUCTION TYPE: MAXIMUM ALLOWABLE HEIGHT: ALLOWABLE AREA:

IA UNLIMITED (TABLE 504.4) UNLIMITED (TABLE 506.2)

PARKING DATA (1 LEVEL BELOW GRADE) CA GOVERNMENT CODE SEC : 65915 AND SECTION) REQUIRED : 18 STALLS STUDIO : 1 PARKING SPACE ONE BEDROOM : 1.5 PARKING SPACES TWO BEDROOM AND TOWN HOUSES : 2 PARKING SPACES GUEST PARKING NOT REQUIRED 1 VAN ACCESSIBLE PROVIDED : 21 STALLS 3 STUDIOS : 3 PARKING SPACES 8 ONE BEDROOMS : 12 PARKING SPACES 1 TWO BEDROOM : 2 1 VAN ACCESSIBLE INCLUDED

MAXIMUM AREA OF EXTERIOR WALL OPENING (TABLE 705.8) FIRE SEPARATION DISTANCE 3' TO 5' UNPROTECTED, SPRINKLERED = 15% FIRE SEPARATION DISTANCE 5' TO 10' UNPROTECTED, SPRINKLERED = 25% FIRE SEPARATION DISTANCE 10' TO 15' UNPROTECTED, SPRINKLERED = 45% FIRE SEPARATION DISTANCE 15' TO 20' UNORITECTED, SPRINKLERED = 75% FIRE SERPARTION DISTANCE 20' TO 25' UNPROTECTED, SPRINKLERED = NO LIMIT

ARC303 WEST HOLLYWOOD HOUSING

GENERAL NOTES 2018/05/30 Peter Ho Barry Milofsky

G0.01

30 May 2018 3:00:21 AM

2. CONTRACTOR WILL HAVE EXAMINED THE PREMISES AND SITE SO ASTO COMPARE THEM WITH THE DRAWINGS AND WILL HAVESATISFIED HIMSELF AS TO THE CONDITION OF THE EXISTING WORKAN ADJACENT PROPERTY PRIOR TO SUBMISSION OF BID. NOALLOWANCES WILL SUBSEQUENTLY BE MADE ON BEHALF OF THECONTRACTOR BY REASON OF ANY OMISSION ON HIS PART TOINCLUDE THE COSTS OF ALL ITEMS OF WORK, EITHER LABOR ORMATERIALS, WHETHER THEY ARE OR ARE NOT SHOWN OR NOTEDBUT WHICH ARE IMPLIED OR REQUIRED TO ATTAIN THE COMPLETEDCONDITIONS PROPOSED IN THE DRAWINGS.


Chunyi Ho chunyiho@cpp.edu 012852359

14' - 6"

27' - 8"

30' - 10"

21' - 8"

30' - 4"

REVISIONS

FIRE RESISTANCE RATING REQUIREMENT SEPARATION BETWEEN RESIDENTIAL UNITS = 1 HR (TABLE 420.2/709.3) EGRESS ENCLOSE FROM RESIDENTIAL UNITS = 2 HR (TABLE 102.1) PRIMARY STRUCTURAL FRAME = 1 HR (TABLE 601) BEARING WALL EXTERIOR = 2 HR (TABLE 601) BEARING WALL INTERIOR = 1 HR (TABLE 601) NON -BEARING WALL EXTERIOR AND INTERIOR PARTITION = 0 HR (TABLE 601) FLOOR CONSTRUCTION AND SECONDARY MEMBERS = 1 HR (TABLE 601) ROOF CONSTRUCTION AND SECONDARY MEMBERS = 1 HR (TABLE 601).

13' - 0"

DETAILS FOUND IN CBC 2016 (TABLE 601)

1

NOTE FOR TABLE 508.4: FIRE SEPERATION BETWEEN PARKING LEVELS S-2 AND UNITS ABOVE GRADE (R-2) MUST HAVE A MINIMUM FIRE RATING OF 1 HOUR AS FIRE SEPERATION BETWEEN PARKING GARAGE AND HOUSING.

2

Trash

INTERIOR BEARING WALL -1 HR. FIRE RATING

18

3

EGRESS STAIR ENCLOSURE -2HR FIRE RATING

30' - 9"

EXTERIOR BEARING WALL -1 HR. FIRE RATING

SEPARATION PARTITION -1 HR. FIRE RATING S-2 ABOVE R-2 -3 HR. FIRE RATING

4

FIRE WALL / EGRESS LEGEND

22

DETAILS

21

20

19

17

14

15

16

1. OUTDOOR AREAS USED EXCLUSIVELY FOR SERVICE OF THE BUILDING NEED ONLY HAVE ONE MEANS OF EGRESS.

29' - 8"

5

OUTDOOR AREAS (SECTION 1004.5:) YARDS, PATIOS, COURTS, AND SIMILAR OUTDOOR AREAS ACCESSIBLE TO AND USABLE BY THE BUILDING OCCUPANTS SHALL BE PROVIDED WITH MEANS OF EGRESS AS REQUIRED BY THIS CHAPTER EXCEPT:

6

2. BOTH OUTDOOR AREAS ASSOCIATED WITH GROUP R-3 AND INDIVIDUAL DWELLING UNITS GROUP R-2. STAIRWAYS (SECTION 105.1:) FOR OTHER THAN GROUP H AND I-2 OCCUPANCIES, THE CAPACITY, IN INCHES, MEANS OF EGRESS AND STAIRWAYS SHALL BE CALCULATED BY MULTIPLYING THE OCCUPANT LOAD SERVED BY SUCH STAIRWAYS BY A MEANS OF EGRESS CAPACITY FACTOR OF 0.2" PER OCCUPANTIN A BUILDING EQUIPPED WITH AN AUTOMATIC SPRINKLER SYSTEM INSTALLED IN ACCORDANCE WITH SECTION 903.3.1.2 AND EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM IN ACCORANCE WITH SECTION 907.5.2.2.

7

1' - 4"

8

MAXIMUM DISTANCE (TABLE 1017.2) REQUIRED: 250 ' PROVIDED: 96 '

9

10

11

9' - 0"

12

13

1' - 4"

16' - 5"

6' - 5"

NUMBER OF EXITS REQUIRED: 51 OCCUPANTS = 2 EXITS

9' - 0"

#Risers 18 #Treads 16

PATH OF TRAVEL

PATH OF TRAVEL LEGEND 12" = 1'-0" FIRE RATING WALL_BASEMENT 1/8" = 1'-0" ARC303 WEST HOLLYWOOD HOUSING

FIRE RESISTING RATING 2018/05/30 Peter Ho Barry Milofsky

G1.01 As indicated

30 May 2018 3:05:53 AM

1


Chunyi Ho chunyiho@cpp.edu 012852359

8' - 0"

REVISIONS

15' - 0" " '-0 ø5

ø5 '-0 "

ø5 '-0 "

Studio

21' - 0"

1 Bed

1 Bed '-0 ø5

'-0 ø5

"

"

1 Bed 1 Bed 0" ø 5' -

Studio

2 Bed Studio

" '-0 ø5

6' - 0"

0" ø 5' -

1

FIRE RATING WALL_FIRST FLOOR 1/8" = 1'-0"

2

FIRE RATING WALL_SECOND FLOOR 1/8" = 1'-0"

DETAILS

1. OUTDOOR AREAS USED EXCLUSIVELY FOR SERVICE OF THE BUILDING NEED ONLY HAVE ONE MEANS OF EGRESS. 2. BOTH OUTDOOR AREAS ASSOCIATED WITH GROUP R-3 AND INDIVIDUAL DWELLING UNITS GROUP R-2. STAIRWAYS (SECTION 105.1:) FOR OTHER THAN GROUP H AND I-2 OCCUPANCIES, THE CAPACITY, IN INCHES, MEANS OF EGRESS AND STAIRWAYS SHALL BE CALCULATED BY MULTIPLYING THE OCCUPANT LOAD SERVED BY SUCH STAIRWAYS BY A MEANS OF EGRESS CAPACITY FACTOR OF 0.2" PER OCCUPANTIN A BUILDING EQUIPPED WITH AN AUTOMATIC SPRINKLER SYSTEM INSTALLED IN ACCORDANCE WITH SECTION 903.3.1.2 AND EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM IN ACCORANCE WITH SECTION 907.5.2.2.

STUDIO UNIT: 493 SF / 200 GROSS = 2.465 TOTAL OF 1 PERSON 1 * 0.2 = 0.2 1 BEDROOM UNIT: 830 SF / 200 GROSS = 4.15 TOTAL OF 1 PEOPLE 1 * 0.2 = 0.2 2 BEDROOM UNIT: 1054 SF / 200 GROSS = 5.27 TOTAL OF 2 PEOPLE 2 * 0.2 = 0.4

NUMBER OF OCCUMPANTS: SF OF PARKING LEVEL / OCCUPANT LOAD SF OF FIRST FLOOR / OCCUPANT LOAD SF OF SECOND FLOOR / OCCUPANT LOAD SF OF THIRD FLOOR / OCCUPANT LOAD SF OF FORTH FLOOR / OCCUPANT LOAD

FACTOR = 9703 SF / 200 SF FACTOR = 3172 SF / 200 SF FACTOR = 3389 SF / 200 SF FACTOR = 1826 SF / 200 SF FACTOR = 1826 SF / 200 SF

/ PER OCCUPANT / PER OCCUPANT / PER OCCUPANT / PER OCCUPANT / PER OCCUPANT

= 49 PEOPLE = 16 PEOPLE = 17 PEOPLE = 10 PEOPLE = 10 PEOPLE

NUMBER OF EXITS REQUIRED: 51 OCCUPANTS = 2 EXITS

ARC303 WEST HOLLYWOOD HOUSING

EXTERIOR BEARING WALL -1 HR. FIRE RATING INTERIOR BEARING WALL -1 HR. FIRE RATING

FIRE RESISTING RATING

EGRESS STAIR ENCLOSURE -2HR FIRE RATING SEPARATION PARTITION -1 HR. FIRE RATING PATH OF TRAVEL

S-2 ABOVE R-2 -3 HR. FIRE RATING

PATH OF TRAVEL LEGEND 12" = 1'-0"

FIRE WALL / EGRESS LEGEND

2018/05/30 Peter Ho Barry Milofsky

G1.02 As indicated

30 May 2018 3:05:54 AM

OUTDOOR AREAS (SECTION 1004.5:) YARDS, PATIOS, COURTS, AND SIMILAR OUTDOOR AREAS ACCESSIBLE TO AND USABLE BY THE BUILDING OCCUPANTS SHALL BE PROVIDED WITH MEANS OF EGRESS AS REQUIRED BY THIS CHAPTER EXCEPT:


Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

" '-0 ø5

" '-0 ø5

1 Bed

1 Bed

1 Bed

ø5 '-0 "

ø5 '-0 "

2

FIRE RATING WALL_FOURTH FLOOR 1/8" = 1'-0"

EXTERIOR BEARING WALL -1 HR. FIRE RATING INTERIOR BEARING WALL -1 HR. FIRE RATING EGRESS STAIR ENCLOSURE -2HR FIRE RATING SEPARATION PARTITION -1 HR. FIRE RATING

FIRE RATING WALL_THIRD FLOOR 1/8" = 1'-0"

S-2 ABOVE R-2 -3 HR. FIRE RATING

PATH OF TRAVEL LEGEND 12" = 1'-0"

FIRE WALL / EGRESS LEGEND

ARC303 WEST HOLLYWOOD HOUSING

FIRE RESISTING RATING 2018/05/30 Peter Ho Barry Milofsky

G1.03 As indicated

30 May 2018 3:05:56 AM

1

PATH OF TRAVEL


Chunyi Ho

130' - 0"

chunyiho@cpp.edu 012852359

REVISIONS

0"

12' - 0"

3' -

100' - 0"

G S W E

G S W E

DEMOLISH EXISTING SINGLE FAMILY HOUSE

G

S

W

E

G

S

W

E

G

S

W

E

G

S

W

E

SPAULDING AVE

8' - 0"

PARKWAY

21' - 0"

SIDEWALK

15' - 0"

DEMOLISHED DRIVEWAY NEW SIDEWALK & LANDSCAPE S

W

E

G

S

W

E

6' - 0"

G

ARC303 WEST HOLLYWOOD HOUSING

SITE PLAN 4'

8'

16'

32'

Peter Ho Barry Milofsky

A1.01 1/8" = 1'-0"

30 May 2018 3:00:01 AM

2018/05/30 0'


Chunyi Ho chunyiho@cpp.edu 012852359

13' - 3"

GRASS

13' - 7"

13' - 10"

13' - 0"

28' - 7"

10' - 9"

19' - 10"

6' - 3"

REVISIONS

1' - 10"

17' - 6"

11' - 0"

3' - 6"

1 X 1 TILE

2' - 6"

6' - 9"

15' - 5"

13' - 6"

10' - 1"

8' - 9"

PLANTER

5' - 0"

14' - 2"

14' - 4"

7' - 3"

5' - 0"

2' - 6"

7' - 6"

10' - 2"

9' - 1"

43' - 10"

2' - 0"

12' - 3"

4' - 6"

4' - 2"

7' - 7"

OUTDOOR DECK

SPAULDING AVE

17' - 8"

8' - 9"

6' - 7"

13' - 6"

2' - 2"

3' - 0"

7' - 0"

18' - 0"

WOODDECKING

7' - 4"

TREE

2' - 6"

7' - 0"

2' - 6"2' - 9"

32' - 5"

LANDSCAPE PLAN 1/8" = 1'-0"

ARC303 WEST HOLLYWOOD HOUSING

LANDSCAPE PLAN 2018/05/30 Peter Ho Barry Milofsky

A1.02 1/8" = 1'-0"

30 May 2018 3:00:01 AM

1


P1

P2

P3

14' - 6"

27' - 8"

P4

P5

30' - 10"

21' - 8"

P6

Chunyi Ho

30' - 4"

chunyiho@cpp.edu 012852359

3' - 0"

REVISIONS 21' - 7"

PA

PB

30' - 7"

7' - 1"

6' - 0"

9' - 6"

1' - 10"

4' - 0"

13' - 3"

-10' - 0"

1' - 1"

4' - 0"

4' - 0"

29' - 8"

PC

16' - 5"

PD

PE 1' - 6"

FOUNDATION PLAN 1/8" = 1'-0" ARC303 WEST HOLLYWOOD HOUSING

FOUNDATION PLAN PROPERTY LINE

2018/05/30 Peter Ho Barry Milofsky

FOUNDATION FOOTINGS/PAD

0'

4'

8'

16'

32'

A1.11 1/8" = 1'-0"

30 May 2018 3:00:02 AM

1


Chunyi Ho chunyiho@cpp.edu 012852359

P1

P2

P3

14' - 6"

P4

27' - 8"

P5

30' - 10"

P6

21' - 8"

REVISIONS

30' - 4"

DRAINEGE

PA 1' - 6"

13' - 0"

-10' - 0"

1

PB

ELECTRICAL D4

Trash

WATER

1' - 6"

GAS D3

D3

18

3

D3

D4

30' - 9"

2

4 21

20

5

19

17

PC

17' - 0"

15 2

"

'-

SLOPE TO DRAIN

1"

29' - 8"

81

2 '-

6

TYPICAL

7

1' - 4"

9' - 0"

9' - 0"

12

13

1' - 4"

3' - 2"

D3

9

10

11

14

15

16 16' - 5"

18' - 0"

6' - 5"

#Risers 18 #Treads 16 PE

1' - 0"

ARC303 WEST HOLLYWOOD HOUSING

PARKING LEVEL PLAN 2018/05/30 0'

4'

8'

16'

32'

Peter Ho Barry Milofsky

A1.21 1/8" = 1'-0"

30 May 2018 3:00:02 AM

5' - 10"

PD

8


Chunyi Ho chunyiho@cpp.edu 012852359

76' - 10"

48' - 2"

5' - 0"

AREA OF STACK 15' - 9"

10' - 9"

5' - 5"

12' - 7"

24' - 7"

4' - 0"

REVISIONS

4' - 6"

17' - 2"

2' - 0" 9' - 10"

8' - 9"

5' - 11"

7' - 9"

4' - 6"

30' - 0"

12' - 0"

5' - 0"

15' - 9"

8' - 2"

"

0" ø 5' -

21' - 2"

D3

W2

13' - 4" 25' - 0"

74' - 11"

W7

D1

W2 D1

W6

D1 '-0 ø5

121 1 BED UNIT 723.64 SF

111 GYM 272.29 SF

112 1 BED UNIT 747.68SF

W2

D1

122 STUDIO UNIT 471.22 SF

8' - 5"

W14

W6

6' - 10"

ø5 '-0 "

W14

W8

14' - 10"

W1

W13

W9

4' - 6"

5' - 6"

W1

4' - 6" W3

123 STUDIO UNIT 480.75 SF

0" ø 5' -

12' - 3"

W15

5' - 10"

D1

12' - 10"

20' - 3"

3' - 6"

W3

D3

13' - 5"

ARC303 WEST HOLLYWOOD HOUSING

FIRST FLOOR PLAN

FLOOR PLAN_1F 1/8" = 1'-0"

2018/05/30 Peter Ho Barry Milofsky 0'

4'

8'

16'

32'

A1.22 1/8" = 1'-0"

30 May 2018 3:00:03 AM

1


Chunyi Ho chunyiho@cpp.edu 012852359 AREA OF STACK

25' - 0"

24' - 1"

REVISIONS 14' - 1"

4' - 0"

5' - 5"

26' - 1"

W1 4' - 6"

12' - 7"

W9

W8

7' - 9"

2' - 5"

"

W2 D1

6' - 0"

15' - 9"

4' - 6"

D1 D1 '-0 ø5

W14

W6

W10

W2

221 1 BED UNIT 723.64 SF

6' - 7"

211 STUDIO UNIT 515.08 SF

212 1 BED UNIT 747.68 SF

31' - 1"

ø5 '-0 "

11' - 9"

" '-0 ø5

7' - 9"

W1X W13

4' - 6"

24' - 7"

14' - 10"

3' - 6"

5' - 7"

10' - 4"

7' - 10"

22' - 6"

11' - 0"

4 A8.01

Sim

W2 18' - 0"

12' - 6"

9' - 10"

8' - 9"

5' - 11"

74' - 11"

21' - 0"

55' - 0"

D1

W14

W2

20' - 4"

222 2 BED UNIT 974.25 SF

" '-0 ø5

W2

12' - 3"

W15

W3

8' - 0"

W1X

4' - 8"

13' - 5"

26' - 1"

FLOOR PLAN_2F 1/8" = 1'-0" ARC303 WEST HOLLYWOOD HOUSING

SECOND FLOOR PLAN 2018/05/30 0'

4'

8'

16'

32'

Peter Ho Barry Milofsky

A1.23 1/8" = 1'-0"

30 May 2018 3:00:04 AM

1


Chunyi Ho chunyiho@cpp.edu 012852359 AREA OF STACK

REVISIONS 32' - 4" 7' - 10"

4' - 6"

3' - 2"

16' - 10"

W12X W12

15' - 7"

10' - 6"

W4 " '-0 ø5

14' - 0"

W5

W5

311 1 BED UNIT 759.17 SF

W11

24' - 4"

6' - 7"

56' - 1"

28' - 2"

D1

D4

4 A8.01

74' - 7"

2' - 10"

W5

W5

11' - 0"

20' - 7"

ø5 '-0 "

W12X W12

W4

PLANTER

8' - 5" 10' - 6"

39' - 5"

W11 5' - 2"

4' - 3"

D1

312 1 BED UNIT 759.17 SF

11' - 0"

7' - 0"

14' - 0"

D3

7' - 10"

WOOD DECKING 722.44 SF

6' - 6"

FLOOR PLAN_3F 1/8" = 1'-0" ARC303 WEST HOLLYWOOD HOUSING

THIRD FLOOR PLAN 2018/05/30 0'

4'

8'

16'

32'

Peter Ho Barry Milofsky

A1.24 1/8" = 1'-0"

30 May 2018 3:00:05 AM

1

8' - 8"

14' - 10"

9' - 11"


Chunyi Ho chunyiho@cpp.edu 012852359

AREA OF STACK

32' - 4"

W4

W12X W12

6' - 5"

W5

411 1 BED UNIT 759.17 SF

W11

D1

2' - 0"

2' - 9"

1/4" / 12" SLOPE TO DRAIN

5' - 2"

24' - 6" 6' - 8"

W5

REVISIONS

20' - 0"

8' - 11"

" '-0 ø5

4' - 6"

1' - 10" 2' - 8"

1 A4.11

8' - 8"

7' - 10"

12' - 4"

4' - 6"

11' - 11"

3' - 6" 4 A8.01

D4

ROOF OF THE STAIR CACE

Sim

D1 W5

412 1 BED UNIT 759.17 SF

W11

W5 ø5 '-0 "

4' - 0"

4' - 0"

W12X W12 W4

FLOOR PLAN_4F 1/8" = 1'-0"

2

Roof Plan 1/8" = 1'-0"

ARC303 WEST HOLLYWOOD HOUSING

FORTH FLOOR & ROOF PLAN 2018/05/30 0'

4'

8'

16'

32'

Peter Ho Barry Milofsky

A1.25 1/8" = 1'-0"

30 May 2018 3:00:07 AM

1


---

AREA OF STACK

W4

W11

Roof 40' - 0"

W11

W12X W12

Roof 40' - 0"

W4

FLOOR PLAN_2F 10' - 0"

6' - 10"

chunyiho@cpp.edu 012852359

W2

FLOOR PLAN_3F 20' - 0"

REVISIONS

6' - 8"

D1

W4

2' - 6"

FLOOR PLAN_4F 30' - 0"

D3

FLOOR PLAN_2F 10' - 0"

D1

7' - 0"

5' - 0"

8' - 6" 3' - 0"

W1

2' - 0"

7' - 2"

W2

W3

3' - 7"

FLOOR PLAN_3F 20' - 0"

W10

8' - 6"

1

FLOOR PLAN_4F 30' - 0"

W11

3' - 6"

W11

2' - 0"

Chunyi Ho

FLOOR PLAN_1F 0' - 0"

East 1/8" = 1'-0"

2

FLOOR PLAN_1F 0' - 0"

South 1/8" = 1'-0"

---

7' - 5"

7' - 5"

7' - 5"

7' - 5"

7' - 11"

7' - 5"

5' - 9"

6' - 0"

Roof 40' - 0"

6' - 0" W12 W12X

6' - 0"

6' - 0"

2' - 11"

Roof 40' - 0"

2' - 2"

6' - 0"

W4

6' - 0"

4' - 0"

6' - 1"

AREA OF STACK

4' - 0"

FLOOR PLAN_4F 30' - 0"

FLOOR PLAN_4F 30' - 0"

D3

FLOOR PLAN_3F 20' - 0"

W6

W8

FLOOR PLAN_3F 20' - 0"

W1

W9

2' - 0"

W1

3' - 3"

3' - 6"

6' - 0"

W5

1' - 0"

FLOOR PLAN_2F 10' - 0"

FLOOR PLAN_1F 0' - 0"

FLOOR PLAN_2F 10' - 0"

FLOOR PLAN_1F 0' - 0"

ARC303 WEST HOLLYWOOD HOUSING West 1/8" = 1'-0"

4

North 1/8" = 1'-0"

ELEVATIONS 2018/05/30 Peter Ho Barry Milofsky 0'

4'

8'

16'

32'

A2.01 1/8" = 1'-0"

30 May 2018 3:00:09 AM

3


---

Chunyi Ho

Roof 40' - 0"

chunyiho@cpp.edu 012852359

FLOOR PLAN_4F 30' - 0" 10 A5.01

REVISIONS

FLOOR PLAN_3F 20' - 0" 2 A3.11

FLOOR PLAN_2F 10' - 0"

FLOOR PLAN_1F 0' - 0"

Basement -10' - 0" 1

Section 1 1/8" = 1'-0"

---

Roof 40' - 0"

FLOOR PLAN_4F 30' - 0"

FLOOR PLAN_3F 20' - 0"

FLOOR PLAN_2F 10' - 0"

FLOOR PLAN_1F 0' - 0"

Basement -10' - 0"

ARC303 WEST HOLLYWOOD HOUSING

Section 2 2 1/8" = 1'-0"

SECTION Peter Ho Barry Milofsky 0'

4'

8'

16'

32'

A3.01 1/8" = 1'-0"

30 May 2018 3:00:10 AM

2018/05/30


---

Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

1 M1.01 A4.31

2 A8.01

11 A5.01

ARC303 WEST HOLLYWOOD HOUSING

SECTION 2018/05/30 Peter Ho Barry Milofsky

A3.02 1/4" = 1'-0"

30 May 2018 3:00:10 AM

Section 3 1 1/4" = 1'-0"


10" COPING WATER PROOFING RIDGID INSULATION CANT STRIP B310 BEAM HANGER

SLIDING WALL PANEL

Chunyi Ho

4X12 RIM JOIST

chunyiho@cpp.edu 012852359

DOUBLE TOP PLATE 6 A5.01

3/4" PLYWOOD 2X6 STUDS @ 16" O.C. 1 A4.31

1/2" GYPSUM BOARD

1 M1.01

REVISIONS

DOUBLE INSULATING GLASS 7 A5.01

2X12 RIM JOIST 1 1/2" LIGHT WEIGHT CONCRETE 1/4" ACOUSTIC MATT 3/4" PLYWOOD 2X10 TJI @ 16" O.C.

9 A5.01

WOOD SIDING

2x12 TJI @ 16" O.C. 3/4" ACOUSTIC CHANNEL 8 A5.01

2 A4.31

ARC303 WEST HOLLYWOOD HOUSING

WALL SECTION A-A' 1/2" = 1'-0"

2

B-B' 1/2" = 1'-0"

2018/05/30 Peter Ho Barry Milofsky 0'

1'

2'

4'

8'

A3.11 1/2" = 1'-0"

30 May 2018 3:00:12 AM

1


Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

32' - 4" 24' - 1" 4' - 6"

20' - 0" 7' - 10"

4' - 6"

5' - 2"

KITCHEN 8' - 0" B

411 1 BED UNIT 759.17 SF

3' - 6"

211 STUDIO UNIT 515.08 SF

8' - 11"

1' - 0"

4' - 6"

10' - 4"

2' - 0"

UNIT PLAN_1 BED_B (UNIT 411) 1/4" = 1'-0"

LIVINGROOM 9' - 0" A

BALCONY 9' - 0" D

D1

12' - 4"

2 A4.11

20' - 0"

6' - 8"

LIVINGROOM 9' - 0" A

W5

1

7' - 0" 10' - 6"

D2

D2

6' - 5"

24' - 6"

D2

D2

BATHROOM 8' - 0" C

9' - 6"

BATHROOM 8' - 0" C

" '-0 ø5

5' - 2"

W5

BEDROOM 411-2 A

D2

- 0"

2' - 8"

ø 5'

1' - 10"

Sim

2' - 9"

1 A4.11

8' - 8"

W4

4' - 6"

6' - 7"

11' - 11"

D1

3' - 6"

2

UNIT PLAN_2 BED (UNIT 211) 1/4" = 1'-0"

ARC303 WEST HOLLYWOOD HOUSING

UNIT PLAN 2018/05/30 Peter Ho Barry Milofsky

0'

2'

4'

8'

16'

A4.01 1/4" = 1'-0"

30 May 2018 3:00:12 AM

7' - 10"


0' - 10"

2' - 4"

1' - 0"

2' - 10"

Chunyi Ho

1' - 5"

1' - 5"

1' - 5"

1' - 5"

2' - 8"

chunyiho@cpp.edu 012852359 2' - 1"

6 3

REVISIONS 2' - 7"

3' - 4"

4

3' - 4"

0' - 6"

A4.11

3' - 4"

5

2' - 8"

1' - 7"

1' - 7"

1' - 7"

1' - 7"

1' - 5"

3' - 6"

0' - 7"

3' - 0"

BATHROOM ELEVATION - A 1/2" = 1'-0"

4

BATHROOM ELEVATION - B 1/2" = 1'-0"

5

BATHROOM ELEVATION - C 1/2" = 1'-0"

6

BATHROOM ELEVATION - D 1/2" = 1'-0"

2' - 0" 2' - 0"

1' - 4"

2' - 0"

3

1' - 5"

1' - 3"

9

A4.11 8 2' - 4"

1' - 0"

1' - 0"

1' - 0" 0' - 11"

2' - 8"

1' - 4"

2' - 0"

2' - 10"

A4.11

0' - 9"

7

1' - 8"

2' - 4"

2' - 8"

1' - 4"

3' - 0"

4' - 0"

1' - 4"

2' - 7"

1' - 4"

2' - 4"

2' - 0"

2' - 10"

1' - 4"

2' - 0"

3' - 11"

3' - 2"

UNIT PLAN_2 BED (UNIT 211) - Callout 1 1/2" = 1'-0"

1' - 4"

2

7

ENLARGED KITCHEN ELEVATION 1/2" = 1'-0"

1' - 2" 0' - 10"

ENLARGED 1 BEDROOM KITCHEN & BATHROOM PLAN 1/2" = 1'-0"

0' - 11"

2' - 4"

1' - 0"

1' - 0"

1' - 11"

1' - 3"

1' - 2"

1' - 8"

1' - 10"

2' - 4"

2' - 11"

8

3' - 7"

ARC303 WEST HOLLYWOOD HOUSING

Elevation 1 - c 1/2" = 1'-0"

9

Elevation 1 - d 1/2" = 1'-0"

INTERIOR ELEVATION 2018/05/30 Peter Ho Barry Milofsky

A4.11 1/2" = 1'-0"

30 May 2018 3:00:14 AM

1


2 A5.01

8" COPING

WATER PROOFING

RIDGID INSULATION

Chunyi Ho

3 A5.01

CANT STRIP

chunyiho@cpp.edu 012852359

B310 BEAM HANGER

REVISIONS 4X12 RIM JOIST

DOUBLE TOP PLATE

4 A5.01

3/4" PLYWOOD

2X6 STUDS @ 16" O.C.

1/2" GYPSUM BOARD

DOUBLE INSULATING GLASS

1 A5.01

5 A5.01

1 1/2" LIGHT WEIGHT CONCRETE

1/4" ACOUSTIC MATT

3/4" PLYWOOD 2X10 I JOIST @ 16" O.C.

ARC303 WEST HOLLYWOOD HOUSING

ENLARGED WALL SECTION Peter Ho Barry Milofsky

1

A-A' - CALLOUT 2 1 1/2" = 1'-0"

2

A-A' - CALLOUT 1 1" = 1'-0"

A4.31 As indicated

30 May 2018 3:00:14 AM

2018/05/30


4 X 10 HEADER GYPSUM BOARD

PLYWOOD WHITE FIBER CEMENT PANEL

ALUMINUM PROFILE CONNECTOR

PEDESTAL SYSTEM ADJUSTABLE FEET

WOODECKING

ALUMINUM WINDOW FRAME

TRACK WHEEL

Chunyi Ho

NAILS

chunyiho@cpp.edu 012852359

CONCRETE SLAB

SLEEPER REVISIONS

2 X 6 SILL PLATE

9

11

OUTDOOR WOOD DECK 1 1/2" = 1'-0"

10

HANGER & TRACK @ SLIDING DOOR 3" = 1'-0"

WINDOWS DETAIL 1 1/2" = 1'-0"

GYPSUM BOARD

2 X 10 RIM JOIST

WHITE FIBER CEMENT PANEL

WHITE FIBER CEMENT PANEL

WOOD SIDING

0' - 2"

SLIDING WALL PANEL

PLYWOOD WOOD SIDING

WOOD SIDING CAP FLASHING

0' - 2"

PLYWOOD

BATT INSULATION

GYPSUM BOARD 0' - 2"

FLASHING

GYPSUM BOARD

FLASHING

WOOD SIDINGS

WHITE FIBER CEMENT PANEL

WHITE FIBER CEMENT PANEL PLYWOOD

8

FIBER CEMENT PANEL @ CANTILEVER 3" = 1'-0"

7

BALCONY OPENING_BOTTOM 3" = 1'-0"

6

BALCONY OPENING_TOP 3" = 1'-0"

5

FIBER CEMENT PANEL @ WOOD SIDING BOTTOM 6" = 1'-0"

BLACK FIBER CEMENT PANAL

ANCHOR BOLT

2 X 6 PT BOOTTOM PLATE

CANT STRIP

CAP SHEET

WHITE FIBER CEMENT PANEL

WOOD NAILER

SELF HEALING WATER PROOF SHEATING

COPING

BACE SHEET

SHAPED WOOD CAP NAILER

TOP PLATE

Z FLASH RIGID INSULATION

VAPOR BARRIER PROTECTION BOARD

WHITE FIBER CEMENT PANEL

FLASHING

10% DRIVING SLOPE

EARTH

ARC303 WEST HOLLYWOOD HOUSING

TJI HANGER PLYWOOD DIAPHRAGM

DETAILS

WOOD SIDING

4

CEMENT PANEL @ WOOD SIDING TOP 6" = 1'-0"

3

CANT STRIP & ROOFING 3" = 1'-0"

2

PARAPET DETAIL 3" = 1'-0"

Peter Ho Barry Milofsky

1

FOUNDATION DETAIL 3" = 1'-0"

A5.01 As indicated

30 May 2018 3:00:15 AM

2018/05/30

GRAVEL


3' - 6" 3' - 0"

3' - 0" 2' - 6"

3' - 6" 3' - 0"

6' - 4" 6' - 0"

2HR 1HR 2HR 2HR

WOOD WOOD METAL METAL

FIRE ESCAPE FIRE ESCAPE

7' - 0"

8 20 5 4

36" X 80" 30" X 80" 36" X 80" 72" X 80"

6' - 8"

DESCRIPTION

6' - 11"

MATERIAL

6' - 8"

FIRE RATING

6' - 11"

COUNT

6' - 8"

D1 D2 D3 D4

SIZE

6' - 8"

TYPE

6' - 11"

DOOR SCHEDULE (PARKING AND STACK)

Chunyi Ho chunyiho@cpp.edu 012852359

D1

D2

D3

D4

REVISIONS

TURN 90Ëš BACK

1' - 6"

WINDOW SCHEDULE (STACK) COUNT

TYPE

MATERIAL

DESCRIPTION

2 4 3 1 1 2 2 2

CORNER, FIXED SLIDING FIXED SLIDING FIXED SLIDING FIXED SINGLE CASEMENT

ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM

FIRE ESCAPE

4' - 0"

6' - 0"

72" X 72" 32" X 34" 72" X 108" 32" X 34" 230" X 108" 116" X 108" 48" X 72" 24" X 72"

2' - 0"

2' - 10"

W4 W5 W6 W7 W10 W11 W12 W12X

SIZE

2' - 8"

6' - 0"

TYPE

6' - 0"

W4

W4 (3D NOT IN SCALE)

6' - 0"

W5

W12X

10' - 0"

5' - 7"

5' - 6"

0' - 2"

W12

9' - 8" 3' - 8"

4' - 6"

0' - 2"

4' - 4"

WALL

CEILING

BASE

A B C D

WOOD WOOD TILE CONCRETE

DRYWALL PAINTED DRYWALL PAINTED & GLASS TILE & DRYWALL STUCCO

DRYWALL DRYWALL DRYWALL DRYWALL

WOOD WOOD TILE CONCRETE

9' - 0"

FLOOR

9' - 0"

ROOM

9' - 0"

FINISH SCHEDULE

EQUIPMENT SCHEDULE (STACK) DIMENSION

LOCATION

REFRIDGERATOR DISH WASHER STOVE AC UNIT

5 5 5 6

24" X 25" X 63" 24" X 24"X 34" 24" X 24"X 34" 35" X 35"X 44"

KITCHEN KITCHEN KITCHEN ROOF

W6

W7

22' - 2" 5' - 3"

0' - 3"

COUNT

DIMENSION

LOCATION

SINK A SINK B TOILET SHOWER HEAD

5 6 6 5

20" X 22" 19" X 19" 18" X 8 1/2" -

KITCHEN BATHROOM BATHROOM BATHROOM

5' - 4"

0' - 3"

5' - 4"

0' - 3"

5' - 3"

8' - 7"

FIXTURE SCHEDULE (STACK) EQUIPMENT

W11

ARC303 WEST HOLLYWOOD HOUSING

DOORS & WINDOW SCHEDUAL 2018/05/30 Peter Ho Barry Milofsky

W10

WINDOWS & DOORS ELEVATION 1/2" = 1'-0"

A6.01 1/2" = 1'-0"

30 May 2018 3:00:15 AM

COUNT

9' - 0"

EQUIPMENT


Chunyi Ho chunyiho@cpp.edu 012852359

5' - 0"

2' - 10"

2' - 4"

2' - 2"

4' - 0"

6' - 6"

6' - 4"

3' - 3"

6' - 2"

3' - 6"

1' - 9"

4' - 6"

3' - 0"

REVISIONS

RECESSED DOWNLIGHT

WALL WASHER DOWNLIGHT

4' - 0"

DINING PENDANT LIGHT

8' - 6"

7' - 7"

UNDER CABINET LIGHT

5' - 7"

3' - 8"

WALL LAMP

5' - 9"

WATERPROOF BALCONY LIGHT

REFLECTED CEILING PLAN 1/2" = 1'-0"

CEILING PLAN LEGEND 1/2" = 1'-0" ARC303 WEST HOLLYWOOD HOUSING

REFLECTED CEILING PLAN 2018/05/30 Peter Ho Barry Milofsky

A7.01 1/2" = 1'-0"

30 May 2018 3:00:16 AM

1

3' - 2"

2' - 6"

WALL LAMP


Chunyi Ho chunyiho@cpp.edu 012852359

1' - 0"

REVISIONS

Sim

2' - 10"

3 A8.02

2 A8.02

Sim

1 A8.02

Sim

Sim

0' - 2"

Sim

ARC303 WEST HOLLYWOOD HOUSING

3' - 0"

4 A8.02 5 A8.02

3' - 0"

3' - 0"

10' - 0"

7' - 4"

VERTICAL CIRCULATION Peter Ho Barry Milofsky

1

STAIR SECTION 1 1/2" = 1'-0"

2

STAIR SECTION 2 1/2" = 1'-0"

3

STAIR ELEVATION 1/2" = 1'-0"

4

A8.01

STAIR PLAN 1/2" = 1'-0" 0'

1'

2'

4'

8'

1/2" = 1'-0"

30 May 2018 3:00:19 AM

2018/05/30


Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

0' - 11"

2' - 10"

1' - 0"

5

HANDRAIL END 1 1/2" = 1'-0"

HARD WOOD FLOORING 0' - 11"

10'/(RISERS #=18)

10'/(RISERS #=18)

0' - 11"

L ANGLE BOLTED CONNECTION ARC303 WEST HOLLYWOOD HOUSING

BLOCKING

VERTICAL CIRCULATION DETAILS

0' - 2"

Peter Ho Barry Milofsky

1 1/2" LIGHT WEIGHT CONCRETE

4

HANDRAIL DETAIL 1 1/2" = 1'-0"

3

STAIR/LANDING CONNECTION DETAIL 1 1/2" = 1'-0"

2

STAIR TO FLOOR DETAIL 1 1/2" = 1'-0"

1

STAIR TO WALL 1 1/2" = 1'-0"

A8.02 1 1/2" = 1'-0"

30 May 2018 3:00:19 AM

2018/05/30

HARD WOOD FLOORING


HURRICANE STRONG TIE

Chunyi Ho chunyiho@cpp.edu 012852359

TJI HANGER 43 '-

PE

6"

RR IP IT

40 '-

43 '

0"

RO OF

30 '

40 '

REVISIONS

-

30 '

-0

FO " RT H

FL OO R

FL OO R

-

TH 0" IR D

20 '

FL OO R 10 '

-0

FL OO R

-0

FL

OO R 10 '

"

FI R ST F

-0

TH " IR D

SE " CO ND

0'

T

-0 "

RO OF

FO 0" RT H

20 '

-

PA 6" RA PE

-0 "

SE CO ND

LO OR

FL OO R

HOLD DOWN POST BASE

0' -

TIE DOWN

0

FIR " ST

FL OO R

5 C

C

6

FSA STRAP B

3 B

6 A

1

S3_FRAME 3D_VIEW NE 1/4"=1'-0"

2

5

ARC303 WEST HOLLYWOOD HOUSING

S3_FRAME 3D_VIEW SW

STACK STRUCTURE FRAMING

1/4"=1'-0"

2018/05/30 Peter Ho Barry Milofsky 0'

2'

4'

8'

S1.01 1/4" = 1'-0"

30 May 2018 3:09:47 AM

A


Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

Corner & Window Details 1/4"=1'-0"

ARC303 WEST HOLLYWOOD HOUSING

FRAMING CORNER DETAIL 0'

2'

4'

8'

Peter Ho Barry Milofsky

S1.02 1/4" = 1'-0"

30 May 2018 3:09:49 AM

2018/05/30


2x6 BOTTOM PLATE 2x6 BOTTOM PLATE

Chunyi Ho chunyiho@cpp.edu 012852359

TJI HANGER 2X10 TJI @ 16" O.C. 4X10 RIM JOIST

REVISIONS

2x6 DOUBLE TOP PLATE

TJI HANGER PHOTO https://www.strongtie.com/topflangehangersijoist_ijoistconnectors/lbv-ba-bhb_productgroup_wcc/p/lbv.ba.b.hb

1

BEAM HANGER DETAIL

0' -

3"

FOR HOLDOWN INSTALLATION MINIMUM THICKNESS

2X6 STUDS @ 16 O.C. HOLDOWN ANCHOR BOLT 2X6 PRESSURE TREATED BOTTOM PLATE

0' - 6"

6" CONCRETE RAISE

HOLDOWN PHOTO 0' - 0"

ARC303 WEST HOLLYWOOD HOUSING

3D STRUCTURE DETAIL 2018/05/30 0'

2

HOLDDOWN DETAIL

1'

Peter Ho Barry Milofsky

S2.01 3"=1'-0"

30 May 2018 3:09:50 AM

https://www.strongtie.com/boltedholdowns_holdowns/hdbhd_productgroup_wcc/p/hdb.hd


P5

Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

2 S_LOAD_First FLOOR 1 1/8" = 1'-0"

S_LOAD_SECOND FLOOR 1/8" = 1'-0"

P5 S_LOAD_FORTH FLOOR 1/8" = 1'-0"

ARC303 WEST HOLLYWOOD HOUSING

GRAVITATIONAL LOAD DIAGRAM

P2 SHEAR WALL

ECCENTRICITY

BRACING

P2

RE-ENTRANT CORNER

P5

OUT-OF PLAN OFFSET

2018/05/30 Peter Ho Barry Milofsky

0'

3

S_LOAD_THIRD FLOOR 1/8" = 1'-0"

2'

4'

8'

16'

S3.01 1/8" = 1'-0"

30 May 2018 3:06:01 AM

4


Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

S_LOAD_NORTH 1/8" = 1'-0"

2

S_LOAD_EAST 1/8" = 1'-0"

3

S_LOAD_SOUTH 1/8" = 1'-0"

4

S_LOAD_WEST 1/8" = 1'-0"

ARC303 WEST HOLLYWOOD HOUSING

LATERAL LOAD DIAGRAM 2018/05/30

BRACING

Peter Ho Barry Milofsky

SHEAR WALL SHEAR WALL HIDDEN

0'

4'

8'

16'

32'

S3.02 1/8" = 1'-0"

30 May 2018 3:06:05 AM

1


Chunyi Ho chunyiho@cpp.edu 012852359

CONCEPT & LIGHTING LAYER

REVISIONS

THERE ARE FOUR TYPE OF LIGHT IN THIS UNIT, THE COMBINATION OF LIGHTINGS IN EACH ROOM IS COORDING TO THE PURPOSE AND THE ACTIVITIES THAT WILL HAPPEN IN THE SPACE. LAYER 1 THIS IS THE RECESSED DOWNLIGHT LAYER, THE RECESSED LIGHT IS EVENLY SPREAD OUT THE APARTMENT TO PROVIDE THE BASIC LAYER OF LIGHT. LAYER 2 THE SECOND LAYER IS TASK LIGHT, WHICH INCLUDES THE BED-SIDE WALL LAMP, TOILET READING LAMP, CABINET LIGHT AND PENDANT DINING ROOM LIGHT. LAYER 3 THIS LAYER CONTAINS SOME WALL WASHER DOWN LIGHTING TO LIGHT UP SOME FLAT WALL, AND GIVE THE SPACE SOME MORE PATTERN.

RECESSED DOWN LIGHTING PENDANT LIGHTING WALL WASHER DOWN LIGHTING

UNIT_LIGHT_CONCEPT 12" = 1'-0"

TASK LIGHTING ARC303 WEST HOLLYWOOD HOUSING

LIGHTING DESIGN CONCEPT 2018/05/30 Peter Ho Barry Milofsky

E1.01 12" = 1'-0"

30 May 2018 3:05:50 AM

1


Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

WIRE

DUPLEX OUTLET

GFCI OUTLET

SINGLE POLE SWITCH 2

DOUBLE POLE SWITCH VS

SINGLE POLE SWITCH WITH VACANCY SENSOR

UNIT LIGHTING PLAN 1/2" = 1'-0"

LIGHTING PLAN LEGEND 1/2" = 1'-0"

CRI

COLOR TEMPERATURE

EFFICIENCY

HIGH EFFICIENCY

650

90+

2700

65

Y

66

568

90+

3000

51.7

Y

32.3

32.3

2762

90+

3000

85.5

Y

9.5

38

756

94

2700

80.3

Y

QUANTITY

WATTS

TOTAL WATTS

16

10

160

AMERLUX E2.9RLW-HP-NC-A1

6

11

DINING PENDANT LIGHT

DELRAY IL793-KG-W30-LI-BDIM-W11

1

UNDER CABINET LIGHT

PHILIPS 523-000027-88

4

WALL LAMP

PHILIPS WL484W LED40S

3

32.7

98.1

4000

80+

4000

122

Y

WATERPROOF BALCONY LIGHT

PHILPIS WT120C LED60S

2

57

114

6000

80+

4000

150

Y

TYPE

INFORMATION

RECESSED DOWNLIGHT

ECOSMART DL-N14A10FR2-27

WALL WASHER DOWNLIGHT

LUMENS

ARC303 WEST HOLLYWOOD HOUSING

ELECTRICAL PLAN 2018/05/30

LIGHTING SCHEDULE 1/2" = 1'-0"

Peter Ho Barry Milofsky

E1.11 1/2" = 1'-0"

30 May 2018 3:00:20 AM

1


Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

ARC303 WEST HOLLYWOOD HOUSING

LIGHTING FIXTURE SEPSIFICATION Peter Ho Barry Milofsky

E1.12

30 May 2018 3:00:21 AM

2018/05/30


Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

UNIT_DAY LIGHT 12" = 1'-0"

2

UNIT_NIGHT LIGHT 12" = 1'-0"

ARC303 WEST HOLLYWOOD HOUSING

UNIT LIGHTING RENDER 2018/05/30 Peter Ho Barry Milofsky

E1.21 12" = 1'-0"

30 May 2018 3:05:51 AM

1


8" COPING WATER PROOFING RIDGID INSULATION CANT STRIP

THROUGH INSULATION(90%) OUTSIDE AIR FILM WATERPROOF MEMBRANE 3" TAPERED RIGID INSULATION 3/4" PLYWOOD 9.25" HIGH DENSITY FIBER BATT INSULATION INSIDE AIR FILM TOTAL R-VALUE TOTAL U-VALUE 1/(22.77X10%+42.77X90%)=

0.17 0.06 11 0.93 30 0.61 42.77 0.022

FLOOR R-VALUE 3/4" LIGHT WEIGHT CONCRETE 0.08 3/4" PLYWOOD 0.93 INSIDE AIR FILM 0.68 OUTSIDE AIR FILM 0.17 TOTAL R-VALUE 1.86 TOTAL U-VALUE 1/1.86 =

0.54

Chunyi Ho

WALL R-VALUE THROUGH STUDS(10%) OUTSIDE AIR FILM 0.17 FIBER CEMENT PANEL 1.23 3/4" AIR SPACE 1 WATERPROOF MEMBRANE 0.06 3/4" PLYWOOD 0.93 2X6 I STUDS@16"O.C. 5.5 INSIDE AIR FILM 0.68 TOTAL R-VALUE 9.57 THROUGH INSULATION(90%) OUTSIDE AIR FILM FIBER CEMENT PANEL 3/4" AIR SPACE WATERPROOF MEMBRANE 3/4" PLYWOOD 5 1/4" HIGH DENSITY FIBER BATT INSULATION INSIDE AIR FILM TOTAL R-VALUE TOTAL U-VALUE 1/(9.57X10%+25.07X90%)=

chunyiho@cpp.edu 012852359 FIBER CEMENT PANEL 3/4" AIR SPACE

REVISIONS B310 BEAM HANGER 4X12 RIM JOIST DOUBLE TOP PLATE

0.17 1.23 1 0.06 0.93 21

3/4" PLYWOOD 2X6 STUDS @ 16" O.C. 1/2" GYPSUM BOARD DOUBLE INSULATING GLASS

0.68 25.07 0.043

GLASS R-VALUE Soft Coat Low-E insulated Glass 3.50 TOTAL U-VALUE 1/3.50=

INFILTRATION 8540/60=

0.28

R-VALUE 142.3

1 1/2" LIGHT WEIGHT CONCRETE 1/4" ACOUSTIC MATT 3/4" PLYWOOD 2X10 I JOIST @ 16" O.C.

ARC303 WEST HOLLYWOOD HOUSING

R-VALUE ESTIMATION 2018/05/30 Peter Ho Barry Milofsky

1

R-VALUE ESTIMATION 1 1/2" = 1'-0"

M1.01 1 1/2" = 1'-0"

30 May 2018 3:00:22 AM

ROOF R-VALUE THROUGH JOIST(10%) OUTSIDE AIR FILM 0.17 WATERPROOF MEMBRANE 0.06 3" TAPERED RIGID INSULATION 11 3/4" PLYWOOD 0.93 2X10 I JOIST@16"O.C. 10 INSIDE AIR FILM 0.61 TOTAL R-VALUE 22.77


Heating Load Calculation Heating Load Calculation Indoor Design Temp. = 72 Item Area(SF) x U-Value x Delta T = BTUH Roof Walls Glass Infiltration

854 SF 1026 SF 173.5 SF 142.3 CFM

x x x x

0.024 0.043 0.62 1.08

x x x x

29 29 29 29

TOTAL HEATING LOAD

=594.384 =1279.422 =3119.52 =4456.836

COOLING LOAD CFM= 17199.49 / (1.08X20) = 796.27CFM 796 X 120%ALLOWANCE = 955 USE 900CFM

=9450.162

Cooling Load Calculation Cooling Load Calculation -

COOLING LOAD > HEATING LOAD USE 900CFM TO DECIDE THE EQUIPMENT SIZE.

Indoor Design Condition = 72

Transmission: Item Area(SF) x U-Value x DETD

= BTUH

Roof Wall(N) Wall(E) Wall(S) Wall(W)

=20.5 =41.02 =67.92 =92.88 =128.57

854 SF x 318 SF x 121.5 SF x 360 SF x 230 SF x

Outdoor Design Temp. = 43

0.024 0.043 0.043 0.043 0.043

x x x x x

33 3 13 6 13

Outdoor Design Condition = 80/68

Outside Air: Mech.Vent.

52 SF x 17 118.5 SF x 66 20 SF x 66

REQUIRED CFM LIVING ROOM 2300 CF KITCHEN 1860 CF BATHROOM 760 CF BEDROOM 2220 CF

32.2% 26.1% 10.6% 31.1%

Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

300CFM 200CFM 100CFM 300CFM

CONVENTION TO TONS 1 TON = 12000 BTU/H 17199.49 X 120%ALLOWANCE / 12000 = 1.716 TONS USE 2 TONS

Solar Transmission: Item Area(SF) x DCLF Glass(N) Glass(E) Glass(W)

HEATING LOAD CFM= 9450.162/(1.08X50)= 175 175 X 120%ALLOWANCE = 210 USE 200CFM

DUCT SIZING 100CFM Φ= 2.7" 200CFM Φ= 3.8" 300CFM Φ= 4.6" 900CFM Φ= 8"

=884 =7821 =1320

142.3 CFM x 6 (vent.factor.) =853.8

Internal Heat Gain Light 180 (watts) x 3.4 x (1.20 Ballast Factor) Equipment 1281 (watts) x 3.4 People 2 (no.) x 250 (sensible heat)

=734.4 =4335.4 =500

Total Sensible Heat Gain

=16799.49

People

=400

2 (no.)

x 200 (latent heat)

Total Latent Heat Gain

=400

Sensible Heat Ratio (SHR) = (Tot. Sensible Heat Gain) / (Tot. Sen. Heat Gain + Tot. Latent Heat Gain) = 0.976 =17199.49 BTUH

ARC303 WEST HOLLYWOOD HOUSING

DUCT SIZING 2018/05/30 Peter Ho Barry Milofsky

M1.02

30 May 2018 3:00:23 AM

TOTAL COOLING LOAD (Sensible + Latent)


Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

ARC303 WEST HOLLYWOOD HOUSING

AC UNIT SELECTION Peter Ho Barry Milofsky

M1.03

30 May 2018 3:00:23 AM

2018/05/30


Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

ARC303 WEST HOLLYWOOD HOUSING

HVAC CONCEPT DIAGRAM Peter Ho Barry Milofsky

M1.04

30 May 2018 3:05:56 AM

2018/05/30


Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

2

COLD & HOT WATER SUPPLY_3D NO SCALE

COLD WATER LINE HOT WATER LINE

DRAINAGE

COLD WATER PIPING 3/4" FOR MAIN 1/2" FOR BRANCH

ARC303 WEST HOLLYWOOD HOUSING

WATER CLOSET

DRAINAGE PIPING FLOW AT 1/8 IN/FT SLOPE GPM

WATER HEATER

COLD & HOT WATER 2018/05/30 Peter Ho Barry Milofsky

3

COLD & HOT WATER SUPPLY_SECTION 1/4" = 1'-0" TO CITY LINE

P1.01 1/4" = 1'-0"

30 May 2018 3:05:57 AM

1

COLD & HOT WATER SUPPLY_PLAN 1/4" = 1'-0"


Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

2

SEWER & VENT_PLAN 1/4" = 1'-0"

6"

6"

6"

1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2"

3"

2

4"

4" 4" 4" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2"

3"

2

4"

1

4"

SEWER & VENT_3D NO SCALE

4"

1 1/2"

6"

1 1/2"

1 1/2" 1 1/2"

1 1/2"

3"

2

4"

VENT STACK SEWER 8" 1 1/2"

CLEANOUT

1 1/2"

1 1/2"

SEWER PIPE SIZE BASEMENT10” PIPE FIRST FLOOR 8” PIPE SECOND FLOOR 6” PIPE THIRD FLOOR 4” PIPE

10"

SEWER & VENT 2018/05/30

UNIT SEWER & VENT DIAGRAM 4 12" = 1'-0"

10"

sanitary sewer

SEWER & VENT_SECTION 3 1/4" = 1'-0"

Peter Ho Barry Milofsky

P1.02 12" = 1'-0"

30 May 2018 3:06:00 AM

EXHAUST VENT 1- 1/2” FROM FIXTURE MAIN 4" UP TO ROOF 6"

ARC303 WEST HOLLYWOOD HOUSING


ROOM

FIXTURE

PRODUCT NAME AND MODEL

WATER CONSUMPTION CODE COMPLIANT

KITCHEN

FAUCET

KOHLER SENSATE FAUCET K-72218

1.5 GAL/MIN

KITCHEN

WASHER & DRYER

LG SIGNITURE WASHER & DRYER COMBO 2.8 CU.FT. LUWM101HWA

YES N/A

Chunyi Ho

BATHROOM

FAUCET

KOHLER BOL FAUCET K-11000

1.5GAL/MIN

YES

BATHROOM

SHOWER HEAD

KOHLER HYDRORAIL-R MOXIE FLIPSIDE K-76475

2.0GAL/MIN

YES

KOHLER KARING INTELLIGENT TOILET K-4026

1.28GAL PER FLUSH

TOILET

REVISIONS

YES

ARC303 WEST HOLLYWOOD HOUSING

KITCHEN FIXTURE SPECIFICATION 2018/05/30 Peter Ho Barry Milofsky

P1.03

30 May 2018 3:00:25 AM

BATHROOM

chunyiho@cpp.edu 012852359


Chunyi Ho chunyiho@cpp.edu 012852359

REVISIONS

ARC303 WEST HOLLYWOOD HOUSING

BATHROOM FIXTURE SPECIFICATION Peter Ho Barry Milofsky

P1.04

30 May 2018 3:00:25 AM

2018/05/30


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.