Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
WEST HOLLYWOOD HOUSING PETER HO
SANTA MONICA BLVD
SPAULDING AVE
USE: BUOLDING HEIGHT: SITE LOCATION:
MULTI FAMILY HOUSING 42'-0" 1047 N SPAULDING AVE W HOLLYWOOD, CA 90046
LEGAL DESCRIPTION APN: OCCUPANCY GROUP: TYPE OF CONSTRUCTION: ZONING:
5530015029 R-2 / S-1 VA R3B
SITE DATA LOT SIZE (ACRES): LOT SIZE (SF):
0.298 ACRES 13,000 SF
FOOTAGE DATA PROPOSED BUILDING AREA: 8,024 SF FLR1: 4,256SF FLR2: 3,742SF
CONSTRUCTION MANAGER MICHAEL FOX 3801 W. TEMPLE AVE. POMONA, CA 91768 MICHAELFOX@CPP.EDU STRUCTURAL ENGINEER GARY L MCGAVIN 3801 W TEMPLE AVE, POMONA, CA 91768 GMCGAVIN@CPP.EDU
STORIES: DWELLING UNITS:
MECHANICAL ENGINEER
4 ABOVE GRADE 12
HOFU WU 3801 W TEMPLE AVE, POMONA, CA 91768 HWU@CPP.EDU CODE ANALYST ANDREW J. THUL 3801 W TEMPLE AVE, POMONA, CA 91768 ATHUL@CPP.EDU
SYMBOLS LEGEND 1 A101
SIM 1
REVISION CLOUD & TAG
CALLOUT SYMBOL
1
SIM
SECTION SYMBOL
A101
STRUCTURE GRID HEAD
1
A101
Ref 1
NORTH ARROW
Ref
LEVEL ELEVATION HEAD
Ref
Ref 1
Name Elevation
BARRY MILOFSKY 3801 W TEMPLE AVE, POMONA, CA 91768 BARRY@M2A-ARCHITECTS.COM
PROPOSED PARKING AREA: 11,971 SF PARKING SPACES: 23
VICINITY MAP 12" = 1'-0"
0
CHUNYI HO 3400 POLY VISTA, POMONA, CA 91768 PETERHO0103@GMAIL.COM MAIN PROJECT MANAGER
FLR3: 3,798SF FLR4: 1,904SF
1
ELEVATION MARK
SHEET LIST
OWNER
PROPOSED LOT COVERAGE: 61.7%
INCREASE DENSITY SB1818 2 UNIT AFFORDABLE HOUSING 1
PROJECT CONSULTANTS
GOVERNING CODES 2016 CALIFORNIA RESIDENTIAL CODE 2016 CALIFORNIA BUILDING CODE 2016 CALIFORNIA ELECTRICAL CODE 2016 CALIFORNIA MECHANICAL CODE 2016 CALIFORNIA PLUMBING CODE 2016 CALIFORNIA ENERGY CODE 2016 CALIFORNIA ELEVATOR SAFETY ORDERS 2016 CALIFORNIA FIRE CODE 2000 WEST HOLLYWOOD MUNICIPAL CODE
Sheet Number G0.00 G0.01 G1.01 G1.02 G1.03 A1.01 A1.02 A1.11 A1.21 A1.22 A1.23 A1.24 A1.25 A2.01 A3.01 A3.02 A3.11 A4.01 A4.11 A4.31 A5.01 A6.01 A7.01 A8.01 A8.02 S1.01 S1.02 S2.01 S3.01 S3.02 E1.01 E1.11 E1.12 E1.21 M1.01 M1.02 M1.03 M1.04 P1.01 P1.02 P1.03 P1.04
Sheet Name TITLE SHEET GENERAL NOTES FIRE RESISTING RATING FIRE RESISTING RATING FIRE RESISTING RATING SITE PLAN LANDSCAPE PLAN FOUNDATION PLAN PARKING LEVEL PLAN FIRST FLOOR PLAN SECOND FLOOR PLAN THIRD FLOOR PLAN FORTH FLOOR & ROOF PLAN ELEVATIONS SECTION SECTION WALL SECTION UNIT PLAN INTERIOR ELEVATION ENLARGED WALL SECTION DETAILS DOORS & WINDOW SCHEDUAL REFLECTED CEILING PLAN VERTICAL CIRCULATION VERTICAL CIRCULATION DETAILS STACK STRUCTURE FRAMING FRAMING CORNER DETAIL 3D STRUCTURE DETAIL GRAVITATIONAL LOAD DIAGRAM LATERAL LOAD DIAGRAM LIGHTING DESIGN CONCEPT ELECTRICAL PLAN LIGHTING FIXTURE SEPSIFICATION UNIT LIGHTING RENDER R-VALUE ESTIMATION DUCT SIZING AC UNIT SELECTION HVAC CONCEPT DIAGRAM COLD & HOT WATER SEWER & VENT KITCHEN FIXTURE SPECIFICATION BATHROOM FIXTURE SPECIFICATION
ARC303 WEST HOLLYWOOD HOUSING
TITLE SHEET 2018/05/30 Peter Ho Barry Milofsky
G0.00 As indicated
30 May 2018 3:05:52 AM
PROJECT INFORMATION
VICINITY MAP
GENERAL NOTE
WEST HOLLYWOOD MUNICIPAL CODES
DETAILS
ADA
1. ALL WORK SHALL BE IN COMPLIANCE WITH ALL APPLICABLE LOCALBUILDING CODES AND REGULATIONS. CONTRACTOR SHALL BERESPONSIBLE FOR PERMITS APPLICABLE TO SPECIFIC TRADES ORSUBCONTRACTORS
HIGH-RISE TRAINING FOR OCCUPANTS REQUIRED (S 14.08.010:) ALL HIGH-RISE BUILDING OCCUPANTS SHALL BE INSTRUCTED ANNUALLY ON THE PROCEDURES TO BE FOLLOWED IN THE EVENT OF FIRE, EARTHQUAKE, OR OTHER EMERGENCY. DOCUMENTATION OF OCCUPANT INSTRUCTION SHALL BE MAINTAINED BY THE FIRE SAFETY DIRECTOR OF EACH HIGH-RISE BUILDING, AND SHALL BE AVAILABLE FOR INSPECTION BY THE FIRE MARSHAL. INSTRUCTION FOR ALL NEW OCCUPANTS SHALL OCCUR WITHIN FOURTEEN DAYS OF THEIR ASSUMING OCCUPANCY OF THE BUILDING.
EXTERIOR WALL OPENINGS (TABLE 705.8:) NORTH ELEVATION: 5 FT. TO LESS THAN 10 FT. = 25% OF WALL PROTECTED SOUTH ELEVATION: 5 FT. TO LESS THAN 10 FT. = 25% OF WALL PROTECTED WEST ELEVATION: 15 FT. TO LESS THAN 20 FT. = 75% OF WALL PROTECTED EAST ELEVATION: 25 FT. TO LESS THAN 30 FT. = NO LIMIT
ADA REQUIREMENTS: FOUND IN CHAPTER 11 A, RESIDENTIAL, AND FAIR HOUSING ACT ELEVATOR CONNECTS TO ALL FLOORS. ALL UNITS MUST BE ADA COMPATIBLE, ADA ADAPTABLE/ACCESSIBLE. AREAS REQUIRED: BATHROOMS, KITCHENS, DOORS, AND HALLWAYS.
GREEN BUILDING REQUIREMENTS (S 15.64.020:) ALL NEW PUBLIC BUILDINGS OR ADDITIONS TO PUBLIC BUILDINGS OF 10,000 SQUARE FEET OR MORE, OR PUBLIC BUILDING TENANT IMPROVEMENT AND MAJOR REMODEL PROJECTS 10,000 DQUARE FEET OR MORE, SHALL ACHIEVE THE LEED-CERTIFIED LEVEL AT A MINIMUM.
DOORS (S 1010.2:) EGRESS DOORS SHALL BE OF THE PIVOTED SIDE-HINGED SWINGING TYPE. EXCEPTION: DOORS WITHIN OR SERVING A SINGLE DWELLING UNIT IN GROUPS R-2 AND R-3.
3. ALL SUBCONTRACTORS TO THE GENERAL CONTRACTOR SHALLINSPECT THE SITE AND SHALL CONVEY ANY QUESTIONSREGARDING DESIGN INTENT AND S COPE OF WORK TO THEARCHITECT PRIOR TO SUBMITTING BID AND PRIOR TO COMMENCINGWORK. 4. CONTRACTOR SHALL COORDINATE THE WORK OF THE VARIOUSTRADES AND SUBCONTRACTORS AND SHALL BE RESPONSIBLE FORANY ACTS, OMISSIONS, OR ERRORS OF THE SUBCONTRACTORS ANDOF PERSONS DIRECTLY OR INDIRECTLY EMPLOYED BY THEM. 5. CONTRACTOR TO ASSUME SOLE RESPONSIBILITY FOR JOB SITECONDITIONS INCLUDING SAFETY OF PERSONS AND PROPERTY FORTHE DURATION OF THE PROJECT. 6. CONTRACTOR TO NOTIFY ARCHITECT IMMEDIATELY AND PRIOR TOORDERING OF ALL LONG LEAD ITEMS AND OF APPROXIMATEDELIVERY DATES.
RESIDENTIAL DENSITY IN R1 AND R2 ZONES (S 19.060.050:) FOR R-2 OCCUPANCY: 2 UNITS PER LOT OF LESS THAN 4,000 SQ. FT.; 3 UNITS PER LOT BETWEEN 4,000 SQ. FT. AND 7,999 SQ. FT.; 4 UNITS PER LOT BETWEEN 8,000 SQ. FT. AND 9,999 SQ. FT.; PLUS 1 ADDITIONAL UNIT PER LOT, FOR EACH 2,000 SQ. FT. OF FRACTION THEREOF IN EXCESS OF 9,999 SQ. FT. AFFORDABLE UNITS REQUIRED (S 19.22.030:) A. REQUIREMENT: INCLUSIONARY UNITS. IN THE QUANTITY AND OF THE QUALITY SPECIFIED IN SUBSECTIONS B AND D OF THIS SECTION. B. PROJECTS OF ELEVEN TO TWENTY UNITS: TWENTY PERCENT OF THE UNIT COUNT PROVIDED AS UNITS OF COMPARABLE SIZE AND FINISH QUALITY TO THE NONINCLUSIONARY UNITS, OR PROVIDED AS UNITS THAT ARE
11. THESE NOTES TO APPLY TO ALL DRAWINGS AND GOVERN UNLESSMORE SPECIFIC REQUIREMENTS ARE INDICATED APPLICABLE TOPARTICULAR DIVISION OF THE WORK. SEE SPECIFICATIONS ANDGENERAL NOTES IN THE SUBSECTIONS OF THESE DRAWINGS.
SPECIAL PROVISIONS (S 510.2:) A BUILDING SHALL BE CONSIDERED AS SEPERATE AND DISTINCT BUILDINGS FOR THE PURPOSE OF DETERMINING LIMITATIONS, CONTINUITY FOR FIRE WALLS, LIMITATION IN NUMBER OF STORIES, AND TYPE OF CONSTRUCTION WHERE ALL OF THE FOLLOWING CONDITIONS ARE MET: 1. THE BUILDING SEPERATED WITH A HORIZONTAL ASSEMBLY HAS A FIRE RESISTANCE RATING OF NOT LESS THAN 3 HOURS. 2. THE BUILDING BELOW THE HORIZONTAL ASSEMBLY IS NOT GREATER THAN ONE STORY ABOVE GRADE PLANE. 3. THE BUILDING BELOW THE HORIZONTAL ASSEMBLY IS OF TYPE A CONSTRUCTION. 4. SHAFT, STAIRWAY, RAMP, AND ESCALATOR ENCLOSURES THROUGH THE HORIZONTAL ASSEMBLY SHALL NOT HAVE LESS THAN A 2-HOUR FIRE RESISTANCE RATING WITH OPENING PROTECTIONS IN ACCORDING WITH SECTION 716.5
SET BACK SETBACKS FRONT: 25 FT. ALLOWED 25 FT. PROVIDED N SIDES: LEVELS
5 FT. ALLOWED + 3 FT. FOR UPPER
S SIDES: LEVELS
5 FT. ALLOWED + 1 FT. FOR UPPER
REAR:
15 FT. ALLOWED 15 FT. PROVIDED
8 FT. PROVIDED
6 FT. PROVIDED
RAMP (S 1012:) GARAGE RAMP IS NOT A RAMP: SLOPE <2% HANDRAILS (S 1014.2:) HANDRAILS HEIGHT, MEASURED ABOVE STAIR TREAD NOSING, OR FINISH SURFACE RAMP SLOPE, SHALL BE UNIFORM, NOT LESS THAN 34 INCHES AND NOT MORE THAN 38 INCHES. HANDRAIL HEIGHT OF ALTERNATING TREAD DEVICES AND SHIPS LADDERS, MEASURE ABOVE TREAD NOSINGS, SHALL BE UNIFORM, NOT LESS THAN 30 INCHES AND NOT MORE THAN 34 INCHES.
REVISIONS
GARAGES (S 405.3:) PARKING GARAGES ARE PROVIDED WITH AUTOMATIC SPRINKLER SYSTEMS WHERE THE LOWER STORY IS THE ONLY STORY THAT WOULD QUALIFY THE BUILDING AS AN UNDERGROUND BUILDING AND HAS AN AREA NOT GREAER THAN 1,500 SQ. FT. AND HAS AN OCCUPANT LOAD LESS THAN 10.
10. WHEN SPECIFIC FEATURE OF CONSTRUCTION ARE NOT FULLYSHOWN ON THE DRAWINGS OR CALLED FOR IN THE GENERALNOTES, THEIR CONSTRUCTION SHALL BE THE SAME CHARACTER ASSIMILAR CONDITIONS.
PROVISIONS
chunyiho@cpp.edu 012852359
EGRESS BALCONIES (S 1021 & S 1027.6:) OUTDOOR CORRIDORS COMPLY. SEPERATION BETWEEN OPEN STAIRS WITH EGRESS BALCONY IN BETWEEN: >50%.
9. DRAWINGS SCHEMATICALLY INDICATE NEW CONSTRUCTION. THECONTRACTOR SHOULD ANTICIPATE, BASED ON EXPERIENCE, AREASONABLE NUMBER OF ADJUSTMENTS TO BE NECESSARY TOMEET THE DESIGN OBJECTIVES AND SHOULD CONSIDER SUCHADJUSTMENTS AS INCLUDED IN THE SCOPE OF WORK.
14. SEE CONSTRUCTION SCHEDULE SHEET (A-800) FOR LIST OFABBREVIATIONS.
Chunyi Ho
CORRIDER WIDTHS (1 1020:) ALL CORRIDORS COMPLY.
8. IF ERRORS OR OMISSIONS ARE FOUND IN THE DRAWINGS, THEYSHALL BE BROUGHT TO THE ATTENTION TO THE ARCHITECTBEFORE PROCEEDING WITH THE WORK.
13. CONTRACTOR SHALL PROVIDE ADEQUATE WEATHER PROTECTIONFOR THE BUILDING AND ITS CONTENTS DURING THE COURSE OFWORK.
STAIRWAYS (S 1011.2:) STAIRWAYS SERVING OCCUPIED PORTIONS OF A BUILDING SHALL COMPLY WITH THE REQUIREMENTS OF SECTIONS 1011.2 THROUGH SECTION 1011.14. EXCEPTION: STAIRWAYS SERVING AN OCCUPANT LOAD OF LESS THAN 50 SHALL HAVE A WIDTH OF NOT LESS THAN 36 INCHES (913 MM.)
NON-ENCLOSED EXIST STAIRS (S 1019:) RESIDENTIAL NON-ENCLOSED EXIT STAIRS COMPLY.
7. ALL CONSTRUCTION MATERIALS AND SUPPLIES TO BE STORED,HANDLED AND INSTALLED ACCORDING TO MANUFACTURER'Sâ&#x20AC;&#x2122;RECOMMENDATIONS
12. CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN ALLTEMPORARY BARRIERS AND GUARDS, AND TEMPORARY SHORINGAND BRACING AS REQUIRED BY ALL CITY AND STATE REGULATIONS.
LOCATION OF EXITS: STAIRS MUST BE LOCATED 1/2 THE DIAGONAL OF THE WORKABLE FLOOR.
ELEVATORS (S 405.4.3:) WHERE ELEVATORS ARE PROVIDED, EACH COMPARTMENT SHALL HAVE DIRECT ACCESS TO AN ELEVATOR. WHERE AN ELEVATOR SERVES MORE THAN ONE COMPARTMENT BY A SMOKE BARRIER IN ACCORDANCE WITH SECTION 709. DOORS SHALL BE GASKETED, HAVE DROP SILL AND BE AUTOMATIC-CLOSING BY SMOKE DETECTORS IN ACCORDANCE WITH SECTION 716.5.9.3.
ALLOWABLE HEIGHTS AND AREA MAX FLOOR AREA (TABLE 504.4:) Aa = [At + (NS * lf)] * Sa Aa: ALLOWABLE AREA At: TABULAR ALLOWABLE AREA FACTOR Ns: TABULAR ALLOWABLE AREA FACTOR (NON-SPRINKLER REGARDLESS OF WHETHER THE BUILDING IS SPRINKLED) lf: AREA FACTOR INCREASE DUE TO FRONTAGE Sa: FOR OTHER THAN GROUP A, E, H, I, L AND R OCCUPANCIES, HIGH-RISE BUILDINGS AND OTHER APPLICATIONS LISTED IN TABLE 504.4 REGULATED BY THE OFFICE OF THE STATE FIRE MARSHAL, ACTUAL NUMBER OF STORIES ABOVE GRADE PLANE (WITHOUT AREA INCREASE), NOT TO EXCEED FOUR. Aa = [36,000 + (36,000 * 0] * 1
= 36,000 SF
AREA OCCUPANCY R-2 (2016 CBC) CONSTRUCTION TYPE: MAXIMUM ALLOWABLE HEIGHT: ALLOWABLE AREA:
VA 4 STORIES, 60 FT. (TABLE 504.3) 36,000 SF (TABLE 504.4)
OCCUPANCY S-2: CONSTRUCTION TYPE: MAXIMUM ALLOWABLE HEIGHT: ALLOWABLE AREA:
IA UNLIMITED (TABLE 504.4) UNLIMITED (TABLE 506.2)
PARKING DATA (1 LEVEL BELOW GRADE) CA GOVERNMENT CODE SEC : 65915 AND SECTION) REQUIRED : 18 STALLS STUDIO : 1 PARKING SPACE ONE BEDROOM : 1.5 PARKING SPACES TWO BEDROOM AND TOWN HOUSES : 2 PARKING SPACES GUEST PARKING NOT REQUIRED 1 VAN ACCESSIBLE PROVIDED : 21 STALLS 3 STUDIOS : 3 PARKING SPACES 8 ONE BEDROOMS : 12 PARKING SPACES 1 TWO BEDROOM : 2 1 VAN ACCESSIBLE INCLUDED
MAXIMUM AREA OF EXTERIOR WALL OPENING (TABLE 705.8) FIRE SEPARATION DISTANCE 3' TO 5' UNPROTECTED, SPRINKLERED = 15% FIRE SEPARATION DISTANCE 5' TO 10' UNPROTECTED, SPRINKLERED = 25% FIRE SEPARATION DISTANCE 10' TO 15' UNPROTECTED, SPRINKLERED = 45% FIRE SEPARATION DISTANCE 15' TO 20' UNORITECTED, SPRINKLERED = 75% FIRE SERPARTION DISTANCE 20' TO 25' UNPROTECTED, SPRINKLERED = NO LIMIT
ARC303 WEST HOLLYWOOD HOUSING
GENERAL NOTES 2018/05/30 Peter Ho Barry Milofsky
G0.01
30 May 2018 3:00:21 AM
2. CONTRACTOR WILL HAVE EXAMINED THE PREMISES AND SITE SO ASTO COMPARE THEM WITH THE DRAWINGS AND WILL HAVESATISFIED HIMSELF AS TO THE CONDITION OF THE EXISTING WORKAN ADJACENT PROPERTY PRIOR TO SUBMISSION OF BID. NOALLOWANCES WILL SUBSEQUENTLY BE MADE ON BEHALF OF THECONTRACTOR BY REASON OF ANY OMISSION ON HIS PART TOINCLUDE THE COSTS OF ALL ITEMS OF WORK, EITHER LABOR ORMATERIALS, WHETHER THEY ARE OR ARE NOT SHOWN OR NOTEDBUT WHICH ARE IMPLIED OR REQUIRED TO ATTAIN THE COMPLETEDCONDITIONS PROPOSED IN THE DRAWINGS.
Chunyi Ho chunyiho@cpp.edu 012852359
14' - 6"
27' - 8"
30' - 10"
21' - 8"
30' - 4"
REVISIONS
FIRE RESISTANCE RATING REQUIREMENT SEPARATION BETWEEN RESIDENTIAL UNITS = 1 HR (TABLE 420.2/709.3) EGRESS ENCLOSE FROM RESIDENTIAL UNITS = 2 HR (TABLE 102.1) PRIMARY STRUCTURAL FRAME = 1 HR (TABLE 601) BEARING WALL EXTERIOR = 2 HR (TABLE 601) BEARING WALL INTERIOR = 1 HR (TABLE 601) NON -BEARING WALL EXTERIOR AND INTERIOR PARTITION = 0 HR (TABLE 601) FLOOR CONSTRUCTION AND SECONDARY MEMBERS = 1 HR (TABLE 601) ROOF CONSTRUCTION AND SECONDARY MEMBERS = 1 HR (TABLE 601).
13' - 0"
DETAILS FOUND IN CBC 2016 (TABLE 601)
1
NOTE FOR TABLE 508.4: FIRE SEPERATION BETWEEN PARKING LEVELS S-2 AND UNITS ABOVE GRADE (R-2) MUST HAVE A MINIMUM FIRE RATING OF 1 HOUR AS FIRE SEPERATION BETWEEN PARKING GARAGE AND HOUSING.
2
Trash
INTERIOR BEARING WALL -1 HR. FIRE RATING
18
3
EGRESS STAIR ENCLOSURE -2HR FIRE RATING
30' - 9"
EXTERIOR BEARING WALL -1 HR. FIRE RATING
SEPARATION PARTITION -1 HR. FIRE RATING S-2 ABOVE R-2 -3 HR. FIRE RATING
4
FIRE WALL / EGRESS LEGEND
22
DETAILS
21
20
19
17
14
15
16
1. OUTDOOR AREAS USED EXCLUSIVELY FOR SERVICE OF THE BUILDING NEED ONLY HAVE ONE MEANS OF EGRESS.
29' - 8"
5
OUTDOOR AREAS (SECTION 1004.5:) YARDS, PATIOS, COURTS, AND SIMILAR OUTDOOR AREAS ACCESSIBLE TO AND USABLE BY THE BUILDING OCCUPANTS SHALL BE PROVIDED WITH MEANS OF EGRESS AS REQUIRED BY THIS CHAPTER EXCEPT:
6
2. BOTH OUTDOOR AREAS ASSOCIATED WITH GROUP R-3 AND INDIVIDUAL DWELLING UNITS GROUP R-2. STAIRWAYS (SECTION 105.1:) FOR OTHER THAN GROUP H AND I-2 OCCUPANCIES, THE CAPACITY, IN INCHES, MEANS OF EGRESS AND STAIRWAYS SHALL BE CALCULATED BY MULTIPLYING THE OCCUPANT LOAD SERVED BY SUCH STAIRWAYS BY A MEANS OF EGRESS CAPACITY FACTOR OF 0.2" PER OCCUPANTIN A BUILDING EQUIPPED WITH AN AUTOMATIC SPRINKLER SYSTEM INSTALLED IN ACCORDANCE WITH SECTION 903.3.1.2 AND EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM IN ACCORANCE WITH SECTION 907.5.2.2.
7
1' - 4"
8
MAXIMUM DISTANCE (TABLE 1017.2) REQUIRED: 250 ' PROVIDED: 96 '
9
10
11
9' - 0"
12
13
1' - 4"
16' - 5"
6' - 5"
NUMBER OF EXITS REQUIRED: 51 OCCUPANTS = 2 EXITS
9' - 0"
#Risers 18 #Treads 16
PATH OF TRAVEL
PATH OF TRAVEL LEGEND 12" = 1'-0" FIRE RATING WALL_BASEMENT 1/8" = 1'-0" ARC303 WEST HOLLYWOOD HOUSING
FIRE RESISTING RATING 2018/05/30 Peter Ho Barry Milofsky
G1.01 As indicated
30 May 2018 3:05:53 AM
1
Chunyi Ho chunyiho@cpp.edu 012852359
8' - 0"
REVISIONS
15' - 0" " '-0 ø5
ø5 '-0 "
ø5 '-0 "
Studio
21' - 0"
1 Bed
1 Bed '-0 ø5
'-0 ø5
"
"
1 Bed 1 Bed 0" ø 5' -
Studio
2 Bed Studio
" '-0 ø5
6' - 0"
0" ø 5' -
1
FIRE RATING WALL_FIRST FLOOR 1/8" = 1'-0"
2
FIRE RATING WALL_SECOND FLOOR 1/8" = 1'-0"
DETAILS
1. OUTDOOR AREAS USED EXCLUSIVELY FOR SERVICE OF THE BUILDING NEED ONLY HAVE ONE MEANS OF EGRESS. 2. BOTH OUTDOOR AREAS ASSOCIATED WITH GROUP R-3 AND INDIVIDUAL DWELLING UNITS GROUP R-2. STAIRWAYS (SECTION 105.1:) FOR OTHER THAN GROUP H AND I-2 OCCUPANCIES, THE CAPACITY, IN INCHES, MEANS OF EGRESS AND STAIRWAYS SHALL BE CALCULATED BY MULTIPLYING THE OCCUPANT LOAD SERVED BY SUCH STAIRWAYS BY A MEANS OF EGRESS CAPACITY FACTOR OF 0.2" PER OCCUPANTIN A BUILDING EQUIPPED WITH AN AUTOMATIC SPRINKLER SYSTEM INSTALLED IN ACCORDANCE WITH SECTION 903.3.1.2 AND EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM IN ACCORANCE WITH SECTION 907.5.2.2.
STUDIO UNIT: 493 SF / 200 GROSS = 2.465 TOTAL OF 1 PERSON 1 * 0.2 = 0.2 1 BEDROOM UNIT: 830 SF / 200 GROSS = 4.15 TOTAL OF 1 PEOPLE 1 * 0.2 = 0.2 2 BEDROOM UNIT: 1054 SF / 200 GROSS = 5.27 TOTAL OF 2 PEOPLE 2 * 0.2 = 0.4
NUMBER OF OCCUMPANTS: SF OF PARKING LEVEL / OCCUPANT LOAD SF OF FIRST FLOOR / OCCUPANT LOAD SF OF SECOND FLOOR / OCCUPANT LOAD SF OF THIRD FLOOR / OCCUPANT LOAD SF OF FORTH FLOOR / OCCUPANT LOAD
FACTOR = 9703 SF / 200 SF FACTOR = 3172 SF / 200 SF FACTOR = 3389 SF / 200 SF FACTOR = 1826 SF / 200 SF FACTOR = 1826 SF / 200 SF
/ PER OCCUPANT / PER OCCUPANT / PER OCCUPANT / PER OCCUPANT / PER OCCUPANT
= 49 PEOPLE = 16 PEOPLE = 17 PEOPLE = 10 PEOPLE = 10 PEOPLE
NUMBER OF EXITS REQUIRED: 51 OCCUPANTS = 2 EXITS
ARC303 WEST HOLLYWOOD HOUSING
EXTERIOR BEARING WALL -1 HR. FIRE RATING INTERIOR BEARING WALL -1 HR. FIRE RATING
FIRE RESISTING RATING
EGRESS STAIR ENCLOSURE -2HR FIRE RATING SEPARATION PARTITION -1 HR. FIRE RATING PATH OF TRAVEL
S-2 ABOVE R-2 -3 HR. FIRE RATING
PATH OF TRAVEL LEGEND 12" = 1'-0"
FIRE WALL / EGRESS LEGEND
2018/05/30 Peter Ho Barry Milofsky
G1.02 As indicated
30 May 2018 3:05:54 AM
OUTDOOR AREAS (SECTION 1004.5:) YARDS, PATIOS, COURTS, AND SIMILAR OUTDOOR AREAS ACCESSIBLE TO AND USABLE BY THE BUILDING OCCUPANTS SHALL BE PROVIDED WITH MEANS OF EGRESS AS REQUIRED BY THIS CHAPTER EXCEPT:
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
" '-0 ø5
" '-0 ø5
1 Bed
1 Bed
1 Bed
ø5 '-0 "
ø5 '-0 "
2
FIRE RATING WALL_FOURTH FLOOR 1/8" = 1'-0"
EXTERIOR BEARING WALL -1 HR. FIRE RATING INTERIOR BEARING WALL -1 HR. FIRE RATING EGRESS STAIR ENCLOSURE -2HR FIRE RATING SEPARATION PARTITION -1 HR. FIRE RATING
FIRE RATING WALL_THIRD FLOOR 1/8" = 1'-0"
S-2 ABOVE R-2 -3 HR. FIRE RATING
PATH OF TRAVEL LEGEND 12" = 1'-0"
FIRE WALL / EGRESS LEGEND
ARC303 WEST HOLLYWOOD HOUSING
FIRE RESISTING RATING 2018/05/30 Peter Ho Barry Milofsky
G1.03 As indicated
30 May 2018 3:05:56 AM
1
PATH OF TRAVEL
Chunyi Ho
130' - 0"
chunyiho@cpp.edu 012852359
REVISIONS
0"
12' - 0"
3' -
100' - 0"
G S W E
G S W E
DEMOLISH EXISTING SINGLE FAMILY HOUSE
G
S
W
E
G
S
W
E
G
S
W
E
G
S
W
E
SPAULDING AVE
8' - 0"
PARKWAY
21' - 0"
SIDEWALK
15' - 0"
DEMOLISHED DRIVEWAY NEW SIDEWALK & LANDSCAPE S
W
E
G
S
W
E
6' - 0"
G
ARC303 WEST HOLLYWOOD HOUSING
SITE PLAN 4'
8'
16'
32'
Peter Ho Barry Milofsky
A1.01 1/8" = 1'-0"
30 May 2018 3:00:01 AM
2018/05/30 0'
Chunyi Ho chunyiho@cpp.edu 012852359
13' - 3"
GRASS
13' - 7"
13' - 10"
13' - 0"
28' - 7"
10' - 9"
19' - 10"
6' - 3"
REVISIONS
1' - 10"
17' - 6"
11' - 0"
3' - 6"
1 X 1 TILE
2' - 6"
6' - 9"
15' - 5"
13' - 6"
10' - 1"
8' - 9"
PLANTER
5' - 0"
14' - 2"
14' - 4"
7' - 3"
5' - 0"
2' - 6"
7' - 6"
10' - 2"
9' - 1"
43' - 10"
2' - 0"
12' - 3"
4' - 6"
4' - 2"
7' - 7"
OUTDOOR DECK
SPAULDING AVE
17' - 8"
8' - 9"
6' - 7"
13' - 6"
2' - 2"
3' - 0"
7' - 0"
18' - 0"
WOODDECKING
7' - 4"
TREE
2' - 6"
7' - 0"
2' - 6"2' - 9"
32' - 5"
LANDSCAPE PLAN 1/8" = 1'-0"
ARC303 WEST HOLLYWOOD HOUSING
LANDSCAPE PLAN 2018/05/30 Peter Ho Barry Milofsky
A1.02 1/8" = 1'-0"
30 May 2018 3:00:01 AM
1
P1
P2
P3
14' - 6"
27' - 8"
P4
P5
30' - 10"
21' - 8"
P6
Chunyi Ho
30' - 4"
chunyiho@cpp.edu 012852359
3' - 0"
REVISIONS 21' - 7"
PA
PB
30' - 7"
7' - 1"
6' - 0"
9' - 6"
1' - 10"
4' - 0"
13' - 3"
-10' - 0"
1' - 1"
4' - 0"
4' - 0"
29' - 8"
PC
16' - 5"
PD
PE 1' - 6"
FOUNDATION PLAN 1/8" = 1'-0" ARC303 WEST HOLLYWOOD HOUSING
FOUNDATION PLAN PROPERTY LINE
2018/05/30 Peter Ho Barry Milofsky
FOUNDATION FOOTINGS/PAD
0'
4'
8'
16'
32'
A1.11 1/8" = 1'-0"
30 May 2018 3:00:02 AM
1
Chunyi Ho chunyiho@cpp.edu 012852359
P1
P2
P3
14' - 6"
P4
27' - 8"
P5
30' - 10"
P6
21' - 8"
REVISIONS
30' - 4"
DRAINEGE
PA 1' - 6"
13' - 0"
-10' - 0"
1
PB
ELECTRICAL D4
Trash
WATER
1' - 6"
GAS D3
D3
18
3
D3
D4
30' - 9"
2
4 21
20
5
19
17
PC
17' - 0"
15 2
"
'-
SLOPE TO DRAIN
1"
29' - 8"
81
2 '-
6
TYPICAL
7
1' - 4"
9' - 0"
9' - 0"
12
13
1' - 4"
3' - 2"
D3
9
10
11
14
15
16 16' - 5"
18' - 0"
6' - 5"
#Risers 18 #Treads 16 PE
1' - 0"
ARC303 WEST HOLLYWOOD HOUSING
PARKING LEVEL PLAN 2018/05/30 0'
4'
8'
16'
32'
Peter Ho Barry Milofsky
A1.21 1/8" = 1'-0"
30 May 2018 3:00:02 AM
5' - 10"
PD
8
Chunyi Ho chunyiho@cpp.edu 012852359
76' - 10"
48' - 2"
5' - 0"
AREA OF STACK 15' - 9"
10' - 9"
5' - 5"
12' - 7"
24' - 7"
4' - 0"
REVISIONS
4' - 6"
17' - 2"
2' - 0" 9' - 10"
8' - 9"
5' - 11"
7' - 9"
4' - 6"
30' - 0"
12' - 0"
5' - 0"
15' - 9"
8' - 2"
"
0" ø 5' -
21' - 2"
D3
W2
13' - 4" 25' - 0"
74' - 11"
W7
D1
W2 D1
W6
D1 '-0 ø5
121 1 BED UNIT 723.64 SF
111 GYM 272.29 SF
112 1 BED UNIT 747.68SF
W2
D1
122 STUDIO UNIT 471.22 SF
8' - 5"
W14
W6
6' - 10"
ø5 '-0 "
W14
W8
14' - 10"
W1
W13
W9
4' - 6"
5' - 6"
W1
4' - 6" W3
123 STUDIO UNIT 480.75 SF
0" ø 5' -
12' - 3"
W15
5' - 10"
D1
12' - 10"
20' - 3"
3' - 6"
W3
D3
13' - 5"
ARC303 WEST HOLLYWOOD HOUSING
FIRST FLOOR PLAN
FLOOR PLAN_1F 1/8" = 1'-0"
2018/05/30 Peter Ho Barry Milofsky 0'
4'
8'
16'
32'
A1.22 1/8" = 1'-0"
30 May 2018 3:00:03 AM
1
Chunyi Ho chunyiho@cpp.edu 012852359 AREA OF STACK
25' - 0"
24' - 1"
REVISIONS 14' - 1"
4' - 0"
5' - 5"
26' - 1"
W1 4' - 6"
12' - 7"
W9
W8
7' - 9"
2' - 5"
"
W2 D1
6' - 0"
15' - 9"
4' - 6"
D1 D1 '-0 ø5
W14
W6
W10
W2
221 1 BED UNIT 723.64 SF
6' - 7"
211 STUDIO UNIT 515.08 SF
212 1 BED UNIT 747.68 SF
31' - 1"
ø5 '-0 "
11' - 9"
" '-0 ø5
7' - 9"
W1X W13
4' - 6"
24' - 7"
14' - 10"
3' - 6"
5' - 7"
10' - 4"
7' - 10"
22' - 6"
11' - 0"
4 A8.01
Sim
W2 18' - 0"
12' - 6"
9' - 10"
8' - 9"
5' - 11"
74' - 11"
21' - 0"
55' - 0"
D1
W14
W2
20' - 4"
222 2 BED UNIT 974.25 SF
" '-0 ø5
W2
12' - 3"
W15
W3
8' - 0"
W1X
4' - 8"
13' - 5"
26' - 1"
FLOOR PLAN_2F 1/8" = 1'-0" ARC303 WEST HOLLYWOOD HOUSING
SECOND FLOOR PLAN 2018/05/30 0'
4'
8'
16'
32'
Peter Ho Barry Milofsky
A1.23 1/8" = 1'-0"
30 May 2018 3:00:04 AM
1
Chunyi Ho chunyiho@cpp.edu 012852359 AREA OF STACK
REVISIONS 32' - 4" 7' - 10"
4' - 6"
3' - 2"
16' - 10"
W12X W12
15' - 7"
10' - 6"
W4 " '-0 ø5
14' - 0"
W5
W5
311 1 BED UNIT 759.17 SF
W11
24' - 4"
6' - 7"
56' - 1"
28' - 2"
D1
D4
4 A8.01
74' - 7"
2' - 10"
W5
W5
11' - 0"
20' - 7"
ø5 '-0 "
W12X W12
W4
PLANTER
8' - 5" 10' - 6"
39' - 5"
W11 5' - 2"
4' - 3"
D1
312 1 BED UNIT 759.17 SF
11' - 0"
7' - 0"
14' - 0"
D3
7' - 10"
WOOD DECKING 722.44 SF
6' - 6"
FLOOR PLAN_3F 1/8" = 1'-0" ARC303 WEST HOLLYWOOD HOUSING
THIRD FLOOR PLAN 2018/05/30 0'
4'
8'
16'
32'
Peter Ho Barry Milofsky
A1.24 1/8" = 1'-0"
30 May 2018 3:00:05 AM
1
8' - 8"
14' - 10"
9' - 11"
Chunyi Ho chunyiho@cpp.edu 012852359
AREA OF STACK
32' - 4"
W4
W12X W12
6' - 5"
W5
411 1 BED UNIT 759.17 SF
W11
D1
2' - 0"
2' - 9"
1/4" / 12" SLOPE TO DRAIN
5' - 2"
24' - 6" 6' - 8"
W5
REVISIONS
20' - 0"
8' - 11"
" '-0 ø5
4' - 6"
1' - 10" 2' - 8"
1 A4.11
8' - 8"
7' - 10"
12' - 4"
4' - 6"
11' - 11"
3' - 6" 4 A8.01
D4
ROOF OF THE STAIR CACE
Sim
D1 W5
412 1 BED UNIT 759.17 SF
W11
W5 ø5 '-0 "
4' - 0"
4' - 0"
W12X W12 W4
FLOOR PLAN_4F 1/8" = 1'-0"
2
Roof Plan 1/8" = 1'-0"
ARC303 WEST HOLLYWOOD HOUSING
FORTH FLOOR & ROOF PLAN 2018/05/30 0'
4'
8'
16'
32'
Peter Ho Barry Milofsky
A1.25 1/8" = 1'-0"
30 May 2018 3:00:07 AM
1
---
AREA OF STACK
W4
W11
Roof 40' - 0"
W11
W12X W12
Roof 40' - 0"
W4
FLOOR PLAN_2F 10' - 0"
6' - 10"
chunyiho@cpp.edu 012852359
W2
FLOOR PLAN_3F 20' - 0"
REVISIONS
6' - 8"
D1
W4
2' - 6"
FLOOR PLAN_4F 30' - 0"
D3
FLOOR PLAN_2F 10' - 0"
D1
7' - 0"
5' - 0"
8' - 6" 3' - 0"
W1
2' - 0"
7' - 2"
W2
W3
3' - 7"
FLOOR PLAN_3F 20' - 0"
W10
8' - 6"
1
FLOOR PLAN_4F 30' - 0"
W11
3' - 6"
W11
2' - 0"
Chunyi Ho
FLOOR PLAN_1F 0' - 0"
East 1/8" = 1'-0"
2
FLOOR PLAN_1F 0' - 0"
South 1/8" = 1'-0"
---
7' - 5"
7' - 5"
7' - 5"
7' - 5"
7' - 11"
7' - 5"
5' - 9"
6' - 0"
Roof 40' - 0"
6' - 0" W12 W12X
6' - 0"
6' - 0"
2' - 11"
Roof 40' - 0"
2' - 2"
6' - 0"
W4
6' - 0"
4' - 0"
6' - 1"
AREA OF STACK
4' - 0"
FLOOR PLAN_4F 30' - 0"
FLOOR PLAN_4F 30' - 0"
D3
FLOOR PLAN_3F 20' - 0"
W6
W8
FLOOR PLAN_3F 20' - 0"
W1
W9
2' - 0"
W1
3' - 3"
3' - 6"
6' - 0"
W5
1' - 0"
FLOOR PLAN_2F 10' - 0"
FLOOR PLAN_1F 0' - 0"
FLOOR PLAN_2F 10' - 0"
FLOOR PLAN_1F 0' - 0"
ARC303 WEST HOLLYWOOD HOUSING West 1/8" = 1'-0"
4
North 1/8" = 1'-0"
ELEVATIONS 2018/05/30 Peter Ho Barry Milofsky 0'
4'
8'
16'
32'
A2.01 1/8" = 1'-0"
30 May 2018 3:00:09 AM
3
---
Chunyi Ho
Roof 40' - 0"
chunyiho@cpp.edu 012852359
FLOOR PLAN_4F 30' - 0" 10 A5.01
REVISIONS
FLOOR PLAN_3F 20' - 0" 2 A3.11
FLOOR PLAN_2F 10' - 0"
FLOOR PLAN_1F 0' - 0"
Basement -10' - 0" 1
Section 1 1/8" = 1'-0"
---
Roof 40' - 0"
FLOOR PLAN_4F 30' - 0"
FLOOR PLAN_3F 20' - 0"
FLOOR PLAN_2F 10' - 0"
FLOOR PLAN_1F 0' - 0"
Basement -10' - 0"
ARC303 WEST HOLLYWOOD HOUSING
Section 2 2 1/8" = 1'-0"
SECTION Peter Ho Barry Milofsky 0'
4'
8'
16'
32'
A3.01 1/8" = 1'-0"
30 May 2018 3:00:10 AM
2018/05/30
---
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
1 M1.01 A4.31
2 A8.01
11 A5.01
ARC303 WEST HOLLYWOOD HOUSING
SECTION 2018/05/30 Peter Ho Barry Milofsky
A3.02 1/4" = 1'-0"
30 May 2018 3:00:10 AM
Section 3 1 1/4" = 1'-0"
10" COPING WATER PROOFING RIDGID INSULATION CANT STRIP B310 BEAM HANGER
SLIDING WALL PANEL
Chunyi Ho
4X12 RIM JOIST
chunyiho@cpp.edu 012852359
DOUBLE TOP PLATE 6 A5.01
3/4" PLYWOOD 2X6 STUDS @ 16" O.C. 1 A4.31
1/2" GYPSUM BOARD
1 M1.01
REVISIONS
DOUBLE INSULATING GLASS 7 A5.01
2X12 RIM JOIST 1 1/2" LIGHT WEIGHT CONCRETE 1/4" ACOUSTIC MATT 3/4" PLYWOOD 2X10 TJI @ 16" O.C.
9 A5.01
WOOD SIDING
2x12 TJI @ 16" O.C. 3/4" ACOUSTIC CHANNEL 8 A5.01
2 A4.31
ARC303 WEST HOLLYWOOD HOUSING
WALL SECTION A-A' 1/2" = 1'-0"
2
B-B' 1/2" = 1'-0"
2018/05/30 Peter Ho Barry Milofsky 0'
1'
2'
4'
8'
A3.11 1/2" = 1'-0"
30 May 2018 3:00:12 AM
1
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
32' - 4" 24' - 1" 4' - 6"
20' - 0" 7' - 10"
4' - 6"
5' - 2"
KITCHEN 8' - 0" B
411 1 BED UNIT 759.17 SF
3' - 6"
211 STUDIO UNIT 515.08 SF
8' - 11"
1' - 0"
4' - 6"
10' - 4"
2' - 0"
UNIT PLAN_1 BED_B (UNIT 411) 1/4" = 1'-0"
LIVINGROOM 9' - 0" A
BALCONY 9' - 0" D
D1
12' - 4"
2 A4.11
20' - 0"
6' - 8"
LIVINGROOM 9' - 0" A
W5
1
7' - 0" 10' - 6"
D2
D2
6' - 5"
24' - 6"
D2
D2
BATHROOM 8' - 0" C
9' - 6"
BATHROOM 8' - 0" C
" '-0 ø5
5' - 2"
W5
BEDROOM 411-2 A
D2
- 0"
2' - 8"
ø 5'
1' - 10"
Sim
2' - 9"
1 A4.11
8' - 8"
W4
4' - 6"
6' - 7"
11' - 11"
D1
3' - 6"
2
UNIT PLAN_2 BED (UNIT 211) 1/4" = 1'-0"
ARC303 WEST HOLLYWOOD HOUSING
UNIT PLAN 2018/05/30 Peter Ho Barry Milofsky
0'
2'
4'
8'
16'
A4.01 1/4" = 1'-0"
30 May 2018 3:00:12 AM
7' - 10"
0' - 10"
2' - 4"
1' - 0"
2' - 10"
Chunyi Ho
1' - 5"
1' - 5"
1' - 5"
1' - 5"
2' - 8"
chunyiho@cpp.edu 012852359 2' - 1"
6 3
REVISIONS 2' - 7"
3' - 4"
4
3' - 4"
0' - 6"
A4.11
3' - 4"
5
2' - 8"
1' - 7"
1' - 7"
1' - 7"
1' - 7"
1' - 5"
3' - 6"
0' - 7"
3' - 0"
BATHROOM ELEVATION - A 1/2" = 1'-0"
4
BATHROOM ELEVATION - B 1/2" = 1'-0"
5
BATHROOM ELEVATION - C 1/2" = 1'-0"
6
BATHROOM ELEVATION - D 1/2" = 1'-0"
2' - 0" 2' - 0"
1' - 4"
2' - 0"
3
1' - 5"
1' - 3"
9
A4.11 8 2' - 4"
1' - 0"
1' - 0"
1' - 0" 0' - 11"
2' - 8"
1' - 4"
2' - 0"
2' - 10"
A4.11
0' - 9"
7
1' - 8"
2' - 4"
2' - 8"
1' - 4"
3' - 0"
4' - 0"
1' - 4"
2' - 7"
1' - 4"
2' - 4"
2' - 0"
2' - 10"
1' - 4"
2' - 0"
3' - 11"
3' - 2"
UNIT PLAN_2 BED (UNIT 211) - Callout 1 1/2" = 1'-0"
1' - 4"
2
7
ENLARGED KITCHEN ELEVATION 1/2" = 1'-0"
1' - 2" 0' - 10"
ENLARGED 1 BEDROOM KITCHEN & BATHROOM PLAN 1/2" = 1'-0"
0' - 11"
2' - 4"
1' - 0"
1' - 0"
1' - 11"
1' - 3"
1' - 2"
1' - 8"
1' - 10"
2' - 4"
2' - 11"
8
3' - 7"
ARC303 WEST HOLLYWOOD HOUSING
Elevation 1 - c 1/2" = 1'-0"
9
Elevation 1 - d 1/2" = 1'-0"
INTERIOR ELEVATION 2018/05/30 Peter Ho Barry Milofsky
A4.11 1/2" = 1'-0"
30 May 2018 3:00:14 AM
1
2 A5.01
8" COPING
WATER PROOFING
RIDGID INSULATION
Chunyi Ho
3 A5.01
CANT STRIP
chunyiho@cpp.edu 012852359
B310 BEAM HANGER
REVISIONS 4X12 RIM JOIST
DOUBLE TOP PLATE
4 A5.01
3/4" PLYWOOD
2X6 STUDS @ 16" O.C.
1/2" GYPSUM BOARD
DOUBLE INSULATING GLASS
1 A5.01
5 A5.01
1 1/2" LIGHT WEIGHT CONCRETE
1/4" ACOUSTIC MATT
3/4" PLYWOOD 2X10 I JOIST @ 16" O.C.
ARC303 WEST HOLLYWOOD HOUSING
ENLARGED WALL SECTION Peter Ho Barry Milofsky
1
A-A' - CALLOUT 2 1 1/2" = 1'-0"
2
A-A' - CALLOUT 1 1" = 1'-0"
A4.31 As indicated
30 May 2018 3:00:14 AM
2018/05/30
4 X 10 HEADER GYPSUM BOARD
PLYWOOD WHITE FIBER CEMENT PANEL
ALUMINUM PROFILE CONNECTOR
PEDESTAL SYSTEM ADJUSTABLE FEET
WOODECKING
ALUMINUM WINDOW FRAME
TRACK WHEEL
Chunyi Ho
NAILS
chunyiho@cpp.edu 012852359
CONCRETE SLAB
SLEEPER REVISIONS
2 X 6 SILL PLATE
9
11
OUTDOOR WOOD DECK 1 1/2" = 1'-0"
10
HANGER & TRACK @ SLIDING DOOR 3" = 1'-0"
WINDOWS DETAIL 1 1/2" = 1'-0"
GYPSUM BOARD
2 X 10 RIM JOIST
WHITE FIBER CEMENT PANEL
WHITE FIBER CEMENT PANEL
WOOD SIDING
0' - 2"
SLIDING WALL PANEL
PLYWOOD WOOD SIDING
WOOD SIDING CAP FLASHING
0' - 2"
PLYWOOD
BATT INSULATION
GYPSUM BOARD 0' - 2"
FLASHING
GYPSUM BOARD
FLASHING
WOOD SIDINGS
WHITE FIBER CEMENT PANEL
WHITE FIBER CEMENT PANEL PLYWOOD
8
FIBER CEMENT PANEL @ CANTILEVER 3" = 1'-0"
7
BALCONY OPENING_BOTTOM 3" = 1'-0"
6
BALCONY OPENING_TOP 3" = 1'-0"
5
FIBER CEMENT PANEL @ WOOD SIDING BOTTOM 6" = 1'-0"
BLACK FIBER CEMENT PANAL
ANCHOR BOLT
2 X 6 PT BOOTTOM PLATE
CANT STRIP
CAP SHEET
WHITE FIBER CEMENT PANEL
WOOD NAILER
SELF HEALING WATER PROOF SHEATING
COPING
BACE SHEET
SHAPED WOOD CAP NAILER
TOP PLATE
Z FLASH RIGID INSULATION
VAPOR BARRIER PROTECTION BOARD
WHITE FIBER CEMENT PANEL
FLASHING
10% DRIVING SLOPE
EARTH
ARC303 WEST HOLLYWOOD HOUSING
TJI HANGER PLYWOOD DIAPHRAGM
DETAILS
WOOD SIDING
4
CEMENT PANEL @ WOOD SIDING TOP 6" = 1'-0"
3
CANT STRIP & ROOFING 3" = 1'-0"
2
PARAPET DETAIL 3" = 1'-0"
Peter Ho Barry Milofsky
1
FOUNDATION DETAIL 3" = 1'-0"
A5.01 As indicated
30 May 2018 3:00:15 AM
2018/05/30
GRAVEL
3' - 6" 3' - 0"
3' - 0" 2' - 6"
3' - 6" 3' - 0"
6' - 4" 6' - 0"
2HR 1HR 2HR 2HR
WOOD WOOD METAL METAL
FIRE ESCAPE FIRE ESCAPE
7' - 0"
8 20 5 4
36" X 80" 30" X 80" 36" X 80" 72" X 80"
6' - 8"
DESCRIPTION
6' - 11"
MATERIAL
6' - 8"
FIRE RATING
6' - 11"
COUNT
6' - 8"
D1 D2 D3 D4
SIZE
6' - 8"
TYPE
6' - 11"
DOOR SCHEDULE (PARKING AND STACK)
Chunyi Ho chunyiho@cpp.edu 012852359
D1
D2
D3
D4
REVISIONS
TURN 90Ë&#x161; BACK
1' - 6"
WINDOW SCHEDULE (STACK) COUNT
TYPE
MATERIAL
DESCRIPTION
2 4 3 1 1 2 2 2
CORNER, FIXED SLIDING FIXED SLIDING FIXED SLIDING FIXED SINGLE CASEMENT
ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM
FIRE ESCAPE
4' - 0"
6' - 0"
72" X 72" 32" X 34" 72" X 108" 32" X 34" 230" X 108" 116" X 108" 48" X 72" 24" X 72"
2' - 0"
2' - 10"
W4 W5 W6 W7 W10 W11 W12 W12X
SIZE
2' - 8"
6' - 0"
TYPE
6' - 0"
W4
W4 (3D NOT IN SCALE)
6' - 0"
W5
W12X
10' - 0"
5' - 7"
5' - 6"
0' - 2"
W12
9' - 8" 3' - 8"
4' - 6"
0' - 2"
4' - 4"
WALL
CEILING
BASE
A B C D
WOOD WOOD TILE CONCRETE
DRYWALL PAINTED DRYWALL PAINTED & GLASS TILE & DRYWALL STUCCO
DRYWALL DRYWALL DRYWALL DRYWALL
WOOD WOOD TILE CONCRETE
9' - 0"
FLOOR
9' - 0"
ROOM
9' - 0"
FINISH SCHEDULE
EQUIPMENT SCHEDULE (STACK) DIMENSION
LOCATION
REFRIDGERATOR DISH WASHER STOVE AC UNIT
5 5 5 6
24" X 25" X 63" 24" X 24"X 34" 24" X 24"X 34" 35" X 35"X 44"
KITCHEN KITCHEN KITCHEN ROOF
W6
W7
22' - 2" 5' - 3"
0' - 3"
COUNT
DIMENSION
LOCATION
SINK A SINK B TOILET SHOWER HEAD
5 6 6 5
20" X 22" 19" X 19" 18" X 8 1/2" -
KITCHEN BATHROOM BATHROOM BATHROOM
5' - 4"
0' - 3"
5' - 4"
0' - 3"
5' - 3"
8' - 7"
FIXTURE SCHEDULE (STACK) EQUIPMENT
W11
ARC303 WEST HOLLYWOOD HOUSING
DOORS & WINDOW SCHEDUAL 2018/05/30 Peter Ho Barry Milofsky
W10
WINDOWS & DOORS ELEVATION 1/2" = 1'-0"
A6.01 1/2" = 1'-0"
30 May 2018 3:00:15 AM
COUNT
9' - 0"
EQUIPMENT
Chunyi Ho chunyiho@cpp.edu 012852359
5' - 0"
2' - 10"
2' - 4"
2' - 2"
4' - 0"
6' - 6"
6' - 4"
3' - 3"
6' - 2"
3' - 6"
1' - 9"
4' - 6"
3' - 0"
REVISIONS
RECESSED DOWNLIGHT
WALL WASHER DOWNLIGHT
4' - 0"
DINING PENDANT LIGHT
8' - 6"
7' - 7"
UNDER CABINET LIGHT
5' - 7"
3' - 8"
WALL LAMP
5' - 9"
WATERPROOF BALCONY LIGHT
REFLECTED CEILING PLAN 1/2" = 1'-0"
CEILING PLAN LEGEND 1/2" = 1'-0" ARC303 WEST HOLLYWOOD HOUSING
REFLECTED CEILING PLAN 2018/05/30 Peter Ho Barry Milofsky
A7.01 1/2" = 1'-0"
30 May 2018 3:00:16 AM
1
3' - 2"
2' - 6"
WALL LAMP
Chunyi Ho chunyiho@cpp.edu 012852359
1' - 0"
REVISIONS
Sim
2' - 10"
3 A8.02
2 A8.02
Sim
1 A8.02
Sim
Sim
0' - 2"
Sim
ARC303 WEST HOLLYWOOD HOUSING
3' - 0"
4 A8.02 5 A8.02
3' - 0"
3' - 0"
10' - 0"
7' - 4"
VERTICAL CIRCULATION Peter Ho Barry Milofsky
1
STAIR SECTION 1 1/2" = 1'-0"
2
STAIR SECTION 2 1/2" = 1'-0"
3
STAIR ELEVATION 1/2" = 1'-0"
4
A8.01
STAIR PLAN 1/2" = 1'-0" 0'
1'
2'
4'
8'
1/2" = 1'-0"
30 May 2018 3:00:19 AM
2018/05/30
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
0' - 11"
2' - 10"
1' - 0"
5
HANDRAIL END 1 1/2" = 1'-0"
HARD WOOD FLOORING 0' - 11"
10'/(RISERS #=18)
10'/(RISERS #=18)
0' - 11"
L ANGLE BOLTED CONNECTION ARC303 WEST HOLLYWOOD HOUSING
BLOCKING
VERTICAL CIRCULATION DETAILS
0' - 2"
Peter Ho Barry Milofsky
1 1/2" LIGHT WEIGHT CONCRETE
4
HANDRAIL DETAIL 1 1/2" = 1'-0"
3
STAIR/LANDING CONNECTION DETAIL 1 1/2" = 1'-0"
2
STAIR TO FLOOR DETAIL 1 1/2" = 1'-0"
1
STAIR TO WALL 1 1/2" = 1'-0"
A8.02 1 1/2" = 1'-0"
30 May 2018 3:00:19 AM
2018/05/30
HARD WOOD FLOORING
HURRICANE STRONG TIE
Chunyi Ho chunyiho@cpp.edu 012852359
TJI HANGER 43 '-
PE
6"
RR IP IT
40 '-
43 '
0"
RO OF
30 '
40 '
REVISIONS
-
30 '
-0
FO " RT H
FL OO R
FL OO R
-
TH 0" IR D
20 '
FL OO R 10 '
-0
FL OO R
-0
FL
OO R 10 '
"
FI R ST F
-0
TH " IR D
SE " CO ND
0'
T
-0 "
RO OF
FO 0" RT H
20 '
-
PA 6" RA PE
-0 "
SE CO ND
LO OR
FL OO R
HOLD DOWN POST BASE
0' -
TIE DOWN
0
FIR " ST
FL OO R
5 C
C
6
FSA STRAP B
3 B
6 A
1
S3_FRAME 3D_VIEW NE 1/4"=1'-0"
2
5
ARC303 WEST HOLLYWOOD HOUSING
S3_FRAME 3D_VIEW SW
STACK STRUCTURE FRAMING
1/4"=1'-0"
2018/05/30 Peter Ho Barry Milofsky 0'
2'
4'
8'
S1.01 1/4" = 1'-0"
30 May 2018 3:09:47 AM
A
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
Corner & Window Details 1/4"=1'-0"
ARC303 WEST HOLLYWOOD HOUSING
FRAMING CORNER DETAIL 0'
2'
4'
8'
Peter Ho Barry Milofsky
S1.02 1/4" = 1'-0"
30 May 2018 3:09:49 AM
2018/05/30
2x6 BOTTOM PLATE 2x6 BOTTOM PLATE
Chunyi Ho chunyiho@cpp.edu 012852359
TJI HANGER 2X10 TJI @ 16" O.C. 4X10 RIM JOIST
REVISIONS
2x6 DOUBLE TOP PLATE
TJI HANGER PHOTO https://www.strongtie.com/topflangehangersijoist_ijoistconnectors/lbv-ba-bhb_productgroup_wcc/p/lbv.ba.b.hb
1
BEAM HANGER DETAIL
0' -
3"
FOR HOLDOWN INSTALLATION MINIMUM THICKNESS
2X6 STUDS @ 16 O.C. HOLDOWN ANCHOR BOLT 2X6 PRESSURE TREATED BOTTOM PLATE
0' - 6"
6" CONCRETE RAISE
HOLDOWN PHOTO 0' - 0"
ARC303 WEST HOLLYWOOD HOUSING
3D STRUCTURE DETAIL 2018/05/30 0'
2
HOLDDOWN DETAIL
1'
Peter Ho Barry Milofsky
S2.01 3"=1'-0"
30 May 2018 3:09:50 AM
https://www.strongtie.com/boltedholdowns_holdowns/hdbhd_productgroup_wcc/p/hdb.hd
P5
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
2 S_LOAD_First FLOOR 1 1/8" = 1'-0"
S_LOAD_SECOND FLOOR 1/8" = 1'-0"
P5 S_LOAD_FORTH FLOOR 1/8" = 1'-0"
ARC303 WEST HOLLYWOOD HOUSING
GRAVITATIONAL LOAD DIAGRAM
P2 SHEAR WALL
ECCENTRICITY
BRACING
P2
RE-ENTRANT CORNER
P5
OUT-OF PLAN OFFSET
2018/05/30 Peter Ho Barry Milofsky
0'
3
S_LOAD_THIRD FLOOR 1/8" = 1'-0"
2'
4'
8'
16'
S3.01 1/8" = 1'-0"
30 May 2018 3:06:01 AM
4
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
S_LOAD_NORTH 1/8" = 1'-0"
2
S_LOAD_EAST 1/8" = 1'-0"
3
S_LOAD_SOUTH 1/8" = 1'-0"
4
S_LOAD_WEST 1/8" = 1'-0"
ARC303 WEST HOLLYWOOD HOUSING
LATERAL LOAD DIAGRAM 2018/05/30
BRACING
Peter Ho Barry Milofsky
SHEAR WALL SHEAR WALL HIDDEN
0'
4'
8'
16'
32'
S3.02 1/8" = 1'-0"
30 May 2018 3:06:05 AM
1
Chunyi Ho chunyiho@cpp.edu 012852359
CONCEPT & LIGHTING LAYER
REVISIONS
THERE ARE FOUR TYPE OF LIGHT IN THIS UNIT, THE COMBINATION OF LIGHTINGS IN EACH ROOM IS COORDING TO THE PURPOSE AND THE ACTIVITIES THAT WILL HAPPEN IN THE SPACE. LAYER 1 THIS IS THE RECESSED DOWNLIGHT LAYER, THE RECESSED LIGHT IS EVENLY SPREAD OUT THE APARTMENT TO PROVIDE THE BASIC LAYER OF LIGHT. LAYER 2 THE SECOND LAYER IS TASK LIGHT, WHICH INCLUDES THE BED-SIDE WALL LAMP, TOILET READING LAMP, CABINET LIGHT AND PENDANT DINING ROOM LIGHT. LAYER 3 THIS LAYER CONTAINS SOME WALL WASHER DOWN LIGHTING TO LIGHT UP SOME FLAT WALL, AND GIVE THE SPACE SOME MORE PATTERN.
RECESSED DOWN LIGHTING PENDANT LIGHTING WALL WASHER DOWN LIGHTING
UNIT_LIGHT_CONCEPT 12" = 1'-0"
TASK LIGHTING ARC303 WEST HOLLYWOOD HOUSING
LIGHTING DESIGN CONCEPT 2018/05/30 Peter Ho Barry Milofsky
E1.01 12" = 1'-0"
30 May 2018 3:05:50 AM
1
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
WIRE
DUPLEX OUTLET
GFCI OUTLET
SINGLE POLE SWITCH 2
DOUBLE POLE SWITCH VS
SINGLE POLE SWITCH WITH VACANCY SENSOR
UNIT LIGHTING PLAN 1/2" = 1'-0"
LIGHTING PLAN LEGEND 1/2" = 1'-0"
CRI
COLOR TEMPERATURE
EFFICIENCY
HIGH EFFICIENCY
650
90+
2700
65
Y
66
568
90+
3000
51.7
Y
32.3
32.3
2762
90+
3000
85.5
Y
9.5
38
756
94
2700
80.3
Y
QUANTITY
WATTS
TOTAL WATTS
16
10
160
AMERLUX E2.9RLW-HP-NC-A1
6
11
DINING PENDANT LIGHT
DELRAY IL793-KG-W30-LI-BDIM-W11
1
UNDER CABINET LIGHT
PHILIPS 523-000027-88
4
WALL LAMP
PHILIPS WL484W LED40S
3
32.7
98.1
4000
80+
4000
122
Y
WATERPROOF BALCONY LIGHT
PHILPIS WT120C LED60S
2
57
114
6000
80+
4000
150
Y
TYPE
INFORMATION
RECESSED DOWNLIGHT
ECOSMART DL-N14A10FR2-27
WALL WASHER DOWNLIGHT
LUMENS
ARC303 WEST HOLLYWOOD HOUSING
ELECTRICAL PLAN 2018/05/30
LIGHTING SCHEDULE 1/2" = 1'-0"
Peter Ho Barry Milofsky
E1.11 1/2" = 1'-0"
30 May 2018 3:00:20 AM
1
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
ARC303 WEST HOLLYWOOD HOUSING
LIGHTING FIXTURE SEPSIFICATION Peter Ho Barry Milofsky
E1.12
30 May 2018 3:00:21 AM
2018/05/30
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
UNIT_DAY LIGHT 12" = 1'-0"
2
UNIT_NIGHT LIGHT 12" = 1'-0"
ARC303 WEST HOLLYWOOD HOUSING
UNIT LIGHTING RENDER 2018/05/30 Peter Ho Barry Milofsky
E1.21 12" = 1'-0"
30 May 2018 3:05:51 AM
1
8" COPING WATER PROOFING RIDGID INSULATION CANT STRIP
THROUGH INSULATION(90%) OUTSIDE AIR FILM WATERPROOF MEMBRANE 3" TAPERED RIGID INSULATION 3/4" PLYWOOD 9.25" HIGH DENSITY FIBER BATT INSULATION INSIDE AIR FILM TOTAL R-VALUE TOTAL U-VALUE 1/(22.77X10%+42.77X90%)=
0.17 0.06 11 0.93 30 0.61 42.77 0.022
FLOOR R-VALUE 3/4" LIGHT WEIGHT CONCRETE 0.08 3/4" PLYWOOD 0.93 INSIDE AIR FILM 0.68 OUTSIDE AIR FILM 0.17 TOTAL R-VALUE 1.86 TOTAL U-VALUE 1/1.86 =
0.54
Chunyi Ho
WALL R-VALUE THROUGH STUDS(10%) OUTSIDE AIR FILM 0.17 FIBER CEMENT PANEL 1.23 3/4" AIR SPACE 1 WATERPROOF MEMBRANE 0.06 3/4" PLYWOOD 0.93 2X6 I STUDS@16"O.C. 5.5 INSIDE AIR FILM 0.68 TOTAL R-VALUE 9.57 THROUGH INSULATION(90%) OUTSIDE AIR FILM FIBER CEMENT PANEL 3/4" AIR SPACE WATERPROOF MEMBRANE 3/4" PLYWOOD 5 1/4" HIGH DENSITY FIBER BATT INSULATION INSIDE AIR FILM TOTAL R-VALUE TOTAL U-VALUE 1/(9.57X10%+25.07X90%)=
chunyiho@cpp.edu 012852359 FIBER CEMENT PANEL 3/4" AIR SPACE
REVISIONS B310 BEAM HANGER 4X12 RIM JOIST DOUBLE TOP PLATE
0.17 1.23 1 0.06 0.93 21
3/4" PLYWOOD 2X6 STUDS @ 16" O.C. 1/2" GYPSUM BOARD DOUBLE INSULATING GLASS
0.68 25.07 0.043
GLASS R-VALUE Soft Coat Low-E insulated Glass 3.50 TOTAL U-VALUE 1/3.50=
INFILTRATION 8540/60=
0.28
R-VALUE 142.3
1 1/2" LIGHT WEIGHT CONCRETE 1/4" ACOUSTIC MATT 3/4" PLYWOOD 2X10 I JOIST @ 16" O.C.
ARC303 WEST HOLLYWOOD HOUSING
R-VALUE ESTIMATION 2018/05/30 Peter Ho Barry Milofsky
1
R-VALUE ESTIMATION 1 1/2" = 1'-0"
M1.01 1 1/2" = 1'-0"
30 May 2018 3:00:22 AM
ROOF R-VALUE THROUGH JOIST(10%) OUTSIDE AIR FILM 0.17 WATERPROOF MEMBRANE 0.06 3" TAPERED RIGID INSULATION 11 3/4" PLYWOOD 0.93 2X10 I JOIST@16"O.C. 10 INSIDE AIR FILM 0.61 TOTAL R-VALUE 22.77
Heating Load Calculation Heating Load Calculation Indoor Design Temp. = 72 Item Area(SF) x U-Value x Delta T = BTUH Roof Walls Glass Infiltration
854 SF 1026 SF 173.5 SF 142.3 CFM
x x x x
0.024 0.043 0.62 1.08
x x x x
29 29 29 29
TOTAL HEATING LOAD
=594.384 =1279.422 =3119.52 =4456.836
COOLING LOAD CFM= 17199.49 / (1.08X20) = 796.27CFM 796 X 120%ALLOWANCE = 955 USE 900CFM
=9450.162
Cooling Load Calculation Cooling Load Calculation -
COOLING LOAD > HEATING LOAD USE 900CFM TO DECIDE THE EQUIPMENT SIZE.
Indoor Design Condition = 72
Transmission: Item Area(SF) x U-Value x DETD
= BTUH
Roof Wall(N) Wall(E) Wall(S) Wall(W)
=20.5 =41.02 =67.92 =92.88 =128.57
854 SF x 318 SF x 121.5 SF x 360 SF x 230 SF x
Outdoor Design Temp. = 43
0.024 0.043 0.043 0.043 0.043
x x x x x
33 3 13 6 13
Outdoor Design Condition = 80/68
Outside Air: Mech.Vent.
52 SF x 17 118.5 SF x 66 20 SF x 66
REQUIRED CFM LIVING ROOM 2300 CF KITCHEN 1860 CF BATHROOM 760 CF BEDROOM 2220 CF
32.2% 26.1% 10.6% 31.1%
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
300CFM 200CFM 100CFM 300CFM
CONVENTION TO TONS 1 TON = 12000 BTU/H 17199.49 X 120%ALLOWANCE / 12000 = 1.716 TONS USE 2 TONS
Solar Transmission: Item Area(SF) x DCLF Glass(N) Glass(E) Glass(W)
HEATING LOAD CFM= 9450.162/(1.08X50)= 175 175 X 120%ALLOWANCE = 210 USE 200CFM
DUCT SIZING 100CFM Φ= 2.7" 200CFM Φ= 3.8" 300CFM Φ= 4.6" 900CFM Φ= 8"
=884 =7821 =1320
142.3 CFM x 6 (vent.factor.) =853.8
Internal Heat Gain Light 180 (watts) x 3.4 x (1.20 Ballast Factor) Equipment 1281 (watts) x 3.4 People 2 (no.) x 250 (sensible heat)
=734.4 =4335.4 =500
Total Sensible Heat Gain
=16799.49
People
=400
2 (no.)
x 200 (latent heat)
Total Latent Heat Gain
=400
Sensible Heat Ratio (SHR) = (Tot. Sensible Heat Gain) / (Tot. Sen. Heat Gain + Tot. Latent Heat Gain) = 0.976 =17199.49 BTUH
ARC303 WEST HOLLYWOOD HOUSING
DUCT SIZING 2018/05/30 Peter Ho Barry Milofsky
M1.02
30 May 2018 3:00:23 AM
TOTAL COOLING LOAD (Sensible + Latent)
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
ARC303 WEST HOLLYWOOD HOUSING
AC UNIT SELECTION Peter Ho Barry Milofsky
M1.03
30 May 2018 3:00:23 AM
2018/05/30
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
ARC303 WEST HOLLYWOOD HOUSING
HVAC CONCEPT DIAGRAM Peter Ho Barry Milofsky
M1.04
30 May 2018 3:05:56 AM
2018/05/30
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
2
COLD & HOT WATER SUPPLY_3D NO SCALE
COLD WATER LINE HOT WATER LINE
DRAINAGE
COLD WATER PIPING 3/4" FOR MAIN 1/2" FOR BRANCH
ARC303 WEST HOLLYWOOD HOUSING
WATER CLOSET
DRAINAGE PIPING FLOW AT 1/8 IN/FT SLOPE GPM
WATER HEATER
COLD & HOT WATER 2018/05/30 Peter Ho Barry Milofsky
3
COLD & HOT WATER SUPPLY_SECTION 1/4" = 1'-0" TO CITY LINE
P1.01 1/4" = 1'-0"
30 May 2018 3:05:57 AM
1
COLD & HOT WATER SUPPLY_PLAN 1/4" = 1'-0"
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
2
SEWER & VENT_PLAN 1/4" = 1'-0"
6"
6"
6"
1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2"
3"
2
4"
4" 4" 4" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2"
3"
2
4"
1
4"
SEWER & VENT_3D NO SCALE
4"
1 1/2"
6"
1 1/2"
1 1/2" 1 1/2"
1 1/2"
3"
2
4"
VENT STACK SEWER 8" 1 1/2"
CLEANOUT
1 1/2"
1 1/2"
SEWER PIPE SIZE BASEMENT10” PIPE FIRST FLOOR 8” PIPE SECOND FLOOR 6” PIPE THIRD FLOOR 4” PIPE
10"
SEWER & VENT 2018/05/30
UNIT SEWER & VENT DIAGRAM 4 12" = 1'-0"
10"
sanitary sewer
SEWER & VENT_SECTION 3 1/4" = 1'-0"
Peter Ho Barry Milofsky
P1.02 12" = 1'-0"
30 May 2018 3:06:00 AM
EXHAUST VENT 1- 1/2” FROM FIXTURE MAIN 4" UP TO ROOF 6"
ARC303 WEST HOLLYWOOD HOUSING
ROOM
FIXTURE
PRODUCT NAME AND MODEL
WATER CONSUMPTION CODE COMPLIANT
KITCHEN
FAUCET
KOHLER SENSATE FAUCET K-72218
1.5 GAL/MIN
KITCHEN
WASHER & DRYER
LG SIGNITURE WASHER & DRYER COMBO 2.8 CU.FT. LUWM101HWA
YES N/A
Chunyi Ho
BATHROOM
FAUCET
KOHLER BOL FAUCET K-11000
1.5GAL/MIN
YES
BATHROOM
SHOWER HEAD
KOHLER HYDRORAIL-R MOXIE FLIPSIDE K-76475
2.0GAL/MIN
YES
KOHLER KARING INTELLIGENT TOILET K-4026
1.28GAL PER FLUSH
TOILET
REVISIONS
YES
ARC303 WEST HOLLYWOOD HOUSING
KITCHEN FIXTURE SPECIFICATION 2018/05/30 Peter Ho Barry Milofsky
P1.03
30 May 2018 3:00:25 AM
BATHROOM
chunyiho@cpp.edu 012852359
Chunyi Ho chunyiho@cpp.edu 012852359
REVISIONS
ARC303 WEST HOLLYWOOD HOUSING
BATHROOM FIXTURE SPECIFICATION Peter Ho Barry Milofsky
P1.04
30 May 2018 3:00:25 AM
2018/05/30