Year 2013-2016
portfolio | Phyllis Law Tze Cin
1
“..the beginning of my architecture journey..”
Dip. in Architecture | Tunku Abdul Rahman University College
year 1 | semester 2
2
opening & lighting
rethinking used material: the model’s main structure is made up of used magazine. Other materials used are aluminium pop tabs, string and rubber bands. portfolio | Phyllis Law Tze Cin
Dip. in Architecture | Tunku Abdul Rahman University College
year 2 | semester 4
detached house design | plan & elevations
8 9 1
10
2
3
7 11
4
13
6
12 5
14
Legend: 1. guest bedroom 2. bedroom 2 3. wet kitchen 4. bar 5. dning room 6. courtyard 7. powder room 8. bathroom 1 9. gym 10. laundry 11. living room 12. balcony 13. foyer 14. car porch I II
III
I ground floor plan II front elevation III left elevation
portfolio | Phyllis Law Tze Cin
Dip. in Architecture | Tunku Abdul Rahman University College
year 2 | semester 5
4
precedent study | pasar sentul | analytic composition
reimagining space portfolio | Phyllis Law Tze Cin
Dip. in Architecture | Tunku Abdul Rahman University College
year 3 | semester 7
1 6
2
3 7
4
5
long span design workshop
5 8
1. satay sticks 2. uhu glue 3. string 4. measuring process 5. cutting process 6. 400mm deep truss spanning 1000mm 7. horizontal members (a.k.a. purlin) are added to allow the force to be transferred evenly along the truss 8. with the weight of 490g, the model sustained up to 15kg of load
portfolio | Phyllis Law Tze Cin
Dip. in Architecture | Tunku Abdul Rahman University College
year 3 | semester 7
6
precedent study | tai lue house | exploded section
1 2 3 4 5 6 7
8
9
10 11 12
portfolio | Phyllis Law Tze Cin
Legend: 1. common rafter 2. fascia board 3. rainwater gutter 4. ridge beam 5. gable end 6. roof frame 7. ceiling joist 8. batten 9. floor pplate 10. floor joist 11. floor beam 12. column
Dip. in Architecture | Tunku Abdul Rahman University College
year 3 | semester 7
7
a
b
c
a
b
c
1
3
5
2
4
6
d
d
1. column to floor level connection a. bottom wall plate b. wall strips between the wall panels c. wall panels 2. column to ground connection a. floor joist b. floor beam c. metal plate, bolt, nuts & concrete foundation to strengthen the column after the relocation of the house d. notching improves the bearing of the beams and provide better connection to the round stilt
portfolio | Phyllis Law Tze Cin
a
b
a
precedent study | tai lue house | details sketches
c
d
e
b
a
a
3. Elevation of the roof structure a. roof beam b. ceiling joist c. small wooden component d. ridge beam e. common rafter
b
b
c
c
d
e
f
g
5. Single lapping roof perspective a. roof tiles b. batten c. common rafter
4. Unique roof structure of the house a. ceiling joist b. small yet powerful wooden component to support the whole roof structure
6. Cut section of rainwater gutter between the roofs a. column b. roof beam c. rainwater gutter d. common rafter e.batten f. vertical support g. wooden wall panel
Dip. in Architecture | Tunku Abdul Rahman University College
year 3 | semester 7
8
chiang mai | site analysis | landuse & swot analysis diagram
SWOT analysis: 1. Landuse study of proposed site 2. The land is rather flat and windy. 3. The sub-cable station at the northeast is rather lower and it is not suitable for the entrance to be located there. 4. Traffic lights is needed to guarantee a smoother traffic circulation as the current traffic condition is unorganised (current width of the road- 4200mm and 6000mm) 5.Less trees to provide shades 6. Presence of hotels nearby provide accommodation services to whom coming from outstation to attend some activities held at the proposed community centre 7. Located besides a water canal which has a
portfolio | Phyllis Law Tze Cin
1 2
3 4
5
6 7
Colour Code: proposed site residential commercial religion education institutional green area
Dip. in Architecture | Tunku Abdul Rahman University College
year 3 | semester 7
9
chiang mai community centre | master planning
1 2 3 Legend: 1. the design started a simplest rectabgular layout with “mirror image from the water� as the main concept. 2. more features such as park and pond are added in to create more communal spaces for the users. 3. the final ideas are the combination of the first two design concepts.
portfolio | Phyllis Law Tze Cin
Dip. in Architecture | Tunku Abdul Rahman University College
year 3 | semester 7
1
2
3
4
10
chiang mai community centre | sport centre | space planning diagram
5
1. sport activities 2. circulation 3. facilities 4. maintenance & support 5. overall summary
1
2
3
4 5
6
7
8
9
10 11 12 13 14 15 16 17 18
19
20
21
22
Legend: 1. futsal with volleyball court 2. badminton court 3. studio 4. boxing ring 5. gymnasium 6. sepak takraw court
7. common circulation 8. lift core 9. glas steel staircase
portfolio | Phyllis Law Tze Cin
10. club 11. recreation area 12. medical room 13. cafe 14. massage 15. reception with staff office 16. bazaar 17. recreation area II 18. children area
19. restroom 20. technical room 21. janitor, equipemnt & store room 22. equipemnt & store room
Dip. in Architecture | Tunku Abdul Rahman University College
year 3 | semester 7
11
1
2
3
4
5
6
chiang mai community centre | sport centre | section x-x
7
8 9 10 11
12
13
Legend: 1. shaded jogging track 2. futsal with volleyball court 3. 132 spectator seats 4. allow view from level 1 5. 1200mm long span structure 6. steel glass staircase 7. medical room 8. storage 9. equipment room 10. children area 11. walkway from children area to club 12. restroom 13. club house
portfolio | Phyllis Law Tze Cin
Dip. in Architecture | Tunku Abdul Rahman University College
year 3 | semester 7
1
12
2
3
4
5 6
chiang mai community centre | sport centre | section y-y
7
8
9
10
Legend: 1. water feature 2. gymnasium 3. sepak takraw court 4. boxing ring 5. corridor 6. viewing area to the futsal and sepak takraw court 7. futsal with volleyball court 8. zig zag structure to allow natural lighting 9. drop off area 10. parking area
portfolio | Phyllis Law Tze Cin
Dip. in Architecture | Tunku Abdul Rahman University College
year 3 | semester 7
13
chiang mai community centre | sport centre | sectional details 11
10 1
12 13
2 14 3 4 5
6
15 16
19
17 20
18
7
21
8 9
Legend: 1. galvanised bolt c/w neoprene rubber line washer 2. steel plate where the truss are welded on it 3. 50mmx50mm angle cleat bolted to the truss box and the frame of the skylight 4. 300x800mm truss box 5. steel plate bolted to the truss box 6. 100mmx100mm aluminium frame
portfolio | Phyllis Law Tze Cin
7. 3.5mm thick reinforced pvc wear resistant coating with buffer layer according to manuf’s details 8. 100mm concrete slab 9. 350mm thick hardcore filling 10. special shaped zincalume gutter 11. 75mm cellular metal decking 12. 500mm deep truss 13. 1200mm deep truss
14. 100mmx100mm aluminium frame 15. timber louvre 16. deterent seal 17. 100mmx100mm thick aluminiumframe 18. 10mm plate glass 19. 50mm spacing between the two member 20. setting block 21. tight air seals
Dip. in Architecture | Tunku Abdul Rahman University College
year 3 | semester 7
portfolio | Phyllis Law Tze Cin
14
chiang mai community centre | sport centre | perspective
Dip. in Architecture | Tunku Abdul Rahman University College
year 3 | competition 2
15
YSDAF Future Living Design Competition | Pavilion Design
1
3 1. 1:50 scale study model 2. sectional drawing 3. diagramatic illustration
“..Earthship inspired where adaption to the microclimate and assimilation of the design form to the KLPAC ground as the main design concept of the pavilion..� exhibition performance backstage gallery stage seating area
spaces during the art festival
basement exhibition shaded relaxation area gallery relaxation area
spaces after the art festival
portfolio | Phyllis Law Tze Cin
vertical circulation
vertical circulation
circulation
tree planted from vegetation planted basement on the crate
ventilation
greenery
Dip. in Architecture | Tunku Abdul Rahman University College
glass bottles
16
RESUME | PHYLLIS LAW TZE CIN education background 2008-2012 SPM Graduates | SMK Green Road, Kuching, Sarawak, Malaysia. PMR- 8A | SPM- 10A 2013-2016
Diploma in Architecture | Tunku Abdul Rahman University College | CGPA: 3.84/4.00
working experience
2011-2012
Part time tutor | Pusat Tuisyen Cendekiawan
2013 (3weeks)
Trainee | Design Network Architect
2015-2016
Architectural Intern | T. R. Hamzah & Yeang Sdn. Bhd.
extra curricular activities & achievements 2008-2012 Taekwondo Club | Member | Inter-School Taekwondo Championship 2009 | Sparring-Bronze Inter School Christian Fellowship | Member Sports Day | Badminton player | Sports Day’s Badminton Team 2011, 2012 | Champion
2013
National Service | Volleyball team | Champion in inter-camp sports carnival
2014-2015 Tunku Abdul Rahman University College Architecture Society | Vice President
2015
portfolio | Phyllis Law Tze Cin
KL Tour organized by Student Represantative Council | Vice President PAM Best Student Award 2015 Dip. in Architecture | Tunku Abdul Rahman University College
17
For more information, please contact: Phyllis Law phyllislaw95@gmail.com
portfolio | Phyllis Law Tze Cin
Dip. in Architecture | Tunku Abdul Rahman University College