Progress Set PLANNING INITIATIVE DESCRIPTIONS wot nD
erPlantsmpM wnTot D
ertnCiy
Temple decided to undertake the visioning and planning for the reclamation of the three oldest buildings in the Downtown area. A conceptual design package was developed which outlined the necessary steps to support this type of redevelopment process. Implementation of new streetscape and pedestrian facilities was proposed to correspond with the building renovations to maximize the catalytic impact of the project in fostering adjacent redevelopment investments.
Completed in 2 014, the goal of the Downtown Master Plan was to create a framework for city leaders, property owners, and developers to achieve a areas for capital improvement projects, development, and redevelopment while incorporating the principles activity.
ail r tTe andMrkPlzFS Santa Fe Plaza is a $40 million redevelopment project centered in around a highly design and active plaza. The development includes a new business center,
3retrdS
As a gatew ay into downtown, 3rd Street is a major arterial connecting downtown to South Temple. This bridge connects three neighborhood districts, several parks and open spaces, and many community services. Its location, at the apex of many recently completed open space improvements and enhancements, drives its need for improved functionality and aesthetic.
Fe Depot. This project brought about 300 jobs to Downtown Temple and has expedited and invigorated redevelopment in the area.
al trCen damsA Corid tConcep Plan The Central Adams Corri dor Concept Plan serves as a guide for improving one of the major corridors in and out of Downtown Temple. The plan aims to create and enhance gateway opportunities, connect Temple corridors. This plan includes a series of analysis mapping, overlay suggestions, street enhancement
Downtown City Center
10 Downtown District
ciltesarnFd tP
erPlants2M0TIRZ The 2022 Ma ster Plan provides a vision and future for the TIRZ in terms of land use, transportation needs, growth areas, and utility requirements. Through a series of workshops, meetings, and stakeholder presentations, the current progress of the TIRZ was assessed and a strategy was put forward that organized and prioritized project for TIRZs funding.
Downtown Temple Master Plan
Central Adams Corridor Concept Plan