FIRST QUARTER FINANCIAL STATEMENTS 2018/ 19 Prepared by the
Finance Department
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
2
QUARTERLY FINANCIAL STATEMENTS For the three months ended 12.31.18 Prepared by:
City of Temple, Finance Department
Traci L. Barnard, CPA
Melissa A. Przybylski, CPA
Director of Finance
Assistant Director of Finance
Stacey Reisner, CPA
Jennifer Emerson
Treasury/Grants Manager
Director of Budget
Sherry M. Pogor
Erica Glover
Financial Analyst
Senior Accountant
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
4
TABLE OF CONTENTS Page
Exhibit/Table
Introductory Section – Transmittal Letter .................................................................................................. 9
Financial Section – General Fund Comparative Balance Sheets.................................................................. 14
A-1
Schedule of Revenues, Expenditures, and Changes in Fund Balance – Actual and Budget...................................................... 16
A-2
Schedule of Revenues – Actual and Budget........................................... 17
A-3
Schedule of Expenditures – Actual and Budget ...................................... 19
A-4
Detail Schedule of Expenditures – Actual and Budget............................ 21
A-5
Water and Wastewater Fund Statement of Net Position ....................................................................... 26
B-1
Statements of Revenues, Expenses, and Changes in Fund Net Position ...................................................... 28
B-2
Comparative Schedule of Operating Revenues ..................................... 29
B-3
Comparative Schedule of Operating Expenses by Department...................................................................................... 30
B-4
Comparative Statement of Revenues and Expenses – Actual and Budget................................................................................ 32
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
B-5
5
TABLE OF CONTENTS Page
Exhibit/Table
Special Revenue Funds Hotel-Motel Tax Fund – Comparative Balance Sheets ………...................................................... 34
C-1
Statement of Revenues, Expenditures, and Changes in Fund Balance – Actual and Budget ...……........................................... 35
C-2
Detail Schedule of Expenditures – Actual and Budget ………................ 36
C-3
Drainage Fund – Comparative Balance Sheets ……......................................................... 37
D-1
Statement of Revenues, Expenditures, and Changes in Fund Balance – Actual and Budget ……............................................. 38
D-2
Capital Projects Schedule of Capital Projects Bond Proceeds & Related Expenditures – Summary of all Bond Issues .................................................................. 40
E-1
Utility System Revenue Bonds 2006, 2008, 2010, 2015 & 2017............ 41
E-2
Combination Tax & Revenue Certificates of Obligation Bonds 2012, 2014, 2016, 2018 .…..…………………………….…….... 42
E-3
Reinvestment Zone No. 1 Combination Tax & Revenue Certificates of Obligation Bonds 2013 ................................................ 43
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
E-4
6
TABLE OF CONTENTS Page
Exhibit/Table
Capital Projects (Continued) Schedule of Capital Projects Bond Proceeds & Related Expenditures (Continued) – Parks General Obligation Bonds 2015……........................................... 44
E-5
Combination Tax & Revenue Certificates of Obligation Bonds 2017…. 45
E-6
SECO LoanSTAR Loan Program ………………………………………....46
E-7
Reinvestment Zone No. 1 Tax Increment Revenue Bonds 2018……....47
E-8
Capital Improvement Program – Projects Underway/Scheduled ............................................................. 48
E-9
Projects Underway/Scheduled – Detail ................................................ 49
E-10
Project Status {Based on $’s}................................................................ 58
E-11
Project Status {Based on # of Projects} ............................................... 59
E-12
Project Status {Based on Funding Source}........................................... 60
E-13
Project Status {Based on Completion Date} ......................................... 61
E-14
Investments Schedule of Investment Allocations ..................................................... 65
F-1
Investment Portfolio – Marked to Market ............................................ 66
F-2
Carrying Value and Fair Value Comparison ........................................ 67
F-3
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
7
TABLE OF CONTENTS Page
Exhibit/Table
Supplemental Financial Information Tables Fund Balance – General Fund ................................................................ 71
I
Schedule of Expenditures of Federal and State Awards......................... 72
II
Schedule of Expenditures of Federal and State Awards – By Project Type .................................................................................... 74
III
Hotel/Motel Tax Receipts – By Reporting Entity ..................................... 75
IV
Historical Sales Tax Revenue – By Month .............................................. 76
V
Parks Escrow Funds – By Addition Name .............................................. 77
VI
Strategic Investment Zones Redevelopment Grants and Incentive Programs within Strategic Investment Zones (SIZ) ....................................................... 80
VII
Strategic Investment Zone Map (SIZ) ..................................................... 81
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
8
TRANSMITTAL LETTER February 21, 2019
Honorable Mayor and Council Members City of Temple, Texas We are pleased to submit the Quarterly Financial Statements for the General Fund, Water and Sewer Fund, and Special Revenue Funds of the City of Temple, Texas for the three months ended December 31, 2018. These financial statements were prepared by the Finance Department of the City of Temple. The key criteria by which internal interim reports are evaluated are their relevance and usefulness for purposes of management control, which include planning future operations as well as evaluating current financial status and results to date. Continual efforts are made to assure that accounting and related interim information properly serves management needs. Because managerial styles and perceived information needs vary widely, appropriate internal interim reporting is largely a matter of professional judgment rather than one set forth in Governmental Accounting and Financial Reporting Standards. Currently, there is no Generally Accepted Accounting Principles (GAAP) for government interim financial statements. These financial statements have been compiled in accordance with standards the Finance Department considered to be applicable and relevant for the City of Temple’s interim financial reports. The Finance Department has also followed standards established by the American Institute of Certified Public Accountants in compiling these financial statements.
THREE-MONTH REVIEW GENERAL FUND – The amount of revenues from various sources for the three months ended December 31, 2018, as compared to the FY 2019 amended budget, is shown in the following table (presented in thousands):
Amended Budget
Actual Revenues: Taxes Franchise fees Licenses and permits Intergovernmental Charges for services Fines Interest and other Total revenues
Percent of Budget
$
15,339 1,764 234 14 6,318 430 374
$
36,499 7,103 909 50 26,587 2,209 1,631
42% 25% 26% 29% 24% 19% 23%
$
24,474
$
74,988
33%
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
9
TRANSMITTAL LETTER Revenues compared to the amended budget for FY 2019 are at 33% with 25% of the year completed. A detail of the revenues as compared to budget is shown below: % of Budget 70.51% 24.77% 27.25% 24.84% 25.70% 28.63% 23.76% 19.45% 22.93%
Revenues Ad valorem taxes Sales tax receipts Other taxes Franchise fees Licenses and permits Intergovernmental revenues Charges for services Fines Interest and other
Expenditures by major function for the three months ended December 31, 2018, as compared to the FY 2019 amended budget are shown in the following table (presented in thousands):
Amended Budget
Actual Expenditures: General government Public safety Highways and streets Sanitation Parks and recreation Education Airport Debt Service: Principal Interest
$
4,421 9,441 952 1,853 2,181 474 634
$
27 4
Total expenditures
$
19,986
$
Percent of Budget
17,979 34,429 3,871 6,715 10,771 1,844 2,381
25% 27% 25% 28% 20% 26% 27%
135 16
20% 24%
78,140
26%
Expenditures compared to the amended budget are at 26% with 25% of the year complete. Detail is provided below: Expenditures Personnel Operations Capital Debt service
% of Budget 23.80% 24.77% 54.30% 20.35%
Detail of expenditures begins on page 19, Exhibit A-4 and A-5.
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
10
TRANSMITTAL LETTER WATER/WASTEWATER FUND – Operating revenue has decreased by $1,073,405 over the same time period as last fiscal year. Operating expenses increased by $52,750 compared to the same period of last fiscal year. First quarter financials for this fund begin on page 26.
HOTEL-MOTEL FUND – The Hotel-Motel Fund is reported beginning on page 34. This special revenue fund is used to account for the levy and utilization of the hotel-motel room tax.
DRAINAGE FUND – Drainage Fund is reported beginning on page 37. This special revenue fund was created in fiscal year 1999 to account for recording revenues and expenditures addressing the storm water drainage needs of our community. The City Council extended the ordinance on September 18, 2003, establishing the drainage fund for an additional five years. On September 4, 2008, Council amended the ordinance removing the 5-year sunset provision from the ordinance. The ordinance was also amended to remove the calculation of the fees from the ordinance and set the fees by resolution.
CAPITAL PROJECTS – The City of Temple has in the past and is currently investing heavily in improving infrastructure. This section contains detailed schedules that review current capital projects funded by bond proceeds and begins on page 40. Also included in this section, is a detailed listing of current projects in the City’s capital improvement program.
INVESTMENTS/CASH MANAGEMENT – All of the City’s cash and investments are maintained in a pool that is available for use by all funds. Interest earnings are allocated based on cash amounts in individual funds in a manner consistent with legal requirements. Investments are made in accordance with the Comprehensive Policy adopted by the City on August 24, 2018. The City’s primary investment objectives, in order of priority, are as follows: Safety Liquidity Yield As of December 31, 2018, the City had cash and investments with a carrying value of $188,608,779 and a fair value of $191,114,488. Total interest earnings for the three months ended are $1,022,830. The investment schedules presented in Exhibit F-1 through F-3 are prepared in accordance with Generally Accepted Accounting Principles (GAAP).
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
11
TRANSMITTAL LETTER The investment portfolio complies with the City’s Investment Policy and Strategy and the Public Funds Investment Act, Chapter 2256, Texas Government Code, as amended. We are investing municipal funds in accordance with our investment policy using basically four of our investment type options. Triple A rated (AAA) investment pools Money market sweep accounts Money market deposit accounts Certificates of deposits Details of our current investment portfolio begin on page 65, Exhibit F-1 through F-3.
SUPPLEMENTAL INFORMATION – This section has details of General Fund balances and designations (page 71). Also in this section is a schedule of federal and state grants, a detailed schedule of historical sales tax revenue by month, a schedule of Hotel/Motel receipts by month, and a schedule of parks escrow funds.
CONCLUSION – I want to take time to thank the Finance Department staff for their hard work in preparing these financial statements particularly Assistant Director of Finance, Melissa Przybylski, CPA; Treasury/Grants Manager, Stacey Reisner, CPA; Director of Budget, Jennifer Emerson; Financial Analyst, Sherry Pogor; and Senior Accountant, Erica Glover for their excellent work and efforts.
Respectively submitted,
Traci L. Barnard, CPA Director of Finance
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
12
GENERAL FUND FINANCIALS
The General Fund is the general operating fund of the City. It is used to account for all financial resources except those required to be accounted for in other funds.
CITY OF TEMPLE, TEXAS GENERAL FUND COMPARATIVE BALANCE SHEETS December 31, 2018 and 2017 Increase FY 2019
FY 2018
(Decrease)
ASSETS Cash
$
Investments
5,850
$
5,700
$
150
38,334,343
39,245,690
(911,347)
State sales tax
1,786,879
1,721,105
65,774
Accounts
1,365,861
1,510,366
(144,505)
Ad valorem taxes
3,572,852
3,610,876
(38,024)
333,985
319,870
Receivables (net of allowance for estimated uncollectible):
Inventories Prepaid items
14,115
572,614
623,511
(50,897)
45,972,384
47,037,118
(1,064,734)
266,133
187,952
Public safety
30,798
30,984
(186)
R.O.W. Escrow
22,238
91,864
(69,626)
422,076
376,472
45,604
Total current assets
Restricted cash and investments: Drug enforcement
Parks Escrow
{Table VI, pg. 77}
Rob Roy MacGregor Trust - Library
7,481
8,483
Total restricted cash and investments
748,726
695,755
TOTAL ASSETS
$ 46,721,110
$ 47,732,873
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
78,181
(1,002) 52,971 $ (1,011,763)
14
Exhibit A-1
Increase FY 2019
FY 2018
(Decrease)
LIABILITIES AND FUND BALANCES Liabilities: Vouchers payable
$
Retainage payable Accrued payroll Deposits
5,628,303
$
5,100,932
$
527,371
5,884
-
5,884
2,670,511
2,490,656
179,855
39,327
42,638
(3,311)
3,545,267
3,583,291
(38,024)
22,238
13,774
8,464
Deferred revenues: Ad valorem taxes R.O.W. Escrow Parks Escrow Electric franchise Gas franchise Other Total liabilities
457,401
376,472
80,929
1,760,445
1,725,863
34,582
211,647
199,528
12,119
360,356
171,278
189,078
14,701,379
13,704,432
996,947
492,994
432,639
60,355
241,001
163,594
77,407
30,643
30,909
Fund Balance: Nonspendable: Inventories and prepaid items Restricted for: Drug enforcement Public safety Rob Roy MacGregor Trust - Library Municipal court Vital statistics preservation Public education channel
(266)
8,590
9,925
(1,335)
320,950
615,493
(294,543)
3,050
-
144,338
147,256
3,050 (2,918)
Assigned to: Technology replacement
234,640
189,225
Capital projects
915,630
1,819,483
20,132,300
20,132,300
-
5,255,592
4,941,288
314,304
27,779,728
28,482,112
(702,384)
4,240,003
5,546,329
(1,306,326)
{Table I, pg. 71}
Unassigned: Budgeted decrease in fund balance Total fund balance Excess revenues over expenditures YTD TOTAL LIABILITIES AND FUND BALANCES
$
46,721,110
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
$
47,732,873
45,415 (903,853)
$
(1,011,763)
15
CITY OF TEMPLE, TEXAS
Exhibit A-2
GENERAL FUND SCHEDULE OF REVENUES, EXPENDITURES, AND CHANGES IN FUND BALANCE - ACTUAL AND BUDGET For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017) FY 2019
FY 2018
Analytical $ Increase
Percent Actual
Budget
(Decrease)
of Budget
Actual
Prior yr.
Revenues: Taxes
$
Franchise fees Licenses and permits Intergovernmental Charges for services
15,339,091
$ 36,498,625
42.03%
$ 15,410,244
1,764,362
7,103,030
24.84%
1,650,955
$
(71,153)
233,697
909,250
25.70%
160,823
72,874
14,398
50,285
28.63%
25,576
(11,178)
113,407
6,318,436
26,587,467
23.76%
5,947,524
Fines
429,524
2,208,553
19.45%
432,145
(2,621)
Interest and other
374,023
1,631,047
22.93%
389,490
(15,467)
24,473,531
74,988,257
32.64%
24,016,757
456,774
General government
4,420,730
17,979,301
24.59%
3,939,048
481,682
Public safety
9,440,590
34,429,109
27.42%
8,550,603
889,987
952,357
3,870,671
24.60%
848,008
Sanitation
1,853,086
6,714,524
27.60%
2,118,761
(265,675)
Parks and recreation
2,180,689
10,771,418
20.25%
2,200,321
(19,632)
Education
474,418
1,843,555
25.73%
437,851
36,567
Airport
633,741
2,380,903
26.62%
618,179
15,562
Principal
26,791
134,876
19.86%
12,845
13,946
Interest
3,926
16,072
24.43%
948
2,978
19,986,328
78,140,429
25.58%
18,726,564
1,259,764
4,487,203
(3,152,172)
-
5,290,193
-
(1,506,800)
0.00%
-
(693,114)
35.67%
-
(6,732)
0.00%
-
0.00%
256,136
(256,136)
(2,103,420)
11.75%
256,136
(503,336)
4,240,003
(5,255,592)
-
5,546,329
(1,306,326)
27,779,728
27,779,728
-
28,482,112
(702,384)
32,019,731
$ 22,524,136
-
$ 34,028,441
$ (2,008,710)
Total revenues
370,912
Expenditures:
Highways and streets
104,349
Debt Service:
Total expenditures Excess (deficiency) of revenues over expenditures
(802,990)
Other financing sources (uses): Transfers out: Debt Service Capital Projects - Designated
(247,200)
Grant Fund
-
Lease Proceeds
-
Total other financing sources (uses)
(247,200)
103,226
(247,200) -
Excess (deficiency) of revenues and other financing sources over expenditures and other financing uses Fund balance, beginning of period Fund balance, end of period
$
$
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
16
CITY OF TEMPLE, TEXAS
Exhibit A-3
GENERAL FUND SCHEDULE OF REVENUES - ACTUAL AND BUDGET For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017) FY 2019
FY 2018
Analytical $ Increase
Percent Actual
Budget
of Budget
(Decrease) Actual
Prior yr.
Taxes: Ad valorem: Property, current year Property, prior year Penalty and interest Total ad valorem taxes
$
9,670,762
$ 13,527,275
71.49%
$ 10,010,721
21,383
141,350
15.13%
25,846
$
(339,959) (4,463)
9,159
90,000
10.18%
11,631
(2,472)
9,701,304
13,758,625
70.51%
10,048,198
(346,894)
271,256
Non-property taxes: City sales
5,580,567
22,530,000
24.77%
5,309,311
Mixed beverage
{Table V, pg. 76}
46,905
155,000
30.26%
40,495
6,410
Occupation
10,315
40,000
25.79%
12,240
(1,925)
Bingo
15,000
0.00%
5,637,787
22,740,000
24.79%
5,362,046
275,741
15,339,091
36,498,625
42.03%
15,410,244
(71,153)
Electric franchise
812,569
3,445,000
23.59%
735,013
77,556
Gas franchise
216,122
560,000
38.59%
178,839
37,283
95,502
380,000
25.13%
98,385
(2,883)
Total non-property taxes Total taxes
-
-
-
Franchise Fees:
Telephone franchise Cable franchise
180,000
835,821
21.54%
194,000
(14,000)
Water/Sewer franchise
448,965
1,795,859
25.00%
430,352
18,613
11,204
86,350
12.98%
14,366
(3,162)
1,764,362
7,103,030
24.84%
1,650,955
113,407
142,679
605,500
23.56%
53,407
89,272
Electrical permits and licenses
6,964
36,000
19.34%
21,428
(14,464)
Mechanical
5,548
18,000
30.82%
16,909
(11,361)
24,837
96,000
25.87%
32,256
(7,419)
Other Total franchise fees Licenses and permits: Building permits
Plumbing permit fees Other Total licenses and permits
53,669
153,750
34.91%
36,823
16,846
233,697
909,250
25.70%
160,823
72,874
Intergovernmental revenues: Federal grants
5,220
5,220
100.00%
14,713
(9,493)
State grants
-
-
0.00%
1,685
(1,685)
State reimbursements
-
8,352
0.00%
-
9,178
36,713
25.00%
9,178
14,398
50,285
28.63%
25,576
-
Department of Civil Preparedness Total intergovernmental revenues
(11,178) (Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
17
CITY OF TEMPLE, TEXAS
Exhibit A-3
GENERAL FUND
(Continued)
SCHEDULE OF REVENUES - ACTUAL AND BUDGET For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017) FY 2019
FY 2018
Analytical $ Increase
Percent Actual Library fees
$
Budget
5,933
$
(Decrease)
of Budget
25,500
23.27%
Actual $
Prior yr.
5,979
$
(46)
Recreational entry fees
13,287
104,500
12.71%
18,822
(5,535)
Summit recreational fees
91,717
405,800
22.60%
87,542
4,175
109,929
842,080
13.05%
126,121
(16,192)
-
34,000
0.00%
-
174
478,820
0.04%
893
Golf course revenues Swimming pool Lions Junction water park
(719)
Sammons indoor pool
12,898
90,100
14.32%
12,395
503
Vital statistics
24,946
115,000
21.69%
24,468
478
Police revenue
340,909
985,757
34.58%
354,674
1,057,476
4,310,357
24.53%
1,037,191
9,482
40,000
23.71%
11,276
(13,765)
Contractual services -proprietary fund Curb and street cuts Other
20,285 (1,794)
1,365
80,000
1.71%
212
1,153
1,388,095
5,641,221
24.61%
1,282,997
105,098
Solid waste collection - commercial
852,170
3,351,342
25.43%
805,237
46,933
Solid waste collection - roll-off
767,531
2,710,527
28.32%
657,914
109,617
Landfill contract
506,560
2,441,794
20.75%
490,659
15,901
Airport sales and rental
596,628
2,270,196
26.28%
619,851
(23,223)
7,724
22,000
35.11%
9,830
(2,106)
200,428
1,215,500
16.49%
199,298
1,130
26,891
80,732
33.31%
26,792
99
Solid waste collection - residential
Subdivision fees Recreational services Fire department Reinvestment Zone reimbursements
304,293
1,342,241
22.67%
175,373
128,920
6,318,436
26,587,467
23.76%
5,947,524
370,912
287,435
1,479,853
19.42%
297,340
(9,905)
Animal pound
9,493
49,000
19.37%
12,678
(3,185)
Over parking
3,575
20,000
17.88%
-
129,021
659,700
19.56%
122,127
6,894
429,524
2,208,553
19.45%
432,145
(2,621)
Total charges for services Fines: Court
Administrative fees Total fines
3,575
Interest and other: Interest
155,906
793,500
19.65%
97,627
58,279
Lease and rental
48,075
177,380
27.10%
104,024
(55,949)
Sale of fixed assets
39,998
136,900
29.22%
16,954
23,044
3,355
53,026
6.33%
25,096
(21,741)
16,588
18,033
91.99%
18,033
(1,445)
25,899
86,390
29.98%
25,554
84,202
365,818
23.02%
102,202
374,023
1,631,047
22.93%
389,490
Total revenues $ 24,473,531
$ 74,988,257
32.64%
$ 24,016,757
Insurance claims Payment in lieu of taxes Building rental BOA bldg. Other Total interest and other
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
345 (18,000) (15,467) $
456,774
18
CITY OF TEMPLE, TEXAS
Exhibit A-4
GENERAL FUND SCHEDULE OF EXPENDITURES- ACTUAL AND BUDGET For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017) FY 2019
FY 2018
Analytical $ Increase
Percent Actual
Budget
(Decrease)
of Budget
Actual
Prior yr.
General government: City council City manager Administrative services
$
53,335 400,903 -
$
215,269
24.78%
1,425,337
28.13%
-
$
24,150
$
29,185
160,461
240,442
0.00%
82,759
(82,759)
Finance
432,594
1,729,350
25.01%
409,669
22,925
Purchasing
129,523
575,779
22.50%
109,580
19,943
City secretary
114,849
505,397
22.72%
125,948
(11,099)
Special services
189,877
1,796,096
10.57%
304,748
(114,871)
Legal
235,826
963,696
24.47%
235,318
508
City planning
181,142
711,381
25.46%
176,500
4,642
Information technology services
999,333
3,031,224
32.97%
914,085
85,248
Human resources
223,517
1,000,757
22.33%
241,302
(17,785)
Economic development
665,249
2,521,213
26.39%
453,904
211,345
Fleet services
223,888
1,223,784
18.29%
280,556
(56,668)
Inspections/Permits
168,031
631,985
26.59%
132,617
35,414
Facility services
402,663
1,648,033
24.43%
287,451
115,212
4,420,730
17,979,301
24.59%
3,939,048
481,682
208,741
826,304
25.26%
245,304
5,354,072
18,282,290
29.29%
4,463,367
Public safety: Municipal court Police Animal control Fire Communications Code compliance
136,418
566,851
24.07%
137,983
3,250,239
12,529,150
25.94%
3,205,056
235,223
940,894
25.00%
248,564
(36,563) 890,705 (1,565) 45,183 (13,341)
255,897
1,283,620
19.94%
250,329
5,568
9,440,590
34,429,109
27.42%
8,550,603
889,987
Street
670,564
2,800,165
23.95%
607,424
63,140
Traffic signals
113,209
440,447
25.70%
92,236
20,973
Engineering
168,584
630,059
26.76%
148,348
20,236
952,357
3,870,671
24.60%
848,008
104,349
1,853,086
6,714,524
27.60%
2,118,761
Highways and streets:
Sanitation:
(265,675) (Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
19
CITY OF TEMPLE, TEXAS
Exhibit A-4
GENERAL FUND
(Continued)
SCHEDULE OF EXPENDITURES- ACTUAL AND BUDGET For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017) FY 2019
FY 2018
Analytical $ Increase
Percent Actual
Budget
(Decrease)
of Budget
Actual
Prior yr.
Parks and recreation: Administration Parks Recreation Golf course
$
626,827
22.40%
1,016,979
140,430
$
4,707,460
21.60%
$
1,005,717
150,458
$
(10,028)
731,045
4,027,691
18.15%
740,112
(9,067)
11,262
292,235
1,409,440
20.73%
304,034
(11,799)
2,180,689
10,771,418
20.25%
2,200,321
(19,632)
Library:
474,418
1,843,555
25.73%
437,851
36,567
Airport:
633,741
2,380,903
26.62%
618,179
15,562
30,717
150,948
20.35%
13,793
16,924
$ 19,986,328
$ 78,140,429
25.58%
$ 18,726,564
$ 1,259,764
Debt service: Totals
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
20
CITY OF TEMPLE, TEXAS GENERAL FUND DETAILED SCHEDULE OF EXPENDITURES - ACTUAL AND BUDGET For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017)
Exhibit A-5
FY 2019
Actual General government: City council: Personnel services Operations
City manager: Personnel services Operations Capital outlay
Administrative services: Personnel services Operations Capital outlay
Finance: Personnel services Operations Capital outlay
Purchasing: Personnel services Operations Capital outlay
City secretary: Personnel services Operations Capital outlay
Special services: Personnel services Operations Capital outlay (Contingency)
Legal: Personnel services Operations Capital outlay
City planning: Personnel services Operations Capital outlay
$
FY 2018
Percent of Budget
Budget
3,320 50,015 53,335
$
Actual
35,740 179,529 215,269
9.29% 27.86% 24.78%
230,774 43,139 126,990 400,903
1,153,835 144,512 126,990 1,425,337
20.00% 29.85% 100.00% 28.13%
142,773 12,346 5,342 160,461
88,001 30,793 121,648 240,442
-
-
0.00% 0.00% 0.00% 0.00%
57,668 21,440 3,651 82,759
(57,668) (21,440) (3,651) (82,759)
281,673 150,921 432,594
1,139,573 589,777 1,729,350
24.72% 25.59% 0.00% 25.01%
257,618 131,845 20,206 409,669
24,055 19,076 (20,206) 22,925
123,843 5,680 129,523
557,840 17,939 575,779
22.20% 31.66% 0.00% 22.50%
94,773 5,360 9,447 109,580
29,070 320 (9,447) 19,943
104,651 10,198 114,849
422,439 82,958 505,397
24.77% 12.29% 0.00% 22.72%
100,331 10,337 15,280 125,948
4,320 (139) (15,280) (11,099)
120,989 68,888 189,877
353,012 778,359 664,725 1,796,096
34.27% 8.85% 0.00% 10.57%
146,984 157,764 304,748
(25,995) (88,876) (114,871)
215,596 20,230 235,826
858,623 105,073 963,696
25.11% 19.25% 0.00% 24.47%
204,282 18,995 12,041 235,318
11,314 1,235 (12,041) 508
169,824 11,318 181,142
669,720 41,661 711,381
25.36% 27.17% 0.00% 25.46%
150,814 17,785 7,901 176,500
19,010 (6,467) (7,901) 4,642 (Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
$
3,016 21,134 24,150
Analytical $ Increase (Decrease) Prior yr.
$
304 28,881 29,185
21
CITY OF TEMPLE, TEXAS GENERAL FUND DETAILED SCHEDULE OF EXPENDITURES - ACTUAL AND BUDGET For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017)
Exhibit A-5 (Continued)
FY 2019
Actual Information technology services: Personnel services Operations Capital outlay
Human resources: Personnel services Operations Capital outlay
Economic development: Operations
Fleet services: Personnel services Operations Capital outlay
Inspections/Permits: Personnel services Operations Capital outlay
Facility services: Personnel services Operations Capital outlay Total general government Public safety: Municipal court: Personnel services Operations Capital outlay
Police: Personnel services Operations Capital outlay
Animal control: Personnel services Operations Capital outlay
$
368,455 620,537 10,341 999,333
Budget $
FY 2018
Percent of Budget
Actual
1,510,201 1,502,770 18,253 3,031,224
24.40% 41.29% 56.65% 32.97%
150,344 73,173 223,517
645,518 342,621 12,618 1,000,757
23.29% 21.36% 0.00% 22.33%
151,251 76,884 13,167 241,302
(907) (3,711) (13,167) (17,785)
665,249 665,249
2,521,213 2,521,213
26.39% 26.39%
453,904 453,904
211,345 211,345
205,118 18,770 223,888
1,076,642 95,442 51,700 1,223,784
19.05% 19.67% 0.00% 18.29%
230,558 26,501 23,497 280,556
(25,440) (7,731) (23,497) (56,668)
129,508 10,712 27,811 168,031
524,128 48,047 59,810 631,985
24.71% 22.29% 46.50% 26.59%
115,416 12,445 4,756 132,617
14,092 (1,733) 23,055 35,414
181,573 112,572 108,518 402,663 4,420,730
828,643 558,199 261,191 1,648,033 17,979,301
21.91% 20.17% 41.55% 24.43% 24.59%
166,650 119,242 1,559 287,451 3,939,048
14,923 (6,670) 106,959 115,212 481,682
182,668 13,387 12,686 208,741
740,742 72,875 12,687 826,304
24.66% 18.37% 99.99% 25.26%
175,166 13,117 57,021 245,304
7,502 270 (44,335) (36,563)
3,765,171 560,759 1,028,142 5,354,072
15,448,328 1,762,109 1,071,853 18,282,290
24.37% 31.82% 95.92% 29.29%
3,776,037 512,589 174,741 4,463,367
(10,866) 48,170 853,401 890,705
85,876 22,732 27,810 136,418
437,544 96,928 32,379 566,851
19.63% 23.45% 85.89% 24.07%
97,962 21,015 19,006 137,983
(12,086) 1,717 8,804 (1,565) (Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
$
328,071 469,195 116,819 914,085
Analytical $ Increase (Decrease) Prior yr. $
40,384 151,342 (106,478) 85,248
22
CITY OF TEMPLE, TEXAS GENERAL FUND DETAILED SCHEDULE OF EXPENDITURES - ACTUAL AND BUDGET For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017)
Exhibit A-5 (Continued)
FY 2019
Actual Fire: Personnel services Operations Capital outlay
Communications: Operations
Code compliance: Personnel services Operations Capital outlay Total public safety Highways and streets: Streets: Personnel services Operations Capital outlay
Traffic signals: Personnel services Operations Capital outlay
Engineering: Personnel services Operations Capital outlay Total highways and streets Sanitation: Personnel services Operations Capital outlay Total sanitation Parks and recreation: Administration Personnel services Operations Capital outlay
$
2,818,336 243,964 187,939 3,250,239
Budget $
FY 2018
Percent of Budget
Actual
11,224,974 1,089,166 215,010 12,529,150
25.11% 22.40% 87.41% 25.94%
235,223 235,223
940,894 940,894
25.00% 25.00%
248,564 248,564
(13,341) (13,341)
178,663 37,548 39,686 255,897 9,440,590
692,746 382,317 208,557 1,283,620 34,429,109
25.79% 9.82% 19.03% 19.94% 27.42%
175,892 24,758 49,679 250,329 8,550,603
2,771 12,790 (9,993) 5,568 889,987
277,770 290,713 102,081 670,564
1,229,901 1,297,183 273,081 2,800,165
22.58% 22.41% 37.38% 23.95%
282,104 320,927 4,393 607,424
(4,334) (30,214) 97,688 63,140
95,198 18,011 113,209
345,634 94,813 440,447
27.54% 19.00% 0.00% 25.70%
77,611 14,535 90 92,236
17,587 3,476 (90) 20,973
123,386 14,237 30,961 168,584 952,357
496,313 102,785 30,961 630,059 3,870,671
24.86% 13.85% 100.00% 26.76% 24.60%
119,236 24,630 4,482 148,348 848,008
4,150 (10,393) 26,479 20,236 104,349
665,454 1,098,294 89,338 1,853,086
2,765,787 3,850,399 98,338 6,714,524
24.06% 28.52% 90.85% 27.60%
605,989 1,100,872 411,900 2,118,761
59,465 (2,578) (322,562) (265,675)
100,305 40,125 140,430
403,181 223,646 626,827
24.88% 17.94% 0.00% 22.40%
103,009 37,294 10,155 150,458
(2,704) 2,831 (10,155) (10,028) (Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
$
2,818,084 253,770 133,202 3,205,056
Analytical $ Increase (Decrease) Prior yr. $
252 (9,806) 54,737 45,183
23
CITY OF TEMPLE, TEXAS GENERAL FUND DETAILED SCHEDULE OF EXPENDITURES - ACTUAL AND BUDGET For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017)
Exhibit A-5 (Continued)
FY 2019
Actual Parks Personnel services Operations Capital outlay
$
Actual
21.76% 14.59% 55.28% 21.60%
439,973 286,251 4,821 731,045
2,417,056 1,555,664 54,971 4,027,691
18.20% 18.40% 8.77% 18.15%
448,356 262,381 29,375 740,112
(8,383) 23,870 (24,554) (9,067)
192,730 99,505 292,235 2,180,689
808,698 497,516 103,226 1,409,440 10,771,418
23.83% 20.00% 0.00% 20.73% 20.25%
171,417 95,816 36,801 304,034 2,200,321
21,313 3,689 (36,801) (11,799) (19,632)
Library: Personnel services Operations Capital outlay Total library
311,695 162,723 474,418
1,260,534 583,021 1,843,555
24.73% 27.91% 0.00% 25.73%
263,144 170,431 4,276 437,851
48,551 (7,708) (4,276) 36,567
Airport: Personnel services Operations Capital outlay Total airport
162,206 459,540 11,995 633,741
887,239 1,449,669 43,995 2,380,903
18.28% 31.70% 27.26% 26.62%
218,943 397,838 1,398 618,179
(56,737) 61,702 10,597 15,562
26,791 3,926 30,717 19,986,328
134,876 16,072 150,948 78,140,429
19.86% 24.43% 20.35% 25.58%
12,845 948 13,793 18,726,564
Golf course Personnel services Operations Capital outlay Total parks and recreation
Debt service: Principal Interest Total debt service Total
$
$
Percent of Budget
$
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
$
$
428,791 406,304 170,622 1,005,717
Analytical $ Increase (Decrease) Prior yr.
1,849,237 2,372,502 485,721 4,707,460
Recreation Personnel services Operations Capital outlay
402,403 346,056 268,520 1,016,979
Budget
FY 2018
$
(26,388) (60,248) 97,898 11,262
13,946 2,978 16,924 $ 1,259,764
24
WATER & WASTEWATER ENTERPRISE FUND FINANCIALS
The Water & Wastewater Fund is to account for the provision of water and wastewater services to the residents of the City. All activities necessary to provide such services are accounted for in this fund, including but not limited to administration, operation, maintenance, financing and related debt services, billing and collection.
CITY OF TEMPLE, TEXAS
Exhibit B-1
WATER AND WASTEWATER ENTERPRISE FUND STATEMENT OF FUND NET POSITION December 31, 2018 and 2017 Increase FY 2019
FY 2018
(Decrease)
ASSETS Current assets: Cash
$
Investments
7,650
$
5,125
$
2,525
27,986,742
32,785,702
2,140,657
1,495,708
644,949
Accounts receivable
564,784
146,192
418,592
Inventories
298,196
285,924
12,272
8,400
9,000
(600)
31,006,429
34,727,651
(3,721,222)
4,646,875
4,397,609
249,266
748,965
721,423
27,542
25,498,163
43,185,395
(17,687,232)
30,894,003
48,304,427
(17,410,424)
3,238,061
2,583,946
654,115
196,156,933
188,575,591
7,581,342
Buildings
48,838,737
47,931,635
907,102
Machinery and equipment
12,874,772
11,134,762
1,740,010
261,108,503
250,225,934
10,882,569
(122,588,179)
(115,735,439)
(6,852,740)
59,075,048
43,252,616
15,822,432
Net property and equipment
197,595,372
177,743,111
19,852,261
Total assets
259,495,804
260,775,189
(1,279,385)
2,018,621
2,339,477
(320,856)
499,673
444,307
55,366
Deferred amounts of changes in assumptions
60,797
774,284
(713,487)
Difference in expected and actual experience
136,497
13,488
123,009
Customer receivables
Prepaid items Total current assets
(4,798,960)
Restricted cash and investments: Revenue bond debt service Customer deposits Construction account
Property and equipment: Land Improvements other than buildings
Less accumulated depreciation Construction in progress
DEFERRED OUTFLOWS OF RESOURCES Deferred amounts on refunding Deferred amounts of contributions
Total deferred outflows of resources
$
2,715,588
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
$
3,571,556
$
(855,968)
26
Exhibit B-1
Increase FY 2019
FY 2018
(Decrease)
LIABILITIES Current liabilities: Vouchers & contracts payable
$
6,155,773
$
7,662,742
$
(1,506,969)
Retainage payables
148,329
146,057
2,272
Accrued payroll
282,822
244,162
38,660
70,641
70,641
-
6,657,565
8,123,602
748,965
721,423
27,542
15,613,472
15,207,649
405,823
709,344
172,499
536,845
Deferred revenue Total current liabilities Liabilities payable from restricted assets: Customers deposits Vouchers & contracts payable Retainage payables Accrued interest - revenue bonds Current maturities of long-term liabilities
(1,466,037)
724,275
676,809
47,466
6,016,895
5,950,000
66,895
23,812,951
22,728,380
1,084,571
103,285,000
109,295,000
(6,010,000)
Long-term liabilities, less current maturities: Revenue bonds payable Vacation and sick leave payable
346,027
346,027
2,927,428
4,000,525
Other post-employment benefits payable
785,048
737,386
47,662
Net supplemental death benefits payable
252,091
-
252,091
14,418 7,159,587
28,216 7,725,409
Net pension liability
Notes payable Premium on bonds payable Discount on bonds payable
(713,445)
(1,073,097)
(13,798) (565,822)
(771,820)
58,375
114,056,154 144,526,670
121,360,743 152,212,725
Difference in projected and actual investment earnings
490,452
-
490,452
Total deferred inflows of resources
490,452
-
490,452
110,082,188
102,222,860
7,859,328
3,922,600 3,025,200
3,720,800 4,943,155
201,800 (1,917,955)
117,029,988 164,282
110,886,815 1,247,205
6,143,173 (1,082,923)
$ 262,211,392
$ 264,346,745
Total liabilities
(7,304,589) (7,686,055)
DEFERRED INFLOWS OF RESOURCES
NET POSITION Invested in capital assets, net of related debt Restricted for debt service Unrestricted Total net position Net income {YTD} Total liabilities and net position
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
$
(2,135,353) 27
CITY OF TEMPLE, TEXAS WATER AND WASTEWATER ENTERPRISE FUND STATEMENT OF REVENUES, EXPENSES, AND CHANGES IN FUND NET POSITION For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017)
Exhibit B-2
Increase FY 2019
FY 2018
(Decrease)
Operating revenues: Water service
$
Sewer service Other Total operating revenues
3,756,149
$
4,669,995
$
(913,846)
3,002,994
3,129,151
(126,157)
517,044
550,446
(33,402)
7,276,187
8,349,592
(1,073,405)
Operating expenses: Personnel services
1,384,801
1,321,327
Supplies
389,893
471,362
(81,469)
Repairs and maintenance
271,307
265,996
5,311
Depreciation
1,756,301
1,686,502
69,799
Other services and charges
3,515,806
3,520,171
(4,365)
7,318,108
7,265,358
52,750
Total operating expenses Operating income
(41,921)
63,474
1,084,234
(1,126,155)
Nonoperating revenues (expenses): Interest income
299,779
243,638
56,141
Interest expense
(96,671)
(94,808)
1,863
203,108
148,830
54,278
161,187
1,233,064
(1,071,877)
3,095
14,141
(11,046)
164,282
1,247,205
(1,082,923)
117,029,988
110,886,815
$ 117,194,270
$ 112,134,020
Total nonoperating revenues (expenses) Income before transfers and contributions Contributions from TxDot Change in net position Net position, beginning of period Net position, end of period
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
6,143,173 $
5,060,250
28
CITY OF TEMPLE, TEXAS WATER AND WASTEWATER ENTERPRISE FUND COMPARATIVE SCHEDULE OF OPERATING REVENUES For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017)
Exhibit B-3
Increase FY 2019
FY 2018
(Decrease)
Current water service: Residential
$
Commercial
1,725,638
$
2,279,952
$
(554,314)
1,620,329
1,944,508
(324,179)
Wholesale
209,552
219,293
(9,741)
Effluent
200,630
226,242
(25,612)
3,756,149
4,669,995
(913,846)
Residential
1,743,834
1,714,416
29,418
Commercial
1,259,160
1,414,735
(155,575)
3,002,994
3,129,151
(126,157)
39,745
42,315
(2,570)
116,096
114,774
1,322
Reconnect fees
74,710
72,015
2,695
Tap fees
57,271
57,572
207,206
207,206
22,016
56,564
(34,548)
517,044
550,446
(33,402)
Total water service Current sewer service:
Total sewer service Other: Transfers and rereads Penalties
Panda reimbursements Other sales Total other Total operating revenues
$
7,276,187
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
$
8,349,592
(301) -
$
(1,073,405)
29
CITY OF TEMPLE, TEXAS WATER AND WASTEWATER ENTERPRISE FUND COMPARATIVE SCHEDULE OF OPERATING EXPENSES BY DEPARTMENT For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017)
Exhibit B-4
Increase FY 2019
FY 2018
(Decrease)
Administrative: Personnel services Supplies Repairs and maintenance
$
175,279 11,573
$
162,771 2,143
$
12,508 9,430
655
387
268
1,543,693
1,431,514
112,179
1,731,200
1,596,815
134,385
Personnel services
274,876
301,679
(26,803)
Supplies
223,244
325,042
(101,798)
98,223
104,648
(6,425)
574,557
674,886
(100,329)
1,170,900
1,406,255
(235,355)
Other services and charges Water treatment and production:
Repairs and maintenance Other services and charges Distribution system: Personnel services
292,640
280,024
12,616
Supplies
55,694
55,596
98
Repairs and maintenance
88,625
90,092
Other services and charges
(1,467)
25,243
24,855
388
462,202
450,567
11,635
105,191
93,941
11,250
52,322
48,685
3,637
Metering: Personnel services Supplies Repairs and maintenance
5,798
5,546
252
79,129
75,915
3,214
242,440
224,087
18,353
292,626
279,767
12,859
Supplies
43,233
29,810
13,423
Repairs and maintenance
58,100
45,099
13,001
Other services and charges
44,261
19,369
24,892
438,220
374,045
64,175
2,811
-
2,811
993,243
1,000,680
(7,437)
996,054
1,000,680
(4,626)
Other services and charges Wastewater collection system: Personnel services
Wastewater treatment and disposal: Supplies Other services and charges
(Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
30
WATER AND WASTEWATER ENTERPRISE FUND COMPARATIVE SCHEDULE OF OPERATING EXPENSES BY DEPARTMENT For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017)
(Continued)
Increase FY 2019
FY 2018
(Decrease)
Water collection offices: Personnel services
$
Supplies
142,724
$
1,943
Repairs and maintenance Other services and charges
128,404
$
9,095
14,320 (7,152)
17,025
19,400
(2,375)
251,430
288,678
(37,248)
413,122
445,577
(32,455)
17,429
19,734
(2,305)
368
194
174
-
758
(758)
1,760
1,289
19,557
21,975
(2,418)
84,036
55,007
29,029
1,516
797
719
70
66
4
Water purchasing: Personnel services Supplies Repairs and maintenance Other services and charges
471
Environmental programs: Personnel services Supplies Repairs and maintenance Other services and charges
Depreciation Totals
$
2,490
2,985
88,112
58,855
29,257
1,756,301
1,686,502
69,799
7,318,108
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
$
7,265,358
(495)
$
52,750
31
CITY OF TEMPLE, TEXAS WATER AND WASTEWATER ENTERPRISE FUND COMPARATIVE STATEMENT OF REVENUES & EXPENSES ACTUAL AND BUDGET For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017)
Exhibit B-5
FY 2019 Actual Operating revenues: Water service Sewer service Effluent Other Total operating revenues Operating expenses: Personnel services Supplies Repairs and maintenance Depreciation Other services and charges Total operating expenses
$
Budget
FY 2018 % of Budget
Actual
3,555,519 $ 18,574,662 3,002,994 12,881,780 200,630 1,050,000 517,044 2,112,159 7,276,187 34,618,601
19.14% 23.31% 19.11% 24.48% 21.02%
1,384,801 389,893 271,307 1,756,301 3,515,806 7,318,108
5,856,520 2,007,065 1,353,024 7,000,000 13,737,169 29,953,778
Operating income
(41,921)
Nonoperating revenues (expenses): Interest income Interest expense Total nonoperating revenues (expenses) Income before transfers and contributions Contributions from TxDot Net income
$
4,443,753 $ 18,147,198 3,129,151 12,701,253 226,242 775,000 550,446 2,051,826 8,349,592 33,675,277
24.49% 24.64% 29.19% 26.83% 24.79%
23.65% 19.43% 20.05% 25.09% 25.59% 24.43%
1,321,327 471,362 265,996 1,686,502 3,520,171 7,265,358
5,399,757 1,834,203 1,347,818 6,600,000 13,540,524 28,722,302
24.47% 25.70% 19.74% 25.55% 26.00% 25.30%
63,474 (81,469) 5,311 69,799 (4,365) 52,750
4,664,823
-0.90%
1,084,234
4,952,975
21.89%
(1,126,155)
299,779 (96,671)
1,301,823 -
23.03% 0.00%
243,638 (94,808)
752,914 (4,728,699)
32.36% 2.00%
56,141 1,863
203,108
1,301,823
-
148,830
(3,975,785)
-
54,278
161,187
5,966,646
-
1,233,064
977,190
-
(1,071,877)
3,095
155,349
1.99%
14,141
629,006
2.25%
(11,046)
6,121,995
-
1,606,196
-
164,282 $
$
Budget
FY 19 vs. FY 18 Increase (Decrease)
% of Budget
$
1,247,205 $
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
$
$
(888,234) (126,157) (25,612) (33,402) (1,073,405)
(1,082,923)
32
SPECIAL REVENUE FUND FINANCIALS
Special Revenue Fund is used to account for specific revenue that are legally restricted to expenditures for particular purposes.
Hotel-Motel Fund: To account for the levy and utilization of the hotel-motel room tax. State law requires that the revenue from this tax be used for advertising and promotion of the City.
Drainage Fund: To account for the levy and assessment of the drainage fee.
CITY OF TEMPLE, TEXAS
Exhibit C-1
HOTEL-MOTEL FUND COMPARATIVE BALANCE SHEETS December 31, 2018 and 2017 Increase FY 2019
FY 2018
(Decrease)
ASSETS Cash
$
Investments
$
4,600
$
-
1,542,878
166,500
123,918
13,865
14,386
6,450
6,450
18,561 $ 1,721,535
18,561 $ 1,710,793
$
10,742
$
$
$
64,366
Accounts receivable Inventories Prepaid items Museum collection Total assets
4,600 1,511,559
(31,319) 42,582 (521) -
LIABILITIES AND FUND BALANCES Liabilities: Vouchers payable Accrued payroll Deposits Total liabilities
143,011 73,943
78,645 68,571
5,372
53,504
47,108
6,396
270,458
194,324
76,134
20,315
20,836
(521)
1,068,838
1,074,507
(5,669)
Fund Balance: Nonspendable: Inventories and prepaid items Restricted for: Promotion of tourism Budgeted decrease in fund balance Total fund balance Excess revenues over expenditures YTD Total liabilities and fund balances
355,410
386,240
(30,830)
1,444,563
1,481,583
(37,020)
6,514 $ 1,721,535
34,886 $ 1,710,793
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
$
(28,372) 10,742
34
CITY OF TEMPLE, TEXAS
Exhibit C-2
HOTEL-MOTEL FUND STATEMENT OF REVENUES, EXPENDITURES, AND CHANGES IN FUND BALANCE - ACTUAL AND BUDGET For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017) FY 2019
FY 2018
Analytical Increase
Percent Actual
Budget
(Decrease)
of Budget
Actual
Prior year
Revenues: Taxes City
$
County
396,592
$ 1,472,500
26.93%
74,438
74,438
100.00%
$
340,496 73,307
$
56,096 1,131
131,948
368,500
35.81%
120,225
11,723
16,981
90,100
18.85%
9,943
7,038
Charges for services Civic center and Visitor center Museum Interest and other
6,928
27,600
25.10%
23,462
(16,534)
626,887
2,033,138
30.83%
567,433
59,454
Civic center
279,839
1,130,911
24.74%
272,377
7,462
Railroad museum
196,759
576,133
34.15%
117,149
79,610
Tourism marketing
142,894
677,978
21.08%
156,366
(13,472)
806
3,262
24.71%
-
75
264
28.41%
-
75
620,373
2,388,548
25.97%
545,892
74,481
Total revenues Expenditures:
Debt Service: Principal Interest Total expenditures
806
Excess (deficiency) of revenues over expenditures
6,514
(355,410)
-
21,541
(15,027)
-
-
0.00%
13,345
13,345
-
-
0.00%
13,345
13,345
6,514
(355,410)
-
34,886
(28,372) (37,020)
Other financing sources (uses): Lease Proceeds Total other financing sources (uses) Excess (deficiency) of revenues and other financing sources over expenditures and other financing uses Fund balance, beginning of period Fund balance, end of period
1,444,563
1,444,563
-
1,481,583
$ 1,451,077
$ 1,089,153
-
$ 1,516,469
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
$
(65,392)
35
CITY OF TEMPLE, TEXAS
Exhibit C-3
HOTEL-MOTEL FUND DETAILED SCHEDULE OF EXPENDITURES - BUDGET AND ACTUAL For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017) FY 2019
FY 2018
Analytical Increase
Percent Actual
Budget
(Decrease)
of Budget
Actual
Prior yr.
Civic center: Personnel services
697,270
26.46%
Operations
$
184,503 78,162
$
300,729
25.99%
$
186,121 80,022
$
(1,618) (1,860)
Capital outlay
17,174
132,912
12.92%
6,234
10,940
279,839
1,130,911
24.74%
272,377
7,462
Personnel services
71,556
312,586
22.89%
70,612
944
Operations
43,722
175,766
24.88%
34,644
9,078
Capital outlay
81,481
87,781
92.82%
11,893
69,588
196,759
576,133
34.15%
117,149
79,610
Personnel services
51,887
233,900
22.18%
39,868
12,019
Operations
85,087
438,078
19.42%
107,469
(22,382)
5,920
6,000
98.67%
9,029
(3,109)
142,894
677,978
21.08%
619,492
$ 2,385,022
25.97%
Railroad museum:
Tourism marketing:
Capital outlay Totals
$
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
156,366 $
545,892
(13,472) $
73,600
36
CITY OF TEMPLE, TEXAS
Exhibit D-1
DRAINAGE FUND COMPARATIVE BALANCE SHEETS December 31, 2018 and 2017 Increase FY 2019
FY 2018
$ 2,419,371
$ 2,101,812
(Decrease)
ASSETS Investments Accounts receivable Total assets
$
317,559
114,837
114,311
$ 2,534,208
$ 2,216,123
$
318,085
526
$
958,440
$ 1,308,637
$
(350,197)
50,574
46,261
1,009,014
1,354,898
958,443
671,814
286,629
1,185,113
1,143,485
41,628
2,143,556
1,815,299
328,257
LIABILITIES AND FUND BALANCES Liabilities: Vouchers payable Accrued payroll Total liabilities
4,313 (345,884)
Fund balance: Committed to: Drainage Budgeted decrease in fund balance Total fund balance Excess revenues over expenditures YTD Total liabilities and fund balances
(618,362) $ 2,534,208
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
(954,074) $ 2,216,123
335,712 $
318,085
37
CITY OF TEMPLE, TEXAS
Exhibit D-2
DRAINAGE FUND STATEMENT OF REVENUES, EXPENDITURES, AND CHANGES IN FUND BALANCE - ACTUAL AND BUDGET For the three months ended December 31, 2018 (With comparative amounts for the three months ended December 31, 2017) FY 2019
FY 2018
Analytical $ Increase
Percent Actual
Budget
(Decrease)
of Budget
Actual
Prior yr.
Revenues: Drainage fee - commercial Drainage fee - residential
$
327,671
$ 1,310,000
25.01%
$
326,489
$
1,182
333,568
1,410,000
23.66%
343,354
(9,786)
Interest and other
10,537
34,500
30.54%
19,659
(9,122)
Total revenues
671,776
2,754,500
24.39%
689,502
(17,726)
196,846
1,030,622
19.10%
190,781
6,065
Expenditures: Drainage Personnel services Operations Capital outlay Total expenditures
72,865
588,404
12.38%
76,238
(3,373)
1,020,427
2,056,418
49.62%
1,376,557
(356,130)
1,290,138
3,675,444
35.10%
1,643,576
(353,438)
Excess (deficiency) of revenues over expenditures
(618,362)
(920,944)
-
(954,074)
335,712
-
(264,169)
0.00%
-
-
-
(264,169)
0.00%
-
-
(1,185,113)
-
2,143,556
-
958,443
-
Other financing sources (uses): Transfers out - Debt Service Fund Total other financing uses Excess (deficiency) of revenues and other financing sources over expenditures and other financing uses Fund balance, beginning of period Fund balance, end of period
(618,362) 2,143,556 $ 1,525,194
$
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
(954,074)
335,712
1,815,299 $
861,225
328,257 $
663,969
38
CAPITAL PR OJECTS
The Capital Projects Fund is used to account for financial resources to be used for the acquisition or construction of major capital. New construction, expansion, renovation or replacement project for an existing facility or facilities. The project must have a total costs of at least $10,000 over the life of the project. Project costs can include the cost of land, engineering, architectural planning and contractual services. Purchase of major equipment (assets) costing $10,000 or more with a useful lie of at least 10 years. Major maintenance or rehabilitation project for existing facilities with a cost of $10,000 or more and an economic life of at least 10 years.
CITY OF TEMPLE, TEXAS SCHEDULE OF CAPITAL PROJECTS BOND PROCEEDS & RELATED EXPENDITURES As of Decemer 31, 2018
Exhibit E-1
Issue Proceeds
Adjusted Bond Fund Revenues
Total Project Costs (1)
$ 115,590,344
$ 122,279,085
$ 121,128,994
Remaining Funds (2)
Exhibit
Bond Issue
Focus of Issue
E-2
2006, 2008, 2010, 2015, & 2017 Utility Revenue Bond Issue (Fund 561)
Various Utility Infrastructure Improvements
E-3
2012, 2014, 2016 & 2018 Combination Tax & Revenue Certificates of Obligation Bond Issue (Fund 365)
Street Improvements
84,948,791
91,567,611
89,919,773
1,647,838
E-4
2013 Combination Tax & Revenue Certificates of Obligation Bond Issue (Fund 795)
Various Reinvestment Zone Infrastructure Improvements
25,313,032
25,548,917
25,417,076
131,841
E-5
2015 Parks General Obligation Bond Issue (Fund 362)
Parks Infrastructure Improvements
27,786,449
28,233,358
27,867,297
366,061
E-6
2017 Combination Tax & Revenue Certificates of Obligation Bond Issue (Fund 353)
Drainage Improvements
4,049,422
6,652,702
6,544,728
107,974
E-7
2017 LoneSTAR Loan (Fund 358)
Facility Improvements
2,803,109
2,803,109
2,802,359
750
E-8
2018 Reinvestment Zone No. 1 Tax Increment Revenue Bond Issue (Fund 795)
Various Reinvestment Zone Infrastructure Improvements
24,179,452
24,321,449
24,179,451
141,998
$ 284,670,599
$ 301,406,231
$ 297,859,678
$
$
1,150,091
3,546,553
Note (1) Total project costs include costs incurred, encumbered and estimated costs to complete. Note (2) Remaining funds represent funds that are available for allocation to projects.
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
40
CITY OF TEMPLE, TEXAS
Exhibit E-2
SCHEDULE OF CAPITAL PROJECTS BOND PROCEEDS & RELATED EXPENDITURES UTILITY SYSTEM REVENUE BONDS 2006, 2008, 2010, 2015 & 2017 - WATER/SEWER CAPITAL PROJECTS FUND 561 For the period beginning October 11, 2006 and ending December 31, 2018 Expenditures
Revenue & Bond Proceeds
Construction in Progress Expenditures Encumbrances as of 12/31/18
$ (1)
Estimated Costs to Complete Projects
96,649,500
Prior Issues FY 2007 - FY 2017
14,458,689
Intent to Reimburse {FY 2019 Issuance}
10,020,805
Issuance Premium
$ 121,128,994
$ 109,190,000 2,000,000 6,400,344
Interest Income
(2)
2,758,602
Reimbursement Received from TxDOT
1,930,139 $ 122,279,085
***Detail of Construction Costs*** BUDGET
ACTUAL
Adjustments Original Project Bond Issue Costs
to Original
Budget *
CIP Management Cost
$
Adjusted
Budget
1,194,609
$
-
Budgeted -
$
1,194,609
885,435
Total Costs
Estimated
Total
Incurred &
Costs to
Designated
Encumbered $
Complete
1,194,609
$
Project Cost -
$
1,194,609
885,435
822,261
63,174
885,435
-
66,722,996
Completed Projects - Prior to FY 2019
*
76,795,849
(10,072,853)
66,722,996
66,722,996
Loop 363/31st Street Utility Relocation
*
3,200,000
1,205,746
4,405,746
4,405,746
-
4,405,746
Leon River Trunk Sewer, Lift Station and Force Main
*
-
6,062,172
6,062,172
5,947,055
115,117
6,062,172
1,850,000
215,100
2,065,100
214,071
1,851,029
2,065,100
-
1,528,646
1,528,646
1,481,221
47,425
1,528,646
750,000
489,623
1,239,623
1,239,623
-
1,239,623
(757,168)
242,832
242,832
-
242,832
-
600,000
600,000
600,000
-
600,000
610,000
550,000
1,160,000
1,159,999
-
1,159,999
(842,798)
7,357,202
TCIP - Hogan Road Waterline Improvements Bird Creek, Phase III Const.; Phase IV & V Design Temple-Belton WWTP Expansion, Phase 2 {Design Only} WTP Improvements - Tasks 1-3 (Prelim Eng Only)
1,000,000
TCIP - Outer Loop, Phase III-B Old Town South Sewer Line (3rd, 11th, 9th St) Shallowford Lift Station Reconstruction & Relocation
7,357,202
7,176,990
180,212
-
495,482
495,482
495,482
-
495,482
Bird Creek Intereceptor, Phase V - Construction
1,500,000
112,349
1,612,349
1,612,349
-
1,612,349
Force Main - Shallowford to Temple-Belton Plant
Jackson Park Vicinty Water & Wastewater Line Impr
8,200,000 *
2,700,000
275,100
2,975,100
2,975,100
-
2,975,100
Ferguson Park Utility Design
-
300,000
300,000
75,600
224,400
300,000
WTP Chlorine Storage Safety
-
95,636
95,636
95,636
-
95,636
TCIP - Kegley Road, Phase III & IV
-
39,600
39,600
39,600
-
39,600
WTP Improvements - Tasks 2 - MWTT Optimization
-
39,353
39,353
20,810
18,543
39,353
614,373
278,597
335,776
614,373
WTP Improvements - Tasks 3 - Lagoon Improvements
3,500,000
WTP Improvements - Tasks 4 Intake Conditioner
(2,885,627)
-
Williamson Creek Trunk Sewer
36,360
3,200,000
(34,621)
36,360
36,360
-
36,360
3,165,379
2,925,477
239,902
3,165,379
TCIP - Outer Loop, Phase IV
-
84,000
84,000
84,000
-
84,000
TCIP - Poison Oak, Phase I & II
-
125,000
125,000
123,429
1,571
125,000
Temple-Belton WWTP Expansion, Phase 1 {Construction}
10,100,000
20,869
10,120,869
10,118,751
2,118
10,120,869
Scott Elevated Storage Tank Rehabilitation
-
1,400,149
1,400,149
1,400,149
-
1,400,149
WTP Byproduct Reduction Initiative
-
500,000
500,000
-
500,000
500,000
1,000,000
-
1,000,000
709,541
290,459
1,000,000
WTP Clarifier #3 Rehabilitation
-
777,319
777,319
770,694
6,625
777,319
New Pepper Creek Elevated Storage Tank
-
500,000
500,000
159,590
340,410
500,000
57th - 43rd, Ave R - Ave Z Utility Improvements
-
500,000
500,000
-
500,000
500,000
Garden District Utility Improvements
-
300,000
300,000
-
300,000
300,000
West Temple Distribution Line
-
200,000
200,000
-
200,000
200,000
Apache Elevated Storage Tank Rehabilitation
-
100,000
100,000
-
100,000
100,000
1,000,000
-
1,000,000
906,490
93,510
1,000,000
Outer Loop Water Line & Wastewater Line
-
1,220,000
1,220,000
390,055
829,945
1,220,000
WTP Clarifier #4 Rehabilitation
-
6,625
6,625
6,625
-
6,625
191,772
-
-
$ 121,320,766
$ 111,108,189
City-Wide SECAP
Friar Creek Assessment
Contingency
(3)
4,189,886 $ 117,590,344
(3,998,114) $
3,730,422
$
10,020,805
Remaining (Needed) Funds
$ 121,128,994 $
1,150,091
* Project Final ** Substantially Complete Note (1): Encumbered amounts are included in total construction in progress due to the obligation of funds by contract(s) or purchase order(s). Note (2): Reclassification of capitalized interest expense allowing the use of interest income on eligible projects. Note (3): Contingency funds were used for FY 2016 projects in the FY 2016 Annual Operating and Capital Budget.
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
41
CITY OF TEMPLE, TEXAS SCHEDULE OF CAPITAL PROJECTS BOND PROCEEDS & RELATED EXPENDITURES COMBINATION TAX & REVENUE CERTIFICATES OF OBLIGATION BONDS 2012, 2014, 2016 & 2018 - CAPITAL PROJECTS BOND FUND 365 For the period beginning November 15, 2012 and ending December 31, 2018
Exhibit E-3
Expenditures
Revenue & Bond Proceeds
Construction in Progress Expenditures Encumbrances as of 12/31/18
$ (1)
Estimated Costs to Complete Projects $
61,412,896
Prior Issues CO Bonds, Series 2012-2016
11,479,750
Series 4 Issue - CO Bonds, Series 2018
$
48,935,000
17,027,127
Intent to Reimburse - Series 2019 Issuance
1,350,000
89,919,773
Net Offering Premium
5,848,791
KTMPO Category 7 Grant {Prairie View Construction}
3,888,000
30,165,000
Transfer In - PTF Bond Funds {Prairie View Road}
112,409
Transfer In - Street Perimeter Fees
112,695
Transfer In - Street Perimeter Fees {Hogan Road}
77,650
Interest Income
1,078,066 $
91,567,611
**Detail of Construction Costs** BUDGET
ACTUAL
Adjustments Original Project Bond Issue Costs
to Original
Budget *
$
CIP Management Cost
Budget
982,036
$
-
Completed Projects - Prior to FY 2019
*
Kegley Road Improvements, Phase I
**
$
700,000
1,320,265
Estimated
Total
Incurred &
Costs to
Designated
Encumbered $
Complete
1,302,843
$
Project Cost -
$
1,302,843
582,181
451,382
130,799
582,181
42,470,053
42,470,053
-
42,470,053
655,550
1,355,550
1,236,617
118,933
1,355,550
(484,654)
3,492,996
523,545
2,969,451
3,492,996
(6,233,523)
3,977,650
Westfield Boulevard Improvements, Phase II
Budgeted
338,229 582,181
48,703,576
Hogan Road Improvements
Adjusted
Total Costs
-
2,792,210
2,792,210
2,733,248
58,962
2,792,210
Outer Loop, Phase IIIB
5,800,000
515,475
6,315,475
5,678,647
636,828
6,315,475
S Pea Ridge Developer Agreement (WBW Develepment)
1,000,000
(850,000)
150,000
150,000
-
150,000
75,792
75,792
-
75,792
75,792
East Temple Greenfield Development
-
Prairie View Road Improvements-Phase II Prairie View Road Improvements, Phase II - Construction SH317 Sidewalks
(2) *
Kegley Road Improvements, Phase II Kegley Road Improvements, Phase III & IV
8,562,000
(5,740,807)
2,821,193
2,697,046
124,147
2,821,193
3,888,000
3,075,560
6,963,560
6,375,661
587,899
6,963,560
-
200,000
200,000
200,000
-
200,000
4,550,000
613,800
5,163,800
450,145
4,713,655
5,163,800
720,000
456,090
1,176,090
756,124
419,966
1,176,090
Signal - N Kegley @ Airport
-
224,650
224,650
216,360
8,290
224,650
Signal - Adams-LP/Greenview
-
291,650
291,650
247,521
44,129
291,650
N Pea Ridge, Phase I
1,800,000
385,000
2,185,000
665,650
1,519,350
2,185,000
Outer Loop, Phase IV
1,600,000
800,000
2,400,000
894,900
1,505,100
2,400,000
Poison Oak Road, Phase I & II
3,400,000
805,000
4,205,000
1,588,809
2,616,191
4,205,000
550,000
70,000
620,000
618,382
1,618
620,000
Hogan Road Developer Agreement
-
800,240
800,240
800,240
-
800,240
S 31st Sidewalk Advanced Funding Agreement
-
415,000
415,000
415,000
-
415,000
SouthTemple Park Restrooms
-
79,400
79,400
62,250
17,150
79,400
Westfield Developer Agreement (Keilla)
-
70,510
70,510
70,509
-
70,509
S 5th Street Cost Sharing Agreement
-
73,619
73,619
73,619
-
73,619
(474,600)
25,400
-
25,400
25,400
Sammons Golf Course - Green Improvements
*
Grant Match Sidewalks/Trail Connections
500,000
Friars Creek Trail - Grant
-
24,600
24,600
-
24,600
24,600
Azalea Drive Developer Agreement (Patco Construction)
-
682,163
682,163
682,163
-
682,163
Replace 2004 Crimson Spartan - Upgrade to Small Quint
973,500
-
973,500
933,080
40,420
973,500
Medium Rescue Apparatus
376,500
-
376,500
329,500
47,000
376,500
-
168,000
168,000
166,560
1,440
168,000
Azalea Drive
-
1,442,800
1,442,800
102,800
1,340,000
1,442,800
Contingency
2,396,058
(1,824,421)
571,637
-
-
-
240,000
(224,951)
15,049
-
-
Signal - Video Detection Equipment FY 19 / FY 20
*
Contingency - CIP Management Cost $
90,719,320
$
(195,437)
$
90,523,883
* Project Final
$
72,892,646
$
17,027,127
Remaining (Needed) Funds
$
89,919,773
$
1,647,838
** Substantially Complete Note (1): Encumbered amounts are included in total construction in progress due to the obligation of funds by contract(s) or purchase order(s). Note (2): Includes funding from KTMPO Category 7 Grant funding of $3,888,000 and Pass-Through Financing bond funds of $112,409.
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
42
CITY OF TEMPLE, TEXAS SCHEDULE OF CAPITAL PROJECTS BOND PROCEEDS & RELATED EXPENDITURES COMBINATION TAX & REVENUE CERTIFICATES OF OBLIGATION BONDS 2013 - CAPITAL PROJECTS BOND FUND - 795 For the period beginning August 8, 2013 and ending December 31, 2018
Exhibit E-4
Expenditures
Revenue & Bond Proceeds
Construction in Progress Expenditures Encumbrances as of 12/31/18
$ (1)
Estimated Costs to Complete Projects $
24,960,757
Original Issue {August 2013}
$
274,214
Net Offering Premium/Discount
182,105
Interest Income
25,260,000 53,032 235,885
25,417,076
$
25,548,917
**Detail of Construction Costs** BUDGET
ACTUAL
Adjustments Original Project
to Original
Budget
Bond Issue Costs
*
TMED Avenue R - Intersections
*
$
Adjusted
Budget
120,000
$
Budgeted
(15,305)
$
104,695
Total Costs
Estimated
Total
Incurred &
Costs to
Designated
Encumbered $
99,850
Complete $
Project Cost -
$
99,850
-
1,077,710
1,077,710
1,077,710
-
1,077,710
Outer Loop (IH-35 to Wendland Ultimate)
2,705,000
741,000
3,446,000
3,427,621
18,379
3,446,000
Outer Loop (Wendland to McLane Pkwy)
5,960,000
(3,535,000)
2,425,000
2,313,462
111,538
2,425,000
Outer Loop (McLane Pkwy to Cen Pt Pkwy)
1,500,000
(656,000)
844,000
791,812
52,188
844,000
Corporate Campus Park - Bioscience Trail
*
750,000
(295,100)
454,900
454,900
-
454,900
McLane Pkwy / Research Pkwy Connection
*
710,000
(212,959)
497,041
497,041
-
497,041
2,950,150
2,950,150
-
2,950,150
Crossroads Park @ Pepper Creek Trail
1,750,000
Synergy Park Entry Enhancement
1,200,150
500,000
(484,745)
15,255
15,255
-
15,255
Lorraine Drive / Panda Drive Asphalt
*
610,000
(272,673)
337,327
337,327
-
337,327
Santa Fe Plaza (Design)
*
300,000
663,600
963,600
963,600
-
963,600
Downtown Master Plan
*
125,000
(19,500)
105,500
105,500
-
105,500
TMED - Loop 363 Frontage (UPRR to 5th) - TXDOT AFA
**
6,450,000
-
6,450,000
6,450,000
-
6,450,000
520,000
461,527
981,527
981,527
-
981,527
TMED - Avenue U - 1st Street to 13th Street
*
1,275,000
1,485,319
2,760,319
2,760,319
-
2,760,319
TMED Master Plan (Health Care Campus)
*
125,000
(20,150)
104,850
104,850
-
104,850
Friar's Creek Trail to Ave R Trail
*
500,000
36,558
536,558
536,557
-
536,557
Airport Enhancement Projects
*
1,320,000
47,490
1,367,490
1,367,490
-
1,367,490
TMED - 31st Street/Loop 363/Monumentation
$
25,220,000
$
201,922
$
25,421,922
$
25,234,971
$
182,105
Remaining (Needed) Funds
$
25,417,076
$
131,841
* Project Final ** Substantially Complete Note (1): Encumbered amounts are included in total construction in progress due to the obligation of funds by contract(s) or purchase orders(s).
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
43
CITY OF TEMPLE, TEXAS SCHEDULE OF CAPITAL PROJECTS BOND PROCEEDS & RELATED EXPENDITURES GENERAL OBLIGATION BONDS 2015 - CAPITAL PARKS PROJECTS BOND FUND 362 For the period beginning May 10, 2015 and ending December 31, 2018
Exhibit E-5
Expenditures
Revenue & Bond Proceeds
Construction in Progress Expenditures Encumbrances as of 12/31/18
$ (1)
22,535,679
Original Issue {September 2015}
4,380,970
Estimated Costs to Complete Projects
950,648 $
$
25,130,000
Net Offering Premium/Discount
2,656,449
Interest Income
446,909
27,867,297
$
28,233,358
***Detail of Construction Costs*** BUDGET
ACTUAL
Adjustments Project Bond Issue Costs
*
$
CIP Management Cost Carver Park
*
Crossroads Athletic Park
Total Costs
Estimated
Total
Original
to Original
Adjusted
Incurred &
Costs to
Designated
Budget
Budget
Budgeted
Encumbered
Complete
Project Cost
111,449
$
-
$
111,449
$
111,449
$
-
$
111,449
55,464
133,407
188,871
187,287
-
177,915
(52,643)
125,272
125,272
-
125,272
2,413,691
14,313,691
13,656,616
657,075
14,313,691
11,900,000
187,287
Jaycee Park
*
989,570
69,575
1,059,145
1,059,145
-
1,059,145
Jefferson Park
*
377,675
(81,954)
295,721
295,721
-
295,721
Korampai Soccer Fields
*
254,745
(25,408)
229,337
229,337
-
229,337
Linkage Trails-Echo Village
*
490,000
(360,943)
129,057
129,057
-
129,057
Linkage Trails-Windham Trail
*
-
193,240
193,240
193,240
-
193,240
Lions Junction
*
1,925,000
29,986
1,954,986
1,954,986
-
1,954,986
Mercer Fields
677,610
-
677,610
512,646
164,964
677,610
Northam Complex
*
647,090
11,260
658,350
658,350
-
658,350
Oak Creek Park
*
458,415
(42,505)
415,910
415,910
-
415,910
Optimist Park
*
496,285
(65,697)
430,588
430,587
-
430,587
Prairie Park
**
440,000
(321,826)
118,174
68,776
49,398
118,174
Sammons Community Center
*
1,750,000
244,290
1,994,290
1,994,290
-
1,994,290
Scott & White Park
*
300,590
58,884
359,474
359,474
-
359,474
Southwest Community Park
*
3,330,000
(2,463,264)
866,736
866,736
-
866,736
Western Hills Park
*
302,140
(14,577)
287,563
287,563
-
287,563
Wilson Basketball Cover
*
203,770
(2,243)
201,527
201,527
-
201,527
Wilson Football Field
*
611,375
(111,028)
500,347
500,347
-
500,347
Wilson Recreation Center
*
1,300,000
(42,568)
1,257,432
1,257,432
-
1,257,432
Wilson South
*
789,755
535,353
1,325,108
1,320,272
4,836
1,325,108
New Vestibule - Summit Fitness Center
-
47,529
47,529
47,529
-
47,529
Clarence Martin, Phaes 1B Facility Upgrade
-
51,200
51,200
5,100
46,100
51,200
Pool Floor Plaster - Sammons Indoor Pool
-
20,000
20,000
20,000
-
20,000
Gold Course Pump Station (Design)
-
28,000
28,000
28,000
-
28,000
Light Control - Miller Park
-
9,425
9,425
-
9,425
9,425
Light Control - West Temple
-
9,425
9,425
-
9,425
9,425
Light Control - Freedom Park
-
9,425
9,425
-
9,425
9,425
78,215
(14,794)
63,421
-
-
-
119,386
(119,386)
-
-
-
Contingency Contingency - CIP Management Cost $
27,786,449
$
145,854
$
27,932,303
$
26,916,649
$
950,648
Remaining (Needed) Funds
$
27,867,297
$
366,061
* Project Final **Substantially Complete Note (1): Encumbered amounts are included in total construction in progress due to the obligation of funds by contract(s) or purchase order(s).
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
44
CITY OF TEMPLE, TEXAS SCHEDULE OF CAPITAL PROJECTS BOND PROCEEDS & RELATED EXPENDITURES COMBINATION TAX & REVENUE CERTIFICATES OF OBLIGATION 2017 - CAPITAL PROJECTS BOND FUND 353 For the period beginning April 1, 2017 and ending December 31, 2018
Expenditures
Exhibit E-6
Revenue & Bond Proceeds
Construction in Progress Expenditures Encumbrances as of 12/31/18
$ (1)
2,433,905
Current Revenues - FY 2017 ^
888,385
Estimated Costs to Complete Projects $
$
1,033,722
Fund Balance Appropriation
1,495,941
3,222,438
Original Issue {October 2017}
3,735,000
6,544,728
Net Offering Premium/Discount
314,422
Interest Income
73,617 $
6,652,702
**Detail of Construction Costs** BUDGET
ACTUAL
Adjustments Original Project Bond Issue Costs
to Original
Budget *
$
Adjusted
Budget
51,079
$
Budgeted -
$
51,079
Total Costs
Estimated
Total
Incurred &
Costs to
Designated
Encumbered $
50,525
Complete $
Project Cost -
$
50,525
Meadowbrook/Conner Park Drainage Improvements
1,807,095
(4,638)
1,802,457
1,792,395
10,062
1,802,457
Azalea Drive Drainage Improvements
1,223,468
-
1,223,468
123,593
1,099,875
1,223,468
Ave T & Ave R Drainage Improvements
1,248,300
-
1,248,300
164,900
1,083,400
1,248,300
Ave D & 14th Street Drainage Improvements
516,300
8,850
525,150
42,616
482,534
525,150
Drainage Master Plan Modeling Assessment
1,330,500
-
1,330,500
783,933
546,567
1,330,500
-
364,328
364,328
364,328
-
364,328
402,343
(368,540)
33,803
-
-
-
Azalea Drive Developer Agmt (Patco Construction) Contingency $
6,579,085
$
-
$
6,579,085
* Project Final
$
3,322,290
$
3,222,438
Remaining (Needed) Funds
$
6,544,728
$
107,974
** Substantially Complete ^ Available funding due to fee increase effective January 2017 desginated for drainage capital improvements Note (1): Encumbered amounts are included in total construction in progress due to the obligation of funds by contract(s) or purchase order(s).
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
45
CITY OF TEMPLE, TEXAS SCHEDULE OF CAPITAL PROJECTS BOND PROCEEDS & RELATED EXPENDITURES SECO LOANSTAR LOAN PROGRAM 2017 - CAPITAL PROJECTS FUND 358 For the period beginning June 1, 2017 and ending December 31, 2018
Exhibit E-7
Expenditures
Revenue & Bond Proceeds
Construction in Progress Expenditures Encumbrances as of 12/31/18
$ (1)
2,700,387
Loan Proceeds {July 2017}
101,972
Estimated Costs to Complete Projects
$
2,803,109
Transfer - In
-
$
2,802,359
2,803,109
**Detail of Construction Costs** BUDGET
ACTUAL
Adjustments Original Project
to Original
Budget
Adjusted
Budget
Budgeted
Total Costs
Estimated
Total
Incurred &
Costs to
Designated
Encumbered
Complete
Project Cost
Completed Projects prior to FY 2019 - Lighting Upgrades
*
Police Department - Lighting Upgrade
*
142,000
(30,026)
111,974
111,975
-
111,975
City Hall - Lighting Upgrade
*
17,950
4,149
22,099
22,099
-
22,099
Summit Fitness Center - Lighting Upgrade
*
6,490
6,864
13,354
13,355
-
13,355
Fire Station - #8 - Lighting Upgrade
*
6,285
5,483
11,768
11,768
-
11,768
Sammons Comm Cntr - Indoor Pool - Lighting Upgrade
*
3,415
(1,139)
2,276
2,276
-
2,276
Completed Projects prior to FY 2019 - HVAC Improvements
*
497,950
189,756
687,706
687,706
-
687,706
236,812
129,744
366,556
366,556
-
366,556
465,300
6,085
471,385
471,385
-
471,385
172,575
(57,664)
114,911
114,911
-
114,911
$
Santa Fe - HVAC Improvements Mayborn Convention Center - HVAC Improvements
*
City Hall - HVAC Improvements
294,675
$
(118,754)
$
175,921
$
175,921
$
-
$
175,921
Summit Fitness Center - HVAC Improvements
*
165,325
85,641
250,966
250,966
-
250,966
Service Centers A/B/C - HVAC Improvements
*
189,360
104,574
293,934
293,934
-
293,934
33,150
14,406
47,556
47,556
-
47,556
7,704
231,953
231,953
-
231,953
750
-
-
-
Elmer Reed General Aviation Term - HVAC Improvements Design Fees
224,249
Contingency
336,373 $
2,803,109
(335,623) $
-
$
2,803,109
$
2,802,359
$
Remaining (Needed) Funds
-
$
2,802,359
$
750
* Project Final ** Substantially Complete Note (1): Encumbered amounts are included in total construction in progress due to the obligation of funds by contract(s) or purchase order(s).
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
46
CITY OF TEMPLE, TEXAS SCHEDULE OF CAPITAL PROJECTS BOND PROCEEDS & RELATED EXPENDITURES REINVESTMENT ZONE NO. 1 TAX INCREMENT REVENUE BONDS 2018 - CAPITAL PROJECTS BOND FUND - 795 For the period beginning September 27, 2018 and ending December 31, 2018
Exhibit E-8
Expenditures
Revenue & Bond Proceeds
Construction in Progress Expenditures Encumbrances as of 12/31/18
$ (1)
Estimated Costs to Complete Projects
2,283,767
Original Issue {September 2018}
2,941,978
Net Offering Premium/Discount
18,953,706 $
$
23,565,000 614,452
Interest Income
141,997
24,179,451
$
24,321,449
**Detail of Construction Costs** BUDGET
ACTUAL
Adjustments Project Bond Issue Costs
*
$
Outer Loop (IH 35 to Wendland) - ROW
Total Costs
Estimated
Total
Original
to Original
Adjusted
Incurred &
Costs to
Designated
Budget
Budget
Budgeted
Encumbered
Complete
Project Cost
179,452
$
-
$
179,452
$
179,452
$
-
$
179,452
500,000
-
500,000
-
500,000
500,000
Outer Loop (McLane to Central Point Parkway)
7,250,000
-
7,250,000
45,030
7,204,970
7,250,000
Santa Fe Plaza
1,300,000
-
1,300,000
1,300,000
-
1,300,000
TMED - 31st Street/Loop 363/Monumentation
450,000
-
450,000
-
450,000
450,000
Downtown City Center/Hawn Hotel
2,050,000
-
2,050,000
-
2,050,000
2,050,000
Outer Loop, Phase VI (Old Waco Road to IH 35 South)
3,340,000
-
3,340,000
1,210,159
2,129,841
3,340,000
623,000
-
623,000
622,210
790
623,000
1,380,000
-
1,380,000
-
1,380,000
1,380,000
132,000
-
132,000
131,600
400
132,000
440,000
-
440,000
-
440,000
440,000
Outer Loop, Phase V (Poison Oak to Old Waco Road)
2,820,000
-
2,820,000
871,865
1,948,135
2,820,000
Avenue C from Main Street to 24th Street
2,740,000
-
2,740,000
648,330
2,091,670
2,740,000
325,000
-
325,000
217,100
107,900
325,000
East Outer Loop 1st Street from Ave A to Central Ave Airport Corporate Hangar, Phase IV {Design}
*
Airport FBO Center & Parking {Design}
Santa Fe Plaza - Central Ave Parking & Enhancement Overlay Industrial Blvd
650,000 $
24,179,452
$
-
650,000 $
24,179,452
$
5,225,745
650,000 $
18,953,706
Remaining (Needed) Funds
650,000 $
24,179,451
$
141,998
* Project Final ** Substantially Complete Note (1): Encumbered amounts are included in total construction in progress due to the obligation of funds by contract(s) or purchase orders(s).
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
47
CITY OF TEMPLE, TEXAS
Exhibit E-9
CAPITAL IMPROVEMENT PROGRAM - PROJECTS UNDERWAY/SCHEDULED As of December 31, 2018 Reinvestment Zone No. 1
$
87,073,770
Water & Wastewater
68,073,816
Streets & Traffic Signals
43,855,186
Parks & Recreation
16,156,684
Equipment/Other
7,833,631
Drainage
6,870,613
Building Construction & Renovations
3,127,584
Land Acquisitions
1,140,923
Total of Capital Improvement Projects Underway/Scheduled
Millions
$0
$20
$40
$
$60
$80
234,132,207
$100
Reinvestment Zone No. 1 37.2%
Water & Wastewater 29.1%
Streets & Traffic Signals 18.7%
Parks & Recreation 6.9%
Total = $ 234,132,207 Equipment/Other 3.4%
Drainage 2.9%
Facility Improvements 1.3%
Land Acquisitions 0.5%
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
48
Exhibit E-10
CITY OF TEMPLE, TEXAS CAPITAL IMPROVEMENT PROGRAM-PROJECTS UNDERWAY/SCHEDULED - DETAIL December 31, 2018
Project Exterior Master Plan Construction, Phase I - Mayborn
Project # Funding 101389 Hotel/Motel
Security Upgrade at Service Center - Video Surveillance and Door Access Control System Upgrade Gate - Service Center
101404
New Vestibule - Summit Fitness Center
101548
Office Remodel - City Manager's Office
101654
Roof Replacement, Bldg A - Service Center
101659
BUDG-18
Facility Upgrade, Phase 1B - Clarence Martin (Brick Work with Engineering) Santa Fe - HVAC Improvements (Additional Funding in LoanStar Loan Program) Mayborn Convention Center - HVAC Improvements (Additional Funding in LoanStar Loan Program) Downtown Lighting
101692 101751
BUDG-18 GO-15 Hotel/Motel
364-3800-519-6310 520-5000-535-6310 110-5924-519-6310 364-3800-519-6310 520-5000-535-6310 110-5932-551-6310 362-3200-551-6421 110-1100-513-6310 110-5911-513-6310 364-1100-513-6310 110-5924-519-6310 292-2900-534-6310 520-5000-535-6310 110-5932-551-6310 362-3200-551-6422 240-7000-551-6310
101752
Hotel/Motel
101836
Airfield Lighting/Wiring (AIP Grant) {Engineering Only} Facility Improvements
Status On Hold
Scheduled Completion TBD
84,199
84,198
Complete
Nov-18
68,537
68,537
Complete
Nov-18
54,300
54,300
Jan-19
149,821
149,822
Substantially Complete Substantially Complete
63,750
-
Planning
Apr-19
53,400
7,300
On Hold
TBD
78,918
78,918
Construction
Feb-19
240-4400-551-6310
11,537
11,537
Complete
Nov-18
BUDG-18
110-3795-524-6310
60,000
-
Planning
TBD
101868
BUDG-19
110-5900-560-6310
32,000
-
Planning
TBD
101873
BUDG-19
110-5924-519-6310
76,500
-
Planning
TBD
Study for Firing Range
101895
BUDG-19
110-5900-521-2616
25,000
-
Planning
TBD
Utility Business Office - Soundproofing
101941
BUDG-U
520-5800-535-6310
17,000
-
Planning
May-19
1 South First Street - Building Purchase {Relocate Human Resource Department}
101984
280,000
271,271
Complete
Nov-18
1 South First Street, Install Network Connections Human Resource Offices
101989
15,000
12,248
Complete
Nov-18
1 South First Street, Remodel Human Resource Offices
101993
Hotel/Motel 240-4400-551-6310 Drainage 292-2900-534-6310 DESCAP 351-1100-513-6310 BUDG-U 520-5000-535-6310 BUDG-18 110-1900-519-6240 Hotel/Motel 240-4400-551-6310 Drainage 292-2900-534-6310 BUDG-U 520-5000-535-6310 BUDG-19 110-5924-519-6310 Hotel/Motel 240-4400-551-6310 Drainage 292-2900-534-6310 BUDG-U 520-5000-535-6310 LSL-17 358-XXXX-XXX-6310
20,000
13,361
Complete
Nov-18
210,181
210,182
Complete
Oct-18
1,728,551
1,728,551
Construction
Feb-19
3,127,584 $
2,690,224
Lighting Upgrades - Multi Facility {LoneSTAR Loan Program} HVAC Improvements - Multi Facility {LoneSTAR Loan Program}
101405
Multi Multi
LTN-16 BUDG-U BUDG-19 LTN-16 BUDG-U BUDG-18 GO-15 BUDG-18 LTN-16
Acct # 240-4400-551-6310
Actual Project Commit / Budget Spent $ 98,890 $ -
LSL-17
358-XXXX-XXX-6310
Total Building Construction & Renovations
$
Meadowbrook/Conner Park Drainage
101592
Azalea Drive Drainage Improvements
101636
Ave T & Ave R Drainage Improvements
101637
Ave D & 14th Street Drainage Improvements
101638
Drainage Master Plan Modeling Assessment
101777
Hogan Road Developer Agreement {Kiella Development, Inc.} Westfield Developer Agreement {Kiella Development, Inc.}
Jan-19
Drainage CO-18D Drainage CO-18D Drainage CO-18D Drainage
292-2900-534-6312 353-2900-534-6714 292-2900-534-6312 353-2900-534-6712 292-2900-534-6312 353-2900-534-6713 292-2900-534-6312
1,802,457
1,792,410
Construction
May-19
1,223,468
123,593
Engineering
Nov-19
1,248,300
164,900
Engineering
Aug-19
525,150
42,632
On Hold
TBD
292-2900-534-6510 353-2900-534-6710 292-2900-534-6312
1,330,500
783,933
Engineering
Dec-19
101802
Drainage CO-18D Drainage
305,900
305,900
TBD
101822
Drainage
292-2900-534-6312
70,510
70,509
Cost Sharing Agreement Authorized Cost Sharing Agreement Authorized
Mar-19
(Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
49
Exhibit E-10
CITY OF TEMPLE, TEXAS CAPITAL IMPROVEMENT PROGRAM-PROJECTS UNDERWAY/SCHEDULED - DETAIL December 31, 2018
Project Azalea Drive Developer Agreement {Patco Construction, LLC}
Project # Funding 101860 CO-18D
Acct # 353-2900-534-6715
Total Drainage
(Continued)
Actual Project Commit / Budget Spent $ 364,328 $ 364,328
$
Advanced Metering Infrastructure
101173
CityWorks AMS Software - Public Works
101640
Replace '05 Ford F150 Pickup - Animal Services Asset #12134 Replace '07 Ford F150 4X4 - Engineering Asset #12571 Replace '03 Dodge Ram - Facility Services Asset #13402 Quad Truck, Shared Custodial Crew - Facility Services Asset #'s 12342, 12786 Replace '05 Ford Expedition - Fire Asset #12113 Oil Dispenser Expansion - Fleet Services
6,870,613 $
3,648,205
Status Cost Sharing Agreement Authorized
Scheduled Completion Mar-19
520-5300-535-6250 520-5900-535-6250 110-5919-519-6221 292-2900-534-6221 351-1900-519-6221 520-5000-535-6221 110-5921-529-6213
1,275,000
1,121,151
Construction
May-19
108,402
77,022
In Progress
June-19
101652
BUDG-U Util-RE BUDG-17 Drainage DESCAP BUDG-U BUDG-18
28,379
27,810
Ordered
Feb-19
101655
BUDG-18
110-5900-533-6213
30,961
30,961
Complete
Nov-18
101656
BUDG-18
110-5924-519-6213
65,949
65,949
Complete
Oct-18
101658
BUDG-18
110-5924-519-6213
28,200
27,545
Complete
Oct-18
101663
BUDG-18
110-5900-522-6213
42,697
42,697
Complete
Dec-18
101666
BUDG-18
110-5938-519-6216
10,000
-
Planning
Feb-19
Replace '07 Ford F150 - Inspection/Permits Asset #12573 Replace '03 Ford F150 - Parks Asset #11625 Replace '05 Dodge Ram 2500 - Parks Asset #12192 Replace '07 Ford F150 - Parks Asset #12570 Replace '08 Kubota RTV - Parks Asset #12801 Van with Equipment for Crash Reconstruction - Police Asset #9945 and #11147 Replace (3) BMW Motorcycles for (1) Ford Taurus - Police Asset #'s 13709, 13710, 13872 Replace '01 GMC Pickup - Police Asset #13406 Replace '98 International Dump Truck - Streets Asset #10365 Pickup Truck, New C&D Technician - Metering **Addition to Fleet** Replace '04 Chevrolet Silverado - Water/Wastewater Asset #11925 Replace '06 Chevrolet Silverado - Water/Wastewater Asset #12274 Replace '06 Chevrolet Silverado - Water/Wastewater Asset #12275 K-9 (2017 JAG Grant) - Police
101670
BUDG-18
110-5947-519-6213
27,810
27,811
Complete
Oct-18
101678
BUDG-18
110-5935-552-6213
27,810
27,811
Complete
Oct-18
101679
BUDG-18
110-5935-552-6213
43,525
43,525
Ordered
Feb-19
101681
BUDG-18
110-5935-552-6213
27,810
27,811
Complete
Oct-18
101683
BUDG-18
110-5935-552-6222
19,000
17,097
Complete
Oct-18
101687
BUDG-18
59,843
59,843
Complete
Dec-18
101688
BUDG-18
110-2032-521-6213 110-5900-521-6213 110-5900-521-6213
41,103
41,103
Complete
Oct-18
101689
BUDG-18
110-5900-521-6213
25,128
25,128
Complete
Oct-18
101701
BUDG-18
110-5900-531-6222
102,081
102,081
Ordered
Apr-19
101705
BUDG-18
520-5300-535-6213
28,000
27,836
Complete
Oct-18
101706
BUDG-18
520-5200-535-6213
32,000
25,455
Complete
Oct-18
101708
BUDG-18
520-5100-535-6213
41,823
40,963
Ordered
Feb-19
101709
BUDG-18
520-5100-535-6213
41,823
40,963
Ordered
Feb-19
101779
GRANT
260-2000-521-6211
17,167
-
Planning
Oct-20
Replace '10 Ford Crown Victoria - Police Asset #13217 Replace '08 Ford F350 - Streets Asset #12589 Velocity Migration Ugrade - Court
101816
BUDG-18
110-2031-521-6213
43,633
43,633
Complete
Nov-18
101859
BUDG-18
110-5900-531-6213
52,000
-
Planning
June-19
101861
BUDG-18
110-1800-525-6221
12,688
12,686
Complete
Dec-18
Shredder - Airport
101867
BUDG-19
110-5900-560-6222
11,995
11,995
Complete
Oct-18
Replace '05 Ford F150 Regular Cab - Code Compliance Asset #12136 Replace '08 F350 / Upgrade F250 Crew Cab & Utility Body Code Compliance Asset #12920
101869
BUDG-19
110-5900-524-6213
32,000
-
Planning
July-19
101870
BUDG-19
110-5900-524-6213
45,000
-
Planning
July-19
(Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
50
Exhibit E-10
CITY OF TEMPLE, TEXAS CAPITAL IMPROVEMENT PROGRAM-PROJECTS UNDERWAY/SCHEDULED - DETAIL December 31, 2018
Project Replace '01 Dodge / Upgrade F250 Regular Cab with Utility Body & Lift Gate - Facility Services Asset #10638 Replace '05 Ford F150 - Facility Services Asset # 12135 Replace Cardiac Defibrilator Monitor - Fire
Project # Funding 101871 BUDG-19
Acct # 110-5924-519-6213
(Continued)
Actual Project Commit / Budget Spent $ 43,000 $ -
Status Planning
Scheduled Completion July-19
Planning
July-19 Jan-19 June-19
101872
BUDG-19
110-5924-519-6213
34,000
-
101878
BUDG-19
140,488
133,417
Vehicle Exhaust System Update/Repair - Fleet
101879
BUDG-19
110-2230-522-6211 110-5900-522-6211 110-5938-519-6310
19,500
-
Substantially Complete Planning
Pro-Cut On Car Brake Lathe -Fleet
101881
BUDG-19
110-5938-519-6216
14,000
-
Planning
June-19
Replace '08 Ford F150 - Inspections/Permits Asset #12821 Replace '04 Crimson Spartan / Upgrade to Small Quint Fire Apparatus {Intent to Reimburse} Replace '06 Ford F350 - Parks Asset #12356 Replace '06 Chevy Truck - Parks Asset #12345 3/4 Ton Truck - Irrigation Technician **Addition to Fleet** Replace Marked Unit, SRO - Police Asset #13223 Replace (10) Marked Units, Patrol - Police
101885
BUDG-19
110-5942-519-6213
32,000
-
Planning
July-19
101886
CO-19
365-2200-522-6776
973,500
933,080
Ordered
Aug-19
101887
BUDG-19
110-5935-552-6213
43,000
-
Planning
July-19
101888
BUDG-19
110-5935-552-6213
32,000
-
Planning
July-19
101889
BUDG-19
110-3500-552-6213
43,000
-
Planning
July-19
101891
BUDG-19
110-3500-552-6211
47,750
42,017
Ordered
July-19
101892
BUDG-19
110-5900-521-6213
477,500
474,447
Ordered
May-19
Axon Evidence Management Software System
101893
BUDG-19
110-5900-521-6211
293,476
293,476
In Progress
July-19
Utility Vehicle, Sergeant - Police **Addition to Fleet** Medium Rescue Fire Apparatus **Addition to Fleet** {Intent to Reimburse} Replace '01 Chevrolet Astro - Recreation Asset #11143 Skid Steer # 2 - Recycling Program **Addition to Fleet** Lift Truck # 2 - Recycling Program **Addition to Fleet** Replace '14 Freightliner/Heil Garbage Collection - Solid Waste Asset #13688 {Intent to Reimbuse} Replace '11 Peterbilt, Frontload - Solid Waste Asset #13276 {Intent to Reimburse} Replace '08 International Work Star, Sideload - Solid Waste Asset #12581 {Intent to Reimburse}
101894
BUDG-19
110-5900-521-6213
57,750
40,202
Ordered
May-19
101896
CO-19
365-2200-522-6776
376,500
329,500
Ordered
Aug-19
101899
BUDG-19
110-5932-551-6213
32,200
-
Planning
July-19
101904
BUDG-19
110-5900-540-6222
51,337
51,337
Jan-19
101905
BUDG-19
110-5900-540-6222
32,106
32,106
Substantially Complete Complete
Nov-18
101906
LTN-19
364-2300-540-6220
335,500
329,636
Ordered
June-19
101908
LTN-19
364-2300-540-6220
349,500
326,385
Ordered
June-19
101909
LTN-19
364-2300-540-6220
295,500
283,845
Ordered
June-19
Replace '08 Ford F250 - Streets Asset #12867 Replace '95 Ford F800 Water Truck - Streets Asset #9837 Replace '00 Freightliner Dump Truck - Drainage Asset #10942 Replace '09 International Street Sweeper - Drainage Asset #13120 72" Cut Zero Turn Mower - New Drainage Maintenance Crew **Addition to Fleet** 192" Cut Batwing Mower - New Drainage Maintenance Crew **Addition to Fleet** Trailer for Equipment - New Drainage Maintenance Crew **Addition to Fleet** 1 Ton Crew Cab Pick w Utility Body New Drainage Maintenance Crew **Addition to Fleet**
101910
BUDG-19
110-5900-531-6213
32,000
-
Planning
July-19
101912
BUDG-19
110-5900-531-6222
79,000
-
Planning
Aug-19
101914
Drainage
292-2900-534-6222
112,500
102,081
Ordered
May-19
101915
Drainage
292-2900-534-6222
240,000
234,027
Ordered
Feb-19
101916
Drainage
292-2900-534-6222
12,000
-
Planning
May-19
101917
Drainage
292-2900-534-6222
98,000
-
Planning
May-19
101918
Drainage
292-2900-534-6211
10,000
-
Planning
May-19
101919
Drainage
292-2900-534-6213
52,000
-
Planning
May-19
(Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
51
Exhibit E-10
CITY OF TEMPLE, TEXAS CAPITAL IMPROVEMENT PROGRAM-PROJECTS UNDERWAY/SCHEDULED - DETAIL December 31, 2018
Project Replace '08 Ford F350 Regular Cab - Water/Wastewater Asset #12918 Replace '08 Ford F350 Regular Cab - Water/Wastewater Asset #12919 Replace '09 Ford F350 Regular Cab - Water/Wastewater Asset #12968 Replace '10 Ford F350 Regular Cab - Water/Wastewater Asset #13133 Replace '10 Ford F450 Regular Cab - Water/Wastewater Asset #13139 Freightliner SD114 with Vactor Body - W/WW Specialty Crew **Addition to Fleet** Upgrade for the Manhole Inspection Van (Closed Circuit Television) - W/WW Specialty Crew (Asset # 11606) Service Center Office Improvements - Suite 123
Project # Funding 101923 BUDG-U
Acct # 520-5400-535-6213
(Continued)
Actual Project Commit / Budget Spent $ 48,000 $ -
Status Planning
Scheduled Completion July-19
101924
BUDG-U
520-5400-535-6213
48,000
-
Planning
July-19
101925
BUDG-U
520-5400-535-6213
48,000
-
Planning
July-19
101926
BUDG-U
520-5400-535-6213
48,000
-
Planning
July-19
101927
BUDG-U
520-5400-535-6213
50,000
-
Planning
July-19
101929
BUDG-U
520-5200-535-6222 520-5400-535-6222
382,000
366,587
Ordered
June-19
101930
BUDG-U
520-5200-535-6213 520-5400-535-6310
55,000
-
Planning
May-19
101931
BUDG-U
10,000
-
Planning
TBD
Replace '08 Ford F150 Regular Cab - Metering Asset #12825 1/2 Ton Reg Cab Truck - W/WW New Crew Leader **Addition to Fleet** Golf Cart GPS Screens
101932
BUDG-U
520-5200-535-6310 520-5400-535-6310 520-5300-535-6213
32,000
-
Planning
July-19
101934
BUDG-U
32,000
-
Planning
July-19
101936
BUDG-19
520-5200-535-6213 520-5400-535-6213 110-3110-551-6213
103,226
-
Planning
Mar-19
Replace '09 Ford F350 - Water/Wastewater Asset # 12967 Water Distribution Modeling and Management Software
101937
BUDG-U
520-5200-535-6213
48,000
-
Planning
July-19
101938
BUDG-U
520-5200-535-6221
31,215
-
Planning
July-19
(3) Handheld GIS Units
101939
BUDG-U
520-5200-535-6211
26,200
-
Planning
Aug-19
Replace '03 Caterpillar 420D Backhoe - Waste/Wastewater Asset # 11623
101940
BUDG-U
520-5100-535-6220
91,000
-
Planning
July-19
K-9 (2018 JAG Grant) - Police
101959
GRANT
260-2000-521-6211
18,534
-
Planning
Oct-21
Swift Water Boat, State Farm Grant - Fire
101991
BUDG-19
110-2230-522-6222
20,000
-
Planning
May-19
AreaRAE Air Monitor Deployment Kit, LETPA Grant - Fire
101994
BUDG-19 GRANT
110-2230-522-6211 260-2200-522-6211
61,522
61,522
Complete
Dec-18
Total Equipment/Other Charter Oak Waterline Replacement, Phase II {ROW} Bird Creek Interceptor {ROW} New Pepper Creek Tank {Property Acquisition} S Temple Ground Storage and Pump Station {Property Acquisition} SH 317 Ground Storage and Pump Station {Property Acquisition} Land Purchase 908 E Ave B
$
7,833,631 $
6,002,540
100608
Util-RE
520-5900-535-6110
324,102
314,973
In Progress
Apr-19
101213
Util-RE
520-5900-535-6110
577,134
276,586
In Progress
Apr-19
101944
Util-RE
520-5900-535-6110
100,000
-
Planning
June-19
101953
Util-RE
520-5900-535-6110
50,000
-
Planning
TBD
101954
Util-RE
520-5900-535-6110
50,000
-
Planning
TBD
101990
BUDG-19
110-3795-524-6110
39,687
39,686
Complete
Oct-18
1,140,923 $
631,246
Total Land Acquisitions
$
Caboose Renovations
101303
Hotel/Motel
240-7000-551-6310
21,809
20,279
Construction
Apr-19
Crossroads Athletic Park {RZ Funds in Project 101005} Mercer Fields
101311
GO-15
362-3500-552-6402
14,313,691
13,656,616
Construction
Apr-19
101317
GO-15
362-3500-552-6408
677,610
512,646
Construction
Apr-19
Prairie Park
101321
GO-15
362-3500-552-6412
118,174
68,776
Jan-19
Trail Repair - Wilson Park
101674
BUDG-18
110-5935-552-6310
17,900
8,910
Substantially Complete Complete
Sammons Golf Course Green Improvements
101771
CO-18
365-3100-551-6984
620,000
618,382
Complete
Oct-18
Oct-18
(Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
52
Exhibit E-10
CITY OF TEMPLE, TEXAS CAPITAL IMPROVEMENT PROGRAM-PROJECTS UNDERWAY/SCHEDULED - DETAIL December 31, 2018
Project South Temple Park Restrooms Meadow Bend Park
Project # Funding 101819 BUDG-18 CO-18 101862 BUDG-18
Acct # 110-3500-552-6332 365-3500-552-6988 110-3500-552-6332
(Continued)
Actual Project Commit / Budget Spent $ 199,325 $ 182,175
Status Construction
Scheduled Completion Mar-19
33,862
28,911
Complete
Dec-18
Von Rosenburg Park
101863
BUDG-18
110-3500-552-6332
13,577
13,577
In Progress
Feb-19
West Temple Park
101864
BUDG-18
110-3500-552-6332
15,786
15,535
In Progress
Feb-19
Pool Floor Plaster - Sammons
101897
BUDG-19
362-3200-551-6423
20,000
20,000
Construction
Apr-19
Alta Vista Park
101996
BUDG-19
110-3500-552-6332
76,950
-
Planning
May-19
Golf Course Pump Station {Design}
102002
GO-15
362-3100-551-6840
28,000
28,000
Engineering
May-19
Total Parks & Recreation
$ 16,156,684 $ 15,173,806
Rail Maintenance
100692
RZ
795-9500-531-6514
383,706
209,073
In Progress
TBD
Road/Sign Maintenance
100693
RZ
795-9500-531-6317
320,331
213,562
In Progress
Sept-19
Little Elm Trunk Sewer
101000
RZ
795-9500-531-6368
1,925,000
1,867,193
Construction
Apr-19
Temple Industrial Park - Outer Loop (IH35 to Wendland) Temple Industrial Park - Outer Loop (Wendland to McLane Pkwy) {Design & ROW} Corporate Campus Park - Outer Loop (McLane Pkwy to Cen Pt Pkwy) Crossroads Park @ Pepper Creek Trail {Park Bond Funds in Project 101311} Synergy Park - Entry Enhancement {Design} Downtown - Santa Fe Plaza
101000
RZ
3,946,000
3,427,621
Engineering
TBD
101001
RZ
795-9600-531-6863 795-9800-531-6863 795-9800-531-6864
2,425,000
2,313,462
Engineering
TBD
101004
RZ
8,094,000
836,842
Engineering
Oct-20
101005
RZ
5,925,000
5,925,000
Construction
Apr-19
101006
RZ
62,101
62,100
On Hold
TBD
101008
RZ
15,112,538
14,772,861
Construction
Apr-19
TMED - Loop 363 Frontage (UPRR Bridge to 5th TRZ Portion) {AFA - TXDOT} TMED - 31st St./Loop 363 Improvements/Monumentation
101010
RZ
795-9600-531-6881 795-9800-531-6881 795-9500-531-6867 795-9800-531-6867 795-9500-531-6868 795-9800-531-6868 795-9500-531-6870 795-9600-531-6870 795-9800-531-6870 795-9500-531-6872 795-9800-531-6872
6,749,994
6,567,065
Substantially Complete
Jan-19
101011
RZ
1,495,000
1,013,637
Construction
Apr-19
Downtown City Center / Hawn Hotel
101029
RZ
2,200,000
150,000
Engineering
TBD
Santa Fe Market Trail
101262
RZ
795-9500-531-6873 795-9600-531-6873 795-9800-531-6873 795-9500-531-6565 795-9600-531-6565 795-9500-531-6566
5,035,100
4,819,290
Construction
June-19
Veteran's Memorial Boulevard, Phase II {Design & ROW} R & D Rail Tracks {Design} Taxiway for Airport
101263
RZ
795-9500-531-6567
925,000
622,217
On Hold
TBD
101457
RZ
795-9500-531-6568
124,400
124,400
On Hold
TBD
101563
RZ
795-9500-531-6558
1,038,600
153,785
Engineering
July-19
Outer Loop, Phase VI (IH35 South) {Design & ROW} TMED South 1st Street, Phase I (Change Order to Project 101010) {AFA - TXDOT} East Outer Loop
101585
RZ
3,750,000
1,615,665
Engineering
Dec-19
101627
RZ
795-9500-531-6557 795-9600-531-6557 795-9500-531-6570
1,845,000
1,845,000
Substantially Complete
Jan-19
101796
RZ
795-9600-531-6890
623,000
622,210
Engineering
TBD
1st Street from Ave A to Central Ave
101797
RZ
1,676,000
295,260
Engineering
Jan-20
N 31st Street (Nugent to Central) {Concept Design & Land Acquisition} Corporate Hangar, Phase IV {Design} Airport FBO Center & Parking Visioning {Design}
101798
RZ
795-9500-531-6561 795-9600-531-6561 795-9500-531-6571
2,552,000
2,325,697
Engineering
Oct-19
101800
RZ
232,000
231,600
Complete
Nov-18
101801
RZ
795-9500-531-6558 795-9600-531-6558 795-9500-531-6573 795-9600-531-6573
559,000
118,860
Engineering
TBD (Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
53
Exhibit E-10
CITY OF TEMPLE, TEXAS CAPITAL IMPROVEMENT PROGRAM-PROJECTS UNDERWAY/SCHEDULED - DETAIL December 31, 2018
Project Outer Loop, Phase V {Design & ROW} 1st Street Parking Garage
Project # Funding 101824 RZ 101840
RZ
Ave C (Main Street to 24th Street) {Design & ROW} Santa Fe Plaza Parking Design
101841
Acct # 795-9600-531-6813
(Continued)
Actual Project Commit / Budget Spent $ 2,820,000 $ 871,865
Status Engineering
Scheduled Completion Mar-20
Planning
TBD
6,450,000
-
RZ
795-9500-531-6891 795-9600-531-6891 795-9600-531-6892
2,740,000
648,330
Engineering
Feb-20
101842
RZ
795-9600-531-6893
325,000
217,100
Planning
TBD
Rail Backage Road
101844
RZ
795-9500-531-6527
2,500,000
362,299
Engineering
Oct-19
Industrial Boulevard Overlay
101845
RZ
795-9600-531-6512
650,000
-
Planning
TBD
Corporate Campus Property Acquisition
101846
RZ
795-9500-531-6110
750,000
568,336
In Progress
Apr-19
1st Street from Ave A to Ave B
101847
RZ
795-9500-531-6551
1,275,000
1,059,652
Construction
June-19
Mouser Road Improvements
101928
RZ
795-9500-531-6317
340,000
22,326
Construction
July-19
3rd Street Improvements {United Way}
101977
RZ
795-9500-531-6315
125,000
125,000
TBD
East/West Gateway Landscaping
101978
RZ
795-9500-531-6319
560,000
59,700
Cost Sharing Agreement Authorized Engineering
Nov-19
Land @ Synergy Park
101979
RZ
795-9500-531-6110
750,000
-
Planning
TBD
Airport Improvements - Clear Area Near Fire Station
101980
RZ
795-9500-531-6341
172,500
-
Planning
TBD
Airport Improvements - Repaint Tower
101981
RZ
795-9500-531-6341
172,500
-
Planning
TBD
Airport Improvements - Demolition of Old Terminal Building
101982
RZ
795-9500-531-6341
115,000
-
Planning
TBD
Airport Improvements - Fence Realignment
101983
RZ
795-9500-531-6341
175,000
-
Planning
TBD
Adams/Central Ave Bicycle Pedestrian
101987
RZ
795-9500-531-6315
155,000
153,250
Engineering
Apr-19
Jan-19 June-20
Total Reinvestment Zone No. 1 Infrastructure
$ 87,073,770 $ 54,220,258
Kegley Road, Phase I
100346
CO-14
365-3400-531-6888
1,355,550
1,236,616
Hogan Road Improvements
100952
365-3400-531-6857
3,248,850
279,399
Westfield Boulevard Improvements, Phase II
100970
CO-12 CO-18 CO-12
Substantially Complete Construction
365-3400-531-6859
2,792,210
2,733,249
Construction
May-19
Outer Loop, Phase IIIB
101121
365-3400-531-6813
6,506,055
5,869,227
Construction
Apr-19
S Pea Ridge Developer Agreement {WBW Development, LTD}
101214
CO-12 CO-14 CO-18 CO-18
365-3400-531-6860
150,000
150,000
Mar-19
East Temple - Greenfield
101234
CO-12
365-3400-531-6884
75,792
-
Cost Sharing Agreement Authorized On Hold
Prairie View, Phase II (N Pea Ridge to FM 2483) SH317 Sidewalks {AFA - TXDOT} Kegley Road, Phase II
101257
GRANT CO-14 CO-14
260-3400-531-6862 365-3400-531-6862 365-3400-531-6315
9,784,753
9,072,707
Construction
Apr-19
200,000
200,000
Complete
Dec-18
365-3400-531-6888
5,163,800
450,145
Engineering
Aug-20
Kegley Road, Phase III & IV {Preliminary Design & ROW} Traffic Signal Upgrade - N Kegley @ Airport Rd
101607
365-3400-531-6888
1,176,090
756,124
Engineering
Aug-19
101611
CO-16 CO-18 CO-16 CO-18 CO-16
365-2800-532-6810
224,650
216,360
Construction
Feb-19
Traffic Signal Upgrade - Adams @ Greenview
101612
CO-16
365-2800-532-6810
291,650
247,521
Construction
Feb-19
Sidewalk/Transportation Enhancements
101711
GRANT
260-6100-571-6315
25,000
19,780
Engineering
June-19
101285 101606
TBD
(Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
54
Exhibit E-10
CITY OF TEMPLE, TEXAS CAPITAL IMPROVEMENT PROGRAM-PROJECTS UNDERWAY/SCHEDULED - DETAIL December 31, 2018
Project N Pea Ridge, Phase I {Design & ROW} Outer Loop, Phase IV {Design & ROW} Poison Oak, Phase I & II {Design & ROW} Hogan Road Developer Agreement {Kiella Development, Inc.}
Project # Funding 101713 CO-16 CO-18 101714 CO-16 CO-18 101715 CO-16 CO-18 101802 CO-16
Acct # 365-3400-531-6985
(Continued)
Actual Project Commit / Budget Spent $ 2,185,000 $ 665,650
Status Engineering
Scheduled Completion Nov-19
365-3400-531-6813
2,400,000
894,900
Engineering
June-20
365-3400-531-6886
4,205,000
1,588,809
Engineering
Jan-20
365-3400-531-6857
800,240
800,240
Cost Sharing Agreement Authorized Engineering
TBD
S 31st Street Sidewalk - TXDOT AFA
101804
CO-18
365-3400-531-6532
415,000
415,000
Westfield Developer Agreement {Kiella Development, Inc.}
101822
CO-18
365-3500-552-6516
388,964
388,964
S 5th Street Sidewalk - Cost Sharing Agreement {WBW Development, Ltd}
101827
CO-18
365-3400-531-6315
73,619
73,619
Grant Match Sidewalks/Trail Connections
101829
CO-18
365-3400-531-6315
25,400
Friars Creek Trail - Grant
101855
CO-18
365-3400-531-6315
Azalea Drive Developer Agreement {Patco Construction, LLC}
101860
CO-18
Sidewalk/Transportation Enhancements
101942
Video Detection Equipment 2019/2020 - Signals Azalea Drive
Jan-20
Feb-19
-
Cost Sharing Agreement Authorized Cost Sharing Agreement Authorized Planning
24,600
-
Planning
TBD
365-3400-531-6715
682,163
682,163
Mar-19
GRANT
260-6100-571-6315
50,000
-
Cost Sharing Agreement Authorized Planning
101956
CO-18
365-2800-532-6810
168,000
166,560
Complete
Dec-18
101985
CO-18
365-3400-531-6715
1,442,800
102,800
Engineering
May-20
Jan-19 June-19
Total Streets/Related Facilities
Mar-19
TBD
TBD
$ 43,855,186 $ 27,009,833
TCIP - Kegley Road Utility Improvements, Phase I
100346
BUDG-U
520-5200-535-6357
110,000
89,220
Charter Oak Waterline Replacement, Phase II
100608
561-5200-535-6939
4,791,792
1,011,801
TXDOT I-35 Utility Relocation Project: North Loop 363 to Northern Temple City Limits {Engineering Only} TXDOT I-35 Utility Relocation Project: South Loop 363 to Nugent {Engineering Only} TXDOT I-35 Utility Relocation Project: Nugent to North Loop 363 {Engineering Only} Leon River Trunk Sewer, Lift Station and Force Main TCIP - Hogan Road Waterline Improvements
100682
UR-15 UR-17 TxDOT
Substantially Complete Engineering
520-5900-535-6618
193,240
193,240
Construction
Mar-19
100687
TxDOT
520-5900-535-6618
544,852
492,690
Construction
Mar-19
100688
TxDOT
520-5900-535-6618
456,838
404,675
Construction
Mar-19
100851
UR-10
561-5400-535-6941
6,062,172
5,947,055
Complete
Dec-18
100952
561-5200-535-6983
2,065,100
214,071
Construction
June-20
TCIP - Westfield Blvd Utility Improvements, Phase II
100970
UR-15 UR-17 BUDG-U
520-5200-535-6357
127,096
113,319
Construction
May-19
Bird Creek Interceptor, Phase IV {Design Only} Utility Improvements - FY 2014 {Greenfield Development} Temple-Belton WWTP Expansion, Phase II {Engineering Only} WTP Improvements - Tasks 1-3 {Preliminary Engineering Only} TCIP - Outer Loop, Phase III-B {Utilities} Water/Wastewater Replacement 2nd & 4th; Ave C to Adams Ave WW Master Plan Update
100980
UR-15
561-5400-535-6925
563,615
516,190
Engineering
Mar-19
101064
BUDG-U
520-5000-535-6370
312,893
-
On Hold
TBD
101086
Util-RE UR-15 UR-15
520-5900-535-6310 561-5500-535-6938 561-5100-535-6954
1,589,623
1,589,623
Engineering
Apr-19
242,832
242,832
Engineering
Feb-19
520-5900-535-6521 561-5200-535-6813 520-5900-535-6521
1,282,087
1,245,080
Construction
Apr-19
101186
Util-RE UR-15 Util-RE
83,715
83,715
On Hold
TBD
101197
Util-RE
520-5900-535-2616
499,200
492,934
Engineering
Mar-19
Old Town South Sewer Line (3rd & 11th/Ave D to Ave H & 3rd & 9th/Ave K to Ave N)
101201
BUDG-U UR-15
520-5400-535-6361 561-5400-535-6964
3,342,907
3,113,944
Construction
Mar-19
101087 101121
(Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
55
Exhibit E-10
CITY OF TEMPLE, TEXAS CAPITAL IMPROVEMENT PROGRAM-PROJECTS UNDERWAY/SCHEDULED - DETAIL December 31, 2018
Project TCIP - Prairie View Utility Improvements, Phase II (N Pea Ridge to FM 2483) WTP Membrane Plant - Repaint Piping, Floors, and Concrete Slab Ave G & Loop 363 Pump Stations - Install Overhead Monorail and Chain Hoist System WTP Conventional - Lab Upgrades
Project # Funding 101257 Util-RE
Acct # 520-5900-535-6521
(Continued)
Actual Project Commit / Budget Spent $ 850,000 $ 779,281
Status Construction
Scheduled Completion Apr-19
Construction
May-19
On Hold
TBD Jan-19 July-19
101420
BUDG-U
520-5100-535-6310
494,000
398,555
101433
BUDG-U
520-5100-535-6222
100,000
-
101452
BUDG-U
520-5100-535-6310
144,833
144,833
Shallowford Lift Station Reconstruction & Relocation
101475
561-5400-535-6905
7,357,202
7,176,990
Jackson Park Vicinity Water & Wastewater Line Improvements Bird Creek Interceptor, Phase V
101476
520-5900-535-6361 561-5400-535-6970 520-5400-535-6361 561-5400-535-6925
1,692,778
1,646,277
Complete
Nov-18
2,612,349
2,336,272
Construction
July-19
Highland Park Water Lines {Stellar Development}
101488
UR-15 UR-17 Util-RE UR-15 BUDG-U UR-15 UR-17 Util-RE
Substantially Complete Construction
520-5900-535-6366
152,844
152,844
TBD
Force Main - Shallowford to TBP
101512
520-5900-535-6352 561-5400-535-6973
4,275,100
3,413,792
June-19
East Temple Utility Improvements
101575
Util-RE UR-15 UR-17 UR-15
Cost Sharing Agreement Authorized Construction
561-5200-535-6974
300,000
75,600
Engineering
TBD
TCIP - Kegley Road Utility Improvements, Phase II
101606
BUDG-U
520-5200-535-6357
514,000
-
Engineering
Aug-20
TCIP - Kegley Road, Phase III & IV {Preliminary Design} WTP Improvements - Task 2 - MWTT Optimization
101607
UR-15
561-5200-535-6888
39,600
39,600
Engineering
Aug-19
101613
UR-15
561-5100-535-6954
39,353
20,810
Engineering
Feb-19
WTP Improvements - Task 3 - Lagoon Improvements {Final Engineering} WTP Improvements - Task 4 - Intake Conditioning {Design} Williamson Creek Trunk Sewer
101614
UR-15 UR-17 UR-17
561-5100-535-6954
614,373
278,597
On Hold
TBD
561-5100-535-6959
36,360
36,360
Engineering
July-19
561-5400-535-6980
3,165,379
2,925,477
Engineering
Sept-19
Knob Creek Trunk Sewer {Design of Phase I-V} Wastewater Line Projects - FY 2018
101629
UR-15 UR-17 Util-RE
520-5900-535-6631
2,268,126
2,139,429
Engineering
July-19
101704
BUDG-18
520-5400-535-6361
21,749
-
Planning
TBD
Water Line Improvement Projects - FY 2018
101707
BUDG-18
520-5200-535-6357
10,063
-
Planning
TBD
Replace Membrane Modules - FY 2018
101710
BUDG-18
520-5100-535-6211
349,687
332,312
Construction
Mar-19
TCIP - N Pea Ridge, Phase I {Design & ROW} TCIP - Outer Loop, Phase IV {Design & ROW} TCIP - Poison Oak Utility Improvements, Phase I & II {Design} North Gate Subdivision, Utility Extension {West Tanglefoot Development, Inc} Temple-Belton WWTP Expansion, Phase I {Construction} Hogan Road Developer Agreement {Kiella Development, Inc.}
101713
Util-RE
520-5900-535-6985
584,900
54,900
Engineering
Nov-19
101714
UR-15
561-5200-535-6813
84,000
84,000
Engineering
June-20
101715
UR-15
561-5200-535-6986
125,000
123,429
Engineering
May-20
101719
Util-RE
520-5900-535-6368
436,031
436,030
Complete
Oct-18
101774
UR-17
561-5500-535-6938
10,120,869
10,118,751
Construction
May-19
101802
Util-RE
520-5900-535-6368
169,286
169,286
TBD
Wastewater Line Developer Agreement {Cedon Realty, Ltd}
101823
BUDG-U
520-5400-535-6361
36,751
36,751
Turbine Pump at Membrane Water Treatment Plant
101828
BUDG-U
520-5100-535-6211
11,563
11,563
Cost Sharing Agreement Authorized Cost Sharing Agreement Authorized Complete
Nov-18
Scott Elevated Storage Tank Rehabilitation
101834
561-5100-535-6954
1,425,149
1,424,949
Construction
July-19
Azalea Drive Developer Agreement {Patco Construction, LLC}
101860
BUDG-U UR-17 Util-RE
520-5900-535-6362
305,412
305,412
Cost Sharing Agreement Authorized
Mar-19
101477
101619 101628
TBD
(Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
56
Exhibit E-10
CITY OF TEMPLE, TEXAS CAPITAL IMPROVEMENT PROGRAM-PROJECTS UNDERWAY/SCHEDULED - DETAIL December 31, 2018
Project WTP - Disinfection Byproduct Reduction Initiative {Design} FY 2019 - Approach Mains
Project # Funding 101902 UR-17
Acct # 561-5100-535-6992
(Continued)
Actual Project Commit / Budget Spent $ 500,000 $ -
Status Planning
Scheduled Completion TBD
Planning
TBD
101921
BUDG-U
520-5000-535-6369
500,000
-
City-wide SECAP {Intent to Reimburse} Gateway Center Area Utility Improvements
101922
UR-19
561-5400-535-6997
1,000,000
709,541
Engineering
Jan-20
101943
Util-RE
520-5900-535-6521
500,000
37,221
In Progress
July-19
MWTP - Upgrade Turbidity Analyzers
101945
Util-RE
520-5900-535-6211
100,000
-
Planning
Feb-19
Waterline Pressure Monitors (20) - Link to SCADA
101946
Util-RE
520-5900-535-6211
100,000
-
Planning
TBD
WTP - Clarifier #3 Rehabilitation
101947
UR-17
561-5100-535-6990
777,319
777,319
Construction
May-19
New Pepper Creek Storage Tank {Design} 57th - 43rd, Ave R - Ave Z Utility Improvements {Design} Garden District Utility Improvements {Design} West Temple Distribution Line {Design} Apache Elevated Storage Tank Rehabilitation {Design} Friar Creek Assessment {Intent to Reimburse} Outer Loop Water Line and East/West Sewer Main
101948
UR-17
561-5100-535-6991
500,000
159,590
Engineering
Mar-19
101949
UR-17
561-5200-535-6994
500,000
-
Planning
TBD
101950
UR-17
561-5200-535-6995
300,000
-
Planning
Oct-19
101951
UR-17
561-5200-535-6996
200,000
-
Planning
TBD
101952
UR-17
561-5100-535-6993
100,000
-
Planning
TBD
101992
UR-19
561-5400-535-6997
1,000,000
906,490
Engineering
Jan-20
101997
UR-17
1,220,000
390,055
Construction
Aug-19
Wildflower Wastewater Line Replacement
102000
BUDG-U
561-5200-535-6813 561-5400-535-6813 520-5400-535-6990
117,093
108,343
Construction
Feb-19
Hidden Villages Subdivision, Utility Extension {Sears-Bond LP}
520004
Util-RE
520-5900-535-6366
54,685
54,685
Cost Sharing Agreement Authorized
TBD
Total Water & Wastewater Facilities
$ 68,073,816 $ 53,555,732
Total Capital Projects
$ 234,132,207 $ 162,931,844
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
57
CITY OF TEMPLE, TEXAS CAPITAL IMPROVEMENT PROGRAM - PROJECT STATUS {BASED ON $'s} As of December 31, 2018 Under Construction / In Progress
Exhibit E-11
$
118,876,200
Engineering
73,825,338
Projects Complete
21,541,199
Planning Phase
19,889,470
Total Estimated Costs of Capital Improvement Projects
$
234,132,207
Total = $ 234,132,207
Under Construction / In Progress 50.8%
Engineering 31.5%
Projects Complete 9.2%
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
Planning Phase 8.5%
58
CITY OF TEMPLE, TEXAS Exhibit E-12 CAPITAL IMPROVEMENT PROGRAM - PROJECT STATUS {BASED ON NUMBER OF PROJECTS} As of December 31, 2018
Planning Phase
87
Under Construction / In Progress
59
Projects Complete
43
Engineering
40
Total Number of Capital Improvement Projects
229
Total = $ 234,132,207
Planning Phase 38.0%
Under Construction/ In Progress 25.8%
Projects Complete 18.8%
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
Engineering 17.5%
59
CITY OF TEMPLE, TEXAS CAPITAL IMPROVEMENT PROGRAM - PROJECT STATUS {BASED ON FUNDING SOURCE} As of December 31, 2018
Reinvestment Zone No. 1 Utility Revenue Bonds (2015,2017,2019) Combination Tax & Revenue CO Bonds (2016,2018,2019) Parks GO Bonds (2015) Water Fund - Retained Earnings Drainage Fund - Designated from Fund Balance and CO Bonds (2018) Budgeted Capital - Utility Fund Grant Funds Budgeted Capital - General Fund LoanSTAR Loan Program * TxDOT Reimbursable Utility Agreements * Limited Tax Notes (2016,2019) *
$
General Fund - Designated from Fund Balance/Other * Hotel-Motel Fund - Designated from Fund Balance * Total Capital Improvement Projects {by funding source}
Millions
$0
$20
$
$40
$60
Total Dollars 87,073,770 51,187,669 38,866,026 15,236,204 11,559,818 7,406,433 7,288,509 7,132,783 3,736,885 1,938,732 1,194,930 1,057,299
Exhibit E-13
% of Total 37.19% 21.86% 16.60% 6.51% 4.94% 3.16% 3.11% 3.05% 1.60% 0.83% 0.51% 0.45%
236,010 217,139
0.10% 0.09%
234,132,207
100.00%
$80
$100
Reinvestment Zone No. 1 37.2% Utility Revenue Bonds (2015,2017,2019) 21.9% CO Bonds (2016,2018,2019) 16.6% Parks GO Bonds (2015) 6.5% Water Fund Retained Earnings 4.9% Drainage - Fund Balance & CO Bonds (2018) 3.2% Budgeted Capital Utility Fund 3.1% Grant Funds 3.1%
Total = $ 234,132,207
* Other 2.0% Budgeted Capital General Fund 1.6% *Funding source is reflected in "other" on graph
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
60
CITY OF TEMPLE, TEXAS CAPITAL IMPROVEMENT PROGRAM - PROJECT STATUS {COMPLETION DATE} As of December 31, 2018
Exhibit E-14
Capital Improvement Program Project Status Number of Projects Based on Completion Date Oct-18
15
Nov-18
11
Dec-18
8 9
Jan-19
15
Feb-19
13
Mar-19
16
Apr-19
18
May-19
14
Completion Date
Jun-19
30
Jul-19
7
Aug-19
2
Sep-19 Oct-19
3
Nov-19
3 2
Dec-19
4
Jan-20
13-Feb-19
1
Feb-20
1 Prepared by City Mar-20 of Temple Finance Department-je 0
Apr-20
2
May-20
2
Jun-20
0
Jul-20
1
Aug-20
0
Sep-20
2
Oct-20 Nov-20
0
Dec-20
0 1
Oct-21
49
TBD 0
10
20
30
40
50
60
Number of Projects = 229
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
61
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
62
INVESTMENTS
The Public Funds Investment Act, Chapter 2256 of Texas Government Code, requires the investment officer to prepare and submit a written report of investments to the governing body of the entity not less than quarterly.
Treasury Yield Curve 3.50% 3.00% 2.50%
2.00% 1.50% 1.00% 0.50% 0.00%
3 Mo
6 Mo
1 Yr
2 Yr
3 Yr
5 Yr
10 Yr
30 Yr
Source - Board of Governors of the Federal Reserve System Statistical Release H.15, January 2, 2019
Average 3-Month Treasury Bill Rate 2.50%
2.00%
1.50%
1.00%
0.50%
0.00%
Source - Board of Governors of the Federal Reserve System; https://fred.stlouisfed.org/series/TB3MS
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
64
CITY OF TEMPLE, TEXAS
Exhibit F-1
SCHEDULE OF INVESTMENT ALLOCATIONS December 31, 2018 Carrying
Bank Balance/
Value
Fair Value
Entity Allocation Based on Carrying Value
Entity Allocation BBVA Compass
8,320,147
$ 10,825,856
East West Bank
15,064,347
15,064,347
Green Bank
18,061,385
18,061,385
Independent Bank
10,256,714
10,256,714
LegacyTexas Bank
15,283,376
15,283,376
9,690,826
9,690,826
26,832,377
26,832,377
9,383,580
9,383,580
Texpool*
14,084,090
14,084,090
TexSTAR*
41,235,703
41,235,703
NexBank Southside Bank Texas CLASS*
Third Coast Bank Wallis State Bank
$
15,293,912
15,293,912
5,102,322
5,102,322
$188,608,779
$191,114,488
Carrying
Bank Balance/
Value
Fair Value
Asset Allocation Cash
$ 47,872,365
$ 50,378,074
Gov't Pools
64,703,373
64,703,373
CDs
76,033,041
76,033,041
$188,608,779
$191,114,488
Third Coast Bank 8% TexSTAR* 22%
Wallis State Bank 3% BBVA Compass 4% East West Bank 8%
Green Bank 10% Texpool* 8%
Independent Bank 5%
Texas CLASS* 5%
LegacyTexas Bank NexBank 8% 5%
Southside Bank 14%
Asset Allocation Based on Carrying Value CDs 40%
Cash 26% Gov't Pools 34%
% of Carrying
Carrying
Value
Value
Fund Allocation General Fund (GF)
$ 39,083,070
20.72%
Water & Wastewater (Wtr/WW)
58,880,746
31.22%
GO Interest & Sinking (I&S)
10,080,182
5.34%
1,511,559
0.80%
35,040,479
18.58%
15,315
0.01%
(28,835)
-0.02%
Hotel / Motel (Hot/Mot)
Fund Allocation Based on Carrying Value Other RZ No.1 22%
Capital Projects - GO/CO Bond Program (GO/CO Bonds)
GF 21%
Capital Projects - Designated Fund Balance (CP/FB) Federal / State Grant Fund (Grant) Drainage (Drng) Employee Benefits Trust (Emp) Reinvestment Zone No.1 (RZ No.1)
2,419,371
GO/CO Bonds 18%
Wtr/WW 31%
1.28%
571,367
0.30%
41,035,525
21.76%
$188,608,779
100.00%
Note: Other includes I&S, Hot/Mot, CP/FB, PTF, Grant, Drng, & Emp
* The City's investments in local government investment pools are stated at carrying value, w hich also represents the value of the investments upon w ithdraw al. Accordingly, carrying and fair value are reported as the same amount.
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
65
CITY OF TEMPLE, TEXAS INVESTMENT PORTFOLIO - MARKET TO MARKET December 31, 2018 Par Term* Type Value (Days) Independent Bank CD Southside Bank CD Southside Bank CD Independent Bank CD Third Coast Bank CD Legacy Texas CD East West Bank CD Wallis State Bank CD LegacyTexas CD Third Coast Bank CD Third Coast Bank CD East West Bank CD Green Bank CD Legacy Texas CD TexPool Investment Pool TexSTAR Investment Pool Texas CLASS Investment Pool BBVA Compass Cash BBVA Compass Money Market Green Bank Money Market NexBank Money Market Southside Bank Money Market
$
5,113,874 5,000,000 5,000,000 5,121,542 5,082,726 5,144,101 10,023,523 5,097,201 5,114,625 5,062,868 5,064,129 5,040,824 5,000,000 5,012,370 14,084,090 41,235,703 9,383,580 5,238,135 3,082,012 13,049,993 9,690,826 16,811,399 $ 188,453,521
3 59 59 60 113 127 150 163 224 275 367 448 518 609 87 95 56 1 1 1 1 1
Exhibit F-2
Yield % 1.5000 2.4900 2.4900 1.6000 2.2000 2.1000 2.7200 1.9300 1.7000 2.5000 2.5500 2.9100 3.0000 3.0500 2.2872 2.3069 2.5000 0.6100 1.1100 2.4000 2.5600 2.4400
Maturity Date 03-Jan-19 28-Feb-19 28-Feb-19 01-Mar-19 23-Apr-19 07-May-19 30-May-19 12-Jun-19 12-Aug-19 02-Oct-19 02-Jan-20 23-Mar-20 01-Jun-20 31-Aug-20 -
Carrying Value $
5,124,172 5,010,489 5,010,489 5,132,542 5,103,865 5,151,204 10,023,523 5,102,322 5,119,389 5,094,077 5,095,970 5,040,824 5,011,392 5,012,783 14,084,090 41,235,703 9,383,580 5,238,135 3,082,012 13,049,993 9,690,826 16,811,399 $ 188,608,779
Fair Value $
5,124,172 5,010,489 5,010,489 5,132,542 5,103,865 5,151,204 10,023,523 5,102,322 5,119,389 5,094,077 5,095,970 5,040,824 5,011,392 5,012,783 14,084,090 41,235,703 9,383,580 7,743,844 3,082,012 13,049,993 9,690,826 16,811,399 $ 191,114,488
Fair Value as a % of Carrying Value
Fair vs Carrying $
$
N/A N/A N/A N/A N/A 100.00%
Weighted Average Maturity
119.33 Days
2.30% Yield
Benchmark Yield Average rolling 90-day T-Bill rate Key Rates: Cash Markets Rate City of Temple Texpool TexSTAR Texas Class Fed funds* CDs: Three months* CDs: Six months* T- bill 91-day yield* T- bill 52-week yield* Bond Buyer 20- bond municipal index
2.37%
Year ago 1.22 1.18 1.18 1.40 1.33 0.12 0.19 1.37 1.70
Dec 31 2.30 2.29 2.31 2.50 2.40 0.22 0.38 2.40 2.54
3.44
4.10
Key Rates 4.50% 4.00% 3.50% 3.00% 2.50% 2.00% 1.50% 1.00% 0.50% 0.00%
Year ago
*S o urc e - F e de ra l R e s e rv e B a nk
Traci L. Barnard Director of Finance
Stacey Reisner Treasury Manager
Melissa Przybylski Assistant Director of Finance
Sherry M. Pogor Financial Analyst
Dec 31
Erica Glover
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
66
CITY OF TEMPLE, TEXAS
Exhibit F-3
CARRYING VALUE AND FAIR VALUE COMPARISON For the Quarter Ending December 31, 2018
Carrying Value Par Type BBVA Compass CD
Value $
Increase / Maturity
9/30/2018 5,107,819
$
(Decrease)
5,091,234
03-Dec-18
Independent Bank CD
5,113,874
03-Jan-19
5,104,871
5,124,172
19,301
Southside Bank CD
5,000,000
28-Feb-19
0
5,010,489
5,010,489
Southside Bank CD
5,000,000
28-Feb-19
0
5,010,489
5,010,489
Independent Bank CD
5,121,542
01-Mar-19
5,111,927
5,132,542
20,615
Third Coast Bank CD
5,082,726
23-Apr-19
5,075,719
5,103,865
28,146
Legacy Texas CD
5,144,101
07-May-19
5,124,034
5,151,204
27,170
10,023,523
30-May-19
0
10,023,523
10,023,523
East West Bank CD
$
12/31/2018 -
$
(5,107,819)
Wallis State Bank CD
5,097,201
12-Jun-19
5,077,620
5,102,322
24,702
LegacyTexas CD
5,114,625
12-Aug-19
5,097,515
5,119,389
21,874
Third Coast Bank CD
5,062,868
02-Oct-19
5,062,178
5,094,077
31,899
Third Coast Bank CD
5,064,129
02-Jan-20
5,063,426
5,095,970
32,544
East West Bank CD
5,040,824
23-Mar-20
5,003,988
5,040,824
36,836
Green Bank CD
5,000,000
01-Jun-20
0
5,011,392
5,011,392
5,012,370
31-Aug-20
5,012,783
Legacy Texas CD
0
5,012,783
TexPool Investment Pool
14,084,090
-
8,354,898
14,084,090
TexSTAR Investment Pool
41,235,703
-
55,663,757
41,235,703
Texas CLASS Investment Pool
9,383,580
-
6,110,852
9,383,580
3,272,728
BBVA Compass Cash
5,238,135
-
8,049,466
5,238,135
(2,811,331)
BBVA Compass Money Market Green Bank Money Market NexBank Money Market Southside Bank Money Market
5,729,192 (14,428,054)
3,082,012
-
3,071,182
3,082,012
10,830
13,049,993
-
3,011,786
13,049,993
10,038,207
9,690,826
-
40,506,744
9,690,826
16,811,399
-
7,495,106
16,811,399
$193,544,755
$
183,092,888
$
188,608,779
(30,815,918) 9,316,293 $
5,515,891
Fair Value Par Type BBVA Compass CD
Value
9/30/2018 $
12/31/2018
5,107,819
$
(Decrease)
5,091,234
03-Dec-18
Independent Bank CD
5,113,874
03-Jan-19
5,104,871
5,124,172
19,301
Southside Bank CD
5,000,000
28-Feb-19
0
5,010,489
5,010,489
Southside Bank CD
5,000,000
28-Feb-19
0
5,010,489
5,010,489
Independent Bank CD
5,121,542
01-Mar-19
5,111,927
5,132,542
20,615
Third Coast Bank CD
5,082,726
23-Apr-19
5,075,719
5,103,865
28,146
Legacy Texas CD
5,144,101
07-May-19
5,124,034
5,151,204
27,170
10,023,523
30-May-19
0
10,023,523
10,023,523
East West Bank CD
$
Increase / Maturity
-
$
(5,107,819)
Wallis State Bank CD
5,097,201
12-Jun-19
5,077,620
5,102,322
24,702
LegacyTexas CD
5,114,625
12-Aug-19
5,097,515
5,119,389
21,874
Third Coast Bank CD
5,062,868
02-Oct-19
5,062,178
5,094,077
31,899
Third Coast Bank CD
5,064,129
02-Jan-20
5,063,426
5,095,970
32,544
East West Bank CD
5,040,824
23-Mar-20
5,003,988
5,040,824
36,836
Green Bank CD
5,000,000
01-Jun-20
0
5,011,392
5,011,392
5,012,370
31-Aug-20
5,012,783
Legacy Texas CD
0
5,012,783
TexPool Investment Pool
14,084,090
-
8,354,898
14,084,090
TexSTAR Investment Pool
41,235,703
-
55,663,757
41,235,703
Texas CLASS Investment Pool
9,383,580
-
6,110,852
9,383,580
3,272,728
BBVA Compass Cash
5,238,135
-
10,435,137
7,743,844
(2,691,293)
BBVA Compass Money Market Green Bank Money Market NexBank Money Market Southside Bank Money Market
5,729,192 (14,428,054)
3,082,012
-
3,071,182
3,082,012
10,830
13,049,993
-
3,011,786
13,049,993
10,038,207
9,690,826
-
40,506,744
9,690,826
16,811,399
-
7,495,106
16,811,399
$193,544,755
$
185,478,559
$
191,114,488
(30,815,918) 9,316,293 $
5,635,929
Investments with a $0 Carrying and Fair Value at 9/30/2018 were purchased after 9/30/2018.
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
67
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
68
SUPPLEMENTAL INFORMATION
Supplemental Information includes: Fund Balance Reserves/Designations – General Fund ................. 71 Expenditures of Federal and State Awards .................................. 72 Awards of Federal & State Grants by Project Type ...................... 74 Hotel/Motel Tax Receipts by Reporting Entity ............................. 75 Historical Sales Tax Revenue by Month........................................ 76 Parks Escrow Deposits by Addition Name .................................... 77
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
70
City of Temple, Texas
Table I
Schedule of Fund Balance - General Fund December 31, 2018
Council Approved Appropriation Balance 10/01/18
Reallocation
Increase
Balance
(Decrease)
12/31/18
CAPITAL PROJECTS:
2018/2019 Budgetary Supplement-Capital/SIZ/TEDC Matrix: Capital Equipment Purchases
$
1,833,739
$
-
$
(1,833,739)
$
-
Strategic Investment Zone
100,000
-
(100,000)
-
TEDC Matrix Allocation
863,236
-
(863,236)
-
Capital Replacement - Sanitation Vehicles
274,000
-
(274,000)
-
Capital Replacement - P25 Radios
249,500
-
(249,500)
-
TOTAL BUDGETARY SUPPLEMENT
3,320,475
-
(3,320,475)
-
TOTAL - PROJECT SPECIFIC
3,320,475
-
(3,320,475)
-
1,035,999
-
(120,369)
915,630
4,356,474
-
(3,440,844)
915,630
1,675,168
-
(1,675,168)
-
492,994
-
-
492,994
8,590
-
-
8,590
Drug enforcement {Forfeiture Funds}
258,281
-
(17,280)
241,001
Municipal Court Restricted Fees
320,950
-
-
320,950
CAPITAL PROJECTS ***ASSIGNED***
TOTAL CAPITAL PROJECTS
Other Fund Balance Classifications: Encumbrances: Nonspendable: Inventory & Prepaid Items Restricted for: Rob Roy MacGregor Trust - Library
Vital Statistics Preservation Fund Public Safety Public Education Government (PEG) Access Channel
3,050
-
-
3,050
30,643
-
-
30,643
144,338
-
-
144,338
356,940
-
(122,300)
234,640
(5,255,592)
5,255,592
Assigned to: Technology Replacement Budgeted decrease in Fund Balance
-
Unassigned: { 4 months operations }
20,132,300
Total Fund Balance
$ 27,779,728
$
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
-
$
20,132,300 $
27,779,728
71
CITY OF TEMPLE, TEXAS SCHEDULE OF EXPENDITURES OF FEDERAL AND STATE AWARDS For three months ended December 31, 2018
Table II
Federal/State Grantor Agency or Pass-Through Program Title
Federal CFDA Number
Grant Number
Federal Financial Assistance: U.S. Department of H.U.D. CDBG 2014 CDBG 2015 CDBG 2016 CDBG 2017 CDBG 2018
14.218 14.218 14.218 14.218 14.218
B-14-MC-48-0021 B-15-MC-48-0021 B-16-MC-48-0021 B-17-MC-48-0021 B-18-MC-48-0021
97.042
19TX-EMPG-1142
Program or Award Amount
$
390,268 357,357 410,971 431,615 536,232
Passed Through to Subrecipients
$
Program Expenditures
-
$
6,496 11,398 5,722 206 23,822
U.S. Department of Homeland Security Texas Department of Public Safety: Civil Defense
36,713
-
9,178 9,178
U.S. Department of Justice 2018 Bullet Proof Vests Grant
16.607
2018-BU-BX-13069168
13,039
-
-
2017 Edward Byrne Memorial Justice Assistance Grant
16.738
2017-DJ-BX-0809
17,167
-
-
2018 Edward Byrne Memorial Justice Assistance Grant
16.738
2018-DJ-BX-0877
18,534
-
-
Killeen Police Department:
U.S. Department of Transportation Texas Department of Transportation: Surface Transportation Program (through KTMPO)
20.205
0909-36-155
3,888,000
-
Pass-Through Agreement
20.205
0320-06-001
16,555,000
-
234,077 234,077
U.S. Environmental Protection Agency Special Appropriation Act Projects
66.202
01F18601
970,000
-
84,976 84,976
Institute of Museum and Library Services Texas State Library and Archives Commission Interlibrary Loan Program
45.310
LS-00-17-0044-17
5,220
-
5,220 5,220
Total Federal Financial Assistance
23,630,116
-
357,273
34,350
-
563
State Financial Assistance:
Office of the Governor - Criminal Justice Division Crisis Assistance Program
-
2820003
563 Texas Department of Transportation 2019 Routine Airport Maintenance Program (RAMP)
-
M1909TEMP
50,000
-
-
Total State Financial Assistance Total Federal, State and State Administered Financial Assistance
84,350 $
23,714,466
$
-
563 $
357,836 (Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
72
CITY OF TEMPLE, TEXAS
Table II
SCHEDULE OF EXPENDITURES OF FEDERAL AND STATE AWARDS
(Continued)
For three months ended December 31, 2018
Schedule of Federal and State Awards by Funding Source
Total = $ 23,714,466
Pass-Through Agreement - 69.80% US Department of Transportation - 16.40% US Department of HUD - 9.00% Other - 0.70% U.S. Environmental Protection Agency - 4.10%
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
73
CITY OF TEMPLE, TEXAS SCHEDULE OF AWARDS OF FEDERAL AND STATE GRANTS - BY PROJECT TYPE For three months ended December 31, 2018
Pass-Through Agreement Transportation Community Development Health & Human Services Public Safety & Youth Programs Airport
Table III
$ 16,555,000 3,888,000 2,126,443 970,000 125,023 50,000 $ 23,714,466
Schedule of Federal and State Awards by Project Type
Total = $ 23,714,466
Pass-Through Agreement - 69.80%
Transportation - 16.40% Community Development - 9.00% Health & Human Services - 4.10% Public Safety & Youth Programs - 0.50% Airport - 0.20%
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
74
City of Temple, Texas Hotel/Motel Tax Receipts by Reporting Entity For the three months ended December 31, 2018 & 2017
Table IV
Hotel/Motel Tax By Reporting Entity Thousands
$0
$10
$20
$30
$40
$50
$60
$70
$80
Hilton Garden Inn Residence Inn Holiday Inn
Hampton Inn Holiday Inn Express Fairfield Inn Country Inn & Suites Super 8 Motel Best Western Candlewood Suites LaQuinta Inn
18/19
Towneplace Suites
17/18
Econo Lodge Quality Suites Motel 6-Nugent Motel 6-Gen. Bruce Days Inn Americas Best Value Travelodge
Budget Inn Stratford House Inn & Suites
Hotel/Motel Tax Total Receipts - By Month
Ranch House Inn
Thousands
Knights Inn/Studio 6 $0
Barrington Apts & Inn
$200
$400
$600
Texas Inn Red Roof Inn
18/19
Oct
Nov
Dec
Classic Inn
Chappel Creek Apts Eagle Inn
17/18
Oct
Nov
Dec
Economy Inn Oasis Motel
Hotel/Motel Tax # Reporting Fiscal Year at 12/31 18/19 31 17/18 30
Actual YTD $396,592 $343,706
Budget $1,472,500 $1,462,500
% of Budget 26.93% 23.50%
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
75
CITY OF TEMPLE, TEXAS Historical Sales Tax Revenue - By Month
Table V % Increase
FY Month Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept
% Increase
FY
FY
FY
FY
FY
FY
(Decrease)
19^
$
12 1,519,727 $ 1,167,140 1,214,504 1,861,602 1,157,552 1,299,150 1,645,580 1,271,981 1,476,697 1,623,468 1,342,609 1,387,390 16,967,401 $
13 1,534,807 $ 1,392,450 1,462,327 1,838,329 1,258,123 1,414,245 1,687,794 1,317,625 1,478,838 1,693,502 1,459,520 1,480,015 18,017,575 $
14 1,675,339 $ 1,479,695 1,419,763 1,960,221 1,433,592 1,400,219 1,835,107 1,489,931 1,493,886 1,709,959 1,593,968 1,489,789 18,981,471 $
15 * 3,489,994 $ 1,566,784 1,430,286 2,213,612 1,457,610 1,421,812 1,826,749 1,486,686 1,461,142 1,880,703 1,567,111 1,509,256 21,311,743 $
16 1,857,540 $ 1,524,999 1,514,737 2,260,144 1,418,289 1,792,732 1,997,512 1,536,106 1,583,839 2,076,129 1,611,072 1,685,981 20,859,081 $
17 ** 1,782,147 $ 1,562,275 1,642,007 2,214,514 1,558,862 1,663,682 2,013,932 1,599,119 2,081,701 2,080,101 1,736,904 1,717,281 21,652,524 $
18 1,889,493 $ 1,698,713 1,721,105 2,215,777 1,563,720 1,603,658 2,115,654 1,663,248 1,670,814 2,116,191 1,748,973 1,824,277 21,831,623 $
1,917,501 1,876,187 1,786,879 2,233,215 1,623,767 1,665,239 2,196,895 1,727,116 1,734,973 2,197,453 1,816,134 1,894,330 22,669,689
$
841,539 $
1,050,174 $
963,895 $
2,330,272 $
(452,662) $
793,443 $
179,099 $
838,066
5.35%
12.28%
-2.12%
3.80%
0.83%
$
Annual: $ Increase
FY
5.22%
6.19%
19 Vs. 18 1.48% 10.45% 3.82% 0.79% 3.84% 3.84% 3.84% 3.84% 3.84% 3.84% 3.84% 3.84% 3.84%
3.84%
* - Includes audit adjustm ent in the am ount $1,798,088.19. ** - Includes single audit adjustm ent in the am ount $355,927.23.
Annual Sales Tax $25
$20
Millions
$15
$10
$5
$0 2010
2011
2012
2013
Budget
2014
2015
2016
2017
2018
2019
Actual
^ Forecasted as of 09/30/19
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
76
City of Temple, Texas
Table VI
Parks Escrow Deposits - By Addition Name December 31, 2018 Total Addition
Date of
Amount of
Expenditures/
Balance
Name
Deposit
Deposit
Refunds
12/31/2018
Bell Addition
08/13/97
Colwell
03/31/99
$
2,250.00
450.00
$
-
2,250.00
Alford
11/06/03
450.00
-
450.00
Chesser-Pitrucha
02/05/04
450.00
-
450.00
Simpson
03/05/04
225.00
-
225.00
Ditzler
07/09/04
225.00
-
225.00
Avanti
11/22/04
450.00
-
450.00
Meadow Bend I & II
07/08/05
26,662.50
-
26,662.50
Willow Grove
10/12/05
225.00
-
225.00
Berry Creek
03/17/06
450.00
-
450.00
Krasivi
04/13/06
900.00
-
900.00
Bluebonnet Meadows
08/21/06
2,025.00
-
2,025.00
Lantana II
10/03/07
1,350.00
Meadow Oaks
11/05/07
225.00
-
225.00
Eagle Oaks at the Lake III
02/14/08
4,725.00
-
4,725.00
Clark
02/14/08
225.00
-
225.00
Downs First I
07/30/08
1,125.00
-
1,125.00
Country Lane III
05/07/09
7,200.00
-
7,200.00
Scallions
08/18/09
900.00
-
900.00
Overlook Ridge Estates
11/13/09
3,375.00
-
3,375.00
Hamby
06/11/10
225.00
-
225.00
Villa Andrea
02/07/11
450.00
-
450.00
West Ridge Village
07/27/12
5,850.00
-
5,850.00
Nathans
10/18/12
225.00
-
225.00
Lago Terra
11/06/12
17,550.00
-
17,550.00
Wildflower Meadows I
11/14/12
16,200.00
-
16,200.00
Creeks at Deerfield
02/25/13
7,875.00
Porter
05/07/13
450.00
-
450.00
King's Cove
07/10/13
1,125.00
-
1,125.00
Residences at D'Antoni's V
10/22/13
1,125.00
-
1,125.00
Brazos Bend
02/27/14
8,550.00
Oaks at Lakewood
02/27/14
8,325.00
-
8,325.00
Alta Vista II
03/06/14
55,125.00
-
55,125.00
Ranch at Woodland Trails
04/22/14
4,500.00
-
4,500.00
Ranch at Woodland Trails #2
04/22/14
4,950.00
-
4,950.00
Villas at Friars Creek
12/31/14
15,300.00
5,400.00
9,900.00
Salusbury VII
01/26/15
1,350.00
1,044.00
306.00
Westfield X
09/09/15
12,600.00
7,037.25
Villas at Friars Creek
09/28/15
14,850.00
-
Phillips
10/13/15
225.00
-
225.00
Hartrick Valley Estates
12/02/15
5,400.00
-
5,400.00
Plains at Riverside I
06/17/16
10,350.00
-
10,350.00
Spurlock's Arbour
07/11/16
450.00
-
450.00
Long View Estates
07/27/16
2,925.00
-
2,925.00
Bluebonnet Ridge Estates II
09/29/16
225.00
-
225.00
Barnhardt
10/31/16
225.00
-
225.00
Goates
02/21/17
675.00
-
675.00
Portico at Fryers Creek
03/28/17
29,475.00
-
29,475.00
1,325.47
306.99
2,690.11
$
450.00
3
24.53
3
6
7
7,568.01
5,859.89
5
8
2
5,562.75 14,850.00
2
2
2
2
(Continued)
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
77
City of Temple, Texas
Table VI
Parks Escrow Deposits - By Addition Name
(Continued)
December 31, 2018 Total Addition
Date of
Amount of
Expenditures/
Balance
Name
Deposit
Deposit
Refunds
12/31/2018
Hills of Westwood IX
03/31/17
Moore's Mill
04/13/17
225.00
-
225.00
Hidden Creek
05/11/17
1,350.00
-
1,350.00
Park Ridge
06/30/17
2,700.00
Wells Place
08/15/17
225.00
-
225.00
Highline
09/22/17
22,387.50
-
22,387.50
Alta Vista III
09/26/17
53,325.00
-
53,325.00
Lago Terra III
10/31/17
3,375.00
-
3,375.00
MKC
12/01/17
900.00
-
900.00
Amata Terra
03/09/18
11,475.00
-
11,475.00
Tennesse Valley
05/01/18
6,075.00
-
6,075.00
Hills of Westwood IX
05/25/18
7,200.00
-
7,200.00
JS Clark
07/02/18
225.00
-
225.00
Horsehugger Acres
08/09/18
450.00
-
450.00
Quill Estates
08/10/18
225.00
-
225.00
Legacy Ranch II
08/31/18
21,825.00
-
21,825.00
Riverside Trail
09/17/18
900.00
-
900.00
Portico at Fryers Creek
09/19/18
450.00
-
450.00
Oliver
09/25/18
450.00
-
450.00
Kurek
10/17/18
225.00
-
225.00
Hilldell Estates III
10/25/18
225.00
-
225.00
Evans
11/07/18
675.00
-
675.00
Accumulated Interest
$
1
14,400.00
$
$
533,681.62
$
14,400.00
2,122.40
103,931.62 Total
-
111,605.23
2
577.60
91,679.01 $
4
2, 8
2
12,252.61 $
422,076.39
Notes: 1. In response to an opinion from the City Attorney's Office, the interest earnings will no longer be added to each individual deposit. 2. Funds appropriated to construct restrooms at South Temple Park. 3. Funds appropriated for a playground at Meadow Bend Park 4. Funds appropriated for a shade structure and Ten Spin play feature at Von Rosenberg Park. 5. Funds appropriated for a sculpture, doggie pots, a pollinator wildflower area and benches at Conner Park. 6. Funds appropriated for a picnic shelter at Westridge Park. 7. Funds appropriated for a shade structure at West Temple Park. 8. Fund appropriated for development of Alta Vista Park. Park escrow funds may be used only for land acquisition or development of a neighborhood park located within the same area as the development or in close proximity to the development. Land acquisition or development costs include but are not limited to land purchases; design and construction of landscaping, utilities, structures, sidewalks and trails; and purchase and installation of new equipment such as playscapes, outdoor furniture and lighting fixtures. Park escrow funds may not be used for costs of operation, maintenance, repair or replacement. Funds designated for development of an existing neighborhood park must be spent within two years from receipt. Funds designated for land acquisition and development of a new neighborhood park must be spent within five years from receipt. QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
78
STRATEG IC INVESTMENT ZONE S
The City’s Strategic Investment Zone (SIZ) is designed to encourage redevelopment of strategically important neighborhoods and corridors that might otherwise not occur in the absence of incentives. The incentives would include the availability of a matching grant where the City participates with dollars or in-kind services to encourage redevelopment. The grant matrix includes funds or services related to façade replacement or upgrading, sign improvements, landscaping improvements, asbestos abatements, demolitions and sidewalk replacement.
Table VII
City of Temple, Texas Redevelopment Grants and Incentive Programs within Strategic Investment Zones (SIZ) As of December 31, 2018 SIZ Contract/ Map Council # Award
Original Match Amount
Grantee
$
Expiration Date
Payment Date
14,429
11/15/2018
In Process
In Progress
Façade, Sign, Landscaping and Demolition
115,000
115,000
12/7/2018
In Process
In Progress
Façade, Sign, Sidewalks, and Landscaping Façade and Sprinkler System
14,429
Actual City Match $
Improvement Status Improvement Description
46
11/15/2017 Knob Creek Masonic Lodge
47
12/7/2017 Caelum Altus IV, LLC
48
2/15/2018 Investors Lane, Inc
26,000
26,000
2/15/2019
12/28/2018
Complete
49
6/28/2018 Short Term Lending, LLP
90,530
90,530
6/28/2019
In Process
In Progress
Façade, Sign, Landscaping and Demolition
50
6/28/2018 Short Term Lending, LLP
70,000
70,000
6/28/2019
In Process
In Progress
Façade, Sign, Sidewalks, and Landscaping
51
6/28/2018 United Way of Central Texas
70,000
70,000
6/28/2019
In Process
In Progress
Façade and Sprinkler System
*Committed/Encumbered/Pending FY 2019 $
385,959
SIZ Program Summary
FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 *FY 2019
Budget Reinvestment Budget Zone #1 General Fund Expenditures $ 85,000 $ - $ 85,000 24,198 95,714 119,004 142,437 80,712 100,000 69,994 100,000 65,785 100,000 135,528 100,000 22,508 42,132 100,000 204,158 250,000 162,000 146,887 275,000 100,000 385,959
Total
$
525,000 $
1,170,151 $
Total Allocated to Date Expenditures to Date Remaining Available Funds
$ $
1,695,151 (1,296,865) 398,286
1,296,865
Redevelopment Grants and Incentive Programs with Strategic Investment Zones (SIZ) $450,000 $400,000 $350,000 $300,000 $250,000 $200,000 $150,000 $100,000 $50,000 $2009
2010
2011
2012
2013
2014
2015
2016
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
2017
2018
2019*
80
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
81
QUARTERLY FINANCIAL STATEMENTS – FOR THE THREE MONTHS ENDED 12.31.18
82