Project Package PROJECT NAME: PROJECT VALUE:
Terra World_Office Block-Project Package_Rev.0
US$
422,900.35
PROJECT DURATION:
8.8 Month Timeline
PROJECT LOCATION:
Harare, Zimbabwe
PROJECT BRIEF:
Office Block Bungalow, with floor area of; 1,025 m²
Summary of basic materials, further details available inside Package Cement 3,727 bags ¾ Stones 229.8 m³ R/Sand 174.6 m³ Bricks 309,167 bricks P/Sand 341.0 m³ 230 B/Force 334 rolls 115 B/Force 154 rolls 230 DPC 26 rolls 115 DPC 12 rolls
┐
┌
┘
└
Contents Page a) Materials Procurement in Stages …………1 Consists of builders materials in construction stages, from the sub-structure to the superstructure and any waste management system. b) Bill of Quantities | Interface (Summary) …………2 Consists of the summary of a 14 paged Bill of Quantities priced in USD, full version available upon request. c) Resources | Console
…………3
Consists of the Quantity and Monetary Value of Requirements for payment and procurement, which are Man-hours for Labour, Plant-hours for Machines & Equipment and a detailed Material Schedule of Quantities for every item to be installed on site. d) Construction Schedule | Baseline …………6 This document shows the sequence of operations to be executed on site in a safe manner, indicating durations of activities calculated from the measured quantity of work and determined by the productivity expected in each day, and it's linked to the Bill of Quantities.
(i)
┐
┌
NB: Materials shown in Monetary Terms will have to be viewed in the Resources Console For any clarifications, feel free to contact the undersigned Agent for assistance
DWG Ref - 001 Terra World_Office Block-Project Package_Rev.0 Materials in Construction Stages Item
Description
Cement
¾ Stones
R/Sand
Bricks
P/Sand
230 B/Force
115 B/Force
230 DPC
115 DPC
others as described
SUBSTRUCTURE (UP TO SLAB) a) b) c) d) e) f)
Clearing & / Setting Out Trench Excavations Blinding Concrete Footing Substructure Brickwork Concrete Slab
g) h) i) j) k) l) m) n) o) p) q) r)
Doors with frame c/w hinges, screws & locksets Windows & Handles c/w nuts, bolts & washer Superstructure Brickwork, Window Level Superstructure Brickwork, Wall Plate Level Ring Beam Plaster External Plaster Internal Rhinoset Paint PVA High Gloss (Steel Frames) Sush Putty (N/A to Aluminium Frames) Wall Plate
s) t) u) v) w)
Roof Trusses (aggregates where gable ends exist) Purlins & Brandering Roof Covering (900 x 2,400 Chromadek) Ceiling & Cornice Rainwater Goods
antkill- 13.1ℓ bags 688 bags 185 bags 895 bags
0.0 m³ 81.2 m³
0.0 m³ 65.7 m³ 40,500 bricks
33.3 m³
44 rolls
20 rolls
26 rolls
12 rolls
105.6 m³ 85.5 m³ SUPER STRUCTURE (UP TO WALL PLATE)
rebar- kgs 300m 859 m² S.193- 58 sheets $ 3,116.16 $ 59,546.30
631 bags 571 bags 223 bags 59 bags 417 bags
138,533 bricks 126,835 bricks 26.4 m³
113.6 m³ 102.8 m³
150 rolls 136 rolls
70 rolls 64 rolls
21.4 m³
rebar 1,515 kgs 10.6 m³ 75.0 m³ 332 bags 946 ℓ 16 ℓ kgs 172 m
bags
ROOF (TRUSSES, COVERING & CEILING) bricks
0.0 m³
rolls
$ 34,683.06 4,661 m 506 sheets $ 5,662.70 $ 3,369.87
SERVICES (WATER & ELECTRICITY) x) y) z)
Plumbing & Fittings Electricals & Fittings Septic Tank Column Totals for Material Headings
Created on 6/6/2020 @ 8:36 PM
$ 15,383.79 $ 2,097.12 54 bags 3,727 bags
16.6 m³ 229.8 m³
WASTE MANAGEMENT 2.0 m³ 3,300 bricks 174.6 m³ 309,167 bricks
001_TERRA WORLD_OFFICE BLOCK-PROJECT PACKAGE_REV.0.xlsx Materials Procurement in Stages Page 1 of 6
5.3 m³ 341.0 m³
4 rolls 334 rolls 154 rolls 26 rolls 12 rolls
300m 12.5 m²
+263 77 192 7337 jeffstar@presageprojects.co.zw Presage Projects (Pvt) Ltd © 2020 All Rights Reserved
RICS NRM 2 Adoption 6/6/2020
PPHBQ2020_Rev.0
DWG Ref - 001 Terra World_Office Block-Project Package_Rev.0 Elemental Bill of Quantities Item №
Pay Ref
$
Bill Description
Unit
Quantity
Rate (US$)
-
Amount (US$)
Quick Stats building $/m² =$421.49/m²
Summary
building $/m³ =$105.37/m³ 0.00% $
Bill No. 1 Preliminaries (Main Contract)
-
Bill No. 2 Substructure
14.13% $
51,150.20
Bill No. 3 Superstructure
65.18% $
236,012.35
Bill No. 4 Finishes
10.87% $
39,345.21
Bill No. 5 Fittings, Furnishings and Equipment
3.92% $
14,207.24
Bill No. 6 Services
5.35% $
19,377.54
Bill No. 7 External Works
0.56% $
2,010.68
Subtotal
$
362,103.22
Plus 2.00% Contingency Sum
$
7,242.06
Subtotal
$
369,345.28
Add Vat @ 14.50%
$
53,555.07
Total Amount
$
422,900.35
001_TERRA WORLD_OFFICE BLOCK-PROJECT PACKAGE_REV.0.xlsx Bill of Quantities|Interface Page 2 of 6
+263 77 192 7337 jeffstar@presageprojects.co.zw Presage Projects (Pvt) Ltd © 2020 All Rights Reserved
┌
Created on 6/6/2020 @ 8:36 PM┐
Confidential Resource Usage
DWG Ref - 001 Terra World_Office Block-Project Package_Rev.0 Bill of Resources Cost Code L L01 L03 L04 L05 L06 L07 L09 L14 L16 L17 P F01 P02 P03 P04 P16 P17 P18 P19 M BM CMT01 CMT02 CMT03 CMT04 BM003 BM004 BM005 RP01 MAS01 MAS06 MAS07 MAS08 RNF01 RNF02 RNF03 RNF04 RNF06 RNF07 SH01 MP01 MP02 MP03 DP01 DP02 DP03 DP04 DP05 DP06 DP10 DF01 DF02 DF03
AWF01 AWF02 AWF03 AWF04 AWF05 AWF06 AWF07 AWF08 AWF09 AWF10 AWF11 AWF12 AWF13 AWF14 AWF15 AWF16
DR01 DR02 DR03 TT01 J01 J02 J03 J04 J07
Resource Description Payroll Budget Information @ 9 Man-hours/Day General Hand Carpenter (C) Builder (B) Painter (T) Steel Fixer (X) Glazier (G) Electrician (E) Plumber (P) Light Plant/Equipment Operator (L) Heavy Plant Operator (H)
Plant Hire Hours @ 8 Plant-hours/Day Diesel (Information only, already included in Plant Rates) 140H Grader (b) 3CX TLB (c) Plate Compactor (d) 750/500 Concrete Mixer (n) Concrete Dumper (o) Concrete Vibrator Set (p) Power Trowel Machine (q) Bill of Materials (BoM) Procurement Building Materials Cements Tile Adhesive (20kg) Tile Grout (5kg) 22,5 (Masonry) Cement 32,5 (PC 15) Cement Aggregates 19mm Stone Washed Riversand (Cash - Pre-Payment at the Quarry) Pitsand Rhino Products Rhinoset Masonry Beta Common Bricks Cement air bricks/vents (pair) Window Cills Galvanised wall ties Reinforcement Deformed Reinforcement Bars (Cut & Bent) Tying Wire 1.6mm ø MeshRef S193 MeshRef S245 Brickforce 230 (@ every 4th course) Brickforce 115 (@ every 4th course) Shuttering Formwork for lintels Moisture Protection DPC 2 Ply 230 DPC 2 Ply 115 Polythene Sheets (2Ply) Paints & Products Dulux Universal Undercoat Dulux Int - Ext PVA White Dulux Ceiling White Dulux Steel Prime Dulux Gloss White Dulux Pink Wood Primer Dulux Tinters (Shelf price selling @ $5.00/50ml tube) Door Frames Standard 230 double door frame Standard 230 single door frame Standard 115 single door frame No Yes Aluminium Window Frames 2000×1250 11700×5000 600×600 9540×5000 1300×960 15702×5000 5112×2500 12549×2500 5540×2500 7213×2500 7393×2500 2577×2500 3827×2500 1500×960 8290×2500 4300×1200
20.11% Bill Mark-Up @ 0.00% ≡ 2.16% 8.8 Month Timeline ≡ 77.73% US$ 362,103.22 78% 1 0 Excluding VAT Cost Usage Amount (US$) (All in Labour Rates) 40,531.6 hours $ 72,810.33 $ 1.57/hour 30,912.5 hours $ 48,596.15 $ 2.50/hour 795.4 hours $ 1,991.31 $ 2.50/hour 7,290.3 hours $ 18,252.28 $ 2.50/hour 722.7 hours $ 1,809.26 $ 2.50/hour 26.4 hours $ 66.03 $ 2.50/hour 02.5 hours $ 6.26 $ 2.50/hour 189.7 hours $ 475.05 $ 2.50/hour 363.3 hours $ 909.52 $ 2.85/hour 173.5 hours $ 494.87 $ 3.78/hour 55.4 hours $ 209.61 20% 2%
(Plant Charges) $ 1.13/ℓ $ 71.81/hour $ 32.74/hour $ 7.93/hour $ 29.66/hour $ 23.77/hour $ 4.06/hour $ 18.78/hour (Material Costs)
330.4 hours 1,564.25 ℓ 10.7 hours 41.5 hours 8.6 hours 105.1 hours 58.3 hours 58.3 hours 48.0 hours Order Quantity
$ $ $ $ $ $ $ $ $ $
$ $ $
7,832.59 1,764.39 765.10 1,359.31 68.12 3,116.80 1,386.03 236.58 900.66 281,460.30 281,356.35 38,354.82 1,384.42 492.85 59.82 36,417.72 17,302.58 7,522.58 3,812.29 5,967.71 4,347.42 4,347.42 49,834.69 48,602.64 24.89 1,185.30 21.87 11,196.29 5,292.65 10.15 4,501.83 393.01 729.52 269.13 326.47 326.47 490.71 92.18 20.64 377.88 5,186.77 2,713.38 2,003.73 225.09 61.23 60.12 20.97 102.25 753.71 366.81 104.80 282.10
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
59,493.89 2,364.13 9,220.11 510.65 7,517.93 393.39 12,373.86 2,014.24 4,944.58 4,365.76 2,842.08 2,913.00 2,030.79 3,015.84 907.83 3,266.44 813.26
$ $ $5.24/sack $5.24/sack $8.30/sack $9.78/sack
264.19 94.05 7 3,723
bags bags bags bags
$ $ $ $ $
$34.93/m³ $21.83/m³ $17.47/m³
215.3 m³ 174.6 m³ 341.7 m³
$ $ $ $
$13.10/sack
332 bags
$ $
$0.16/brick $0.66 ea $0.87 ea $0.17 ea
309,167 bricks 38 no 1,357 cills 125 no
$ $ $ $ $
$3,493.45/ton $2.36/kg $5.24/m² $10.48/m² $2.18/roll $1.75/roll
1.515 tons 4.30 kgs 859 m² 38 m² 334 rolls 154 rolls
$ $ $ $ $ $ $
$3.93/m
83 m
$ $
$3.49/roll $1.75/roll $0.22/m²
26 rolls 12 rolls 1,731 m²
$ $ $ $
$5.68/ℓ $5.24/ℓ $2.62/ℓ $9.61/ℓ $10.48/ℓ $5.68/ℓ $87.34/ℓ
478 382 86 6.4 5.7 3.7 1.17
$ $ $ $ $ $ $
ℓ ℓ ℓ ℓ ℓ ℓ ℓ $
$52.40 ea $26.20 ea $14.85 ea 1st Choice/Option $394.02 $9220.11 $56.74 $7517.93 $196.70 $12373.86 $2014.24 $4944.58 $2182.88 $2842.08 $2913.00 $1015.39 $1507.92 $226.96 $3266.44 $813.26
US$ ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea
Doors External quality standard double door to suit frame $174.67 ea Solid standard single door to suit frame $87.34 ea Hollow standard single door to suit frame $17.47 ea Trusses Roof Trusses to detail $554.04 ea Joinery 114mm × 38mm sw wall plate $4.37/m 38mm × 38mm sw purlins $2.62/m 38mm × 38mm sw brandering $0.87/m 9mm Plaster Board Ceiling (Supply Dimension - 2.4m × 1.2m) $4.80/m² 001_TERRA WORLD_OFFICE BLOCK-PROJECT PACKAGE_REV.0.xlsx Rhinocove Cornice $1.31/m Resources|Console Page 3 of 6
7 no 4 no 19 no 540.00 6 no 1 no 9 no 1 no 2 no 1 no 1 no 1 no 2 no 1 no 1 no 2 no 2 no 4 no 1 no 1 no
$
$ 7 no 4 no 19 no
$ $ $ $
63 no
$ $
172 m 1,766 m 2,895 m 859.1 m² 1,172 m
$ $ $ $ $
1,903.93 1,222.71 349.34 331.88 34,683.06 34,683.06 13,570.00 751.09 4,627.61 2,528.60 4,126.68 1,536.02 +263 77 192 7337 info@presageprojects.co.zw Presage Projects (Pvt) Ltd © 2020 All Rights Reserved
┌
Created on 6/6/2020 @ 8:36 PM┐
Confidential Resource Usage
DWG Ref - 001 Terra World_Office Block-Project Package_Rev.0 Bill of Resources
20% 2%
≡ ≡ 1
Cost Code IM01 IM05 IM06 RG03 RG07 RG10 RG11 RG12 RG13 RG14 KF01 KF03 KF04
HVAC02
Resource Description Iron Mongery Locksets 3 Lever Hinges c.w. screws for doors Window handle c/w nut, bolt & washer Rainwater Goods PVC Rainwater Gutters ½ round 125 × 87 Rainwater Downpipe 80mm Drip stones 0.9 x 2.4 Chromadek Roof Sheets Concrete Roof Tiles 25mm × 220mm sw Fascia Galvanised Roof Ridge Galvanised Valley Kitchen Fittings Kitchen sink 1.2m drop in Cupboards under sink Cupboards on walls
PCI01 PCI02
GP01 CP01 GF01 GF02 GF03 GF04 GF05 CF01 CF02 CF03 PVCFT01 PVCFT02 PVCFT03 PVCFT04 PVCFT05 PVCFT06 PVCFT07 PVCFT08 PVCFT09 TM01 TM02 TM06 RF01 SD01 WMS01
CN01 CNF01 CNF02 CB02 CB05 SW01 SW04 ST01 ST02 ST03 ST04 ST05 ST07
$13.97 ea $1.31 ea $1.75 ea $4.37/m $3.91/m $13.10 ea $5.66 ea $10.48/m $5.24/m $3.50/m $61.14 ea $1353.71 ea $1222.71 ea
3 no
170.31 170.31
$ $
$39.30 ea
8 no
314.41 314.41 1,751.97 209.61 136.24 628.82 104.80 279.48 393.01 8,306.53 4,415.06 3,891.48
$ $
$52.40 $22.71 $78.60 $52.40 $34.93 $131.00
ea ea ea ea ea ea
4 6 8 2 8 3
no no no no no no
$ $ $ $ $ $ $
$1.89 ea $0.63 ea
2,340 no 6,189 no
$ $ $
$78.60 ea $1.75/m
Plumbing PVC Sewer Pipes ø110mm sewer pipe ø60mm sewer pipe Galvanised Pipes ø20mm GI pipe Copper Pipes ø20mm copper pipe Galvanised Fittings ø20mm Gi elbow ø20mm Gi tee ø20mm Gi sleeve ø35mm brass p-trap for bath ø35mm Gate Valve Copper Fittings ø20mm copper elbow ø20mm copper tee ø20mm copper sleeve PVC Fittings ø160mm to ø110mm reducer ø110mm x 90° bend ø110mm x 45° bend ø110mm equal tees ø110mm end caps ø110mm p-trap ø110mm sieve ø110mm × 2m pvc vent pipe ø110mm fly trap over vent pipe Taps & Mixers ø15mm basin taps (Cobra) Sink Mixer ø35mm brass tap Rubber Fittings ø35mm rubber p-trap Sewer Disposal (Septic Tank) Square Manhole Cover & Frame Water Main Supply ZINWA flow meter Electricals Conduits ø19mm pvc conduit Conduit Fittings ø20mm pvc sleeve Junction box (6 × 6) Cables 2.5mm² triple core copper conductors armoured cable Switches Single gang switch Cooker switch Sockets single electric socket double electric socket Cooker terminal Shaver socket Lamp holder (Brass) Fluorescent socket
Usage
$56.77 ea
Pre-Cast Items Double Cam Concrete Sink Pre-cast lintels
PVCSP01 PVCSP02
78%
$
TL01 TL02
BF01 BF02 BF03 BF07 BF09 BF10
Cost
HVAC Ceiling fan Fire Fighting 4.5kg fire extinguisher Bathroom Fittings Wall mounted cabinet with mirror Towel rack Water Closet Medium Urinal Ceramic wash basin & pedestal Shower Cubicle 950 × 950 × 2000mm corner type Tiles Floor tiles 600 x 600 Wall tiles 600 x 200
BM064
0
20.11% Bill Mark-Up @ 0.00% 2.16% 8.8 Month Timeline 77.73% US$ 362,103.22 Excluding VAT Amount (US$) $ 510.92 30 sets $ 419.21 30 no $ 39.30 30 no $ 52.40 $ 6,232.84 168 m $ 733.07 20 m $ 78.26 5 no $ 65.50 506 no $ 2,862.97 168 m $ 1,759.38 65 m $ 341.66 112 m $ 392.00 $ 9,144.10 1 no $ 61.14 4 no $ 5,414.85 3 no $ 3,668.12
3 no 83 m
$ $ $ $
$9.61/m $1.75/m
60 m 22 m
$ $ $
$21.83/m
180 m
$ $
$21.83/m
180 m
$ $
$7.86 $14.85 $13.10 $3.49 $4.80
ea ea ea ea ea
46 46 46 3 20
no no no no no
$ $ $ $ $ $
$8.73 ea $16.59 ea $14.85 ea
46 no 46 no 46 no
$ $ $ $
$31.44 $31.70 $34.93 $17.47 $4.37 $30.57 $5.24 $7.42 $2.18
ea ea ea ea ea ea ea ea ea
1 21 21 21 1 21 21 8 8
no no no no no no no no no
$ $ $ $ $ $ $ $ $ $
$6.99 ea $48.03 ea $4.37 ea
19 no 1 no 6 no
$ $ $ $
$1.75 ea
9 no
$ $
$39.30 ea
1.0 no
$ $
$33.19 ea
1 no
$ $ $
$1.75/m
291 m
$ $
$0.44 ea $0.87 ea
145 no 40 no
$ $ $
$0.26/m $3.49/m
872 m 40 m
$ $ $
$1.92 ea $8.73 ea
40 no 1 no
$ $ $
$2.62 ea $5.24 ea $30.57 ea $3.06 ea $1.75 ea $4.80 ea 001_TERRA WORLD_OFFICE BLOCK-PROJECT PACKAGE_REV.0.xlsx Resources|Console Page 4 of 6
40 30 1 5 40 4
no no no no no no
$ $ $ $ $ $
380.91 235.81 145.10 15,383.79 614.85 576.42 38.43 3,930.13 3,930.13 3,930.13 3,930.13 1,753.71 361.57 682.97 602.62 10.48 96.07 1,848.03 401.75 763.32 682.97 2,630.83 31.44 665.76 733.62 366.81 4.37 641.92 110.04 59.39 17.47 206.99 132.75 48.03 26.20 15.72 15.72 39.30 39.30 33.19 33.19 2,097.12 507.77 507.77 98.41 63.47 34.93 368.24 228.50 139.74 85.59 76.86 8.73 396.94 104.80 157.21 30.57 15.28 69.87 19.21 +263 77 192 7337 info@presageprojects.co.zw Presage Projects (Pvt) Ltd © 2020 All Rights Reserved
┌
Created on 6/6/2020 @ 8:36 PM┐
Confidential Resource Usage
DWG Ref - 001 Terra World_Office Block-Project Package_Rev.0 Bill of Resources
20% 2%
≡ ≡ 1
Cost Code B01 B02 EMS01 EMS02 EMS04 EMS05
ACC ACC01 ACC02 ACC03 ACC08 ACC11
Resource Description Bulbs/Lights Bulkhead c/w gland seal Osram 11watt fluorescent bulb Electrical Main Supply 3 Phase meter board Generator/Solar change over switch Distribution board 16 Way c/w Breakers ZETDC Prepaid meter
0 Cost
Usage $6.99 ea $3.06 ea $34.93 $48.03 $388.65 $32.31
Accessories Diesel (Information only, already included in Plant Rates) Petrol (Information only, already included in Plant Rates) 4" wire nails Termite Poison (app rate @ 5ℓ/m² of 5ℓ/95ℓ termicide/water mix) PVC Solvent Cement (100mℓ)
ea ea ea ea
$ $1.07/ℓ $1.18/ℓ $1.75/packet $0.61/ℓ $2.62 ea
001_TERRA WORLD_OFFICE BLOCK-PROJECT PACKAGE_REV.0.xlsx Resources|Console Page 5 of 6
78%
20.11% Bill Mark-Up @ 0.00% 2.16% 8.8 Month Timeline 77.73% US$ 362,103.22 Excluding VAT Amount (US$) $ 136.24 2 no $ 13.97 40 no $ 122.27 $ 503.93 1 no $ 34.93 1 no $ 48.03 1 no $ 388.65 1 no $ 32.31
890.49 ℓ 673.76 ℓ 50 packets 13.06 ℓ 3.0 no
$ $ $ $ $
103.95 956.60 794.39 88.06 7.99 7.91
+263 77 192 7337 info@presageprojects.co.zw Presage Projects (Pvt) Ltd © 2020 All Rights Reserved
Conditions of Contract 3rd Edition 1977 (International) Clause 14.1 Program
Created on 6/6/2020 @ 8:36 PM
WBS ID Operation % Complete % Planned 1 Terra World_Office Block-Project Package_Rev.00.00% 0.00% 2 Mobilisation/Procurement 0.00% 0.00% 3 Substructure 0.00% 0.00% 3.1 Earthworks 0.00% 0.00% 3.2 Strip Footing 0.00% 0.00% 3.3 Foundation Wall 0.00% 0.00% 3.4 Foundation Slab 0.00% 0.00%
Start 16-Jun-20 16-Jun-20 18-Jun-20 18-Jun-20 4-Jul-20 12-Jul-20 28-Jul-20
4 4.1 4.2 4.3
Superstructure Masonry Plastering Roof
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
5-Aug-20 5-Aug-20 16-Aug-20 23-Aug-20
5 5.1 5.2 5.3 5.4
Finishes Wall & Floor Finishes Glazing Painting Tiling
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
12-Sep-20 18-Sep-20 12-Sep-20 12-Sep-20 19-Nov-20
Duration 259 Days 5 days 47 days 15 days 7 days 15 days 7 days 57 52 32 39
days days days days
170 days 164 days 0 days 72 days 62 days
Finish 3-Mar-21 21-Jun-20 4-Aug-20 3-Jul-20 11-Jul-20 27-Jul-20 4-Aug-20
31-Mar-20
30-Apr-20
30-May-20
29-Jun-20
16-Jun-20
259 Days
16-Jun-20
5 days
29-Jul-20
28-Aug-20
5-Aug-20
57 days
5-Aug-20
52 days
16-Aug-20
1-Oct-20 26-Sep-20 17-Sep-20 1-Oct-20
27-Sep-20
9.1
Fittings and Equipment Services External Works Project Completion Furnish and Commission
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
17-Sep-20 5-Aug-20 1-Oct-20 1-Mar-21 1-Mar-21
69 days 68 days 3 days 2 days 2 days
26-Nov-20
23-Aug-20
1-Mar-21 1-Mar-21 12-Sep-20 23-Nov-20 20-Jan-21
12-Sep-20
0 days
12-Sep-20
72 days
25-Apr-21
62 days
69 days
68 days 1-Oct-20
Page 6 of 6
26-Mar-21
164 days
19-Nov-20
001_TERRA WORLD_OFFICE BLOCK-PROJECT PACKAGE_REV.0.xlsx Construction Schedule|Baseline
24-Feb-21
170 days
18-Sep-20
5-Aug-20
25-Jan-21
39 days
12-Sep-20
25-Nov-20 12-Oct-20 4-Oct-20 3-Mar-21 3-Mar-21
26-Dec-20
32 days
17-Sep-20
6 7 8 9
27-Oct-20
3 days 1-Mar-21
2 days
1-Mar-21
2 days
+263 77 192 7337 info@presageprojects.co.zw Presage Projects (Pvt) Ltd © 2020 All Rights Reserved
┘
└
Special Note Terra World_Office Block-Project Package_Rev.0 While every care has been exercised in preparing the information contained herein, Presage Projects will not be held responsible for material descripancies that may occure when changes are made to the design without notification, or materials that are procured without following the quantities calculated in this document. We ecourage records of materials received and issued for construction to be kept by Site Security and the Site Agent on behalf of the Client
+263 77 192 7337 Presage Projects P/L info@presageprojects.co.zw Central Business District, Harare, Zimbabwe © 2020 All Rights Reserved
┐
┌