The Australian Pipeliner October 21

Page 54

PIPELINES IN QUEENSLAND

Queensland hits peak production amid pandemic Queensland’s energy sector has continued to operate and employ people through the country’s most difficult days. The most recent data shows Australia’s resource and energy export earnings are estimated to have reached an all-time high, despite the impact of the COVID-19 pandemic.

I

t’s been a busy few months for Queensland. The state made Australian history in July 2021 when Brisbane was selected to host the 2032 Olympics, while major infrastructure works like the Cross River Rail have commenced in anticipation for the mega event

54

and to stimulate local economic recovery. New investment in energy continues to support jobs across regional Queensland and will remain a key driver in economic bounceback post COVID-19. The petroleum industry in the state now exceeds $1 billion in

The Australian Pipeliner | October 2021

production value, with significant potential for further developments in both exploration and production of LNG and CSG. Onshore gas is now the state’s second largest commodity export with two basins currently producing CSG – the Bowen and Surat basins.


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

CCE expands its corrosion management offering Corrosion inhibiting grease for equipment 72 Anode offers GreenAmp for cathodic protection 74

41min
pages 70-92

Futureproofing gas detection in a hydrogen future

4min
pages 68-69

Super Emitters no match for Picarro solution

3min
pages 66-67

Remote operation on pipeline isolation

6min
pages 62-63

Intelligent pigging and emissions reduction technologies

6min
pages 64-65

Fast game’s a good game on the Sunshine Coast

3min
pages 60-61

Spiecapag makes mark on pipeline history

5min
pages 58-59

HDD installations on the Parmelia Gas Pipeline

3min
pages 56-57

Queensland hits peak production

3min
pages 54-55

Enhanced solutions for your ESG Program

1min
page 52

Sentanil CMS supports pipeline construction

1min
page 53

Tracer wire system ensures safe utility location

2min
pages 48-49

kwik-ZIP’s simple spacer solutions

2min
pages 50-51

Supporting projects from the ground up

4min
pages 46-47

More reach for Vermeer Australia customers

2min
pages 40-41

PER teams with trusted name

4min
pages 44-45

Nacap’s approach keeps Arrow on target

5min
pages 36-37

HDD construction methodology insights

5min
pages 38-39

Unconscious bias in recruitment

6min
pages 32-33

Pollard's leaves competition in the dust

3min
pages 42-43

Supporting projects from concept to completion

2min
pages 34-35

Breaking down barriers in the pipeline industry

10min
pages 28-31

Convention goes virtual in 2021

3min
pages 18-19

VEGA equipment keeps Santos gas on track

3min
pages 24-25

Survey finds widespread support for hydrogen

2min
pages 16-17

Registration for pipeline engineers

3min
pages 14-15

APGA establishes women’s forum

1min
pages 26-27

CEO's report

10min
pages 8-11

Gas and energy policy

3min
pages 12-13

President's Message

3min
pages 6-7
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.