2 Re-purpose Statement
“...and these buildings deserve our undivided attention.”

Sustainability, carbon neutrality, and supply chain volatility demand that our cities begin to fundamentally reconsider contemporary development. We understand that real estate at some point sheds value and as responsible designers and thinkers, it is our job to imagine ways to recover existing assets and respect the built environment’s impact on climate change. We believe in the renewal of buildings that have lost their way, not because this may be the most cost effective or sustainable strategy, but because the adaptive transformation of buildings aligns with our desire to create memorable spaces and reveal a site’s potential.

Re-purpose is not simply the more cost-effective thing to do, it is the most sustainable way to build.

Buildings that came before us captivate our imagination. We find these buildings durable and well crafted – the result of the hands that shaped them years before. We approach these unique opportunities with precision and boldness, rigor and invention. We aim to breathe new life into these forgotten places and design them to be memorable civic, cultural, and community destinations. We see existing conditions as a series of productive constraints which yield unexpected design solutions and site-specific interventions.

Property renewal promotes unique financial incentives, reduces sprawl, demands less energy and labor, and results in both lower operational costs and embodied carbon. Timelines, when compared to new builds, are often shortened for repositions and therefore occupancy may come sooner, generating early returns while compressing carrying costs in the service of fulfilling a greater need.

Every Re-purpose project needs a great team – committed to the collective vision. We need partners who share in this belief that some buildings need advocates for their defense. The process of re-purposing takes time and patience, like all good endeavors — and these buildings deserve our undivided attention.

3
4
Re-purpose Strategy
“Re-purpose is not simply the more costeffective thing to do, it is the most sustainable way to build.”
5 Reuse Reimagine an asset. Reposition Transform a place. Reclad Optimize energy performance.

Re-purpose: 8 Insights

When we think about how to [re]purpose a building, (8) critical insights emerged from our design process. These act as lessons in which some, not necessarily all, apply to each project we reuse, reposition, or reclad.

01

Conduct due diligence.

Understand real upgrade capital costs: both immediate, deferred, and operational.

02

Anticipate the unexpected.

Explore the asset: mitigate unforeseen conditions.

03

Define the potential.

Commission Zoning and ‘BestUse’ feasibility study: as-of-right yield vs approvals process.

04

Set building expectations.

Catalog a building’s traits, i.e. floor-to floor heights and bay sizing, with best reuse program types.

6
7 Create a brand. Recognize an asset’s market perception - capitalize on its own strengths to reflect and amplify the owner’s brand. 05 Curate first impressions. Prioritize investments to yield greatest value, attractiveness, and memorability to tenants and visitors. 06 Differentiate the asset. Confer with brokerage community and determine which amenity experiences will create a unique tenant offering. 07 Use timeless materials. Lower maintenance and replacement costs while addressing tenant’s interests in sustainability and material health. 08
8

[re] purpose Selected Projects

9

01: Conduct Due Diligence

The Exchange at 100 Federal Street

Boston, Massachusetts

Client: Boston Properties

Size: 20,000 square feet

Completion Date: 2018

Critical to limiting financial exposure within existing buildings is early research and time spent onsite, uncovering the extents of remedial work necessary to bring an asset up to code, maximum efficiency, or current accessibility. At this repositioning, much of the above ground public space relied in needling through existing lower levels of original construction, the condition of which was largely unknown at the outset of the project.

Tracing existing utilities through the basement levels, and discovering early on which were critical for maintenance during and after construction was instrumental to lowering downtime to the tower during construction, and lowering risks associated with unknown conditions.

10
↑ Before images show the building entrance. → Renovation includes a new Congress Street entry that slips into the atrium to receive people traveling from the South, while the reflecting the distinctive geometry of the tower in a modern way.

↑ Congress Street Elevation

← Approach from Congress Street

→ Interior View out to Post Office Square

12
grand civic
at a crucial nexus of
A
gesture
Boston’s Financial District.
01: Conduct Due Diligence
13

02: Anticipate the Unexpected

238 Main Street, SoMa Site 3

Cambridge, Massachusetts

Client: Massachusetts Institute of Technology, MITIMCo

Size: 451,000 square feet

Completion Date: Spring 2021

Sustainability: LEED Gold

The building’s design reinforces the scale and character of its neighborhood. By preserving the existing 238 Main Street Building and creating a connector through a 5-story glass atrium, the design will preserve the pedestrian scale of Kendall Square.

The design team welcomed a challenge during construction to tie the buildings together “with a bridge.” The unexpected design opportunity become a catalyst for how the existing building and new building formed a new architectural dialogue. Together they reflect both the particular and the whole, creating a community of scholars that fits comfortably into the community of Kendall Square, MIT and Cambridge.

14
↑ Construction Process → Interior of SoMa Site 3’s atrium and existing building

02: Anticipate the Unexpected

→ Site 3 Approach from Main Street, Glass Atrium interfaces with existing 238 Main Street building

↙ New connecting bridge creates a dynamic interface between old and new, while vertical conveying systems become a structurally expressive element.

16
A unique case study in designing a research community within a multi-tenant lab/ office building.
17
Efficient Floor Plate Site 3 Massing Diagram Rotate Upper Mass Gateway between Green Spaces

03: Define the Potential

Davis Square Plaza

Somerville, Massachusetts

Client: Asana Partners

Size: 80,000 square feet

Completion Date: 2024

Sustainability: LEED Platinum ®

The project began with an existing, underutilized plaza sited two brick structures. Its proportion and sense of scale and proportion were primed for renewal and reimagination.

The design for the Davis Square Plaza interweaves both new and adaptively reused buildings that flank a midblock urban connector in the heart of Somerville’s Davis Square. The new Architecture responds to its existing masonry neighbors with a quiet nod to the industrial past. A LEED Platinum, contextual modern building seems inevitable in this vibrant neighborhood

↑ The design for Davis Square interweaves new and adaptively reused buildings that flank a mid-block urban connector; an underutilized public open space dating from the 1970’s.

↗ New Elm Street approach where 2-story “drawer” slides out to become a contemporary facade matching the tone and scale of the neighboring building

← Concept Diagram, Civic Space as the catalyst

18

A reborn plaza in the heart of Davis Square is transformed into a multi-disciplinary urban place.

19

↖ Concept sketch - Civic Space is the heart of the project

← Partnership with Somerville High School to paint temporary murals during construction

→ Newly conceived Davis Square Plaza at night

↙ Approach from Herbert Street, a contextually modern backdrop to the already successful farmer’s market

20
03: Define the Potential
21

Innolabs 45-18 Court Square West

Long Island City, New York

Client: King Street Properties

Size: 235,000 square feet

Completion Date: Spring 2021

Sustainability: Anticipated LEED Gold certification; Certified ™ Gold, WELL Certified ™

Platinum

Located on Court Square, the six-story building is just steps away from dining, cultural, and lifestyle destinations for a true live, work, and play experience. The project involved stitching together three existing structures with a new overbuild to create a facility for varying scales and programs serving Commercial Life Science Start-Ups. Our design focuses on enhancing the tenant experience with innovative, modern lab/office space, welcoming collaboration areas, flexible event space, secure bike storage, and lockers.

The building is designed with centralized MEP services on the roof served by three vertical distribution cores surgically inserted to enable flexible spatial allocations and an ability to add, remove, or alter laboratory space with minimal disturbance to other spaces (or floors) in the building.

↑ By leveraging the adaptive re-use of an existing building and facade, the project preserves a pre-1930’s construction, and creating unique spaces that acknowledge the history of the structure. → Court Square Entrance

22
04: Set Building Expectations

↑ ↗ The building accommodates a variety of tenant sizes to address current market needs and tenant growth over time.

→ Designers wove the new in with the old as a way of respecting the historical building context and guiding the aesthetic design

24
New Existing Final
An existing underutilized urban site/ office building transformed and repositioned into a high-performing life sciences facility.
04: Set Building Expectations
25

05: Create a Brand

1222 22nd Street

Washington, DC

Client: Bernstein Management Corporation

Size: 58,000 square feet

Completion Date: 2022

Awards: Best Renovation - Adaptive Reuse, NAIOP DC-MD, Awards of Excellence, 2022

Sustainability: LEED Gold® (Tracking)

1222 22nd St, formerly the white house transportation facility, has undergone a complete transformation and now stands as a creative and sustainable office building in the West End of DC. Its loftstyle interior features high ceilings and oversized industrial windows that provide ample natural light and clear views throughout the 14,000 sq. ft. floor plate.

The 6,000 sq. ft. overbuild not only expands the building’s leasable space, but also offers tenants a conference amenity & an exceptional outdoor experience. The building’s LEED Gold & Well Ready certification showcases the owner’s dedication to sustainability and the health and well-being of its occupants.

26
↑ The design takes full advantage of the high ceilings and unique structure of the former industrial building, a rarity in Washington.

05: Create a Brand

Transformation of the former White House transportation facility into a creative loft office space.

↑ The façade is enhanced through clean articulation and minimal interventions, celebrating textures and materiality

← Penthouse level roof terrace and amenity space is shared by the building’s tenants

→ Lobby reconciles new and old in unique arrival branded experience

28
29

Reservoir Place Fitness

Boston, Massachusetts

Client: Boston Properties

Size: 8,000 square feet

Completion Date: 2021

In the middle of a sprawling suburban office campus was a tired and dated fitness center waiting to be reimagined into a place for wellness and gathering.

The new Reservoir Place Fitness Center focused a refreshing, modern, and inclusive take on the corporate fitness center. The design solution began with a buildingwide rebranding effort to change the building’s identity to the acronym RSVP. The brand expression became integral to the interior architecture developing a series of motivational quotes, images, and graphics that compliment an industrial material palette of blackened steel and natural wood.

↑ Existing Boston Sports Club and Approach from long corridors

→ New Rebranded Entry Panels framed by warm, wood ceiling panels and furnishings

30
05: Create a Brand

→ New blackened steel stair connects the 3 floors

↓ Mezzanine floor is extended and opened up to views down to courts below

→ Rebranded court level splits basketball and weight training

↙ Entrance elevation from corridor with new large-scale brand expressions

32
05: Create a Brand
33
A reimagined asset becomes a branding catalyst for the existing building and promotes a culture of wellness.

Hudson Research Center

New York, New York

Client: Taconic/Silverstein

Size: 335,000 SF

Completed: 2023

The project consists of the adaptive reuse of a 335,000 square-foot automotive assembly building into a state-of-the-art research and laboratory complex designed to attract tenants of multiple scales. The building is being entirely reclad to achieve a level of performance consistent with the city’s new carbon reduction and energy performance guidelines.

A robust mechanical retrofit supports purpose-built lab infrastructure to create a sleek, vertical and metallic expression that respects the underlying frame of the building while celebrating its eccentricities to evoke a modern scientific culture. Wet and dry labs and a range of amenities have been designed to engage tenants and the larger Science community. Upon completion, 125 West End Avenue will reflect the Client’s desire to rebrand this site as a front runner in the local Commercial Life Science economic development story.

↑ The building was originally a maintenance and final assembly facility for Chrysler Motors built in 1929

→ The design will repurpose the existing “helix” automobile ramp as amenity and collaboration spaces utilizing active design; demolition started earlier this year

34
05: Create a Brand
35
36
05: Create a Brand
↓Interior spaces represent a cross section of the full industry scales - Incubator to multi-floor tenants

↑ The project adds life science commercial use to the neighborhood and increases the New York City economic development of life sciences that the city has been advocating for several years

Conversion of 335,000 square-foot automotive assembly building to state-ofthe-art research and laboratory complex.

37

06: Curate the First Impression

191 Spring Street

Lexington, Massachusetts

Client: Boston Properties

Size: 200,000 square feet

Completion Date: 2018

Sustainability: LEED Gold®

Essential to a successful repositioning is understanding where to devote resources to maximum effect. In the case of 191 Spring Street, creating a new tenant entrance and drop-off brings a new address, presence and personality to the building, all geared towards a wow-factor first impressions for tenants and visitors alike.

Similar with a lot of existing structures, this building was not originally designed to address the way in which current occupants would engage the facility, and in opening a new entrance to the building, the design narrates your first impression as a welcoming, fresh, new building for its next generations.

↑ The building was originally a maintenance and final assembly facility for Chrysler Motors built in 1929

→ The new and improved facade carries it’s design aesthetic to the outdoors with the creation of the front courtyard.

38

Breathing fresh life into the great bones of this 1960s, Brutalist-era concrete structure.

↑ Reimagined interiors highlight existing precast concrete walls with warm wood accents and furnishings

→ A new roof deck offers views back to the city high above the tree canopy

40
06: Curate the First Impression
41

Carbon Case Study: 191 Spring Street

Transformation through Transparency A Carbon Sequestration Story

The building and the tenant spaces are transformed through transparency. Conversion of the building’s opaque, exterior mechanical shafts into multi-story glazing, presents improved interior workspace and a new identity for both building and tenants alike.

42

of global greenhouse gas emissions come from the built environment, including operations and all materials

Operational Carbon Embodied Carbon Industry (non-building) Transport & Other
+/- 47%

Newly constructed buildings are more energy efficient, but many of the buildings that we need between now and 2050 could come from existing stock. Decarbonization of operations are major priorities in adaptive reuse.

6,253.5

3,245.8

44
Baseline Project | EUI = 72.6 | New Materials
Total est. tCO2e Embodied Carbon, Inclusive of Life Cycle Stages A-C, study period of 60 years
est. tCO2e 191 Spring Street - as Designed | EUI = 60.5 | Adaptive Transformation Carbon Case Study: 191 Spring Street
Total
45 48% CO2e Reduction Comparing Reuse to New Scenarios: Impact reduction assessment Impacts reduced through reuse 1. Concrete 2. Metals 3. Openings &Glazing 4. Finishes IMPACTS PER MATERIAL TYPE (GWP, t CO2e ) 0 1,000 2,000 3,000 4,000 5,000

Carbon Case Study: 191 Spring Street

46 Results per Division 191 SPRING STREET Full building summary 12/2/2022 0% 50% 100% 2,890,199 kg Mass 87% kg CO₂eq Global Warming Potential 75% 15% kg SO₂eq Acidification Potential 63% 26% kg Neq Eutrophication Potential 38% 49% kg O₃eq Smog Formation Potential 71% 17% 2.915E+007 MJ Non-renewable Energy 66% 20% Legend Divisions 03 - Concrete 04 - Masonry 05 - Metals 06 - Wood/Plastics/Composites 07 - Thermal and Moisture Protection 08 - Openings and Glazing 09 - Finishes 75% 6% 15% 4% Results per Division 191 SPRING STREET Full building summary 4 0% 50% 100% 1.597E+007 kg Mass 96% 5,606,056 kg CO₂eq Global Warming Potential 84% 23,949 kg SO₂eq Acidification Potential 75% 18% 1,316 kg Neq Eutrophication Potential 60% 31% 334,925 kg O₃eq Smog Formation Potential 82% 10% 5.287E+007 MJ Non-renewable Energy 75% 15% Legend Divisions 03 - Concrete 04 - Masonry 05 - Metals 06 - Wood/Plastics/Composites 07 - Thermal and Moisture Protection 08 - Openings and Glazing 09 - Finishes 84% 4% 9% 2% Global Warming Potential Results per Division 191 SPRING STREET Full building summary 12/2/2022 0% 50% 100% 1.597E+007 kg Mass 96% 5,606,056 kg CO₂eq Global Warming Potential 84% 23,949 kg SO₂eq Acidification Potential 75% 18% 1,316 kg Neq Eutrophication Potential 60% 31% 334,925 kg O₃eq Smog Formation Potential 82% 10% 5.287E+007 MJ Non-renewable Energy 75% 15% Legend Divisions 03 - Concrete 04 - Masonry 05 - Metals 06 - Wood/Plastics/Composites 07 - Thermal and Moisture Protection 08 - Openings and Glazing 09 - Finishes 84% 4% 9% 2% New Construction

Adaptive Re-Use

48% CO2e Reduction

47 Results per Division 191 SPRING STREET Full building summary 12/2/2022 4 0% 50% 100% 2,890,199 kg Mass 87% 2,598,371 kg CO₂eq Global Warming Potential 75% 15% 12,252 kg SO₂eq Acidification Potential 63% 26% 748.7 kg Neq Eutrophication Potential 38% 49% 155,344 kg O₃eq Smog Formation Potential 71% 17% 2.915E+007 MJ Non-renewable Energy 66% 20% Legend Divisions 03 - Concrete 04 - Masonry 05 - Metals 06 - Wood/Plastics/Composites 07 - Thermal and Moisture Protection 08 - Openings and Glazing 09 - Finishes 75% 6% 15% 4% Global Warming Potential Results per Division 191 SPRING STREET Full building summary 12/2/2022 0% 50% 100% 2,890,199 kg Mass 87% 2,598,371 kg CO₂eq Global Warming Potential 75% 15% 12,252 kg SO₂eq Acidification Potential 63% 26% 748.7 kg Neq Eutrophication Potential 38% 49% 155,344 kg O₃eq Smog Formation Potential 71% 17% 2.915E+007 MJ Non-renewable Energy 66% 20% Legend Divisions 03 - Concrete 04 - Masonry 05 - Metals 06 - Wood/Plastics/Composites 07 - Thermal and Moisture Protection 08 - Openings and Glazing 09 - Finishes 75% 6% 15% 4%

07: Differentiate the Asset

View Boston Boston,

Massachusetts

Client: Boston Properties

Size: 110,000 square feet

Completion Date: 2023

While already a Class-A asset, the Prudential Center sought a new life through imagining a new program to elevate visitor and tenant experience alike. Early on, the team identified a missing program, not offered anywhere in the city, that this tower could uniquely address – a new public Observation deck and facility.

The geometry of the tower’s top floors lends themselves to a public space worthy of the scale of the city, and that could not be afforded by any other property in the city. Translating a boldness of vision through re-inventing the tower will differentiate this asset for generations to visit and enjoy.

48
↑ Upon its completion in 1964, the Prudential was the tenth tallest building in the world. → The new observation deck will open and offer 360-degree views of the city.

A

50
↑ → The skyscraper’s new observation deck will feature an outdoor viewing area, a cocktail lounge, and immersive exhibits. ↓ View from the city
07: Differentiate the Asset
universally accessible public space at the top of Boston, in the Prudential
tower.
51

08: Use Timeless

Unilever North American Headquarters

Englewood Cliffs, New Jersey

Client: Unilever

Size: 300,000 square feet

Completion Date: 2018

Sustainability: LEED Platinum ® , WELL Certified Gold; 2019 USGBC New Jersey LEED Commercial Project of the Year

We creatively repositioned Unilever’s corporate campus by consolidating four 1960’s office buildings into a conceptually unified, highly flexible, collaborative work environment. At its core is “The Marketplace”—a vibrant, light-filled atrium bursting with the colors, flavors, and personalities of Unilever North America brands. Whimsical interior branding creates a memorable experience for a millennial workforce.

Integrated smart technologies record energy data and automate use, enabling the building to learn from employee behavior. Employees choose where and how they wish to work, thereby boosting productivity. This allows Unilever to increase efficiency, break down silos, and attract and retain talent from nearby New York City. At least 75 percent of waste generated during construction was diverted from the landfill, inspiring us to repurpose old materials, like salvaged wood, which was used to create Unilever’s reception desk.

↑ The client wanted to recreate this 1960s slab construction building and turn it into a funky New York loft

→ By enclosing the outdoor courtyard that had originally separated the five buildings across the campus, the design team created a vast atriumlike space in which Unilever employees can meet, work, dine, play, or simply unwind

52
Materials

08: Use Timeless Materials

↓ Employees choose where and how they wish to work, thereby boosting their productivity. It’s an approach that allows Unilever to increase efficiency, break down silos, and attract and retain talent from nearby New York City

54

↑Rather that razing the site and starting fresh, the architects chose to renovate four existing rectilinear buildings and added a central courtyard

→ An array of spaces supports Unilever employees’ physical, mental, and emotional health. These include a full-service fitness center and a café serving healthy foods

55
This creative consolidation of four drab 1960s office buildings resulted in an ultra-sustainable, high-tech workplace.

University of Virginia Gilmer Hall

Charlottesville, Virginia

Client: University of Virginia

Area: 180,000 SF

Completed: 2022

Like most other buildings of its time, Gilmer Hall concealed research and discovery behind opaque brick walls and accessed only though dimly lit corridors. The repurpose seeks to redress these legacy issues through new high-performance curtain wall enclosures that significantly increase the amount of daylight while providing a building envelope that significantly improves the enclosure performance and LEED goals.

Providing a new north/south enclosure aesthetic that proudly puts Gilmer’s scientific mission on display, the repurposing decisions were based on a design strategy that put enhancement of the building asset and occupants first. Spaces were defined with a range of capabilities versus specific uses and beautiful enclosure details were manifest from obstacles in the existing interface between materials.

→Original south facade

↓New high performance south facade enclosure performance study

56
↑Historical terracotta facade
Annual Insolation / Shading Option 2C / 18% Perf Annual Solar Irradiance Falling on the Facade Glass Elevation Rendering gD g8 g9 g8 g9 gD OPTION 2C - INTEGRAL SUNSHADE 1/4" 1'-0"Ref: A2/A31-05.6, B1/A31-05.6, A1/A31-05.6, A2/A31-04.6, 3A SOUTH WALL SECTION 1/4" 1'-0"Ref: B1/A20-01.6, 2 ENLARGED SOUTH ELEVATION VM OPT2C 3 VM AXON OPT2C 4 ENLARGED PARTIAL LEVEL 2 PLAN Section Reference 475 425 375 325 275 225 175 125 75 25 kWh/m2 Louver Material Openness Average Irradiance Falling on Glass: 260 kWh/m2 Annual Insolation / Shading Option 2C / 18% Perf Annual Solar Irradiance Falling on the Facade Glass Elevation Rendering gD g8 g9 g8 g9 gD OPTION 2C - INTEGRAL SUNSHADE 1/4" 1'-0"Ref: A2/A31-05.6, B1/A31-05.6, A1/A31-05.6, A2/A31-04.6, 3A SOUTH WALL SECTION 1/4" 1'-0"Ref: B1/A20-01.6, 2 ENLARGED SOUTH ELEVATION - VM OPT2C 3 VM - AXON OPT2C 4 ENLARGED PARTIAL LEVEL 2 PLAN Section Reference 475 425 375 325 275 225 175 125 75 25 kWh/m2 Louver Material Openness Average Irradiance Falling on Glass: 260 kWh/m2 Annual Insolation / Shading Option 2C / 18% Perf Annual Solar Irradiance Falling on the Facade Glass Elevation Rendering gD g8 g9 g8 g9 gD OPTION 2C INTEGRAL SUNSHADE 1/4" = 1'-0"Ref: A2/A31-05.6, B1/A31-05.6, A1/A31-05.6, A2/A31-04.6, 3A SOUTH WALL SECTION 1/4" 1'-0"Ref: B1/A20-01.6, 2 ENLARGED SOUTH ELEVATION VM OPT2C 3 VM AXON OPT2C 4 ENLARGED PARTIAL LEVEL 2 PLAN Section Reference 475 425 375 325 275 225 175 125 75 25 kWh/m2 Louver Material Openness Average Irradiance Falling on Glass: 260 kWh/m2 Section Reference Elevation Rendering Annual Solar Irradiance 08: Use Timeless Materials
58 08: Use Timeless Materials
59
60-year old Gilmer Hall has been completely reinvented - transparent and visible from McCormick Road. The renewed facilities are transformational in their impact on developing programs designed to best support learning and research.
Anna Towns, Director, UVA Arts and Sciences

+50% AIA Article published May 3, 2022

of work focused on renovati on and reuse

Work on existing facilities has been a growing share of design activity

Renovations, rehabilitations, additions, and historic preservation as a percent of firm building design billings

Source: Historical data from AIA Firm Survey Reports , April 2022

60 Summary

The most sustainable building is one that is repurposed and we continue to see growth toward re-evaluting existing building assets. Client portfolios are being reassessed and reimagined. While every project may not learn from all “8 insights”, we believe this is a constructive framework for our clients to evaluate reclad, reuse, and reposition projects. The process requires an in depth understanding of existing conditions. Once we have accessed the these conditions and reviewed applicable “insights” the following Design Process would take place:

1. Establish a collective vision

Review the “8 insights” and the goals that will define a successful project.

2. Clarify the design opportunities

This is the framework for decision making - to distill and identify the key design opportunities within the existing building constraints.

3. Iterate together

With a collective focus, we examine multiple options to reveal new amenity, workplace, and public realm potential.

4. Discover an effective, efficient, and visionary solution

The best interventions are ones that solve multiple problems, illuminate program opportunities, and create unique market value.

5. Increase sustainable goals

Review existing conditions and examine opportunities to elevate existing sustainabiliy, wellness, and material health metrics

The process of repurposing takes time and patience – like all good endeavors these buildings deserve our undivided attention. Do you have a vision for an existing buildingsomething greater, more meaningful, and significant? Do you aspire toward reimagining a building with a renewed spirit and a memorable experience?

Perhaps its time to reclad, reuse, or reposition your project and give it a profound (re) purpose.

61

Contacts

62
↑Perkins&Will Repurpose project featured in Architectural Record February 2023

Boston

Robert Brown, Managing Principal robert.brown@perkinswill.com

Derek Johnson, Associate Principal derek.johnson@perkinswill.com

Ryan Kurlbaum, Senior Associate ryan.kurlbaum@perkinswill.com

New York

Robert Clemens, Associate Principal robert.clemens@perkinswill.com

Allan Horton, Senior Associate allan.horton@perkinswill.com

Washington D.C.

Carl Knutson, Design Director carl.knutson@perkinswill.com

Rod Letonja, Associate Principal rod.letonja@perkinswill.com

63

Contact:

Robert Brown

Derek Johnson

Ryan Kurlbaum

Robert Clemens

Allan Horton

Carl Knutson

Rod Letonja

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.