02_MTVbook_web_optimized

Page 1

MTV Networks



1

MTV MTV is a dynamic company, full of young people. They are growing rapidly, and the existing building is too small. MTV needed a building in Amsterdam that felt both ‘at home’, while containing state-of-the-art production facilities. The building should reflect the ideals of MTV Networks.


2


3

Brand Environment Design

Brand Environment Design ensures that all brand items originate from the core values of the organisation. Every item produced is an outcome of this process.


4

WHY ? The new headquarters is to be situated in an old industrial area of Amsterdam. It is part of a regeneration scheme for this location. We must keep the existing structure, along with the original look of the buildings exterior. Several production companies, such as MTV, Nickelodeon and TMF will use the building. It should include meeting rooms, editing suites, studios, offices, a restaurant and welcome area. Special attention should be paid to lighting and soundproofing. The atmosphere should be ‘open’ but with private areas. It should be ‘hip’ but professional; a great place to work, overlooking the water in Amsterdam.

Initiate


5


6

Research


7

Research includes workshops with everyone that will use the building. We are trying to find that ‘MTV feeling’.


8

Outside Lot

Studios

Research

Entrance Central Area


9

Restaurant

Offices

Meeting rooms

The workshops lead to ‘Moodboards’ that create atmospheres for various areas of the building.


10

Concept


11

The original structure of the building is kept intact. We open a central area around which everybody works.


12

Explore


13

Initial sketches of the building.


14

Explore


15

The design develops into large open spaces and quiet production rooms. Graphics and animations are kept purely for integrated screens.


16

Explore


17

Studios Editing rooms Hall Reception

The functions of the building become more defined, and material choices are made.


18

Explore


19

A large, hanging meeting-room overlooks the central hall. All materials are kept to natural colours, except elements of high-gloss red and video screens.


20

Finalise


21

Cross section of ‘Hall A’ and Reception Area.


22

Finalise


23

Final computer presentation. All structures, materials and lighting are added to give the client the closest representation of the final design.


24

Production


25

Production begins; opening-up the central hall.


26

Production


27

1st floor balcony towards entrance.


28

Production


29

Editing suites in the central hall. Lighting and sound-proofing were important considerations.


30

Production


31

Various materials and finishes.


32

Production


33

View from the offices through the original structure, over the central hall.


34

Production


35

Industrial heritage and modern media.


36

Production


37

Various sound proofed film studios.


38

Production


39

Restaurant overlooking the water.


40

Production


41

Top floor offices.


42

Production


43

Management offices and meeting rooms built through the steel structure.


44

Production


45

Top floor office with access to balcony.


46

Production


47

“...and Action!” - The opening party.


48

For more information please contact: QuA Associates Grasweg 61 1031 HX Amsterdam The Netherlands P: +31(0)20 494 6565 F: +31(0)20 494 6500 E: info@qua.nl www.qua.nl




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.