Architecture Portfolio by Renata Jelenic

Page 1

RENATA JELENIC Architecture Graduate

renata.jelenic@yahoo.com

academic + professional PORTFOLIO

Munich, Melbourne 2013 - 2016





KEY LITTLE SAIGON PRECINCT PROJECT SCOPE LITTLE SAIGON MARKET PROPOSED BUILDING SITE PROPOSED POCKET PARK

KEY

1

3

4

5

6

LITTLE SAIGON MARKET

PROJECT SCOPE

PROPOSED BUILDING SITE

LITTLE SAIGON MARKET

PROPOSED POCKET PARK

7

8

TOP OF LIFT OVERRUN RL +38,850 ROOF RL +37,600

LEVEL 4 RL +34,600

LEVEL 4 RL +34,600

PM-01

LEVEL 3 RL +31,600

LEVEL 3 RL +31,600

PM-01

LEVEL 2 RL +28,600

LEVEL 2 RL +28,600

PM-01

PROPOSED BUILDING SITE

PM-01

LEVEL 1 RL +25,600

PROPOSED POCKET PARK

9

RF-01

ROOF RL +37,600

PROJECT SCOPE LITTLE SAIGON PRECINCT

6a

PERFORATED METAL SCREEN CLADDING. REFER TO ELEVATIONS A3.01-A3.04 AND METAL SCREEN DETAILS A8.31, A8.32 & A8.33

TOP OF LIFT OVERRUN RL +38,950

LITTLE SAIGON PRECINCT KEY

2

AB-01

AB-01

LEVEL 1 RL +25,600 CANOPY RL +24,540

GROUND RL +20,600

GROUND RL +20,600

01 1

South Elevation

A3.06

1:100

South Elevation

LITTLE SAIGON 47-61 Byron St, Footscray, VIC 3012

Client: Marybirnong City Council

Stage: for contruction


XX SPACES AVAILABLE

XX SPACES AVAILABLE

L O W C LAE RAN C E 2 . 4 M

1

North Elevation

North Elevation 1:100

West Elevation 1

LITTLE SAIGON 47-61 Byron St, Footscray, VIC 3012

West Elevation

East Elevation

East Elevation

1

1:100

Client: Marybirnong City Council

1:100

Stage: for contruction


50 X 62 'CONCEPT CLICK' EXTERIOR ALUMINIUM BATTENS POWDERCOATED TO MATCH COLOUR OF WINDOW FRAMES.

GENERAL NOTES

+4.60

50 X 62 'CONCEPT CLICK' EXTERIOR ALUMINIUM BATTENS

+4.60

FIXED TO ONTRAX TRACK SYSTEM. BATTENS

FIXED TO ONTRAX TRACK SYSTEM. BATTENS

THIS DRAWING AND DESIGN IS SUBJECT TO COPYRIGHT AND MAY NOT BE REPRODUCED WITHOUT PRIOR WRITTEN CONSENT.

POWDERCOATED TO MATCH COLOUR OF WINDOW FRAMES.

REFER TO FINISHES SCHEDULE FOR DETAILS.

REFER TO FINISHES SCHEDULE FOR DETAILS.

ALL DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO CONSTRUCTION, MANUFACTURE AND/OR INSTALLATION DO NOT SCALE FROM DRAWINGS.

COMPRESSED FIBRE CEMENT SHEET FIXED TO

COMPRESSED FIBRE CEMENT SHEET FIXED TO

ZINKALUME PARAPET CAPPING FINISHED TO MATCH FACIA

STUD WALL BEHIND. SHEET PAINTED BLACK BEFORE BATTENS ARE APPLIED. METAL DECK ROOFING AS SPECIFIED WITH INSULATION UNDER

13

90

15

300

ZINKALUME PARAPET CAPPING FINISHED TO MATCH FACIA

BEFORE BATTENS ARE APPLIED. METAL DECK ROOFING AS SPECIFIED WITH INSULATION UNDER

+4.09

FALL 1°

FLASHING

RHS 250 x 150 x 6 REFER STRUCTURAL ENG. DRAWINGS FOR STEEL MEMBER SIZE

ANY DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT.

STUD WALL BEHIND. SHEET PAINTED BLACK

13 62

600

C150-15 AT 1200 CTS

13

THE BEAM CONTINUES BEHIND THE WALL

ALL WORKS TO COMPLY WITH ALL RELEVANT AUSTRALIAN STANDARDS AND CODES OF PRACTICE. ALL WORKS TO COMPLY WITH RELEVANT MANUFACTURER'S STANDARDS AND SPECIFICATIONS UNLESS OTHERWISE NOTED.

C150-15 AT 1200 CTS

150 C PURLINS TO SUPPORT SOFFIT EAVE TOP HAT SECTIONS

STEEL TOP HAT SECTIONS

EQUITONE FIBRE CEMENT SHEETING FIXED TO STEEL MEMBERS.

+3.60 180 PFC TO SUPPORT SOFFIT EAVE TOP HAT SECTIONS

250 PFC REFER STRUCTURAL ENG. DRAWINGS FOR STEEL MEMBER SIZE TO BE HOT DIPPED GALVANIZED

STEEL TOP HAT SECTIONS

EQUITONE FIBRE CEMENT SHEETING FIXED TO STEEL MEMBERS.

250 PFC REFER STRUCTURAL ENG. DRAWINGS FOR STEEL MEMBER SIZE TO BE HOT DIPPED GALVANIZED

+3.00 RHS 250 x 150 x 6 REFER STRUCTURAL ENG. DRAWINGS FOR STEEL MEMBER SIZE

INSIDE

GENERAL NOTE : THE DRAWING TO BE READ IN CONJUNCTION WITH STRUCTURAL , CIVIL, HYDRALIC, MECHANICAL, LANDSCAPE AND FIRE SERVICES ENGINEERS DOCUMENTION .

FALL 1:100

+3.60 P50 SHADOWLINE DETAIL BETWEEN PLASTERBOARD AND WINDOW FRAME.

SUSPENDED CEILING TO BE PROVIDED BY TENANTS

REFER TO STRUCTURAL ENGINEERS DOCUMENTS FOR ALL STRUCTURAL REQUIREMENTS.

+4.09

FALL 1°

FLASHING

300

300

THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE SCHEDULES AND OTHER RELEVANT CONTRACT DOCUMENTS.

ALL WORKS TO BE CARRIED OUT IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS AND RELEVANT AUSTRALIAN STANDARDS UNLESS NOTED OTHERWISE .

+3.00

ALL DIMENSIONS TO BE CONFIRMED ON SITE.

METAL CAPPING OVER STEEL MEMBER. SAME COLOUR AND PAINT FINISH AS WINDOW FRAMES.

INSIDE

OUTSIDE

+2.75

+2.75

THRESHOLD DETAILS: PROVIDE LEVEL THRESHOLDS OR THRESHOLD RAMPS WITH A MAXIMUM RISE OF 35M M , LENGTH OF 260MM AND MAX GRADIENT OF 1:8 TO MEET AS1428.1

OUTSIDE

REFER TO DOOR DETAILS AND DOOR SCHEDULE FOR BI-FOLD DOOR SPECIFICATION

FLOOR WASTE

WHEELCHAIR ACCESSIBLE THRESHOLD

SETDOWN IN SLAB FOR TENANT FLOOR FINISH. INSTALLED BY TENANT.

1

WHEELCHAIR ACCESSIBLE THRESHOLD

STONE PAVERS FALL TO GRADE REFER FINISHES SCHEDULE

STONE PAVERS FALL TO GRADE REFER FINISHES SCHEDULE

+0.00

TYPICAL CANOPY SECTION DETAIL EASTERN FACADE

8

1:10

CANOPY SECTION DETAIL THROUGH THE DOWN PIPE EASTERN FACADE

50 X 62 'CONCEPT CLICK' EXTERIOR ALUMINIUM BATTENS FIXED TO ONTRAX TRACK SYSTEM. BATTENS POWDERCOATED TO MATCH COLOUR OF WINDOW FRAMES. REFER TO FINISHES SCHEDULE FOR DETAILS. METAL DECK ROOFING AS SPECIFIED WITH INSULATION UNDER

FLASHING

13mm PLASTERBOARD

300

+0.00

1:10

50 X 62 'CONCEPT CLICK' EXTERIOR ALUMINIUM BATTENS FIXED TO ONTRAX TRACK SYSTEM. BATTENS POWDERCOATED TO MATCH COLOUR OF WINDOW FRAMES. REFER TO FINISHES SCHEDULE FOR DETAILS.

ZINKALUME PARAPET CAPPING FINISHED TO MATCH FACIA

FLASHING CAPPING THE STEEL MEMBER

FALL 1°

REFER STRUCTURAL ENG. DRAWINGS FOR STEEL MEMBER SIZE

ALUMINIUM LOUVRES TO THE SUBSTATION. ALUMINIUM LOUVRES POWDER COATED TO MATCH COLOUR OF WINDOW FRAMES. REFER TO FINISHES SCHEDULE FOR FURTHER DETAILS.

C150-15 AT 1200 CTS 180 PFC

INSULATION AS SPECIFIED

SUSPENDED CEILING TO BE PROVIDED BY TENANTS

EQUITONE FIBRE CEMENT SHEETING FIXED TO STEEL MEMBERS.

UNEQUEL STEEL SINGLE SECTION GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.

FIXED SHOPFRONT WINDOW. SEE FINISHES SCHEDULE AND GROUND FLOOR ELEVATIONS FOR FURTHER DETAILS.

STEEL TOP HAT SECTIONS

+3.60

150 C PURLINS TO SUPPORT SOFFIT EAVE TOP HAT SECTIONS

STEEL UNEQUAL SECTION GALVANISED AND PAINTED PT03

250 PFC REFER STRUCTURAL ENG. DRAWINGS FOR STEEL MEMBER SIZE TO BE HOT DIPPED GALVANIZED

STEEL UNEQUEL SECTION WELDED TO THE STEEL SECTION. STEEL SECTIONS GALVANISED AND PAINTED PT03

LOUVRED HINGED DOORS TO THE SUBSTATION. ALUMINIUM LOUVRES POWDER COATED TO MATCH COLOUR OF WINDOW FRAMES. REFER TO DOOR SCHEDULE FOR FURTHER DETAILS.

+2.70

SHOP

SUBSTATION PERFORATED METAL PANEL

13mm PLASTERBOARD

VAPOUR BARRIER THRESHOLD AT DOOR OPENING TO MATCH PAVEMENT LEVEL.

OUTSIDE

+0.90

EQUITONE SHEET

STEEL FRAME TO HOLD EQUITONE SHEET. SEE ARCH SPECIFICATIONS FOR FURTHER DETAILS. STEEL FRAME GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.

ALL LOUVRED DOORS TO THE SUBSTATION BY 'AUSTRALIAN COMMERCIAL DOORS' O R SIMILAR APPROVED. INSTALL TO MANUFACTURERS INSTRUCTION .

+0.00

50

50mm ZONE FOR TENANTS FINISHES

2

+2.10

OUTSIDE

13 90 INSULATION AS SPECIFIED

+3.75

TYPICAL CANOPY SECTION DETAIL NORTHERN FACADE

+0.00

4

1:10

LITTLE SAIGON 47-61 Byron St, Footscray, VIC 3012

SUBSTATION SECTION DETAIL (LOUVRED DOORS)

Client: Marybirnong City Council

1:10

Stage: for contruction


13mm PLASTERBOARD

INSULATION AS SPECIFIED

SUSPENDED CEILING TO BE PROVIDED BY TENANTS

SUSPENDED CEILING TO BE PROVIDED BY TENANTS

UNEQUEL STEEL SINGLE SECTION GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.

13mm PLASTERBOARD

UNEQUEL STEEL SINGLE SECTION GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.

SUSPENDED CEILING TO BE PROVIDED BY TENANTS

STEEL FRAME TO HOLD WINDOW. SEE ARCH SPECIFICATIONS FOR FURTHER DETAILS. STEEL WINDOW FRAME GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.

P50 SHADOWLINE

VAPOUR BARRIER INSULATION AS SPECIFIED

FIXED WINDOW. SEE FINISHES SCHEDULE AND GROUND FLOOR ELEVATIONS FOR FURTHER DETAILS. INSTALLED AS PER MANUFACTURER'S INSTRUCTIONS.

DIGITALLY PRINTED GLASS PANEL (GL05)

FIXED SHOPFRONT WINDOW. SEE FINISHES SCHEDULE AND GROUND FLOOR ELEVATIONS FOR FURTHER DETAILS

SHOP

OUTSIDE

PERFORATED METAL PANEL

VAPOUR BARRIER

EQUITONE SHEET

INSULATION AS SPECIFIED

STEEL FRAME TO HOLD EQUITONE SHEET. SEE ARCH SPECIFICATIONS FOR FURTHER DETAILS. STEEL FRAME GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.

THRESHOLD AT DOOR OPENING TO MATCH PAVEMENT LEVEL.

50mm ZONE FOR TENANTS FINISHES

50mm ZONE FOR TENANTS FINISHES

EQUITONE SHEET

STEEL FRAME TO HOLD EQUITONE SHEET. SEE ARCH SPECIFICATIONS FOR FURTHER DETAILS. STEEL FRAME GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.

FACADE SECTION DETAIL FIXED SHOPFRONT WINDOW 1:10

2

PIVOT DOOR FLOOR SPRING RECESSED INTO CONCRETE SLAB.

PIVOT DOOR FLOOR SPRING AS SPECIFIED. REFER TO DOOR SCHEDULE AND HARDWARE SPECIFICATIONS. 50mm ZONE FOR TENANTS FINISHES

BLUESTONE PAVERS FALL TO GRADE REFER TO CIVIL ENG. AND LANDSCAPE DWGS

50

50 1

FLAT STEEL TO BE WELDED TO THE STEEL ANGLE

SCABBLE BACK SLAB AS NECESSARY FOR PIVOT DOOR FLOOR SPRING. 50

VAPOUR BARRIER

LOCATION FOR THE TENANT'S SIGN. SIGN TO BE PROVIDED BY TENANTS.

STEEL FRAME TO HOLD EQUITONE SHEET. SEE ARCH SPECIFICATIONS FOR FURTHER DETAILS. STEEL FRAME GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.

13mm PLASTERBOARD

THRESHOLD AT DOOR OPENING TO MATCH PAVEMENT LEVEL.

OUTSIDE

SHOP

OUTSIDE

GLAZED PIVOT DOOR AS SPECIFIED. REFER TO DOOR SCHEDULE AND ELEVATIONS.

13 90 INSULATION AS SPECIFIED

UNEQUEL STEEL ANGLE GALVANISED AND PAINTED PT03

SHOP

FACADE SECTION DETAIL DIGITALLY PRINTED GLAS 1:10

FACADE DETAIL PIVOT DOOR

3

1:10

STEEL FRAME TO HOLD EQUITONE SHEET SEE ARCH SPECIFICATIONS FOR FURTHER DETAILS. STEEL FRAME GALVANISED AND PAINTED PT03 REFER FINISHES SCHEDULE

3710 NOM. 10

120

2 X 1170 (CLEAR OPENING)

10

10

DIGITALLY PRINTED GLASS PANEL (GL05)

1,230

UNEQUEL STEEL SINGLE SECTION GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.

FULLY WEATHERED, VERMIN PROOF FIXED LOUVRES

FULLY WEATHERED, VERMIN PROOF FIXED LOUVRES

EQUITONE SHEET

2960 NOM. 2950 (CLEAR OPENING)

FIXED SHOPFRONT WINDOW SEE FINISHES SCHEDULE AND GROUND FLOOR ELEVATIONS FOR FURTHER DETAILS

DIGITALLY PRINTED GLASS PANEL (GL05)

4

FACADE PLAN DETAIL FIXED SHOPFRONT WINDOW 1:10

5

ACCESS DOORS TO HAVE 180O HINGES

FACADE PLAN DETAIL DIGITALLY PRINTED GLAS 1:10

FULLY WEATHERED, VERMIN PROOF FIXED LOUVRES

5

LITTLE SAIGON 47-61 Byron St, Footscray, VIC 3012

FULLY WEATHERED, VERMIN PROOF FIXED LOUVRES

SUBSTATION DOOR ELEVATION

Client: Marybirnong City Council

Scale1:20

Stage: for contruction


LITTLE SAIGON 47-61 Byron St, Footscray, VIC 3012

Client: Marybirnong City Council

Stage: for contruction





HENN Architekten

HVB-TOWER MODERNISATION, MUNICH, GERMANY

Client: HVZ GmbH & Co. Objekt KG

Construction management assistant


Einfahrtstor Sheddach-Oberlicht

531,41

531,62

531,51

531,62

531,58

531,78

531,83

n

Einfahrtstor

531,74

Baustrom Niederspannungshauptverteiler mit ungezählten Bereichen zum Anschluss eines gezählten Baustrom 3

531,79

531,83

1 8 3 2 6 /4

531,63

0

0,01 m2

1

0 531,7

A KD 531,59

531,63

531,41

531,41 531,65

2

531,63

3 2 6 /1

531,51

Sheddach-Oberlicht

e

531,94

l a

R 531,62

t r

15

2,86

2,97

10,01

A

8 5

1,63

5

89,44 m532

A

5

531,66

531,62

531,96

531,70

531,69

2,36

529,29

1,60 1,06 1,60 10,875

2,36

532,03

30

531,74

2,315

2,66

531,90

2

C

5,465

15

21,37

531,74

E 14 IPBv 400

2,66

6,92

BE Schadstoffsanierung

Bestand = 0.00

21,90

531,88

2,01 2.20

C

2,01 2.20

2,66

5 Stellplätze PKW

532,03

1,06

1,30

531,99

532,00

BE Schadstoffsanierung

2,66

1,60 10,875

1,06

531,91

2,66

1,60

531,94

1,06

3,20

531,93

531,91

135 5

5

531,94 531,94

2,36

1,10

1,30

3,38

531,78

531,83

1,30

5,16

2,36

2,66

m

ca.

60

5,12

a

G

2,36

531,83

Grünfläche Abbruch

531,82

531,83

531,86 531,81

E

531,84

531,86

531,82

Sträucher

531,92

531,86 84

531,91

B

531,89

531,88

A

531,89

Höhe: 2,00 m

IV

6

531,77

531,79

531,84

5 265

5

365

135 5

5 265

5

E

1,02

der

531,89

B = -1.72

531,75

1,60

1,60

2,835

7,42

2,66

Dixi 1,01 2.20

5

2

1,30 4,165

D

b/d = 70/30 cm

531,77

4

E 13

531,84

V

Unterzug

531,97

BE Schadstoffsanierung

Bestand = 0.00

531,97

531,86

531,83

531,75

531,86

I

AN von Parkplatz bei Bedarf durch Stadt anzumieten

D

Pflaster mit Rasenfuge Abbruch

2,11 2.20

2,36

1,01 2.20

531,99

531,93

1 8 2 7 8 /8

1,06

885 2.20

E 12 IPBv 240

2,11 2.20

0 vo .25 n H 4, 18,2 56 4 m m

2,66

531,90

2,36 30

532,08

1,30 65 1,30

531,99

532,00

5,00

E 14 IPBv 1000

3,84

6,79

6,54

21,37

1 8 3 2 6 /7

m

B

KD 531,65

1,01 2.20

8,99

,0

7

28

=

1,01 2.20

C

65

8

1

21,90

C

,0

3

532,06

115

7,42

1,60 4,05 2,45

m

H

2,835

531,64 30

1,06

i e r F

531,83

531,71

531,88

KD 531,80

m 5

531,91

V 531,88

1 8 3 3 1 /1

1

ca. 30 Fahrradstellplätze

1,01 2.20

531,87

531,87

7 4 7 2

532,08

2,36

1,60

3,20

d

531,52

50

1,04 2.20

532,02

84

5

5

265 5

531,93

531,70

365

13

e

A

7,14 m2

1,02

n

l e

531,85

1

G

Kiesstreifen Abbruch

Stahltreppe

531,85 532,01

532,01

9

531,61

531,91

21 STG 183/26

s

531,65

531,75

531,76

B

365

6,815

30

4,515

9

1,60

b

KD 531,81

9 95

18

5,98

1,335

A

7,15

ä u

l

6,28

8,21

18

9

531,85

531,64 531,61

531,70

A

2

3 531,72

531,74

531,808

R

531,68

Kabelkanal

531,68

531,81

531,80

531,79

531,77

531,81

531,85

25

0.

531,86

531,63 531,63

531,71

531,71

1

KD 531,66

531,71

531,70

531,90

e

I

A

531,71

d

Picture Friedenstr. 26

9 9 9

531,67

0

365

8,51 22,00

531,85

KD 531,87

7,875

30

6,04

531,71

e

9

531,71

e

365

531,95

96,45 m2 531,88

A

2%

9

Bauwasser Bauwasser über TG Geb. A über FROSTFREI Leitung NEU und Kernbohrung ins EG zur BE Gebäude C

7,875

30

531,94

531,99

9 9

531,62

1,50

15

531,64

a

1,51 30

Einfügepunkt

g

185

8,21 22,00

5,26 6,815

1,80

53

531,77

i s

6,28

4m

1,60

531,6

7,15

1,97 365

B

n

9

531,68

18

9

5

.

9

265 5

532,00

135

531,64

531,55

9

n

A

531,63

KD 532,01

531,62

531,65

531,72

531,65

531,76

g

531,83

531,823

V

531,70

OK Mauer 533,79

H

OK Mauer 535,11

531,82

2,00

a M

I

a

Einfahrtstor Einfahrtstor

F60 F90

EbB

2,43

5

UZ neu b/h=20/50

Ableitung

B Materialcontainer

F90

F90

2,00

F90

UZ neu b/h=15/80

Art Brandwand

2

Brandwand F90

Abw.1

F90

Tiefe 4m 1. RW

C

H

Mastleuchte Bestand Montage und Demontage an neuer Lage

E 13 b/d = 70/30 cm

1

3

5

4

7

6

9

2 18

17

16

15

14

13

12

11

UKRD +3.39 Bestand ANB OKFFB ±0.00

Fläche für Material

UKRD 5.335 NEU

der

OKFFB 1.895 NEU

OKFFB xxx

30

Ableitung

30

90

E Ableitung

ENST

83

A

B

Ableitung

Abwasser

Abwasser

Wasser 3,50

m

E

D Unterzug

2. RW 10

AN von Parkplatz bei Bedarf durch Stadt anzumieten

77

5,

RASS

Materialcontainer

Ableitung

D

Ableitung

Gebäude B

Gebäude

Tiefe 4m

F e u e r w e h r u m fa h r t

Tiefe 4m

3 Zeiler

0

1

2

3

Gebäude C

Architekten Nickl Bausback

Sight plan Education Centre Consolidation of the Education Centre Munich of the Chamber for Trade and Crafts for Munich and Upper Bavaria

2,00

E 14 IPBv 400

T-VDS

E

Gebäude nicht mehr vorhanden LaMa FRIED

Abw 1

8

= vo

Art Brandwand

Anlieferung

8m

,0

H

WC-Container

30 30

Ableitung

1 8 3 3 1 /2

m

77

5,

UKRD +3.49 Bestand ANB OKFFB ±0.00

Art Brandwand

23 n

5

2 0.

, 23

=

C

Rinne (Anschluss in Sickerschacht Bestand)

30

n

17

vo m 08

90

UKRD +3.39 Bestand ANB OKFFB ±0.00

Art Brandwand

25

0.

Gebäude A

C

1. RW

MÜHLDORFSTRASSE

E 14 IPBv 1000

C

Rinne (Anschluss in Sickergrube Neu)

Anlieferung Kurzlager

2. RW E 12 IPBv 240

2,00

5

4 ,1

Lagercontainer

T30-RS UKRD +3.39 Bestand ANB OKFFB ±0.00

90

4

25

T-VDS

Abw.1

Abw.1

BehindertenBauaufzug gerechter Zugang

1. RW

Art Brandwand

6,00

F60

T30-RS

F90

T-VDS

T-VDS

1. RW

B

F90

T-D Ableitung

Art Brandwand

Picture Roof

2. RW

F90

UKRD +3.49 Bestand ANB OKFFB ±0.00

T30 F90

T-D RWF

2,00

T30

2. RW

1 8 3 3 3

standsflächen 1:250 Site plan with distance spaces

2,00 2,00 2,00

90

A

30

Art Brandwand

F30

UKRD +3.39 Bestand ANB OKFFB ±0.00

V 23

Art Brandwand

B

H

vo

A

e

VI

m

77

5,

Umgriffsgrenze Brandschutznachweis Ableitung

Abw.1

Fliegengitter

d

=

Lüftung TG Geb. A

Ableitung

Ableitung

u

m 08

,

n

25

Bestandsdach wurde abgekürzt

Gasleitung

ä

1 8 3 3 1

0.

Einfügepunkt

20,00

B

A

b

vo

e

H

G

m

85

5,

n

5 0.2

23

5,8

=

5

=

9 ,2

6

1m

,4

5H

0.2

2m

m

1

,7

23 4

vo

4,8

17

n

vo

C

H

n

2 ,9

=

5 9,

Art Brandwand

/2

e

25

9m

7m

93

Bauwasser Bauwasser über TG Geb. A über FROSTFREI Leitung NEU und Kernbohrung ins EG zur BE Gebäude C

Umgriffsgrenze Brandschutznachweis

d

m

u

92

0.

3

2%

ä

4,

1

30

0m

1,

1,3

Sheddach-Oberlicht LM-Glas-Trennwand

b

=

3

Sheddach-Oberlicht

93

e

9m

,6

8

2

89

G

19

1

1

4,

5

83

2,

88

n

vo

!

4,

V

H

II

0

=

F

m

,24

r

n5

25

5

Baustrom Niederspannungshauptverteiler mit ungezählten Bereichen zum Anschluss eines gezählten Baustrom 3

vo

8

i

8

2,00

0.

r

5H

Fluchtweg aus TG

F e u e r w e h r u m fa h r t

L

6

Sheddach-Oberlicht

Baustelleneinrichtungen Bestand 1:100

,6

0.

!

2,00

e d u ä b e G

m 30 1, = m 24 5, n vo

H

s n

25

t

r

.

Abwasse

13

0.2

,8

3

,2

16

Sheddach-Oberlicht

r

e

Construction site equipment Demolition Wasse

d

531,74

531,77

m

13

85

4,

e

Sheddach-Oberlicht LM-Glas-Trennwand

m

H

2 5,

56

25

0.

531,81

4,

89

93

26

35

531,81 531,83

=

4,

m

=

82

7m

5,

,5

=

19 5

42

3,

,4

m

30

1,

4m

n

vo

v

12

n vo

=

4m

,2

H 9m 25 3,2 0. n 2

vo

H

2

H

5

vo

5 0.2

2 3,

84

H

9,5

1 on

3,

n

25

0.

=

=

4,

25

9m

7m

m

82

5,

0.

m

9 4,8

89

18

!

n

vo

93 !

2

a

531,62

Construction site equipment New Project Phase III_Conversion and Modernisation of Building C


BAUSBACK ARCHITEKTEN

B

A

21 STG 183/26

Einfügepunkt

2%

2%

A

2%

Bauwasser Bauwasser über TG Geb. A über FROSTFREI Leitung NEU und Kernbohrung ins EG zur BE Gebäude C

B

A R

Lüftung TG Geb. A

A

Einfügepunkt

Stahltreppe

Putzraum 4,3m2

Büro Reimann (Büro Kantine) 12,3m2

Kantine Ausgabe 43,1m2

Vorraum ILT-Verteiler 5,1m2

Schacht 3,4m2

WC Da 2,8m2

Küche Kantine 34,5m2

2

WC Beh. 5,9m2

UZ neu b/h=20/50

Flur 9,1m2

UZ neu b/h=15/80

WC He 4,9m2

ca. 30 Fahrradstellplätze

Speisesaal 1, 92 Plätze 123,7m2

C Windfang 4,9m2

C

C

Eingang (notwendiger Flur) 82,6m2

C

5 Stellplätze PKW

Treppenraum u. Aufzug, Anlieferung (notwendiger Treppenraum) 35,5m2

Speisesaal 2, Besprechung 48,5m2

32 Sitzplätze

B

A

B

A

Höhe: 2,00 m

81 Sitzplätze

LKW 7,5 t / 12 t (bxlxh) 6 x 2,45 x 3m

LKW 3,5 t (lxbxh) 6,55x2,37 x 2,13m

LKW 7,5 t / 12 t (bxlxh) 6 x 2,45 x 3m

LKW 3,5 t (lxbxh) 6,55x2,37 x 2,13m

LKW 7,5 t / 12 t (bxlxh) 6 x 2,45 x 3m

LKW 3,5 t (lxbxh) 6,55x2,37 x 2,13m

A A

0

Ground floor plan Demolition

Ground floor plan New Büro Reimann (Büro Kantine)

1 WC Herren

Putzraum

C 0.06

C 0.05

12,30 qm

2

WC Damen

C 0.07a

WC Behinderte

C 0.07b

4,90 qm

4,30 qm

Flur

C 0.07c

2,80 qm

43,10 qm

34,50 qm

Decke

Decke

Decke

Decke

Decke

Decke

Decke

BEG F3_F10

BEG F3_F10

BEG F3_F10

BEG F3_R10

BEG S1_F9

BEG F1_F12

Wand

Wand Wand

Wand

Wand

Wand

Wand

Wand

Wand

Wand

Wand

Wand

Wand

Wand

Wand

Wand

BEG F2_R12 Wand

Wand Wand

Wand

Ground floor plan seating meeting

C 0.10

C 0.09

9,10 qm

Decke

BEG L1_k.A.

Wand

Kantine Ausgabe

Küche Kantine

C 0.04

5,90 qm

A

Baustrom Niederspannungshauptverteiler mit ungezählten Bereichen zum Anschluss eines gezählten Baustrom 3

A

Wand

Wand

Wand

Wand

Wand

Wand

Wand

Wand

Wand

Wand

Wand

+3,41

+3,41

+3,41

+3,41

+3,41

+3,41

+3,53

+3,38

+3,09

+2,59

+2,59

+2,59

+2,59

+2,59

+2,69

+2,69

+0,00

+0,00

+0,00

+0,00

+0,00

+0,00

+0,00

+0,00

-0,15

-0,15

-0,15

-0,15

-0,15

-0,15

-0,079

-0,08

Sheddach-Oberlicht LM-Glas-Trennwand

Pausenplatz

Floor covering

2%

Bodenbelag

REFLECTED CEILING PLAN ANB

22

21

20

19

OKFFB -0.15 NEU

UKRD +3.49 NEU OKFFB -0.09 NEU

11 STG 17.6/32

UPN 240

Einfügepunkt

B

Umbau

Dac

A 11 STG 17.6/32

Lichte Laufbreite 1,20m

Fundament Stütze l / b / h = 60 / 60 / ca. 125 cm OK=30 cm über OK Gelände

UKRD +1.56 NEU

A neu

Bestandsdach wurde abgekürzt

Außen

Abw.1 Fliegengitter

Fliesen Kleinformat 2,5 x 2,5

120°

l/b/t= 12/8/1 cm

Art Brandwand HLS 1

Rollo

F90

4,3m2

80

VORBEREITUNG

Rollo

BE DN100

penANLIEFERUNG

F90

80

Option 3

Neue Fläche 42,21 m2

F90

Option 1

Option 1

Demontage Fahrradständer neue Lage noch zu überprüfen

Brandwand F90

2

Brandwand

1. RW

Art Brandwand Option Verzug vom 1.OG

Abw.1

Abw.1

ELT 2

F90

ß

decke

Rippen

EU

DS

hN ac sd Gla

Rinne

C

UKRD +3.39 Bestand ANB

2%

Sauberlaufmatte

E 14 IPBv 400

E 14 IPBv 1000

Fluchtweg für Speisesaalbesucher

OKFFB ±0.00

80,9m2

Rinne

Bodenrinnen Ablauf

Deckensprung = Splitlevel ceiling

X 30

Facade edges keep at least 40cm deep

Plasterboard-acoustic ceiling (partially sealed installation)

Kitchen ventilating ceiling

Ceiling acoustic sail (partially sealed installation)

Rinne (Anschluss in Sickerschacht Bestand)

Unterzug Bestand

Unterzug Bestand

Rollo alternative Lage Rollo

Abw 1

1. RW

TS Einspeisung

C 0.01 Treppenraum u. Aufzug, Anlieferung (notwendiger Treppenraum)

Rollo

ke

Fassadenbuchstaben Bestand an Wand Eingang als Gestaltungselement

Art Brandwand

Grid luminaire square/round mounting Mounting linear luminaire wall vertical Mounting linear luminaire wall horizontal

ec pend

55

Rip

30

Lino

Art Brandwand

65

Linear luminaire mounting

Hygiene acousticsystem-ceiling grid (Ecophone Foodtec AC3)

Ceiling cavity till lower edge suspended ceiling (cm)

Sauberlaufmatte

DS

ZUGANG

C

A neu 2. RW

123,7m2

50

E 12 IPBv 240

C 0.02 Eingang (notwendiger Flur)

4,9m2

Rinne (Anschluss in Sickergrube Neu)

C

DS

C 0.11 Speisesaal 1, 90 Plätze 1. RW

Decke F90

C 0.03 Windfang

Grid luminaire square/round installation

rma

nde

OKFFB ±0.00

Behindertengerechter Zugang

ELECTRO NEW ANB

Hygiene acousticsystem-ceiling grid (Ecophone Foodtec AC4)

REFLECTED CEILING PLAN ANB

Windfang

UKRD +3.39 Bestand ANB

C

ELT Bodenkanäle

So

Notausgang

1. RW

Art Brandwand

Abw.1

Automatiktür

F90

Fliesen Kleinformat 2,5 x 2,5

ELT 1

Kitchen ventilating ceiling

Linear luminaire installation

Abtrennung Ausgabe zu Speisesaal Option 1 - Schiebetür Option 2 - Rollelement aus der Decke Option 3 - einfache Drehtür mit Offenhaltung

Rollo

Neue Fläche 123,74 m2

F90

Tor

Linoleum

Öffnungssperre

Option 2

Abtrennung Ausgabe zu Speisesaal Option 1 - Schiebetür Option 2 - Rollelement aus der Decke Option 3 - einfache Drehtür mit Offenhaltung

3,4m2

Schacht

Lino

DS

DS Option 2

34,4 m2

Rollo

alternative Lage Rollo

F90

OKFFB ±0.00

F90

HLS 4 (1,11x3,195) bis zum 5.OG

6,0 m2

50

C 0.10 Kantine Ausgabe 42,8 m2

F90

UZ neu b/h=20/50

F90

F90

UKRD +3.39 Bestand ANB

kein Gefälle im Boden

C 0.07c WC Beh.

5,0 m2

80

SPÜLKÜCHE

C 0.09 Küche Kantine

Demontage Fahrradständer neue Lage noch zu überprüfen

HLS 5 (1,11x0,585) bis zum 5.OG F90

BE DN100

HLS 3 (2,66 x0,125)

C 0.08 Vorraum ILT-Verteiler

80

OKFFB ±0.00

ELT

Neue Fläche 6,15 m2

F90

Option 3

2,9 m2

BA

UZ neu b/h=15/80

HLS 2 (1,125 x0,125)

Kiesstreifen

Rollo

Neue Fläche 2,45 m2

UKRD +3.49 Bestand ANB

F90

9,0 m2

2. RW

85x150

C 0.07b WC Da

keep at least 40cm deep

UND LAGERUNG

C 0.04 Flur

C 0.07a WC He

RWF 2. RW

Porcelain stoneware Facade edges 30

Öffnungssperre

85x150

4,8 m2

B

BE DN100

80

Rip ung rstärk ten un 0 Ve M1 e von deck

12,3m2

Bodenbelag Funktionsfliesen

Feinsteinzeug

kein Gefälle im Boden

BE DN100

2. RW C 0.06 Büro Reimann (Büro Kantine)

edge suspended ceiling (cm)

F90

ELT

F30 ELT C 0.05 Putzraum

Deckensprung = Split-

level ceiling Tiles Ceiling cavity till lower Small format 2,5x2,5cm X

Ansaugung Lüftung

EbB

Feinsteinzeug

DS

NEU

Durchgang

UPN 240

Kiesstreifen

A

über UG

1

2

3

4

10

6

5

11

7

9

8

Decke

120°

Functional tiles

LaMa-Gebäude

18

12

15

16

14

13

Rohbau

Stahlkonstruktion

17

A

B

Fluchttreppe neu

Fundament Stütze l / b / h = 60 / 60 / ca. 125 cm OK=30 cm über OK Gelände

h Bes

tand

Bauwasser Bauwasser über TG Geb. A über FROSTFREI Leitung NEU und Kernbohrung Funktionsfliesen ins EG zur BE Gebäude C

Pendandt luminaire E

Ceiling-Electrants

D

Lichte Laufbreite 1,20m Aufzug und Treppe NEU

Unterzug

VK Treppe

6 7 8 9

VK Treppe

OKFFB 1.89 NEU

Sichtbeton

Sichtbeton

Zwisch

enp

OKFFB ±0.00

st

TS

TS = Trockensteigleitung HLS 6 Kellerwand

A

B

A

A neu

Anlieferung

rda

chu

2%

ng

A neu

Dach Anlieferung

Dach Anlieferung

UK Dach +5.00

2%

Plasterboard-acoustic ceiling (partially sealed installation)

Reinforcement of the ribbed slab from below, by concreting of ribbs

Ceiling acoustic sail (partially sealed installation)

Plasterboard ceiling directly beneath the acoustic ceiling

Toranlage bereits vorhanden

+3,40

+3,14

+3,14

+2,89

+3,09/+2,89

Wand

Wand

Ceiling outlet for luminaire 360° motion detector Escape route pictogram

Wand

Wand

Wand

Wand

Wand

Wand

Wand

BEG S1_R9

BEG S1_R9

BEG S1_R9

BEG S1

Decke

4,90 qm

Decke

Decke

5,10 qm

82,60 qm

Decke

Decke

48,50 qm

C 0.08

C 0.02

C 0.12

Vorraum ILT-Verteiler

Eingang

Speisesaal 2, Besprechung

C 0.01

C 0.11

No suspended ceiling (plaster and coating)

Speisesaal 1

Treppenraum, Aufzug, Anlieferur

1

Legend floor covering, reflected ceiling plan and electrical installations

Decke 123,70 qm

35,50 qm

C 0.03

Plasterboard ceiling

2%

Wand

Wand

BEG L1_k.A.

Windfang

2

3 Müllplatz

Consolidation of the Education Centre Munich of the Chamber for Trade and Crafts for Munich and Upper Bavaria Pflanzfläche freiwachsene Sträucher

RLT-Element = ventilation technology element visible

-0,08 Wand Wand

Wand

BEG S1

Ground floor plan reflected ceiling plan 0

KLT-Element = cooling system element visible

+0,00

Wand Wand

KLT + RLT New

+2,89

-0,03

Wand Wand

+3,39

--+0,00

-0,08

Wand Wand

+3,48

+0,00

-0,04

Wand Wand

+2,99

+0,00

-0,17

-0,04

+3,39

+3,09/+2,89

+0,00

+0,00

Wand Wand

LKW 7,5 t / 12 t (bxlxh) 6 x 2,45 x 3m

VK Vordach

Müllplatz

Architekten Nickl Bausback

No suspended ceiling (plaster and coating)

Sträucher

ode

LKW 3,5 t (lxbxh) 6,55x2,37 x 2,13m

Ground floor plan floor covering

Hygiene acousticsystem-ceiling grid (Ecophone Foodtec AC3)

Inspection flap 40 x 40cm

Anlieferpodest UKRD 5.34 NEU

Übe

2%

Kiesstreifen

Rollo

Sichtbeton

10

Rinne (Anschluss in Sickerschacht Bestand)

2%

Mastleuchte Bestand Montage und Demontage an neuer Lage

VK Treppe

E

10 STG 18.05/29

12

alternative Lage Rollo

Rollo st

Neulage der Fahradständer aus dem Hinterhof

ode

13

11

Plasterboard ceiling

Aufzug

5

14

Antrittstufe

Hygiene acousticsystem-ceiling grid (Ecophone Foodtec AC4)

4

15 10 STG 17.75/29

b/d = 70/30 cm

Art Brandwand

40

OKFFB ±0.00

enp

Art Brandwand

UKRD +3.39 Bestand ANB

Zwisch

3

16

ca. 24 Fahrradstellplätze

E 13

1 2

VK Treppe

Aufzug

Antrittstufe

17

Bestandsputz 2 cm

Rollo

ca. 24 Fahrradstellplätze

VK Treppe

18 VK Treppe

lichter Durchgang min. 60cm

19

2. RW

Rollo

Sichtbeton

Fluchtfenster

B

Aufzug und Treppe NEU

Bestandsputz 2 cm

36,7 m2

C 0.12 Speisesaal 2, Besprechung 30 Sitzplätze 48,5m2

Pflanzfläche freiwachsene Sträucher

Reinforcement of the ribbed slab from below, by concreting of ribbs Plasterboard ceiling

Project Phase III_Conversion and Modernisation of Building C


Dachzentrale Neu 8,5%

8,5%

5.OG Öffnung nach Angabe BDH

Öffnung nach Angabe BDH

4.OG

Technik

5.OG

Technik

2,7%

2,7%

2%

2%

5.OG

Technik

4.OG

ZBV

3.OG

Flur

2.OG

4.OG

ZBV

3.OG

Ausbilder Büro

2.OG

Ausbilder Büro

1.OG

Flur

Ausbilderbüro

EG

Fleischwerkstatt

Fleischwerkstatt Küche

3.OG

UG

Section C-C Demolition

Flur

Ausbilderbüro

Schnitt C - C 1:50

OK Attika +19.78 Bestand

Feinbäcker

Gastronomiebereich

2.OG

Feinbäcker

OK Attika +19.75 Bestand

5.OG

OKFFB +18.77

5.OG

8

OKRD +18.69 ?

UKRD +18.38 IB Trost

UKRD +18.37 IB Trost

3,745

UKRD +18.37 IB Trost

UKRD +18.35 IB Trost

3,355

UKRD +18.37 IB Trost

23

UKRD +18.37 IB Trost

Flur

Bäcker

Lager OKRD +14.99 IB Trost

OKFFB +15.025 ANB

OKRD +14.98 IB Trost

OKRD +14.97 IB Trost

OKRD +14.96 IB Trost

OKRD +14.94 ANB

4.OG

1.OG

UKRD +14.65 IB Trost

UKRD +14.90 IB Trost

23

9

55

OKRD +14.99 IB Trost

65

4.OG

UKRD +14.87 IB Trost UKRD +14.64 IB Trost

29

UKRD +14.63 IB Trost

3.OG

OKRD +11.23 IB Trost

OKFFB +11.31 ANB

OKRD +11.22 IB Trost

OKRD +11.21 IB Trost

OKRD +11.21 IB Trost

Vordach

1.OG

Bäcker

3.OG

7

29

10

G 17/

10

ST

LaMa-Gebäude

Lager

3,715

Öffnung Bestand 1,68x 2,20m - 2,24m auf OKFF BS

G 17/

ST

3,33

11

11

UKRD +10.89 IB Trost

UKRD +10.89 IB Trost

OKRD +7.47 IB Trost OKRD +7.47 IB Trost

OKFFB +7.52 ANB

OKRD +7.46 IB Trost

UKRD +7.13 IB Trost

UKRD +7.13 IB Trost

3,41

1.OG

1/2

9

OKFFB +3.74 ?

OKRD 3.73 IB Trost

OKFFB +3.78 ANB

OKRD 3.73 IB Trost

UKRD +3.39 IB Trost

UKRD +3.65 IB Trost

UKRD +3.63 IB Trost UKRD +3.36 IB Trost

UKRD +3.36 IB Trost

Eingang

EG

Kantine

UKRD +3.38 IB Trost

KG

Umkleide Ausbilder

KG

HLS

LaMa-Gebäude

LaMa-Gebäude

Toranlage, bereits vorhanden

Schranke

3,78

G 17.

ST

EG

1.OG

OKRD +3.72 IB Trost

OKRD +3.72 IB Trost

9

2/2

11

Toranlage, bereits vorhanden

Speisesaal

OK Attika +5.24

9

G 17.

Eingang

25

ST

6

11

2.OG

Öffnung Bestand 1,68x 2,20m - 2,24m auf OKFF BS

ST

3,41

G 17.

Windfang

OKRD +7.47 IB Trost

UKRD +7.39 IB Trost UKRD +7.12 IB Trost

9

1/2

11

Ansaugung Lüftung NEU

3,79

3,42

2.OG

04/ 29

8

G 17.

26

ST

5

11

Windfang Innen Optional

Öffnung Bestand 1,68x 2,20m - 2,24m auf OKFF BS

ST

3,74

G 17.

25

UKRD +11.21 IB Trost UKRD +10.87 IB Trost

29

04/

11

Schranke ST

EG

2/2

9

OKRD -0.08 IB Trost

OKG -0.14 BS

OKRD -0.10 ANB

OKFFB ±0.00 ANB

OKRD -0.09 IB Trost

3,55 3,72

3,17

AUFZUG

11

OKG -0.38 (?) BS

Lüftung

ST

3,12

10

OKG -0.15 BS

UKRD -0.57 IB Trost

3/2

G 16.

OKRD -0.08 IB Trost

UKRD -0.40 ANB

OKG -0.29

9

7,67

G 17.

ST

G 17

.4/29

OKFFB -3.57 oder -3.55 alte Vermutung u jetzt?

OKRD -3.57

OKRD -3.60

OKFFB -3.66

OKRD -3.68 ANB

OKFFB -3.96 ?

OKFFB -3.96 ? OKRD -4.29

UKRD -3.98 ANB

OKRD -3.71

OKFFB -3.67

OKRD -3.73

VORABZUG

11

UKRD -4.00 ANB UKF -4.58 ANB

UKRD -4.60

UKF -4.96 ANB

Schnitt B - B 1:50

Schnitt A - A 1:50

Section A-A Demolition

Section B-B Demolition

Section C-C New

Dachzentrale Neu

Technik

5.OG

Abdichtung

Technik

4,6%

3,1%

4,1%

3,1%

5.OG

Technik

4.OG

ZBV

4,5%

3%

3,3%

4,1%

ZBV

TS = Trockensteigleitung

4.OG

Aufzug

28 STG 16.78/29

/29 Öffnung Bestand 1,68x 2,20m - 2,24m auf OKFF BS

Rohrbahn

22 STG 17.1/29 Tiefkühlbereich

Ausbilder Kabine

Rohrbahn C 3.13 Fleischwerkstatt

Kühlzelle

Leinwand

16.9

G

ST

11

UK abgehängte Decke

Räucherofen

3.OG

11

ST

G

Metzger

16.9

/29

3.OG

Fleischwerkstatt Küche

2.OG

Feinbäcker

/29

11

17.1

G

Öffnung Bestand 1,68x 2,20m - 2,24m auf OKFF BS

ST

22 STG 17.1/29 Spülbereich

2.OG

11

Feinbäcker

ST

G

17.1

/29

Feinbäcker + Gastrobereich

/29

17.1

G

ST

11

Öffnung Bestand 1,68x 2,20m - 2,24m auf OKFF BS

22 STG 17.1/29 Bäcker

Bäcker

LaMa-Gebäude

ST

G

17.1

TS = Trockensteigleitung

1.OG

11

/29

Wartungsebene NEU

Bäcker

/29

Toranlage, bereits vorhanden

17.2

G

ST

11

Müllplatz Eingang

Schranke

EG

1.OG

Spülküche

Toranlage, bereits vorhanden Anlieferung

Speisesaal groß

Essenausgabe

Schranke

Anlieferung

LaMa-Gebäude

Küche Durchgang neu

22 STG 17.2/29

11

Kantine

EG

ST

G

Podest Anlieferung

17.2

/29

Kantine 1,70 m2

1,03 m2

45°

5 /29

45°

.7

10

76,4°

G

ST

17

54,6°

Tiefgarage 10

KG

ST

Lager/ Abstellraum

G

18

.0 5 /29

OKFFB -3.66

KG

ELT

HLS Anschlussraum

HLS Zentrale Ausgang TG Gebäude A

Tiefgarage

HLS, ZBV

OKRD -3.71

Aufzug Unterfundament

Section A-A New Architekten Nickl Bausback

Section B-B New Consolidation of the Education Centre Munich of the Chamber for Trade and Crafts for Munich and Upper Bavaria

Project Phase III_Conversion and Modernisation of Building C


3,87

5

F90

10

89

Architekten Nickl Bausback

50

965

Tragwand Mauerwerk Bestand

Stütze Stb NEU

2,135

2,135

50 50

20

Brandwand

80

65

Schacht

5

17

Brandwand

2,795

30

465

25

Gehwegplatte

3,1% T1 +18.81

HLS 4 175

30

OK Dach+18.91

3,1% +18.70

HLS 5

4.OG

3,195

175

585

115

3,175

18

F90

F30

30

F90

50

Mauerwerk NEU

1,135 2,135

F90

11,5cm

F90

3,15 2,135

Schacht HLS 4

Mauerwerk NEU 11,5cm

HLS 5

C 1.08

1.OG

Putzraum

F90

30 F90

2,135

50

Stütze Stb NEU 20x30

ELT 2

3,35

3,36

2,97

3,36

3,36

3,76

Türöffnung NEU

F90

Stütze Stb NEU 20x30

F90

Flur (notwend. Flur)

2,87

4,195 3,08

815

40

47

1,63 2,48

3,12 3,40

50

F90

7

5

12

5

24

Schacht HLS 4 3,21

Leichtwand NEU 12,5cm

EG

4

80

30

F90

24

41

2,84 5

F90

UKRD +3.49 ANB

ELT 2

Vorbereitung

UKRD +3.49 ANB 65

Rippendecke Rippe h=21cm, b=12com, Platte h=10cm, Achsabstand Rippen 50cm

F90

40

F90

50

9 11 80

10

21 10

31 5 29

F90 75

5

U 20 x 50cm Überzug NE

9

9

96

60

31 29

15

F90 UKRD +7.25 ANB

2,135

65

F90

545

F90

24

UKRD +7.25 ANB

F90

F90

5 abgehängte Decke 11

F90

10

7

31

31

40

41

05

05

05 19 21 39

21

U 20 x 50cm

Überzug NE

Anlieferung

30

3,4m2

2.OG

175 75

HLS 515

115

2,995

18

18

30 15

HLS 5

Section E-E | 1:25

Bestandsöffnung DD neu

30 24

1,01

1,365

175

5.OG

5

ELT aus EG

Basement | 1:50

3,205

30

ELT 2

125

2,75

l.D. min 105

TC -1.01-1 T30-RS

EG

7,89

175

ELT aus EG

Art Brandwand

10

Schacht

885 2,135 TC -1.01-5 T30-RS

9

1,01 2,125

2,9 m2

Stütze

10

25

TC -1.01-6

875 125 2,125

TC -1.10d-1

UKRD +3.59

abgehängte Decke

30

10

10 8 TC -1.07-1 l.D. min 85cm

1,07

1,10

TC -1.10c-1 l.D. min 80cm

2,655

40

475 885 2,135 65 1,455 145

24

85x150

C -1.10d WC Kantine

A 25

60

F 1,12 10 5,6 m2

Rippendecke BS

HLS 4 (1,07x3,20) aus dem EG

875 2,125

C -1.10c Umkleide Kantine DA

3,27 2,845

4,035

1.OG

F90

HLS 5 (1,07x0,575) aus dem EG

10

4,645

30 6 24 425

B

C

30

97

TC -1.10c-2 110

3,07 3,25

Section F-F | 1:25

Überzug Stb NEU 15 x 96cm

30

C -1.12 ELT Verteiler 1,20qm

10

25

49

21 5

Vorsatzschale Verstärkung der Rippendecke über UG

TC 0.02-2 T30-RS S

10

TC -1.10b-1 TC -1.10b-2

10 8

30

875 125 2,135

F90

F90

Stahlbeton NEU 20cm

1,185

TC -1.01-7

1,66

OKFFB -3.55 NEU

70x70

UKRD -0.25 Bestand ANB

2,73 1,895

30

abgehängte Decke

Leichtwand NEU 12,5cm

5,32

F90

165

52

76

F90

1,01 2,125

3,0 m2

2%

Gefälle

10

Gefälle

BA

Aufsatz Dusche

2%

105X105

69

49

5

Flur

69

125 125

10 9 5 0

60 10

96

40 2,76

Option 3

24 30

ELT 2

1,66

1cm Versatz

2% Gefälle

l.D. min 85cm

Stütze

2,235

80

38

Abdichtung

C 1.07a

Mauerwerk NEU 11,5cm

Brandwand F90

6 2

Brandwand

1,045

Ground floor | 1:50 C -1.10b Dusche Kantine

Stütze

16

38 2,39

5

C 1.02

WC Azubi H

G

I

H

1,135 2,135

Abtrennung Ausgabe zu Speisesaal Option 1 - Schiebetür Option 2 - Rollelement aus der Decke Option 3 - einfache Drehtür mit Offenhaltung

30

36

24

1. RW

3,4m2

Schacht

3,61

F90

2,49

31

F90 F90

3,195

F90

3,30

Option 2

D

F90

UKRD +7.35 Rippendecke Rippe h=21cm, b=12com, Platte h=10cm, Achsabstand Rippen 50cm

HLS 4 (1,11x3,195) bis zum 5.OG

F90

43

15

175 175

F90

I 125

ELT 1

Option Verzug vom 1.OG

1,01 2,135

25

10 25

38

12

275

1,11

Bodenaufbau 1.-2.OG h = 9cm Bodenaufbau 3.OG h = 9,5cm

2.OG 31

1,01 2,135

125 F90 F90

UZ neu b/h=20/50

HLS 3 (2,66 x0,12 ) F90

Abw.1

Mauerwerk NEU 11,5cm

6

11

12

F90

4.OG

Überzug Stb NEU 15 x 96cm

3,70 UKRD +3.49 Bestand ANB

125 3,985

F90

HLS 5 (1,11x0,585) bis zum 5.OG

OKFFB ±0.00

UZ neu b/h=15/80

F90

F90 OKFFB ±0.00

UKRD +3.39 Bestand ANB

HLS 2 (1,125 x0,125)

125

5

Art Brandwand

Massivdecke NEU h=20cm

EG

5,495

5,14

NEU

5

12

Mauerwerk NEU 11,5cm

Stütze Stb NEU

1,99

25 5

20 3,26 2,135

F90

1,00 72

12

Türöffnung BS wird zugemauert Mauerwerk

12

20

20

41 3,35

50

20 25 5

Estrich nur Option

75

BE DN100

34,4 m2

TC 0.09-1 T-30-RS

30

TC 0.04-1 T-VDS

1,26

10

18 18

5

31 1,01 2,135

2. RW

SPÜLKÜCHE

5

6

F90

VORBEREITUNG

C 0.09 Küche Kantine

5

F90

30 30 U 20 x 50cm

4,57 25

5.OG

Stb Aufkantung b/h = 15/25 cm

5

F90

ELT

2,59

G

F

H F90

165

BE DN100

kein Gefälle im Boden

125

Türöffnung BS wird zugemauert Mauerwerk

Brandwand

F

1,07

3,87

90

E

BE DN100

3,07

5,38 15

Rippendecke BS

ANLIEFERUNG

D

1,10

50 F90

60

2. RW

B

2,75

18 185

30 15

HLS 4

90

F90

2

F90

Überzug NE

120°

TC 0.09-3

25 1,01 2,135 9,0 m

5

1,11

2

Estrich nur Option

TC 0.09-2 T-30 UND LAGERUNG

C 0.04 Flur

30

abgehängte Decke 5

UKRD +18.59

E

315

80

20

5,88

TC 0.10-1 T-30

33

95

25 05 20 3,76 2,97

3,92

UG

275

Stb Aufkantung b/h = 275/25 cm

F30 HLS 1

TC -1.08-1

5

1,335

F30

5

9

60 20 5

80

F90

1,05

1

30

Abw.1 Fliegengitter

BE DN100

Mauerwerk NEU 11,5cm

Section D-D | 1:25

G

2

1

2

3

4

5

6

85

625

1,16

2

A

Schacht HLS 4

50

15

1,26 2,24 BESTAND 7

8

40

Leichtwand NEU 12,5cm

30

25

15

Bürstenvorricht. f. Schuhe

UPN 240

1,11

ELT 2

30

Ertüchtigung der Decke über 1.OG mit Lamellen

ELT

115

abgehängte Decke

F90

ELT 2 0,3x ca.1,11m

Characteristic floor | 1:50 1 9

35

F90 Schacht

3,07

3,195 F90

175 1,645

85

50

15

115

10

15

15

21

2,845

F90

Massivdecke NEU h=20cm

F90

D

TC 2.02-1 T-D S

l.D. min 85

4,405

25

2

30

115

125

1,00

F30

15 285 24

30

F30

15 285

F30

H

F30

Wandgarderobe

ELT 1 2,845x30

F30

F90

1.OG

Rippendecke Rippe h=21cm, b=12com, Platte h=10cm, Achsabstand Rippen 50cm

18

Stb Balken NEU 17,5 x 20cm bxh

30

115

F90

15

Stb Stütze Neu 20 x 30cm

975

1,145

F90

85x150

Mauerwerk NEU 11,5cm

UKRD +3.59

UKRD +3.49 ANB

Spüllküche

1,11

TC 2.02-4 T90

F90

Überzug Stb NEU 15 x 85cm

Massivdecke h=20cm

EG

HLS 4 (1,11x3,195) bis zum 5.OG

15

TC 2.07a-2

Toilettenpapierspender

HLS 3 5 (3,02 x0,60) bis zum 5.OG

5 30 12

2,795

U 20 x 50cm

Überzug NE

F90

Mauerwerk NEU 11,5cm

abgehängte Decke

Stb Stütze Neu 20 x 30cm

885 2,135

885 2,125

F90

1,025 3,9 m2

175

Stb Balken NEU 17,5 x 20cm bxh

TC 2.07a-1 T-D

75 10 2,125

Papierrollenspender

45

UKRD +3.49

F90

625

F90

Verstärkung der Rippendecke über 1.OG

535

30

2.OG

F90

HLS 4

20

775

F90

HLS 5 (1,11x0,585) bis zum 5.OG

975

4,195

3,4m2

45

C 2.07a WC Azubi Da

D

E Rippendecke BS

885

1,21

Rippendecke Rippe h=21cm, b=12com, Platte h=10cm, Achsabstand Rippen 50cm

525

F90

F90

F90

Überzug Stb NEU 15 x 85cm

30

625

F30

33

45

Seifenspender

F90

585

2. Rettungsweg

885 2,125

55

TC 2.07b-1 T-D

Seifenspender

F90

175

55

Massivdecke NEU

45 Papierrollenspender

1,32

1,18

1,85

15

75 10 2,125

15

F90

1,025

F90

TC 2.07b-2

6,5 m2

75

45

7,215

115

2,995 35

115

165

B

15

F30

C 2.07b WC Azubi He

45

F90

F90

HLS 2 (2,64 x0,60) bis zum 5.OG

Stb ÜZ NEU 1,10/30/40cm l/b/h

1,645 15

30

T-RS

1.OG

Brandwand

115 15

Neue Fläche 5,39 m2

17

75

15

2.50m/2.00m

3,4m2

TC 2.02-5 T30

625

85x150

Überzug Stb NEU 15x 96cm 1,875

Kühlraum C 2.08 Putzraum

F90

165

60

365

F Toilettenpapierspender

Rippendecke NEU

4,195 Stb Überzug 50x20 /hxb 1,21 30

55

F90

E

Papierrollenspender

Mauerwerk 11,5cm NEU

Überzug BS l/b/h = 110/30/40 cm

ELT

Decke bleibt

2,2 m2

85x150 Toilettenpapierspender

F90

1,01 2,135

40

F90

lichter Durchgang min. 105

Stahlbeton NEU 20cm

Art Brandwand

525

UKRD +7.35

abgehängte Decke

Stütze Stb NEU 20 x 24cm

2,13

165

39 TC 2.07c T-D C 2.07c WC Ausbilder

75

Seifenspender

? F90 ?

Stb ÜZ NEU 1,10/30/40cm l/b/h

55

HLS 1 bis zum 5.OG

76 10 2,125

25

HLS 1

2,87

G

1

2

3

4

H

5

6

7

8

l.D. min 105

9

T-RS

1,135

125

1,20

F90 UKRD +7.25 ANB

Flur

WC Azubi D

Mauerwerk NEU 11,5cm

HLS 3

1,01

Mauerwerk NEU 11,5cm

2 120°

A

C 1.07a

Vorsatzschale

F90 Schacht

F

G

H

5 Floor | M 1:50

75

HLS 5

abgehängte Decke

th

1

155

60

30

ELT 2 0,3x ca.1,11m

Massivdecke h=20cm

UKRD +7.35

1,11 275 ELT 2 Schacht ist im 5.OG 7cm kürzer wg. Stb Aufkantung; mit IBS abgestimmt

25

21

15

20

05

STB Aufkantung für Stütze l/b/h 25/25/25

25

3,87

1,26

F90

4.OG

HLS 5

3,07

Bodenaufbau 1.-2.OG h = 9cm Bodenaufbau 3.OG h = 9,5cm (z. Z. höher)

5

17

5

15

25

60 1,025

115 15 15 7

1,645

F90

175 30

15

25

25

25 275

45

2.OG

HLS 3

STB Aufkantung für Stütze l/b/h 25/25/25

6

+18.70

F90

Überzug Stb NEU 15 x 85cm

60 85

D

4

Abdichtung auf Rohdecke( Estrich nur Option)

4,57

3,26

1,875

5

T1 +18.81

Stütze Stb NEU

25

75

Überzug BS l/b/h = 110/30/40 cm

4,57

3,19

35 165

5.OG

25

3,1%

OK Dach+18.91

Estrich 1% Gefälle

Massivdecke h=20cm

4.OG

29

17 Kamin

25

115

Gehwegplatte

3,1%

Estrich nur Option

UKRD +18.49

75

275

1,11

5,14

Rippendecke BS

5

STB Aufkantung h 25

3,195

HLS 4 (1,11x3,195) bis zum 5.OG

75

20

225 5

STB Aufkantung für Stahl-Stütze l/b/h 25/25/25

1,50 STB Aufkantung 2.10 im Bereich Tür durchlaufend

5.OG

25 50

25

475 STB Aufkantung h 25

3,995 3,025

STB Aufkantung h 25

3,785

1,065

E

15

STB Aufkantung h 25

D

175

20

E

Estrich nur Option

25

25 25 STB Aufkantung für Stahl-Stütze l/b/h 25/25/25

HLS 5 (1,11x0,475)

25

Stb Aufkantung b/h = 25/25 cm 25

Stb Aufkantung b/h = 15/25 cm

25

15

Brandwand

Öffnung nach Angaben HLS

STB Aufkantung b=25 x h=50 13,18

C

4,03 60

13,88

HLS 2 Teil 2

B

A

2

275

Stb Aufkantung b/h = 275/25 cm

1,435

G

F

3,1 % Gefälle

Decke ble HLS 2 Teil 1

1

Dachtiefpunkt

n ibt erhalte

50

VK Attika >

1,435

3,72

3,1 % Gefälle

H

VK Attika >

HLS 1 kein Schacht nur Kernbohrung in Decke Über 4.OG

1,58

24

3,20

UG

DD neu

24

6 515

44

10

C -1.12 ELT Verteiler 1,20qm

Section G-G | 1:25

Consolidation of the Education Centre Munich of the Chamber for Trade and Crafts for Munich and Upper Bavaria

Project Phase III_Conversion and Modernisation of Building C


HWK Bildungszentrum

GEBĂ„UDE C

HWK Bildungszentrum

HWK Bildungszentrum

Elevation view North-West New (current planning)

Option 1 Sun protection > Sun protection over casement > prevention from solar radiation by opened casement

Elevation view South-East New

Option 2 Sun protection > casement free without sun protection > cost saving > promotes the colour concept

ANLIEFERUNG

Elevation view South-West New

Elevation view North-East New

HWK Bildungszentrum

FACADE CONCEPT BUILDING C

HWK Bildungszentrum

F

P

HWK Bildungszentrum

Sun protection

HWK Bildungszentrum

Education Professional training

Consulting Training and further education

Education Professional training

Fixed glazing

Consulting

>

Training and further education

Parapet with electrict duct lacquered Sheet

Elevation view NW Colour concept orange + yellow + green

Colour concept yellow + green

Elevation view NW Colour concept orange + yellow + green

HWK Bildungszentrum

HWK Bildungszentrum

> HWK Bildungszentrum

Parapet

HWK Bildungszentrum

HWK Bildungszentrum

HWK Bildungszentrum

lacquered Glass

Craft Representatives

Education Professional training

Consulting

Craft

Training and further education

Representatives

Craft Representatives

Education Professional training

Section P Panel window

Part facade view 70

Section F Fixed glazing

Education Professional training

Consulting

Normal parapet

Training and further education

Consulting Training and further education

4,62

BrĂźstungskanal

Elevation view NW Colour concept all colours without blue V1

Elevation view NW Colour concept all colours without blue V1

Part plan view Architekten Nickl Bausback

Elevation view NW Colour concept all colours without blue V2

Colour concept red + yellow + green Consolidation of the Education Centre Munich of the Chamber for Trade and Crafts for Munich and Upper Bavaria

Project Phase III_Conversion and Modernisation of Building C


Zimmer

Bad

DG

DG

Wohnzimmer

27a OG

nicht Teil des Bauantrags

OG Bad EG

EG Heizung UG

UG

Schnitt A-A Bestand

Ansicht Nord

Section A-A Demolition

Schlafzimmer

Elevation view North

Küche

DG

Schlafzimmer

DG

OG

OG

Bad EG

EG

Heizung UG

Official site plan

UG

Ansicht Ost

Schnitt A-A Neu

Section A-A New

Pictures Villa Elisabeth

Elevation view East

A

A

A

A Windfang

Windfang Laubengang

Balkon

Besenkammer

W1 Arbeitszimmer

Wäschekammer Wäschekammer

W1 Wohnzimmer

Küche

Zimmer

Wohnzimmer

Bad

Kamin Frühstücksraum

Büro

Stube

Garderobe

Treppe + Flur

W1 Küche

Kamin

Büro

Bad W1 Flur

Treppe + Flur

Bad

Bad W1 Schlafzimmer

W1 Esszimmer

Terrasse

Bad

Bad Balkon

Flur Balkon

Rezeption

Balkon

Treppe + Flur

Balkon

Balkon

Treppe + Flur

W1 Kinderzimmer

Zimmer

Balkon

Besenkammer

Zimmer

Bad

Wohnzimmer

Schlafzimmer

W1 Ankleide

Bad

Bad

W1 Kinderzimmer

No rd

rd

rd

rd

No

No

No

Balkon

Balkon

A

Ground floor plan New

Architekten Nickl Bausback

VILLA ELISABETH

A

A

A

Existing ground floor plan

Existing 1st floor plan

Seestraße 27 83700 Rottach Egern Gem. Rottach Egern Fl.St.-Nr. 135

1st floor plan New

Approval planning I Application for a change of use


676.66 678.56

N

a

b 677

676.55

678.08

6.5 67

7 67

678.12

5 677.

678.56

678.56

c

d

5 680.

678.5

677

676. 5

678

678.12 678.28

677.35 1

2

3

4

5

6

7

8

9

10

11

12

677.59

678

28,92 2,40

2,40

2,40

2,40

2,40

2,40

e

29,96 63

47 2,40

2,40

2,40

2,40

2,40

2,40

e

0

57

53

678.25 OK First

3,34

OK Traufe

2,65 2,236

676.5 +0,00

-0,06

67

9

679.5

b

d

68

1

681.5

679

Elevation view West

a

677

677.5

680 678

677

0 68

678

Haus 5

c

67 8.5

678 677.956

SPE 6

6.5

67

68

2

678.5

68

4.5

3.5

68

5.5

68

679.5

3

Mögliche Erweiterung nach B-Plan Änderung

68 OK FFB ± 0,00

677,83

677,50 677,25

12

11

10

9

8

7

6

5

4

3

2

1

Haus 05

0

29,96 47

67

53

9

28,92 2,40

2,40

2,40

2,40

2,40

57

2,40

2,40

2,40

2,40

2,40

2,40

2,40

63

681.5

Kiesweg Neu

678

961 685

677

68 0.5

679

677

SPE 5 5

3,34

OK First

2,65

OK Traufe

Schnitt a - a

2,236

10,0 WHR 750 G 1500 GF

677

+0,00

-0,06

681 676

68

0

OK FFB ± 0,00

677,83

676.5

677,00 676,25

Haus 6c

67

6

Elevation view East

676

Schnitt b - b

68

1.5

67 9

677

OK FFB ± 0,00

67

678.

Haus 6b

5

8.5 677,83

Haus 05

677,25

677

8

67 680.5

679.

67 8

D

68

A

10,75 9,26

5

50

B

C

3,50

Schnitt c - c

99

2,00

3,50

1,07

OK First 3,34

678

OK Traufe 2,65

WH 10,0 GR 3250 GF 5500

2,236

677

WH 10,0 GR 600 GF 1200

677

Haus 8

8.5

67

±0,00 -0,17

5

676.

Haus

OK FFB ± 0,00

-0,06

677,96

6a

677,83

677,00

Rampe 2,69 °

677,59

676,66 677,35

676,55

109 Schnitt d - d 678.5

Site plan

Elevation view South

678

Terrain sections

677

9,21 3,50

2,00

Voliere 6 V05/0.06 3631 4,01 MPI

Voliere 7 V05/0.07 3631 4,01 MPI

Voliere 8 V05/0.08 3631 4,01 MPI

Voliere 9 V05/0.09 3631 4,01 MPI

677

Geländermodelling notwendig

0

1

2

3

Voliere 10 V05/0.10 3631 4,01 MPI

4

Voliere 11 V05/0.11 3631 4,01 MPI

5

Voliere 12 V05/0.12 3631 4,01 MPI

Voliere 13 V05/0.13 3631 4,01 MPI

Voliere 14 V05/0.14 3631 4,01 MPI

6

Voliere 15 V05/0.15 3631 4,01 MPI

Voliere 16 V05/0.16 3631 4,01 MPI

7

Voliere 17 V05/0.17 3631 4,01 MPI

Voliere 18 V05/0.18 3631 4,01 MPI

8

Voliere 19 V05/0.19 3631 4,01 MPI

Voliere 20 V05/0.20 3631 4,01 MPI

9

Voliere 21 V05/0.21 3631 4,01 MPI

Voliere 22 V05/0.22 3631 4,01 MPI

10 VK Dach

Voliere 23 Voliere 24 V05/0.23 V05/0.24 3631 3631 4,01 4,01 MPI MPI

11

OK Traufe

1,20

Insektenschutzgitter 1,20

1,20

Kiesstreifen

Schutzflies als Sicht- und Insektenschutz

12 % Gefäl

le

le

Insektenschutzgitter

240 x 160

140 mm Mineralwolle 2mm Dampfbremse: PE-Folie, diffusionshemmend 98 mm Luftschicht 30/50 mm Holzlattung 15 mm Gipskartonplatten

Netz

12,5 mm GK-Platten

2.661

15 mm OSB Platten mit Nut u. Feder

12,5 mm GK-Platten

mm Balke

n

mm Balke

n

doppeltes Netz

Netz

Kabeltrasse

160 x 160 mm Holzträger

Abdichtung 140mm Mineralwolle

+2.236

60 x 140 mm Stiel

60 x 140 mm Stiel

2,035

Fensteröffnung - die Höhe ist noch zu klären 40

3,50

3,34

VK Dach

120 x 160

0. 5

-0,12

Plexi - Wellblech

Netz

2.821

Kiesstreifen

60 x 140 mm Stiel

A

68

Stützmauer NEU

A

12,5 mm Gipskartonplatten

8

B

12 % Gefäl

12

Baulinie

28,80

Teilrückbau Treppenterrasse

+2.64

3,50

575

Voliere 5 V05/0.05 3631 4,01 MPI

679

Voliere 4 V05/0.04 3631 4,01 MPI

Baulinie

Voliere 3 V05/0.03 3631 4,01 MPI

Dachlüftung in Klärung

679.5

Voliere 2 V05/0.02 3631 4,01 MPI

A

C

678.5

677

Voliere 1 V05/0.01 3631 4,01 MPI

+3.34

.5

677

676.5

Haus 5

OK First

678

D 26 mm Doppelstehfalzeindeckung 8 mm Trennlage aus PP- Gewirr (schützt die Dachdeindeckung vor Staunässe und dämpft Geräusche durch Regen und Hagen) 24 mm Schalung 40/60 mm Holzlattung Diffusionsoffene Unterspannbahn 24 mm Schalung 240 mm Holzbalken

679

125

16

beheizter Bereich

unbeheizter Bereich

unbeheizter Bereich

Futterregal

B

1,135 ca. 2,135

3,635

1,01

3,14

1,30 ca. 2,135

815

0,00

2,795

1,33 ca. 2,135

VK Dach

3,50

3,755

Rinne

2 % Gefälle

15

Baulinie

VK Dach Büro Auswertung V05/0.28 2111 15,12 MPI

ELT/Technik V05/0.27 8500 7,15 MPI

Außenlager V05/0.26 4110 24,16 MPI

Kiesweg Neu

677

A

140mm Mineralwolle 15 mm OSB Platten mit Nut u. Feder

Abdichtung

OK Gelände in Klärung

Anstrich: Estrich

Anstrich auf flügelgeglätteter Bodenplatte

+0.00

60 x 140 mm Riegel

678.5

Lager V05/0.29 4110 15,12 MPI

677.5

Futterküche V05/0.30 3670 14,39 MPI

Abdichtung

2,955

+0.00

Baulinie Schleuse V05/0.31 9140 7,15 MPI

12,5 mm GK-Platten

Traglattung (Hinterlüftungslattung), 6/5cm

Kiesstreifen

Baulinie

60 x 140 mm Fußpfette

679

D

- 3,37

2 % Gefälle

2 % Gefälle

2,28 ca. 2,135

Spülmaschine

Lattung mit Netz hinterspannt

2 % Gefälle

Kühlschrank

Lattung mit Netz hinterspannt

doppeltes Netz

65 2,00

Fassadenbekleidung aus Lärchenholzbrettern, waagrecht, 40/60mm vierseitig ausgehobelt, mit Edelstahlschrauben befestigen. Abstand ca. 1,5cm

2,89

3

C

Industriespüle

678

2,465

1,135

1,135 ca. 2,135

+0.00

-0.10

681.5 -0.10

Flur V05/0.25 9110 48,64 MPI

-0.30

-0.30

678

60 mm Zementestrich PE-Folie als Trennlage Stösse verklebt 20 mm Trittschalldämmung 20 mm Polyesteroll Abdichtung gegen aufsteigende Feuchtigkeit z.B. Bitumen / Polymerbitumen 310 mm Stahlbetondecke PE-Folie 80 mm Perimeterdämmung 150 mm Sauberkeitsschicht

67 7.5

9,21 255

Ground floor plan

Anstrich auf flügelgeglätteter Bodenplatte

Bodenablauf 6

3,235

3,245

Section A-A

255

1,79 681

68

0

16

3,34

16

BE

1,135 ca. 2,135

37

1,01 3,37 ca. 2,135Kaltwasseranschluss

Kaltwasseranschluss

wieder herstellen

±0,00 3,215

Fluchttür

1,01 ca. 2,135

±0,00

9,00

415

Fluchttür

120 x 160 mm Stütze

Architekten Nickl Bausback

Max Planck Institute for Ornithology in Seewiesen

Client: Max Planck Society, Munich 0,00

Aviaries: House 5b I Design planing Voliere 10 Futterregal

V05/0.10 3631 4,00


UNIV ER SIT Ä T D E R B UND E S W E HR M Ü N C H E N IN NE UB IB E R G

GEB 16 - 300

GEB 16 - 300

G R UND INS T A ND S E T Z UNG - UNT E R K UNF T S G E B Ä UD E 16

-0,15 OK GEL.

0

10

EIL 400

EIL

UT

BAUT

BA

Emergency stairway full-coloured: red facade

Elevation with coloured roller blinds: purple

Emergency stairway full-coloured: grey facade

0

EIL

30

Visualization with coloured roller blinds

Emergency stairway version A

Entrance area North: part-coloured

Entrance area West: two-tone

Emergency stairway version B

Emergency stairway two-tone red and grey

GEB 16 - 300

Entrance area West: full-coloured

GEB 16 - 300

EIL 200 BAUT

Siteplan Living Unit 16

ER

AM

BE

GEB 16 - 300

ER

AM

BE

GEB 16 - 300

UT

BA

Pictures on site Architekten Nickl Bausback

UNIVERSITÄT DER BUNDESWEHR MÜNCHEN IN NEUBIBERG

Client: Universität der Bundeswehr, Munich

Basic Maintenance - Accommodation Building 16


Abbr. Geländer Wange aufdoppeln

Beamer Konsole + Anschluss

Beamer Konsole + Anschluss

Außenbereich - anthrazit Innenbereich - weiß LERNBEREICH

GEB 16 - 300

Schnitt Treppe

Schnitt Lernbereich

Gangbereich OG

Section learning area B

C

Longitudinal section corridor area upper level

Section stairs

Typical floor plan

Section DDDD Schnitt

Section DDFF Bathroon Schnitt Bad

Typisches Grundriss

A

LERNBEREICH

WOHNBEREICH

WOHNBEREICH

30

F

F

E

E Schiebetür Anschlagprofil

2,42 m2

WOHNBEREICH

LERNBEREICH

D

D

D

A

B

C

Festverglasung

Gangbereich DG Lern- und Wohnbereiche Grundriss

Deckenspiegel

Longitudinal section corridor area attic: learning and living areas

Detail

Visualization inner view living area: proposal 1

Visualization inner view learning area

Picture learning area current phase

Visualization inner view corridor area

Visualization inner view living area: proposal 2

Visualization inner view apartment

Picture apartment current phase

Visualization inner view apartment

Architekten Nickl Bausback

UNIVERSITÄT DER BUNDESWEHR MÜNCHEN IN NEUBIBERG

Client: Universität der Bundeswehr, Munich

Basic Maintenance - Accommodation Building 16


My final thesis

Department of Architecture, TU MĂźnchen



Maison d‘ Maison d‘Orleans Orleans

Lageplan 1:2500 Site planM 1:2500

Lageplan 1:500 Site planM 1:500

Aufenthaltszonen Stay areas

Viewundand orientation Blick Orientation

Movement peopleininBezug relation semi-public Bewegung vonof Menschen auf dieto halböffentlichen Bereiche des Maison du peuple areas of the Maison du peuple

Movement people ininBezug relation toöffentlichen public areas of Bewegung vonofMenschen auf die Bereiche des Maison du peuple the Maison du peuple

The relation ofzum theOrleansplatz hall to Orleansplatz and the inner courtyard Bezug des Saals und zum Innenhof

TUM Faculty of Architecture

General Diploma Thesis March-July 2013

Focus Design and Construction

Chair for Intergrated Design Univ. Prof. Dipl. Ing. Dietrich Fink

Maison du Peuple


Maison d‘ Maison d‘Orleans Orleans

La W ge er rra ks u ta m tt 1

W er ks ta tt

W er ks ta tt

1

La W ge er rra ks u ta m tt 2

W er ks ta tt

2

44

Ste ig

1

W er ks ta tt :5

2

In

In

fo ,A be nd ka ss e

fo ,A be nd ka ss e

La ge rra um

Gar dero be

Foy er

Sa

Sa

al

WC

al

Büh ne

Büh ne

WC D

UG WC D

Cafe

Papeterie

Chocolaterie

Cafe

Lager Mode

Mode

Papeterie

Chocolaterie

Mode

WC H

Lager Bar

WC H Küche & Lager Cafe

Lager Papeterie

Lager Chocolaterie

Bar

Bar

Lager Mode

Technikraum 44 Steig : 5

44 Steig : 5

44 Steig : 5

Pumi

Weißenburger Str. 1:200

1:200

Grundriss M 1:200 1st floor 1.OG plan 1:200

Ve rw alt un g

Bü ro

Ve rw alt un g

W

C

H

C

C

tz

um In te

um Au fe

ra

um

Bü ro nth alt s

ra um

Arc

hiv

Be sp re ch un gs ra um

D Au fe nth alt s

Ate

ra um

lie r

Ate lie r

Arc

hiv

Te rr Bü asse ros

Be sp re ch un gs ra um

C

tz

ra

nd en z

K ch opie rb ere i

ra um

Te ek üc he

Au fe nth alt s

Ate lie r

H

W

Pu

D

Te ek üc he

ra

C

H

W Pu

D

lie r

W

Ko pie rb ere ich

C

tz

Bü ro

W

W

Pu

Ate

Ko pie rb ere ich

Grundriss EG 1:200 Ground floorMplan

Te ek üc he

Grundriss UGfloor M 1:200 Basemant plan

Cafè

Lese saal

Terra Biblio sse thek

O Au ffen ste e llu (P ng av sfl illo äc ns he )

Ausle Info ihe /R ückg abe

Terrasse Büros

Ausle Info ihe /R ückg abe

Putzraum

WC H Arbeitsraum

WC H

WC H Lager

Arbeitsraum

Büro

WC D

Archiv Aufenthaltsraum

WC H

Lagerraum

Arbeitsraum

Teeküche

Arbeitsraum

Abstellraum Aufenthaltsraum

WC H

Putzraum

Putzraum

WC D

Teeküche

Arbeitsraum

Abstellraum

Atelier

Atelier

Atelier

Teeküche

Abstellraum

WC D

WC D

WC D

Arbeitsraum

Offene Austellungsfläche

Büro

Büro

Büro

Büro

( Pavillons )

TUM Faculty of Architecture

Grundriss 1:200 3rd floor3.OG plan M1:200

General Diploma Thesis March-July 2013

Atelier

Atelier

Atelier

44 Steig : 5

44 Steig : 5

Grundriss 1:200 2nd floor2.OG planM1:200

Atelier

Kopierbereich

Büro

Kopierbereich

Büro

Großraum

Großraum

Kopierbereich

Großraum

Großraum

Focus Design and Construction

Grundriss 1:200 4th floor4.OG plan M1:200

Chair for Intergrated Design Univ. Prof. Dipl. Ing. Dietrich Fink

Maison du Peuple


Maison d‘Orleans Orleans Maison d‘

Ansicht Orleansplatz M 1:200 Elevation view Orleansplatz 1:200

Ansicht Weißenburgerstraße M 1:200 Elevation view Weißenburgerstraße 1:200

Querschnitt M 1:200 Cross section 1:200

Ansicht Wörthstraße M 1:200 Elevation view Wörthstraße 1:200

Längsschnitt Msection 1:200 Longitudinal 1:200

TUM Faculty of Architecture

General Diploma Thesis March-July 2013

Focus Design and Construction

Chair for Intergrated Design Univ. Prof. Dipl. Ing. Dietrich Fink

Maison du Peuple


Maison d‘ Maison d‘Orleans Orleans

DACHAUFBAU Begrünung Extensivsubstrat 60 mm, Filterflies Dränschicht 30 mm Schutz- und Speichervlies Bautenschutzmatte Abdichtung Elastomerbitumen mit Vlieseinlage Dämmung PUR-Hartschaum / 200-110 ,mm 2% Gefälle Dämmung PUR-Hartschaum / 100 mm Dampfsperre Elastomerbitumen Bitumenvoranstrich Stahlbetondecke 180 mm

DECKENAUFBAU Stahlbetondecke 180mm Unterzug h = 400mm abgehängte Gipskartondecke

20,68

+20,50

Erschließung Maison d`Orleans Access to des Maison d`Orleans

5

+20,03

FASSADE Innenliegender Sonnenschutz - Rollo 3-fach Verglasung Pfosten/Riegelfassade 300/100 mm CAFE BODENAUFBAU Fliesen in Mörtelbett 20 mm Estrich 30 mm Trittschalldämmung 22 mm PE-Folie Stahlbetondecke 180 mm

Bewegung Besucher Saal Movement visitors hall

DECKENAUFBAU

+15,50

5

15,28

Stahlbetondecke 180mm Unterzug h = 400mm abgehängte Gipskartondecke

+15,11 5

+14,61

GALERIE BIBLIOTHEK

FASSADE

BODENAUFBAU Bodenbelag Teppich Estrich 30 mm Trittschalldämmung 22 mm PE-Folie Stahlbetondecke 180 mm

+11,75

11,67

Innenliegender Sonnenschutz - Rollo 3-fach Isolierverglasung 6/18/6/18/6 mm Pfosten und Riegel 300/60 mm

5

+11,36

DECKENAUFBAU

Movement visitors library Bewegung Besucher Bibliothek

FASSADE

Stahlbetondecke 180mm Unterzug h = 400mm abgehängte Gipskartondecke

Innenliegender Sonnenschutz - Rollo 2-fach Isolierverglasung 6/18/8mm Pfosten und Riegel 300/60 mm

BIBLIOTHEK BODENAUFBAU Bodenbelag Teppich Estrich 30 mm Trittschalldämmung 22 mm PE-Folie Stahlbetondecke 180 mm

+8,00 +7,92

+7,74

+7,275

Bewegung Besucher Cafe cafe Movement visitors

DECKENAUFBAU Stahlbetondecke 180mm Unterzug h = 400mm abgehängte Gipskartondecke FASSADE Innenliegender Sonnenschutz - Rollo 3-fach Isolierverglasung 6/18/8mm Pfosten und Riegel 300/60 mm

FOYER BODENAUFBAU Fliesen in Mörtelbett 20 mm Estrich 30 mm Trittschalldämmung 22 mm PE-Folie Stahlbetondecke 180 mm ±0,00

Volumen Maison d`Orleans Volume Maison d`Orleans

-0,08

-0,25 -0,45

DECKENAUFBAU

Fassadenschitt - Ansicht Mview 1:33 Section elevation 1:20

Stahlbetondecke 180mm abgehängte Gipskartondecke

BODENAUFBAU

Ateliers Ateliers Büros Offices Läden Retails Cafe Coffee shop Bibliothek Library Foyer Foyer

-3,58

Fliesen in Mörtelbett 20 mm Estrich 30 mm Trittschalldämmung 22 mm PE-Folie Stahlbetondecke 180 mm

-3,75

Unter zug h=

2,08 5

Facade cross section 1:20

Axonometry of the supporting structure Tragwerksaxonometrie

400m m

M 1:33 FASSADE Innenliegender Sonnenschutz - Rollo 2-fach Isolierverglasung 6/18/8mm Pfosten und Riegel 300/100 mm

STÜTZE Stahlbeton Ø 400mm Unter zug h=

2,08 5

Fassadenschitt

4,27 5

Pictogram functions Piktogramm Funktionen

-3,50

400m m

Grundrissplan M 1:33 SectionFassadenschitt ground- floor 1:20

TUM Faculty of Architecture

General Diploma Thesis March-July 2013

Focus Design and Construction

Chair for Intergrated Design Univ. Prof. Dipl. Ing. Dietrich Fink

Maison du Peuple


Maison d‘ Orleans

TUM Faculty of Architecture

General Diploma Thesis March-July 2013

Focus Design and Construction

Chair for Intergrated Design Univ. Prof. Dipl. Ing. Dietrich Fink

Maison du Peuple


RENATA JELENIC Architecture Graduate

renata.jelenic@yahoo.com

academic + professional PORTFOLIO

Munich, Melbourne 2013 - 2016


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.