RENATA JELENIC Architecture Graduate
renata.jelenic@yahoo.com
academic + professional PORTFOLIO
Munich, Melbourne 2013 - 2016
KEY LITTLE SAIGON PRECINCT PROJECT SCOPE LITTLE SAIGON MARKET PROPOSED BUILDING SITE PROPOSED POCKET PARK
KEY
1
3
4
5
6
LITTLE SAIGON MARKET
PROJECT SCOPE
PROPOSED BUILDING SITE
LITTLE SAIGON MARKET
PROPOSED POCKET PARK
7
8
TOP OF LIFT OVERRUN RL +38,850 ROOF RL +37,600
LEVEL 4 RL +34,600
LEVEL 4 RL +34,600
PM-01
LEVEL 3 RL +31,600
LEVEL 3 RL +31,600
PM-01
LEVEL 2 RL +28,600
LEVEL 2 RL +28,600
PM-01
PROPOSED BUILDING SITE
PM-01
LEVEL 1 RL +25,600
PROPOSED POCKET PARK
9
RF-01
ROOF RL +37,600
PROJECT SCOPE LITTLE SAIGON PRECINCT
6a
PERFORATED METAL SCREEN CLADDING. REFER TO ELEVATIONS A3.01-A3.04 AND METAL SCREEN DETAILS A8.31, A8.32 & A8.33
TOP OF LIFT OVERRUN RL +38,950
LITTLE SAIGON PRECINCT KEY
2
AB-01
AB-01
LEVEL 1 RL +25,600 CANOPY RL +24,540
GROUND RL +20,600
GROUND RL +20,600
01 1
South Elevation
A3.06
1:100
South Elevation
LITTLE SAIGON 47-61 Byron St, Footscray, VIC 3012
Client: Marybirnong City Council
Stage: for contruction
XX SPACES AVAILABLE
XX SPACES AVAILABLE
L O W C LAE RAN C E 2 . 4 M
1
North Elevation
North Elevation 1:100
West Elevation 1
LITTLE SAIGON 47-61 Byron St, Footscray, VIC 3012
West Elevation
East Elevation
East Elevation
1
1:100
Client: Marybirnong City Council
1:100
Stage: for contruction
50 X 62 'CONCEPT CLICK' EXTERIOR ALUMINIUM BATTENS POWDERCOATED TO MATCH COLOUR OF WINDOW FRAMES.
GENERAL NOTES
+4.60
50 X 62 'CONCEPT CLICK' EXTERIOR ALUMINIUM BATTENS
+4.60
FIXED TO ONTRAX TRACK SYSTEM. BATTENS
FIXED TO ONTRAX TRACK SYSTEM. BATTENS
THIS DRAWING AND DESIGN IS SUBJECT TO COPYRIGHT AND MAY NOT BE REPRODUCED WITHOUT PRIOR WRITTEN CONSENT.
POWDERCOATED TO MATCH COLOUR OF WINDOW FRAMES.
REFER TO FINISHES SCHEDULE FOR DETAILS.
REFER TO FINISHES SCHEDULE FOR DETAILS.
ALL DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO CONSTRUCTION, MANUFACTURE AND/OR INSTALLATION DO NOT SCALE FROM DRAWINGS.
COMPRESSED FIBRE CEMENT SHEET FIXED TO
COMPRESSED FIBRE CEMENT SHEET FIXED TO
ZINKALUME PARAPET CAPPING FINISHED TO MATCH FACIA
STUD WALL BEHIND. SHEET PAINTED BLACK BEFORE BATTENS ARE APPLIED. METAL DECK ROOFING AS SPECIFIED WITH INSULATION UNDER
13
90
15
300
ZINKALUME PARAPET CAPPING FINISHED TO MATCH FACIA
BEFORE BATTENS ARE APPLIED. METAL DECK ROOFING AS SPECIFIED WITH INSULATION UNDER
+4.09
FALL 1°
FLASHING
RHS 250 x 150 x 6 REFER STRUCTURAL ENG. DRAWINGS FOR STEEL MEMBER SIZE
ANY DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT.
STUD WALL BEHIND. SHEET PAINTED BLACK
13 62
600
C150-15 AT 1200 CTS
13
THE BEAM CONTINUES BEHIND THE WALL
ALL WORKS TO COMPLY WITH ALL RELEVANT AUSTRALIAN STANDARDS AND CODES OF PRACTICE. ALL WORKS TO COMPLY WITH RELEVANT MANUFACTURER'S STANDARDS AND SPECIFICATIONS UNLESS OTHERWISE NOTED.
C150-15 AT 1200 CTS
150 C PURLINS TO SUPPORT SOFFIT EAVE TOP HAT SECTIONS
STEEL TOP HAT SECTIONS
EQUITONE FIBRE CEMENT SHEETING FIXED TO STEEL MEMBERS.
+3.60 180 PFC TO SUPPORT SOFFIT EAVE TOP HAT SECTIONS
250 PFC REFER STRUCTURAL ENG. DRAWINGS FOR STEEL MEMBER SIZE TO BE HOT DIPPED GALVANIZED
STEEL TOP HAT SECTIONS
EQUITONE FIBRE CEMENT SHEETING FIXED TO STEEL MEMBERS.
250 PFC REFER STRUCTURAL ENG. DRAWINGS FOR STEEL MEMBER SIZE TO BE HOT DIPPED GALVANIZED
+3.00 RHS 250 x 150 x 6 REFER STRUCTURAL ENG. DRAWINGS FOR STEEL MEMBER SIZE
INSIDE
GENERAL NOTE : THE DRAWING TO BE READ IN CONJUNCTION WITH STRUCTURAL , CIVIL, HYDRALIC, MECHANICAL, LANDSCAPE AND FIRE SERVICES ENGINEERS DOCUMENTION .
FALL 1:100
+3.60 P50 SHADOWLINE DETAIL BETWEEN PLASTERBOARD AND WINDOW FRAME.
SUSPENDED CEILING TO BE PROVIDED BY TENANTS
REFER TO STRUCTURAL ENGINEERS DOCUMENTS FOR ALL STRUCTURAL REQUIREMENTS.
+4.09
FALL 1°
FLASHING
300
300
THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE SCHEDULES AND OTHER RELEVANT CONTRACT DOCUMENTS.
ALL WORKS TO BE CARRIED OUT IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS AND RELEVANT AUSTRALIAN STANDARDS UNLESS NOTED OTHERWISE .
+3.00
ALL DIMENSIONS TO BE CONFIRMED ON SITE.
METAL CAPPING OVER STEEL MEMBER. SAME COLOUR AND PAINT FINISH AS WINDOW FRAMES.
INSIDE
OUTSIDE
+2.75
+2.75
THRESHOLD DETAILS: PROVIDE LEVEL THRESHOLDS OR THRESHOLD RAMPS WITH A MAXIMUM RISE OF 35M M , LENGTH OF 260MM AND MAX GRADIENT OF 1:8 TO MEET AS1428.1
OUTSIDE
REFER TO DOOR DETAILS AND DOOR SCHEDULE FOR BI-FOLD DOOR SPECIFICATION
FLOOR WASTE
WHEELCHAIR ACCESSIBLE THRESHOLD
SETDOWN IN SLAB FOR TENANT FLOOR FINISH. INSTALLED BY TENANT.
1
WHEELCHAIR ACCESSIBLE THRESHOLD
STONE PAVERS FALL TO GRADE REFER FINISHES SCHEDULE
STONE PAVERS FALL TO GRADE REFER FINISHES SCHEDULE
+0.00
TYPICAL CANOPY SECTION DETAIL EASTERN FACADE
8
1:10
CANOPY SECTION DETAIL THROUGH THE DOWN PIPE EASTERN FACADE
50 X 62 'CONCEPT CLICK' EXTERIOR ALUMINIUM BATTENS FIXED TO ONTRAX TRACK SYSTEM. BATTENS POWDERCOATED TO MATCH COLOUR OF WINDOW FRAMES. REFER TO FINISHES SCHEDULE FOR DETAILS. METAL DECK ROOFING AS SPECIFIED WITH INSULATION UNDER
FLASHING
13mm PLASTERBOARD
300
+0.00
1:10
50 X 62 'CONCEPT CLICK' EXTERIOR ALUMINIUM BATTENS FIXED TO ONTRAX TRACK SYSTEM. BATTENS POWDERCOATED TO MATCH COLOUR OF WINDOW FRAMES. REFER TO FINISHES SCHEDULE FOR DETAILS.
ZINKALUME PARAPET CAPPING FINISHED TO MATCH FACIA
FLASHING CAPPING THE STEEL MEMBER
FALL 1°
REFER STRUCTURAL ENG. DRAWINGS FOR STEEL MEMBER SIZE
ALUMINIUM LOUVRES TO THE SUBSTATION. ALUMINIUM LOUVRES POWDER COATED TO MATCH COLOUR OF WINDOW FRAMES. REFER TO FINISHES SCHEDULE FOR FURTHER DETAILS.
C150-15 AT 1200 CTS 180 PFC
INSULATION AS SPECIFIED
SUSPENDED CEILING TO BE PROVIDED BY TENANTS
EQUITONE FIBRE CEMENT SHEETING FIXED TO STEEL MEMBERS.
UNEQUEL STEEL SINGLE SECTION GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.
FIXED SHOPFRONT WINDOW. SEE FINISHES SCHEDULE AND GROUND FLOOR ELEVATIONS FOR FURTHER DETAILS.
STEEL TOP HAT SECTIONS
+3.60
150 C PURLINS TO SUPPORT SOFFIT EAVE TOP HAT SECTIONS
STEEL UNEQUAL SECTION GALVANISED AND PAINTED PT03
250 PFC REFER STRUCTURAL ENG. DRAWINGS FOR STEEL MEMBER SIZE TO BE HOT DIPPED GALVANIZED
STEEL UNEQUEL SECTION WELDED TO THE STEEL SECTION. STEEL SECTIONS GALVANISED AND PAINTED PT03
LOUVRED HINGED DOORS TO THE SUBSTATION. ALUMINIUM LOUVRES POWDER COATED TO MATCH COLOUR OF WINDOW FRAMES. REFER TO DOOR SCHEDULE FOR FURTHER DETAILS.
+2.70
SHOP
SUBSTATION PERFORATED METAL PANEL
13mm PLASTERBOARD
VAPOUR BARRIER THRESHOLD AT DOOR OPENING TO MATCH PAVEMENT LEVEL.
OUTSIDE
+0.90
EQUITONE SHEET
STEEL FRAME TO HOLD EQUITONE SHEET. SEE ARCH SPECIFICATIONS FOR FURTHER DETAILS. STEEL FRAME GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.
ALL LOUVRED DOORS TO THE SUBSTATION BY 'AUSTRALIAN COMMERCIAL DOORS' O R SIMILAR APPROVED. INSTALL TO MANUFACTURERS INSTRUCTION .
+0.00
50
50mm ZONE FOR TENANTS FINISHES
2
+2.10
OUTSIDE
13 90 INSULATION AS SPECIFIED
+3.75
TYPICAL CANOPY SECTION DETAIL NORTHERN FACADE
+0.00
4
1:10
LITTLE SAIGON 47-61 Byron St, Footscray, VIC 3012
SUBSTATION SECTION DETAIL (LOUVRED DOORS)
Client: Marybirnong City Council
1:10
Stage: for contruction
13mm PLASTERBOARD
INSULATION AS SPECIFIED
SUSPENDED CEILING TO BE PROVIDED BY TENANTS
SUSPENDED CEILING TO BE PROVIDED BY TENANTS
UNEQUEL STEEL SINGLE SECTION GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.
13mm PLASTERBOARD
UNEQUEL STEEL SINGLE SECTION GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.
SUSPENDED CEILING TO BE PROVIDED BY TENANTS
STEEL FRAME TO HOLD WINDOW. SEE ARCH SPECIFICATIONS FOR FURTHER DETAILS. STEEL WINDOW FRAME GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.
P50 SHADOWLINE
VAPOUR BARRIER INSULATION AS SPECIFIED
FIXED WINDOW. SEE FINISHES SCHEDULE AND GROUND FLOOR ELEVATIONS FOR FURTHER DETAILS. INSTALLED AS PER MANUFACTURER'S INSTRUCTIONS.
DIGITALLY PRINTED GLASS PANEL (GL05)
FIXED SHOPFRONT WINDOW. SEE FINISHES SCHEDULE AND GROUND FLOOR ELEVATIONS FOR FURTHER DETAILS
SHOP
OUTSIDE
PERFORATED METAL PANEL
VAPOUR BARRIER
EQUITONE SHEET
INSULATION AS SPECIFIED
STEEL FRAME TO HOLD EQUITONE SHEET. SEE ARCH SPECIFICATIONS FOR FURTHER DETAILS. STEEL FRAME GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.
THRESHOLD AT DOOR OPENING TO MATCH PAVEMENT LEVEL.
50mm ZONE FOR TENANTS FINISHES
50mm ZONE FOR TENANTS FINISHES
EQUITONE SHEET
STEEL FRAME TO HOLD EQUITONE SHEET. SEE ARCH SPECIFICATIONS FOR FURTHER DETAILS. STEEL FRAME GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.
FACADE SECTION DETAIL FIXED SHOPFRONT WINDOW 1:10
2
PIVOT DOOR FLOOR SPRING RECESSED INTO CONCRETE SLAB.
PIVOT DOOR FLOOR SPRING AS SPECIFIED. REFER TO DOOR SCHEDULE AND HARDWARE SPECIFICATIONS. 50mm ZONE FOR TENANTS FINISHES
BLUESTONE PAVERS FALL TO GRADE REFER TO CIVIL ENG. AND LANDSCAPE DWGS
50
50 1
FLAT STEEL TO BE WELDED TO THE STEEL ANGLE
SCABBLE BACK SLAB AS NECESSARY FOR PIVOT DOOR FLOOR SPRING. 50
VAPOUR BARRIER
LOCATION FOR THE TENANT'S SIGN. SIGN TO BE PROVIDED BY TENANTS.
STEEL FRAME TO HOLD EQUITONE SHEET. SEE ARCH SPECIFICATIONS FOR FURTHER DETAILS. STEEL FRAME GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.
13mm PLASTERBOARD
THRESHOLD AT DOOR OPENING TO MATCH PAVEMENT LEVEL.
OUTSIDE
SHOP
OUTSIDE
GLAZED PIVOT DOOR AS SPECIFIED. REFER TO DOOR SCHEDULE AND ELEVATIONS.
13 90 INSULATION AS SPECIFIED
UNEQUEL STEEL ANGLE GALVANISED AND PAINTED PT03
SHOP
FACADE SECTION DETAIL DIGITALLY PRINTED GLAS 1:10
FACADE DETAIL PIVOT DOOR
3
1:10
STEEL FRAME TO HOLD EQUITONE SHEET SEE ARCH SPECIFICATIONS FOR FURTHER DETAILS. STEEL FRAME GALVANISED AND PAINTED PT03 REFER FINISHES SCHEDULE
3710 NOM. 10
120
2 X 1170 (CLEAR OPENING)
10
10
DIGITALLY PRINTED GLASS PANEL (GL05)
1,230
UNEQUEL STEEL SINGLE SECTION GALVANISED AND PAINTED PT03. REFER FINISHES SCHEDULE.
FULLY WEATHERED, VERMIN PROOF FIXED LOUVRES
FULLY WEATHERED, VERMIN PROOF FIXED LOUVRES
EQUITONE SHEET
2960 NOM. 2950 (CLEAR OPENING)
FIXED SHOPFRONT WINDOW SEE FINISHES SCHEDULE AND GROUND FLOOR ELEVATIONS FOR FURTHER DETAILS
DIGITALLY PRINTED GLASS PANEL (GL05)
4
FACADE PLAN DETAIL FIXED SHOPFRONT WINDOW 1:10
5
ACCESS DOORS TO HAVE 180O HINGES
FACADE PLAN DETAIL DIGITALLY PRINTED GLAS 1:10
FULLY WEATHERED, VERMIN PROOF FIXED LOUVRES
5
LITTLE SAIGON 47-61 Byron St, Footscray, VIC 3012
FULLY WEATHERED, VERMIN PROOF FIXED LOUVRES
SUBSTATION DOOR ELEVATION
Client: Marybirnong City Council
Scale1:20
Stage: for contruction
LITTLE SAIGON 47-61 Byron St, Footscray, VIC 3012
Client: Marybirnong City Council
Stage: for contruction
HENN Architekten
HVB-TOWER MODERNISATION, MUNICH, GERMANY
Client: HVZ GmbH & Co. Objekt KG
Construction management assistant
Einfahrtstor Sheddach-Oberlicht
531,41
531,62
531,51
531,62
531,58
531,78
531,83
n
Einfahrtstor
531,74
Baustrom Niederspannungshauptverteiler mit ungezählten Bereichen zum Anschluss eines gezählten Baustrom 3
531,79
531,83
1 8 3 2 6 /4
531,63
0
0,01 m2
1
0 531,7
A KD 531,59
531,63
531,41
531,41 531,65
2
531,63
3 2 6 /1
531,51
Sheddach-Oberlicht
e
531,94
l a
R 531,62
t r
15
2,86
2,97
10,01
A
8 5
1,63
5
89,44 m532
A
5
531,66
531,62
531,96
531,70
531,69
2,36
529,29
1,60 1,06 1,60 10,875
2,36
532,03
30
531,74
2,315
2,66
531,90
2
C
5,465
15
21,37
531,74
E 14 IPBv 400
2,66
6,92
BE Schadstoffsanierung
Bestand = 0.00
21,90
531,88
2,01 2.20
C
2,01 2.20
2,66
5 Stellplätze PKW
532,03
1,06
1,30
531,99
532,00
BE Schadstoffsanierung
2,66
1,60 10,875
1,06
531,91
2,66
1,60
531,94
1,06
3,20
531,93
531,91
135 5
5
531,94 531,94
2,36
1,10
1,30
3,38
531,78
531,83
1,30
5,16
2,36
2,66
m
ca.
60
5,12
a
G
2,36
531,83
Grünfläche Abbruch
531,82
531,83
531,86 531,81
E
531,84
531,86
531,82
Sträucher
531,92
531,86 84
531,91
B
531,89
531,88
A
531,89
Höhe: 2,00 m
IV
6
531,77
531,79
531,84
5 265
5
365
135 5
5 265
5
E
1,02
der
531,89
B = -1.72
531,75
1,60
1,60
2,835
7,42
2,66
Dixi 1,01 2.20
5
2
1,30 4,165
D
b/d = 70/30 cm
531,77
4
E 13
531,84
V
Unterzug
531,97
BE Schadstoffsanierung
Bestand = 0.00
531,97
531,86
531,83
531,75
531,86
I
AN von Parkplatz bei Bedarf durch Stadt anzumieten
D
Pflaster mit Rasenfuge Abbruch
2,11 2.20
2,36
1,01 2.20
531,99
531,93
1 8 2 7 8 /8
1,06
885 2.20
E 12 IPBv 240
2,11 2.20
0 vo .25 n H 4, 18,2 56 4 m m
2,66
531,90
2,36 30
532,08
1,30 65 1,30
531,99
532,00
5,00
E 14 IPBv 1000
3,84
6,79
6,54
21,37
1 8 3 2 6 /7
m
B
KD 531,65
1,01 2.20
8,99
,0
7
28
=
1,01 2.20
C
65
8
1
21,90
C
,0
3
532,06
115
7,42
1,60 4,05 2,45
m
H
2,835
531,64 30
1,06
i e r F
531,83
531,71
531,88
KD 531,80
m 5
531,91
V 531,88
1 8 3 3 1 /1
1
ca. 30 Fahrradstellplätze
1,01 2.20
531,87
531,87
7 4 7 2
532,08
2,36
1,60
3,20
d
531,52
50
1,04 2.20
532,02
84
5
5
265 5
531,93
531,70
365
13
e
A
7,14 m2
1,02
n
l e
531,85
1
G
Kiesstreifen Abbruch
Stahltreppe
531,85 532,01
532,01
9
531,61
531,91
21 STG 183/26
s
531,65
531,75
531,76
B
365
6,815
30
4,515
9
1,60
b
KD 531,81
9 95
18
5,98
1,335
A
7,15
ä u
l
6,28
8,21
18
9
531,85
531,64 531,61
531,70
A
2
3 531,72
531,74
531,808
R
531,68
Kabelkanal
531,68
531,81
531,80
531,79
531,77
531,81
531,85
25
0.
531,86
531,63 531,63
531,71
531,71
1
KD 531,66
531,71
531,70
531,90
e
I
A
531,71
d
Picture Friedenstr. 26
9 9 9
531,67
0
365
8,51 22,00
531,85
KD 531,87
7,875
30
6,04
531,71
e
9
531,71
e
365
531,95
96,45 m2 531,88
A
2%
9
Bauwasser Bauwasser über TG Geb. A über FROSTFREI Leitung NEU und Kernbohrung ins EG zur BE Gebäude C
7,875
30
531,94
531,99
9 9
531,62
1,50
15
531,64
a
1,51 30
Einfügepunkt
g
185
8,21 22,00
5,26 6,815
1,80
53
531,77
i s
6,28
4m
1,60
531,6
7,15
1,97 365
B
n
9
531,68
18
9
5
.
9
265 5
532,00
135
531,64
531,55
9
n
A
531,63
KD 532,01
531,62
531,65
531,72
531,65
531,76
g
531,83
531,823
V
531,70
OK Mauer 533,79
H
OK Mauer 535,11
531,82
2,00
a M
I
a
Einfahrtstor Einfahrtstor
F60 F90
EbB
2,43
5
UZ neu b/h=20/50
Ableitung
B Materialcontainer
F90
F90
2,00
F90
UZ neu b/h=15/80
Art Brandwand
2
Brandwand F90
Abw.1
F90
Tiefe 4m 1. RW
C
H
Mastleuchte Bestand Montage und Demontage an neuer Lage
E 13 b/d = 70/30 cm
1
3
5
4
7
6
9
2 18
17
16
15
14
13
12
11
UKRD +3.39 Bestand ANB OKFFB ±0.00
Fläche für Material
UKRD 5.335 NEU
der
OKFFB 1.895 NEU
OKFFB xxx
30
Ableitung
30
90
E Ableitung
ENST
83
A
B
Ableitung
Abwasser
Abwasser
Wasser 3,50
m
E
D Unterzug
2. RW 10
AN von Parkplatz bei Bedarf durch Stadt anzumieten
77
5,
RASS
Materialcontainer
Ableitung
D
Ableitung
Gebäude B
Gebäude
Tiefe 4m
F e u e r w e h r u m fa h r t
Tiefe 4m
3 Zeiler
0
1
2
3
Gebäude C
Architekten Nickl Bausback
Sight plan Education Centre Consolidation of the Education Centre Munich of the Chamber for Trade and Crafts for Munich and Upper Bavaria
2,00
E 14 IPBv 400
T-VDS
E
Gebäude nicht mehr vorhanden LaMa FRIED
Abw 1
8
= vo
Art Brandwand
Anlieferung
8m
,0
H
WC-Container
30 30
Ableitung
1 8 3 3 1 /2
m
77
5,
UKRD +3.49 Bestand ANB OKFFB ±0.00
Art Brandwand
23 n
5
2 0.
, 23
=
C
Rinne (Anschluss in Sickerschacht Bestand)
30
n
17
vo m 08
90
UKRD +3.39 Bestand ANB OKFFB ±0.00
Art Brandwand
25
0.
Gebäude A
C
1. RW
MÜHLDORFSTRASSE
E 14 IPBv 1000
C
Rinne (Anschluss in Sickergrube Neu)
Anlieferung Kurzlager
2. RW E 12 IPBv 240
2,00
5
4 ,1
Lagercontainer
T30-RS UKRD +3.39 Bestand ANB OKFFB ±0.00
90
4
25
T-VDS
Abw.1
Abw.1
BehindertenBauaufzug gerechter Zugang
1. RW
Art Brandwand
6,00
F60
T30-RS
F90
T-VDS
T-VDS
1. RW
B
F90
T-D Ableitung
Art Brandwand
Picture Roof
2. RW
F90
UKRD +3.49 Bestand ANB OKFFB ±0.00
T30 F90
T-D RWF
2,00
T30
2. RW
1 8 3 3 3
standsflächen 1:250 Site plan with distance spaces
2,00 2,00 2,00
90
A
30
Art Brandwand
F30
UKRD +3.39 Bestand ANB OKFFB ±0.00
V 23
Art Brandwand
B
H
vo
A
e
VI
m
77
5,
Umgriffsgrenze Brandschutznachweis Ableitung
Abw.1
Fliegengitter
d
=
Lüftung TG Geb. A
Ableitung
Ableitung
u
m 08
,
n
25
Bestandsdach wurde abgekürzt
Gasleitung
ä
1 8 3 3 1
0.
Einfügepunkt
20,00
B
A
b
vo
e
H
G
m
85
5,
n
5 0.2
23
5,8
=
5
=
9 ,2
6
1m
,4
5H
0.2
2m
m
1
,7
23 4
vo
4,8
17
n
vo
C
H
n
2 ,9
=
5 9,
Art Brandwand
/2
e
25
9m
7m
93
Bauwasser Bauwasser über TG Geb. A über FROSTFREI Leitung NEU und Kernbohrung ins EG zur BE Gebäude C
Umgriffsgrenze Brandschutznachweis
d
m
u
92
0.
3
2%
ä
4,
1
30
0m
1,
1,3
Sheddach-Oberlicht LM-Glas-Trennwand
b
=
3
Sheddach-Oberlicht
93
e
9m
,6
8
2
89
G
19
1
1
4,
5
83
2,
88
n
vo
!
4,
V
H
II
0
=
F
m
,24
r
n5
25
5
Baustrom Niederspannungshauptverteiler mit ungezählten Bereichen zum Anschluss eines gezählten Baustrom 3
vo
8
i
8
2,00
0.
r
5H
Fluchtweg aus TG
F e u e r w e h r u m fa h r t
L
6
Sheddach-Oberlicht
Baustelleneinrichtungen Bestand 1:100
,6
0.
!
2,00
e d u ä b e G
m 30 1, = m 24 5, n vo
H
s n
25
t
r
.
Abwasse
13
0.2
,8
3
,2
16
Sheddach-Oberlicht
r
e
Construction site equipment Demolition Wasse
d
531,74
531,77
m
13
85
4,
e
Sheddach-Oberlicht LM-Glas-Trennwand
m
H
2 5,
56
25
0.
531,81
4,
89
93
26
35
531,81 531,83
=
4,
m
=
82
7m
5,
,5
=
19 5
42
3,
,4
m
30
1,
4m
n
vo
v
12
n vo
=
4m
,2
H 9m 25 3,2 0. n 2
vo
H
2
H
5
vo
5 0.2
2 3,
84
H
9,5
1 on
3,
n
25
0.
=
=
4,
25
9m
7m
m
82
5,
0.
m
9 4,8
89
18
!
n
vo
93 !
2
a
531,62
Construction site equipment New Project Phase III_Conversion and Modernisation of Building C
BAUSBACK ARCHITEKTEN
B
A
21 STG 183/26
Einfügepunkt
2%
2%
A
2%
Bauwasser Bauwasser über TG Geb. A über FROSTFREI Leitung NEU und Kernbohrung ins EG zur BE Gebäude C
B
A R
Lüftung TG Geb. A
A
Einfügepunkt
Stahltreppe
Putzraum 4,3m2
Büro Reimann (Büro Kantine) 12,3m2
Kantine Ausgabe 43,1m2
Vorraum ILT-Verteiler 5,1m2
Schacht 3,4m2
WC Da 2,8m2
Küche Kantine 34,5m2
2
WC Beh. 5,9m2
UZ neu b/h=20/50
Flur 9,1m2
UZ neu b/h=15/80
WC He 4,9m2
ca. 30 Fahrradstellplätze
Speisesaal 1, 92 Plätze 123,7m2
C Windfang 4,9m2
C
C
Eingang (notwendiger Flur) 82,6m2
C
5 Stellplätze PKW
Treppenraum u. Aufzug, Anlieferung (notwendiger Treppenraum) 35,5m2
Speisesaal 2, Besprechung 48,5m2
32 Sitzplätze
B
A
B
A
Höhe: 2,00 m
81 Sitzplätze
LKW 7,5 t / 12 t (bxlxh) 6 x 2,45 x 3m
LKW 3,5 t (lxbxh) 6,55x2,37 x 2,13m
LKW 7,5 t / 12 t (bxlxh) 6 x 2,45 x 3m
LKW 3,5 t (lxbxh) 6,55x2,37 x 2,13m
LKW 7,5 t / 12 t (bxlxh) 6 x 2,45 x 3m
LKW 3,5 t (lxbxh) 6,55x2,37 x 2,13m
A A
0
Ground floor plan Demolition
Ground floor plan New Büro Reimann (Büro Kantine)
1 WC Herren
Putzraum
C 0.06
C 0.05
12,30 qm
2
WC Damen
C 0.07a
WC Behinderte
C 0.07b
4,90 qm
4,30 qm
Flur
C 0.07c
2,80 qm
43,10 qm
34,50 qm
Decke
Decke
Decke
Decke
Decke
Decke
Decke
BEG F3_F10
BEG F3_F10
BEG F3_F10
BEG F3_R10
BEG S1_F9
BEG F1_F12
Wand
Wand Wand
Wand
Wand
Wand
Wand
Wand
Wand
Wand
Wand
Wand
Wand
Wand
Wand
Wand
BEG F2_R12 Wand
Wand Wand
Wand
Ground floor plan seating meeting
C 0.10
C 0.09
9,10 qm
Decke
BEG L1_k.A.
Wand
Kantine Ausgabe
Küche Kantine
C 0.04
5,90 qm
A
Baustrom Niederspannungshauptverteiler mit ungezählten Bereichen zum Anschluss eines gezählten Baustrom 3
A
Wand
Wand
Wand
Wand
Wand
Wand
Wand
Wand
Wand
Wand
Wand
+3,41
+3,41
+3,41
+3,41
+3,41
+3,41
+3,53
+3,38
+3,09
+2,59
+2,59
+2,59
+2,59
+2,59
+2,69
+2,69
+0,00
+0,00
+0,00
+0,00
+0,00
+0,00
+0,00
+0,00
-0,15
-0,15
-0,15
-0,15
-0,15
-0,15
-0,079
-0,08
Sheddach-Oberlicht LM-Glas-Trennwand
Pausenplatz
Floor covering
2%
Bodenbelag
REFLECTED CEILING PLAN ANB
22
21
20
19
OKFFB -0.15 NEU
UKRD +3.49 NEU OKFFB -0.09 NEU
11 STG 17.6/32
UPN 240
Einfügepunkt
B
Umbau
Dac
A 11 STG 17.6/32
Lichte Laufbreite 1,20m
Fundament Stütze l / b / h = 60 / 60 / ca. 125 cm OK=30 cm über OK Gelände
UKRD +1.56 NEU
A neu
Bestandsdach wurde abgekürzt
Außen
Abw.1 Fliegengitter
Fliesen Kleinformat 2,5 x 2,5
120°
l/b/t= 12/8/1 cm
Art Brandwand HLS 1
Rollo
F90
4,3m2
80
VORBEREITUNG
Rollo
BE DN100
penANLIEFERUNG
F90
80
Option 3
Neue Fläche 42,21 m2
F90
Option 1
Option 1
Demontage Fahrradständer neue Lage noch zu überprüfen
Brandwand F90
2
Brandwand
1. RW
Art Brandwand Option Verzug vom 1.OG
Abw.1
Abw.1
ELT 2
F90
ß
decke
Rippen
EU
DS
hN ac sd Gla
Rinne
C
UKRD +3.39 Bestand ANB
2%
Sauberlaufmatte
E 14 IPBv 400
E 14 IPBv 1000
Fluchtweg für Speisesaalbesucher
OKFFB ±0.00
80,9m2
Rinne
Bodenrinnen Ablauf
Deckensprung = Splitlevel ceiling
X 30
Facade edges keep at least 40cm deep
Plasterboard-acoustic ceiling (partially sealed installation)
Kitchen ventilating ceiling
Ceiling acoustic sail (partially sealed installation)
Rinne (Anschluss in Sickerschacht Bestand)
Unterzug Bestand
Unterzug Bestand
Rollo alternative Lage Rollo
Abw 1
1. RW
TS Einspeisung
C 0.01 Treppenraum u. Aufzug, Anlieferung (notwendiger Treppenraum)
Rollo
ke
Fassadenbuchstaben Bestand an Wand Eingang als Gestaltungselement
Art Brandwand
Grid luminaire square/round mounting Mounting linear luminaire wall vertical Mounting linear luminaire wall horizontal
ec pend
55
Rip
30
Lino
Art Brandwand
65
Linear luminaire mounting
Hygiene acousticsystem-ceiling grid (Ecophone Foodtec AC3)
Ceiling cavity till lower edge suspended ceiling (cm)
Sauberlaufmatte
DS
ZUGANG
C
A neu 2. RW
123,7m2
50
E 12 IPBv 240
C 0.02 Eingang (notwendiger Flur)
4,9m2
Rinne (Anschluss in Sickergrube Neu)
C
DS
C 0.11 Speisesaal 1, 90 Plätze 1. RW
Decke F90
C 0.03 Windfang
Grid luminaire square/round installation
rma
nde
OKFFB ±0.00
Behindertengerechter Zugang
ELECTRO NEW ANB
Hygiene acousticsystem-ceiling grid (Ecophone Foodtec AC4)
REFLECTED CEILING PLAN ANB
Windfang
UKRD +3.39 Bestand ANB
C
ELT Bodenkanäle
So
Notausgang
1. RW
Art Brandwand
Abw.1
Automatiktür
F90
Fliesen Kleinformat 2,5 x 2,5
ELT 1
Kitchen ventilating ceiling
Linear luminaire installation
Abtrennung Ausgabe zu Speisesaal Option 1 - Schiebetür Option 2 - Rollelement aus der Decke Option 3 - einfache Drehtür mit Offenhaltung
Rollo
Neue Fläche 123,74 m2
F90
Tor
Linoleum
Öffnungssperre
Option 2
Abtrennung Ausgabe zu Speisesaal Option 1 - Schiebetür Option 2 - Rollelement aus der Decke Option 3 - einfache Drehtür mit Offenhaltung
3,4m2
Schacht
Lino
DS
DS Option 2
34,4 m2
Rollo
alternative Lage Rollo
F90
OKFFB ±0.00
F90
HLS 4 (1,11x3,195) bis zum 5.OG
6,0 m2
50
C 0.10 Kantine Ausgabe 42,8 m2
F90
UZ neu b/h=20/50
F90
F90
UKRD +3.39 Bestand ANB
kein Gefälle im Boden
C 0.07c WC Beh.
5,0 m2
80
SPÜLKÜCHE
C 0.09 Küche Kantine
Demontage Fahrradständer neue Lage noch zu überprüfen
HLS 5 (1,11x0,585) bis zum 5.OG F90
BE DN100
HLS 3 (2,66 x0,125)
C 0.08 Vorraum ILT-Verteiler
80
OKFFB ±0.00
ELT
Neue Fläche 6,15 m2
F90
Option 3
2,9 m2
BA
UZ neu b/h=15/80
HLS 2 (1,125 x0,125)
Kiesstreifen
Rollo
Neue Fläche 2,45 m2
UKRD +3.49 Bestand ANB
F90
9,0 m2
2. RW
85x150
C 0.07b WC Da
keep at least 40cm deep
UND LAGERUNG
C 0.04 Flur
C 0.07a WC He
RWF 2. RW
Porcelain stoneware Facade edges 30
Öffnungssperre
85x150
4,8 m2
B
BE DN100
80
Rip ung rstärk ten un 0 Ve M1 e von deck
12,3m2
Bodenbelag Funktionsfliesen
Feinsteinzeug
kein Gefälle im Boden
BE DN100
2. RW C 0.06 Büro Reimann (Büro Kantine)
edge suspended ceiling (cm)
F90
ELT
F30 ELT C 0.05 Putzraum
Deckensprung = Split-
level ceiling Tiles Ceiling cavity till lower Small format 2,5x2,5cm X
Ansaugung Lüftung
EbB
Feinsteinzeug
DS
NEU
Durchgang
UPN 240
Kiesstreifen
A
über UG
1
2
3
4
10
6
5
11
7
9
8
Decke
120°
Functional tiles
LaMa-Gebäude
18
12
15
16
14
13
Rohbau
Stahlkonstruktion
17
A
B
Fluchttreppe neu
Fundament Stütze l / b / h = 60 / 60 / ca. 125 cm OK=30 cm über OK Gelände
h Bes
tand
Bauwasser Bauwasser über TG Geb. A über FROSTFREI Leitung NEU und Kernbohrung Funktionsfliesen ins EG zur BE Gebäude C
Pendandt luminaire E
Ceiling-Electrants
D
Lichte Laufbreite 1,20m Aufzug und Treppe NEU
Unterzug
VK Treppe
6 7 8 9
VK Treppe
OKFFB 1.89 NEU
Sichtbeton
Sichtbeton
Zwisch
enp
OKFFB ±0.00
st
TS
TS = Trockensteigleitung HLS 6 Kellerwand
A
B
A
A neu
Anlieferung
rda
chu
2%
ng
A neu
Dach Anlieferung
Dach Anlieferung
UK Dach +5.00
2%
Plasterboard-acoustic ceiling (partially sealed installation)
Reinforcement of the ribbed slab from below, by concreting of ribbs
Ceiling acoustic sail (partially sealed installation)
Plasterboard ceiling directly beneath the acoustic ceiling
Toranlage bereits vorhanden
+3,40
+3,14
+3,14
+2,89
+3,09/+2,89
Wand
Wand
Ceiling outlet for luminaire 360° motion detector Escape route pictogram
Wand
Wand
Wand
Wand
Wand
Wand
Wand
BEG S1_R9
BEG S1_R9
BEG S1_R9
BEG S1
Decke
4,90 qm
Decke
Decke
5,10 qm
82,60 qm
Decke
Decke
48,50 qm
C 0.08
C 0.02
C 0.12
Vorraum ILT-Verteiler
Eingang
Speisesaal 2, Besprechung
C 0.01
C 0.11
No suspended ceiling (plaster and coating)
Speisesaal 1
Treppenraum, Aufzug, Anlieferur
1
Legend floor covering, reflected ceiling plan and electrical installations
Decke 123,70 qm
35,50 qm
C 0.03
Plasterboard ceiling
2%
Wand
Wand
BEG L1_k.A.
Windfang
2
3 Müllplatz
Consolidation of the Education Centre Munich of the Chamber for Trade and Crafts for Munich and Upper Bavaria Pflanzfläche freiwachsene Sträucher
RLT-Element = ventilation technology element visible
-0,08 Wand Wand
Wand
BEG S1
Ground floor plan reflected ceiling plan 0
KLT-Element = cooling system element visible
+0,00
Wand Wand
KLT + RLT New
+2,89
-0,03
Wand Wand
+3,39
--+0,00
-0,08
Wand Wand
+3,48
+0,00
-0,04
Wand Wand
+2,99
+0,00
-0,17
-0,04
+3,39
+3,09/+2,89
+0,00
+0,00
Wand Wand
LKW 7,5 t / 12 t (bxlxh) 6 x 2,45 x 3m
VK Vordach
Müllplatz
Architekten Nickl Bausback
No suspended ceiling (plaster and coating)
Sträucher
ode
LKW 3,5 t (lxbxh) 6,55x2,37 x 2,13m
Ground floor plan floor covering
Hygiene acousticsystem-ceiling grid (Ecophone Foodtec AC3)
Inspection flap 40 x 40cm
Anlieferpodest UKRD 5.34 NEU
Übe
2%
Kiesstreifen
Rollo
Sichtbeton
10
Rinne (Anschluss in Sickerschacht Bestand)
2%
Mastleuchte Bestand Montage und Demontage an neuer Lage
VK Treppe
E
10 STG 18.05/29
12
alternative Lage Rollo
Rollo st
Neulage der Fahradständer aus dem Hinterhof
ode
13
11
Plasterboard ceiling
Aufzug
5
14
Antrittstufe
Hygiene acousticsystem-ceiling grid (Ecophone Foodtec AC4)
4
15 10 STG 17.75/29
b/d = 70/30 cm
Art Brandwand
40
OKFFB ±0.00
enp
Art Brandwand
UKRD +3.39 Bestand ANB
Zwisch
3
16
ca. 24 Fahrradstellplätze
E 13
1 2
VK Treppe
Aufzug
Antrittstufe
17
Bestandsputz 2 cm
Rollo
ca. 24 Fahrradstellplätze
VK Treppe
18 VK Treppe
lichter Durchgang min. 60cm
19
2. RW
Rollo
Sichtbeton
Fluchtfenster
B
Aufzug und Treppe NEU
Bestandsputz 2 cm
36,7 m2
C 0.12 Speisesaal 2, Besprechung 30 Sitzplätze 48,5m2
Pflanzfläche freiwachsene Sträucher
Reinforcement of the ribbed slab from below, by concreting of ribbs Plasterboard ceiling
Project Phase III_Conversion and Modernisation of Building C
Dachzentrale Neu 8,5%
8,5%
5.OG Öffnung nach Angabe BDH
Öffnung nach Angabe BDH
4.OG
Technik
5.OG
Technik
2,7%
2,7%
2%
2%
5.OG
Technik
4.OG
ZBV
3.OG
Flur
2.OG
4.OG
ZBV
3.OG
Ausbilder Büro
2.OG
Ausbilder Büro
1.OG
Flur
Ausbilderbüro
EG
Fleischwerkstatt
Fleischwerkstatt Küche
3.OG
UG
Section C-C Demolition
Flur
Ausbilderbüro
Schnitt C - C 1:50
OK Attika +19.78 Bestand
Feinbäcker
Gastronomiebereich
2.OG
Feinbäcker
OK Attika +19.75 Bestand
5.OG
OKFFB +18.77
5.OG
8
OKRD +18.69 ?
UKRD +18.38 IB Trost
UKRD +18.37 IB Trost
3,745
UKRD +18.37 IB Trost
UKRD +18.35 IB Trost
3,355
UKRD +18.37 IB Trost
23
UKRD +18.37 IB Trost
Flur
Bäcker
Lager OKRD +14.99 IB Trost
OKFFB +15.025 ANB
OKRD +14.98 IB Trost
OKRD +14.97 IB Trost
OKRD +14.96 IB Trost
OKRD +14.94 ANB
4.OG
1.OG
UKRD +14.65 IB Trost
UKRD +14.90 IB Trost
23
9
55
OKRD +14.99 IB Trost
65
4.OG
UKRD +14.87 IB Trost UKRD +14.64 IB Trost
29
UKRD +14.63 IB Trost
3.OG
OKRD +11.23 IB Trost
OKFFB +11.31 ANB
OKRD +11.22 IB Trost
OKRD +11.21 IB Trost
OKRD +11.21 IB Trost
Vordach
1.OG
Bäcker
3.OG
7
29
10
G 17/
10
ST
LaMa-Gebäude
Lager
3,715
Öffnung Bestand 1,68x 2,20m - 2,24m auf OKFF BS
G 17/
ST
3,33
11
11
UKRD +10.89 IB Trost
UKRD +10.89 IB Trost
OKRD +7.47 IB Trost OKRD +7.47 IB Trost
OKFFB +7.52 ANB
OKRD +7.46 IB Trost
UKRD +7.13 IB Trost
UKRD +7.13 IB Trost
3,41
1.OG
1/2
9
OKFFB +3.74 ?
OKRD 3.73 IB Trost
OKFFB +3.78 ANB
OKRD 3.73 IB Trost
UKRD +3.39 IB Trost
UKRD +3.65 IB Trost
UKRD +3.63 IB Trost UKRD +3.36 IB Trost
UKRD +3.36 IB Trost
Eingang
EG
Kantine
UKRD +3.38 IB Trost
KG
Umkleide Ausbilder
KG
HLS
LaMa-Gebäude
LaMa-Gebäude
Toranlage, bereits vorhanden
Schranke
3,78
G 17.
ST
EG
1.OG
OKRD +3.72 IB Trost
OKRD +3.72 IB Trost
9
2/2
11
Toranlage, bereits vorhanden
Speisesaal
OK Attika +5.24
9
G 17.
Eingang
25
ST
6
11
2.OG
Öffnung Bestand 1,68x 2,20m - 2,24m auf OKFF BS
ST
3,41
G 17.
Windfang
OKRD +7.47 IB Trost
UKRD +7.39 IB Trost UKRD +7.12 IB Trost
9
1/2
11
Ansaugung Lüftung NEU
3,79
3,42
2.OG
04/ 29
8
G 17.
26
ST
5
11
Windfang Innen Optional
Öffnung Bestand 1,68x 2,20m - 2,24m auf OKFF BS
ST
3,74
G 17.
25
UKRD +11.21 IB Trost UKRD +10.87 IB Trost
29
04/
11
Schranke ST
EG
2/2
9
OKRD -0.08 IB Trost
OKG -0.14 BS
OKRD -0.10 ANB
OKFFB ±0.00 ANB
OKRD -0.09 IB Trost
3,55 3,72
3,17
AUFZUG
11
OKG -0.38 (?) BS
Lüftung
ST
3,12
10
OKG -0.15 BS
UKRD -0.57 IB Trost
3/2
G 16.
OKRD -0.08 IB Trost
UKRD -0.40 ANB
OKG -0.29
9
7,67
G 17.
ST
G 17
.4/29
OKFFB -3.57 oder -3.55 alte Vermutung u jetzt?
OKRD -3.57
OKRD -3.60
OKFFB -3.66
OKRD -3.68 ANB
OKFFB -3.96 ?
OKFFB -3.96 ? OKRD -4.29
UKRD -3.98 ANB
OKRD -3.71
OKFFB -3.67
OKRD -3.73
VORABZUG
11
UKRD -4.00 ANB UKF -4.58 ANB
UKRD -4.60
UKF -4.96 ANB
Schnitt B - B 1:50
Schnitt A - A 1:50
Section A-A Demolition
Section B-B Demolition
Section C-C New
Dachzentrale Neu
Technik
5.OG
Abdichtung
Technik
4,6%
3,1%
4,1%
3,1%
5.OG
Technik
4.OG
ZBV
4,5%
3%
3,3%
4,1%
ZBV
TS = Trockensteigleitung
4.OG
Aufzug
28 STG 16.78/29
/29 Öffnung Bestand 1,68x 2,20m - 2,24m auf OKFF BS
Rohrbahn
22 STG 17.1/29 Tiefkühlbereich
Ausbilder Kabine
Rohrbahn C 3.13 Fleischwerkstatt
Kühlzelle
Leinwand
16.9
G
ST
11
UK abgehängte Decke
Räucherofen
3.OG
11
ST
G
Metzger
16.9
/29
3.OG
Fleischwerkstatt Küche
2.OG
Feinbäcker
/29
11
17.1
G
Öffnung Bestand 1,68x 2,20m - 2,24m auf OKFF BS
ST
22 STG 17.1/29 Spülbereich
2.OG
11
Feinbäcker
ST
G
17.1
/29
Feinbäcker + Gastrobereich
/29
17.1
G
ST
11
Öffnung Bestand 1,68x 2,20m - 2,24m auf OKFF BS
22 STG 17.1/29 Bäcker
Bäcker
LaMa-Gebäude
ST
G
17.1
TS = Trockensteigleitung
1.OG
11
/29
Wartungsebene NEU
Bäcker
/29
Toranlage, bereits vorhanden
17.2
G
ST
11
Müllplatz Eingang
Schranke
EG
1.OG
Spülküche
Toranlage, bereits vorhanden Anlieferung
Speisesaal groß
Essenausgabe
Schranke
Anlieferung
LaMa-Gebäude
Küche Durchgang neu
22 STG 17.2/29
11
Kantine
EG
ST
G
Podest Anlieferung
17.2
/29
Kantine 1,70 m2
1,03 m2
45°
5 /29
45°
.7
10
76,4°
G
ST
17
54,6°
Tiefgarage 10
KG
ST
Lager/ Abstellraum
G
18
.0 5 /29
OKFFB -3.66
KG
ELT
HLS Anschlussraum
HLS Zentrale Ausgang TG Gebäude A
Tiefgarage
HLS, ZBV
OKRD -3.71
Aufzug Unterfundament
Section A-A New Architekten Nickl Bausback
Section B-B New Consolidation of the Education Centre Munich of the Chamber for Trade and Crafts for Munich and Upper Bavaria
Project Phase III_Conversion and Modernisation of Building C
3,87
5
F90
10
89
Architekten Nickl Bausback
50
965
Tragwand Mauerwerk Bestand
Stütze Stb NEU
2,135
2,135
50 50
20
Brandwand
80
65
Schacht
5
17
Brandwand
2,795
30
465
25
Gehwegplatte
3,1% T1 +18.81
HLS 4 175
30
OK Dach+18.91
3,1% +18.70
HLS 5
4.OG
3,195
175
585
115
3,175
18
F90
F30
30
F90
50
Mauerwerk NEU
1,135 2,135
F90
11,5cm
F90
3,15 2,135
Schacht HLS 4
Mauerwerk NEU 11,5cm
HLS 5
C 1.08
1.OG
Putzraum
F90
30 F90
2,135
50
Stütze Stb NEU 20x30
ELT 2
3,35
3,36
2,97
3,36
3,36
3,76
Türöffnung NEU
F90
Stütze Stb NEU 20x30
F90
Flur (notwend. Flur)
2,87
4,195 3,08
815
40
47
1,63 2,48
3,12 3,40
50
F90
7
5
12
5
24
Schacht HLS 4 3,21
Leichtwand NEU 12,5cm
EG
4
80
30
F90
24
41
2,84 5
F90
UKRD +3.49 ANB
ELT 2
Vorbereitung
UKRD +3.49 ANB 65
Rippendecke Rippe h=21cm, b=12com, Platte h=10cm, Achsabstand Rippen 50cm
F90
40
F90
50
9 11 80
10
21 10
31 5 29
F90 75
5
U 20 x 50cm Überzug NE
9
9
96
60
31 29
15
F90 UKRD +7.25 ANB
2,135
65
F90
545
F90
24
UKRD +7.25 ANB
F90
F90
5 abgehängte Decke 11
F90
10
7
31
31
40
41
05
05
05 19 21 39
21
U 20 x 50cm
Überzug NE
Anlieferung
30
3,4m2
2.OG
175 75
HLS 515
115
2,995
18
18
30 15
HLS 5
Section E-E | 1:25
Bestandsöffnung DD neu
30 24
1,01
1,365
175
5.OG
5
ELT aus EG
Basement | 1:50
3,205
30
ELT 2
125
2,75
l.D. min 105
TC -1.01-1 T30-RS
EG
7,89
175
ELT aus EG
Art Brandwand
10
Schacht
885 2,135 TC -1.01-5 T30-RS
9
1,01 2,125
2,9 m2
Stütze
10
25
TC -1.01-6
875 125 2,125
TC -1.10d-1
UKRD +3.59
abgehängte Decke
30
10
10 8 TC -1.07-1 l.D. min 85cm
1,07
1,10
TC -1.10c-1 l.D. min 80cm
2,655
40
475 885 2,135 65 1,455 145
24
85x150
C -1.10d WC Kantine
A 25
60
F 1,12 10 5,6 m2
Rippendecke BS
HLS 4 (1,07x3,20) aus dem EG
875 2,125
C -1.10c Umkleide Kantine DA
3,27 2,845
4,035
1.OG
F90
HLS 5 (1,07x0,575) aus dem EG
10
4,645
30 6 24 425
B
C
30
97
TC -1.10c-2 110
3,07 3,25
Section F-F | 1:25
Überzug Stb NEU 15 x 96cm
30
C -1.12 ELT Verteiler 1,20qm
10
25
49
21 5
Vorsatzschale Verstärkung der Rippendecke über UG
TC 0.02-2 T30-RS S
10
TC -1.10b-1 TC -1.10b-2
10 8
30
875 125 2,135
F90
F90
Stahlbeton NEU 20cm
1,185
TC -1.01-7
1,66
OKFFB -3.55 NEU
70x70
UKRD -0.25 Bestand ANB
2,73 1,895
30
abgehängte Decke
Leichtwand NEU 12,5cm
5,32
F90
165
52
76
F90
1,01 2,125
3,0 m2
2%
Gefälle
10
Gefälle
BA
Aufsatz Dusche
2%
105X105
69
49
5
Flur
69
125 125
10 9 5 0
60 10
96
40 2,76
Option 3
24 30
ELT 2
1,66
1cm Versatz
2% Gefälle
l.D. min 85cm
Stütze
2,235
80
38
Abdichtung
C 1.07a
Mauerwerk NEU 11,5cm
Brandwand F90
6 2
Brandwand
1,045
Ground floor | 1:50 C -1.10b Dusche Kantine
Stütze
16
38 2,39
5
C 1.02
WC Azubi H
G
I
H
1,135 2,135
Abtrennung Ausgabe zu Speisesaal Option 1 - Schiebetür Option 2 - Rollelement aus der Decke Option 3 - einfache Drehtür mit Offenhaltung
30
36
24
1. RW
3,4m2
Schacht
3,61
F90
2,49
31
F90 F90
3,195
F90
3,30
Option 2
D
F90
UKRD +7.35 Rippendecke Rippe h=21cm, b=12com, Platte h=10cm, Achsabstand Rippen 50cm
HLS 4 (1,11x3,195) bis zum 5.OG
F90
43
15
175 175
F90
I 125
ELT 1
Option Verzug vom 1.OG
1,01 2,135
25
10 25
38
12
275
1,11
Bodenaufbau 1.-2.OG h = 9cm Bodenaufbau 3.OG h = 9,5cm
2.OG 31
1,01 2,135
125 F90 F90
UZ neu b/h=20/50
HLS 3 (2,66 x0,12 ) F90
Abw.1
Mauerwerk NEU 11,5cm
6
11
12
F90
4.OG
Überzug Stb NEU 15 x 96cm
3,70 UKRD +3.49 Bestand ANB
125 3,985
F90
HLS 5 (1,11x0,585) bis zum 5.OG
OKFFB ±0.00
UZ neu b/h=15/80
F90
F90 OKFFB ±0.00
UKRD +3.39 Bestand ANB
HLS 2 (1,125 x0,125)
125
5
Art Brandwand
Massivdecke NEU h=20cm
EG
5,495
5,14
NEU
5
12
Mauerwerk NEU 11,5cm
Stütze Stb NEU
1,99
25 5
20 3,26 2,135
F90
1,00 72
12
Türöffnung BS wird zugemauert Mauerwerk
12
20
20
41 3,35
50
20 25 5
Estrich nur Option
75
BE DN100
34,4 m2
TC 0.09-1 T-30-RS
30
TC 0.04-1 T-VDS
1,26
10
18 18
5
31 1,01 2,135
2. RW
SPÜLKÜCHE
5
6
F90
VORBEREITUNG
C 0.09 Küche Kantine
5
F90
30 30 U 20 x 50cm
4,57 25
5.OG
Stb Aufkantung b/h = 15/25 cm
5
F90
ELT
2,59
G
F
H F90
165
BE DN100
kein Gefälle im Boden
125
Türöffnung BS wird zugemauert Mauerwerk
Brandwand
F
1,07
3,87
90
E
BE DN100
3,07
5,38 15
Rippendecke BS
ANLIEFERUNG
D
1,10
50 F90
60
2. RW
B
2,75
18 185
30 15
HLS 4
90
F90
2
F90
Überzug NE
120°
TC 0.09-3
25 1,01 2,135 9,0 m
5
1,11
2
Estrich nur Option
TC 0.09-2 T-30 UND LAGERUNG
C 0.04 Flur
30
abgehängte Decke 5
UKRD +18.59
E
315
80
20
5,88
TC 0.10-1 T-30
33
95
25 05 20 3,76 2,97
3,92
UG
275
Stb Aufkantung b/h = 275/25 cm
F30 HLS 1
TC -1.08-1
5
1,335
F30
5
9
60 20 5
80
F90
1,05
1
30
Abw.1 Fliegengitter
BE DN100
Mauerwerk NEU 11,5cm
Section D-D | 1:25
G
2
1
2
3
4
5
6
85
625
1,16
2
A
Schacht HLS 4
50
15
1,26 2,24 BESTAND 7
8
40
Leichtwand NEU 12,5cm
30
25
15
Bürstenvorricht. f. Schuhe
UPN 240
1,11
ELT 2
30
Ertüchtigung der Decke über 1.OG mit Lamellen
ELT
115
abgehängte Decke
F90
ELT 2 0,3x ca.1,11m
Characteristic floor | 1:50 1 9
35
F90 Schacht
3,07
3,195 F90
175 1,645
85
50
15
115
10
15
15
21
2,845
F90
Massivdecke NEU h=20cm
F90
D
TC 2.02-1 T-D S
l.D. min 85
4,405
25
2
30
115
125
1,00
F30
15 285 24
30
F30
15 285
F30
H
F30
Wandgarderobe
ELT 1 2,845x30
F30
F90
1.OG
Rippendecke Rippe h=21cm, b=12com, Platte h=10cm, Achsabstand Rippen 50cm
18
Stb Balken NEU 17,5 x 20cm bxh
30
115
F90
15
Stb Stütze Neu 20 x 30cm
975
1,145
F90
85x150
Mauerwerk NEU 11,5cm
UKRD +3.59
UKRD +3.49 ANB
Spüllküche
1,11
TC 2.02-4 T90
F90
Überzug Stb NEU 15 x 85cm
Massivdecke h=20cm
EG
HLS 4 (1,11x3,195) bis zum 5.OG
15
TC 2.07a-2
Toilettenpapierspender
HLS 3 5 (3,02 x0,60) bis zum 5.OG
5 30 12
2,795
U 20 x 50cm
Überzug NE
F90
Mauerwerk NEU 11,5cm
abgehängte Decke
Stb Stütze Neu 20 x 30cm
885 2,135
885 2,125
F90
1,025 3,9 m2
175
Stb Balken NEU 17,5 x 20cm bxh
TC 2.07a-1 T-D
75 10 2,125
Papierrollenspender
45
UKRD +3.49
F90
625
F90
Verstärkung der Rippendecke über 1.OG
535
30
2.OG
F90
HLS 4
20
775
F90
HLS 5 (1,11x0,585) bis zum 5.OG
975
4,195
3,4m2
45
C 2.07a WC Azubi Da
D
E Rippendecke BS
885
1,21
Rippendecke Rippe h=21cm, b=12com, Platte h=10cm, Achsabstand Rippen 50cm
525
F90
F90
F90
Überzug Stb NEU 15 x 85cm
30
625
F30
33
45
Seifenspender
F90
585
2. Rettungsweg
885 2,125
55
TC 2.07b-1 T-D
Seifenspender
F90
175
55
Massivdecke NEU
45 Papierrollenspender
1,32
1,18
1,85
15
75 10 2,125
15
F90
1,025
F90
TC 2.07b-2
6,5 m2
75
45
7,215
115
2,995 35
115
165
B
15
F30
C 2.07b WC Azubi He
45
F90
F90
HLS 2 (2,64 x0,60) bis zum 5.OG
Stb ÜZ NEU 1,10/30/40cm l/b/h
1,645 15
30
T-RS
1.OG
Brandwand
115 15
Neue Fläche 5,39 m2
17
75
15
2.50m/2.00m
3,4m2
TC 2.02-5 T30
625
85x150
Überzug Stb NEU 15x 96cm 1,875
Kühlraum C 2.08 Putzraum
F90
165
60
365
F Toilettenpapierspender
Rippendecke NEU
4,195 Stb Überzug 50x20 /hxb 1,21 30
55
F90
E
Papierrollenspender
Mauerwerk 11,5cm NEU
Überzug BS l/b/h = 110/30/40 cm
ELT
Decke bleibt
2,2 m2
85x150 Toilettenpapierspender
F90
1,01 2,135
40
F90
lichter Durchgang min. 105
Stahlbeton NEU 20cm
Art Brandwand
525
UKRD +7.35
abgehängte Decke
Stütze Stb NEU 20 x 24cm
2,13
165
39 TC 2.07c T-D C 2.07c WC Ausbilder
75
Seifenspender
? F90 ?
Stb ÜZ NEU 1,10/30/40cm l/b/h
55
HLS 1 bis zum 5.OG
76 10 2,125
25
HLS 1
2,87
G
1
2
3
4
H
5
6
7
8
l.D. min 105
9
T-RS
1,135
125
1,20
F90 UKRD +7.25 ANB
Flur
WC Azubi D
Mauerwerk NEU 11,5cm
HLS 3
1,01
Mauerwerk NEU 11,5cm
2 120°
A
C 1.07a
Vorsatzschale
F90 Schacht
F
G
H
5 Floor | M 1:50
75
HLS 5
abgehängte Decke
th
1
155
60
30
ELT 2 0,3x ca.1,11m
Massivdecke h=20cm
UKRD +7.35
1,11 275 ELT 2 Schacht ist im 5.OG 7cm kürzer wg. Stb Aufkantung; mit IBS abgestimmt
25
21
15
20
05
STB Aufkantung für Stütze l/b/h 25/25/25
25
3,87
1,26
F90
4.OG
HLS 5
3,07
Bodenaufbau 1.-2.OG h = 9cm Bodenaufbau 3.OG h = 9,5cm (z. Z. höher)
5
17
5
15
25
60 1,025
115 15 15 7
1,645
F90
175 30
15
25
25
25 275
45
2.OG
HLS 3
STB Aufkantung für Stütze l/b/h 25/25/25
6
+18.70
F90
Überzug Stb NEU 15 x 85cm
60 85
D
4
Abdichtung auf Rohdecke( Estrich nur Option)
4,57
3,26
1,875
5
T1 +18.81
Stütze Stb NEU
25
75
Überzug BS l/b/h = 110/30/40 cm
4,57
3,19
35 165
5.OG
25
3,1%
OK Dach+18.91
Estrich 1% Gefälle
Massivdecke h=20cm
4.OG
29
17 Kamin
25
115
Gehwegplatte
3,1%
Estrich nur Option
UKRD +18.49
75
275
1,11
5,14
Rippendecke BS
5
STB Aufkantung h 25
3,195
HLS 4 (1,11x3,195) bis zum 5.OG
75
20
225 5
STB Aufkantung für Stahl-Stütze l/b/h 25/25/25
1,50 STB Aufkantung 2.10 im Bereich Tür durchlaufend
5.OG
25 50
25
475 STB Aufkantung h 25
3,995 3,025
STB Aufkantung h 25
3,785
1,065
E
15
STB Aufkantung h 25
D
175
20
E
Estrich nur Option
25
25 25 STB Aufkantung für Stahl-Stütze l/b/h 25/25/25
HLS 5 (1,11x0,475)
25
Stb Aufkantung b/h = 25/25 cm 25
Stb Aufkantung b/h = 15/25 cm
25
15
Brandwand
Öffnung nach Angaben HLS
STB Aufkantung b=25 x h=50 13,18
C
4,03 60
13,88
HLS 2 Teil 2
B
A
2
275
Stb Aufkantung b/h = 275/25 cm
1,435
G
F
3,1 % Gefälle
Decke ble HLS 2 Teil 1
1
Dachtiefpunkt
n ibt erhalte
50
VK Attika >
1,435
3,72
3,1 % Gefälle
H
VK Attika >
HLS 1 kein Schacht nur Kernbohrung in Decke Über 4.OG
1,58
24
3,20
UG
DD neu
24
6 515
44
10
C -1.12 ELT Verteiler 1,20qm
Section G-G | 1:25
Consolidation of the Education Centre Munich of the Chamber for Trade and Crafts for Munich and Upper Bavaria
Project Phase III_Conversion and Modernisation of Building C
HWK Bildungszentrum
GEBĂ„UDE C
HWK Bildungszentrum
HWK Bildungszentrum
Elevation view North-West New (current planning)
Option 1 Sun protection > Sun protection over casement > prevention from solar radiation by opened casement
Elevation view South-East New
Option 2 Sun protection > casement free without sun protection > cost saving > promotes the colour concept
ANLIEFERUNG
Elevation view South-West New
Elevation view North-East New
HWK Bildungszentrum
FACADE CONCEPT BUILDING C
HWK Bildungszentrum
F
P
HWK Bildungszentrum
Sun protection
HWK Bildungszentrum
Education Professional training
Consulting Training and further education
Education Professional training
Fixed glazing
Consulting
>
Training and further education
Parapet with electrict duct lacquered Sheet
Elevation view NW Colour concept orange + yellow + green
Colour concept yellow + green
Elevation view NW Colour concept orange + yellow + green
HWK Bildungszentrum
HWK Bildungszentrum
> HWK Bildungszentrum
Parapet
HWK Bildungszentrum
HWK Bildungszentrum
HWK Bildungszentrum
lacquered Glass
Craft Representatives
Education Professional training
Consulting
Craft
Training and further education
Representatives
Craft Representatives
Education Professional training
Section P Panel window
Part facade view 70
Section F Fixed glazing
Education Professional training
Consulting
Normal parapet
Training and further education
Consulting Training and further education
4,62
BrĂźstungskanal
Elevation view NW Colour concept all colours without blue V1
Elevation view NW Colour concept all colours without blue V1
Part plan view Architekten Nickl Bausback
Elevation view NW Colour concept all colours without blue V2
Colour concept red + yellow + green Consolidation of the Education Centre Munich of the Chamber for Trade and Crafts for Munich and Upper Bavaria
Project Phase III_Conversion and Modernisation of Building C
Zimmer
Bad
DG
DG
Wohnzimmer
27a OG
nicht Teil des Bauantrags
OG Bad EG
EG Heizung UG
UG
Schnitt A-A Bestand
Ansicht Nord
Section A-A Demolition
Schlafzimmer
Elevation view North
Küche
DG
Schlafzimmer
DG
OG
OG
Bad EG
EG
Heizung UG
Official site plan
UG
Ansicht Ost
Schnitt A-A Neu
Section A-A New
Pictures Villa Elisabeth
Elevation view East
A
A
A
A Windfang
Windfang Laubengang
Balkon
Besenkammer
W1 Arbeitszimmer
Wäschekammer Wäschekammer
W1 Wohnzimmer
Küche
Zimmer
Wohnzimmer
Bad
Kamin Frühstücksraum
Büro
Stube
Garderobe
Treppe + Flur
W1 Küche
Kamin
Büro
Bad W1 Flur
Treppe + Flur
Bad
Bad W1 Schlafzimmer
W1 Esszimmer
Terrasse
Bad
Bad Balkon
Flur Balkon
Rezeption
Balkon
Treppe + Flur
Balkon
Balkon
Treppe + Flur
W1 Kinderzimmer
Zimmer
Balkon
Besenkammer
Zimmer
Bad
Wohnzimmer
Schlafzimmer
W1 Ankleide
Bad
Bad
W1 Kinderzimmer
No rd
rd
rd
rd
No
No
No
Balkon
Balkon
A
Ground floor plan New
Architekten Nickl Bausback
VILLA ELISABETH
A
A
A
Existing ground floor plan
Existing 1st floor plan
Seestraße 27 83700 Rottach Egern Gem. Rottach Egern Fl.St.-Nr. 135
1st floor plan New
Approval planning I Application for a change of use
676.66 678.56
N
a
b 677
676.55
678.08
6.5 67
7 67
678.12
5 677.
678.56
678.56
c
d
5 680.
678.5
677
676. 5
678
678.12 678.28
677.35 1
2
3
4
5
6
7
8
9
10
11
12
677.59
678
28,92 2,40
2,40
2,40
2,40
2,40
2,40
e
29,96 63
47 2,40
2,40
2,40
2,40
2,40
2,40
e
0
57
53
678.25 OK First
3,34
OK Traufe
2,65 2,236
676.5 +0,00
-0,06
67
9
679.5
b
d
68
1
681.5
679
Elevation view West
a
677
677.5
680 678
677
0 68
678
Haus 5
c
67 8.5
678 677.956
SPE 6
6.5
67
68
2
678.5
68
4.5
3.5
68
5.5
68
679.5
3
Mögliche Erweiterung nach B-Plan Änderung
68 OK FFB ± 0,00
677,83
677,50 677,25
12
11
10
9
8
7
6
5
4
3
2
1
Haus 05
0
29,96 47
67
53
9
28,92 2,40
2,40
2,40
2,40
2,40
57
2,40
2,40
2,40
2,40
2,40
2,40
2,40
63
681.5
Kiesweg Neu
678
961 685
677
68 0.5
679
677
SPE 5 5
3,34
OK First
2,65
OK Traufe
Schnitt a - a
2,236
10,0 WHR 750 G 1500 GF
677
+0,00
-0,06
681 676
68
0
OK FFB ± 0,00
677,83
676.5
677,00 676,25
Haus 6c
67
6
Elevation view East
676
Schnitt b - b
68
1.5
67 9
677
OK FFB ± 0,00
67
678.
Haus 6b
5
8.5 677,83
Haus 05
677,25
677
8
67 680.5
679.
67 8
D
68
A
10,75 9,26
5
50
B
C
3,50
Schnitt c - c
99
2,00
3,50
1,07
OK First 3,34
678
OK Traufe 2,65
WH 10,0 GR 3250 GF 5500
2,236
677
WH 10,0 GR 600 GF 1200
677
Haus 8
8.5
67
±0,00 -0,17
5
676.
Haus
OK FFB ± 0,00
-0,06
677,96
6a
677,83
677,00
Rampe 2,69 °
677,59
676,66 677,35
676,55
109 Schnitt d - d 678.5
Site plan
Elevation view South
678
Terrain sections
677
9,21 3,50
2,00
Voliere 6 V05/0.06 3631 4,01 MPI
Voliere 7 V05/0.07 3631 4,01 MPI
Voliere 8 V05/0.08 3631 4,01 MPI
Voliere 9 V05/0.09 3631 4,01 MPI
677
Geländermodelling notwendig
0
1
2
3
Voliere 10 V05/0.10 3631 4,01 MPI
4
Voliere 11 V05/0.11 3631 4,01 MPI
5
Voliere 12 V05/0.12 3631 4,01 MPI
Voliere 13 V05/0.13 3631 4,01 MPI
Voliere 14 V05/0.14 3631 4,01 MPI
6
Voliere 15 V05/0.15 3631 4,01 MPI
Voliere 16 V05/0.16 3631 4,01 MPI
7
Voliere 17 V05/0.17 3631 4,01 MPI
Voliere 18 V05/0.18 3631 4,01 MPI
8
Voliere 19 V05/0.19 3631 4,01 MPI
Voliere 20 V05/0.20 3631 4,01 MPI
9
Voliere 21 V05/0.21 3631 4,01 MPI
Voliere 22 V05/0.22 3631 4,01 MPI
10 VK Dach
Voliere 23 Voliere 24 V05/0.23 V05/0.24 3631 3631 4,01 4,01 MPI MPI
11
OK Traufe
1,20
Insektenschutzgitter 1,20
1,20
Kiesstreifen
Schutzflies als Sicht- und Insektenschutz
12 % Gefäl
le
le
Insektenschutzgitter
240 x 160
140 mm Mineralwolle 2mm Dampfbremse: PE-Folie, diffusionshemmend 98 mm Luftschicht 30/50 mm Holzlattung 15 mm Gipskartonplatten
Netz
12,5 mm GK-Platten
2.661
15 mm OSB Platten mit Nut u. Feder
12,5 mm GK-Platten
mm Balke
n
mm Balke
n
doppeltes Netz
Netz
Kabeltrasse
160 x 160 mm Holzträger
Abdichtung 140mm Mineralwolle
+2.236
60 x 140 mm Stiel
60 x 140 mm Stiel
2,035
Fensteröffnung - die Höhe ist noch zu klären 40
3,50
3,34
VK Dach
120 x 160
0. 5
-0,12
Plexi - Wellblech
Netz
2.821
Kiesstreifen
60 x 140 mm Stiel
A
68
Stützmauer NEU
A
12,5 mm Gipskartonplatten
8
B
12 % Gefäl
12
Baulinie
28,80
Teilrückbau Treppenterrasse
+2.64
3,50
575
Voliere 5 V05/0.05 3631 4,01 MPI
679
Voliere 4 V05/0.04 3631 4,01 MPI
Baulinie
Voliere 3 V05/0.03 3631 4,01 MPI
Dachlüftung in Klärung
679.5
Voliere 2 V05/0.02 3631 4,01 MPI
A
C
678.5
677
Voliere 1 V05/0.01 3631 4,01 MPI
+3.34
.5
677
676.5
Haus 5
OK First
678
D 26 mm Doppelstehfalzeindeckung 8 mm Trennlage aus PP- Gewirr (schützt die Dachdeindeckung vor Staunässe und dämpft Geräusche durch Regen und Hagen) 24 mm Schalung 40/60 mm Holzlattung Diffusionsoffene Unterspannbahn 24 mm Schalung 240 mm Holzbalken
679
125
16
beheizter Bereich
unbeheizter Bereich
unbeheizter Bereich
Futterregal
B
1,135 ca. 2,135
3,635
1,01
3,14
1,30 ca. 2,135
815
0,00
2,795
1,33 ca. 2,135
VK Dach
3,50
3,755
Rinne
2 % Gefälle
15
Baulinie
VK Dach Büro Auswertung V05/0.28 2111 15,12 MPI
ELT/Technik V05/0.27 8500 7,15 MPI
Außenlager V05/0.26 4110 24,16 MPI
Kiesweg Neu
677
A
140mm Mineralwolle 15 mm OSB Platten mit Nut u. Feder
Abdichtung
OK Gelände in Klärung
Anstrich: Estrich
Anstrich auf flügelgeglätteter Bodenplatte
+0.00
60 x 140 mm Riegel
678.5
Lager V05/0.29 4110 15,12 MPI
677.5
Futterküche V05/0.30 3670 14,39 MPI
Abdichtung
2,955
+0.00
Baulinie Schleuse V05/0.31 9140 7,15 MPI
12,5 mm GK-Platten
Traglattung (Hinterlüftungslattung), 6/5cm
Kiesstreifen
Baulinie
60 x 140 mm Fußpfette
679
D
- 3,37
2 % Gefälle
2 % Gefälle
2,28 ca. 2,135
Spülmaschine
Lattung mit Netz hinterspannt
2 % Gefälle
Kühlschrank
Lattung mit Netz hinterspannt
doppeltes Netz
65 2,00
Fassadenbekleidung aus Lärchenholzbrettern, waagrecht, 40/60mm vierseitig ausgehobelt, mit Edelstahlschrauben befestigen. Abstand ca. 1,5cm
2,89
3
C
Industriespüle
678
2,465
1,135
1,135 ca. 2,135
+0.00
-0.10
681.5 -0.10
Flur V05/0.25 9110 48,64 MPI
-0.30
-0.30
678
60 mm Zementestrich PE-Folie als Trennlage Stösse verklebt 20 mm Trittschalldämmung 20 mm Polyesteroll Abdichtung gegen aufsteigende Feuchtigkeit z.B. Bitumen / Polymerbitumen 310 mm Stahlbetondecke PE-Folie 80 mm Perimeterdämmung 150 mm Sauberkeitsschicht
67 7.5
9,21 255
Ground floor plan
Anstrich auf flügelgeglätteter Bodenplatte
Bodenablauf 6
3,235
3,245
Section A-A
255
1,79 681
68
0
16
3,34
16
BE
1,135 ca. 2,135
37
1,01 3,37 ca. 2,135Kaltwasseranschluss
Kaltwasseranschluss
wieder herstellen
±0,00 3,215
Fluchttür
1,01 ca. 2,135
±0,00
9,00
415
Fluchttür
120 x 160 mm Stütze
Architekten Nickl Bausback
Max Planck Institute for Ornithology in Seewiesen
Client: Max Planck Society, Munich 0,00
Aviaries: House 5b I Design planing Voliere 10 Futterregal
V05/0.10 3631 4,00
UNIV ER SIT Ä T D E R B UND E S W E HR M Ü N C H E N IN NE UB IB E R G
GEB 16 - 300
GEB 16 - 300
G R UND INS T A ND S E T Z UNG - UNT E R K UNF T S G E B Ä UD E 16
-0,15 OK GEL.
0
10
EIL 400
EIL
UT
BAUT
BA
Emergency stairway full-coloured: red facade
Elevation with coloured roller blinds: purple
Emergency stairway full-coloured: grey facade
0
EIL
30
Visualization with coloured roller blinds
Emergency stairway version A
Entrance area North: part-coloured
Entrance area West: two-tone
Emergency stairway version B
Emergency stairway two-tone red and grey
GEB 16 - 300
Entrance area West: full-coloured
GEB 16 - 300
EIL 200 BAUT
Siteplan Living Unit 16
ER
AM
BE
GEB 16 - 300
ER
AM
BE
GEB 16 - 300
UT
BA
Pictures on site Architekten Nickl Bausback
UNIVERSITÄT DER BUNDESWEHR MÜNCHEN IN NEUBIBERG
Client: Universität der Bundeswehr, Munich
Basic Maintenance - Accommodation Building 16
Abbr. Geländer Wange aufdoppeln
Beamer Konsole + Anschluss
Beamer Konsole + Anschluss
Außenbereich - anthrazit Innenbereich - weiß LERNBEREICH
GEB 16 - 300
Schnitt Treppe
Schnitt Lernbereich
Gangbereich OG
Section learning area B
C
Longitudinal section corridor area upper level
Section stairs
Typical floor plan
Section DDDD Schnitt
Section DDFF Bathroon Schnitt Bad
Typisches Grundriss
A
LERNBEREICH
WOHNBEREICH
WOHNBEREICH
30
F
F
E
E Schiebetür Anschlagprofil
2,42 m2
WOHNBEREICH
LERNBEREICH
D
D
D
A
B
C
Festverglasung
Gangbereich DG Lern- und Wohnbereiche Grundriss
Deckenspiegel
Longitudinal section corridor area attic: learning and living areas
Detail
Visualization inner view living area: proposal 1
Visualization inner view learning area
Picture learning area current phase
Visualization inner view corridor area
Visualization inner view living area: proposal 2
Visualization inner view apartment
Picture apartment current phase
Visualization inner view apartment
Architekten Nickl Bausback
UNIVERSITÄT DER BUNDESWEHR MÜNCHEN IN NEUBIBERG
Client: Universität der Bundeswehr, Munich
Basic Maintenance - Accommodation Building 16
My final thesis
Department of Architecture, TU MĂźnchen
Maison d‘ Maison d‘Orleans Orleans
Lageplan 1:2500 Site planM 1:2500
Lageplan 1:500 Site planM 1:500
Aufenthaltszonen Stay areas
Viewundand orientation Blick Orientation
Movement peopleininBezug relation semi-public Bewegung vonof Menschen auf dieto halböffentlichen Bereiche des Maison du peuple areas of the Maison du peuple
Movement people ininBezug relation toöffentlichen public areas of Bewegung vonofMenschen auf die Bereiche des Maison du peuple the Maison du peuple
The relation ofzum theOrleansplatz hall to Orleansplatz and the inner courtyard Bezug des Saals und zum Innenhof
TUM Faculty of Architecture
General Diploma Thesis March-July 2013
Focus Design and Construction
Chair for Intergrated Design Univ. Prof. Dipl. Ing. Dietrich Fink
Maison du Peuple
Maison d‘ Maison d‘Orleans Orleans
La W ge er rra ks u ta m tt 1
W er ks ta tt
W er ks ta tt
1
La W ge er rra ks u ta m tt 2
W er ks ta tt
2
44
Ste ig
1
W er ks ta tt :5
2
In
In
fo ,A be nd ka ss e
fo ,A be nd ka ss e
La ge rra um
Gar dero be
Foy er
Sa
Sa
al
WC
al
Büh ne
Büh ne
WC D
UG WC D
Cafe
Papeterie
Chocolaterie
Cafe
Lager Mode
Mode
Papeterie
Chocolaterie
Mode
WC H
Lager Bar
WC H Küche & Lager Cafe
Lager Papeterie
Lager Chocolaterie
Bar
Bar
Lager Mode
Technikraum 44 Steig : 5
44 Steig : 5
44 Steig : 5
Pumi
Weißenburger Str. 1:200
1:200
Grundriss M 1:200 1st floor 1.OG plan 1:200
Ve rw alt un g
Bü ro
Ve rw alt un g
W
C
H
C
C
tz
um In te
um Au fe
ra
um
Bü ro nth alt s
ra um
Arc
hiv
Be sp re ch un gs ra um
D Au fe nth alt s
Ate
ra um
lie r
Ate lie r
Arc
hiv
Te rr Bü asse ros
Be sp re ch un gs ra um
C
tz
ra
nd en z
K ch opie rb ere i
ra um
Te ek üc he
Au fe nth alt s
Ate lie r
H
W
Pu
D
Te ek üc he
ra
C
H
W Pu
D
lie r
W
Ko pie rb ere ich
C
tz
Bü ro
W
W
Pu
Ate
Ko pie rb ere ich
Grundriss EG 1:200 Ground floorMplan
Te ek üc he
Grundriss UGfloor M 1:200 Basemant plan
Cafè
Lese saal
Terra Biblio sse thek
O Au ffen ste e llu (P ng av sfl illo äc ns he )
Ausle Info ihe /R ückg abe
Terrasse Büros
Ausle Info ihe /R ückg abe
Putzraum
WC H Arbeitsraum
WC H
WC H Lager
Arbeitsraum
Büro
WC D
Archiv Aufenthaltsraum
WC H
Lagerraum
Arbeitsraum
Teeküche
Arbeitsraum
Abstellraum Aufenthaltsraum
WC H
Putzraum
Putzraum
WC D
Teeküche
Arbeitsraum
Abstellraum
Atelier
Atelier
Atelier
Teeküche
Abstellraum
WC D
WC D
WC D
Arbeitsraum
Offene Austellungsfläche
Büro
Büro
Büro
Büro
( Pavillons )
TUM Faculty of Architecture
Grundriss 1:200 3rd floor3.OG plan M1:200
General Diploma Thesis March-July 2013
Atelier
Atelier
Atelier
44 Steig : 5
44 Steig : 5
Grundriss 1:200 2nd floor2.OG planM1:200
Atelier
Kopierbereich
Büro
Kopierbereich
Büro
Großraum
Großraum
Kopierbereich
Großraum
Großraum
Focus Design and Construction
Grundriss 1:200 4th floor4.OG plan M1:200
Chair for Intergrated Design Univ. Prof. Dipl. Ing. Dietrich Fink
Maison du Peuple
Maison d‘Orleans Orleans Maison d‘
Ansicht Orleansplatz M 1:200 Elevation view Orleansplatz 1:200
Ansicht Weißenburgerstraße M 1:200 Elevation view Weißenburgerstraße 1:200
Querschnitt M 1:200 Cross section 1:200
Ansicht Wörthstraße M 1:200 Elevation view Wörthstraße 1:200
Längsschnitt Msection 1:200 Longitudinal 1:200
TUM Faculty of Architecture
General Diploma Thesis March-July 2013
Focus Design and Construction
Chair for Intergrated Design Univ. Prof. Dipl. Ing. Dietrich Fink
Maison du Peuple
Maison d‘ Maison d‘Orleans Orleans
DACHAUFBAU Begrünung Extensivsubstrat 60 mm, Filterflies Dränschicht 30 mm Schutz- und Speichervlies Bautenschutzmatte Abdichtung Elastomerbitumen mit Vlieseinlage Dämmung PUR-Hartschaum / 200-110 ,mm 2% Gefälle Dämmung PUR-Hartschaum / 100 mm Dampfsperre Elastomerbitumen Bitumenvoranstrich Stahlbetondecke 180 mm
DECKENAUFBAU Stahlbetondecke 180mm Unterzug h = 400mm abgehängte Gipskartondecke
20,68
+20,50
Erschließung Maison d`Orleans Access to des Maison d`Orleans
5
+20,03
FASSADE Innenliegender Sonnenschutz - Rollo 3-fach Verglasung Pfosten/Riegelfassade 300/100 mm CAFE BODENAUFBAU Fliesen in Mörtelbett 20 mm Estrich 30 mm Trittschalldämmung 22 mm PE-Folie Stahlbetondecke 180 mm
Bewegung Besucher Saal Movement visitors hall
DECKENAUFBAU
+15,50
5
15,28
Stahlbetondecke 180mm Unterzug h = 400mm abgehängte Gipskartondecke
+15,11 5
+14,61
GALERIE BIBLIOTHEK
FASSADE
BODENAUFBAU Bodenbelag Teppich Estrich 30 mm Trittschalldämmung 22 mm PE-Folie Stahlbetondecke 180 mm
+11,75
11,67
Innenliegender Sonnenschutz - Rollo 3-fach Isolierverglasung 6/18/6/18/6 mm Pfosten und Riegel 300/60 mm
5
+11,36
DECKENAUFBAU
Movement visitors library Bewegung Besucher Bibliothek
FASSADE
Stahlbetondecke 180mm Unterzug h = 400mm abgehängte Gipskartondecke
Innenliegender Sonnenschutz - Rollo 2-fach Isolierverglasung 6/18/8mm Pfosten und Riegel 300/60 mm
BIBLIOTHEK BODENAUFBAU Bodenbelag Teppich Estrich 30 mm Trittschalldämmung 22 mm PE-Folie Stahlbetondecke 180 mm
+8,00 +7,92
+7,74
+7,275
Bewegung Besucher Cafe cafe Movement visitors
DECKENAUFBAU Stahlbetondecke 180mm Unterzug h = 400mm abgehängte Gipskartondecke FASSADE Innenliegender Sonnenschutz - Rollo 3-fach Isolierverglasung 6/18/8mm Pfosten und Riegel 300/60 mm
FOYER BODENAUFBAU Fliesen in Mörtelbett 20 mm Estrich 30 mm Trittschalldämmung 22 mm PE-Folie Stahlbetondecke 180 mm ±0,00
Volumen Maison d`Orleans Volume Maison d`Orleans
-0,08
-0,25 -0,45
DECKENAUFBAU
Fassadenschitt - Ansicht Mview 1:33 Section elevation 1:20
Stahlbetondecke 180mm abgehängte Gipskartondecke
BODENAUFBAU
Ateliers Ateliers Büros Offices Läden Retails Cafe Coffee shop Bibliothek Library Foyer Foyer
-3,58
Fliesen in Mörtelbett 20 mm Estrich 30 mm Trittschalldämmung 22 mm PE-Folie Stahlbetondecke 180 mm
-3,75
Unter zug h=
2,08 5
Facade cross section 1:20
Axonometry of the supporting structure Tragwerksaxonometrie
400m m
M 1:33 FASSADE Innenliegender Sonnenschutz - Rollo 2-fach Isolierverglasung 6/18/8mm Pfosten und Riegel 300/100 mm
STÜTZE Stahlbeton Ø 400mm Unter zug h=
2,08 5
Fassadenschitt
4,27 5
Pictogram functions Piktogramm Funktionen
-3,50
400m m
Grundrissplan M 1:33 SectionFassadenschitt ground- floor 1:20
TUM Faculty of Architecture
General Diploma Thesis March-July 2013
Focus Design and Construction
Chair for Intergrated Design Univ. Prof. Dipl. Ing. Dietrich Fink
Maison du Peuple
Maison d‘ Orleans
TUM Faculty of Architecture
General Diploma Thesis March-July 2013
Focus Design and Construction
Chair for Intergrated Design Univ. Prof. Dipl. Ing. Dietrich Fink
Maison du Peuple
RENATA JELENIC Architecture Graduate
renata.jelenic@yahoo.com
academic + professional PORTFOLIO
Munich, Melbourne 2013 - 2016