ARCHITECTURE PORTFOLIO LIN LUO
CONTENTS
01 02 03
THESIS DESIGN STUDIO 2015 STUDIO LEVEL E 2015 STUDIO LEVEL D 2014
04 05 06
CRAFTING WORKSHOP 2014 APPLIED CONSTRUCTION 2014 STUDIO AIR 2013
07
CONSTRUCTION DESIGN 2013
01
This thesis investigates the current under representation of design solutions in the Australian market for people living with hearing impairment. In Australia, according to the Australian Bureau of Statistics, 1 in 6 Australians live with some kind of hearing impairment, translating an estimated 30,000 individuals. Compared with design solutions available to people living with mobility impairment, the solutions offered to people with hearing impairment are often limited and require unique solutions for quality of living. The research conducted identifies the difficulties that people living with hearing impairments commonly incur, and current solutions offered. It identifies the importance of communication through visual prompts and aims to further extend the catalogue of aids for the hearing impaired through the use of architectural design. Offered in the thesis are solutions that will aid people with hearing impairments move more safely through spaces through chamfering of circulation wall corners, communicate easily with others by creating open and visually connected spaces which collectively help to build confidence in their domestic environment.
ISSUES
SOLUTIONS
CURRENT
TIME
RADIUS CORNER
DIAGONAL CORNER
AVOID CORNER
Corner in circulation Time relationship - Make people with Hearing Impairment notice the other one earlier when turning corner - Maximise their vision and capture each other’s flicker - Reduce the hazard of people bump into each other
Hearing, the sense of sound perception is helping us get awareness of things surround us by capturing the vibration of sounds
Inability to hear will cause potential danger and insecurity where the space is lacking of visuality, which people with hearing impairment will be more sensitive on the other sense
The idea for improving living quality for people with hearing impairment is to maximise the sight line in their living space
CURRENT /Be obstruct
CUT OUT /Flicker
LIFT UP /Shadow
TRANSLUCENT /Silhouette
SPACE
Spatial Division from room to room Spatial relationship - Make people with Hearing Impairment notice the others from private space (bedroom, toilet) to public space (corridor, living) - Maximise their vision and capture each other’s shadow of movement - Bring sense of control and safe, and make them live confidently
Ground Floor Plan (Apartment Building)
Typical Floor Plan (Apartment Building)
Section (Apartment Building)
Idea implements
Corner
Walls
Section A-A Plan Rendered plan
Section B-B
Timber Floor
Translucent Glass
Polyurethane Vinyl Floor
Clear Glass
(Corridor&Living room)
(Wet Area- Bathroom, Kitchen, Balcony)
(Diagonal Corner)
(Window)
Wool Carpet (Bedroom)
Mosaic Wall Tiles (Bathroom)
Special Designed Door
(Bathroom)
Ceramic Wall Tiles
Material Palette
Expected experience
(Kitchen)
Special Designed Door
(Bathroom)
Ground Floor Plan (Town-house Group)
First Floor Plan (Town-house Group)
Section (Town-house Group)
Idea implements
Corner
Walls
Ground Floor Plan
First Floor Plan
Rendered Ground Floor Plan
Rendered First Floor Plan
Rendered Section B-B
Rendered Section A-A
Timber Floor
Timber Floor
Polyurethane Vinyl Floor
Polyurethane Vinyl Floor
Wool Carpet
Wool Carpet
(Corridor&Living room) (Wet Area- Bathroom, Kitchen, Balcony) (Bedroom)
(Bedroom)
Mosaic Wall Tiles
Feature Glass
Metal Deck Panels
Ground floor bedroom ‘seethrough’ panel)
Expected experience
(Wet Area- Bathroom, Kitchen, Balcony)
Mosaic Wall Tiles (Bathroom)
Material Palette
(Corridor&Living room)
(Bathroom) (Roof)
02
The proposal for this studio is about to design a performing school in Dockland, Melbourne. The performing school is a contemporary dance school where the place is located in the crossing of Wurundjeri Way and Siddeley Street in North Wharf. The place currently is transition place between South Wharf and North Wharf where the No.5 Goods Shed and the Mission to Seafarers are situated. Dockland Contemporary Dance School is a dancing school open for public and students. It is including 2 theatres and 5 dance studios (2 of them can be rented by public) as well as other essential required functional space by a dancing school. The idea of the design comes out from contemporary dance history. Referring from Cunningham’s key ideas, contemporary dance is a creative freedom dance form, which generated from classical ballet dance and refused some traditional techniques. It is presented with unpredictable changes in rhythm, speed and direction. The form of contemporary dance can be seen as a breakthrough form traditions. Basing on these valuations, the designing idea is going capture the breakthrough moment. Reflected to my haptic object, which I designed a belt that keeping me away from foods, I also set a base for building representing the traditions, the box with normal continuous floor plates. In order to achieve breakthrough as well as continuous visual connection, strategies of split floors and tearing skin were given to internal and external respectively. Moreover, different transparent glass is used for various visual experience from room to room, between inside and outside.
SITE STRATEGY
FORM MAKING
SITE PLAN
GROUND FLOOR PLAN
WEST ELEVATION
FIRST FLOOR PLAN
SECOND FLOOR PLAN
SOUTH ELEVATION
THIRD FLOOR PLAN
EAST ELEVATION
FOUR FLOOR PLAN
NORTH ELEVATION
SECTION A-A
SECTIONAL MOMENT 1
SECTION B-B
SECTIONAL MOMENT 2
SECTIONAL MOMENT 3
PUBLIC JOURNEY
STUDIO 2 (PUBLIC RENTAL)
STAIRCASE
CHANGING ROOM
LOBBY
STUDENT JOURNEY
STUDIO 2 (PUBLIC RENTAL)
PUBLIC DANCE SPACE LOBBY
PUBLIC DANCE SPACE
AUDIENCE JOURNEY
LECTURE THEATRE
PUBLIC DANCE SPACE
PUBLIC DANCE SPACE
LOBBY
LOUNGE
CHANGING ROOM
WAITING
STUDIO 5
LIBRARY & ARCHIVE
03
This studio has two phases. The first phase is to design gallery for 5 five picked artists based on their quote from their interview. The aim of this phase is trying to find different ways helping artists express their works as well as themselves. The second phase of the studio is allocating 5 different gallery into 5 different locations all around the world (places were not specified). By following the picked quote from one of the curators’ interview, 5 museums are designed for placing the 5 galleries relatively.
04
This project is about a Design Development Proposal with Key Envelope Details for a Free-Standing Office Tower located in a hypothetical site in Melbourne CBD. This project is a teamwork project including some individual tasks.
05
3D Modelling
Crafting Workshop
06
LEGEND FLOOR FINISHES CPT SELECTED 10mm CARPET FINISH TO
1
150mm STIFFEND RAFT CONCRETE SLAB
A4
A
38.000
2165
EQ
915
EQ
8165 EQ
EQ
EQ
685 280915
915
905
6000 3915
C
1820
905
2085 170 915 110 530 915
6000
4100 EQ 915
100 905
250UB
WT1
957
1
193 108
270 13 795
B
6000
D
3000 3975
ST1 SELECTED 19mm STRIP TIMBER FLOORING TO 150mm STIFFEND RAFT CONCRETE SLAB
2165
CT SELECTED 7mm W CERAMIC & 1MM TILE GLUE TO 150MM STIFFEND RAFT CONCRETE SLAB
965
P
ST2 SELECTED 19mm STRIP TIMBER FLOORING TO 180mm CONCRETE BONDEK FLOOR
WT2
250UB
SELECTED POLISHED FINISH TO 150mm STIFFEND RAFT CONCRETE SLAB
V
SELECTED 3.5mm POLYSAFE STANDARD VINYL FLOOR TAPED ON STIFFENED CONCRETE FLOOR
BUILDING OVER
ST
4628
5924
WALL TYPES WT1 280mm W WALL WITH 60mm THK EXTERNAL PRECAST CONCRETE & 70mm THK INSULATION & 150mm INTERNAL PRECAST CONCRETE & 13mm W PLASTERBOARD LINING INTERNALLY
EXHIBITION
WT2 163-176mm W WALL WITH 150mm THK CONCRETE & 1or2*13mm PLASTER BOARD LINING INTERNALLY AND PAINT EXTERIOR FINISHING
OUTDOOR EXHIBITION FFL 38.91
146
WT3
150 SHS
250UB
250UB
WT2
sl D2
2062
ENTRY LOBBY
1800
5924
150mm W CONCRETE PATH
WT6 253mm W LIGHTWEIGHT METAL FRAME WALL WITH 4mm THK ALUCOBOND PANEL & 35mm TOP HAT & 70mm INSULATION & 2*13 PLASTER BOARD
800 11
Disabled Ramp 1:14
A4
10
sl D1
R=1800
Ramp 1:8
sl D3
09 08
2
ALW STEGBAR ALUMINUM WINDOW
06 05
BCH BENCHTOP
04 03
2062
02
WT2 150 SHS
hd D6
WT4
hd D7
1
vb1
LADIES
vb1
CT
vb1
5924 186 100 2087
vb1
MALES
drg
WT4
RECEPTION
KITCHEN WT1
CPT
V
bch
WT3
hd
rsd WT1
ss
hd D9
SKL VELUX GLAZED SKYLIGHT WINDOW SL
D4
LOADING/CARS WT4
280
900
1000
EQ
EQ
1000
3110
1000 900 900 455 900 200 100 180 235
1000 1375 300 2810
RL
837
280 150
1150 150 130
2070
REDUCED LEVEL TEMPORARY BENCH MARK
WT1
5570 5570
TOILET
FFL FINISHED FLOOR LEVEL
WT1
1000 1150 55
BASINS
KEYS
dp
125 SHS wc WT4
wc
STAINLESS STEEL SINK
VB WC
P
WT4
WT4
wc
SLIDING DOOR
SS
FFL 38.91
GLAZED ROOF OVER
STORAGE wc
GLAZED ROOF HINGE DOOR
RSD ROLLER SHUTTER DOOR
CT
CT
hd D10
GR HD
MDR KINGSPAN METAL DECK ROOF
WT4
drg hd
WT4
100 1788
A8
DISABLE
vb2
WT1
WT4
WT4
drg
D8
87 280 13
FFL 39.24
CPT WT4
WT4
dp
800
89 SHS
hd D5
3100 WT3
150 SHS
987
100 1124 146
WT3
STRATCO 450 W 150 D BOX GUTTER
DRG DRAINAGE
WT2
190mm R 240 G 70 S TIMBER STAIRCASE
vb1
4
BG
50mm TIMBER BALUSTRADE
01
dp
FURNISHING
A4
07
3
WT4 113-126mm W INTERNAL CONCRETE WALL WITH100mm THK CONCRETE BLOCK & 13mm PLASTER BOARD
WT3
CPT
146mm W DANPALON PANEL WALL WITH 30mm THK EXTERIOR DANPALON PANEL & 90*35mm STEEL FRAME & 2*13mm PLASTERBOARD LINING INTERNALLY
WT5 138mm W LOUVER WINDOW WALL WITH 50 THK LOUVER WINDOW FRAME & 75 STEEL FRAME & 13mm PLASTER BOARD
50 2
dp
150 SHS
WT3
WT2
2
250UB dp
1285
100 8315
2545
785 100
280
F E D C B A
22/05/2013 24/04/2013 17/04/2013 10/04/2013 03/04/2013 27/03/2013
FINAL SUBMISSION PRELIMINARY ISSUE REVISION ISSUE REVISION ISSUE REVISION ISSUE REVISION
SCALE:
1:50
DRAWING DESCRIPTION:
GROUND FLOOR PLAN
1 A4
PROJECT DESCRIPTION: 154-156 CARDIGAN STREET PROJECT SUBJECT NAME:
TUTOR:
STUDENT NAME
STUDENT NUMBER
CONSTRUCTION DESIGN
F GROUND FLOOR PLAN A1 SCALE: 1:50@A1
LIN LUO
DATE:
IRENE NG
366038
DRAWN BY:
22/05/2013 LIN LUO
DRAWING NO:
A1
REVISION NO:
F
LEGEND FLOOR FINISHES CPT SELECTED 10mm CARPET FINISH ON
1
2
5924
3
5924
150mm STIFFENED RAFT CONCRETE SLAB
4
5924
ST1 SELECTED 19mm STRIP TIMBER FLOORING NAILED ON 134mm STIFFENED RAFT CONCRETE SLAB CT SELECTED 7mm W CERAMIC & 1MM TILE GLUE TO 145mm STIFFENED RAFT CONCRETE SLAB
RL 47.24
UPPER ROOF
mdr
gr
PSC SELECTED POLISHED FINISH TO 150mm STIFFENED RAFT CONCRETE SLAB
bgu
Z150 PURLIN
RL 46.14
150UB
mdr
LOWER ROOF
ST2 SELECTED 19mm STRIP TIMBER FLOORING NAILED ON 180mm CONCRETE BONDEK FLOOR
dp 180UB
150UB
Z150 PURLIN
dp
OFFICE WT5
WT6
BOARDROOM
WT1
W3
F
W4
ST2
F
F
F
SELECTED 3.5mm POLYSAFE STANDARD VINYL FLOOR TAPED ON 150mm STIFFENED CONCRETE FLOOR
250UB
WT1 280mm W WALL WITH 60mm THK EXTERNAL PRECAST CONCRETE & 70mm THK INSULATION & 150mm INTERNAL PRECAST CONCRETE & 13mm W PLASTERBOARD LINING INTERNALLY
W8
W7
F
F
V
WT6
WT6
WT6
F
FFL 42.74
150PFC
WT6
FIRST FLOOR CEILING
skl
150PFC 150UB
200UB
FCL 45.44
ST2
F
WALL TYPES
F
F
F
F
FIRST FLOOR
250UB
180UB
250UB
250UB
250UB
gr
FCL 41.94
WT2 163-176mm W WALL WITH 150mm THK CONCRETE & 1or2*13mm PLASTER BOARD LINING INTERNALLY AND PAINT EXTERIOR FINISHING
GROUND FLOOR CEILING
WT4
WT1
WT3 146mm W DANPALON PANEL WALL WITH 30mm THK EXTERIOR DANPALON PANEL & 90*35mm STEEL FRAME & 2*13mm PLASTERBOARD LINING INTERNALLY
WT1
CLEAR HEADROOM
LOBBY WT1
D3
ST1
FFL 39.24
FILLED CLASS P SOIL
ST1
CPT
GROUND FLOOR
RL 38.90
RL 38.64 NATURAL GROUND LINE
WT4 113-126mm W INTERNAL CONCRETE WALL WITH100mm THK CONCRETE BLOCK & 13mm PLASTER BOARD WT5 138mm W LOUVER WINDOW WALL WITH 50 THK LOUVER WINDOW FRAME & 75 STEEL FRAME & 13mm PLASTER BOARD WT6 253mm W LIGHTWEIGHT METAL FRAME WALL WITH 4mm THK ALUCOBOND PANEL & 35mm TOP HAT & 70mm INSULATION & 2*13 PLASTER BOARD FURNISHING
1 SECTION A-A A4 SCALE: 1:50@A1
ALW STEGBAR ALUMINUM WINDOW
A
B
6000
RL 46.14
LOWER ROOF
C
6000
D
6000
skl
150PFC 150UB
FIRST FLOOR CEILING
GR
GLAZED ROOF
HD
HINGE DOOR
150PFC
150UB
150UB
RSD ROLLER SHUTTER DOOR
150UB
dp
SKL VELUX GLAZED SKYLIGHT WINDOW WT6
WT3
hd
SL
WT6
WT6
STRATCO 450 W 150 D BOX GUTTER LOUVRE WINDOW
MDR KINGSPAN METAL DECK ROOF
bg
FCL 45.44
BG LW
SS
D11
SLIDING DOOR STAINLESS STEEL SINK KEYS
FFL FINISHED FLOOR LEVEL
FFL 42.74
ST2
RL
FIRST FLOOR
300UB
300UB
REDUCED LEVEL
FCL FINISHED CEILING LEVEL
FCL 41.94
GROUND FLOOR CEILING
rsd
WT3
FFL 39.24
WT1
WT3
WT3
WT3
WT3
D3 sl
LOBBY sl D1
lw
lw
lw
WT3
WT3
WT3
lw
WT3
lw
lw
lw
lw
WT3
WT3
WT3
WT3
F E D C B A
CPT
GROUND FLOOR
RL 38.91
22/05/2013 24/04/2013 17/04/2013 10/04/2013 03/04/2013 27/03/2013
FINAL SUBMISSION PRILIMINARY ISSUE REVISION ISSUE REVISION ISSUE REVISION ISSUE REVISION
SCALE:
1:50
RL 38.66 NATURAL GROUND LINE
DRAWING DESCRIPTION: FILLED CLASS P SOIL
2 SECTION B-B A4 SCALE: 1:50@A1
SECTION A-A & B-B
PROJECT DESCRIPTION: 154-156 CARDIGAN STREET PROJECT SUBJECT NAME:
TUTOR:
STUDENT NAME
STUDENT NUMBER
DATE:
DRAWN BY:
DRAWING NO:
REVISION NO:
CONSTRUCTION DESIGN
LIN LUO
IRENE NG
366038
22/05/2013 LIN LUO
A4
F
B
LYSAGHT KLIPLOK @ 406 METAL DECK ROOF WITH 3 DEGREE FALL CONCEALED-FIXED ON 150 ZED PURLIN KINGSPAN AIR-CELL INSULBREAK@ 65 R VALUE 3.2 INSULATION INSTALLED ON SAFETY MESH
1MM THK. METAL UNDERFLASHING
B
PACKER
METAL STUD
SAFETY MESH SPECIALLY MANUFACTURED BY KINGSPAN
75*35MM TOP HAT
COLORBOND METAL FLASHING SCREW-FIXED ON FIBER CEMENT SHEET
VOID
4MM ALUCOBOND CLADDING PANEL SCREW ALUCOBOND CLIP
LYSAGHT 150 ZED PURLIN LYSAGHT ANGLE CONNECTOR BOLTED BETWEEN 150 ZED PURLIN AND 150 UNIVERSAL BEAM ONESTEEL 150 UNIVERSAL BEAM CLEATED ON METAL 150 UB 5MM SUSPENSION ROD WITH ONE PIECE SUSPENSION CLIP
EXTRUDED AULMINUM SUB-FRAME AB 416 PARTL CUTTED
150 UNIVERSAL BEAM
RONDO DUO I MAIN TEE
10MM PLASTERBOARD TILED ON RONDO TEE WITH TILE HOLD-DOWN CLIP
2
13MM THK. PLASTERBOARD ON 70MM THK. ALUOCOBOND SYSTEM WITH 80MM THK. METAL STUDS WALL
MANAGER
METAL STUD
13MM PLASTER BOARD METAL STUD NAILED ON 150 SHS 150 SQUARE HALLOW SECTION
LOW MODULUS SEALENT
KINGSPAN AIR-CELL INSULBREAK 65 R VALUE 1.7 INSULATION FIXED WITH SPACER BISCUITS AND METAL NOGGINGS
RONDO DUO H CROSS TEE
BOARDROOM
LOUVRE HAND SPLICE WINDOW SLAT
EXTERIOR
EXTERNAL 10MM THK. 50MM H DRESSED TIMBER SKIRTING 19MM THK. CYPRESS STRIP FLOORING FASTENED WITH 38*2.2MM NAILS AT 300MM SPACING
COLORBOND METAL FLASHING
2 DETAIL PLAN A11 SCALE 1:5 @ A1
COLORBOND CAPPING 180MM SUSPENDED METAL BONDEK CONCRETE SLAB FLOOR SUPPORTED BY 250 UNIVERSAL BEAM
WINDOW FRAME BOTTOM BEAM DRAW BAR SCROLL CONNECTS SLAT AND PRIMARY GRIDER WINDOW FRAME PRIMARY GRIDER NAILED ON 150 SHS
METAL DECK ROOF 150 ZED PURLIN
ONESTEEL 250 UNIVERSAL BEAM CLEATED ON PRECAST CONCRETE WALL
ALUCOBOND CAPPING SCREWED WITH EPDM WASHER
EQUAL ANGLE
10MM PLASTERBOARD TILED ON RONDO TEE WITH TILE HOLD-DOWN CLIP
PACKER METAL STUD
13MM PLASTERBOARD
4MM ALUCOBOND CLADDING PANELS
13MM PLASTER BOARD
PARAPET
150MM PRECAST CONCRETE WALL
RECEPTION
METAL STUD EXTRUDED AULMINUM SUB-FRAME AB 416
DISABLED
C
1MM FLASHING OVER SCREW FIXED ON FIBRE CEMENT SHEET 4.5MM FIBER CEMENT SHEET SCREW FIXED ON METAL STUD 450MM*150MM METAL GUTTER WITH 3 DEGREE FALL
SARKING INTO THE GUTTER CLEAT BOLITED ON PURLIN
LYSAGHT KLIPLOK @ 406 METAL DECK ROOF WITH 3 DEGREE FALL CONCEALED-FIXED ON 150 ZED PURLI
150 ZED PURLIN
FIBER GLASS INSULATION
SCREW ALUCOBOND CLIP 10MM THK. 50MM H DRESSED TIMBER SKIRTING
LOW MODULUS SEALANT EXTRUDED ALUMINUM SUB-FRAME AB 415
4MM MAN-MADE CARPET FLOOR FINISHING FIXED ON 6MM FOAM RUBBER UNDERLAY
ISOLATION TAPE BETWEEN STEEL & ALUMINUM SURFACE
150MM CONCRERE STIFFENED RAFT FOOTING 6 RADIUS REINFORCEMENT POLYTHENE MEMBRANE
3.5MM POLYSAFE STANDARD VINYL FLOOR ESPECIALLY FOR DISABLED TAPED ON STIFFENED CONCRETE FLOOR
SAND BAG LIGTURE
PILE FOOTING
1 DETAIL SECTION A11 SCALE 1:20@A1
KINGSPAN AIR-CELL INSULBREAK@ 65 R VALUE 3.2 INSULATION INSTALLED ON SAFETY MESH
FILL CLASS P FOUNDATION
STABLE FOUNDATION
75*35MM TOP HAT@ 600CRS ONESTEEL150 UNIVERSAL BEAM
450MM W * 200MM H TAPERED BOTTOM RAINWATER HAT KINGSPAN AIR-CELL INSULBREAK 65 R VALUE 1.7 INSULATION FIXED WITH SPACER BISCUITS AND METAL NOGGINGS 30MM R DOWN PIPE 10MM PLASTERBOARD TILED ON RONDO TEE WITH TILE HOLD-DOWN CLIP SHEETROCK CORNER REINFORCEMENT 13MM PLASTER BOARD
3 DETAIL SECTION A11 SCALE 1:5 @ A1
GUTTER HANGER MARIN PLY GUTTER BOARD ONESTEEL 150 UNIVERSAL BEAM
F E D C B A
22/05/2013 24/04/2013 17/04/2013 10/04/2013 03/04/2013 27/03/2013
FINAL SUBMISSION PRILIMINARY ISSUE REVISION ISSUE REVISION ISSUE REVISION ISSUE REVISION
DRAWING DESCRIPTION:
DETAIL SECTION
5MM SUSPENSION ROD WITH ONE PIECE SUSPENSION CLIP RONDO DUO H CROSS TEE
PROJECT DESCRIPTION: 154-156 CARDIGAN STREET PROJECT SUBJECT NAME:
TUTOR:
STUDENT NAME
STUDENT NUMBER
CONSTRUCTION DESIGN
IRENE NG
LIN LUO
366038
DATE:
DRAWN BY:
22/05/2013 LIN LUO
DRAWING NO:
A8
REVISION NO:
F
07
Thank you for taking your time to have a look of this portfolio