denison st cycle hub 10 denison street, bondi junction U R B A N D E S I G N J U S T I F I C AT I O N R E P O R T F O R E V O LV E P R O J E C T C O N S U LT I N G NOVEMBER 2019
DISCLAIMER & COPYRIGHT This document was prepared for the exclusive use of Evolve Project Consulting. This information is considered 'preliminary' and should not be used for detailed design discussions. RobertsDay acts in all professional matters as a faithful advisor to its clients and exercises all reasonable skill and care in the provision of its professional services. The information presented herein has been compiled from a number of sources using a variety of methods. RobertsDay does not attempt to verify the accuracy, validity or comprehensiveness of any information supplied to RobertsDay by third parties. RobertsDay makes no warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, validity or comprehensiveness of this document, or the misapplication or misinterpretation by third parties of its contents. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favouring by RobertsDay. This document cannot be copied or reproduced in whole or part for any purpose without the prior written consent of RobertsDay. RobertsDay Level Four, 17 Randle Street Surry Hills NSW 2010 T: +612 8202 8000 Roberts Day Pty Ltd, 2018 ABN 53 667 373 703, ACN 008 892 135 www.robertsday.com.au
table of contents EXECUTIVE SUMMARY 4 PROJECT HIGHLIGHTS 6 INTRODUCTION 8 URBAN DESIGN ANALYSIS
10
DCP + ADG ANALYSIS
48
SUMMARY 58
executive summary RobertsDay was engaged by Evolve Project Consulting (The Client) to undertake an independent urban design review of 10 Denison Street and evolve the concept with the Design Team, to support the revised Development Application to Waverley Council. The evolved concept responds directly to Waverley Council's Pre DA correspondence dated 19 February 2018. The Report provides justification to support the revised scheme, meeting the design objectives of the Waverley Council Development Control Plan (DCP) 2012 Part E Site Specific Developments, where a variation to the DCP is sought. RobertsDay collaborated with Mcgregor Westlake Architects to ensure that the project responds to Council’s Pre DA feedback, including emphasis on strategic objectives, improving the public realm interface as well as the treatment and appearance of the built form, in order to provide a more suitable design, aligned with the changing face of Bondi Junction and this transitional location. During the review process, clarification and recommendations were provided to the Design Team to improve the urban design and built form response to Council's feedback, including: • Mitigating site isolation matters without the need for site amalgamation, allowing for adjacent sites to achieve full development potential;
4
• General Design and Urban Form provisions, including: • A performance based architectural response to varied setbacks above 6 Storeys • Rethinking Podium and street wall design to achieve more 'Human Scale'; • Aligning with the podium with the 6 Storey datum line; • Achieving a more identifiable articulation of building; • Reduce Greenhouse emission to be 30% less than those of the reference building; and • Appropriate waste storage and collection measures that respond to the sites challenges of the future cycle path, reflected by a Waste Management Strategy. The collaboration of RobertsDay and the Design Team has resulted in a fine tuned and refined urban design strategy and built form, higher building efficiency and more focused on active travel/transport. Based on these improvements, RobertsDay is in a position to support the proposed scheme and recommends Council approve the Development Application in light of the responses highlighted in this report.
de n i s o n street | urban desi gn j usti fi c ati on report
why approve it? 1. To conserve the fine grain character of Denison Street through a contemporary podium/tower model. 2. Create a more vibrant and attractive commercial area, particularly within the west end of Bondi Junction. 3. A site and place responsive design and built form that achieves the objectives of the Development Control Plan. 4. An active travel oriented design that focuses on created Waverley Junction's first Cycle Hub.
1 0 de n i s on street | bondi j unc ti on
5
project highlights A holistic design that allows the adjoining site to develop incrementally. An innovative human scale podium, activating the site. A new corner plaza for Denison St and pedestrian colonnade for Spring St. 100% of the site frontage dedicated for people.
A housing solution to suit community needs (1,2 & 3 bed units)
6
7
IN T R O D U C TI O N THE OPPORTUNITY
THE PROPOSAL
Bondi Junction continues to evolve. New developments are emerging that demonstrate that this strategic centre is under pressure to accommodate proposals for substantial uplift in residential floor space. There is a growing need for development proposals to provide a more balanced approach to working and living activities while addressing the community's interests.
This Urban Design Justification Report, takes a place-based approach to establishing a strategic context for 10 Denison Street.
THE SITE TODAY Lying in the heart of Bondi Junction's West End, the site currently accommodates a two-storey workshop which occupies a dual street frontage bound by Denison Street (west) and Spring Street (south). The low intensity use gives it a strong potential for redevelopment, particularly being positioned near or adjacent to large apartment complexes (east and south of the site) as well as new apartment development on Oxford & Denison Street (north).
The slender tower design is highly compatible with its urban context and terrace facade typology, featured on Denison Street. It maximises activity along its western and southern facades, addressing both street frontages. The proposal positions itself well along the future key network of the Waverley Bike Plan and successfully manages the interfaces between its high and low neighbours, to all sides. The site is designed appropriately to its urban context, the resulting built form does not hinder the development potential to the undeveloped sites.
The site totals 315sqm and is 30.25m deep and approximately 10.45m wide, presenting an opportunity to design a site and context responsive built form, unique to Bondi Junction.
OXF O
ST
N ST DENISO
MILL HIL
L RD
RD
10 DENISON STREET 315m2
SPRING
ST
LOCATION PLAN, 10 DENISON ST, BONDI JUNCTION
8
de n i s o n street | urban desi gn j usti fi c ati on report
Denison St Cycle Hub, from adjacent terraces 1 0 de n i s on street | bondi j unc ti on
9
urban design analysis supporting the design
10
de n i s o n street | urban desi gn j usti fi c ati on report
“SUSTAINABLE DEVELOPMENT IS A DYNAMIC PROCESS WHICH ENABLES ALL PEOPLE TO REALISE THEIR POTENTIAL, AND TO IMPROVE THEIR QUALITY OF LIFE, IN WAYS WHICH SIMULTANEOUSLY PROTECT AND ENHANCE THE EARTH’S LIFE SUPPORT SYSTEMS” FORUM FOR THE FUTURE ANNUAL REPORT, 2000
1 0 de n i s on street | bondi j unc ti on
11
P R E AM BL E RESPONDING TO COUNCIL FEEDBACK This Urban Design Justification Report reviewed the concept for the subject site and the feedback received by Waverley Council in the assessment of the Pre DA application. Whilst there were some technical variations found in the review of proposal, it is considered that the revised concept comprehensively addresses the commentary and architectural and urban design feedback received by Council. Council's feedback has been addressed throughout this report. The majority of Council's DCP controls have been met. The revised the design addresses Council's concerns through an appropriate built form and urban design response, drawing particular attention to precedents of case studies where similar approaches have been achieved elsewhere in Bondi Junction, Sydney, Melbourne, as well as internationally. It is recognised that the DCP provides guiding design controls to supplement the design intent or objectives for site specific developments within Bondi Junction. These controls are recognised as being focused on larger sites and lend themselves to promote site amalgamation. However the DCP does not to consider the potential development and contribution of small or narrow sites on place, streetscape character, human scale, diversity and variety of skyline and built form. Arguably, Bondi Junction has experienced development in the past of varying setbacks above 6 storeys, as such controls within the DCP have not been consistently applied, nor have they created human scale or provided a clear delineation between podium and tower elements (Spring Street, Oxford Street, Grafton Street, Waverley Street and Bronte Road). Thus it is considered that there are parts of the DCP that are unreasonable, given that the DCP is silent and does not distinguish development potential of smaller sites.
THE REVISED CONCEPT Based on RobertsDay's independent design review and recommendations, the revised concept satisfies Council’s feedback through technical compliance, design performance, architectural/landscape design and public benefit. Whilst variations are sought, the concept provides a higher quality urban design outcome compared with the Pre DA submission. It is acknowledged that whilst the proposed scenario features minor variations, it produces a superior urban design outcome for residents, the community and the future transformation of the Precinct. The holistic design approach and quality urban design outcome increases the sites contribution to future growth of the Precinct, and shift towards active travel (cycling), whilst maximising the potential future development of adjacent lots without the need for amalgamation and the creation of larger format, bulkier tower forms that dominate streetscape and diminish the human scale.
THE APPROACH For this chapter we analyse the specific items addressed in Council's Pre DA correspondence, highlighting our response to these comments and the recommendations moving forward. In the following chapter, the remaining parts of the DCP will be explored and touched on where relevant.
place inspiration
We have provided the justification to support the objectives of Council's DCP, where the controls have been varied and detail how and where these variations have been achieved successfully and produced good urban design outcomes, elsewhere.
BARCYCLE WORKSHOP + CAFE , WALSH BAY SYDNEY
12
de n i s o n street | urban desi gn j usti fi c ati on report
1 0 de n i s on street | bondi j unc ti on
13
SIT E IS O L ATI O N M AT T ER S S c a l ed S tre e t Wall COUNCIL FEEDBACK
OUR RESPONSE
•
The urban design controls in the DCP requires an appropriately scaled street wall to Denison and Spring Streets with a taller tower set behind this element.
•
The built form is split into two (2) identifiable parts; the podium form (inclusive of a mid rise street wall) and tower form.
•
Providing a clear delineation between the podium and tower, provides an appropriate scaled building at pedestrian level, with the tower form not visually obvious and overbearing to the pedestrian on the street.
•
To Spring Street a 6 level podium relates to the DCP requirement for built form along Spring Street. Within this 6 level podium, level 2 is recessed to distinguish the 2 levels of retail and commercial space from the residential fenestration above.
•
This 2 level expression turns the corner to Denison Street, creating a lower podium and setting up the required 2 metres setback for the tower form above. The 2 level podium scale responds to the predominant 2 level built form of the terrace housing to the West and is consistent with the newly approved and under construction project at 59 Oxford Street.
•
In this way the corner form responds to and stitches together, the differing scales and building types of each street.
et Wall
um
Spring Street 2 Storeys Podium 6 Storeys Street Wall Tower
2/3 Storeys Podium
Denison Street 2 Storeys Podium 6 Storeys Street Wall Tower
6 Storeys Street Wall 2 Storeys Podium
Spring Street 2 Storeys Podium 6 Storeys Street Wall Tower
STREET WALL AND PODIUM HEIGHTS
14
de n i s o n street | urban desi gn j usti fi c ati on report
DENISON ST STREET WALL
Future 6 Storeys Streewall
SPRING ST STREET WALL
1 0 de n i s on street | bondi j unc ti on
15
SIT E IS O L ATI O N M AT T ER S S t re e t Align me n t COUNCIL FEEDBACK
OUR RESPONSE
•
•
The proposed podium is aligned with both streets.
•
Ground level setbacks to both streets create a more generous public domain, which will complement the new cycle path planned for both streets, creating a safer and more comfortable movement area and crossing.
•
The applicable setback of 6m is unachievable for small or narrow sites. When applied to smaller sites, the setback control extinguishes development potential of narrow and slender towers, contradicting Objective 1.2 (J) of achieving a diverse skyline for Bondi Junction as well as Control 1.2 (c) regarding the creation of slender towers.
•
As such the setback control favours larger sites and does not take in consideration corner building.
•
Rather than adopting Council's prescribed setback to delineate between podium and tower forms, the built form is redesigned to incorporate horizontal and vertical articulation and facade treatments to celebrate a corner building.
•
As seen in the attached visuals, the revised scheme is clearly broken up into two distinct zones, podium/street wall and tower.
Corner sites are to be built to both street alignments (E1 1.9.e)
Figure 15a CornerSITES sites build to boundary FIGURE 15A - CORNER BUILD TO BOUNDARY (DCP)
•
Towers are to be setback a minimum of 6m from the street wall and parallel to the street boundary (Figures below. E1 1.9.h)
Figure 15b Corner sites build to boundary - Plan
WAVERLEY DEVELOPMENT CONTROL PLAN 2012
272
SETBACKS FOR TOWER FORMS (DCP)
16
de n i s o n street | urban desi gn j usti fi c ati on report
SPRING ST - DCP ENVELOPE
SPRING ST - PROPOSED ENVELOPE
SPRING ST - DCP ENVELOPE
SPRING ST - PROPOSED ENVELOPE
DENISON ST - DCP ENVELOPE
DENISON ST - PROPOSED ENVELOPE
1 0 de n i s on street | bondi j unc ti on
17
SIT E IS O L ATI O N M AT T ER S B u i l d i n g Ty po logy - P od ium COUNCIL FEEDBACK
OUR RESPONSE
•
•
Human scale can be achieved without the need for large setbacks between tower and podium forms.
•
Whilst it is considered one of many ways to delineate between tower and podium forms, we have ensured the built form is designed for human scale through the following alternative measures:
The design should incorporate human scale at street level with a distinct separation between the tower and podium form so as to reduce the visual impacts of the tower. From an urban design point of view, a thinner tower atop an appropriately scaled podium is the desired outcome for all sites within the Bondi Junction Centre.
1.
Vertical rhythm of the podium and exposed columns
2. Podium design and materiality (glazing for south orientation for non-residential uses)
3. Layered awnings
18
de n i s o n street | urban desi gn j usti fi c ati on report
4. Podium Greenery and planters to soften up built form
5. Public Art
6. Alfresco Dining
1 0 de n i s on street | bondi j unc ti on
19
SIT E IS O L ATI O N M AT T ER S B u i l d i n g Ty po logy - P od ium 7. Active frontages and larger floor to ceiling
Figure 10 Location of active frontages heights of podium levels
PRIMARY SHOPPING STREET ACTIVE FRONTAGE (DCP)
Figure 11 Primary shopping street active frontage GLASS LINE FINISH TO TRANSITION BETWEEN DIFFERENT USES
WAVERLEY DEVELOPMENT CONTROL PLAN 2012
DOMINANT VERTICAL STRUCTURE
4.3 m
WINDOW FRAME IN HUMAN SCALE REFLECTING FINE GRAIN ELEMENT
A VARIETY OF VERTICAL ELEMENT
3.6 m
AWNING TO REDUCE BUILDING BULKINESS
4.85 m
4.85 m
4.85 m
4.85 m
4.85 m
4.85 m
ABOVE AND BEYOND PRIMARY SHOPPING STREET ACTIVE FRONTAGE - OUR RESPONSE
20
de n i s o n street | urban desi gn j usti fi c ati on report
ADG COMPLIANT FTC HEIGHT
B u i l d i n g Ty po logy - P od ium + Tower 8. Facade framing & volumetric definition
TOWER FORM
VERTICAL BLADE TO DEFINE CORNER BUILDING
TOWER FORM VERTICAL PLANTING
HORIZONTAL BLADE TO DEFINE 6 STOREYS PODIUM
VERTICAL PLANTING
6 STOREY STREET WALL
BUILDING ARTICULATION BETWEEN RETAIL AND RESIDENTIAL
BUILDING ARTICULATION BETWEEN RETAIL AND RESIDENTIAL
PERMANENT ART WALL
RETAIL PODIUM
PERMANENT ART WALL
RETAIL PODIUM
place inspiration
GOODSPEED CYCLE WORKSHOP, NEW ACTON CANBERRA 1 0 de n i s on street | bondi j unc ti on
21
SIT E IS O L ATI O N M AT T ER S B u i l d i n g Ty po logy : P od ium + Tower
9. Art walls on blank facades
PERMANENT ART WALL
10. Vertical gardens
VERTICAL PLANTING VERTICAL PLANTING
22
de n i s o n street | urban desi gn j usti fi c ati on report
Site responsive & performance based design solution 1 0 de n i s on street | bondi j unc ti on
23
place inspiration MAD BIKE BUILDING BY MAD ARKITECKTER, OSLO • 200 illuminated bike racks that act as public art • 10m wide built form • minimal setbacks used • ground floor cafe
24
de n i s o n street | urban desi gn j usti fi c ati on report
Facade treatments are used to further delineate podium & tower form
1 0 de n i s on street | bondi j unc ti on
25
AD J AC E N T S I TE I S O L AT I O N E n v el o pe fo r 6-8 De nison St reet COUNCIL FEEDBACK
OUR RESPONSE
•
•
The development potential of adjoining site at 6-8 Denison Street has been protected by ensuring the proposed design complies with the applicable building separation setbacks prescribed by the ADG's. As 10 Denison Street will provide a blank party wall on the northern facade, the adjacent envelope will join the party wall, and pursue a single loaded building.
•
The proposed building envelope at 10 Denison Street will protect the amalgamation and development potential for the adjacent sites, and maximises visual privacy through ADG compliant building setbacks.
•
The potential future built form at 6-8 Denison Street would be north and west facing, thus would not have issues with receiving adequate solar access.
•
The following diagrams represent the adjacent built form envelope (red) which can be achieved.
It would also need to be demonstrated that both sites, without amalgamation can achieve a development that is consistent with the planning controls.
38 meter Height Plane
BEFORE
38 meter Height Plane
AFTER 1300 5
1500 7 AFTER
ISSUE
[-]
26
DATE
09/07/19
REVISION
DRAFT DA FOR CO-ORDINATION
de n i s o n street | urban desi gn j usti fi c ati on report © Copyright
PRELIMINARY DESIGN ONLY
Comply with relevan requirements, the B Australia and all rel Standards when ex described in this dra
Dimensions in millim Confirm all dimensi prior to commencin Use figured dimens Do not scale. If discrepancy exist
76.74 76.74 STEP STEP
1 1 599645 DP 599645 DP
82.82 82.82 TG TG
87.52 87.52 Chimney Chimney
83.38 83.38 PARAPET PARAPET
80.33 80.33 BALC BALC
COVERED COVERED VERANDAH VERANDAH
TWO STOREYED TWO STOREYED RESIDENCE BRICK BRICK RESIDENCE ROOF METAL METAL ROOF No. 9 No. 9
1 1 799127 DP 799127 DP
76.95 76.95 VER VER
82.81 82.81 TG TG
83.39 83.39 PARAPET PARAPET
83.38 83.38 PARAPET PARAPET
75.99 75.99
84.28 84.28 PARAPET PARAPET
STREET STREET
86.25 86.25 RIDGE RIDGE
REAR OF REAR OF 59 59 OXFORD OXFORD STREET STREET MIXED-USE RESIDENTIAL MIXED-USE RESIDENTIAL 14 STOREYS 14 STOREYS
85.01 85.01 PARAPET PARAPET 76.45 76.45
86.33 86.33 Chimney Chimney
2-4 2-4 DENISON DENISON STREET STREET (REAR OF (REAR OF 88 SPRING SPRING STREET) STREET) COMMERCIAL/RETAIL COMMERCIAL/RETAIL 22 STOREYS STOREYS
79.76 79.76 AWNING AWNING 85.18 85.18 PARAPET PARAPET
ADJACENT SITE SCENARIO - GROUND FLOOR PLAN
88 SPR SPR RESIDENTIA RESIDENTIA 10 S 10 S
84.28 84.28 PARAPET PARAPET
COVERED COVERED VERANDAH VERANDAH
61 61 B SECT B SECT 976168 DP 976168 DP
84.16 84.16 RIDGE RIDGE
80.23 80.23 TG TG
80.79 80.79 TG TG 77.26 77.26 VER VER
87.30 87.30 Chimney Chimney
85.04 85.04 TG TG
1 1 913643 DP 913643 DP
86.73 86.73 RIDGE RIDGE
84.00 84.00 TG TG
83.33 83.33 BALCONY BALCONY
existing kerb existing kerb shown dashed shown dashed 3000 4885 4885
44 33 21 21 22 22 23 23 24 24
25 25 26 26
22 11
LIFT LIFT
ctr ctr
rpr rpr
2 3
1800 1800
1
FS 2 FS 2 FS 2
bulky waste 4
5
6
7
8
9
10
bulky bulky
11
waste waste
Services Services AH
AH
52m2 52m2
1540 x 1540 x 2070 2070
27.4sqm 27.4sqm 26sqm
18
hydrant booster 16
15
Art Wall Art Wall
+ FFL 76.08 + +FFL FFL76.08 76.08
1/40fall 1/40 fall to fall to footpath footpath 1/20 footpath
17
1200 1200
+ FFL FFL 76.10 76.10 + + FFL 76.10
fhr fhr
55sqm
OSD OSD and and rainwater rainwater tanks tanks above above
75.71 75.71
BICYCLES 4.0m2 4.0m2
1500 1500
RETAIL
WALLS WALLS
85.43 85.43 PAR PAR
ge ge
FH
REAR OF 59 OXFORD 6.5m2 STREET 18 Bike Bike Lockers 18 Lockers MIXED-USE RESIDENTIAL AH AH LOBBY LOBBY 14 STOREYS LOBBY
RETAIL RETAIL 36.5sqm 36.5sqm
H H 84.9 84.9 S S 83.9 83.9
resiwaste resi waste waste 15m2 15m2 resi 15m2
E E
600 600
S S 83.9 83.9
H 84.9 H 84.9 S 83.9 S 83.9
FS 1 FS 1 FS 1
E E
FIP/ewis FIP/ewis F 600 ewis 600 x 2400P x 2400
fhr
18 18 19 19 20 20
.4 xx .4 .4 .4
com com com waste waste waste 3m2 3m2 3m2
FS 22 FS 2 FS (B) (B) (B)
FS 11 FS 1 FS (B) (B) (B)
13
12
hydrant hydrant booster booster
FH FH
M M M M
Art Wall
AH AH
COVERED COVERED VERANDAH VERANDAH
76.09 76.09
30.255 BDY 30.255 BDY
76.12 76.12
76.08 76.08
76.11 76.11
BELOW
83.79 83.79 TOP TOP WALL WALL
DRIVEWAY DRIVEWAY
75.92 75.92
VEHICULAR CROSSING VEHICULAR CROSSING
CONCRETE CONCRETE DRIVEWAY DRIVEWAY
79.47 79.47 ROOF ROOF
balcony
83.80 83.80 TW TW
76.00 76.00 75.87 75.87
76.09 76.09
A A 04.01 04.01
denotes denotes existing existing right right of of way way
1500 14
RL 75.84 RL 75.84 AHD AHD 80.81 80.81 BALCONY BALCONY
75.41 75.41
WASTE AND RECYCLING H H 84.9 84.9 S 83.9 S 83.9
H 84.9 84.9 FHH
FH
1540 x 1540 x 2070 2070
.4 .4 .4 xx .4 .4 x .4 .4 .4 xx .4 .4 .4 x .4
Plaza Plaza
87.47 87.47 Chimney Chimney
METAL METAL ROOF ROOF
88
77
10.445 BDY 10.445 BDY
COVERED COVERED VERANDAH VERANDAH
13 13 595550 DP 595550 DP
99
66
83.19 83.19 TG TG
86.34 86.34 RIDGE RIDGE
10 10
+ FFL 76.08 + FFL FFL 76.08 76.08 +
83.88 83.88 TG TG
30.255 BDY 30.255 BDY
.4 x .4 14 14 13 13 12 12 11 11
55
awning awning above above awning above
87.58 87.58 Chimney Chimney
86.41 86.41 RIDGE RIDGE H 85.95 H 85.95 S S 84.65 84.65
85.43 85.43 PARAPET PARAPET
SEPERATE SEPERATE
17 17 16 16 15 15
Visitor Visitor bicycles bicycles
COVERED COVERED VERANDAH VERANDAH
11 11 595550 DP 595550 DP
FS 3
86.33 86.33 PARAPET PARAPET
Art Wall Art Wall
80.84 80.84 BALCONY BALCONY 86.40 86.40 RIDGE RIDGE
LIFT
86.33 86.33 PARAPET PARAPET
600 1150 ELEL 600 600xx x1150 1150EL
85.0 85.0 TG TG 75.97 75.97
85.33 85.33 TW TW
76.34 76.34
FS 2
WALL WALL
FS 1
10.38 BDY 10.38 BDY
80.83 80.83 BALCONY BALCONY
BRICK BRICK
3 3 913643 DP 913643 DP
LOBBY
2260 2260 2180
COVERED COVERED VERANDAH VERANDAH
86.32 86.32 RIDGE RIDGE
(A) (A)
86.93 86.93 PARAPET PARAPET
83.61 83.61 TG TG
DENISON DENISON
87.23 87.23 Chimney Chimney
RETAIL
1540 x 1540 x 2070 2070
COVERED COVERED VERANDAH VERANDAH
80.80 80.80 BALCONY BALCONY
76.35 76.35
6-8 DENISON STREET 6-8 DENISON STREET BONDI BONDI WAVERLEY WAVERLEY SQUASH SQUASH CLUB CLUB 33 STOREYS STOREYS
(20.115 (20.115 WIDE) WIDE)
83.61 83.61 TG TG
2 2 913643 DP 913643 DP
86.30 86.30 PARAPET PARAPET
76.18 76.18
1500
86.34 86.34 RIDGE RIDGE
profile of awning above
profile of profile of awning awning above above
2-4 DENISON STREET BELOW existing existing vehicular vehicular crossing crossing crossing removed removed existing vehicular removed (REAR OF 8 SPRING STREET) COMMERCIAL/RETAIL 2 STOREYS
75.91 75.91 75.81 75.81
ADJACENT SITE SCENARIO - TYPICAL PODIUM PLAN
80.18 80.18 AWNING AWNING
80.21 80.21 AWNING AWNING
79.58 79.58 AWNING AWNING
75.98 75.98 75.80 75.80
8 SPR RESIDENTIA 10 S
76.05 76.05 75.89 75.89
COVERED COVERED VERANDAH VERANDAH
1 1 999895 DP 999895 DP
STREET
84.64 84.64 PARAPET PARAPET
87.96 87.96 Chimney Chimney
DRIVEWAY DRIVEWAY
77.29 77.29 VER VER
80.51 80.51 BALC BALC
77.69 77.69 VER VER
76.01 76.01 MH MH
83.62 83.62 TG TG
SPRING SPRING
COVERED COVERED VERANDAH VERANDAH
ISSUE ISSUE
D
DATE DATE
1/11/19
76.10 76.10
REVISION REVISION
FOR DA
HW
© Copyright © Copyright
HW
DENISON
PRELIMINARY DESIGN PRELIMINARY DESIGN ONLY ONLY
C C
B B
04.03 04.03
04.02 04.02
WIDE) (20.115 (20.115 WIDE)
Comply Comply with with relevant relevant Authorities Authorities requirements, of requirements, the the Building Building Code Code of Australia Australia and and all all relevant relevant Australian Australian Standards Standards when when executing executing works works described described in in this this drawing drawing
PROJECT PROJECT
Dimensions Dimensions in in millimetres. millimetres. Confirm Confirm all all dimensions dimensions on on site site prior to commencing commencing work. work. prior to Use Use figured figured dimensions dimensions only. only. Do Do not not LOBBY scale. scale. discrepancy exists exists notify notify architect. architect. If If discrepancy in doubt doubt ask. ask. If in If
DWG DWG
LIFT 3050
FS 1
FH
CLIENT CLIENT
76.17 76.17
10 Denison Street, Bondi Bondi Junction 10 Denison Street, Junction 4210 Stephen Carmen Davidson Davidson & Carmen Stephen & balcony
Ground floor Adjacent Siteplan Scenario - Ground Floor Plan
SCALE @ @A3 A3 SCALE
DRAWN DRAWN
1:200 1:200
DM JH
CHKD CHKD
PM PM
PLOT DATE DATE PLOT
13/11/19 28/10/19
G
FS 2
30.255 BDY
W
bal 6560
E
FH
A 04.01
10.38 BDY
10.445 BDY
4600
2150
STREET STREET
76.12 76.12
REAR OF REAR OF 59 59 OXFORD OXFORD STREET STREET MIXED-USE RESIDENTIAL MIXED-USE RESIDENTIAL 14 STOREYS 14 STOREYS
balcony balcony
BELOW BELOW
30.255 BDY
2-4 2-4 DENISON DENISON STREET STREET BELOW BELOW (REAR (REAR OF OF 88 SPRING SPRING STREET) STREET) COMMERCIAL/RETAIL COMMERCIAL/RETAIL 22 STOREYS STOREYS
STREET STREET
ADJACENT SITE SCENARIO - TYPICAL FLOOR PLAN
C
B
04.03
04.02
SPRING
STREET
indicative future development envelope
REVISION
PRELIMINARY DESIGN ONLY
LIFT 2645
FS 1
FH
30.255 BDY 30.255 BDY
LIFT LIFT
FHFS FHFS
FH
FHFS FHFS
FS FS 1 1
15
ge ge
PLOT DATE
28/10/19
bal bal
sss rp rp
FS FS 2 2 FH FH
Service Service balcony balcony
5m3
Privacy hood
LR LR -2m2 -2m2 2m3
A A 04.01 04.01
5780 5780
10.445 BDY 10.445 BDY
0
60
+ FFL + FFL 103.10/106.20/109.30 103.10/106.20/109.30
25sqm 21sqm
PM ADG Building Separation nine storeys and above 18m between habitable and non-habitable rooms
6450 6450
level 10 roof
level 10 roof over
CHKD
JH
W
HSR HSR D SVA SVA D
FH
FTC FTC
DRAWN
1:200
E
FH
ER ER
DB DB
ER ER
HW HW
balcony balcony
Adjacent Site Scenario - Typical Podium Floor SCALE @ A3
G
FS 2 3050 3050
Stephen & Carmen Davidson DWG
4600 4600
HW
2050 2150
10 Denison Street, Bondi Junction 4210 4210 CLIENT
Dimensions in millimetres. Confirm all dimensions on site prior to commencing work. Use figured dimensions only. Do not scale. LOBBY If discrepancy exists notify architect. If in doubt ask.
HW
© Copyright
PROJECT
10.38 BDY 10.38 BDY
DATE
BELOW
6-8 DENISON STREET BELOW BONDI WAVERLEY Comply withSQUASH relevantCLUB Authorities requirements, the Building Code of 3 STOREYS Australia and all relevant Australian Standards when executing works described in this drawing
1540 x 2070
ISSUE
DENISON DENISON
88 SPR SPR RESIDENTIA RESIDENTIA 10 10 S S
33 BED BED
130sqm 130sqm A6.01 A6.01
30.255 BDY 30.255 BDY 5420 5420
1 0 de n i s on street | bondi j unc ti on SPRING SPRING
C C
B B
04.03 04.03
04.02 04.02
STREET STREET
27 BELOW BELOW
CHANGE OVER TIME - BEFORE DEVELOPMENT
CHANGE OVER TIME- AFTER DEVELOPMENT
28
de n i s o n street | urban desi gn j usti fi c ati on report
SIT E IS O L ATI O N RECOMMENDATIONS Based on our response to Council feedback, below is a list of recommendations that should be considered in light of the proposal and its approval: •
We respect Council's vision and objectives for built form to look and feel a certain way, however for smaller sites, the DCP is not transparent.
•
Urban Form vision from Council suggests that a thinner tower atop an appropriately scaled podium is the desired outcome for all sites within the Bondi Junction Centre, however this has not been replicated. Rather, it is not translated in the DCP controls for smaller sites (recommends amalgamation).
•
The evidence provided has revealed that both sites can be adequately be developed separately and achieve satisfactory urban and built form outcomes.
•
A schematic design of the adjacent site indicates an appropriate height; setbacks; and resultant site coverage. Given that both sites will share a party wall it is considered that minimal solar access and privacy impacts will arise between the two residential developments.
Based on the above considerations and findings, it is recommended that Council approve the Development Application based on the evidence provided, given the compliance with Council's controls and objectives where variations are sought.
1 0 de n i s on street | bondi j unc ti on
29
GE N E R A L D E S I G N & UR BAN FO R M G e n er a l De s ign COUNCIL FEEDBACK
OUR RESPONSE
•
The height and FSR proposed is not supported;
•
The proposed height for 10 Denison street is 11 storeys (38m height plane) with an FSR of 5:1, compliant with LEP.
•
A 2/3 storey street wall is anticipated for Denison Street. To Spring Street, the street wall is to match the façade of the adjoining property (6 storey street wall).
•
A 2 Storey street wall is proposed for Denison Street, compatible with adjacent development on Denison Street. An identifiable 6 storey street wall has been provided to Spring Street.
reet Wall
dium
Spring Street 2 Storeys Podium 6 Storeys Street Wall
2/3 Storeys Podium
Denison Street 2 Storeys Podium
6 Storeys Street Wall 2 Storeys Podium
Spring Street 2 Storeys Podium 6 Storeys Street Wall
STREET WALL AND PODIUM HEIGHTS
30
de n i s o n street | urban desi gn j usti fi c ati on report
E n v el o pe & S e tbacks COUNCIL FEEDBACK
OUR RESPONSE
•
•
The applicable setback of 6m is unachievable for small or narrow sites. When applied to smaller sites the setback control extinguishes development potential of narrow and slender towers, contradicting Objective 1.2 (J) of achieving a diverse skyline for Bondi Junction as well as Control 1.2 (c) regarding the creation of slender towers.
•
As such it is considered that the setback control favours larger sites.
•
Rather than adopting Council's prescribed setback to delineate between podium and tower forms, the built form is redesigned to incorporate horizontal and vertical articulation and facade treatments.
•
As seen the attached elevations and visuals, the revised scheme is clearly broken up into two distinct zones, podium/street wall and tower.
A 6m setback between the street wall and tower must be provided to Spring Street.
PROPOSED ENVELOPE OF 10 DENISON STREET
1 0 de n i s on street | bondi j unc ti on
31
GE N E R A L D E S I G N & UR BAN FO R M G ro u n d Floor OUR RESPONSE The ground floor proposed building provide a setback:
•
Denison Street: Ground Floor + First Level: 0m (colonnade), 5m (wall), creating a public accessible plaza Integrated with the new cycleway.
•
Spring Street: Ground Floor: 0m (colonnade) - 2.3m (wall), wider the footpath for a better integration of the future cycleway.
MIXED-USE RESIDENTIAL 14 STOREYS
85.01 PARAPET 76.45
3 ney
•
82.82 TG 83.38 PARAPET
84.28 PARAPET
STREET
82.81 TG
83.39 PARAPET
83.38 PARAPET
75.99
2-4 DENISON STREET (REAR OF 8 SPRING STREET) COMMERCIAL/RETAIL 2 STOREYS
79.76 AWNING 85.18 PARAPET
RE
84.28 PARAPET
85.04 TG
86.30 PARAPET
6-8 DENISON STREET BONDI WAVERLEY SQUASH CLUB 3 STOREYS
(20 .115 WIDE)
1
ONY
76.35
76.18
86.73 RIDGE
(A)
86.93 PARAPET
83.33 BALCONY
existing kerb shown dashed 76.34
85.33 TW
4885
16
15
14
13
12
11
10
9
8
.4 x .4 .4 x .4
Visitor
7
bicycles
5 4
+ FFL 76 .08
3 18
19
20
21
22
23
24
25
26
2 1
LIFT
ctr
H 84 .9 S 83 .9
FIP/ewis 600 x 2400
85.43 PAR
OSD and rainwater tanks above
resi waste 15m2
E
rpr
FS 1 FS 2 2 3
4
5
6
7
8
9
10
bulky
11
4.0m2
com
1500
RETAIL LOBBY
75.71
waste
1800
1
18 Bike Lockers 36.5sqm
H 84 .9 S 83 .9
WALLS
ge
E
600
10.445 BDY
H 84 .9 S 83 .9
H 84 .9 S 83 .9
AH
Services
waste
52m2
3m2
1540 x 2070
FS 2 (B)
FS 1 (B)
denotes existing right of way
+ FFL 76 .10 1/40 fall to footpath
18
17
1200
fhr
27.4sqm
Plaza
16
Art Wall
+ FFL 76 .08
15
14
13
12
hydrant booster
FH
M
M
AH
83.80 TW
RL 75 .84 AHD
NY
76.09
30.255 BDY
76.00 75.87
76.12
76.11
83.79 TOP
DRIVEWAY
CROSSING
CONCRETE DRIVEWAY
76.08
75.92
profile of awning above
existing vehicular crossing removed
VEHICULAR
76.09
A 04.01
BRICK
awning above
.4 x .4
6
30.255 BDY
WALL
85.43 PARAPET
SEPERATE
17
1540 x 2070
ONY
86.33 PARAPET
1540 x 2070
86.33 PARAPET
Art Wall
600 x 1150 EL
85.0 TG 75.97
75.41
10.38 BDY
ONY
2260
DENISON
1
80.18 AWNING
75.91
80.21 AWNING
79.58 AWNING
75.98 75.81
75.80
76.05 75.89
DRIVEWAY
76.01 MH
SPRING TYPICAL GROUND FLOOR PLAN + ENHANCED PUBLIC REALM
62
76.10
ISSUE
DATE
B
25/10/19
B 04.02
(20 .115 WIDE)
Comply with relevant Authorities requirements , the Building Code of Australia and all relevant Australian Standards when executing works described in this drawing
REVISION
Revised bike parking
32
C 04.03
STREET
76.12
PROJECT
CLIENT
de n i s o n street | urban desi gn j usti fi c ati on report Dimensions in millimetres . © Copyright
PRELIMINARY
DESIGN ONLY
Confirm all dimensions on site prior to commencing work . Use figured dimensions only. Do not scale .
DWG
76.17
10 Denison Street , Bondi Junction Stephen & Carmen Davidson Ground floor plan
SCALE @ A3
DRAWN
CHKD
PLOT DA
G e n er a l COUNCIL FEEDBACK
OUR RESPONSE
•
The northern façade appears bland and is to provide further articulation. Consideration of the heat load is of concern.
•
The northern facade is a blank party wall and will be appropriately insulated to mitigate heat gain in the short term, until 6-8 Denison Street is developed. As described in more detail in the site isolation response, as per the recommendations of the ADG's, this wall will allow the adjoining site (6-8 Denison Street) to achieve development potential similar to 10 Denison Street, adjoining the northern wall.
•
The ground and first floor is required to be provided with commercial uses with the floor to floor heights at least 4m on the ground floor and 3.5m on the first floor.
•
The ground floor to ceiling height has been increased to 4.3m and first floor to ceiling height increased to 3.6m to accommodate change over time.
•
Storage areas and bicycle storage areas should be provided in a basement level, not occupying usable commercial floor space in the Bondi Junction Centre.
•
Storage areas have been moved to the basement level;
•
Bicycle storage remains on the ground floor. for ease of access to the cycle path on Spring Street. As bicycles are anticipated to be the primary mode of transport for residents, ease of access from parking areas to cycle path is critical to efficiency of use and transportation. If located in the basement, residents would have to transport bicycles via the lift which would be highly inconvenient for residents.
Awnings are to be provided around the streets to provide weather protection, define the edge of the footpath and reduce the apparent bulk of the building when viewed from the street.
•
Two layered awnings are provide.
•
NORTHERN WALL - BLANK PARTY WALL
1 0 de n i s on street | bondi j unc ti on
33
GE N E R A L D E S I G N & UR BAN FO R M REAR OF 59 OXFORD STREET MIXED-USE RESIDENTIAL 14 STOREYS
U p p e r Le ve ls
balcony
OUR RESPONSE BELOW
The ground floor proposed building provide a setback: Denison Street:
2-4 DENISON STREET BELOW (REAR OF 8 SPRING STREET) COMMERCIAL/RETAIL 2 STOREYS
STREET
•
Level 2-5: 2m (terrace) - 4m (wall)
• Level 6-10: 2.1m (terrace) - 5.7m (wall) Spring Street:
indicative future development envelope
2050 HW
LIFT
1 BED 50sqm A2.01
Terrace 8m2
•
Second Level: 0m (terrace), vary from 1.3m 2.5m (wall)
•
All other levels: 0m
4210
balcony balcony
960
FHFS
ADG Building Separation up to four stories 12m between habitable rooms/balconies
6560
FH
FHFS
ge
rp FH
1540 x 2070
1540 x 2070
A 04.01
+ FFL 84.00 W
E
G
LR -2m2
HW
Studio 44sqm A2.03
indicative future
1 BED development envelope
REAR OF 59 OXFORD STREET 6-8MIXED-USE DENISON STREET BELOW RESIDENTIAL BONDI WAVERLEY SQUASH CLUB 14 STOREYS 3 STOREYS
50.5 sqm A2.02
Terrace 24m2
R
sss
HSR SVA
10.38 BDY
10.445 BDY
First Level: 0m
2-4 DENISON STREET BELOW (REAR OF 8 SPRING STREET) COMMERCIAL/RETAIL BDY 230.255 STOREYS
3050
STREET
•
1540 x 2070
BELOWDENISON
6-8 DENISON STREET STREET BELOW REAR OF 59 OXFORD BONDI WAVERLEY SQUASH CLUB MIXED-USE RESIDENTIAL 3 STOREYS 14 STOREYS
planter
R
Terrace 24m2
4210
balcony 30.255 BDY
balcony
2-4 DENISON STREET BELOW (REAR OF 8 SPRING STREET) COMMERCIAL/RETAIL 2 STOREYS
2
C
FH
FH
1/11/19
REVISION
W
E LR -2m2
HW
indicative future development envelope
FOR DA Terrace 8m2
© Copyright
STREET
G
Misc
Comply with relevant Authorities requirements, the Building Code of Australia and all relevant Australian when executing works 6-8Standards DENISON STREET BELOW described in SQUASH this drawing BONDI WAVERLEY CLUB 3 STOREYS Dimensions in millimetres. Confirm all dimensions on site prior to commencing work. Use figured dimensions only. Do not scale. 30.255 BDY exists notify architect. If discrepancy If in doubt ask.
1m3
Service balcony
HW
1.2m3
1.8m3
PROJECT
1.3m3
1 BED 50sqm A5.01
61sqm A5.02DWG adaptable and liveable
Terrace 9m2
A 04.01
10 Denison Street, Bondi Junction Stephen & Carmen Davidson Level 2 plan 4210
SCALE @ A3
DRAWN
1:200
DM
CHKD
balcony
PM
PLOT
13
DENISON
PRELIMINARY DESIGN ONLY
CLIENT
1 BED
BELOW
10.38 BDY
DATE
10.445 BDY
STREET
C
04.02
rp
1540 x 2070
+ FFL 93.80
3m3
B
ge sss
PLANT
1540 x 2070 SPRING
ISSUE
FHFS
04.03
HSR SVA D
4600
FHFS
R
5780
LIFT
13
30.255 BDY
2050
ADG Building Separation five to eight storeys 13.5m between habitable and non-habitable rooms
6560 63
3050
1540 x 2070
DENISON BELOW
TYPICAL FLOOR PLAN: LEVEL 2
ADG Building Separation five to eight storeys 18m between habitable rooms/balconies
TYPICAL FLOOR PLAN: LEVELS 3-5 2645
FHFS
FH
FHFS
FS 1
C
HSR D SVA
15
ge
B
sss
04.03
04.02
rp
FS 2
4600
LIFT
0
60
ER
DB
1540 x 2070
HW
FH
DATE
1/11/19
REVISION
FOR DA
21sqm
© Copyright
3 BED
TYPICAL FLOOR PLAN: LEVELS 6-10
34
2m3
PROJECT
CLIENT
Dimensions in millimetres. Confirm all dimensions on site prior to commencing work. Use figured dimensions only. BDY Do not30.255 scale. If discrepancy exists notify architect. If in doubt ask.
PRELIMINARY DESIGN ONLY
BELOW
Privacy hood
LR -2m2
Comply with relevant Authorities requirements, the Building Code of Australia and all relevant Australian Standards when executing works described in this drawing
130sqm A6.01
Service balcony
DWG
10.38 BDY
FTC
level 10 roof over
STREET
5m3
+ FFL 103.10/106.20/109.30
10 Denison Street, Bondi Junction Stephen & Carmen Davidson Level 5 plan
SCALE @ A3
DRAWN
1:200
DM
5420
C
B
de n i s o n street | urban desi gn j usti fi c ati on report 04.03 04.02 SPRING
STREET
A 04.01
5780
C
10.445 BDY
SPRING
ISSUE
ADG Building Separation nine storeys and above 18m between habitable and non-habitable rooms
6450
30.255 BDY
ER
3050 2050
BELOW
CHKD
PM
PLOT
13
OUR RESPONSE We identify tower form heights of 6 storeys or more within the Bondi Junction Town Centre. This study allows us to understand past, current and future trends, to justify the appropriate tower form setbacks for 10 Denison Street. Whilst there are many examples of this variation shown throughout the Bondi Junction Town Centre, it is considered that each of these examples has a significantly larger footprint compared with 10 Denison Street. With a site area of only 315m2 and a tower floorplate of 130.5m2 (above 6 storeys), it is considered that 10 Denison Street will not cause undue impact to the streetscape.
Whilst the proposal seeks to also vary the prescribed tower setback, we aim to create a more diverse, unique and place led tower typology that responds to the adjacent facade character. This will produce a far superior urban design outcome as opposed to an amalgamated site scenario. LEGEND 10 Denison Street Tower Form Tower Form within 6m Setback 2-6 Storey Street Wall
79-81 Grafton Street
59-75 Grafton Street
55 Grafton Street
253 Oxford Street
257 Oxford Street
35 Grafton Street
570-588 Oxford Street
1 Adelaide Street
241 Oxford Street
251 Oxford Street
10 Densison Street
T
1 Hollywood Avenue
T
3 Waverley Street
520 Oxford Street
25-33 Bronte Road
95-97 Grafton Street
71-73 Spring Street + 83-85 Spring Street
Train Station
1 Newland Street 36-42 Spring Street
T
79-81 Grafton Street
n
59-75 Grafton Street
Street Wall
As a variation is sought and given the sites challenging dimensions, the proposed model would be considered an appropriate built form response in accordance with the precedents shown adjacent and meeting future growth within the Town Centre.
55 Grafton Street
m within k
35 Grafton Street
m
10 Densison Street
n Street
A larger tower mass on 10 Denison Street (amalgamated scenario) similar to examples shown below, would have additional adverse impact to neighbouring properties particularly from the perspective of the terrace houses on Denison Street. Highlighted below are examples of where the 6m setback has been varied, particularly above a 2-6 storey street wall.
NTS VARIED UPPER LEVEL SETBACKS IN BONDI JUNCTION
1 0 de n i s on street | bondi j unc ti on
35
GE N E R A L D E S I G N & UR BAN FO R M P rec e d e n t Cas e S tu dies PRECEDENTS Below is a list of local and national precedents which detail good urban design outcomes for tower forms on narrow sites. It is worth noting the lack of setbacks required but rather the delineation between podium and tower form is expressed through the use of facade treatments (framing and articulation).
36
PHEONIX82 - MELBOURNE
PHEONIX82 - MELBOURNE
BENNETTS LANE - MELBOURNE
PITT ST - SYDNEY
de n i s o n street | urban desi gn j usti fi c ati on report
320 GEORGE ST - BRISBANE
320 GEORGE ST - BRISBANE
744 HARRISON ST - SAN FRANCISCO
STUDIOS 54 - SURRY HILLS SYDNEY
1 0 de n i s on street | bondi j unc ti on
37
GE N E R A L D E S I G N & UR BAN FO R M B u i l d i n g S e paration COUNCIL FEEDBACK
OUR RESPONSE •
Given the orientation and size of the site, the built form is orientated towards the Denison and Spring Street frontages to avoid residential outlook to east (8 Spring Street) and north.
•
Apartments are primarily orientated west and south.
•
Majority of the northern wall will be used for a party wall.
•
Side setbacks (northern boundary) are: • 0m (blank wall) to create a party wall; • 4.6m for some apartments openings, separation are maintained as per the ADGs to 8 Spring Street of 12m.
•
Minor windows off secondary spaces (bathroom and bedrooms) proposed within setback but are designed on an angle to obtain daylight access and avoid direct overlooking.
•
Rear setbacks predominantly between 5.4 and 6.5m to maintain separation of habitable openings to 8 Spring Street.
Figure 16 Minimum distances between residential living areas
FIGURE 16: MINIMUM DISTANCES BETWEEN RESIDENTIAL LIVING ARES
EXISTING RESIDENTIAL BUILDING
SECONDARY HIGHLIGHT WINDOW
BLANK WALL Figure 17 Separation distances between residential living areas and commercial uses
WAVERLEY DEVELOPMENT CONTROL PLAN 2012
274 30M DISTANCE TO PRIMARY WINDOW
PRIMARY WINDOW
LEVEL 2 BUILDING SEPARATION
38
de n i s o n street | urban desi gn j usti fi c ati on report
EXISTING RESIDENTIAL BUILDING
BLANK WALL SECONDARY WINDOW
28.1M DISTANCE TO PRIMARY WINDOW
4.6M REAR PODIUM SETBACK FROM SECONDARY WINDOW COMPLIANT
PRIMARY WINDOW
LEVEL 3 TO 5 BUILDING SEPARATION
EXISTING RESIDENTIAL BUILDING
BLANK WALL
SECONDARY WINDOW
24M DISTANCE TO PRIMARY WINDOW
PRIMARY WINDOW
LEVEL 6 TO 10 BUILDING SEPARATION
1 0 de n i s on street | bondi j unc ti on
39
GE N E R A L D E S I G N & UR BAN FO R M P ed e s t rian & Ve hicle A c c ess COUNCIL FEEDBACK
OUR RESPONSE
•
•
Given the site's lot dimensions, this is not possible. Council's feedback does not consider smaller sites. Alternative waste collection measures are required for sites 10m (or less) wide.
•
Our Vehicle Access strategy is aligned with Figure 4 Vehicle & Service Access of the DCP which shows that no vehicle entries are permitted to the sites off Denison Street and Spring Street.
•
All existing vehicle access points to the site are removed, with the kerb reinstated and footpath widened (to incorporate the cycleway)
•
An embellished footpath and the integration of the cycleway will enable the shift to a cycle oriented development and will greatly improve amenity and safety for both pedestrians and cyclists.
The building must be designed to allow Council’s collection vehicles (Medium Rigid Vehicle) to enter and exit the property in a forward direction with adequate vehicle clearance.
SITE CONNECTIVITY Bus: 200 328 Bus: 333 340 352
355 388 389 440
Bondi Junction Interchange Bus: 333 380 381
10 Denison Street, Bondi Junction
5 min walk
Bus: 357
Bus: 313 314 316 317
40
348 353 360 379 400
de n i s o n street | urban desi gn j usti fi c ati on report
l a c o l f o % 2 5 rs travel to workrek via public wo ansport tr
did you know...
CURRENT SITE - CAR DOMINATED & UNPLEASANT
17.5M GARAGE ACCESS
FUTURE SCENARIO - PEDESTRIANISED STREETSCAPE & CYCLERS PARADISE
30.2M FRONTAGE FOR PEDESTRIANS AND CYCLISTS
1 0 de n i s on street | bondi j unc ti on
41
GE N E R A L D E S I G N & UR BAN FO R M T h e G re e n Trave l Plan OUR RESPONSE •
•
The Green Travel Plan submitted highlights the following key points to transition towards a cycle oriented hub and encourage modal/ transport shift to active travel. •
In addition, the proposed retail/café uses are anticipated to attract walk-in customers only.
•
Council’s DCP specifies a minimum parking provision of zero spaces for residential and retail land uses on the site. In this regard, the proposed nil on-site car parking spaces complies with the DCP.
•
All residents and visitors will be encouraged to travel to the site by bike through bicycle maps and routes posted on the building lobby. In addition, 27 bicycle parking spaces are proposed on the site which exceed DCP requirements;
•
Additional bicycle racks are accommodated along the site frontage for retail staff and visitor use;
The success and progress of the GTP is monitored and measured by setting modal share targets and identifying the measures and actions that have the greatest impact (refer to the plan for details);
BONDI JUNCTION CYCLEWAY MASTER PLAN - GREEN TRAVEL PLAN
our site
42
de n i s o n street | urban desi gn j usti fi c ati on report
RECOMMENDATIONS Based on our response to Council feedback, below is a list of recommendations that should be considered in light of the proposal and its approval: Council's objectives are robust however they ignore and do not consider smaller, narrower sites. As such site diversity, skyline and built form diversity and slender towers will not be achieved. Setback controls have been inconsistently applied across Bondi Junction. As shown in the precedents on the previous page, and based on our analysis of Sydney, Melbourne and other precedents for slender tower forms on narrow sites there are minimal setbacks. Rather, the precedents reveal a clearly defined building bases of 3-4 storeys and taller elements on top. This is achieved through architectural treatment of the facade (articulation and framing). Based on an ADG compliant single loaded buildings, a 6m setback would not apply to sites less than 18-20m wide. For the 6m setback to be applied to single loaded buildings, a 20m lot width is required.
(j) Creates diversity within the Bondi Junction Skyline, with a unique and site responsive built form. Further to the Urban Form Objectives, we also satisfy the following relevant 1.9 Street Alignment Objectives within the DCP: (a) Reinforces the character of the commercial centre through consistent setbacks. As these setbacks have not been consistently applied and there are many instances which prove this, it can be argued that the setbacks provided are appropriate for a corner site. (b) Enhances streets (Denison and Spring Streets) as the commercial and civic spaces, particularly through active frontages and the Cycle Hub. (c) Provides legible access ways and entrances into buildings for residents, visitors to the cafe, and cycle shop. (d) Creates consistent and unified building elevations along streets by matching the appropriate datum line on Spring and Denison Streets.
In light of variations sought, we satisfy the following Objectives from 1.2 Urban Form (where relevant) within the DCP:
(e) Improves the quality of the public domain by adding a new plaza space, complementing the cycle way through land use and the integration of public art and vertical greenery into the facade.
(a) Ensures Bondi Junction Centre is a vibrant and attractive commercial area, with the introduction of the Cycle Hub.
(f) Ensures building facades create a human scale to the street, through layered awnings and identifiable human scale podium
(d) Promotes built form that increases access to natural ventilation and lighting.
(g) Defines and complements public spaces.
(g) Mitigates the visual effect of tall buildings on the street through a slender tower proposal that incorporates horizontal and vertical articulation, layered awnings, facade treatment (framing), vertical green and art wall. (h) Mitigates environmental effects of tall buildings on existing surrounding low scale residential development, a slender tower form provides less overshadowing than an amalgamated site scenario. (i) Ensures the streetscape setting for character homes on Denison Street (Terrace typology) is retained and enhanced. A tower width of 10m is more suitable to the adjacent context than a amalgamated tower scenario.
(h) Maximise safety through passive surveillance opportunities and clear glazing to retail uses. Based on the above response and recommendations, it is recommended that Council approve the Development Application based on the evidence provided, compliance with Council's controls and alignment with objectives in cases of variations. RobertsDay considers the proposal for 10 Denison Street as an acceptable solution to achieving the matters of general design and urban form raised by Council.
1 0 de n i s on street | bondi j unc ti on
43
WASTE S TO R A GE & C O L L EC T I O N P ro p o se d M anage me nt St ra t eg y COUNCIL FEEDBACK
OUR RESPONSE
In the Pre DA feedback, Council raised the following key points in relation to waste storage and collection:
In response to the feedback received by Council, below is a list of responses that have been prepared from an urban design and place perspective, which provide an appropriate solution waste storage and collection:
•
•
The building must have a system for the convenient transportation of waste and recyclables to waste and recycling storage area;
•
Bins or crates should be situated in waste compartment areas on each floor to accompany to store a volume of paper/cardboard likely to be generated on that floor;
•
The development must have rooms or caged areas with a minimum volume 4m³ available for the storage of discarded residential bulky waste; and
•
44
Waste collection to be accommodated on site and allow Council’s collection vehicles (Medium Rigid Vehicle) to enter and exit the property;
•
Supported by the attached Waste Management Strategy, collection can be achieved from the footpath without resulting in an interruption or loss of amenity or the interruption of vehicles entering and exiting 8 Spring Street;
•
It is highly unlikely that the proposed street side waste collection will disrupt the functioning of the Bondi Junction Centre, particularly the West End. Examples of other strategic centres of where this occurs and is considered acceptable (Surry Hills and Redfern), given diverse lot typologies, are shown on the following pages.
•
All waste facilities and equipment are designed to be in compliance with the Waverley Council’s Waverley Development Control Plan (2012), Australian Standards and statutory requirements;
•
The bin storage area is located within the building on the ground floor, with direct access to the waste collection point (located adjacent to the entrance to the site). It is considered that the proposed bin collection strategy will not detrimentally impact the streetscape, but rather enable access and convenience. A bulky waste room of 4sqm is also provided on the ground floor;
•
Waste will be transported via the lift shown on the flood plans.
All new developments are to provide adequate storage for waste to accommodate future change of uses.
de n i s o n street | urban desi gn j usti fi c ati on report
86.73 RIDGE
(A)
83.33 BALCONY
76.34
85.33 TW
LIFT
4 3 2 1
600 x 1150 EL
5
ctr
OSD and rainwater tanks above
resi waste 15m2
E
rpr
FS 1
1
FS 2
2 3
4
5
6
7
8
9
10
bulky
11
4.0m2
1500
18 Bike Lockers LOBBY
75.71
waste
1800
600
85.43 PAR
ge
E
FIP/ewis 600 x 2400
H 84.9 S 83.9
WALLS
AH
com Services
waste
52m2
3m2
1540 x 2070
FS 2 (B)
FS 1 (B)
denotes existing right of way
17
16
Art Wall
+ FFL 76.08
15
14
13
12
hydrant booster
FH
M
M
BRICK
fhr
18
1200
27.4sqm + FFL 76.10
A 04.01
AH
83.80 TW
30.255 BDY
2260
.4 x .4
6
H 84.9 S 83.9
10.38 BDY
.4 x .4 7
H 84.9 S 83.9
H 84.9 S 83.9
1540 x 2070
.4 x .4
30.255 BDY
1540 x 2070
85.43 PARAPET
WALL
GROUND FLOOR PLAN (NTS)
75.41
76.08
76.11
DRIVEWAY profile of awning above
existing vehicular crossing removed
80.18 AWNING
80.2 AWN
75.98
75.80
DRIVEWAY
SPRING
76.10
C
B
04.03
04.02
(20.115 WIDE)
STREET
76.12
7
LEGEND
place10inspiration Denison Street, Bon
Comply with relevant Bulky Waste Storage Authorities Area requirements, the Building Code of Australia andWaste all relevant Australian Residential Storage Standards when executing works described in this drawing Commercial Waste Storage Dimensions in millimetres. Confirm all dimensions onStreet) site Waste Collection (Spring prior to commencing work. Use Lift figured dimensions only. Do not scale. If discrepancy exists notify architect. Stopping IfSRV in doubt ask. Area
PROJECT
CLIENT
DWG
Stephen & Carmen Dav Ground floor plan
SCALE @ A3
1:200
DRAWN
DM
RMIT BIKE HUB, MELBOURNE IMAGE: HINGE ARCHITECTS
1 0 de n i s on street | bondi j unc ti on
45
WASTE S TO R A GE & C O L L EC T I O N C a se S tu die s GEORGE STREET REDFERN With a dual lane cycle way on the eastern side of the street, on collection days George Street functions well without any disruption to cyclists or pedestrians. Bin tucks stop on the road and access bins which are left on the footpath.
GEORGE STREET AERIAL
GEORGE STREET & FOOTPATH BIN COLLECTION
BOURKE STREET SURRY HILLS Similar to George Street, Bourke Street achieves the same outcome without any disruptions to cycle paths or pedestrians. Collection times being early morning during leisure rides, prior to work commuting commences. Recycling is usually collected during the day.
BOURKE STREET AERIAL
46
BOURKE STREET VIEW, STREET BIN COLLECTION
de n i s o n street | urban desi gn j usti fi c ati on report
P ro p o se d M anage me nt St ra t eg y RECOMMENDATIONS
(c) Ensuring the use and operation of waste storage and collection does not impact the amenity of adjoining residential properties as the only time bins will be visible to the street is on bin days.
Based on our response to Council feedback, below is a list of recommendations that should be considered in light of the proposal and its approval: •
Council's objectives are robust, however the controls do not consider small sites and the restrictions of having Waste Collection vehicles entering and exiting the site in forward gear;
•
Whilst the proposal does adopt all of the feedback from Council in Pre DA correspondence, we comply with the general objectives and intent of Building Services and Facilities by:
Based on the response, case studies and recommendations, it is recommended that Council approve the Development Application based on the evidence of precedents provided, technical consultant advice (WMP), compliance with controls as well as design responses where variations sought. The waste strategy for 10 Denison Street, is considered an acceptable solution as prescribed by the Waste Management Strategy.
(a) Ensuring adequate provision is made for waste storage on site and waste collection, supported by the Waste Management Plan. These services have been integrated into the overall design of the building, particularly on the ground floor. (b) Ensuring waste services and facilities are unobtrusive and do not detrimentally impact on the appearance of the building (located internally), this is achieved through direct access to the bin collection area on Spring Street; and PA3L
NEW PO
LE
1/2P
ADJOIN S4
T8
LE
5-3(R)
TICKET
8 AM - 6PM
TICKET
6PM - 9 PM
R5-16/R
3P
5-3(L) R 5-40(R)
TICKET
) R5-16/R
SMALL WASTE COLLECTION VEHICLE PS-3
PS-3
PA1
PA1
S5 LINE
PS-3
E7 LINE
Drivewa
y
195m
5.5m
TB LINE
BB LINE
6.6m
B9 Vehicle (Realistic min radius) (20 4)
5.5m
D4-6
PA-1
ONLY
PS-3
KING
ONLY
PX MAR
S
90.3m PS-3
PA1
PA1
SL1
3 -3
5-3(R)
S
PS -
2m
PS
6PM - 9 PM
R5-40(L
E1
LIN
TB1 LINE 7.2m
PS-3
PS-3
Drivewa
y
SRV - Small Rigid Vehicle
S
PA1
PA1
PS-3
Drivewa
y
PX MAR
KING
S 115º
E1 LINE
SPRING
29.3m
STREET
S1 LINE
S
S1 L
R5-400( L)
y
Drivewa
y
LE
1/2P
PS-3
S SHEE
L S4
T8
3P
R5-400(
5-16/R51 0 de n i s on street | bondi j uncL)tiRon 3(R)
PROPOSED WASTE PICK-UP AREA
NEW PO
LE
TICKET
8 AM - 6PM
TICKET
6PM - 9 PM
1/2P
3P
TICKET
8 AM - 6PM
TICKET
6PM - 9 PM
R5-16/R
10
x Tyres
ADJOIN
1/2P
8 AM - 6PM
SHEET
ONLY
TICKET
3P
INE
5-3(L) R 5-40(R
12
in radius) (20 4)
PA3L
Drivewa
S
NEW PO
VEHICLE EXITING FROM ADJOINING PROPERTY PS Ja -3
135m
B9 Vehicle (Realistic min radius) (20 4)
SL1
)
TICKET
R5-40(L
6PM - 9 PM
) R5-16/R
5-3(R)
DJOINS
BB LINE
T 10
1/2P
3P
L) R5-16 /R
PROPOSED WASTE PICK-UP AREA
NEW PO
TICKET
8 AM - 6PM
TICKET
R5-400(
S SHEE
1/2P
3P
6PM - 9 PM
S SHEE
x Tyres
PS-3
-3
TICKET
8 AM - 6PM
ADJOIN
ONLY
VEHICLES ENTERING TO ADJOINING PROPERTY (NTS) - WASTE MANAGEMENT STRATEGY VEHICLE ENTERING TO ADJOINING PROPERTY PS Ja
47
dcp + adg analysis adg + dcp compliance 48
de n i s o n street | urban desi gn j usti fi c ati on report
1 0 de n i s on street | bondi j unc ti on
49
DC P C O M P L I A N CE In recognising Council's Development Control Plan for Site Specific Developments, and satisfying the key feedback received in the Pre DA correspondence, we provide a comprehensive analysis of the DCP in which the proposal complies with or varies through built form, place and urban design response. It is considered that the development proposal for 10 Denison Street is generally compliant with the guiding controls of the DCP No. Part E, Site Specific Developments (The DCP).
WAVERLEY DCP 2012 Provision
Proposed
Part B: General Design Provisions
50
B1. Waste
A Waste Management Plan has been prepared and is submitted as part of the DA. The waste management strategy details how waste is to stored, managed and collected so as to ensure there is no conflict between the cycle path and garbage trucks. Refer to the attached report(s) for more details.
B2. Ecologically Sustainable Development
An ESD consultant has prepared an updated BASIX Certificate as well as an Energy Efficiency Report to accompany and support the ESD initiatives of the Development Application. The Report details compliance with DCP controls in achieving emissions which are 30% less than the reference building. Refer to the attached report(s) for more details.
B7. Adaptable Housing
Based on the provision of 15 units, 1 units are required to be adaptable. An Access Report is submitted with the DA and confirms that adaptable designed apartments are able to comply with the relevant requirements subject to further design detail at CC stage. The design is consistent with Australian Standards relating to adaptable units specifications, providing 3 adaptable/liveable units. Refer to the attached report(s) for more details.
B8. Transport
A Green Travel Plan and Traffic Impact Assessment has been prepared for 10 Denison Street, which provides strong justification to support the provision of nil parking spaces proposed for reduced traffic and more emphasis on cycling. The attached Green Travel Plan is aligned with the goals of Council's Bike Plan and details reasons for the parking variation. The proposal provides 28 bike parking spaces (18 resident/retail spaces and 10 visitors spaces). Nil vehicular entry point is proposed off Denison Street nor Spring Street, maximising the width of the footpath and the integration of the cycleway. The shift to a cycle oriented development at 10 Denison street will greatly improve amenity and safety for both pedestrian and cyclist.
B10. Safety
The proposal complies with CPTED principles by enabling clear sightlines through the development and avoiding areas of concealment. The basement storage area and resident’s foyer/bicycle parking area will be secured with access controlled.
B11. Public Art
The treatment of the blank walls addressing Spring Street and Denison Street are used for public art purposes, in conjunction with variations to the façade material and colour. Refer to Pages 20-21.
B12. Design Excellence
A detailed context analysis is provided that satisfies the controls and justifies the design excellence of the proposal, exhibited by the attached drawing and visuals. The proposals makes use of the challenging site dimensions to provide a site responsive, slender built form that greatly improves the streetscape and celebrates the Denison and Spring Street corner. Refer to ADG for additional commentary.
de n i s o n street | urban desi gn j usti fi c ati on report
WAVERLEY DEVELOPMENT CONTROL PLAN 2012 – PART E1: BONDI JUNCTION CENTRE Provision
Proposed
1.2 Urban Form Controls
The proposal demonstrates partial compliance with the Urban Form Controls, whilst satisfying the Objectives. The proposed two storey shopfront to Denison Street and 6 storey street wall to Spring Street, combined with an appropriately setback tower (given the sites lot dimensions), exhibits: • Cross ventilation; • High quality amenity to occupants; • View corridors; • Solar access to public spaces and other buildings; and • Differentiation between podium and tower forms through facade treatments and articulation.
1.3 Building Use
The proposal fully complies with the Building Use Controls outlined in the DCP by providing a new retail space and art wall to Denison Street/Spring Street (Primary Shopping Streets) at ground level, retail is also proposed on the first floor.
1.4 Access and Movement
A Traffic Impact Assessment report has been prepared for the proposed development. The proposed access and movement scenario is compliant with the relevant controls of 1.4, including Figure 4: Vehicle and Service Access, with no vehicle access proposed on either Denison or Spring Streets.
1.5 Subdivision
Whilst the subject site is not included in locations for Small Lot Subdivisions, it is considered that proposal is compliant with the objectives for Small Lot Subdivision as it: • Reinforces the expression of patterns of adjacent built form (i.e. terrace housing facades); • Contributes to character and diversity of tower built form; • Defines the public and private domains via a public corner plaza, gathering space and adjacent retail; • Encourages a human scale in building design with awnings, and sheltered plaza. • Encourages a diversity of shop fronts (7m wide corner cafe) along Denison Street. • Encourages the highest and best use of land (added retail) along shopping streets.
1.6 Heritage
As the proposal is neither heritage listed or adjacent to any heritage items, Denison Street is designated as a Street with Heritage. The proposal is partially compliant (where relevant) as open space is provided on Denison Street. This seeks to resemble terrace housing forecourts (the front porch), a key characteristic of terrace housing. Much like the typical front porch, the open space to Denison Street will provide a space that allows for community and neighbour cohesion and interaction. The proposal is compliant with the following general objectives: • Ensures that the existing height of 2-3 storey shop fronts is retained along Denison Street; • Enhances the streetscape setting adjacent to heritage sites through the cycle hub, covered plaza space, corner cafe/bike workshop, visitor bike parking and art wall; and • Reinforces a pedestrian scale through a covered plaza space, active facade and awning at ground floor heights.
1.7 Active street frontages
The proposal is compliant with 1.7 Active Street Frontages, given the new cafe and bike workshop space proposed on the corner of Denison Street and Spring Street. The upper level associated retail will also contribute to the active frontage to Denison and Spring Streets.
1.8 Building Orientation
The proposal complies with Building Orientation Controls, as the podium/street wall is oriented towards Spring and Denison Streets. The tower form also addresses both Denison Street and Spring Street due to the blank party walls proposed on the northern and eastern elevations, securing development potential for adjacent sites. Less openings are proposed on the northern and eastern elevation to preserve privacy to the existing eastern development and future northern development. Where blank walls front public streets, they will be utilised for public art/mural purposes.
1.9 Street Alignment
The proposal partially complies with the Controls of the DCP. Facades are built up to the street alignments for Denison Street and Spring Street. Variations are sought to upper level setbacks of the tower, due to the site's lot dimensions. It is considered that the proposed development satisfies the objectives of Street Alignment and thus presents an appropriate design and performance based response to the DCP recommendations such as the following: reinforces the commercial through consistent setbacks; enhances streetscapes of Denison and Spring Street; provides a legible access way; creates consistent building elevations, improves the quality of the public domain, creates human scale, defines the plaza area on Denison street, whilst maximising safety for pedestrians using the wide foot/cycle paths, supported by strong passive surveillance opportunities.
w
1 0 de n i s on street | bondi j unc ti on
51
DC P C O M P L I A N CE WAVERLEY DEVELOPMENT CONTROL PLAN 2012 – PART E1: BONDI JUNCTION CENTRE
52
Provision
Proposed
1.10 Separation Distances
The proposal is consistent with the objectives and controls of the DCP relating to Separation Distances. As highlighted on pages 35-36, the proposal provides separation distances in accordance with the guidelines established by the ADG's, refer to pages 35-36 for the applied distances between living areas and openings. Given the orientation and size of the site, dwellings are orientated towards the Denison (west) and Spring Street (south) frontages to minimise residential outlook to east/north-east (8 Spring Street). Some secondary windows and openings orientated north-east to allow for cross ventilation but are compliant with the required distances.
1.11 Side & Rear Boundary Setbacks
Side and rear setbacks vary from Level 2 and above to ensure that adequate separation distances are achieved, maintaining visual privacy between openings (primary or secondary) to 8 Spring Street. Refer to pages 35-36 for proposed side and rear setbacks to existing (8 Spring Street) and future development scenarios (6-8 Denison St). Appropriate setbacks are provided to blank party walls, whilst nil setbacks are proposed where possible in the podium levels.
1.12 Building Footprint
Site coverage proposed for 10 Denison Street is compliant as per the DCP controls and objectives, the residential component is also compliant as per the Apartment Design Guide (ADGs).
1.13 Number of Storeys
The proposal has a 11 Storey built form complies with the the 38m height limit (12 storeys) under WLEP 2012, as detailed in the attached drawings.
1.14 Views, vistas and Tree Preservation
Proposal does not encroach into or over existing view corridors, but rather improves and anchors the intersection of key view corridors along Spring Street and Denison Street. The built form acts as a demarcation of the cycle hub and celebrates diversity of skyline within Bondi Junction. Thus it is considered that the proposal complies with the controls and objectives.
1.15 Open Spaces at the Street Frontage
The proposal seeks a new plaza space on the corner of Denison Street and Spring Street to to complement the Cycle Hub at 10 Denison Street. This space will allow space for outdoor dining, visitor bike parking for the cycle hub as well as providing traditional articulation and built form differentiation. The space is activated by the future retail space which will be an associated cafe and bicycle workshop, allowing cyclists to stop, grab a coffee, get their bike serviced along the new cycleway. As a result the new plaza space will be well designed (inclusive of an art wall) and will enhance/activate the public domain. As a result this new space will provide increased safety and passive surveillance opportunities. An awning above and vertical columns retain the street alignment whilst providing shelter and adequate solar access. The space will be fully accessible and useable for the public and users of the cafe. The proposal seeks variation to the controls of the DCP, however is aligned with the objectives of 1.15 Open Spaces at the Street Frontage.
1.16 Building Elevations
The proposed building elevations comply with the objectives and controls of the DCP. The appropriate measures have been undertaken to ensure each floor level is consistent with the intent of the controls or objectives, where variation is sought. The proposal provides a superior design outcome as seen in pages 18-21. This is particularly evident for the first floor, which ensures the south elevation is more suitable for retail purposes (exceeds the recommended 35% openness), compared with the example shown in Figure 25. It is recognised the proposal aligns with the following objectives, including: • Promoting high architectural quality; • Ensuring the built form is climate responsive; • Reducing reliance on mechanical heating and cooling (openness of the first floor, particularly facing south, will allow more light in winter, reducing reliance on heating); and • Improving the visual quality of communal and public spaces.
1.17 Awnings and Colonnades
Awnings are provided for the full extent of the Denison Street and Spring Street frontage, a minor variation is sought in the awning height to the Denison Street frontage, however this is to complement the built form and the two level void created at ground level within the new plaza. The proposed colonnade is an additional interpretation of creating a more human scaled built form. As this variation to the controls is sought, the colonnade proposed satisfies the key objective by providing shelter to public streets to minimise adverse effects of rain, strong wings, summer sunlight and reflectivity.
de n i s o n street | urban desi gn j usti fi c ati on report
WAVERLEY DEVELOPMENT CONTROL PLAN 2012 – PART E1: BONDI JUNCTION CENTRE Provision
Proposed
1.18 Public Art in the Private Domain
The proposal incorporates public art in the form of art murals on blank walls created. A public art proposal has been considered in light of the creation of a future Cycle Hub for 10 Denison Street.
1.19 Designing Buildings for Flexibility
Levels 3 and 5 are designed primarily for residential uses. Apartment layouts on levels 3-5 are generally open and can be adapted over time if need be.
1.20 Ceiling Heights
The proposal is compliant as per the recommended floor to ceiling (FTC) heights prescribed by the DCP. As seen in the drawings attached, the ground floor FTC height is 4.3m and Level 1 FTC is 3.6m.
1.21 External living areas
Refer to Apartment Design Guidelines (ADG) Compliance which prevails in this instance.
1.22 Wind Mitigation
A wind study has been prepared and accompanies the DA package. Refer to the attached wind report for more information. The findings of the report indicate that wind conditions for the majority of trafficable outdoor locations within and around the development will be suitable for their intended uses, subject to additional minor treatments.
1.23 Reflectivity
Glass facades are oriented south and therefore will not impact the reflection of light.
1 0 de n i s on street | bondi j unc ti on
53
AD G S TATE M E N T M c g regor We s tlake Arc hit ec t s CONTEXT The area is designated for high density mixed use developments that are 11-14 storeys in order to take advantage of the excellent amenity of Bondi Junction, including; Transport. Bondi Junction train station and bus interchange are within a 400m radii, which service multiple bus routes, with regular frequency. Public open space. Centennial Park is within 400m of the site. Council services, including Waverley Library, which is 100m from site.
Moving east along the Spring Street, the approved development is typically 2 storey podiums with tower over, with some 6 storey street walls further East. 1 Spring Street, directly south of the subject site, has an existing 2/3 storey podium with tower over. To the West of Denison Street, 2 storey terrace/row housing is the typical built form.
Shopping and restaurants, including Westfield Bondi Junction.
There is a great range in the setbacks and podium heights along the street such that Spring Street’s urban form is relatively shambolic.
Bondi Junction town centre is currently undergoing substantial development, with high density mixed used developments recently approved and under construction in close proximity to the subject site. These include:
Across Denison Street is a relatively consistent row of 2 storey terrace housing. The 2 level podium along the western side of the street and including our site is a response to this.
59 Oxford Street, North of the site, 14 storey mixed use development approved and currently under construction.
The proposal for a project within the FSR and height, will provide a more appropriate building to this site and undergoing urban transformation with the proposed bike path.
87-99 Oxford Street, East of the site, 14 Storey mixed use development approved.
BUILT FORM AND SCALE
302 Oxford Street, on the North side of Oxford Street, 12 storey mixed use development approved. 304-308 Oxford Street, on the North side of Oxford Street, 14 storey mixed use development approved. Further to the East, along Oxford Street, there are several 14 storey mixed use developments under construction. The site for the proposed development is the South-West corner of a block that sits at the western edge of the Bondi Junction Town Centre. It is currently occupied by a two-storey shop/ garage. The neighbouring context includes; 6-8 Denison Street, to the North, a 2-storey commercial building. 71-77 Oxford Street, to the North and East. A 2-storey podium with tower form over. This 2-storey scale is expressed on all street frontages, including Spring Street, Denison Street and Oxford Street.
54
59 Oxford Street, which is the North-West corner of the block, is an approved 14 storey mixed use development also made up of a 2-storey podium form and 12 level tower.
The building has a 3:1 ratio of width, giving the built form inherently sculptural qualities as it provides quite different proportions, depending on which street it is approached and seen from. This sculptural form is amplified by a consistent material palette on all sides. Approaching south from Denison and Oxford, the form appears diminutive when compared to the higher, wider and squarer 59 Oxford Street. It’s wider northern wall is articulated by a vertical band of glass blocks (at the lift lobby), which creates 2 finer vertical forms. Approaching westwards along Spring Street, the forms are fine and slender with the longer 6 level podium, stepping up to the tower form beyond. Viewed from the south west the fine narrow frontage to Denison Street and the wider frontage to Spring Street can be clearly read. The built form is in 2 parts; podium and a tower. To Spring Street a 6 level podium relates to the DCP
de n i s o n street | urban desi gn j usti fi c ati on report
requirement for built form along Spring Street. Within this 6 level podium, level 2 is recessed to distinguish the 2 levels of retail and commercial space from the residential fenestration above. This 2 level expression turns the corner to Denison Street, creating a lower podium and setting up the required 2 metres setback for the tower form above. The 2 level podium scale responds to the predominant 2 level built form of the terrace housing to the West and is consistent with the newly approved and under construction project at 59 Oxford Street. In this way the corner form responds to and stitches together, the differing scales and building types of each street.
•
73% (11 apartments), have 2 hours of sunlight into outdoor space and living areas
•
The remaining 4 have indirect north light to their rear living areas.
•
86% or 13 of the 15 apartments are dual aspect/ orientation. 5 of the 13 have 3 orientations. The remaining 2 are 2 level apartments.
•
Thermal gain is reduced with screens and deep walls.
•
Common circulation areas are naturally ventilated with natural light.
The Spring Street podium and tower are subtly distinguished by changes to their fenestration and the concrete framing of this fenestration. Levels 3-5 have a greater solid to void ratio, (panel to glazing) and the panel will be a slightly rich tone, adding visual weight to the podium. Levels 6-10 above have a 350mm wall section, which enables a deeper vertical glazing bar to emphasise the vertical form. The 6 level podium is framed by a simple concrete frame, the tower above has a more open ended frame with the balcony setback on it’s south east end. Both podium and tower are linked and unified by the angled concrete blade on the south west, which marks and punctuates this important strategic corner.
•
The basement is 1 level only, minimising excavation waste and landfill.
•
0 car parking spaces are proposed, ensuring that the abundant public transport (and adjacent bike path), is utilised.
•
Every apartment has a secure bike space and storage spaces as per the ADG guidelines.
•
Solar Panels are proposed for the roof
•
Rainwater capture and re-use for irrigation.
•
Landscape design, incorporating indigenous planting.
•
The energy efficiency is compliant with Council’s DCP with a 30% exceedance of the controls.
On the ground level setbacks to both streets create a more generous public domain, which will complement the new bicycle lane planned for these streets.
DENSITY The proposed GFA and FSR (5:1) is compliant with the LEP. The first 2 levels are Retail/Commercial and the 9 levels above house 15 apartments, including 1 studio, 2 x 1 bedroom maisonettes, 7 x 1 bedroom and 5 x 3 bed apartments. The density does not compromise the amenity and is appropriate for such a site.
LANDSCAPE The site is a high density urban site, with a street wall form meaning minimal soft landscaping is not possible. Planting has been facilitated in key areas, including the level 2 planter, which will have drop down plants visible from the plaza below and the western facade which has planting to facilitate vertical screening climbers.
SUSTAINABILITY A high-quality development, with excellent amenity will result in a long-life building. In addition, the following aspects can be highlighted; •
86% (13) of the apartments have cross ventilation, through dual aspect design, the remaining 2 apartments being 2 levels have convective ventilation. 1 0 de n i s on street | bondi j unc ti on
55
AD G S TATE M E N T M c g regor We s tlake Arc hit ec t s AMENITY The locality has a high level of public amenity, as outlined in section 1 ‘Context’. On levels 2-4 there are 5 apartment types including;
56
•
TYPE A, 2 of 51sqm 1 bedroom apartment, 2 level apartment located in the North-West corner of the site.
•
TYPE B, 3 of an efficiently planned 50sqm 1 bedroom apartment, located in the South-West, corner of the site.
•
TYPE C, 3 of a 50sqm 1 bedroom apartment, centered around a central loggia located on the South-East corner.
•
And on level 2 there is a studio and 1 bedroom apartment, which are variations on Apartment types B+C, designed so as to enable the setback and shadowed articulation between the commercial and residential building expression.
•
On levels 6-10 there are 5 x 3 bedroom apartments offering larger more generous plans that take advantage of the panoramic views over Queens Park Centennial parklands to Botany Bay.
•
Apartment amenity is of a high quality, the following aspects can be highlighted;
•
All Apartments have efficient plans whereby circulation is minimised and the kitchen, living and dining rooms all relate well to their outdoor living spaces.
•
86% (13) of the apartments have cross ventilation, through dual aspect design, the remaining 2 apartments being 2 levels have convective ventilation.
•
73% (11 apartments), have 2 hours of sunlight into outdoor space and living areas
•
The remaining 4 have indirect north light to their rear living areas.
•
86% or 13 of the 15 apartments are dual aspect/ orientation. 5 of the 13 have 3 orientations. The remaining 2 are 2 level apartments.
•
Windows and glazing are setback from the building face providing shade and protection from the rain.
•
Privacy is provided to internal spaces, from the public domain, with continuous horizontal spandrels.
•
Rooms are generous proportions, and easily furnished, yet still efficiently designed.
•
Generous and well-proportioned balconies are provided.
•
All apartments are provided with bicycle parking and generous private storage.
•
Common areas, are generous, naturally lit and naturally ventilated.
SAFETY Currently the site has a single use mechanical workshop, which will be inherently conflictual with the proposed bike path. This new development with no car parking will be better suited to the proposed bike path. The only conflict is garbage but this is weekly or bi-weekly and so much less interfering than the daily passage of cars to and from the garage. Further improvements to safety include; •
All 15 apartments overlook either Denison Street or Spring Street providing excellent passive surveillance.
•
The generous setbacks on the ground level to both streets will further improve the amenity and safety of this busy corner.
•
The proposed retail will improve the activation and passive surveillance of the corner and will result in greater activation of site, especially after hours and on weekends, an improvement on the current condition.
•
All common areas are generous proportions, with no long or furtive spaces. Common spaces are open and well-lit and providing a safe and inviting environment.
de n i s o n street | urban desi gn j usti fi c ati on report
HOUSING DIVERSITY AND SOCIAL IMPACT The proposed development includes a shop/retail space on the corner of ground floor and residential entry from Spring Street. The range of apartments is very broad considering there are not many of them. The 3 bedroom family apartments are a less common type and will provide further diversity in the area. Having only 3 apartments per floor (for levels 2-5), is more personable and will improve the social relations between neighbours on each floor. The apartments are efficiently planned and will provide high quality accommodation. There are 3 Adaptable apartment types.
AESTHETICS The proposal has clarity and legibility in terms of site planning, massing, faรงade composition, articulation and material expression. The aesthetics are integral to the design. The facade elements, concrete framing, fenestration, spandrels, screening, setbacks, and the like, are informed and driven as a response to the site, such as orientation, weathering, passive solar control, privacy and views. Concrete is used strategically as an expression of the structure and primary forms such as the vertical corner element and the articulation of the 6level and 2 level podiums to each street. Within this framework fenestration creates secondary articulation, whilst maximising amenity in terms of light and views. A minimal material schedule, ensures a calm unified expression. Factory or off form (unpainted), finishes ensure a more durable construction. This material palette is an extension of the material expression and aesthetic of previous buildings MWA have completed in the LGA, including 28 New Street, Bondi and 34 Curlewis Street, Bondi Beach.
1 0 de n i s on street | bondi j unc ti on
57
SU MMA RY CONCLUSION The proposed development has a strong architectural character with an elegant vertical proportion that is appropriately scaled to its context. It marks and punctuates a strategic corner at the south western end of Bondi Junction. It’s height, FSR and setbacks are comparable or more modest, with the recently approved developments in the area. It provides a more appropriate scheme for this challenging site, particularly in the context of urban transformation, as well as the proposed bike path. Apartments have high quality amenity throughout, both internally and in common areas. The design provides a high-quality outcome, architecturally for the Bondi Junction Town Centre. It has been identified that the proposed development for 10 Denison Street is consistent with strategic and local planning strategies for Bondi Junction, and will encourage both daytime and night time activity through the provision of a new a high quality public space and a range of social activities. This design is also highly considerate of its urban context and provides a good urban design and built form response to the challenging site dimensions. It maintains development potential of the adjoining site. Based on RobertsDay’s urban design and placemaking review of 10 Denison Street, it is strongly considered that the evolved concept, prepared in collaboration with the design team, creates a more functional, dynamic and resilient proposal based upon a robust and liveable built form proposal that leverages off proximity to public transport and cycle path. It is considered that the vision of the proposed development is in accordance with the Council’s objectives for site specific development within Bondi Junction. Therefore it is recommended that Council approve the amended Planning Proposal, based on the exhibition of design excellence as well as quality urban design outcomes that will set the precedent for the future transformation of the Precinct.
58
de n i s o n street | urban desi gn j usti fi c ati on report
A holistic design proposal for Bondi Junction's West End 1 0 de n i s on street | bondi j unc ti on
59
planning.design.place SYDNEY
level four 17 randle street surry hills nsw australia 2010 t+61 2 8202 8000 h e l l o _ s y d n e y @ r o b e r t s d a y. c o m . a u
P e r th
level two 442 murray street perth wa australia 6000 t+61 8 9213 7300 h e l l o _ p e r t h @ r o b e r t s d a y. c o m . a u
MELBOURNE
level five 441 collins street melbourne vic australia 3000 t+61 3 9620 5421 h e l l o _ m e l b o u r n e @ r o b e r t s d a y. c o m . a u
B R I S B AN E
level four 99 creek street brisbane qld australia 4000 t+61 7 3221 1311 h e l l o _ b r i s b a n e @ r o b e r t s d a y. c o m . a u
r o b e r ts day . c o m . a u