Sheet List Sheet Number A1 A100 A101 A102 A103 A104 A105 A106 A107 A108 A109 A110 A111 A112 A113 A114 A115 A116 A117
Sheet Name Concept Page Cover Sheet Site Plan Ground Floor Plan Level 1 Plan Level 2 Plan Roof Plan Elevations S & W Elevations N & E Section Section Detail Diagrams Part Facade Exploded Iso 3D Cut Away Internal Perspectives Internal Perspectives External Perspectives External Perspectives
Sheet Number:
A100
Sheet Name: Scale: Date: Client/Tutor:
Cover Sheet 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
2 A101
A107
1
A106
2
2
A107 -
1
A106
1
Site Plan
A101
1 : 1000
Roof Height 12250
Ground Floor 0
2 A101
Sheet Number:
A101
Site Section 1 : 500
Sheet Name: Scale: Date: Client/Tutor:
Site Plan As indicated 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
1
2
3
4
5
6
7
90000 15680
17800
11520
11520
17800
2.4
15680
2.3 A107
2.2
00 360
2.1
00 612 00 232
00 190 00 180
1
2.A
00 190
18204
00 180
A
2.C
2.E
B Fire Tank
17000
Air Handling Units
104 m²
Fire Pump Room
216 m²
110 m²
Storage 84 m²
C
UP
E
A106
2
Change Room
63 m²
63 m²
Change Room
Change Room
63 m²
63 m²
Boiler Plant Room
Solar Hot Water System
64 m²
64 m²
1
Chiller Plant Room
Switch Room & Solar Inverter
A108
64 m²
64 m²
2
A107 -
1
14328
F
10936
D
110000
14328
UP Change Room
A109
Female Toilet
Female Toilet
50 m²
50 m²
Male Toilet
Male Toilet
57 m²
57 m²
17000
G Security Office
Cafe Store
84 m²
84 m²
Cafe / Shop
Office
148 m²
148 m²
H 18204
1
1
A106
2 A108
I
Sheet Number:
A102
Sheet Name: Scale: Date: Client/Tutor:
Ground Floor Plan 1 : 500 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
1
2
3
4
5
6
7
90000
2.4 2.3
A107
2.2
1
2.A
00 612 00 360
2.1
2.C
A 2.E
B
Service Space 103 m²
DN
UP
D E F
110000
C
A106
2
2
A107 -
1 A108
1 A109
G
Service Space
H
103 m²
1
A106
2 A108
I
Sheet Number:
A103
Sheet Name: Scale: Date: Client/Tutor:
Level 1 Plan 1 : 500 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
1
2
3
4
5
6
7 2.4
23040
2.3
A107
2.2
1
2.A
00 612 00 360 00 280
2.1
2.C
A 2.E
B DN
DN
DN
DN
C DN
9736
DN
9736
34008
E
73592
D A106
2
2
A107 -
1 A108
F 9736
1 A109
G
H 1
A106
2 A108
I
Sheet Number:
A104
Sheet Name: Scale: Date: Client/Tutor:
Level 2 Plan 1 : 500 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
A107
1
A106
2
2
A107 -
1 A108
1 A109
1
A106
2 A108
Sheet Number:
A105
Sheet Name: Scale: Date: Client/Tutor:
Roof Plan 1 : 500 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
1
2
3
4
5
6
7
90000 15680
17800
11520
11520
17800
15680
2 A108
Roof Height 12250
Level 2 7140
Level 1 4080
Ground Floor 0
Column Footing -2500
1
South
A106
1 : 300
A
B
C
D
E
F
G
H
I
110000 18204
17000
14328
5468
5468
14328
17000
18204
1 A108
Roof Height 12250
Level 2 7140
Level 1 4080
Ground Floor 0
Column Footing -2500
2
West
A106
1 : 300
Sheet Number:
A106
Sheet Name: Scale: Date: Client/Tutor:
Elevations S & W 1 : 300 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
7
6
5
4
3
2
1
90000 15680
17800
11520
11520
17800
15680
2 A108
Roof Height 12250
Level 2 7140
Level 1 Base Lvl DNT
4080
3000
Ground Floor 0
Column Footing -2500
1
North
A107
1 : 300
I
H
G
F
E
D
C
B
A
110000 18204
17000
14328
5468
5468
14328
17000
18204
1 A108
Roof Height 12250
Level 2 7140
Level 1 4080
Ground Floor 0
Column Footing -2500
2 A107
East 1 : 300
Sheet Number:
A107
Sheet Name: Scale: Date: Client/Tutor:
Elevations N & E 1 : 300 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
1
2
3
4
5
6
7
90000 15680
17800
11520
11520
17800
15680
2 A108
Roof Height 12250
Level 2 7140
Level 1 4080 Base Lvl DNT 3000
Ground Floor 0
Column Footing -2500
1 A110
1 A108
Section 1 1 : 300
I
H
G
F
E
D
C
B
A
110000 18204
17000
14328
2
5468
5468
14328
17000
18204
1 A108
A110
Roof Height 12250
Level 2 7140
Level 1 4080
Ground Floor 0
Column Footing -2500
2 A108
Section 2 1 : 300
Sheet Number:
A108
Sheet Name: Scale: Date: Client/Tutor:
Section 1 : 300 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
2.1
2.2
2.3
2.4
61200 19000
23200
19000
Roof Height 12250
Level 2 7140
Level 1 4080
Ground Floor 0
Column Footing -2500
1 A109
Section 3 1 : 300
Sheet Number:
A109
Sheet Name: Scale: Date: Client/Tutor:
Section 1 : 300 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
600
600
South facing glazing located behind solar panels provide year round diffused lighting
Solar panels face North, at optimum angle of 58 degrees for year round exposure
300
300
300
300
58 .00 °
170
170
170
680
510
0° 34.5
170
170
Roof louvered to angle to 34.5 degrees; equivalent of sun angle at noon on winter solstice. Allows increased winter sun penetration over main court, while provides increasing shade over summer.
200
1100
1 A110
Seating Detail
2 A110
1 : 10
Sheet Number:
A110
Sheet Name: Scale: Date: Client/Tutor:
Detail Diagrams As indicated 02/10/2016 Dan Giuffre
Skylight Diagram 1 : 20
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
Sheet Number:
A111
Sheet Name: Scale: Date: Client/Tutor:
Part Facade 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
Sheet Number:
A112
Sheet Name: Scale: Date: Client/Tutor:
Exploded Iso 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
Sheet Number:
A113
Sheet Name: Scale: Date: Client/Tutor:
3D Cut Away 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
Sheet Number:
A114
Sheet Name: Scale: Date: Client/Tutor:
Internal Perspectives 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
Sheet Number:
A115
Sheet Name: Scale: Date: Client/Tutor:
Internal Perspectives 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
Sheet Number:
A116
Sheet Name: Scale: Date: Client/Tutor:
External Perspectives 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker
Sheet Number:
A117
Sheet Name: Scale: Date: Client/Tutor:
External Perspectives 02/10/2016 Dan Giuffre
Project Name: Basketball Stadium Project Number: ARCT5590 Project Address: Perth, Western Australia 6002
Drawn By: Signed Checked By: Signed
21313068 Checker