ARCT 5590 - ASSIGNMENT 2 21313068
Assignment 2 - Sheet List
A200 A201 A202 A203 A204 A205 A207 A208 A209 A210 A211 A212 A213 A214
Sheet Name Cover Sheet Facade / Roof Panel Schedule Door Schedule Seating Schedule Floor Schedule Glazing, Wall & Ceiling Schedule Material Take-Offs Render 1 Render 2 Render 3 Render 4 Render 5 Render 6 Energy Analysis
Project Name:
Basketball Stadium
Perth, Western Australia 6002 Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Cover Sheet Scale
A200
22/10/2016 12:13:25 PM
Sheet Number
Assembly Code Space Frame Pattern Space Frame Pattern B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220
System Panel Glazed B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 Polycarbonate Panel B2020220 B2020220 B2020220 B2020220 B2020220 B2020220 B2020220
Count
Construction Type
Area (rounded)
Total Area
Cost (/sqm)
Total Cost (rounded nearest 1000)
1 m² 12 m² 4 m² 148 m² 977 m² 91 m² 1314 m² 524 m² 144 m² 751 m² 326 m² 283 m² 567 m² 125 m² 565 m² 816 m² 959 m² 720 m² 76 m² 848 m² 417 m² 147 m² 297 m² 28 m² 88 m² 182 m² 54 m² 226 m² 35 m² 94 m² 12 m² 13 m² 13 m² 14 m² 10868 m²
$1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00 $1770.00
$1000 $21000 $8000 $262000 $1729000 $161000 $2326000 $928000 $254000 $1329000 $577000 $501000 $1003000 $221000 $1000000 $1445000 $1697000 $1274000 $134000 $1500000 $738000 $260000 $526000 $50000 $155000 $323000 $95000 $399000 $61000 $166000 $22000 $22000 $23000 $25000 $19236000
0 m² 5 m² 201 m² 303 m² 28 m² 175 m² 7 m² 3241 m²
$730.00 $730.00 $730.00 $730.00 $730.00 $730.00 $730.00 $730.00
$0 $4000 $147000 $221000 $20000 $128000 $5000 $2366000
2 m² 47 m² 27 m² 47 m² 99 m² 83 m² 1598 m² 5863 m² 16731 m²
$785.00 $785.00 $785.00 $785.00 $785.00 $785.00 $785.00
$2000 $37000 $21000 $37000 $78000 $65000 $1255000 $4385000 $23621000
1 10 3 83 434 36 466 160 40 189 75 61 112 23 99 131 142 99 10 107 50 17 33 3 9 18 5 20 3 8 1 1 1 1 2451
Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame Steel Space Frame
1 m² 1 m² 1 m² 2 m² 2 m² 3 m² 3 m² 3 m² 4 m² 4 m² 4 m² 5 m² 5 m² 5 m² 6 m² 6 m² 7 m² 7 m² 8 m² 8 m² 8 m² 9 m² 9 m² 9 m² 10 m² 10 m² 11 m² 11 m² 12 m² 12 m² 12 m² 13 m² 13 m² 14 m²
10 9 165 179 12 57 2 853
Glazed Roofing Panel Glazed Roofing Panel Glazed Roofing Panel Glazed Roofing Panel Glazed Roofing Panel Glazed Roofing Panel Glazed Roofing Panel Glazed Roofing Panel
1 m² 1 m² 2 m² 2 m² 3 m² 3 m² 4 m²
4 44 16 22 34 25 421 1853 4304
Roofing Panel Roofing Panel Roofing Panel Roofing Panel Roofing Panel Roofing Panel Roofing Panel
1 m² 1 m² 2 m² 2 m² 3 m² 3 m² 4 m²
FACADE SPACE FRAME AND PANEL UNIT
GLAZED AND POLYCARBONATE ROOF PANELS
Project Name:
Basketball Stadium
Perth, Western Australia 6002
*EACH PANEL IN FACADE SYSTEM IS UNIQUE AND AREAS RESPRESENTED IN SCHEDULE ARE ROUNDED VALUES - A MORE DETAILED AND ACCRATE COSTING COULD BE ACHIEVED IN SCHEDULING
Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Facade / Roof Panel Schedule Scale
A201
22/10/2016 12:13:28 PM
Facade / Roof Schedule
Door Schedule Level
Family
Type
Count
Height
Width
Unit Cost
Total Cost
D01 C1020320
Ground Floor
M_Single-Flush
0915 x 2134mm
12
2134
915
$670.10
$8041.20
C1020320
Level 1
M_Single-Flush
0915 x 2134mm
4
2134
915
$670.10
$2680.40
D02 C1020320
Ground Floor
Double-Flush
1830 x 2134mm
6
2134
1830
$1240.00
$7440.00
D03 B2030120
Ground Floor
Door - Double Glass - Push bar Door - Double Glass (AUS) Push bar (AUS)
1
1925
1828
$3810.00
$3810.00
B2030120
Ground Floor
Door - Double Glass - Push bar Door - Double Glass (AUS) Push bar (AUS)
9
1925
1850
$3810.00
$34290.00
D04 C1020330
Ground Floor
M_Single-Flush
Toilet Door 700
30
2134
700
$376.00
$11280.00
D05 B2030900
Ground Floor
Sliding Door - 4 Panel (AUS)
Type 1
1
2900
6600
$22950.00
$22950.00
Image
Project Name: $90491.60
Basketball Stadium
Perth, Western Australia 6002 Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Door Schedule Scale
A202
22/10/2016 12:13:28 PM
Assembly Code
Straight Seating Schedule Assembly Code
Family
Type
Tier Level
Seats in Row
Count
Total Number of Seats
Unit Cost
Total Cost
4 Seat Row E2010500 E2010500
Stadium Seating Rows Stadium Seating Rows
4 Seat Row 4 Seat Row
Ground Floor Level 1
4 4
16 48
64 192
$250.00 $250.00
$16000.00 $48000.00
16 Seat Row E2010500
Stadium Seating Rows
16 Seat Row
Ground Floor
16
16
256
$250.00
$64000.00
20 Seat Row E2010500 E2010500
Stadium Seating Rows Stadium Seating Rows
20 Seat Row 20 Seat Row
Ground Floor Level 1
20 20
48 36
960 720 2192
$250.00 $250.00
$240000.00 $180000.00 $548000.00
Curve Seating Schedule Family
Type
Tier Level
Base Offset
Seats in Row
Count
Total Number of Seats
Unit Cost
Total Cost
Seating - Stadium Curves 2 E2010500 Railing E2010500 Railing E2010500 Railing E2010500 Railing E2010500 Railing E2010500 Railing
Seating - Stadium Curves 2 Seating - Stadium Curves 2 Seating - Stadium Curves 2 Seating - Stadium Curves 2 Seating - Stadium Curves 2 Seating - Stadium Curves 2
Ground Floor Ground Floor Ground Floor Ground Floor Ground Floor Ground Floor
1020 mm 1530 mm 2040 mm 2550 mm 3060 mm 3570 mm
5 7 8 10 11 13
4 4 4 4 4 4
21 27 33 39 45 51
$250.00 $250.00 $250.00 $250.00 $250.00 $250.00
$5314 $6805 $8297 $9788 $11279 $12770
Seating - Stadium Curves E2010500 Railing E2010500 Railing E2010500 Railing E2010500 Railing E2010500 Railing E2010500 Railing
Seating - Stadium Curves Seating - Stadium Curves Seating - Stadium Curves Seating - Stadium Curves Seating - Stadium Curves Seating - Stadium Curves
Level 1 Level 1 Level 1 Level 1 Level 1 Level 1
0 mm 510 mm 1020 mm 1530 mm 2040 mm 2550 mm
34 37 40 43 46 49
4 4 4 4 4 4
138 150 162 174 186 198 1223
$250.00 $250.00 $250.00 $250.00 $250.00 $250.00
$34465 $37447 $40430 $43412 $46395 $49377 $305780
ORANGE HIGHLIGHT BLUE HIGHLIGHT -
Project Name:
STRAIGHT SEATING CURVE SEATING
Basketball Stadium
Perth, Western Australia 6002 Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Seating Schedule 1 : 500
Scale
A203
22/10/2016 12:14:07 PM
Assembly Code
Assembly Code
Elevation
Area
Volume
Cost (/sqm)
Total Cost
Basketball Court Basketball Court
0 mm 0 mm
829 m² 2203 m²
141.00 m³ 374.54 m³
$116.25 $116.25
$96422.40 $256122.00
In-Situ Ground Slab 200mm A1030200 Floor
In-Situ Ground Slab 200mm
0 mm
6025 m²
1204.99 m³
$85.15
$513025.79
Pre-Cast Stadium Tier Floors 170mm B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor B1010412 Floor
Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm Pre-Cast Stadium Tier Floors 170mm
0 mm 0 mm 510 mm 1020 mm 1530 mm 2040 mm 2550 mm 3060 mm 3570 mm 4080 mm 4080 mm 4590 mm 5100 mm 5610 mm 6120 mm 6630 mm 7140 mm 7140 mm
73 m² 146 m² 76 m² 96 m² 99 m² 83 m² 106 m² 109 m² 112 m² 152 m² 1933 m² 158 m² 164 m² 170 m² 165 m² 183 m² 163 m² 423 m² 13470 m²
13.95 m³ 27.76 m³ 14.43 m³ 18.29 m³ 18.88 m³ 15.87 m³ 20.07 m³ 20.65 m³ 21.24 m³ 28.83 m³ 367.33 m³ 29.99 m³ 31.19 m³ 32.37 m³ 31.34 m³ 34.74 m³ 31.06 m³ 80.32 m³ 2558.85 m³
$130.00 $130.00 $130.00 $130.00 $130.00 $130.00 $130.00 $130.00 $130.00 $130.00 $130.00 $130.00 $130.00 $130.00 $130.00 $130.00 $130.00 $130.00
$9541.62 $18993.89 $9870.49 $12514.22 $12918.99 $10851.83 $13737.37 $14129.76 $14533.55 $19724.10 $251329.01 $20506.68 $21341.53 $22149.38 $21439.87 $23767.05 $21253.50 $54956.87 $1439129.91
Basketball Court C3020450 C3020450
Family Floor Floor
Type
Project Name:
Basketball Stadium
Perth, Western Australia 6002 Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Floor Schedule Scale
A204
22/10/2016 12:14:08 PM
Floor Schedule
Glazing & Wall Schedule Assembly Code
Family
Type
Base Offset
Total Lengths
Width
Area
Cost (/sqm)
Total Cost
20
109 m²
$305.00
$33165.09
500 m²
$730.00
$365237.06
3407 m² 29 m² 29 m² 31 m² 32 m² 34 m² 45 m² 47 m² 49 m² 51 m² 55 m² 4418 m²
$355.00 $355.00 $355.00 $355.00 $355.00 $355.00 $355.00 $355.00 $355.00 $355.00 $355.00
$1209341.68 $10139.49 $10460.03 $11076.85 $11397.65 $11998.10 $16061.42 $16703.82 $17346.21 $17988.60 $19546.03 $1750462.04
Bathroom Partition Wall 20mm C1010180 Basic Wall
Bathroom Partition Wall 20mm
0
76720 mm
Glazed Curtain Wall B2020200 Curtain Wall
Glazed Curtain Wall
0
180289 mm
Stadium Wall - Pre-Cast Concrete Wall C1010120 Basic Wall C1010120 Basic Wall C1010120 Basic Wall C1010120 Basic Wall C1010120 Basic Wall C1010120 Basic Wall C1010120 Basic Wall C1010120 Basic Wall C1010120 Basic Wall C1010120 Basic Wall C1010120 Basic Wall
Stadium Wall - Pre-Cast Concrete Wall Stadium Wall - Pre-Cast Concrete Wall Stadium Wall - Pre-Cast Concrete Wall Stadium Wall - Pre-Cast Concrete Wall Stadium Wall - Pre-Cast Concrete Wall Stadium Wall - Pre-Cast Concrete Wall Stadium Wall - Pre-Cast Concrete Wall Stadium Wall - Pre-Cast Concrete Wall Stadium Wall - Pre-Cast Concrete Wall Stadium Wall - Pre-Cast Concrete Wall Stadium Wall - Pre-Cast Concrete Wall
0 1020 1530 2550 3060 3570 4080 4590 5100 5610 6630
1217197 mm 89143 mm 91964 mm 97394 mm 100218 mm 106103 mm 140557 mm 146212 mm 151867 mm 157522 mm 171432 mm 2726618 mm
200 200 200 200 200 200 200 200 200 200 200
Ceiling Schedule
C3030220 C3030220 C3030220 C3030220 C3030220 C3030220 C3030220
Family Compound Ceiling Compound Ceiling Compound Ceiling Compound Ceiling Compound Ceiling Compound Ceiling Compound Ceiling
Type Gypsum Finish Ceiling Gypsum Finish Ceiling Gypsum Finish Ceiling Gypsum Finish Ceiling Gypsum Finish Ceiling Gypsum Finish Ceiling Gypsum Finish Ceiling
Area
Cost (/sqm)
Total Cost
84 m² 106 m² 84 m² 84 m² 216 m² 104 m² 194 m² 872 m²
$76.50 $76.50 $76.50 $76.50 $76.50 $76.50 $76.50
$6421.97 $8075.23 $6421.96 $6421.96 $16561.22 $7979.10 $14807.14 $66688.59
CURTAIN WALL GLAZING PANELS
Project Name:
Basketball Stadium
Perth, Western Australia 6002 Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Glazing, Wall & Ceiling Schedule Scale
A205
22/10/2016 12:14:09 PM
Assembly Code
Wall Material Takeoff Assembly Code
Material: Name
Facade and Roof Material Takeoff
Material: Area
Basic Wall Bathroom Partition Wall 20mm C1010180 Wood Sheathing, Chipboard Stadium Wall - Pre-Cast Concrete Wall C1010120 Concrete, Precast C1010120 Gypsum Wall Board
Width
109 m²
20 mm
3808 m² 3801 m² 7717 m²
200 mm 200 mm
Assembly Code
Material: Name
Material: Area
Space Frame Pattern Space Frame Pattern B2020220 B2020220
GFRC Plastic, Opaque Blue
10868 m² 10868 m²
System Panel Glazed B2020220
Glass
3968 m²
Polycarbonate Panel B2020220
Polycarbonate, White
1910 m² 27614 m²
Ceiling Material Takeoff Assembly Code
Material: Name
Gypsum Finish Ceiling C3030220 Gypsum Wall Board C3030220 Steel, Alloy
Material: Area 872 m² 872 m² 1743 m²
Floor Material Takeoff
Floor Basketball Court C3020450 C3020450
Material: Name
Concrete - Cast-in-Place Concrete - 35 MPa Custom Basketbal Court Material
In-Situ Ground Slab 200mm A1030200 Concrete, Cast In Situ Pre-Cast Stadium Tier Floors 170mm B1010412 Concrete - Cast-in-Place Concrete - 35 MPa B1010412 Terrazzo
Material: Area
3033 m² 3033 m²
6025 m²
4412 m² 4412 m² 20914 m²
Project Name:
Basketball Stadium
Perth, Western Australia 6002 Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Material Take-Offs Scale
A207
22/10/2016 12:14:13 PM
Assembly Code
Basketball Stadium
Perth, Western Australia 6002 Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Render 1 Scale
A208
22/10/2016 12:14:15 PM
Project Name:
Basketball Stadium
Perth, Western Australia 6002 Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Render 2 Scale
A209
22/10/2016 12:14:16 PM
Project Name:
Basketball Stadium
Perth, Western Australia 6002 Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Render 3 Scale
A210
22/10/2016 12:14:18 PM
Project Name:
Basketball Stadium
Perth, Western Australia 6002 Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Render 4 Scale
A211
22/10/2016 12:14:21 PM
Project Name:
Basketball Stadium
Perth, Western Australia 6002 Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Render 5 Scale
A212
22/10/2016 12:14:23 PM
Project Name:
Basketball Stadium
Perth, Western Australia 6002 Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Render 6 Scale
A213
22/10/2016 12:14:26 PM
Project Name:
Project Name:
Basketball Stadium
Perth, Western Australia 6002 Project number
ARCT5590
Due Date
23/10/2016
Drawn By Client/Tutor:
21313068 Dan Giuffre
Energy Analysis Scale
A214
22/10/2016 12:15:13 PM
3D ENERGY MODEL USED FOR ANALYSIS
(QHUJ\ $QDO\VLV 5HSRUW
(QHUJ\ $QDO\VLV 5HSRUW
$QQXDO &DUERQ (PLVVLRQV
$VVLJQPHQW (QHUJ\ 0RGHO $VVLJQPHQW (QHUJ\ $QDO\VLV $QDO\]HG DW 30
(QHUJ\ $QDO\VLV 5HVXOW
$QQXDO (QHUJ\ 8VH &RVW
%XLOGLQJ 3HUIRUPDQFH )DFWRUV
(QHUJ\ 8VH )XHO (QHUJ\ 8VH ,QWHQVLW\
/LIH &\FOH (QHUJ\ 8VH &RVW
5HQHZDEOH (QHUJ\ 3RWHQWLDO (QHUJ\ 8VH (OHFWULFLW\
(QHUJ\ $QDO\VLV 5HSRUW
(QHUJ\ $QDO\VLV 5HSRUW
0RQWKO\ +HDWLQJ /RDG
0RQWKO\ (OHFWULFLW\ &RQVXPSWLRQ
0RQWKO\ 3HDN 'HPDQG 0RQWKO\ &RROLQJ /RDG
$QQXDO :LQG 5RVH 6SHHG 'LVWULEXWLRQ
0RQWKO\ )XHO &RQVXPSWLRQ
(QHUJ\ $QDO\VLV 5HSRUW
(QHUJ\ $QDO\VLV 5HSRUW
$QQXDO :LQG 5RVH )UHTXHQF\ 'LVWULEXWLRQ
0RQWKO\ 'HVLJQ 'DWD
0RQWKO\ :LQG 5RVHV $QQXDO 7HPSHUDWXUH %LQV
(QHUJ\ $QDO\VLV 5HSRUW
'LXUQDO :HDWKHU $YHUDJHV
+XPLGLW\