Rome, Italy ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021
MEGHAN E. RODENHISER ROBERTO VIOLA OCHOA ARCH 513 INTEGRATED PROJECT DESIGN FALL 2021
TABLE OF CONTENTS: SITE & CONTEXT REGIONAL CITY SITE BUILDING NARRATIVE TECHNICAL RESEARCH CODE STRUCTURAL ENVELOPE MECHANICAL APPENDICES SCHEMATIC DESIGN SET ADDITIONAL RESEARCH PRELIMINARY STUDIES
1 SITE AND ITS CONTEXT
As the ancient and modern seat of power in the Mediterranean, the city of Rome has a rich and diverse history spanning millennia. Traces of this deep rooted history are visible today through the city’s multitude of monuments, piazzas, urban systems, and architecture. It is impossible to design in a city such as this without understanding the context in which the city has developed and grown. This research looks beyond aesthetics and design and seeks to understand how factors such as climate, geography, history, and politics shaped both the architecture and the urban fabric surrounding the city and the site. This analysis will help to inform our design and allow us to create a building that is truly connected and integrated into the urban fabric of the area.
ROME, ITALY The country of Italy is located on a boot-shaped peninsula in the middle of the Mediterranean Sea. The mountainous peninsula is divided down the center by the Apennine Mountain Range and protected in the north by the Alps. The rivers flowing from these mountain ranges into the valleys below created areas that were ideal for early settlements. Today’s major cities across Italy, such as Milan, Venice, and Florence, grew from early settlements located along these rivers. Today as in ancient times, roads and various modern means of transportation connect these major cities creating a network through which people, ideas, and goods can travel and spread. These cities established unique cultures that formed the various regions of Italy. Rome is located in the region of Lazio bounded to the East by the Apennine Mountains and to the West by the Tyrrhenian Sea. Even though Lazio has the capital of Italy within it, the region is predominantly agricultural, producing goods such as olives, wine grapes and kiwi. This is due to the area’s Mediterranean climate, consisting of moderate winters and warm/humid summers. Rome, like many other major cities in Italy, was settled around the Tiber River. The river provided the city not only protection from invaders but a means of transportation for goods and people, creating the basis for their economy. The early settlement was located close to the banks of the Tiber river. The river was constantly flooding yet the Romans did not see this as a problem, they celebrated the floods because they understood what the river provided for the settlement. In fact, they created plaques for buildings that survived the flooding. After a while flooding became too much for the city and they constructed walls in order to keep the floods at bay. This ultimately cut all ties to the river for the citizens of Rome. As the city grew people began to fill in the low lying areas in between the 7 hills. These hills acted as the first boundary of Rome with vineyards on the outskirts and Palatine Hill serving as the city center for the area’s scattered inhabitants.
ETTER ihr
one
Th
of
Bologna
Florence
ow
Rome
h Ee
m ooo
3
o
Ei
E
j
Palermo
Highway’s Throughout Italy
E
Naples o
Railway’s Throughout Italy
E E Ei y
a
E
if
o
Ei
g
EI
M
Rome
According to ancient Roman Myths, the city of Rome, first known as the Eternal City, was founded on the banks of the Tiber where the twins Romulus and Remus were found by a she-wolf. In reality, Rome was formed around 750 BC when scattered settlements around the Seven Hills of Rome came together. Palatine hill served as the city center where inhabitants created markets, temples, and other civic buildings, turning the water-logged valley into a city. As the city continued to grow, the Romans began to engineer paved roads, reaching in all directions towards far away settlements and lands. The roads allowed merchants and armies to quickly move between cultural and civic centers across the peninsula, elevating Rome’s status as a military power and transportation hub. As Rome continued to grow and prosper, as both a military and economic power, the city became subject to outside attacks and invasions. In order for the city to protect itself and its people, Rome invested heavily in its military and constructed walls as a defensive border around the city. The first set of walls, known as the Servian Wall were constructed in the fourth century BC. Over the next six centuries, the city outgrew the limits of the Servian Wall, rendering the wall useless. The city then constructed the new Aurelian Wall in the late third century AD Which encompassed an area almost three times the size of the previous city limits. Within the new walls, the city was divided into 14 districts called the Rioni. From the third century AD through the medieval era, the urban fabric of Rome remained largely unchanged. The ancient Roman systems, temples, and structures fell into disrepair after the Fall of the Roman Empire. It wasn’t until the eighth century that the papacy came into power. For nearly a milenia, the Pope was the primary religious and civic leader of Rome, responsible for all urban reconstruction projects throughout the city. The largest of these projects happened during the 16th century when for nearly 50 years, several popes, including Pius IV, Pius V and Sixtus V, sought to restore the city of Rome and improve the urban fabric. They ordered ancient roman aqueducts be restored, roads widened and paved, and public fountains to be installed in piazzas across the city. Pope Sixtus V conceived of a new system of roads that would cut across the existing medieval fabric, connecting major monuments and landmarks around Rome. Many of these roads are still in existence today.
After Italy became a unified country in 1861, roughly 300 years after Pope Sixtus V carved new roads through the city, Rome underwent another transformation. The city was named the capital of the new nation, however it’s infrastructure was insufficient to handle the influx of new residents. There was no sewer system, poor circulation, and a lack of housing. Between 1873 and the 1910s, the city completed several master plans which outlined new neighborhoods, a number of which were brought to fruition.
ROME TRANSPORTATION The roads created by Pope Sixtus V are still used today as the primary routes throughout Rome, giving way to nearly every neighborhood while also allowing travel out of the city. Rome has always been a transportation hub for Italy. The main train station, Roma Termini, is located in the midst of the city, creating a landmark for what the city stands for and how it has developed over the years. Almost every neighborhood within Rome has a major landmark that begins to make up the layout of that particular area. These landmarks also help to give Rome its identity,
Highways Throughout Rome
Railway’s Throughout Rome
7
21 22 8
2
20 23 9
3
Esquilino Monti Celio S.Saba Testaccio Ripa Campitelli S.Angelo Regola Ponte Parione S.Eustachio Pigna Trevi Castro Pretorio Sallustiano Ludovisi Colonna Campo Marzo Pincino Olympic Village Flaminio Della Vittoria Prati Borgo Trastevere
24 19
25
16
17
18
15
4
10
14 10 11
12
13 2
9
8
1
26 7
5
11
3 6 4 6
5
12
1. Trervi Fountain 2. Roman Forum 3. Spanish Steps 4. Vatican 5. Villa Giulia 6. Baths of Caracalla 7. Colosseum 8. St. Mary of Angels Martyrs 9. Pantheon 10. Piazza Navona 11. Porta Pinciana 12. Basilica Di Santa Maria Maggiore
Today, Rome spans far beyond the Aurelian Wall and the original 14 Roni. With close to three millennia of growth and history it is not surprising that the urban structure varies between neighborhoods. In the old neighborhoods of Rome, such as Ponte, located within the borders of the Aurelian wall, the streets are extremely narrow and laid out haphazardly, with no discernible pattern. The buildings are unusually shaped and densely packed into the irregular blocks. As is typical with the vernacular architecture of the area, the buildings in this neighborhood are stone structures, rising multiple stories tall with minimal footprints. Neighborhoods that were planned after the unification of Italy, such as Prati and Della Vittoria are much more formal than the older neighborhoods. Unlike Ponte, the Della Vittoria neighborhood is designed in a radial pattern, centered around a piazza. The main streets were designed much wider to accommodate the circulation of traffic (and later automobiles) with banks of trees lining the streets. The architecture, while constructed in a similar manner to the older areas of Rome, is more formal, taking on the characteristics of the neoclassical style. The blocks are taken up almost entirely by large buildings with central courtyards, as opposed to the random collection of buildings in the historic center. The main difference between Della Vittoria and Prati is that the latter was laid out in a grid pattern as opposed to a radial plan. Both neighborhoods are reminiscent of Hussman’s design for Paris.
Ponte
The neighborhoods planned in the beginning of the twentieth century, such as Pinciano, are laid out in the romantic/ picturesque style. The streets in these neighborhoods are wide, curving roads that were designed for automobile traffic and inspired by the rural movement occurring around the world during this period in time. The buildings are multistory apartments that utilize concrete as opposed to the traditional stone construction. Unlike other neighborhoods in Rome, the buildings in areas such as Pinciano are not densely packed, instead they are detached from the other buildings.
Della Vittoria
Prati
Pinciano
GENERAL CLIMATE: The weather that Rome experiences throughout the year is very mild with summer highs of 80-90 degrees and winters that get down to around 40 degrees. This type of weather leaves Rome with four seasons, Spring, Summer, Fall and Winter. Each of these seasons bring different environmental conditions for the city. All the conditions are generally more mild allowing the architecture within Rome to use specific design elements such as a patio and thinner buildings to help with combating the varying weather conditions. The geographical location puts it under the CSA, Mediterranean Climate, on the Koppen Climate Classification Chart. This classification just means that Rome is susceptible to more dry summer’s and wetter winter’s. With the location near the water the humidity within Rome tends to be higher. This is also something to take into consideration when looking at the architecture and how they begin to combat the weather. It is also important to look into the humidity and the varying weather it is also important to note the movement of air within the city. The wind speed in Rome ranges from a light to gentle breeze according to the Beaufort Scale. What this means for Rome is leaves and twigs will move and there will be a slight rustle of leaves throughout the year. With this slight breeze being nearly year round, the city is able to use differing types of architectural elements such as window placements to help circulate air through the use of patio design. VERNACULAR ARCHITECTURE Vernacular architecture is designed to respond to the local needs of the people and the climate. The climate in Italy, particularly Rome, is hot and humid, especially during the summer months. One way in which the local architecture combats this is by constructing buildings out of stone. The thick stone walls absorb the sun’s energy during the day, keeping the interior of the buildings at a comfortable temperature, and release the stored heat at night when the temperature drops. For this reason, Italians have been constructing their buildings out of stone for centuries. Modern buildings use this same principle however instead of using stone, they use concrete.
KOPPEN CLIMATE CLASSIFICATION CHART
WEATHER IN ROME
VERNACULAR ARCHITECURE (CONT.) Another traditional material used in Italian vernacular architecture is the iconic clay tile. Clay tile roofs are incredibly durable, capable of lasting for over three hundred years. They are also naturally thermal resistant, meaning that they reflect the heat of the sun during the day, preventing the interior of the building from heating up. The way they are configured also adds to their thermal resistance. In the area around Rome, clay roofs use a series of interlocked half round tiles; two on the top and one on the bottom. This configuration allows for a natural air barrier, reducing the amount of heat transferred into the building. Another common, yet simple device used to combat the climate in the region is shutters. In Rome, operable shutters are not only used to prevent water from entering the building, but to control the amount of sun as well. On a warm day, shutters can be closed to filter the amount of light coming into the space, preventing the air from heating up. The way the structures are configured also helps to combat the heat. Many buildings in Rome either have thin profiles or have a courtyard at the center. These building configurations allow for increased cross ventilation through the structure, cooling the space without the need for A/C. Courtyard buildings, or buildings arranged along a narrow street also enjoy the benefits of the “courtyard effect”. During the day, the sun heats the air in the courtyard or narrow street. The warm air rises, causing the cooler air in the interior of the building to rush out, creating a cooling effect. When night falls, and the temperatures drop, the cool air then drops into the courtyard, causing the airflow to move in the opposite direction.
NEIGHBORHOOD The project is located at the edge of two neighborhoods in Rome, the Flaminio neighborhood and the Pinciano neighborhood. The Flaminio neighborhood is named for the Via Flaminia which marks the eastern edge of the area. For centuries, the land along the Via Flaminia was made up of vineyards and farmland. At the turn of the century, after the unification of Italy, the area was laid out and developed as an industrial district just outside of the historic center. The major business in the area was related to the automobile industry until WWI when the plants were converted into weapons manufacturing plants. In recent years, the neighborhood has undergone another transformation, shifting from a center of industry to a center for the arts. Today the area is home to cultural institutions such as the MAXXI museum, Auditorium Parco della Musica, and the Accademia Filarmonica Romana. The accademia is an institution that has been in the area for over a century, bringing together amateurs and professional musicians through their shared love of music.
Important Places Along / Near Via Flaminia
CULTURE Since Rome has been around for centuries it has a very rich culture. THe culture within Rome has changed from century to century and that is seen through how the different neighborhoods have changed. This specific neighborhood along via flaminia has a very interesting culture. Along one side of the street there are what would consist of typical Roman vernacular architecture and what one would think of when they think of coming to the city. While on the other side of the road it is more industrial with a rich street art culture. This street also has a very popular market that became a stop along the road. This market begins to bring a different feel for the space. As of right now the side of the street that is more industrial is full of one story buildings that are either boarded up or worn down. There are also advertisements stuck to the front of the facades. This is adding to the idea of street art and the street as a way to advertise within this area. Another thing to note about the culture is the tram system with these wires that hang above the street. These begin to establish a height over the street almost as if it is its own space. This condition is not specific to this area, it is a system used all throughout the city. The neighborhood is not full of color, the streets seem almost as if they were monochrome. The vibrance within the city comes from the gardens. This creates an interesting vegetation condition for the area.
SITE HISTORY / DEVELOPEMENT The Accademia Filarmonica Romana is located in an incredibly unique part of Rome. The site sits along the Via Flaminia, less than a half mile from the Porta Flaminia, the Aurelian Wall, and Piazza del Popolo. In ancient times, the Via Flaminia was one of the most important roads in Rome, stretching from Piazza Colonna in Rome to Rimini. The route was not only important for trade with cities north of Rome, but also for military campaigns and expansion. Throughout the Roman Empire, emperors, military leaders, and wealthy citizens, took exceptional interest in the road, building temples, bridges, and even tombs at the edge of the street. To have a tomb on the street was considered a high honor. The Via Flaminia retained its importance well into the Renaissance. When dignitaries or nobility visited Rome from the north, they would travel along the Via Flaminia and ceremoniously enter through the Porta Flaminia (Porta Del Popolo). As visitors would often stay the night just outside the gate, the area was the ideal place to build papal villas such as Villa Giulia and eventually Villa Borghese. In the sixteenth century, the area just outside the gate consisted mainly of vineyards and farms owned by wealthy citizens. It was not until Italy was unified in the mid nineteenth century that the area was developed into neighborhoods and middle class housing. The site sits between two of these neighborhoods, Pinciano to the west, which encompasses Villa Giulia and Villa Borghese, and Flaminio to the east, which was named for the ancient road.
SUMMERS IN ROME Summers in Rome consist of consistent 80 degree weather paired with little to no rain. Though there is little to no rain because of the geographical location of Rome the summers are extremely humid. The site that we are looking at will have direct sun at almost all hours, this means we need to take this into consideration when looking at how to approach the site. The sun at its highest point will be hitting the front facade, there will be no relief from the direct beams other than if it is more cloudy. Though the site is generally more vulnerable to the sun, luckily Rome tends to have a slight breeze at all times. The wind direction in the summer predominately comes from the West. Taking advantage of this breeze could be helpful when creating airflow within the site. Architectural solutions to these conditions would be looking at finding a material that can be heated up from the sun throughout the day and used for heat at night when the temperatures begin to drop. As for the wind, window placement and thinking about having a patio for air to flow throughout the space cooling it naturally.
LOCATION:
Rome, LZ, ITA
Latitude/Longitude: Data Source:
41.9° North, 12.483° East, Time Zone from Greenwich 1 ISD-TMYx 162400 WMO Station Number, Elevation 311 ft
JUNE - AUGUST
0 5 10 15 20 25 30 35 mph
WEST
WIND SPEED (mph)
EAST 35 mph
MAX
30
25 20 AVG 15 10 5 MIN 0
25 20 15 10 5 0
0% AVG
RH
100%
MIN
TEMP 0%
AVG MAX
10%
HOURS
20%
10%
Start "Animation" to see monthly plots or select the "One Month" option and cycle through months by clicking "Next Month".
Back
Next
WINTERS IN ROME The winter season for Rome consists of rain and stronger winds, combined with temperatures that get down to 40 degrees. Just as in the summer there will be solar gains for the site with the sunrising southeast of the site and setting in the southwest. Through the winter season the wind predominantly comes from the East. This brings an interesting condition to the site of understanding how the hill along the back of the site begins to move the air. There will be cover from the wind and it will be broken up by the vegetation around the site. The conditions that are currently around the site have are more focused on patio buildings, also their materiality. This area is protected by the vegetation that is within the area. Architectural solutions and thinking about the approach to the site should be more focused on how to use the sun and its orientation and how to protect the courtyard condition that is being created by the existing buildings on the site.
WIND WHEEL
LOCATION:
Rome, LZ, ITA
Latitude/Longitude: Data Source:
41.9° North, 12.483° East, Time ISD-TMYx 162400 WMO Statio
LEGEND TEMPERATURE (Deg. F) < 32
DECEM
32 - 70 70 - 75 75 - 100 > 100 RELATIVE HUMIDITY (%) <30
0
30-70
5
>70
10 15 20 25 30 35 mph
WEST
EAST 35 mph 30 25 20
All Hours 1 a.m.
Selected Hours through
All Months DEC
Selected Months through
One Month One Day Animate Monthly Daily Hourly
midnight
JAN 1
15 10 5 0
0% AVG
100%
FEB Next Month Next Day
0%
Pause Stop
10% 20%
Start 10%
20%
Start "Animation" to see monthly plots or select the "One Month" option and cycle through months by clicking "Next Month".
The vegetation that is more local to our site consists of Cypress and Stone Pine trees. These trees like many others around the area were planted in place of the native vegetation. When looking at the site these will be the trees that line the street in front of the site, Via Flaminia. The trees within the site, like the architecture, help to control the wind that enters these spaces, especially in the winter. Since the Cypress and Stone Pine trees categorize as evergreens their leaves sprout and stay around yearly, but the Mulberry trees being deciduous the leaves fall around the winter time. Around the year our site is protected by the vegetation that emcompasses it. SITE CONTEXT / CONDITIONS The Accademia Filarmonia Romana is located along the edge of Villa Giulia. This leaves the site with an interesting topographic condition. The site is mostly flat but at the back of the site there is about an 80’ hill, leading to the gardens of Villa Giulia. This hill begins to create a border between the Accademia and Villa Giulia. Giving the feeling of disconnect, even though the site used to be used as farmland for the vineyards. It is worth noting that this site is surrounded by local shops and restaurants and also has a bus stop just down the road at Del Popolo, this will give the site a very active street life. Another thing when looking deeper into the context where the site is, the street art culture that is prevalent. There are also advertisements placed along the facade of the building. One half of the street seems more worn down while the other half seems as if it is a completely different vernacular of architecture. As of right now the layout of the buildings that the accademia uses create a courtyard space which they use for performance and such. Also across the street there is an open space with parking, this could be used as access to the site. The site is roughly 163’ by 300’ ; these dimensions are a rough estimate around the site to understand scale and the area that we will be dealing with. This does not include touching the already existing accademia buildings.
VEGETATION / SOIL / TOPOGRAPHY Throughout history this site has been subject to change in the soil makeup. This is due to its geographical location, being in between two volcanoes and along the Tiber River. These two major landmarks played a huge role in how the soil is on the site today. It is made up of volcanic deposits, which leaves the soil in a permeable state. The soil got this way over many years with volcanic activity and also the flooding of the Tiber river. Both of these, you could say “natural disasters’ changed the makeup of the soil. When the volcanoes erupted and the river flooded it left debris which was ultimately soaked into the soil, giving it the unique conditions that it has today. The soil that is in Italy has the ability to become geothermal. With the specifics of the site the only way for this to happen would be to create a vertical loop, instead of horizontal. This just means that to get the energy in a geothermal way we would need to drill deeper into the soil. Italian soil has the correct make up and almost all of italy could be fueled by geothermal energy. The vegetation on the site has changed drastically over its lifetime, starting with being a vineyard and now it is a place where gardens and trees are the main source of vegetation. The inspiration for how the vegetation that we now see in Rome was based on the aesthetic of Italian renaissance gardens. Over the course of time the species that were native to Rome began to disappear because people were planting new species of plants for their gardens. These plants were not native to Rome and led to the shift in vegetation throughout. Rome started to become known for their stone pine trees also known as Umbrella Trees that line the streets. These trees are exactly as they sound, they look like giant umbrellas and provide the perfect amount of shae when walking along the streets of Rome. Though these trees are rooted in the identity of Rome, they are not native to the area, they were planted by Mussolini in the 1920’s. With a lifespan of 100 to 150 years these trees are beginning to fall and creating a concern for trees crashing into buildings.
VEGETATION ON SITE The vegetation around our site is very dense, there are a lot of stone pine trees, palm trees and bamboo stocks. Yes, bamboo. They are used as a means of creating a wall for the outdoor performance space to feel as if it is its own room. There are also little flowers throughout the site. Helping to give this space a feel for what a roman garden would be like. The vegetation within this site provides the academia with the perfect set up for outdoor performances.
ACCADEMIA FILARMONICA ROMANA The Accademia Filarmonica Romana is one of the oldest musical institutions in Italy. This institution was founded in 1821 in the spirit of amateurism. People who received a great musical preparation only for them to play in their living rooms. It was founded by nobles and wealthy bourgeois who were led by Marquis Raffaele Muti Papazzuri. All of these amatuer singers and instrumentalists used this space to put on performances that showcase their talent. After about 3 years the academia received recognition from the Papal state, this led them to change their agreement between private individuals so they could stay a part of the cultural life in Rome. In 1870 the Papal government ordered a reauthorization of the filarmonica, changing their outlook to not be focused on amateurism but rather a more professional institution. With this change the enthusiasm of amatures was only a memory and they began to lack on their financial means. This particular building along via flaminia is used as an administrative headquarters. This is because of the growth of academia. They were able to purchase a theater in the Olympic village which is north of the headquarters. The Accademia Filarmonica Romana the years of the filarmonicas life have been filled with troubles but it has broadened the musical activity and understanding within the accademia, these changes are associated with what was happening in the city at that time. This is a place that holds a lot of history along via flaminia and within the musical community. The accademia not only does performances in theaters but they also do them in the garden that is just behind the building. The layout of the accademia has created almost a courtyard condition for the institution to be able to put on concerts and great an outdoor experience.
This project is an “addition” to the Accademia Filarmonica Romana. We will be using the unused space by the institution to give more space to the accademia. The location of this site is in between the existing Accademia Filarmonica Romana and one story industrial buildings. Across the street there is a garden which creates an interesting condition for when looking into how to deal with climatic issues.
Site
The main way to access the site would be from Via Flaminia, which is one of the main roads within Rome. This street has vehicle access while also having a tram that runs along the street. The train station for people to travel that way is down the road by Piazza Del Popolo. Pedestrians are able to walk up next to the building but this road within Rome is mostly vehicular based rather than being for pedestrians. This site is within an industrial area within Rome that could be developed soon. Taking this into consideration when looking at not focusing too much on the buildings to the south for this reason. These buildings could and probably will change over time which will change how the building receives the sun from the south and the site will be more shaded then it is as of now. The other site condition that should be noted is how the buildings look architecturally. Being that the neighborhood they were built in was built in the 18th century it is important to look into how they used design and materials to uphold the test of time and weather.
Accademia Filarmonica Romana
Site Access
Park Across from the Site
The site is bound to the North by an 80’ hill filled with vegetation. This hill creates a barrier between our site and Villa Guilia. This hill creates multiple conditions when thinking about the climate by also how the site could be used. Is there a way to use the hill to create an interesting spatial condition? The hill becomes an identity for the site giving it a backdrop that the Accademia puts to use. The importance of the hill and the spaces it creates for the accademia seems important to how they function within the space.
2 BUILDING NARRATIVE
Given the knowledge of the region, city, and site acquired through extensive research, it becomes the challenge of the designer to decide how to best shape the project. How does one relate the architecture to the place, context, and site? What character and identity is being expressed through the design? What is the best approach to the organization of the site and the spaces within the project. How do the materials and tectonics of the building enhance the character of the project? How does the design respond to the climate and site conditions? By considering and exploring these questions, a set of princples and site intentions emerge that help to guide the project through all phases of the design, from the conceptual to the technical.
SITE SCHEME - PUBLICLY PRIVATE Throughout Rome, there is a set of relationships between public vs. private, street and site, interior vs. exterior that most buildings adhere to. The public area of the street is defined by the massive facades that protect the interior of the building from the world outside. It is very clear where the public space ends and the private space begins. This scheme asks the question what if this was not the case? What if the public space extended beyond the street? How can this be achieved without ignoring the relationship between street and site? Often along Italian streets, loggia’s are used as transitional spaces between the public and private realms. They allow for the creation of a barrier without shutting out the public. Instead of thinking as the loggia as a series of columns and arches, the loggia at the edge of the site is made of a series of parallel walls extending into the site. As one approaches the site the walls create the illusion of a closed, solid façade, maintaining the relationship to the street. it is only as one passes in front of the loggia that the walls open up revealing the site beyond. The extended walls of the loggia frame ones few of the garden and the buildings beyond allowing the public to visually interact with the site. The perspective quality of the loggia lining up with the parallel buildings beyond entices visitors to be pulled through the site, where they can appreciate the gardens and the artists at work. The central pathway between the two buildings was inspired by the feeling of walking through the old streets of Rome. Life happens between the buildings and in the streets in Italy. One walks by store fronts, restaurants, and shops and there is an opportunity to interact with the people around you. The pathway between the buildings becomes the main circulation space for both the public and the artists. Instead of an imposing façade separating the interior of the buildings from the exterior of the building, the façade becomes permeable, through the use of a double wall system. The interior wall is made of glass while the exterior wall is composed of a brick screen. This screen allows the sounds of music, dancing, and performances to move flow out towards the public, creating a sensory experience for those moving between the buildings, while providing a sense of privacy and protection from the sun at the interior. Just as with the loggia, and the screened walls, the design of the landscape plays off of the idea of conceal and reveal. Reminicant of moving through the Villa Giula, it is not until one moves through the the site that they discover the changes in the landscape that create sunken spaces where exterior performance and gathering can take place.
INITIAL SITE SCHEME
CONCEPTUAL SITE RENDERING
PRECEDENT ANALYSIS 1: BAGSVAERD CHURCH LOCATION: BAGSVAERD, DENMARK BUILT: 1976 ARCHITECT: JORN UTZON Bagsvaerd Church has a long, slender, rectangular form, arranged along a grid, which encompasses the entire program. The corridors, which serve as the primary circulation space, run along the exterior walls, creating the façades, and divide the building into distinct programmatic zones, ranging from public to private. On one side of the building, the exterior wall is completely closed off, protecting the spaces within from the outside world. On the other side of the building, the exterior walls have been punctured and eroded, allowing people to access the interior courtyards located in each section of the building. These courtyards serve as secondary circulation spaces. Though the exterior walls hide the true form of the spaces within the building, they do express the hierarchy of the spaces through height. The taller walls correspond with the religious and public programs of the building, all located to one side of the building. As one moves further into the building, the spaces within become more private and closed off. The rooms become smaller, the courtyards become enclosed, and the corridors become less permeable.
GENERATIVE PLAN
PROJECT PLAN This plan was organized using a grid system and a 7.5 foot square module. Like Jorn Utzon’s Bagsvared Church, the circulation corridors are pushed to the exterior of the building creating a protective barrier between the interior and the outside world. This protective barrier is solid and monolithic on three of the foor sides of the buildings. The fourth side is carved away allowing entrances into courtards located in the more public areas of the buildings. these court yards serve as secondary circulation. The facade uses a perforated brick screen to maintain a sense of privacy and protection for the interior spaces while also allowing light and music to flow between the public street and the spaces. The brick screen also references the degree of privacy each space posesses. Denser screens are used in front of the more private spaces. The building’s facade hides the true form of the building inside, whose ceiling are shape to create the best acoustical enviornment for the various concert halls and practive rooms. The corridors, in addition to providing the primary circulation space for the building, also help to divide the space into distinct public, semi-public, and private zones. Dividing the program into two buildings allows for built enviornment to define a space for social interaction inbetween.
HIERARCHY OF SPACE
SPATIAL RELATIONS
GENERATIVE MODEL
CIRCULATION
PRECEDENT ANALYSIS 2: MUSEE CANTONAL DES BEAUX ARTS LOCATION: LAUSANNE, SWITZERLAND BUILT: 2019 ARCHITECT: BAROZZI VEGA
GENERATIVE PLAN
HIERARCHY OF SPACE
The geometric composition of Barozzi Vega’s Musee Cantonal des Beaux Arts is based off of a long, narrow module that is repeated to create a compact, slender form. The width of this module is expressed on the exterior of the building using a series of louvers that spans the entire north facade. The louvers allow the façade to become more permeable on this side, where the building faces onto a public space. In contrast, the south façade of the building is monolithic, protecting the building and the program from the industrial railyard beyond. On the inside, the modules are used to place the interior partitions. Throughout the first floor, there are a number of narrow cores, typically 2 -3 modules wide, which hold the auxiliary functions and service spaces that help to define the public areas of the building. The most important public space is the central atrium. The atrium is aligned with the historic 19th building located along the south wall of the museum and is further accentuated by the walls that extend into the public square. The main horizontal circulation space occurs along the south wall, where visitors can pass between the various galleries. A secondary circulation space occurs along the north side of the building, at the top of the service cores. These small passages lead to emergency exits located on either side of each space. As one moves from the central atrium towards the ends of the building the spaces become more private, holding functions such as office and classrooms, and less important hierarchically. PROJECT PLAN
SPATIAL RELATIONS
GENERATIVE MODEL
CIRCULATION
This plan was generated using long narrow modules to organize the various programmatic spaces. The spaces are separated on the interior by long, cores that serve as the vertical circulation and service spaces for the buildings. The primary horizontal circulation space is located at the rear of the building and extends the entire length of each building, giving access to each area. The programmatic spaces are organized within the building moving from public to private along the horizontal axis. The facades of the building facing the public street are louvered, providing a sense of permiability as one moves through the site. The more private a space is the denser the louvers become, allowing visitors to get a sense of the building’s program from the exterior. The public is able to further read the building from the exterior through the use of banding that coresponds with the service spaces. These spaces are constricted allowing light to enter the building through these spaces. Dividing the program into two buildings allows for built enviornment to define a space for social interaction inbetween.
FORMAL COMPOSITION: This composition, like the last one, also used the second site strategy, in which the buildings and structures placed on the site become the shapers of space. Many of the elements from the previous composition remained the same, such as the grid organization, circulation corridors, strong protective facades, and hierarchical massing of the various programmatic volumes. The main difference between this composition and the last one is the connection between the public pathway created by the twin buildings and the Giardini della Filarmonica. The first compositional strategy completely blocked off the public spaces of the new project from the Accademia gardens. While this defined the edge of the site and the space of the garden, it limited the interaction between the two spaces. As this intervention on the site is conceptualized as an addition to the Accademia, this second iteration strives to make that connection. The courtyards, instead of serving as secondary circulation between interior spaces, become the links between the Giardini della Filarmonica and the new public pathway. This compositional strategy also plays more with the erosion of the rectilinear form. Towards the front of the site, where the programmatic spaces are more public, the walls of the building begin to be carved away creating courtyards that are partially visible from the street. This strategy allows for different layers of the building to be visible from the street, enticing the public to enter the space. This architectural move give the illusion that the public pathway narrows as one moves through the space, creating a moment at the end of the path where the space opens up to the garden beyond.
PLACE, CONTEXT, SCALE The site is located along the Via Flaminia, an ancient Roman road that once served both merchants and the military, connecting Rome to cities in northern Italy. The road begins just outside of the ancient city walls, at the Porta Del Popolo, and stretches all the way to Rimini. For centuries, the land along this road consisted of vineyards, farms, and villas owned by prominent members of Roman society, including Pope Julius’s Villa Giulia, located just behind the site. Farm buildings, churches, tombs, and walls lined the road much like the current buildings do today. In one such building, located directly adjacent to the site, is the Accademia Filarmonica Romana, an organization that brings together musicians and artists of all skill levels and social standings to promote the arts within the community. Often, the Accademia will utilize the rear garden as a social and concert space, inviting the public to view various performances throughout the year. The garden, however, is cut off from the street by the Accademia buildings, greatly limiting the public’s interaction with the space. The main intention of this intervention is to create a series of public spaces that connect the Giardini della Filarmonica will the public realm of Via Flaminia. Similar to the ancient and medieval fabric of the city, the buildings and structures on the site are designed to serve as shapers of public space. They not only define the boundary of the site itself, but the edges of the public spaces within the site as well. In some cases, the buildings define the edges of the public spaces whereas at other times the buildings are carved away to create courtyard spaces within the building. The courtyards are used to bring natural light into the various programmatic spaces. When arranging the buildings on the site, it was important push the intervention up to the edge of the street, creating a strong relationship between the area of the street and the site. Throughout Rome, buildings line the street, not only defining the edges of the public realm, but creating an imposing, continuous façade that stretching the length of the roadway. These strong facades were designed to protect the interior of the building by creating a barrier between interior and the outside world. To ignore the established relationship between the street and the facade would make the building feel out of place within the context of the city. This intervention, however, challenges the notion that the street facade has to be an impenetrable barrier between the street and the interior of the site. Instead this façade becomes permeable as one approaches the site, extending the public realm into the interior of the site.
SPACE, CHARACTER, ATMOSPHERE, IDENTITY Throughout Italy, one of the most common building typologies is the courtyard building. The courtyard plan has been used in this part of the world for millennia, stretching back to the time of the Roman Empire. In ancient and modern plans alike, courtyards are used as social spaces as well as circulation spaces within the building. They are public areas, surrounded and protected by the rooms of the house, to be used by members of the family and their guests. In most cases, these courtyards also serve as devices to bring light and fresh air into the building. Much like the public piazzas in the city, the building defines the edges of the courtyard creating these public spaces. In this intervention, the intention is that visitors will be able to circulate through the site via the public spaces created by the various buildings and structures. The spaces are purposefully arranged so the more public spaces, such as the gardens and entry areas, are located towards the front of the site while the more private areas, such as the administration offices, are located to the rear of the site. The pathway created by the two buildings is designed to draw visitors through the site, allowing them to discover aspects of the building as that travel down the path. When walking through the site and courtyards, the line between public and private becomes slightly blurred. The facades of the buildings facing the central path become semi permeable, through the use of brick screens. This allows visitors to catch a glimpse of the activity on the interior of the buildings while also allowing music and sound to flow into the courtyards and pathway, filling the space. The buildings are designed to have a monolithic quality. This design choice is in reference to the monolithic nature of the Aurelian Wall, located just a few hundred feet away, and ancient ruins scattered throughout Rome. This building quality was also inspired by Rationalist Italian architecture, which became popular in the 1920s and 30s when this area of Rome was developed. Rationalist architecture in Italy drew inspiration from the tradition forms of ancient Roman architecture, such as the arch and column, and simplified these elements to create a modern architecture that felt timeless, yet still connected to site and its context. As this site has a rich history that spans several thousand years, it is important to design buildings in such a way that they feel both of the time and connected to the past.
ORGANIZATION & ARTICULATION In addition to the loggia that serves as the entrance to the site from the Via Flaminia, there are two, twin, rectilinear buildings that contain the project’s programmatic spaces. One building contains all of the conservatory spaces whereas the other building houses the public and chamber orchestra spaces. The buildings are organized along a grid system that is based off of a square module. Similar to the way the buildings and structures define the public spaces on the site, the circulation corridors define the different spaces within the building. These circulation corridors make up the inhabitable, protective barrier between the interior spaces and the outside world. The sizes of these corridors are depended on the programs that they serve; the more public the program is the wider the corridors become. The articulation of the facades change based on their relationship to the site and the interior programs. Where the facades face the edges of the site, the walls of the buildings become more soild, drawing from the Roman tradition of protecting the building’s interior. When the facades face onto a public space the walls are carved away, creating entrances into courtyards that connect to public areas of the buildings. In addition to allowing light an air to enter the building, these courtyards also serve as circulation spaces between the public pathway and the Giardini della Filarmonica, creating a physical and visual connection between the two spaces. The exterior facade sof both buildings are comprised of a reclaimed tile screen. This screen appears monolithic from a distance, relating to the monolithic nature of the ancient Roman architecture, and become more permiable as the closer one gets. an interior facade, comprised of clay blocks and curtian walls, set just behind the screen creates a series of solids and voids that plays with the concept of permiablity. More public spaces within the building are highlighted with opens while the private function are shelded from the outside. As one moves through the site and the buildings, the program shifts from public to private, similar to a traditional Roman house. The difference between a traditional Roman house plan and this design is that the pathway created between the two buildings extends the public space further into the site, creating a condition where the buildings become more private as one move away from the center. The hierarchy of the spaces within the building is expressed by the height of the various volumes. While this gives visitors a hint at what is happening on the interior of the building, it is not until they are inside that they discover the true form of each rooms. Inside the ceilings are shaped to create the best acoustical environment for the various concert halls and practice rooms.
1
2
4
3
5
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
440'-0"
8'-0"
48'-0"
16'-0"
16'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
24'-0"
16'-0"
8'-0"
16'-0"
8'-0"
GRILL OVER FRESH AIR INTAKE PIT
A 8'-0"
ELECTRICAL A118
8'-0"
B
C ACOUSTIC WALL TREATMENTS
COVERED WALKWAY
SKY BRIDGE ABOVE
LINEAR VENTILATION GRILLS
LOUNGE
COURTYARD
A101
A102
24'-0"
A113 DANCE HALL
BATHROOM ACOUSTIC WALL TREATMENTS
A107
1 1
A2.01
A2.01
ACOUSTIC WALL TREATMENTS DANCE HALL
LARGE REHEARSAL ROOM
COURTYARD
LARGE REHEARSAL ROOM
A103
A104
A105
A106
CHOIR ROOM
COURTYARD
A109
A110
D
RECORDING BOOTH
MAINTENANCE
A115
A117
16'-0"
CONTROL ROOM A114
BATHROOM A108
E 8'-0"
SOUND LOCK A116
8'-0"
F
G CLOSET
CLOSET
A111
A112
8'-0"
PUBLIC GARDEN SPACE
48'-0"
PUBLIC PATHWAY
208'-0"
H
COVERED WALKWAY
RECLAIMED CLAY TILE SCREEN FACADE
I
PUBLIC GARDEN SPACE
B109
8'-0"
CURTAIN WALL SYSTEM
CLOSET
8'-0"
J
LOBBY
K ACOUSTIC WALL TREATMENTS
ACOUSTIC WALL TREATMENTS
VESTIBULE
OFFICE
8'-0"
B104
B125
B112
STORAGE
COFFEE LOUNGE
B120
B121
B102
OFFICE
16'-0"
L LINEAR VENTILATION GRILLS STORAGE
B126
CAFE/ BAR B101
TECHNICAL
ORCHESTRA HALL
STAGE
BACKSTAGE
B108
B113
B115
B116
B118
RECEPTION/ SECURITY
B124
MEETING ELECTRICAL
B105
M
COURTYARD
B122
OFFICE
2
B127
A2.01
B119
16'-0"
2 A2.01
SMALL ORCHESTRA HALL
KITCHEN CLOAKROOM
FIRSTAID
B106
B107
BATHROOM
BATHROOM
VESTIBULE
B110
B111
B114
N
OFFICE VESTIBULE
STAFFCLOSET
B117
B123
B128
8'-0"
B103
8'-0"
O
8'-0"
P ELECTRICAL B117
Q GRILL OVER FRESH AIR INTAKE PIT
ACCADEMIA FILARMONICA ROMANA
SCALE : 1/8" = 1'-0"
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
FIRST FLOOR PLAN DATE : 12/10/2021
A1.02
1
2
4
3
6
7
11
12
18
21
20
25
26
27
32
34
35
37
T.O_PARAPET 31'-4" T.O_ROOF_SLAB 28'-8"
DANCE HALL
COURTYARD
DANCE HALL
A101
A102
A103
SMALL REHEARSAL ROOM
SMALL REHEARSAL ROOM
A202
A206
T.O_PARAPET 23'-9" T.O_ROOF_SLAB 21'-2"
BATHROOM A107
LARGE REHEARSAL ROOM
LARGE REHEARSAL ROOM
A104
A106
T.O._TECHNICAL_FLOOR 16'-5" T.O_SECOND_FLOOR_SLAB 14'-4"
COURTYARD
BATHROOM
CHOIR ROOM
A105
A108
A109
COURTYARD
RECORDING STUDIO
A110
MAINTENANCE
A114
A115 T.O_TECHNICAL_FLOOR 2'-1" T.O_FIRST_FLOOR_SLAB 000'-0"
T.O_BSMT_FLOOR -12'-6" B.O_FOOTING -15'-3" BOREHOLE @ 300 FT DEEP. EACH BOREHOLE PROVIDES 2 COOLING TONS
1
BUILDING A: LONGITUDINAL SECTION SCALE: 1/8" - 1'-0"
1
2
3
6
7
8
10
16
18
19
20
25
28
29
31
32
33
35
36
37
T.O_PARAPET 37'-4" T.O_ROOF_SLAB 34'-8" T.O_PARAPET 31'-4" T.O_ROOF_SLAB 28'-8" TECHNICAL B202
T.O_PARAPET 23'-9" T.O_ROOF_SLAB 21'-2"
BALCONY B204
INSTRUMENT STORAGE B207
T.O._TECHNICAL_FLOOR 16'-5" T.O_SECOND_FLOOR_SLAB 14'-4"
KITCHEN
CAFE/ BAR
RECEPTION/ SECURITY
B103
B101
B105
SMALL ORCHESTRA HALL B108
TECHNICAL B113
ORCHESTRA HALL
STAGE
B115
B116
BACKSTAGE
MEETING
COURTYARD
OFFICE
B118
B120
B126
B124
T.O_TECHNICAL_FLOOR 2'-1" T.O_FIRST_FLOOR_SLAB 000'-0"
T.O_BSMT_FLOOR -12'-6" B.O_FOOTING -15'-3"
BOREHOLE @ 300 FT DEEP. EACH BOREHOLE PROVIDES 2 COOLING TONS
2
BUILDING B: LONGITUDINAL SECTION SCALE: 1/8" - 1'-0"
ACCADEMIA FILARMONICA ROMANA
SCALE : 1/8" = 1'-0"
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
BUILDING SECTIONS DATE : 12/10/21
A2.01
TECTONICS & MATERIALITY This project is designed to be monolithic in nature, using brick as the primary building material. This is a reference to the ancient Roman’s use of brick masonry in many of their structures and buildings as well as the continued use of masonry construction across Italy throughout the centuries. The heaviness of the material anchors the project to the earth and the site while also enhancing the protective quality of the private facades. In this environment, brick masonry is an ideal choice for construction. The inherent qualities of the material and the various types of wall constructions provide the opportunity for brick to be utilized as more than just structure. Whenr constructed out of masonry, walls can be used to achieve a thermal mass that helps keeps the building temperature regulated throughout the year. Clay bricks, a traditional Roman building material, have intrinsic thermal qualities that allow them to absorb heat during the day and release it at night. As a result, the use of brick could allow for little to no insulation to be used within the walls themselves. Another material used throught the project is the reclaimed clay tile that comprises the screen which envelopes the buildings. The reclaimed clay tile is a referenc to the iconic clay tile roof used across Rome and throughout Italy. For centuries, local builders have been using clay tiles to not only protect the interoir of their building from inclimate weather, but also to combat the intense Roman sun. The clay tiles, much like the clay bricks, absorb the heat, preventing any thermal transfer into the buildings. The use of this iconic tile helps to connect the project back to the history and the context of the site. The clay tile screen helps the project to achieve the desired monolithic look while still allowing for indirect sulight and ventilation. Additionally, the clay tiles help to enhance the concept of permiablity at the envelope. The spacing of the clay tiles, as well as the curtian wall beyond, allows visitors to the site to catch a glimpse of what is going on inside of the building, enticing vistors to explore the Accademia further. By using the reclaimed tiles in this way, the facades of the project feel rooted in the history of the site, yet modern and timeless.
ENVIORNMENTAL STEWARDSHIP: One of the goals of this intervention is to draw inspiration from traditional and vernacular Roman architecture in order to integrate passive strategies into the design of the buildings. One such aspect of vernacular Roman architecture is the use of brick masonry. Thick masonry walls have thermal properties that allow the brick to absorb the sun’s energy during the day, keeping the interior of the buildings at a cool, comfortable temperature. At night, when the temperature drops, the stored heat is released into the interior of the building warming the space throughout the night. The use of these thermal walls helps to keep the interior of the buildings comfortable without the need for heavy, excessive mechanical systems. Another common strategy for solar management in Rome is shutters. Shutters on Roman buildings are used to help control the amount of sunlight coming into the building, preventing the air on the interior of the building from heating up. While traditional shutters will not be employed in this design, the idea of controlling and managing the amount of sunlight entering a space a consideration. The clay tile screens employed along the public facing façades help to control the amount of sunlight coming into the building, helping to create a cooler environment for users of the space. The configuration of courtyards within the structure is also inspired by traditional Roman architecture. Many buildings in Rome either have thin profiles or have a courtyard at the center. These building configurations allow for increased cross ventilation through the structure, cooling the space without the need for A/C. Courtyard buildings, or buildings arranged along a narrow street also enjoy the benefits of the “courtyard effect”. During the day, the sun heats the air in the courtyard or a narrow street. The warm air rises, causing the cooler air in the interior of the building to rush out, creating a cooling effect. When night falls, and the temperatures drop, the cool air then drops into the courtyard, causing the airflow to move in the opposite direction.
Garden space to engage with the public and absorb rainwater. Buildings oriented to take advantage of the east west winds for cooling. Brick screening to control the amount of sunlight entering the space. Brick masonry construction for thermal mass benefits. Courtyard effect to help cool the interior spaces of the building. Courtyards provide light and fresh air to interior spaces
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
440'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
24'-0"
GRILL OVER FRESH AIR INTAKE PIT
BE
16X20
20X28
LINEAR VENTILATION GRILLS
L
16X20
BATHROOM A107
LARGE REHEARSAL ROOM
CHOIR ROOM
COURTYARD
A105
A106
A109
A110
16X20
COURTYARD
CONTROL ROOM A114
BATHROOM
3 TECHNICAL SOLUTIONS 1
A2.02 2
20X28
CLOSET
CLOSET
A111
A112
16X20
16X20
16X20
20X28
16X20
16X20
16X20
16X20
A108
33
34
16'-0"
35
8'-0"
36
16'-0"
37
8'-0"
8'-0"
A
B 8'-0"
ELL MOUTH RETURN DUCT 16X20
24'-0"
1 A2.01
D MAINTENANCE
A115
A117
16'-0"
RECORDING BOOTH
16X20
E 8'-0"
SOUND LOCK
8'-0"
F
8'-0"
G
208'-0"
H
48'-0"
16X20
A116
16X20
A113
16X20
LOUNGE
16X20
16X20
C
Good architecture is about more than the overall design and aesthetics of a project. Successful architects and designers find a way to intergrate all aspects of the design, from the appearance of the project to the configureation of the building systems, into one cohesive unit. Any changes to the structure, envelope, or systems would affect the way the project percieved by the public and change the function of the design. This protion of the design process draws upon the intentions and priciples established earlier in the project to inform choices about the more technical aspects of the design.
PROGRAM
NET SF/ROOM QTY
TL NET SF
TL GROSS SF
OCC. GROUP
OCC. FCTR
PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS
entrance/lobby recep0on/info center security sta0on cloakroom first aid sta0on Cafeteria bar kitchen kitchen storage
1500 200 100 300 150 800 300 250 80
1 1 1 1 1 1 1 1 1
1500 200 100 300 150 800 300 250 80
2500.00 333.33 166.67 500.00 250.00 1333.33 500.00 416.67 133.33
A-3 B B B B A-2 A-2 A-2 S-2
CHAMBER ORCHESTRA HALL CHAMBER ORCHESTRA HALL CHAMBER ORCHESTRA HALL CHAMBER ORCHESTRA HALL CHAMBER ORCHESTRA HALL CHAMBER ORCHESTRA HALL
Main Hall stage Main hall Secondary Hall Changing room (performer)-backstage Instrument/equipment storage IT-Control room
3500 1200 800 1200 800 500
1 1 1 1 1 2
3500 1200 800 1200 800 1000
5833.33 2000.00 1333.33 2000.00 1333.33 1666.67
A-1 AS PER PROGRAM A-1 STAGE A-1 AS PER PROGRAM B LOCKER ROOM S-1 STORAGE B BUSINESS
MANAGEMENT MANAGEMENT MANAGEMENT MANAGEMENT MANAGEMENT
staff entrance offices mee0ng rooms staff closet coffee room/staff room
60 1250 300 150 400
1 1 1 1 1
60 1250 300 150 400
100.00 2083.33 500.00 250.00 666.67
B B B S-1 B
CONSERVATORY CONSERVATORY CONSERVATORY CONSERVATORY CONSERVATORY CONSERVATORY CONSERVATORY CONSERVATORY
Rehearsal room-small Rehearsal room-large Rehearsal room-choir Dance studio Recording studio Instructor/Manager lounge area instrument/equipment storage Locker rooms
350 2500 1800 1200 1150 600 1500 2000
8 2 1 2 1 1 1 1
2800 5000 1800 2400 1150 600 1500 2000
4666.67 8333.33 3000.00 4000.00 1916.67 1000.00 2500.00 3333.33
E VOCA. ROOM E AS PER PROGRAM E AS PER PROGRAM E EXERCISE E VOCA. ROOM B BUSINESS S-1 STORAGE A-3 LOCKER ROOM
MAINTENANCE MAINTENANCE MAINTENANCE MAINTENANCE
Waste room/recycling Equipment room Locker room/changing area Laundry room
250 500 250 250
1 1 2 1
250 500 500 250
416.67 833.33 833.33 416.67
S-2 S-2 B S-2
ASM. UNCON BUSINESS BUSINESS LOCKER ROOM BUSINESS ASM. UNCON ASM. UNCON KITCHEN STORAGE
BUSINESS BUSINESS BUSINESS STORAGE BUSINESS
STORAGE STORAGE LOCKER ROOM STORAGE
OCC./
OUP A-3 B B B B A-2 A-2 A-2 S-2
OCC. FCTR
OCC./ ROOM
EGRESS REQS
50% OCC.
M. TOILETS
F. TOILETS
LAVATORY
BUBBLERS
ASM. UNCON BUSINESS BUSINESS LOCKER ROOM BUSINESS ASM. UNCON ASM. UNCON KITCHEN STORAGE
100.00 2.22 1.11 10.00 1.67 53.33 20.00 2.08 0.44
2 EXITS 1 EXIT 1 EXIT 1 EXIT 1 EXIT 2 EXITS 1 EXIT 1 EXIT 1 EXIT
50.00 1.11 0.56 5.00 0.83 26.67 10.00 1.04 0.22
0.40 0.04 0.02 0.20 0.03 0.36 0.25 0.01 0.00
0.77 0.02 0.01 0.10 0.02 0.36 0.25 0.01 0.00
0.50 0.06 0.03 0.25 0.04 0.27 0.27 0.01 0.00
0.20 0.02 0.01 0.10 0.02 0.11 0.04 0.00 0.00
A-1 AS PER PROGRAM A-1 STAGE A-1 AS PER PROGRAM B LOCKER ROOM S-1 STORAGE B BUSINESS
300.00 80.00 40.00 40.00 4.44 11.11
2 EXITS 2 EXITS 1 EXIT 1 EXIT 1 EXIT 1 EXIT
150.00 40.00 20.00 20.00 2.22 5.56
1.20 0.32 0.16 0.80 0.02 0.22
2.31 0.62 0.31 0.40 0.02 0.11
1.50 0.40 0.20 1.00 0.04 0.28
0.60 0.16 0.08 0.40 0.00 0.11
BUSINESS BUSINESS BUSINESS STORAGE BUSINESS
0.67 13.89 3.33 0.83 4.44
1 EXIT 1 EXIT 1 EXIT 1 EXIT 1 EXIT
0.33 6.94 1.67 0.42 2.22
0.01 0.28 0.07 0.00 0.09
0.01 0.14 0.03 0.00 0.04
0.02 0.35 0.08 0.01 0.11
0.01 0.14 0.03 0.00 0.04
E VOCA. ROOM E AS PER PROGRAM E AS PER PROGRAM E EXERCISE E VOCA. ROOM B BUSINESS S-1 STORAGE A-3 LOCKER ROOM
56.00 80.00 80.00 48.00 23.00 6.67 8.33 66.67
2 EXITS 2 EXITS 2 EXITS 1 EXIT 1 EXIT 1 EXIT 1 EXIT 2 EXITS
28.00 40.00 40.00 24.00 11.50 3.33 4.17 33.33
0.56 0.80 0.80 0.48 0.23 0.13 0.04 0.27
0.56 0.80 0.80 0.48 0.23 0.07 0.04 0.51
1.12 1.60 1.60 0.96 0.46 0.17 0.08 0.33
0.56 0.80 0.80 0.48 0.23 0.07 0.01 0.13
S-2 S-2 B S-2
1.39 2.78 16.67 1.39
1 EXIT 1 EXIT 1 EXIT 1 EXIT
0.69 1.39 8.33 0.69
0.01 0.01 0.33 0.01
0.01 0.01 0.17 0.01
0.01 0.03 0.42 0.01
0.00 0.00 0.17 0.00
8.17
9.22
12.21
5.33
B B B S-1 B
STORAGE STORAGE LOCKER ROOM STORAGE
1080.47
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DISTANCE 179'-2"
EXIT DISTANCE 145'-4"
BATHROOM 4-OCC REHEARSAL-SMALL
REHEARSAL-SMALL
16-OCC
16-OCC
BATHROOM 4-OCC
EXIT STAIR 48" EGRESS WIDTH OCC. CAP = 240
EXIT STAIR 48" EGRESS WIDTH CAP = 240
LONGEST DIAGONAL 211'-2"
EXIT DISTANCE 74'-1"
EXIT DOOR 48" EGRESS WIDTH CAP = 240
LONGEST DIAGONAL 196'-2"
EXIT DISTANCE 138'-3"
EXIT DISTANCE 138'-11"
BATHROOM BATHROOM 3-OCC IT-CONTROL
BALCONY
3-OCC
107-OCC
3-OCC OCC. BY FLOOR - BASEMENT
STORAGE 3-OCC
3
40 PEOPLE
2 REQ. EXITS
BUILDING B
119 PEOPLE
2 REQ. EXITS
3 EXITS 3 EXITS
REQ. EGRESS WIDTH ACTUAL WIDTH REQ. STAIR WIDTH
ACTUAL WIDTH
8 INCHES
72 INCHES
12 INCHES
42 INCHES
24 INCHES
72 INCHES
36 INCHES
42 INCHES
EXIT DISTANCE 63'-10"
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DOOR 36" EGRESS WIDTH CAP = 180
REQ. EGRESS EXITS ACTUAL EXITS
BUILDING A
SECOND LEVEL LIFE SAFETY: OCCUPANCY AND EGRESS WIDTH
6
SCALE: 1/32" = 1'-0"
SECOND LEVEL LIFE SAFETY: EGRESS DISTANCE
9
SCALE: 1/32" = 1'-0"
SECOND LEVEL LIFE SAFETY: EGRESS REQUIREMENTS SCALE: N/A
EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180 EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DISTANCE 93'-6"
EXIT DISTANCE 92'-2"
LONGEST DIAGONAL 149'-1"
EXIT DISTANCE 140'-9"
LONGEST DIAGONAL 93'-7"
LOUNGE BATHROOM
DANCE-HALL
6-OCC
4-OCC
40-OCC DANCE-HALL
REHEARSAL-LARGE
REHERSAL-LARGE
REHERSAL-CHOIR
40-OCC
80-OCC
80-OCC
80-OCC
MAINTENANCE RECORDING-STUDIO
BATHROOM
18-OCC
21-OCC
4-OCC EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360 EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360
EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360
EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360
EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180
EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180
EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360
EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180
EXIT DOOR 72" EGRESS WIDTH CAP = 360
EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360
EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360
EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180
EXIT DOOR 36" EGRESS WIDTH CAP = 180 EXIT DISTANCE 134'-3"
EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 180
LONGEST DIAGONAL 196'-1"
EXIT DISTANCE 128'-1"
EXIT DISTANCE 72'-3"
EXIT DISTANCE 93'-2"
EXIT DOOR 72" EGRESS WIDTH CAP = 360
LOBBY 122-OCC
COFFEE-STAFF
STORAGE
6-OCC
1-OCC CAFE-BAR
RECEPT.-SEC.
147-OCC
4
KITCHEN
CLOAKROOM
FIRSTAID
2-OCC
4-OCC
2-OCC
SMALL-ORCHESTRA
IT-CONTROL
LARGE-ORCHESTRA
STAGE
BACKSTAGE
40-OCC
3-OCC
195-OCC
90-OCC
29-OCC
BATHROOM
BATHROOM
8-OCC
8-OCC
11
OFFICES MEETING
OCC. BY FLOOR - BASEMENT
7-OCC
4-OCC CLOSET 1-OCC
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DOOR 36" EGRESS WIDTH CAP = 180
REQ. EGRESS EXITS ACTUAL EXITS
BUILDING A
373 PEOPLE
2 REQ. EXITS
14 EXITS
BUILDING B
673 PEOPLE
3 REQ. EXITS
7 EXITS
REQ. EGRESS WIDTH ACTUAL WIDTH REQ. STAIR WIDTH
EXIT DOOR 36" EGRESS WIDTH CAP = 180
LONGEST DIAGONAL 443'-4"
EXIT DISTANCE 190'-4"
EXIT DISTANCE 165'-3"
ACTUAL WIDTH
74.6 INCHES
576 INCHES
-
-
135 INCHES
396 INCHES
-
-
EXIT DISTANCE 227'-8"
MINIMUM R
BUILDING
CONSERVA
2
FIRST LEVEL LIFE SAFETY:OCCUPANCY AND EGRESS WIDTH
5
SCALE: 1/32" = 1'-0"
FIRST LEVEL LIFE SAFETY: EGRESS DISTANCE
8
SCALE: 1/32" = 1'-0"
UTILITIES
FIRST LEVEL LIFE SAFETY: EGRESS REQUIREMENTS
UTILITIES
SCALE: N/A
UTILITIES UTILITIES BUILDING
CONSERVA
CONSERVA
CONSERVA
CONSERVA
CONSERVA
CONSERVA
CONSERVA
CONSERVA
CONSERVA
CONSERVA
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DISTANCE 179'-4"
EXIT DOOR 36" EGRESS WIDTH CAP = 180
LONGEST DIAGONAL 211'-3"
BUILDING
CONSERVA
CONSERVA
CONSERVA BUILDING
PUBLIC FU
PUBLIC FU
LOCKER-ROOM
MECH.
44-OCC
11-OCC
MECH
UTILITIES
9-OCC
UTILITIES UTILITIES BUILDING
PUBLIC FU
PUBLIC FU
PUBLIC FU
PUBLIC FU
PUBLIC FU
PUBLIC FU
PUBLIC FU
CHAMBER
CHAMBER
CHAMBER
CHAMBER
CHAMBER
MANAGEM
MANAGEM
MANAGEM
MANAGEM
BATHROOM
PUBLIC FU
4-OCC MECHANICAL
OCC. BY FLOOR - BASEMENT
MECHANICAL
17-OCC
5-OCC
BATHROOM
REQ. EGRESS EXITS ACTUAL EXITS
BUILDING A
64 PEOPLE
2 REQ. EXITS
2 EXITS
BUILDING B
30 PEOPLE
2 REQ. EXITS
2 EXITS
4-OCC
EXIT DOOR 36" EGRESS WIDTH CAP = 180
1
BASEMENT LEVEL LIFE SAFETY: OCCUPANCY AND EGRESS WIDTH
4
SCALE: 1/32" = 1'-0"
ACCADEMIA FILARMONICA ROMANA
LONGEST DIAGONAL 199'-4"
EXIT DOOR 36" EGRESS WIDTH CAP = 180
MEGHAN E RODENHISER
BASEMENT LEVEL LIFE SAFETY: EGRESS DISTANCE SCALE: 1/32" = 1'-0"
REQ. EGRESS WIDTH ACTUAL WIDTH REQ. STAIR WIDTH
ACTUAL WIDTH
12.8 INCHES
72 INCHES
19.2 INCHES
42 INCHES
6 INCHES
72 INCHES
10.5 INCHES
42 INCHES
PUBLIC FU BUILDING
CHAMBER
CHAMBER
CHAMBER
CHAMBER
CHAMBER
EXIT DISTANCE 139'-0"
7
BASEMENT LEVEL LIFE SAFETY: EGRESS REQUIREMENTS SCALE: N/A
10
TH
TS
TH
MINIMUM REQUIRED FIXTURES
PROGRAM
QTY
AREA /ROOM
TL NET SF
OCC. GROUP
OCC. FCTR
EGRESS REQS
OCC./ ROOM
50% OCC.
M. TOILETS
F. TOILETS
LAVATORY
BUBBLERS
BUILDING A - BASEMENT CONSERVATORY
Locker Room
2185
1
2185
B
LOCKER ROOM
44
1 EXIT
22
0.88
0.44
0.55
0.22
UTILITIES
Storage Room
690
1
690
S-1
MECHANICAL
3
1 EXIT
1.5
0.02
0.02
0.02
0.00
UTILITIES
Mechanical Room
1434
1
1434
S-1
MECHANICAL
5
1 EXIT
2.5
0.03
0.03
0.03
0.00
UTILITIES
Storage Room
693
1
693
S-1
MECHANICAL
3
1 EXIT
1.5
0.02
0.02
0.02
0.00
UTILITIES
Mechanical Room
2557
1
2557
S-1
MECHANICAL
9
1 EXIT
4.5
0.05
0.05
0.05
0.00 0.20
BUILDING A - FIRST FLOOR CONSERVATORY
Dance studio
989 2
1978
E
EXERCISE
40
1 EXIT
20
0.40
0.40
0.40
CONSERVATORY
Dance studio
994 2
1988
E
EXERCISE
40
1 EXIT
20
0.40
0.40
0.40
0.20
CONSERVATORY
Rehearsal room-large
3162 1
3162
E
AS PER PROGRAM
80
2 EXITS
40
0.80
0.80
0.80
0.40
CONSERVATORY
Rehearsal room-large
CONSERVATORY
bathroom
181
CONSERVATORY
bathroom
181
CONSERVATORY
Rehearsal room-choir
CONSERVATORY
lounge
574
CONSERVATORY
recording studio
CONSERVATORY
3090
E
AS PER PROGRAM
80
2 EXITS
40
0.80
0.80
0.80
0.40
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
1709
E
AS PER PROGRAM
80
2 EXITS
40
0.80
0.80
0.80
0.40
1
574
B
BUSINESS
6
1 EXIT
3
0.12
0.06
0.08
0.03
1005
1
1005
E
VOCA. ROOM
21
1 EXIT
10.5
0.21
0.21
0.21
0.11
maintenance
1066
1
1066
S-1
STORAGE
18
1 EXIT
9
0.09
0.09
0.09
0.01
CONSERVATORY
Rehearsal room-small
160
8
1280
E
VOCA. ROOM
4
1 EXIT
2
0.04
0.04
0.04
0.02
CONSERVATORY
bathroom
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
CONSERVATORY
bathroom
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
3090 1
1709 1
BUILDING A - SECOND FLOOR
BUILDING B - BASEMENT LEVEL PUBLIC FUNCTIONS
Bathrooms
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
PUBLIC FUNCTIONS
Bathrooms
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
UTILITIES
Mechanical Room
2744
1
2744
S-1
MECHANICAL
10
1 EXIT
5
0.05
0.05
0.05
0.01
UTILITIES
Mechanical Room
1813
1
1813
S-1
MECHANICAL
7
1 EXIT
3.5
0.04
0.04
0.04
0.00
UTILITIES
Mechanical Room
1442
1
1442
S-1
MECHANICAL
5
1 EXIT
2.5
0.03
0.03
0.03
0.00
BUILDING B - FIRST FLOOR PUBLIC FUNCTIONS
entrance/lobby
1824
1
1824
A-3
ASM. UNCON
122
2 EXITS
61
0.49
0.94
0.31
0.12
PUBLIC FUNCTIONS
reception/security station
333
1
333
B
BUSINESS
4
1 EXIT
2
0.08
0.04
0.05
0.02
PUBLIC FUNCTIONS
cloakroom
161
1
161
B
LOCKER ROOM
4
1 EXIT
2
0.08
0.04
0.05
0.02
PUBLIC FUNCTIONS
first aid station
161
1
161
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
PUBLIC FUNCTIONS
Cafeteria/bar
2201
1
2201
A-2
ASM. UNCON
147
2 EXITS
PUBLIC FUNCTIONS
kitchen
215
1
215
A-2
KITCHEN
2
1 EXIT
PUBLIC FUNCTIONS
kitchen storage
104
1
104
S-2
STORAGE
1
1 EXIT
0.5
CHAMBER ORCHESTRA HALL
Main Hall
3048
1
3048
A-1
AS PER PROGRAM
300
2 EXITS
150
CHAMBER ORCHESTRA HALL
stage Main hall
1350
1
1350
A-2
STAGE
90
2 EXITS
45
0.60
CHAMBER ORCHESTRA HALL
Secondary Hall
1012
1
1012
A-3
AS PER PROGRAM
40
1 EXIT
20
0.16
0.31
0.10
0.04
CHAMBER ORCHESTRA HALL
backstage
1416
1
1416
B
LOCKER ROOM
29
1 EXIT
14.5
0.58
0.29
0.36
0.15
73.5
0.98
0.98
0.37
0.15
1
0.01
0.01
0.01
0.00
0.01
0.01
0.01
0.00
1.20
2.31
0.75
0.30
0.60
0.23
0.09
CHAMBER ORCHESTRA HALL
Technical
245
1
245
B
BUSINESS
3
1 EXIT
1.5
0.06
0.03
0.04
0.02
MANAGEMENT
offices
165
4
660
B
BUSINESS
7
1 EXIT
3.5
0.14
0.07
0.09
0.04
MANAGEMENT
meeting rooms
353
1
353
B
BUSINESS
4
1 EXIT
2
0.08
0.04
0.05
0.02
MANAGEMENT
staff closet
160
1
160
S-1
STORAGE
1
1 EXIT
0.5
0.01
0.01
0.01
0.00
MANAGEMENT
coffee room/staff room
516
1
516
B
BUSINESS
6
1 EXIT
3
0.12
0.06
0.08
0.03
PUBLIC FUNCTIONS
bathroom
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
PUBLIC FUNCTIONS
bathroom
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
CHAMBER ORCHESTRA HALL
balcony
1227
1
1227
A-1
AS PER PROGRAM
107
2 EXITS
53.5
0.43
0.82
0.27
0.11
CHAMBER ORCHESTRA HALL
Technical
245
1
245
B
BUSINESS
3
1 EXIT
1.5
0.06
0.03
0.04
0.02
CHAMBER ORCHESTRA HALL
bathroom
154
1
154
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
CHAMBER ORCHESTRA HALL
bathroom
154
1
154
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
CHAMBER ORCHESTRA HALL
instrument storage
658
1
658
S-1
STORAGE
3
1 EXIT
1.5
0.02
0.02
0.02
0.00
BUILDING B - SECOND FLOOR
10
OCCUPANCY AND REQUIRED FIXTURE CHART SCALE: N/A
TOTAL:
10.28
10.63
14.89
3.23
REQUIRED:
11
11
15
4
PROVIDED:
16
22
32
4
STRUCTURAL SCHEME Load bearing masonry construction is the most common type of construction used in Italy. For millennia, Italians have been using stone and masonry to construct their buildings, from the simplest dwelling to their most important places of worship. Load bearing masonry has evolved over centuries of innovation. In ancient times, the first stone structures were constructed using uncut rough stone that where fitted together without any type of mortar. As type when on, builders worked towards perfecting their techniques, learning how to cut stone into smaller blocks and brick and arranging them in such a way that they strengthen the structure. Ancient Romans even developed an early version of concrete that is used in famous buildings such as the Pantheon. Given the location and history of the site, it is appropriate to use load bearing brick masonry in this project.
CONCRETE STRUCTURE ACOUSTIC FINISHES
CONCRETE STRUCTURE
One reason that brick is used so extensively in vernacular Italian architecture is its thermal qualities. Massive masonry structures help to thermally control interior spaces. Heat from the sun is absorbed and stored in the stone and masonry during the day, keeping the interior of the building cool during the day, and released at night when the temperature drops.
GLASS AIR SPACE
BRICK SCREEN FACADE
BRICK STRUCTURE
BRICK PILLAR GLASS
The use of brick masonry in this design will help to ground the project to the site. The heaviness of the material not only anchors the projects to the site but also provides a sense of permanence and timelessness to the design. The monolithic quality of the buildings reference back to nearby structures, such as the Aurelian Wall and Roman ruins, and places the project in context with the surrounding history. While Ancient Roman construction was typically simple, this does not mean that it was not well articulated. Different types and styles of brick and stone were used in order to ornament and define the project. In some cases multiple types of brick were used in the same project. This technique could be applied the this design in order to further articulate the exterior of the building while allowing the visitors better understand it’s interior functions.
Load bearing concrete walls and strucutral members are used to carry the load of the building and support the facade. The brick screen facade is set away from the structure, hiding the concrete from the exterior and creating an airspace interstitally. An operable window is placed infront of the screen for temperature control.
AIR SPACE BRICK SCREEN
In order to achieve the use of perforated brick screens, brick masonry pillars are used to carry the load of the building to the ground allowing the screens to be load free. An operable window is placed infront of the screen for temperature control.
OPUS LATERICIUM Opus caementicium (Roman Concrete) is used to fill the cavity between the brickwork in order to create a stronger more durable wall. The brickwork used to face the core protects the porous concrete.
OPUS MIXTUM Opus Mixtum walls, like Opus Latericium, use a roman concrete core to give the wall strength. The patterning of the size and shape of the brick masonry presents the opportunity to create an articulated facade.
CAVITY WALLS help to acheive thermal insulation and sound isolation as there is little way for heat or sound to transfer. Metal ties are used to connect the walls and slabs will typcially rest on the inner layer of brick. Cavities can be filled will additional insulation.
SOLID MASONRY WALLS with two layers of masonry can be used for both insulation and structure. Terra Cotta bricks have inherent thermal properties that allow them retain/reflect heat. The smaller, inner brick layer acts as the structure whereas the thicker outer layer as as the insulation.
LOAD BEARING MASONRY - CANTILEVERED SLABS
In this project, the interior walls serve as the load bearing walls for the entire project. These wall are stacked on on top of one another in order to create a continuous path from the roof to the ground. Using the interior walls as the main loadbearing walls allows for the slab to be cantilevered over the exterior circulation, creating a column free interior. Cantilevering the concrete slab allows for the exterior walls to be free from the structural load, making it possible for the wall to become more permiable. This would allow for architectural articulation such as brick screens and various texture to occur across the facades.
Load bearing masonry walls are key elements in traditional Italian construction. For this project the main load bearing walls are in set from the exterior envelope. This would allow the interior walls help with sound isolation in the musical spaces. Additionally, moving the load bearing walls to the interior helps to free up the exterior walls to create brick screens and textured effects.
While the walls running the length of the twin buildings serve as the main load bearing walls, the shorter walls running perpendicular serve as lateral support for the building. These wall help to keep the main structural walls from twisting and turning, providing stability for the structure. The concrete slab is a one way joist slab that spans the entire width of the building. The slab uses concrete joists and post tensioning techniques to help span the distance between the support walls creating a clear span below. For this project, a deep foundation system is ideal over a standard shallow foundation. One reason this is ideal is for siesmic purposes, as Rome is located near a fault line. a deep foundation allows the building to be anchored in soild bedrock. Another reason a deep foundation system would be benefitial is that the foundation can be intergrated with the structure of the basement. By using a series of load bearing walls, the basement becomes a deep structural slab. This is the same approach taken by the Maxxi Museum a few blocks away.
CANTILEVERED CONCRETE SLAB MAX = 15 FEET
LOAD BEARING STRUCTURAL MASONRY WALLS SHALLOW FOUNDATION - TYP. IN NEW ENGLAND DEEP FOUNDATION SYSTEM For this project, a deep foundation system is ideal over a standard shallow foundation. One reason this is ideal is for siesmic purposes, as Rome is located near a fault line. a deep foundation allows the building BASEMENT to be anchored in soild bedrock. INTERIOR Another reason a deep foundation REINFORCED system would be benefitial is that CONCRETE WALLS the foundation can be intergrated AND SLAB with the structure of the basement. By using a series of load bearing walls, the basement becomes a deep structural slab. This is the same approach taken by the Maxxi DEEP FOOTING Museum a few blocks away. BEDROCK
CANTILEVERED CONCRETE SLAB
DEEP FOUNDATION
LOAD BEARING STRUCTURAL WALL ONE WALL HOUSE - CHRSITIAN KEREZ
DEEP FOUNDATION / BASEMENT
FIRST FLOOR SLAB
FIRST FLOOR LOAD BEARING WALLS AND COLUMNS
SECOND FLOOR SLAB
SECOND FLOOR LOAD BEARING WALLS AND COLUMNS
ROOF SLAB
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
272'-0" 8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
A 8'-0"
ELECTRICAL A007 INTAKE
EXHAUST
8'-0"
B
24'-0"
C
A.H.U.
1
1
A2.01
A2.01
D LOCKERS
A.H.U.
MECHANICAL
MECHANICAL
A002
H.P.
A003
16'-0"
A001
H.P.
8'-0"
E
8'-0"
F
8'-0"
G CLOSET A004
H
1
48'-0"
2
208'-0"
A2.02
8'-0"
I
8'-0"
J
8'-0"
K
L A.H.U. H.P.
BATHROOM
16'-0"
A.H.U.
H.P.
B001
MECHANICAL
2
STORAGE
B003
A2.01
2
B004
M
A2.01
A.H.U. BATHROOM
16'-0"
H.P.
B002
8'-0"
N
8'-0"
O
P INTAKE
8'-0"
EXHAUST ELECTRICAL B006
Q
ACCADEMIA FILARMONICA ROMANA
SCALE : 1/8" = 1'-0"
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
BASEMENT FLOOR PLAN DATE : 12/10/2021
A1.01
BASEMENT FLOOR PLAN
A FILARMONICA ROMANA
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
272'-0" 8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0" 4'-0" 8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
ELEVATOR
8'-0"
A STAIRWELL
STAIRWELL
8'-0"
B 1'-2" CONCRETE ELEVATOR FOUNDATION SHAFT WALL
1'-2" CONCRETE FOUNDATION WALL
24'-0"
C
1'-0" CONCRETE FOUNDATION WALL
OPEN TO BELOW
D
6" CONCRETE SLAB
6" CONCRETE SLAB
16'-0"
6" CONCRETE SLAB
3'-4" X 1'-2" CONCRETE FOOTING
8'-0"
E 3'-10" X 1'-2" CONCRETE FOOTING
1'-6" CONCRETE FOUNDATION WALL
8'-0"
F 1'-2" CONCRETE ELEVATOR FOUNDATION SHAFT WALL
3'-6" X 1'-2" CONCRETE FOOTING
ELEVATOR
8'-0"
G 1'-2" CONCRETE FOUNDATION WALL
ELEVATOR
48'-0"
208'-0"
H
3'-6" X 1'-2" CONCRETE FOOTING
8'-0"
I 1'-2" CONCRETE FOUNDATION WALL
ELEVATOR 1'-2" CONCRETE ELEVATOR FOUNDATION SHAFT WALL
8'-0"
J
8'-0"
K
L
16'-0"
1'-0" CONCRETE FOUNDATION WALL
6" CONCRETE SLAB
6" CONCRETE SLAB
M
16'-0"
6" CONCRETE SLAB
3'-4" X 1'-2" CONCRETE FOOTING
8'-0"
N 3'-10" X 1'-2" CONCRETE FOOTING
1'-6" CONCRETE FOUNDATION WALL
8'-0"
O 1'-2" CONCRETE FOUNDATION WALL
1'-2" CONCRETE ELEVATOR FOUNDATION SHAFT WALL
STAIRWELL
ELEVATOR
8'-0"
P STAIRWELL
Q
SCALE : 1/8" = 1'-0"
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
BASEMENT STRUCTURAL PLAN DATE : 12/10/21
S1.01
BASEMENT STRUCTURAL PLAN
1
2
4
3
5
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
440'-0"
8'-0"
48'-0"
16'-0"
16'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
24'-0"
16'-0"
8'-0"
16'-0"
8'-0"
GRILL OVER FRESH AIR INTAKE PIT
A 8'-0"
ELECTRICAL A118
8'-0"
B
C ACOUSTIC WALL TREATMENTS
COVERED WALKWAY
SKY BRIDGE ABOVE
LINEAR VENTILATION GRILLS
LOUNGE
COURTYARD
A101
A102
24'-0"
A113 DANCE HALL
BATHROOM ACOUSTIC WALL TREATMENTS
A107
1 1
A2.01
A2.01
ACOUSTIC WALL TREATMENTS DANCE HALL
LARGE REHEARSAL ROOM
A103
A104
COURTYARD
LARGE REHEARSAL ROOM
CHOIR ROOM
COURTYARD
A105
A106
A109
A110
D
RECORDING BOOTH
MAINTENANCE
A115
A117
16'-0"
CONTROL ROOM A114
BATHROOM A108
E 8'-0"
SOUND LOCK A116
8'-0"
F
G CLOSET
CLOSET
A111
A112
8'-0"
PUBLIC GARDEN SPACE
48'-0"
PUBLIC PATHWAY
208'-0"
H
COVERED WALKWAY
RECLAIMED CLAY TILE SCREEN FACADE
I
PUBLIC GARDEN SPACE
B109
8'-0"
CURTAIN WALL SYSTEM
CLOSET
8'-0"
J
LOBBY
K ACOUSTIC WALL TREATMENTS
ACOUSTIC WALL TREATMENTS
VESTIBULE
OFFICE
8'-0"
B104
B125
B112
STORAGE
COFFEE LOUNGE
B120
B121
B102
OFFICE
16'-0"
L LINEAR VENTILATION GRILLS STORAGE
B126
CAFE/ BAR B101
TECHNICAL
ORCHESTRA HALL
STAGE
BACKSTAGE
B108
B113
B115
B116
B118
RECEPTION/ SECURITY
B124
MEETING ELECTRICAL
B105
M
COURTYARD
B122
OFFICE
2
B127
A2.01
B119
16'-0"
2 A2.01
SMALL ORCHESTRA HALL
KITCHEN CLOAKROOM
FIRSTAID
B106
B107
BATHROOM
BATHROOM
VESTIBULE
B110
B111
B114
N
OFFICE VESTIBULE
STAFFCLOSET
B117
B123
B128
8'-0"
B103
8'-0"
O
8'-0"
P ELECTRICAL B117
Q GRILL OVER FRESH AIR INTAKE PIT
ACCADEMIA FILARMONICA ROMANA
SCALE : 1/8" = 1'-0"
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
FIRST FLOOR PLAN DATE : 12/10/2021
A1.02
FIRST FLOOR PLAN
1
2
4
3
5
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
440'-0"
48'-0"
16'-0"
16'-0"
8'-0"
8'-0"
24'-0"
STAIRWELL
EDGE OF SLAB
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
24'-0"
16'-0"
8'-0"
16'-0"
8'-0"
1'-2" LOAD BEARING BRICK MASONRY WALL
1'-2" LOAD BEARING BRICK MASONRY WALL
ELEVATOR
A
STAIRWELL
8'-0"
8'-0"
EDGE OF SLAB
8'-0"
B
C 1'-6" LOAD BEARING BRICK MASONRY WALL
1'-6" LOAD BEARING BRICK MASONRY WALL
24'-0"
1'-6" LOAD BEARING BRICK MASONRY WALL
6" CONCRETE SLAB
EDGE OF SLAB
EDGE OF SLAB 6" CONCRETE SLAB
D
18" REINFORCED CONCRETE BUBBLE DECK
1'-0" LOAD BEARING BRICK MASONRY WALL
1'-0" LOAD BEARING BRICK MASONRY WALL
1'-0" LOAD BEARING BRICK MASONRY WALL
16'-0"
18" REINFORCED CONCRETE BUBBLE DECK
8'-0"
E
8'-0"
F 1'-2" LOAD BEARING MASONRY ELEVATOR SHAFT WALL
G ELEVATOR
ELEVATOR
8'-0"
1'-2" LOAD BEARING BRICK MASONRY WALL 1'-2" LOAD BEARING BRICK MASONRY WALL
48'-0" EDGE OF SLAB
1'-2" LOAD BEARING MASONRY ELEVATOR SHAFT WALL
1'-2" LOAD BEARING BRICK MASONRY WALL
208'-0"
H
8'-0"
I ELEVATOR
J 8'-0"
1'-2" LOAD BEARING BRICK MASONRY WALL
1'-6" LOAD BEARING BRICK MASONRY WALL
1'-6" LOAD BEARING BRICK MASONRY WALL
EDGE OF SLAB
8'-0"
K 1'-6" LOAD BEARING BRICK MASONRY WALL
16'-0"
L
1'-0" LOAD BEARING BRICK MASONRY WALL 1'-0" LOAD BEARING BRICK MASONRY WALL
1'-0" LOAD BEARING BRICK MASONRY WALL
1'-0" LOAD BEARING BRICK MASONRY WALL
18" REINFORCED CONCRETE BUBBLE DECK
M
6" CONCRETE SLAB
16'-0"
6" CONCRETE SLAB
1'-2" LOAD BEARING BRICK MASONRY WALL
1'-0" LOAD BEARING BRICK MASONRY WALL
8'-0"
N
8'-0"
O 1'-2" LOAD BEARING MASONRY ELEVATOR SHAFT WALL
STAIRWELL
8'-0"
P STAIRWELL
ELEVATOR
Q
ACCADEMIA FILARMONICA ROMANA
SCALE : 1/8" = 1'-0
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
FIRST FLOOR STRUCTURAL PLAN DATE : 12/10/2021
S1.02
FIRST FLOOR STRUCTURAL PLAN
1
2
4
3
5
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
440'-0"
8'-0"
48'-0"
16'-0"
16'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
24'-0"
16'-0"
8'-0"
16'-0"
8'-0"
A 8'-0"
ELECTRICAL A211
8'-0"
B
SMALL REHEARSAL ROOM
A201
A205
SMALL REHEARSAL ROOM
SMALL REHEARSAL ROOM
A202
A206
24'-0"
C SMALL REHEARSAL ROOM
BATHROOM A209
1 A2.01
1 A2.01 OPEN TO BELOW
D
OPEN TO BELOW
A203
SMALL REHEARSAL ROOM
ACOUSTIC WALL TREATMENTS
16'-0"
SMALL REHEARSAL ROOM
A207 BATHROOM A210 SMALL REHEARSAL ROOM
A204
A208
E 8'-0"
SMALL REHEARSAL ROOM
8'-0"
F
G
OPEN TO BELOW
8'-0"
OPEN TO BELOW
H
1
48'-0"
2
208'-0"
A2.02
8'-0"
I
J 8'-0"
OPEN TO BELOW
BATHROOM
BATHROOM
B204
B205
B206
L
16'-0"
BALCONY
B201
8'-0"
K VESTIBULE
STORAGE
TECHNICAL
B210
B202
M
OPEN TO BELOW
2
2
STORAGE
A2.01
16'-0"
INSTRUMENT STORAGE
A2.01
B207
B209
N
VESTIBULE
8'-0"
B203 ELECTRICAL B208
8'-0"
O
8'-0"
P
Q
ACCADEMIA FILARMONICA ROMANA
SCALE : 1/8" = 1'-0"
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SECOND FLOOR PLAN DATE : 12/10/2021
A1.03
SECOND FLOOR PLAN
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
272'-0" 8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
A ELEVATOR
STAIRWELL
1'-2" LOAD BEARING BRICK MASONRY WALL
8'-0"
1'-2" LOAD BEARING BRICK MASONRY WALL
STAIRWELL
8'-0"
B
C 1'-6" LOAD BEARING BRICK MASONRY WALL
1'-6" LOAD BEARING BRICK MASONRY WALL
24'-0"
EDGE OF SLAB
OPEN TO BELOW
18" REINFORCED CONCRETE BUBBLE DECK
1'-0" LOAD BEARING BRICK MASONRY WALL
18" REINFORCED CONCRETE BUBBLE DECK
D
OPEN TO BELOW
16'-0"
1'-0" LOAD BEARING BRICK MASONRY WALL
EDGE OF SLAB
8'-0"
E
8'-0"
F 1'-2" LOAD BEARING MASONRY ELEVATOR SHAFT WALL
8'-0"
G ELEVATOR
EDGE OF SLAB
ELEVATOR
48'-0"
208'-0"
H
EDGE OF SLAB
1'-2" LOAD BEARING MASONRY ELEVATOR SHAFT WALL
8'-0"
I ELEVATOR OPEN TO BELOW
8'-0"
J
8'-0"
K 1'-6" LOAD BEARING BRICK MASONRY WALL
1'-6" LOAD BEARING BRICK MASONRY WALL
16'-0"
L
1'-0" LOAD BEARING BRICK MASONRY WALL
1'-0" LOAD BEARING BRICK MASONRY WALL
M
OPEN TO BELOW
16'-0"
18" REINFORCED CONCRETE BUBBLE DECK
18" REINFORCED CONCRETE BUBBLE DECK
EDGE OF SLAB
8'-0"
N
8'-0"
O
1'-2" LOAD BEARING BRICK MASONRY WALL
1'-2" LOAD BEARING BRICK MASONRY WALL
STAIRWELL
ELEVATOR
8'-0"
P STAIRWELL
Q
ACCADEMIA FILARMONICA ROMANA
SCALE : 1/8" = 1'-0
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SECOND FLOOR STRUCT.PLAN DATE : 12/10/2021
SECOND FLOOR STRUCTURAL PLAN
S1.
ENVELOPE CONCEPT: LIGHTWEIGHT
This envelope option is a lightweight system that blends modern and historical materials to create a timeless façade. Throughout much of Rome, building facades are designed to be massive and imposing. They are meant to separate the interior of a building from the public realm of the street, protecting the people and spaces inside. Public façades rarely have windows at street level and minimize the connection of the interior to the public street. Traditionally, builders took advantage of the thermal properties of massive construction in order to maintain comfortable temperatures in interior spaces. Without the creation of a thermal mass, the challenge is to design a system that will protect the building from solar radiation, while still remaining lightweight. The design of this façade challenges the idea that the public realm ends at the street. The design of the structure allows for incredible flexibility in the façade. The load-bearing masonry walls are pushed towards the interior of the buildings allowing the concrete slabs to cantilever to the edge of the building, freeing the exterior walls from any structural load. This allows for a curtain wall system to become the first layer of the enclosure. The curtain wall system is anchored to the edge of the slab and allows for natural light to enter the space. In this case, the glass serves as insulation and water protection. An all-glass building would look out of place within the context of the site. The area surrounding the Academia is filled with historic masonry structures, some dating back to the Ancient Romans. It was important to give the impression that the exteriors of the buildings are monolithic and imposing, like their neighbors, yet permeable as one moves through the space, similar to the loggia at the front of the site. Recycled clay roof tiles, like those found all across Italy, are used to create a screened façade that surrounds the buildings like a second skin. The clay tiles are staggered and hung from cables attached to the underside of the roof slab. This screen helps to protect the interior of the building from the heat of the sun while also providing a feeling of permeability between the interior and exterior spaces. Utilizing the clay tiles connects the design of the project to the history of the site while also giving a sense of timelessness to the space.
1
1
--
T.O. PARAPET 31'-6"
T.O. ROOF 28'-9"
1) TYPICAL ROOF ASSEMBLY 12" ENGINEERED SOIL 1" MINERAL WOOL 3" DRAINAGE BOARD LIVE EDGE ROOF SYSTEM WATERPROOF MEMBRANE 7" RIGID INSULATION 18" REINFORCED CONCRETE BUBBLE DECK 3" AUDIO-THERMAL LAYER 3/4" GYPSUM
2
2) CLAY SCREEN ASSEMBLY STEEL ANGLE BRACKET TENSION SUPPORT CABLES WITH TIGHTENING SCREW 3/8" CLAY TILES STAGGERED CLAY TILE SPACERS TENSION CABLE ANCHORS CONCRETE FOOTER
3 T.O. SECOND FLOOR 16'-6"
T.O. SECOND FLOOR 14'-4"
3 -3) TYPICAL FLOOR ASSEMBLY 1-1/2" SOLID RAISED FLOOR PANEL 24" SUPPORT PEDESTAL SPACED 24" APART 18" REINFORCED CONCRETE BUBBLE DECK 3" AUDIO-THERMAL LAYER 3 4" GYPSUM
2 4) CURTAIN WALL ASSEMBLY 8" AIR SPACE BETWEEN GLASS AND SCREEN INSULATED CURTAIN WALL GLASS STEEL FIN MULLIONS SPANDREL PANEL 4" THERMAL BATT. INSULATION FIRE STOPS AT SLAB EDGE STEEL ANGLE BRACKET
T.O. SECOND FLOOR 2'-2"
T.O. FIRST FLOOR 000'-0"
5) BELOW GRADE WALL ASSEMBLY 3/8" DRAINAGE BOARD 2" RIGID INSULATION WATERPROOF MEMBRANE 18" REINFORCED CONCRETE FOUNDATION 2" RIGID INSULATION
2
ENVELOPE ASSEMBLY ELEVATION
4
1" 72
6) SLAB ON GRADE ASSEMBLY 6" CONCRETE SLAB 2" RIGID INSULATION WATERPROOF MEMBRANE 8" GRAVEL DRAINAGE LAYER
1" 94
5
1'-0"
T.O. BASEMENT FLOOR -10'-4"
2'-0" B.O. FOOTING -12'-6"
3'-0"
4'-6"
14'-0"
1
ENVELOPE ASSEMBLY SECTION
3
ENVELOPE ASSEMBLY PLAN
1'-6"
1'-6"
PASSIVE AND ACTIVE STRATEGIES There are several aspects of the local climate in Rome that are critical to consider during design. The first condition is the intense heat that occurs during the summer months. In Rome, summer temperatures can soar as high as 100 degrees, making both the interior and exterior spaces incredibly uncomfortable and potentially dangerous. If not properly insulated and protected from the heat, building interiors can reach over 80 degrees. Given the program of the building, in which hundreds of people gather together to practice music, watch performance, and dance, temperatures could climb even higher. The activities occurring within the space require that the building remain at a cooler temperature. A major factor in controlling temperatures within the building is how much sunlight is entering the building. Rome is subject to high levels of solar radiation, meaning that a considerable amount of heat is generated by the sun’s rays. Solar radiation levels are particularly high in the summer, causing already warm temperatures to climb even further. This is important to consider when designing a building and its envelope. An all glass building would allow too much direct light into the building, causing it to overheat. While glass facades such as these are ideal for letting natural light into the building, the light much be diffused to keep temperatures down. During summer months, the high humidity can make conditions in Rome oppressive, both indoors and outdoors. These conditions worsen when large groups of people gather together, such as in concert or practice halls. Additionally, rigorous activities such as dancing, can cause humidity level to rise in a space. By protecting a space from the solar radiation, the temperature of the space drops, lowering the humidity level simultaneously. Another way to combat high humidity is through proper ventilation. While ventilation alone will not lower the humidity of a space, it will move air causing interior spaces to feel more comfortable, similar to a breeze on a hot day. One way to respond to these climate conditions is to look at how vernacular architecture has dealt with them in the past. Local builders took advantage of the thermal properties of stone and clay, building massive structures that absorb the heat, keeping the interiors cool. They used courtyards to bring indirect light into the buildings and allow for cross ventilation throughout the structure. They also employed sun controlling devices, such as awnings and shutters to protect the interior from the sun’s rays.
GREEN ROOF SYSTEM One of the main passive strategies employed in this design is the use of green roof. In a local climate, such as the one in Rome, a green roof is ideal for multiple reasons. The first reason is thermal protection. In the past, going back to the time of the ancient Romans, local builders took advantage of the thermal properties of stone and clay to help insulate the building. The thick walls they built created thermal masses which absorbed the heat during the day, keeping the interior spaces cool. At night, the heat would release from these masses and help to regulate the temperature in the building.
SUMMER SUN ANGLE = 70 DEGREES
Green roofs work off of this same idea. Comprised of a number of different layers including soil, insulation, and a drainage mat, green roof systems can often reach about two feet in depth. These two feet of material becomes an insulation layer that protects the slab below from transferring heat into the building. Instead, the soil absorbs the heat and stores it to aid in plant growth.
SUMMER SUN ANGLE = 70 DEGREES
SUN/SOLAR HEAT REFLECTION off of the flat roof. The reflection of heat off flat roof adds to the heat island effect in urban areas.
SUN/SOLAR HEAT REFLECTION: Green roof are less reflective of heat than normal flat roofs. Solar heat is absorbed by the soil aiding in plan growth.
HEAT TRANSFER through the slab heating the interior spaces. The insulation and mass of the slab are the only thermal barriers.
HEAT TRANSFER: Build a green roof ontop of the structure adds thermal mass. The soil insulates the slab, keeping the space below cooler and reduces ambient noise
In addition to helping protect the interior of the building from heat, green roof systems help to reduce the heat of the overall urban area. Flat roofs are a common sight in many urban areas across the globe. When left untreated flat roofs will reflect the solar radiation contributing to what is known as the heat island affect. While one building may not have much of an impact on its own, multiple flat roofs in one area can create significantly raise the temperature of the air. Green roofs, unlike flat, untreated concrete roofs, do not reflect solar radiation, thus limiting the heat island affect. Green roofs are also beneficial because they help to reduce the amount of water runoff during a rain event. Traditional roof materials are not permeable or absorptive. In the event of rain, all the water that lands and collects on the roof will eventually flow off of the roof causing issues at grade level. Green roofs absorb much of the rain water that falls onto roofs. The rain water will hydrate the plants growing on the roof while excess water can be stored in the drainage matt to be used at a later time. In this building, over 90% of the roofs are covered with a green roof system. Helping to reduce the impact of the building on the environment.
TRADITIONAL ROOF STRUCTURES: Do not absorb rain water, increasing the about of runoff during a heavy rain event.
GREEN ROOF STRUCTURES: Engineered soil in green roof system are high absorbative and limit the amout of rain runoff. Excess water can be stored by the roof system to be used later.
GREEN ROOF COVERAGE: The green roof systems covers over 90% of the building’s roof plane. The surface of the roof is broken up by a series of square skylights that let light into the interior spaces of the building. The skylights are placed using the same modular grid system which helped to generate the design.
COURTYARDS/ LIGHT WELLS: As much of the building’s program is pushed to the interior of the building it is important to introduce natural light into these space. Courtyard and lightwells provide the space for light to enter the building and for people to gather.
CLAY TILE SCREEN SYSTEM One of the biggest climatic challenges of the site is the high levels of solar radiation combined with the intense heat of Roman summers. While the thermal mass of the building and the green roof can help the prevent heat from transferring into the building through the walls, designers also have to be concerned with the sun rays coming through windows and curtain walls. In ancient and vernacular forms of Roman architecture, local builders and users employed several devices to prevent the sun from entering a space. One such device was shutters. Shutters are still seen on building across Rome and greater Italy today. Operable shutters allow the user of the space to control the amount of sunlight that is entering the building simply by opening and closing the shutters and louvers. Another device that was often used to protect people from the Sun’s heat is a velarium. Velariums are a type of cloth shading device that are suspended between two cables. When the sun’s rays are intense velariums would be pulled out to create a shaded spot below and retracted when they are no longer needed. It is believed that there was once a large velarium covering the Colosseum that would be used during gladiator shows and other sporting events. Velariums are still used today across Rome to create more comfortable areas to inhabit during the warm weather. Each of these devices was used to prevent the Sun’s intense rays from entering a building or an area in order to keep it cooler. Similarly, the clay tile screen system which wraps around the entirety of each building was design to help control the amount of light entering the spaces beyond. The climate in Rome consists of very hot summer and cool winters, meaning that direct sunlight is needed in the winter rather than in the summer. In order to accommodate this need each clay tile is spaced exactly 8” apart. The 8” in gap between tiles takes into consideration the angle of the sun at different times during the year. During the summer time, the angle of the sun reaches 70 degrees above the horizon. At 8” apart the clay tiles block the light from directly entering the building while still allowing the ambient light to enter the space, keeping the interior cool. In the winter, the angle of the sun drops down to just 25 degrees above the horizon line. At 8” apart the clay tiles allow direct light to enter the building, allowing the interior spaces to benefit from direct solar gain.
SUMMER SUN ANGLE = 70 DEGREES
WINTER SUN ANGLE = 25 DEGREES
SUMMER SUN ANGLE = 70 DEGREES
WINTER SUN ANGLE = 25 DEGREES
WINTER SUN ANGLE = 25 DEGREES
8”
While it is important to block the sunlight during summer months to prevent the building from over heating, it is also important to let light in during the winter months. In the winter, the sun hits the facade at a lower angle. By properly spacing the clay tiles, the screening system allows light to enter the building during the winter while diffusing it in the summer.
HORIZONTAL SCREEN SYSTEM: helps to block the instense sunlight from entering the building keeping the interior spaces cooler in the summer time .
HORIZONTAL SCREEN SYSTEM: In the winter, when the sun is at a lower angle, the screen helps to diffuse the harsh sunlight entering the building while still allowing the sun to heat the interior spaces
COURTYRADS / NATURAL VENTILATION One of the most common building typologies in Rome is the courtyard building. Since the time of the ancient Roman Empire, local builders have been including courtyards in the vernacular architecture. While piazzas were the space for the public to interact with one another, the courtyard was a private, protected gathering space within the home for family and friends. Unlike today’s facades, which are full of windows and floor to ceiling glass, traditional roman building facades were monolithic and solid, protecting the interior of the building from the public realm of the street. Additionally, streets were narrow and buildings were infilled creating dense urban blocks. The closed off facades, narrow condition of the streets, and infilled urban fabric all resulted in the need to bring light into the building from above. Courtyards and light wells are used throughout Rome to bring light into interior spaces. This design in particular benefits from the use of these carved out spaces. As the circulation spaces are pushed to the exterior of the building, the main programmatic spaces are collected at the interior of the building, away from the facades. Similar to the urban fabric of Rome, these internal spaces needed to be lit from above. The courtyards and light wells are carved into the areas between main programmatic spaces, such as the rehearsal rooms and the dance studios. This allows indirect, natural light to enter these areas of the building. In some cases, these carved away spaces are used as private areas for the building occupants whereas elsewhere they are used as secondary circulation space, connecting the public pathway with the Accademia’s garden. Additional light is brought into the internal spaces via the skylights set into the green roof. These skylights are organized using the same grid system used to modulate the building. In addition to bringing added light into the building, these courtyards help to provide the adjacent spaces with some natural ventilation. Windows can be opened on either side of the courtyard, when needed, creating a cross ventilation effect across the rooms. Utilizing the courtyard spaces for ventilation also allows users to take advantage of the courtyard effect. As the sun heats up the air in the courtyard, the warm air raises causing cooler air to rush into the space, creating a cross breeze effect. At night, the process reverses allowing the cool air to drop back down into the courtyard. Natural ventilation is supplemented by mechanical ventilation.
COURTYARD EFFECT: In vertical spaces such as courtyards, hot air rises as the cool air fall creating air movement that helps to cool the spaces withing the building.
NATURAL CROSS VENTILATION: Cross ventilation is used to move fresh air through out the spaces surrounding the courtyards, cooling the interior spaces of the building.
GEOTHERMAL VENTILATION: Geothermal ventilation is used to provide fresh air to areas of the building that are pushed to the interior and have no direct access to the various courtyards.
ACTIVE STRATEGIES In today’s world in which society is facing incredible environmental challenges brought on by climate change, it is important to use as many passive systems as possible in order to create more environmentally responsible buildings. Though passive strategies are employed throughout the design, it is difficult in this climate and at this scale to create a completely passive building. Passive strategies alone can only provide comfort about 47% of the time between 8am to 8pm. As a result, mechanical systems are required to work in concert with the passive strategies. Natural ventilation and sun shading to prevent solar gain are combined with active cooling and ventilation systems while direct solar gain is paired with active heating systems. The active systems in the building will mostly focus on providing heat and ventilation to the building during the winter months when the local climate gets colder and natural ventilation is no longer a viable option. In order to make the interior spaces of the building comfortable, heating is required about 66% of the time. Given the climate challenges currently facing the world, energy consumption and pollution are two major concerns when it comes to using mechanical systems. Traditional mechanical systems such as boilers, condensers, and HVAC use fossil fuels to operate, creating pollution. Additionally, these systems are often too heavily relied upon, using energy to condition spaces where passive strategies could have been employed. When buildings are conditioned using only HVAC, the interior spaces are often over conditioned to the point where people are forced to wear sweater during the summer to stay warm. Pairing active and passive systems and introducing more adaptive comfort systems are critical in reducing energy waste. Alternatives to burning fossil fuels, such as using geothermal wells, can be used to heat air without releasing carbon emissions. This building in particular will require active systems to help manage ventilation, heating, and humidity. Given the program of the building, which includes concert spaces, music rooms, gathering places, and dance halls, the number of people in the spaces varies depending on the hour and can change rapidly. While passive system will certainly help to condition these spaces, they are too slow to respond to these quick changes in the interior conditions. Active strategies have the benefit of being utilized when needed and can respond to new climate condition quickly, providing comfort in public spaces.
VENTILATION ARRANGEMENT:
POOR VENTILATION ARRANGEMENT Direct supply line allows sound to travel through all rooms
GOOD VENTILATION ARRANGEMENT Acoustically lined supply branches prevent sounds from travelling between rooms
POOR MECHANICAL SOUND ISOLATION: Vibrations and soundwaves travel through the structure.
GOOD MECHANICAL SOUND ISOLATION: Vibrations and soundwaves are isolated from the structure.
DESIGN CONSIDERATIONS There were several design considerations when choosing active systems for the project. The first design consideration was that the ceiling was to remain free of mechanical systems. By freeing the ceiling of mechanical systems, they became another plane on which acoustic material could be applied. In spaces such as the large concert hall and large rehearsal rooms, where acoustical quality is important, the shape of the ceiling was manipulated using suspended acoustical panels. These panels helped to reflect and diffuse the sound throughout the spaces creating more even sounds. Having mechanical systems run along these ceiling would not only affect the aesthetic quality of the space but the acoustical quality as well. Additionally, mechanical system can be loud. Noise and vibrations produced by the mechanical system could affect how the musicians and performers hear themselves, interfering with the program of the space. While passive strategies have been employed throughout the building, several spaces such as the concert halls, rehearsal rooms and recording studios need mechanical system to provide sufficient heating, cooling, ventilation and humidification. One way to run these systems without using the ceiling is to run duct work beneath a technical floor. Technical floors are raised off of the structural slab using pedestal supports arranged in a grid system. As the building was organized using a grid system, the technical floor was an easy element to incorporate into the design. These floors can range from 4” deep to 4 feet deep and can accommodate many types of building systems including electrical, plumbing, and mechanical. In this design a 2 foot deep technical floor was used to run ductwork beneath the floor. Additionally, the air space provided by the technical floor creates an acoustic barrier helping to further isolate the sound throughout the building. Sound was an important design consideration when laying out the mechanical systems. When several vents are connected along the same duct branch, the ventilation system can act like a sound bridge. Similar to a thermal bridge, a sound bridge can transfer sound between rooms. While such an occurrence may not affect an office space, sound bridges would greatly impact the sound quality and isolation of rehearsal rooms and theaters. For this reason, acoustically important rooms such as the rehearsal rooms, concert halls and recording studios are all ventilated using individual supply and return branches. Additionally, the main ventilation ducts do not run under any of these sound sensitive rooms. Instead, the main ventilation branches
are run beneath the corridors where any potential noise pollution would make less of an impact. Finally, it was important to the design of the buildings that the roofs remain free from mechanical equipment. Surrounding the site are several buildings that are upwards of seven stories tall while the original Accademia Filarmonica is three stories tall at highest point. Given the new buildings’ maximum height of just over two stories tall, the roofs will be visible to the surrounding buildings, therefore, it is important that they be treated as a fifth façade. Instead of placing the mechanical equipment on the roof, the AHU’s and heat pumps were located in the basement. This move not only limits the amount of vibrations transferred through the structure, but allows for easier access to the geothermal wells below the building. Placing the mechanical equipment in the basement also allows for more direct access to the technical floor layer and less large service chases running through the building.
ZONE TWO ZONE THREE ZONE FOUR ZONE FIVE
HEATING
ZONE ONE
POSSIBLE SYSTEMS
VENTILATION
COOLING
ZONE SIX
ZONE ONE: DANCE HALLS, LARGE REHERSAL ROOMS, SMALL REHERSAL ROOMS
ZONE TWO: CHOIR ROOM, LARGE REHERSAL ROOMS, SMALL REHERSAL ROOMS
- HEATING IN THESE SPACES WILL PRIMARILY HAPPEN IN THE WINTER WHEN THE TEMPRETURES IN ROME DROP.
- HEATING IN THIS SPACE WILL PRIMARILY HAPPEN IN THE WINTER WHEN THE TEMPURATURES IN ROME DROP.
- DIRECT ACCESS TO COURTYARDS ALLOWS FOR POTENTIAL SOLAR HEAT GAIN IN THE WINTER THROUGH WINDOWS
- DIRECT ACCESS TO COURTYARDS ALLOWS FOR POTENTIAL SOLAR HEAT GAIN IN THE WINTER THROUGH WINDOWS
- THERMAL MASS HELPS TO STORE HEAT DURING THE DAY AND PREVENT HEAT LOSS
- THERMAL MASS HELPS TO STORE HEAT DURING THE DAY AND PREVENT HEAT LOSS
- COOLING IS NEEDED DUE TO THE WARM LOCAL CLIMATE AND POTENTIALLY HIGH RELATIVE HUMIDITY
- COOLING IS NEEDED DUE TO THE WARM LOCAL CLIMATE AND POTENTIALLY HIGH RELATIVE HUMIDITY
- SPACES SUCH AS DANCE HALLS HAVE MORE COOLING NEEDS DUE TO INTENSE PHYSICAL ACTIVITY.
- SPACES SUCH AS THE LARGE REHERSAL ROOMS MAY REQUIRE MORE COOLING DUE TO OCCUPANCY. CONSISTANT RELATIVE HUMIDITY IS IDEAL FOR INSTRUMENTS
- ACTIVE COOLING TO BE USED IN COMBINATION WITH PASSIVE STATEGIES SUCH AS THERMAL MASS AND SUN SHADING
- COMBINATION ACTIVE AND PASSIVE STRATEGIES
- VENTILATION SYSTEM TO SUPPLIMENT NATURAL VENTILATION. LARGE REHERSAL ROOMS ARE DEEP LIMITING THE ABILITY OF THE COURTYARDS TO FULLY VENTILATE THE SPACE.
- VENTILATION SYSTEM TO SUPPLIMENT NATURAL VENTILATION. LARGE REHERSAL ROOMS ARE DEEP LIMITING THE ABILITY OF THE COURTYARDS TO FULLY VENTILATE THE SPACE .
- INDIVIDUAL VENTIALTION BRACHES USED TO PREVENT SOUND BRIDGING BETWEEN REHERSAL ROOMS
- INDIVIDUAL VENTIALTION BRACHES USED TO PREVENT SOUND BRIDGING BETWEEN REHERSAL ROOMS
- AIR HANDLING UNIT PROVIDING COOLING, HEATING, AND VENTILATION. - HEAT PUMP CONNECTED TO GEOTHERMAL FIELD LOCATED BELOW THE BUILDINGS
- AIR HANDLING UNIT PROVIDING COOLING, HEATING, AND VENTILATION. - HEAT PUMP CONNECTED TO GEOTHERMAL FIELD LOCATED BELOW THE BUILDINGS
ZONE THREE: RECORDING STUDIO, LOUNGE, MAINTENANCE
ZONE FOUR: CAFE, LOBBY, KITCHEN, PUBLIC FUNCTIONS, SMALL CONCERT HALL
ZONE FIVE: LARGE CONCERT HALL, STAGE, BACK STAGE, TECHNICAL BOOTHS
ZONE SIX: OFFICES AND ACCADEMIA ADMINISTRATION.
- HEATING IN THIS SPACE WILL PRIMARILY HAPPEN IN THE WINTER WHEN THE TEMPURATURES IN ROME DROP.
- HEATING IN THIS SPACE WILL PRIMARILY HAPPEN IN THE WINTER WHEN THE TEMPURATURES IN ROME DROP.
- HEATING IN THIS SPACE WILL PRIMARILY HAPPEN IN THE WINTER WHEN THE TEMPURATURES IN ROME DROP.
- LIMITED SOLAR GAIN POTENTIAL IN RECORDING STUDIO DUE TO PROGRAMMATIC NEEDS OF THE SPACE TO BE ACOUSTICALLY BALANCED
-LARGEST POTENTIAL FOR SOLAR HEAT GAIN THROUGH FACADE AND SKYLIGHTS. SMALL CONCERT HALL NEEDS CONSISTENT THERMAL AND LIGHTING CONTROL.
- NO SOLAR GAIN POTENTIAL IN THE THEATER AS THE SPACE NEEDS TO HAVE CONSISTENT THERMAL AND LIGHTING CONTROL.
- HEATING IN THIS SPACE WILL PRIMARILY HAPPEN IN THE WINTER WHEN THE TEMPURATURES IN ROME DROP.
- LIMITED NUMBER OF PEOPLE USING THE SPACES EQUALS LESSER DEMAND ON SYSTEMS
-LARGE FLUXUATIONS IN OCCUPANCY DEPENDING ON EVENTS
-GREAT POTENTIAL FOR SOLAR HEAT GAIN THROUGH THE COURTYARD AND THE SKYLIGHTS IN THE OFFICE. -REGULAR OCCUPANCY EQUALS CONSISTANT SYSTEM NEEDS
- COOLING IS NEEDED DUE TO THE WARM LOCAL CLIMATE - COOLING IS NEEDED DUE TO THE WARM LOCAL CLIMATE - COOLING IS NEEDED DUE TO THE WARM LOCAL AND POTENTIALLY HIGH RELATIVE HUMIDITY AND POTENTIALLY HIGH RELATIVE HUMIDITY CLIMATE AND POTENTIALLY HIGH RELATIVE HUMIDITY. CONSISTENT THERMAL AND HUMIDITY CONTROL REQ. -TECHNICAL EQUPIMENT NEEDS TO BE KEPT IN A COOL -LARGE FLUXUATIONS IN OCCUPANCY DEPENDING ON ENVIRONMENT TO PREVENT OVER HEATING. EVENTS. LARGE CROWDS RAISE THE TEMPERATURE AND - THERMAL MASS TO PROTECT SPACE FROM HEAT HUMIDITY IN A ROOM CAUSING DISCOMFORT. - LIMITED NUMBER OF PEOPLE USING THE SPACES -LARGE FLUXUATIONS IN OCCUPANCY DEPENDING ON EQUALS LESSER DEMAND ON SYSTEMS EVENTS. LARGE CROWDS RAISE THE TEMPERATURE AND - COOLING SYSTEMS COMBINED WITH NATURAL VENTILATION AND SUN SHADING HUMIDITY IN A ROOM CAUSING DISCOMFORT.
- COOLING IS NEEDED DUE TO THE WARM LOCAL CLIMATE AND POTENTIALLY HIGH RELATIVE HUMIDITY
- MECHANICAL VENTILATION REQUIRED IN RECORDING STUDIO. SPACE NEEDS TO BE ACOUSTICALLY ISOLATED FROM THE REST OF THE BUILDING.
- VENTILATION SYSTEM TO SUPPLIMENT NATURAL VENTILATION WHEN NEEDED
-INDIVIDUAL VENTIALTION BRACHES USED TO PREVENT SOUND BRIDGING BETWEEN SPACES
- VENTILATION SYSTEM TO SUPPLIMENT NATURAL VENTILATION WHEN NEEDED - ADDITIONAL VENTILATION NEEDED IN KITCHEN AND INTERIOR ROOMS
- MECHANICAL VENTILATION REQUIRED THROUGHOUT THE SPACE. LARGE CONCERT HALL NEEDS TO BE ACOUSTICALLY ISOLATED FROM THE REST OF THE BUILDING. INDIVIDUAL VENTIALTION BRACHES USED TO PREVENT SOUND BRIDGING BETWEEN SPACES
-TECHNICAL EQUPIMENT NEEDS TO BE KEPT IN A COOL ENVIRONMENT TO PREVENT OVER HEATING.
- INDIVIDUAL VENTIALTION BRACHES USED TO PREVENT SOUND BRIDGING BETWEEN LOBBY/ CAFE AND SMALL CONCERT HALL
- LARGE VARIATIONS IN OCCUPANCY REQUIRE ADDITIONAL VENTILATION
- AIR HANDLING UNIT PROVIDING COOLING, HEATING, AND VENTILATION. - HEAT PUMP CONNECTED TO GEOTHERMAL FIELD LOCATED BELOW THE BUILDINGS
- AIR HANDLING UNIT PROVIDING COOLING, HEATING, AND VENTILATION. - HEAT PUMP CONNECTED TO GEOTHERMAL FIELD LOCATED BELOW THE BUILDINGS
- AIR HANDLING UNIT PROVIDING COOLING, HEATING, AND VENTILATION. - HEAT PUMP CONNECTED TO GEOTHERMAL FIELD LOCATED BELOW THE BUILDINGS
- WINDOWS ALLOW FOR USER OPPERATED CONTROL -- REGULAR OCCUPANCY EQUALS CONSISTANT SYSTEM NEEDS
- INDIVIDUAL VENTIALTION BRACHES USED TO PREVENT SOUND BRIDGING BETWEEN OFFICES
- AIR HANDLING UNIT PROVIDING COOLING, HEATING, AND VENTILATION. - HEAT PUMP CONNECTED TO GEOTHERMAL FIELD LOCATED BELOW THE BUILDINGS
ZONE ONE:
ZONE TWO:
SQFT OF AREA SERVED: 8,226 SQFT
SQFT OF AREA SERVED: 6,428 SQFT
COOLING CAPACITY: 47 TONS
COOLING CAPACITY: 37 TONS
PACKAGED UNIT SIZE: 25’-11” X 7’-4”
PACKAGED UNIT SIZE: 25’-11” X 7’-4”
COOLING AIR VOLUME (CFM): 20,000
COOLING AIR VOLUME (CFM): 16,000
MAIN SUPPLY/ RETURN: 11 SQFT
MAIN SUPPLY/ RETURN: 8.5 SQFT
BRANCH SUPPLY/ RETURN: 20 SQFT
BRANCH SUPPLY/ RETURN: 16 SQFT
ZONE THREE: (NOT SHOWN ON CHART) SQFT OF AREA SERVED: 2,769 SQFT COOLING CAPACITY: 5 TONS (EST.) PACKAGED UNIT SIZE: N/A COOLING AIR VOLUME (CFM): 1000 (EST.) MAIN SUPPLY/ RETURN: 1 SQFT (EST.) BRANCH SUPPLY/ RETURN: 2 SQFT (EST.)
ZONE FOUR:
ZONE FIVE:
SQFT OF AREA SERVED: 10,248 SQFT
SQFT OF AREA SERVED: 10,046 SQFT
COOLING CAPACITY: 55 TONS
COOLING CAPACITY: 55 TONS
PACKAGED UNIT SIZE: 25’-11” X 7’-4”
PACKAGED UNIT SIZE: 25’-11” X 7’-4”
COOLING AIR VOLUME (CFM): 25,000
COOLING AIR VOLUME (CFM): 25,000
MAIN SUPPLY/ RETURN: 15 SQFT
MAIN SUPPLY/ RETURN: 15 SQFT
BRANCH SUPPLY/ RETURN: 25 SQFT
BRANCH SUPPLY/ RETURN: 25 SQFT
ZONE SIX: (NOT SHOWN ON CHART) SQFT OF AREA SERVED: 1,766 SQFT COOLING CAPACITY: 5 TONS (EST.) PACKAGED UNIT SIZE: N/A COOLING AIR VOLUME (CFM): 1000 (EST.) MAIN SUPPLY/ RETURN: 1 SQFT (EST.) BRANCH SUPPLY/ RETURN: 2 SQFT (EST.)
MECHANICAL AXONOMETRIC
1
2
4
3
6
7
11
12
18
21
20
25
26
27
32
34
35
37
T.O_PARAPET 31'-4" T.O_ROOF_SLAB 28'-8"
SMALL REHEARSAL ROOM
SMALL REHEARSAL ROOM
A202
A206
A107
LARGE REHEARSAL ROOM
COURTYARD
DANCE HALL
A101
A102
A103
T.O._TECHNICAL_FLOOR 16'-5"
LARGE REHEARSAL ROOM
A104
DANCE HALL
T.O_PARAPET 23'-9" T.O_ROOF_SLAB 21'-2"
BATHROOM
T.O_SECOND_FLOOR_SLAB 14'-4"
A106
COURTYARD
BATHROOM
CHOIR ROOM
COURTYARD
RECORDING STUDIO
A105
A108
A109
A110
MAINTENANCE
A114
A115 T.O_TECHNICAL_FLOOR 2'-1" T.O_FIRST_FLOOR_SLAB 000'-0"
T.O_BSMT_FLOOR -12'-6" B.O_FOOTING -15'-3" BOREHOLE @ 300 FT DEEP. EACH BOREHOLE PROVIDES 2 COOLING TONS
1
BUILDING A: LONGITUDINAL SECTION SCALE: 1/8" - 1'-0"
1
2
3
6
7
8
10
16
18
19
20
25
28
29
31
32
33
35
36
37
T.O_PARAPET 37'-4" T.O_ROOF_SLAB 34'-8" T.O_PARAPET 31'-4" T.O_ROOF_SLAB 28'-8" TECHNICAL B202
T.O_PARAPET 23'-9" T.O_ROOF_SLAB 21'-2"
BALCONY B204
INSTRUMENT STORAGE B207
T.O._TECHNICAL_FLOOR 16'-5" T.O_SECOND_FLOOR_SLAB 14'-4"
KITCHEN
CAFE/ BAR
RECEPTION/ SECURITY
B103
B101
B105
SMALL ORCHESTRA HALL B108
TECHNICAL B113
ORCHESTRA HALL
STAGE
B115
B116
BACKSTAGE
MEETING
COURTYARD
OFFICE
B118
B120
B126
B124
T.O_TECHNICAL_FLOOR 2'-1" T.O_FIRST_FLOOR_SLAB 000'-0"
T.O_BSMT_FLOOR -12'-6" B.O_FOOTING -15'-3"
BOREHOLE @ 300 FT DEEP. EACH BOREHOLE PROVIDES 2 COOLING TONS
2
BUILDING B: LONGITUDINAL SECTION SCALE: 1/8" - 1'-0"
ACCADEMIA FILARMONICA ROMANA
SCALE : 1/8" = 1'-0"
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
BUILDING SECTIONS DATE : 12/10/21
A2.01
LONGITUDINAL BUILDING SECTIONS
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
272'-0" 8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
A 8'-0"
ELECTRICAL A007
8'-0"
B
24'-0"
C
A.H.U.
1
1
D
A2.01 MECHANICAL
A001
A002
H.P.
A.H.U.
A2.01
MECHANICAL A005
16'-0"
LOCKERS
H.P.
8'-0"
E
8'-0"
F
8'-0"
G CLOSET A006
H
1
48'-0"
2
208'-0"
A2.02
8'-0"
I
8'-0"
J
8'-0"
K
L A.H.U. H.P.
BATHROOM
16'-0"
A.H.U.
H.P.
B001 2
2
A2.01
A2.01 STORAGE MECHANICAL
B004
M
B003 A.H.U. BATHROOM
16'-0"
H.P.
B002
8'-0"
N
8'-0"
O
8'-0"
P ELECTRICAL B006
Q
ACCADEMIA FILARMONICA ROMANA
SCALE : 1/8" = 1'-0
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
BASEMENT MECHANICAL PLAN DATE : 12/10/2021
M1.01
BASEMENT MECHANICAL PLAN
1
2
4
3
5
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
440'-0"
8'-0"
48'-0"
16'-0"
16'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
24'-0"
16'-0"
8'-0"
16'-0"
8'-0"
GRILL OVER FRESH AIR INTAKE PIT
8'-0"
A
B 8'-0"
BELL MOUTH RETURN DUCT 20X28
20X28
BELL MOUTH RETURN DUCT
16X20
16X20
16X20
16X20
16X20
C LINEAR VENTILATION GRILLS
LOUNGE
16X20
16X20
24'-0"
A113 DANCE HALL
16X20
COURTYARD
A101
BATHROOM
A102
16X20
16X20
1 A2.01
1 A2.01
LARGE REHEARSAL ROOM
COURTYARD
LARGE REHEARSAL ROOM
CHOIR ROOM
COURTYARD
RECORDING BOOTH
MAINTENANCE
A103
A104
A105
A106
A109
A110
A115
A117
16X20
DANCE HALL
20X28
CONTROL ROOM
D
16'-0"
16X20
A107
16X20
A114
BATHROOM A108
E 8'-0"
SOUND LOCK
F 8'-0"
16X20
20X28
16X20
16X20
16X20
16X20
20X28
16X20
16X20
16X20
16X20
16X20
20X28
16X20
16X20
16X20
16X20
16X20
A116
CLOSET
A111
A112
8'-0"
G CLOSET
H
1
48'-0"
2
208'-0"
A2.02
8'-0"
16X20
16X20
I 18X32
CLOSET 18X32
18X32
B109 18X32
8'-0"
12X30
16X20
16X20
J
16X20
16X20
16X20
LOBBY
16X20
16X20
18X32
18X32
K
B104 8X14
8X14
VESTIBULE
OFFICE
B112
B125
8'-0"
LINEAR VENTILATION GRILLS
COFFEE LOUNGE
B120
B121
8X14
8X14 PERFORATIONS IN TECHNICAL FLOOR FOR VENTILATION
10X16
16X20
OFFICE B126
16X20
8X14
CAFE/ BAR
TECHNICAL
STAGE
BACKSTAGE
B108
B113
B116
B118
RECEPTION/ SECURITY
B101
B105
8X14
M
COURTYARD B124
8X14
2
8X14
A2.01
18X32
10X16
OFFICE
MEETING ELECTRICAL
16X20
A2.01
16X20
2
SMALL ORCHESTRA HALL
B127
B122
16'-0"
B102
STORAGE
16'-0"
16X20
16X20
16X20
L STORAGE
B119
B103
16X20
16X20
8X14 KITCHEN
8X14
8X14
FIRSTAID
CLOAKROOM
BATHROOM
BATHROOM
VESTIBULE
B110
B111
B114
N
OFFICE
ORCHESTRA HALL
VESTIBULE
STAFFCLOSET
B115
B117
B123
B128
8'-0"
16X20
B107
B106
8X14
O
16X20
BELL MOUTH RETURN DUCT
18X32
16X20
18X32
18X32
16X20
12X30
8'-0"
16X20
18X32
16X20
BELL MOUTH RETURN DUCT
8'-0"
P
Q GRILL OVER FRESH AIR INTAKE PIT
ACCADEMIA FILARMONICA ROMANA
SCALE : 1/8" = 1'-0
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
FIRST FLOOR MECH.PLAN DATE : 12/10/2021
M1.02
FIRST FLOOR MECHANICAL PLAN
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
272'-0" 8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
A ELEVATOR
STAIRWELL
1'-2" LOAD BEARING BRICK MASONRY WALL
8'-0"
1'-2" LOAD BEARING BRICK MASONRY WALL
STAIRWELL
8'-0"
B
C 1'-6" LOAD BEARING BRICK MASONRY WALL
1'-6" LOAD BEARING BRICK MASONRY WALL
24'-0"
EDGE OF SLAB
OPEN TO BELOW
18" REINFORCED CONCRETE BUBBLE DECK
1'-0" LOAD BEARING BRICK MASONRY WALL
18" REINFORCED CONCRETE BUBBLE DECK
D
OPEN TO BELOW
16'-0"
1'-0" LOAD BEARING BRICK MASONRY WALL
EDGE OF SLAB
8'-0"
E
8'-0"
F 1'-2" LOAD BEARING MASONRY ELEVATOR SHAFT WALL
8'-0"
G ELEVATOR
EDGE OF SLAB
ELEVATOR
48'-0"
208'-0"
H
EDGE OF SLAB
1'-2" LOAD BEARING MASONRY ELEVATOR SHAFT WALL
8'-0"
I ELEVATOR OPEN TO BELOW
8'-0"
J
8'-0"
K 1'-6" LOAD BEARING BRICK MASONRY WALL
1'-6" LOAD BEARING BRICK MASONRY WALL
16'-0"
L
1'-0" LOAD BEARING BRICK MASONRY WALL
1'-0" LOAD BEARING BRICK MASONRY WALL
M
OPEN TO BELOW
18" REINFORCED CONCRETE BUBBLE DECK
16'-0"
18" REINFORCED CONCRETE BUBBLE DECK
EDGE OF SLAB
8'-0"
N
8'-0"
O
1'-2" LOAD BEARING BRICK MASONRY WALL
1'-2" LOAD BEARING BRICK MASONRY WALL
STAIRWELL
ELEVATOR
8'-0"
P STAIRWELL
Q
ACCADEMIA FILARMONICA ROMANA
SCALE : 1/8" = 1'-0
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SECOND FLOOR STRUCT.PLAN DATE : 12/10/2021
S1.03
SECOND FLOOR MECHANICAL PLAN
OMANA
G BORIN IT 2 (22 FEET) CIRCU @ 300 HOLES
G BORIN T) IT 1 (24 CIRCU @ 300 FEE HOLES
G BORIN IT 5 (25 FEET) CIRCU @ 300 HOLES
G BORIN T) IT 4 (29 CIRCU @ 300 FEE HOLES
G BORIN T) IT 3 (29 CIRCU @ 300 FEE HOLES
GEOTHERMAL WELLS SCALE : 1/8" = 1'-0"
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
DATE :
12/10/2021
GEO
4 APPENDICES
$&&$'(0,$ ),/$5021,&$ 6&+(0$7,& '(6,*1 6(7 52*(5 :,//,$06 81,9(56,7< 6$$+3 $5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 635,1* 352)(6625 52%(572 9,2/$ 2&+2$
'5$:,1* /,67 $
&29(5 3$*( 5(1'(5
$
/$5*( 6&$/( 6,7( 3/$1
$
6,7( 3/$1
$
&2'( 5(48,5(0(176
$
%$6(0(17 )/225 3/$1
$
),567 )/225 3/$1
$
6(&21' )/225 3/$1
$
522) 3/$1
$
%8,/',1* 6(&7,216
$
%8,/',1* (/(9$7,216
$
:$// $66(0%/<
6
6758&785$/ $;21
6
%$6(0(17 6758&785$/ 3/$1
6
),567 )/225 6758&785$/ 3/$1
6
6(&21' )/225 6758&785$/ 3/$1
0 0(&+$1,&$/ $;21 0 %$6(0(17 0(&+$1,&$/ 3/$1 0 ),567 )/225 0(&+$1,&$/ 3/$1 0 6(&21' )/225 0(&+$1,&$/ 3/$1 0 *(27+(50$/ ),(/'
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/( 1 7 6
&29(5 3$*( '$7(
$
VI
LL
AG
UI
LIA
ACC ADE MIA FILA RMO A
T IB E R R IV E R
NIC VIA FLA MIN A OUN S IT E B
D RY
MIN
L IG H T
IN D U S AREA
T R IA L
ISTE RO MAR INA 1/8” = 1’-0” 12/12/2021
REGIONAL SITE PLAN
A0.01
ACC ADE MIA FILA RMO NIC A PUBL
PUBL
PUBL
RD IC G A
MAN RFOR IC P E E S PA C
CE
H WAY IC PAT
EN
VIA FLA MIN A OUN S IT E B
D RY
1/8” = 1’-0” 12/12/2021
SITE PLAN
A0.02
(;,7 '225 (*5(66 :,'7+ &$3
(;,7 '225 (*5(66 :,'7+ &$3
(;,7 ',67$1&(
(;,7 ',67$1&(
%$7+5220 2&& 5(+($56$/ 60$//
5(+($56$/ 60$//
2&&
2&&
%$7+5220 2&&
(;,7 67$,5 (*5(66 :,'7+ 2&& &$3
(;,7 67$,5 (*5(66 :,'7+ &$3
/21*(67 ',$*21$/
(;,7 ',67$1&(
(;,7 '225 (*5(66 :,'7+ &$3
/21*(67 ',$*21$/
(;,7 ',67$1&(
(;,7 ',67$1&(
',$0(7(5 &/($5$1&(
%$7+5220 %$7+5220 2&& ,7 &21752/
%$/&21<
2&&
2&&
2&& 2&& %< )/225 %$6(0(17
6725$*( 2&&
(;,7 '225 (*5(66 :,'7+ &$3
5(4 (*5(66 (;,76 $&78$/ (;,76
%8,/',1* $
3(23/(
5(4 (;,76
%8,/',1* %
3(23/(
5(4 (;,76
(;,76 (;,76
5(4 (*5(66 :,'7+ $&78$/ :,'7+ 5(4 67$,5 :,'7+
$&78$/ :,'7+
,1&+(6
,1&+(6
,1&+(6
,1&+(6
,1&+(6
,1&+(6
,1&+(6
,1&+(6
'225 :,'7+
(;,7 ',67$1&(
(;,7 '225 (*5(66 :,'7+ &$3
6(&21' /(9(/ /,)( 6$)(7< 2&&83$1&< $1' (*5(66 :,'7+
6&$/(
6(&21' /(9(/ /,)( 6$)(7< (*5(66 ',67$1&(
6&$/(
'225 :,'7+
6(&21' /(9(/ /,)( 6$)(7< (*5(66 5(48,5(0(176 6&$/( 1 $
',$0(7(5 &/($5$1&(
(;,7 '225 (*5(66 :,'7+ 2&& &$3 (;,7 '225 (*5(66 :,'7+ 2&& &$3
(;,7 '225 (*5(66 :,'7+ &$3
(;,7 '225 (*5(66 :,'7+ &$3
'$1&( +$//
5(+($56$/ /$5*(
5(+(56$/ /$5*(
5(+(56$/ &+2,5
2&&
2&&
2&&
2&&
(;,7 ',67$1&(
(;,7 ',67$1&(
/21*(67 ',$*21$/
(;,7 ',67$1&(
/21*(67 ',$*21$/
2&&
2&&
2&&
(;,7 '225 (*5(66 :,'7+ &$3
/281*(
%$7+5220
'$1&( +$//
(;,7 '225 (*5(66 :,'7+ 2&& &$3
(;,7 '225 (*5(66 :,'7+ &$3
0$,17(1$1&( 5(&25',1* 678',2
%$7+5220
2&&
2&&
2&& (;,7 '225 (*5(66 :,'7+ 2&& &$3 (;,7 '225 (*5(66 :,'7+ 2&& &$3
(;,7 '225 (*5(66 :,'7+ 2&& &$3
(;,7 '225 (*5(66 :,'7+ 2&& &$3
(;,7 '225 (*5(66 :,'7+ 2&& &$3
(;,7 '225 (*5(66 :,'7+ 2&& &$3
(;,7 '225 (*5(66 :,'7+ 2&& &$3
(;,7 '225 (*5(66 :,'7+ 2&& &$3
(;,7 '225 (*5(66 :,'7+ &$3
(;,7 '225 (*5(66 :,'7+ 2&& &$3
(;,7 '225 (*5(66 :,'7+ 2&& &$3
(;,7 '225 (*5(66 :,'7+ 2&& &$3
(;,7 '225 (*5(66 :,'7+ &$3 (;,7 ',67$1&(
(;,7 '225 (*5(66 :,'7+ 2&& &$3
/21*(67 ',$*21$/
(;,7 ',67$1&(
(;,7 ',67$1&(
(;,7 ',67$1&(
(;,7 '225 (*5(66 :,'7+ &$3
/2%%< 2&&
&2))(( 67$))
6725$*(
2&&
2&& &$)( %$5
5(&(37 6(&
2&&
.,7&+(1
&/2$.5220
),567$,'
2&&
2&&
2&&
60$// 25&+(675$
,7 &21752/
/$5*( 25&+(675$
67$*(
%$&.67$*(
2&&
2&&
2&&
2&&
2&&
%$7+5220
%$7+5220
2&&
2&&
2)),&(6 0((7,1*
2&&
2&& &/26(7
(;,7 '225 (*5(66 :,'7+ &$3
5(4 (*5(66 (;,76 $&78$/ (;,76
3(23/(
5(4 (;,76
3(23/(
5(4 (;,76
%8,/',1* %
2&&
(;,7 '225 (*5(66 :,'7+ &$3
2&& %< )/225 %$6(0(17 %8,/',1* $
5(4 (*5(66 :,'7+ $&78$/ :,'7+ 5(4 67$,5 :,'7+
(;,7 '225 (*5(66 :,'7+ &$3
/21*(67 ',$*21$/
(;,7 ',67$1&(
(;,7 ',67$1&(
$'$ %$7+5220 3/$16 6&$/(
(;,76 (;,76 $&78$/ :,'7+
,1&+(6
,1&+(6
,1&+(6
,1&+(6
(;,7 ',67$1&(
0,1,080 5(48,5(' ),;785(6
352*5$0
),567 /(9(/ /,)( 6$)(7< 2&&83$1&< $1' (*5(66 :,'7+
6&$/(
47<
$5($ 5220
7/ 1(7 6)
2&& *5283
2&& )&75
(*5(66 5(46
2&& 5220
2&&
0 72,/(76
) 72,/(76
/$9$725<
%8%%/(56
%8,/',1* $ %$6(0(17 &216(59$725<
),567 /(9(/ /,)( 6$)(7< (*5(66 ',67$1&(
6&$/(
),567 /(9(/ /,)( 6$)(7< (*5(66 5(48,5(0(176 6&$/( 1 $
ϭ y/d
ϮϮ
87,/,7,(6
6WRUDJH 5RRP
6
0(&+$1,&$/
ϭ y/d
ϭ͘ϱ
Ϭ͘ϬϮ
Ϭ͘ϬϮ
Ϭ͘ϬϮ
Ϭ͘ϬϬ
87,/,7,(6
0HFKDQLFDO 5RRP
/RFNHU 5RRP
6
0(&+$1,&$/
ϭ y/d
Ϯ͘ϱ
Ϭ͘Ϭϯ
Ϭ͘Ϭϯ
Ϭ͘Ϭϯ
Ϭ͘ϬϬ
87,/,7,(6
6WRUDJH 5RRP
6
0(&+$1,&$/
87,/,7,(6
0HFKDQLFDO 5RRP
6
0(&+$1,&$/
%
/2&.(5 5220
Ϭ͘ϴϴ
Ϭ͘ϰϰ
Ϭ͘ϱϱ
Ϭ͘ϮϮ
ϭ y/d
ϭ͘ϱ
Ϭ͘ϬϮ
Ϭ͘ϬϮ
Ϭ͘ϬϮ
Ϭ͘ϬϬ
ϭ y/d
ϰ͘ϱ
Ϭ͘Ϭϱ
Ϭ͘Ϭϱ
Ϭ͘Ϭϱ
Ϭ͘ϬϬ
&216(59$725<
'DQFH VWXGLR
(
(;(5&,6(
ϭ y/d
ϮϬ
Ϭ͘ϰϬ
Ϭ͘ϰϬ
Ϭ͘ϰϬ
&216(59$725<
'DQFH VWXGLR
(
(;(5&,6(
ϭ y/d
ϮϬ
Ϭ͘ϰϬ
Ϭ͘ϰϬ
Ϭ͘ϰϬ
&216(59$725<
5HKHDUVDO URRP ODUJH
ϰϬ
%8,/',1* $ ),567 )/225
Ϯ y/d^
Ϭ͘ϴϬ
Ϭ͘ϴϬ
Ϭ͘ϴϬ
Ϭ͘ϰϬ
(
$6 3(5 352*5$0
Ϯ y/d^
ϰϬ
Ϭ͘ϴϬ
Ϭ͘ϴϬ
Ϭ͘ϴϬ
Ϭ͘ϰϬ
EDWKURRP
%
%86,1(66
ϭ y/d
ϭ
Ϭ͘Ϭϰ
Ϭ͘ϬϮ
Ϭ͘Ϭϯ
Ϭ͘Ϭϭ
&216(59$725<
EDWKURRP
%
%86,1(66
ϭ y/d
ϭ
Ϭ͘Ϭϰ
Ϭ͘ϬϮ
Ϭ͘Ϭϯ
Ϭ͘Ϭϭ
(;,7 ',67$1&(
(;,7 '225 (*5(66 :,'7+ &$3
/21*(67 ',$*21$/
&216(59$725<
5HKHDUVDO URRP FKRLU
(
$6 3(5 352*5$0
Ϯ y/d^
ϰϬ
Ϭ͘ϴϬ
Ϭ͘ϴϬ
Ϭ͘ϴϬ
Ϭ͘ϰϬ
ORXQJH
Ϭ͘ϮϬ
$6 3(5 352*5$0
5HKHDUVDO URRP ODUJH
&216(59$725<
(;,7 '225 (*5(66 :,'7+ &$3
Ϭ͘ϮϬ
(
&216(59$725< &216(59$725<
%
%86,1(66
ϭ y/d
ϯ
&216(59$725<
UHFRUGLQJ VWXGLR
(
92&$ 5220
ϭ y/d
ϭϬ͘ϱ
Ϭ͘Ϯϭ
Ϭ͘Ϯϭ
Ϭ͘Ϯϭ
Ϭ͘ϭϭ
&216(59$725<
PDLQWHQDQFH
6
6725$*(
ϭ y/d
ϵ
Ϭ͘Ϭϵ
Ϭ͘Ϭϵ
Ϭ͘Ϭϵ
Ϭ͘Ϭϭ
&216(59$725<
5HKHDUVDO URRP VPDOO
(
92&$ 5220
ϭ y/d
Ϯ
Ϭ͘Ϭϰ
Ϭ͘Ϭϰ
Ϭ͘Ϭϰ
Ϭ͘ϬϮ
&216(59$725<
EDWKURRP
%
%86,1(66
ϭ y/d
ϭ
Ϭ͘Ϭϰ
Ϭ͘ϬϮ
Ϭ͘Ϭϯ
Ϭ͘Ϭϭ
&216(59$725<
EDWKURRP
%
%86,1(66
ϭ y/d
ϭ
Ϭ͘Ϭϰ
Ϭ͘ϬϮ
Ϭ͘Ϭϯ
Ϭ͘Ϭϭ
Ϭ͘Ϭϰ
Ϭ͘ϭϮ
Ϭ͘Ϭϲ
Ϭ͘Ϭϴ
Ϭ͘Ϭϯ
%8,/',1* $ 6(&21' )/225
%8,/',1* % %$6(0(17 /(9(/
/2&.(5 5220
0(&+
2&&
2&&
38%/,& )81&7,216
%DWKURRPV
38%/,& )81&7,216
%DWKURRPV
%
%86,1(66
ϭ y/d
ϭ
%86,1(66
ϭ y/d
ϭ
0(&+
87,/,7,(6
0HFKDQLFDO 5RRP
6
0(&+$1,&$/
ϭ y/d
ϱ
Ϭ͘Ϭϱ
Ϭ͘Ϭϱ
Ϭ͘Ϭϱ
Ϭ͘Ϭϭ
2&&
87,/,7,(6
0HFKDQLFDO 5RRP
6
0(&+$1,&$/
ϭ y/d
ϯ͘ϱ
Ϭ͘Ϭϰ
Ϭ͘Ϭϰ
Ϭ͘Ϭϰ
Ϭ͘ϬϬ
87,/,7,(6
0HFKDQLFDO 5RRP
6
0(&+$1,&$/
ϭ y/d
Ϯ͘ϱ
Ϭ͘Ϭϯ
Ϭ͘Ϭϯ
Ϭ͘Ϭϯ
Ϭ͘ϬϬ
$
Ϯ y/d^
ϲϭ
Ϭ͘ϰϵ
Ϭ͘ϵϰ
Ϭ͘ϯϭ
%
Ϭ͘Ϭϰ
Ϭ͘ϬϮ Ϭ͘ϬϮ
Ϭ͘Ϭϯ Ϭ͘Ϭϯ
Ϭ͘Ϭϭ Ϭ͘Ϭϭ
%8,/',1* % ),567 )/225 38%/,& )81&7,216
HQWUDQFH OREE\
38%/,& )81&7,216
UHFHSWLRQ VHFXULW\ VWDWLRQ
FORDNURRP
ILUVW DLG VWDWLRQ
&DIHWHULD EDU
38%/,& )81&7,216 38%/,& )81&7,216 38%/,& )81&7,216
NLWFKHQ
38%/,& )81&7,216
38%/,& )81&7,216
NLWFKHQ VWRUDJH
&+$0%(5 25&+(675$ +$//
2&&
%$7+5220
0(&+$1,&$/
0(&+$1,&$/
2&&
2&&
2&& %< )/225 %$6(0(17
5(4 (*5(66 (;,76 $&78$/ (;,76
%8,/',1* $
3(23/(
5(4 (;,76
(;,76
%8,/',1* %
3(23/(
5(4 (;,76
(;,76
2&&
(;,7 '225 (*5(66 :,'7+ &$3
%$6(0(17 /(9(/ /,)( 6$)(7< 2&&83$1&< $1' (*5(66 :,'7+
6&$/(
$&&$'(0,$ ),/$5021,&$ 520$1$
/21*(67 ',$*21$/
(;,7 '225 (*5(66 :,'7+ &$3
0(*+$1 ( 52'(1+,6(5
%$6(0(17 /(9(/ /,)( 6$)(7< (*5(66 ',67$1&( 6&$/(
5(4 (*5(66 :,'7+ $&78$/ :,'7+ 5(4 67$,5 :,'7+
$&78$/ :,'7+
,1&+(6
,1&+(6
,1&+(6
,1&+(6
,1&+(6
,1&+(6
,1&+(6
,1&+(6
$60 81&21
%
%86,1(66
%
/2&.(5 5220
%$6(0(17 /(9(/ /,)( 6$)(7< (*5(66 5(48,5(0(176 6&$/( 1 $
Ϯ
Ϭ͘Ϭϴ Ϭ͘Ϭϴ
Ϭ͘Ϭϰ Ϭ͘Ϭϰ
Ϭ͘Ϭϱ Ϭ͘Ϭϱ
Ϭ͘ϭϮ Ϭ͘ϬϮ Ϭ͘ϬϮ
ϭ y/d
Ϯ
%86,1(66
ϭ y/d
ϭ
Ϭ͘Ϭϰ
Ϭ͘ϬϮ
Ϭ͘Ϭϯ
Ϭ͘Ϭϭ
$60 81&21
Ϯ y/d^
ϳϯ͘ϱ
Ϭ͘ϵϴ
Ϭ͘ϵϴ
Ϭ͘ϯϳ
Ϭ͘ϭϱ
$
ϭ y/d
ϭ
Ϭ͘Ϭϭ
Ϭ͘Ϭϭ
Ϭ͘Ϭϭ
Ϭ͘ϬϬ
ϭ y/d
Ϭ͘ϱ
Ϭ͘Ϭϭ
Ϭ͘Ϭϭ
$6 3(5 352*5$0
Ϯ y/d^
ϭϱϬ
ϭ͘ϮϬ
Ϯ͘ϯϭ
Ϭ͘ϳϱ
Ϭ͘ϯϬ
VWDJH 0DLQ KDOO
$
67$*(
Ϯ y/d^
ϰϱ
Ϭ͘ϲϬ
Ϭ͘ϲϬ
Ϭ͘Ϯϯ
Ϭ͘Ϭϵ
6HFRQGDU\ +DOO
$
$6 3(5 352*5$0
ϭ y/d
ϮϬ
Ϭ͘ϭϲ
Ϭ͘ϯϭ
Ϭ͘ϭϬ
&+$0%(5 25&+(675$ +$//
EDFNVWDJH
%
/2&.(5 5220
ϭ y/d
ϭϰ͘ϱ
Ϭ͘ϱϴ
Ϭ͘Ϯϵ
Ϭ͘ϯϲ
Ϭ͘ϭϱ
&+$0%(5 25&+(675$ +$//
7HFKQLFDO
%
%86,1(66
ϭ y/d
ϭ͘ϱ
Ϭ͘Ϭϲ
Ϭ͘Ϭϯ
Ϭ͘Ϭϰ
Ϭ͘ϬϮ
0$1$*(0(17
RIILFHV
%
%86,1(66
ϭ y/d
ϯ͘ϱ
Ϭ͘ϭϰ
Ϭ͘Ϭϳ
Ϭ͘Ϭϵ
Ϭ͘Ϭϰ
0$1$*(0(17
PHHWLQJ URRPV VWDII FORVHW
6
.,7&+(1 6725$*(
0DLQ +DOO
&+$0%(5 25&+(675$ +$//
$
%86,1(66
Ϭ͘Ϭϭ
Ϭ͘ϬϬ
Ϭ͘Ϭϰ
%
ϭ y/d
Ϭ͘Ϭϴ
Ϭ͘Ϭϰ
Ϭ͘Ϭϱ
Ϭ͘ϬϮ
6
6725$*(
ϭ y/d
Ϭ͘ϱ
Ϭ͘Ϭϭ
Ϭ͘Ϭϭ
Ϭ͘Ϭϭ
Ϭ͘ϬϬ
0$1$*(0(17
FRIIHH URRP VWDII URRP
%
%86,1(66
ϭ y/d
ϯ
Ϭ͘ϭϮ
Ϭ͘Ϭϲ
Ϭ͘Ϭϴ
Ϭ͘Ϭϯ
38%/,& )81&7,216
EDWKURRP
%
%86,1(66
ϭ y/d
ϭ
Ϭ͘Ϭϰ
Ϭ͘ϬϮ
Ϭ͘Ϭϯ
Ϭ͘Ϭϭ
38%/,& )81&7,216
EDWKURRP
%
%86,1(66
ϭ y/d
ϭ
Ϭ͘Ϭϰ
Ϭ͘ϬϮ
Ϭ͘Ϭϯ
Ϭ͘Ϭϭ
EDOFRQ\
$
$6 3(5 352*5$0
Ϯ y/d^
ϱϯ͘ϱ
Ϭ͘ϰϯ
Ϭ͘ϴϮ
Ϭ͘Ϯϳ
Ϭ͘ϭϭ
%
%86,1(66
Ϯ
%8,/',1* % 6(&21' )/225 &+$0%(5 25&+(675$ +$// &+$0%(5 25&+(675$ +$//
7HFKQLFDO
EDWKURRP
%
%86,1(66
&+$0%(5 25&+(675$ +$//
EDWKURRP
%
%86,1(66
&+$0%(5 25&+(675$ +$//
LQVWUXPHQW VWRUDJH
6
6725$*(
&+$0%(5 25&+(675$ +$//
(;,7 ',67$1&(
ϭ y/d
% $
&+$0%(5 25&+(675$ +$//
0$1$*(0(17
%$7+5220
ϭ y/d
ϭ y/d
ϭ
ϭ y/d
ϭ
ϭ y/d
ϭ͘ϱ
Ϭ͘ϬϮ
Ϭ͘ϬϮ
Ϭ͘ϬϮ
Ϭ͘ϬϬ
dKd >͗
ϭϬ͘Ϯϴ
ϭϬ͘ϲϯ
ϭϰ͘ϴϵ
ϯ͘Ϯϯ
Z Yh/Z ͗
ϭϭ
ϭϭ
ϭϱ
ϰ
WZKs/ ͗
ϭϲ
ϮϮ
ϯϮ
ϰ
ϭ͘ϱ
Ϭ͘Ϭϲ Ϭ͘Ϭϰ Ϭ͘Ϭϰ
Ϭ͘Ϭϯ Ϭ͘ϬϮ Ϭ͘ϬϮ
Ϭ͘Ϭϰ Ϭ͘Ϭϯ Ϭ͘Ϭϯ
Ϭ͘ϬϮ Ϭ͘Ϭϭ Ϭ͘Ϭϭ
2&&83$1&< $1' 5(48,5(' ),;785( &+$57 6&$/( 1 $
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
&2'( $1$/<6,6 '$7(
$
$
(/(&75,&$/ $ ,17$.(
(;+$867
%
&
$ + 8
$
$
' /2&.(56
$ + 8
0(&+$1,&$/
0(&+$1,&$/
$
+ 3
$
$
+ 3
(
)
* &/26(7 $
+
$
,
-
.
/ $ + 8 + 3
%$7+5220
$ + 8
+ 3
%
0(&+$1,&$/
6725$*(
%
$
0
%
$
$ + 8 %$7+5220
+ 3
%
1
2
3 ,17$.(
(;+$867 (/(&75,&$/ %
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
4
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
%$6(0(17 )/225 3/$1 '$7(
$
*5,// 29(5 )5(6+ $,5 ,17$.( 3,7
(/(&75,&$/
$
$
%
& $&2867,& :$// 75($70(176
&29(5(' :$/.:$<
6.< %5,'*( $%29(
/,1($5 9(17,/$7,21 *5,//6
/281*(
&2857<$5'
$
$
$ '$1&( +$//
%$7+5220 $&2867,& :$// 75($70(176
$
$
$
$&2867,& :$// 75($70(176 '$1&( +$//
/$5*( 5(+($56$/ 5220
$
$
&2857<$5'
/$5*( 5(+($56$/ 5220
&+2,5 5220
&2857<$5'
$
$
$
$
'
5(&25',1* %227+
0$,17(1$1&(
$
$
&21752/ 5220 $
%$7+5220 $
(
6281' /2&. $
)
* &/26(7
&/26(7
$
$
38%/,& *$5'(1 63$&(
38%/,& 3$7+:$<
+
&29(5(' :$/.:$<
5(&/$,0(' &/$< 7,/( 6&5((1 )$&$'(
,
38%/,& *$5'(1 63$&(
%
&857$,1 :$// 6<67(0
&/26(7
-
/2%%<
. $&2867,& :$// 75($70(176
9(67,%8/(
2)),&( %
%
6725$*(
&2))(( /281*(
%
%
%
2)),&( %
&$)( %$5
$
%
60$// 25&+(675$ +$//
7(&+1,&$/
25&+(675$ +$//
67$*(
%$&.67$*(
%
%
%
%
%
5(&(37,21 6(&85,7<
%
%
%
0
&2857<$5'
0((7,1*
(/(&75,&$/
%
/
/,1($5 9(17,/$7,21 *5,//6 6725$*(
2)),&(
%
$
$&2867,& :$// 75($70(176
%
.,7&+(1 &/2$.5220
),567$,'
%
%
%$7+5220
%$7+5220
9(67,%8/(
%
%
%
1
2)),&( 9(67,%8/(
67$))&/26(7
%
%
%
%
2
3 (/(&75,&$/ %
4 *5,// 29(5 )5(6+ $,5 ,17$.( 3,7
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
),567 )/225 3/$1 '$7(
$
$
(/(&75,&$/ $
%
& 60$// 5(+($56$/ 5220
$
$
60$// 5(+($56$/ 5220
60$// 5(+($56$/ 5220
$
$
60$// 5(+($56$/ 5220
%$7+5220 $
$
$ 23(1 72 %(/2:
'
23(1 72 %(/2:
$
60$// 5(+($56$/ 5220
$&2867,& :$// 75($70(176
60$// 5(+($56$/ 5220
$ %$7+5220 $ 60$// 5(+($56$/ 5220
$
$
(
60$// 5(+($56$/ 5220
)
*
23(1 72 %(/2:
23(1 72 %(/2:
+
$
,
23(1 72 %(/2:
%$7+5220
%$7+5220
%
%
%
/
%$/&21<
%
. 9(67,%8/(
6725$*(
7(&+1,&$/
%
%
0
23(1 72 %(/2:
6725$*(
$
,167580(17 6725$*(
$
%
%
1
9(67,%8/(
% (/(&75,&$/ %
2
3
4
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
6(&21' )/225 3/$1 '$7(
$
$
%
&
$
$
'
(
)
*
+
$
,
-
.
/
0 $
$
1
2
3
4
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
522) 3/$1 '$7(
$
7 2B3$5$3(7 7 2B522)B6/$%
'$1&( +$//
&2857<$5'
'$1&( +$//
$
$
$
60$// 5(+($56$/ 5220
60$// 5(+($56$/ 5220
$
$
7 2B3$5$3(7 7 2B522)B6/$%
%$7+5220 $
/$5*( 5(+($56$/ 5220
/$5*( 5(+($56$/ 5220
$
$
7 2 B7(&+1,&$/B)/225 7 2B6(&21'B)/225B6/$%
&2857<$5'
%$7+5220
&+2,5 5220
$
$
$
&2857<$5' $
5(&25',1* 678',2
0$,17(1$1&(
$
$
7 2B7(&+1,&$/B)/225 7 2B),567B)/225B6/$%
7 2B%607B)/225 % 2B)227,1* %25(+2/( # )7 '((3 ($&+ %25(+2/( 3529,'(6 &22/,1* 7216
%8,/',1* $ /21*,78',1$/ 6(&7,21 6&$/(
7 2B3$5$3(7 7 2B522)B6/$% 7 2B3$5$3(7 7 2B522)B6/$% 7(&+1,&$/ %
7 2B3$5$3(7 7 2B522)B6/$%
%$/&21< %
,167580(17 6725$*( %
7 2 B7(&+1,&$/B)/225 7 2B6(&21'B)/225B6/$%
.,7&+(1
&$)( %$5
5(&(37,21 6(&85,7<
%
%
%
60$// 25&+(675$ +$// %
7(&+1,&$/ %
25&+(675$ +$//
67$*(
%
%
%$&.67$*(
0((7,1*
&2857<$5'
2)),&(
%
%
%
%
7 2B7(&+1,&$/B)/225 7 2B),567B)/225B6/$%
7 2B%607B)/225 % 2B)227,1* %25(+2/( # )7 '((3 ($&+ %25(+2/( 3529,'(6 &22/,1* 7216
%8,/',1* % /21*,78',1$/ 6(&7,21 6&$/(
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
%8,/',1* 6(&7,216 '$7(
$
7 2B3$5$3(7 7 2B522)B6/$% 7 2B3$5$3(7 7 2B522)B6/$% 7 2B3$5$3(7 7 2B522)B6/$% 7 2 B7(&+1,&$/B)/225 7 2B6(&21'B)/225B6/$%
7 2B7(&+1,&$/B)/225 7 2B),567B)/225B6/$%
7 2B%607B)/225 % 2B)227,1*
%8,/',1* % (/(9$7,21 6&$/(
7 2B3$5$3(7 7 2B522)B6/$% 7 2B3$5$3(7 7 2B522)B6/$% 7 2B3$5$3(7 7 2B522)B6/$% 7 2 B7(&+1,&$/B)/225 7 2B6(&21'B)/225B6/$%
7 2B7(&+1,&$/B)/225 7 2B),567B)/225B6/$%
7 2B%607B)/225 % 2B)227,1*
%8,/',1* % (/(9$7,21 :,7+ 6&5((1 6&$/(
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
%8,/',1* (/(9$7,216 '$7(
$
7 2B3$5$3(7 7 2B522)B6/$% 7 2B3$5$3(7 7 2B522)B6/$% 7 2 B7(&+1,&$/B)/225 7 2B6(&21'B)/225B6/$%
7 2B7(&+1,&$/B)/225 7 2B),567B)/225B6/$%
7 2B%607B)/225 % 2B)227,1*
%8,/',1* $ (/(9$7,21 6&$/(
7 2B3$5$3(7 7 2B522)B6/$% 7 2B3$5$3(7 7 2B522)B6/$% 7 2 B7(&+1,&$/B)/225 7 2B6(&21'B)/225B6/$%
7 2B7(&+1,&$/B)/225 7 2B),567B)/225B6/$%
7 2B%607B)/225 % 2B)227,1*
%8,/',1* $ (/(9$7,21 :,7+ 6&5((1 6&$/(
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
%8,/',1* (/(9$7,216 '$7(
$
7 2 3$5$3(7
7 2 522) 6/$%
7<3,&$/ 522) $66(0%/< (1*,1((5(' 62,/ 0,1(5$/ :22/ '5$,1$*( %2$5' /,9( ('*( 522) 6<67(0 :$7(53522) 0(0%5$1( 5,*,' ,168/$7,21 5(,1)25&(' &21&5(7( %8%%/( '(&. $8',2 7+(50$/ /$<(5 *<3680
&/$< 6&5((1 $66(0%/< 67((/ $1*/( %5$&.(7 7(16,21 6833257 &$%/(6 :,7+ 7,*+7(1,1* 6&5(: &/$< 7,/(6 67$**(5(' &/$< 7,/( 63$&(56 7(16,21 &$%/( $1&+256 &21&5(7( )227(5
7 2 6(&21' )/225
7 2 6(&21' )/225 6/$%
7<3,&$/ )/225 $66(0%/< 62/,' 5$,6(' )/225 3$1(/ 6833257 3('(67$/ 63$&(' $3$57 5(,1)25&(' &21&5(7( %8%%/( '(&. $8',2 7+(50$/ /$<(5 *<3680
&857$,1 :$// $66(0%/< $,5 63$&( %(7:((1 */$66 $1' 6&5((1 ,168/$7(' &857$,1 :$// */$66 67((/ ),1 08//,216 63$1'5(/ 3$1(/ 7+(50$/ %$77 ,168/$7,21 ),5( 67236 $7 6/$% ('*( 67((/ $1*/( %5$&.(7
7 2 ),567 )/225
7 2 ),567 )/225 6/$%
%(/2: *5$'( :$// $66(0%/< '5$,1$*( %2$5' 5,*,' ,168/$7,21 :$7(53522) 0(0%5$1( 5(,1)25&(' &21&5(7( )281'$7,21 5,*,' ,168/$7,21
(19(/23( $66(0%/< (/(9$7,21
6/$% 21 *5$'( $66(0%/< &21&5(7( 6/$% 5,*,' ,168/$7,21 :$7(53522) 0(0%5$1( *5$9(/ '5$,1$*( /$<(5
7 2 %$6(0(17 )/225
% 2 )227,1*
(19(/23( $66(0%/< 6(&7,21
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
(19(/23( $66(0%/< 3/$1
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
:$// $66(0%/< '$7(
$
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
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
6758&785$/ $;21 '$7(
6
(/(9$725
$ 67$,5:(//
67$,5:(//
%
&21&5(7( (/(9$725 )281'$7,21 6+$)7 :$//
&21&5(7( )281'$7,21 :$//
&
&21&5(7( )281'$7,21 :$//
23(1 72 %(/2:
&21&5(7( 6/$%
'
&21&5(7( 6/$%
&21&5(7( 6/$%
; &21&5(7( )227,1*
( ; &21&5(7( )227,1*
&21&5(7( )281'$7,21 :$//
) &21&5(7( (/(9$725 )281'$7,21 6+$)7 :$//
; &21&5(7( )227,1*
(/(9$725
* &21&5(7( )281'$7,21 :$//
(/(9$725
+
; &21&5(7( )227,1*
, &21&5(7( )281'$7,21 :$//
(/(9$725 &21&5(7( (/(9$725 )281'$7,21 6+$)7 :$//
-
.
/
&21&5(7( )281'$7,21 :$//
&21&5(7( 6/$%
&21&5(7( 6/$%
0
&21&5(7( 6/$%
; &21&5(7( )227,1*
1 ; &21&5(7( )227,1*
&21&5(7( )281'$7,21 :$//
2 &21&5(7( )281'$7,21 :$//
&21&5(7( (/(9$725 )281'$7,21 6+$)7 :$//
67$,5:(//
(/(9$725
3 67$,5:(//
4
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
%$6(0(17 6758&785$/ 3/$1 '$7(
6
67$,5:(//
('*( 2) 6/$%
$
/2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
(/(9$725
67$,5:(//
('*( 2) 6/$%
%
& /2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
&21&5(7( 6/$%
('*( 2) 6/$%
('*( 2) 6/$% &21&5(7( 6/$%
'
5(,1)25&(' &21&5(7( %8%%/( '(&.
/2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
5(,1)25&(' &21&5(7( %8%%/( '(&.
(
) /2$' %($5,1* 0$6215< (/(9$725 6+$)7 :$//
* (/(9$725
(/(9$725
/2$' %($5,1* %5,&. 0$6215< :$// /2$' %($5,1* %5,&. 0$6215< :$//
('*( 2) 6/$%
/2$' %($5,1* 0$6215< (/(9$725 6+$)7 :$//
/2$' %($5,1* %5,&. 0$6215< :$//
+
, (/(9$725
/2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
('*( 2) 6/$%
. /2$' %($5,1* %5,&. 0$6215< :$//
/
/2$' %($5,1* %5,&. 0$6215< :$// /2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
5(,1)25&(' &21&5(7( %8%%/( '(&.
0
&21&5(7( 6/$%
&21&5(7( 6/$%
/2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
1
2 /2$' %($5,1* 0$6215< (/(9$725 6+$)7 :$//
67$,5:(//
3 67$,5:(//
(/(9$725
4
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
),567 )/225 6758&785$/ 3/$1 '$7(
6
$ (/(9$725
67$,5:(//
/2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
67$,5:(//
%
& /2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
('*( 2) 6/$%
23(1 72 %(/2:
5(,1)25&(' &21&5(7( %8%%/( '(&.
/2$' %($5,1* %5,&. 0$6215< :$//
5(,1)25&(' &21&5(7( %8%%/( '(&.
'
23(1 72 %(/2:
/2$' %($5,1* %5,&. 0$6215< :$//
('*( 2) 6/$%
(
) /2$' %($5,1* 0$6215< (/(9$725 6+$)7 :$//
* (/(9$725
('*( 2) 6/$%
(/(9$725
+
('*( 2) 6/$%
/2$' %($5,1* 0$6215< (/(9$725 6+$)7 :$//
, (/(9$725 23(1 72 %(/2:
-
. /2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
/
/2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
0
23(1 72 %(/2:
5(,1)25&(' &21&5(7( %8%%/( '(&.
5(,1)25&(' &21&5(7( %8%%/( '(&.
('*( 2) 6/$%
1
2
/2$' %($5,1* %5,&. 0$6215< :$//
/2$' %($5,1* %5,&. 0$6215< :$//
67$,5:(//
(/(9$725
3 67$,5:(//
4
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
6(&21' )/225 6758&7 3/$1 '$7(
6
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
=21( 21( 64)7 2) $5($ 6(59(' 64)7 &22/,1* &$3$&,7< 7216 3$&.$*(' 81,7 6,=( µ ; µ &22/,1* $,5 92/80( &)0 0$,1 6833/< 5(7851 64)7 %5$1&+ 6833/< 5(7851 64)7
=21( 7:2 64)7 2) $5($ 6(59(' 64)7 &22/,1* &$3$&,7< 7216 3$&.$*(' 81,7 6,=( µ ; µ &22/,1* $,5 92/80( &)0 0$,1 6833/< 5(7851 64)7 %5$1&+ 6833/< 5(7851 64)7
=21( 7+5(( 64)7 2) $5($ 6(59(' 64)7 &22/,1* &$3$&,7< 7216 (67 3$&.$*(' 81,7 6,=( 1 $ &22/,1* $,5 92/80( &)0 (67 0$,1 6833/< 5(7851 64)7 (67 %5$1&+ 6833/< 5(7851 64)7 (67
=21( )285 64)7 2) $5($ 6(59(' 64)7 &22/,1* &$3$&,7< 7216 3$&.$*(' 81,7 6,=( µ ; µ &22/,1* $,5 92/80( &)0 0$,1 6833/< 5(7851 64)7 %5$1&+ 6833/< 5(7851 64)7
=21( ),9( 64)7 2) $5($ 6(59(' 64)7 &22/,1* &$3$&,7< 7216 3$&.$*(' 81,7 6,=( µ ; µ &22/,1* $,5 92/80( &)0 0$,1 6833/< 5(7851 64)7 %5$1&+ 6833/< 5(7851 64)7
=21( 6,; 64)7 2) $5($ 6(59(' 64)7 &22/,1* &$3$&,7< 7216 (67 3$&.$*(' 81,7 6,=( 1 $ &22/,1* $,5 92/80( &)0 (67 0$,1 6833/< 5(7851 64)7 (67 %5$1&+ 6833/< 5(7851 64)7 (67 *(27+(50$/ :(//6 727$/ 7216 5(48,5(' 7216 )227 '((3 :(// 7216 7216 7216 3(5 :(// :(//6
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
0(&+$1,&$/ $;21 '$7(
0
$
(/(&75,&$/ $
%
&
$ + 8
'
$ 0(&+$1,&$/
$
$
+ 3
$ + 8
$
0(&+$1,&$/ $
/2&.(56
+ 3
(
)
* &/26(7 $
+
$
,
-
.
/ $ + 8 + 3
%$7+5220
$ + 8
+ 3
%
$
$
6725$*( 0(&+$1,&$/
0
%
% $ + 8 %$7+5220
+ 3
%
1
2
3 (/(&75,&$/ %
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
4
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
%$6(0(17 0(&+$1,&$/ 3/$1 '$7(
0
*5,// 29(5 )5(6+ $,5 ,17$.( 3,7
$
%
%(// 0287+ 5(7851 '8&7 ;
;
%(// 0287+ 5(7851 '8&7
;
;
;
;
;
& /,1($5 9(17,/$7,21 *5,//6
/281*(
;
;
&2857<$5'
%$7+5220
$
$
;
;
$
/$5*( 5(+($56$/ 5220
&2857<$5'
/$5*( 5(+($56$/ 5220
$
$
$
$
$ &+2,5 5220
&2857<$5'
$
$
;
'$1&( +$//
;
'
5(&25',1* %227+
0$,17(1$1&(
$
$
&21752/ 5220
;
$
$ '$1&( +$//
;
;
$
%$7+5220 $
(
6281' /2&.
)
;
;
;
;
;
;
;
;
;
;
;
;
;
;
;
;
;
;
$
&/26(7
$
$
* &/26(7
+
$
;
;
, ;
&/26(7
;
;
% ;
;
;
;
;
;
;
;
;
;
;
/2%%<
.
% ;
%
%
/ 6725$*(
&2))(( /281*(
%
%
;
;
3(5)25$7,216 ,1 7(&+1,&$/ )/225 )25 9(17,/$7,21
;
;
2)),&( %
;
;
&$)( %$5
60$// 25&+(675$ +$//
7(&+1,&$/
67$*(
%$&.67$*(
%
%
%
%
5(&(37,21 6(&85,7<
%
%
;
0
&2857<$5' %
;
;
;
2)),&(
0((7,1*
(/(&75,&$/
%
%
%
;
% &/2$.5220
;
;
),567$,' %$7+5220
%$7+5220
9(67,%8/(
%
%
%
1
2)),&(
25&+(675$ +$//
9(67,%8/(
67$))&/26(7
%
%
%
%
%
;
;
; .,7&+(1
%
;
2
;
;
%(// 0287+ 5(7851 '8&7
;
;
;
;
;
;
; ;
$
; ;
$
;
2)),&(
%
;
9(67,%8/(
;
6725$*(
;
;
/,1($5 9(17,/$7,21 *5,//6
%(// 0287+ 5(7851 '8&7
3
4 *5,// 29(5 )5(6+ $,5 ,17$.( 3,7
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
),567 )/225 0(&+ 3/$1 '$7(
0
$
;
;
;
;
;
% %(// 0287+ 5(7851 '8&7
;
& 60$// 5(+($56$/ 5220 $
$
;
60$// 5(+($56$/ 5220
60$// 5(+($56$/ 5220
;
; ;
60$// 5(+($56$/ 5220
;
;
;
$ ;
$
$
$
; ;
'
60$// 5(+($56$/ 5220
60$// 5(+($56$/ 5220
$
$
; ;
;
$
;
%$7+5220
;
%$7+5220 $ 60$// 5(+($56$/ 5220
$
$
( ;
;
60$// 5(+($56$/ 5220
)
*
+
$
,
-
;
.
;
%$/&21<
%$7+5220
%$7+5220
%
%
/
%
;
;
;
;
0
7(&+1,&$/
% ,167580(17 6725$*( %
1
;
;
$
;
;
$
2 ;
3
4
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
6(&21' )/225 0(&+ 3/$1 '$7(
0
25,1* 7 % )((7 &,5&8,(6 # +2/
25,1* 7 % 7 &,5&8, )(( +2/(6 #
25,1* 7
7 % )(( &,5&8,(6 # +2/
25,1* 7 7 % &,5&8, )(( +2/(6 #
25,1* 7 7 % &,5&8, )(( +2/(6 #
$&&$'(0,$ ),/$5021,&$ 520$1$
0(*+$1 ( 52'(1+,6(5
$5&+ ,17(*5$7(' 352-(&7 '(6,*1 678',2 )$// 3URI 5REHUWR 9LROD 2FKRD
6&$/(
'$7(
*(27+(50$/ :(//6
0
A1 RESEARCH
As the ancient and modern seat of power in the Mediterranean, the city of Rome has a rich and diverse history spanning millennia. Traces of this deep rooted history are visible today through the city’s multitude of monuments, piazzas, urban systems, and architecture. It is impossible to design in a city such as this without understanding the context in which the city has developed and grown. This research looks beyond aesthetics and design and seeks to understand how factors such as climate, geography, history, and politics shaped both the architecture and the urban fabric surrounding the city and the site. This analysis will help to inform our design and allow us to create a building that is truly connected and integrated into the urban fabric of the area.
SPRING IN ROME
SUMMER IN ROME
FALL IN ROME
WINTER IN ROME
VEGETATION IN ROME
Flower Carpet outside of the Vatican
Mulberry Tree
Roman Rose Garden
Salvia Rosmarinus
Cypress Tree -
Roses
Cork Oak
Holly
Stone Pine
Carob
By researching, anaylizing, and drawing assemblies of other buildings, we are able to develop an understanding of how those materials and structures contributed to the over all architectural concept of the project. Often, when analyizing previously unknown buildings, new means and methods of construction are discovered as well as new materials. Looking at precedent projects allows designers to learn from other architects, as they may be dealing with similar programmatic, design, climatic and structural challenges. This project introduced us to the concept of intergrated envelope, structural, and architectural designs.
ALPINE SPORTS CENTER ARCHITECT: BERNARDO BADER SCHRUNS, AUSTRIA The Alpine Sports Center in Schruns, Austria was built as an administrative office for Silvretta Montafon. The building was conceive of as the centerpiece of a larger urban planning project which included creating a new town square. According the Bernardo Bader, the project’s architect, the building, which is slight bowed inward at the main facade, serves as a hinge connecting the new development with the greater urban fabric surrounding the site. The exterior of the building is clad using a natural cut local stone. Using this stone not only allows the building to command a presence in the square but allows the modern form to fit into the context of the town and vernacular architecture. The goal was to make the being feel as though it belonged to the alpine landscape. The walls of the Alpine Sports Center are comprised of three main layers: two layers of vertically cored clay brickwork and the natural stone facade with no added insulation. The interior layer of the vertically cored clay brickwork serves as the main structural support for the floors. The floors of the center are comprised of a 10 inch concrete slab,poured over top of an audio thermal layer, topped with impact sound insulation, sub floors, and oak wood flooring. The edge of the concrete slab rests on only the interior layer of brickwork as opposed to both the interior and exterior. As such only the interior layer of brick work is load bearing. Precast concrete lintels, set into the wall, are used to span the distance above the large window openings. The structural lintel are separated from the lintels seen on the exterior of the building by an insulation layer to prevent thermal bridging. The exterior layer of the vertically cored clay brickwork serves as the thermal insulation layer for the building as well as the AVM barrier. The clay bricks used for this layer are highly insulated and moisture controlling, eleminating the need for any additional insulation or barriers. In general, the natural thermal properties of the clay blocks allows them to retain heat, preventing it from traveling between the interior and the exterior. In addition to the clay, the exterior stone cladding also contributes to the insulation of the building because it creates more thermal mass, keeping the interior conditioned as desired. Where there are window openings, double insulated thermal glass is used maintain a continuous thermal barrier around the entire envelope. Small thin panels at the edge of the windows open up to provide natural ventilation as needed during the summer. Pull down sun shades, embedded in the exterior concrete lintel allow for users to control the amount of sunlight let into the building.
THERMAL INSULATION / AIR & MOISTURE BARRIER At Bernardo Bader’s Alpine Sports Center in Schruns, the first layer of vertically cored clay brickwork serves as the thermal layer as well as the AVM barrier. Clay’s natural thermal properties allows it to retain heat preventing it from traveling between the interior and the exterior. In addition to the clay, the exterior stone cladding also contributed to the insulation of the building because it creates more thermal mass, keeping the interior conditioned as desired. Where there are window opens, double insulated thermal glass is used maintain a continuous thermal barrier around the entire envelope. Pull down sun shades, embedded in the concrete lintel allow for users to control the amount of sunlight let into the building.
STRUCTURAL SYSTEM At Bernardo Bader’s Alpine Sports Center in Schruns, the interior layer of vertically cored clay brickwork serves as the main structural support at the building envelope. 10 inch thick concrete slabs span each level and carry the loads of each floor. The edge of these concrete slabs rests only on the interior layer of clay blocks as opposed to both the interior and exterior layers. As previously noted, the exterior layer serves as the thermal insulation for the building. Precast structural concrete lintels are used to span the window openings. These lintels are separated from the decorative lintels seen on the exterior of the building by a layer of insulation to pervent thermal bridging.
COWAN COURT by : 6a Architects where : Churchill College Cambridge CONSTRUCTION Cowan Court was an addition to an already existing residential complex for Churchill College. The project was centered around the idea of sustainability while also beginning to blend in with the existing buildings. The materials are used as a way to bring back the colors that were original to the college. The bay windows used are a characteristic of the original students rooms, the design of these windows was to give a space for the students to sit while, this was possible because of the thickly insulated walls for the most energy efficient structure. This design is a courtyard plan giving the students an area to study in the summer. The materials used within this project were part of an environmental strategy, having passive ventilation throughout the structure, triple glazed windows and the use of solar electricity, solar water and rainwater collection. This was to reduce the amount of energy used by the building. They even went as far as to install a system that monitored the electricity within each room to make sure that people were not being wasteful.
STRUCTURE DIAGRAM
The structure of this project is composed of glulam beams spanning 6.5 meters between glulam columns, this is an example of traditional beam and joist construction. There are deeper beams that provide a stiffness to the long span floors. The internal structure of the project does not line up between floors but the columns were placed in a very particular manner that allowed this project to be constructed the way it is. A major note of how this project is constructed is that all four walls on the exterior have a curve to them. The courtyard design of this project is accompanied by the use of operable shutters on the exterior. This allows air flow throughout the space, giving the student the ability to control their own environment.
WATERPROOFING AND VAPOR BARRIER DIAGRAM
INSULATION DIAGRAM
TYPICAL ROOF ASSEMBLY -STAND AND SEAM METAL ROOF -4” INSULATION -1 1/2’ EXPOSED GLULAM -VAPOR CONTROL -METAL DECKING -1” INSULATION -3/4” GYPROC SOUND BLOCK -3/4” SKIM
-150x50mm GLULAM COLUMN TYPICAL FLOOR ASSEMBLY -3/4” WOOD FLOOR -RIGID INSULATION -BATTEN -PLYWOOD -360mm GLULAM BEAM TYPICAL CEILING ASSEMBLY -2x4 WOOD JOISTS -3” INSULATION -U-SHAPED METAL BRACKET -GYPROC SOUND BLOCK -SKIM TYPICAL WALL ASSEMBLY -PREFABRICATED CLADDING CASSETTE -70x50 TAPERED HORIZONTAL BATTEN -50x38 VERTICAL BATTEN -2x100mm CELOTEX FR5100 PIR BOARD FITTED BETWEEN TIMBERS -150x50mm SFS FRAMING AT 600 -GYPROC SOUNDBLOC -SKIM
TYPE 3A+3B have arc pattern to routed 3-5mm into the face of the timber to remove dark weathered surface revealing fresh oak
TYPE 5
TYPE 2
TYPE 4
-ALLOW FOR SOME NARROW BOARDS (SHADED) TO ENSURE JOINT LINES DO NOT ALIGN WITH THOSE ABOVE
TYPE 2
-ALUMINIUM SOFFIT ABOVE WINDOW / CLADDING -OAK TRIPLE GLAZED WINDOW TYPICAL SLAB ON GRADE ASSEMBLY -3/4” WOOD FINISH -WATER BARRIER -GLULAM BEAM -6” CONCRETE SLAB -RAMMED EARTH
-5mm x 60mm length dome head pozidrive stainless steel wood screw
TYPE 4
TYPE 1 TYPICAL BELOW GRADE WALL ASSEMBLY -RAMMED EARTH -WATERPROOFING MEMBRANE -4” DRAINAGE PIPE -CAST IN PLACE CONCRETE FOOTING -200 RC UPSTAND BOARDMARKED WITH 400mm VERTICAL TIMBERS
COMPOSITE DRAWING : 1/2”=1’0”
The materials used for the facade of this project were reclaimed wood from floors of the french railway carriers. All these elements were prefabricated cladding cassette compositing of seven 150 wide by 30 thick. These boards are tapered to horizontal battens screwed in with 5mm x 150mm long wood screws into prefixed vertical battens. There are five different types of facade design, all varying in length and one that varies in style. The one that is different sets at the top of the project and they are used as a way to give depth between old and new materials, showing the weathered pattern along the reclaimed wood. ALong these facades there are elements that are slightly smaller just to make sure that the joints do not line up perfectly, these will be clad on site . This project uses the sun as a way to power and heat the building. They do this through the use of solar panels and triple glazed windows that allow little amounts of light through. This use of passive energy consumption helps the project to be sustainable not only through its materials but also through its energy usage. There are mechanical units that are located in the basement just in case but they try to solely rely on other uses of power. This project is also constructed using a dense roof to help keep the building a normal temperature. This project also has a system in place to collect rainwater and use it throughout the project, and also to water the courtyard space. The water runs off from the roof into a drainage pipe that then drains the water to a tank. This will purify the water and make sure that it is still able to be used. MANUFACTURERS
7
I
I
I
I
7
ff
A2 PRELIMINARY STRATEGIES
These preliminary design studies were used as a way to develop site and compositional strategies that were not dictated by program and adjacencies. Consideration was given first to the site. Free from the preconceived notions of program, site schemes were developed based on the surrounding context, history, and extensive research. This helped to generate initial thoughts on design principles and site intentions that would be carried throughout the project. These intentions were further explored through compositional exercises, during which buildings utilizing different organizational strategies were studied and analyzed. Geometric principles and organizational stragtegies from these building were applied to the initial site schemes in order to help concieve of the project as an architectural form rather than a series of adjacencies. Only after these initial explorations were complete was occupancy and programming added into the design process and design principles further articulated.
SCHEME 1 - GATEWAY TO CULTURE This project is intended to interact with the Accademia Filarmonica Romana; a public institution that celebrates and promotes the arts. One of the most important spaces at the Filarmonica is the Gardini della Filarmonica. The garden serves as a performance and gathering space; a place where the musicians and artists can share their work and interact with the public. The garden is accessible through an arched passageway carved from the Accademia’s imposing façade, set against the street. The goal of this intervention is to engage with the Gardini della Filarmonica as well as the public along the Via Flaminia. The building is set against the street, similar to the Accademia and other facades surrounding it, creating the illusion of an imposing wall continuing down the street. A path is carved through the building at angle, visually connecting the street to the garden, giving the public a glimpse at what lays beyond the walls. Like the pathways of the Gardini della Filarmonica, the path through the space does not reveal the entire garden, instead it draws people down the path, enticing them to discover what is on the other end. The walls of the buildings gradually compress the space between them as one walks towards the garden, as the vegetation and trees do within the garden. At the end of the path, the walls fall away to reveal the main outdoor performance space of the Accademia. This journey down the path is reminiscent of journey visiting dignitaries would make down the Via Flaminia, as they passed through the Porta del Popolo, and Rome was revealed to them. The main cut through the building was designed to interact with people traveling from the Porta del Popolo towards Flaminio. In order to engage with members of the public travelling towards the historic center a secondary cut was made creating a small piazza at the start of the path to the garden. This cut invites people to enter into the space and provide a space for informal and impromptu performances by musicians and artists of the Accademia. While the shapes of the buildings are determined by the pathways cut through the site, the materiality and organization are inspired by the vernacular buildings of Rome. The buildings are designed to be massive and monolithic in appearance, making use of thick masonry walls similar to those of the ancient roman ruins and the defensive walls of the city. Similar to the urban fabric that surrounds the site, the buildings and their programs are centered around courtyards. These courtyards serve not only as circulation and recreation spaces for the resident artists, but as a means of allowing light and air to move through and enter the building. While the walls facing the street remain massive and monolithic, as many roman buildings do, the walls facing the private gardens open up allowing musicians and visitors to the garden to enjoy an easy flow between the interior and exterior.
SCHEME 2 - PUBLICLY PRIVATE Throughout Rome, there is a set of relationships between public vs. private, street and site, interior vs. exterior that most buildings adhere to. The public area of the street is defined by the massive facades that protect the interior of the building from the world outside. It is very clear where the public space ends and the private space begins. This scheme asks the question what if this was not the case? What if the public space extended beyond the street? How can this be achieved without ignoring the relationship between street and site? Often along Italian streets, loggia’s are used as transitional spaces between the public and private realms. They allow for the creation of a barrier without shutting out the public. Instead of thinking as the loggia as a series of columns and arches, the loggia at the edge of the site is made of a series of parallel walls extending into the site. As one approaches the site the walls create the illusion of a closed, solid façade, maintaining the relationship to the street. it is only as one passes in front of the loggia that the walls open up revealing the site beyond. The extended walls of the loggia frame ones few of the garden and the buildings beyond allowing the public to visually interact with the site. The perspective quality of the loggia lining up with the parallel buildings beyond entices visitors to be pulled through the site, where they can appreciate the gardens and the artists at work. The central pathway between the two buildings was inspired by the feeling of walking through the old streets of Rome. Life happens between the buildings and in the streets in Italy. One walks by store fronts, restaurants, and shops and there is an opportunity to interact with the people around you. The pathway between the buildings becomes the main circulation space for both the public and the artists. Instead of an imposing façade separating the interior of the buildings from the exterior of the building, the façade becomes permeable, through the use of a double wall system. The interior wall is made of glass while the exterior wall is composed of a brick screen. This screen allows the sounds of music, dancing, and performances to move flow out towards the public, creating a sensory experience for those moving between the buildings, while providing a sense of privacy and protection from the sun at the interior. Just as with the loggia, and the screened walls, the design of the landscape plays off of the idea of conceal and reveal. Reminicant of moving through the Villa Giula, it is not until one moves through the the site that they discover the changes in the landscape that create sunken spaces where exterior performance and gathering can take place.
PROGRAM
NET SF/ROOM QTY
TL NET SF
TL GROSS SF
OCC. GROUP
OCC. FCTR
PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS PUBLIC FUNCTIONS
entrance/lobby recep0on/info center security sta0on cloakroom first aid sta0on Cafeteria bar kitchen kitchen storage
1500 200 100 300 150 800 300 250 80
1 1 1 1 1 1 1 1 1
1500 200 100 300 150 800 300 250 80
2500.00 333.33 166.67 500.00 250.00 1333.33 500.00 416.67 133.33
A-3 B B B B A-2 A-2 A-2 S-2
CHAMBER ORCHESTRA HALL CHAMBER ORCHESTRA HALL CHAMBER ORCHESTRA HALL CHAMBER ORCHESTRA HALL CHAMBER ORCHESTRA HALL CHAMBER ORCHESTRA HALL
Main Hall stage Main hall Secondary Hall Changing room (performer)-backstage Instrument/equipment storage IT-Control room
3500 1200 800 1200 800 500
1 1 1 1 1 2
3500 1200 800 1200 800 1000
5833.33 2000.00 1333.33 2000.00 1333.33 1666.67
A-1 AS PER PROGRAM A-1 STAGE A-1 AS PER PROGRAM B LOCKER ROOM S-1 STORAGE B BUSINESS
MANAGEMENT MANAGEMENT MANAGEMENT MANAGEMENT MANAGEMENT
staff entrance offices mee0ng rooms staff closet coffee room/staff room
60 1250 300 150 400
1 1 1 1 1
60 1250 300 150 400
100.00 2083.33 500.00 250.00 666.67
B B B S-1 B
CONSERVATORY CONSERVATORY CONSERVATORY CONSERVATORY CONSERVATORY CONSERVATORY CONSERVATORY CONSERVATORY
Rehearsal room-small Rehearsal room-large Rehearsal room-choir Dance studio Recording studio Instructor/Manager lounge area instrument/equipment storage Locker rooms
350 2500 1800 1200 1150 600 1500 2000
8 2 1 2 1 1 1 1
2800 5000 1800 2400 1150 600 1500 2000
4666.67 8333.33 3000.00 4000.00 1916.67 1000.00 2500.00 3333.33
E VOCA. ROOM E AS PER PROGRAM E AS PER PROGRAM E EXERCISE E VOCA. ROOM B BUSINESS S-1 STORAGE A-3 LOCKER ROOM
MAINTENANCE MAINTENANCE MAINTENANCE MAINTENANCE
Waste room/recycling Equipment room Locker room/changing area Laundry room
250 500 250 250
1 1 2 1
250 500 500 250
416.67 833.33 833.33 416.67
S-2 S-2 B S-2
ASM. UNCON BUSINESS BUSINESS LOCKER ROOM BUSINESS ASM. UNCON ASM. UNCON KITCHEN STORAGE
BUSINESS BUSINESS BUSINESS STORAGE BUSINESS
STORAGE STORAGE LOCKER ROOM STORAGE
OCC./
OUP A-3 B B B B A-2 A-2 A-2 S-2
OCC. FCTR
OCC./ ROOM
EGRESS REQS
50% OCC.
M. TOILETS
F. TOILETS
LAVATORY
BUBBLERS
ASM. UNCON BUSINESS BUSINESS LOCKER ROOM BUSINESS ASM. UNCON ASM. UNCON KITCHEN STORAGE
100.00 2.22 1.11 10.00 1.67 53.33 20.00 2.08 0.44
2 EXITS 1 EXIT 1 EXIT 1 EXIT 1 EXIT 2 EXITS 1 EXIT 1 EXIT 1 EXIT
50.00 1.11 0.56 5.00 0.83 26.67 10.00 1.04 0.22
0.40 0.04 0.02 0.20 0.03 0.36 0.25 0.01 0.00
0.77 0.02 0.01 0.10 0.02 0.36 0.25 0.01 0.00
0.50 0.06 0.03 0.25 0.04 0.27 0.27 0.01 0.00
0.20 0.02 0.01 0.10 0.02 0.11 0.04 0.00 0.00
A-1 AS PER PROGRAM A-1 STAGE A-1 AS PER PROGRAM B LOCKER ROOM S-1 STORAGE B BUSINESS
300.00 80.00 40.00 40.00 4.44 11.11
2 EXITS 2 EXITS 1 EXIT 1 EXIT 1 EXIT 1 EXIT
150.00 40.00 20.00 20.00 2.22 5.56
1.20 0.32 0.16 0.80 0.02 0.22
2.31 0.62 0.31 0.40 0.02 0.11
1.50 0.40 0.20 1.00 0.04 0.28
0.60 0.16 0.08 0.40 0.00 0.11
BUSINESS BUSINESS BUSINESS STORAGE BUSINESS
0.67 13.89 3.33 0.83 4.44
1 EXIT 1 EXIT 1 EXIT 1 EXIT 1 EXIT
0.33 6.94 1.67 0.42 2.22
0.01 0.28 0.07 0.00 0.09
0.01 0.14 0.03 0.00 0.04
0.02 0.35 0.08 0.01 0.11
0.01 0.14 0.03 0.00 0.04
E VOCA. ROOM E AS PER PROGRAM E AS PER PROGRAM E EXERCISE E VOCA. ROOM B BUSINESS S-1 STORAGE A-3 LOCKER ROOM
56.00 80.00 80.00 48.00 23.00 6.67 8.33 66.67
2 EXITS 2 EXITS 2 EXITS 1 EXIT 1 EXIT 1 EXIT 1 EXIT 2 EXITS
28.00 40.00 40.00 24.00 11.50 3.33 4.17 33.33
0.56 0.80 0.80 0.48 0.23 0.13 0.04 0.27
0.56 0.80 0.80 0.48 0.23 0.07 0.04 0.51
1.12 1.60 1.60 0.96 0.46 0.17 0.08 0.33
0.56 0.80 0.80 0.48 0.23 0.07 0.01 0.13
S-2 S-2 B S-2
1.39 2.78 16.67 1.39
1 EXIT 1 EXIT 1 EXIT 1 EXIT
0.69 1.39 8.33 0.69
0.01 0.01 0.33 0.01
0.01 0.01 0.17 0.01
0.01 0.03 0.42 0.01
0.00 0.00 0.17 0.00
8.17
9.22
12.21
5.33
B B B S-1 B
STORAGE STORAGE LOCKER ROOM STORAGE
1080.47
VILLA FARNESE LOCATION: CAPRAROLA, ITALY BUILT:1521 ARCHITECT: VIGNOLA The plan of the Villa Farnese is a courtyard plan arranged along two axes; the primary axis running north to south and the secondary axis running east to west. The square courtyard is centered were these two axes intersect, creating four quadrants. A smaller square is located in each quadrant of the courtyard helping to articulate the axes and the four entrances to the villa. The geometry of the courtyard is then used to arrange the rooms in the rest of the plan as the lines forming the edges of the squares are carried through the building to create walls. The courtyard is surrounded by a gallery space, used primarily for circulation. The east and west sides of the gallery are narrower than the north and south sides. This change in dimension is suggestive of greater importance given to the entrances at the north and south façades of the villa. A similar geometry is used in the rooms that form the perimeter of the building, lending greater importance to the rooms situated along the north and south façades. The fenestration pattern on the façades further articulates the importance of the north and south facades over the east and west facades as the windows to the north and south are regularly spaced whereas the windows to the east and west are symmetrical about the axis, but are irregularly spaced. While the axes and the gallery serve as the primary circulation space in the villa, visitors also have the option of circulating through the villa along the outer walls of the rooms. This secondary circulation space allows visitors to move between rooms without having to use the gallery.
GEOMETRIC RELATIONS
PROJECT PLAN This plan began with creating a square mass and placing it paralell against the street. In order to create a connection between the gardens and the street, a path was cut through the building creating the primary axis of the building. A secondary cut was made perpendicular to the first, creating the secondary axis and providing the space for a small public piazza in the front of the building. Like Villa Farnese, a courtyard and gallery space serves as the primary circulation space in the building. The rooms are placed around the courtyard, protecting the interior of the building. The unusual geometry of the courtyard, which was created using the direction of the exterior walls instead of an orthagonal grid, is use to determine where the walls of the various rooms will be placed. the smaller of the two building holds the public function as well as the orchestra halls. The larger building holds the conservatory and office. The hierarchy of the building is express through the tilted roof. The walls use a brick screening method to creat a monolitihic facade while still allowing light into the building.
HIERARCHICAL SPACES
SPATIAL RELATIONS
CIRCULATION
ORCHESTRA CHAMBERS CONSERVATORY MANAGMENT PUBLIC SPACES PROJECT PLAN
CIRCULATION/ SERVICE
BAGSVAERD CHURCH LOCATION: BAGSVAERD, DENMARK BUILT: 1976 ARCHITECT: JORN UTZON Bagsvaerd Church has a long, slender, rectangular form, arranged along a grid, which encompasses the entire program. The corridors, which serve as the primary circulation space, run along the exterior walls, creating the façades, and divide the building into distinct programmatic zones, ranging from public to private. On one side of the building, the exterior wall is completely closed off, protecting the spaces within from the outside world. On the other side of the building, the exterior walls have been punctured and eroded, allowing people to access the interior courtyards located in each section of the building. These courtyards serve as secondary circulation spaces. Though the exterior walls hide the true form of the spaces within the building, they do express the hierarchy of the spaces through height. The taller walls correspond with the religious and public programs of the building, all located to one side of the building. As one moves further into the building, the spaces within become more private and closed off. The rooms become smaller, the courtyards become enclosed, and the corridors become less permeable.
PROJECT PLAN
GEOMETRIC RELATIONS
This plan was organized using a grid system and a 7.5 foot square module. Like Jorn Utzon’s Bagsvared Church, the circulation corridors are pushed to the exterior of the building creating a protective barrier between the interior and the outside world. This protective barrier is solid and monolithic on three of the foor sides of the buildings. The fourth side is carved away allowing entrances into courtards located in the more public areas of the buildings. these court yards serve as secondary circulation. The facade uses a perforated brick screen to maintain a sense of privacy and protection for the interior spaces while also allowing light and music to flow between the public street and the spaces. The brick screen also references the degree of privacy each space posesses. Denser screens are used in front of the more private spaces. The building’s facade hides the true form of the building inside, whose ceiling are shape to create the best acoustical enviornment for the various concert halls and practive rooms. The corridors, in addition to providing the primary circulation space for the building, also help to divide the space into distinct public, semipublic, and private zones. Dividing the program into two buildings allows for built enviornment to define a space for social interaction inbetween.
HIERARCHICAL SPACES
SPATIAL RELATIONS
CIRCULATION
ORCHESTRA CHAMBERS CONSERVATORY MANAGMENT PUBLIC SPACES PROJECT PLAN
CIRCULATION/ SERVICE
CREMATORIUM POLDERBOS LOCATION: OOSTENDE, BELGIUM BUILT: 2014 ARCHITECT: KERSTEN GEERS DAVID van SEVEREN The geometry of the Crematorium Polderbos originated with a square that has been slightly rotated. This rotation contrasts with the orthogonal orientation of the interior geometries, creating triangular exterior spaces around the entire building. The spaces in this building are organized in a series of longitudinal bands that vary in width, alternating between narrow and wide. These bands are shifted in response to the rotation of the roof. Areas of the bands that would have extended past the roof have been cut in order contain the program within the square geometry. The narrow bands running through the building contain all of the auxiliary and service spaces, as well as portions of the circulation. These narrow bands separate the wider bands that hold the building’s primary functions. The central band is the widest, suggesting its hierarchical importance, and contains the ceremonial/ religious spaces. The midsized ban, located to the left of the building, holds the private/ technical functions of the building while the small band to the right holds the public spaces. The semicircular space holds the administrative offices of the building. Visitors enter the building via the narrow band that separates the two public bands. Movement throughout the building occurs by weaving between the public areas and the circulation bands as needed.
GEOMETRIC RELATIONS
PROJECT PLAN This plan begins with a square mass that was placed paralell to the street. In order to create a connection between the street and the Giardini della Accademia, the mass was cut on a diagonal. The building’s spaces are organized in alternating lateral bands. The smaller bands of this plan contain the service and circulation spaces for the building as well as the entrances to the concert halls and the conservatory. the bands are arranged from the street to the interior of the site going from public to private functions. The largest of the bands, holds the conservatory spaces and has the potential open up onto the garden beyond. The exerior of the building expresses hierarchy through the height of the bands which have been carved by pulling and shifting the corners of the masses. The concept of banding is carried onto the facade where the windows have been arranged in long, narrow strips emphazing the importance of the cut through the mass.
HIERARCHICAL SPACES
SPATIAL RELATIONS
CIRCULATION
ORCHESTRA CHAMBERS CONSERVATORY MANAGMENT PUBLIC SPACES PROJECT PLAN
CIRCULATION/ SERVICE
MUSEE CANTONAL DES BEAUX ARTS LOCATION: LAUSANNE, SWITZERLAND BUILT: 2019 ARCHITECT: BAROZZI VEGA The geometric composition of Barozzi Vega’s Musee Cantonal des Beaux Arts is based off of a long, narrow module that is repeated to create a compact, slender form. The width of this module is expressed on the exterior of the building using a series of louvers that spans the entire north facade. The louvers allow the façade to become more permeable on this side, where the building faces onto a public space. In contrast, the south façade of the building is monolithic, protecting the building and the program from the industrial railyard beyond. On the inside, the modules are used to place the interior partitions. Throughout the first floor, there are a number of narrow cores, typically 2 -3 modules wide, which hold the auxiliary functions and service spaces that help to define the public areas of the building. The most important public space is the central atrium. The atrium is aligned with the historic 19th building located along the south wall of the museum and is further accentuated by the walls that extend into the public square. The main horizontal circulation space occurs along the south wall, where visitors can pass between the various galleries. A secondary circulation space occurs along the north side of the building, at the top of the service cores. These small passages lead to emergency exits located on either side of each space. As one moves from the central atrium towards the ends of the building the spaces become more private, holding functions such as office and classrooms, and less important hierarchically.
GEOMETRIC RELATIONS
PROJECT PLAN This plan was generated using long narrow modules to organize the various programmatic spaces. The spaces are separated on the interior by long, cores that serve as the vertical circulation and service spaces for the buildings. The primary horizontal circulation space is located at the rear of the building and extends the entire length of each building, giving access to each area. The programmatic spaces are organized within the building moving from public to private along the horizontal axis. The facades of the building facing the public street are louvered, providing a sense of permiability as one moves through the site. The more private a space is the denser the louvers become, allowing visitors to get a sense of the building’s program from the exterior. The public is able to further read the building from the exterior through the use of banding that coresponds with the service spaces. These spaces are constricted allowing light to enter the building through these spaces. Dividing the program into two buildings allows for built enviornment to define a space for social interaction inbetween. HIERARCHICAL SPACES
SPATIAL RELATIONS
CIRCULATION
ORCHESTRA CHAMBERS CONSERVATORY MANAGMENT PUBLIC SPACES PROJECT PLAN
CIRCULATION/ SERVICE
CATHEDRAL OF OUR LADY OF THE ANGELS LOCATION: LOS ANGELES, CA, USA BUILT: 2002 ARCHITECT: RAFAEL MONEO Unlike the other plans analyzed in this exercise, Rafael Moneo’s plan for the Cathedral of Our Lady of the Angels is not organized by overarching geometries. Instead, this plan was organized around a directional quality. Due to the fact that both the entry and the altar had to be facing the east, Moneo had to come up with a way to bring visitors all the way to the back of the church so they could enter on axis with the nave. The nave of the cathedral is separated from the circulation spaces by long cores that hold smaller programmatic and auxiliary spaces. These cores direct visitors down the long hallways towards the back of the church from which they can approach on altar on axis. One will notice that the main axis of the cathedral passes through the cross window and altar and dictates the path of the central aisle. The walls of the service cores and the circulations spaces are angled in such a way that as one moves down the aisle the walls open up towards the stage and alter. Secondary circulation paths are cut through the service cores that allow visitors to enter the nave from the side. These paths are also cut in order to direct ones attention towards the central aisle. As a result of this directional geometry, the nave and altar become the main hierarchical spaces, followed by the service cores, circulation spaces, and garden.
GEOMETRIC RELATIONS
PROJECT PLAN This plan was generated with the experiance of the approach in mind. The building was formed by creating a square mass and placing it paralell against the street. A path was cut through the building to create a connection between the gardens and the street, while a secondary cut was made, perpendicular to the first, to create small public piazza in the front of the building. the lines of the exterior walls of the building were used to determine perspectival point from which the location of the walls was determined. The goal of this approach was to create spaces where the hierarchically important programs have the sense of opening up as you move through them. The spaces that were given hierarchical importance were the large rehersal spaces in the conservatory and the concert halls. These spaces are defined by large cores on either side that separate these programs from the circulation areas. Within these cores are smaller programatic spaces and service areas. The massing of these servic cores reach higher than the other spaces. This allows visitors to read the program of the building from the exterior and light to enter into the building through these cores.
HIERARCHICAL SPACES
SPATIAL RELATIONS
CIRCULATION
ORCHESTRA CHAMBERS CONSERVATORY MANAGMENT PUBLIC SPACES PROJECT PLAN
CIRCULATION/ SERVICE
ONE HALF HOUSE LOCATION: N/A DESIGNED: 1966 ARCHITECT: JOHN HEJDUK The formal composition of John Hejduk’s One Half House is consistent with that of a fragmented plan. The composition of this plan is dictated by the primary geometries he uses: the circle, square, and diamond. These geometries are sized in such a way that the diamond fits within the circle and the circle fits within the square. The geometries are then cut in half, creating a semi-circle, a rectangle, and a triangle. The rectangle is placed beneath the semi-circle, along its vertical axis, at a distance equal to half the rectangle’s height. The triangle is rotated 90 degrees and is aligned along the semicircle’ horizontal axis. The area formed by these primary geometries becomes the main circulation area between these spaces. These geometries are then placed within a square, with the edges of the square meeting the bottom of the rectangle, the point of the triangle, the outermost point of the circle. The resulting square helps to place the upper, horizontal circulation band. This horizontal band is then connected to the primary geometries via a vertical band, which meets the center point of the right side of the rectangle. An orthogonal grid is then overlaid on top of these geometries, which allows for the interior walls to be placed. The main functions of the house are held within the primary geometries whereas the circulation is held in the bands and the space between the geometries.
GEOMETRY
GEOMETRIC RELATIONS
PROJECT PLAN The goal of this plan was to create a complex that plays with the idea of conceal and reveal. The unique rectangular mass at the front of the site is a loggia. This loggia is design to create the illusion of a solid mass until people approach the space. The primary program spaces are arranged around a central circulation axis. The exterior walls of these programmatic masses begin to suggest boundries that create smaller courtyards for the public to move through and occupy between the buildings. These courtyards created by the building allow the public to move through the space and discover the different forms of art and proformance that are house in this institution. The spaces are arranged so the public spaces are located near the front of the site while the private spaces are protected in the back of the site. The size of the buildings express the hierarchy of the spaces within
HIERARCHICAL STRUCTURE
HIERARCHICAL SPACES
SPATIAL STRUCTURE
SPATIAL RELATIONS
MOVEMENT
CIRCULATION
PLAN OF YOUR PROJECT
ORCHESTRA CHAMBERS CONSERVATORY MANAGMENT PUBLIC SPACES PROJECT PLAN
CIRCULATION/ SERVICE
Formal Composition:
This building was organized using a grid system and a 7.5 foot square module. Similar to the way the buildings and structures define the public spaces on the site, the circulation corridors define the different spaces within the building. These circulation spaces create an inhabitable, protective barrier between the interior spaces and the outside world that are sized depending on the programs that they service. Where the facades face the edges of the site, the walls of a building become solid and monolithic in nature, drawing from the roman tradition of protecting the building’s interior. When the facades face onto a public space, such as the pathway between the buildings the walls are carved away, allowing entrances into courtyards located in the more public areas of the buildings. In addition to allowing light an air to enter the building, these courtyards also serve as circulation spaces between the public pathway and interior spaces of the building, creating a connection between the two spaces. The public facades of the building, rather than being solid masonry walls are articulated with perforated brick screens maintain a sense of privacy and protection for the interior spaces while also allowing light and music to flow between the public street and the spaces. The brick screen also references the degree of privacy each space possesses. Denser screens are used in more private space where as more permeable screens are used in public spaces. The hierarchy of the spaces within the building is readable from the building’s exterior. The taller the volumes are, the more important the spaces are within. While this gives visitors a hint at what is happening on the interior of the building, it is not until they are inside that they discover the true form of the various rooms. Inside the ceilings are shape to create the best acoustical environment for the various concert halls and practice rooms
Formal Composition:
This building was organized using a grid system and a 7.5 foot square module. Similar to the way the buildings and structures define the public spaces on the site, the circulation corridors define the different spaces within the building. These circulation spaces create an inhabitable, protective barrier between the interior spaces and the outside world that are sized depending on the programs that they service. Where the facades face the edges of the site, the walls of a building become solid and monolithic in nature, drawing from the roman tradition of protecting the building’s interior. When the facades face onto a public space, such as the pathway between the buildings or the Giardini della Filarmonica, the walls are carved away, allowing entrances into courtyards located in the more public areas of the buildings. In addition to allowing light an air to enter the building, these courtyards also serve as circulation spaces between the public pathway and the Giardini della Filarmonica, creating a connection between the two spaces. The public facades of the building, rather than being solid masonry walls are articulated with perforated brick screens maintain a sense of privacy and protection for the interior spaces while also allowing light and music to flow between the public street and the spaces. The brick screen also references the degree of privacy each space possesses. Denser screens are used in more private space where as more permeable screens are used in public spaces. The hierarchy of the spaces within the building is readable from the building’s exterior. The taller the volumes are, the more important the spaces are within. While this gives visitors a hint at what is happening on the interior of the building, it is not until they are inside that they discover the true form of the various rooms. Inside the ceilings are shape to create the best acoustical environment for the various concert halls and practice rooms
PLACE, CONTEXT, SCALE The site is located along the Via Flaminia, an ancient road that connected Rome to cities in the north. The Via Flaminia begins just outside of the ancient city walls at the Porta Del Popolo and stretches all the way to Rimini. For centuries, the land along this road was made up of vineyards, farms, and villas. Farm buildings, churches, tombs, and wall lined the road much like the modern buildings do today. Located next to the site is the Accademia Filarmonica Romana, an organization that brings together musicians and artists of all skill levels and social standings to promote the arts within the community. Often, the Accademia will utilize the back garden as a social and concert space inviting the public in to view the various performances throughout the year. The issue however is that the Giardini is cut off from the street, limiting the public’s interaction with the space. The main intention of this intervention is to create a series of public spaces that connect the Giardini della Filarmonica will the public realm of Via Flaminia. Similar to the medieval fabric of the city, the buildings and structures on the site are designed to serve as shapers of these public spaces. They not only define the boundary of the site itself, but also the edges of the public spaces within the site. In some cases, the buildings define the edges of the spaces whereas at other times they are carved away to create spaces within the building. When placing the building on the site, it was important push the intervention up to street, creating a strong relationship between the street and the rest of the site. Throughout Rome, buildings line the street, not only defining the edges of the public realm, but creating an imposing, continuous façade stretching the length of the roadway. These strong facades protected the interior of the building by creating a barrier between it and the outside world. To ignore this established relationship to the street would make the building feel out of place within the context of the city. However, this intervention challenges the notion that these street facades have to be a barrier between the street and the interior of the site. What if this façade where to become permeable?
SPACE, CHARACTER, ATMOSPHERE, IDENTITY Throughout Italy, one of the most common building typologies is the courtyard building. The courtyard plan has been used in this part of the world for millennia, stretching all the way back to the Roman Empire. In plans such as these, courtyards are used both a social spaces as well as circulation spaces within their building. They are protected public areas to be used by members of the family and their guests. In many cases, these courtyards also served as devices to bring light and fresh air into the building. Much like the public piazzas in the city, the building defines the edges of the courtyard creating these public spaces. In this intervention, the intention is that visitors to the site will be able to circulate through the site via the public spaces created by the buildings and structures. The spaces are purposefully arranged so the more public spaces are located towards the front of the site (such as the gardens and entry areas) while the more private areas are located to the rear of the buildings. The pathway created by the two buildings is designed to draw visitors through the site, allowing them to discover aspects of the building as that travel down the path. When walking through the site and courtyards, the line between public and private becomes slightly blurred. The walls of the courtyard become semi permeable, through the use of brick screens. This allows visitors to catch a glimpse of the artists at work while also allowing the music to flow into the courtyards, filling the space. The building is designed to have a monolithic quality. This design choice is in reference to the monolithic qualities of the Roman ruins and city walls located just a few hundred feet away. This quality of the building was also inspired by the rationalist Italian architecture, which became popular in the 1920s and 30s when this area of Rome was developed. Rationalist architecture in Italy drew inspiration from the tradition forms of ancient roman architecture and simplified these elements to create a modern architecture that felt timeless, yet still connected to site and its context.
ORGANIZATION, ARTICULATION This building was organized using a grid system and a 7.5 foot square module. Similar to the way the buildings and structures define the public spaces on the site, the circulation corridors define the different spaces within the building. These circulation spaces create an inhabitable, protective barrier between the interior spaces and the outside world that are sized depending on the programs that they service. Where the facades face the edges of the site, the walls of a building become solid and monolithic in nature, drawing from the roman tradition of protecting the building’s interior. When the facades face onto a public space, such as the pathway between the buildings or the Giardini della Filarmonica, the walls are carved away, allowing entrances into courtyards located in the more public areas of the buildings. In addition to allowing light an air to enter the building, these courtyards also serve as circulation spaces between the public pathway and the Giardini della Filarmonica, creating a connection between the two spaces. The public facades of the building, rather than being solid masonry walls are articulated with perforated brick screens maintain a sense of privacy and protection for the interior spaces while also allowing light and music to flow between the public street and the spaces. The brick screen also references the degree of privacy each space possesses. Denser screens are used in more private space where as more permeable screens are used in public spaces. The hierarchy of the spaces within the building is readable from the building’s exterior. The taller the volumes are, the more important the spaces are within. While this gives visitors a hint at what is happening on the interior of the building, it is not until they are inside that they discover the true form of the various rooms. Inside the ceilings are shape to create the best acoustical environment for the various concert halls and practice rooms
TECTONICS, MATERIALITY, DETAIL/HAPTICITY This project is designed to be monolithic in nature, using brick as the primary building material. The use of brick is a reference to the ancient Roman’s use of brick in many of their structures and buildings as well as the continued use of masonry construction across Italy. The heaviness of the material anchors the project to the earth and the site and enhances the protective quality of the facades. While the use of brick helps the design to achieve this monolithic quality, the material is also incredibly versatile allowing for different application of the same brick unit across the entire façade. While inherently textured, bricks can be arranged in order to create different wall textures across the building, adding an extra layer of dimension to the project and allowing further definition of space. The use of brick, as opposed to concrete, also helps to enhance the sense of scale that accompanies this building. Regular module of the brick helps visitor to understand the true size and dimensions of the building. While bricks are typically thought of as a solid material, this project uses them to create transparency in transitional spaces. The bricks are arranged in such a way that they create various types of brick screens, allowing light to be filtered into the building, while sound is allowed to travel out into the public spaces. The density of the screens is used to articulate the building and allow the public to read the building from the exterior. Denser screens are used in more private space where as more permeable screens are used in public spaces. In this environment, brick is an ideal choice for construction. The density of the brick and the configuration of the walls provides the opportunity for the brick to be utilized as more than just structure. The brick walls can be used to help achieve a thermal mass that keeps helps the building temperature regulated. Additionally, if designed correctly, the use of brick could allow for little to no insulation to be used within the walls themselves.
ENVIRONMENTAL STEWARDSHIP One of the goals of this intervention is to draw from traditional and vernacular Roman architecture in order to integrate concepts of passive strategies. One such aspect of vernacular Roman architecture is the use of brick masonry. The thick masonry walls absorb the sun’s energy during the day, keeping the interior of the buildings at a comfortable temperature, and release the stored heat at night when the temperature drops. The use of these thermal walls helps to keep the interior of the buildings comfortable without the need for heavy mechanical systems. Another common strategy for sun management in Rome is shutters. Shutters on roman buildings are used to help control the amount of sunlight coming into the building, preventing the air on the interior of the building from heating up. While traditional shutters will not be employed in this design, the idea of controlling and managing the amount of sunlight entering a space a consideration. The brick screens employed along the façade help to control the amount of sunlight coming into the building, helping to create a cooler environment for users of the space. The configuration of courtyards within the structure is also inspired by traditional Roman architecture. Many buildings in Rome either have thin profiles or have a courtyard at the center. These building configurations allow for increased cross ventilation through the structure, cooling the space without the need for A/C. Courtyard buildings, or buildings arranged along a narrow street also enjoy the benefits of the “courtyard effect”. During the day, the sun heats the air in the courtyard or narrow street. The warm air rises, causing the cooler air in the interior of the building to rush out, creating a cooling effect. When night falls, and the temperatures drop, the cool air then drops into the courtyard, causing the airflow to move in the opposite direction.
Garden space to engage with the public and absorb rainwater. Buildings oriented to take advantage of the east west winds for cooling. Brick screening to control the amount of sunlight entering the space. Brick masonry construction for thermal mass benefits. Courtyard effect to help cool the interior spaces of the building. Courtyards provide light and fresh air to interior spaces
A3 DEVELOPMENT OF PRELIMINARY DES
SIGN
The purpose of this assignment was to further strengthen our design principles and intentions. In good architecture, every aspect of the project’s design is helping to further the intentions and enhance the character of the building. Developing a cohesive set of design prinicples helps to create a stonger, more thoughtful project. This assignment also began to consider the technical needs of the variuos programmatic spaces of the project. Research on acoustics, room shapes, finishes, and technology was conducted as the needs of these space would greatly affect the design of the overall project.
TECHNICAL RESEARCH:
VOLUME REQUIREMENTS: A=A B = 1.6A C= 2.6A
Arguably the most important part of designing for a rehearsal space is the room geometry. Yes, existing rooms with poor geometries can be adapted to perform better acoustically through different finishes. However, when the room is shaped with music in mind, the acoustical potential for the room will grow exponentially. The geometry of the room defines the quality of the music that is produced. When designing rehearsal spaces, architects should avoid using flat, parallel facing walls. If the finishes of these walls are sound reflective, this configuration can cause flutters and echoes, where sound bounces back at the musicians uncontrolled, creating an uneven mix of music. Designers should also avoid using concave shapes, such as curving walls, as this configuration will focus the music to one area in the room, creating a hot spot. The optimal configuration for walls and ceilings is splayed and angled surfaces. The angle of these surfaces help to prevent flutter and echoes while allowing the sound to better distribute throughout the room. When sizing rehearsal spaces, a good rule of thumb is each musician requires 30 square feet of floor space and vocalists require 15 square feet. This rule allows for both rehearsal and circulation space. The volume of the room is critical when designing rehearsal spaces for both orchestras and choirs. Small band rooms with low ceilings will be overly loud and reverberant, affecting the quality of the music. Higher ceilings help to control the sound of larger bands and allow the musicians to accurately hear their sound. Ideally, rehearsal spaces should have 550 – 700 cubic feet of volume per instrumentalist and 350 – 500 cubic feet per vocalist. At a minimum, rehearsal spaces require 400 cubic feet per musician and 300 per vocalist. In most cases, large music groups require at least 15 – 20 foot ceilings.
ROOM GEOMETRY: Individual Practice Room ≥8.5ft
1 - 2 People Small Ensemble Room
Flutter Echo
Splayed Reflective Walls
≥11.5ft
Rehearsal Rooms (Instruments) Ideally = 550FT3 - 700FT3 / musician Minimum = 400FT3 / musician Rehearsal Rooms (Choir) Ideally = 350FT3 - 500FT3 / vocalist Minimum = 300 FT3 / vocalist
3 - 12 People Large Ensemble Room
Traditionally, the most acoustically perfect room is one whose dimensions are based off of the golden ratio.
≥16.5ft
Noise Hotspot
Angled Reflective Ceiling
Up to 80 musicians or 80 vocalists
ACOUSTICAL FINISHES:
1
5
3
4
2
1) Wall Diffuser Panels on the upper and lower walls. 2) Hard surface prefered on floor for sound reflection. 3) Absorbtion Panels help to evenly distribute the sound. 4) Air space below the risers to maintain room volume. 5) Mix of diffusers and absorbtion panels for better sound quality.
1
5
2
6
3
4
1) Barrel Diffuser 2) Pyramid Diffuser 3) Absorbtion Panel 4) Wood Diffuser 5/6) Corner Absorbtion
Once the geometry of the room has been designed, or if the room is existing, acoustical finishes can be used to further refine the acoustical properties of the room. Ideally, every rehearsal space should have a mix of sound reflection, sound diffusion, and sound absorption. Mixing these acoustically strategies will help to create a well-balanced room. Sound reflecting materials help to direct the sound across the room, towards the conductor, and back to the musicians. This allows them to hear their own music in relation to the rest of the group. Because musicians’ sound is directed at different angles reflective materials have to be placed throughout the room. For trumpets, whose sound is directed forward, reflective materials are best placed on the walls. For woodwind instruments, such as clarinets, reflective materials are best placed on the ground, where the majority of their sound is directed. Because of this, rehearsal room floors should not be finished with carpeting or soft materials, as this would dampen the sound. Having solely sound reflecting surfaces in a rehearsal room will cause a big, booming effect and could result in an uneven distribution of sound. Sound diffusing devices and finishes help to scatter the sound throughout the room, creating a more even sound throughout the space. Additionally, sound diffusing surfaces help to reduce flutter and echoes in spaces that are not geometrically ideal. There are several different types of commonly used diffusers including barrel diffusers, pyramid diffusers, and wood block diffusers, all of which can be applied to either the ceiling or the wall. As with sound reflecting panels, sound diffusers should be placed throughout the space, on the upper and lower walls as well as the ceiling. Sound absorbing materials are incredibly important in rehearsal spaces. While sound reflecting and diffusing materials help to disperse the sound throughout the space, there may still be issues with the volume of the music or the geometry of the space. Sound absorbing materials can help to correct geometric issues in the space and reduce the amount of reverberation in the hall. Additionally, while reflection and diffusion panels help the control the higher and mid frequency sounds, absorption panels help to control the lower frequency bass sounds. Like with everything in acoustics, too much absorption material can cause the sound to be dull and flat.
SOUND ISOLATION:
VENTILATION ARRANGEMENT:
While the geometry and acoustic finishes focus on fine tuning the sound inside the room, designers should also consider the sound travelling outside of the room. In rehearsal spaces, ambient noise and other sounds can affect the tone of the music produced by the musicians. Ideally, designers should try to isolate rehearsal spaces from other noise producing spaces. POOR VENTILATION ARRANGEMENT Direct supply line allows sound to travel through all rooms
Rehearsal rooms and other practice rooms should not be placed next to each other, as the sound will travel through the walls and affect the surrounding rooms. In this case, the only way to isolate the sound would be through costly construction assemblies. Ideally, rehearsal and practice rooms should be separated by buffer zones or acoustically dead areas. This arrangement limits the amount of sound traveling between live music rooms, providing the sound isolation desired in these spaces. Another consideration is the mechanical equipment that the building requires. Every room requires ventilation; however tradition means of ventilation are not suitable for music spaces. Commonly, air supply ducts supply air to multiple rooms along a single duct. While this arrangement saves money, it allows sound to travel between the spaces which can affect the musicians in other rooms. One way to solve this issue is by using acoustically lined air supply branches off the main duct. This configuration would limit the amount of sound traveling between the rooms. Mechanical units themselves also can cause acoustic issues. When in use, mechanical units emit vibrations and sound waves that can travel that can travel through the floor. For this reason, mechanical units are not usually placed directly above or below the rehearsal or musical spaces. In such cases that mechanical equipment has to be placed near the playing spaces, there are ways to mitigate the vibrations that travel through the structure. The most common way to isolate these vibrations is to mount the mechanical equipment on steel spring isolators. These springs absorb the vibrations of the equipment, much like the shocks on a car, and limit the level of noise transmitted through the structure.
GOOD VENTILATION ARRANGEMENT Acoustically lined supply branches prevent sounds from travelling between rooms
1
SPATIAL ARRANGEMENT: 1) Poor Room Adjacencies 2) Correct Room Adjacencies POOR MECHANICAL SOUND ISOLATION: Vibrations and soundwaves travel through the structure.
2
Band Rehearsal Room Choir Rehearsal Room Small Practice Room Storage Room Office Space
GOOD MECHANICAL SOUND ISOLATION: Vibrations and soundwaves are isolated from the structure.
WALL ASSEMBLY OPTION 1: STC RATING: 60
WALL ASSEMBLY OPTION 2: STC RATING: 60
WALL ASSEMBLY OPTION 2: STC RATING: 60
5/8” GYPSUM WALL BOARD (2) 3 5/8” STEEL STUDS @ 16” O.C. 3 1/2” FIBERGLASS BATT INSULATION 1” AIR SPACE 3 1/2” FIBERGLASS BATT INSULATION 3 5/8” STEEL STUDS @ 16” O.C. 5/8” GYPSUM WALL BOARD (2)
5/8” GYPSUM WALL BOARD GREEN GLUE SOUND MEMBRANE 5/8” GYPSUM WALL BOARD 3 5/8” STEEL STUDS @ 16” O.C. RESILIANT BARS @16 O.C. 3 5/8” STEEL STUDS @ 16” O.C. 3 1/2” FIBERGLASS BATT INSULATION 1” AIR SPACE LOAD BEARING BRICK WALL
5/8” GYPSUM WALL BOARD GREEN GLUE SOUND MEMBRANE 5/8” GYPSUM WALL BOARD 3 5/8” STEEL STUDS @ 16” O.C. RESILIANT BARS @16 O.C. 1 1/2” WOOD BATTENS @ 16” O.C. 1 1/2” FIBERGLASS BATT INSULATION LOAD BEARING CAVITY BRICK WALL
TECHNICAL RESEARCH :
CHAMBER MUSIC HALL When looking to design a chamber music hall it is important to understand all of what goes into the design. There are multiple different ways to approach this type of hall, but it is also important to understand the difference between a chamber music hall and a theater. Chamber music is focused on string and wind instruments as well as piano and maybe opera. This type of program has differing requirements as well as considerations that need to be had. It is the consideration of seating and how that effects the stage and those requirements, which in turn effects how an architect will need to approach the space acoustically. All of these come together to create an overall experience that a person could have within the Chamber Music Hall. There are overarching styles of theaters that begin to determine specific layouts within a concert hall. The first is a SHOEBOX it is a simple rectangular room with balconies. It is a simple design but if it is not designed correctly, it can have flutter echoes. This will need certain materials and the introduction of elements along the walls help to reduce the amount of flutter echoes. The next hall type is FAN SHAPED can accommodate large number of audience members while still having everyone face the performers. It is not prone to flutter echo because there are no parallel walls. Having the back of the hall be wider and more spacious this helps for the sound to not get trapped making the use of acoustical elements not as necessary. The last style is VINEYARD. This type has become very popular because of the relationships it begins to create with the audience and performers. The irregular nature of this type of concert hall helps to break up the sound to help avoid acoustical issues such as flutter echo’s and focusing. Starting with a general shape these three styles help to determine the seating arrangement and how the overall design of the theater can progress. SEATING CONFIGURATION TYPES: There are many different seating types that a Chamber Music Hall can have, this will determine how the space is then made up. The first seating layout that the space could be END STAGE, this is a seating arrangement where all the audience members are facing the stage in the same direction. Having everyone face the stage can cause problems with the relationships that people can have with the performers. This is because as more and more seats get added people are getting farther and farther away and are not able to feel as if they are one with the stage. The next seating arrangement that can be chosen is WIDE FAN. Wide fan is when all the seats are placed along 130-degree angle of inclusion, having this angle brings people closer to the performers ultimately bringing a more intimate experience with the performers. When looking to design in this way the consideration of how and where the focus of the stage and which way will be will people be facing. Next seating arrangement is ¾ ARENA. This type of seating configuration is based on
FRONTAL / SHOEBOX
CONSIDERATIONS Row Spacing 2’9” ft Sloped 7.1 Risers 13 Space per seat 7.4
THRUST
SURROUND
CONSIDERATIONS Row Spacing 4’0” ft Stage elevatin 12” Riser 12” Sloped 6.6 Space per seat 8.7
CONSIDERATIONS Row Spacing 3’0” ft Stage elevatin 2’6”” Riser 12” & 4” Sloped 6.6 Space per seat 11.1
180-270-degree angle of inclusion, having this type of arrangement helps with visual and audible connection between the audience and the performers. This type of seating arrangement allows the sound to carry in a more natural way leaving out no spaces within the hall. There are OTHER ways to consider seating types, it can be the combination of any of the types already stated or it could be 360-degree around the stage. This is just a matter of what works within the space and knowing what acoustical and mechanical considerations must be had with each seating configuration. STAGE CONFIGURATION TYPES: Though seating configuration types leans its way into how the stage will be set up there are still types fo stage configurations to accommodate look into. The first is FRONTAL (proscenium) this type of stage is usually deep or raked and sloped away from the audience. This normally has a frame surrounding the stage to help with the acoustics and projecting the sound. This type of stage creates almost like a movie quality for the audience to sit and enjoy. The next stage type is a THRUST stage this type is where the audience goes around and above the stage. This allows for an intimate experience between performers and the audience because no one has a bad view because the stage is not covered by walls. The final stage type is SURROUND this is when the audience can sit around the entire stage allowing for everyone to have a full view of what is happening. With a surround stage there are more issues with how the performers are to be set up and how the acoustics can be carried within the space.
83 FT
130 FT
STAGE GENERAL REQUIREMENTS: The stage within a chamber music hall on average should be 16-20 SF per musician, with a width of about 55’-80’ this will probably be closer to 50. The stage should be made up of mounted felt cushions under sleepers, variably spaced to dampen resonant vibration. Is under stage is unused the structural base can be ground slab. There is normally a soft reflective material that is used for the stage. Another consideration that needs to be had is the acoustical panels that can be used, risers if necessary and lighting.
130 FT
130 FT
ACOUSTICAL CONSIDERATIONS: The consideration that needs to be had for acoustical needs are the forms of the hall, the volume per person and the type of performance. Shoebox auditoriums have strong early reflections which play a significant role in the acoustical quality. This creates a richness to the auditory experience for the audience. The narrow walls provide dynamic response to the music that is being played. This can be optimized by textured finishes and promoting reflections to all areas equally. This style limits the amount of people that can be within the theater, because as the theater gets larger it leads to more uneven sound distribution. Fan shaped auditoriums are typically not as great for an acoustical experience, they are better for actual experience. The wide nonparallel walls are reflected to the back of the hall rather than the audience. This is due to the
lateral reflections arriving later because of the distance between the walls. The fullness is normally limited due to lower ceiling and higher sound absorption because of the larger audience. Vineyard is the best shape for visual and audible interest, being so close to the stage there is direct sound for most of the audience. This type of shape project the sound directly to the listeners which is great but when the sound reflects to itself there is no lateral movement for the audience which gives the hall a lack of sense. Though the reflection throughout the space does give a fullness to the sound. Since the stage is directly in the center with this layout it causes the sound to not be distributed evenly, mostly because most instruments project their sound forward. Most of the issues with sound within a place can be enhance by sound reflectors around the auditorium and above the stage. Another way to eliminate sound reflection is by the addition of soft surface such as the chairs and curtains along the wall. With keeping a reverberation time of 2 seconds which is what a chamber music hall calls for the volume per person should be around 10 cubic meters. When resolving acoustical issues it needs to be considered who is performing, with strong instruments they resonate sound where as with wind instruments they are more direct with the sound that they are producing. Just as string instruments the piano resonate sound while a singer projects sound in one direction. So when trying to resolve the issue of reverberation within a theater all types of performance should be taken into consideration. LIGHTING REQUIREMENTS: Within a music hall there are many considerations when it comes to lighting. A hall needs WORKING LIGHTS, which is composed of rear entrance, stage, loft, and performance. Having 4-500w quartz lamps with toggle switches located both backstage right and left. These are the lights that are used for the staff, so they can work from day to day. These lights are a lower power source so that the hall because they are easy to maintain. These are the lights that will be always used when public is not in the hall. Another type of lighting system would be the HOUSE LIGHTS, these are the lights that are used in the concert hall before and after a performance, but never during a performance. This will be a strip of lights that is placed at 60 and 45 degrees from the stage, this light will be white light to not make shadows on the stage and provide an illumination rather than a harsh light. These will be surrounding the stage and pointed towards the stage. Then there will be recessed lighting that will cause a soft glow of light throughout the entire Hall. Having them placed along the rows that are being created. The house lights are composed of walkway downlights, tungsten roof, fluorescents. These lights are controlled by a two pushbutton control station, one will be located on stage left towards the corner near the access ladder. The main control panel is located at the back of the hall to the right of the stage. There are 124 controls for both the tungsten roof lights and walkway downlighters and the 125 controls for the fluorescent light. The last part of lighting is the PERFORMANCE LIGHTING. This is a lighting system that is directly focused on the stage, normally these lights are set
FRONTAL / SHOEBOX
THRUST
SURROUND
USING ACOUSTICAL PANELS TO LINE THE WALLS AND THE CEILING TO HELP WITH THE SOUND BOUNCING FROM WALL TO WALL.
USING ACOUSTICAL PANELS ABOVE STAGE AND ALONG WALLS TO HELP GUIDE THE SOUND WHILE ALSO HELPING WITH REVERBERATION IN THEATER
USING ACOUSTICAL PANELS TO LINE BACK WALLS OF THE THEATER AND DIRECTLY ABOVE STAGE TO HELP WITH EQUAL DISTRIBUTION
slightly upstage, so they are creating a wash of light rather than focused light. Lastly there are EMERGENCY LIGHTING this is composed of exit signs and lighting along the isles, so people know where and how to leave. Specifically for orchestra performance there are considerations that need to be had such as lighting the music, conductor, audience, the orchestra, and scores. Lighting the music for the performers is normally done by music stand lights, these are smaller rectangular lights that are on the top of the music stands. Making sure that the conductor is light so that the musicians can see is also important when setting up a lighting system. Placement of the conductor can change based on the layout of the orchestra, so it is making sure that no matter where they are it is taken into consideration. Lighting the audience for an orchestral performance is a light bit different than in the theater. The audience will need a soft low light to help them to better see the performers. When lighting the orchestra glare and shadows need to be taken into consideration. So, making sure that the lights that are being used are softer and allow for more of a glow than an intense downlight. Making sure that the angles are lower will help to make the ideal lighting set up for the performers. MECHANICAL SYSTEM REQUIREMENTS: Looking further into mechanical systems a chamber music hall should account for larger and smaller groups of people. While also maintain a good level of humidity because for the instruments to sound right having a super dry environment would not be ideal. As for mechanical system set up the best system would be going underneath the floor so there is no chance of dripping this will also allow for less rattling. Having airways underneath the seat will also allow for the hall to remain a solid temperature, with having them below the seats the air return vents would be at the top of the theater. The type of mechanical system has to be a configuration of smaller vents so there is less noise and will not interrupt the performances. TYPICAL WALL ASSEMBLY COMPOSITION’S: When designing typical wall assembly, it is important to look at how sounds can travel through the wall or doors. Music can be carried through a common wall when door is open the sounds will carry. There can be flanking below the wall through the floor, the sound can travel through ductwork. There are many things to consider when completing a wall within a chamber music hall.
FRONTAL / SHOEBOX
THRUST
SURROUND
Gypsum Board Layers
Insulation
Insulation Concrete Wall Steel Channel Wood Acoustic Panels
Fabric over PCF Fiberglass
Resilient Furring Channel
Clips
SITE SCHEME - PUBLICLY PRIVATE Throughout Rome, there is a set of relationships between public vs. private, street and site, interior vs. exterior that most buildings adhere to. The public area of the street is defined by the massive facades that protect the interior of the building from the world outside. It is very clear where the public space ends and the private space begins. This scheme asks the question what if this was not the case? What if the public space extended beyond the street? How can this be achieved without ignoring the relationship between street and site? Often along Italian streets, loggia’s are used as transitional spaces between the public and private realms. They allow for the creation of a barrier without shutting out the public. Instead of thinking as the loggia as a series of columns and arches, the loggia at the edge of the site is made of a series of parallel walls extending into the site. As one approaches the site the walls create the illusion of a closed, solid façade, maintaining the relationship to the street. it is only as one passes in front of the loggia that the walls open up revealing the site beyond. The extended walls of the loggia frame ones few of the garden and the buildings beyond allowing the public to visually interact with the site. The perspective quality of the loggia lining up with the parallel buildings beyond entices visitors to be pulled through the site, where they can appreciate the gardens and the artists at work. The central pathway between the two buildings was inspired by the feeling of walking through the old streets of Rome. Life happens between the buildings and in the streets in Italy. One walks by store fronts, restaurants, and shops and there is an opportunity to interact with the people around you. The pathway between the buildings becomes the main circulation space for both the public and the artists. Instead of an imposing façade separating the interior of the buildings from the exterior of the building, the façade becomes permeable, through the use of a double wall system. The interior wall is made of glass while the exterior wall is composed of a brick screen. This screen allows the sounds of music, dancing, and performances to move flow out towards the public, creating a sensory experience for those moving between the buildings, while providing a sense of privacy and protection from the sun at the interior. Just as with the loggia, and the screened walls, the design of the landscape plays off of the idea of conceal and reveal. Reminicant of moving through the Villa Giula, it is not until one moves through the the site that they discover the changes in the landscape that create sunken spaces where exterior performance and gathering can take place.
PRECEDENT ANALYSIS 1: BAGSVAERD CHURCH LOCATION: BAGSVAERD, DENMARK BUILT: 1976 ARCHITECT: JORN UTZON Bagsvaerd Church has a long, slender, rectangular form, arranged along a grid, which encompasses the entire program. The corridors, which serve as the primary circulation space, run along the exterior walls, creating the façades, and divide the building into distinct programmatic zones, ranging from public to private. On one side of the building, the exterior wall is completely closed off, protecting the spaces within from the outside world. On the other side of the building, the exterior walls have been punctured and eroded, allowing people to access the interior courtyards located in each section of the building. These courtyards serve as secondary circulation spaces. Though the exterior walls hide the true form of the spaces within the building, they do express the hierarchy of the spaces through height. The taller walls correspond with the religious and public programs of the building, all located to one side of the building. As one moves further into the building, the spaces within become more private and closed off. The rooms become smaller, the courtyards become enclosed, and the corridors become less permeable. PROJECT PLAN This plan was organized using a grid system and a 7.5 foot square module. Like Jorn Utzon’s Bagsvared Church, the circulation corridors are pushed to the exterior of the building creating a protective barrier between the interior and the outside world. This protective barrier is solid and monolithic on three of the foor sides of the buildings. The fourth side is carved away allowing entrances into courtards located in the more public areas of the buildings. these court yards serve as secondary circulation. The facade uses a perforated brick screen to maintain a sense of privacy and protection for the interior spaces while also allowing light and music to flow between the public street and the spaces. The brick screen also references the degree of privacy each space posesses. Denser screens are used in front of the more private spaces. The building’s facade hides the true form of the building inside, whose ceiling are shape to create the best acoustical enviornment for the various concert halls and practive rooms. The corridors, in addition to providing the primary circulation space for the building, also help to divide the space into distinct public, semi-public, and private zones. Dividing the program into two buildings allows for built enviornment to define a space for social interaction inbetween.
PRECEDENT ANALYSIS 2: MUSEE CANTONAL DES BEAUX ARTS LOCATION: LAUSANNE, SWITZERLAND BUILT: 2019 ARCHITECT: BAROZZI VEGA The geometric composition of Barozzi Vega’s Musee Cantonal des Beaux Arts is based off of a long, narrow module that is repeated to create a compact, slender form. The width of this module is expressed on the exterior of the building using a series of louvers that spans the entire north facade. The louvers allow the façade to become more permeable on this side, where the building faces onto a public space. In contrast, the south façade of the building is monolithic, protecting the building and the program from the industrial railyard beyond. On the inside, the modules are used to place the interior partitions. Throughout the first floor, there are a number of narrow cores, typically 2 -3 modules wide, which hold the auxiliary functions and service spaces that help to define the public areas of the building. The most important public space is the central atrium. The atrium is aligned with the historic 19th building located along the south wall of the museum and is further accentuated by the walls that extend into the public square. The main horizontal circulation space occurs along the south wall, where visitors can pass between the various galleries. A secondary circulation space occurs along the north side of the building, at the top of the service cores. These small passages lead to emergency exits located on either side of each space. As one moves from the central atrium towards the ends of the building the spaces become more private, holding functions such as office and classrooms, and less important hierarchically. PROJECT PLAN This plan was generated using long narrow modules to organize the various programmatic spaces. The spaces are separated on the interior by long, cores that serve as the vertical circulation and service spaces for the buildings. The primary horizontal circulation space is located at the rear of the building and extends the entire length of each building, giving access to each area. The programmatic spaces are organized within the building moving from public to private along the horizontal axis. The facades of the building facing the public street are louvered, providing a sense of permiability as one moves through the site. The more private a space is the denser the louvers become, allowing visitors to get a sense of the building’s program from the exterior. The public is able to further read the building from the exterior through the use of banding that coresponds with the service spaces. These spaces are constricted allowing light to enter the building through these spaces. Dividing the program into two buildings allows for built enviornment to define a space for social interaction inbetween.
FORMAL COMPOSITION: This composition, like the last one, also used the second site strategy, in which the buildings and structures placed on the site become the shapers of space. Many of the elements from the previous composition remained the same, such as the grid organization, circulation corridors, strong protective facades, and hierarchical massing of the various programmatic volumes. The main difference between this composition and the last one is the connection between the public pathway created by the twin buildings and the Giardini della Filarmonica. The first compositional strategy completely blocked off the public spaces of the new project from the Accademia gardens. While this defined the edge of the site and the space of the garden, it limited the interaction between the two spaces. As this intervention on the site is conceptualized as an addition to the Accademia, this second iteration strives to make that connection. The courtyards, instead of serving as secondary circulation between interior spaces, become the links between the Giardini della Filarmonica and the new public pathway. This compositional strategy also plays more with the erosion of the rectilinear form. Towards the front of the site, where the programmatic spaces are more public, the walls of the building begin to be carved away creating courtyards that are partially visible from the street. This strategy allows for different layers of the building to be visible from the street, enticing the public to enter the space. This architectural move give the illusion that the public pathway narrows as one moves through the space, creating a moment at the end of the path where the space opens up to the garden beyond.
PLACE, CONTEXT, SCALE The site is located along the Via Flaminia, an ancient Roman road that once served both merchants and the military, connecting Rome to cities in northern Italy. The road begins just outside of the ancient city walls, at the Porta Del Popolo, and stretches all the way to Rimini. For centuries, the land along this road consisted of vineyards, farms, and villas owned by prominent members of Roman society, including Pope Julius’s Villa Giulia, located just behind the site. Farm buildings, churches, tombs, and walls lined the road much like the current buildings do today. In one such building, located directly adjacent to the site, is the Accademia Filarmonica Romana, an organization that brings together musicians and artists of all skill levels and social standings to promote the arts within the community. Often, the Accademia will utilize the rear garden as a social and concert space, inviting the public to view various performances throughout the year. The garden, however, is cut off from the street by the Accademia buildings, greatly limiting the public’s interaction with the space. The main intention of this intervention is to create a series of public spaces that connect the Giardini della Filarmonica will the public realm of Via Flaminia. Similar to the ancient and medieval fabric of the city, the buildings and structures on the site are designed to serve as shapers of public space. They not only define the boundary of the site itself, but the edges of the public spaces within the site as well. In some cases, the buildings define the edges of the public spaces whereas at other times the buildings are carved away to create courtyard spaces within the building. The courtyards are used to bring natural light into the various programmatic spaces. When arranging the buildings on the site, it was important push the intervention up to the edge of the street, creating a strong relationship between the area of the street and the site. Throughout Rome, buildings line the street, not only defining the edges of the public realm, but creating an imposing, continuous façade that stretching the length of the roadway. These strong facades were designed to protect the interior of the building by creating a barrier between interior and the outside world. To ignore the established relationship between the street and the facade would make the building feel out of place within the context of the city. This intervention, however, challenges the notion that the street facade has to be an impenetrable barrier between the street and the interior of the site. Instead this façade becomes permeable as one approaches the site, extending the public realm into the interior of the site.
SPACE, CHARACTER, ATMOSPHERE, IDENTITY Throughout Italy, one of the most common building typologies is the courtyard building. The courtyard plan has been used in this part of the world for millennia, stretching back to the time of the Roman Empire. In ancient and modern plans alike, courtyards are used as social spaces as well as circulation spaces within the building. They are public areas, surrounded and protected by the rooms of the house, to be used by members of the family and their guests. In most cases, these courtyards also serve as devices to bring light and fresh air into the building. Much like the public piazzas in the city, the building defines the edges of the courtyard creating these public spaces. In this intervention, the intention is that visitors will be able to circulate through the site via the public spaces created by the various buildings and structures. The spaces are purposefully arranged so the more public spaces, such as the gardens and entry areas, are located towards the front of the site while the more private areas, such as the administration offices, are located to the rear of the site. The pathway created by the two buildings is designed to draw visitors through the site, allowing them to discover aspects of the building as that travel down the path. When walking through the site and courtyards, the line between public and private becomes slightly blurred. The facades of the buildings facing the central path become semi permeable, through the use of brick screens. This allows visitors to catch a glimpse of the activity on the interior of the buildings while also allowing music and sound to flow into the courtyards and pathway, filling the space. The buildings are designed to have a monolithic quality. This design choice is in reference to the monolithic nature of the Aurelian Wall, located just a few hundred feet away, and ancient ruins scattered throughout Rome. This building quality was also inspired by Rationalist Italian architecture, which became popular in the 1920s and 30s when this area of Rome was developed. Rationalist architecture in Italy drew inspiration from the tradition forms of ancient Roman architecture, such as the arch and column, and simplified these elements to create a modern architecture that felt timeless, yet still connected to site and its context. As this site has a rich history that spans several thousand years, it is important to design buildings in such a way that they feel both of the time and connected to the past.
ORGANIZATION & ARTICULATION In addition to the loggia that serves as the entrance to the site from the Via Flaminia, there are two, twin, rectilinear buildings that contain the project’s programmatic spaces. One building contains all of the conservatory spaces whereas the other building houses the public and chamber orchestra spaces. The buildings are organized along a grid system that is based off of a square module. Similar to the way the buildings and structures define the public spaces on the site, the circulation corridors define the different spaces within the building. These circulation corridors make up the inhabitable, protective barrier between the interior spaces and the outside world. The sizes of these corridors are depended on the programs that they serve; the more public the program is the wider the corridors become. The articulation of the facades change based on their relationship to the site and the interior programs. Where the facades face the edges of the site, the walls of the buildings become more soild, drawing from the Roman tradition of protecting the building’s interior. When the facades face onto a public space the walls are carved away, creating entrances into courtyards that connect to public areas of the buildings. In addition to allowing light an air to enter the building, these courtyards also serve as circulation spaces between the public pathway and the Giardini della Filarmonica, creating a physical and visual connection between the two spaces. . The public facades of the building, rather than being solid masonry walls are articulated with perforated brick screens that maintain a sense of privacy and protection for the interior spaces while also allowing light and music to flow between the public street and the spaces. The brick screen also references the degree of privacy each space possesses. Denser screens are used in more private spaces whereas more permeable screens are used in public spaces. As one moves through the site and the buildings, the program shifts from public to private, similar to a traditional Roman house. The difference between a traditional Roman house plan and this design is that the pathway created between the two buildings extends the public space further into the site, creating a condition where the buildings become more private as one move away from the center. The hierarchy of the spaces within the building is expressed by the height of the various volumes. While this gives visitors a hint at what is happening on the interior of the building, it is not until they are inside that they discover the true form of each rooms. Inside the ceilings are shaped to create the best acoustical environment for the various concert halls and practice rooms.
429'-2"
48'-11"
25'-2"
58'-1"
22'-5"
48'-10"
25'-2"
74'-0"
8'-10"
22'-5"
8'-10"
104'-2"
LOUNGE A113 DANCE HALL A101
COURTYARD BATHROOM
A102
51'-8"
A107
1
1
A2.01
A2.01
LARGE REHEARSAL ROOM
COURTYARD
LARGE REHEARSAL ROOM
CHOIR ROOM
COURTYARD
MAINTENANCE
A103
A104
A105
A106
A109
A110
A115
74'-2"
DANCE HALL
RECORDING STUDIO A114
BATHROOM A108
25'-2"
CLOSET
CLOSET
A111
A112
7'-6"
54'-6"
1 A2.02 2
27'-0"
71'-6"
174'-2"
7'-6"
99'-0"
CLOSET
54'-6"
31'-3"
B109
LOBBY 21'-0"
B104 VESTIBULE 44'-8"
OFFICE
B115
VESTIBULE
B122
B112 COFFEE LOUNGE STORAGE
B119
B102 OFFICE 74'-2"
B123
2 A2.01 51'-8"
CAFE/ BAR B101
TECHNICAL
ORCHESTRA HALL
STAGE
BACKSTAGE
B108
B113
B115
B116
B118
COURTYARD B126
2 A2.01
RECEPTION/ SECURITY
MEETING
B105
B120
KITCHEN B103
SMALL ORCHESTRA HALL
CLOAKROOM
FIRSTAID
B106
B107
BATHROOM
BATHROOM
B110
B111
OFFICE B124
VESTIBULE
OFFICE VESTIBULE
B114
B125
STAFFCLOSET
B117
8'-10"
B121
205'-8"
22'-5"
95'-4"
22'-5"
426'-2"
ACCADEMIA DELLA FILARMONICA
SCALE :
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
FIRST FLOOR PLAN DATE : 10/19/2021
A1.02
T.O_PARAPET 32'-0" T.O_CEILING 28'-10"
SMALL REHEARSAL ROOM
SMALL REHEARSAL ROOM
A202
A206
T.O_PARAPET 24'-6" BATHROOM
T.O_CEILING 21'-4"
A107
LARGE REHEARSAL ROOM
T.O._SECOND_FLOOR 15'-0"
LARGE REHEARSAL ROOM
A104
T.O_CEILING 13'-10"
A106 CHOIR ROOM
DANCE HALL
COURTYARD
DANCE HALL
COURTYARD
BATHROOM
A101
A102
A103
A105
A108
A109
COURTYARD
RECORDING STUDIO
MAINTENANCE
A110
A114
A115
T.O_FIRST_FLOOR 000'-0"
T.O_BSMT_FLOOR -10'-0"
1 A2.01
BUILDING A: LONGITUDINAL SECTION SCALE: 1/8" - 1'-0"
T.O_PARAPET 39'-6" T.O_CEILING 36'-4" T.O_PARAPET 32'-0" T.O_CEILING 28'-10" TECHNICAL B202 BALCONY
INSTRUMENT STORAGE
B204
B207 T.O._SECOND_FLOOR 15'-0" T.O_CEILING 13'-10"
ORCHESTRA HALL
KITCHEN
CAFE/ BAR
RECEPTION/ SECURITY
SMALL ORCHESTRA HALL
TECHNICAL
B103
B101
B105
B108
B113
B115
STAGE
BACKSTAGE
MEETING
COURTYARD
OFFICE
B116
B118
B120
B126
B124
T.O_FIRST_FLOOR 000'-0"
T.O_BSMT_FLOOR -10'-0"
2 A2.01
BUILDING B: LONGITUDINAL SECTION SCALE: 1/8" - 1'-0"
ACCADEMIA DELLA FILARMONICA
SCALE :
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
BUILDING SECTIONS DATE : 10/19/2021
A2.01
TECTONICS & MATERIALITY This project is designed to be monolithic in nature, using brick as the primary building material. This is a reference to the ancient Roman’s use of brick masonry in many of their structures and buildings as well as the continued use of masonry construction across Italy throughout the centuries. The heaviness of the material anchors the project to the earth and the site while also enhancing the protective quality of the several facades. While the use of brick helps the design to achieve this monolithic quality, the material is also incredibly versatile, allowing for different application of the same brick unit across the entire façade. While inherently textured, bricks can be arranged in order to create different wall textures across the building, adding an extra layer of dimension to the project. Bricks can also be designed to have unique shapes and textures that can be used to convey different qualities of the building and spaces within. The added dimension and articulation allow for further definition of space. The use of brick, as opposed to other monolithic materials such as concrete, also helps to enhance the sense of scale that accompanies this building. The regular module of the brick helps visitors to understand the true size and dimensions of the building. While bricks are traditionally thought of as a solid material, this project uses them to create transparency in transitional spaces. The bricks are arranged in such a way that they create various types of brick screens, allowing light to be filtered into the building, while sound is allowed to travel out into the public spaces. The density of the screens is used to articulate the facade and allow the public to read the building from the exterior. Denser screens are used in more private spaces where as more permeable screens are used in public spaces. The transparency and permeability of these screens allow people to glimpse the activity going on within the building, further challenging the relationship of the public realm and protected interior. In this environment, brick masonry is an ideal choice for construction. The inherent qualities of the material and the various types of wall constructions provide the opportunity for brick to be utilized as more than just structure. Whenr constructed out of masonry, walls can be used to achieve a thermal mass that helps keeps the building temperature regulated throughout the year. Clay bricks, a traditional Roman building material, have intrinsic thermal qualities that allow them to absorb heat during the day and release it at night. As a result, the use of brick could allow for little to no insulation to be used within the walls themselves.
ENVIORNMENTAL STEWARDSHIP: One of the goals of this intervention is to draw inspiration from traditional and vernacular Roman architecture in order to integrate passive strategies into the design of the buildings. One such aspect of vernacular Roman architecture is the use of brick masonry. Thick masonry walls have thermal properties that allow the brick to absorb the sun’s energy during the day, keeping the interior of the buildings at a cool, comfortable temperature. At night, when the temperature drops, the stored heat is released into the interior of the building warming the space throughout the night. The use of these thermal walls helps to keep the interior of the buildings comfortable without the need for heavy, excessive mechanical systems. Another common strategy for solar management in Rome is shutters. Shutters on Roman buildings are used to help control the amount of sunlight coming into the building, preventing the air on the interior of the building from heating up. While traditional shutters will not be employed in this design, the idea of controlling and managing the amount of sunlight entering a space a consideration. The brick screens employed along the public facing façades help to control the amount of sunlight coming into the building, helping to create a cooler environment for users of the space. The configuration of courtyards within the structure is also inspired by traditional Roman architecture. Many buildings in Rome either have thin profiles or have a courtyard at the center. These building configurations allow for increased cross ventilation through the structure, cooling the space without the need for A/C. Courtyard buildings, or buildings arranged along a narrow street also enjoy the benefits of the “courtyard effect”. During the day, the sun heats the air in the courtyard or a narrow street. The warm air rises, causing the cooler air in the interior of the building to rush out, creating a cooling effect. When night falls, and the temperatures drop, the cool air then drops into the courtyard, causing the airflow to move in the opposite direction.
Garden space to engage with the public and absorb rainwater. Buildings oriented to take advantage of the east west winds for cooling. Brick screening to control the amount of sunlight entering the space. Brick masonry construction for thermal mass benefits. Courtyard effect to help cool the interior spaces of the building. Courtyards provide light and fresh air to interior spaces
A4 STRUCTURE
This exercise encouraged us to go beyond our own preconceptions of structure and consider other ways of constructing this project. Two structural schemes were developed; one using load bearing construction and the other using light weight framing. Through developing these two strategies, we were able to explore how each structural system could benefit and enhance the spatial and conceptual qualities of the design and were they were lacking. A final structural system was selected and further articulated based on the established design principles and intentions. Looking at the structural systems through the lense of the principles provided the oppurtunity for the structure and the design to become intertwined.
CONCEPT 1: LOAD-BEARING
CONCRETE STRUCTURE
Load bearing masonry construction is the most common type of construction used in Italy. For millennia, Italians have been using stone and masonry to construct their buildings, from the simplest dwelling to their most important places of worship. Load bearing masonry has evolved over centuries of innovation. In ancient times, the first stone structures were constructed using uncut rough stone that where fitted together without any type of mortar. As type when on, builders worked towards perfecting their techniques, learning how to cut stone into smaller blocks and brick and arranging them in such a way that they strengthen the structure. Ancient Romans even developed an early version of concrete that is used in famous buildings such as the Pantheon. Given the location and history of the site, it is appropriate to use load bearing brick masonry in this project. The use of brick masonry in this design will help to ground the project to the site. The heaviness of the material not only anchors the projects to the site but also provides a sense of permanence and timelessness to the design. The monolithic quality of the buildings reference back to nearby structures, such as the Aurelian Wall and Roman ruins, and places the project in context with the surrounding history. While Ancient Roman construction was typically simple, this does not mean that it was not well articulated. Different types and styles of brick and stone were used in order to ornament and define the project. In some cases multiple types of brick were used in the same project. This technique could be applied the this design in order to further articulate the exterior of the building while allowing the visitors better understand it’s interior functions. One reason that brick is used so extensively in vernacular Italian architecture is its thermal qualities. Massive masonry structures help to thermally control interior spaces. Heat from the sun is absorbed and stored in the stone and masonry during the day, keeping the interior of the building cool during the day, and released at night when the temperature drops.
Load bearing concrete walls and strucutral members are used to carry the load of the building and support the facade. The brick screen facade is set away from the structure, hiding the concrete from the exterior and creating an airspace interstitally. An operable window is placed infront of the screen for temperature control.
ACOUSTIC FINISHES
CONCRETE STRUCTURE
GLASS AIR SPACE
BRICK SCREEN FACADE
BRICK STRUCTURE
BRICK PILLAR GLASS AIR SPACE BRICK SCREEN
In order to achieve the use of perforated brick screens, brick masonry pillars are used to carry the load of the building to the ground allowing the screens to be load free. An operable window is placed infront of the screen for temperature control.
OPUS LATERICIUM Opus caementicium (Roman Concrete) is used to fill the cavity between the brickwork in order to create a stronger more durable wall. The brickwork used to face the core protects the porous concrete.
OPUS MIXTUM Opus Mixtum walls, like Opus Latericium, use a roman concrete core to give the wall strength. The patterning of the size and shape of the brick masonry presents the opportunity to create an articulated facade.
CAVITY WALLS help to acheive thermal insulation and sound isolation as there is little way for heat or sound to transfer. Metal ties are used to connect the walls and slabs will typcially rest on the inner layer of brick. Cavities can be filled will additional insulation.
SOLID MASONRY WALLS with two layers of masonry can be used for both insulation and structure. Terra Cotta bricks have inherent thermal properties that allow them retain/reflect heat. The smaller, inner brick layer acts as the structure whereas the thicker outer layer as as the insulation.
CONCEPT 2: POST AND BEAM
HOLLOW CORE STEEL COLUMN A series of hollow structural steel columns makes up the main vertical structural element of the building. This column is filled with concrete and reinforced with rebar to provide extra strength and stability. In order to help the structure blend into the building and appear more monolithic, the HSS columns would be clad with Roman brick. For vistors to the building, the strcuture will appear as if it were made of load bearing masonry while still providing the nessecary flexiblity. REINFORCED CONCRETE CORE MORTAR HOLLOW STRUCTURAL STEEL COLUMN BRICK COLUMN CLADDING
CONCRETE STRUCTURAL SLAB
OPEN WEB JOISTS STEEL BEAM
LIGHT GAUGE STEEL FRAMING
BRICK SCREEN VENEER
STEEL FRAME STRUCTURE - DETAIL The main vertical elements of this structural grid system are the hollow structural steel columns. Between these steel columns are light gauge metal framing members than make up the main structure of the walls. The vertical structural members support wide flange steel beams which in turn support the open web joists. The open web joists have the capability of spaning the entire with of the structure allowing the spaces below to be column free. The space between the webs has acoustic benefits and provide space to run mechanical systems if need be. This steel structure also support the brick veneer on the exterior of the building, allowing the project to apper monolitihic in nature.
ONE WALL HOUSE - CHRSITIAN KEREZ
Final Concept
Load bearing masonry construction is the most common type of construction used in Italy. For millennia, Italians have been using stone and masonry to construct their buildings, from the simplest dwelling to their most important places of worship. Load bearing masonry has evolved over centuries of innovation. In ancient times, the first stone structures were constructed using uncut rough stone that where fitted together without any type of mortar. As type when on, builders worked towards perfecting their techniques, learning how to cut stone into smaller blocks and brick and arranging them in such a way that they strengthen the structure. Ancient Romans even developed an early version of concrete that is used in famous buildings such as the Pantheon. Given the location and history of the site, it is appropriate to use load bearing brick masonry in this project. The use of brick masonry in this design will help to ground the project to the site. The heaviness of the material not only anchors the projects to the site but also provides a sense of permanence and timelessness to the design. The monolithic quality of the buildings reference back to nearby structures, such as the Aurelian Wall and Roman ruins, and places the project in context with the surrounding history. While Ancient Roman construction was typically simple, this does not mean that it was not well articulated. Different types and styles of brick and stone were used in order to ornament and define the project. In some cases multiple types of brick were used in the same project. This technique could be applied the this design in order to further articulate the exterior of the building while allowing the visitors better understand it’s interior functions.
CANTILEVERED CONCRETE SLAB
DEEP FOUNDATION
LOAD BEARING STRUCTURAL WALL
LOAD BEARING MASONRY - CANTILEVERED SLABS Load bearing masonry walls are key elements in traditional Italian construction. For this project the main load bearing walls are in set from the exterior envelope. This would allow the interior walls help with sound isolation in the musical spaces. Additionally, moving the load bearing walls to the interior helps to free up the exterior walls to create brick screens and textured effects.
One reason that brick is used so extensively in vernacular Italian architecture is its thermal qualities. Massive masonry structures help to thermally control interior spaces. Heat from the sun is absorbed and stored in the stone and masonry during the day, keeping the interior of the building cool during the day, and released at night when the temperature drops.
CANTILEVERED CONCRETE SLAB MAX = 15 FEET
LOAD BEARING STRUCTURAL MASONRY WALLS
In this project, the interior walls serve as the load bearing walls for the entire project. These wall are stacked on on top of one another in order to create a continuous path from the roof to the ground. Using the interior walls as the main loadbearing walls allows for the slab to be cantilevered over the exterior circulation, creating a column free interior. Cantilevering the concrete slab allows for the exterior walls to be free from the structural load, making it possible for the wall to become more permiable. This would allow for architectural articulation such as brick screens and various texture to occur across the facades. While the walls running the length of the twin buildings serve as the main load bearing walls, the shorter walls running perpendicular serve as lateral support for the building. These wall help to keep the main structural walls from twisting and turning, providing stability for the structure. The concrete slab is a one way joist slab that spans the entire width of the building. The slab uses concrete joists and post tensioning techniques to help span the distance between the support walls creating a clear span below. For this project, a deep foundation system is ideal over a standard shallow foundation. One reason this is ideal is for siesmic purposes, as Rome is located near a fault line. a deep foundation allows the building to be anchored in soild bedrock. Another reason a deep foundation system would be benefitial is that the foundation can be intergrated with the structure of the basement. By using a series of load bearing walls, the basement becomes a deep structural slab. This is the same approach taken by the Maxxi Museum a few blocks away.
SHALLOW FOUNDATION - TYP. IN NEW ENGLAND
DEEP FOUNDATION SYSTEM
BASEMENT INTERIOR
REINFORCED CONCRETE WALLS AND SLAB
DEEP FOOTING BEDROCK
For this project, a deep foundation system is ideal over a standard shallow foundation. One reason this is ideal is for siesmic purposes, as Rome is located near a fault line. a deep foundation allows the building to be anchored in soild bedrock. Another reason a deep foundation system would be benefitial is that the foundation can be intergrated with the structure of the basement. By using a series of load bearing walls, the basement becomes a deep structural slab. This is the same approach taken by the Maxxi Museum a few blocks away.
1
2
4
3
5
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
432'-0" 8'-0"
48'-0"
16'-0"
16'-0"
8'-0"
8'-0"
24'-0"
4'-8"
8'-0"
11'-4"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
16'-0"
4'-0"4'-0"4'-11"
16'-6"
11'-1"
15'-6"
8'-0"
8'-0"
16'-0"
8'-0"
16'-0"
8'-0"
16'-0"
24'-0"
16'-0"
8'-0"
16'-0"
8'-0"
8'-0"
A
8'-0"
A
8'-0"
B
8'-0"
B
24'-0"
C
24'-0"
C
16'-0"
D
16'-0"
D
8'-0"
E
8'-0"
E
8'-0"
F
8'-0"
F
8'-0"
G
8'-0"
G
48'-0" 8'-0"
I
8'-0"
I
208'-0"
48'-0"
H
208'-0"
H
8'-0"
J
8'-0"
J
8'-0"
K
8'-0"
K
16'-0"
L
16'-0"
L
16'-0"
M
16'-0"
M
8'-0"
N
8'-0"
N
8'-0"
O
8'-0"
O
8'-0"
P
8'-0"
P
Q
Q
8'-0"
48'-0"
16'-0"
16'-0"
8'-0"
8'-0"
24'-0"
4'-8"
8'-0"
11'-4"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
16'-0"
4'-11" 4'-0"4'-0"4'-11"
16'-6"
11'-1"
15'-6"
8'-0"
8'-0"
16'-0"
8'-0"
16'-0"
8'-0"
16'-0"
24'-0"
16'-0"
8'-0"
16'-0"
8'-0"
432'-0" 1
2
3
4
5
6
7
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
FIRST FLOOR STRUCTURAL PLAN
FIRST FLOOR PLAN
DEEP FOUNDATION / BASEMENT
FIRST FLOOR SLAB
FIRST FLOOR LOAD BEARING WALLS AND COLUMNS
SECOND FLOOR SLAB
SECOND FLOOR LOAD BEARING WALLS AND COLUMNS
ROOF SLAB
A5 ENVELOPE
This exercise, like the previous one, encouraged us to go beyond our own preconceptions of envelope and consider other ways of enclosing our buildings. When working with a design for weeks it is easy to be come complacent in one way of thinking, robbing both the design and the project of the opputunity of exploring other systems and becoming something more engaging. Two building envelope schemes were developed; one using heavy cladding materials and the other using light weight systems. Through developing these two strategies, we were able to explore how each skin system could help to further articulate the facade and enhance the charater and identity of the project. A final envelope system was selected and further develope based on the established design principles and intentions. Looking at the overall design, structure , and envelope systems as one cohesive units provided the oppurtunity for the structure and the design to become intertwined.
CONCEPT 1: MASSIVE CONSTRUCTION
This envelope option is a massive system that references the thick masonry envelopes found across Rome. Ancient Romans used brick masonry, clay blocks, and concrete to construct their buildings, resulting in large and imposing facades. These facades were meant to separate the interior of the building from the public realm of the street, protecting the people and spaces inside. Often, these façades only had small windows facing the street, minimizing the interior’s interaction with the public. While this type of envelope construction was ideal for privacy purposes, Romans also utilized thermal properties of the thick walls to help control the temperature within the building. These massive walls would absorb and store the heat of the sun during the day and release it at night, helping to regulate the temperature of the interior spaces. This system borrows from the vernacular system of construction in Rome with the exterior walls consisting of several masonry layers. The inner most layer consists of a brick cavity wall serving as the backup wall for the thermal layer. Using a cavity wall is ideal in this case because of its ability to isolate sound and it provides a space for smaller systems like electrical to run within the walls. The next layer is the thermal layer, made up of clay blocks. Clay has been used in Roman construction for centuries in walls and on roofs. The material properties of clay allow it to be using for a variety of applications including thermal insulation, sound isolation, and fireproofing. The brick cavity walls and the clay blocks are tied together using masonry ties, causing these tow layer to act as one wall. The final layer is brick screen applied over the entire building using roman brick. The brick screen creates a consistent and monolithic look across the entire building, reminiscent of the ancient ruins found around the city. While the brick screen itself is never interrupted, the solid wall behind it opens up to allow light into the buildings. Like the loggia at the front of the site, this envelope system appears to change as on approaches it, allowing previously protected spaces to become more permeable challenging the idea that the public realm ends at the street.
1
1
--
2
T.O. PARAPET 29'-4" T.O. ROOF 28'-7"
1) PARAPET ASSEMBLY COPPER COPING STONE CAP BRICK SCREEN FACADE 2" AIR SPACE THERMAL CLAY BLOCK SINGLE BRICK WYTHE
2) TYPICAL ROOF ASSEMBLY 4" ENGINEERED SOIL 1" MINERAL WOOL 1" DRAINAGE BOARD LIVE EDGE ROOF SYSTEM WATERPROOF MEMBRANE 5" RIGID INSULATION 18" REINFORCED CONCRETE BUBBLE DECK
3
5
T.O. SECOND FLOOR 14'-0"
3 -3) TYPICAL WALL ASSEMBLY BRICK SCREEN FACADE 2" AIR SPACE THERMAL CLAY BLOCK SINGLE BRICK WYTHE MASONRY WALL TIES 2" AIR SPACE SINGLE BRICK WYTHE
4
4) LINTEL ASSEMBLY CLAY PANEL 2" RIGID INSULATION REINFORCED CONCRETE LINTEL
5) TYPICAL FLOOR ASSEMBLY 3/4" OAK FLOORING 3/4" PLYWOOD SUB-FLOOR 2" IMPACT SOUND INSULATION 1X4 SLEEPERS 18" REINFORCED CONCRETE BUBBLE DECK
T.O. FIRST FLOOR 000'-0"
6) BELOW GRADE WALL ASSEMBLY 3/8" DRAINAGE BOARD 2" RIGID INSULATION WATERPROOF MEMBRANE 18" REINFORCED CONCRETE FOUNDATION 2" RIGID INSULATION
6
2
ENVELOPE ASSEMBLY ELEVATION
7) SLAB ON GRADE ASSEMBLY 6" CONCRETE SLAB 2" RIGID INSULATION WATERPROOF MEMBRANE 8" GRAVEL DRAINAGE LAYER
7 T.O. BASEMENT FLOOR -10'-8"
B.O. FOOTING -12'-10"
1'-35 8"
115 8"
VARIES
VARIES
1
ENVELOPE ASSEMBLY SECTION
3
ENVELOPE ASSEMBLY PLAN
1'-6"
CONCEPT 2: LIGHTWEIGHT CONSTRUCTION
This envelope option is a lightweight system that blends modern and historical materials to create a timeless façade. Throughout much of Rome, building facades are designed to be massive and imposing. They are meant to separate the interior of a building from the public realm of the street, protecting the people and spaces inside. Public façades rarely have windows at street level and minimize the connection of the interior to the public street. Traditionally, builders took advantage of the thermal properties of massive construction in order to maintain comfortable temperatures in interior spaces. Without the creation of a thermal mass, the challenge is to design a system that will protect the building from solar radiation, while still remaining lightweight. The design of this façade challenges the idea that the public realm ends at the street. The design of the structure allows for incredible flexibility in the façade. The load-bearing masonry walls are pushed towards the interior of the buildings allowing the concrete slabs to cantilever to the edge of the building, freeing the exterior walls from any structural load. This allows for a curtain wall system to become the first layer of the enclosure. The curtain wall system is anchored to the edge of the slab and allows for natural light to enter the space. In this case, the glass serves as insulation and water protection. An all-glass building would look out of place within the context of the site. The area surrounding the Academia is filled with historic masonry structures, some dating back to the Ancient Romans. It was important to give the impression that the exteriors of the buildings are monolithic and imposing, like their neighbors, yet permeable as one moves through the space, similar to the loggia at the front of the site. Recycled clay roof tiles, like those found all across Italy, are used to create a screened façade that surrounds the buildings like a second skin. The clay tiles are staggered and hung from cables attached to the underside of the roof slab. This screen helps to protect the interior of the building from the heat of the sun while also providing a feeling of permeability between the interior and exterior spaces. Utilizing the clay tiles connects the design of the project to the history of the site while also giving a sense of timelessness to the space.
1 --
T.O. PARAPET 29'-2"
1
T.O. ROOF 27'-7"
2
1) TYPICAL ROOF ASSEMBLY 4" ENGINEERED SOIL 1" MINERAL WOOL 1" DRAINAGE BOARD LIVE EDGE ROOF SYSTEM WATERPROOF MEMBRANE 5" RIGID INSULATION 18" REINFORCED CONCRETE BUBBLE DECK 3" AUDIO-THERMAL LAYER
3 T.O. SECOND FLOOR 13'-8"
2) TYPICAL ENVELOPE ASSEMBLY 3/8" CLAY TILES STAGGERED 3/8" SUPPORT RODS 9" AIR SPACE CURTAIN WALL SYSTEM FIRE STOPS AT SLAB EDGE STEEL ANGLE BRACKET
3 --
3) TYPICAL FLOOR ASSEMBLY 3/4" OAK FLOORING 3/4" PLYWOOD SUB-FLOOR 2" IMPACT SOUND INSULATION 1X4 SLEEPERS 18" REINFORCED CONCRETE BUBBLE DECK 3" AUDIO-THERMAL LAYER
T.O. FIRST FLOOR 000'-0"
4) BELOW GRADE WALL ASSEMBLY 3/8" DRAINAGE BOARD 2" RIGID INSULATION WATERPROOF MEMBRANE 18" REINFORCED CONCRETE FOUNDATION 2" RIGID INSULATION
2
4
ENVELOPE ASSEMBLY ELEVATION
5) SLAB ON GRADE ASSEMBLY 6" CONCRETE SLAB 2" RIGID INSULATION WATERPROOF MEMBRANE 8" GRAVEL DRAINAGE LAYER
3'-0"
5
1" 94
1" 72
T.O. BASEMENT FLOOR -10'-8"
1'-0"
B.O. FOOTING -12'-10"
2'-0"
3'-0"
4'-6"
14'-0"
1
ENVELOPE ASSEMBLY SECTION
3
ENVELOPE ASSEMBLY PLAN
1'-6"
1'-6"
ACCADEMIA FILARMONICA SCHEMATIC DESIGN SET ROGER WILLIAMS UNIVERSITY, SAAHP ARCH 513.02 INTEGRATED PROJECT DESIGN STUDIO SPRING 2021 PROFESSOR ROBERTO VIOLA OCHOA
DRAWING LIST A0.00
COVER PAGE - RENDER
A0.01
LARGE SCALE SITE PLAN
A0.02
SITE PLAN
A0.03
CODE REQUIREMENTS
A1.01
BASEMENT FLOOR PLAN
A1.02
FIRST FLOOR PLAN
A1.03
SECOND FLOOR PLAN
A1.04
ROOF PLAN
A2.01
BUILDING SECTIONS
A2.02
BUILDING ELEVATIONS
A3.01
WALL ASSEMBLY
S1.00
STRUCTURAL AXON
S1.01
BASEMENT STRUCTURAL PLAN
S1.02
FIRST FLOOR STRUCTURAL PLAN
S1.03
SECOND FLOOR STRUCTURAL PLAN
M1.00 MECHANICAL AXON M1.01 BASEMENT MECHANICAL PLAN M1.02 FIRST FLOOR MECHANICAL PLAN M1.03 SECOND FLOOR MECHANICAL PLAN M1.04 GEOTHERMAL FIELD
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : N.T.S.
COVER PAGE DATE : 12/10/2021
A0.00
VI
LL
AG
UI
LIA
ACC ADE MIA FILA RMO A
TIBER R IVER
NIC VIA FLA MIN A
DR N U O SITE B
Y
MIN
IA R T S U D N I T LIGH AREA
L
ISTE RO MAR INA 1/8” = 1’-0” 12/12/2021
REGIONAL SITE PLAN
A0.01
ACC ADE MIA FILA RMO NIC A
E C N A ORM
RF E P C I E PUBL S PA C
Y A W H AT P C I L PUB
DE R A G IC L B U P
N
VIA FLA MIN A
R D N U O SITE B
Y
1/8” = 1’-0” 12/12/2021
SITE PLAN
A0.02
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DISTANCE 179'-2"
EXIT DISTANCE 145'-4"
BATHROOM 4-OCC REHEARSAL-SMALL
REHEARSAL-SMALL
16-OCC
16-OCC
BATHROOM 4-OCC
EXIT STAIR 48" EGRESS WIDTH OCC. CAP = 240
EXIT STAIR 48" EGRESS WIDTH CAP = 240
LONGEST DIAGONAL 211'-2"
EXIT DISTANCE 74'-1"
EXIT DOOR 48" EGRESS WIDTH CAP = 240
LONGEST DIAGONAL 196'-2"
EXIT DISTANCE 138'-3"
EXIT DISTANCE 138'-11"
5'-0" DIAMETER CLEARANCE
BATHROOM BATHROOM 3-OCC IT-CONTROL
BALCONY
3-OCC
107-OCC
3-OCC OCC. BY FLOOR - BASEMENT
STORAGE 3-OCC
EXIT DOOR 36" EGRESS WIDTH CAP = 180
3
REQ. EGRESS EXITS ACTUAL EXITS
BUILDING A
40 PEOPLE
2 REQ. EXITS
3 EXITS
BUILDING B
119 PEOPLE
2 REQ. EXITS
3 EXITS
REQ. EGRESS WIDTH ACTUAL WIDTH REQ. STAIR WIDTH
ACTUAL WIDTH
8 INCHES
72 INCHES
12 INCHES
42 INCHES
24 INCHES
72 INCHES
36 INCHES
42 INCHES
42" DOOR WIDTH
EXIT DISTANCE 63'-10"
EXIT DOOR 36" EGRESS WIDTH CAP = 180
SECOND LEVEL LIFE SAFETY: OCCUPANCY AND EGRESS WIDTH
6
SCALE: 1/32" = 1'-0"
SECOND LEVEL LIFE SAFETY: EGRESS DISTANCE
9
SCALE: 1/32" = 1'-0"
42" DOOR WIDTH
SECOND LEVEL LIFE SAFETY: EGRESS REQUIREMENTS SCALE: N/A
5'-0" DIAMETER CLEARANCE
EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180 EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180
EXIT DOOR 36" EGRESS WIDTH CAP = 180
DANCE-HALL
BATHROOM
40-OCC
4-OCC
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DISTANCE 93'-6"
EXIT DISTANCE 92'-2"
LONGEST DIAGONAL 149'-1"
EXIT DISTANCE 140'-9"
LONGEST DIAGONAL 93'-7"
LOUNGE 6-OCC
DANCE-HALL
REHEARSAL-LARGE
REHERSAL-LARGE
REHERSAL-CHOIR
40-OCC
80-OCC
80-OCC
80-OCC
MAINTENANCE RECORDING-STUDIO
BATHROOM
18-OCC
21-OCC
4-OCC EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360 EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360
EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360
EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360
EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180
EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180
EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360
EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180
EXIT DOOR 72" EGRESS WIDTH CAP = 360
EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360
EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 360
EXIT DOOR 36" EGRESS WIDTH OCC. CAP = 180
EXIT DISTANCE 134'-3"
EXIT DOOR 72" EGRESS WIDTH OCC. CAP = 180
LONGEST DIAGONAL 196'-1"
EXIT DISTANCE 128'-1"
EXIT DISTANCE 72'-3"
EXIT DISTANCE 93'-2"
EXIT DOOR 72" EGRESS WIDTH CAP = 360
LOBBY 122-OCC
COFFEE-STAFF
STORAGE
6-OCC
1-OCC
SMALL-ORCHESTRA CAFE-BAR
RECEPT.-SEC.
147-OCC
4
KITCHEN
CLOAKROOM
FIRSTAID
2-OCC
4-OCC
2-OCC
40-OCC BATHROOM
BATHROOM
8-OCC
8-OCC
IT-CONTROL
LARGE-ORCHESTRA
3-OCC
195-OCC
STAGE
BACKSTAGE
OFFICES
90-OCC
29-OCC
7-OCC
MEETING 4-OCC CLOSET 1-OCC
EXIT DOOR 36" EGRESS WIDTH CAP = 180
2
EXIT DOOR 36" EGRESS WIDTH CAP = 180
EXIT DOOR 36" EGRESS WIDTH CAP = 180
FIRST LEVEL LIFE SAFETY:OCCUPANCY AND EGRESS WIDTH
REQ. EGRESS EXITS ACTUAL EXITS
BUILDING A
373 PEOPLE
2 REQ. EXITS
14 EXITS
BUILDING B
673 PEOPLE
3 REQ. EXITS
7 EXITS
REQ. EGRESS WIDTH ACTUAL WIDTH REQ. STAIR WIDTH
EXIT DOOR 36" EGRESS WIDTH CAP = 180
LONGEST DIAGONAL 443'-4"
EXIT DISTANCE 190'-4"
EXIT DISTANCE 165'-3"
ADA BATHROOM PLANS SCALE: 1/8" = 1'-0"
ACTUAL WIDTH
74.6 INCHES
576 INCHES
-
-
135 INCHES
396 INCHES
-
-
EXIT DISTANCE 227'-8"
MINIMUM REQUIRED FIXTURES
PROGRAM
QTY
AREA /ROOM
TL NET SF
OCC. GROUP
OCC. FCTR
EGRESS REQS
OCC./ ROOM
50% OCC.
M. TOILETS
F. TOILETS
LAVATORY
BUBBLERS
BUILDING A - BASEMENT
5
SCALE: 1/32" = 1'-0"
OCC. BY FLOOR - BASEMENT
11
FIRST LEVEL LIFE SAFETY: EGRESS DISTANCE
8
SCALE: 1/32" = 1'-0"
FIRST LEVEL LIFE SAFETY: EGRESS REQUIREMENTS SCALE: N/A
CONSERVATORY
Locker Room
2185
1
UTILITIES
Storage Room
2185
B
LOCKER ROOM
690
UTILITIES
Mechanical Room
1434
1
690
S-1
1
1434
S-1
UTILITIES
Storage Room
693
1
693
UTILITIES
Mechanical Room
2557
1
44
1 EXIT
22
0.88
0.44
0.55
0.22
MECHANICAL
3
1 EXIT
1.5
0.02
0.02
0.02
0.00
MECHANICAL
5
1 EXIT
2.5
0.03
0.03
0.03
0.00
S-1
MECHANICAL
3
1 EXIT
1.5
0.02
0.02
0.02
0.00
2557
S-1
MECHANICAL
9
1 EXIT
4.5
0.05
0.05
0.05
0.00
BUILDING A - FIRST FLOOR
EXIT DOOR 36" EGRESS WIDTH CAP = 180
CONSERVATORY
Dance studio
989 2
1978
E
EXERCISE
40
1 EXIT
20
0.40
0.40
0.40
0.20
CONSERVATORY
Dance studio
994 2
1988
E
EXERCISE
40
1 EXIT
20
0.40
0.40
0.40
0.20
CONSERVATORY
Rehearsal room-large
3162 1
3162
E
AS PER PROGRAM
80
2 EXITS
40
0.80
0.80
0.80
0.40
CONSERVATORY
Rehearsal room-large
3090
E
AS PER PROGRAM
80
2 EXITS
40
0.80
0.80
0.80
0.40
CONSERVATORY
bathroom
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
CONSERVATORY
bathroom
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
CONSERVATORY
Rehearsal room-choir
1709
E
AS PER PROGRAM
80
2 EXITS
40
0.80
0.80
0.80
0.40
CONSERVATORY
lounge
574
1
574
B
BUSINESS
6
1 EXIT
3
0.12
0.06
0.08
0.03
CONSERVATORY
recording studio
1005
1
1005
E
VOCA. ROOM
21
1 EXIT
10.5
0.21
0.21
0.21
0.11
CONSERVATORY
maintenance
1066
1
1066
S-1
STORAGE
18
1 EXIT
9
0.09
0.09
0.09
0.01
CONSERVATORY
Rehearsal room-small
160
8
1280
E
VOCA. ROOM
4
1 EXIT
2
0.04
0.04
0.04
0.02
CONSERVATORY
bathroom
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
CONSERVATORY
bathroom
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
PUBLIC FUNCTIONS
Bathrooms
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
PUBLIC FUNCTIONS
Bathrooms
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
MECH
UTILITIES
Mechanical Room
2744
1
2744
S-1
MECHANICAL
10
1 EXIT
5
0.05
0.05
0.05
0.01
9-OCC
UTILITIES
Mechanical Room
1813
1
1813
S-1
MECHANICAL
7
1 EXIT
3.5
0.04
0.04
0.04
0.00
UTILITIES
Mechanical Room
1442
1
1442
S-1
MECHANICAL
5
1 EXIT
2.5
0.03
0.03
0.03
0.00
PUBLIC FUNCTIONS
entrance/lobby
1824
1
1824
A-3
ASM. UNCON
122
2 EXITS
61
0.49
0.94
0.31
0.12
PUBLIC FUNCTIONS
reception/security station
333
1
333
B
BUSINESS
4
1 EXIT
2
0.08
0.04
0.05
0.02
PUBLIC FUNCTIONS
cloakroom
161
1
161
B
LOCKER ROOM
4
1 EXIT
2
0.08
0.04
0.05
0.02
PUBLIC FUNCTIONS
first aid station
161
1
161
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
PUBLIC FUNCTIONS
Cafeteria/bar
2201
1
2201
A-2
ASM. UNCON
147
2 EXITS
73.5
0.98
0.98
0.37
0.15
PUBLIC FUNCTIONS
kitchen
215
1
215
A-2
KITCHEN
2
1 EXIT
1
0.01
0.01
0.01
0.00
PUBLIC FUNCTIONS
kitchen storage
104
1
104
S-2
STORAGE
1
1 EXIT
0.5
0.01
0.01
0.01
0.00
CHAMBER ORCHESTRA HALL
Main Hall
3048
1
3048
A-1
AS PER PROGRAM
300
2 EXITS
150
1.20
2.31
0.75
0.30
CHAMBER ORCHESTRA HALL
stage Main hall
1350
1
1350
A-2
STAGE
90
2 EXITS
45
0.60
0.60
0.23
0.09
CHAMBER ORCHESTRA HALL
Secondary Hall
1012
1
1012
A-3
AS PER PROGRAM
40
1 EXIT
20
0.16
0.31
0.10
0.04
CHAMBER ORCHESTRA HALL
backstage
1416
1
1416
B
LOCKER ROOM
29
1 EXIT
14.5
0.58
0.29
0.36
0.15
CHAMBER ORCHESTRA HALL
Technical
245
1
245
B
BUSINESS
3
1 EXIT
1.5
0.06
0.03
0.04
0.02
MANAGEMENT
offices
165
4
660
B
BUSINESS
7
1 EXIT
3.5
0.14
0.07
0.09
0.04
MANAGEMENT
meeting rooms
353
1
353
B
BUSINESS
4
1 EXIT
2
0.08
0.04
0.05
0.02
MANAGEMENT
staff closet
160
1
160
S-1
STORAGE
1
1 EXIT
0.5
0.01
0.01
0.01
0.00
MANAGEMENT
coffee room/staff room
516
1
516
B
BUSINESS
6
1 EXIT
3
0.12
0.06
0.08
0.03
PUBLIC FUNCTIONS
bathroom
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
PUBLIC FUNCTIONS
bathroom
181
1
181
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
CHAMBER ORCHESTRA HALL
balcony
1227
1
1227
A-1
AS PER PROGRAM
107
2 EXITS
53.5
0.43
0.82
0.27
0.11
CHAMBER ORCHESTRA HALL
Technical
245
1
245
B
BUSINESS
3
1 EXIT
1.5
0.06
0.03
0.04
0.02
CHAMBER ORCHESTRA HALL
bathroom
154
1
154
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
CHAMBER ORCHESTRA HALL
bathroom
154
1
154
B
BUSINESS
2
1 EXIT
1
0.04
0.02
0.03
0.01
CHAMBER ORCHESTRA HALL
instrument storage
658
1
658
S-1
STORAGE
3
1 EXIT
1.5
0.02
0.02
0.02
0.00
EXIT DISTANCE 179'-4"
EXIT DOOR 36" EGRESS WIDTH CAP = 180
LONGEST DIAGONAL 211'-3"
3090 1
1709 1
BUILDING A - SECOND FLOOR
BUILDING B - BASEMENT LEVEL
LOCKER-ROOM 44-OCC
MECH. 11-OCC
BUILDING B - FIRST FLOOR
BATHROOM 4-OCC
BATHROOM
MECHANICAL
MECHANICAL
17-OCC
5-OCC
OCC. BY FLOOR - BASEMENT
REQ. EGRESS EXITS ACTUAL EXITS
BUILDING A
64 PEOPLE
2 REQ. EXITS
2 EXITS
BUILDING B
30 PEOPLE
2 REQ. EXITS
2 EXITS
4-OCC
EXIT DOOR 36" EGRESS WIDTH CAP = 180
1
BASEMENT LEVEL LIFE SAFETY: OCCUPANCY AND EGRESS WIDTH
4
SCALE: 1/32" = 1'-0"
ACCADEMIA FILARMONICA ROMANA
LONGEST DIAGONAL 199'-4"
EXIT DOOR 36" EGRESS WIDTH CAP = 180
MEGHAN E RODENHISER
BASEMENT LEVEL LIFE SAFETY: EGRESS DISTANCE SCALE: 1/32" = 1'-0"
REQ. EGRESS WIDTH ACTUAL WIDTH REQ. STAIR WIDTH
ACTUAL WIDTH
12.8 INCHES
72 INCHES
19.2 INCHES
42 INCHES
6 INCHES
72 INCHES
10.5 INCHES
42 INCHES
BUILDING B - SECOND FLOOR
EXIT DISTANCE 139'-0"
7
BASEMENT LEVEL LIFE SAFETY: EGRESS REQUIREMENTS SCALE: N/A
10
TOTAL:
10.28
10.63
14.89
3.23
REQUIRED:
11
11
15
4
PROVIDED:
16
22
32
4
OCCUPANCY AND REQUIRED FIXTURE CHART SCALE: N/A
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/32" = 1'-0"
CODE ANALYSIS DATE : 12/10/2021
A0.03
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
272'-0" 8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
A 8'-0"
ELECTRICAL A007 INTAKE
EXHAUST
8'-0"
B
24'-0"
C
A.H.U.
1
1
A2.01
A2.01
D MECHANICAL
A001
A002
H.P.
A.H.U.
MECHANICAL A003
16'-0"
LOCKERS
H.P.
8'-0"
E
8'-0"
F
8'-0"
G CLOSET A004
H
1
2
208'-0"
48'-0"
A2.02
8'-0"
I
8'-0"
J
8'-0"
K
L A.H.U. H.P.
BATHROOM
16'-0"
A.H.U.
H.P.
B001
2 A2.01
MECHANICAL
STORAGE
B003
B004
2
M
A2.01
A.H.U. BATHROOM
16'-0"
H.P.
B002
8'-0"
N
8'-0"
O
P INTAKE
8'-0"
EXHAUST ELECTRICAL B006
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
Q
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0"
BASEMENT FLOOR PLAN DATE : 12/10/2021
A1.01
1
2
4
3
5
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
440'-0" 8'-0"
48'-0"
16'-0"
16'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
24'-0"
16'-0"
8'-0"
16'-0"
8'-0"
GRILL OVER FRESH AIR INTAKE PIT
ELECTRICAL
A 8'-0"
A118
8'-0"
B
C ACOUSTIC WALL TREATMENTS
COVERED WALKWAY
SKY BRIDGE ABOVE
LINEAR VENTILATION GRILLS
LOUNGE DANCE HALL
COURTYARD
A101
A102
24'-0"
A113
BATHROOM ACOUSTIC WALL TREATMENTS
A107
1 1
A2.01
A2.01
ACOUSTIC WALL TREATMENTS DANCE HALL
LARGE REHEARSAL ROOM
A103
A104
COURTYARD
LARGE REHEARSAL ROOM
CHOIR ROOM
COURTYARD
RECORDING BOOTH
MAINTENANCE
A105
A106
A109
A110
A115
A117
D
16'-0"
CONTROL ROOM A114
BATHROOM A108
E 8'-0"
SOUND LOCK A116
8'-0"
F
G CLOSET
CLOSET
A111
A112
8'-0"
PUBLIC GARDEN SPACE
PUBLIC PATHWAY
208'-0"
48'-0"
H
COVERED WALKWAY
RECLAIMED CLAY TILE SCREEN FACADE
I
PUBLIC GARDEN SPACE
B109
8'-0"
CURTAIN WALL SYSTEM
CLOSET
8'-0"
J
LOBBY
K ACOUSTIC WALL TREATMENTS
VESTIBULE
OFFICE B125
B112
LINEAR VENTILATION GRILLS STORAGE
STORAGE B120
B121
B102
OFFICE B126 SMALL ORCHESTRA HALL
TECHNICAL
CAFE/ BAR
A2.01
B101
STAGE
BACKSTAGE
B115
B116
B118
B113
B108
2
ORCHESTRA HALL
RECEPTION/ SECURITY B105
B124
B122
B119
M
COURTYARD
MEETING
ELECTRICAL
16'-0"
L COFFEE LOUNGE
OFFICE
2
B127
A2.01
16'-0"
ACOUSTIC WALL TREATMENTS
8'-0"
B104
KITCHEN CLOAKROOM
FIRSTAID
B106
B107
BATHROOM
BATHROOM
VESTIBULE
B110
B111
B114
N
OFFICE VESTIBULE
STAFFCLOSET
B117
B123
B128
8'-0"
B103
8'-0"
O
8'-0"
P ELECTRICAL B117
Q GRILL OVER FRESH AIR INTAKE PIT
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0"
FIRST FLOOR PLAN DATE : 12/10/2021
A1.02
1
2
4
3
5
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
440'-0" 8'-0"
48'-0"
16'-0"
16'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
24'-0"
16'-0"
8'-0"
16'-0"
8'-0"
A 8'-0"
ELECTRICAL A211
8'-0"
B
SMALL REHEARSAL ROOM
SMALL REHEARSAL ROOM
A201
A205
24'-0"
C
BATHROOM SMALL REHEARSAL ROOM
SMALL REHEARSAL ROOM
A202
A206
A209 1 A2.01
1 A2.01 OPEN TO BELOW
D
OPEN TO BELOW
A203
SMALL REHEARSAL ROOM
ACOUSTIC WALL TREATMENTS
16'-0"
SMALL REHEARSAL ROOM
A207 BATHROOM A210 SMALL REHEARSAL ROOM
A204
A208
E 8'-0"
SMALL REHEARSAL ROOM
8'-0"
F
G
OPEN TO BELOW
8'-0"
OPEN TO BELOW
H
1
2
208'-0"
48'-0"
A2.02
8'-0"
I
J 8'-0"
OPEN TO BELOW
BALCONY
BATHROOM
BATHROOM
B201
B204
B205
B206
L
16'-0"
VESTIBULE
8'-0"
K
STORAGE
TECHNICAL
B210
B202
M
OPEN TO BELOW
2
2
A2.01 STORAGE
A2.01
16'-0"
INSTRUMENT STORAGE B207
B209
N
VESTIBULE
8'-0"
B203 ELECTRICAL B208
8'-0"
O
8'-0"
P
Q
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0"
SECOND FLOOR PLAN DATE : 12/10/2021
A1.03
1
2
4
3
5
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
440'-0" 8'-0"
48'-0"
16'-0"
16'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
24'-0"
16'-0"
8'-0"
16'-0"
8'-0"
8'-0"
A
8'-0"
B
24'-0"
C
1
1
A2.01
A2.01
16'-0"
D
8'-0"
E
8'-0"
F
8'-0"
G
H
1
2
208'-0"
48'-0"
A2.02
8'-0"
I
8'-0"
J
8'-0"
K
16'-0"
L
M 2
A2.01
A2.01
16'-0"
2
8'-0"
N
8'-0"
O
8'-0"
P
Q
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0"
ROOF PLAN DATE : 12/10/2021
A1.04
1
2
4
3
6
7
11
12
18
21
20
25
26
27
32
34
35
37
T.O_PARAPET 31'-4" T.O_ROOF_SLAB 28'-8"
DANCE HALL
COURTYARD
DANCE HALL
A101
A102
A103
SMALL REHEARSAL ROOM
SMALL REHEARSAL ROOM
A202
A206
T.O_PARAPET 23'-9" T.O_ROOF_SLAB 21'-2"
BATHROOM A107
LARGE REHEARSAL ROOM
LARGE REHEARSAL ROOM
A104
A106
T.O._TECHNICAL_FLOOR 16'-5" T.O_SECOND_FLOOR_SLAB 14'-4"
COURTYARD
BATHROOM
CHOIR ROOM
COURTYARD
A105
A108
A109
A110
RECORDING STUDIO
MAINTENANCE
A114
A115
T.O_TECHNICAL_FLOOR 2'-1" T.O_FIRST_FLOOR_SLAB 000'-0"
T.O_BSMT_FLOOR -12'-6" B.O_FOOTING -15'-3" BOREHOLE @ 300 FT DEEP. EACH BOREHOLE PROVIDES 2 COOLING TONS
1
BUILDING A: LONGITUDINAL SECTION SCALE: 1/8" - 1'-0"
1
2
3
6
7
8
10
16
18
19
20
25
28
29
31
32
33
35
36
37
T.O_PARAPET 37'-4" T.O_ROOF_SLAB 34'-8" T.O_PARAPET 31'-4" T.O_ROOF_SLAB 28'-8" TECHNICAL B202
T.O_PARAPET 23'-9" T.O_ROOF_SLAB 21'-2"
BALCONY B204
INSTRUMENT STORAGE B207
T.O._TECHNICAL_FLOOR 16'-5" T.O_SECOND_FLOOR_SLAB 14'-4"
KITCHEN
CAFE/ BAR
RECEPTION/ SECURITY
B103
B101
B105
SMALL ORCHESTRA HALL B108
TECHNICAL B113
ORCHESTRA HALL
STAGE
B115
B116
BACKSTAGE
MEETING
COURTYARD
OFFICE
B118
B120
B126
B124
T.O_TECHNICAL_FLOOR 2'-1" T.O_FIRST_FLOOR_SLAB 000'-0"
T.O_BSMT_FLOOR -12'-6" B.O_FOOTING -15'-3" BOREHOLE @ 300 FT DEEP. EACH BOREHOLE PROVIDES 2 COOLING TONS
2
BUILDING B: LONGITUDINAL SECTION SCALE: 1/8" - 1'-0"
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0"
BUILDING SECTIONS DATE : 12/10/21
A2.01
37
36
35
33
32
31
29
28
25
20
19
18
16
10
8
7
6
3
2
1
37
36
35
33
32
31
29
28
25
20
19
18
16
10
8
7
6
3
2
1
T.O_PARAPET 37'-4" T.O_ROOF_SLAB 34'-8" T.O_PARAPET 31'-4" T.O_ROOF_SLAB 28'-8" T.O_PARAPET 23'-9" T.O_ROOF_SLAB 21'-2" T.O._TECHNICAL_FLOOR 16'-5" T.O_SECOND_FLOOR_SLAB 14'-4"
T.O_TECHNICAL_FLOOR 2'-1" T.O_FIRST_FLOOR_SLAB 000'-0"
T.O_BSMT_FLOOR -12'-6" B.O_FOOTING -15'-3"
1
BUILDING B: ELEVATION SCALE: 1/8" - 1'-0"
T.O_PARAPET 37'-4" T.O_ROOF_SLAB 34'-8" T.O_PARAPET 31'-4" T.O_ROOF_SLAB 28'-8" T.O_PARAPET 23'-9" T.O_ROOF_SLAB 21'-2" T.O._TECHNICAL_FLOOR 16'-5" T.O_SECOND_FLOOR_SLAB 14'-4"
T.O_TECHNICAL_FLOOR 2'-1" T.O_FIRST_FLOOR_SLAB 000'-0"
T.O_BSMT_FLOOR -12'-6" B.O_FOOTING -15'-3"
2
BUILDING B: ELEVATION WITH SCREEN SCALE: 1/8" - 1'-0"
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0"
BUILDING ELEVATIONS DATE : 12/10/21
A2.02
1
2
3
4
6
7
11
12
18
20
21
25
26
27
32
34
35
37
T.O_PARAPET 31'-4" T.O_ROOF_SLAB 28'-8" T.O_PARAPET 23'-9" T.O_ROOF_SLAB 21'-2" T.O._TECHNICAL_FLOOR 16'-5" T.O_SECOND_FLOOR_SLAB 14'-4"
T.O_TECHNICAL_FLOOR 2'-1" T.O_FIRST_FLOOR_SLAB 000'-0"
T.O_BSMT_FLOOR -12'-6" B.O_FOOTING -15'-3"
1
BUILDING A: ELEVATION SCALE: 1/8" - 1'-0"
1
2
3
4
6
7
11
12
18
20
21
25
26
27
32
34
35
37
T.O_PARAPET 31'-4" T.O_ROOF_SLAB 28'-8" T.O_PARAPET 23'-9" T.O_ROOF_SLAB 21'-2" T.O._TECHNICAL_FLOOR 16'-5" T.O_SECOND_FLOOR_SLAB 14'-4"
T.O_TECHNICAL_FLOOR 2'-1" T.O_FIRST_FLOOR_SLAB 000'-0"
T.O_BSMT_FLOOR -12'-6" B.O_FOOTING -15'-3"
2
BUILDING A: ELEVATION WITH SCREEN SCALE: 1/8" - 1'-0"
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0"
BUILDING ELEVATIONS DATE : 12/10/2021
A2.03
1 T.O. PARAPET
T.O. ROOF SLAB
1) TYPICAL ROOF ASSEMBLY 12" ENGINEERED SOIL 1" MINERAL WOOL 3" DRAINAGE BOARD LIVE EDGE ROOF SYSTEM WATERPROOF MEMBRANE 7" RIGID INSULATION 18" REINFORCED CONCRETE BUBBLE DECK 3" AUDIO-THERMAL LAYER 3/4" GYPSUM
2
10'-6"
2) CLAY SCREEN ASSEMBLY STEEL ANGLE BRACKET TENSION SUPPORT CABLES WITH TIGHTENING SCREW 3/8" CLAY TILES STAGGERED CLAY TILE SPACERS TENSION CABLE ANCHORS CONCRETE FOOTER
3 T.O. SECOND FLOOR
T.O. SECOND FLOOR SLAB
3 -3) TYPICAL FLOOR ASSEMBLY 1-1/2" SOLID RAISED FLOOR PANEL 24" SUPPORT PEDESTAL SPACED 48" APART 18" REINFORCED CONCRETE BUBBLE DECK 3" AUDIO-THERMAL LAYER 3 4" GYPSUM
4 10'-6"
4) CURTAIN WALL ASSEMBLY 8" AIR SPACE BETWEEN GLASS AND SCREEN INSULATED CURTAIN WALL GLASS STEEL FIN MULLIONS SPANDREL PANEL 4" THERMAL BATT. INSULATION FIRE STOPS AT SLAB EDGE STEEL ANGLE BRACKET
T.O. FIRST FLOOR
T.O. FIRST FLOOR SLAB
5) BELOW GRADE WALL ASSEMBLY 3/8" DRAINAGE BOARD 2" RIGID INSULATION WATERPROOF MEMBRANE 18" REINFORCED CONCRETE FOUNDATION 2" RIGID INSULATION
2
ENVELOPE ASSEMBLY ELEVATION
5
1'-0"
9"
1" 72
11'-0"
6) SLAB ON GRADE ASSEMBLY 6" CONCRETE SLAB 2" RIGID INSULATION WATERPROOF MEMBRANE 8" GRAVEL DRAINAGE LAYER
6 1'-10" T.O. BASEMENT FLOOR
10"
1'-4"
4'-6"
4'-0" 12'-0"
B.O. FOOTING
1
ENVELOPE ASSEMBLY SECTION
ACCADEMIA FILARMONICA ROMANA
3
MEGHAN E RODENHISER
ENVELOPE ASSEMBLY PLAN
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/2" = 1'-0"
WALL ASSEMBLY DATE : 12/10/2021
A3.01
STRUCTURAL NOTE: Load bearing masonry construction is the most common type of construction used in Italy. For millennia, Italians have been using stone and masonry to construct their buildings, from the simplest dwelling to their most important places of worship. Load bearing masonry has evolved over centuries of innovation. In ancient times, the first stone structures were constructed using uncut rough stone that where fitted together without any type of mortar. As type when on, builders worked towards perfecting their techniques, learning how to cut stone into smaller blocks and brick and arranging them in such a way that they strengthen the structure. Ancient Romans even developed an early version of concrete that is used in famous buildings such as the Pantheon. Given the location and history of the site, it is appropriate to use load bearing brick masonry in this project. The use of brick masonry in this design will help to ground the project to the site. The heaviness of the material not only anchors the projects to the site but also provides a sense of permanence and timelessness to the design. The monolithic quality of the buildings reference back to nearby structures, such as the Aurelian Wall and Roman ruins, and places the project in context with the surrounding history. While Ancient Roman construction was typically simple, this does not mean that it was not well articulated. Different types and styles of brick and stone were used in order to ornament and define the project. In some cases multiple types of brick were used in the same project. This technique could be applied the this design in order to further articulate the exterior of the building while allowing the visitors better understand it's interior functions. One reason that brick is used so extensively in vernacular Italian architecture is its thermal qualities. Massive masonry structures help to thermally control interior spaces. Heat from the sun is absorbed and stored in the stone and masonry during the day, keeping the interior of the building cool during the day, and released at night when the temperature drops.
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0"
STRUCTURAL AXON DATE : 12/10/2021
S1.00
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
272'-0" 8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0" 4'-0" 8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
STAIRWELL
ELEVATOR
8'-0"
A STAIRWELL
B
8'-0"
1'-2" CONCRETE ELEVATOR FOUNDATION SHAFT WALL
1'-2" CONCRETE FOUNDATION WALL
24'-0"
C
1'-0" CONCRETE FOUNDATION WALL
OPEN TO BELOW
6" CONCRETE SLAB
D
6" CONCRETE SLAB
6" CONCRETE SLAB
16'-0"
3'-4" X 1'-2" CONCRETE FOOTING
8'-0"
E 3'-10" X 1'-2" CONCRETE FOOTING
1'-6" CONCRETE FOUNDATION WALL
8'-0"
F 1'-2" CONCRETE ELEVATOR FOUNDATION SHAFT WALL
1'-2" CONCRETE FOUNDATION WALL
3'-6" X 1'-2" CONCRETE FOOTING
ELEVATOR
8'-0"
G ELEVATOR
208'-0"
48'-0"
H
3'-6" X 1'-2" CONCRETE FOOTING
8'-0"
I 1'-2" CONCRETE FOUNDATION WALL
ELEVATOR 1'-2" CONCRETE ELEVATOR FOUNDATION SHAFT WALL
8'-0"
J
8'-0"
K
L
16'-0"
1'-0" CONCRETE FOUNDATION WALL
6" CONCRETE SLAB
6" CONCRETE SLAB
M
16'-0"
6" CONCRETE SLAB
3'-4" X 1'-2" CONCRETE FOOTING
8'-0"
N 3'-10" X 1'-2" CONCRETE FOOTING
1'-6" CONCRETE FOUNDATION WALL
1'-2" CONCRETE FOUNDATION WALL
8'-0"
O 1'-2" CONCRETE ELEVATOR FOUNDATION SHAFT WALL
STAIRWELL
STAIRWELL
ELEVATOR
8'-0"
P
Q
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0"
BASEMENT STRUCTURAL PLAN DATE : 12/10/21
S1.01
1
2
4
3
5
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
440'-0" 48'-0"
16'-0"
16'-0"
8'-0"
8'-0"
24'-0"
STAIRWELL
EDGE OF SLAB
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
24'-0"
16'-0"
8'-0"
16'-0"
8'-0"
A
1'-2" LOAD BEARING BRICK MASONRY WALL
1'-2" LOAD BEARING BRICK MASONRY WALL
ELEVATOR
STAIRWELL
8'-0"
8'-0"
EDGE OF SLAB
8'-0"
B
C 1'-6" LOAD BEARING BRICK MASONRY WALL
1'-6" LOAD BEARING BRICK MASONRY WALL
24'-0"
1'-6" LOAD BEARING BRICK MASONRY WALL
6" CONCRETE SLAB
EDGE OF SLAB
EDGE OF SLAB 6" CONCRETE SLAB
D
18" REINFORCED CONCRETE BUBBLE DECK
1'-0" LOAD BEARING BRICK MASONRY WALL
1'-0" LOAD BEARING BRICK MASONRY WALL
1'-0" LOAD BEARING BRICK MASONRY WALL
16'-0"
18" REINFORCED CONCRETE BUBBLE DECK
8'-0"
E
8'-0"
F 1'-2" LOAD BEARING MASONRY ELEVATOR SHAFT WALL
G ELEVATOR
ELEVATOR
8'-0"
1'-2" LOAD BEARING BRICK MASONRY WALL 1'-2" LOAD BEARING BRICK MASONRY WALL
EDGE OF SLAB
1'-2" LOAD BEARING MASONRY ELEVATOR SHAFT WALL
1'-2" LOAD BEARING BRICK MASONRY WALL
208'-0"
48'-0"
H
8'-0"
I ELEVATOR
J 8'-0"
1'-2" LOAD BEARING BRICK MASONRY WALL
1'-6" LOAD BEARING BRICK MASONRY WALL
1'-6" LOAD BEARING BRICK MASONRY WALL
1'-6" LOAD BEARING BRICK MASONRY WALL
EDGE OF SLAB
8'-0"
K
16'-0"
L
1'-0" LOAD BEARING BRICK MASONRY WALL 1'-0" LOAD BEARING BRICK MASONRY WALL
1'-0" LOAD BEARING BRICK MASONRY WALL
1'-0" LOAD BEARING BRICK MASONRY WALL
18" REINFORCED CONCRETE BUBBLE DECK
16'-0"
6" CONCRETE SLAB
1'-2" LOAD BEARING BRICK MASONRY WALL
M
6" CONCRETE SLAB
1'-0" LOAD BEARING BRICK MASONRY WALL
8'-0"
N
8'-0"
O 1'-2" LOAD BEARING MASONRY ELEVATOR SHAFT WALL
STAIRWELL
STAIRWELL
8'-0"
P ELEVATOR
Q
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0
FIRST FLOOR STRUCTURAL PLAN DATE : 12/10/2021
S1.02
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
272'-0" 8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
A STAIRWELL
ELEVATOR
STAIRWELL
1'-2" LOAD BEARING BRICK MASONRY WALL
8'-0"
1'-2" LOAD BEARING BRICK MASONRY WALL
8'-0"
B
C 1'-6" LOAD BEARING BRICK MASONRY WALL
1'-6" LOAD BEARING BRICK MASONRY WALL
24'-0"
EDGE OF SLAB
OPEN TO BELOW
18" REINFORCED CONCRETE BUBBLE DECK
1'-0" LOAD BEARING BRICK MASONRY WALL
18" REINFORCED CONCRETE BUBBLE DECK
D
OPEN TO BELOW
16'-0"
1'-0" LOAD BEARING BRICK MASONRY WALL
EDGE OF SLAB
8'-0"
E
8'-0"
F 1'-2" LOAD BEARING MASONRY ELEVATOR SHAFT WALL
ELEVATOR
8'-0"
G EDGE OF SLAB
ELEVATOR
208'-0"
48'-0"
H
EDGE OF SLAB
1'-2" LOAD BEARING MASONRY ELEVATOR SHAFT WALL
8'-0"
I ELEVATOR OPEN TO BELOW
8'-0"
J
K 1'-6" LOAD BEARING BRICK MASONRY WALL
8'-0"
1'-6" LOAD BEARING BRICK MASONRY WALL
16'-0"
L
1'-0" LOAD BEARING BRICK MASONRY WALL
1'-0" LOAD BEARING BRICK MASONRY WALL
M
OPEN TO BELOW
16'-0"
18" REINFORCED CONCRETE BUBBLE DECK
18" REINFORCED CONCRETE BUBBLE DECK
EDGE OF SLAB
8'-0"
N
8'-0"
O
STAIRWELL
1'-2" LOAD BEARING BRICK MASONRY WALL
1'-2" LOAD BEARING BRICK MASONRY WALL
STAIRWELL
ELEVATOR
8'-0"
P
Q
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0
SECOND FLOOR STRUCT.PLAN DATE : 12/10/2021
S1.03
MECHANICAL NOTE: In today's world in which society is facing incredible environmental challenges brought on by climate change, it is important to use as many passive systems as possible in order to create more environmentally responsible buildings. Though passive strategies are employed throughout the design, it is difficult in this climate and at this scale to create a completely passive building. Passive strategies alone can only provide comfort about 47% of the time between 8am to 8pm. As a result, mechanical systems are required to work in concert with the passive strategies. Natural ventilation and sun shading to prevent solar gain are combined with active cooling and ventilation systems while direct solar gain is paired with active heating systems. The active systems in the building will mostly focus on providing heat and ventilation to the building during the winter months when the local climate gets colder and natural ventilation is no longer a viable option. In order to make the interior spaces of the building comfortable, heating is required about 66% of the time. One way to run these systems without using the ceiling is to run duct work beneath a technical floor. Technical floors are raised off of the structural slab using pedestal supports arranged in a grid system. In this design a 2 foot deep technical floor was used to run ductwork beneath the floor. Additionally, the air space provided by the technical floor creates an acoustic barrier helping to further isolate the sound throughout the building. Sound was an important design consideration when laying out the mechanical systems. When several vents are connected along the same duct branch, the ventilation system can act like a sound bridge, transferring sound between rooms. For acoustically important rooms such as the rehearsal rooms, concert halls and recording studios are all ventilated using individual supply and return branches. Additionally, the main ventilation branches are run beneath the corridors where any potential noise pollution would make less of an impact. Instead of placing the mechanical equipment on the roof, the AHU's and heat pumps were located in the basement. This move not only limits the amount of vibrations transferred through the structure, but allows for easier access to the geothermal wells below the building. Placing the mechanical equipment in the basement also allows for more direct access to the technical floor layer and less large service chases running through the building
ZONE ONE: SQFT OF AREA SERVED: 8,226 SQFT COOLING CAPACITY: 47 TONS PACKAGED UNIT SIZE: 25'-11” X 7'-4” COOLING AIR VOLUME (CFM): 20,000 MAIN SUPPLY/ RETURN: 11 SQFT BRANCH SUPPLY/ RETURN: 20 SQFT
ZONE TWO: SQFT OF AREA SERVED: 6,428 SQFT COOLING CAPACITY: 37 TONS PACKAGED UNIT SIZE: 25'-11” X 7'-4” COOLING AIR VOLUME (CFM): 16,000 MAIN SUPPLY/ RETURN: 8.5 SQFT BRANCH SUPPLY/ RETURN: 16 SQFT
ZONE THREE: SQFT OF AREA SERVED: 2,769 SQFT COOLING CAPACITY: 5 TONS (EST.) PACKAGED UNIT SIZE: N/A COOLING AIR VOLUME (CFM): 1000 (EST.) MAIN SUPPLY/ RETURN: 1 SQFT (EST.) BRANCH SUPPLY/ RETURN: 2 SQFT (EST.)
ZONE FOUR: SQFT OF AREA SERVED: 10,248 SQFT COOLING CAPACITY: 55 TONS PACKAGED UNIT SIZE: 25'-11” X 7'-4” COOLING AIR VOLUME (CFM): 25,000 MAIN SUPPLY/ RETURN: 15 SQFT BRANCH SUPPLY/ RETURN: 25 SQFT
ZONE FIVE: SQFT OF AREA SERVED: 10,046 SQFT COOLING CAPACITY: 55 TONS PACKAGED UNIT SIZE: 25'-11” X 7'-4” COOLING AIR VOLUME (CFM): 25,000 MAIN SUPPLY/ RETURN: 15 SQFT BRANCH SUPPLY/ RETURN: 25 SQFT
ZONE SIX: SQFT OF AREA SERVED: 1,766 SQFT COOLING CAPACITY: 5 TONS (EST.) PACKAGED UNIT SIZE: N/A COOLING AIR VOLUME (CFM): 1000 (EST.) MAIN SUPPLY/ RETURN: 1 SQFT (EST.) BRANCH SUPPLY/ RETURN: 2 SQFT (EST.) GEOTHERMAL WELLS: TOTAL TONS REQUIRED: 204 TONS 1 300 FOOT DEEP WELL = 2 TONS 204 TONS / 2 TONS PER WELL = 102 WELLS
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0"
MECHANICAL AXON DATE : 12/10/2021
M1.00
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
272'-0" 8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
A 8'-0"
ELECTRICAL A007
8'-0"
B
24'-0"
C
A.H.U.
1
1
D
A2.01 MECHANICAL
A001
A002
H.P.
A.H.U.
MECHANICAL A005
16'-0"
LOCKERS
A2.01
H.P.
8'-0"
E
8'-0"
F
8'-0"
G CLOSET A006
H
1
2
208'-0"
48'-0"
A2.02
8'-0"
I
8'-0"
J
8'-0"
K
L A.H.U. H.P.
BATHROOM
16'-0"
A.H.U.
H.P.
B001 2
2
A2.01
A2.01
STORAGE MECHANICAL
M
B004
B003 A.H.U. BATHROOM
16'-0"
H.P.
B002
8'-0"
N
8'-0"
O
8'-0"
P ELECTRICAL B006
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
Q
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0
BASEMENT MECHANICAL PLAN DATE : 12/10/2021
M1.01
1
2
4
3
5
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
440'-0" 8'-0"
48'-0"
16'-0"
16'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
24'-0"
16'-0"
8'-0"
16'-0"
8'-0"
GRILL OVER FRESH AIR INTAKE PIT
8'-0"
A
B
20X28
BELL MOUTH RETURN DUCT
20X28
16X20
16X20
16X20
8'-0"
BELL MOUTH RETURN DUCT
LINEAR VENTILATION GRILLS
16X20
16X20
C
LOUNGE
16X20
16X20
COURTYARD
BATHROOM
A102
A107
16X20
16X20
A101
16X20
1 A2.01
A103
A104
A2.01
COURTYARD
LARGE REHEARSAL ROOM
CHOIR ROOM
COURTYARD
RECORDING BOOTH
MAINTENANCE
A105
A106
A109
A110
A115
A117
16X20
DANCE HALL
LARGE REHEARSAL ROOM
1
20X28
CONTROL ROOM
D
16'-0"
DANCE HALL
16X20
24'-0"
A113
16X20
A114
BATHROOM A108
E 8'-0"
SOUND LOCK
F 8'-0"
16X20
20X28
16X20
16X20
16X20
16X20
20X28
16X20
16X20
16X20
16X20
16X20
20X28
16X20
16X20
16X20
16X20
16X20
A116
CLOSET
CLOSET
A111
A112
8'-0"
G
H
1
2
208'-0"
48'-0"
A2.02
18X32
CLOSET
18X32
8'-0"
16X20
16X20
I 18X32
B109 18X32
J 8'-0"
12X30
16X20
16X20
16X20
16X20
18X32
16X20
LOBBY
16X20
16X20
18X32
K
B104 8X14
B112
B125
L STORAGE
COFFEE LOUNGE
B120
B121
8X14
8X14
PERFORATIONS IN TECHNICAL FLOOR FOR VENTILATION
10X16
16X20
OFFICE B126 8X14
16X20
SMALL ORCHESTRA HALL
TECHNICAL
STAGE
BACKSTAGE
B113
B116
B118
B108 CAFE/ BAR
RECEPTION/ SECURITY
B101
18X32
B105
8X14
M
COURTYARD B124
8X14
8X14
10X16
OFFICE
MEETING
ELECTRICAL
B127
B122
B119
FIRSTAID
16X20
B107 CLOAKROOM
8X14
8X14
BATHROOM
BATHROOM
VESTIBULE
B110
B111
B114
N
OFFICE
ORCHESTRA HALL
VESTIBULE
STAFFCLOSET
B115
B117
B123
B128
8'-0"
B103
16X20
16X20
8X14 KITCHEN
B106
8X14
O
16X20
16X20
BELL MOUTH RETURN DUCT
18X32
16X20
18X32
18X32
16X20
12X30
8'-0"
18X32 16X20
2 A2.01
16X20
A2.01
16X20
2
8'-0"
OFFICE
16'-0"
B102
VESTIBULE
16'-0"
16X20
STORAGE
16X20
16X20
LINEAR VENTILATION GRILLS
8X14
BELL MOUTH RETURN DUCT
8'-0"
P
Q GRILL OVER FRESH AIR INTAKE PIT
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0
FIRST FLOOR MECH.PLAN DATE : 12/10/2021
M1.02
1
2
4
3
5
7
6
8
9
10
11
12
13
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
440'-0" 8'-0"
48'-0"
16'-0"
16'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
24'-0"
8'-0"
8'-0"
8'-0"
8'-0"
12'-0"
8'-0"
4'-0"
8'-0"
8'-0"
16'-6"
15'-6"
8'-0"
8'-0"
16'-0"
16'-0"
16'-0"
8'-0"
16'-0"
24'-0"
16'-0"
8'-0"
16'-0"
8'-0"
8'-0"
A
8X20
8X14
8X14
8'-0"
8X20
BELL MOUTH RETURN DUCT
8X20
B 8X20
C
8X14
SMALL REHEARSAL ROOM
A201
A205
8X14 8X14
24'-0"
8X14
SMALL REHEARSAL ROOM
8X14
A202
A206
BATHROOM
8X14
A209 8X14
A2.01
8X14 8X14
1
D
SMALL REHEARSAL ROOM
SMALL REHEARSAL ROOM
A207
A2.01
8X14 8X14
8X14
A203
16'-0"
8X14
1
SMALL REHEARSAL ROOM
8X20
8X14
SMALL REHEARSAL ROOM
BATHROOM A210 SMALL REHEARSAL ROOM
A204
A208
E 8X14
8'-0"
8X14
SMALL REHEARSAL ROOM
8'-0"
F
8'-0"
G
H
1
2
208'-0"
48'-0"
A2.02
8'-0"
I
8'-0"
J
8X14
K 8'-0"
8X14
BALCONY
BATHROOM
B205
B206
L
16'-0"
B204
BATHROOM
8X20
8X14
8X14
8X14
M
TECHNICAL
2
B202 8X20
8X14
INSTRUMENT STORAGE B207
N
8X14
8'-0"
8X14
2 A2.01
16'-0"
A2.01
8'-0"
O 8X20
8'-0"
P
Q
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0
SECOND FLOOR MECH.PLAN DATE : 12/10/2021
M1.03
G ORIN (22 B EET) F UIT 2 CIRC ES @ 300 HOL
G ORIN (24 B UIT 1 00 FEET) C IR C 3 S@ HOLE
G ORIN ) (25 B UIT 5 300 FEET C IR C S@ HOLE G
ORIN (29 B ET) UIT 4 CIRC @ 300 FE S HOLE
G ORIN (29 B ET) UIT 3 CIRC @ 300 FE S HOLE
ACCADEMIA FILARMONICA ROMANA
MEGHAN E RODENHISER
ARCH 513 INTEGRATED PROJECT DESIGN STUDIO FALL 2021 Prof. Roberto Viola Ochoa
SCALE : 1/8" = 1'-0"
DATE :
12/10/2021
GEOTHERMAL WELLS
M1.04