ONONDAGA COUNTY DEPARTMENT OF WATER ENVIRONMENT PROTECTION VISION To be a respected leader in wastewater treatment, storm water management, and the protection of our environment using state-of-the-art, innovative technologies and sound scientific principles as our guide.
MISSION To protect and improve the water environment of Onondaga County in a cost-effective manner ensuring the health and sustainability of our community and economy.
CORE VALUES
Excellence Teamwork Honesty Innovation Cost-Effectiveness Safety
Table of Contents Report from Commissioner Gray Projects Update
Progress of Projects Under Construction Fact Sheets
Green Projects Update
Projects Summary Fact Sheets
Green Improvement Fund Update
Green Improvement Fund Program Summary Fact Sheets
Metro WWTP Phosphorus Projects/TMDL/Ambient Monitoring Program Update
Metro Phosphorus Optimization Project Metro Phosphorus Work Plan Project Onondaga Lake Water Quality Model Ambient Monitoring Program Water Quality Sampling Tributary Sampling Tributary Bacteria Compliance Assessment Onondaga Lake Sampling Biological Monitoring Program Sampling Summary
Legislative/Regulatory/Media Update
Action Items for County Legislature Action Items for the Environmental Protection Committee Media Articles
Financial Update
Contracts New Contracts Amendments to Existing Contracts Change Orders
Funding State Bond Act Funds Federal EPA Funds
Federal Army Corps of Engineers Funds EFC Loans
Onondaga County Lake Improvement Project Fourth Stipulation of the ACJ Clinton/Lower MIS CSO Improvement Harbor Brook Drainage Basin CSO Abatement Midland CSO Abatement Sewer Separation of CSO Areas: 022/038/040/045/046A/046B/047/048/050/051/053/054 Save the Rain Education and Outreach Grant Appendix
Project Payments Lake Improvement Project Status Report Federal and State Grants/Loans Approved and Received Chronology of Project Construction Starts Contractors for Construction Projects Metro Treatment Plant CSOs WEP Acronyms
Project Progress Report from the Commissioner Connect the Drops Q2 2016 Education & Outreach Summary: the Connect the Drops ad campaign ramped up in the second quarter of 2016. We launched the new messaging and outreach materials coinciding with Earth Day this year. Education and outreach efforts included participation in public events, online educational materials on our website and social media platforms, and some traditional advertising as well as earned media attention. This campaign is integral to the ACJ required floatables control requirements. Onondaga County had a Connect the Drops team participating in the annual OCRRA Earth Day Cleanup. Over a dozen participants cleaned up along the Onondaga Lake Parkway and near the shore of the lake. This was the first of several litter cleanups this year aimed at cleaning up street litter before it reaches our water.
Information tables on Save the Rain and Connect the Drops have been available at several public events since Earth Day, including the Baltimore Woods Earth Day celebration and the Izaak Walton League CNY Chapter Family Fun Fishing Derby during Free Fishing Weekend at the end of June. Throughout the summer and into fall, we will continue to have a robust outreach
Connect the Drops
Summary Since launching in mid-April, the Connect the Drops landing page has over 2,000 visits The average session is about :47 seconds and non-bounced users (those who interact before leaving) are spending over 3 minutes per visit The recent sidewalk art video Facebook post received 448 shares, over 2,000 likes, 60 comments and 133,000 video views! The Save the Rain Facebook page has received 650+ new likes
Google Analytics - Summary 04/01/2016 - 06/29/2016 OVERVIEW ALL USERS
Sessions
Sessions Trendline
800
600
400
200
0
04/08/16
04/15/16
04/22/16
ALL TRAFFIC
04/29/16
05/06/16
05/13/16
ALL REFERRALS
SESSIONS
05/27/16
06/03/16
06/10/16
06/17/16
GOALS
SESSIONS
2,277
05/20/16
GOAL COMPLETIONS
162
85
TOP TRAFFIC ALL USERS
CHANNELS ▲
SESSIONS
NEW USERS
BOUNCE RATE
PAGES / SESSION
AVG. SESSION DURATION
(Other)
1,751 (76.90%)
1,593 (78.28%)
77.04%
1.09
0:25
Direct
244 (10.72%)
183 (8.99%)
59.84%
1.47
1:21
Social
139 (6.10%)
123 (6.04%)
49.64%
1.08
0:36
Organic Search
110 (4.83%)
105 (5.16%)
90.00%
1.04
0:08
33 (1.45%)
31 (1.52%)
93.94%
1.88
19:35
Referral
TOP SOCIAL NETWORK REFERRALS ALL USERS
SOCIAL NETWORK ▲
Facebook Twitter
SESSIONS
PAGE VIEWS
AVG. SESSION DURATION
PAGES / SESSION
GOAL CONVERSION RATE
110 (79.14%)
118 (78.67%)
0:32
1.07
14.55%
26 (18.71%)
29 (19.33%)
0:57
1.12
7.69%
SOCIAL NETWORK â–²
LinkedIn Trackbacks
SESSIONS
PAGE VIEWS
AVG. SESSION DURATION
PAGES / SESSION
GOAL CONVERSION RATE
3 (2.16%)
3 (2.00%)
0:00
1.00
0.00%
0 (0.00%)
0 (0.00%)
0:00
0.00
0.00%
TOP EVENTS SESSIONS
EVENT CATEGORY â–²
Scroll Depth
TOTAL EVENTS
UNIQUE EVENTS
EVENT VALUE
AVG. VALUE
987 (81.23%)
416 (71.48%)
0 (0.00%)
0.00
Connect the Drops - Offpage Link
64 (5.27%)
53 (9.11%)
0 (0.00%)
0.00
Connect the Drops - Intro Button
55 (4.53%)
52 (8.93%)
0 (0.00%)
0.00
Non-Linked Click Attempt
31 (2.55%)
9 (1.55%)
0 (0.00%)
0.00
External Link
22 (1.81%)
16 (2.75%)
0 (0.00%)
0.00
Connect the Drops - Logo
21 (1.73%)
15 (2.58%)
0 (0.00%)
0.00
Connect the Drops - ScrollTo Nav
21 (1.73%)
9 (1.55%)
0 (0.00%)
0.00
Connect the Drops - Social Link
11 (0.91%)
9 (1.55%)
0 (0.00%)
0.00
Copied Text
3 (0.25%)
3 (0.52%)
0 (0.00%)
0.00
TOP CAMPAIGNS ALL USERS
SOURCE / MEDIUM â–²
SESSIONS
NEW USERS
BOUNCE RATE
PAGES / SESSION
AVG. SESSION DURATION
(direct) / (none)
244 (10.72%)
183 (8.99%)
59.84%
1.47
1:21
Facebook / Carousel
458 (20.11%)
400 (19.66%)
77.73%
1.11
0:28
1,010 (44.36%)
922 (45.31%)
78.42%
1.09
0:25
283 (12.43%)
271 (13.32%)
71.02%
1.06
0:20
21 (0.92%)
20 (0.98%)
38.10%
1.00
0:27
3 (0.13%)
1 (0.05%)
33.33%
10.67
3:35:29
108 (4.74%)
103 (5.06%)
90.74%
1.03
0:05
l.facebook.com / referral
27 (1.19%)
27 (1.33%)
100.00%
1.00
0:00
lm.facebook.com / referral
1 (0.04%)
1 (0.05%)
0.00%
1.00
0:37
lnkd.in / referral
3 (0.13%)
3 (0.15%)
100.00%
1.00
0:00
Facebook / PromoPost Facebook / Video facebook.com / referral forum.topic76298666.6hopping.com / referral google / organic
Facebook - Summary 04/01/2016 - 06/29/2016 (compared to 01/02/2016 - 03/31/2016) LIKES
ONONDAGA COUNTY SAVE THE RAIN
Total Lifetime Likes
Total Lifetime Likes Trendline
16,000
12,000
9.7k
9.7k
11.1k
10.5k
11.1k
11.2k
11.5k
12.2k
12.5k
12.9k
12.9k 11.2k
8,000
4.2k 4,000
0
04/08/16
04/15/16
04/22/16
04/29/16
05/06/16
05/13/16
05/20/16
05/27/16
06/03/16
06/10/16
06/17/16 LIMITED TO A 90-DAY PERIOD
WEEKLY TOTAL REACH
ONONDAGA COUNTY SAVE THE RAIN
111,235 PREVIOUS: 517
21415.47% LIMITED TO A 90-DAY PERIOD
LIKES
ONONDAGA COUNTY SAVE THE RAIN
1,890
PREVIOUS: 1,391
35.87% LIMITED TO A 90-DAY PERIOD
LIKE SOURCES
ONONDAGA COUNTY SAVE THE RAIN LIKE SOURCES â–²
LIKES
Sponsored Story
301
Feed Story
101
Page Profile
99
Mobile Ads
9
Feed Chaining
4
Timeline Like Chaining
3
API
3
Favorites
3
Mobile
2
Hovercard
2 LIMITED TO A 90-DAY PERIOD
PAGE POSTS
ONONDAGA COUNTY SAVE THE RAIN DATE ▲
POST
2016-06-23 16:22:28
See Save the Rain’s new sidewalk art around...
2016-06-23 10:58:19
We're on Bridge Street on NewsChannel 9 this...
2016-06-15 18:04:11
Let's Connect the Drops and work together to keep...
2016-06-07 14:17:13
LIKES
COMMENTS
REACH
1,997
60
167,312
--
--
52
214
7
76,456
ICYMI - We're accepting Green Improvement Fund...
--
--
86
2016-06-04 16:29:11
Thanks to everyone who participated in the...
4
1
82
2016-06-03 16:25:01
The recipe for a cleaner community is simple:...
394
17
55,035
2016-06-03 10:30:00
Heading to the Westcott Art Trail this weekend?...
3
--
169
2016-05-27 12:48:55
The first rain barrel workshops of 2016 will be...
6
--
261
2016-05-26 11:59:02
Photo - Onondaga County
--
--
80
2016-05-18 14:55:39
Thanks to all who participated in Save the Rain's...
9
--
193
2016-05-16 16:14:35
Have you voted for your favorite rain barrels...
5
--
138
2016-05-16 13:32:35
Miss the trashcan by an inch, and you could...
1,125
62
55,807
2016-05-12 11:15:40
Link - Onondaga County
1
--
138
2016-05-04 11:15:03
The rain barrel art is on display at the zoo...
10
2
689
2016-04-29 14:30:00
Spring tree planting season is here! Join the...
1
--
135
2016-04-23 13:59:16
Thanks to everyone on the Onondaga County...
14
--
465
2016-04-23 12:00:00
Photo - Baltimore Woods Nature Center
--
--
--
2016-04-20 09:45:32
Thanks to everyone who participated in the...
1
--
131
2016-04-19 12:38:54
TONIGHT!!!
3
--
138
2016-04-18 15:28:56
This Earth Day, everyone’s looking for ways to...
801
35
76,209
2016-04-18 14:25:37
Photo - Onondaga County
3
1
342
2016-04-16 17:31:36
Thanks to all who stopped to chat with us at the...
2
1
114
2016-04-15 09:58:25
Photo - Onondaga County
1
--
168
2016-04-14 14:48:49
Link - Onondaga County
1
--
300
2016-04-14 10:11:44
The latest Save the Rain quarterly report (Q1...
2
--
223
2016-04-08 14:24:00
#EarthDay is only 2 weeks away! Register now for...
1
--
93
LIMITED TO A 90-DAY PERIOD
Connect the Drops Q2 2016 Facebook Posts TOTAL PAGE LIKES APRIL 1: 1,390
TOTAL PAGE LIKES JUNE 29: 2,063
NET PAGE LIKES: 673
Summary of Connect the Drops activity on Save the Rain’s Facebook page (April 1, 2016 to June 29, 2016 at 8:45 AM) Our post reach, reactions, and comments are illustrated with the peaks in the graphs below, corresponding to posts related to Connect the Drops.
Most of the reactions have been “Like” followed by “Love” and a few “Wow” reactions. Overall, many positive responses have been received for these posts. The rain activated sidewalk art video has been particularly popular and started some interesting conversation about addressing the street litter problem.
The first Connect the Drops post was on April 18. The Earth Day themed post promotes Connect the Drops and links to the landing page savetherain.us/drops  76,209 impressions (3,414 organic/72,795 paid), 164 shares, 35 comments
The weekend of Earth Day, Save the Rain shared a post from Baltimore Woods Nature Center about their Earth Day celebration, at which Save the Rain had a table with Save the Rain and Connect the Drops information:  85 impressions (all organic)
The same weekend, Onondaga County Connect the Drops team participated in OCRRA’s Annual Earth Day Cleanup and posted photos of the team picking up litter near Onondaga Lake.  465 impressions (all organic)
Onondaga County shared a post about Connect the Drops, linking to the landing page.  130 impressions (all organic)
Another Connect the Drops post in mid-May shared the message “miss the trashcan by an inch and you could be missing by miles” making the connection that litter can reach Onondaga Lake even when it is dropped on the street miles away. 55,807 impressions (6,481 organic/49,326 paid), 262 shares, 62 comments
The following Connect the Drops post was promoted during the Taste of Syracuse festival in Downtown Syracuse in the first weekend of June to remind people to be mindful of their disposable items reaching the trashcan while enjoying the food samples at the festival.  55,035 impressions (1,389 organic/53,646 paid), 58 shares, 17 comments
The first Connect the Drops video provides a general overview of Connect the Drops and the route litter can take from the street to Onondaga Lake and how to prevent that from happening by dropping trash in a trashcan, not on the street.  76,456 impressions (1,784 organic/74,672 paid), 37 shares, 6 comments, 78K views
The second Connect the Drops video demonstrates the new rain-activated sidewalk art to get people’s attention on a rainy day with a reminder to “keep litter out of the forecast” and other litter reduction messages and Save the Rain/Connect the Drops branding. This is our most popular video to date with a lot of positive comments about this unique facet of the program. 165,833 impressions (34,532 organic/131,301 paid), 426 shares, 58 comments, 128K video views
•
•
Reach & Frequency: GRPs: Impressions:
Reach & Frequency: GRPs: Impressions:
38% of Adults 18+, 9.9 times 354 1,420,000
AM Drive, Weekend and ROS Value Added
May 16th – September 25th 301
33.2% of Adults 18+, 7.4 times 238 954,689
RADIO MARKET TOTALS: R&F – 56.2%, 15.9 times
• • •
•
May 16th – September 25th 226
AM Drive, Mid Day, PM Drive, and ROS Value Added
WNTQ-FM • Flight: • Total Spots:
• • •
•
WWHT-FM • Flight: • Total Spots:
SAVE THE RAIN RADIO
Impressions:
2,374,689
Infrastructure Asset Management in Action at Onondaga County Department of Water Environment Protection (WEP)
Onondaga County Department of Water Environment Protection
June 2016
Joanne M. Mahoney County Executive Tom Rhoads, P.E. Commissioner
P a g e |2
Infrastructure Asset Management in Action Introduction Onondaga County Department of Water Environment Protection (WEP) is a wastewater utility organization that serves a portion of central New York centered on Syracuse, New York. The County provides sanitary and storm sewer services through the Consolidated Sewer District and several drainage districts. The infrastructure managed by the Department is as diverse as the services provided by the staff. Staff includes administrative personnel, biologist, construction inspection, electricians, engineers, fiscal personnel, fleet maintenance, HVAC technicians, heavy machine operators, instrumentation technicians, inventory control personnel, IT, janitorial, laboratory technicians, managerial staff, mechanics, operations staff, permitting, personnel staff, sampling staff, sewer televising and inspection, and sewer and stream maintenance staff. The magnitude and variety of the asset inventory for the Department requires organized practices to aid in the management of the infrastructure. WEP uses Asset Management (AM) as one method to organize, plan, make decisions, and keep staff informed regarding the relatively large collection of assets. This document summarizes the main goals and focus of WEP’s AM program. WEP’s Asset Management Program Background WEP provides services to Onondaga County residents in the Consolidated Sanitary District with an emphasis on being a respected leader in wastewater treatment, storm water management, and the protection of our environment using state-of-the-art, innovative technologies and sound scientific principles as a guide. Through this work WEP protects and improves the water environment of Onondaga County in a cost-effective manner ensuring the health and sustainability of our community and economy. One way WEP carries out its vision and mission is through the use of Infrastructure Asset Management (AM). The United States Environmental Protection Agency (EPA) defines asset management as managing infrastructure capital assets to minimize the total cost of owning and operating them, while delivering the service levels desired by customers. As stated by the EPA ―Sewer system assets that are not regularly maintained usual deteriorate faster than expected and lead to higher replacement and emergency cost.‖ WEP’s asset management program is designed to better deliver acceptable service and provide it on a sustainable cost basis to the ratepayer. WEP’s Asset Management Mission is to consistently deliver established levels of service and achieve sustainability using best-in-class Asset Management practices. What are best-in-class AM practices? At WEP, we have adopted many AM concepts developed by the EPA as our focus to be best-in-class. The EPA published its own Best Practices guide, which asserts that AM programs should focus on answering the following five (5) core questions of Asset Management. 1. 2. 3. 4. 5.
What is the current state of our assets? What is the desired level of service? Which assets are critical to sustained performance? How to achieve the minimum life cycle cost for an asset? What is the long-term funding plan?
OCDWEP – Asset Management Program Whitepaper
June 2016
P a g e |3
As stated in WEP’s AM Mission, it strives to answer these questions. In addition to being best-in-class by answering these questions, WEP is also focused on being sustainable, and providing customers with the best service possible while minimizing the lifecycle cost of the assets or equipment owned, operated, and maintained by WEP’s staff. WEP’s AM program defines an asset as the following: “A component of a facility with an independent physical and functional identity and age (e.g., pump, motor, sedimentation tank, main).” This definition is taken from the EPA asset management guidance. WEP expanded the definition to better define the meaning as it applies to specific equipment and facilities being managed as part of WEP’s AM program. An asset is the lowest level where a work task is generated and tracked. By definition, assets shall satisfy one or more of the following:
A necessary component in the conveyance or treatment of wastewater, stormwater, and combined sewers (CSOs). Examples: Valves, Piping, Aeration Diffusers, Controls, Pumps, Tanks, and Aeration Blowers. A necessary component in the supply of electricity; Examples: Motors, Circuit Breakers, Transfer Switches, and Emergency Generators. A necessary component required to comply with local, state, or federal regulatory standard; Examples: Flow Meter, Chemical Containment, and Operational Monitoring Equipment. A component providing a safe and healthy work environment including ventilation of confined spaces; Examples: Exhaust Fans, Hazardous Gas Detector, and Boilers. Green infrastructure owned and maintained by WEP; Computers, laboratory equipment, or sampling equipment; Any piece of equipment with an estimated value greater than $5,000; or Any piece of equipment with an estimated useful life equal to or greater than three (3) years.
Assets DO NOT include miscellaneous fixtures such as light fixtures, light switches, toilets, sinks, and floor drains. Infrastructure and Asset Management within the County’s sewer system have a long history, taking on many forms and names. The Department began formalizing it’s AM program in the late 1990’s through early 2000’s. Since that time the program has grown. It has consolidated simple computer and paper databases that staff utilized to manage work. The consolidation of these systems resulted in the implementation of a computerized maintenance management system (CMMS) referred to as Maximo. Maximo was and is still one of the leaders in the industry for CMMS. WEP has continued to implement Maximo and its continual upgrades to keep up with technology. Since the original implementation IBM bought Maximo and now maintains it as one of its product offerings. Maximo has continued to add features to allow users, including WEP, to utilize it as their Enterprise Asset Management System. This software continues to help WEP in accomplishing its AM mission.
OCDWEP – Asset Management Program Whitepaper
June 2016
P a g e |4
What is the state of our assets? WEP currently has over 12,000 operational assets being tracked in its Maximo system. These assets meet the conditions described above but do not include every component of every facility and that number does not include all ―linear assets‖ such as sewer lines, manholes, and force mains: these linear assets include another 20,000 assets. As part of an ongoing effort, these linear assets are being organized and vetted for addition into WEP’s Maximo system. In addition to tracking and performing over 46,000 maintenance work orders each year, a constant effort is being made to update and replace assets in our system to keep this list up-to-date.
OCDWEP – Asset Management Program Whitepaper
June 2016
P a g e |5
These assets are categorized into 33 ―parent‖ classes and over 100 different ―child‖ classifications. These asset classifications group equipment by similar characteristics and expected service life. Each classification has a set list of specifications. These classes provide multiple benefits such as allowing for the estimate of replacement values and reference materials for staff when doing maintenance. Above is a description of the different wastewater maintenance divisions within WEP and the typical types of assets that they maintain. In addition to these groups, WEP also maintains Laboratory Equipment which is also part of Maximo. Fleet maintenance is done in a similar way but the records and inventory are kept in a specialized fleet maintenance software program known as Faster. In an effort to further its asset management, WEP began performing formal condition assessments in 2013. These condition assessments are being performed by WEP staff, consultants, vendors, and manufacturers. Condition scoring results are entered into Maximo with the date which they were conducted. We also consider other factors, the asset’s condition score allows WEP to grade each piece of equipment based on a one (1) to ten (10) scale with ten being a piece of equipment which is currently failing. The table below shows the extremes of the condition score represented by very good or very poor. However, an asset may also be scored as good, fair, or poor which correspond to the scores of two (2), five (5), or seven (7) respectively.
Once the condition is assessed the staff then assigns a performance score to each asset, also on a scale of one (1) to ten (10). This performance score is an indicator of the asset’s capacity to meet its required Level of Service (LOS), its efficiency, and availability of replacement parts. Similar to condition, performance has specific criteria to determine the score. Criteria for a performance score of one (1) and a ten (10) are shown below.
OCDWEP – Asset Management Program Whitepaper
June 2016
P a g e |6
Condition and performance are a good indication of the likelihood an asset will fail. As part of WEP’s AM program the likelihood of failure (LOF) also considers the level of documentation of O&M protocols as well as the maintenance history. Thus for assets which have been reviewed, WEP can quantify the probability of an asset failing. The assets with the highest risk of failing need further investigate regarding their criticality. Often the most important assets cannot be allowed to approach failure because of their impact to the services we provide.
What are Levels of Service? The International Infrastructure Management Manual defines "Level of Service" as "the defined service quality for a particular activity‖. WEP has established levels of service through work with consultants and internal staff. These levels of service support the overall goals of our utility and similar wastewater utilities. Maintenance, repairs, capital projects, and long-range planning are all aimed in an effort to have all County owned assets of the Consolidated Sanitary District meet these required levels of service.
OCDWEP – Asset Management Program Whitepaper
June 2016
P a g e |7
WEP’s levels of service identify are centered on the functions and goals of our department. These levels of service are the basis for a metric to measure each asset utility or importance to provide service to our customers. Using the established metric WEP can quantify each assets relative criticality. Which Assets are most critical? Based on the above discussed levels of service, WEP assets are assigned a Consequence of Failure (COF) score. This score directly relates to the impact of an asset’s failure on the Department and its mission. These assets are said to have a high consequence of failure if the results of a failed asset negatively impact the levels of service. We score COF based on a scale of one (1) to ten (10) with 10 being the most critical assets. The COF score is based on the five (5) LOS categories, system reliability, regulatory compliance, public and employee health and safety, fiscal impacts, and public confidence. A COF score of one (1) or a negligible consequence of failure equates to the asset’s failure not affect the levels of service. For the asset’s failure to be a severe or a score of ten (10), the failure must meet or exceed the follow criteria of each category.
OCDWEP – Asset Management Program Whitepaper
June 2016
P a g e |8
This COF score can be reduced by process changes or adding redundancy to a particular system. For example if a process requires two (2) pumps to function properly and it is critical to maintaining permit compliance, these assets would have a high COF. If we added a third (3) pump that would reduce the impact or consequence of one (1) pump failing. The rubric for which assets are scored on consequence of failure is included below and is based on the above described levels of service.
OCDWEP – Asset Management Program Whitepaper
June 2016
P a g e |9
How to get Risk from Likelihood of Failure and the Consequence of Failure? The Likelihood of Failure (LOF) and Consequence of Failure (COF) already discussed give WEP the understanding of potential future failures and what the impacts might be of those failures. Once both of these have been quantified then an overall risk score can be assigned. This risk score is the product of the likelihood of failure multiplied by the consequence of failure.
This score is a numerical value between one (1) and 100. An asset with a score of above 25, is considered to be a major indicator for further investigation. However, it is not necessary to replace all assets above a risk score of 25. Instead it has been WEP’s experiences that understanding the circumstances which make that asset’s score a 25 or higher is the most important task. In the case of assets with a risk score greater than 50, the asset should be included in a current project or reviewed for potential replacement or rehabilitation, as these assets are susceptible to a pending failure and will impact system operations. Below is a risk matrix with the likelihood of failure on the ―x‖ axis and the consequence of failure on the ―y‖ axis. These two as shown above give you the risk score. Risk scores from 10-90 are shown as dotted lines on the graph as examples of where asset would be on the graph. Ultimaltely the red shaded area shows on the graph where asset with a score of 25 or higher would be located. As you move to the top right of the graph the risk score increases.
OCDWEP – Asset Management Program Whitepaper
June 2016
P a g e | 10
In addition there are some cases in which an asset has failed but because the consequence of that failure is so small that the asset never reaches a risk score of 25. These assets require planned replacement or rehabilitation as is the case with assets with a risk score greater than 50. The majority of assets are in a range between a risk score of 10 and 50. This large group of assets is where good planning and forecasting will lead to savings. Within this range, good Asset Management practices are able to help predict failures and reduce the impacts and costs of unexpected failures. As stated by the EPA, lack of maintenance will lead to greater replacement and failure cost, thus this level of maintenance can lead to saving. “We can impact the overall cost of maintaining our infrastructure by replacing the right asset, at the right time, for the right reasons.”
How to minimize the lifecycle cost of an asset? Using the adage of replacing the right asset, at the right time, for the right reasons we can improve our management of an asset’s lifecycle. Unfortunately once we replace an asset the process is not complete. To the contrary, the process begins again. We initiate monitoring the new asset’s condition, performance, and work order history. With the information obtained from the previous asset and the new asset’s information we are able to make more informed decisions and react more efficiently to failures. These efforts lead to minimizing the lifecycle costs of an asset. As a part of the asset management program, WEP is currently working to optimize the preventative maintenance schedules for its assets. These efforts utilize staff experience, historical maintenance records, and recommended best practices to define the right intervals for preventative maintenance. This is becoming a living process with the intent to continual improve the efficient use of scarce resources. Planning for the Future (long-term) funding plan WEP has extended its application of Asset Management through the use of consultants. As an example, consultants were tasked to work with WEP staff at two treatment facilities - Brewerton and Baldwinsville Seneca Knolls treatment plants. These projects assessed the overall condition of the facilities and forecasted infrastructure rehabilitation and replacement over the next twenty (20) years.
OCDWEP – Asset Management Program Whitepaper
June 2016
P a g e | 11
This same approach is being is expected to be implemented for other facilities within WEP. A 20 year forecast allows WEP is to better prepare for design and construction of facility capital rehabilitation improvements. This approach is proactive in nature and allows monitoring of assets to ensure if an asset begins to deteriorate more rapidly that it will be included in the next project cycle. Resources are scarce and WEP striving to invest resources to replace the right asset, at the right time, for the right reasons using AM. An example of a 20-year planning level projection for the Baldwinsville Seneca Knolls (vintage 1982) treatment facility is shown below.
Conclusion: The importance of AM for Sustainability of WEP Answering the five core questions is crucial for WEP because of its significant responsibility to maintain a vast number of aging assets. WEP is making progress each year in furthering its effort to know the condition of all assets. Those assets are being maintained to ensure the required levels of service will be provided to the residents being served by the Consolidated Sanitary District. The levels of service allow WEP to plan more efficiently, and invest more cost effectively based on the criticality of each asset. These planning efforts are leading WEP in its efforts to minimize the overall lifecycle cost of each asset and properly manage the cost of service to every ratepayer in the Consolidated Sanitary District. Based on information collected, efforts are made to insure the right assets are being replaced, at the right time, for the right reasons. This replacement or rehabilitation of assets is fundamentally necessary in an asset rich industry such as a wastewater utility. As stated by the US EPA ―Sewer System assets that are not regularly maintained usual deteriorate faster than expected and lead to higher replacement and emergency response costs.‖ The diagram below shows a simplistic visualization of asset decay as published by the EPA. OCDWEP – Asset Management Program Whitepaper
June 2016
P a g e | 12
As WEP continues in its asset management journey, it strives to make the benefits of its asset management program more measurable and even more effective over time. These efforts include moving away from a reactive or run-to-failure management as well as making sure all investments in asset renewal are done in a responsible and defensible manner. In addition to the day to day benefits that can be attributed to AM, the department anticipates that AM can provide the best use of scare resources. Ultimately, all of the work done by WEP to promote Asset Management will lead to the sustainability of the wastewater infrastructure, our community, and the economy WEP serves. Acknowledgements: The work summarized in this document is the result of work done by WEP’s staff and several consulting engineering firms including GHD Consulting Service, Barton & Loguidce D.P.C., CH2M Hill Inc. This would not be possible without the support of Onondaga County Executive Joanne Mahoney, county legislatures, and direction provided by WEP’s commissioner Tom Rhoads. References: 1. Office of Water, Environmental Protection Agency. April 2008. Asset Management: A Best Management Practices Guide. EPA 816-F-08-014. Retrieved from https://www.epa.gov/small-and-rural-wastewater-systems/asset-managementwater-and-wastewater-treatment-systems-best. 2. Office of Wastewater Management, Environmental Protection Agency. April 2002. SSO Fact Sheet—Asset Management for Sewer Collection Systems. EPA 833-F-02-001. Retrieved from https://www3.epa.gov/npdes/pubs/assetmanagement.pdf 3. International Infrastructure Management Manual, International Version 4.0. New Zealand National Asset Management Steering Group (NAMS Limited) and Institute of Public Works Engineering Australia (IPWEA), Wellington, NZ, 2011. www.nams.org.nz
OCDWEP – Asset Management Program Whitepaper
June 2016
GRAY PROJECTS UPDATE
Cit
FACT SHEET Sewer Separation Project at CSO Area 061
Project: Project Owner: Project Location: Sewershed: Technology: CSO Capture: No. of CSOs Abated: Completion Date: Project Cost: Prime Contractor:
Sewer Separation at CSO 061 Onondaga County Syracuse Midland Sewer Separation 100,000 gal/yr 1 November 2016 (projected) $200,000 (estimated) D.E. Tarolli, Inc.
Project Description: The CSO 061 Area includes 1.8 acres within a residential neighborhood in the south side of the City of Syracuse. During large rain events, the combined sewage from the Crehange Street combined sewer can overflow to an existing 12-inch outfall to Onondaga Creek (CSO 061). The proposed design includes construction of a new storm sewer along Crehange Street to convey tributary stormwater from the Crehange Street properties, as well as two catch basins that are tributary to the Hatch Street combined sewer. The CSO-061 outfall will be repurposed and utilized for stormwater discharge only. The existing sanitary sewer along Crehange Street will convey sewage only and the Hatch Street combined sewer will have reduced stormwater contributions.
CSO 061 Project Area Photo – Crehange Street
The County evaluated the use of Green Infrastructure for mitigating overflows at CSO-061. It was concluded that complete separation would be more effective than green infrastructure due to the short conveyance distance, proximity to Onondaga Creek, and the desire to implement a total closure of CSO-061. Project Update: It is anticipated that construction on the project will begin by the end of summer 2016.
Aerial view of CSO 061 Project Area
Version 07/05/2016
GREEN PROJECTS UPDATE
Green Projects Update Progress has continued on several Save the Rain projects during the second quarter of 2016. The Green Separation in CSO 052 project design was finalized and bid for construction during the second quarter. The project is expected to be awarded to the low bidder, Marcellus Construction, and construction is anticipated to begin during the third quarter of 2016 with completion by the end of the year. The project consists of a new stormwater management facility on the former Garzone’s Restaurant property to manage ponding onsite as well as additional stormwater from Cornell Avenue. and South Avenue. Additionally, a separate storm sewer will be constructed on Mitchell Avenue between South Avenue and Armstrong Place that will capture road runoff from Mitchell Avenue. The proposed project will provide the dual benefits of managing stormwater runoff in the CSO 052 area to reduce combined sewer overflows and reducing localized flooding episodes experienced in the neighborhood. Prior to construction, the County’s Save the Rain team will hold the third public information meeting on the project to lay out construction expectations and scheduling. The State Street Green Corridor design was completed during the second quarter and construction is expected to begin during the beginning of the third quarter, using the County’s Green Structures Term Contractors (DE Tarolli, Inc. and J&J Landscaping, LLC). The project is funded in part by a Water Quality Improvement Project grant from the NYSDEC and consists of the installation of several green infrastructure practices along State Street in three different segments: Taylor St. to Adams St., Fayette St. to Water St., and James St. to Salina St. Construction will be complete by the end of the year, and the County’s Save the Rain team will keep the public informed with meetings, flyers, and other forms of communication. The CSO 060/077 green street candidate projects design was advanced during the second quarter to the 90% phase. These candidates include projects on McKinley Avenue, East Colvin Street, Roney Lane, Comstock Avenue, Lancaster Avenue, and Ackerman Avenue. The projects on Lancaster Avenue, Ackerman Avenue, and McKinley Avenue are expected to be under construction during the third and fourth quarters of 2016. The projects on Comstock Avenue, East Colvin Street, and Roney Lane will proceed to final design, public outreach and construction in 2017 and 2018. The Save the Rain team presented the Lancaster and Ackerman projects at the May Eastside TNT meeting, and at the Southeast University Neighborhood Association’s June board meeting. Outreach will continue as these projects advance to construction. The Green Planning Committee (GPC) continued to make progress this quarter. Design of the CSO 067 green project candidates – McKinley Park, Vacant Lot at 621 West Newell Street, and Vale Street at Newell Street – kicked off during the second quarter and 25% design concepts are expected early in the third quarter.
The GPC is also finalized the development of additional project candidates in CSO 052 for implementation by 2018. The County will be awarding design contracts for these candidates during the third quarter. Discussions between the GPC, County, and City on a green infrastructure approach for CSO 029 area (located in Armory Square) continued during the third quarter, with the expectation of developing a plan of action sometime during 2016.
Project: Project Owner: Project Location: Sewershed/CSO: GI Technologies:
FACT SHEET Green Park: McKinley Park
Capture Area: Runoff Reduction: Runoff Capture: Year Contracted: Bid Cost: Prime Contractor:
McKinley Park City of Syracuse West Newell Street, West Calthrop, and West Pleasant Avenues. 067 Bioretention, Infiltration, and Porous Pavement 80,400 sq. ft. (estimated) 1,028,000 (estimated) 490,000 (estimated) 2016 TBD TBD
Project Description: The McKinley Park Project is one of many projects being accomplished through the collaborative efforts of Onondaga County and the City of Syracuse. As a neighborhood park, McKinley Park has served the recreational needs of the community since 1920. The primary goal of the project is to reduce the volume of stormwater that flows into the combined sewer system along West Newell Street, West Calthrop Avenue, and West Pleasant Avenue – all within CSO 067. The County and the City have partnered to help reduce this runoff through the installation of various green infrastructure technologies, including bioretention and porous pavement with an underground infiltration system in the parking area. This infrastructure will capture runoff from the park and surrounding areas, totaling 80,000 square feet of drainage area and will have the capacity to store approximately 103,000 gallons of stormwater during rain events. Stormwater will slowly evaporate and/or infiltrate underground, eliminating excess drainage to the sewer system and improving the overall stormwater management and drainage in this area. A secondary goal of this project is to enhance McKinley Park by increasing green space and improving the basketball court. Some of the existing pavement, which was once used as a tennis court will be completely removed and replaced with open green space. Additionally, the current half-court basketball facility will be removed and replaced with a full court porous basketball court. Even with this addition, this project will result with an overall reduction in pavement, an increase in green open space, and a reduction is stormwater overflow into the city’s sewer system.
Basketball court to be replaced with a new full porous pavement court
Parking lot pavement to be replaced with porous pavement Version 6/28/16
Project: Project Owner: Project Location: Sewershed: CSO: GI Technologies:
FACT SHEET Green Separation CSO052 South & Mitchell Avenues
Capture Area: Runoff Reduction: Year Contracted: Bid Cost: Prime Contractor:
Green Separation CSO 052 City of Syracuse 2426 South Avenue and Mitchell Ave. between South Ave. & Armstrong Pl. Midland 052 Detention/Slow Release, Infiltration, and Storm Sewer Separation 1,031,100 sq. ft. 3,781,200 gal/yr (estimated) 2016 $1,840,000 Marcellus Construction Co., Inc.
Project Description: The Green Separation of CSO 052 Project will be accomplished through the collaborative efforts of Onondaga County and the City of Syracuse. Historically, the area around the proposed detention basin has been prone to severe flooding throughout the year. This is due, in part, to years of illegal dumping that impacted the natural surface and groundwater flow patterns. The County and the City have partnered to help limit this problem through the installation of a slow-release stormwater detention basin and infiltration. Additionally, the County is undertaking a storm sewer separation project on Mitchell Avenue to separate stormwater from the existing combined sewer system. The primary goal of the project is to reduce the volume of stormwater that flows into the combined sewer system along South, Cornell, and Mitchell Avenues, all within CSO 052. The secondary goal is to reduce the level of flooding experienced in this area. The new detention/slow release facility will be constructed on property owned by the City of Syracuse and will capture runoff from South and Cornell Avenues as well as from the City’s property, totaling 890,400 square feet of drainage area. The facility will have the capacity to store 1,155,700 gallons of stormwater during rain events. Stormwater will be slowly released to the Armstrong Place sewer system. It is expected that the detention/slow release facility will improve the stormwater management and drainage in this area and lessen the effects of flooding onto residential properties that adjoin the City-owned property. Additionally, runoff from 140,700 square feet of drainage area along Mitchell Avenue will be collected in a new storm sewer system and directed to an underground stormwater infiltration basin with a runoff reduction volume of approximately 1,241,900 gallons per year. When the project is complete, it will capture a combined total of approximately 3,781,200 gallons of runoff per year from the project area.
Example of Residential Flooding
Rendering of the Green Separation Project Version 6/23/16
Project: Project Owner: Project Location:
FACT SHEET Green Street: Newell Street
Sewershed: CSO: GI Technologies: Capture Area: Runoff Reduction: Year Contracted: Construction cost: Prime Contractor:
Newell Street City of Syracuse Newell Street between Vale and Onondaga Creek Blvd. Midland 067 Underground Infiltration 5150 sq. ft. 90,933 gal/yr 2016 (anticipated) $ 31,850 (Engineer Estimate) TBD
Project Description: The Newell Street Green Street Project demonstrates the continued partnership between the City of Syracuse and Onondaga County through the Save the Rain Program. The project concept was put forth by the Green Project Committee with stakeholder input from county, city, and citizen representatives. This project involves the construction of an underground infiltration trench which will occupy the south side of Newell Street between the Onondaga Creek Bridge and Vale Street. The infiltration trench will manage runoff from an estimated 5,150 square feet of drainage area from Newell Street in the maximum amount of storage space possible without disrupting the existing underground utilities in this area. Being completely underground, the infiltration trench system will provide high capture efficiency without requiring an obtrusive footprint at the surface.
Photo of the Project Area before Construction at Newell and Vale Streets, Looking West
Upon completion, this green street project will capture nearly 91,000 gallons of stormwater runoff annually.
Version 6/27/2016
Map of the Green Street Project Area
Project: Project Owner: GI Technologies: Project Locations:
FACT SHEET Green Streets in CSO 060/077 Sewershed Project Description: The Green Streets Project in CSO 060/077 is a comprehensive green street application located on multiple streets within the CSO Sewershed: 060/077 sewershed. CSO 060/077 is a high priority CSO: sewershed that discharges frequently during rain Capture Area : events. The candidates streets are listed below with Runoff Reduction: capture area and runoff reduction estimates: Bid Price: Ackerman Avenue (Summer 2016) Year Contracted: Capture Area: 462,636 sq. ft. Contractors: Runoff Reduction: 4,230,000 gal/yr Lancaster Avenue (Summer 2016) Project Locations Capture Area: 486,474 sq. ft. Runoff Reduction: 4,730,000 gal/yr in Red Boxes McKinley Avenue (Fall 2016) Capture Area: 136,508 sq. ft. Runoff Reduction: 1,150,000 gal/yr Roney Lane (2017) Capture Area: 121,303 sq. ft. Runoff Reduction: 1,190,000 gal/yr East Colvin Street (2017) CA: 105,790 sq. ft. Runoff Reduction: 920,000 gal/yr Comstock Avenue (2017) Capture Area: 807,144 sq. ft. Runoff Reduction: 3,700,000 gal/yr
Green Streets in CSO 060/077 Onondaga County Bioretention, Bioswales, Infiltration Trenches McKinley Ave. between S. Salina St. and S. State St. Rony Ln. at Smith Ln. E Colvin St. between Benedict Ave. and I-81. Comstock Ave. between E. Colvin St. and Euclid Ave. Ackerman Ave between Euclid and Kensington Lancaster Ave. between Euclid and Kensington Midland 060/077 2,119,855 sq. ft. (total, all areas) 15,920,000 gal/year (total) TBD Estimated 2016 TBD
In 2016, three candidates will proceed to construction. This project is intended to demonstrate green infrastructure applications at key points along these streets in order to capture stormwater and enhance local urban streetscapes. The project is proposed to incorporate street tree plantings in the right-of-way, the installation of infiltration trenches underneath the roadway, tree planters, and rain gardens and bioretention areas throughout the project boundaries. Version 6/17/2016
Example Infiltration Trench
Project: Project Owner: Project Location:
FACT SHEET Road Reconstruction: West Colvin Street
Sewershed: CSO: GI Technology: Capture Area: Runoff Reduction: Year Contracted: Construction Cost: Prime Contractor:
West Colvin St. Road Reconstruction City of Syracuse West Colvin St. (Wellesley Ave. to Columbia Ave.) Midland 052 Underground Infiltration Trench 13,360 sq. ft. 236,000 gal/yr 2016 $92,680.20 DE Tarolli
Project Description: The West Colvin Street Road Reconstruction Project exemplifies the continued partnership between the City of Syracuse and Onondaga County through the Save the Rain Program. The City of Syracuse will be reconstructing West Colvin Street along the project limits in 2016 and Onondaga County partnered with the City to construct an underground infiltration trench system prior to the City’s reconstruction efforts. This project will be constructed by the County’s green infrastructure term Contractor. A four foot deep underground infiltration trench Example Underground Infiltration Trench spanning the length of West Colvin Street between (Richmond Avenue) Wellesley Avenue and Columbia Avenue will be constructed in July 2016. The trench will be located on the south half of the street to avoid conflicts with water and electrical utilities on the north half of the street. Being completely underground, the infiltration trench system provides a very high capture volume without requiring any obtrusive footprint at the surface. Stormwater runoff will be conveyed to the infiltration trench through new and existing street catch basins. This project will capture approximately 236,000 gallons of stormwater runoff annually.
Drainage Areas (in pink) Captured by the West Colvin Street Road Reconstruction Project Version 6/28/16
Project: Project Owner: GI Technology: Project Location:
FACT SHEET State Street Green Corridor
Sewershed: CSO: Capture Area: Run-off Reduction: Bid Price: Year Contracted: Contractors:
State Street Green Corridor Onondaga County Bioretention, Bioswales, Porous Paver Parking Areas State Street Corridor between Taylor St. and N. Salina St. Clinton/Lower MIS 021, 027, 034, 080A 465,015 sq. ft. 3,300,000 gal/yr TBD Summer 2016 D.E. Tarolli, J&J Landscaping
Project Description: The State Street Green Corridor project is a comprehensive green street application located on South State Street between Burt Street and East Adams Street, between East Fayette Street and East Water Street and along North State Street between James Street and North Salina Street. This project will demonstrate green infrastructure applications at key points along the State Street corridor to capture stormwater and enhance the urban streetscape in this area. The project will incorporate enhanced tree plantings in the right-of-way, the installation of porous pavers in parking lanes, the use of infiltration trenches and planters, and bioretention measures and landscape features throughout project boundaries along the State Street corridor. Additionally, parking bump-outs will be installed at key intersections to enhance the pedestrian space in those areas and provide greater definition of parking lanes. This project will be funded in part by the NYSDEC through their Water Quality Improvement Project (WQIP) Program. In 2015, the County received a WQIP grant of $1.8 million for the project.
Example of Porous Pavers to be Installed Along State Street
Project Locations in Red Boxes
Version 6/17/2016
FACT SHEET Vacant Lot at 621 W. Newell Street Project Description: This project will be one of two Save the Rain projects on West Newell Street. Previously, the existing lot was taken into ownership by the City of Syracuse in the year 2000. The lot has remained vacant and the site contains good soil, ideal for infiltration practices. A unique facet of this project is that the site is located approximately three hundred feet from Onondaga Creek and just down the road (approximately three and a half blocks) from McKinley Park, where another Save the Rain project will be constructed. The green infrastructure technologies included with this project include a bioretention area. The bioretention area is located towards the middle to back area of the vacant lot parcel and is designed to capture stormwater from West Newell Street; taking stormwater from existing drainage structures on West Newell Street from Vale Street to Baldwin Avenue. The bioretention area will be planted with native vegetation and it will serve as a form of community beautification. In total, the bioretention basin will capture approximately 160,000 gallons of stormwater annually. Upon completion of the project in 2017, all runoff from this 1 block stretch of road on West Newell Street will be drained into green infrastructure, instead of the sewer system.
Project: Project Owner: Project Location: Sewershed: CSO: GI Technology: Capture Area: Runoff Reduction: Year Contracted: Bid Price: Contractors:
CSO 067 Vacant Lot City of Syracuse, SCSD 621 West Newell Street Midland 067 Bioretention 17,500 sq. ft. 160,000 gal/yr 2017 TBD TBD
Existing Conditions at Vacant Lot 621 West Newell Street
Existing Conditions at Vacant Lot 621 West Newell Street
Version 6/17/16
GREEN IMPROVEMENT FUND
Green Improvement Fund Update The second quarter of 2016 saw the progression of several Green Improvement Fund (GIF) projects into the award and implementation phases. In total, 15 projects were approved for by the GIF Review Committee to proceed to the award phase during the second quarter, with construction expected to be complete by the end of 2017. One previously awarded project, GIF#130: St. Joseph’s Hospital (301 Prospect Avenue) was completed during the second quarter. Another project, GIF#110: RJ Westcott, (522 Westcott Street) began construction during the second quarter with completion expected in the third quarter. Additionally, the 2016 GIF Program application period opened on May 26, 2016 with an updated priority map (below) based on the 2015 SWMM model calibration. The application period will remain open through December 16, 2016. No new applications were received during the second quarter.
Green Improvement Fund Summary (as of 6/30/16) Projects Completed
82
Contract/Implementation Phase
33
Projects in Award Phase
3
Applications Under Review
2
Inactive/Ineligible
34
Total Applications Received
154
Project:
FACT SHEET Green Improvement Fund: St. Joseph’s Hospital (301 Prospect Ave.)
Project Owner: Project Location: Sewershed: CSO: GI Technology: Capture Area: Runoff Reduction: Year Completed: GIF Award:
St. Joseph’s Hospital (301 Prospect Ave.) Private 301 Prospect Ave. Clinton 020 Cistern/Slow Release 40,500 sq. ft. 713,300 gal/yr 2016 $145,900
Project Description: The 301 Prospect Avenue parking lot project is the second of two Green Improvement Fund (GIF) projects undertaken by St. Joseph’s Hospital to date. St. Joseph’s Hospital has been providing services to patients throughout the City of Syracuse since 1869. This GIF project consists installing a cistern and slow release system beneath a reconstructed parking lot to capture runoff form the parking lot and adjacent buildings. The cistern system is a series of underground storage and infiltration chambers. Due to poor infiltration, the system was designed to slowly release the captured stormwater back to the sewer after rain events have ended. Runoff from the roof of adjacent buildings was replumbed into the cistern system to maximize the stormwater capture to the greatest extent. Construction of the project began in 2015 and was completed in 2016.
Installation of Underground Cistern/Chamber System
Approximately 40,500 square feet of impervious drainage area is managed by this green infrastructure project, capturing a total of approximately 713,300 gallons of stormwater runoff each year. Version 6/28/16
Building Roof Leader Disconnection and Plumbing to the Green Infrastructure System
METRO WWTP PHOSPHORUS PROJECTS /TMDL/AMBIENT MONITORING PROGRAM UPDATE
ACJ Quarterly Status Report – 2nd Quarter 2016 Metro WWTP Projects Metro WWTP Phosphorus Optimization Project This project is currently in the design phase by GHD Consulting Engineers. The Basis of Design has been completed and submitted for regulatory review. Project construction is expected to be completed in 2019.
Ambient Monitoring Program (AMP) Water Quality Monitoring Program Tributary Bacteria Compliance Summary (Second Quarter 2016) As per the 2016 AMP Sampling Work Plan, five (5) Fecal Coliform samples per month at the AMP Tributary sampling sites are limited during the April to October disinfection period, and therefore Fecal Coliform compliance was not assessed for the months of February & March 2016. Table 1 below summarizes the results of the bacteria compliance assessment for samples collected during the April 2016 Tributary sampling events.
Table 1: AMP Tributary Bacteria Monthly Compliance Assessment1 (April 2016) Sampling Site Harbor Brook Velasko Road Hiawatha Boulevard Onondaga Creek Tully Farms Road Dorwin Avenue Kirkpatrick Street Ley Creek at Park Street Ninemile Creek at Lakeland (Route 48) Bloody Brook at Onondaga Lake Parkway Tributary 5a at State Fair Boulevard Sawmill Creek at Onondaga Lake Recreational Trail
√ x √ √ √ √ √ √ √ √
1
Compliance assessed with the applicable NYS Ambient Water Quality Standard (AWQS) for Fecal Coliform bacteria in the surface water as set forth in 6NYCRR Part 703.4 as follows: “The monthly mean geometric mean, from a minimum of five examinations, shall not exceed 200.”
Tributary Sampling Event Summary (Second Quarter 2016) April 2016: Tributary Bacteria sampling events: April 4, April 7, April 18 and April 21
Tributary Biweekly sampling events: April 12 and April 26
May 2016: Tributary Bacteria sampling events: May 2, May 9 and May 19 Tributary Biweekly sampling event: May 24 Tributary High Flow sampling event: May 3 June 2016: Tributary Bacteria sampling event: June 2, June 6, June 13 and June 20 Tributary Biweekly sampling event: June 28 Tributary Quarterly (High Flow) sampling event: June 14
Onondaga Lake Sampling Event Summary (Second Quarter 2016) April 2016: Lake Weekly sampling events: April 11, April 14, April 27 and April 28 Lake Biweekly sampling events: April 19 Lake Quarterly sampling event: April 6 May 2016: Lake Weekly sampling events: May 5, May 12 and 23 Lake Biweekly sampling event: May 10 and 17 June 2016: Lake Weekly sampling events: June 9, 16 and 27 Lake Biweekly sampling event: June 8 Lake Quarterly sampling event: June 21
Onondaga Lake Phosphorus (2016 to-date) The AMP tracks the summer average total phosphorus (TP) concentration in the lake’s upper waters. New York State has promulgated a narrative standard for phosphorus in water: “None in amounts that will result in growths of algae, weeds and slimes that will impair the waters for their best usages” (NYSCRR §703.2). For ponded waters the narrative standard is interpreted using a guidance value of 20 μg/L calculated as the average total phosphorus concentration in the lake’s upper waters between June 1 and September 30. This number was developed from statistical analysis of surveys of lake users conducted throughout New York State as to their perception of the suitability of specific waterbodies for swimming and other forms of contact recreation (Kishbaugh, 1994). The total maximum daily load TMDL target is a numeric endpoint that ensures protection of the designated best uses of a water body. The phosphorus TMDL was approved by USEPA on June 29, 2012. The ultimate measure of the success of the Onondaga Lake Phosphorus TMDL is the extent to which the in-lake total phosphorus criteria and beneficial uses are achieved.
Comparisons to Other Regional Lakes Advanced wastewater treatment has resulted in major decreases in total phosphorus and chlorophyll-a levels in Onondaga Lake. A comparison of total phosphorus and chlorophyll-a conditions in Onondaga Lake to other regional lakes provides context for the magnitude of the water quality improvements that have been achieved. During the 1998–2005 interval total phosphorus and chlorophyll-a levels in Onondaga Lake far exceeded those measured in some of the eastern Finger Lakes and Oneida Lake. Since 2007, levels of these important water quality indicators have been similar to those measured in Otisco Lake and Oneida Lake. The absence of blue-green algal blooms in Onondaga Lake stands in contrast to the widespread occurrence of harmful algal blooms in lakes across New York State http://www.dec.ny.gov/chemical/83310.html
BIOLOGICAL MONITORING PROGRAM Sampling Summary (June)  Completed alewife hyroacoustic survey on June 23.  Completed first larval fish sampling event on June 23.  Nesting Survey tentatively scheduled on June 30.
Onondaga Lake Larval Fish Larval fish can best be described as those fish that have not yet developed characteristics found in adult fish. The fins may not be fully developed, scales will not be present and fish movement will be limited. Fish eggs and larvae start life as relatively rare components of aquatic food webs but become increasingly dominant as they develop from lower to upper trophic levels. In most species, biomass initially declines as a result of high mortality rates but eventually increases as growth rates surpass losses (Spotte 2007)1. Larval fish are found in a variety of habitats; some species such as bluegill upon hatching will reside in the open waters for the first few days of life then return to the shallow water areas and develop into juveniles. Species which receive parental protection, such as bowfin and largemouth bass, tend to remain in the shallow water areas their entire life. The larval life stage is the most vulnerable to different types of stresses, water quality, predation and competition all of which affect larval growth and survival. Annual recruitment variability of fishes is often significantly affected by survival during the larval phase. Cumulative larval mortality can be 99% or more, and relatively minor changes in this value can translate to large differences in the size of an annual cohort of adult fish (Steinhart 2004)2. Some species including gizzard, alewife, and round goby
have been documented, when in large numbers, to significantly reduce larval fish abundance especially the members of the sunfish family. Domestic and industrial waste inputs can also reduce the standing crop of larval fish in an aquatic system. In particular elevated levels of ammonia are detrimental to larval fish. Additionally, several studies have found that larval fish exposed to microplastic particles during development displayed changed behaviors and stunted growth which lead to greatly increased mortality rates. The researchers discovered that larval perch which had access to microplastic particles only ate plastic and ignored their natural food source of free-swimming zooplankton (Lonnstedt 2016)3. As the water quality and habitats of Onondaga Lake continue to improves, larval fish populations should reflect these improvements through increases in population size and species diversity and the subsequent recruitment to adult stocks. References 1 Spotte, S. 2007. Bluegills: biology and behavior. American Fisheries Society, Bethesda Maryland. 2 Steinhart, G. B., Stein, R. A., and Marschall, E. A. 2004. High Growth Rate of Young-of-the-year Smallmouth Bass in Lake Erie: a Result of the Round Goby Invasion? International Association for Great Lakes Research. 30(3):381–389 3 O. M. Lonnstedt, P. Eklov. Environmentally relevant concentrations of microplastic particles influence larval fish ecology. Science, 2016; 352.
Collecting larval fish from Onondaga Lake
Bluegill nest in Onondaga Lake (larval bluegill will remain in nest after hatching for several days).
Larval Yellow Perch
LEGISLATIVE /REGULATORY / MEDIA UPDATE
Legislative/Regulatory Update Action Items for the County Legislature (April – June)
Approving Various Energy Conservation Projects to benefit the Onondaga County Sanitary District.
Bond Resolution – Authorizing the Issuance of $10,300,000 Serial Bonds of the County of Onondaga to Pay the Cost of Various Energy Conservation projects to benefit the Onondaga County Sanitary District.
Calling a Public Hearing in Connection with Proposed Improvements for the Onondaga County Sanitary District (Westside Pump Station).
Approving Proposed Improvements to the Onondaga County Sanitary District Consisting of the Rehabilitation of the Westside Pump Station.
Bond Resolution – Authorizing the Issuance of $13,700,000 Serial Bonds of the County of Onondaga to Pay the Cost of Improvements for the Onondaga County Sanitary District Consisting of the Rehabilitation of the Westside Pump Station.
Amending the Onondaga County Budget to Make Available Funds in Support of the Westside Pump Station Improvement Project ($2,850,000).
Action Items for the Environmental Protection Committee (June)
None to Report.
Onondaga Lake's rebirth will be celebrated with a regatta this summer
Syracuse, N.Y. -- For more than 40 years, summer meant a regatta on Onondaga Lake. That tradition stopped in the late 1990s, but it's on a comeback this year. The Onondaga Cup & Lakefest will be July 16 at Willow Bay on the lake. The festival will include a regatta, and then some. There will be races, competitions, food, drink, music and a final race at night under the lights. Syracuse Media Group, in partnership with the Syracuse CHARGERS, is producing the regatta, with support from several community sponsors.
http://www.syracuse.com/entertainment/index.ssf/2016/04/onondaga_lakes_rebirth_will_be_celebrated_w ith_a_regatta_this_summer.html
"The rebirth of Onondaga Lake is one of the great stories in Central New York," said Tim Kennedy, Syracuse Media Group president. "This regatta will be a summer tradition that we will promote across Upstate New York." There will be corporate rowing competitions and individual races for paddleboarders and kayakers. The day will include competition among 32 corporate rowing teams and 50 kayakers and paddleboarders. The finalists will race in the evening under the lights. While the festival will be free, there will be a ticketed event at the finish line that will include a clambake dinner, wine tastings, cooking and cocktail making demonstrations. Crew teams will be from the Syracuse CHARGERS seven-week corporate rowing league, which runs from the end of May through the middle of July. For more information visit the event's website: http://www.onondagalakefest.com/
http://www.syracuse.com/entertainment/index.ssf/2016/04/onondaga_lakes_rebirth_will_be_celebrated_w ith_a_regatta_this_summer.html
Let public use all of Onondaga Lake shore, county asks Honeywell, NY state
Syracuse, N.Y. -- Onondaga County, which already owns 90 percent of the Onondaga Lake shoreline, is asking other landowners to make the entire lake shore public. The county wants Honeywell, the state of New York and others to give permanent rights for the public to use their land along the lake, much of which is now clean enough for swimming. "This could truly be a fully public lake," said county legislator Mike Plochocki, RMarcellus, chairman of the Environmental Protection Committee. "Because the county http://www.syracuse.com/news/index.ssf/2016/04/onondaga_county_make_entire_onondaga_lake_shore line_open_to_public.html
already owns well over 90 percent, it's not that far of a leap from where we are to make the entire shore accessible to the public." The committee on Wednesday will consider a nonbinding resolution that asks Honeywell and the state Department of Transportation to grant public easements. Honeywell and the state would still own the land but allow the public to use it. In e-mailed statements to Syracuse.com, representatives for Honeywell and the DOT were noncommittal. DOT regional spokesman Gene Cilento said that if the department receives a formal request from the county, "we will look into the matter and make a determination then." Honeywell spokeswoman Victoria Streitfeld said the company already allows public access for the county bike trail and has an "ongoing dialogue with Onondaga County officials and the community" on uses of its land. Onondaga Lake, once considered America's most polluted, has undergone a more than $1 billion cleanup by the county and Honeywell. The county built a $50 million amphitheater on the west shore, and plans to study building a beach at Willow Bay. Tests show that the northern portion of the lake meets state standards for swimming.
http://www.syracuse.com/news/index.ssf/2016/04/onondaga_county_make_entire_onondaga_lake_shore line_open_to_public.html
Onondaga County officials to discuss public use of Onondaga Lake
Syracuse, N.Y. -- Onondaga County officials will speak Friday morning about public use of Onondaga Lake. Environment Director Travis Glazier and parks Commissioner Bill Lansley will speak at a meeting of FOCUS Greater Syracuse. The meeting runs from 7:30 to 8:45 a.m. at the City Hall Commons atrium, 201 E. Washington St. The group issued a report in 2012 calling for the lake to kept public. Onondaga County owns more than 90 percent of the shoreline of the lake. The county Legislature is asking Honeywell, the state and other property owners along the lake to open their land to the public. The county has spent about $700 million to reduce bacteria in the lake and make it safe again for swimming. The county also built the $50 million Lakeview Amphitheater and plans to add docks and eventually extend a bike trail around the entire perimeter of the lake.
http://www.syracuse.com/news/index.ssf/2016/04/post_1182.html
ESF Hosts Photo Exhibit of Migratory Birds along Onondaga Lake Display sponsored by Onondaga Lake Conservation Corps, Audubon New York, Honeywell 4/14/2016
The Central New York community has a second opportunity - on Earth Day - to see local wildlife photographers' stunning images of migratory birds taken along the Onondaga Lake shoreline. An exhibit titled "Onondaga Lake: An Important Stop for Birds on an Impressive Journey" will be on display 6 to 7 p.m. Friday, April 22, at the SUNY College of Environmental Science and Forestry. The exhibit, which debuted earlier this month, is sponsored by the Onondaga Lake Conservation Corps in partnership with Audubon New York and Honeywell. The exhibit is free and open to the public, and will take place in the Gateway Center on the ESF campus. Fifteen photos from the original, larger exhibit will be on display. Several of the photographers will be on hand to greet visitors and talk about their work. Following the exhibit, ESF will host the third event in its Moonlighting Discourse Series: "Ethics and Earth Day: Finding Environmental Justice in a Complex World." Moonlighting is hosted by ESF President Quentin Wheeler. Joining him for this discussion will be Sanjit "Bunker" Roy, the founder of the internationally acclaimed Barefoot College in India; Meagan Fallone, CEO of Barefoot College International; and Dr. Samuel Gorovitz, a professor of philosophy at Syracuse University and a leader in the development of medical ethics. The photo exhibit was first on display April 2 and 3 at Honeywell's Onondaga Lake Visitors Center.
http://www.esf.edu/communications/view.asp?newsID=4212
"Onondaga Lake was named an important bird area because it provides critical habitat for migratory and overwintering species of the Atlantic Flyway," said Erin Crotty, executive director of Audubon New York. "Thanks to the cleanup and restoration efforts of Onondaga County, Honeywell, the Onondaga Lake Conservation Corps, and the Syracuse community, a variety of bird species can once again depend on Onondaga Lake for year-round nesting, breeding and stopover habitat. Thank you to the event photographers for sharing their talents with us and allowing us to showcase the significant role Onondaga Lake plays in the Atlantic Flyway." Onondaga Lake is a priority Audubon Important Bird Area (IBA) and a vital stop for migratory birds along the Atlantic Flyway. Flyways are the general pathways that birds use to migrate each year between their breeding and wintering areas, including the places where they stop to rest and forage (or refuel) on the way. The Atlantic Flyway follows the Atlantic Coast and the Appalachian Mountains and encompasses some of the hemisphere's most productive ecosystems, including forests, beaches, and coastal wetlands. The Atlantic Flyway is home to a wide variety of ecosystems and more than one-third of the human population of the United States. Onondaga Lake became an IBA in 1998 and was subsequently adopted by Honeywell, Montezuma Audubon Center, and Onondaga Audubon Society because of its value to waterfowl and bald eagles during the winter months, to connecting local communities to the importance of stewardship, and to improving the quality of habitat for birds and other wildlife. The IBA program serves as a catalyst for achieving bird conservation. As part of the Onondaga Lake cleanup, Honeywell is planting about 1.1 million plants, shrubs, and trees in the Onondaga Lake watershed. To date, more than 50 acres of wetlands have been restored and more than 170 species of birds, fish, and other wildlife have returned to restored habitat near the lake. More than 85 unique bird species have been identified in and around Onondaga Lake, including several species categorized as threatened or of special interest in New York State. Pied-billed grebe, northern harrier, and bald eagle are among the notable bird species that have returned.
http://www.esf.edu/communications/view.asp?newsID=4212
Tree-planting at Onondaga Lake Park will replace ash trees killed by borer
Syracuse, N.Y. - A tree-planting in Onondaga Lake Park Thursday will help replace ash trees cut down because of the invasion of the emerald ash borer. Several groups will plant 125 trees in the park from 9:30 a.m. to 2 p.m. Registration begins at 9:30 a.m. with a tree-planting demonstration. Anyone wishing to volunteer should meet at the Griffin Visitor Center, 6790 Onondaga Lake Parkway. Lunch will be provided. To registration before the event, call Kat Korba at 424-9485, ext. 230, or send an email to kk569@cornell.edu. You can also register online. http://www.syracuse.com/news/index.ssf/2016/05/treeplanting_at_onondaga_lake_park_will_replace_ash_trees_killed_by_borer.html
Running the event are Onondaga County, the Onondaga County Soil and Water District, and Cooperative Extension of Onondaga County. The county plans to cut down 44,000 ash trees on county property, including the park, as the emerald ash borer makes its way through Central New York. Soil and water district officials are also trying to save some larger shade ash trees with inoculations of pesticides.
http://www.syracuse.com/news/index.ssf/2016/05/treeplanting_at_onondaga_lake_park_will_replace_ash_trees_killed_by_borer.html
These tree planters have a stake in America's future
Syracuse, NY-- Over 30 student members from the Future Farmers of America, from around the state, practiced a "day of service" at the Earth Day Tree Planting Event held at Onondaga Lake Park on Thursday. The students were in Syracuse for their FAA State Convention. Their ages ranged from 7-12. The students joined volunteers from the community, Cornell Cooperative Extension, Onondaga County employees, including Soil and Water Conservation. They planted 125 bare root trees in Onondaga Lake Park in an effort to restore the canopy impacted by the emerald ash borer. http://www.syracuse.com/living/index.ssf/2016/05/these_planters_have_a_stake_in_americas_future.html
Onondaga County partnered with Onondaga County Soil and Water Conservation and CCE Onondaga to organize the tree planting event to replace the ash trees lost due to EAB.
http://www.syracuse.com/living/index.ssf/2016/05/these_planters_have_a_stake_in_americas_future.html
e. tur Fu
On on da
le
orner for a Sus ty’s C n u tai Co na a b g
Fact Of The Month Using compost in your garden grows
Onondaga County Connect the Drops Earth Day Clean Up along a section of Onondaga Lake Parkway. All of the trash collected went to the annual OCRRA Earth Day cleanup goal.
healthier plants and reduces the need to water. Get OCRRA’s top quality, US Composting Council certified compost and help “save the world a little each
green infrastructure! Check out the list of
day!” Arc of Onondaga is now bagging
retail locations here:
OCRRA’s premium compost and it is
www.tinyurl.com/OCRRAretail
for sale at over thirty local retailers.
Staff from one of the local garden centers
Buy local and support our community’s
that sells OCRRA Compost by the bag (Ballantyne Gardens in Liverpool). Ballantyne Gardens is one of more than 30 retailers in our area that sell OCRRA’s ready-to-use bagged product, which is certified by the US Composting Council.
ONONDAGA COUNTY COMMUNICATOR
3
EPA Grant to Syracuse University Project Educates Local Teachers and Students about the Traditions and Future of the Onondaga Lake Watershed June 2, 2016 The U.S. Environmental Protection Agency awarded a $91,000 environmental education grant to Syracuse University for an education outreach project focused on Onondaga Lake. The project will include both traditional customs in partnership with the Onondaga Nation and science to educate Central New York teachers about species and landscapes native to the Onondaga Lake watershed. “Syracuse University is combining traditional Native American customs and scientific advancement in a unique way,” said Judith A. Enck, EPA Regional Administrator. “The teachers involved in this project will educate hundreds of local Syracuse students about the past, present and future of the Onondaga Lake watershed.” Through this project, Syracuse University is developing educational materials and tools that allow students of various ages to explore and learn about the watershed. Weaved into the curriculum materials is the Haudenosaunee Thanksgiving Address, which is an expression of Haudenosaunee perspectives. As part of the grant project, a summer workshop will be held for Central New York teachers. Syracuse University was one of three recipients to receive the 2015 round of environmental education grants from EPA Region 2, which is responsible for New York, New Jersey, Puerto Rico, the U.S. Virgin Islands and eight Indian Nations. A total of $222,000 was awarded in EPA Region 2 for the three grants and funding nationwide for this round of grants totaled more than $3.3 million. Nationally, EPA funded 35 grants from organizations in 26 states for the 2015 Environmental Education Grants. Since 1992, EPA has distributed approximately $68 million supporting more than 3,600 projects. This competitive grants program supports environmental education projects that increase public awareness about environmental issues and provide participants with the skills to take responsible actions to protect the environment. For more information on the new awardees and on how to apply for future environmental education grant competitions, please visit http://www2.epa.gov/education/environmental-education-ee-grants.
http://madisoncountycourier.com/?p=69442
'World's Largest Rubber Duck' coming to Syracuse for Onondaga Lake regatta
Syracuse, N.Y. -- The self-styled "World's Largest Rubber Duck" will float on Onondaga Lake this summer as part of the first Onondaga Cup & LakeFest. The duck weighs 11 tons and is 61 feet high when inflated. It has appeared in water festivals from Los Angeles to Long Island. The July 16 regatta is co-sponsored by Syracuse Media Group and the Syracuse CHARGERS rowing club. The duck's appearance is sponsored by Tarson Pools and Spas. The duck is the brainchild of Craig Samborski, who is the executive producer of Tall Ships Duluth in his native Minnesota. He told the Minneapolis Star-Tribune he came up with the idea to promote a similar event in Los Angeles.
http://www.syracuse.com/weather/index.ssf/2016/06/worlds_largest_rubber_duck_coming_to_syracuse_f or_onondaga_lake_regatta.html
"I knew it was going to be either really smart or really dumb, and thank goodness it worked out to be really smart," Samborski said. The Duluth tall ships web page notes that the duck is "is not available to ride." Can't wait until July to see the duck? You can follow its public figure Facebook page. The daylong regatta will be at Willow Bay and feature 24 corporate sponsored rowing teams and 50 independent kayakers and paddleboarders. The final races will be run at night, under lights. "The rebirth of Onondaga Lake is one of the great stories in Central New York," said Tim Kennedy, Syracuse Media Group president, in a statement. "This regatta will be a summer tradition that we will promote across Upstate New York." Onondaga Lake, once considered among America's most polluted, has undergone a cleanup that has cost Onondaga County and Honeywell more than $1 billion combined.
http://www.syracuse.com/weather/index.ssf/2016/06/worlds_largest_rubber_duck_coming_to_syracuse_f or_onondaga_lake_regatta.html
Syracuse City Students Get Their Feet Wet in Nature in the City Water Quality Lessons With Support from Onondaga County Save the Rain May 15, 2016 This spring, hundreds of third-grade students from the Syracuse City School District will wade into Furnace Brook at Elmwood Park in search of crayfish, dragonfly larva, and other aquatic macroinvertebrates as part of their Nature in the City lessons about water quality. Funded in part through a grant from Onondaga County’s Save the Rain Program, this hands-on program is one component of Baltimore Woods Nature Center’s Nature in the City program, a K-6 science education program that links 19 Syracuse city schools with local parks and green spaces, connecting children to science in their own neighborhoods. Onondaga County’s Save the Rain Program has partnered with Baltimore Woods Nature Center for 6 years to teach 3rd grade children about the water cycle, pollution, storm runoff and how Onondaga County uses green infrastructure projects to keep Onondaga Lake clean. The grant from Save the Rain includes three, one-hour long lessons that align with the New York State science curriculum. The Save the Rain Program is Onondaga County Executive Joanie Mahoney’s award-winning initiative to improve the water quality of Onondaga Lake and its tributaries. To date, the County has advanced more than 180 distinct green infrastructure projects, on public and private property. Onondaga County is a national model for the implementation of a balanced approach to storm water management – a combination of smart gray investments with innovative green infrastructure solutions. Onondaga Lake has seen tremendous improvement in water quality and the ecosystem is thriving. In addition to program funding, Onondaga County Save the Rain has developed Green Infrastructure projects at or near local schools to show children successful examples of green infrastructure, such as rain gardens and porous pavement, and their impacts on water quality. In the parking lot at White Branch Library, students see green infrastructure in action as they pour water on both gray asphalt and newer, porous pavement and compare the resulting run-off effects.
http://madisoncountycourier.com/?p=68502
For these Syracuse City school students, instilling a love of science opens their eyes not only to the natural world in their neighborhoods but also exposes them to a wide range of science-related career fields. According to one teacher, “Our third-grade students love getting outside and feeling like they are contributing to actual science information gathering.” In order to continually improve the quality of the Nature in the City programs as well as assess students’ gains in scientific knowledge, Baltimore Woods educators administer pre and post assessments in different grade levels each year. During the 2014-2015 school year, third grade students were assessed and the outcomes were impressive: Third graders in the Syracuse City School District increased their scientific knowledge an average of 60% from pre to post instruction, higher than any of the other
evaluated grades 90% of the schools showed a significant increase between pre and post assessment scores ESL students showed a significantly higher jump between pre and post scores than non-ESL students.
Nature in the City is a successful working example of a partnership between public, private and non-for-profit sectors of the community. The Syracuse City School District funds a portion through annual budgeting and Onondaga County’s Save the Rain initiative supports the 3rd grade lessons in 11 of the 19 Syracuse City School District elementary schools. Local corporations with a vested interest in promoting STEM education sponsor individual schools each year. Corporate and foundation sponsors for the current 2015/16 school year include: National Grid, SRC, Key Bank, Carrier, Lockheed Martin, Byrne Dairy, O’Brien and Gere, The Jim and Juli Boeheim Foundation, Dominion, Upstate Medical University, Price Chopper’s Golub Foundation, Lockheed Martin Employee Federated Fund, Mohawk Global Logistics, Le Moyne College of Arts & Sciences, The Madden School of Business, First Niagara Bank, Daemon Barclay, and Time Warner Cable’s Connect a Million Minds. Baltimore Woods Nature Center and its certified educators implement the program.
http://madisoncountycourier.com/?p=68502
http://www.currentcast.org/stormwater-management/from-vacant-lot-to-rain-garden-plot/
Go fish! 30th annual Family Fun Fishing Day to be held June 26 By Ashley M. Casey June 23, 2016 While the jury is still out on whether Onondaga Lake is ready for swimmers, budding fishers can get their feet — or their fishing rods — wet at this weekend‟s Family Fun Fishing Day. Hosted by the Central New York Chapter of the Izaak Walton League in conjunction with New York State Free Fishing Day, Family Fun Fishing Day celebrates its 30th annual event this Sunday, June 26, at Willow Bay. Fishers of all ages can vie for prizes at Sunday‟s catch-and-release event without having to sign up for a fishing license. Families can participate in a “Learn to Fish” session before the Family Fun Fishing Derby, while more experienced anglers can compete in the Carp Fishing Tournament. “Exactly 30 years ago, the CNY chapter of the Izaak Walton League decided it would be a very good idea for the community to reconnect to Onondaga Lake as a resource for recreation and fishing,” said event organizer Al Daher. “They figured, „Hey, let‟s give Onondaga Lake a face lift.‟” Daher, who co-owns Mickey‟s Bait and Tackle in North Syracuse, said while a return to swimming in Onondaga Lake won‟t happen overnight, the lake is getting healthier. “Twenty-five years ago you could count the number of fish [species] surviving in Onondaga Lake on one hand,” he said, adding that more than 60 species can be found in the lake today. “It‟s getting cleaner, the plant life is coming back, the oxygen levels are increasing,” Daher said. “The water is getting clearer; it doesn‟t stink like it used to.” Kids who participate in the Family Fun Fishing Derby will be entered into a lottery for prizes, so no one should go home empty-handed. “Prizes and awards are not based on how many fish you catch or what kind of fish,” Daher said. “We eliminated that competitive component and it‟s really worked out — especially for the fish.” Carp fishers can win prizes at the tournament as well. In both the derby and the tournament, fish must be alive and unharmed to be weighed and measured, and they must be released immediately afterward.
http://www.eaglenewsonline.com/news/2016/06/23/go-fish-30th-annual-family-fun-fishing-day-to-be-heldjune-26
Daher said Family Fun Fishing Day is an opportunity for families to “enjoy the outdoors, get these kids away from these damn handheld objects … [and] teach them where their food comes from.” The Family Fun Fishing Derby gives families a chance to connect with nature and learn about the lake‟s recovery. “I think they learn that Onondaga Lake‟s not really a bad place and it‟s been getting a bad rap. They see the progress that‟s being made and it restores their faith. It‟s like a pride thing in the community,” Daher said. “I think maybe not our generation but certainly the next generation are going to see some amazing achievements.”
http://www.eaglenewsonline.com/news/2016/06/23/go-fish-30th-annual-family-fun-fishing-day-to-be-heldjune-26
Rain-activated sidewalk art around Syracuse for environmental awareness campaign
June 27, 2016 SYRACUSE, N.Y. (WSYR-TV) The next time it rains, look down. Rain-activated sidewalk art is all a part of Onondaga County's Save The Rain "Connect the Drops" initiative. It’s meant to educate community members about the connection between littering, stormwater and the cleanliness of our lakes and water system. “All too often, things that actually get into the street find their way to our water bodies, so what we're really trying to do, we have this great campaign so every time it rains, you'll see these images appear reminding the community to keep litter out of the forecast,” said Tom Rhoads, Commissioner of the Department of Water/Environment Protection. Messages will be strategically located across the city all summer long. If you find one, post a picture to social media using the hashtag "Connect The Drops."
http://www.localsyr.com/news/rain-activated-sidewalk-art-around-syracuse-for-environmentalawareness-campaign
Special sidewalk art only shows up when it's wet, reminds you not to litter
June 30, 2016 SYRACUSE, N.Y. -- The next time it rains take a look down at the sidewalk if you're walking through downtown Syracuse. Onondaga County is unveiling new sidewalk street art to encourage you to protect the environment and stop littering. County leaders gave us a sneak peak of what you'll see Thursday. The new sidewalk street art will only be visible in the rain and will last for a few months. The rain-activated art was recently engraved in three spots around the OnCenter, with the goal of reducing litter in our community. County leaders say every time it rains, litter in the street gets washed into the local sewer system. That litter can clog up the water treatment plant and flow directly into local streams and Onondaga Lake. They hope the art will serve as a friendly reminder to throw away trash and keep it off the street. The non-toxic art is biodegradable and environmentally friendly. It's part of the county's Save the Rain initiative.
http://cnycentral.com/news/local/special-sidewalk-art-only-shows-up-when-its-wet-reminds-younot-to-litter
FINANCIAL UPDATE
Financial Update Contracts New Contracts
Suburban Green Infrastructure Program Contract with the Town of Camillus for reimbursement of green infrastructure improvements for the Park Way and Sawyer Street projects. Contract Amount: $200,000. Executed: 3/30/16. Suburban Green Infrastructure Program Contract with the Town of Geddes for reimbursement of green infrastructure improvements for the Crestview Terrace pervious pavement project. Contract Amount: $201,000. Executed: 3/30/16. Community-Based Tree Planting Contract with the Onondaga Earth Corps for community tree plantings in the Midland and Clinton sewersheds. Contract Amount: $317,032. Executed: 5/26/16. Green Infrastructure Maintenance Contract with the Onondaga Earth Corps to provide green maintenance for green infrastructure installed under the Save the Rain program. Contract Amount: $175,071. Executed: 5/31/16. Green Improvement Fund Contract with the Tan A Grocery Store for reimbursement of green improvements in the Clinton sewershed. Contract Amount: $52,000. Executed: 3/30/16. Green Improvement Fund Contract with the Nick Orso’s Body Shop for reimbursement of green improvements in the Clinton sewershed. Contract Amount: $382,000. Executed: 5/26/16.
Amendments to Existing Contracts
Green Improvement Fund Contract with the CDM/C&S amended for additional program management (flow monitoring). Contract Amount: $250,000. Executed: 3/30/16. Environmental Education Contract with the Cornell Cooperative Extension amended for 2016 ongoing outreach and education efforts. Amendment Amount: $156,979. Executed: 5/26/16. 1
Green Improvement Fund Contract with the 538 Erie Boulevard West, LLC. amended for additional reimbursement of green improvements in the Clinton sewershed. Amendment Amount: $42,900. Executed: 6/16/16. Suburban Green Infrastructure Program Contract with the Town of Geddes amended for reimbursement of green infrastructure improvements for Bergner Road. Amendment Amount: $101,949. Executed: 5/31/16. Suburban Green Infrastructure Program Contract with the Town of Geddes amended for reimbursement of green infrastructure improvements for the Geddes Town Hall. Amendment Amount: $62,725. Executed: 5/31/16.
Change Orders
None to Report.
2
Funding Grants State Bond Act Funds Reimbursements requested: None Reimbursements received: None Federal EPA Funds Reimbursements requested: None Reimbursements received: None Federal Army Corps of Engineers Funds Reimbursements requested: None Reimbursements received: None
GIGP Grants Requested: None Received: None
EFC Reimbursements Requested: LT HB for $981,524.71 on 5/5/16
EFC Reimbursements Received: LT HB for $981,524.71 on 5/13/16
Total reimbursement monies received to date through EFC loans for the funded ACJ projects: $247,603,598 (short term) and $117,013,164 (long term).
Onondaga County Lake Improvement Project 4th Stipulation of the ACJ Clinton/Lower MIS CSO Improvements Summary of Current and County Authorizations
Total Project Costs Expended To 6/30/16
Project /Task/Line Item
Authorization Remaining
Total Proposed Budget
Clinton Street CSO Facility Planning (Original) Engineering Services (EEA)
$
751,266
$
751,266
$
(0)
Original Facility Plan Subtotal $
751,266
$
751,266
$
(0)
Clinton Street CSO Conveyances Project Contract No. 1 - Phase 1 Conveyances (Delaney)
$
14,478,053
$
14,478,053
$
(0)
Contract No. 2 - Phase 2A Conveyances (Delaney)
$
4,074,455
$
4,074,455
$
(0)
Engineering/Construction Services (CDM/C&S) $ Conveyances Subtotal $
2,738,000 21,290,508
$ $
2,738,000 21,290,508
$ $
0 (0)
(1,899,442)
Clinton Storage Project
(1)
Construction Estimate
$
77,742,858
$
79,642,300
$
Engineering Services (EEA and others)
$
12,122,013
$
11,895,340
$
226,673
Construction Management and Administration (CDM/C&S)
$
4,833,411
$
4,501,082
$
332,329
Construction Testing (CME)
$
327,847
$
277,716
$
50,131
96,316,438
$ $
(1,290,309)
$
3,100,000
CSO Storage Subtotal $
95,026,129
$
Construction Estimate
$
3,100,000
Engineering Services (Ch2MHill)
$
91,211
$
91,186
$
25
Engineering Services (TBD) Floatables Arcadis
$
782,032
$
12,816
$
769,216
County Administration and Other Costs
$
3,973,243
$
104,001
$
3,869,242
38,508,611 15,900,000 54,408,611
$ $ $
29,722,992 11,408,686 41,131,678
$ $ $
8,785,619 4,491,314 13,276,933
Facility Plan for CSOs 027 & 029
-
Facility Plan Subtotal $
$
-
Clinton/Lower MIS Green Implementation Program Construction Contracts incl. GIF Public/Private Ch2MHill Program Management & Engineering
$ $ Green Subtotal $
Program Management Project Management (CDM/C&S) Project Management for Facility Plan (CDM/C&S) (2) $ Program Management Subtotal $ Miscellaneous County Costs Land Acquisition IMA Legal Consulting (John Clare & Mezey) Debt Other Contingency
-
$
-
$ $ $ $ $ $ $ Miscellaneous Subtotal $
3,726,350 4,861,000 126,115 301,334 234,885 310,738 489,863 10,050,285
$ $ $ $ $ $
3,726,350 3,959,746 350,857 226,334 822,540 740,023
$
$
185,500,042
$
Authorized Budget 185,500,042
Notes: (1) Includes engineering costs from original Clinton RTF Project (2) CDM/C&S Project Management costs are included in the total facility plan costs
$ $ $
-
9,825,850
$ $ $ $ $ $ $ $
901,254 (224,742) 75,000 (587,655) (429,285) 489,863 224,435
169,419,741
$
16,080,301
Onondaga County Lake Improvement Project 4th Stipulation of the ACJ Harbor Brook Drainage Basin CSO Abatement Summary of Current and Proposed Costs, and County Authorizations Total Project Costs Total Proposed Budget
Project /Task/Line Item
Expended to 6/30/16
Authorization Remaining
Harbor Brook CSO Abatement Project Original Engineering Expenses
$
5,500,000
$
5,500,000
$
HBIS Replacement and CSO Abatement Project Construction Contract No. 1 (1) (JJ Lane) Other Miscellaneous Work Engineering/Construction Sevices (CDM/C&S) County Administration and Other Costs
$ $ $ $
18,289,918 2,482,920 2,012,615 114,547
$ $ $ $
23,391,425 2,651,315 953,218
$ $ $ $
(5,101,507) 2,482,920 (638,700) (838,671)
HBIS Replacement and CSO Abatement Project Total $
22,900,000
$
26,995,959
$
(4,095,959)
$ $ $ $ $
34,502,000 4,200,000 3,390,000 2,280,000 44,372,000
$ $ $ $ $
29,279,884 3,971,487 1,497,536 5,360,579 40,109,486
$ $ $ $ $
5,222,116 228,513 1,892,464 (3,080,579) 4,262,514
$ $ $ $ FCF Program Total $
12,000,000 1,878,731 800,000 400,000 15,078,731
$ $
144,843 15,300
$
160,143
$ $ $ $ $
12,000,000 1,733,888 784,700 400,000 14,918,588
Other Harbor Brook Green Construction Contracts incl. GIF Public/Private & Rain Barrels $ Ch2MHill Engineering & Program Management $ Harbor Brook Green Project Total $
9,300,000 3,650,000 12,950,000
$ $ $
16,333,856 5,840,427 22,174,283
$ $ $
(7,033,856) (2,190,427) (9,224,283)
Program Management Project Management (CDM/C&S) $ Project Management for FCF Plan Implem (CDM/C&S) $ Program Management Total $
499,269 499,269
$
2,799,304
$
(2,300,035)
$
2,799,304
$
(2,300,035)
Lower Harbor Brook Storage & Conveyance Construction Estimate (with contingency) Engineering Services (EEA) Engineering Services (CDM/C&S) Project Escalation to Midpoint of Construction Lower Harbor Brook Storage & Conv Total Harbor Brook CSOs FCF Program Construction Estimate Engineering Services (Arcadis) County Administration and Other Costs Project Escalation to Midpoint of Construction
-
Harbor Brook Mitigation
$
3,500,000
$
3,265,000
$
235,000
Total Costs for Harbor Brook CSO Area under 4th Stip
$
104,800,000
$
101,004,175
$
3,795,825
Onondaga County Lake Improvement Project 4th Stipulation of the ACJ Midland CSO Abatement Summary of Current and Proposed Costs, and County Authorizations
Total Project Costs Total Proposed Budget
Project /Task/Line Item Midland Ave. RTF & Conveyances Midland Phase 1 Conveyances - Construction Midland Phase 2 RTF & Conveyances - Construction Midland Demolition Contracts - Construction Other Construction Phase 1 and 2 Engineering (Parsons & EEA) CME Construction Testing RTF Modifications (Construction, Eng, CM, Admin) Facility Plan Total
Expended to 6/30/16
$ $ $ $ $ $ $ $
1,836,434 53,372,689 748,483 137,000 14,717,163 227,341 3,000,000 74,039,110
$ $ $ $ $ $
1,836,434 53,372,689 748,483 136,342 12,503,353 219,815
$
68,817,116
$ $ $
12,296,549 64,800 750,000
$ $ $
12,098,662 729,224
$
13,111,349
$
12,827,887
FCF Facility Plan Construction Estimate Engineering Services (Arcadis and others) Construction Management and Administration Project Escalation to Midpoint of Construction Clinton Storage Project Total
$ $ $ $ $
5,000,000 623,954 210,000 5,833,954
$ $
Facility Plan for Midland CSOs Construction Estimate Engineering Services (Ch2MHill) Engineering Services, County Admin, ect (TBD) Facility Plan Total
$ $ $ $
14,900,000 121,401 3,720,000 18,741,401
CSO 044 Conveyances Project Contract No. 6. - JJ Lane Construction Contingency 5% Engineering Services (EEA) Construction Management Sevices (CDM/C&S) see below Conveyances Project Total
Midland Green Implementation Program Construction Contracts incl. GIF Public/Private $ Ch2MHill Program Management & Engineering $ Clinton Green Program Total $ Program Management Project Management (CDM/C&S) includes CSO 044 $ Project Management for Facility Plan (CDM/C&S) (1) Program Management Total $
Miscellaneous County Costs Land Acquisition IMA Legal Consulting (John Clare & Mezey) Debt Contingency Other
$ $ $ $ $ $ $ $ $
(0) (0) 0 658 2,213,810 7,526 3,000,000 5,221,994 5,221,994
$ $ $ $ $ $
197,887 64,800 20,776 283,462 283,462
46,039
$ $ $
5,000,000 577,915 210,000
$
46,039
$ $
5,787,915 5,787,915
$ $ $ $
121,368 121,368
$ $ $ $ $
14,900,000 33 3,720,000 18,620,033 18,620,033
4,087,920 $ 2,845,345 $ 6,933,265 $ $
3,412,080 1,072,291 4,484,371 4,484,371
7,500,000 $ 3,917,636 $ 11,417,636 $
6,633,686 6,633,686
$
(103,084)
6,530,602
$ $ $
$ $
(103,084) (103,084)
$
1,809,802
$
1,809,802
$
$ $ $ $ $ Miscellaneous Costs Total $
182,323 194,317 635,031 2,591,117 526,211 5,938,801
$ $ $ $ $
$181,975 194,317 690,054 529,271 3,405,419
$ $ $ $ $ $
348 0 (55,023) 2,591,117 (3,060) 2,533,382
135,612,853
$
$
36,828,073
Total Cost for Midland project under 4th stipulation
Authorized Master Budget $128,300,000
$
6,530,602
Authorization Remaining
98,784,780
-
Onondaga County Lake Improvement Project 4th Stipulation of the ACJ Sewer Separation of CSO Areas 022/038/040/045/046A/046B/047/048/050/051/053/054 Summary of Current and Proposed Costs, and County Authorizations
Total Project Costs Total Proposed Budget
Project /Task/Line Item Sewer Separation Construction Contracts CSO 024 (Falter) CSO 053/054 (Falter) CSO 038//40/046A/046B (Falter) CSO 047/048 (Falter) CSO 050 (Lane) CSO 051 (Lane) CSO 022/045 (estimated Project Costs)
Expended to 6/30/16
Authorization Remaining
Construction Total
$698,864 $2,000,817 $3,598,931 $1,654,022 $4,362,188 $5,037,280 $6,750,000 $24,102,102
$698,864 $2,000,817 $3,524,487 $1,654,022 $4,362,188 $5,037,280 $5,611,423 $22,889,082
$0 $0 $74,444 $0 $0 $0 $1,138,577 $1,213,020
Service Contracts (Engineering /Consulting /Program Management) ACE CDM/C&S CME Department of the Army Spectra Engineering/Management Total
$484,286 $1,446,468 $109,492 $153,504 $437,996 $2,631,746
$484,286 $1,997,539 $49,704 $153,504 $437,996 $3,123,029
$0 -$551,071 $59,788 $0 $0 -$491,283
Miscellaneous Costs Total
$135,084 $101,425 $116,269 $14,235 $13,540 $380,553
$135,084 $101,425 $142,816 $14,235 $4,093 $397,652
$0 $0 -$26,547 $0 $9,447 -$17,099
Total
$27,114,401
$26,409,763
$704,638
Miscellaneous County Costs City of Syracuse Consulting (John Clare & Mezey) Debt Legal Other
Authorized by Legislature $27,684,286
Onondaga County Lake Improvement Project Save The Rain Education and Outreach Grant Summary of Current and Additional Costs, and County Appropriations June 2016
Funding Sources
Appropriations
Program Funding 09,10,11 Appropriations 2011 Suburban Green Infrastructure 2012 Appropriation 2011 Trolley Lot Parking Mitigation Appropriation* 2012 Green grant education 2013 Green Grant education 2014 Green Grant education 2015 Green Grant education 2016 Green Grant education Total Appropriation
$ $ $ $ $ $ $ $ $
875,000 200,000 400,000 125,000 200,000 400,000 400,000 100,000 185,000
$
2,885,000
Funding Uses Retz Advertising + Design
Contract Amount
2010/2011 Marketing Services 2012 Marketing Services Marketing Services Subtotal
$ $ $
411,789 224,303 636,092
Expended to Date $ $ $
411,789 224,303 636,092
Difference + (-)
$
(0)
Environmental Finance Center Education and Outreach Environmental Finance Center Staff Onondaga Environmental Institute ESF Onondaga Earth Corps Baltimore Woods Nature Center Purchased Services (ASLF) SubTotal Non-Labor Expenses (EFC) Printing-Outreach Postage Travel Facilities Rental Program-related Supplies - Other Web -based Marketing Efforts Training Supplies and Materials Indirect/Overhead SubTotal
Contract Amount $ 100,155 $ 110,212 $ 49,937 $ 13,040 $ 22,601 $ 7,937 $ 303,882
Expended to Date $ 84,510 $ 70,623 $ 27,024 $ 2,833 $ 22,601 $ 20,000 $ 227,590
$ $ $ $ $ $ $ $ $
21,000 4,000 1,200 5,200 3,000 1,000 4,000 60,614 100,014
$ $ $ $ $ $ $ $ $
10,131 78 1,359 35 2,022 50,328 63,953
2011 Education and Outreach 2012 Education and Outreach 2013 Education and Outreach 2014 Education and Outreach
$ $ $ $ $
346,677 241,815 237,758 350,126 1,176,376
$ $ $ $ $
346,677 241,815 237,758 350,125 1,176,376 $
$ $ $ $ $
8,260 16,510 2,851 28,673 37,036
$ $ $ $ $
4,234 10,407 322 28,551 14,928
$ $ $ $ $
4,026 6,103 2,530 122 22,108
Baltimore Education & Outreach $
93,330
$
58,441 $
34,889
Education & Outreach Subtotal
Difference + (-)
0
Baltimore Woods Supplies Transport Travel Env Educator Hours Administrative Hours
Onondaga County Lake Improvement Project Save The Rain Education and Outreach Grant Summary of Current and Additional Costs, and County Appropriations June 2016 2012 Miscellaneous Exp. 2013 Miscellaneous Exp 2014 Miscellaneous Exp 2015 Miscellaneous Exp 2016 Miscellaneous Exp
$ $ $ $ $
79,852 34,158 46,657 20,988 425,791
Travel Purchase card/Petty cash Rainharvest systems Catering at the zoo Add Associates All the right stuff
OEI - RB Workshops Pinckney Hugo Grp Environmental Design and Research 2010/2011 media 2012 Media
Miscellaneous Subtotal
STR Education and Outreach Totals
79,852 34,158 46,657 20,988
$ $ $ $ $
248 33,228 1,998 370 979
$ $ $ $ $ $
15,741 200,000 20,000 28,750 1,500 -
$ $ $ $ $ $
15,741 74,274 20,000 28,750 1,500 -
$
$
873,437
$
358,742
$
Contract Amount $
Remaining Balance
$ $ $ $
2,779,236
Expended to Date $
2,229,651
514,695
Difference + (-) $
549,585
$
549,585
APPENDIX
June 2016 FINANCIAL TRACKING SUMMARY: FEDERAL & STATE GRANTS/LOANS APPROVED & RECEIVED
PROJECT NAME METRO - CURRENT AERATION SYSTEM UPGRADE AMMONIA REMOVAL DEMO BIOSOLIDS-MECHANICAL THICKENERS(c ) DIGESTER MOD/CHEMICAL STORAGE DIGITAL SYSTEM IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ODOR CONTROL AMMONIA REMOVAL FULL SCALE/ STAGE II PHOSPHORUS REMOVAL PHOSPHORUS REMOVAL PILOT CSO - CURRENT CLINTON ST CONVEYANCE & RTF ERIE BLVD SEW SEP STORAGE FRANKLIN ST FCF HARBOR BROOK FCF HARBOR BROOK CSO ABATEMENT (a) HIAWATHA INTERCEPTOR/RTF KIRKPATRICK ST PUMP STATION MALTBIE ST FCF MIDLAND AVE CONVEYANCE MIDLAND AVE PHASE II & RTF MIDLAND AVE PHASE III MIDLAND AVE MITIGATION COSTS (b) NEWELL ST FCF ONONDAGA CREEK FCF SEWER SEPARATION(a) SIPHON REHABILITATION TEALL BROOK FCF WEST ST SEWER SEPARATION OTHER AMBIENT WATER MONITORING OXYGENATION DEMO SEQR REGULATORY TOTAL DOLLARS
PROJECT BUDGET
NYS GRANT APPROVED
NYS GRANT RECEIVED
FED EPA GRANT APPROVED
FED EPA GRANT RECEIVED
SHORT-TERM SHORT-TERM LONG-TERM LONG-TERM ACE EFC LOAN EFC LOAN EFC LOAN EFC LOAN GRANT APPROVED RECEIVED APPROVED RECEIVED APPROVED
$8,500,000 $2,000,000
$5,834,381 $1,145,109
$5,834,381 $1,145,109
$7,365,000 Full-Scale
$6,868,954 $202,078
$5,600,000 $2,900,000 $1,400,000 $7,700,000
$4,319,819 $1,563,317
$4,319,819 $1,563,317
$4,938,419 $1,849,000
$4,938,419 $1,849,000
$190,000,000 $5,000,000
$47,331,203
$47,331,203
$31,245,000 $3,000,000 $3,200,000 $250,000 $5,444,000 $8,000,000 $5,642,000 $250,000 $3,000,000 $45,000,000 $27,000,000
$54,870,000 $1,700,000 $3,828,053 $384,200 $3,880,000
$54,870,000 $1,700,000 $3,828,053 $384,200 $3,880,000
$7,502,302 $211,097 $26,055,238
$7,502,302 $211,097 $26,055,238
$1,310,000 $3,000,000 $7,704,000 $1,230,000 $175,000 $1,000,000
$367,737 $442,154
$367,737 $442,154
$870,768 $1,045,162 $2,299,460
$870,768 $1,045,162 $2,299,460
$54,705,015
$14,003,569
$34,900,616
$54,705,015
$15,378,304
$1,049,185
$14,613
$14,676,422 $775,509 $285,682
$14,711,148 $154,126 $3,833
$7,413,199
$7,389,197
ACE GRANT RECEIVED
$108,000,000 Full Scale
$105,860,930 $1,936,991
$17,200,000
$989,323
$70,288,890 $2,301,876 $4,726,762
$41,834,264 $2,094,314 $4,589,759
$53,689,500
$46,700,136
$12,000,000 $212,000
$10,940,632 $188,106
$78,568,119 $923,162 $1,179,012 $343,500 $62,477,416 $2,710,169 $4,246,376
$37,198,856 $216,543 $296,823 $348,596 $25,587,531 $37,749 $828,115
$15,000,000 $10,000,000
$15,000,000
$37,339,317
$19,775,718
$1,024,433 $1,094,139 $2,481,443
$11,332,407 $140,623 $188,809 $395,540
$10,276,648 $1,958 $5,743 $6,621
$14,050,177 $14,050,177
$1,435,500 $1,236,594 $3,059,716
$247,603,598 $241,244,447 $117,843,140
$17,456,177 $17,456,177
$3,406,000
$3,406,000
$33,525,880
$8,000,000 $2,400,000 $50,000 *$380,000,000
$163,650,000 $163,650,000 $103,609,200 $103,609,200
*Original budget figures were based on 1997 dollars NYS includes awards beyond original pledge (i.e. civic strip) (a) NOTE: PROJECT IS US ARMY CORPS OF ENGINEERS PROJECT (b) NOTE: PROJECT RECEIVED $40,500 COST SHARE GRANT FROM (NYSERDA) (c )NOTE: PROJECT RECEIVED $87,500 COST SHARE GRANT FROM (NYSERDA)
$296,103,257
Lake Improvement Project Status Report For The Period Ending 06/30/2016
ACJ START DATE
Project Title
ACJ FINISH DATE
COUNTY FINISH DATE
ORIGINAL BUDGET(2)
AUTHORIZED BUDGET
ENGINEER
METRO - Current 1 AERATION SYSTEM UPGRADE 2 AMMON. REMOVAL DEMONSTRATION
11/1/1998
7/1/2002
01/03/00 $
8,500,000 $
3/1/2000
12/31/99 $
2,000,000 $
3 BIOSOLIDS - MECHANICAL THICKENERS
$
6,925,115 EEA 1,347,187 EEA 14,815,674
4 DIGESTER MOD/CHEMICAL STORAGE
7/1/2002
10/31/00 $
5,600,000 $
5,092,545 C&S
5 DIGITAL SYSTEMS IMPROVEMENTS
7/1/2002
06/31/01 $
2,900,000 $
3,520,317 Systems Integrated
6 MISCEL. IMPROVEMENTS
7/1/2002
01/31/99 $
1,400,000 $
1,400,000
7,700,000 $
8,393,855 OBG
7 ODOR CONTROL
7/1/2002
12/20/00 $
AMMONIA REMOVAL FULL SCALE/
10/1/2001
11/1/2003
11/01/03 $
125,000,000
STAGE II PHOSPHORUS REMOVAL
10/1/2003
4/1/2005
$
65,000,000
4/1/2006
4/1/2007
12/31/00 $
CLINTON ST. CONVEYANCE/
5/1/2003
5/1/2007
10/28/06 $
15,987,190
CLINTON ST. RTF
5/1/2007
1/1/2012
12/28/10 $
15,258,090
7/1/2002
04/13/02 $
3,000,000 $
2,684,523 Barton & Loguidice
5/1/2000
05/01/00 $
3,200,000 $
4,948,516 EEA
13 HARBOR BROOK FCF
7/1/2002
07/01/02 $
250,000 $
14 HARBOR BROOK CSO ABATEMENT
7/1/2002
$
5,443,980 $
104,800,000 Moffa & Assoc.
(3) 15 HIAWATHA INTERCEPTOR/RTF
7/1/2002
12/31/00 $
8,000,000 $
6,047,183 EEA/Parsons
8
9 PHOSPHORUS REMOVAL - PILOT
$
128,688,040 EEA
5,000,000 $
4,111,714 EEA
CSO - Current 10
11 ERIE BLVD STORAGE SYSTEM 12 FRANKLIN ST. FCF
4/26/1999
16 KIRKPATRICK ST. PUMP STATION 17 MALTBIE STREET FCF 18 MIDLAND AVE RTF & CSO ABATEMENT
$
185,500,042 EEA
889,109 EEA
7/1/2002
10/29/02 $
5,641,860 $
12,558,335 EEA
8/31/1998
7/1/2002
04/26/99 $
250,000 $
362,028 EEA
5/1/1999
5/1/2004
12/06/00 $
75,000,000 $
135,612,853 EEA
19 MIDLAND AVE MITIGATION COSTS
$
3,000,000
20 NEWELL STREET RTF
7/1/2002
07/01/01 $
1,310,000 $
21 ONONDAGA CREEK FCF
7/1/2002
07/01/02 $
3,000,000 $
22 SEWER SEPARATION
1/1/2012
01/01/12 $
7,703,880 $
27,684,286 OBG
23 SIPHON REHABILITATION
7/1/2002
06/11/99 $
1,230,000 $
1,026,391 C&S
24 TEALL BROOK FCF
7/1/2002
12/01/01 $
175,000 $
01/14/00 $
1,000,000 $
25 WEST ST SEWER SEPARATION
5/1/1999
473,132 Moffa & Assoc. 648,342 Parsons
1,235,346 EEA 2,720,572 CHA
26 ERIE BLVD CSO ABATEMENT
New Project
OTHER 27 AMBIENT WATER MONITORING(4) 28 OXYGENATION DEMO PROJECT 29 SEQRA REGULATORY COMPLIANCE
5/1/1999
7/1/2002
$
4/1/2003
02/25/04 $
(1)
$
TOTAL DOLLARS (2)
* $
*Original budget figures were based on 1997 dollars (1) SEQR costs are reflected in the individual projects under total payments to date (2) Original budget figures were based on 1997 dollars (3) Hiawatha project costs did not all appear on county account partial ACE (4) AMP is paid through operating funds not in projects
A-3
8,000,000 2,400,000 $
10,087
50,000
380,000,000 $
Parsons
664,495,192
Lake Improvement Project Status Report For The Period Ending 06/30/2016
CONSTRUCTION CONTRACT AMOUNTS
SOFT COST CONTRACTS
1 $
352,747 $
6,473,110
TOTAL PAYMENTS TO DATE
$
TOTAL ESTIMATED COST
FORECASTED COSTS
6,925,115
$
6,925,115 $
OVER/UNDER BUDGET
% COMPLETED EXPENDITURES
(1,574,885)
100.00%
(652,813)
100.00%
2 $
1,346,856
$
1,347,187
$
1,347,187 $
3 $
1,266,345 $
13,131,105
$
14,815,674
$
14,815,674 $
4 $
748,386 $
4,357,480
$
5,092,545
$
5,092,545 $
(507,455)
100.00%
5 $
451,713 $
2,974,514
$
3,520,317
$
3,520,317 $
620,317
100.00%
$
1,400,000
$
1,400,000 $
6
14,815,674
-
100.00%
7 $
999,299 $
6,956,868
$
8,393,855
$
8,393,855 $
8 $
21,289,868 $
106,962,810
$
128,688,040
$
128,688,040 $
(61,311,960)
100.00%
$
4,111,714
$
4,111,714 $
(888,286)
100.00%
16,080,301 $
185,500,042 $
9 $
4,055,734
10 $
34,284,008 $
125,145,882
$
169,419,741 $
11 $
901,556 $
1,734,929
$
2,684,523
$
2,684,523 $
12 $
973,543 $
3,920,238
$
4,948,516
$
4,948,516 $
13 $
436,363 $
373,370
$
889,109
14 $
22,435,066 $
77,791,826
$
101,004,173 $
15 $
540,945
$
5,535,152
$
16 $
2,520,394 $
9,882,154
17 $
109,483 $
152,418
18 $
27,898,800 $
73,231,960
19
693,855
100.00%
154,254,762 (315,477)
100.00%
91.33% 100.00%
1,748,516
100.00%
$
889,109 $
639,109
100.00%
3,795,827 $
104,800,000 $
99,356,020
96.38%
6,047,183
$
9,453,183 $
1,453,183
63.97%
$
12,558,335
$
12,558,335 $
6,916,475
100.00%
$
362,028
$
362,028 $
112,028
100.00%
$
98,784,781 $
36,828,072 $
$
3,000,000 $
-
135,612,853 $
60,612,853
72.84%
$
3,000,000 $
3,000,000
100.00%
20 $
472,572
$
473,132
$
473,132 $
(836,868)
100.00%
21 $
503,551
$
648,342
$
648,342 $
(2,351,658)
100.00%
26,409,763 $
1,274,523 $
27,684,286 $
19,980,406
95.40%
22 $
2,600,778 $
22,879,464
$
23
$
1,021,823
$
1,026,391
$
1,026,391 $
24 $
320,039 $
903,566
$
1,235,346
$
1,235,346 $
1,060,346
100.00%
25 $
403,332 $
2,311,126
$
2,720,572
$
2,720,572 $
1,720,572
100.00%
$
-
(2,389,913)
100.00%
26
27 28 $
10,087
$
20,385,693 $
$
10,087
-
$
(203,609)
-
$
10,087 $
57,978,723 $
667,901,192 $
29
$
124,921,462 $
465,739,796
$
626,902,162 $
A-4
100.00%
295,951,192
June 2016
Project Title
TOTAL PAYMENTS TO DATE 06-30-16
TOTAL PAYMENTS TO DATE 03-31-16
Change
METRO - Current 1 AERATION SYSTEM UPGRADE
$
6,925,115
$
6,925,115
$
-
2 AMMON. REMOVAL DEMONSTRATION
$
1,347,187
$
1,347,187
$
-
3 BIOSOLIDS - MECHANICAL THICKENERS
$
14,815,674
$
14,815,674
$
-
4 DIGESTER MOD/CHEMICAL STORAGE
$
5,092,545
$
5,092,545
$
-
5 DIGITAL SYSTEMS IMPROVEMENTS
$
3,520,317
$
3,520,317
$
-
6 MISCEL. IMPROVEMENTS
$
1,400,000
$
1,400,000
$
-
7 ODOR CONTROL
$
8,393,855
$
8,393,855
$
-
8 AMMONIA REMOVAL FULL SCALE/
$
128,688,040
$
128,688,040
$
-
STAGE II PHOSPHORUS REMOVAL 9 PHOSPHORUS REMOVAL - PILOT
$ $
4,111,714
$ $
4,111,714
CSO - Current 10 CLINTON ST. CONVEYANCE/ CLINTON ST. RTF
$ $
169,419,741
$
169,017,223
-
$
-
$
-
$
402,518
$
-
11 ERIE BLVD STORAGE SYSTEM
$
2,684,523
$
2,684,523
$
-
12 FRANKLIN ST. FCF
$
4,948,516
$
4,948,516
$
-
13 HARBOR BROOK FCF
$
889,109
$
889,109
$
-
14 HARBOR BROOK CSO ABATEMENT
$
101,004,173
$
100,808,791
$
15 HIAWATHA INTERCEPTOR/RTF
$
6,047,183
$
6,047,183
$
-
16 KIRKPATRICK ST. PUMP STATION
$
12,558,335
$
12,558,335
$
-
17 MALTBIE STREET FCF
$
362,028
$
362,028
$
-
18 MIDLAND AVE RTF & CSO ABATEMENT
$
98,784,781
$
98,580,185
$
19 MIDLAND AVE MITIGATION COSTS
$
3,000,000
$
3,000,000
$
-
20 NEWELL STREET RTF
$
473,132
$
473,132
$
-
21 ONONDAGA CREEK FCF
$
648,342
$
648,342
$
-
22 SEWER SEPARATION
$
26,409,763
$
26,409,763
$
-
23 SIPHON REHABILITATION
$
1,026,391
$
1,026,391
$
-
24 TEALL BROOK FCF
$
1,235,346
$
1,235,346
$
-
25 WEST ST SEWER SEPARATION
$
2,720,572
$
2,720,572
$
-
26 ERIE BLVD CSO ABATEMENT
$
$
-
$
-
-
$
-
OTHER
195,383
204,596
27 AMBIENT WATER MONITORING
$
20,385,693
$
20,385,693
$
-
28 OXYGENATION DEMO PROJECT
$
10,087
$
10,087
$
-
29 SEQRA REGULATORY COMPLIANCE
$
-
$
-
$
-
$
-
TOTAL DOLLARS
$
626,902,162
$
626,099,665
$
802,496
Chronology of Project Construction Starts Status
Location
Complete Complete
Metro Metro
Digital Systems Upgrade Ammonia Removal Demonstration Aeration System Upgrade Hiawatha RTF - ACOE Newell St. RTF Demo/Improvements Maltbie St. FCF Siphon Rehab
Complete Complete Complete Complete Complete Complete Complete
Metro Metro Metro Regional Market W.Newell/Vale St. Maltbie/Plum St. Various
Digester Modifications/Chemical Storage Franklin St. FCF West Street Sewer Separation
Complete Complete Complete
Ammonia Trackdown
Complete
Metro I-690/Franklin W. Genesee, Plum, Tracy, N. West St. Metro
Midland Ave. Conveyance Phase I Phosphorus Removal – Phase I Pilot
Complete Complete
Tallman/Oxford St. Metro
Erie Blvd. Storage System Upgrade Full Scale Ammonia Removal/ Stage II Phosphorus Removal Kirkpatrick St. Pump Station & Force Main Onondaga Creek FCF Teall Brook FCF Water Street Sewer Separation (CSO 024)
Complete
Franklin to Teall
Complete Complete Complete Complete Complete
Metro Kirkpatrick St. Inner Harbor Teall Ave. Water Street
Harbor Brook FCF Brighton Ave Sewer Separation (CSO 053/054)
Complete Complete
W.Hiaw./I-690 Brighton/Bishop Ave
Pre-ACJ Signing (1/20/98) General Improvements Odor Control and Residuals Handling
1998
1999
2000
2001
2002
Project
Status
Location
Tallman/Onondaga Sewer Separation (CSO 038, 040, 046A &046B) Midland Phase II RTF/Conveyances
Complete
Tallman/Onondaga
Complete
Blaine/Oxford St.
Phosphorus Removal – Phase II Pilot Biosolids Handling Improvements
Complete Complete
Metro Metro
Sewer Separation – CSO 047 & 048
Complete
South Ave/ Bissell St.
Sewer Separation – CSO 050 Clinton Phase I Conveyances
Complete Complete
Parkway/Rockland
Clinton Phase IIA Conveyances
Complete
Sewer Separation – CSO 051
Complete
Colvin St.
Harbor Brook Interceptor Sewer
Complete
Velasko/Fayette
Midland CSO 044 Clinton Storage Facility Lower Harbor Brook (Conveyance & Storage) Save the Rain Green Projects CSO 022 Sewer Separation Project CSO 045 Sewer Separation Project
Complete Complete Complete Authorized/Underway Authorized/Underway Authorized/Underway
W. Castle/South Ave Armory Square Hiawatha/State Fair Blvd. Various West Genesee/Franklin South Avenue
Save the Rain Green Projects
Completed
Various
Save the Rain Green Projects
Completed
Various
Save the Rain Green Projects Harbor Brook CSO 063 Conveyances Project
Completed Underway
Various Hiawatha/State Fair Blvd.
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
CONTRACTORS FOR CONSTRUCTION PROJECTS Metro Treatment Plant AERATION SYSTEM UPGRADE Bongiovanni Construction (General) Ridley Electric (Electrical)
$ 5,626,956.41 $ 846,154.00
DIGITAL SYSTEM UPGRADE Systems Integrated
$ 2,974,514.27
ODOR CONTROL CONTRACT #1 Falconet, Inc. (General) Scriba Electric (Electrical) Burns Bros. (Heating/Ventilation) Burns Bros. (Plumbing)
$ 4,872,660.53 $ 315,580.30 $ 82,459.00 $ 50,168.00
ODOR CONTROL CONTRACT #2 Murnane Construction
$ 1,636,000.00
PHASE III IMPROVEMENTS CONTRACT 1 - DIGESTER & LAGOON IMPROVEMENTS Maxim Construction
$
645,730.74
PHASE III IMPROVEMENTS CONTACT 2 - CHEMICAL STORAGE & FEED FACILITIES C.O. Falter Construction Corp. (General) Barry & Barry Electrical Co. (Electrical) Burns Bros. (HVAC) Edward Joy Company (Plumbing)
$ 2,527,300.08 $ 193,665.22 $ 224,232.51 $ 38,669.35
PHASE III IMPROVEMENTS CONTRACT 3 - DIGESTER & LAGOON CLEANING Waste Stream Environmental Inc.
$
727,881.80
$ $ $ $
28,388.00 112,224.00 32,295.00 18,440.00
FULL SCALE AMMONIA/PHOSPHORUS REMOVAL - FIELD OFFICE James & Son Construction Resun Leasing, Inc. Ridley Electric Co. Burns Brothers
FULL SCALE AMMONIA/PHOSPHORUS REMOVAL U.S. Filter - Kruger Products, Inc. U.S. Filter - Kruger Products, Inc.
$ 8,261,182.00 $ 3,918,080.00
CONTRACTORS FOR CONSTRUCTION PROJECTS Metro Treatment Plant FULL SCALE AMMONIA/PHOSPHORUS REMOVAL SITE PREPARATION - CONTRACT 2 C.O. Falter Construction Corp. (General) Ridley Electric (Electrical) C.O. Falter Construction Corp. (Pile Testing) Moretrench Environmental
$ 22,243,604.98 $ 255,627.00 $ 431,008.00 $ 4,602,086.57
PILE INSTALLATION - CONTRACT 3 M.A. Bongiovanni Construction
$ 9,045,731.95
GENERAL - CONTRACT 4 The Pike Company (General) Ridley Electric Co. (Electrical) Edward Joy Company (HVAC) Burns Brothers (Plumbing/Fire Protection)
$ $ $ $
46,860,263.46 6,927,238.00 3,009,057.61 1,217,583.74
BIOSOLIDS HANDLING IMPROVEMENTS C. O. Falter Construction Corp. (General) Ridley Electric (Electrical) Airside Technology (HVAC) Burns Bros. (Plumbing) Independent Field Svs (Cogen)
$ 10,929,016.19 $ 1,476,223.00 $ 532,187.00 $ 173,679.09 $ 18,019.75
CSO's CLINTON CONVEYANCES PHASE I & 2A The Delaney Group, Inc. The Delaney Group, Inc. SIDA MOU (City of Syracuse) MOU City of Syracuse (Connective Corridor)
$ 14,478,053.39 $ 4,074,455.32 $ 2,634,999.43 $ 168,000.00 $3,825,000.00
CLINTON CSO ABATEMENT Ruston Paving (Farmers' market Lot) Davis Wallbridge (Pearl St/Lot 3) Davis Wallbridge (Townsend St.) J&B (Pirro Conv. Center) C.O. Falter (War Memorial) Ridley (War Memorial) Economy Paving (On Center) J&B (Erie Canal Museum) Jett Industries (Clinton Storage) Joy Process Mechanical (Cistern War Memorial) C&S Technical (Cistern War Memorial) Green Culture (Rain Barrels) Syracuse Utilities (Duct Bank) Water Cooling Corp. (Storage Tank)
$ 188,046.14 $ 635,873.93 $ 476,625.39 $ 1,083,727.39 $ 692,298.87 $ 447,957.66 $ 1,094,119.49 $ 73,480.00 $ 79,762,239.12 $ 82,615.00 $ 233,652.56 $ 44,335.50 $ 59,982.56 $ 2,875.00
CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) MOU City of Syracuse (Road Reconstruction) MOU City of Syracuse (Dr. Weeks) MOU City of Syracuse (Bank Alley) MOU City of Syracuse (Upstate) Wallbridge (Streetscape/Water St) Ruston Paving (Sunnycrest Parking Lot) MA Bongiovanni Inc. Acts II Construction (Skiddy Park) D.E. Tarolli (Otisco Street) Orchard Earth & Pipe (Syr School dist Park Lot) Slate Hill Construction (E. Water St) Davis Wallbridge (Onon Cty Pub Library) Tumbers, Schichtels Nursery (Trees), Martisco, Dixie, Pro Scapes Acts II (Seymour Academy) Paul R. Vitale (City Lot 4) John R. Dudley (Leavenworth Park) VIP (Onon Public Library) Ballard Construction (Westcott Comm Ctr) Cornerstone Paving (Oswego St) John Dudley Construction (W. Onondaga St.) Barrett Paving (W. Fayette St.) Davis Wallbridge (Westcott St.) ProScapes (Sunnycrest Arena) Acts II (E. Washington St) John R. Dudley (690 Downspout) Josall (Maganelli Comm Ctr) Spectra (Butternut Circle) Barton & Loguidice (State St) D E Tarolli (annual green) J&J Landscape (annual green) King & King Architects (GIF) Jefferson Clinton Commons (GIF) ESF Foundation, Abby Lane Housing (GIF) Hotel Skyler (GIF) Near West Side Initiatives, Inc. (GIF) Near West Side Initiatives, Inc. (GIF) Tash Taskale (GIF) St. Lucy's Church (GIF) Putnam Properties (GIF) Centro (GIF) 500 W. Onondaga St. Inc. (GIF) CNY Jazz Arts Foundation (GIF) Jim & Juli Boeheim Foundation (GIF) Home Headquarters, Inc. (GIF) Galleries of Syr, 147 E. Onondaga St. (GIF) Syracuse Housing (GIF) Kopp Billing Agency (GIF)
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
638,997.06 89,000.00 108,000.00 1,500,000.00 1,432,437.86 410,372.20 3,000.00 550,916.44 1,847,459.81 430,172.42 147,952.84 320,291.95 833,289.61 373,309.00 607,852.44 719,311.20 51,382.74 52,500.00 109,046.54 1,371,475.75 588,982.07 870,263.89 87,585.22 155,591.53 597,965.65 378,400.00 65,640.00 159,400.00 430,266.47 197,991.00 100,000.00 100,000.00 78,000.00 100,000.00 22,730.69 78,000.00 100,011.00 125,000.00 75,757.00 65,390.00 52,740.00 52,188.00 163,203.51 40,500.00 100,000.00 120,290.00 25,300.00
CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) CNY Philanthropy (GIF) American Beech (GIF) Park Central Presbyterian Church (GIF) Loon Creek (GIF) NHW Syracuse (GIF) McMahan/Ryan Child Advocacy (GIF) Jeffrey DeRoberts (GIF) Bethany Baptist Church (GIF) St. Lucy's Church (GIF) 500 W. Onondaga St. Inc. (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) Gemmi Boy (GIF) Mr. Lady Bug (GIF) Grace Episcopal Church (GIF) Snapse Downtown (GIF) 360 Warren Associates (GIF) Housing Visions Unlimited (GIF) Near West Side Initiatives, Inc. (GIF) Scannell Properties (GIF) Genesee Armory (GIF) Third National Associates (GIF) Center for Peace & Social Justice (GIF) Graham Millwork (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) PEACE (GIF) Syracuse Business Center (GIF) Erie Bruce Corp (GIF) 538 Erie Boulevard West (GIF) Near West Side Initiatives, Inc. (GIF) JNJ Syracuse (GIF) UAS (GIF) Brewster Medical (GIF) Richmond UAS Properties (GIF) J C Smith Inc. (GIF) Burnet Railroad (GIF) Taksum Assoc. (GIF) Zip Networks (GIF) Ra lin Inc. (GIF) Ra lin Inc. (GIF) Butternut St. LLC (GIF) Nojaim Inc. (GIF) St. Joseph's Hospital Health Center (GIF)
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
62,700.00 53,050.00 61,050.00 137,350.00 129,400.00 178,050.00 99,311.00 301,930.00 69,000.00 34,347.00 124,200.00 198,300.00 175,787.00 77,800.00 47,537.00 46,700.00 99,000.00 35,700.00 107,864.00 194,650.00 34,500.00 204,000.00 144,400.00 533,300.00 57,700.00 90,500.00 124,100.00 33,400.00 294,300.00 52,200.00 288,400.00 151,700.00 130,850.00 94,300.00 32,600.00 57,600.00 221,000.00 299,200.00 337,250.00 357,400.00 45,200.00 205,775.00 137,000.00 206,450.00 104,430.00 234,800.00 145,900.00
CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) Auto Row (GIF) WCNY (GIF) Auto Row (GIF) University Hill Apts. (GIF) J C Smith Inc. (GIF) St. Joseph's Hospital Health Center (GIF) Housing Visions Unlimited (GIF) Thomas J Cerio (GIF) R J Westcott (GIF) R J Westcott (GIF) R J Westcott (GIF) Nick's Garage (GIF) Tan A Grocery (GIF) Consuela's-Tato Britter Transp. (GIF)
$ $ $ $ $ $ $ $ $ $ $ $ $ $
138,000.00 98,527.00 164,000.00 36,500.00 84,411.00 33,100.00 70,200.00 36,750.00 125,750.00 119,687.00 18,000.00 382,000.00 52,000.00 38,237.50
ERIE BOULEVARD STORAGE SYSTEM M. Hubbard Construction Ridley Electric (Electrical) Endeco/YSI (SE33923)
$ 1,556,752.00 $ 154,059.00 $ 24,117.90
FRANKLIN STREET FCF Burns Bros (Mechanical) Scriba Electric (Electrical) Burns Bros. (Plumbing) Maxim
$ 179,167.67 $ 144,640.61 $ 28,400.00 $ 3,568,029.43
HARBOR BROOK CSO ABATEMENT Joseph J. Lane Construction (Interceptor Sewer Replacement) Bette Cring (Elephant Barn Greening) John Dudley Construction (Geddes St) J&B Installations (Hazard Library/Erie Canal Museum) Economy Paving (Rosamond Gifford Zoo) J.J. Lane (Lower HB) A.J. Montclair (HB CSO Storage) C.O. Falter (HB CSO Storage) Davis Wallbridge (Onon Cty Pub Library) Cornerstone Paving (Parking Lots) Green Culture Tumbers, Schichtels Nursery (trees), Proscapes, Dixie City of Syracuse VIP Steadman Old Farm Marcellus Const. (CSO 063) OnSite J J Lane (CSO 18)
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
23,391,425.07 207,701.00 279,068.06 67,275.00 688,638.00 5,373,078.94 260,000.00 30,259,100.80 378,920.43 149,195.48 80,665.00 327,868.48 3,342,875.63 51,382.74 11,480.00 6,065,362.00 8,755.00 4,370,168.29
CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) Patricia Electric (Wetland Pilot) MOU City of Syracuse (Road Reconstruction) Bette Cring (Zoo Wetlands) Davis Wallbridge (Wadsworth Park) Acts II (Lewis Park) J & J Landscape (Annual Green) DE Tarolli (Green Structures) Knapp Electric (Wetlands) Vitale Excavating (Bedding Sand), Butler Fence Syracuse Academy of Science (GIF) NYSARC, Inc. (GIF) Vibrant Spaces, LLC (GIF) James Ranalli, W. Genesee (GIF) Vibrant Spaces, LLC (GIF) Brooklyn Pickle (GIF) St. Patrick's Loft (GIF) Smith Housing (GIF) Richard Destito (GIF) Burnet Park Newstand (GIF) Visiting Nurse Assoc. of CNY (GIF) All Times (GIF)
$ 197,767.56 $ 138,165.00 $ 1,290,064.10 $ 345,524.55 $ 217,285.58 $ 2,407.00 $ 10,329.00 $ 41,856.00 $ 232,533.35 $ 158,600.00 $ 78,907.14 $ 153,618.00 $ 616,100.00 $ 198,680.00 $ 30,555.00 $ 177,300.00 $ 52,600.00 $ 152,300.00 $ 59,256.00 $ 60,349.20 $ 92,600.00
HARBOR BROOK FCF C.O. Falter Construction Corp. (General)
$
373,370.21
KIRKPATRICK ST. PUMP STATION & FORCE MAIN C.O. Falter Construction Corp. C.O. Falter Construction Corp. Patricia Electric King & King Mechanical G.J. Adams Plumbing
$ 4,398,009.12 $ 4,425,766.31 $ 761,184.63 $ 245,569.51 $ 51,624.16
MALTBIE STREET FCF Over & Under Piping
$
152,418.00
MIDLAND AVENUE CONVEYANCES Marcellus Construction (General)
$ 1,836,434.47
MIDLAND AVENUE PHASE II CONVEYANCES & RTF Empire Dismantlement Corp. (Demolition) Murnane Building Contractors, Inc. (General) Ridley Electric Company (Electrical) Edward Joy Company (HVAC) Edward Joy Company (Plumbing)
$ 457,681.50 $ 47,929,392.75 $ 2,904,771.00 $ 2,053,808.50 $ 484,717.17
CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) MIDLAND AVENUE PHASE III CONVEYANCES Titan Wrecking & Environmental, LLC (Demolition) Tumbers, Schichtels Nursery (Trees) J.J. Lane Acts II (Hugh's Magnet School Parking Lot) Davis Wallbridge (Onon Cty Pub Library) J & J Landscape (annual green) VIP (Onon Public Library) Green Culture (Rain Barrels) Weather Guard Tecta (USPO Salina St) MOU City of Syracuse (Road Reconstruction) MA Bongiovanni (storage Tank) MOU City of Syracuse (ESF) Env. Design (Gazones Stormwater) Barton & Loguidice (green design) D E Tarolli (Annual green) Jubilee Homes of Syracuse (GIF) Dunbar Association, Inc. (GIF) Syracuse Model Neighborhood (GIF) People's AME Zion Church (GIF) People's Community Dev. Corp (GIF) Salina Shoe Salon (GIF) People's AME Zion Church (GIF) Matawon Development Group (GIF) Tucker Missionary Baptist Church (GIF) Swallows (GIF) Southside Comm. Coalition (GIF)
$ 290,801.39 $ 311,406.42 $ 12,098,662.37 $ 314,439.81 $ 116,033.35 $ 45,796.00 $ 25,691.39 $ 44,335.50 $ 242,860.00 $ 408,332.04 $ 66,130.00 $ 100,000.00 $ 92,825.15 $ 334,800.00 $ 1,146,326.95 $ 100,000.00 $ 99,840.00 $ 250,000.00 $ 61,300.00 $ 80,825.00 $ 48,000.00 $ 5,000.00 $ 24,214.00 $ 146,700.00 $ 111,900.00 $ 59,800.00
SEWER SEPARATION - CSO 022/045 Joy Process Mechanical (Plumbing) Joseph J. Lane Construction
$ 853,536.68 $ 4,757,886.66
SEWER SEPARATION - CSO 024 C.O. Falter Construction Corp.
$
698,863.74
SEWER SEPARATION - CSO 053/054 C.O. Falter Construction Corp.
$ 2,000,817.40
SEWER SEPARATION - CSO 038, 040, 046A&B C.O. Falter Construction Corp.
$ 3,524,487.29
SEWER SEPARATION - CSO 047 & 048 C.O. Falter Construction Corp.
$ 1,654,022.34
CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) SEWER SEPARATION - CSO 050 Joseph J. Lane Construction
$ 4,360,527.06
SEWER SEPARATION - CSO 051 Joseph J. Lane Construction
$ 5,029,323.00
SIPHON REHABILITATION Insituform Metropolitan
$ 1,021,822.99
TEALL BROOK FCF C.O. Falter Construction Corp. (General) Scriba Electric (Electrical)
$ $
877,095.43 26,470.20
WEST STREET AREA SEWER SEPARATION Maxim Construction (General)
$ 2,311,125.85
WEP ACRONYMS ACJ
Amended Consent Judgment
AMP
Ambient Monitoring Program
AMSA
Association of Metropolitan Sewerage Agencies
ARRA
American Recovery and Reinvestment Act
ASLF
Atlantic States Legal Foundation
AWQS
Ambient Water Quality Standards
BAF
Biological Aerated Filter (Biostyr)
BMP
Best Management Practices
BOD
Biological Oxygen Demand
BPJ
Best Professional Judgment
Brew
WEP’s Standard Abbreviation for the Brewerton Wastewater Treatment Plant
Bville
WEP’s Standard Abbreviation for the Baldwinsville Wastewater Treatment Plant
CAA
Clean Air Act
CALM
Consolidated Assessment and Listing Methodology
CAMP
Community Air Monitoring Plan
CIP
Capital Improvement Plan
CMOM
Capacity, Management, Operation, and Maintenance
CSLAP
Citizens Statewide Lake Assessment Program
CSO
Combined Sewer Overflow
CWA
Clean Water Act
DMR
Discharge Monitoring Report
DO
Dissolved Oxygen
EBM
Ecosystem-Based Management
ECL
Environmental Conservation Law
ECM
Energy Conservation Measures
EECBG
Energy Efficiency and Conservation Block Grant
ELAP
Environmental Laboratory Approval Program
EMS
Environmental Management System
ERM
Environmental Resource Mapper
FCF
Floatable Control Facility
FOG
Fats, Oil, and Grease
GIF
Green Improvement Fund
H:\2013\MoRpt\Abbreviations\abbreviations.doc
HRFS
High Rate Flocculation Settling
I&I
Inflow & Infiltration
IW
Industrial Wastewater
km
Kilometers
km2
Square Kilometers
LA
Load Allocations
LF
Linear Feet
m
Meters
MCP
Municipal Compliance Plan
MDV
Multiple Discharge Variance
Metro
WEP’s Standard Abbreviation for the Metropolitan Syracuse Wastewater Treatment Plant
MGD
Million Gallons Per Day
mg/L
Milligrams Per Liter
MIS
Main Interceptor Sewer
ML
WEP’s Standard Abbreviation for the Meadowbrook/Limestone WWTP
MS4s
Municipal Separate Storm Sewer Systems
mt
Metric Tons
NACWA
National Association of Clean Water Agencies
NBP
National Biosolids Partnership
NELAC
National Environmental Laboratory Accreditation Conference
NPDES
National Pollutant Discharge Elimination System
NYSDEC
New York State Department of Environmental Conservation
NYSDOH
New York State Department of Health
NYSEFC
New York State Environmental Facilities Corp.
NYWEA
New York Water Environmental Association
OAK
WEP’s Standard Abbreviation for the Oak Orchard WWTP
OLP
Onondaga Lake Partnership
OLWQM
Onondaga Lake Water Quality Model
OU
Odor Unit
P2
Prevention Program
P2CO
Prevention Program County Operations
PdM
Predictive Maintenance
H:\2013\MoRpt\Abbreviations\abbreviations.doc
PIDs
Photo-ionization Detectors
PFRP
Process to Further Reduce Pathogens
PLA
Project Labor Agreement
POTW
Publicly Owned Treatment Works
PWL
Priority Waterbodies List
RTF
Regional Treatment Facility
SCA
Sediment Consolidation Area
SCADA
Supervisory Control and Data Acquisition
SEPS
Secondary Effluent Pump Station
SEQR
State Environmental Quality Review
SGIP
Suburban Green Infrastructure Program
SHB
Solids Handling Building
SMPs
Storm Water Management Practices
SOP
Standard Operating Procedure
SORP
Sewer Overflow Response Plan
SPCC
Spill Prevention, Control, and Countermeasures
SPDES
State Pollutant Discharge Elimination System
SRP
Soluble Reactive Phosphorus
SSES
Sanitary Sewer Evaluation Study
SSI
Sewage Sludge Incinerator
SSV
Site-Specific Variance
SUNY-ESF
State University of New York College of Science and Forestry
SWMM
Storm Water Management Modeling
SWMP
Storm Water Management Plan
SWPPP
Storm Water Pollution Prevention Plan
TBEL
Stechnology-Based Effluent Limits
TDP
Total Dissolved Phosphorus
TMDL
Total Maximum Daily Load
TP
Total Phosphorus
TSI
Trophic State Index
UAA
Use Attainability Analysis
UFI
Upstate Freshwater Institute
ug/l
Micrograms per Liter
USEPA
United States Environmental Protection Agency
H:\2013\MoRpt\Abbreviations\abbreviations.doc
USFWS
United States Fish and Wildlife Service
USGBC
United States Green Building Council
USGS
United States Geological Survey
UST
Underground Storage Tank
VOC
Volatile Organic Compounds
WAN
Wide Area Network
WLA
Waste Load Allocations
WEF
Water Environment Federation
WEP
Water Environment Protection
WET
Whole Effluent Toxicity
WLA
Waste Load Allocations
WQBEL
Water Quality-Based Effluent Limits
WR
WEP’s Standard Abbreviation for the Wetzel Road Wastewater Treatment Plant
WSE
Waste Stream Environmental
H:\2013\MoRpt\Abbreviations\abbreviations.doc