2016 Q4 STR Quarterly Report

Page 1

Save the Rain Fourth Quarterly Report 2016

October - December 2016 Joanne M. Mahoney County Executive

www.savetherain.us


ONONDAGA COUNTY DEPARTMENT OF WATER ENVIRONMENT PROTECTION VISION To be a respected leader in wastewater treatment, storm water management, and the protection of our environment using state-of-the-art, innovative technologies and sound scientific principles as our guide.

MISSION To protect and improve the water environment of Onondaga County in a cost-effective manner ensuring the health and sustainability of our community and economy.

CORE VALUES

Excellence Teamwork Honesty Innovation Cost-Effectiveness Safety


Table of Contents Report from Commissioner Gray Projects Update  

Progress of Projects Under Construction Fact Sheets

Green Projects Update  

Projects Summary Fact Sheets

Green Improvement Fund Update  

Green Improvement Fund Program Summary Fact Sheets

Metro WWTP Phosphorus Projects/TMDL/Ambient Monitoring Program Update    

Metro Phosphorus Optimization Project Metro Phosphorus Work Plan Project Onondaga Lake Water Quality Model Ambient Monitoring Program Water Quality Sampling Tributary Sampling Tributary Bacteria Compliance Assessment Onondaga Lake Sampling Biological Monitoring Program Sampling Summary

Legislative/Regulatory/Media Update   

Action Items for County Legislature Action Items for the Environmental Protection Committee Media Articles

Financial Update 

Contracts New Contracts Amendments to Existing Contracts Change Orders

Funding State Bond Act Funds Federal EPA Funds


Federal Army Corps of Engineers Funds EFC Loans 

Onondaga County Lake Improvement Project Fourth Stipulation of the ACJ Clinton/Lower MIS CSO Improvement Harbor Brook Drainage Basin CSO Abatement Midland CSO Abatement Sewer Separation of CSO Areas: 022/038/040/045/046A/046B/047/048/050/051/053/054 Save the Rain Education and Outreach Grant Appendix     

Project Payments Lake Improvement Project Status Report Federal and State Grants/Loans Approved and Received Chronology of Project Construction Starts Contractors for Construction Projects  Metro Treatment Plant  CSOs WEP Acronyms




GRAY PROJECTS UPDATE



Cit

FACT SHEET Sewer Separation Project at CSO Area 061 Project Description: The CSO 061 Area includes 1.6 acres within a residential neighborhood in the south side of the City of Syracuse. During large rain events, the combined sewage from the Crehange Street combined sewer can overflow to an existing 12-inch outfall to Onondaga Creek (CSO-061). The proposed design included construction of a new sanitary sewer along Crehange Street, connecting to the existing combined sewer on Kirk Park Drive. The combined sewer along Crehange Street was repurposed for storm water only, which will convey tributary stormwater from the Crehange Street properties, as well as two catch basins that are tributary to the Hatch Street combined sewer. The CSO-061 outfall was disconnected from the combined sewer and was repurposed and utilized for stormwater discharge only. The Hatch Street combined sewer and the Kirk Park Drive combined sewer will have reduced stormwater contributions.

Project: Project Owner: Project Location: Sewershed: Technology: CSO Capture: No. of CSOs Abated: Completion Date: Project Cost: Prime Contractor:

Sewer Separation at CSO 061 Onondaga County Syracuse Midland Sewer Separation 100,000 gal/yr one December 5, 2016 $250,000 (estimated) D.E. Tarolli, Inc.

Project Area on Crehange Street

Green Components: The County evaluated the use of Green Infrastructure for mitigating overflows at CSO-061. It was concluded that complete separation would be more effective than green infrastructure at this location, due to the short conveyance distance, proximity to Onondaga Creek and the desire to implement a total closure of CSO-061. Project Update: The project began Monday November 7, 2016 and was completed December 5, 2016.

Intersection of Kirk Park Drive and Crehange Street Version 12/30/16



GREEN PROJECTS UPDATE



Green Project Update The fourth quarter of 2016 was another productive period in the Save the Rain program. The Lynch Avenue infiltration trench project was completed during the fourth quarter of 2016 utilizing. The project included a one block infiltration trench on Lynch Avenue between Russell Place and Fletcher Avenue to manage runoff within CSO 052. The total stormwater capture for this project is approximately 400,000 gallons annually. Construction of the Green Separation in CSO 052 project continued during the quarter. The project consists of a new stormwater management facility on the city-owned property (the former location of Garzone’s Restaurant) to manage ponding on-site as well as additional stormwater runoff from Cornell and South avenues. Work on the stormwater management facility began in August and continued into November. The work is suspended for winter, but will resume in Spring 2017. The separate storm sewer and infiltration facility on Mitchell Avenue was constructed during the quarter and included stormwater capture between South Avenue and Armstrong Place. The project provides the dual benefit of managing stormwater runoff in CSO 052 and reducing localized flooding episodes in the neighborhood. The western detention basin on the former Garzone’s Restaurant property was constructed during the third quarter and stabilized for the winter as well. In the spring of 2017, the eastern basin will be constructed and the facility will be put fully online receiving runoff from the various drainage areas mentioned. The Save the Rain program continues to stay in close contact with the local neighborhood and has heard positive feedback from many residents to date. Also during the fourth quarter, construction of the State Street Green Corridor project was completed utilizing the County’s Green Structures Term Contractors (DE Tarolli, Inc. and J&J Landscaping, LLC). The project was funded in part by a Water Quality Improvement Project grant from the New York State Department of Environmental Conservation (NYSDEC). The project consisted of several green infrastructure practices along State Street in three different segments: Taylor Street to Adams Street, Fayette Street to Water Street, and James Street to Salina Street. Aside from minor punch list items to be completed in the spring, the project was completed and operational in December 2016. The design of the CSO 060/077 green street candidate projects was advanced during the fourth quarter. These candidates include projects on McKinley Avenue, East Colvin Street, Roney Lane, Comstock Avenue, Lancaster Avenue, and Ackerman Avenue. The projects on Lancaster Avenue, Ackerman Avenue, and McKinley Avenue are expected to proceed to construction during the spring and summer of 2017. The projects on Comstock Avenue, East Colvin Street, and Roney Lane will proceed to final detailed design, public outreach and construction in 2017. The County’s Save the Rain team has been coordinating the construction schedule with local community groups to inform the community of these projects and receive feedback during the design process. Additional public outreach will continue as these projects advance to construction.


Progress continues through the efforts of the Green Planning Committee (GPC). Design of the CSO 067 candidates (McKinley Park, Vacant Lot at 621 West Newell, and Vale Street at Newell Street) proceeded to the 90% design phase in the fourth quarter. The GPC also finalized the development of additional project candidates in CSO 052, and developed a list of preliminary candidate projects in the Harbor Brook CSOs (005, 006, 006A, 009, 010, 011, 014, 015, 017, 078) for implementation by 2018. Discussions between the GPC, County, and City on a green infrastructure approach for CSO 029 continued during the fourth quarter, with the expectation of the development of a plan of action in spring 2017.


Project: Project Owner: Project Location: Sewershed: CSO: GI Technologies:

FACT SHEET Green Park: McKinley Park

Capture Area: Runoff Reduction: Year Contracted: Cost: Prime Contractor:

McKinley Park City of Syracuse Parks Department West Newell Street, West Calthrop, and West Pleasant Avenues. Midland 067 Bioretention, Infiltration, and Porous Pavement 51,000 sq. ft. (estimated) 930,000 gal/yr (estimated) 2017 (projected) $750,000 (engineer’s estimate) TBD

Project Description: The McKinley Park Project is one of many projects being accomplished through the collaborative efforts of Onondaga County and the City of Syracuse Parks Department. As a neighborhood park, McKinley Park has served the recreational needs of the community since 1920. The primary goal of the project is to reduce the volume of stormwater that flows into the combined sewer system along West Newell Street, West Calthrop Avenue, and West Pleasant Avenue – all within the CSO 067 area. The County intends to implement various green infrastructure technologies, including bioretention and porous pavement with an underground infiltration system. This infrastructure will capture runoff from the park and surrounding areas, totaling 51,000 square feet of drainage area. Stormwater will slowly evaporate and/or infiltrate underground, eliminating excess drainage to the sewer system and improving the overall stormwater management and drainage in this area. A secondary goal of this project is to enhance McKinley Park by increasing green space and improving the basketball court. An existing paved area formerly used as a tennis court will be completely removed and replaced with open green space. Additionally, the current half-court basketball facility will be removed and replaced with a full court porous pavement basketball court in partnership with the Jim and Juli Boeheim Foundation’s Courts4Kids Program. This will be the fifth porous pavement basketball court project constructed in partnership with the Foundation since 2011. When complete, it is estimated that 930,000 gallons of stormwater runoff per year will be removed from the CSO 067 combined sewer.

Example of a Courts4Kids Porous Pavement Basketball Court (Skiddy Park)

Rendering of Bioretention Area Along W. Newell Street Version 12/21/2016


Project: Project Owner: Project Location: Sewershed: CSO: GI Technologies:

FACT SHEET Green Separation in CSO 052: South & Mitchell Avenues

Capture Area: Runoff Reduction: Year Contracted: Bid Cost: Prime Contractor:

Green Separation in CSO 052 City of Syracuse 2426 South Avenue and Mitchell Ave. between South Ave. & Armstrong Pl. Midland 052 Detention/Slow Release, Infiltration, and Storm Sewer Separation 1,031,100 sq. ft. 3,781,200 gal/yr 2016 $1,840,000 Marcellus Construction Co., Inc.

Project Description: The Green Separation of CSO 052 Project will be accomplished through the collaborative efforts of Onondaga County and the City of Syracuse. Historically, the area around the proposed detention basin has been prone to severe flooding throughout the year. This is due, in part, to years of illegal dumping that impacted the natural surface and groundwater flow patterns. The County and the City have partnered to help limit this problem through the installation of a slow-release stormwater detention basin and infiltration. Additionally, the County undertook a storm sewer separation project on Mitchell Avenue to separate stormwater from the existing combined sewer system. The primary goal of the project is to reduce the volume of stormwater that flows into the combined sewer system along South, Cornell, and Mitchell Avenues, all within CSO 052. The secondary goal is to reduce the level of flooding experienced in this area. The new detention/slow release facility will be constructed on property owned by the City of Syracuse and will capture runoff from South and Cornell Avenues as well as from the City’s property, totaling 890,400 square feet of drainage area. The facility will have the capacity to store 1,155,700 gallons of stormwater during rain events. Stormwater will be slowly released to the Armstrong Place combined sewer system over time. It is expected that the detention/slow release facility will improve the stormwater management and drainage in this area and lessen the effects of flooding onto residential properties that adjoin the City-owned property. Additionally, runoff from 140,700 square feet of drainage area along Mitchell Avenue is collected in a new storm sewer system and directed to an underground stormwater infiltration basin with a runoff reduction volume of approximately 1,241,900 gallons per year. Construction of the project began in August 2016 and the Mitchell Avenue storm sewer system was complete in September 2016. The western detention/slow release basin off of South Ave. was also constructed in 2016, with expected completion of the eastern basin and project the project as a whole in 2017.

Mitchell Ave Underground Infiltration System

South Ave Basin construction Version 12/29/16


Project: Property Owner: GI Technologies: Project Locations:

FACT SHEET Green Streets in CSO 060/077 Sewershed Project Description: The Green Streets in CSO 060/077 Sewershed projects are comprehensive green street applications located on multiple streets within the CSO 060/077 sewershed. CSO 060/077 is a high priority sewershed that discharges frequently during rain events. The candidate streets are listed below with capture area and runoff reduction estimates:  McKinley Avenue (Spring 2017) Capture Area: 123,709 sq. ft. Runoff Reduction: 1,370,000 gal/yr  Lancaster Avenue (Spring 2017) Capture Area: 560,489 sq. ft. Runoff Reduction: 3,290,000 gal/yr  Ackerman Avenue (Summer 2017) Capture Area: 387,245 sq. ft. Runoff Reduction: 4,210,000 gal/yr  Roney Lane (Summer 2017) Capture Area: 121,303 sq. ft. Runoff Reduction: 1,190,000 gal/yr  East Colvin Street (Summer 2017) Capture Area: 105,790 sq. ft. Runoff Reduction: 920,000 gal/yr  Comstock Avenue (Summer 2017) Capture Area: 807,144 sq. ft. Runoff Reduction: 3,700,000 gal/yr

Sewershed: CSO: Capture Area: Runoff Reduction: Bid Price: Year Contracted: Contractors:

Green Streets in CSO 060/077 City of Syracuse Bioretention, Bioswales, Infiltration Trenches McKinley Ave. between S. Salina St. and S. State St. Roney Ln. at Smith Ln. E Colvin St. between Benedict Ave. and I-81. Comstock Ave. between E. Colvin St. and Euclid Ave. Ackerman Ave between Euclid and Kensington Rd Lancaster Ave. between Euclid and Kensington Rd Midland 060/077 2,105,680 sq. ft. (total, all areas) 14,680,000 gal/year (total) TBD Estimated 2016/2017 D.E. Tarolli and J&J Landscaping

Project Locations in Red Boxes

In 2017, each street identified above will proceed to construction. Each design is intended to demonstrate green infrastructure applications at key points along these streets in order to capture stormwater and enhance local urban streetscapes. The project is proposed to incorporate street tree plantings in the right-of-way, the installation of infiltration trenches underneath the roadway, tree planters, and rain gardens and bioretention areas throughout the project boundaries. Version 12/15/2016

Example Infiltration Trench


Project: Project Owner: Project Location:

FACT SHEET Lynch Avenue Infiltration Trench

Sewershed: CSO: GI Technology: Capture Area: Runoff Reduction: Year Contracted: Construction Cost: Prime Contractor:

Lynch Avenue Infiltration Trench City of Syracuse Lynch Avenue (Russell Place to Fletcher Avenue) Midland 052 Underground Infiltration Trench 22,644 sq. ft. 398,800 gal/yr 2016 $106,251 Marcellus Construction Co., Inc.

Project Description: The Lynch Avenue Infiltration Trench Project was completed in November 2016 as part of the County’s targeted approach to green infrastructure within CSO 052, a sewershed that discharges high volumes during high intensity during rain events. A four and half foot deep by eight foot wide underground infiltration trench was constructed on Lynch Avenue between Russell Place and Fletcher Avenue. The trench is located on the north half of the street to avoid conflicts with water and sewer utilities on the south. Being completely underground, the infiltration trench system provides a high capture Underground Infiltration Trench installed volume without an obtrusive footprint at the surface. on Lynch Avenue Stormwater runoff is conveyed to the infiltration trench via existing and new street catch basins. This project manages a total of 22,644 square feet of impervious drainage area, equating to approximately 398,800 gallons of stormwater runoff capture annually.

Version 9/20/16

Drainage Areas (in pink) Captured by Lynch Avenue Road Infiltration Trench Project Version 12/30/16


Project: Property Owner: GI Technology: Project Location:

FACT SHEET State Street Green Corridor

Sewershed: CSOs: Capture Area: Run-off Reduction: Bid Price: Year Contracted: Contractors:

State Street Green Corridor City of Syracuse Bioretention, Bioswales, Porous Paver Parking Areas State Street Corridor between Taylor St. and N. Salina St. Clinton/Lower MIS 021, 027, 034, 080A 465,015 sq. ft. 3,300,000 gal/yr $1,523,602 Summer 2016 D.E. Tarolli, J&J Landscaping

Project Description: The State Street Green Corridor project was a comprehensive green street application that recently completed construction along State Street. There were three project areas: on South State Street between Burt Street and East Adams Street, between East Fayette Street and East Water Street, and along North State Street between James Street and North Salina Street. This project installed green infrastructure applications at key points along the State Street corridor to capture stormwater and enhance the urban streetscape. The project incorporated enhanced tree plantings in the right-of-way, the installation of porous pavers in parking lanes, the use of infiltration trenches and planters, and bioretention measures and landscape features throughout project boundaries along the State Street corridor. Additionally, parking bumpouts were installed at key intersections to enhance the pedestrian space in those areas and provide greater definition of parking lanes. This project was funded in part by the NYSDEC through their Water Quality Improvement Project (WQIP) Program. In 2015, the County received a WQIP grant of $1.8 million for the project.

Porous pavers installed within on-street parking lanes (above) and flexible porous pavement tree trench (below)

Project Locations in Red Boxes

Version 12/29/2016


FACT SHEET Vacant Lot at 621 W. Newell Street Project Description: This project will be one of two Save the Rain projects on West Newell Street. Previously, the 621 West Newell Street vacant lot was taken into ownership by the City of Syracuse in the year 2000. The lot has remained vacant since then and the site contains soil ideal for infiltration practices. A unique facet of this project is that the site is located approximately three hundred feet from Onondaga Creek and just down the road (approximately three and a half blocks) from McKinley Park, where another Save the Rain project will be constructed. The green infrastructure technology included with this project is a bioretention basin. The bioretention basin is located between the sidewalk and existing tree line on the vacant lot parcel and is designed to capture stormwater from West Newell Street via existing drainage structures. The drainage area extends on West Newell Street from Vale Street to Baldwin Avenue. The bioretention area will be planted with native vegetation and it will serve as a form of community improvement. In total, the bioretention basin will capture approximately 160,000 gallons of stormwater annually. Upon completion of the project in 2017, all runoff from this 1one block stretch of road on West Newell Street will be drained into a green infrastructure practice, instead of the combined sewer system.

Project: Project Owner: Project Location: Sewershed: CSO: GI Technology: Capture Area: Runoff Reduction: Year Contracted: Price: Contractor:

Vacant Lot at 621 W. Newell St. City of Syracuse 621 West Newell Street Midland 067 Bioretention 15,598 sq. ft. 160,000 gal/yr 2017 (expected) $64,344.72 (estimated) TBD

Existing Conditions at Vacant Lot 621 West Newell Street

Existing Conditions at Vacant Lot 621 West Newell Street

Version 12/30/2016


Project: Project Owner: Project Location:

FACT SHEET West Colvin Street Road Reconstruction

Sewershed: CSO: GI Technology: Capture Area: Runoff Reduction: Year Contracted: Construction Cost: Prime Contractor:

West Colvin Street Road Reconstruction City of Syracuse West Colvin Street (Wellesley Avenue to Columbia Avenue) Midland 052 Underground Infiltration Trench 13,360 sq. ft. 236,000 gal/yr 2016 $92,680.20 DE Tarolli, Inc.

Project Description: The West Colvin Street Road Reconstruction Project exemplifies the continued partnership between the City of Syracuse and Onondaga County through the Save the Rain Program. The City of Syracuse reconstructed West Colvin Street along the project limits in 2016 and Onondaga County partnered with the City to construct an underground infiltration trench system prior to the City’s reconstruction efforts. This project was constructed by the County’s Green Infrastructure Term Contractor.

A four and a half foot deep underground infiltration trench spanning the length of West Colvin Street between Wellesley Avenue and Columbia Avenue was constructed in July 2016. The trench is located on the south half of the street to avoid conflicts with water and electrical utilities on the north half.

Underground Infiltration Trench Construction on West Colvin Street

As it is completely underground, the infiltration trench system provides a very high capture volume without requiring an obtrusive footprint at the surface. Stormwater runoff is conveyed to the infiltration trench via existing and new street catch basins. In total, this project manages runoff from 13,360 square feet of impervious drainage area, resulting in approximately 236,000 gallons of stormwater runoff captured annually.

Completed Underground Infiltration Trench Version 12/30/16



GREEN IMPROVEMENT FUND



Green Improvement Fund Update Several Green Improvement Fund (GIF) projects progressed into the construction and completion phase in the fourth quarter of 2016. Over the course of the year, five GIF projects were completed: GIF#110 RJ Westcott at 522 Westcott Street, GIF#134 Ra-Lin Retail Facility, GIF#130 St. Joseph’s Hospital, GIF#131 712 East Fayette Street, and GIF#133 RF Esposito at 538 Erie Boulevard West. Four other projects GIF#005 Jubilee Homes (Price Rite), GIF#129 Vibrant Syracuse Spaces, GIF#140 Tan A Grocery Store, and GIF#152 Syracuse Business Center continued construction during the fourth quarter with completion expected in 2017. Seven new applications were submitted prior to the December 16 th deadline. Those applications are currently under review by the County.

Green Improvement Fund Summary (as of 12/31/16) Projects Completed

87

Contract/Implementation Phase

20

Projects in Award Phase

3

Applications Under Review

8

Inactive/Ineligible

44

Total Applications Received

162


Project: Project Owner: Project Location: Sewershed: CSO: GI Technology:

FACT SHEET Green Improvement Fund: 712 East Fayette Street

Capture Area: Runoff Reduction: Year Contracted: GIF Award:

712 East Fayette Street Private 712 East Fayette Street Clinton 027 Porous Pavement/ Underground Infiltration 25,800 sq. ft. 392,900 gal/yr 2016 $46,800.00

Project Description: The 712 East Fayette Street Green Improvement Fund (GIF) project was completed in 2016. The project consisted of porous pavement, underground infiltration, and added green space. This work was part of a larger redevelopment project including business and residential space. The existing building was demolished and a new, smaller building and parking lot were constructed. Porous pavement parking areas are now available on the east and south sides of the building with an area of added green space for tenant usage on the south side of the building.

Porous Parking Lot at 712 East Fayette Street

Stormwater runoff from the parking lot and the roof of the building is collected and conveyed to the porous pavement and underground infiltration system. Runoff from a total of 25,800 square feet of impervious area is managed by the installed green infrastructure, equating to approximately 392,900 gallons of stormwater runoff captured annually.

Version 12/30/16

Added Green Space at 712 East Fayette Street


FACT SHEET Green Improvement Fund: RF Esposito Parking Lot

Project: Project Owner: Project Location: Sewershed: CSO: GI Technology: Capture Area: Runoff Reduction: Year Contracted: GIF Award:

RF Esposito Private 538 Erie Boulevard West Clinton 066 Capture and Slow Release 33,974 sq. ft. 643,200 gal/yr 2016 $136,150

Project Description: The RF Esposito GIF project was completed in 2016. The project was part of a larger redevelopment project for a former industrial building that was converted to residential and business space. The GIF work completed included a capture and slow release system and 14 new tree plantings on the private property. Runoff from the building roof and parking lot is conveyed to the underground stone storage area where it is detained and slowly released back to the combined sewer system over time. The building roof RF Esposito Parking Lot Detention Basin drains were modified to allow for redirecting the roof runoff into the parking lot, and out of the combined system. Being completely underground, the slow release system provides an increased high capture volume without requiring an obtrusive footprint at the surface. In total, 33,974 square feet of impervious drainage area is managed in this project, equating to approximately 643,200 gallons of stormwater runoff capture annually.

RF Esposito Parking Lot and Inlet Structures – Completed Version 12/30/16


Project:

RJ Westcott Holdings (522 Westcott Street) Private 522 Westcott Street Clinton EBSS Storm Basin Porous Pavement 25,361 sq. ft. 446,700 gal/yr 2015 $125,750

Project Owner: Project Location: Sewershed: CSO: GI Technology: Capture Area: Runoff Reduction: Year Contracted: GIF Award:

FACT SHEET Green Improvement Fund: RJ Westcott Holdings (522 Westcott Street) Project Description: The 522 Westcott Street parking lot project is the first of three GIF projects undertaken by RJ Westcott Holdings, LLC in the Westcott neighborhood. This GIF project consisted of reconstructing a parking lot with porous pavement and capturing the parking lot runoff in addition to the runoff from the adjacent mixed-use building. The entire 15,300 square foot parking lot was paved with porous asphalt pavement with a subsurface infiltration bed. In addition, roof drain and scupper modifications were made to redirect the roof runoff to the surface of the parking lot for increased stormwater capture. Construction of the project was completed in 2016.

Porous Asphalt Parking Lot

Approximately 25,361 square feet of impervious drainage area is managed by the green infrastructure system, resulting in an approximate annual capture of 446,700 gallons per year.

Subsurface Infiltration Bed

Roof Drain Modification Version 12/30/16


Project: Project Owner: Project Location: Sewershed: CSO: GI Technology:

FACT SHEET Green Improvement Fund: Ra-Lin Retail Facility (625 Burnet Ave.)

Capture Area: Runoff Reduction: Year Completed: GIF Award:

Ra-Lin Retail Facility Private 625 Burnet Ave. Clinton 080A Porous Pavement, Bioretention, & Added Green Space 66,988 sq. ft. 1,281,300 gal/yr 2016 $238,600

Project Description: The Ra-Lin Retail Facility Project consists of reconstructing the parking lot with porous pavement to capture stormwater runoff from the parking lot and the roof of the adjacent the building. In addition to the porous pavement, two bioretention areas were added. This is the second Ra-Lin project completed, the first being a green roof on their warehouse building, completed in 2015. The 18,000 square foot parking lot was paved with porous asphalt pavement with an underground infiltration bed. In addition, roof drain modifications were made to redirect the roof runoff to the surface of the parking lot and the bioretention area for additional stormwater capture. Construction of the project was completed in 2016.

Completed Porous Pavement Parking Lot

Approximately 66,988 square feet of impervious drainage area is managed by the green infrastructure system, resulting in an approximate annual capture of 1,281,300 gallons of stormwater per year.

Parking Lot Condition Before Construction

Newly Constructed Bioretention Area Version 12/30/16


Project:

FACT SHEET Green Improvement Fund: St. Joseph’s Hospital (301 Prospect Ave.)

Project Owner: Project Location: Sewershed: CSO: GI Technology: Capture Area: Runoff Reduction: Year Completed: GIF Award:

St. Joseph’s Hospital (301 Prospect Ave.) Private 301 Prospect Ave. Clinton 020 Cistern/Slow Release 40,500 sq. ft. 713,300 gal/yr 2016 $145,900

Project Description: The 301 Prospect Avenue parking lot project is the second of two Green Improvement Fund (GIF) projects undertaken by St. Joseph’s Hospital to date. St. Joseph’s Hospital has been providing services to patients throughout the City of Syracuse since 1869. This GIF project consists installing a cistern and slow release system beneath a reconstructed parking lot to capture runoff form the parking lot and adjacent buildings. The cistern system is a series of underground storage and infiltration chambers. Due to poor infiltration, the system was designed to slowly release the captured stormwater back to the sewer after rain events have ended. Runoff from the roof of adjacent buildings was replumbed into the cistern system to maximize the stormwater capture to the greatest extent. Construction of the project began in 2015 and was completed in 2016.

Installation of Underground Cistern/Chamber System

Approximately 40,500 square feet of impervious drainage area is managed by this green infrastructure project, capturing a total of approximately 713,300 gallons of stormwater runoff each year. Version 6/28/16

Building Roof Leader Disconnection and Plumbing to the Green Infrastructure System


METRO WWTP PHOSPHORUS PROJECTS /TMDL/AMBIENT MONITORING PROGRAM UPDATE



ACJ Quarterly Status Report – 4th Quarter 2016 Metro WWTP Phosphorus Optimization Project This project is currently in the design phase by GHD Consulting Engineers. The 95% Design has been completed and submitted for regulatory review. Project construction is expected to be completed in 2019.

Ambient Monitoring Program (AMP) Water Quality Monitoring Program Tributary Sampling Event Summary (Fourth Quarter 2016) October:  Tributary Bacteria sampling events: October 6, October 13,  Tributary Biweekly sampling events: October 4, October 18, October 24 November:  Tributary Biweekly sampling events: November 15  Tributary Quarterly sampling event: November 1 December:  Tributary Biweekly sampling event: December 13, December 20

Onondaga Lake Sampling Event Summary (Fourth Quarter 2016) October:  Lake Weekly sampling events: October 3, October 17, October 20  Lake Biweekly sampling events: October 11, October 26 November:  Lake Quarterly sampling events: November 8  Lake Biweekly sampling event: November 30 December:  Lake Biweekly sampling event: December 6

BIOLOGICAL MONITORING PROGRAM (October – December 2016) October 2016:  Lake sampling for Zebra and Quagga mussels completed in October.  Completed sorting Zebra and Quagga samples collected from Onondaga Lake.


Mussel Sample Collection

Quagga Mussels

Zebra Mussels


Dreissenid mussels ( zebra mussel and quagga mussel) in Onondaga Lake Dreissenid mussels, both zebra mussel (Dreissena polymorpha) and quagga mussel (Dreissena rostriformis bugensis), are invasive ecosystem engineers with large effects on the ecosystem through filtering and alteration of the benthic habitat (Higgins and VanderZanden 2010). Both species arrived to North America in the mid-1980s (Carlton 2008) and were found in Onondaga Lake in 1992, around 5 years after they were documented as present in Lake Erie (Mills et al. 1993). Dreissenid mussels remained rare in Onondaga Lake up to and including 1997 when reported densities were < 1 m-2 (Spada et al. 2002). Spada et al. (2002) reported a large increase in zebra mussels in 1999 with densities in year 2000 between 1,200 and 22,200 m-2 in four areas of the lake. This increase was attributed to improvement in the Metro sewage plants decreasing the ammonia levels in the lake. The lake was surveyed for mussels again in 2002 by OCDWEP and Stantec Consulting Services (OCDWEP 2003), and each year from 2005 to 2015 by OCDWEP. In Onondaga Lake zebra mussels increased in abundance first and dominated collections in 2005-2007. quagga mussels increased from 2006 to 2008 and largely replaced zebra mussels in water 3 - 6 m (>90% of the biomass) by 2009. However, zebra mussels remained co-dominant with quagga mussels in shallower water. The proportion of quagga mussel by biomass in water shallower than 3 m ranged from 21 to 80% with no time trend between 2008 and 2015. Quagga mussels were larger than zebra mussels in all years suggesting that faster growth rates of quagga mussels are not limited to oligotrophic systems. These results suggest that the dominance of quagga mussels is related to their faster growth rate across food levels and to their higher ability to colonize deeper, softer sediments even if these bottoms are located in the epilimnion. The continued coexistence of both species in 0-3 m depths may be related to the advantage of greater attachment strength of zebra mussels in areas more affected by wave action and/or higher predation rates by fish in shallow water. Currently, predation on mussels in North America may be too low to give zebra mussels a competitive advantage from their higher anti-predation investments given the cost in reduced growth rates (Naddafi and Rudstam 2014). This could change with the invasion of a dreissenid specialist, the round goby (Houghton and Janssen 2014). Round goby arrived to Onondaga Lake in 2010 and has increased in abundance each year (UFI et al. 2015). Mussel biomass in Onondaga Lake did decline from 2011 to 2014 although biomass in 2014 was higher than in 2013. The mussels in 2014 were small and likely from new settlement during that year indicating high mortality of larger mussels. The timing of the decline is consistent with the increase in round goby and the decline is larger for quagga mussels than for zebra mussels, both observations that are consistent with a predation effect from round goby. However, the low values in 2013 are also partly due to dredging at several of the sample stations in 2013 in the southern part of the lake.

References Carlton, J. T. 2008. The zebra mussel Dreissena polymorpha found in North America in 1986 and 1987. Journal of Great Lakes Research 34:770-773. Higgins, S. N. and M. J. Vander Zanden. 2010. What a difference a species makes: a metaanalysis of dreissenid mussel impacts on freshwater ecosystems. Ecological Monographs 80:179-196. Houghton, C. J. and J. Janssen. 2014. Variation in predator -prey interactions between round gobies and dreissenid mussels. Pages 359-367 in T. F. Nalepa and D. W. Schloesser (editors). Quagga and zebra mussels. Biology, impacts and control. CRC Press, Boca Raton, FL.


Mills, E. L., R. M. Dermott, E. F. Roseman, D. Dustin, E. Mellina, D. B. Conn, and A. P. Spidle. 1993. Colonization, ecology, and population structure of the quagga mussel (Bivalvia, Dreissenidae) in - of Fisheries and Aquatic Sciences 50:2305 -2314. the lower Great Lakes. Canadian Journal Naddafi, R. and L. G. Rudstam. 2014. Predator induced morphological defences in two invasive dreissenid mussels: implications for species replacement. Freshwater Biology 59:703-713. Onondaga County Department Water Environment Protection (OCDWEP). 2003. 2002 Onondaga Lake and Seneca River zebra mussel (Dreissena polymorpha) assessment program. Report. Spada, M. E. and N. H. Ringler. 2002. Invasion of Onondaga Lake, New York, by the zebra mussel (Dreissena polymorpha) following reductions in pollution. Journal of the North American Benthological Society 21:634-650. Upstate Freshwater Institute, Anchor QEA LLC, Onondaga County Department of Water Environment Protection, L. Rudstam, and W. W. Walker. 2014. Onondaga 2012 Lake ambient monitoring program. 2012 Annual Report. Onondaga County, NY.


LEGISLATIVE /REGULATORY / MEDIA UPDATE



Legislative/Regulatory Update Action Items for the County Legislature (July – September) 

No items to Report.

Action Items for the Environmental Protection Committee (September) 

Authorizing the County Executive to Enter into a Contract with the U.S. Department of the Interior for the Operation and Maintenance of Stream Gaging Stations in the County of Onondaga.

Reducing Authorized Costs for Certain Improvements Made for the Midland Avenue CSO Abatement Project in and for the County of Onondaga, New York, Pursuant to Section 41 of the Local Finance Law, and Amending Resolution Nos. 50-08 and 5108.

Calling a Public Hearing for the Purpose of Considering an Increase in the Cost of the Harbor Brook CSO Improvements Project.


Connect the Drops

Summary To date (since mid-April), the Connect the Drops landing page has over 9,500+ visits (6,305 were in Q4 2016) The average session is increased this quarter to 1:24 and non-bounced users (those who interact before leaving) are spending nearly 5 minutes (4:45 average) There was a spike in traffic on November 15 from launching our promoted video, "Reverse Litter" Our paid efforts on Facebook this quarter resulted in a reach of 159,773 people The Save the Rain Facebook page is up to over 2,345 likes


Google Analytics - Summary 10/01/2016 - 12/31/2016 OVERVIEW SESSIONS

Sessions

Sessions Trendline

1,000

750

500

250

0

10/08/16

10/15/16

10/22/16

ALL TRAFFIC

10/29/16

11/05/16

11/12/16

ALL REFERRALS

SESSIONS

11/26/16

12/03/16

12/10/16

12/17/16

GOALS

SESSIONS

6,305

11/19/16

GOAL COMPLETIONS

709

42

TOP TRAFFIC ALL USERS

CHANNELS ▲

SESSIONS

NEW USERS

BOUNCE RATE

PAGES / SESSION

AVG. SESSION DURATION

Organic Search

2,473 (39.22%)

2,056 (38.51%)

70.00%

2.09

1:35

Direct

2,184 (34.64%)

1,939 (36.32%)

78.89%

1.74

1:13

(Other)

866 (13.74%)

836 (15.66%)

67.67%

1.08

0:14

Referral

591 (9.37%)

387 (7.25%)

48.05%

3.38

2:47

Social

118 (1.87%)

63 (1.18%)

58.47%

2.31

2:34

Display

73 (1.16%)

58 (1.09%)

78.08%

1.27

0:24

TOP SOCIAL NETWORK REFERRALS ALL USERS

SOCIAL NETWORK ▲

Facebook

SESSIONS

77 (65.25%)

PAGE VIEWS

149 (54.58%)

AVG. SESSION DURATION

1:14

PAGES / SESSION

1.94

GOAL CONVERSION RATE

2.60%


SOCIAL NETWORK â–²

SESSIONS

PAGE VIEWS

AVG. SESSION DURATION

PAGES / SESSION

GOAL CONVERSION RATE

Twitter

39 (33.05%)

122 (44.69%)

5:20

3.13

0.00%

Pinterest

2 (1.69%)

2 (0.73%)

0:00

1.00

0.00%


TOP EVENTS SESSIONS

EVENT CATEGORY â–²

TOTAL EVENTS

UNIQUE EVENTS

EVENT VALUE

AVG. VALUE

Scroll Depth

789 (83.67%)

383 (77.06%)

0 (0.00%)

0.00

Connect the Drops - IntroButton

43 (4.56%)

40 (8.05%)

0 (0.00%)

0.00

Connect the Drops -ScrollTo Nav

37 (3.92%)

15 (3.02%)

0 (0.00%)

0.00

Connect the Drops - Logo

25 (2.65%)

22 (4.43%)

0 (0.00%)

0.00

Connect the Drops -Offpage Link

13 (1.38%)

13 (2.62%)

0 (0.00%)

0.00

Copied Text

12 (1.27%)

6 (1.21%)

0 (0.00%)

0.00

External Link

10 (1.06%)

8 (1.61%)

0 (0.00%)

0.00

Non-Linked Click Attempt

7 (0.74%)

5 (1.01%)

0 (0.00%)

0.00

Connect the Drops -Social Link

6 (0.64%)

4 (0.80%)

0 (0.00%)

0.00

Print

1 (0.11%)

1 (0.20%)

0 (0.00%)

0.00


TOP CAMPAIGNS SESSIONS

SESSIONS â–¼

NEW USERS

(direct) / (none)

2,184 (34.64%)

1,939 (36.32%)

78.89%

1.74

1:13

google / organic

1,859 (29.48%)

1,497 (28.04%)

65.68%

2.27

1:52

Facebook / Video

861 (13.66%)

831 (15.56%)

67.60%

1.08

0:15

yahoo / organic

484 (7.68%)

454 (8.50%)

86.57%

1.33

0:26

ongov.net / referral

467 (7.41%)

284 (5.32%)

46.04%

3.58

3:00

bing / organic

94 (1.49%)

75 (1.40%)

62.77%

2.70

2:23

google / cpc

73 (1.16%)

58 (1.09%)

78.08%

1.27

0:24

facebook.com / referral

49 (0.78%)

22 (0.41%)

61.22%

2.24

1:42

t.co / referral

39 (0.62%)

12 (0.22%)

41.03%

3.13

5:20

m.facebook.com / referral

20 (0.32%)

20 (0.37%)

70.00%

1.55

0:36

SOURCE / MEDIUM

BOUNCE RATE

PAGES / SESSION

AVG. SESSION DURATION


Facebook - Summary 10/01/2016 - 12/31/2016 LIKES

ONONDAGA COUNTY SAVE THE RAIN

Total Lifetime Likes

Total Lifetime Likes Trendline

20,000

15.8k

15.8k

15.8k

15.8k

16.1k

16.4k

16.4k

16.4k

16.4k

16.4k

16.4k

16.4k

15,000

10,000

7.0k

4.5k 5,000

0

10/08/16

10/15/16

10/22/16

10/29/16

11/05/16

11/12/16

11/19/16

11/26/16

12/03/16

12/10/16

12/17/16

12/24/16

12/31/16

LIMITED TO A 90-DAY PERIOD

WEEKLY TOTAL REACH

ONONDAGA COUNTY SAVE THE RAIN

1,422 LIMITED TO A 90-DAY PERIOD

LIKES

ONONDAGA COUNTY SAVE THE RAIN

2,343 LIMITED TO A 90-DAY PERIOD


LIKE SOURCES

ONONDAGA COUNTY SAVE THE RAIN LIKE SOURCES â–²

LIKES

Sponsored Story

44

Page Profile

36

Feed Story

12

Timeline Like Chaining

5

External Connect

3

Favorites

2

Ads

2

Hovercard

1

Search

1

Feed Pyml

1 LIMITED TO A 90-DAY PERIOD


PAGE POSTS

ONONDAGA COUNTY SAVE THE RAIN DATE â–²

POST

LIKES

COMMENTS

REACH

2016-12-26 09:02:34

Help keep our workers safe this holiday season....

5

--

1,591

2016-12-15 16:29:51

One more day to submit Green Improvement Fund...

1

--

148

2016-12-09 10:05:09

There is one week left in the 2016 Green...

2

1

397

2016-12-05 10:21:10

Photo - Onondaga County Save the Rain's cover...

11

--

359

2016-12-05 10:18:05

Photo - Onondaga County Save the Rain's cover...

--

--

8

2016-12-01 17:35:03

Link - EPA Water

5

1

309

2016-11-28 16:44:23

Photo - EPA Water

5

--

262

2016-11-28 14:37:30

Photo - Onondaga County Save the Rain's cover...

3

--

130

2016-11-15 10:03:04

Together, we can reverse litter and take our...

2

--

1,041

2016-11-15 09:20:37

Link - EPA Water

1

--

125

2016-11-10 09:39:13

Link - David

2

--

154

2016-11-09 10:41:55

Photo - Onondaga County Save the Rain's cover...

3

--

105

2016-11-08 11:38:13

The 2016 Green Improvement Fund (GIF) application...

1

--

159

2016-11-07 11:40:37

We had a fantastic day and an excellent group of...

7

--

409

2016-11-07 10:26:40

Photo - Onondaga County Save the Rain's cover...

8

--

120

2016-11-05 21:01:16

Thanks to all the participants in the Save the...

15

--

456

2016-11-03 07:00:00

Help the Save the Rain team plant 100 trees this...

15

--

102,320

2016-11-01 17:43:47

Join the Save the Rain team this Saturday for our...

340

8

33,364

2016-11-01 10:47:23

Link - EPA Water

1

--

99

2016-10-27 10:20:01

Join the Save the Rain team on November 5 for our...

2

--

2,335

2016-10-26 10:45:18

Photo - Onondaga County

--

--

83

2016-10-24 16:37:33

Thanks F.O.C.U.S. Greater Syracuse, Inc. for...

--

--

98

2016-10-19 12:52:27

Learn more about #ConnectTheDrops this Friday...

--

--

82

2016-10-17 12:40:57

Did you know - 98% of trash in our waters comes...

5

--

395

2016-10-13 12:45:48

Did you know that #litter, rain, our water...

1

--

106

2016-10-12 17:07:37

Link - EPA Water

4

--

188

2016-10-03 17:00:19

Link - EPA Water

1

--

155 LIMITED TO A 90-DAY PERIOD





EFC APPROVES $497.5 MILLION IN GRANTS & LOANS TO UPGRADE LOCAL WASTEWATER AND DRINKING WATER SYSTEMS October 4, 2016

New York, NY — During, the second quarter of EFC’s fiscal year, commencing in July and ending on September 30, the Board of Directors of the New York State Environmental Facilities Corporation (EFC) has approved $497.5 million in grants and interest-free and low-cost loans to support vital wastewater and drinking water infrastructure projects throughout New York State. ―Strengthening our water systems is critical for improving the quality of life for communities across the state,‖ said Sabrina Ty, President & CEO of the Environmental Facilities Corporation. ―EFC remains committed to working in partnership with these municipalities and others throughout the state to safeguard our water resources and achieve a higher quality of life for our citizens.‖ The EFC Board of Directors has approved $497.5 million in financial assistance for drinking water and wastewater projects in Upstate New York and Long Island. This funding includes nearly $13.6 million in grants that were part of the first two rounds issued pursuant to the New York State Water Infrastructure Improvement Act (WIIA) of 2015. Funds under WIIA were increased in the 2016-17 New York State budget, allowing EFC to broaden eligibility for wastewater projects and increase the maximum grant amount for drinking water projects from $2 million to $3 million, or 60 percent of eligible projects costs – whichever is less. The 2nd Round of awards were announced by Governor Cuomo in a series of seven regional Press Releases. Recently approved projects include: […] 

 

Village of Marcellus (Onondaga County) – $5.6 million ($1.4 million New York State Water Grant and $4.2 million interest-free loan) to finance costs associated with the planning, design and construction of the Village of Marcellus Wastewater Treatment Plant (WWTP) upgrade. The project will produce higher quality effluent discharged to Ninemile Creek and Onondaga Lake. Onondaga County — $3.9 million low-interest loan to finance costs for the planning, design, and construction of Phase II of the Clinton Combined Sewer Overflow (CSO) Abatement Project. Onondaga County — $372,788 low-interest loan to finance costs to install green infrastructure practices at the Southwest Community Center, located on South Avenue in the City of Syracuse, to infiltrate stormwater runoff and reduce flows to the City’s combined sewer system.

http://newyork.realestaterama.com/2016/10/04/efc-approves-497-5-million-in-grants-loans-to-upgradelocal-wastewater-and-drinking-water-systems-ID05100.html



State-of-the-art parking lot soaks up rain water

by Daniel Messineo October 21, 2016 SYRACUSE, N.Y. — The rain hitting Central New York over the past day flows down driveways and parking lots across Syracuse inundating the sewage system, and when it overflows, that water has got to go somewhere. "The lake we're saving is Onondaga Lake. We're saving the sewage from going into Onondaga Lake," Alan Poushter, owner of Ra-Lin, said. Poushter is hoping to be a small part of the solution. It's a green initiative spearheaded by Onondaga County called "Save the Rain." With the financial help from the county, Poushter put in a new parking lot, but this is not your ordinary parking lot, this one acts as a sponge. "This is the water coming off the roof and you see it's coming down the driveway, but it's not running down at all. It's not running anywhere it's just going right into the porous blacktop," Poushter said. http://cnycentral.com/news/local/state-of-the-art-parking-lot-soaks-up-rain-water


The intent of the parking lot is to cut down on water pollution from Onondaga County's lakes and streams. There is a dramatic difference between the old parking lot at Ra-Lin and the new one. The rain water freely flows across the old parking lot; when the water hits the new one, it seeps into the porous surface and disappears. Poushter said the county picked up more than $200,000 of the $250,000 bill to install it. "Not totally free, but almost free driveway. Brand new driveway and you're helping the county and you're helping your community. It's a win, win," Poushter said. The state-of-the-art parking lot is expected to last about 10 years. Eventually, dust and dirt will clog the porous surface, keeping it from absorbing.

http://cnycentral.com/news/local/state-of-the-art-parking-lot-soaks-up-rain-water


“Connect The Drops” Anti-Litter Campaign BY ANNALISA PARDO, BDJ 664.01 Published on October 22, 2016 at 7:41pm

SYRACUSE, N.Y. (NCC NEWS) – Onondaga County is asking residents to connect drops of litter with drops of rain in their latest Onondaga Lake clean up campaign, Connect the Drops. In 1994, Onondaga Lake was put on the National Priorities List by the Environmental Protection Agency. Since then, the county has been successful in removing some of the most harmful chemical pollutants from the lake, including: mercury and toluene. Now, it’s time they tackle the next lake polluter: street-born litter. The Connect the Drops campaign says 98% of debris in lakes, is street-born litter. They said drops of litter on the street is brought into storm drains and gray infrastructure by drops of rain, which then clogs waterways or is overflowed into Onondaga Lake.

https://nccnews.expressions.syr.edu/2016/10/22/connect-the-drops-anti-litter-campaign/


Travis Glazier, Director of the Office of Environment for Onondaga County explained one of the biggest challenges the campaign faces is changing peoples’ habits. He encourages citizens to help out by picking up trash they pass on the street. He told us the litter in Onondaga Lake does not only cost the environment. “It’s creating a lot of municipal costs by us having to go in the waterways and collect these floatables and get them out of the water,” he said. Glazier told us another challenge is the fact that litter doesn’t only come from community members, but also from open load trucks passing through Onondaga County. He told us he hopes the financial costs of litter clean up paired with the fact that Onondaga Lake is “our lake” and is in our own backyard will encourage citizens to take action and help reduce littering. On Friday a F.O.C.U.S. Forum was helped to educate citizens about the new campaign and to launch a new survey regarding the future use of the lake. The comprehensive survey will be open until January 2017. To be part of the survey on the future use of Onondaga Lake, sign up here.

https://nccnews.expressions.syr.edu/2016/10/22/connect-the-drops-anti-litter-campaign/


New report says Lakeview Amphitheater doubled initial economic impact projections by Alexander Dunbar | Thursday, November 10th 2016

A report on the Lakeview Amphitheater's first season says the venue has shattered expectations and more than doubled initial projections. The Syracuse Convention and Visitors Bureau and SMG, the company running the amphitheater, delivered the details to the Onondaga County Legislature's Planning and Economic Development committee. Initial estimates called for the Lakeview Amphitheater to host 18 events, have a economic spending impact of $24.98 million and have a local direct tax impact of $588,077. The new report presented by David Holder from the Convention and Visitors Bureau and Kelly Carr from SMG estimates the amphitheater doubled those numbers. Their presentation said the amphitheater had a $53 million economic impact and a helped bring in $1.25 million in local sales and hotel taxes just in year one.

http://cnycentral.com/news/local/new-report-says-lakeview-amphitheater-doubled-initial-economic-impactprojections


"This tourism would not necessarily have happened without the amphitheater in place," said Holder. Initially it was predicted only 11% of people seeing shows at the amphitheater would travel from out of the area and need a hotel. Instead Holder and Carr say 41% of concert goers were overnight guests. "On average, hotel performance on any given night of a concert was up 11%," said Holder. It all sounds impressive but Onondaga County Comptroller Bob Antonacci says he wants to see more data, more numbers from SMG to prove the county's investment was worth it. "The lack of transparency is frightening. We can't get data, we can get copies of the contracts. I don't understand - it's a taxpayer facility," said Antonacci. Onondaga County legislator Kathy Rapp asked the Carr if the amphitheater if it turned a profit in its first season. Carr said the details are being worked out but it "does look promising."

http://cnycentral.com/news/local/new-report-says-lakeview-amphitheater-doubled-initial-economic-impactprojections


F.O.C.U.S. survey on Onondaga Lake now online Nov 22, 2016

By Sarah Hall Editor

What do you want for Onondaga Lake? That’s the central theme of a survey now available from F.O.C.U.S. Greater Syracuse, a civic group that has been conducting research on the lake and the surrounding community for nearly 20 years. The nonprofit has been working to create the survey since July. It’s now online for residents and other lake stakeholders to fill out. In 2012, F.O.C.U.S. released a citizen-centered report entitled F.O.C.U.S. on Onondaga Lake: A Roadmap to Facilitate Reconnecting the Lake with the Community. That report is available at focussyracuse.org. One of the report’s most significant findings, after conducting more than 1,000 citizen surveys and 100 stakeholder interviews, was that

http://www.eaglenewsonline.com/news/2016/11/22/f-o-c-u-s-survey-on-onondaga-lake-now-online


the majority wanted to make the lake more accessible to the public. That involved continuing the cleanup, as well as allowing for more public access and more public events. From the 2012 report, F.O.C.U.S continued reaching out to the public to learn more about its desires for the lake. This online survey is the latest effort in that endeavor. Results from the survey, which will be conducted through 2017, will be incorporated with those of a July 2016 snapshot survey and stakeholder interviews into a report that will eventually be presented to Onondaga County Executive Joanie Mahoney. The county will then use the report to decide how to proceed with the lake once cleanup is complete. To take the survey, visit focussyracuse.org/ourlake.

http://www.eaglenewsonline.com/news/2016/11/22/f-o-c-u-s-survey-on-onondaga-lake-now-online


See former Syracuse factory transformed into apartments (photos)

Syracuse, N.Y. — A nearly $20 million redevelopment is turning the former R.E. Dietz Co. lantern factory in Syracuse's Park Avenue neighborhood into apartments and offices. http://www.syracuse.com/businessnews/index.ssf/2016/12/see_former_syracuse_factory_transformed_into_apartments_photos.html


Work on the $19.2 million project at 225-303 Wilkinson St. began this fall. The building is expected to be ready for occupancy by Aug. 1. The developers — Larry Losty Jr. and his son-in-law, Matthew Paulus — are putting 92 apartments into the old factory's top three floors and 37,500 square feet of commercial space on the first floor. "The Dietz" will have 68 one-bedroom, 21 two-bedroom and three three-bedroom units, with monthly rents ranging from $1,000 to $2,300. Each will have large windows, high ceilings, granite countertops, stainless steel appliances, and in-unit washers and dryers. In addition, the 208,000-square-foot building will have a fitness center and a conference room for tenants, as well as 108 indoor parking spaces and 98 outdoor parking spaces. Losty and Paulus said they plan to leave the building's brick walls and its many wooden ceiling beams and support posts exposed as a reminder of the building's past. "People are going to like the industrial look," Losty said. "They made things here." The Steam Gauge and Lantern Co. operated on the site from 1888 to 1897. Prior to that, it was home to a cabinet maker's shop. The Dietz company took it over in 1897. It built a large addition in 1904 when it obtained a major contract to supply lanterns for the construction of the Panama Canal. The building was expanded again in 1913, 1915 and in the 1930s. By 1969, the company employed 545 people at the factory. Dietz shut down in 1992 following a labor dispute. The Dietz family sold the building to Losty for $35,000 in 1992. Losty spent $500,000 for roof repairs, a new sprinkler system and other needed upgrades soon after the purchase and until recently ran his office furniture business, Superior Office Interiors, out of it. Paulus said he expects the apartments to attract young professionals, empty nesters and graduate students. The building's location across the street from Leavenworth Park, its proximity to downtown Syracuse and its easy access to Interstates 690 and 81 are all major draws, he said. "There are a lot of people who want to be downtown without being downtown," he said. The project is the latest sign of a revival of the Westside neighborhood. The former C.G. Meaker Food Co. warehouse at 538 Erie Blvd. W., a block from the Dietz, recently reopened as an apartment and office building. And the former Marsellus Casket factory nearby was recently redeveloped as the local headquarters of the American Medical Response ambulance service.

http://www.syracuse.com/businessnews/index.ssf/2016/12/see_former_syracuse_factory_transformed_into_apartments_photos.html


The Community Preservation Corp. and its lending partners Pathfinder Bank and NBT Bank are providing a $19.2 million construction loan for the Dietz project. CPC also is providing a $16.2 million permanent loan funded through its agreement with the state Common Retirement Fund. "It's part of the revitalization of a neighborhood," said Nicholas Petragnani Jr., senior vice president and regional director of CPC. "That's how we look at this, not so much as a one-off loan for a project." The state has agreed to provide a $900,000 grant through its Regional Economic Development Council initiative. In addition, Onondaga County is providing a $517,000 grant through its Save the Rain program. The project also will be eligible for state and federal historic preservation tax credits.

http://www.syracuse.com/businessnews/index.ssf/2016/12/see_former_syracuse_factory_transformed_into_apartments_photos.html


Onondaga County warns residents of possible sewer overflows By Brett Hall | December 17, 2016

SYRACUSE, N.Y. -- The combined sewer overflow notification service sent out an alert Saturday morning warning that weather conditions were opportune for system backups. "Anytime it rains there is a chance that there can be a backup in the system," said Tom Rhoads, the commissioner of the Department of Water Environment Protection in Onondaga county. "Right now however the system is operating normally." The alert puts the county in compliance with the New York State’s Sewage Pollution Right to Know Act. It was sent out in conjunction with 'Save the Rain,' a program which is aimed at cleaning up and fixing up the sewer system so that rain runoff overflows do not continue to pollute the Onondaga Lake Watershed.

http://cnycentral.com/news/local/onondaga-county-warns-residents-of-possible-sewer-overflows


From the Legislature: Lakeview Amphitheater surpasses expectations in inaugural season December 23, 2016

The Lakeview Amphitheater has completed its inaugural season, and the draw of our new music venue surpassed expectations. At a recent Planning and Economic Development meeting, representatives from Visit Syracuse and SMG Management provided an update on the financial impact of the first season and some things that we can look forward to as we start booking for next year. At the end of 2014, the legislature had a tough decision to make based on preliminary numbers. The original projections estimated that the Lakeview Amphitheater would host 18 shows and ticket sales would be just under $142,000. In 2016, we hosted 22 shows and ticket sales exceeded $200,000! Visit Syracuse, our region’s tourism promoter, provided some interesting data on the concertgoers — where they were from and how much they would spend. Initial estimates http://www.eaglenewsonline.com/news/2016/12/23/from-the-legislature-lakeview-amphitheatersurpasses-expectations-in-inaugural-season


projected 89 percent of spectators would be “local/regional” — in other words, no more than an hour from Syracuse. The actual numbers suggest that only 59 percent of attendees were local/regional patrons, which is great news! More than 40 percent of concertgoers came to Onondaga County from more than an hour away, and brought their entertainment dollars with them. With that distance comes potential room nights at local hotels, dinners at local restaurants, and time to visit other attractions in the area. Room nights, or hotel room stays as they are called in hospitality jargon, were positively affected by the Lakeview Amphitheater as well. Original projections estimated that 10 percent of domestic spectators and 1 percent of Canadian spectators would spend at least one night in Syracuse. Actual figures show that 26 percent of domestic and 15 percent of Canadian concert attendees spent the night! This generated additional sales tax revenues to operate county government and room occupancy taxes, which are used to fund other arts and cultural opportunities in Onondaga County like Symphoria, JazzFest and the Everson Museum. The total spending and direct tax impact were substantially higher than the estimates. Total spending was estimated at just under $25 million for the season; however, spectators spent more than $50 million! The direct local tax impact will be more than $1 million. In a tough budget year, where we saw personnel and healthcare costs increase significantly, the additional revenue from the Lakeview Amphitheater was needed. Lastly, the legislature was told that the Amphitheater would create approximately 360 jobs. Between SMG Management, Aramark Refreshments, Live Nation, and local businesses that total exceeded 780 jobs. SMG and county officials received a lot of feedback throughout the concert season on ways to improve the experience at the Lakeview Amphitheater, and we’re working together to implement some of these suggestions, most critically with improvements to be made to the concessions and parking in the near future. The shuttles from downtown proved to be quite successful and those will continue next year, which is great news for downtown businesses that also saw the impact on concert nights. Overall, it was a great first season! We must build on this momentum and secure great acts that keep attendees coming to the Lakeview Amphitheater and staying in Syracuse. Derek Shepard represents the 13th legislative district; this includes the town of Van Buren, the town of Elbridge and portions of the town of Camillus. Derek welcomes constituent feedback; he can be reached by email at shepard@twcny.rr.com or by phone at 635-3875.

http://www.eaglenewsonline.com/news/2016/12/23/from-the-legislature-lakeview-amphitheatersurpasses-expectations-in-inaugural-season


FINANCIAL UPDATE



Financial Update Contracts New Contracts               

Green Improvement Fund Contract with Jorge Auto Repair for reimbursement of green improvements in the Clinton sewershed. Contract Amount: $109,500. Executed: 10/31/16. Green Improvement Fund Contract with Pyramids Halal Metals for reimbursement of green improvements in the Clinton sewershed. Contract Amount: $49,600. Executed: 10/31/16. Green Improvement Fund Contract with Viraj Salina for reimbursement of green improvements in the Midland sewershed. Contract Amount: $320,100. Executed: 11/22/16. Save the Rain Education & Outreach Contract with FOCUS Greater Syracuse for education and outreach with the Save the Rain Program. Contract Amount: $20,000. Executed: 11/22/16. Green Improvement Fund Contract with Lisa Welch for reimbursement of green improvements in the Clinton sewershed. Contract Amount: $32,877. Executed: 12/13/16.

Amendments to Existing Contracts      

Save the Rain Education & Outreach Contract with Baltimore Woods Nature Center amended for public education and outreach for 2017. Contract Amount: $46,665. Executed: 10/14/16. Green Improvement Fund Contract with Vibrant Syracuse Spaces amended for additional green improvements in the Harbor Brook sewershed. Amendment Amount: $87,900. Executed: 10/31/16.

1


Change Orders   

Green Infrastructure Program Contract with Marcellus Construction, Inc. amended to include the addition of an access drive on Mitchell Ave and an infiltration trench system on Lynch Ave. Amendment Amount: $130,818.15. Executed: 10/14/16.

2


Funding Grants State Bond Act Funds  Reimbursements requested: None  Reimbursements received: None Federal EPA Funds  Reimbursements requested: None  Reimbursements received: None Federal Army Corps of Engineers Funds  Reimbursements requested: None  Reimbursements received: None 

GIGP Grants Requested: None Received: None

EFC Reimbursements Requested: LT Clinton for $76,931.29 on 12/1/16 LT Midland for $220,059.78 on 12/1/16 LT HB $350,528.83 on 12/1/16 EFC Reimbursements Received: LT Clinton for $76,931.29 on 12/16/16 LT Midland for $220,059.78 on 12/16/16 LT HB $350,528.83 on 12/16/16

Total reimbursement monies received to date through EFC loans for the funded ACJ projects: $247,603,598 (short term) and $120,507,379 (long term).


Onondaga County Lake Improvement Project 4th Stipulation of the ACJ Clinton/Lower MIS CSO Improvements Summary of Current and County Authorizations

Total Project Costs Expended To Total Proposed Budget 12/31/16

Project /Task/Line Item

Authorization Remaining

Clinton Street CSO Facility Planning (Original) Engineering Services (EEA)

$

751,266 $

751,266

$

(0)

Original Facility Plan Subtotal $

751,266 $

751,266

$

(0)

Clinton Street CSO Conveyances Project Contract No. 1 - Phase 1 Conveyances (Delaney)

$

14,478,053 $

14,478,053

$

(0)

Contract No. 2 - Phase 2A Conveyances (Delaney)

$

4,074,455 $

4,074,455

$

(0)

Engineering/Construction Services (CDM/C&S) $ Conveyances Subtotal $

2,738,000 $ 21,290,508 $

2,738,000 21,290,508

$ $

0 (0)

(2,088,742)

Clinton Storage Project

(1)

Construction Estimate

$

77,742,858 $

79,831,600

$

Engineering Services (EEA and others)

$

12,122,013 $

11,923,385

$

198,628

Construction Management and Administration (CDM/C&S)

$

4,833,411 $

4,519,246

$

314,165

Construction Testing (CME)

$

327,847 $

277,716

$

50,131

96,551,946

$ $

(1,525,817)

$

3,100,000

CSO Storage Subtotal $

95,026,129 $

Facility Plan for CSOs 027 & 029 Construction Estimate

$

3,100,000

Engineering Services (Ch2MHill)

$

91,211

$

91,186

$

25

Engineering Services (TBD) Floatables Arcadis

$

782,032 $

12,816

$

769,216

County Administration and Other Costs

$

-

Facility Plan Subtotal $

$

-

3,973,243 $

104,001

$

3,869,242

38,508,611 $ 15,900,000 $ 54,408,611 $

31,629,116 11,519,346 43,148,462

$ $ $

6,879,495 4,380,654 11,260,149

Clinton/Lower MIS Green Implementation Program Construction Contracts incl. GIF Public/Private Ch2MHill Program Management & Engineering

$ $ Green Subtotal $

Program Management Project Management (CDM/C&S) Project Management for Facility Plan (CDM/C&S) (2) $ Program Management Subtotal $ Miscellaneous County Costs Land Acquisition IMA Legal Consulting (John Clare & Mezey) Debt Other Contingency

-

$

-

$ $ $ $ $ $ $ Miscellaneous Subtotal $

3,726,350 4,861,000 126,115 301,334 234,885 310,738 489,863 10,050,285

$ $ $ $ $ $

3,726,350 3,959,746 350,857 226,334 869,953 740,944

$

$

185,500,042

$

Authorized Budget 185,500,042

Notes: (1) Includes engineering costs from original Clinton RTF Project (2) CDM/C&S Project Management costs are included in the total facility plan costs

$ $ $

-

9,874,184

$ $ $ $ $ $ $ $

901,254 (224,742) 75,000 (635,068) (430,206) 489,863 176,101

171,720,368

$

13,779,674


Onondaga County Lake Improvement Project 4th Stipulation of the ACJ Harbor Brook Drainage Basin CSO Abatement Summary of Current and Proposed Costs, and County Authorizations Total Project Costs Total Proposed Budget

Project /Task/Line Item

Expended to 12/31/16

Authorization Remaining

Harbor Brook CSO Abatement Project Original Engineering Expenses

$

5,500,000

$

5,500,000

$

HBIS Replacement and CSO Abatement Project Construction Contract No. 1 (1) (JJ Lane) Other Miscellaneous Work Engineering/Construction Sevices (CDM/C&S) County Administration and Other Costs

$ $ $ $

18,289,918 2,482,920 2,012,615 114,547

$ $ $ $

23,391,425 2,651,315 953,749

$ $ $ $

(5,101,507) 2,482,920 (638,700) (839,202)

HBIS Replacement and CSO Abatement Project Total $

22,900,000

$

26,996,490

$

(4,096,490)

$ $ $ $ $

34,502,000 4,200,000 3,390,000 2,280,000 44,372,000

$ $ $ $ $

29,279,884 3,971,487 1,497,536 5,360,579 40,109,486

$ $ $ $ $

5,222,116 228,513 1,892,464 (3,080,579) 4,262,514

$ $ $ $ FCF Program Total $

12,000,000 1,878,731 800,000 400,000 15,078,731

$ $

144,843 15,300

$

160,143

$ $ $ $ $

12,000,000 1,733,888 784,700 400,000 14,918,588

Other Harbor Brook Green Construction Contracts incl. GIF Public/Private & Rain Barrels $ Ch2MHill Engineering & Program Management $ Harbor Brook Green Project Total $

13,000,000 3,650,000 16,650,000

$ $ $

16,343,958 6,108,662 22,452,620

$ $ $

(3,343,958) (2,458,662) (5,802,620)

Program Management Project Management (CDM/C&S) $ Project Management for FCF Plan Implem (CDM/C&S) $ Program Management Total $

499,269 499,269

$

2,813,628

$

(2,314,359)

$

2,813,628

$

(2,314,359)

Lower Harbor Brook Storage & Conveyance Construction Estimate (with contingency) Engineering Services (EEA) Engineering Services (CDM/C&S) Project Escalation to Midpoint of Construction Lower Harbor Brook Storage & Conv Total Harbor Brook CSOs FCF Program Construction Estimate Engineering Services (Arcadis) County Administration and Other Costs Project Escalation to Midpoint of Construction

-

Harbor Brook Mitigation

$

3,500,000

$

3,265,000

$

235,000

Total Costs for Harbor Brook CSO Area under 4th Stip

$

108,500,000

$

101,297,367

$

7,202,633


Onondaga County Lake Improvement Project 4th Stipulation of the ACJ Midland CSO Abatement Summary of Current and Proposed Costs, and County Authorizations

Total Project Costs Total Proposed Budget

Project /Task/Line Item Midland Ave. RTF & Conveyances Midland Phase 1 Conveyances - Construction Midland Phase 2 RTF & Conveyances - Construction Midland Demolition Contracts - Construction Other Construction Phase 1 and 2 Engineering (Parsons & EEA) CME Construction Testing RTF Modifications (Construction, Eng, CM, Admin) Facility Plan Total

Expended to Date 12/31/16

$ $ $ $ $ $ $ $

1,836,434 53,372,689 748,483 137,000 14,717,163 227,341 3,000,000 74,039,110

$ $ $ $ $ $

1,836,434 53,372,689 748,483 136,342 12,503,353 219,815

$

68,817,116

$ $ $

12,296,549 64,800 750,000

$ $ $

12,098,662 729,224

$

13,111,349

$

12,827,887

FCF Facility Plan Construction Estimate Engineering Services (Arcadis and others) Construction Management and Administration Project Escalation to Midpoint of Construction Clinton Storage Project Total

$ $ $ $ $

1,300,000 623,954 210,000 2,133,954

$ $

Facility Plan for Midland CSOs Construction Estimate Engineering Services (Ch2MHill) Engineering Services, County Admin, ect (TBD) Facility Plan Total

$ $ $ $

14,900,000 121,401 3,720,000 18,741,401

CSO 044 Conveyances Project Contract No. 6. - JJ Lane Construction Contingency 5% Engineering Services (EEA) Construction Management Sevices (CDM/C&S) see below Conveyances Project Total

Midland Green Implementation Program Construction Contracts incl. GIF Public/Private $ Ch2MHill Program Management & Engineering $ Clinton Green Program Total $ Program Management Project Management (CDM/C&S) includes CSO 044 $ Project Management for Facility Plan (CDM/C&S) (1) Program Management Total $

Miscellaneous County Costs Land Acquisition IMA Legal Consulting (John Clare & Mezey) Debt Contingency Other

$ $ $ $ $ $ $ $ $

(0) (0) 0 658 2,213,810 7,526 3,000,000 5,221,994 5,221,994

$ $ $ $ $ $

197,887 64,800 20,776 283,462 283,462

46,039

$ $ $

1,300,000 577,915 210,000

$

46,039

$ $

2,087,915 2,087,915

$ $ $ $

121,368 121,368

$ $ $ $ $

14,900,000 33 3,720,000 18,620,033 18,620,033

6,211,454 $ 2,956,005 $ 9,167,459 $ $

1,288,546 961,631 2,250,177 2,250,177

7,500,000 $ 3,917,636 $ 11,417,636 $

6,636,528 6,636,528

$

(105,926)

6,530,602

$ $ $

$ $

(105,926) (105,926)

$

1,809,802

$

1,809,802

$

$ $ $ $ $ Miscellaneous Costs Total $

182,323 194,317 635,031 2,591,117 526,211 5,938,801

$ $ $ $ $

$181,975 194,317 694,647 529,813 3,410,553

$ $ $ $ $ $

348 0 (59,616) 2,591,117 (3,602) 2,528,248

131,912,853

$

$

30,885,902

Total Cost for Midland project under 4th stipulation

Authorized Master Budget $128,300,000

$

6,530,602

Authorization Remaining

101,026,951

-


Onondaga County Lake Improvement Project 4th Stipulation of the ACJ Sewer Separation of CSO Areas 022/038/040/045/046A/046B/047/048/050/051/053/054 Summary of Current and Proposed Costs, and County Authorizations

Total Project Costs Total Proposed Budget

Project /Task/Line Item Sewer Separation Construction Contracts CSO 024 (Falter) CSO 053/054 (Falter) CSO 038//40/046A/046B (Falter) CSO 047/048 (Falter) CSO 050 (Lane) CSO 051 (Lane) CSO 022/045 (estimated Project Costs)

Expended to 12/31/16

Authorization Remaining

Construction Total

$698,864 $2,000,817 $3,598,931 $1,654,022 $4,362,188 $5,037,280 $6,750,000 $24,102,102

$698,864 $2,000,817 $3,524,487 $1,654,022 $4,362,188 $5,037,280 $5,611,423 $22,889,082

$0 $0 $74,444 $0 $0 $0 $1,138,577 $1,213,020

Service Contracts (Engineering /Consulting /Program Management) ACE CDM/C&S CME Department of the Army Spectra Engineering/Management Total

$484,286 $1,446,468 $109,492 $153,504 $437,996 $2,631,746

$484,286 $1,997,539 $49,704 $153,504 $437,996 $3,123,029

$0 -$551,071 $59,788 $0 $0 -$491,283

Miscellaneous Costs Total

$135,084 $101,425 $116,269 $14,235 $13,540 $380,553

$135,084 $101,425 $142,816 $14,235 $4,093 $397,652

$0 $0 -$26,547 $0 $9,447 -$17,099

Total

$27,114,401

$26,409,763

$704,638

Miscellaneous County Costs City of Syracuse Consulting (John Clare & Mezey) Debt Legal Other

Authorized by Legislature $27,684,286


Onondaga County Lake Improvement Project Save The Rain Education and Outreach Grant Summary of Current and Additional Costs, and County Appropriations December 2016

Funding Sources

Appropriations

Program Funding 09,10,11 Appropriations 2011 Suburban Green Infrastructure 2012 Appropriation 2011 Trolley Lot Parking Mitigation Appropriation* 2012 Green grant education 2013 Green Grant education 2014 Green Grant education 2015 Green Grant education 2016 Green Grant education Total Appropriation

$ $ $ $ $ $ $ $ $

875,000 200,000 400,000 125,000 200,000 400,000 400,000 100,000 185,000

$

2,885,000

Funding Uses

Contract Amount

Retz Advertising + Design 2010/2011 Marketing Services 2012 Marketing Services Marketing Services Subtotal

$ $ $

411,789 224,303 636,092

Contract Amount

Environmental Finance Center Education and Outreach 2011 Education and Outreach 2012 Education and Outreach 2013 Education and Outreach 2014 Education and Outreach

Expended to Date $ $ $

411,789 224,303 636,092

Difference + (-)

$

Expended to Date

(0)

Difference + (-)

$ $ $ $ $

346,677 241,815 237,758 350,126 1,176,376

$ $ $ $ $

346,677 241,815 237,758 350,125 1,176,376 $

$ $ $ $ $

13,590 26,731 4,055 48,282 47,336

$ $ $ $ $

5,060 13,956 637 30,842 26,975

$ $ $ $ $

8,530 12,775 3,418 17,440 20,361

Baltimore Education & Outreach $

139,995

$

77,471

$

62,524

Education & Outreach Subtotal

0

Baltimore Woods Supplies Transport Travel Env Educator Hours Administrative Hours

Contract Amount

Miscelaneous Ed/Outreach Expenses 2010/2011 Miscellaneous Exp. 2012 Miscellaneous Exp. 2013 Miscellaneous Exp 2014 Miscellaneous Exp 2015 Miscellaneous Exp 2016 Miscellaneous Exp

$ $ $ $ $ $

105,764 79,852 34,158 46,657 20,988 344,558

Travel Purchase card/Petty cash Rainharvest systems Catering at the zoo Add Associates Just the right stuff Syr New times Lamar Iheart Media Coffee Host of CNY Melody Wilkinson Syr Blue Print

Focus Greater Syr OEI - RB Workshops Pinckney Hugo Grp Environmental Design and Research 2010/2011 media 2012 Media

Miscellaneous Subtotal

STR Education and Outreach Totals

$ $ $ $ $

105,764 79,852 34,158 46,657 20,988

$ $ $ $ $ $ $ $ $ $ $

1,664 33,228 1,998 370 3,311 1,120 1,125 910 3,284 200 1,284

Difference + (-)

$ $ $ $ $ $ $

20,000 30,309 200,000 20,000 28,750 1,500 -

$ $ $ $ $ $ $

23,151 169,327 20,000 28,750 1,500 -

$

$

932,536

$

578,641

$

Contract Amount $

Remaining Balance

Expended to Date

2,885,000

Expended to Date $

2,468,580

353,895

Difference + (-) $

416,420

$

416,420


APPENDIX



December 2016 FINANCIAL TRACKING SUMMARY: FEDERAL & STATE GRANTS/LOANS APPROVED & RECEIVED

PROJECT NAME METRO - CURRENT AERATION SYSTEM UPGRADE AMMONIA REMOVAL DEMO BIOSOLIDS-MECHANICAL THICKENERS(c ) DIGESTER MOD/CHEMICAL STORAGE DIGITAL SYSTEM IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ODOR CONTROL AMMONIA REMOVAL FULL SCALE/ STAGE II PHOSPHORUS REMOVAL PHOSPHORUS REMOVAL PILOT PHOS TREAT OPTIMIZATION (587601) CSO - CURRENT CLINTON ST CONVEYANCE & RTF ERIE BLVD SEW SEP STORAGE FRANKLIN ST FCF HARBOR BROOK FCF HARBOR BROOK CSO ABATEMENT (a) HIAWATHA INTERCEPTOR/RTF KIRKPATRICK ST PUMP STATION MALTBIE ST FCF MIDLAND AVE CONVEYANCE MIDLAND AVE PHASE II & RTF MIDLAND AVE PHASE III MIDLAND AVE MITIGATION COSTS (b) NEWELL ST FCF ONONDAGA CREEK FCF SEWER SEPARATION(a) SIPHON REHABILITATION TEALL BROOK FCF WEST ST SEWER SEPARATION OTHER AMBIENT WATER MONITORING OXYGENATION DEMO SEQR REGULATORY TOTAL DOLLARS

PROJECT BUDGET

NYS GRANT APPROVED

NYS GRANT RECEIVED

FED EPA GRANT APPROVED

FED EPA GRANT RECEIVED

SHORT-TERM SHORT-TERM LONG-TERM LONG-TERM ACE EFC LOAN EFC LOAN EFC LOAN EFC LOAN GRANT APPROVED RECEIVED APPROVED RECEIVED APPROVED

$8,500,000 $2,000,000

$5,834,381 $1,145,109

$5,834,381 $1,145,109

$7,365,000 Full-Scale

$6,868,954 $202,078

$5,600,000 $2,900,000 $1,400,000 $7,700,000

$4,319,819 $1,563,317

$4,319,819 $1,563,317

$4,938,419 $1,849,000

$4,938,419 $1,849,000

$190,000,000 $5,000,000

$47,331,203

$47,331,203

$31,245,000 $3,000,000 $3,200,000 $250,000 $5,444,000 $8,000,000 $5,642,000 $250,000 $3,000,000 $45,000,000 $27,000,000

$54,870,000 $1,700,000 $3,828,053 $384,200 $3,880,000

$54,870,000 $1,700,000 $3,828,053 $384,200 $3,880,000

$7,502,302 $211,097 $26,055,238

$7,502,302 $211,097 $26,055,238

$1,310,000 $3,000,000 $7,704,000 $1,230,000 $175,000 $1,000,000

$367,737 $442,154

$367,737 $442,154

$870,768 $1,045,162 $2,299,460

$870,768 $1,045,162 $2,299,460

$54,705,015

$14,003,569

$34,900,616

$54,705,015

$15,378,304

$1,049,185

$14,613

$14,676,422 $775,509 $285,682

$14,711,148 $154,126 $3,833

$7,413,199

$7,389,197

ACE GRANT RECEIVED

$108,000,000 Full Scale

$105,860,930 $1,936,991

$17,200,000

$989,323

$70,288,890 $2,301,876 $4,726,762

$41,834,264 $2,094,314 $4,589,759

$53,689,500

$46,700,136

$12,000,000 $212,000

$10,940,632 $188,106

$78,568,119 $923,162 $1,179,012 $343,500 $62,477,416 $2,710,169 $4,246,376

$39,810,307 $216,543 $296,823 $348,596 $25,938,160 $37,749 $828,115

$15,000,000 $10,000,000

$15,000,000

$37,339,317

$20,333,799

$1,024,433 $1,094,139 $2,481,443

$11,332,407 $140,623 $188,809 $395,540

$10,276,648 $1,958 $5,743 $6,621

$14,050,177 $14,050,177

$1,435,500 $1,236,594 $3,059,716

$247,603,598 $241,244,447 $121,363,301

$17,456,177 $17,456,177

$3,406,000

$3,406,000

$33,525,880

$8,000,000 $2,400,000 $50,000 *$380,000,000

$163,650,000 $163,650,000 $103,609,200 $103,609,200

*Original budget figures were based on 1997 dollars NYS includes awards beyond original pledge (i.e. civic strip) (a) NOTE: PROJECT IS US ARMY CORPS OF ENGINEERS PROJECT (b) NOTE: PROJECT RECEIVED $40,500 COST SHARE GRANT FROM (NYSERDA) (c )NOTE: PROJECT RECEIVED $87,500 COST SHARE GRANT FROM (NYSERDA)

$296,103,257


Lake Improvement Project Status Report For The Period Ending 12/31/2016

Project Title

ACJ START DATE

ACJ FINISH DATE

COUNTY FINISH DATE

ORIGINAL BUDGET(2)

AUTHORIZED BUDGET

ENGINEER

METRO - Current 1 AERATION SYSTEM UPGRADE 2 AMMON. REMOVAL DEMONSTRATION

11/1/1998

7/1/2002

01/03/00 $

8,500,000 $

3/1/2000

12/31/99 $

2,000,000 $

3 BIOSOLIDS - MECHANICAL THICKENERS

$

6,925,115 EEA 1,347,187 EEA 14,815,674

4 DIGESTER MOD/CHEMICAL STORAGE

7/1/2002

10/31/00 $

5,600,000 $

5,092,545 C&S

5 DIGITAL SYSTEMS IMPROVEMENTS

7/1/2002

06/31/01 $

2,900,000 $

3,520,317 Systems Integrated

6 MISCEL. IMPROVEMENTS

7/1/2002

01/31/99 $

1,400,000 $

1,400,000

7,700,000 $

8,393,855 OBG

7 ODOR CONTROL 8

7/1/2002

12/20/00 $

AMMONIA REMOVAL FULL SCALE/

10/1/2001

11/1/2003

11/01/03 $

125,000,000

STAGE II PHOSPHORUS REMOVAL

10/1/2003

4/1/2005

$

65,000,000

4/1/2006

4/1/2007

12/31/00 $

9 PHOSPHORUS REMOVAL - PILOT

$

128,688,040 EEA

5,000,000 $

4,111,714 EEA

$

2,840,000 GHD

$

185,500,042 EEA

PHOSPHORUS OPTIMIZATION (587601) CSO - Current 10

CLINTON ST. CONVEYANCE/

5/1/2003

5/1/2007

10/28/06 $

15,987,190

CLINTON ST. RTF

5/1/2007

1/1/2012

12/28/10 $

15,258,090

7/1/2002

04/13/02 $

3,000,000 $

2,684,523 Barton & Loguidice 4,948,516 EEA

11 ERIE BLVD STORAGE SYSTEM 12 FRANKLIN ST. FCF

5/1/2000

05/01/00 $

3,200,000 $

13 HARBOR BROOK FCF

7/1/2002

07/01/02 $

250,000 $

14 HARBOR BROOK CSO ABATEMENT

7/1/2002

$

5,443,980 $

(3) 15 HIAWATHA INTERCEPTOR/RTF

7/1/2002

12/31/00 $

8,000,000 $

16 KIRKPATRICK ST. PUMP STATION

7/1/2002

10/29/02 $

5,641,860 $

8/31/1998

7/1/2002

04/26/99 $

250,000 $

362,028 EEA

5/1/1999

5/1/2004

12/06/00 $

75,000,000 $

131,912,853 EEA

20 NEWELL STREET RTF

7/1/2002

07/01/01 $

1,310,000 $

473,132 Moffa & Assoc.

21 ONONDAGA CREEK FCF

7/1/2002

07/01/02 $

3,000,000 $

648,342 Parsons

22 SEWER SEPARATION

1/1/2012

01/01/12 $

7,703,880 $

27,684,286 OBG

23 SIPHON REHABILITATION

7/1/2002

06/11/99 $

1,230,000 $

1,026,391 C&S

7/1/2002

12/01/01 $

175,000 $

01/14/00 $

1,000,000 $

17 MALTBIE STREET FCF 18 MIDLAND AVE RTF & CSO ABATEMENT

4/26/1999

19 MIDLAND AVE MITIGATION COSTS

$

24 TEALL BROOK FCF 25 WEST ST SEWER SEPARATION

5/1/1999

889,109 EEA 108,500,000 Moffa & Assoc. 6,047,183 EEA/Parsons 12,558,335 EEA

3,000,000

1,235,346 EEA 2,720,572 CHA

26 ERIE BLVD CSO ABATEMENT

New Project

OTHER 27 AMBIENT WATER MONITORING(4) 28 OXYGENATION DEMO PROJECT

5/1/1999

7/1/2002

$

4/1/2003

02/25/04 $

29 SEQRA REGULATORY COMPLIANCE(1)

$

TOTAL DOLLARS (2)

* $

*Original budget figures were based on 1997 dollars (1) SEQR costs are reflected in the individual projects under total payments to date (2) Original budget figures were based on 1997 dollars (3) Hiawatha project costs did not all appear on county account partial ACE (4) AMP is paid through operating funds not in projects

A-3

8,000,000 2,400,000 $

10,087

50,000

380,000,000 $

Parsons

667,335,192


Lake Improvement Project Status Report For The Period Ending 12/31/2016

CONSTRUCTION CONTRACT AMOUNTS

SOFT COST CONTRACTS

1 $

352,747 $

6,473,110

TOTAL PAYMENTS TO DATE

$

TOTAL ESTIMATED COST

FORECASTED COSTS

6,925,115

$

6,925,115 $

OVER/UNDER BUDGET

% COMPLETED EXPENDITURES

(1,574,885)

100.00%

(652,813)

100.00%

2 $

1,346,856

$

1,347,187

$

1,347,187 $

3 $

1,266,345 $

13,131,105

$

14,815,674

$

14,815,674 $

4 $

748,386 $

4,357,480

$

5,092,545

$

5,092,545 $

(507,455)

100.00%

5 $

451,713 $

2,974,514

$

3,520,317

$

3,520,317 $

620,317

100.00%

$

1,400,000

$

1,400,000 $

6

14,815,674

693,855

100.00%

100.00%

7 $

999,299 $

6,956,868

$

8,393,855

$

8,393,855 $

100.00%

8 $

21,289,868 $

106,962,810

$

128,688,040

$

128,688,040 $

(61,311,960)

100.00%

4,111,714

$

4,111,714 $

(888,286)

100.00%

9 $

4,055,734

$

$

1,749,597

$

566,607 $

2,273,393 $

2,840,000 $

2,840,000

19.95%

13,779,674 $

185,500,042 $

154,254,762

92.57%

10 $

34,268,363 $

126,891,045

$

171,720,368 $

11 $

901,556 $

1,734,929

$

2,684,523

$

2,684,523 $

12 $

973,543 $

3,920,238

$

4,948,516

$

4,948,516 $

1,748,516

100.00%

13 $

436,363 $

373,370

$

889,109

$

889,109 $

639,109

100.00%

14 $

22,429,850 $

77,338,472

$

101,297,366 $

7,202,634 $

108,500,000 $

103,056,020

93.36%

540,945

$

5,535,152

$

6,047,183

$

9,453,183 $

1,453,183

63.97%

2,520,394 $

9,882,154

$

12,558,335

$

12,558,335 $

6,916,475

100.00%

15 $ 16 $ 17 $

109,483 $

152,418

$

362,028

18 $

25,808,343 $

73,418,667

$

101,026,952 $

$

3,000,000 $

19

(315,477)

100.00%

$

362,028 $

112,028

100.00%

30,885,901 $

131,912,853 $

56,912,853

76.59%

3,000,000

100.00%

$

3,000,000 $

20 $

472,572

$

473,132

$

473,132 $

(836,868)

100.00%

21 $

503,551

$

648,342

$

648,342 $

(2,351,658)

100.00%

26,409,763 $

22 $

-

2,600,778 $

22,879,464

$

1,274,523 $

27,684,286 $

$

1,021,823

$

1,026,391

$

1,026,391 $

23

19,980,406 (203,609)

95.40% 100.00%

24 $

320,039 $

903,566

$

1,235,346

$

1,235,346 $

1,060,346

100.00%

25 $

403,332 $

2,311,126

$

2,720,572

$

2,720,572 $

1,720,572

100.00%

$

-

$

(2,389,913)

100.00%

26

27 28 $

10,087

$

20,618,235 $

$

10,087

-

$

10,087 $

55,416,125 $

670,741,192 $

29

$

124,559,741 $

467,218,312

$

632,537,301 $

A-4

298,791,192


December 2016

Project Title

TOTAL PAYMENTS TO DATE 12-31-16

TOTAL PAYMENTS TO DATE 09-30-16

Change

METRO - Current 1 AERATION SYSTEM UPGRADE

$

6,925,115

$

6,925,115

$

-

2 AMMON. REMOVAL DEMONSTRATION

$

1,347,187

$

1,347,187

$

-

3 BIOSOLIDS - MECHANICAL THICKENERS

$

14,815,674

$

14,815,674

$

-

4 DIGESTER MOD/CHEMICAL STORAGE

$

5,092,545

$

5,092,545

$

-

5 DIGITAL SYSTEMS IMPROVEMENTS

$

3,520,317

$

3,520,317

$

-

6 MISCEL. IMPROVEMENTS

$

1,400,000

$

1,400,000

$

-

7 ODOR CONTROL

$

8,393,855

$

8,393,855

$

-

8 AMMONIA REMOVAL FULL SCALE/

$

128,688,040

$

128,688,040

$

-

STAGE II PHOSPHORUS REMOVAL

$

-

$

-

9 PHOSPHORUS REMOVAL - PILOT

$

4,111,714

$

4,111,714

$

PHOSPHORUS OPTIMIZATION

$

566,607

$

351,075

$

CSO - Current 10 CLINTON ST. CONVEYANCE/ CLINTON ST. RTF

$ $ $

171,720,368

$

169,800,884

-

$

215,532 1,919,484

$

-

11 ERIE BLVD STORAGE SYSTEM

$

2,684,523

$

2,684,523

$

-

12 FRANKLIN ST. FCF

$

4,948,516

$

4,948,516

$

-

13 HARBOR BROOK FCF

$

889,109

$

889,109

$

-

14 HARBOR BROOK CSO ABATEMENT

$

101,297,366

$

101,165,648

$

15 HIAWATHA INTERCEPTOR/RTF

$

6,047,183

$

6,047,183

$

-

16 KIRKPATRICK ST. PUMP STATION

$

12,558,335

$

12,558,335

$

-

17 MALTBIE STREET FCF

$

362,028

$

362,028

$

-

18 MIDLAND AVE RTF & CSO ABATEMENT

$

101,026,952

$

99,185,340

$

19 MIDLAND AVE MITIGATION COSTS

$

3,000,000

$

3,000,000

$

-

20 NEWELL STREET RTF

$

473,132

$

473,132

$

-

21 ONONDAGA CREEK FCF

$

648,342

$

648,342

$

-

22 SEWER SEPARATION

$

26,409,763

$

26,409,763

$

-

23 SIPHON REHABILITATION

$

1,026,391

$

1,026,391

$

-

24 TEALL BROOK FCF

$

1,235,346

$

1,235,346

$

-

25 WEST ST SEWER SEPARATION

$

2,720,572

$

2,720,572

$

-

26 ERIE BLVD CSO ABATEMENT

$

$

-

$

-

-

$

-

OTHER

131,717

1,841,612

27 AMBIENT WATER MONITORING

$

20,618,235

$

20,618,235

$

-

28 OXYGENATION DEMO PROJECT

$

10,087

$

10,087

$

-

29 SEQRA REGULATORY COMPLIANCE

$

-

$

-

$

-

$

-

TOTAL DOLLARS

$

632,537,301

$

628,428,956

$

4,108,345


Chronology of Project Construction Starts Status

Location

Complete Complete

Metro Metro

Digital Systems Upgrade Ammonia Removal Demonstration Aeration System Upgrade Hiawatha RTF - ACOE Newell St. RTF Demo/Improvements Maltbie St. FCF Siphon Rehab

Complete Complete Complete Complete Complete Complete Complete

Metro Metro Metro Regional Market W.Newell/Vale St. Maltbie/Plum St. Various

Digester Modifications/Chemical Storage Franklin St. FCF West Street Sewer Separation

Complete Complete Complete

Ammonia Trackdown

Complete

Metro I-690/Franklin W. Genesee, Plum, Tracy, N. West St. Metro

Midland Ave. Conveyance Phase I Phosphorus Removal – Phase I Pilot

Complete Complete

Tallman/Oxford St. Metro

Erie Blvd. Storage System Upgrade Full Scale Ammonia Removal/ Stage II Phosphorus Removal Kirkpatrick St. Pump Station & Force Main Onondaga Creek FCF Teall Brook FCF Water Street Sewer Separation (CSO 024)

Complete

Franklin to Teall

Complete Complete Complete Complete Complete

Metro Kirkpatrick St. Inner Harbor Teall Ave. Water Street

Harbor Brook FCF Brighton Ave Sewer Separation (CSO 053/054)

Complete Complete

W.Hiaw./I-690 Brighton/Bishop Ave

Pre-ACJ Signing (1/20/98) General Improvements Odor Control and Residuals Handling

1998

1999

2000

2001

2002


Project

Status

Location

Tallman/Onondaga Sewer Separation (CSO 038, 040, 046A &046B) Midland Phase II RTF/Conveyances

Complete

Tallman/Onondaga

Complete

Blaine/Oxford St.

Phosphorus Removal – Phase II Pilot Biosolids Handling Improvements

Complete Complete

Metro Metro

Sewer Separation – CSO 047 & 048

Complete

South Ave/ Bissell St.

Sewer Separation – CSO 050 Clinton Phase I Conveyances

Complete Complete

Parkway/Rockland

Clinton Phase IIA Conveyances

Complete

Sewer Separation – CSO 051

Complete

Colvin St.

Harbor Brook Interceptor Sewer

Complete

Velasko/Fayette

Midland CSO 044 Clinton Storage Facility Lower Harbor Brook (Conveyance & Storage) Save the Rain Green Projects CSO 022 Sewer Separation Project CSO 045 Sewer Separation Project

Complete Complete Complete Authorized/Underway Authorized/Underway Authorized/Underway

W. Castle/South Ave Armory Square Hiawatha/State Fair Blvd. Various West Genesee/Franklin South Avenue

Save the Rain Green Projects

Completed

Various

Save the Rain Green Projects

Completed

Various

Save the Rain Green Projects Harbor Brook CSO 063 Conveyances Project

Completed Underway

Various Hiawatha/State Fair Blvd.

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014


CONTRACTORS FOR CONSTRUCTION PROJECTS Metro Treatment Plant AERATION SYSTEM UPGRADE Bongiovanni Construction (General) Ridley Electric (Electrical)

$ 5,626,956.41 $ 846,154.00

DIGITAL SYSTEM UPGRADE Systems Integrated

$ 2,974,514.27

ODOR CONTROL CONTRACT #1 Falconet, Inc. (General) Scriba Electric (Electrical) Burns Bros. (Heating/Ventilation) Burns Bros. (Plumbing)

$ 4,872,660.53 $ 315,580.30 $ 82,459.00 $ 50,168.00

ODOR CONTROL CONTRACT #2 Murnane Construction

$ 1,636,000.00

PHASE III IMPROVEMENTS CONTRACT 1 - DIGESTER & LAGOON IMPROVEMENTS Maxim Construction

$

645,730.74

PHASE III IMPROVEMENTS CONTACT 2 - CHEMICAL STORAGE & FEED FACILITIES C.O. Falter Construction Corp. (General) Barry & Barry Electrical Co. (Electrical) Burns Bros. (HVAC) Edward Joy Company (Plumbing)

$ 2,527,300.08 $ 193,665.22 $ 224,232.51 $ 38,669.35

PHASE III IMPROVEMENTS CONTRACT 3 - DIGESTER & LAGOON CLEANING Waste Stream Environmental Inc.

$

727,881.80

$ $ $ $

28,388.00 112,224.00 32,295.00 18,440.00

FULL SCALE AMMONIA/PHOSPHORUS REMOVAL - FIELD OFFICE James & Son Construction Resun Leasing, Inc. Ridley Electric Co. Burns Brothers

FULL SCALE AMMONIA/PHOSPHORUS REMOVAL U.S. Filter - Kruger Products, Inc. U.S. Filter - Kruger Products, Inc.

$ 8,261,182.00 $ 3,918,080.00


CONTRACTORS FOR CONSTRUCTION PROJECTS Metro Treatment Plant FULL SCALE AMMONIA/PHOSPHORUS REMOVAL SITE PREPARATION - CONTRACT 2 C.O. Falter Construction Corp. (General) Ridley Electric (Electrical) C.O. Falter Construction Corp. (Pile Testing) Moretrench Environmental

$ 22,243,604.98 $ 255,627.00 $ 431,008.00 $ 4,602,086.57

PILE INSTALLATION - CONTRACT 3 M.A. Bongiovanni Construction

$ 9,045,731.95

GENERAL - CONTRACT 4 The Pike Company (General) Ridley Electric Co. (Electrical) Edward Joy Company (HVAC) Burns Brothers (Plumbing/Fire Protection)

$ $ $ $

46,860,263.46 6,927,238.00 3,009,057.61 1,217,583.74

BIOSOLIDS HANDLING IMPROVEMENTS C. O. Falter Construction Corp. (General) Ridley Electric (Electrical) Airside Technology (HVAC) Burns Bros. (Plumbing) Independent Field Svs (Cogen)

$ 10,929,016.19 $ 1,476,223.00 $ 532,187.00 $ 173,679.09 $ 18,019.75

CSO's CLINTON CONVEYANCES PHASE I & 2A The Delaney Group, Inc. The Delaney Group, Inc. SIDA MOU (City of Syracuse) MOU City of Syracuse (Connective Corridor)

$ 14,478,053.39 $ 4,074,455.32 $ 2,634,999.43 $ 168,000.00 $3,825,000.00

CLINTON CSO ABATEMENT Ruston Paving (Farmers' market Lot) Davis Wallbridge (Pearl St/Lot 3) Davis Wallbridge (Townsend St.) J&B (Pirro Conv. Center) C.O. Falter (War Memorial) Ridley (War Memorial) Economy Paving (On Center) J&B (Erie Canal Museum) Jett Industries (Clinton Storage) Joy Process Mechanical (Cistern War Memorial) C&S Technical (Cistern War Memorial) Green Culture (Rain Barrels) Syracuse Utilities (Duct Bank) Water Cooling Corp. (Storage Tank)

$ 188,046.14 $ 635,873.93 $ 476,625.39 $ 1,083,727.39 $ 692,298.87 $ 447,957.66 $ 1,094,119.49 $ 73,480.00 $ 79,762,239.12 $ 82,615.00 $ 233,652.56 $ 44,335.50 $ 59,982.56 $ 2,875.00


CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) MOU City of Syracuse (Road Reconstruction) MOU City of Syracuse (Dr. Weeks) MOU City of Syracuse (Bank Alley) MOU City of Syracuse (Upstate) Wallbridge (Streetscape/Water St) Ruston Paving (Sunnycrest Parking Lot) MA Bongiovanni Inc. Acts II Construction (Skiddy Park) D.E. Tarolli (Otisco Street) Orchard Earth & Pipe (Syr School dist Park Lot) Slate Hill Construction (E. Water St) Davis Wallbridge (Onon Cty Pub Library) Tumbers, Schichtels Nursery (Trees), Martisco, Dixie, Pro Scapes Acts II (Seymour Academy) Paul R. Vitale (City Lot 4) John R. Dudley (Leavenworth Park) VIP (Onon Public Library) Ballard Construction (Westcott Comm Ctr) Cornerstone Paving (Oswego St) John Dudley Construction (W. Onondaga St.) Barrett Paving (W. Fayette St.) Davis Wallbridge (Westcott St.) ProScapes (Sunnycrest Arena) Acts II (E. Washington St) John R. Dudley (690 Downspout) Josall (Maganelli Comm Ctr) Spectra (Butternut Circle) Barton & Loguidice (State St) D E Tarolli (annual green) J&J Landscape (annual green) King & King Architects (GIF) Jefferson Clinton Commons (GIF) ESF Foundation, Abby Lane Housing (GIF) Hotel Skyler (GIF) Near West Side Initiatives, Inc. (GIF) Near West Side Initiatives, Inc. (GIF) Tash Taskale (GIF) St. Lucy's Church (GIF) Putnam Properties (GIF) Centro (GIF) 500 W. Onondaga St. Inc. (GIF) CNY Jazz Arts Foundation (GIF) Jim & Juli Boeheim Foundation (GIF) Home Headquarters, Inc. (GIF) Galleries of Syr, 147 E. Onondaga St. (GIF) Syracuse Housing (GIF) Kopp Billing Agency (GIF)

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

638,997.06 89,000.00 108,000.00 1,500,000.00 1,432,437.86 410,372.20 3,000.00 550,916.44 1,847,459.81 430,172.42 147,952.84 320,291.95 833,289.61 373,309.00 607,852.44 719,311.20 51,382.74 52,500.00 109,046.54 1,371,475.75 588,982.07 870,263.89 87,585.22 155,591.53 597,965.65 378,400.00 65,640.00 159,400.00 430,266.47 197,991.00 100,000.00 100,000.00 78,000.00 100,000.00 22,730.69 78,000.00 100,011.00 125,000.00 75,757.00 65,390.00 52,740.00 52,188.00 163,203.51 40,500.00 100,000.00 120,290.00 25,300.00


CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) CNY Philanthropy (GIF) American Beech (GIF) Park Central Presbyterian Church (GIF) Loon Creek (GIF) NHW Syracuse (GIF) McMahan/Ryan Child Advocacy (GIF) Jeffrey DeRoberts (GIF) Bethany Baptist Church (GIF) St. Lucy's Church (GIF) 500 W. Onondaga St. Inc. (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) Gemmi Boy (GIF) Mr. Lady Bug (GIF) Grace Episcopal Church (GIF) Snapse Downtown (GIF) 360 Warren Associates (GIF) Housing Visions Unlimited (GIF) Near West Side Initiatives, Inc. (GIF) Scannell Properties (GIF) Genesee Armory (GIF) Third National Associates (GIF) Center for Peace & Social Justice (GIF) Graham Millwork (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) PEACE (GIF) Syracuse Business Center (GIF) Erie Bruce Corp (GIF) 538 Erie Boulevard West (GIF) Near West Side Initiatives, Inc. (GIF) JNJ Syracuse (GIF) UAS (GIF) Brewster Medical (GIF) Richmond UAS Properties (GIF) J C Smith Inc. (GIF) Burnet Railroad (GIF) Taksum Assoc. (GIF) Zip Networks (GIF) Ra lin Inc. (GIF) Ra lin Inc. (GIF) Butternut St. LLC (GIF) Nojaim Inc. (GIF) St. Joseph's Hospital Health Center (GIF)

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

62,700.00 53,050.00 61,050.00 137,350.00 129,400.00 178,050.00 99,311.00 301,930.00 69,000.00 34,347.00 124,200.00 198,300.00 175,787.00 77,800.00 47,537.00 46,700.00 99,000.00 35,700.00 107,864.00 194,650.00 34,500.00 204,000.00 144,400.00 533,300.00 57,700.00 90,500.00 124,100.00 33,400.00 294,300.00 52,200.00 288,400.00 151,700.00 130,850.00 94,300.00 32,600.00 57,600.00 221,000.00 299,200.00 337,250.00 357,400.00 45,200.00 205,775.00 137,000.00 206,450.00 104,430.00 234,800.00 145,900.00


CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) Auto Row (GIF) WCNY (GIF) Auto Row (GIF) University Hill Apts. (GIF) J C Smith Inc. (GIF) St. Joseph's Hospital Health Center (GIF) Housing Visions Unlimited (GIF) Thomas J Cerio (GIF) R J Westcott (GIF) R J Westcott (GIF) R J Westcott (GIF) Nick's Garage (GIF) Tan A Grocery (GIF) Consuela's-Tato Britter Transp. (GIF)

$ $ $ $ $ $ $ $ $ $ $ $ $ $

138,000.00 98,527.00 164,000.00 36,500.00 84,411.00 33,100.00 70,200.00 36,750.00 125,750.00 119,687.00 18,000.00 382,000.00 52,000.00 38,237.50

ERIE BOULEVARD STORAGE SYSTEM M. Hubbard Construction Ridley Electric (Electrical) Endeco/YSI (SE33923)

$ 1,556,752.00 $ 154,059.00 $ 24,117.90

FRANKLIN STREET FCF Burns Bros (Mechanical) Scriba Electric (Electrical) Burns Bros. (Plumbing) Maxim

$ 179,167.67 $ 144,640.61 $ 28,400.00 $ 3,568,029.43

HARBOR BROOK CSO ABATEMENT Joseph J. Lane Construction (Interceptor Sewer Replacement) Bette Cring (Elephant Barn Greening) John Dudley Construction (Geddes St) J&B Installations (Hazard Library/Erie Canal Museum) Economy Paving (Rosamond Gifford Zoo) J.J. Lane (Lower HB) A.J. Montclair (HB CSO Storage) C.O. Falter (HB CSO Storage) Davis Wallbridge (Onon Cty Pub Library) Cornerstone Paving (Parking Lots) Green Culture Tumbers, Schichtels Nursery (trees), Proscapes, Dixie City of Syracuse VIP Steadman Old Farm Marcellus Const. (CSO 063) OnSite J J Lane (CSO 18)

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

23,391,425.07 207,701.00 279,068.06 67,275.00 688,638.00 5,373,078.94 260,000.00 30,259,100.80 378,920.43 149,195.48 80,665.00 327,868.48 3,342,875.63 51,382.74 11,480.00 6,065,362.00 8,755.00 4,370,168.29


CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) Patricia Electric (Wetland Pilot) MOU City of Syracuse (Road Reconstruction) Bette Cring (Zoo Wetlands) Davis Wallbridge (Wadsworth Park) Acts II (Lewis Park) J & J Landscape (Annual Green) DE Tarolli (Green Structures) Knapp Electric (Wetlands) Vitale Excavating (Bedding Sand), Butler Fence Syracuse Academy of Science (GIF) NYSARC, Inc. (GIF) Vibrant Spaces, LLC (GIF) James Ranalli, W. Genesee (GIF) Vibrant Spaces, LLC (GIF) Brooklyn Pickle (GIF) St. Patrick's Loft (GIF) Smith Housing (GIF) Richard Destito (GIF) Burnet Park Newstand (GIF) Visiting Nurse Assoc. of CNY (GIF) All Times (GIF)

$ 197,767.56 $ 138,165.00 $ 1,290,064.10 $ 345,524.55 $ 217,285.58 $ 2,407.00 $ 10,329.00 $ 41,856.00 $ 232,533.35 $ 158,600.00 $ 78,907.14 $ 153,618.00 $ 616,100.00 $ 198,680.00 $ 30,555.00 $ 177,300.00 $ 52,600.00 $ 152,300.00 $ 59,256.00 $ 60,349.20 $ 92,600.00

HARBOR BROOK FCF C.O. Falter Construction Corp. (General)

$

373,370.21

KIRKPATRICK ST. PUMP STATION & FORCE MAIN C.O. Falter Construction Corp. C.O. Falter Construction Corp. Patricia Electric King & King Mechanical G.J. Adams Plumbing

$ 4,398,009.12 $ 4,425,766.31 $ 761,184.63 $ 245,569.51 $ 51,624.16

MALTBIE STREET FCF Over & Under Piping

$

152,418.00

MIDLAND AVENUE CONVEYANCES Marcellus Construction (General)

$ 1,836,434.47

MIDLAND AVENUE PHASE II CONVEYANCES & RTF Empire Dismantlement Corp. (Demolition) Murnane Building Contractors, Inc. (General) Ridley Electric Company (Electrical) Edward Joy Company (HVAC) Edward Joy Company (Plumbing)

$ 457,681.50 $ 47,929,392.75 $ 2,904,771.00 $ 2,053,808.50 $ 484,717.17


CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) MIDLAND AVENUE PHASE III CONVEYANCES Titan Wrecking & Environmental, LLC (Demolition) Tumbers, Schichtels Nursery (Trees) J.J. Lane Acts II (Hugh's Magnet School Parking Lot) Davis Wallbridge (Onon Cty Pub Library) J & J Landscape (annual green) VIP (Onon Public Library) Green Culture (Rain Barrels) Weather Guard Tecta (USPO Salina St) MOU City of Syracuse (Road Reconstruction) MA Bongiovanni (storage Tank) MOU City of Syracuse (ESF) Env. Design (Gazones Stormwater) Barton & Loguidice (green design) D E Tarolli (Annual green) Jubilee Homes of Syracuse (GIF) Dunbar Association, Inc. (GIF) Syracuse Model Neighborhood (GIF) People's AME Zion Church (GIF) People's Community Dev. Corp (GIF) Salina Shoe Salon (GIF) People's AME Zion Church (GIF) Matawon Development Group (GIF) Tucker Missionary Baptist Church (GIF) Swallows (GIF) Southside Comm. Coalition (GIF)

$ 290,801.39 $ 311,406.42 $ 12,098,662.37 $ 314,439.81 $ 116,033.35 $ 45,796.00 $ 25,691.39 $ 44,335.50 $ 242,860.00 $ 408,332.04 $ 66,130.00 $ 100,000.00 $ 92,825.15 $ 334,800.00 $ 1,146,326.95 $ 100,000.00 $ 99,840.00 $ 250,000.00 $ 61,300.00 $ 80,825.00 $ 48,000.00 $ 5,000.00 $ 24,214.00 $ 146,700.00 $ 111,900.00 $ 59,800.00

SEWER SEPARATION - CSO 022/045 Joy Process Mechanical (Plumbing) Joseph J. Lane Construction

$ 853,536.68 $ 4,757,886.66

SEWER SEPARATION - CSO 024 C.O. Falter Construction Corp.

$

698,863.74

SEWER SEPARATION - CSO 053/054 C.O. Falter Construction Corp.

$ 2,000,817.40

SEWER SEPARATION - CSO 038, 040, 046A&B C.O. Falter Construction Corp.

$ 3,524,487.29

SEWER SEPARATION - CSO 047 & 048 C.O. Falter Construction Corp.

$ 1,654,022.34


CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) SEWER SEPARATION - CSO 050 Joseph J. Lane Construction

$ 4,360,527.06

SEWER SEPARATION - CSO 051 Joseph J. Lane Construction

$ 5,029,323.00

SIPHON REHABILITATION Insituform Metropolitan

$ 1,021,822.99

TEALL BROOK FCF C.O. Falter Construction Corp. (General) Scriba Electric (Electrical)

$ $

877,095.43 26,470.20

WEST STREET AREA SEWER SEPARATION Maxim Construction (General)

$ 2,311,125.85



WEP ACRONYMS ACJ

Amended Consent Judgment

AMP

Ambient Monitoring Program

AMSA

Association of Metropolitan Sewerage Agencies

ARRA

American Recovery and Reinvestment Act

ASLF

Atlantic States Legal Foundation

AWQS

Ambient Water Quality Standards

BAF

Biological Aerated Filter (Biostyr)

BMP

Best Management Practices

BOD

Biological Oxygen Demand

BPJ

Best Professional Judgment

Brew

WEP’s Standard Abbreviation for the Brewerton Wastewater Treatment Plant

Bville

WEP’s Standard Abbreviation for the Baldwinsville Wastewater Treatment Plant

CAA

Clean Air Act

CALM

Consolidated Assessment and Listing Methodology

CAMP

Community Air Monitoring Plan

CIP

Capital Improvement Plan

CMOM

Capacity, Management, Operation, and Maintenance

CSLAP

Citizens Statewide Lake Assessment Program

CSO

Combined Sewer Overflow

CWA

Clean Water Act

DMR

Discharge Monitoring Report

DO

Dissolved Oxygen

EBM

Ecosystem-Based Management

ECL

Environmental Conservation Law

ECM

Energy Conservation Measures

EECBG

Energy Efficiency and Conservation Block Grant

ELAP

Environmental Laboratory Approval Program

EMS

Environmental Management System

ERM

Environmental Resource Mapper

FCF

Floatable Control Facility

FOG

Fats, Oil, and Grease

GIF

Green Improvement Fund

H:\2013\MoRpt\Abbreviations\abbreviations.doc


HRFS

High Rate Flocculation Settling

I&I

Inflow & Infiltration

IW

Industrial Wastewater

km

Kilometers

km2

Square Kilometers

LA

Load Allocations

LF

Linear Feet

m

Meters

MCP

Municipal Compliance Plan

MDV

Multiple Discharge Variance

Metro

WEP’s Standard Abbreviation for the Metropolitan Syracuse Wastewater Treatment Plant

MGD

Million Gallons Per Day

mg/L

Milligrams Per Liter

MIS

Main Interceptor Sewer

ML

WEP’s Standard Abbreviation for the Meadowbrook/Limestone WWTP

MS4s

Municipal Separate Storm Sewer Systems

mt

Metric Tons

NACWA

National Association of Clean Water Agencies

NBP

National Biosolids Partnership

NELAC

National Environmental Laboratory Accreditation Conference

NPDES

National Pollutant Discharge Elimination System

NYSDEC

New York State Department of Environmental Conservation

NYSDOH

New York State Department of Health

NYSEFC

New York State Environmental Facilities Corp.

NYWEA

New York Water Environmental Association

OAK

WEP’s Standard Abbreviation for the Oak Orchard WWTP

OLP

Onondaga Lake Partnership

OLWQM

Onondaga Lake Water Quality Model

OU

Odor Unit

P2

Prevention Program

P2CO

Prevention Program County Operations

PdM

Predictive Maintenance

H:\2013\MoRpt\Abbreviations\abbreviations.doc


PIDs

Photo-ionization Detectors

PFRP

Process to Further Reduce Pathogens

PLA

Project Labor Agreement

POTW

Publicly Owned Treatment Works

PWL

Priority Waterbodies List

RTF

Regional Treatment Facility

SCA

Sediment Consolidation Area

SCADA

Supervisory Control and Data Acquisition

SEPS

Secondary Effluent Pump Station

SEQR

State Environmental Quality Review

SGIP

Suburban Green Infrastructure Program

SHB

Solids Handling Building

SMPs

Storm Water Management Practices

SOP

Standard Operating Procedure

SORP

Sewer Overflow Response Plan

SPCC

Spill Prevention, Control, and Countermeasures

SPDES

State Pollutant Discharge Elimination System

SRP

Soluble Reactive Phosphorus

SSES

Sanitary Sewer Evaluation Study

SSI

Sewage Sludge Incinerator

SSV

Site-Specific Variance

SUNY-ESF

State University of New York College of Science and Forestry

SWMM

Storm Water Management Modeling

SWMP

Storm Water Management Plan

SWPPP

Storm Water Pollution Prevention Plan

TBEL

Stechnology-Based Effluent Limits

TDP

Total Dissolved Phosphorus

TMDL

Total Maximum Daily Load

TP

Total Phosphorus

TSI

Trophic State Index

UAA

Use Attainability Analysis

UFI

Upstate Freshwater Institute

ug/l

Micrograms per Liter

USEPA

United States Environmental Protection Agency

H:\2013\MoRpt\Abbreviations\abbreviations.doc


USFWS

United States Fish and Wildlife Service

USGBC

United States Green Building Council

USGS

United States Geological Survey

UST

Underground Storage Tank

VOC

Volatile Organic Compounds

WAN

Wide Area Network

WLA

Waste Load Allocations

WEF

Water Environment Federation

WEP

Water Environment Protection

WET

Whole Effluent Toxicity

WLA

Waste Load Allocations

WQBEL

Water Quality-Based Effluent Limits

WR

WEP’s Standard Abbreviation for the Wetzel Road Wastewater Treatment Plant

WSE

Waste Stream Environmental

H:\2013\MoRpt\Abbreviations\abbreviations.doc



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.