Just Touch. Selected work Samantha Buckley BArch.
Samantha Buckley, BArch. / Portfolio
page / 2
Just Touch. Selected work Samantha Buckley / BArch.
Samantha Buckley, BArch. / Portfolio
Just Touch. Table of Contents 00 Introduction
01 Long Bridge veteran housing comprehensive design
05 Park Roulade parkour academy and culinary institute body, phenomena, space
02 I Look Up mixed-use high rise core and shell
06 Personal Works hand work 07 Professional Work
03 Passing Time visitor center sanctuary and building performance 04 Occupied Void film theater and tennis club assembly buildings and context
08 Acknowledgments
Samantha Buckley, BArch. / Portfolio
page / 8
Long Bridge. Project 01 Pedestrian scale housing creating a connection between city and water through material and light.
01 Project long bridge veteran housing and master plan
02 Course housing and comprehensive design
03 Site pier 70 san francisco ca
04 Instructors peter benoit michael tauber
05 Team samantha buckley giovanni ribo
Samantha Buckley, BArch. / Portfolio
184 9W ATE R’S
EDG E
160 100 200
PIER 70 60
100
IRISH HILL
260
20
ETRERO HILL 320
01
page / 10
Project 01 Long Bridge
Pier 70 Veteran Housing 02
03
04
01 Historic Site Analysis topography lines and railroad network with future sea level rise
02 Site Photo view looking east toward bay 04 Site Photo view looking south east toward energy plant
03 Site Photo view looking north east toward existing ship repair facilities
Samantha Buckley, BArch. / Portfolio
COMMUNITY CENTER
IRISH HILL PARK COMMUNITY CENTER
ARTIST STUDIOS VENUE
CHOW HALL
01
21ST SREET
A3
COLORADO STREET
COLORADO STREET
SINGLE-FAMILY RESIDENTIAL
A2
NATURAL COASTAL LANDSCAPING
21ST SREET A3
A2
3 BDRM
2 BDRM
POTRERO POINT PARK
2 BDRM
1 BDRM
1 BDRM
2 BDRM
1 BDRM
ARIZONA STREET
ARIZONA STREET
LONG BRIDGE
03
LONG BRIDGE
02
2 BDRM
ARAGO COURTYARD
POTRERO POINT EARTHWORK
LONG BRIDGE
LONG BRIDGE
A1
OUTDOOR DAYCARE
POTRERO POINT PARK
1 BDRM SOCIAL SERVICES
A1
CATHWOOD DAYCARE
2 BDRM
SOCIAL SERVICES
2 BDRM
SOLAR WATER HEATERS
2 BDRM
2 BDRM EMERALD COURTYARD 1 BDRM
1 BDRM
DURANGO COURTYARD
1 BDRM
2 BDRM 1 BDRM
OUTDOOR DAYCARE
MIXED-USE RESIDENTIAL
MIXED-USE RESIDENTIAL
ROOF PLAN
22ND STREET
5
02 Site Plan aerial view with cast shadows page / 12
03 Floor Plan level 2 showing long bridge connection and relationships
1 BDRM
1 BDRM
3 BDRM 3 BDRM
VETERAN HOUSING
VETERAN HOUSING
GIOVANNI RIBO + SAMANTHA BUCKLEY
GIOVANNI RIBO + SAMANTHA BUCKLEY
20
01 Master Plan high density historic long bridge proposal with adjacent zoning
3 BDRM
22ND STREET
ARH 450: COMPREHENSIVE DESIGN STUDIO
04 Next Page rendering from long bridge approach
LEVEL 2
5
20
ARH 450: COMPREHENSIVE DESIGN STUDIO
MIXED-USE RESIDENTIAL
Project 01 Long Bridge
Pier 70 Veteran Housing
SINGLE FAMILY RESIDENTIAL
GROUND LEVEL RETAIL/ RESTAURANT
MIXED-USE RESIDENTIAL
SCALE: 1” = SITE PLAN SCALE 1” = 16’
0’8’ 24’
5
04
Samantha Buckley, BArch. / Portfolio
page / 14
Samantha Buckley, BArch. / Portfolio 01
page / 16
Project 01 Long Bridge
Pier 70 Veteran Housing
SRO
2 BDRM
SRO
2 CATHWOOD PLAZA SECTION-ELEVATION | 1/16” = 1’ 0”
02 45’ 0”
FOURTH LEVEL 35’ 0”
THIRD LEVEL 25’ 0”
SECOND LEVEL
GROUND LEVEL
15’ 0”
0’ 0”
3 ARIZONA ST SECTION-ELEVATION | 1/16” = 1’ 0”
03
45’ 0”
2 BDRM
2 BDRM
2 BDRM
2 BDRM FOURTH LEVEL 35’ 0”
2 BDRM THIRD LEVEL 25’ 0” SECOND-HALF LEVEL SECOND LEVEL
SRO
2 BDRM
SRO
GROUND LEVEL
2 CATHWOOD PLAZA SECTION-ELEVATION | 1/16” = 1’ 0”
17’ 0” 15’ 0”
01 Rendering approach into housing project on long bridge
02 Section-Elevation north-south section through arizona st 03 Section-Elevation through cathwood plaza
45’ 0”
0’ 0”
Samantha Buckley, BArch. / Portfolio
1 NORTH 1 NORTH SECTION-ELEVATION SECTION-ELEVATION | 1/16”| 1/16” = 1’ 0”= 1’ 0” 01
O
O
N
N
M
M
L
3
K L
K I
I
H
P
H
P
Q
Q
F
3
F
E
D
E
D C
2
C
B
B
A
A
2 45’ 0”
2 BDRM
45’ 0”
2 BDRM FOURTH LEVEL
FOURTH LEVEL
THIRD LEVEL
THIRD LEVEL
SECOND LEVEL
SECOND LEVEL 15’ 0”
GROUND LEVEL
GROUND LEVEL
35’ 0”
2 BDRM
2 BDRM
2 BDRM
2 BDRM
2 BDRM
2 BDRM
1 BDRM
1 BDRM
1 BDRM
25’ 0”
1 BDRM
DAYCARE
1 BDRM
1 BDRM
2 BDRM
2 BDRM
2 BDRM
2 BDRM
b
LOBBY
K
45’ 0”
45’ 0”
27’ 0’
FOURTH LEVEL FOURTH LEVEL 35’ 0”
b
1 BDRM 1 BDRM
THIRD LEVEL THIRD LEVEL
THIRD LEVEL THIRD LEVEL 25’ 0”
27’ 0’
SECOND LEVEL SECOND LEVEL 15’ 0” 15’ 0”
LEVEL 3
DECK & CONCRETE DECK & CONCRETE
35’ 0”
b
25’ 0”
LEVEL 3
LANDSCAPE LANDSCAPE
40”
2 BDRM 2 BDRM
2 BDRM 2 BDRM
STEEL
STEEL
CEILING
CEILING
LEVEL 2
LEVEL 2
SECOND LEVEL SECOND LEVEL 15’ 0”
15’ 0”
DECK & CONCRETE DECK & CONCRETE STEEL
1 BDRM 1 BDRM
STEEL
PAVEMENTPAVEMENT
VETER VET
GIO
SAMAN SA
12’ 6”
12’ 6”
GROUND LEVEL GROUND LEVEL 0’ 0” GROUND LEVEL GROUND LEVEL 0’ 0”
1.1 NORTH 1.1 NORTH SECTION-ELEVATION SECTION-ELEVATION | 1/8” = | 1/8” 1’ 0”= 1’ 0”
0’ 0”
8’ 6”
K
30”
L
40”
L
8’ 6”
M
15’ 0”
LOBBYMULTIPURPOSE MULTIPURPOSE
b
30”
M
25’ 0”
DAYCARE
0’ 0”
02
35’ 0”
GROUND LEVEL GROUND LEVEL 0’ 0”
0’ 0”
ARH ARH 450: DESIGN DESIS
page / 18
Project 01 Long Bridge
Pier 70 Veteran Housing
03
CATHWOOD PLAZA FROM BENEATH LONG BRIDGE
01 Section-Elevation section cut parallel to long bridge 02 Detail zoomed in view of units spanning arizona street
03 Render view from under long bridge into cathwood plaza
Samantha Buckley, BArch. / Portfolio
01
02
01 Wall Section Detail exterior skin system with rain screen and window sill
02 Wall Section Detail interior construction with radiant slab and wood framing 03 Exploded Axon diagram helping explain construction assembly
page / 20
Project 01 Long Bridge
Pier 70 Veteran Housing
03
Samantha Buckley, BArch. / Portfolio
page / 22
I Look Up. Project 02 Introducing open spaces physically, visually, and programmatically to inform program relationships
01 Project i look up splunk hq, and mixed-use tower
02 Program tectonics and structure, core and shell 04 Course karen seong benjamin damron
03 Site aronson building 700 mission street san francisco ca
Samantha Buckley, BArch. / Portfolio
02
page / 24
02
Project 02 I Look Up
Yerba Buena Mixed-Use Tower
01 Formal Studies line drawings cataloging the macquettes
02 Formal Studies cast plaster models reflecting site conditions and material properties
Samantha Buckley, B Arch. / Portfolio
02
page / 26
Project 02 I Look Up
Yerba Buena Mixed-Use Tower 02
01 Site Model large scale cast plaster and wood model in context
02 Diagram process showing where voids were created in original macquette
Samantha Buckley, BArch. / Portfolio
01
02
01 Process Mold mold before the pour showing sun angles and contributing forces
page / 28
02 Program Model inversion of negative and positive to explore program relationships
ELEVATORS EGRESS
CORE REC
SPELUNKING COURSE VIDEO ARCADE/BAR RESTAURANTS OPEN KITCHEN COFFEE SHOP GENERAL STORE
CAFETERIA SKY GARDEN
SCULPTURE GARDEN MEETING AREAS
ASSEMBLY LECTURE HALL LOBBY PROJECTION ROOM STORAGE
RESIDENTIAL RESIDENTS TECH-IN-RESIDENCE
SPLUNK OFFICES
OFFICES CUBICLES MEETING ROOMS COLLABORATIVE WORK SPACES LOUNGE AREAS
OPEN-AIR VOID COMMUNICATION STAIRS
03 Program Diagram coupling pairs relationship between programs
Samantha Buckley, B Arch. / Portfolio
01
page / 30
Project 02 I Look Up
RESIDENTIAL
Yerba Buena Mixed-Use Tower 226'-0"
02
RESIDENTIAL
SKY GARDEN
28'-0"
GATHERING HUB
20'-0"
30'-0"
30'-0"
30'-0"
30'-0"
30'-0"
28’-0”"
INCUBATOR STUDIOS
SKY GARDEN
GATHERING HUB
INCUBATOR STUDIOS
ROOF LEVEL
LEVEL 27 LEVEL 26
SKY GARDEN LEVEL 25 LEVEL 24 LEVEL 23
SCULPTURE GARDEN
LEVEL 22 LEVEL 21
AUDITORIUM LEVEL 20
LEVEL 19
LEVEL 18
LEVEL 17
WESTIN PLAZA
WESTIN PLAZA
LEVEL 16
JESSIE SQUARE PLAZA
JESSIE SQUARE PLAZA
LEVEL 15
LEVEL 14
LEVEL 13
LEVEL 12
CASUAL COLLABORATION SPACE
LEVEL 11
LEVEL 10
LEVEL 9
LEVEL 8
LEVEL 7
LEVEL 6
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
03
01 Sky Garden Render view toward south of market emphasizing the transparency
02 Select Plans ground floor, public dining level, auditorium, and residential level
03 Longitudinal Section showing the structural grid, program location, and context
HACK-A-THON GROUND LEVEL
1
2
EAST-WEST SECTION
3 0 4
4 16FT
5
6
7
8
9
Samantha Buckley, B Arch. / Portfolio
JESSIE SQUARE SOUTH-WEST ELEVATION
MISSION STREET SOUTH-EAST ELEVATION
THIRD STREET NORTH-EAST ELEVATION
WESTIN PLAZA NORTH-WEST ELEVATION
WALL SECTION DETAIL: VOID MEETS GRID 01
page / 32
Project 02 I Look Up
Yerba Buena Mixed-Use Tower
02
01 Skin Study wall section showing intersection of the two skin systems
02 Render ground level approach from yerba buena gardens
Samantha Buckley, B Arch. / Portfolio 01
02
STRUCTURAL COMPONENTS STEEL DIAGRID COLUMNS ON GRID FLOOR SLAB COLUMNS REDIRECTED BY DIAGRID
01 Model cast plaster model with the wood block as the aronson building
page / 34
02 Building Components shell, floor slabs, and structural grids
03 Axon Diagram diagram showing how each structure element interacts
Project 02 I Look Up
BUILDING ENVELOPE
0 10
40FT
EAST VIEW 03
FLOOR SLABS + CORE
Yerba Buena Mixed-Use Tower
CORE, COLUMNS, ARCHES, + DIAGRID
Samantha Buckley, B Arch. / Portfolio
01
page / 36
Project 02 I Look Up
Yerba Buena Mixed-Use Tower
01 Lobby Section section to show lobby, office space, and void
02 Render view as you enter lobby through primary void
02
Samantha Buckley, BArch. / Portfolio
page / 38
Passing Time. Project 03 Inspiration taken from the site drive initial response and land art to develop a formal language and visitor center displays.
01 Project passing time point reyes visitor center
02 Course sancutary, building performance, and wood structure 04 Instructors mark donahue paul haydu
03 Site upper pierce ranch point reyes ca
Samantha Buckley, BArch. / Portfolio
page / 40
Samantha Buckley, BArch. / Portfolio
01
02
page / 42
03
04
Project 03 Passing Time
Point Reyes Visitor Center
01 Photo inspiration from wind blown seagrass at upper pierce ranch
03 Land Art anchors showing wind blown form
02 Site Plan aerial view showing anchors for land art installation
04 Render visitor center approach
Samantha Buckley, BArch. / Portfolio
01
01 Plan Diagram visitor center display progression
02 Plan Diagram progression of displays in visitor center, all relating to time
03 Longitudinal Section through viewing tower adjacencies and first series of displays 04 Program Diagram axon view of program adjacencies and circulation
page / 44
Project 03 Passing Time 02
Point Reyes Visitor Center
03
POINT REYES
EROSION
FAULTS
OBSERVATION TOWER
ROCKS
WIND
FAUNA
OBSERVATION TOWER
FOG
BACK OF HOUSE
DISPLAY DISPLAY
ENTRY
WAVES
INFO
WATER LEVELS
FLORA
SEASONS
BACK OF HOUSE
DISPLAY DISPLAY ENTRY
SUN PATH
INFO
FOUCAULT’S PENDULUM
04
WATER TREATMENT FACILITY DISPLAY
UP
VIEWING DECK
DISPLAY OFFICES
CONFERENCE ROOM/ LECTURE HALL
UP
DISPLAY
DN
BATHROOMS DN
BACK OF HOUSE
UP
INFO DESK
ENTRY
DISPLAY CISTERN
BACK OF HOUSE
DN
OBSERVATION TOWER
OBSERVATION TOWER DN
UP
STORAGE
VIEWING DECK OFFICE
BOOKSTORE
OBSERVATION TOWER
OFFICES ENTRY HALL
RANGER STATION
BOOKSTORE
INFO DESK
RESTROOMS
DISPLAY AREA
CONFERENCE ROOM DISPLAY AREA
MECHANICAL ROOM
TRASH ROOM ELECTRICAL ROOM
GENERAL STORAGE UTILITY YARD
ENTRY INFO
Samantha Buckley, BArch. / Portfolio
POINT REYES
EROSION
FAULTS
ROCKS
WATER TREATMENT FACILITY DISPLAY
FAUNA
WIND
UP
WALL SECTION DETAIL
VIEWING DECK
DISPLAY
RIGID INSULATION SHAPED TO FOGSPECIFIC PROFILE
OFFICES
DN
OBSERVATION TOWER
2 LAYERS 1/4”WAVES PLYWOOD
BACK OF HOUSE
DN
CURVED 16” GLULAM BEAMS OBSERVATION@ 4’-6’ O.C. OBSERVATION TOWER
TOWER
WATER LEVELS
UP
FLORA
DN
SEASONS
CURVED GLULAM POST
DISPLAY
VIEWING DECK
DISPLAY ENTRY
SUN PATH
INFO
WOOD SHINGLE SKIN
INT REYESFOUCAULT’S PENDULUM TOR CENTER
STEEL POST BRACE PRESSURE TREATED SILL PLATE
01
ANCHOR BOLT AND PLATE
TAR PAPER SHAPED PLYWOOD FIN FREEFORM LATH AND PLASTER FINISH
WATER TREATMENT FACILITY DISPLAY
WATERPROOFING MEMBRANE OFFICES
ARH 350: STUDIO 6
UP
VIEWING DECK
DISPLAY
WOOD FLOORING CONFERENCE ROOM/ LECTURE HALL
NS AND BUILDING PERFORMANCE
1/2” PLYWOOD SUBFLOOR
DN
MARK DONAHUE AND PAUL HAYDU UP
UP
DISPLAY
BATHROOMS
INFO DESK
DN
BACK OF HOUSE
CONCRETE TOPPING SLAB WITH RADIANT HEATING TUBE
DISPLAY CISTERN
BACK OF HOUSE
ENTRY
DN
OBSERVATION TOWER
UP
DRAIN ROCK
STORAGE
OFFICE
VIEWING DECK 4” PERFORATED DRAIN PIPE
BOOKSTORE
RIGID INSULATION STRUCTURAL SLAB CONCRETE STEM WALL
02
page / 46
03
OBSERVATION TOWER DN
BACK OF HOUSE
Project 03 Passing Time
Point Reyes Visitor Center
TRANSVERSE SECTION
1/8” = 1’-0”
04
01 Plan Level 2 second half of displays 02 Program Diagram entry sequence and first half of displays
03 Wall Section Detail cut showing wood structure connecting to the foundation
04 Section Diagram a series of form making sections, site and building
Samantha Buckley, BArch. / Portfolio
page / 48
Occupied Void. Project 04 A public assembly space is derived through a cyclical process of analysis, drawing and model making, at an urban edge condition.
01 Project occupied void embarcadero film theater and tennis club
02 Course assembly buildings and context 04 Instructor carol buhrmann
03 Site 370 drumm street san francisco ca
INTRODUCTION BY STANLEY ALLEN Samantha Buckley, BArch. / Portfolio
Las Meninas
01
page / 50
“AND OF CONTRIBUTING T ECONOMY, THE E POWERFUL, THROUGH TH
Project 04 Occupied Void
02
Embarcadero Film Theater
03
01 Analysis Diagram of las maninas’s implied lines
02 Analysis Drawing based on las maninas, part one
03 Analysis Drawing based on las maninas, part two
Samantha Buckley, BArch. / Portfolio
01
page / 52
01 Analytical Model of las maninas’s implied lines
02 Analysis Drawing based on analytical model
02
Samantha Buckley, BArch. / Portfolio
COIT TOWER
1
PIER SEVEN
2
GATEWAY APARTMENTS
3
2 9
VISTA TOWER
4
3
12 TRANSAMERICA BUILDING
5
4 15
14 10
5
13 11
8
FERRY BUILDING
6
7
6
VAILLANCOURT FOUNTAIN
16
7
EMBARCADERO CENTER
8
N 9
SITE: 370 DRUMM STREET SAN FRANCISCO, CA 94111
01
page / 54
10
KEY FIGURES WITHIN SITE VACINITY
11
EACH BLOCK FROM SITE REPRESENTS DIVISABLE FOR PERSEPCTIVE
12
13
14
15
16
Project 04 Occupied Void
Embarcadero Film Theater
03
OUTDOOR OUTDOOR FITNESS INDOOR FITNESS CINEMA
STREET LEVEL
BACK OF HOUSE VOIDS
02
01 Analytical Mapping of context showing significant figures
02 Analytical Site Plan derived from mapping
03 Concept Sketches scanned from sketch book
Samantha Buckley, BArch. / Portfolio
divide designated figure by number of blocks removed from site ACTION RE ACTION P AIR OF MIDGE T KICKING DOG
make rectilinear forms based on the figures most extreme dimensions
EY COMPONEN T ES AS AUTHOR
major geometires will be seperated
PRE TATION OF PERSPECITIVE Y
to emphasize diretionality based on implied lines, cut off LITERA L INTERPRE TATION OF ANA LYSIS AWING a DR corner or edge of the volume
USING STR UCTURE TO SHOW VIS UAL CORRESPON DENCE, CONNEC T THRO UGH THE VOID
based on relationships with their surroundings, divide the figure with a plane
define an axis of rotation opposite major directionality
now figures can connect structurally through the implied lines, using the newly created voids
01
01 Process Diagram of how to decompose significant figures
02 Analytical Site Model plan view
03 Analytical Site Model elevation
page / 56
Project 04 Occupied Void
02
03
Embarcadero Film Theater
Samantha Buckley, BArch. / Portfolio
PACIFIC AVE.
UP
UP
UP
UP
RESTAURANT
UP KITCHEN
UP UP
ERO
AUDITORIUM
UP
CONCESSIONS
JACKSON ST.
RESTROOM
UP UP LOBBY
DN
page / 58
DRUMM ST.
01
LOBBY
CAD
LAP POOL
UP
BAR
EM
UP
Project 04 Occupied Void
Embarcadero Film Theater
02
DN
DN
RESTAURANT PATIO
AMPHITHEATER LOBBY
AUDITORIUM
DN
PIT DN
03
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
01 Floor Plan with model overlay
02 Section through auditorium and outdoor amphitheater
03 Plan Detail of auditorium
Samantha Buckley, BArch. / Portfolio
page / 60
Park Roulade. Project 05 Phenomenal implications of both occupying and generating space from the perspective of the user.
01 Project park roulade parkour academy and culinary institute
02 Course body, phenomena and space 04 Instructor monica tiulescu
03 Site eastshore park oakland ca
Samantha Buckley, BArch. / Portfolio
01
02
01 Photo Montage mapping the process of baking 02 Aggregate Model 3d mapping of the baking process page / 62
03 Vector Diagram mapping the process of baking through vectors
03
Samantha Buckley, BArch. / Portfolio
01 01 Plan showing program relationships and site
page / 64
02 Model Photo of parkour facilities
02
Samantha Buckley, BArch. / Portfolio
01
page / 66
Project 05 Park Roulade
Oakland Parkour Academy and Culinary Institute
01 Model Photograph view looking into cafe
02 West-South Section cutting through culinary facilites
02
03
03 North-South Section cutting through cafe and parkour facilities
Samantha Buckley, BArch. / Portfolio
page / 68
Personal Works. Project 06 A collection of personal enrichment work created through making and hand drafting.
01 Project assorted
Samantha Buckley, BArch. / Portfolio
01
02
page / 70
Project 06 Personal Work
03
04
01 Table created with new, used, and found materials 02 Table grain detail
03 Flagstaff Mapping 24” x 36”
04 Cities on a Chair 11” x 14”
Samantha Buckley, BArch. / Portfolio
01
page / 72
Project 06 Personal Work
02
01 Cube Study development and deconstruction of a cube
02 Cube Study physical models of cube study
Samantha Buckley, BArch. / Portfolio
01
page / 74
Project 06 Personal Work 02
03
01 Carved Plaster view one
02 Carved Plaster view two
03 Carved Plaster view three
Samantha Buckley, BArch. / Portfolio
page / 76
Professional Works. Project 07 Work samples showing construction details, design, and built work from office experience.
01 Professional Work michael heacock architects, inc.
02 Program private residential
03 Site assorted
Samantha Buckley, BArch. / Portfolio
VERIFY HEADER SIZE
GENERAL NOTES:
(E) 4"X6" POST
1. ALL DRAWINGS BY MICHAEL HEACOCK ARCHITECTS ARE BASED ON ORIGINAL PLANS PROVIDED BY OWNER. FIELD DIMENSIONS MAY VARY.
TILE
TILE
7'-8"
3. ALL WORK SHALL COMPLY WITH THE CURRENT EDITION OF THE CALIFORNIA BUILDING CODE.
6'-0"
7'-2 1/2"
TILE SPLASH
3'-0"
7'-9 1/2"
2. CONTRACTOR SHALL NOTIFY ARCHITECT OF ALL DISCREPANCIES BETWEEN DRAWINGS AND FIELD DIMENSIONS PRIOR TO COMMENSING WITH WORK.
FRAMELESS GLASS ENCLOSE
7'-10 5/8"
8'-11 3/4"
REUSE (E) DOOR
4" CURB 2'-6" MATCH (E) DOORS 7'-7" V.I.F.
2'-7 3/4"
3'-8 3/4" 8'-0" V.I.F.
SOUTHWEST ELEVATION
7'-7" V.I.F.
NORTHWEST ELEVATION
GUEST BATH ELEVATIONS
4'-3 1/4" 8'-0" V.I.F.
NORTHEAST ELEVATION
SOUTHEAST ELEVATION MICHAEL MICHAEL HEACOCK HEACOCK ARCHITECTS, ARCHITECTS, INC. INC.
3/8" = 1'0"
Ecological Architecture + Green Interiors
43 Loring 203 E. Blithedale AvenueAve. Mill Valley CA 94941
(E) 4"X6" POST
T 415.845.5326 F 415.873.1301 E mh@MichaelHeacock.com
8'-11 3/4"
TILE
FRAMELESS GLASS ENCLOSE CUSTOM CONC. SPLASH
3'-0"
3'-0"
10"
CUSTOM CONC. SPLASH
3'-10" 7'-7" V.I.F.
2'-10 1/2"
8'-0" V.I.F.
(N) CABS. NORTHEAST ELEVATION
MASTER BATH ELEVATIONS
2'-6"FIN. MIN. CLEAR
7'-7" V.I.F.
SOUTHEAST ELEVATION
SOUTHWEST ELEVATION
V.I.F. 8'-0" V.I.F.
625 Lovell Ave.
NEW HOOD OPTIONS:
NORTHWEST ELEVATION
OPTION A: CUSTOM DOWNDRAFT TO EXTERIOR WALL OPTION B: ROOF MOUNTED REMOTE BLOWER W/ CUSTOM SHROUD OPTION C: OFF THE SHELF HOOD THRU ROOF OPTION D: REPLACE (E) FAN W/ CEILING MOUNTED BLOWER (GAGGENAU AC402 OR SIMILAR)
3/8" = 1'0"
MILL VALLEY, CA 94941 APN
(E) 6" WOOD PANELLING
(E) DOORS TO REMAIN
(E) 6" WOOD PANELLING (E) PAINTED GYP. BD. TO REMAIN
(E) PAINTED GYP. BD. TO REMAIN
(E) 2'-4 1/2"
(E)
(E) WOOD COUNTERS
6'-11 3/8"
(E)
3'-0"
(E) (N) PANTRY CAB.
1'-6"
8'-2 1/8"
8'-8 3/4"
2'-5 3/8"
1 1/2" SCRIBE
(N) HINGE TOP W/ GAS SPRINGS
(E) WOLF 5' RANGE 4" KICK
4" KICK (N) BUILT-IN BENCH (CUSHIONS BY OWNER)
(E) SHELVES
C L
1 1/2" SCRIBE
(E) BOTTOM CABS.
(E) ALARM
(E) CAB.
4" TOEKICK
(E) CAB.
1'-10 5/8" BRACKET
C L
1'-10 5/8" BRACKET
C L
1'-10 5/8" BRACKET
C L
1 1/8"
(N) PANTRY CAB.
(N) BUILT-IN BENCH (CUSHIONS BY OWNER)
SOUTHEAST ELEVATION
SOUTHWEST ELEVATION
FRAMED WALL BELOW
SOAP DISPENSER
INSTANT HOT
DW
FLUSH COUNTER W/ 1-1/2" SCRIBE @ DW 1 1/2"
(N) COPPER SINK BY OWNER WELDED INTO (N) COUNTER
1'-2"
7"
3'-1 1/2"
5'-10"
OPEN SHELVES BELOW
2'-0"
1'-3 1/8" BRACKET
4'-0"
DECK MOUNTED DISPOSAL SWITCH
8 1/2"
3/8" = 1'0" 1'-3 1/8" BRACKET
KITCHEN ELEVATIONS
1'-2"
NORTHEAST ELEVATION
NORTHWEST ELEVATION
2'-0"
1-1/2" OVERHANG @ F.O. COUNTER
NOT FOR CONSTRUCTION
1 1/2"
7'-0" 7'-0"
KITCHEN ISLAND PLAN
JET CUT STEEL 3/4" TRUSS REVEAL WITH CUSTOM PATINA @ BRACKET
2"
Job Number
10-001
Revision Description
Date
PROGRESS PLANS
07/29/13
1 1/2"
3/4" REVEAL @ BRACKET
6"
1 1/2"
1" = 1'0"
COPPER COUNTER
1'-2"
1'-2" 2"
1-1/2" SCRIBE
1-1/2" SCRIBE DW
3'-0"
OPEN
1'-0"
INTERIOR ELEVATIONS MASTER BATH GUEST BATH KITCHEN / ISLAND
OPEN
FLUSH KICK @ SIDE AND BACK
NORTHWEST
KITCHEN ISLAND ELEVATIONS
SOUTHWEST
5'-10"
FLUSH KICK @ SIDE AND BACK
SOUTHEAST
4" KICK, 4" BACK
NORTHEAST
1" = 1'0"
01
01 Interior Elevations of kitchen, and island details
page / 78
Sheet Scale:1/8" = 1'-0"
02 As-Built Plans floor plans of existing home
2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD AND NOTIFY ARCHITECT OF ALL DISCREPANCIES OVER 1/4" PRIOR TO EXECUTION OF THE WORK.
Michael Heacock Architects
Project 07 Professional Work 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
MICHAEL MICHAEL HEAC HEAC
EcologicalArchitec Architec Ecological
ELEC. METER
E
E WASHER
GAS
DRYER
A
HWT
220V
GAS
W.P.
A
T 415.845.5326 F 415.873.1301 E mh@MichaelHeacoc
8'-0"
8'-0"
CLOSET KITCHEN
203Loring 43 East Blithedale Avenue Ave Mill Valley CA 94941
4
BEDROOM #3
B
B
6'-0"
DINING ROOM
BATH
625 Lovell
6'-0"
PANTRY
GAS
4
Mill Valley CA 9494 APN
4'-0"
C
4'-0"
C
4'-0"
D 4'-0"
D
E
E BUILT-IN CABINET CLAWFOOT TUB
BATH
6'-0"
6'-0"
BATH
BUILT-IN CABINET
DESK
F
F
G
BEDROOM #2
CLOSET
CLOSET
E
E
BALCONY
8'-0"
LIVING ROOM
8'-0"
BEDROOM #1
G
BALCONY
BALCONY
NOT FOR C
Job Number
Revision Descrip AS BUILT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
--
02
FLOOR PLAN - EXISTING 1/4" = 1'0"
Sheet Scale:
Samantha Buckley, BArch. / Portfolio
01
02
01 Construction Photo of exterior garage and workout room
page / 80
02 Construction Photo of exterior at entry
03 Construction Photo of kitchen and dining room from living room
04 Construction Photo of inglenook built-ins
05 Construction Photo of master bedroom custom built-ins, niches, and lighting
Project 07 Professional Work
Michael Heacock Architects 03
04
05
TING ENCE
Samantha Buckley, BArch. / Portfolio
NELS NG
AMI R F E
ENC
01
02
VING ROOM / INGLENOOK - NORTH
01 Digital Model of custom cabinet
02 Construction Photo of custom cabinet
04 Elevation Detail of custom cabinet
page / 82
03 Plan Detail of custom cabinet
Michael Heacock Architects
LIVING ROOM - WEST / OPTION C
LIVING ROOM - WEST / OPTION C
4" FLUSH KICK
E.Q.
E.Q.
E.Q.
E.Q.
1'-0"
SCALE: 3/4" = 1'-0"
1'-0"
4"
4"
SK18 L.E.D. LIGHTING INSIDE VALENCE SK18
SCALE: 3/4" = 1
L.E.D. LIGHTING 3FORM PANELS INSIDE VALENCE 3FORM PANELS E ENC
LO LO CA CA TE TE LI LI G G HT HT SW SW IT IT CH CH
VAL
NG
MI FRA
NG
MI FRA NCE
E
VAL
1-1/2" SCRIBBE
2'-6"
1-1/2" SCRIBBE
E.Q.
E.Q.
E.Q.
E.Q.
E.Q.
E.Q.
2'-6"
HALL 2 MIN. 1-1/2" ALIGN BEYOND SCRIBE, TYP. WRAP FIN. PLY INTO HALLWAY MIN. AS1-1/2" SHOWN SCRIBE, WRAPTYP. FIN. PLY INTO HALLWAY AS SHOWN 4" FLUSH 04 KICK
E.Q. E.Q.
FUR DOWN CEILING @ HALLWAY FUR DOWN BEYOND, CEILING @ FINAL DESIGN HALLWAY TBD BY ARCH. BEYOND, FIELD IN HALLWAY FINAL DESIGN BEYOND TBD BY ARCH. IN FIELD HALLWAY HALL 2 ALIGN BEYOND BEYOND
E.Q. E.Q. E.Q. E.Q. E.Q. E.Q. E.Q. E.Q. E.Q.
STAINED 2X4 FSC #1 FRAMING @ 16" O.C. PER PLAN PER LABC: PROVIDE 1/2" GYP. STAINED 2X4 FSC #1 BD. FRAMING AT WALL & CLG. FRAMING @ 16" O.C. PER PLANABOVE VALENCE, TYP. 1 PER LABC: PROVIDE 1/2" GYP. BD. AT WALL & CLG. FRAMING ABOVE VALENCE, TYP. 1
E.Q.
RECESSED L.E.D. UPLIGHTS @ 03 VALENCE RECESSED L.E.D. UPLIGHTS @ VALENCE
1 1/2",TYP. 1 1/2",TYP.
Project 07 Professional Work
C LIVING ROO
C LIVING RO
Samantha Buckley, BArch. / Portfolio
page / 84
Acknowledgments There are not enough words to express my gratitude for the support I’ve received from family, friends, faculty, and the profession. Thank you. 01 Mom, Dad, and Anastasia, thank you for never doubting me, and being my biggest fans.
02 Jennifer Asselstine, Karen Seong, Mark Donahue, Doron Serban, and Carol Buhrmann, thank you for always pushing me to that next level.
04 The American Institute of Architecture Students for honing my skills and giving me so many opportunities.
03 Michael Heacock, for giving me a chance, and giving me my first internship.
Samantha Buckley, BArch. / Portfolio
page / 86
Colophon 01 School academy of art university, school of architecture
07 Text Stock mohawk superfine eggshell ultrawhite 100 lb, 148 gsm
02 Course senior portfolio mary scott
08 Fonts gothic 725 bd bt gothic 725 blk bt
03 Student samantha v buckley
09 Software adobe creative cloud
562.237.f6996 630 leavenworth street
san francisco ca samantha.v.b at gmail.com svbuckley.com 04 Book Binder blurb 05 Photographer samantha v buckley 06 Cover Stock imagewrap matte finish
10 Copyright c. 2015 all rights reserved no part of this publication can be reproduced without express permission from samantha v buckley