Liquid Learning. Thesis Proposal

Page 1

Liquid Learning. Thesis Proposal Samantha Buckley / BArch.


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

page / 2


Alameda needs to become resilient to economic instability and a rising sea level. This thesis proposes a canal to manage the water levels, which connects industrial, commercial, residential, and recreational districts. To stabilize the economy, a network of vocational schools is strung along the canal, encouraging community circulation. By slicing the historic hangar at the waterline, and injecting the vocational school along the public circulation path bridging the canal, all three user types – public, distiller, and student – become engaged.


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

page / 4


INITIAL INTERPRETATIONS OF ALAMEDA POINT

Alameda Point is the northwestern most part of the city and island of Alameda. The island is nestled closely to Oakland, and across the bay from San Francisco. When approaching Alameda, your options are limited to the adjacent Posey and Webster tubes connecting to California Interstate 880 through Oakland, or the bridges near the southeastern edge of the island, Park Street, Fruitvale Avenue, High Street, and Doolittle Drive or the most pleasant way possible, via ferry across the San Francisco Bay. A sense of Alameda Point, formerly the Naval Air Station (NAS) Alameda, is shown through a study using Kevin Lynch’s five elements that define The Image of the City. To the right is a series of images defining the edge, district, path, node, and landmark. These elements were observed during the initial site visit. After having walked through the 1,560 acres of Alameda Point, a mental map was drawn, as seen on the left. This exercise of analysis is also derived from Lynch. The mental map shows many references to previously known information such as the location of heartshaped Lake Merritt in Oakland. During the ferry ride, coming into the Alameda Channel with the Port of Oakland to the North, you went under the giant cranes used for moving shipping containers, also closely resembling a Star Wars AT-ATŽ. Distinct to my recollection of the old NAS is the observation tower marking the end of the airplane hangers, and beginning of the flight line.

WATERFRONT

EDGE

EDGE waterfront

ALAMEDA POINT FLIGHT LINE

DISTRICT

DISTRICT NAS Alameda flight line

REDLINE AVE TOWARD SF

PATH

PATH Redline Ave toward San Francisco

ALAMEDA SKATE PARK

NODE

NODE Alameda skate park

SEAPLANE HANGERS

LAND MARK

LANDMARK Seaplane hanger


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

EVOLUTION OF ALAMEDA'S COASTLINE

Alameda is often referred to as an island, but that has not always been the case. Below is a series of historic maps with direct comparison to the modern 2014 coastline. In 1888 you can see Alameda is not yet an island, but a peninsula off the coast of Oakland. Today’s Alameda Point does not yet exist, and half the peninsula is marshlands with an incredibly long dock bring the train tracks as close to San Francisco as possible, the Alameda Mole. Based on the street grid of the City of Alameda in the 1888 map, you can see where the solid land ended and the mashes began. By 1938, Alameda began to take on a more recognizable shape. First, note that the City of Alameda is now an island. The Tidal Channel was dredged by the Army Corps of Engineers beginning in 1874. This begins the trend of dredging and landfill. In addition to filling along the abandoned Alameda Mole, the land for Benton Field, for the Naval Air Base was created. It was in 1938 that the Navy

began the extensive landfill necessary to build the 10,000 man Naval Air Station. The work was contracted to 25 companies for a total of $12,200,000. The landmass of current Alameda was achieved on November 1, 1940, when the base was formally commissioned.

ALAMEDA CIRCA 1888

page / 6

ALAMEDA WATERLINE COMPARISON, 1888 VS 2014


201

4

1 19 888 38

ALAMEDA WATERLINE COMPARISON, 1888, 1938, 2014

ALAMEDA CIRCA 1938

ALAMEDA WATERLINE COMPARISON, 1938 VS 2014


O REFERE AY FR EEWA RA L ND F AY 8 REIG R WAEYWAY FEREEWA Y 0 HTAEX Y880 FREEWEAYV 880 FREEWAR0EFRY00EFFARREE8YE8WA808F0RFEREEWEAWYA8Y8808F0RFEREEWEWAY880 F EWYAY 0 F FREEWA 80 FREEAWY880 F REEWA 0RFEREEWEAWYA8Y8IST808IFNG0RFRAERILERAEOWD EXAYISTIVNG8RA800FFRREEEEWW 800EFFWAEWEAWY Y880 8 8 Y A R F Y 8 F R F R A A Y W F 8 8 Y 0 A S 8 R F E R R E R YE 0 Y 8W8R 8 Y E REEWEEW 0 FEREEWAY 880 FREE 8 088F0E W E E 8 E Y ILW 8 W W V EEWA 8 0 8 8 RAOADY 880EEF R 8 E Y A F E E R 8 A R 0 Y 902 F W Y 8 E A E R W 0 8 E W 0 A 8 W 0 F E R 8 0 E F E A A E 8 EX FREYEW88A0YFREE REEAWYA880 FRE R Y EW RE ISTINGAYYR8R88EEFREEWEA AY88 0F MAKING ALAMEDAAN I A800ILFFWRRAAYOWYA8Y80 0 FRE 880 FWREAY880Y88F0RFEEW MAPP NG H STORY SAHY PAPYFR0 FREEEWWA8Y8808F0RFEREEWEAWWYAA8Y8808F0RFEREEWEAWYA8Y8808F0RFEREEWEAWWYAA8Y8808F0RNFEREAEWNAYY88880 FREEWAYF8R8E0EFWAYVT88TL0AFK REEEEW88D0 R8E8FLA E WAAYYFRE0ERFETREEEWDEAWTYAY EWAYF8REEWRE 0 Y880 FREEWAY880 FREE T 888800FFWAY 8WOAYSHIP A NGEEAWA AY 880 F 8 W 8 E Y E O R 8 R A R 0 E F EEEWWAAYY PING AND 80 FREAY W 0 N R 8 C COAST RAILRAOD 1887 E Y 8 E D E E N Y W 8 A R A 8 W F F BECAME TH Y E 8 0 E 8 0 R 0 R E F F 8 R 0 F 8 E 8 E Y W A 8 E D R E MO Y L O R GHEETWAY88 LE IN G KA S EAEW 8 R EM F E 19 3 18 CE E 0 M 0 8 F 8 R X R 8 WAT Y E A E 9 W W W S E A R Y E 8 ER R 8 F 0 4R E ER ED T E S E A T K N L K TT E RIT OT A LA G RA AIL S HE L AKE N T L K E ME KG R E RAOD TR A D L AKE AN EX ST IO 80 FR LA K E G SC I TT KE ON E F80RFEEEEWAY R NG RA E R TIN ME LA 1 EEWRAEWEAWY88880 FR T 18 EN T E ME 9 0 FREY 88AY088FR EEWA RAOW 8 TAL 3 K EWA0YFRE0 FEREEWA Y880 D EX 8 LAKE RA 880EFRWEAYEWYA8Y80 F FREE ER ST NG 8 SAN ILR REEWW880 F880RFEE WAY W A KE The C y o A ameda has such a Lch AO AYAY88R8EEWREWEAWY8 880 FR R RA A DT I 00FRFREAY88AY8088FR EEW OI EEWEWA0 FRE0 FEREW AY 88 EX ST NTO E o hs o y was he wes e EnRMITe Tm nus TS AY8Y8880EWAEEAWYA88 0 FRE NG RA WE DG 0 FRFEREEY880Y088F0RE EWA ORM ER ST E EWAWAYF8REEFWREEWEAY Y880 F E R Y E S he Rans Ame can a oad and he RA N ER S Y88080 FRAY 8WA8Y80 F REE HE C NT D IO C FREEEEW8A0 FR880RFEREWWAY 8 W X ST EN R ER E NG RA LRAODORE WAY Y88E0EWAEEAWYA88 80 FR S D A Pdepa MI u e po n o he Pan Ame can A O R 880 F FREEY 880Y088F0RE EEWA A AC R LA88 NU TED8TO L GE1 REEW WAYFREEFREEWA Y 880 E A W T C W R SA D HEPTK S W G RA AY88880 FWRAYE8WYA8Y80 F FREE S E P NG A T NG A nes Ch s ans A an c S A RA AOD na C ppe s W ER X 0 FRE EEW80 FR880RFEREWWAY E R N E E D N R A 8 ND FR CANAL CANAL CANAL CANAL CANAL O EWA Y 88E0EWAEEAWY8 80 FR W HA AOLDRTCANAL A 1 W N YV 8 FREY88AY808FR EEW E B W TS ST O A ERCANAL O N CANALCANAL 9 Navy Rsank R E TCANAL CANAL CANAL E GHT gh The seve a Wo d Wa 1 8 8 0 O E C T G E 0 0 A W 8 F W E Y N F 3 F R U DETA L SHOW NG REETHE REWEAWG 8 80 F TES N GH WW R CANAL TCANAL CANAL CANAL CANAL CANAL Y 8WH X ST W AY88EEWB 8 EX ST E RE R KE T AE H LK PPEZZATOAY 8800FFREAEYW880A8YF8088F0REREEEWAY A EV G H R ER P TCANAL CANAL CANAL CANAL CANAL CANAL FO H e a Des oye s o se ve as a b eakwa e E RAIL R H Y R F O NG R REEWED NE FORM A AM F AY8R8EAEWS LA REWEAWMA O W 88YO ED RA H D 0 G U N Y A BRO AODD AVEN RORA A F T A S D TH C 8 TCANAL CANAL CANAL CANAL CANAL CANAL E F C E 0 A C P A R A R Y T HE G T Y 880 FREEY880AY8088FR EEW ENTRAR N N C L AK A R N P RELA UE A WS NOW S P G E 0 T A F H A W K F E TCANAL CANAL CANAL CANAL CANAL CANAL REEWAY8REEFREEWEAY Y880 o Sea P ane RAThe sCOand NG RAagoon TED ND OS AT W Thas AOD TT TO S AY 8880 FWRAY 8WA8Y80 F FREE R EX A NTESDT NG KE M TCANAL CANAL CANAL CANAL CANAL CANALTCANAL CANAL CANAL CANAL CANAL CANALR R A A G OD L N HIPP T E 0 FREEEW80 FR880RNFEE WAY R S R EX R A N E T D OD O ING A RGEWEAWY 880a EWAAYY88EEhad TCANAL CANAL CANAL CANAL CANAL CANALTCANAL CANAL CANAL C so s o anspo a on hubs he A ME R N L E W S FREE A 8Y808A ND F K 8800FFREAY 88AR R T R G ANAL CANAL CANAL TCANAL CANAL CANAL CANAL CANAL CANAL F LR E S N A E K O REIG D R E A 8 EXeS TSou he n D L ER AA0YYF8R88E0EFWEREEWEAWAY88 Mo HT E I T T c Ra R oad TCANAL CANAL CANAL CANAL CANAL CANALTCANAL CANAL CANAL CANAL CANAL CANAL AREEEWWameda Pac 8 KE

ER

M

R ER

E G

W

S ED

S

AT E R W

E

G

ED

RS

DGE 1938 W ATERS EDG TRIUMPH DR T E1 RIUM 8 G PH 8 8

W H

E

D

GE

E

E

E

E

E

S

R

E

AT S E

S

R

E

T

W A

S DG S E T A 8 W

E G

1 938 W WA W T W S W W 193 W W A 1 A SHERMAN ST SHERMAN ST GE SHERMAN ST SHERMAN D E R G ST SHERMAN ST SHERMAN E R E ST SHERMAN ST SHERM 20 S T S ED AN ST SHERMAN S 14 ER ST SHERMA A G WA N E W 88 1888 WA GE 188 S EDGE WATERS EDGE WATEW 8 E ER AT G E W S ED 8 PA ER W AT W R ER LI U S EDG A S E T TE 1 R T ERS S DG A E 1938 WATER A E T M T W E W E W W A S E 1 ORTON ST MORTON PA E DG 38 ST MORTON ST MORTON E G D G E 19 S E ST MORTON ST MORTON R D U ST MOR D D G S G T E E D W A W PA G R S R A R A U T N E E S ST D R R ET S INE 2014 WAT PA T S G 18 WATER LINE 2014 WATERL 14GE R EDGE WATE EGR ERLINE 20D GE G E1888 WA T E1888 WATERS EDGE 18 S EDGE WATERS U AT 1938 WATERS A E ED E DG ST N RS D PA TE S T R A U G R S A T W N P D A R S U T C AT 18 S O G STANTON 8 T TT ST STA R E PA A 8 A N G N TO R E D A U N ST S W S S T C T T O G S PA TT TAN R A A TO R G N N U E D ST S T E PA 1888 WA GE 188 G E1888 W S EDGE WATERS EDGE WATE R G R R U A N D

ED

S

ER

D G

E W

M R NE ERR 20 RRI T TI

ER LIN E2 01 4

ER

T

WA

W A G

TE

W A

WA G 1938

14 20 LINE W ATER 14 W

W

AT E ER

GE D

8

8 D E 8 1 G T E R

H

T

W

D

T A

E SE T

8

E G

WT

R E E T AT E A EW 88 W ED G SAE

RL TE WA

8 W AT 1 88 D

8

E

A

W

8

E

1 E 88

T A W

1938

LIN TERLIN T E E 20 ADG 1 AT

G

S

W

20

D

W

8

ID

E2 W TE E

E GE W

E

G

T

A

8

8

8

8

8

W

E

R

D

G

E

W 8

WA

G

S ED R

WA

S E

W

2014

TER SINE R L TE A

G

201

A 2 4W

S R 1 E 0

T

W

A

N

E

E

A

01 E2 LIN ER

ATERLINE 2014 WATERLINE 014 W 2014 W ATER LINE

E

S

W

S

E

S

ERS W T A A

R 1 S 8 E L 8 T 8 W A

T

D GE ED S R

A W

D E A S W G R E T S

DG

A

E

W

EN

T

IA

ED

ATE I

G

E

R

P8

D

ID

RE S

IA L

D G E

E1

S

R

E

TE

A D GE D SINGLETO IN N AVE SINGLETON AVE SINGLETON AV E S WA 8 T W E E AW

D E

A W

EDGE 1938 W WATERS ATE A 8 ATERLINE 2014 WATER LINE 2014 WATERL W 3 9 INE 201 4 E 1 14 DGLINE 20 S E G ATEA ER ATER D RT 2014WW LINE 2014 W INE 38 W A RL19 E TE R W E

G

S

A

ARKWAY MARINA VILLAGE P AY W K R A TE R

R

R E8 T

T

R

TE

E AV

R

W

38 9 1

A 8 W

E

DG 8W 20 8 14 1 WA TE R

DG E

GE ED

E

WEBS

S

LIN E2

Y

R

TE

R

W

ERS

G D E

T POS EY T UB

A

E D

E G

E

E DG

ED GE 1 8

W

G

S

PO AY

G

W

A WG 4D

D

E

ED

ED

G

A

S ED

G E

G

D

D

T

ED

S

E

8

E18

ED

8 1

S

ER

ER

GE S ED

DGE

ATE

E W G

W IN RL

W

A W

D E

DG

W

E G

1

D G

E

G

R

ET

E ATERS 1 2014 W 1 LINE AT A 9 E 8 3 W RS 8 WERT W E E L IE NE G G R 2 S 014 ER E 4WATEG AT WA R RE ER 201 DG TE INEWA EL SS E R INE RL 20 T RL S E S INE ER

E

20E 14R

RS

E

RS

E WA ED G

8

8

G

E

8

E

8 WA 8 8 88 WA E T 8 1

E

W E

4WA

8

R

A TE

8

8

1

S

E DGE 1 9 3 S 8 W AT A IN

R ERS T

A

R

ER LIN

S ED

ED G

E 18 8

T 4 WATERLINE 2014 WATERLINE L 2A01W K E M E R RI T T L RI TL ATK LAR I A AK T E T E

W

E

D G E

E

G 1 G EE W E A G

G

E

E

201 4

G ES ED R E9 1 DG

E

S EW E 4 R ERS

1 9 RS E W 3 E8 W D AT

ER RLS IN E2 01 4

W

W A

E

A

D

888 W

T

G

R

W A W

8

A

E

N

E 20D4WA

W

D

E

S

R

8

D

E

8 W S W

ER S

8 ED LI G E 1 918

S

W

8

E

8

E

D

W

R

A 8 W W

8

DG

R

E

18 8 RS EDGEG

G S ED R

3 9

A

T

R

G 014 WAED TE S RL

D

E

D

R

E

DG

D

INE 2014 WATER LINE 2014 WAT

G

88 WATERS E

W

E G

ERS

1

W

8

A

TE

D E AT S E R R

8 8 8 1 E W 38 19 G D E

TE

E G

D

A

LINE

8 E 1 8

S

E

D

8

E

E DGE

W A ETE RR

G

S

S TE R TE

E

3

G D

W

S

GE W A

D

E S EDG AT E W

E

E

E

S

E 18 E D G D E E R

98 980 980 9

W

DG

WA

S

S

R

E

W

G D E

W

8

D G E

8 193

E G

WA

G

8

W

R E T A W

R

EDGE W

A TE R

E E G D G E

S

T 1 E W ERLIN 88 WATERS 1 E E E 2 014 93 S 8 14 R W G A E0 TER W A 8 LINE TE A R R W E DG E1888 WA E S W T E WA 14 ED WATER E GE SLINE GE A ERS ED R 4 WW 2014 1T9 WAT ERLINE 2014 WATERLINE 2014 WATER LINE 201 E DW G D ED G E

RS

S

D

3

W

E

R

R

W

8

4W 201 INE RL

D G E

A W

E

S

E

S

G

W

G

ED

ADMINIS TRATIO

G 88 E 18

D

DG

SHOP

N A

A

AREA SH OP

8

W A TE R

8

DG

T

DG

D

ED

S

ATE

TER’S STREE T

A

8

D

9 1

8 88

W A

G

W

WAT E

A FERRY POIN T FERRY PO W ER R E IN A G T AT A ER ED F D D ERS E W E W US R DG E ED EN P RS 88 E LOOP MARINER R S D SR EDGE 1 8 AM E W RE S M Q D A C U S Y R E DG A A SQU G R S E ST R 8 W P AT AL R R E ER D IN A E 8 ES A 8 O T E ED A EAST CAMPUS DR E 1 8 E G W I A R ER W N G E W E S E DGE 1888 8 E E E G T RS W G E S ED G F ATE D R E W R E E DR G ARS SEAPLANE HOP ARE G YE R POW A SHOP INTA N ADMIN S E D ISTRATI NGE FERRY POINT FERRY A O R N POINT H EGULAR HUMAN SCALE C FERR A Y POINT FERR S NS B GRID IS RELATED TO A Y POINT F TECHNOLOGY USE AND REGULATIO THE 1888 LANDMAS A E ILY ON FOOT THE SCALE JUMPS UP AS S, WHEN TRANSIT WAS PRIMARI W R EN E 88 GE S D A EDGE 1 8 E W 1 W 9 AT W S W D MOONLIG W E DG ER A W 3 E S E HT TERR D W AL R R S ACE D 8 DG W ES ED E N S E S E EN ER S R G D E R R A G E E T E 8 W A T W 88 8 S W RAINBOW CT R A E G E VIKING ST V G W G W IKING ST VIK G IN A S E D ING ST VIKIN D W S ED IK G ST R E K8 V IKING ST VIK E 3 V ING ST VIKI 8 D E S NG ST VIKING T S E S R R DG G E TE N E A G T A AL E A W D A R A T G W W EN E 8 E 88 ORIO S D SID N ST ORION AT E T W 8 RS 8 EDGE 1 8 S E W E ST ORION W ID 8O ST ORION ST S RION ST OR 8 E DG A ID 8 8 A O R ION SST ORIO S AL R 8 E D N ST ORION S S ES T 1 D T ED TE R WE E TT AN E A E ER O E DG W G GE AT E R RI G ON A A D ED S R ST ORION ST A E T O E RION W E ST ORION E S E E D H ST 8TH ST 8T G D H ST8TH ST 8TH ST GE 8TH ST 8TH ST 8TH ST8TH T ED ST TER S ED ST S A R 8 W S W E AT E T E 1 88 S ED D D A SKYHA G E ST SKYHAWK ST R WKE W E SKYHAWK ST SKYHA D 8 JASON ST JASON S WK ST SKYHAWK G E T JASON ST S K T S AT E WATE R R AT W A S L E G AT E R E 1 S ED S 88 W A G G D E E E D N D W G G A W E ATE E T RELATED TO THE 1888 LAND RS R A D W ED A MAIN ST MAIN ST MAIN ST MAIN ST MAIN W MASS, WHEN TRANSIT T S E TER S WAS E S R E R D S R S WA G ED W RS E ED HANCOCK STREET G E R R G T S 8 8 A G R C WOOD ST WOOD E ST WOOD ST WO AT EG S D OD R 1 E LI ED G N E 1 C ND D 2ND S O WATE R A E GE LN T E 2N A W W B S EE RS K D A E S A G G ED MOZART ST MO ST E 8 GE E DG 1 E W 2ND R G E G E E ED 8 D W R D W S E 8 C RS S ATE D WA T G A E D1 E ST R ED RS G T ED ED CHAPIN ST CHAPIN T E TER S ST ED CHAPIN ST CHAPIN ST CHA AVE MOS G G R A S E EY R L G E 38 W D 19E 1 W EY S 8 A T W A 8 I 8 AV TE 3RD ST 3RD ST E D O E EE R EW 3R RS G M D VERDI ST 1 M ED BALLENA D VERTDI AY E G 3R ST 3RD ST3RD ST 3RD ST 3RD S T E O ST3RD ST 3RD ST 3RD B W 8ST S S ST3RD D ST LV 3RD G G ST D S 3RD ST3RD ST 3RD ST LE C RD D 3RD ST3RD ST 3RD ST R D AT E W A Y 3R D ST3 AT E R T R T B A ATER V G A E RS ID S N E W E D 18 RS ED E 8 8 S D E DG 1 G W G 8 T E E 8 ED A 8 W B S G 8 K 8 A 8 8 LANDMASS, WHEN TRANSIT W E 8 TE WAS PRIMARIILY ON FOOT I H R A 1 THE R M L S C S ONT ER V W D EY E W R A 18 G D A ED ED RS A D G S E T TRIUMPH B ED ER E GE E S E DRAT G E1 S E R G D 1 RIUM 8 DG E S G G 4THPH ST 4TH ST 4 8 E W TH ST 4 8 ST 4TH ST 4TH ST4 TH 1 E 88 TH ST 4TH ST 4TH ST 4TH E W 18 MASS, WHEN TRANSIT AT WAS PRIMARIILY ON FOOT ATER W R S E THE RS 8 E DG G A 8 T S E RS E E E W ED S E DG 1 D G W T IDEW G AYA DR TID ER W E D G G RMAN ST SHERMAN ST SH ER CORAL SEA ST D W ERMAN ST SHER T CAR MAN ST SHER OL G M G ERS 1AN WA S 88 8 W E 1 AT A C W 8 T AR E E1 ER W SEA ST S E 18 GOL ST CAROL W S E T A DG RS TE 1 W T W G A TE E 8 E E E DG D ERS E W G G S E T MORTON ST MORTON D E E T A D E ST MOR D ATER W D R E S E G RS E E DG W ED E S E D G W E G W 1938 W SAT E E ER 8 1 A R A D A G TE 88 E W S R 5TH ST 5TH ST 5TH E E T T F ST 5TH ST 5TH ST R G 1938 W S 5TH ST 5TH STO W T S ED G 5TH ST 5 S A ED G 18 E 5TH ST 5TH ST 5TH ST 5TH ST 5TH ST 5TH ST A ER ERS ER GE E 5TH T DGE 1938 W T D W A E G T ED E E ATERS E ADG D G A ST R S E1 E GE S ED S RS TE W 5 18 E A TH E T 1 S T 5TH ST W T S A ER G S EDGE W W D AT ERS W ER W 8 ED S EDG E S E TE R 8938 WATE DG A E 1 E 88 RS W E WA 1 AT 18 E D G E 19 3 8 8 N ST STA T W G A E ER E 8 8 A N E E 8 TO G W E R G R E A E N S E DGE 188 E W ED D W G S D S R G T E E S ED G W AT E ATE S R ATER TAN E W TO G D N 8 W E DG G S E ERS ED E EDGE WATE R 8 WATERS 1 GE 188 G E1888 WA T E1888 WATERS EDGE S EDGE 6TH R 18 T W R ST 6TH ST 6TH ST 6TH ST 9 ED A A 6TH STS 3 S 6TH ST 6TH E1 GE TE R W 8 18 W W G E W A G A D D ERS G US R E ED P E OOP MARINER S N M EL SQ W MCKAY AVE MCKAY AVE M AR CA MCKAY U D U T A SQ R 8 W R AT ER IN AS E 8 A 8 T E E EAST CAMPUS DR 1 8 G W R E DGE E A S E DGE 1888 8 E E G G W S ED G ATE S ED R S ER G D G ER NGE THIS REGULAR HUMAN CHA A SCALE GRID IS RELATED NS 8 W TO THE 1888 LANDMAS AS TECHNOLOGY USE AND REGULATIO G S, WHEN TRANSIT WAS PRIMARIILY ON FOOT THE SCALE JUMPS UP A 1 E S W W R 8 D E

E G

W

W

8

ED

W W TODD ST TODD ST TODD S T

E E LIN ER AT W 14 20 D

01 E2

G

G D

E LIN S

G

N W ER LI

D

ATE R W S

AT GA ST SARA ER TOG A E DG E

8

T E

D

W

WA

R D

E

E

R

S

R R E S E ER G

E

ER

INE 238 R L19 14 WATEE ERLINE 20EDG

M

S AN D E

B

D

W

W

U E

R

4 WAT INE 201WATERS RL938 ATE1 GE

8

“S

RS

E

RM

EDGE

3

E M AR

S

D

FO

8

RM A E T R E

S

E D TTEL A K RR G

W

8

S

W AT

WA 1 8 W 8 8S

E

8

S

8

O

ATER

S R

R TE WA

1

F

R E

E

D

K

W

E

E

T

G E 1

E

19 3 8 GE ED A

R

TE

E

20 14

W

R

S

R

8

I LY

T A

E

S E E EW EAWY 8E8WWINE FRE FREEW ARYEEE 2014 D RG 88A0Y8088FF0RYRYEE888E800WFFR WAT E E AA 19 EER WAEYEAW3 Y888W0W8 ES TE1 T A 2014 WA 19 REE9 REW ATRYEEHEEIS 1 REW AHUMAN T ERSWATER E GULAR N L S I E D T 80 F 8R0EF E0W0FFR S E 8 8808FFRE888 D S ER 4W R ATE S A E W R EM D

R

G L A K E E M E RR T AKA E E M M L A KE R R T T AKE M E R E M T L AKE MW E RAT

E

G

E

8 1

E

DG WA TE

E

A IM M

E

AKE A K EM E R R T T A M ERR AKE M KE M ER T T ERR R TT AKE TT AK ME R AK R E ME

W

D

AT

A

ATER S E

W TE 2014 WA WATERLINE

W

W

W 38 19

T

G

R

D

TD LAN

A W

R

LA N 88 E

W

D

A

R

D

D

E GE

G

G

R P S A TE

W

A

G E

GE

E

M

E TE

S

A S E W R G

DG E E

E

A88 88 T E A8RY8 FYY88 EAWY 8EE8WL0WIANAE WFFARRYEE 2014 W AT

TER

Y L

W D

E DG

E

R

W

G

S

E D

E

88 A W1

ND TE D” LA A G W 1938 WATERS ED W 38 WATERS EDGE E E ATERS EDG S D E 1 T 93 8 W 938 TERS E G G ED G WA T E E E R E 1 8 DG 8 E R DG ATERS EDGE 193 E W 19 938 WATERS D E GE 1 W G 1 A R G E T ER E G S D ED E G DG E E WE A TE DG AT S ED R S E S E R D E GE S T 1938 E AR W

DG

TE A

S E DG

RS

TE A W R E

TER

S EDG

A W

4W ATE

S

GE ED

DG

R

W R S 888 W 1 IND EP ENRS EDEN C 88 D 8 W A 8 1

E1 8 G

G

R

T E

ATER

S

A 8 8 W

A

E

AT E E AT R W 19 3

R

8

AN

1

E E

S

E

E

D

8

E

W

G E

88 8

R

RS

S

W

E

1

G

E

W

W

A

D

B E

E

8

E2 01

W G ST

W

D

RS

E

ATG E E R E G S E 1 D 8 8 8 W GE WA D ATER T S E R S

W

T E

G

8 WA T

E

A

ED G

T R

1

R A TE

G

W

S

IN

G

1

L CRUSHED OYSTER AE GE SHELLS TO PAVE THE 4W WA 3,400-FOOT AND 1,700 E FOOT RUNWAY.PRESENT R S DAY COLLEGE EOF ALAMEDA WAS D THE

DEVELOPED IN 2007EL W T ELEMENTARY SCHOOL E A ELEMENTARY SCHOOL ELEMENTARY SCHOOL EA SCHOOLDEVELOPED IN 2007 A ELEMENTARY SCHOOL ELEMENTARY SCHOOL DEVELOPED IN 2007 EL

R E ED G N E S LL VILLA G A INA E A H E R ISL PA C W A E R M T A D Y A 8 ER G W R WA N H A TE K E R A DG LL S A E RP H S E C R T S S D A E 1 ED E T GE 88 E S

DG

D

8

R TE

8

CIM ST

8

D

ER S

WA

E R

R E AT

GE 18 D

G D

W

W TO

G

E

E

E

8

E WA T

8 8 W

W ATERS

SEAP E LANE HAN D GA G E

W

GE ED

EMERIC LANE EMERIC LANE EMERIC LANE EMERIC

E

SEAPLANE HANG PLANE HANGAR NGAR SEAPLANESEA HA SEAPLANE HANGAR HANGAR SEAPLANE AR SEAPLANE HANG PLANE HANGAR NGAR SEAPLANESEA HA SEAPLANE HANGAR HANGAR SEAPLANE AR SEAPLANE HANG PLANE HANGAR NGAR SEAPLANESEA HA SEAPLANE HANGAR HANGAR SEAPLANE AR SEAPLANE HANG PLANE HANGAR SEA NGAR SEAPLANE HA

E H SA T R T N A

W

S

T

S

R

G D E

014 W ATE RL IN

SEAPLANE HA SEAPLANE HANGAR HANGAR SEAPLANE AR SEAPLANE HANG PLANE HANGAR NGAR SEAPLANESEA 93 SEAPLANE HA 8 HANGAR HANGAR W SEAPLANE AR SEAPLANE HANG PLANE HANGAR NGAR SEAPLANESEA HA SEAPLANE HANGAR HANGAR SEAPLANE AR SEAPLANE HANG PLANE HANGAR NGAR SEAPLANESEA HA

ER

EB

ST ER ED E GS T

D

E

TE R RS

W

G S E D

E RITT L A K R

A

188

W

R

A S EY AVE MR OS SL L O E M W

S LAKEHU R

8

G

W D AG TE

E

S

WATER LINE 2 HANGAR SEA NGAR

M

W

S

8

A

D

E

A

W A

ESIDENTIA L RESIDE

S E R

8 W

W

L“ IL PRESENT DAY T RIES. BUILDING 5 IS NEARLY T R W MIDWAY AVE COLLEGE ITSELF L “W .E W THE SHOP AREA W MIDWAY AVE E FRANC SCO BAY V TIN A S 920,00 SQUARE R CONSISTED1,000,000 KER AVE TINKER A E WILVER DOMELL “WILLIE” STARGELL AVE WILVER D OMEL OF FEET TO SUPPOR RS S REPAIR VERHAU OF ALAMEDAILLWAS THE E W RAN L AND T THE A RDROME WH CH OF MILITARY NGINES, GER I AND AVE ORIES. AIRCRAFT, ACCESS W RAN EARLY 1,000,000 E BUILDING GER LOCATION OF THE SAN 5 IS IN ITSELF. THE ONSISTED OF 1,920,00 N 1930 AND SHOP AREA D ANSEL AVE ANSEL AVE ANSEL AVE OPENED SQUARE UPPORT THE AT W ANSEL AVE FEET TO OVERHA ANSEL AVE ANSEL AVE ANSEFRANCISCO G BAY LITARY AIRCRAF GUL AND REPAIR 18 L E WPL STAR OF WAS A PROJECT DONE T, ENGINES, AND STAR UST CCESSORIES. BUILDING E E R DUS A E 5 IS NEARLY 1,000,000 D WATE ITSELF. THE SHOP RD AIRDROME WHICH TP AREA CONSIST E 920,00 SQUARE BY THE UC BOARD OF ER U T OF FEET TO 1 LS VERHAUL AND REPAIR SUPPORTED THE S T PL STARDUS OPENED EIN 1930 AND OF MILITARY NGINES, AND E 9 T REGENTS THE MARSH AIRCRAFT, ACCESSORIES. EARLY 1,000,000 D BUILDING 5 IS LINA AVE LINA AVE LINA AVE LINA AVE LINA AVE 3 IN ITSELF. THE ONSISTED OF 1,920,00 LINA E THE AVE LINAWATER WAS A PROJECT DONE SHOP HAD SQUARE8FEET AREA UPPORT THE D GE1 W OVERHAUL V E LITARY AIRCRAF AND REPAIR TO 1 W E OF BY THE UC BOARD OF T, ENGINES, AND CCESSORIES. BUILDING W PUMPED OUT GRADED RAINBOW CT R W E 5 IS NEARLY 1,000,000 ITSELF. THE SHOP D W I LV 8 ED AREA CONSISTED E S REGENTS. THE MARSH G 20,00 SQUARE FEET A 1 ER OF T D GEN ERHAUL AND REPAIRTO SUPPORT A E GL VIEW ROBERT LOUIS STEVENSON OF MILITARYTHE GINES, AND ACCESS T ED HAD THE WATER AIRCRAF AR AVE ROBERT T EA ORIES. , LOUIS ARLY 1,000,000 BUILDING E STEVENSON AVE SHIN ELEMENTARY SCHOOL R 5 IS OP AVE WOF ITSELF . THE NSISTED AR TOW SHOP ER AVE 1,920,00 2007 ELEMENTARY SCHOOL S AREA PUMPED OUT, GRADED SQUARE PPORT THE WEA FEET TOW R OVERHA TO ER ELEMENTARY SCHOOL UL AND REPAIR AVE W TOWE LITARY AIRCRAF OF T, ENGINES, AND SEAPLANE HANGAR R AVE W TOWE CESSOR ELEMENTARY SCHOOL S THE SITE, AND USED W R HANGARIES. BUILDING SEAPLANE SEAPLANE HANGAR 5 IS NEARLY TSELF AR SEAPLANE ELEMENTARY SCHOOL 1 R AVE W TOWER HANGAR . SEAPLANE1,000,000 HANG E W E PLANE AR AVE

R

H

D

O

8 W G

D

8

D

R

1

I L A K EK E M E RR R T T LAK E M M L A KE R R I TI T T LAKE M E R E M T L AKE M E R

E

18

S

ETER A

E

RS

G

S

D

L

E

G E W S G B W S ST A A B E ED LL R E W A E RG E WW TA ERS R SW 1 888 W E RS E AT ”S AT E E T W ST E DG EBSTE R TERS R A R W S E 1 G E E T G D D 8 S ES E 1 8 R 8 ED G E WA T E R AT ES E E WTER E A EDG W W 38 WATERS EDGE 1938 WATERS 01 R W WA E G 38 ERS ED S T 1L RS GE 19 WAAT I E R R 2 14W S E 3 8 9 1 2 R 9 0 S E 38 WATE 1 WAT E ED G T G S R E D D G GE W ATERS E W D W G E 88 G E 8 D TER LINE DGE W E W AT 0 A T E GE WE R S S ATE ED R RL NE EDG W S W 01 W E A ER 88 TER ATE T 8 A W ATER RL E RS E A S IR M R W ORT C R E S G G E S E

E D

R E

D G

WA

S

W

E

R

DL ATER

8

W

T E

EBS E R

S R

8 S

E W A TE

G

E

W

E

R

H

E

E G

E

W A

W

BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING

BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG BIGWHITE WHITECOLONEL COLONELHOUSING HOUSING BIG WHITE COLONEL HOUSING BIG BIGWHITE WHITECOLONEL COLONELHOUSING HOUSING BIG WHITE COLONEL HOUSING BIG BIGWHITE WHITECOLONEL COLONELHOUSING HOUSING BIG WHITE COLONEL HOUSING BIG BIGWHITE WHITECOLONEL COLONELHOUSING HOUSING BIG WHITE COLONEL HOUSING BIG BIGWHITE WHITECOLONEL COLONELHOUSING HOUSING BIG WHITE COLONEL HOUSING BIG BIGWHITE WHITECOLONEL COLONELHOUSING HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING BIG WHITE COLONEL HOUSING

G

G

W A

TE RL INT E2

A

E

A E WW S

E E

E

DG

0 98 T E RS G 0 9 80 80 9880 F80 980 980 9 0 F 80 9 REEW980 980 80 98 AY 88 980 980 9 80 980 A0Y98808 0 980 9 0 FREEWAY80 980 980 980AY988088908FR9E80EW 8 80 980 980 980880 FRE0E9W80 980 980 9 980 98

W

E G WA

Y

D S AT R AD S 8 V M N DG G NOW A E ER R W R N A E EW A E H A N N P W T D D S A 014 N TE W E AW Y E RS 3 W R T A TE A G S 8 T E E E 8 T 8 R N 8D A R E H I R 888 O A N S S AT DA W O E 1 G MO A ND D OAKLA KLA S ER EA STE R T K EMOLE TO R OM THE ALAMEDA N N PA S DA E CTED G A MA T ED E R A E ONNE L W E R IL I N ACK C ER O RR TR SQU SL S E . THIS ST ARE A N WAY D RIVE, CON STITUTIO ER T

T

RE D

GE18 R 8

IT WA USE D

AT OD W G R 8 R DG E E NG T EX S OD GHT FRE RS ED R R AND TE G ATER A P NG 8 W TN 93 W SH P EX S GHT D TO ATE FRE A AND AR D RE RAO P NG NG R SH P XS D TO H E ATE RE G D RE ND RAO NG A H PP TO S TED RE A AOD A R

NO D A 8 1 A ER E G DG E WA E 8 8 IM W E T R E 1 R 88 EDGE C W AT GE W E E E W A WA ENT E P D 8 W GED ATER 8 R G RA L R S EG S A TE 19 T E D E D R 3 A E RS , THIS A A 8 R IN ED G R D N G T DEP E R S G IS AN A E A 1D A E CA G AN E E 88 E M O L E W N W D A RA SPLITS INTO T WO ILRAOD TR 8 COAST RAILRAOD THIS TRACK W W A DG ACK FROM THE SOUTH PACIFIC R 3 AT A G 8 ER E 9 OAD RAIL ROAD AN T E R ON R ATERLINE 2014 WA R E 1 R IL R R RAE E WA 8 S 9S, NOW TH ENEDBA E E W 1 W W E ROAD T W NNDGREE IN 186 G A OO A D E E AG A L N A 8 G AT OW LLA AIL LL 8 W E R E W NA VI G A T I 2 A A E 0 G ISL C 1 PA DR A ILR 8 EACPHLANE L R E WA E EN MAR WA ER GES R T A OEAD G G T RD B RBERS D S D AO Y R RS E 188 GE EDGGE A A 8 ER IN ET D A DS W ER R H PO R H A TE K N S SLALENG S S H D R A E A ER CO G G PA DG T WA N O WA M RB T E H S E D A A C RA M S E R B S RAOD TRAC N R S WS W 1 DG F C COAST RA RAOD TH S TRA PR E 8 D THE SOUTH PAC 8 1 ED E R E W A G 8 3 T W GE 88 E E S 9 OAD RAK FROM ROAD A D IS D S E R 1 AT 8 8 V DG N RA R E E G A E E G W N A S E A REOAD A D N W G W T D A 0 E N A GE E W E 1 A S E S Y E RS V 34 W S T ED W R RS E R ATE R G 8 E E ERS G DR E RR DR 8 T E A TE 1 E PE D I 8 R RN O ATERNLT AT AT R WR E B E O 8 WD H1 S AN A R R W G A 8 W A I 93 AN A EK N O S S A T E RS T E S E D G G O E T TE RA RAOD RL H RD SA NTO WOOAK S RW A W S TRACK SP TSED D 8 R F C COAST RA RAODATH TRAC TE MOLE TO OAKLAND M K SOUTH PAC LAN E WE S E ALAMEDA R N THE R G 8 S E 3 OAD RAKOFROM ROAD PA SA W G ED TH S R DM 1 E D G AT E R RA R E E NECT ATETE R ADM N ST A RD PEN D AR E 1 RS L W E ROAD NE G ERA 8 L ON DRE K CON T 8 O I ON A D I C AG N A A A P R ATE AREA S ER W O T SO RR TR R SQU 8 8 G R DR R 3 E G SEAP ANEWAY. THIS ST 9 LE AGREE1 9 S E D 1 N W R R GE IO TG UD D RIVE, CON STITE ER E A 1 T A

AN W E A NT

G

E Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

CR

E AND M O R LAK E A AMEDA MO E TO OAK ERLINE 2014 WATER LINE 2014 WATERLINE 2014 WAT ED H W ATERS L E M C E A E R N K R N I E M TT E E L C2K CO R D L A K E M A K E M ER I T T R RA 4 ER R R T AY H S R ER IN 0 GTERL NE 4 WA E L A K ER I T T L AOINTW U K E ME ME R R VEL ACON S

K2 W K 9T E EK F AT PR 0F A S 14 O O E O TA A TER F C F FO RW MA C E S ED R T W AT R O E N WA RS M D R R EN ERL M R G R ED 8 TER E M E 8 W 8 E M S ED E INE ER 1 S 8 93 G S IA R 20 1 E 1 W N E G D E E E 1 G I 4 D D T E 8 LINE ERS E D W S W R R E 8 T , R K A G T H 8 A R R H A 1 W WAT A AT 9 4WATERLINE GE 12014 E E ATE A E 4 L 9 F D 1 E 1938 N A O G W AT OW W O 3 RS A N D D D N L WA A E N TON I E RWATE8 GA W AINE 2 D ED W E R G M F R LI D S T N 014W S G DA AN ISL A E ED E A E E TER W T ATERL U A T G D A W O E INE 14W W E W S D E GE S T 8 RS R E D DG EN 1 A W U HD IO 20 ED A 8 T RL RS 14E B E 0 8 W 2 W M I NE W IS O E LINE 20 G 4 A RD BAR R RL A N 14 W R INT T BE NI A D SLEY AVE MOSLEY 01 PE G N AT R PO S E AV O NTO EMO S S D T A S E2 D EG W TE A NA R S P E D A O S E O E A D C W LIN E RES DEN N G E TE IN E N B A T T T R 38 N R ER E W E D P T 9 S W W C W 1 R A A D E W AN E S EPRESENT DAY COLLEGE RE REDLINE AVE W R AT W TER S D RED LINE AVE W W D GE W W W W E R R R LY F E E E A A OF ALAMEDA WAS THE 4 IE W I MAY OR R K S LO 8 W E G 01 E P PR 8 S EDG 8 NE R O E LOCAT ON OF THE SAN A A ME O F OF P E2 W T GE W D 8 3 T O EK A IM A C Y E P R G C FRANC SCO BAY W 9 MA 11 T LIN W R R R O IR E N E RI 1 A S 8 E TE R LA D WATE D M FO N ER 8 C AT CL A RDROME WH CH T A E PE E S ER E G E R3 V G E E AT Y T E EA N RM MO E E AR L H 9 LINE 2014 W E OPENED N 1930 AND R G A DE D T N TER R D ER T S CIA A WAS D A PROJECT DONE OLIW S E S AN W R TE D GE S 8 W 8 8S C AP E R LY W A R R L W N W 8 WA BY THE UC BOARD OF8 1 E E K N E M S R H R 88 R D A 3 WW S ESSEX DR W DR S 888 E SA THE MARSH G E 1 A X R ESSEX DR W 1REGENTS ED 9 8 L T E W F U E ESSEX DR W ESS E ED E RS T 1 E W W GE E W AT L RA HAD THE WATER 1 T O R B RS 8 WAT DGE A N INE D D N E EMENTARY SCHOO G E A AT E E R ED R W E W E G E EMENTARY SCHOO M 2 PUMPED OUT GRADED 8 PENSACOLA D 1 014 E S T M W E EMENTARY SCHOO R 8 R D G W S E G W A E EMENTARY SCHOO E S A THE S TE AND USED W W 8 W R E E E W AT YD E EMENTARY SCHOO W 19 W W E G “S M A ER W EDG RG W DEVE OPED N E CRUSHED OYSTER S W D 38 A T L R E E EMENTARY SCHOO RI E IN E D 8 W A U NA RE E EMENTARY SCHOO GE D SHELLS TO PAVE THE ED A G S20E 8 VI HE SHOP AREA E EMENTARY SCHOO WA 8 14 W CONSISTED OF LL 8 EET TO SUPPOR SCHOO OPED N W DG W GE 19 W BM 3 400 FOOT AND 1 700 AV SQUARE CORPUS CHR 8 T THE OVERHA1,920,00 A DEVE A F MILITARY AIRCRAF ION R UL 1 W E EMENTARY SCHOO AND D N REPAIR W 8 ADM E ISTI RD COR G T, ENGINES, AND CCESSO INIS RIES. BUILDING E E DWAY TRA E EMENTARY SCHOO PUS CHRISTI PRESENT E S 1 N AVE TIO1,000,000 ITSELF IS NEARLY S WSHOP R . THE MIDW RRON ST FOOT RUNWAY E 8 D W AY5AVE AREA DEVE OPED N E R R A 920,00 SQUARE R CONSIST W S 8 R ED W M CIMARRON R OFN FEET ER S TO SUPPORMID W NE VERHAUL AND REPAIR CI DAY COLLEGE OF TI 8 E TW THE A G YA T TY A NTO OF MILITARY NGINES, AND S E A E AIRCRAF ACCESS S V W T ORIES. , EARLY 1,000,000 W E L E A BUILDING 5 IS D S WA ALAMEDA WAS D THE N IO IN ITSELF. THE E ONSISTED OF 1,920,00 AT E SHOP D W D SQUARE FEET AREA G G UPPORT THE W R AV ESIDENTI W TYN OVERHAUL AND TO 8 AN ILITARY LOCAT ON OF THE SAN W R MID ” REPAIR OF E WILVER DOMEL A AIRCRAFT, ENGINES E A WAY AVE GE18 CCESSO , AND LIE” STARGELL AV C

R FO K D A EE02 E I O CR E R IN 19 NTO N S ME MPLTED EEK FORM ER SAN A R CO AS W TE L AL FO A ANA KE W AL C E A A SO T R SLANDTHE TID GW S W O M G AL T D E G E H FO D A N R LARG W E SHIPS A

L CAN AL WAS COMPLTED IN 1902

T

A

AE

G

S GE 1 8 D

R

W

R E S

88

W

T

A

E 2014 W M ATER L E R INE R I20T14 WATERLI T L NE 201 AKE4 W RLINE A E 201 G E T MER D

TE A

S

E W G

E

A

8

8

S

E

D

TER’S POS TUBE EY T WEBS UBE TER’S 1928 TUBE WEBS

T

E

A

T

FO2014

D

GE S ED

1

1 ATERS 8

G

R INE 2014 WATERLINE E 2014 WATER

E

W

E RS

D IN

WA

D

TERS

DG

G

W

WA 38

AT E W ATER RS S

T DGE T XIST R R 800FFRREAEY8WYA8Y8 0 FR A W E LA E E CANAL A D 1 ING R R 8 OD TCANAL CANAL CANAL CANAL CANALTCANAL CANAL CANAL CANAL CANAL CANAL P EEWW8A0 F08F80R EE S E 8 W EN E R D E AILR DG E WAY AYY8R8EEFc ERT O he Mun he Ae od ome AOD 8800FFWREAEWEAWYpa E 880 A po EXIS M T R Y 8 A R F W E 8 Y 8 E TING EEWW80 F08F80R REE he Nava A S a on and L ER and Pan Am AAYY8RE EFRE WA RAIL NTA RAILR RAO 8800EW WEEA Y RN INE AOD D E FFRREAY WYA NT T O ITS WESTERN XIST EEEW8W80 Y a bus se v ce ha he Key Sys em CO RM TE S IN N A G R PPEZZATO A AMEDA S MAYOR AY A RAIL FOR EVERYO NU PH A RAOD LPH APPEZNZATO E TR FOR EV RA YONE began du “MA ngYORhe a ERon ng” FOoRMEubbe RA , AL HT TH ED RA AGOON DREDGED IN ILROAD AVEN ALLED RELATED OR AM EDA’S RLY T HE CENTRAL PACIFIC THAT BROU G ERLN CA 1 UE TO S OW C M N W EAPLANE LAG A S O I H and gaso ne du ng Wo d Wa The N N IP R D PING S OON D AND GO ON NUEDREDGE B 014 HE CENTRA PAC F C THAT FREIG 0 AVE on yHT EXway o v sua y documen so 0FR0FREE BROUGHT E E LAGOOND THEmuch TRANSCONT NENTA ISTING RA W R E F R A R R A E OD E A R T O IL T S WESTERN TERM NUS N N DREDGE 800EFFWAEWEAWY Ya EXISTING h ough ch h s o RAyODwas ATER NAMED RA RREEEY88A8Y80880 FREypog aphy RAILRAO E 38SEAANE 8 E F R E 0 W 8 R D EXIS WAAYYFR 0 FERE WAY OA L TINGeach D 2 EAAPTE SEA R888A8E00ILEFFWRAAEWYEAWYA88880nd map e ng T The v dua Ks o y o SW 4WAT AVEN RREEEEO88D0YR08E8FRFEREEWAY E NE 2014WATERL NE 8 SEAR LA 193D 0 FTEW WWAAYYFRELA U T PLL NE 2 2014WATERL N E 201 N O 88ameda componen o wha makes A 8800EFFWRRREAEYDE8AWT8YOAYSHIPP SG T I U SE IT D EA E 014 W A A ING AN EEEEWWAA0Y WAS O R D ATER L WA Y D E RIG TO L NE T L S CO L AZATO ER M R , ALAMEDA’S “MAYOR FOR EVERYO APPEZ SA MP K E NES 014 W NG H STORLPCH WATERL A L 2SHOW M ME NE LA ORME R S A ME NON LTED DETA ATE LED RA AK F ” E N F E A N K R AN OR N AO E 1902 RIT L A K M N E CRALLN ME RE T L KE AGNTO T ON IO NOW ITE 2014 SAN RLY O C NE 20 A EL ANTONIO CR NI UE IS D WATE THE A AMEDA MO E AND T HE CE LE ERL MA ER O THE A AMEDA WARF THE ONGES E T VEN I E NTRA O AN R WA A L PACI FIC T LNE2 A WARF M L THAT D 014W N THE WOR D BR ATER LNE2 E N OUGH P AS T T THEED CR FO W 014ON O TRA ACROS 2NSC ROA S THE BAY TT INEN TALCCESS P EN OUGH014WATERLNE2014WATERLNE2014WATER LNE2014WREACH OR TAO RAILRATO A SAWES MTO ODTHE TO IT RAIL EE RM FIN ATERL N FOR LARGE C R G N TER MINUS N D TERNE K 1869, LATER NAMED R E SH A OO K O IPS N R A AN I AILR MO D AL S FO S EDG C N OA RE 193A8N ADGRO RM A N A DA E SA I O C N ER VE ND DG SEA OON DDR N REE R EEK FO NU N LAN S AN S E D GEEDEGD N P K H E O E G A O CR E EK F O R M NT AN TO 1938 E LAG D N P AN N V N A F I NIO C DE E OR 938RSEA OON N DR 1D A O M R D EEK FO LAN DR D M TH E SEAE RM ER S AN R PLPA D ER EL EA SA AMEDAAN G N E T TL AK ED CC N N THE SA M USE IT W S L E T A R D N S A NT O N TO AL C D S O T N A H F E T ANA NTO O T DAL AOD O DBE M IN CA K M C T E L WA AN E ALAMED NIHO AK ER LAK AA MOLE 902 THE LONGE L WAAND N 1WARF S CO MPALAME LTED DA L N DR 1D9G38 SSETHE MO E N THE CR E19E ST WARF IN THET E 02 S AGOOEN CR ED IN APLA ON ASEI ITO REACHED ER S E M N WORLD IT ED NMS THE BAY LTACROS SEAEAPLAN 1938 NE LA THE ALAM E M MP EEK FORM ER SAN A E CCESS TO OR CE R KR D S L PLA E LDREDG ED A R S G A W S O O E M E AL L T TF AM B A EP N A E SEA NE LAGAOGOONED INE1A9PLANOENLADREDRG A L AK K OL C N L A PLA ON D DRED 38 SE GOO ED IN EA E NOU A ND SO T NE L RED GED APLA N DRE 1938 SLANDTHE T D G O M TH O AL AGO GED ININ 19 NE L DGED SEAPLA N TON E AL H F D NE1938 LAGOON ON D 193838 SE AGOO IN 1938 NE W A BAYBA ENA B AM N OR LA SHIPS AY B A HA ED RE SEAPALPLANN DR ISL RG E A DA AN A A E BAY NO A E LA NPR O

WAT ER L

D E GE E

E

G

A

K

E

B S

R

S

R

E

C

ND

ED

W A

ED

E D

T A

1

E

S

W

8 8 8 A 1

88 18

AT E

E

S

E

R

TE

A

W

E

GE 188

O M 3RD S T

G

AV E

ED AVE MOS EY LE Y

R

E M O S LE Y

A V E S

E

S

R

ATE

GE D W

S R E

S

E

S

AT

E

W

W

S E

WEBER ST WEBER ST WEBER

T A W

H

W

W

BIRBANK ST BURBANK

W

A

A

8 W

E

T

8

E G

W

G

1

WA TE RL I

G

R

B

BA

ATER

BA Y NONPROFIT YACH A

BALLEN

LIN

W

14 WATER

O

WAT ER

W

B

AY

A

N

0 NE2 ACH

BA

W

EST CAR R CAROLINE ST CAROLINE ST CAROLINE R ROLINE ST S S M E S E D E G ER RE D HAWTHORNE ST H G RR T

W

H

INE 201 4

20 1

01 E2 LN ERR

R

W

W

4W ER

ER LIN

W

A

20 14 W AT ER LIN

SA

14 WAT ER

AY “ E2 014 WA TE RL IN E

A 8 W

1938

D

G

R

G

W

W A

RL TE WA 14 20 LINE ATER W 4 1

N

NAVY

NCI

R

W

TE

W A

D

W

D G E

O

T

ER

M

W

RB

B FIT AY

LIN E

CRO F N NE 20

YACHTCL U BALLE B

D

AT E W

S

G

W

VERDI ST VERTDI

E

E

G

D

8

E 19 28

A T

W

8

E R

W

1 9

A BA N A WH Y NONPRO YACH

W

E

P

L ALLEN LE

A

W

E

S

1

S

ED DR WA ON GO LAN LA EAP E NE 8 S PLAN EA

S ER

D

G

DGE 1888 W E

E 20 4WA

RLIN E2 01 4

4WA

W

W

W

DGED IN 1938 SEA PLANE AGOON DREDGED LAGOON DREDGED IN 1938 SEA PLANE LA IN 1938 SEAPLANE

AL ADM N LE STRA N Y T O N BA ADM N STRA A NA BAY “WH T ON A DM N S Y AL B TRAT ON NGAR ” BA NON TE WA

B LENAB BAL

WA

G

E DG

E

W

TE

EA

ED

S

R

A

E

8

MOZART ST MO

D

A

WHALE” BA

ABAYB

E G

ED G

G

3 9 1G D

D

G

W

AT ER

93 8

1

DG

TE R

D

ERS

W

E

WAT

E

R

A 8

DG S E

E

E

LIN

E 14 WA S E ED TER SLINE GE R 2014 W E

T

W

D

LIN TERLIN T E 20 A 1

3

S

AL

R

T

E

S E D

DGE 1938 W ATERS EDG

TE R

ED G

8

G E 1 918

RLIN E

E W D G

C

C

C

1

E G W

E

RT T

W

S

EN E S D S E W E G A H DL D T S A 8 RES T T ED GE W E E N T 8TH S 8TH G ST 8TH ST 8TH ST 8TH S R E W OR ON ST G OR ON ST W OR ON E D

ATERS

E1

T

E

D

G

E

R

G E

S

A W

G

E D

GE ED

W

T

A T L RES DEN

ED

E

ED

W

R

W

BAY NE 2014 WATER N AINE 2014 W ERBL AY AT ” BAY NATERL“IW ERLINE 2014 WB Y HALE

ERS T

W

E 2014 WA T

NCI

8

T E

A

WA

CRO F N

W

W

E G

14 W ATER LINE 20 14 WAT ERLINE 2014W AT ER L

SA

R

S

E

G D

WATE R LIN E2 01 4

R

W

E

W

S

S

ROTE CT TH TE RLIN E 20 14 W

ONT D EREY

D G E

LINE

C

R

R

014 INE 2

M

E

W AT ER

A

TERL IN

SCO CISC

TE

A

W

D

NE

R

E

S

D

G

E1

WA

E

C CISISCO

S

LA TT K

R RS

E

S

E

E

L AK

E

D

G

38

19

E D

ER THIS REGULAR HUMAN SCALE GRID IS RELATED W TO THE 1888 LANDMAS D S, WHEN TRANSIT WAS PRIMARIILY ON FOOT THE G E

W A

NE

A

W W E THIS REGULAR HUMAN SCALE GRID IS RELATED TO THE 1888 LANDMASS, WHEN G ER TRANSIT WAS PRIMARIILY ON FOOT THE D A

KE

E 1 ER MER S L NE R S

E

CHAPIN ST CHAPIN ST CHAPIN ST CHAPIN ST CHA

W

8 EWOOD ST WOOD ST WOO 8WOOD DG D ST W W 8 E 1 1 E

NE

4 WAT ER L

88

T N G A LE A K1E D RR TT M EW 93

ED G

88

S

R

8 W

THIS REGULAR HUMAN S CALE GRID IS RELATED TO THE 1888 LANDMASS, WHEN G W TRANSIT WAS

T

R

8 GE 8 8 G W D S E

R

D G

E 2 19 3 9 GE0141 W W 8 38 ED AT ED E WA A

W

ER

WATERS E EDG 88 DGE E 18

ER LIN

1

E

JASON ST JASON S T JASON

W

E

D RS G ED A GE W W A

A

W

E

A

G S R W E D

R

R

W

8 3

WAT E

T

E

E

9 1

E

A

S

D88 G

A W

W

W

S R

EDGE W

E D G

R

E

R

W

TH ST 8TH ST 8TH ST8TH S T 8TH ST 8TH ST T8 8TH ST 8TH ST8 HS TH ST 8TH ST 8TH ST 8TH ST 8TH ST8TH ST 8T ST

S

E

W

E T E WA DG

E

E

R

W

S

8

W E

A

S ED

W

9

1

E

E

S

G

E

S

8

Y H AWK R E

E

G

8

1

8

G

WEBS

3 8

E

3

E

A 2014 W

T A

S

S 8 ER 3

A

D

A W

D E

9

S

20

R

WEBS TER S POS TUBE EY T W UB

E

W

E

M R NE ERR 20 RRI T TI

A T

8

EDG

W

D

E R

W

1 8 8 8

E

ED G

GE W D E

E R S DGE 1888 WA E T E

8

E E E IN S D G E W RL EA E AT R W S 14 20G

G D E

W

E LIN

A

R

8

A

W A

S

S ATE R ER W S A ED W 88

ER LIN E2 01 4

G

S E R D ER GED

1 20

3

W

E

R

E 18

G

8

E2 TE

A

A

W

E

NE W ER LI

DG

18 8

E

T

20 WATE R LINE 14

8 W

D 19 3 8 GE G ED A ATER S

N ADM N STR AT ON B A R

1

W

S

1

AR E

ED

AREA

SHOP AREA SHOP

ARE

A

SHOP AREA SHO

SHOP

W

A

CM ST

8

OP

D

RRON S T C MARRON MA

E

E

T

E

E R S

W ATERS EDGE W A

E

A

E

D G

D IN 1938 SSEAPLAN LAGOON DREDG W ED IN 1938 E LAGOON DR OON SEA EDGED IN 193 E PLA 2 NE W 8 SE LAG 01 T OO E 1938 N DREDGED IN 193 S EDG 4W 0E W CHA 14 R LNE2014 WATER WAT NE LAGOON A 8 SEAP 8 ER A RL WA WATE ATERLNE201 4 W 3 SEAPLANE LA NAEL T TE 19 201 RL 14 4WTES GOON DRED R T E2 I I GE 20 1 L F 0 LINE DG ED RLWNE LINE 2 4 WA A E E RS TE W RB TER LIN RTE 4 WAT 014WATEA RL NE 2014 1938 E2 NE 238 W L NE 201 014 WW W 14 ATEATBA W 0 W E R 2 N A A H LA TE INE R R 19 L INE N E RL TC E 201TER ATE RL WG B2A0Y NO 4D INE 4 WA S E 201 E 4 TERL DG A N A N E 20 E 1 DGED N 1 4 SEA P WHA E BA ANE W 3 AGOON D ATE9 AGOONDREDGED RL 8 W N N SEA P E DT 2014A N1 R SSE W W W APLANEL W W E938 AG S A O T ON ENE ER SEA DG LAGOO L NPLA E NEE2LA 014 GO WON ATES

G E A W W ER GE A S A D R W S NGLET N ON AVE S NGLETON AV E S NGLETON AV E S WA

G

S

DG

A

E

E R S

TODD ST TO DD ST TOD D ST 20

D E D

8

B OA E” PR R RATOGA ST SA SARATOGA T ST SARAT S OGA

E

G D S E

E

DG E

ER S

W

AREA HA

R

E

8

C

E R

X NGTON ST LEX NG TON ST LE X NGTON

E AV

8

E

Y

TE

DG E

TE

E

E

EDG

E WA T

R AREA HANGAR

S E

A T

R S

E

W

S

E RS EDGE18 88 88 E 18

A

18

R E

8 193

W

D

T

S

T

RS

R

W

S WA R

W

T E RS

E

W 38

E

8 8

88

TE

A

W

GE

W

R

E

E

G E

EDG E 19 38 W ER

WA

E D

EY AVE MOS SL L O E M

S CA OL W RC AP N N E R S

A

S

W

188

W

A TE RS

E

LAND

G

A W

S LAKEHU R

8

W

W

D

W

ED

W

ER T

AT NE2014WATERLNE 2 W014W

8

G

D

G

D

D

S

W

E

D

D

TE

E DG

W

8

A

G

W

S

G

ST 6TH ST 6TH ST 6TH ST 6TH ST 6TH

GE ED

8

A

R

W E 193 EDG W GE 1938 WATERS

E

E W G

1

8

ED G

8

E1

E W ED A S GE T

RS E AT E D GE W

W A T

E

D

W

G

AT ER

8

ER S

A

D ED RS E TE G A

E

E

E 88 E D E 18 E ER W AT G W D 8 D E W G T A E 8 DG W W A A D SEAP W RS E 8 W W W E G S DG G R A TE S R ER E G A AT D G R TE E W G W W RS EE W G E A ED A 88 G S T 8 S E E ER D 1 ATERS E G D W E S ED R ATE D R D G S S ED 8 E S G D R W ED ED G D A G E D G E W TE W W ERS A E DG T E W R S A E ED ED E DGE G S G E G S DG SHOP W D W W A TERS E T A A E 8 E A E T D R E A W R R T 8 E R E A R R S S W E A E D E G 8 E S G D G R E R G E W TE 188E AT E D G G8 W A 8 W WA W D E W A W A E D E R G T G R T T W E E G S G R E A S R 888 W GE D 1 T RS E E PARKWAY TE R 89 E MARINA VILLAGW A A G 3 D GE AY W D RS E ED 8 W G EW W T E E K ERS W E G S E E WA R D G ED R 1 G A TE DG 8 G S W G R E 8 E ER E G 8 AT D 1 G W D W R ER RS G E W S A E EE W ADM N R A ED A E GE T E S 8 T S E R ER D E S G E 1 R ES ED E 8 S 8 D R A 9 R S ED 8 E A W 1 8 DG 8 E 1 G E WG E R EN A E W S D E A ED T A W E E 8 G W S R 8 W S EDG ERS E E T E DG W W EDGE W 8 WATERS W E ED D T GE A G E 188 A T ERS 1 ATERS ED 8 8 W E DGE 1 8 193 8 9 GE D E 1 3 G ED S DG W 8 S RS S E 18 G W S TE A E WA A W E T D W T 19 3 E D G E W A GE R R E ED S E G ATER S WA D R E R E E W ATE R GE R S D S S A W E R G E E A D E D E W R G 888 A E G DG E1888 WA WA G S 8 D R W T E W E 938 ED S 3 E 1 E 1 G A ED DG 9 9 E G S E 3 T R 1 938 ER 8 W 1 E WAT 1 WA R E 1938 TERS ED G E S G E RS 8 E D E 1 W 8 ED

G

E

G

N ADM N STRA T ON

W

W

E

S R

W

ATER L NE 2014 W A

8

T E

8 88

E 2014 WA T

S

E

D

S

ED

W T 8 WA E 193

A

ER

W

8

1

W

R

G GE W E D

G

S

E GED

E

AT E

T A A E W E R S

T

W A

D E

NET

W

DL ATER

W ATER A

E

R

DG

S

RMA L ROAD

W

RD PEN

R

A W

GE

TE R

8

T E

E

T A

GE ED

W

AL DR OA

TE A

DG

HOP ARE A SHOP

W

R

GE18 8

E

E

E

S

D

R

D

ARS SEAPLANE

8

8

8

S

ATERS

9

E

8 W

R

E

AT

A W

E

LE

ARBE R DB S R T N S PO E S ER RB WA A B E RS

T A

R

E

W

W E D NO 8 G E 8 8 W T 18 CEN 88 GE T R RS A E L A T HS S N A E A AN O G E M L D R A LR AOD TRAC R8OAD RA

A

W

S

W

G

A

E

R

G D E

RD

E

W

D

R

S

D

MA R P IS OT S A TE

W

A

R R O B R ED A H SA D

R

BENTON ST BENTON ST BENTON ST BENTON ST BEN

ER

ER S

TIS

D R TE O T 8 WA 88 E S 1

R E

GE

A

WE

A

R

R

DG

GE

AN

E

ED

E R R E LIN O ERN R A TE ATA W S DG 014 E2 D LIN R ER NE AT D ATERLINE 2014 W G R A 4 WWA W 01 W S E

L

R

O

E G

D A AMEDA MO E T D HE EC E CONNAL ES DE NT CK RES DE R RA HS R

R

S R

WA

G

ATER

CO AN N FR IS S SA AN CBAY Y R O BA

W

A

8

RS

E D

GE W

R

O SACISC

S

D N19

SEAP ANE AG REDGED N

RES NT M DWAYDE E AVE T R W M DWAY AVE

T ER S

M

A

D

SL

S

AT E W

T TER A

LEN

E

8 W

W

W

page / 8

W

G G D NRA RA R E NEE AOD N O TS WESTERN S CO AT

LE N NTRAL PACIFIC THAT BR R OUGHT THE TRANSC APPEZZATO W EV PTHAL HE ONN HANGAR NEN MAYOR FOR ERYONEHAD ADM DTIRA ANDRA AND WATER RAILRAOD TAOAM A STERN FORMETHE W HANG ST A EY RO ITSED W M DW 8 WES RA AND AND AND AGAR C PAC F C THAT BROU GH D AVENAR R Y T HE D N AND T N TERMINUS IN 1869, PUMPED AVE O ENTRA OUT GRADED C W W M U THEA D HAN A W SHOP O AND AND A Y LATE 8 E AREA N R NAMED CONS D AND AND HANG AND THE SHOP AREA A AN S V OF FEET TO1 RAILR AR AND AND SUPPORT THESTED CONS D ND SQUA D AND AND AND STED HANG FEET 8 E DM RE OF AR OVER OF TO M L TARY SUPPORT THE O 88 LANDMAS AND AND HAUL AND N ST S, WHEN CORP 9 A RCRAFT ENG NES TRANSIT REPA RE D AND AND WAS PRIMARIIL AND OF OVER AD HAUL AND SQUA M L TARY A RCRA RRAT ACCE Y ON FOOT WM ON AND SSOR THE SCALE AND DWAY AVE R ST RD CO ES REPA R US CH1 AD JUMPS BU FT ENG 3UP D AND AND AND AS LD NG E AND N TSEL SSOR ANES 8 W M ACCE S NEARLY AND AND AND ESM F THE STRA DW BU N RPUS CHR LD NG SHOP AY WAREA CONS D AND AND N AVE TSEL SV ENTAND NEAR O WSHOP F THE AND AND AND M DW LY SQUARE FEET ST STED OF ATO AY AREA DETA L SHOW NG CONS AERODROME D AND AND HANG AND OVER T SUPPORT USTED W DETA LHAUL SHOW NG BARRACKS AR SQUA M DW AND AND RE FEET TO AVE OF AND THE HANG REPA D AND AND AR AND N OVER E SUPP R OF A ENG

HAUL AND REPA ORT THE Y T M L TARY A RCRA NES ANDAND ANDAND AND AND GAR R OF M L TARY D AND AND AND RBU LD ENG NES FT NEARLY AND ACCESSOR ES HAN A 88 LANDMASS A RCRAA NG VE , WHEN TRANSIT AND AND AND AND FT SSHOP N TSELF THE D AND AND AND S NEARLY AND ACCESSOR ES BU LD NG HANG WAS PRIMAR CONS AR IILY ON FOOT STED OF THE SCALE N TSELF THE SHOP S L AREA AND AND AND AND HANG D AND AND CONS STED OF AR AND SQUA SUPP AS TECHNO ORTJUMPS REAND FEET LOGY USE THE UP OVER TO E AND AND AND AND AND GAR D AND AND SQUARE FEET AREA REGULA HAUL M L TARY A 38SUPP W ORT THE OVERHAUL TIONS HAN AND REPA 19ETHIS E CHANG RCRAFT ENG NES DG R OF REGULA AND AND AND D AND AND AND R HUMAN M HANG L TARY AND REPA R TO W ACCESSOR SCALE GRID IS RELATE AR A AND RCRA A OF ES FT D BU ENG HANG AND AND AND AND D AND AND AR AND LD NG ACCESSOR N TSELF THE SHOP S ES BU LD NG NESTOAND T TH AND GAR AND AND AND DAND AND AND N TSEL AREA CONEARLY S NEA HAN FE

Y L

E

D

E

O N

W

WAY U ON

G

20 ATERLINE 14

D

R

B

A

G

AREA HA NGAR

IS CIS CO B AY S

PENSACOLA

W

W

R

H

W

R VE CON S

8

E

HA BO

TE

4 201

WATERLINE 2014 WATER LINE 2014 WATERLIN

S

1

ATER NE

D

A D W EN G T N EA LLA TIE AL ONPR OFY R “S LEN BA A

A TE W RSRS E TE GE WEDG WA 1938 S E 19 ED 38 W R ER IN E 2014 R W

E

W

A

W

E

E

NCISCO BAY SAN

W ESSEX DR DR W ESSEX DR X W ESSEX DR W ESS E

W

8

A

T

E

G

EA STE R

AN

N

H

A

T

N

NER SQU ARE D

R

YA

8

WA TE RL S INE TE

201 D 4 WA TER RS LINE 2014 WATE RLINE 2

FRAN

R AND” D” L E

S

E

01 4

WA

T

4ESTER INE2E01R RL E W D

T E RS

SAN BAYC ISCO S R A N FIS CO N

W

88

A HANG AR DG

IN A E 2014 E EMENTARY SCHOO GE HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK PAVE THE E 1888 LANDMASS, HANGAR WHEN WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON E EMENTARY SCHOO TRANSIT WAS G WATESHELLS TO WA HANG AND AND AR PRIMARIILY ON FOOT THE SCALE JUMPSDG PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASHING SCHOO OPED N R 3 400 FOOT AND 1 700 LINE A DEVESCHOO 2014 WATERLI TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WAS E EMENTARY AND ANDGAR E UP AS TECHNO HAN USE AND REGULA HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK E E LOGY EMENTARY SCHOO FOOT RUNWAY PRESENT TIONS CHANGE THIS S AND AND R HANGAR WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON E REGULAR HUMAN DEVE OPED N E W AND R WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASHING SCALE ER S GRID S PARK HANG W AR AND AND LITTLE JOHN PARK LITTLE JOHN PARK DAY COLLEGE OF E IS RE TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WAS W JOHN PARK LITTLE JOHN PARK LITTLE GAR L W HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK AND AND W AT A D D PARK LITTLE JOHN PARK LITTLE JOHNWAS WA HAN ALAMEDA THE E ED LITTLE JOHN PARK LITTLE JOHN PARK D W AND AND HANGAR G G T W JOHN PARK LITTLE JOHN PARK LITTLE OF THE OSAN 8 LOCAT ON HANGAR E GRID AND AND AND IS RELATED PARK LITTLE JOHN PARK LITTLE JOHN A GE18 TO THE 1888 LANDMA LITTLE JOHN PARK LITTLE SCO JOHN PARK SS, WHEN TRANSIT AND AND AND E FRANC BAY WAS PRIMARIILY ON JOHN PARK LITTLE JOHN PARK LITTLE FOOT THE SCALE JUMPS RS UP AS PARK LITTLE JOHN PARK LITTLE JOHN AND AND TECHNOLOGY USE A LITTLERDROME JOHN PARK LITTLE JOHN PARK WH CH HANGAR AND REGULAT AND W AND IONS JOHN PARK LITTLE JOHN PARK LITTLE CHANGE THIS HANG R E OPENED N 1930 AND AR PARK LITTLE JOHN PARK LITTLE JOHN GU AND AND W LA GAR RH HAN AND AND AND W WAS A PROJECT UM DONE HANGAR AND AND AND AN BY THE UC BOARD OF HANGAR HAN AND AND G GAR REGENTS THE MARSH HAN AND AND

R

W

E

A

N E A D S

A

SO

R

A E E WW DG EBS 1 E8R D E G

N Y RA O BABAY O

R L O R 8 B B R 8 U D B L A LL G H W “ Y A E W LE E 1869. A BA G IN LEN S E D G OLA NU MI

LI ER

ERS

R

C A N FR C S S SA

S

E DG E

EDG

W

D

NP W BALLE LW RO UB HG NA E A S RS ENA BAY DB BA AAY BALL G W E R TEBAL Y B

8

R

3

G

W

E

WA TE

8

T A

SA FR O

N ISC O SAN CISC

R LINE 2014 WAT ERLINE 2014 WATED

DG

W

W S E

S

ED G E WA T E E T A

T

DG

W

N

A

B E

E 1 G T ES DENT A L RES DE

ER S

A BAY BALLE NA B WH AY B A LE” BAY AL NON PRO FIT

A

R

G

N

OA K AS ND MA R E

W

RS E

G

INE 23 R L19 TED E WAE 14S 20EDG EER 4 WATERLINT INE 201WATERS RL938 ATE1 GE

A

E

ERS 1 888 W AT

W

R

D

G

A 8 8 H 1A BA1Y W E NA E

E G W E E ED ERS E 1938 WAT T A E

AT

O

S

W

S R

A LL RG E TA ”S

S

ANCISCO B Y

SC AY SAN FRAAN BAY SAN F BAY SAAN CISCO BAYR ANNFCRANRANCIS COSAN FRA O F N SA ISC SAN FRANCISCO BAY SA AN C I S Y S N C OB A RANC ABAY CISC BAY AYSASNAFR R N ANCISCONBFA F BA N ANC Y S CISCO BAY SAN FRAN ANCYISSAN FRA S I Y B N C A C C A I S O C ANCISCO BAY SAN FR Y SAN FBAY SANOFRBABNAY SARA NCISCO BAY SAN AN RANC CO AN F

W

E

E

BENTON ST BENTON ST BENTON ST BENTON ST BENTON ST BENTON

A

D

A

E 1 9

H

E

H

G E 1

1

ED

R

W

E

W

AT W

N

R

EK

E

1

E G

D

TE

GE

W R OR A G EU H O

R

FRANC SCO SAN B AY

ST

E

N

O DGE S CO CON MPLT N ED IN 19 E CSCO BAYSAN FRAN CTE 02 MAOKBNAGY D PA R SC T OF SEAO C F ALAMEDAAN P BAY SAN FRAN THE CYSSAN SCO BAY SAN FRANC C SOU N A Y TH PANCFFR BAANCIS BA A C CO A S B T RA LRAOD 1887 BECA DETA L SHOW THE BREAKWATER ANG ME THE M L NCY SATN NTA RAILR OLE N E N I F O AOD TO ITS WESTYERN T S RAN I S ON B 18 CC S A E RA 94 BAY SAN FRANCISCO BAT THEATRYANS O BA C SCO B NC S B Y A RA Y A A MERLY T HE CENTRAL PACIFIC THAT BROU GHY SAN FR AN A N Y N F SAN FR BA B Y SAN FR L

193 8

AT

E

AT

G

W

G

T

A

1

E

014

G

UD BH

G

W D 2GE

G

HE B AY B R

R

R E T A W

WATERL

LINE 2014 WATERLIN

R

W

S E D G

E8

R

E

O

G E

A

N

ATER S W

A

E T

S E

E

GE

TE RS A

E

S E

E

D

R

A

E

R TE WA

S

Y L

R TE

S E R D

CA

W

W

A

RL N

R

R

A

A

W

W

TA

188

E

9

S

014 WA

T

W AT E

EDG E 19 38 W

T

E

W

G

D G

D E

88 88 AY A8Y8 0FAAYY88

A

T 1 E R

EB S

88 8

W

W

R

TO NIO CR

E T A

8

R

2 4

E D

E

S ER

A . T 1869 18 IN W 8S8 NU MI

TE W A

I

R S

G

A W

G

AT

NG A LAME Y DAAN A B

W 88

8

S

D

T E

1

W

R

1902 M AK

E 18

W

8

TE A

E

E

21 4W

A

G E

W TA T E A R R 938 SEAPLANE LGAGOO E TE N DRWLEIN E S G W E REDGEDEIN 19 S B D BE 2ST ED R E 3 0 8 S E EAP N 1 L A W E 4 R SW 888 W AT D IN 19138 ESLGEE D AT E T W ST SEAPLAER EBSTE R TERS H AGD ING TE A WA EDGED IN19 W T DG OO 19RLINE E 3 3 2 N G 0 GE DIN 1938S D W DR8 SE114 W E 1 8 S 20 E 8 ED G E WA T E E A8 AT R 4 WATERLINE 1 0 E RS D E GEPLA R LINEE 2 OON DRE DG W D N E LA PSLANE LA GO R IN AT ANE 1W 938 S SEAPL

TE 14 WATERLIN WE R88 E2014 WATE R LINE 2014 S

E

E

A

G

W

N

D E

W

WA

D

A

RLI

T S E AER R

G

ED G E

8

IN

8 WA

D E

S CO MPLT ED IN

JACK LONDON AVE JACK

8

W TRIDENT AVE

A

W S LONDON AVE JACK LONDON AVE JACK ENC D 8 8 E E TRIDENT AVE W TRIDE LON T R RM E N E DR IN T S E NT AVE W W DEPENDE CE A D S WA 2014WA W W D W E G GE G E T E TE W A LOCATION OF THE SAN R 188 8 A GE 1 W R C E GE1888 W E E T E FRANCISCO BAY ED S 8 A H BR S A G Y ANT AVE S BRAYANT AVE G BRRYANT 1 NE2 R W RAVE BRYANT AVE BRYANT AVE BRYANT ER 3 E2014 W E D AIRDROME WHICH 9 0 E N 8 1 1 W 4 S E D DG E OPENED IN 1930 AND A W SEAPLANE LAGOON W SEAP 8 A S W LANE R S IW I LAGOON W T N WAS A PROJECT DONE 8 SE R A HOLLISTER AVE HOLLISTER AVE HOLLIST 8 W AN R E ER AVE HOL TH LISTER AVE HOLLIST RL E GE D RS SEA W 3 W T BY THE UC BOARD OF E PLANE I 18 E E W HAN 1 E O AN 9 D 88 C NE 20 2014 WATER LINE SG REGENTS. THE MARSH ANTIC A T 2014 OU R 14 W W WATE V RLINET ON WA 20 R A WATL R ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE E E W HAD THE WATER TH W ANTO TALAMEDA RIVER IO E LINE BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA W S TE E E IND S N EDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE D PUMPED OUT, GRADED R W T C G E A TERS ED I O E ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE E A R SBELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE RS BELTLINE ALAMEDA W CR 8 E A ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE E S D T E LINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA E N D E E EDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE LLY A K 9T F 20 K ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE 8 W W TT ERS 1 O E BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE 4 F F AC W T E RW ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE S ALAMEDA PARK ALA ED G OW R A R MEDA A O LINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA E D PARK ALAMED R T ME D E E EDA BELTLINE S ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE W A PARK ALAMEDA PA R N R S R R ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE BRUSH ST BRUSHG L ED RK ALAMEDA PARK 8 I TER N W E R ST BRUSH E 8 S E BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE M ST WOODSTOCK PARK 8 ALAMEDA PARK E ALA 1 E E BELTLINE ALAMEDA S M 8 93 W IA MEDA PARK ALAMED S D E R 20 1 OODSTOCK PARK W E 1 N A PARK ALAMEDA PA W E TE ED E A D PARK WOODSTOCK E 14 G I G RK ALAMEDA PARK EAGLE AVE EAGLE E S ED ER D OCK PARK WOODS 1 W TS AVE EAGLE AVE EA R E S S W ALAMEDA PARK ALA R D 8 WOODSTOCK PARK TERLINE TER W GE EAGLE AVE EAGL W W MEDA PARK ALAMED G W 8 A OODSTOCK PARKWWA HE G G 1 E AVE EAGL A A AT A PARK ALAMEDA PA CYPR A WOODSTOCK PARK E 49 GEE AVE EAGLE AVE E S 9 RK ALAMEDA PARK B 11 W ES 93 PARK WOODSTOCK 38 N ALAMEDA 3 E T PARK ALA W W S E K WOODSTOCK PAR O 8 W MEDA ALAMED 8 R ED LINPARK S CK PARK WOODSTO ATE AA PARK ALAMEDA PA E T C A E WOODSTOCK PARK W ED W RK F I ALAMEDA PARK C 201ALA ALE GRID IS RELATED L PARK W YP OODSTOCK S T W A AND 4W ED N D PARK TO THE 1888 P W R W3 LANDMASS, WHEN ERWOODSTOCK AALAMEDA E W RE AND 8 SEAAND 9 TPARK TRANSIT WAS PRIMARI T ATERL 3D TAND GE G U W SS G T OCK PARK WOODS 9 A ILY ON FOOT THE SCALE W 8 O G ST CYPRE IN WA WOODSTOCK AND AND E GE W E PARK E ON JUMPS UP AS TECHNO W T W W W RS G E 2014W ELA GO 3 W LOGY USE R D ED AND AND AND D EN W H ATE R IO S W 9 AND REGULATIONS CHANGE THIS REGULAR HUMAN SCALE E US W PAC AND AND S E AND N LA W RL EIFICW D N EAPAND GRID AV LITTLE JOHN PARK LITTLE JOHN PARK E T WA EW 8 W APAA IS RE DG I NE 2014 W AND AND C RM IFIC AVE JOHN PARK LITTLE JOHN PARK LITTLE W S OR G LA W E S I S S P A C PARK LITTLE JOHN PARK LITTLE JOHN S I FIC AVE PACIFICL O AND AND AND TE NALLY E INE 20 AVE 38 PACIFIC AVE PACIFIC AVE LITTLE JOHN PARK LITTLE JOHN PARK E DT AT E M PACIFIC THIST N RLA REGULAR AND AND AND 14 W R A 14 JOHN PARK LITTLE JOHN PARK LITTLE 1 A T O HUMAN SCALE GRID DG S PARK LITTLE JOHN PARK LITTLE JOHN N RME R SA T 9 W AT IO LA 20 IS RELATED TO THE 1888 LANDMASS, WHEN O R DG S C AND AND ANDGE FD GE 1 LITTLE JOHN PARK LITTLE JOHN PARK A TER GE E T E E 3 N K TRANSIT 8 AN W D WAS A E S JOHN PARK LITTLE JOHN PARK LITTLE D A W PRIMARII H AND D AND AND TON T D D LY ON FOOT THE SCALE A C W LIN PARK LITTLE JOHN PARK LITTLE JOHN G OCT E E JUMPS UP AS TECHNOL RE D S E N O E AND E 8 R S A W AND LITTLE JOHN PARK LITTLE JOHN PARK OGY A E USE T R 3 AND N ANT N REGULAT DED ON W A IONS JOHN PARK LITTLE JOHN PARK LITTLE CHANGE D DG E TE S N AND AND AND MA 19O CRE A THIS REG W ER E O E A A PARK LITTLE JOHN PARK LITTLE JOHN W ER T E EK S W U FOR G W M L AND AND AND WME R W IR E W AR N RE W DO AS O A SA A N I HU K LO KANYT 14 8W AND W TO ORIS A W AND MA AVE LINCOLN AVE E TE FO E W AVE W ORIS S D LN P R NS 20 TH E 8 R LINCOLN AVE LINCOLN AVE O AE N F NA R T AND AND KANY O OK LINCO SH S S AAVE LEN O PO D AND PS AND E3 1 W TORIS A R T O R IM A F AAVE W ORI C KANY AL S EE C R R AND E AND AND WC R W OR W N SKAVE MA T A LIN N W R TER IN WAT E R ETO19 SOU W N CR RS RI SA AND AND TE T L R M EEK FORMER SAN8ANT TER S W D E N E W TH E E RNA V TN O ED E AND AND AND 8 E R3LI W ON E A O E R E V R O E E 9 N C W G E E AND AND T R D 2014 C EK AND EA 3 S EDG G 1938 S O E G 9 N F ATERS OR M A S ERS D W S DA R AND 938E 8 WAT A D E W 1 3 8 AND O C W 9 THIS E REGULAR W A A HUMAN 38 A ED G N E E RE E SCALE GRID IS RELATED E AND FORMW R R S R ED 8 KAND TO THE E R S A AND W 1888 LANDMAS 1 TERSA E TRANSIT KD S, WHEN AND AND AND TE N E S H NA3LLY R E R SA PRIMARIIL T WAS F A WA N E OR G K Y ON FOOT THE SCALE GN K JUMPS UP AS AND AND R M E S EUSEE T WAS WO T E F T ER O E 3LA19 8 WAA W T F R E TAC F A NT AND W TICON AND AND TO E W G A TL R RS S WAT E DEROGA AVE A N O INE TE R A D D FO D E N A O W TICONDEROG AND AND AND 8 RWATE N M W K G D A AVE 201 W 8 W TICON D 1 R WDEROGA AVE WW E W N AND AND G M W R WE R R 8 D E 4 E TICON E T D T R W THIS REGULAR HUMAN E DE G WA E E AND S E S M AND NTO AND N O CR AY SCALE GRID IS RELATED E E 1 W 1888 M ER S S E A E E OE WA S “S TO THE 19 S D DG N A R M ATER LANDMASS AND AND AND E 1 G RM E , WHEN TRANSIT E WWAS 38 ORM W N T L TE IILY ON FOOT THE ER SA 8 WAT ER EPRIMARG G N W 9 D E3 SD O ARIN 8 SCALE JUMPS UP IN AND AND G ED G A A W S D U D R AS F E TECHNO T D R E ED S A LOGY USE AND REGULA R E S20E ER 88 AND AND AND AND VI KA W B E TIONS CHANGETHIS IO 14 W LL D HE G R WATER REGULAR HUMAN A 1 AND AND SO T AV AND AND M A SCALE GRID IS RELATE R S N A AND G D TO AND AND AND AND 19 E W N O M E E S AL O ER W TH D O R C ED R AVE TAYLOR AND AND LOR E R TAY N TON D AND AVE TAYLOR AVETAYLO G N E S G A R AVE TY A AND AND AND TAYLOR AND N S E ED W S F E R GE AVE TAYLOR R NTO G S AVETAYLOR AVE TAYLOR E PS A S E N RGAND N IO ER AVE TAYLOR AVETAYLO AND AND AND DE DA AN SL A E W E SH ED H AND AT A R AVE E D ET AVE W G T TAYLOR AVE TAYLOR AVETAYLOR AVE AV 4 ORN U AND AND AND AND AND HOR WE O NET TYNA N TAYLOR AVE ” LVER DOMW E W 3 EL L AVE WI E ALTEAND T AND AVE W HORNET AVE W HORNE W AND RS C E SENT DAY W “WRL COLLEGE DGO EN A K E H TER T AVE W HORN R INE 2 W AND AND E AND AND A A R ET AVE FO E ALAMEDAILLWAS 014 W THE W RCANAL CANAL9 AND AND AND I TCANAL CANAL CANAL CANAL E 1 E 3 RM R ATESAN S EDG 8 ATION OF THE W 8 AND AND AND AND 8 E 8 S S O R LIN ER 8 AT G K 8 LA AND AND TCANAL CANAL CANAL CANAL CANAL CANAL 1 WAT AND AND E A 8 NCISCO BAY N E WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON E 1 E W D ER R F AND2014 W AND AND PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASHING N E A G E S O DROME WHICH AND L AE TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK O D WAS TCANAL CANAL CANAL CANAL CANAL CANAL ATE AND AND G G WT T AT CENTRAL AVE CENTRAL A HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARKE T E D N D R 2A RLING AVE CENTRAL AVE A C WASHINGTON 014 W WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK W NED EIN 1930 AND AND AND GE O AND AND E 1 E LINEM G A E 20 PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK R CANAL 1938 D E E 8 TCANAL CANAL CANAL CANAL CANAL G ER A D R WASHINGNS T R 38 PARK AND E AND AND WA DED LA E 9TON 14 W8 8 WASHINGTON PARKWASHINGTON PARKWASHINGTONN PARKWASHINGTON PARK WAS S A AND PROJECT DONE WA S S1A 1 A EGE W S E S E I S M HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK D 8 E 8 W 8 TERS 1 AT AND N WG 8 AND AND WE V LCANAL ED R WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON ERL W Y W ATR TCANAL CANAL CANAL CANAL CANAL W E HE UC BOARD OF AS O A AND AND E W W AND AND PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASHING “S S E M I N R K R AV W A E TON T PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WAS I LV AND S E 2014 888 W ENTS. THE MARSH AND ED AND PR E ER E PARK WASHINGTON PARKWASHINGTON R TE HINGTON PARKWASHINGTON PARKWASHINGTON PARK TCANAL CANAL CANAL CANAL CANAL A A F G AYW A DR TIDEWAY U A 1 CANAL O W D WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON L I AND E D AND AND A O N A C PARK WASHING FPARKWASHINGTON A R TER W M THE E DE AL A WATER R STAT ON ALAMEDA 1936 R PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON M WB INE 20 TPARKWASHINGTON S CANAL CANAL CANALTCANAL CANAL W R E PECANAL R AND AND AND AND ED LINCANAL TCANAL CANAL CANALRCANAL CANAL TON PARK WASHINGTON PARKWASHINGTON WAS W N PARKWASHINGTON L A S NR E 1 N W M R PARKPARK MPED GRADED M A HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON EDEN 8 D E 20 AND ANDOUT, AND T AT AV WAT 14CW R 14W CANAL WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON WASHINGTON G EE 4AACANAL G E ED E 19PARKPARK E 2014CANAL AL A R STAT ON CCANAL CANAL E ALA TE88 TCANAL CANAL E TCANAL CANAL SITE, AND USED AND ALAMEDA 1936 PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON WASHING E AND AND E PARK R E S E A E R D G GE 38 G TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON WAS D 8 W A 8 DPARKWASHINGTON AND OYSTER AND AND AND ER G HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON A SHED E W NE D E PARK S E CANAL CANAL WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK TE ANAL CANAL CANALTCANAL CANAL S WASHINGTON PARK WASHINGTON W ACANAL CANAL AND AND NAE 1 R RAND STAT ON THE ALAMEDA 1936 G SAN ANTONIO AVE 201 PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK A WASHING E C A ALAMEDAATER LIN BA G LLS TO PAVE 8 SANA ANTONIO T AND AND AND AND AVE TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WAS SANH 4 O CANAL CANAL CANAL KE E W ANTONIO AVE SAN WHA WA W TCANAL CANAL CANAL CANAL CANAL CANALTCANAL CANAL CANAL W R T ANTONIO AVE S HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON RPARKWASHINGTON PARK A L N R AND AND 1,700 0-FOOT AND E AND AND E T E A WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON A A S L Y ON T ALAMEDA 1936 ALAMEDA MUN CAP F A W R N W E PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASHING AND AND AND E CANAL EW A D B BACANALCANALCANAL S 8 A W T RUNWAY.PRESENT A TCANAL CANAL CANAL CANAL CANALTCANAL CANAL CANAL G G A P W AT TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASOED R RS A E N E A W W E E A AND N AND AND D D D T Y S D N G EE E HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTONA PARKWASHIN PARK NDEN TO E M E EPARK A LL RW S GA C AE N ER COLLEGE 8 W D G WASHINGTON WASHINGTON PARK WASHINGTON WASHINGTON PARK WASHINGTON PARK C AND 1936 AND MEDA ALAMEDA MUN CAP A R PORT AND AND EOF 8 N T R D GPARKWASHINGTON S E WASHINGR DR INDEPENDENCE W PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARK E E ME 1 IO E R E D D D S 1 WA T B AND MEDA THEAND AND WAS AND N TON PARK WASHINGTONE PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WAS S G E AV 2014 NPARKWASHINGTON 1 T E PARK E 93 A E HINGTON PARK WASHINGTON PARKWASHINGTON W A G E W O AND AND 9 PARKWASHINGTON E 8 W TWASHINGTON G WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON N ATION OF THEW SAN A R EDG C 8 SA 3 8 PARKPARKWASHINGTON S D 1 S E PARK PARKWASHINGTONAPARKWASHINGTON PARK WASHING AND AND E ER PARKWASHINGTON 4WASHINGTON R ERLINE 201PARK E W D L N N TON WASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WAS W NCISCO BAY U S RS E L D PARK AND AND A ED L A A HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON G N A A INE PARKWASHINGTON W B T WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON TO AND AND DROME WHICH N E W O PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASHING M W JO N R 2 W S AND AND 014 PARKWASHINGTON TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WAS TO FINISH ATERLI IO NED IN 1930 AND OFF 2 S E S THE W TRA HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK 1.25 MILE T G O E LONG BREAKWATER AV WA AND AND E WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON WASHINGTON R C R AV WPROJECT RD BAPARK TO PREVENT CURRENTS R S A E D N A PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASHING TPARKWASHINGTON A ANDW NT AND DONE RB G N 8 W E G G S FILLING IN THE DREDG TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON WAS RCLI D SLEY AVE MOSLEY W NTO E S SA EPARK O ATBOARD AND HEAND UC OF P E E HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK E ED LAGOON AND TO 1 N E E R N T P W A N AV 888 WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON EA O 1 P E TON D AND THE AND EMO ER RMARSH ES DENT SWAS JO AT RLID E ENTS. PARKD WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASHING 9 S 3 E TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK AND AND L E W A L W S E R SPARKWASHINGTON P W R E C 8 ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE VE RW R S E HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARK ED W PRESENT Y A COLLEGE A DAY THE L NE W K AND WATER AND W TER E W RIVER AV E HANG LINE BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA S A AV WALAMEDA WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTONO W A D AR E C E W R N I RE F EDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE LIO PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASHING D LALAMEDA HANG N E G OF ALAMEDA WAS THE AND AND MPED OUT, GRADED T EE S WBELTLINE DAR B PARKWASHINGTON E NE N AV T TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WAS R N ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA EW E TOR GE S NE A REALAMEDA AND AND GAR R RS DG HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK DL BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE BELTLINE ALAMEDA BELTLINE ST LOCAT ON OF THE HAN N P WASHINGTON E E N M AV E SAN WASHINGTON WASHINGTON PARK WASHINGTON PARK PARK WASHINGTON EBELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE SA W AND AND J ER A D PARK PARKWASHINGTON A RE HANG AV LIN K DL PARK WASHINGTON PARKWASHINGTON E PARKWASHINGTON PARK WASHING AR LINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA ALAMEDA NE S G R FRANC SCO BAY 1 AVE W RED E NPARKWASHINGTON TON PARK WASHINGTON PARKWASHINGTON LLALAMEDA AND AND HANGE E DPARKWASHINGTON PARK WAS D EDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE BELTLINE AR E F 1 C A Y E NA B HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK E E L NE WAT ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE L W AND AND GAR A RDROME WH CH AV L A R R D O E WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON R IN E HAN G PARKWASHINGTON PARKWASHINGTON PARK WASHING BELTLINE E ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE E O T PARK WASHINGTON PARKWASHINGTON TO N R AND AND HANGAR 9 DM ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE L E T OPENED N 1930 AND WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WAS E TON PARK G E N A LINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA EA PROJECT RIS D 8 D AND AND HANGAR HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK D BAL ALAMEDA E G AV EDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE BELTLINE WAS N DONE WASHINGTON PARK WASHINGTON WASHINGTON PARK WASHINGTON PARK WASHINGTON 1R S 8R O W NPARK A E AND AND GAR 93 S A N D S ALAMEDA BELTLINE ALAMEDA ALAMEDA BELTLINE LENA 8 W BA 8 8S PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASHING O PARKWASHINGTON HAN GE BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE G C EW W WA R 8 YBY W ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WAS LI Y AND AND 01BELTLINE ALAMEDA BELTLINE ALAMEDA BELTLINE BOARD OF R HANGAR 8 LYTIS “WHATHEBAUC W N E W E M HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK R W 4W D TO HANGAR S D A AND AND PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON S PARK WASHINGTON888 E THEWASHINGTON P MARSH G R C LE” B 1REGENTS W 1 N PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASHING D U A O AND AND A EAGLE AVE EAGLE E O TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WAS W TIS AVE EAGLE AVE AY ED R TSCHOO HAD THE WATER T EA B AND AND HINGTON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK ERL R E EAGL EMENTARY E E AVE EAGL R D D WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON PARK WASHINGTON REA E AVE R D E C AT CL E EMENTARY SCHOO M R INE EAGL AND AND PUMPED OUT GRADED W E AVE EAGLE PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASHING WS O P E EMENTARY SCHOO AVE E S R E S W AND G 2 TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WAS AND W T 0 HANG E E EMENTARY SCHOO Y 14 W AR THE S TE AND HINGTON USED W W IS PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK E EA WASHINGTON W RE E MO E E EMENTARY SCHOO AND ANDHANG W D AR L 8 D WASHINGTON PARK WASHINGTON PARK PARK WASHINGTON PARK WASHINGTON AR H W W E E RG R W DEVE OPED N E ATEW CRUSHED OYSTER PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WASHING AND ANDGAR O E EMENTARY SCHOO RL HAN TON PARK WASHINGTON PARKWASHINGTON PARKWASHINGTON PARKWASHINGTON PARK WAS E N TER AND AND

8 1


A W

E

T A

G D E

E G

AT E

T

ER

E

W 8

GE D

38 9 1

W A

E

1 E 88

S

R E T A W

D

E RS EDG

E 193 8

E

G

ED

RS

E

RS

E

E

D G

FO

E D

R S

E

E

AT ER

S

N

E

G

93 8

1

R

S

T A W

19D 3

A

L

G E

S

E D

1

D

19

S

38

8 1 E

1

G E

E

8 8

GE

KE

ED

T

E

E G

E

RS

S ED

GE 1 8 D

E

S

R

8 W

E T E WA

DG

E

ED

A

R E S

E

E

S

S

88

G

E

G D

E

S

R

E

E R

S R

R

8

W

W ED A GE

TE R

G

E

AT E W

S

8

ERS

T A

D G

R

E G

E

R 8 W A TE G 8 E

E1

W

8

18

ED

RS

1

E G

S

R

ERS

D G E

E

ED

E

W

E G

ATE

W

E

W

88

AT E 188 W R S E DGE 1888 8 E S ED G

ED G

8

E

E

S

D

GE 1

EDG E

RS

AT E

8 E1 E DG

E RS

A

T

6TH ST 6TH ST 6TH ST 6TH ST 6TH ST 6TH ST 6TH

5TH ST 5TH ST 5TH ST 5TH ST 5TH ST 5TH ST 5TH ST 5TH ST 5

4TH ST 4TH ST 4TH ST 4TH ST 4TH ST 4TH ST4TH ST 4 TH ST 4TH ST 4TH

A

S ER

ED

G

W

ABAYB LLEN BAY BA NA BAY BA “WHALE” BAY N O BAYY NONPROFIT YACH B LENAB A BAL BA T

3 8

1 9

AY “

E

D

G

B

YACH CL U BALLE B

B NA

ANC

S

I

SA

CO FR

B E” PRO

3R D

D E

S

W

W

E G

88

E

T

E

ATER S E D

88

18

E

E

ED G

T

GE

ER T

1

E

S

E

R

W

G

8 8

8 1

S

R

TE

A

W

RS

8

S S

8

E

WATE R

ATE W R E S G

T A

E D

A V E S

E M O S LE Y AV E

AT E

O M ST 3RD ST3RD ST 3RD ST 3RD S T G

TER

W

3R ST3RD ST 3RD ST 3RD 8ST ST3RD ST 3RD ST 3RD D ST3RD ST 3RD ST 3RD RD ST3RD ST 3RD ST 3R D ST3 G

W

8

1 88

A

K

C

D E GE E

B S

S

E

R

ND

C

E D

ED

R

E

T

S

R

GE D W

S R E

E

D E

ED

AT

A

E

ED AVE MOS EY LE Y

S

R

N GE ED N

S

W

GE S ED R E

T

W A

T

E

RA

ON

D E W E DG A A S T R E ER R T A

R

D G E

E

G E

ED

R S

E

S

1

E

W

AT ER S

ED

G E

W

W

19 38

AT ER S

ON NGAR

RA

ON ADM N

RA

ON ADM N

AR

HO

HO

E D

R S

D G E

R

S

R

D G E

S

GE S ED

T E R

A W

A

E

T

W

R

E

G

E

S ED

E

T A

T

8

B

3RD ST 3RD ST

ED

AY

8

DG

D E

WA

Y L ” BA NON

Y BA A NA BAY “WH A

E

8

8 8

A

S EDG AT E W

W

S

B FIT

8

A

18 8 8

T

88 E 18

W

3 8

A

T

O

N

O G

SA AN CBA R O B

AL LE N

9

ER

CH L A

BA

N SAN

L ALLEN LE

A T

R

RB

LU

E

G

E

19 3

8 W A

T E

R S

W

G E

E

DG

E

19 38

AT ER

S

ED G E

W

19 38

AT ER

S

A

AR

HO

AR

HO

A

A

AN

HO

A

AR

AN

A

HANGAR

G ED DR A ON EL GO LAN G LA EAP E LA NE 8 S PLAN EA

AN

A

HANGAR

AR

SE GO SEAPLAN O

DIN 1 93 E S 8 IN 19 L 38 ANE LAGO O S EAPL ANE

I

19

A SAN FR SA

19 38

W AT ER

ED G

19

38

W

A T

E R S

E

GE 193 D 8

R E S

E

8 WA T 3

ED

W

E LAGO

GED

N

LANE 938 N SE APL DRED S DREDGED IN 1938 LAEGAP OON DRED APLANLAGOO

1 OON SEAPLANE LAGOO 38 SE DRE938 S GOO LANESEAPLANE LAGOON DR N AP DG EA N D ED D LAGOON DREDGED GED DRED LAN ED INPLANEREDG

DREDGED IN 1938 NE LAGOON DRE D IN 1938 SSEAPL DGED IN 1938 SEA SEAPLANE LAGOON PLANE LAGOON DREDGED IN OON SEAPLANEANE LAGOON DREDGED IN 193 DREDGED IN 1938 193 8 SEAPLANE LAG LAGOON DREDG SEAPLANE LAG OO 8 ED N NE LAGOON IN D 193 S 8 SEA R PLA SEAPLANE LAG NE LAGOON SEADREDGED IN 1938 SEAPLANOON E LA ED EAP OON DREDGED PLA IN 1938 SEAPLA NE LAGOON DREDGED IN1 GOOGED INLANE NE LAG LA 9 N

DGED IN 1938 SEA PLAN AGOON DREDGE E LAGOON DREDGED IN 1938 SEA D IN 1938 SEAPLA PLANE LAGOON

8

SAN F FR RAN CISC S AN O BAY S

G E

E

193 N GE E LA 19 LAG ED IN OENG ED IN 1938 SEAPLIN AN S 1938 D IN 1GOO 38 SEOON 1938

SA

A BAY BALL LE WHBAL LENABAY ENA BA NA BA Y A LE” BAY “WHAL Y BAL NON E” B PRO AY FIT

AVE TAYL

AY O BF C IS N NCY SA C FRABA CIS

ALL AY

E

BALLE NA B ENA BAY A Y BALL BA BAY ARBOR LLEN BA L BH

Y “WHALELLE A BA LEN

LLENA BAY

ERS 1 938 WAT

A OR Y B

BA

EN N A LL IT AL ONPR OFY “ LEN BA A

FRAN

SAN BAYC ISCO SA N FRCO IS

C

W

1938 WA

FIT

1

W

E

TERS EDGE

L UB NPRO HA

WA

O

TERS ED

1938

M

WHALE” BA

GE

MO

A

W

ED

M

TC

8

T

G E

1

S

8

D

W

D

RA

ATE

E D

W A T

E

WA TER

1 8

E

LI N C O L N

GRAD

TAYLOR AVE TAYLOR AVETAYLOR

WATERS E EDG 88 DGE E 18

S

T

C

M

GE

S

A

A W

R

T

8

ED

8

D

ED

8 3

EDGGE

LAGOON DRE SEAPLANE L

SCO CISIC

O

E

S

ATE

G

TERS E D

E D

19 3

S ED R G

3

T

O

T ERS

A

A T

E

THE MAR

O M

HAD THE WATER PUMPED OUT

A

1

GE W D E

3

ED

S

W

E

E

REGENTS

EAG

A T

A W

G

ED

T A

N 1930 AN

BY THE UC BOARD O

W

8 8 8 1 E W 38 19 G D E

S

E1

OPENED

WAS A PROJECT DO

M

M

O

E

8

D G E

E

S

E

DG

E1

S

D

A RDROME WH CH

O

O

S EDG

D

G

R

E

S

S

D

E

E

LOCAT ON OF THE S FRANC SCO BAY

RS

R

E

L

E

T

S

S

A

R

R

W

TE

E

8

A

T

AT W ER S

W

A W

W 88 EDGE 1 8

D

GE ED

N

ADM N

S

T

E

ERS T

D

R

R

A

T

A

8 3

19 38

ATERS EDGE 1938 WA TER 8 W 193 S ED GE GE E DG E

8

1

8

S

ED RS

S R

E

8

W

A GE D SINGLETO IN N AVE SINGLETON AVE SINGLETON AV E S WA T E 8

TE WA

E

8

888 W

T

A

S

S

R

W

38

T

E

8 WA

E

D E

19

A

W

R E T

8

G

E AV

E

W

8

G

R

TE

Y

G D

E

ED

8 1

DG E

E

N ADM N

1

W

R

TE

S

G D E

S

E

RS

E WA

9 1

HO

8

E

A

W A

8

W

R

GE 1938 W ED A

AR

E 18 8

8

W

8

TE

HO

E

S

WA

S R E

AN

8

1938

T

A

R

R E

AR

E

8 E 1 8

GE S ED

A

SEA

1

S

W

R

R

G

E

DGED IN1 DREDGE 938 DI N A ANE L GOO LAGOON DRED D GE D

S

9 1

AP

DG E1888 WA E T ED E G S E

A

SE

3

R

W

LANE LAGOON D APLANE LAGOO SE NDREDGEDI A

E

TE R S

E

R

8

R

A

E

S

E

W

G

E

D

S

8

E D ERS

DGE 1888 WA E T

G D E

3

A

W

E

S

8

W

R

1 9

E

3

SEA ANE L EA AG PL P L ANE L ANE LAG AG E

DG

8 W

E

8

T

E

E

T

9

EDG SEAPL ANEE LA SEAPL S

G D S E

A

E

A HA

ER T

W

E

D

E

DG E

AR

ED G

E R S

S

AN OON N DR SEA

AT GE W

E

R

A HANGAR

RS E E D

A T

AT E

AR

8 88

W

A HANGAR

1

W A T

A HANGAR AR

E

88

ON DREDGED IN 1938 SEAPLANE E LAGOON DREDG ED IN 1938 SEAP

9

W

T

E

E

1

8

GRAD

AND USED

CRUSHED OYSTER GE SHELLS TO PAVE TH WA 3 400 FOOT AND 1 7 E FOOT RUNWAY PRES R S DAY COLLEGE EOF ALAMEDA WAS D THE ER S

W

O W

8 3

8

G

S

E 1 G

PUMPED OUT THE S TE

E

OO OO

E

9 1

B A AY

TERS A

BY THE UC BOARD O THE MAR 1REGENTS ED E HAD THE WATER W AT

E

T

S R

RS E A

D G

88 8

G S E D

W

D

R 1 93 WATE 8 W A TERS EDGE 1938

W

W

R

OO OO OO

8

LOCAT ON OF THE S AT FRANC SCO BAY E R A A RDROME WH CH T OPENED E N 1930 AN E D WAS A PROJECT DO

W AT E

E

I

G

ER

A

S

3

D

R

AT E R

9 1

E T A W

E

8 WA 8 8 1

D

8

8

D G

E

S

9 3

D E

8

E

E G

OF ALAMEDA WAS T 8

E

OO

E

D

S

E

E

E ERS E AT D W

H

R

1 E 8 G

8

T

NEL T

E T A

E

S

A

D

G

OO OO OO

GE W S ED R W E

E

D

PRESENT DAY COLL

TAYLOR AVE TAYLOR AVE TAYLOR AVETAYLOR AVE

8

AT E WW DG

RS

S

E

G

3

E

R E

WAT

D

OO

W

8

D G

R AATE S

E

1

G

88 8 W

1

ERS 1 888 W AT

E

R

A T

E

S

S R E

E

S

8

E

H

R

D

E

AVE LINCOLN AVE LINCOLN AVE LINCOLN AVE LINCO LN

9

WA T

T

W A T

8

W

E

A

ED G E WA T E

EDG

G D

R

GE W D ATER S G

RS E

S ER

D

RS

O

G

8 W

A EY AVE MOS SL L O E M

8

8

AT

D

W

W

E D

E

T

R

S

G

18

E

W

W

N

G

W

E

T

D

R

A

T A E

E

E

E

GE

S

D E

G

TERS

S

D

O

W

R

YS BA AN F Y Y R SAN FRANCISCO BAY SA Y SAN FRANCISCO BBAAYYSA Y S SANSAN AFNCISCY SA NBA N FRANCISCO BAY SANNFFRAN FR AN RANC FR AN CI SC O BA Y R FR AN O B SAN FRANCISCO BA A 1888 1938 A N 2014AN CI AY SAN FRAN FRANCISCO BAY SAN FR Y

E

M R

E

S

A

O

T WA 38 19

R

E

8 1

W

E

E

8

G

G D E

G

T E

ED G

S R

D G

E

OO M A M O

A T

M

LN O C IN L

8

S

8

O

E T A

E

E V A

G

8

E R

8

W

M

S

D

WATE

M M M M

W

TE

1

EM M M

8

R

E

E WA T

WA

1

E

WA

E

S

E

O

E R S

A

R

E

8

R E AT

G

E T

DGE E

E

A

8

TE

8 8 W

R

A W

R

E

EDG

ED

E

E

88

S R

O

T

A

T

GE

OW

A

W

188

T

8

O

W

OW

A W

S

18

E

8

E

8 3

GE18

G

AT

E

E

W

OM O E

S R

R E

E AT

W E A

T

9 1

D

8

8

A

G

8 8 8

S

A

88

E18

E T 8 W A

AN

G

E 18

8 W

8

H

D

DG

RS EDGE18 8

8

C

W ATERS EDGE W A

E

AT E R S

A

8

D

GE

R

APLAN G ANCISCO BAY N SEA ANCISCO BAY SFR PLANE LAE LAGOOON AN FRANCISCOSA B AY SEAPLANE LAGOOON O D IN FRAN GO S LAGNODRE1D9G38 SSEA ON ED IN 1 PLAN AN SEAEAPLAN D PL E RED 938 SSE LAGO FRA SEAANE LALGAOGOOGNED INE1A9PLANOENLADREDG AY N PLA ON D DRED 38 SE GOO ED IN C SEA P NE L RED GED APLANNEDRED1G9E38 SEA AY SAN ISC 193 LA D IN 1 PLAN PLANE1938 LAGOAGOONGED ININ ON ON 938 E DRE1938 S8ESAEAPGLO FRASAN FFRANO BAY S PLA ANE LDR Y A BA NC RAN FRA AN FR ISC FRA NCIS AN CISC O O BAY SAN FRANCISCO O B NCIS CO BAY SAN FRANCISCO BA BA Y Y SAN FRAN SAN FRANCISCO A CO SE

E

18 88

RS E E D

E

S E R

8 W

GE ED

G

S

G

1

G

W

D G

E

A

O

T

D GE1

W

E

G

8

W

G

ER

8

G D SLEY AVE MOSLEY AV EMO E G TE R S E

G

O

8 8

E

S

D

1

D N E T R S

E

W A

E

GE ED

TE A

1

T

GE18 8

8

S

S

D E

O

R

8 W 88 1

R

A E E M

E

T

O

T

A

T E

OW

A

W

8

E

88

O

N

8

E

A

E

1

A

A W T E RS

D

EA

R

8

E

W

R

SE

CO BAY SANSEAPLANELA

O

8 1

8

A

8 1

A

BA ISCO BAY SAN FRANY SAN FRANCISCO CISCO BAY FRANCISCO BA Y SAN FRANCISSAN FRANCISCO

N 1938 S S APLANE ED IN 938 SEEA NDR EAP OO GOON RE1DGE S A N DREDD GED

S R EA SEA D SEAPL P L A NE

N OO AG EL N A PL

W

W

AT

G

MO

N

R

193 8

8

W

E

E

AT

R

8 W

93 8

CA

W AT E

193

AT W

TE RS A

M

D

N

E

TE

88

S E R D

A

E 1 9

1

938 SEAPLANE LAGOON DR E REDGED IN 1938 SEAPLAN DG D IN 1938 SEA PLA E LAED G IN EDGED IN19 O O 19 3 3 N 8 DIN 1938S D RESEA DG PL GE ED AN OON DRE D O I E LA PLANE LA G

SE L AP SE

1

T E R S

A

18

A

A

T

G

T HE

1 8

G E

R

S E

188

S R TE

1

9

SAN F SAN FR RANCSICOAYSAN FRANC ANCSICO B

W

EDGE

BA Y

E

S

WAT

G

888 1

WA T

GE

DG E

1

APLANE LAGOON ED 938SEA 1 G ANE SEAPLANE LA G RED ED IN 8 SEAPLSEA SE D G 93 EA E A SP LA OON RED IN 1 IN 1938 S APL SEAP D D D G A 938LA OSNEA AP N E LA OON DGEEDGEIN 1N O E R D AE G A LA G N E LA N DRN D DGSEEAPLED IN SEAPL E 8 OO OON DR 938 EDGIN 193 OO

A

D E

G

E

E

DG E

A

NCIS ANCISCO BAY SAN FRA CO BASEAPLANE LAG NCISCO BAY SAN SAN FRANCISCO

ISCO BAY SAN

AT S ER W

E

S E

G

HANGAR

SAN FRANCISCO BAY

WA

DG

1938 WA T

D

AR

LAGOON DREDGE D N R EDGED IN 1938 SEAPLANE N1938 SEAPLANE LAGOO LAGOONDR N DREDGE

SAN FRANCISCO BAY AN FRANCISCO BA SANSEAP SL CO BAY SAN FRA Y SAN FRANCISCOSEAEA

R E

D

E

N

G

GE

8 WA T

BAY

S ED

8

G

G

E

S R E

G

E

HO

CISNC A NCISCO NT CA O BPO SA SON Y A BALAMEDA WATERL A NE COMPAR

Y BA NC CO FRA AN C CIS N Y S AN AN SA BA FR FR

S N ICO BA S A CS ICO BAYAY O B N

SAN N FRANCS N FRFR ANCISC

A

C

CO

FRANCISC AY N FRANCSI CISCOBA O SAN FRANC Y SANFR O BAYS Y SBAAN FRAN A

G

AR

A HAN G

W

SA O B ISCO C

N FR AY O N N R N O B ISC SA SAN SA N F B B Y A O C NC BAY BAY BA Y S ISC CO N O O CO BA C IS A A SC IS O N C S NC ISC FRARAN AY O B ICO A C N F B C S I C B N

SAN FRANCI NCISCO BAY SAN NCS SIC OABYAY ICO SAN FRA F NCISCO BAY SA R N SAN FRAN NCISCO BAY FRAAN CSBAY ICO BAY SA N ANCISCOB SA CSICO BAY SA

ED ERS

ON

AR

W

LAGOON DREDGED IN SEAPLANE LAGOON 1938 SEAPLANE LAGOON DREDGED IN 1 DREDGED IN 1938 SEAP LANE LAGOON D REDGED IN 1938 SEA PLANE

W Y BA S CO Y IS A C CIS AN O B AN FR C FR AN CIS FR AN N N S YS BA RA SA AY B CO N F AY

AY S RA A N FRANCISCO BA CO BAYSAN FRANCSI Y SAN ANC SA RA NCIS N CIS BA BAY SAN FRA Y SAN FRANC FRA ISCN FRANCCO ISCO BAY SA C ISCOCO BAY SAN FRANC ISC NCI O BAY SAN FRANCIS S O ISC B CO BAY SAN FRA ANCISCO BAY SAN NCISCO BAY SAN F FARANC O B A Y SAN FRANCISC R

W

M

RA

W

O

AT

A HAN GAR

W

W

C AN

O

SAN FRANCISCO B AY SAN FRA Y SAN FRAN CISCO BAY SAN FRA NCIS AY SAN FRANCSICO N C BAY SAN F CISCO BAY CO BAY SAN FRANC ISCO BAY RA O B SAN CO BAY SAN FRANCIS CO SA NC A FRANCISCO BAY SAN FRANCIS N FRANCISCO BAY SAN FR BAY N F SI Y SAN FRANCISCO BAY

O

W

A HAN GAR AR

W

O

ISCO BAY

2 MAKINGALAMEDAAN I O

8 3 ADM N

W

M

M

S CO MPLT ED IN 19 0

O M LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL O M M M LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL O LANDFILL LANDFILL M O M LANDFILL LANDFILL M M O LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL RS ED LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL W GE 1938 AT LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL ELANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL ER A T LANDFILL 8 W LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL E 193 S LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL G E LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL D ED GE LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL S LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL R 1 LANDFILL LANDFILL LANDFILL ELANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL 9 LANDFILL LANDFILL LANDFILL T LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL A LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL W LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL 1 LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL E LANDFILLLANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL GLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL R LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL A LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL TE LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL ADM N LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL RA LANDFILLLANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL ON LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFI LANDFILL 1 LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL DM N LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL 9 RA LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL ON ADM LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL 38 LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL N LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL RA W LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL O LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL AT LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL N E LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL R LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL S LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL E LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL DGE 1938 W LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL A LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL T LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL E LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL R LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL S LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL E LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL D LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL G LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL E LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL 1 LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL 9 LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL 3 LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL 8 LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL W A HO LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL AR LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL A HO A LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL AR A LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL HO LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL T AR LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL A HO E LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL AR A LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL R LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL S LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL O LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL OLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL OMLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL OLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL O M LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL O M LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL M OM LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL O O LANDFILL M LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL M MLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL M OM LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLO LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL O LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL M LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL M M LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL O LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL HAN O LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL GAR LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL A LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL AN HANGAR LANDFILL LAN DFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL A LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL AN HANGAR LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL A AN HAN G LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LAND FILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LA LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL NDFILLLANDFILL LANDFILLLANDFILLLANDFILL LANDFILLLANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL A HAN GAR AR

W

M

G

A

1938 WATERS EDGE 1938

OM

TO NIO CR

ING A LAME DAAN I

E

O

OM

S E

1902 M AK

G

W

O

O

S E W D ER AT W

ATER 8 W 93 1

GE 1938 WA D E

W

O

8

E

E

S CO MPLT ED IN

E D

G D

9

A AY S N F ANCISCO BAY SAN FRANCISCO BA Y SAN R ICO B ANCS NCISC BAY SAN FRANCISCO BAY SA FRANCISCO BA N FR

M

D

E

I

DG E E

R

KING ALA MED AAN

1

T

W

BA ANCSICO BAY SAN FSRAN FF AN CO N FR CISBAY SA SAN FR CSICO BAA RA ANC O R Y F AY SAN CSI B N O A SIC BAY SAN FR

18 8

ER S

TE A

E

O

O N FRANCIS Y SAN FRAN AN ANCIS CO BAY SA FR A FRA CISCO BA ISCO BAY SAN C SAN O Y S AN O B B FRA FRANC O BAY SAN FR S CON FRANC ANCISA SIC BAY NCSICO BAY C A IS N O C I O S B AY C SI ANC SAY FR SA FRC N NCIS SAN FRA ANC SI NC SI F RA CO BAY SANCFISR NCISCON CO BAY SAN BAY N B S A C AN AY A O R F N S C A S RANCISC ICO B N SAN FRAN FRANCISCO BA Y SANNFFRR AN Y SA AY SAN ANF SAN FRAS ICO S AN FRANCCISISCO BAY SAN FRAN CS Y BAY AN BA CO CSI SA BA O BAY FR O

BAY

W

W

E

S DG A E E S W RS W A A CTHEL S T R TIDA MED A 1888 W E L A F T DGE G E C A S E T ER E R E 1 K ANAL M 9M 1 FOWAS C 3 A 9 E 13 T 88 8 IN RMOMP FO 8 W R L LT ER ED A R A IN 19 N M T S D 02 ER AN MA ER EA AT W FO KING S SA AN ST E R RM ALA D N THE TO S M BA T EG ER R S ED AN TIDA E 8 N DAE AN 19 Y, L CA 8 SA TO O L3 NAL IO CIS A8 N AK N D V D R NDW TH WA AN A IO E EE T L W T ER G T AN D T C K IDA LSCA E E O E R D G A 1 E FO R E S N N D D AG TH 8 E E IO WAS AL R L 8 K S E M E 1 8 R AM E FO E C O3 ERC9 C M8 W O G H W R PLT ED A R A R AT E SA ED TER A M N TE ER E FR E A N IN 190 S ED NE K S R OM G AN2 MA L FO SA KIN E 193 HA ,8B RM TO M G 8 N A E WS ER WOWA RS N ALAM AT B NL AN ER IO ED SA E E AN E SE TO N ED EN D C AAN IS E DG D E D 1 W AN S S R N GE G L W G E D G AN EA A TO E 19 I O LANDTH 1938 GE S R E E T W 38 EK D THE ST W E E D TE N E TID C W T 1 IO A E D O IDA RE AL CA F BA G AT WD R CR N I93 USE IT EK NAL W OR L CANA E Y A 8 A G W E WAS OR E RM DR ME L WA 3 W R D FO AS OA E S IGINALLY 9 E S E T E S CO R R D O KL ATTA RS E G M S M K SA MPL A ER ME 1 ED AN FO R TED RME R SA T W LA O R DG N C 93 A F S G TER S GE 1 R A E I A N A N 8 K K ME WA T ANTON TH D D N A E S O 8 E H NT 1902 E D E E R E TIDAL 3 NT 1 RE IO E IT SAN W T 9 9 E N SA CAN ONONIO C A S 38 ANTONIO CRE D1 DG E D A TH O AL W TE N S ER E WAT IO A MA IO EK FORMER EE R TERS E E M A A F R N A W H I CR R E O R NT O SA N NN TE C S D P ENO 8 T 8 UGH EE RM TO TH FO E ON FOR LARGE N 3 EL 3 N K E 9 SHIPS AND K S SA O E E 1 9 AN IO 9 38 AL HA R R FO R SA S W SO 1 N RE TE N C T R WA A C E S ME ON E AN T RE S 3 E U BE R S TNIO R EEK FORMER SAN ANTO E IO R E A K O EN N AN NIO C E EK F O R M NT C EDG TONI G FO E RS E ATERS DR O CRE A ED 93 8 D O88 WAT E CR WAT RM N E E K FORM I8 LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL ED D R 1 ER S A E LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL ER SA LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL O LANDFILL LANDFILL LANDFILL GE N E E LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL R G NA LLY A K N THE SA M LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL USE T WAS OR D SLAN TT ERS TIDA LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL R F AC A NT O N TO T DT LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL L CA AN A FO LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL NAL TO HE TIDAL CA M LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL A K W N AK E N LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL WA AL WAS COMPLTED IN 1902 IO ED 8 W LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILLG TE IO CR E E 8 LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL CR IN 1902 MER S E A 8 NTO N LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL T O 1 MPLTED EEK FORM ER SAN A LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL G E W A TE R E W N DE E G LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL WAS CO O G L A D LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL E ERS A F E T D LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL AN 8 P KE LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL R 8 AL C E NOU LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL ATE LANDFILL LANDFILL LANDFILL SO T M M O O OM LANDFILL LANDFILLLANDFILL O M LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLO M SLANDTHE TID G LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL O O M AL OW LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL T M M O O OM LANDFILL LANDFILL LANDFILL O M LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILLO M LANDFILL LANDFILL LANDFILL N TON I E H FO D LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL A N LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL R LARG R M M O O OM O M O M M G O LANDFILLLANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL DA AN SL A E W E SH PS A ED LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILL LANDFILLLANDFILL LANDFILL LANDFILL

I

S RANC O BY SIC ICO SIIC O BA ICO BAY SA O BAY SC NCS N FR IS O C A ANCS R N ISC ICO B NC AY S AN F SC RAN CSIC OMPLTED IN 1 O 902 M A

BAY

S R

AT

E

W

W

ATER

8

GE 18 D E

9 3

8

G D E

1

W ATERS

TON

E

E

A TE R

G

G

D

ED G

E

RS

E 19 3 8 WAT ER S

W

G

S

D

RS E E T A

O AN N SAN FR N FR O BAY SAA YSAN F ANC

G

AN

I

E

N

L TH

D

D

SA

SICO BAY

E

AT

D

N

W

N

V

RM E R

A

E

H

RS

C

8

E

E

T

8 W AT ER S

H

O


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

HISTORICAL HIGHLIGHTS MAPPED

page / 10


HISTORICALLY SIGNIFICANT EVENTS IN ALAMEDA POINT

Alameda Point’s rich history can be most easily summarized by events that impacted the economy. Having the railroad terminate in Alameda made for a huge industry for collecting cargo to send back to the East Coast, distributing the goods brought to Alameda, and train maintenance. Since the tracks did not extent all the way to greater San Francisco, imports had to be shifted from trains to ferries to cross the bay. There was a huge network of infrastructure to support this train-centric economy, bringing people to the city of Alameda to live and work. The Alameda Mole quickly became obsolete with the creation of the Oakland Mole, the Port of Oakland, and the Bay Bridge. Next the Aerodrome was built, creating economic stimulation for the City of Alameda. The construction of the land it was built on, and the hanger, funded by the UC Board of Regents created a draw to the island because of jobs. The depression came and shut down the Aerodrome, but created a place for Pan American Airways to go. The China Clipper, the first of many trans-pacific flights began its service in Alameda, using the former Aerodrome flight lines. In 1940, just after the world’s fair in San Francisco, Treasure Island became vacant, and Pan-Am relocated. Yet another economic stimulant to leave Alameda obsolescent. The most recent occupant of Alameda Point was the Navy and the Naval Air Station. The base went through a variety of fluctuations. In 1941, the presence of the base more than doubled the population of the City of Alameda from 30,000 to 84,000. The Base Realignment and Closure Act was passed in 1993. In 1997, the base was completely shut down. Again, Alameda is obsolescent.

1. WESTERN TERMINUS OF TRANS CONTINENTAL RAILROAD, EARLY 1900S 2. SAN FRANCISCO BAY AERODROME HANGAR DURING THE 1930 DEDICATION 3. HISTORIC 1936 PAN AM TRANSATLANTIC FLIGHT OF THE CHINA CLIPPER 4. A-4C SKY HAWK FLYING OVER NAS ALAMEDA


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

VENICE BEACH, CALIFORNIA PRECEDENT STUDY

Venice Beach in California is a city distinguished by its man-made canals adjacent to southern California’s sunny beaches. When considering Alameda’s vulnerability to sea level rise, canals are a natural thought progression when trying to prevent the land being succumbed by water. The planning of these canals were not carefully done though. The water was not moving, but connected in only one small place to Marina del Rey, Dependant on tides to prevent algae build-up. Regulated tidal movement was not enough though to keep the entire network clean, so in the late 60s, half of the canals were filled in. The remaining properties adjacent to the canals are the most valuable in Venice Beach because of the water-front aspect. Lining the canals are public walkways that were added in the 80s to bring the high-end neighborhood up to date. At this time, the canals were drained for maintenance

and fix water that was seeping through the sandy soil the canal was dredged into.

PLAN OF "OCEAN PARK" OF THE VENICE CANALS, THE ONLY PART STILL TO REMAIN.

page / 12

THE CANAL FRONT PROPERTIES ARE KNOWN TO HAVE INCREDIBLY HIGH PROPERTY VALUE.


VENICE BEACH, CA

PRECEDENT STUDY - VENICE BEACH, CA CHOSEN FOR MAN-MADE CANALS

IMAGE SHOWING THE BEGINNING OF THE DREDGING FOR THE CANALS

VIEW OF THE CANALS IN THE 1950S


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

NOORDOOSTPOLDER, NETHERLANDS PRECEDENT STUDY

VENICE BEACH, CA

ALAMEDA POINT WITH VENICE BEACH CANALS OVERLAY FOR SCALE 100' 300'

It is said that “God created Earth, but the Dutch created Holland”. Most of the country is below sea level. The Dutch have been reclaiming land from the sea since the 11th century. The term polder is used to describe the land that has been reclaimed.

“GOD CREATED EARTH BUT THE DUTCH CREATED HOLLAND”

19-M

tpolder was built after letion of the Afsluitdijk was designed in 1935 and was finnaly dry in 1942. the first polder in which ut was planned as an ask: taking into account al, urban and landscape matters.

ILE

19-M

ILE

D LUIT

AFS

POLDER (noun), A PIECE OF LOW-LYING LAND RECLAIMED FROM THE SEA OR A RIVER AND PROTECTED BY DIKES, ESPECIALLY IN THE NETHERLANDS.

DIJK

LUIT

AFS

NOORDOOSTPOLDER

IJSELMEER POLDER

POLDER AMSTERDAM

NETHERLANDS NOORDOOSTPOLDER, NETHERLANDS

"GIANT WATER MACHINE" (POSAD SPATIAL STRATEGIES)

POLDER (noun), A PIECE OF LOW-LYING LAND RECLAIMED FROM THE SEA OR A RIVER AND PROTECTED BY DIKES, ESPECIALLY IN THE NETHERLANDS.

BUT THE DUTCH CREATED HOLLAND”

The second method is a stepped series of dykes surrounding the water’s edge. These levels allow for a variety of ecosystems, bioretention, and natural absorption. The sectional diagram (opposite page) demonstrates the infrastructure necessary for the Netherlands to maintain their polders.

NOORDOOSTPOLDER, NETHERLANDS

POLDER

There are two major approaches used to protect the below sea-level land. There is the Afsluitdijk, a 19.5 mile long dyke that blocks off the Zuiderzee. The dyke creates a closed loop system for water T WATERwithin MACHINE" the bay of Holland. “GOD CREATED EARTH (POSAD SPATIAL STRATEGIES)

600'

IJK

Noordoostpolder was built after the completion of the Afsluitdijk in 1932. It was designed in 1935 and K the area was LUfinnaly dry in 1942. ITDIJ AFS ILE This was 19-M the first polder in which the layout was planned as an POLDER integral task: taking into account agricultural, urban and landscape NOORDOOSTPOLDER matters.

HAMILTON FIELD/AFB/AAF, NOVATO, CA

POLDER

NOORDOOSTPOLDER

ZUIDERZEE

IJSELMEER POLDER

IJSELMEER

POLDER

POLDER AMSTERDAM

AMSTERDAM

POLDER

AMSTERDAM

As part of Noordoostpolder’s water NETHERLANDS network system, a series of canals and locks are used to help regulate water. The canals are used to collect excess water as a low point,where it can be stored during a surge. The locks can help hold water back during this surges, andHAMILTON FIELD/AFB/AAF, NOVATO, CA can mechanically be released as water begins to absorb. These techniques have been implemented and used for 1,000 years in the Netherlands. As sea level begins to affect more and more major cities, the world will be turning to the Dutch as a precedent. These methods will also serve as a launching point for making Alameda Point more resilient to sea level rise.

NETHERLANDS

ZUIDERZEE

NOORDOOSTPOLDER

PRE 1932 AND THE AFSLUITDIJK

1. POLDERS, LAND RECLAIMED FROM THE SEA, FROM THE COMPLETION OF THE AFSLUITDIJK 2. NOORDOOSTPOLDER IS NEARLY 10’ BELOW SEA LEVEL 3. WATER SYSTEM NETWORK IN NOORDOOSTPOLDER. THIS STUDY HAS BEEN ADAPTED FROM THE WORK OF ARCUSCHIN MACADO, OF POSAD 4. A DIAGRAM SHOWING HOW LOCKS WORKS NEXT TO A LOCK IN NOORDOOSTPOLDER 5. THE 19.5 MILE AFSLUITDIJK MADE IT POSSIBLE FOR THE NETHERLANDS TO RECLAIM THEIR NOW BELOW SEA-LEVEL COUNTRY

"GIANT WATER MACHINE" (POSAD SPATIAL STRATEGIES) Noordoostpolder was built after the completion of the Afsluitdijk in 1932. It was designed in 1935 and the area was finnaly dry in 1942. This was the first polder in which the layout was planned as an integral task: taking into account agricultural, urban and landscape matters.

BERLIN FREE MUSEUM, BERLIN, GERMANY

BERLIN FREE MUSEUM, BERLIN, GERMANY Berlin Free University, by Georges Candilis, Alexis Josic, Shadrach Woods, Jean Prouvé

page / 14

This building designed by Team X members is considered to be a prime example of a mat-building. The low, large footprint structure

ALAMEDA POINT WITH BERLIN FREE UNIVERSITY OVERLAY FOR SCALE they prioritise correspondences between departments rather than the traditional separation into independent faculties. This fosters informal pedagogy based on the spontaneous encounters between

NETHERLANDS

100' 300'

600'


NOORDOOSTPOLDER

ZUIDERZEE A DIAGRAM SHOWING HOW THE NETHERLANDS ARE ABLE TO MAINTAIN THEIR POLDERS TO "MAKE" LAND . THIS STUDY HAS BEEN ADAPTED FROM THE WORK OF ARCUSCHIN MACADO, OF POSAD


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

HAMILTON, NOVATO, CALIFORNIA PRECEDENT STUDY

Hamilton was formerly an Army Air Field (AAF), Air Force Base (AFB), and Hamilton Field. This variety of military and aviation involvement on the site reflects a history similar to Alameda Point, sitting just across the bay.

HAMILTON FIELD/AFB/AAF, NOVATO, CA

Hamilton as a precedent is relevant because it has made the transition from the toxic soil levels of a military base to developable land, and in the last ten years, restored wetlands. The land adjacent to the bay in Hamilton is very flat, and low lying. The combination of available marsh land, and the proximity to San Francisco which is why a levee was built to protect the airstrip. The base prior to development as a military base was marshland, similar to Alameda Point. It raises questions though, that the current coastline of the bay is subject to becoming below sea level, and the decision made was to destroy a dyke that took millions of dollars to build. It is also worth noting how little effort was necessary to open the bay into the restored wetlands. One tractor digging provided a point weak enough for the water to flood the site.

page / 16

PRECEDENT STUDY - HAMILTON FIELD / AIR FORCE BASE /ARMY AIR FIELD, NOVATO, CALIFORNIA


AERIAL VIEW OF THE BASE WITH THE FLIGHT LINE

VIEW OF PLANE HANGERS ADJACENT TO RUNWAY AND FLIGHT PREP SPOTS

CONTRASTING THE FLIGHT LINE OF THE BASE WITH THE NEW DEVELOPMENT AROUND THE HANGERS AND MARSH LANDS

CREATING THE MASH LANDS BY OPENING A LEVEE


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

BERLIN FREE UNIVERSITY PRECEDENT STUDY

The Berlin Free University is an exemplary mat-building project. The project was a competition entry by Georges Candilis, Alexis Josic, Shadrach Woods and Jean Prouve. The design is to be built in an additive way, to respond to the needs of the university. The implementation of this long term construction method is apparent in the aerial photo, where different building materials meet.

BERLIN FREE MUSEUM, BERLIN, GERMANY they prioritise correspondences between departments rather than the traditional separation into independent faculties. This fosters informal pedagogy based on the spontaneous encounters between students, teachers and researchers in the wide corridors. It also caters for increasing numbers of students and changes in curricula which require flexible structures that can be enlarged. And, finally, it encourages the free-flowing exchange of knowledge in keeping with the mat-building’s inherent lack of hierarchy.

One of the priorities of the design is the adjacencies of various departments to create interdisciplinary studies and collaboration. In the areas where departments meet, a lounge space is provided to help nurture awareness beyond the department. These lessons are applied conceptually to the education based aspect of Alameda Point, as a means to create a more resilient city. Learning passively through observation and exposure is a legitimate pedagogy in conjunction with other methods.

http://www.architectural-review.com/essays/the-strategies-of-mat-building/8651102.article

ALAMEDA POINT

WITH BERLIN FREE UNIVERSITY OVERLAY FOR SCALE 100' 300'

Berlin Free University, by Georges Candilis, Alexis Josic, Shadrach Woods, Jean Prouvé This building designed by Team X members is considered to be a prime example of a mat-building. The low, large footprint structure has no front elevation, it is the same all over but responds to site and programme within the constraints of the construction system. It has been successfully extended several times as the facade finish bear witness. Students use the vast areas of wide, carpeted, corridor floor to sit down, study, and socialize. The footprint of the building creates a total interior The courtyards are unable to challange the carpeted interior world as they in courtyard manner look inwards. The beautiful Jean Prouvé facade system in cor-ten steel is in a bad state and is to a large extent covered in gaffer tape and foil. The additions use other finishes with reasonable success but never with the beauty of the original rusting steel.

http://img.kalleswork.net/Berlin_Free_University/

page / 18

600'

1. BERLIN FREE UNIVERSITY, BERLIN, GERMANY 2. AERIAL VIEW SHOWING BUILT CONTEXT OF THE UNIVERSITY 3. DESIGNED BY GEORGES CANDILIS, ALEXIS JOSIC, SHADRACH WOODS, AND JEAN PROUVE 4. THE MAT-BUILDING ALLOWS FOR A VARIETY OF INTERIOR, EXTERIOR, PROTECTED, AND EXPOSED SPACES. 4. FOR A SENSE OF SCALE, THE PLAN OF THE BERLIN FREE UNIVERSITY, SCATTERED ACROSS ALAMEDA POINT IN SCALE.


PLANS AND AERIAL VIEW SHOWING THE ADDITIVE NATURE OF THE MAT BUILDING. THE VARIETY OF MATERIALS SHOW THE NUMBER OF EXTENSIONS FOLLOWING THE SAME PLAN.


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

WASHINGTON

page / 20

GRANT

ST. LOUIS ALLEY ROSS ALLEY

OLD CHINATOWN LANE

FIRST REPUBLIC BANK A A BAKERY & CAFE KANG HUA TRADING (GROCERY) SHU GUANG WEN (GROCERY) LUCKY CREATION VEGETARIAN (RESTAURANT) SAN SUN (RESTAURANT) WASHINGTON CAFE KAM LOK (RESTAURANT) IMPERIAL PALACE (RESTAURANT) Y R GIFT SHOP BUDDHA LOUNGE (BAR) SWEETHEART CAFE

STOCKTON

JACKSON GARDEN BAKERY MING LEE TRADING (GROCERY) FENG HAUNG (RESTAURANT) GOLDEN GATE FORTUNE COOKIE FACTORY FLORIST DOCTOR’S OFFICE HOUSE OF DIM SUM GRAND JEWELRY CO. SPECIAL GIFTS V & M JEWELRY CO. TEN REN’S TEA KWONG SANG LUNG CO. HSBC NAM HAI CORPORATION WO YICK CO. VITAL TEA-LEAF IMPRESSIONS ORIENT


CHINATOWN, SAN FRANCISCO BLOCK STUDY

Chinatown in San Francisco is a very exciting to place to be. There is an energy in the atmosphere that draws tourists and locals alike to the neighborhood. It is hard to understand what it is that create such a distinct character without further analysis. The block between Grant Ave to the East, Stockton on the West and Jackson Street and Washington street to the North and South has a distinct character. In creating the Grand Avenue section study, it becomes apparent that having parking on only one side of the street with one lane of traffic makes it much more pedestrian friendly. People jaywalk back and forth across Grant on a whim, adding to the bustle of the place.

0 1’

3’

6’

10’ SIDEWALK 7’ PARKING 3’ ACCESSORIES

13’-9” GRANT AVE

10’ SIDEWALK 3’ ACCESSORIES

GRANT AVE

WOORNUF EQUIVALENT NO CURB OR SIDEWALK DIFFERENTIATION CURB-CUT AT CROSS STREET 60% BUSINESS-HOUR TRANSPARENCY 10% TRANSPARENCY AFTER BUSINESS-HOURS SWEETHEART FLORIST AND GIFT SHOP DOCTOR FORTUNE COOKIE FACTORY BARBER SHOP LIM FAMILY BENEVOLENT SOCIETY YL TRADING COMPANY SAM BO TRADING CO WO CHONG COMPANY BAI CHING DENG CLINIC

0 1’

3’

6’

14' ROSS ALLEY

ROSS ALLEY 1. SECTIONAL STUDY OF GRANT AVENUE SHOWING STREET ACCESSORIES, SIDEWALKS AND BUILDING RELATIONSHIPS 2. SIMILAR SECTIONAL STUDY OF ROSS ALLEY, A PRIMARILY PEDESTRIAN OCCUPIED STREET, WITH OCCASIONAL VEHICULAR TRAFFIC.


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

CHINATOWN, SAN FRANCISCO BLOCK STUDY

The block is densely built but broken into many parcels. This parcelization can be attributed to the cost of buying an entire block that was not feasible for individual business owners. Parcelized blocks add a variety to the street experience, adding to the visual interest and complexities of Chinatown. The street level is a low first level with nearly completely transparency. As you move to the second floor, the amount of transparency reduces, but the signage does not. The second level is largely offices. The location is of such a density that even the second floor remains mixed use, compared to the typical first-floor mixed use and upperstories as residential.

PRIVATE OFFICES/SERVICES RETAIL

8’ SIDEWALK 3’ ACCESSORIES

WASHINGTON ST .

12’ SIDEWALK 3’ ACCESSORIES

A GR

E AV T N

1. DIAGRAM SHOWING RETAIL, OFFICE, AND PRIVATE USES IN CONJUNCTION WITH TRANSPARENCY 2. DIAGRAM SHOWING RETAIL, OFFICE, AND PRIVATE USES IN CONJUNCTION WITH TRANSPARENCY

page / 22


Y

. VE TA

LE

AL EY

LL

OW AT H IN

SA

DC

S RO

OL NL

E AN

ON KT

275

OC ST 0"

AN GR

U IS . LO ST

N SO K C JA

HI

S WA

N TO G N 0’ 40

AXONOMETRIC VIEW SHOWING THE PARCELIZATION OF A CHINATOWN BLOCK


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

700'

300'

BRIDGEVIEW WAY

. BLVD

page / 24

COIS

770'

FRAN

MISSION BAY BLVD NORTH

Y TERR

3RD STREET

CHINA BASIN STREET


MISSION BAY, SAN FRANCISCO BLOCK STUDY

Mission Bay is a recently developed neighborhood in San Francisco. Due to the housing shortage in the city, Mission Bay has a very high housing density. The particular block I chose to study, between China Basin Street, Terry Francois Boulevard, Mission Bay Boulevard North, and 3rd Street is one block, broken into two parcels, each build with one large mass. The housing block has a jagged front to subdivide the mass. The materials do not shift throughout the mass, so it does not read as anything less than a giant block. The lack of variety in facade makes the large blocks feel very large, even though the proportions of the block are comparable to the China Town block study.

SOFTSCAPE 6'

SIDEWALK 6'

ACCESSORIES 3'

WOORNUF 20'

ACCESSORIES 3'

SIDEWALK 6'

SOFTSCAPE 2'

47' 0

1’

3’

BRIDGEVIEW WAY

6’

400'

GRANT

275'

ST. LOUIS ALLEY ROSS ALLEY

OLD CHINATOWN LANE

STOCKTON

CHINA TOWN

JACKSON

WASHINGTON

BRIDGEVIEW WAY

3RD STREET

300' . BLVD

MISSION BAY BLVD NORTH

700' 770'

COIS FRAN

MISSION BAY

CHINA BASIN STREET Y TERR

Next came the sectional study. Mission Bay is still under construction, so the most complete street section was through Bridgeview Way, the alley put into the block to subdivide it. There are many private entrances to housing units from the street level, as well as back of house services access off of Bridgeview Way. To break down the scale, two rows of trees are added. Since Mission Bay is not yet fully developed, it is hard to tell how dense and lively it will become, but as of right now, it seems overscaled and empty. The store fronts on 3rd street have twelve foot ceilings and floor to ceiling glass, but they are not yet occupied. The stores are large, and have few entrances and breaks in the facade.


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

STREET SECTION STUDIES

Street sections help to explain place, and the proportions of a successful one. Below is a series of street sections. The proportions found in the Seine in Paris impacted design decisions made at Alameda Point. The use of street accessories in Chinatown’s Grant Avenue help to subdivide the understanding of space between the building facades for users. Ross Alley, also in Chinatown, exemplified how reflected light can create a pleasant street level experience in an alley, later implemented in the Alameda Point redevelopment plan. Bridgeview Way in Mission Bay was an interesting study, because although it had similar proportions to Las Ramblas in Spain, it lacked the amenities and density, making it not nearly as successful. Las Ramblas is said to be of the most successful promenades because of its programming, proportions,overall beauty and sense of place. The amount of the street section dedicated to the pedestrian is well over half, giving a priority to pedestrian life.

Tight lanes and minimal parking along Las Ramblas discourage cars from driving along it, but still providing the access of convenience if need be. The last two studies are fictional, taking proportions from the various precedents, and applying them, while also introducing the idea of transparency on the street level. Street accessories and trees break up the space, while using set backs and curbs to help create place.

WOORNUF EQUIVALENT NO CURB OR SIDEWALK DIFFERENTIATION CURB-CUT AT CROSS STREET 60% BUSINESS-HOUR TRANSPARENCY 10% TRANSPARENCY AFTER BUSINESS-HOURS SWEETHEART FLORIST AND GIFT SHOP DOCTOR FORTUNE COOKIE FACTORY BARBER SHOP LIM FAMILY BENEVOLENT SOCIETY YL TRADING COMPANY SAM BO TRADING CO WO CHONG COMPANY BAI CHING DENG CLINIC

0 1’

3’

10’ SIDEWALK 7’ PARKING 3’ ACCESSORIES

6’

13’-9”

10’ SIDEWALK 3’ ACCESSORIES

14'

40'-9" 0 1’

QUAI DE LA TOURNELLE + LA SEINE, PARIS, FRANCE

page / 26

3’

SOFTSCAPE SIDEWALK ACCESSORIES 6' 6' 3'

WOORNUF 20' 47'

ACCESSORIES SIDEWALK SOFTSCAPE 3' 6' 2'

15' SIDEWALK 10'

6’

10'

GRANT AVE, CHINA TOWN, SF

ROSS ALLEY, CHINA TOWN, SF

BRIDGEVIEW WAY, MISSION BAY, SF

MONASTIRAKI, ATHENS, GREECE

1 WAY ROAD 17.

17.


FTSCAPE 2'

Y, SF

WILLIE STARGEL 80’ WIDTH

15' SIDEWALK 10' 10'

1 WAY ROAD + PARKING ACCESSORIES 17.5' 8.5' 17.5'

SIDEWALK / MIXED USE 35'

ACCESSORIES 1 WAY ROAD 8.5' 11'

52'

MONASTIRAKI, ATHENS, GREECE

PARKING 8' 19'

100'

LAS RAMBLAS, BARCELONA, SPAIN

SIDEWALK 6' 6'

WOORNUF 60’ WIDTH


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

CANAL SECTION STUDIES

Many different conditions can be achieved along a water front, just as was studied before in the street section studies. In contrast to an ocean front, a canal provides two approachable edges. The below sketches show various conditions, trying to tie together two urban sides, connecting contrasting neighborhoods, using a building to physically connect either side of the canal, and different ways to access the water. Contrasting a sheer wall with a stepped approach to the water creates a hierarchy, and directs views, while also providing public spaces for people to gather.

CIVIC CORE, AMPHITHEATER + THEATER

CANAL STUDIES page / 28


R + THEATER

CT, BOAT LAUNCH

MANUFACTURING DISTRICT, BOAT LAUNCH


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

ADDRESSING THE PROBLEM

PROBLEM

Alameda Point is vulnerable in many ways. Historically, the economy has been unstable, and in the future, it will be subject to flooding because of sea level rise. Economically, Alameda Point has faced many highs and lows with catastrophic economic repercussions.

VULNERABLE

The vulnerability of Alameda Point provides the opportunity to make it a more resilient, self-sustaining island. There is developable land, and can be developed in such a way that it provides diversification through a job/housing balance, a subdivision of the 1,500 acres into communities. Adding the Urban Studio, will provide continued education facilities to help create more diverse individuals.

page / 30

OPPORTUNITY

REALIZING THE OPPORTUNITY

RESILIENT


15 10

OPPO RESPONSE

RESILIENT

To create resilience, Alameda Point needs to diversify its economy, scale, density, and social structure. These changes can be applied at a ma level through zoning and master planning, but al micro level through education. DIVERSIFY + EDUCATE

DIVERSIFY + EDUCATE

> EDUCATE > URBANIZE > SAVE LAND

IDENTIFY TECHNIQUES

Architecturally, to achieve diversity, there are a series of coupling-pairs. Through both passive and active means, the canal is a center for education. Passive education refers to a transparency, in which people can learn through observation and doing, achieved through transparency. On a master plan level, mixed use, high density , and connections through transportation and view corridors, will increase the diversity of the place, and increasing it’s resilience. Imitating the techniques used in Noordoostpolder in the Netherlands, the polder is a means to preserve the developable land from sea level rise.

TECHNIQUE

10

To create resilience, Alameda Point needs to diversity it’s economy, scale, density, and social structure. Therese changes can be applied at a macro level through zoning and master planning, but also a micro level, through education. Education is considered at a micro level because it provides individuals with the means to make themselves more well-rounded and adaptable to changes in their environment, economically, and environmentally.

RESPONSE

RESPOND

JOB/HOUSING BALANCE EDUCATION SUBDIVIDE

Architecturally this can be achieved in two ways passively, and actively

> CANAL AS EDUCATION

> MIXED USE, DENSITY, CONNECTI > POLDER


2014 2050

USE DREDGED BAY MATERIAL TO RAISE PERIMETER OF ALAMEDA’S COAST 6 FEET

2100

1900 - 1929

EXISTING ALAMEDA COAST-LINE CONDITION

BUILD STORM WATER PROTECTION CANAL AND CONTINUE TO FILL PERIMETER WITH DREDGED MATERIAL

2200

PRE-1900

CONTINUE TO RAISE PERIMETER ELEVATION AND CREATE WETLANDS FOR WATER FILTRATION

2500

Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

BUILD LEVEE AND PLANT TO REDUCE EROSION

1930 - 1946

1953 - 1975

2014 - 2025

2025 - 2100

ALAMEDA POINT

BAY

1. PLAN VIEW DIAGRAM SHOWING THE PHASING OF THE HISTORIC FILLING OF ALAMEDA POINT, COMBINED WITH FUTURE DEVELOPMENT TO ADDRESS SEA LEVEL RISE AND PREVENT THE FLOODING OF ALAMEDA. 2. SECTIONAL DIAGRAM SHOWING THE SCALABLE PHASES OF THE POLDER SYSTEM, AND HOW IT CAN CONTINUE TO GROW WITH TIME AS NEED BE.

page / 32


ADDRESSING SEA LEVEL RISE

Vulnerable Alameda is susceptible to sea level rise. The Intergovernmental Panel on Climate Change predicts the rise could be up to 38 inches by 2100. Alameda Point is primarily at an elevation of four feet. The diagram to the right shows a modest projection for fifty years from now. Obviously this is a serious problem that needs to be addressed when discussing developable, valuable land. Not surprisingly, the areas of Alameda that are not flooded in the 50-year sea level rise were primarily the original land mass. With each new landfill period, and the settling of the land fill, the land has come closer and closer to current sea level. Alameda Point has a long history of cut and fill. As was pointed out in the historical maps of Alameda, it was once a peninsula connected to Oakland. Also, the phasing of the landfill can be seen in the diagram to the left. Only a small fraction of what is today considered Alameda Point existed in 1900.

VULNERABLE ALAMEDA dredged material is then deposited just outside the bay in a sandbar where it slowly gets washed back into the bay over the course of the year. To keep with the ongoing tradition of Alameda’s cut and fill, with the dredged material, a 500 year plan (see opposite page) has been created. This scalable polder system requires phases of VACANCY + LOW DENSITY landfill as an occupiable levee. The levees will also create marshlands that will be lost as the sea level rises. In contrast to the large stepped polder system on the northern and western sides of Alameda Point, a large dyke has been to designed with a lock to allow the Coast Guard the necessary open ocean access from the Sea Plane Lagoon where they dock. Adding this dyke and locks will further protect the depth of the lagoon, as well as the ships withinFLOODING it.

RESILIENT ALAMEDA

1 19 888 38

2014

VARIETY + HIGH DENSITY

VULNERABLE ALAMEDA 20 15 10

25 20

15 10 10

10 10

10

15 10

POLDER VACANCY + LOW DENSITY

An annual part of San Francisco Bay maintenance is to dredge the bottom of the bay, 3 to 6 million cubic yards, to make sure it remains deep enough for the ships. This

FLOODING ISOLATION

CIRCULATION INFRUSTRUCTURE + GREEN NETWORK 40

35

30

25 20

10

FILL

CUT

15

FILL

10

20 15 10

1. MODEST PROJECTION OF 50 YEAR SEA LEVEL RISE 2. HISTORIC WATER'S EDGE SHOWING PATTERNS OF DREDGING AND FILLING 3. ANNUALLY, THE BAY HAS 3-6 MILLION CUBIC YARDS DREDGED AND RE-DEPOSITED DIRECTLY OUTSIDE THE GOLDEN GATE 4. EARLY DRAFT OF TOPOGRAPHICAL CHANGES TO PROTECT ALAMEDA POINT FROM SEA LEVEL RISE 5. TOPOGRAPHY IN CONJUNCTION WITH POLDER MARSHES AS A SCALABLE METHOD TO PROTECT ALAMEDA POINT FROM SEA LEVEL RISE

25 20

15 10

10 10 10

10

15 10

3-6 MILLION CUBIC YARDS ARE DREDGED ANNUALLY FROM THE SAN FRANCISCO BAY AND RE-DEPOSITED OUTSIDE THE GOLDEN GATE

ISOLATION


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

ECONOMICS OF ALAMEDA

The next economic boom came with the building of the Alameda Municipal Airport/Bay Airdrome. The lack of level land with relatively few fog days made Alameda Point an ideal location. The Municipal Airport was built in 1928, but the depression made private air travel obsolete. Similar to before, the construction, maintenance, and running of the airport brought many people to Alameda for work, but quickly left them without work. In 1930 it became vacant. Boom-bust. In 1935, Pan American Airways moved into the former Airdrome. There was a lot of excitement when the China Clipper made the first transpacific flight from Alameda Point. As the mail carrier flights became more frequent, and Pan Am acquired a larger fleet, more jobs were created. After the World’s Fair in San Francisco and the building of Treasure Island, Pan Am moved. Again, boom-bust.

page / 34

SPIKES AND CRASHES OF ALAMEDA INDUSTRY PRE- 2000 % OF EMPLOYMENT

PAN-AM MOVES

DEPRESSION

97 19

28

19

19

30 19 3 19 5 3 19 6 3 19 8 39

BAY BRIDGE

TIME ALAMEDA MOLE LOCAL TROLLEY CARS, FERRY TO SF, STEAM COMMUTE LINES MANUFACTURING INDUSTRIES TURNING RAW MATERIAL INTO A PRODUCT

ALAMEDA MUNICIPAL AIRPORT/BAY AIRDROME PAN AMERICAN AIRWAYS

SERVICE INDUSTRIES NO RAW MATERIAL OR PRODUCT

TRANS-PACIFIC AIR SERVICE

HIGH TECH INDUSTRIES HIGH TECH INDUSTRIES, RESEARCH AND DEVELOPMENT

NAVAL AIR STATION, ALAMEDA

In order to reduce the devastating effects of having a single-industry economy and the Detroit Syndrome, a diverse economy rich in manufacturing, service, and high-tech industries is introduced. Although the crashes of certain industries cannot always be avoided, the overall devastation of Alameda Point can be. As depicted in the diagram to the left, the multiplicity allows industries to grow and fail but jobs remain more stable because of the diversity. Economic and industrial diversity provides more options for residents. Alameda’s separation from East Bay makes commuting very difficult because of traffic. A job/housing balance can help alleviate this problem by reducing the number of people that leave the island from 9-5 each day for work. The three different types of industries on Alameda Point itself makes it possible for diversity to be maintained.

DIVERSITY OF ALAMEDA INDUSTRY POST-

BASE REALIGNMENT + CLOSURE ACT

OAKLAND MOLE

18 87

The Alameda Mole was a ferry port on the westernmost part of Alameda. It began in 1864 and was used to move goods from the Western Terminus of the Trans-Continental railroad onto ferries to get to the city of San Francisco, and vice versa. The Alameda Mole brought services relating to rail-car and ferry maintenance, shipping and packing; an economy dependent on the connection between East Bay and San Francisco, but in 1887 the Oakland Mole began to replace the Alameda mole. By 1936, the Bay Bridge made the ferries to East Bay Obsolete. The available jobs in the mid-1800s brought people quickly, but the Oakland Mole, and completion of the Bay Bridge quickly took away those jobs. Boom-bust.

Most recently was the military involvement at Alameda Point. In 1938 the government acquired the land and it became Benton Air Field for the army, and then the base grew with substantial landfill into the Naval Air Station (NAS) Alameda. After the attack on Pearl Harbor, the NAS went through a major transformation and growth period, it was intended to be one of the bases that remain after war-time ended. The Base Realignment and Closure Act forced the NAS Alameda to shut down completely within three years. Boom-bust.

18 64

When describing the vulnerability of Alameda Point, the economics are a significant factor. Alameda Point has had a large number of boom and bust phases.

37,175 WORKERS

N: LATIO

POPU

76,419

+50,000 JOBS

+45 DU/ACRE

POPULATION: 175,000

JOB HOUSING BALANCE

1. DIAGRAM SHOWING THE HISTORIC TRENDS OF ALAMEDA'S ECONOMY VERSUS THE PROPOSED DIVERSIFIED ECONOMY WITH THE PERCENTAGE OF EMPLOYMENT NEUTRALIZING. 2. DIAGRAM EXPLAINING THAT BY BALANCING JOBS AVAILABLE AND HOUSING, ALAMEDA HAS A GREATER CAPACITY FOR DENSITY. OPPOSITE PAGE. DIAGRAM SHOWING HOW THE CANAL STRINGS TOGETHER A VARIETY OF USE DISTRICTS.



Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

EDUCATION AND THE URBAN LAB

Alameda Point is currently a vulnerable place. Its economy has been unstable in the past. Its isolation has made the island reach capacity long before achieving density. The flat low-lying land that was once an asset, now lends itself to being quickly overtaken as sea levels rise.

constant change and development, new industries prosper, as old ones become more efficient and refined. The constant change sets a stage for continuous learning. A laboratory for learning in the urban environment, the Urban Lab.

The solution is found within the opportunities the problem creates. To create a more resilient place, education is made a VULNERABLE VULNERABLE ALAMEDA ALAMEDA consistence part of the city. During the economic recession of 2008, people went VULNERABLE ALAMEDA back to school to make themselves more competitive and apt for what the future brings. Similarly, when Alameda Point has an industry go through an economic crash, VACANCY + LOW DENSITY VACANCY + LOW DENSITY education will create stabilization, and help the city to quickly bounce back and the shift towards new technologies faster. Vocational VACANCY + LOW DENSITY schooling will allow people to learn the skills to make them competitive in the work force. In these schooling centers, both active and passive learning methods will be developed.

RESILIENT ALAMEDA RESILIENT ALAMEDA RESILIENT ALAMEDA

VARIETY + HIGH DENSITYVARIETY + HIGH DENSITY

VARIETY + HIGH DENSITY

20

20 15

15 10

10

25

25

20

20

15

15

10 10

10

10 10

10

10

10

10

20

10

15 10

The polder marshes are designed to prevent Alameda from being engulfed by FLOODING the San Francisco Bay as sea levels rise. To maintain these polder marshes, the city will have to continuously monitor them, and to educate the citizens about how they work. The knowledge used to create them will need to evolve as the environment does. Through observation of how the locks and polder marshes work, as well as more active means of education, the technology will be constantly questioned and improved. Alameda Point will become a resource for the world just as the Netherlands have been in creating land below sea level. ISOLATION Alameda Point will becomes a place of

page / 36

15

15

10

10

25 20

15 10

FLOODING

POLDER

POLDER

10 10 10

10

15 10

FLOODING

POLDER

ISOLATION

ISOLATION

HERE, I DEFINE ALAMEDA POINT AS VULNERABLE BECAUSE OF ITS LOW DENSITY, HIGH VACANCY, ISOLATION SUSCEPTIBILITY TO SEA LEVEL RISE, AND THE LACK OF CONTINUITY BETWEEN THE TWO PARTS OF THE ISLAND.

CIRCULATION INFRUSTRUCTURE CIRCULATION INFRUSTRUCTURE + GREEN NETWORK + GREEN NETWORK

INTRODUCING A VARIETY OF DISTRICTS, NODES, PATHS, EDGES, AND LANDMARKS, WILL CREATE DENSITY. CIRCULATION INFRUSTRUCTURE + GREEN NETWORK THE POLDER SYSTEM WILL PROTECT THE LAND FROM SEA LEVEL RISE AND PROVIDE MASH LAND HABITAT. A MULTITUDE OF CIRCULATION HELPS CONNECT THE HALVES OF THE ISLAND THROUGH A PERIMETER TRAIL, RAIL LINE, AND CANAL WALKWAYS.


ACTIVE LEARNING

50%

70%

30%

WHAT YOU WRITE

WHAT YOU SEE

70% WHAT YOU SAY

PASSIVE LEARNING

ANALYZE DEFINE EVALUATE

WHAT YOU HEAR

DEMONSTRATE APPLY PRACTICE

IMPLEMENTING A SYSTEM FOR LEARNING IN BOTH PASSIVE AND ACTIVE CAPACITIES WILL HELP TO INCREASE DIVERSITY AND RESILIENCE


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

WESTERN TERMINUS OF TRANS-CONTINENTAL RAILROAD c.1869

100' 300'

CHINA CLIPPER DEPARTURE POINT FIRST TRANS-PACIFIC FLIGHT c.1935

EDGE OF LANDFILL c.1938

HISTORICAL IDENTITY

600'

WESTERN TERMINUS OF TRANS-CONTINENTAL RAILROAD c.1869

NAS BARRACKS c.1940

FORMER LANDFILL EDGE c.1938

NAS FIRE STATION c.1940

CHINA CLIPPER DEPARTURE POINT FIRST TRANS-PACIFIC FLIGHT c.1935

NAS FLIGHT CONTROL TOWER c.1941

OPEN SPACE 0'-30' 30'-70' 70'-100' 100'-200' 200'-300' RED

LINE

URBAN FABRIC

CANALS

OPEN SPACES

ROADS

PUBLIC TRANSPORTATION

ALAMEDA POINT

CLIPPER CANAL

WILLIE STARGEL

DIKE AS EXTENSION OF EXISTING BREAK WATER

NAS FLIGHT CONTROL TOWER c.1941

APPEZATTO

NAS FIRE STATION c.1940

EARLY DRAFT EMPHASIZING REGULAR GRID EXTENDING EXISTING ROADS, A LIGHT RAIL SYSTEM EXTENDING TO THE HISTORIC TERMINUS OF THE TRANSCONTINENTAL RAILROAD, AND A GREEN SYSTEM NETWORK

BREAKDOWN OF THE EARLY DRAFT SHOWING THE VARIETY OF ASPECTS CREATING THE MASTER PLAN

LO C

K

AL TI N SE DE -U SI ED RE IX M

POLD ER M

ARSH ES

CANAL

R

HT

O

G

LI

ID RR

CO

LIGHT INDUSTRIA L

AL TI N SE DE -U SI ED RE IX M

IL TA RE

CIVIC CORE

RESIDENTIAL MIXED-USE

I RA L

FINANCIAL DISTRICT

POLDER MARSHES + WETLANDS

FERRY TERMINAL

C LO

MANUFACTURIN G MIXED-USE

K

ALAMEDA POINT, ALAMEDA, CA EXISTING + TO REMAIN BUILDINGS SITE PROPOSALS LIGHT RAIL OPEN SPACES: HARDSCAPE/LANDSCAPE 100' 300'

SECOND MAJOR DRAFT SHOWING THE HISTORIC GRID OF THE NAVAL BASE BEING EXTENDED, AND SHIFTING TO A GRID THAT MIMICS THE FLIGHT LINES . FERRY TERMINAL IS SHIFTED TO FEED "DOWNTOWN" OF PROPOSAL. POLDER MARSHES ARE INTRODUCED TO ADDRESS SEA LEVEL RISE BASED ON RESEARCH OF NOORDOOSTPOLDER, NETHERLANDS. CANAL HAS BEEN ABSTRACTED FROM FORMER COASTAL EDGE.

page / 38

600'

N

LOCK

CANAL

EXTEND EXISTING

BREAK WATER

TO MAKE DYK

E

DRAFT PRESENTED AT HALF WAY POINT OF THESIS. ORANGE ZONES REPRESENT SITES INTENDED FOR FURTHER INVESTIGATION. FURTHER DEVELOPED THE TYPE OF DENSITY TO SURROUNDED THE PURPOSED SITES AS MANUFACTURING, CIVIC, RESEARCH, AND POLDER OBSERVATION WITHIN A RESIDENTIAL NEIGHBORHOOD.


URBAN LAB MASTER PLANS

LO C

K

10

AL TI N SE DE -U SI ED E R IX M

POLD ER M

ARSH ES

20

CANAL

15

IL TA RE

AL TI N SE DE -U SI ED RE IX M

10

L

CIVIC CORE

RESIDENTIAL MIXED-USE

CO I RR R

HT

G

DO

LI

25 20

I RA

15

L

10

10

10 10

POLDER MARSHES + WETLANDS

FINANCIAL DISTRICT

10

15

FERRY TERMINAL

10

C LO

MANUFACTURIN G MIXED-USE

K

ALAMEDA POINT, ALAMEDA, CA CANAL EXISTING + TO REMAIN BUILDINGS SITE PROPOSALS LIGHT RAIL OPEN SPACES: HARDSCAPE/LANDSCAPE 100' 300'

600'

N

LOCK

It is not until the second to last draft that each of these things were explored to a level that made the flaws apparent, hence the beginning the most recent draft. The fourth draft used the canal in a very topical way, it has not become part of a greater water network. In the next draft, water run-off from the roads will go into bioswales, that will connect to the canal. Also, the topography is not refined enough for water to actually

drain towards the canal, and that needs to be addressed. Also, the abstraction of the historic 1938 waterline does no benefit to the master plan. Keeping the canal along the historic waterline also will bring the canal directly through the center of the civic center and help to further connect the various districts of Alameda Point. Refining the water network will help to improve the complexities and efficiencies of the master plan proposal.

LIGHT INDUSTRIA

Through a series of drafts, the master plan for Alameda took into consideration the need for it to become a resilient place. Precedent research was applied. The use of canals as a way to control water, districts, street width hierarchy, historical references and greenway networks are used differently in each iteration.

EXTEND EXISTING

BREAK WATER

TO MAKE DYK

E

IN PROGRESS DRAFT OF MASTER PLAN, WITH NEW SITES BEING PART OF A SYMBIOTIC RELATIONSHIP WITH HISTORIC BUILDINGS FROM THE NAVAL AIR STATION. CANAL HAS REVERTED BACK TO MORE TRULY REPRESENT FORMER COASTLINE.


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

URBAN LAB SITE PROPOSAL

producing replacement parts for ships and is adjacent to the canal with a large loading ramp into it. Adding a vocational learning facility into a factory will create a symbiotic relationship of students learning how the process works, but also improving on the inefficiencies, benefiting both the factory and students.

LO

CK

L TIA E EN -US SID ED RE IX M

POLD ER MA RSHE

CO ID

LIG

RR

FERRY TERMINAL

C LO

MANUFACTURING MIXED-USE

K

page / 40

RESIDENTIAL MIXED-USE

IL RA

The site located in the manufacturing mixeduse district is part of a factory used for

R

HT

O

In the civic core is where the third site is. The civic core has a large amphitheater space that plays off the canal as the backdrop of the set, and the sheer wall on the Northern side to be a display for the arts. Adjacent to this large public square and amphitheater is the performing arts building of the city of Alameda. The auditorium and the classroom are meant to intersect to allow passive learning and an understanding of all that goes into a production.

LIGHT INDUSTRIAL

IL TA RE

Where the canal begins to widen to allow for additional water retention and absorption adjacent to the polder marshes is the second site. This site is part of a larger research facility for habitat restoration and preservation. Architecturally, this location will allow a science lab classroom to open up onto a habitat to allow passive and active learning behaviors to take place together to improve the experience and retention.

CIVIC CORE

FINANCIAL DISTRICT

POLDER MARSHES + WETLANDS

ALAMEDA POINT, ALAMEDA, CA CANAL EXISTING + TO REMAIN BUILDINGS SITE PROPOSALS LIGHT RAIL OPEN SPACES: HARDSCAPE/LANDSCAPE 100' 300'

600'

LOCK

The first site is at the locks where sea level and Alameda’s elevation intersect. This is an interesting condition to explore as an opportunity for passive and active learning because the mechanics of the pump system used to move the water in and out of the lock, in addition to the mechanism to open and close the doors of the locks.

S

CANAL L TIA E EN -US SID ED RE IX M

In creating the Urban Lab, education has become a consistent theme that compliments the canal as it strings together the various districts into one stronger identity. The master plan proposal on the left has four sites indicated with orange dots, each in a different district. Moving top to bottom, each of these sites coordinate with the perspective drawings and aerial view details to the right.

EXTEND EXISTIN

G BREAK WATER

TO MAKE DYKE

N

THE ABOVE MASTER PLAN PROPOSAL INDICATES THE FIRST PROPOSED SITES IN A VARIETY OF CANAL CONDITIONS AND DISTRICTS.


POLDER MARSHES, LOCK

BI

LO C

K

BIOSWALE, RESEARCH FACILITY

AL TI E N S DE D-U I S E RE IX M

CIVIC CORE, + THEATER CIVIC CORE,AMPHITHEATER AMPHITHEATER + THEATER

MAR SHES

LEFT: VIGNETTES SHOWING PROPOSED SITES FOR EDUCATIVE STUDIES CITY COMPONENTS. RIGHT: IMMEDIATE CONTEXT OF THE CANAL CANAL STUDIES ORIGINALLY PROPOSED SITES.

MANUFACTURING DISTRICT, BOAT LAUNCH

MANUFACTURING DISTRICT, BOAT LAUNCH

POLD ER M

ARSH ES


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

page / 42


PHOTO MONTAGES OF WHAT THE SITES MIGHT LOOK LIKE WHEN BIOSWALE AND POLDER MARSHES AMONG CONTEXT


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

MASTERPLAN PHASE II

Now that analysis and critique has been made on the previous draft, the next step is to create a new iteration. As was noted earlier, turning the canal into a full water network will help make the canal a more thoroughly integrated, vital part of Alameda Point as a place. Also, refining the topography lines to show that water will in fact flow towards the canal as a low point, and not collect in undesired places. To make the proposal more thorough and complete, serious attention will be given to filling the blocks with parcelized massing based on analysis of other cities with strong identities of place. To keep the Urban Labs along the canal, all the site proposals had to change when the canal moved. The first remains where the polder marshes, canal, and San Francisco Bay intersect. The second holds a similar function as the Manufacturing Mixed-use district in that it is an historic hanger occupied by a distillery, where the class will be able to establish the same sort of symbiotic relationship by improving the quality of education, while also providing critique and suggestions to streamline the process of manufacturing. The third site is connected to the historic fire department as part of the civic core.

PRIMARY ITERATION SKETCH OF MASTER PLANNING. EMPHASIS ON HISTORIC BUILDINGS TO REMAIN, PRESERVATION OF HISTORIC WATER'S EDGE AS CANAL, EXTENSION OF GRID LINES, DIAGONALS DERIVED FROM FLIGHT LINES.

LO C

K

10

AL TI N SE DE -U SI ED RE IX M

POLD ER M

ARSH ES

20

CANAL

15

L

LIGHT INDUSTRIAL

I TA RE

AL TI N SE DE -U SI ED RE IX M

10

CIVIC CORE

RESIDENTIAL MIXED-USE

RR CO R O

HT

G

ID

LI

25

20

IL RA

15 10

10

10

FINANCIAL DISTRICT

10

POLDER MARSHES + WETLANDS

10

15

FERRY TERMINAL

ALAMEDA POINT, ALAMEDA, CA

CK LO

MANUFACTURING MIXED-USE

CANAL EXISTING + TO REMAIN BUILDINGS SITE PROPOSALS LIGHT RAIL OPEN SPACES: HARDSCAPE/LANDSCAPE 100' 300'

600'

LOCK

Having chosen two sites that including already existing historic structures, a catalogue of drawings and photographs needs to be collected so a set of as built drawings can be created.

10

EXTEND EXISTING

BREAK WATER

TO MAKE DYKE

N

MOST RECENT ITERATION OF MASTER PLAN, WITH HISTORIC BUILDINGS TO REMAIN, THE CANAL MIMICKING THE HISTORIC WATER'S EDGE.

page / 44


CONCEPTUAL VISUALIZATION OF CANAL


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

PROPOSED MASTERPLAN OF ALAMEDA'S FORMER NAVAL AIR STATION WITH POTENTIAL SITE PROPOSALS HIGHLIGHTED FOR FURTHER EXPLORATION AND ANALYSIS

page / 46


SITE SELECTION

PO

LD ER

MAR SH

PO

LD ER

MAR SH

LDER

MA RSH

- FO UR TH

- TH

PO

IRD

PH

URBAN LAB SITE PROPOSAL 1 POLDER

AS

E

SCALE: 1” = 32’ 1

PH

E

ALAM EDA

- SE

CO ND

/ OA

KLAN

PHAS

E

POLD ER MA RSH

The first site, the polder marsh, is interesting because the intersection of the locks and the historic redline rail line adapted for public transportation. The locks lend themselves to a vocational school relating to hydrology and sea level rise, an issue very relevant to Alameda and the Bay Area.

ANNE L

LOCK

- FIR ST PH

2500

BUILD LEVEE AND PLANT TO REDUCE EROSION

<< RE

DLINE

STR EET >> RE

CAR << DLINE STR EET

CAFE

CAR >> STO P

2200

CONTINUE TO RAISE PERIMETER ELEVATION AND CREATE WETLANDS FOR WATER FILTRATION

RESIDENTIAL

- LO CK

2100

BUILD STORM WATER PROTECTION CANAL AND CONTINUE TO FILL PERIMETER WITH DREDGED MATERIAL

REDL

INE

2014 2050

USE DREDGED BAY MATERIAL TO RAISE PERIMETER OF ALAMEDA’S COAST 6 FEET

ALAMEDA POINT

BAY

PUBLIC PARK MOM + POP RESIDENTIAL RESTAURANT

RESIDENTIAL

RESIDENTIAL

<< >> REDLINE STREET CAR

>>

BOOK STORE RESIDENTIAL

BENTON CANAL

GROCERY RESIDENTIAL

STREET CAR

HOBBY SHOP

HARDWARE

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL RESIDENTIAL

BIKE REPAIR RESIDENTIAL

POTENTIAL SITE PROPOSAL AT POLDER MARSHES AND LOCKS

URBAN LAB SITE PROPOSAL 2 HANGAR SCALE: 1” = 32’ 1

The second site, the hangar, also intersects a variety of conditions, most notably the canal. This site offers the opportunity to work with a historic hangar so crutial to the place making of Alamdea Point. The third site considered was in the civic center neighborhood and was also at the intersection of a historic building, the former firestation, as well as the canal, with adjact buildings having cultural and civic functions.

D CH

ASE

EXISTING ALAMEDA COAST-LINE CONDITION

<< REDLINE

Throughout the process of place making in the Alameda Point masterplan, it was important to identify places where there were multiple intersections of pedestrians, neighborhoods, industry and old versus new. Wanting to focus on those four things, three sites immediately became relevant.

N

AS

N

DISTILLERY BENTON CANAL

ST. GEORGE'S SPIRITS

POTENTIAL SITE PROPOSAL AT INTERSECTION OF CANAL AND HISTORIC AIRPLANE HANGAR

CITY HALL

URBAN LAB SITE PROPOSAL 1 CIVIC CENTER SCALE: 1” = 32’ 1

N

PLAZA

LIBRARY - MAIN BRANCH

FIRE HOUSE

POTENTIAL SITE PROPOSAL IN CIVIC CENTER NEIGHBORHOOD WITH HISTORIC FIREHOUSE INTERSECTION


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

page / 48


FINAL PROPOSED MASTERPLAN OF ALAMEDA POINT WITH THE NETWORK OF VOCATIONAL SCHOOLS AND PASSIVE LEARNING HIGHLIGHTED IN ORANGE ALONG THE CANAL


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

<< REDLINE AVE >>

<< MONARCH ST.

C-C

C-C C-C C-C

<< CAPT. DODGE PL >>

M-1

AR

M-2

M-1

AR

<< W. ESSEX DR. >>

M-2

MONARCH ST. >>

<< ESSEX DR. >>

M-2 AR : Adaptive Reuse C-C : Community Commercial M-1 : Intermediate Industrail M-2 : General Industrail

AR

INITIAL SITE PLAN USED TO BEGIN SITE ANALYSIS, AND ARCHITECTURAL PROPOSAL FOR VOCATIONAL SCHOOL AND PASSIVE LEARNING SYSTEM,

page / 50

M-2


PROGRAM SITED

After exploring the various sites, site two, the hangar was selected. This site has so many intersections of historic and new, canal and thoroughfares, that it seemed it would be a precedent for the rest of the network of vocational schools. The hangar already is part of Spirit Alley in Alameda Point. All the hangars are currently in use by breweries, distilleries and wineries. The proportions, open floor plan and accessibility to the hangars make them ideal for the large process of manufacturing. The hangar that overlaps the canal is occupied by distiller St. George’s Spirits. The already thriving distillery became an ideal way to test the vocational school to improve economic resilience. With choosing to maintain the industry as a distillery, program began to be informed. To the right are a series of iterations on program relationship diagrams relative to the site conditions, public versus private, and circulation.

PROGRAM REQUIREMENTS ACTIVE LEARNING (STUDENT PERSPECTIVE): CLASSROOM LAB OUTDOOR CLASSROOM CANAL INDUSTRY PASSIVE LEARNING (PUBLIC PERSPECTIVE): OUTDOOR CLASSROOM LAB CANAL BREAK-OUT ROOM

POLDER LOCKS ACTIVE LEARNING

DISTILLERY FIRE HOUSE

TRASH STORAGE ENTRY CIRCULATION

CLASSROOM LAB

INDUSTRY

INDUSTRY (VARIES PER SITE)

BREAK-OUT ROOM

RESTROOMS

PASSIVE LEARNING

OUTDOOR CLASSROOM

VERTICAL `CIRCULATION

VERTICAL `CIRCULATION RESTROOMS ACTIVE LEARNING

PUBLIC

BREAK-OUT ROOM

CLASSROOM

PARK

PUBLIC

EN

PASSIVE LEARNING RESTAURANT

LAB

TR Y

PROGRAM REQUIREMENTS ACTIVE LEARNING (STUDENT PERSPECTIVE): CLASSROOM LAB OUTDOOR CLASSROOM CANAL INDUSTRY PASSIVE LEARNING (PUBLIC PERSPECTIVE): OUTDOOR CLASSROOM LAB CANAL BREAK-OUT ROOM TRASH STORAGE ENTRY CIRCULATION

ACTIVE LEARNING

DISTILLERY CLASSROOM LAB

PUBLIC

INDUSTRY (VARIES PER SITE)

BREAK-OUT ROOM

PASSIVE LEARNING VERTICAL `CIRCULATION PROGRAM REQUIREMENTS ACTIVE LEARNING (STUDENT PERSPECTIVE): CLASSROOM LAB OUTDOOR CLASSROOM CANAL DISTILLERY ARCHIVE DISTILLERY ADJACENCY

VERTICAL `CIRCULATION

POLDER MARSHES

BREAK-OUT ROOM RESTAURANT

LOCKS PARK

CLASSROOM OUTDOOR CLASSROOM

PASSIVE LEARNING (PUBLIC PERSPECTIVE): PUBLIC PATH TRANSPARENCY TO EDU. / DISTILLERY

LIGHT RAIL STOP PUBLIC

ACTIVE LEARNING

RESTROOMS

PASSIVE LEARNING

LAB DISTILLERY LAB

DISTILLERY STILLS TASTING ROOM TANK FARM STORAGE PRODUCE STAGING CRUSHING

PROGRAM REQUIREMENTS ACTIVE LEARNING (STUDENT PERSPECTIVE): CLASSROOM LAB OUTDOOR CLASSROOM CANAL INDUSTRY PASSIVE LEARNING (PUBLIC PERSPECTIVE): OUTDOOR CLASSROOM LAB CANAL BREAK-OUT ROOM TRASH STORAGE ENTRY CIRCULATION

BREAK-OUT ROOM ACTIVE LEARNING ACTIVE LEARNING

INDUSTRY (VARIES PER SITE)

LAB

DISTILLERY LAB

CLASSROOM LAB

BAR

BREAK-OUT ROOM

PASSIVE LEARNING VERTICAL `CIRCULATION

VAULT

CLASSROOM

RESTROOMS

RESTAURANT TASTING ROOM

VAULT

PROGRAM ADJACENCIES PROGRAM REQUIREMENTS ACTIVE LEARNING (STUDENT PERSPECTIVE): CLASSROOM LAB OUTDOOR CLASSROOM CANAL DISTILLERY ARCHIVE DISTILLERY ADJACENCY

STILLS STORAGE TANK FARM

PASSIVE LEARNING (PUBLIC PERSPECTIVE): PUBLIC PATH TRANSPARENCY TO EDU. / DISTILLERY

PUBLIC RESTAURANTS RETAIL RECREATION

DISTILLERY STILLS TASTING ROOM TANK FARM STORAGE PRODUCE STAGING CRUSHING

SERIES OF PROGRAMMATIC RELATIONSHIP STUDIES RELATIVE TO SITE CONDITIONS, CONSIDERING THE ACCESS BETWEEN PUBLIC, DISTILLERY, AND SCHOOL PROGRAMS


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

STUDY MODEL USED TO EXPLORE THE RELATIONSHIP BETWEEN THE EXISTING HISTORIC HANGAR, AND PROPOSED CANAL

page / 52


EXISTING HANGAR

PHOTOS TAKEN AT SAINT GEORGE'S DISTILLERY INSIDE THE HISTORIC HANGAR AT ALAMEDA POINT


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

PROGRAM PRECEDENT

The Finnish are deemed the smartest in the world by an international measure testing 57 countries sponsored by the Organization for Economic Cooperation and Development, a group funded by 30 countries that monitors social and economic trends. Their test scores reflect their first place overall ranking, including measures of critical thinking and the application of knowledge, first place ranking in science, and ranked near the top in math and reading. Although test scores are not all that matter, as Einstein said, “What counts may not be counted; what can be counted may not count.” Test scores cannot measure the learning environment. The Finnish standard of education as described by Pasi Sahlberg, the general director of the Center for International Mobility and Cooperation at Finland’s education department, is onethird dependent on learning environment, which is the classroom, collaborative area, or outdoor place in which a pupil learns. Sahlberg attributes the nation’s academic achievements of the last 45 years to a three-part system: quality academic curriculum, impartiality in educational access, and the third one is the environment. How the environment and design of the school is supporting students’ learning. When we combine these three things we can say something about the overall goodness of the school system.

of the schoolhouse, corporal punishment Learning is context-dependent, Bombay Sapphire Distillery “invariably grounded in the situation, was outlawed in all Finnish schools, Heatherwick Studio environment and culture in which new where previously, there were private Laverstoke, UK knowledge is acquired and applied”. rooms for disciplining pupils. Legislation Learning is inseparable from its physical was drafted in 1917 to make primary environment, affecting the pedagogical education, the first 6 years of schooling, opportunities, making architecture an compulsory and free. Forty-one years integral part of the functional design of later, The Primary Schools Act of 1958 increased primary school to a mandatory the school environment. It was in 1970 that the new comprehensive school 8 years. The 50s also brought a change curriculum for the country of Finland was in the classroom, where teacher’s drafted. This marked the termination of podiums began to shrink, and by 1960 completely disappeared in the classroom. the traditional secondary school system from factory-style schools to modern From the mid-19ths century onward, “project based learning” schools. In the schoolhouses began springing up in factory-style school, students sit in rows urban and rural regions of Finland. The of desks facing the teacher in a very design was assigned to a civil servant professional architect, but soon after the hierarchical arrangement. Project based turn of the century, the design of schools learning classrooms are becoming part of a contemporary campus network, where opened to architectural competition to social needs of students and teachers ensure the best understanding of the complex programming of modern project are being addressed. The design process is now dependent on collaboration based learning schools. 48,500 square foot paper mill factory complex converted and restored to be the Bombay Sapphire Distillery. RIGHT: Exterior view of the botanical garden greenhouse connecting to the historic papermill, now distillery BOTTOM RIGHT: Looking across the restored river toward the two greenhouses, one tropical, the other Mediterannean BOTTOM LEFT: Aerial view showing the distillery as a complex with the reintroduced river and Heatherwick Studio’s addition

/ vapo

Saunalahti School VERSTAS Architects Espoo, Finland TOP LEFT: Exterior view of the canteen from the school yards TOP RIGHT: Looking across a home-ec lab, with floor to ceiling glass along the public road BOTTOM LEFT: Exterior view from school yards showing classroom windows, versus circulation windows, adjacent to the curtain wall system. BOTTOM RIGHT: Interior view of a classroom with both desks and flexible work spaces with large amounts of natural light, and transparency to adjacent classrooms and the hallway.

The architecture of Finland’s schools has made a dramatic change because of much political, economic, and technological advancement in the last century. The first official document specifying the subjects to be taught in finish schools are described in the Finnish Decree on Primary Schools, enacted in 1866. Prior to the 1870s, the school as an architectural typology for primary education did not exist in Finland. Changing programmatic needs PRECEDENT STUDY ON SAUNALAHTI SCHOOL BY VERSTAS ARCHITECTS

page / 54 Carpenter Center


from instructors, the principle, and the architect to make sure the pedagogy, curriculum, and program requirements all synchronize. The 1970s marks the pedagogical shift toward project based learning, forcing the architecture of learning environments to transform to support this new education method. The new teaching methods of post-1970 posed architectural challenges: integrated classes, space for group work, more flexible and adaptable facilities, an increase in a variety of electives, and a new need for classrooms with distinct specialties. The two types of architecture for education prior to and post the major pedagogical shift of 1970 are exemplified in Aleksis Kivi School in Helsinki by architect Gunnar Taucher and Saunalahti School in Espoo, Finland by Verstas Architects.When / vapor infusion stills

Distilling Process Semi-Public Private

describing the Saunalahti School, Verstas Architects describe the school to be a “Future School” in that it emphasizes unorthodox ways of using a classroom, promotes creative thinking and the arts, collaboration, and interaction at a variety of scales. Project Based Learning can be described as learning by doing. This hands on approach to education increases retention and application of the content in the lesson. Typically, a school addressed active learning environments, but here, the workshops face the public street and school yard with floor to ceiling glass allowing passive learning through impromptu observation. According to the research by C. Kenneth Tanner, Director of the School Design and Planning Laboratory at the University of Georgia in Athens, as part of a 2008 study found after analyzing 71 schools, that students exposed to more natural light and views of outdoors had higher

mathematics, vocabulary, and language arts scores. This research emphasizes the importance of large windows in learning environments, as exemplified by Verstas Architects’ school. This transparency also increases community awareness, involvement, and safety within the school.

Distilling Process

CLASSROOMS SHARED SPACE STAIRS

CLASSES ARE CLUSTERED AT THE ENDS OF THE BUILDING IN THREES AND FOURS AROUND A BREAK-OUT CLASSROOM ADJACENT TO THE VERTICAL CIRCULATION

Private

Public

Semi-Public

Public


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

PROGRAM PRECEDENT

The Bombay Sapphire Distillery was master-planned and renovated by the Heatherwick Studio. This project became a significant influence on the thesis proposal because of it’s program as a distillery, it’s use of site, adapting a historic paper mill, and their intent of including the public for tours. The scale of the distillery is much larger than the historic hangar used by St. George’s Spirits, but through analyzing the plan, and researching the process of distilling it provided great insight into the Liquid Learning proposal.

Bombay Sapphire Distillery Heatherwick Studio Laverstoke, UK 48,500 square foot paper mill factory complex converted and restored to be the Bombay Sapphire Distillery. RIGHT: Exterior view of the botanical garden greenhouse connecting to the historic papermill, now distillery BOTTOM RIGHT: Looking across the restored river toward the two greenhouses, one tropical, the other Mediterannean BOTTOM LEFT: Aerial view showing the distillery as a complex with the reintroduced river and Heatherwick Studio’s addition

/ vap

page / 56


Distilling Process Semi-Public Private

/ vapor infusion stills

Distilling Process Semi-Public Private Distilling Process

Private

Public

Semi-Public

Public

PRECEDENT STUDY ON THE BOMBAY SAPPHIRE DISTILLERY BY HEATHERWICK STUDIO


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

CIRCULATION PRECEDENT

Le Corbusier’s Carpenter Center is an interesting example because according to an article written in the Harvard Crimson by Zachary R. Heineman, “Le Corbusier did not understand that few students have any need to travel this rounte (not to mention that they are lazy and would never walk up an inclined ramp just to walk down the other side. The University has done a commendable job in adding the Sert Cafe and revitalizing the Sert gallery, giving people a reason to use the ramp more often”. The Kunsthal by OMA became a much more relavent precedent because the road that cuts under the building is comparable to the canal in the Alameda Point masterplan, and the path that cuts through the building is used to connect two levels, a major thoroughfare, and a park, that could not easily be traversed before.

Carpenter Center Le Corbusier

“Unfortunately, Le Corbusier did not understand that few students have any need to travel this route (not to mention that they are lazy and would never walk up an inclined ramp just to walk down the other side). The University has done a commendable job in adding the Sert Café and revitalizing the Sert Gallery, giving people a reason to use the ramp more often. ” Zachary R. Heineman The Harvard Crimson

CIRCULATION STUDY OF THE CARPENTER CENTER SELECTED FOR ITS PUBLIC PATH

KUNSTHAL | OMA

PUBLIC 24/7

PUBLIC 24/7

PUBLIC 24/7

PUBLIC 24/7

With the integration of a 24/7 public path through the distillery and vocational school to promote passive learning, it became imperative to find other examples to understand access and security.

CIRCULATION STUDY OF THE KUNSTHAL SELECTED FOR ITS PUBLIC PATH

page / 58


/7

PUBLIC 24

PUBLIC 24/7


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

PROGRAM

Public

circulation observation area installation display

PROGRAM STUDY, AND BEGINNING TO UNDERSTAND WHICH PROGRAMS TRANSCEND THE THREE PRIMARY USES AND BECOME OCCUPIED BY MIXED-USERS

page / 60

SECTIONAL RELATIONSHIPS OF THE CANAL AS THE STRING THAT HOLDS THE EDUCATION NETWORK TOGETHER, WITH THE PUBLIC PATH, VOCATIONAL SCHOOL, AND DISTILLERY


CONCEPTUAL INTERPRETATION OF BRAIDING PUBLIC (ORANGE) AND VOCATIONAL SCHOOL (GREEN) TOGETHER WITHIN THE DISTILLERY


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

DIAGRAM EXPLAINING THE "NOODLE IN A BOX" EXPLORATION OF PROGRAM RELATIONSHIPS FORMALLY, GETTING SO MUCH DISTANCE TO FIT INTO A LIMITED SIZE BOX.

page / 62


PROGRAM RELATIONSHIPS

DISTILLERY

The series of studies shown here explore sectional relationships of program, and can be compared to the relationships studied in the Kunsthal.

BREAKOUT ROOM

PUBLIC PATH

On the left is a diagram showing a length of ramp required to make the grade change while remaining within code limitations, and then how it has to be bent to fit with the parameters of the box, “noodle in a box”. After these two programs, the public path, and the distillery are established, the spaces created become the vocational school.

CONCEPTUAL STUDY DESCRIBING SECTIONAL RELATIONSHIPS OF PROGRAM IN RELATION TO THE CANAL

PUBLIC PATH

DISTILLERY KITCHEN

INDOOR/OUTDOOR CLASSROOM

BREAKOUT ROOM

PUBLIC PATH

CONCEPTUAL STUDY DESCRIBING SECTIONAL RELATIONSHIPS OF PROGRAM IN RELATION TO THE CANAL


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

OBJECT W/IN EXISTING

page / 64

CIRCULATION AS EXTENSION OF EXISTING


CIRCULATION AS FORM

CANAL AS EXTENSION OF EXISITING

PERPINDICULAR TO CANAL MATRIX SHOWING ITERATIONS AND VARIATIONS OF FORMAL STUDIES


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

AERIAL VIEWS OF STUDY MODELS SITTING IN SITE CONTEXT,

page / 66


AERIAL VIEWS OF STUDY MODELS SITTING IN SITE CONTEXT,


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

page / 68


PEDESTRIAN LEVEL VIEWS LOOKING AT INTERVENTION RELATION TO CANAL AND CONTEXT


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

Cut Hangar at Canal

Introduce Public through Circulation Across Canal

Push Circulation through Distillery

Connect to Water

A BREAKDOWN OF THE STEP-BY-STEP OF MOVES MADE TO CREATE FINAL FORM AND SITE RELATIONSHIPS

page / 70


DIAGRAMMING

8

9

10

11

12

1

2

3

4

5

6

7

8

9

10

11

12

1

2

3

4

5

6

7

Student

Distiller

Public

DIAGRAM DESCRIBING THE USE OF THE SITE OVER A DAY, FROM THE THREE DIFFERENT USER TYPES.

PROGRAM PROGRESSION

PROGRAM PROGRESSION LABS

PUBLIC PATH

E S

LABS

PUBLIC PATH

ARCHIVE LIBRARY

OLFACTORY

OLFACTORY SMELL

ARCHIVE LIBRARY SEE

BREAKOUT ROOM

HEAR BREAKOUT ROOM

SMELL

SEE

TASTING ROOM

BOTANICAL GARDEN

TASTING TASTE ROOM

BOTANICAL TOUCH GARDEN

CLASSROOMS

CLASSROOMS

DIAGRAM DESCRIBING THE PROGRAM PROGRESSION HEAR TASTE TOUCH FROM THE PERSPECTIVE OF THE PUBLIC PATH

On the opposite page is a sequential diagram depicting the series of moves made to generate the final form. The major moves are to cleave the building at the canal, create pedestrian access across the canal, and create a public path along the canal. The diagram at left is describing the hours of operation and when each of the three primary users, public, school, and distiller, are present. The public is allowed access to the path 24/7 (in orange) but during the middle of the night, the number of users is greatly reduced. The vocational school (in green)is most active in the evenings, when people who are currently working could most easily attend classes, yet still overlap with the processes of the distillery. Those that work in the distillery and help to make it function begin early, with stocking and unloading, and work through the day. The program progression diagram describes the narrative of the passive learning experience and also relates back to the “noodle in a box” exploration previously described. The intertwined circulation is a very important part of the Liquid Learning organization of program and users. To emphasize the passive and active learning, the circulation paths cross back and forth to give visual access to various parts of the distillery, the public spaces, and the labs, classrooms, and archive.

INTERTWINED CIRCULATION

INTERTWINED CIRCULATION

1DIAGRAM DESCRIBING THE CIRCULATION PATH OF THE PUBLIC (ORANGE) AND THE VOCATIONAL SCHOOL AND HOW THEY INTERTWINE


<< MONARCH ST. >>

Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

+15’

-12’

<< MONARCH ST. >>

<< W. ESSEX DR. >>

page / 72

AR

M-2

SITE PLAN


FLOOR PLANS

+15’

Entry 1:32 slope

Plaza / Event Space 1:32 slope

Library + Archive Tasting Room 1:12 slope

Bar

Kitchen Classroom

-12’

Classroom

Classroom

0’

Breakout Room

SECOND LEVEL PLAN

+15’

Distillery Lab

School Lab

School Lab Breakout Room

School Lab

Stills

-12’ Bulk Storage

Cased Goods

Produce Staging

UP

Fermenting Tank

0’ Botanivore Gin Garden Processing

Small Bottling Terrior Gin Garden

Dry Rye Gin Garden

Raspberry Brandy Green Chile Vodka Garden

Raspberry Liquour Garden

Absinthe Garden

Pear Brandy Garden Rum Garden California Oranges Vodka

Apple Brandy Garden

Coffee Liquour Garden

Bourbon Garden

Garden

Single Malt Whiskey Garden Barlette Pear Vodka Garden

GROUND LEVEL PLAN


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

SECTIONS

SECTION THROUGH VOCATIONAL SCHOOL AND ALONG BRIDGE TO THE NORTH BANK OF CANAL

page / 74


184’ 6” 24’ 8”

45’ 0”

22’ 6”

22’ 6”

45’ 0”

24’ 8”

55’ 6”

0’-0”

7’-2” 0’ 0”

-12’ 0”

-37’-0”

NORTH -SOUTH SECTION, PERPENDICULAR TO CANAL

184’ 6” 24’ 8”

45’ 0”

22’ 6”

22’ 6”

45’ 0”

24’ 8”

55’ 6”

0’-0”

7’-2” 0’ 0”

-12’ 0”

-37’-0”

NORTH -SOUTH SECTION, PERPENDICULAR TO CANAL


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

RENDER AT DUSK LOOKING DOWN CANAL AT PUBLICALLY OCCUPIED PLAZA

page / 76


VISUALIZATION

A SERIES OF LAYERS USED TO PRODUCE THE FINAL RENDERING ON THE OPPOSITE PAGE.


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

A SERIES OF ITERATIONS LEADING TO THE FINAL RENDERING ON THE OPPOSITE PAGE

page / 78


FINAL RENDERING SHOWING PERFORATED METAL MATERIAL AFFECT, AND LAYERED RELATIONSHIP OF THE PUBLIC WITH THE VOCATIONAL SCHOOL


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

A SERIES OF ITERATIONS LOOKING AT WARMTH OF LIGHT AND AFFECT OF THE PERFORATED METAL

page / 80


BASE IMAGE FOR DEVELOPMENT OF BREAK-OUT ROOM IN VOCATIONAL SCHOOL

VIEW FROM WITHIN PUBLIC PATH ALONG LIBRARY AND VOCATIONAL SCHOOL BREAK-OUT ROOMS


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

page / 82


GREYSCALE MASSING SHADOW STUDY

PHASE ONE OF ADDING ENTOURAGE

PHASE TWO OF ADDING CONSISTENT LIGHTING AND MOOD TO RENDERING


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

page / 84


PHYSICAL MODEL

PROCESS PHOTOS OF CREATING SITE MODEL


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

PROCESS PHOTOS OF CREATING CAST PLASTER SITE

page / 86


PLASTER SITE ONCE RELEASED FROM MOLD


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

BUILDING THE EXISTING HANGAR'S SPACE FRAME STRUCTURE

page / 88


EXISTING HANGAR WITH SPACE FRAME STRUCTURE ON SITE WITH BEGINNING PHASE OF BRIDGE ACROSS CANAL


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

MODEL PHOTO OF INSIDE LIBRARY OF VOCATIONAL SCHOOL ADJACENT TO PUBLIC PATH

page / 90


LOOKING INTO HANGAR FROM SOUTH DOORS AT INTERVENTION OF VOCATIONAL SCHOOL AND PUBLIC PATH

EXISTING HANGAR WITH BEGINNING OF INTERVENTION BEING BUILT


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

FINAL MODEL VIEW FROM PEDESTRIAN APPROACH ON NORTH BANK OF CANAL

page / 92


AERIAL VIEW OF FINAL MODEL


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

Liquid Learning.

Alameda needs to become resilient to economic instability and a rising sea level. This thesis proposes a canal to manage the water levels, which connects industrial, commercial, residential, and recreational districts. To stabilize the economy, a network of vocational schools is strung along the canal, encouraging community circulation. By slicing the historic hangar at the waterline, and injecting the vocational school along the public circulation path bridging the canal, all three user types – public, distiller, and student – become engaged.

page / 94



Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

page / 96


Acknowledgments My sincerest thanks to the family, friends, and faculty who have supported my endeavors and provided me with the guidance that got me where I am today. 01 My grandmother Anne Sabo Cook, for taking the time to read every single word I wrote, and asking questions about it every step of the way.

02 Paul Jamtgaard, Robert Shepherd, and Amit Patel, for pushing me every which direction, until I realized my own direction.

04 My Mom, Dad, and Sister, for being there, no matter what since day one.

03 Doron Serban, for ensuring I had the skills and tools necessary to build, physically and digitally, all that I think up


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

page / 98


Colophon 01 School academy of art university, school of architecture

07 Text Stock mohawk superfine eggshell ultrawhite 100 lb, 148 gsm

02 Course b.arch thesis paul jamtgaard robert shepherd amit patel

08 Fonts din light helvetica neue light gothic725 bd bt

03 Student samantha v buckley 562.237.6996 630 leavenworth street

san francisco ca samantha.v.b at gmail.com svbuckley.com 04 Book Binder blurb 05 Photographer samantha v buckley 06 Cover Stock softcover 4-color 10pt. overlaminate

09 Software adobe creative cloud 10 Copyright c. 2015 all rights reserved no part of this publication can be reproduced without express permission from samantha v buckley


Samantha Buckley, BArch. Thesis Proposal / Liquid Learning

page / 100


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.