Factor Analysis of Constructing International Contractor Claim Management Organization Based on the

Page 1

Construction Engineering Volume 3, 2015 www.seipub.org/ce doi: 10.14355/ce.2015.03.003

Factor Analysis of Constructing International Contractor Claim Management Organization Based on the Method of Fuzzy Decision ZHANG Peng1, GAO Quanchen1, GAO Shuliang2, XIAO Lili1,3, JIN Kun1,3 China University of Mining and Technology , Beijing, Beijing 100083,China;

1.

China Beijing Metallurgical Engineering Technology co., LTD, Beijing 100088,China;

2.

State Key Laboratory for GeoMechanics and Deep Underground Engineering Beijing, Beijing 10083, China

3.

Abstract The influence factors of organizational structure design are divided into four categories from the angle of factor attribute: environmental factors, management factors, organizational structure characteristics factors and the organizational scale factors, this paper will analyse specifically the impact of these factors on organizational structure, meanwhile, the importance of these factors will be sorted by the fuzzy decision method, the subjective evaluation of the group can be quantified, and then the scientificity of constructing the claim organization will be improved. Keywords Claim Organization; Factor; Fuzzy Decision; International Contractor; Claim Management

Introduction In order to improve the level of international engineering project claim management, a claim management organization is essential, but the establishment of claim organization is influenced by many factors, how to determine the role of various factors has important influences upon the creation of the organization. This paper will analyse the factors of establishing the claim organization using the method of the fuzzy decision, so that the problem of qualitative can be quantified, the individual subjectivity that frequently occur in the organization design can be reduced by quantifying the subjective evaluation of the group, as a result, the scientificity of constructing the claim organization will be improved. The Introduce of Fuzzy Decision The fuzzy decision is the method that the evaluation object will be sorted according to the advantages and disadvantages, or in some way from the evaluation objects to select a ʺsatisfactoryʺ solution, which will be needed for decision making. Fuzzy decision includes comments, dual contrast decision‐making and comprehensive evaluation method. In this paper, the structure factors of evaluation have fuzzy dual contrast decision and fuzzy opinion centralized decision making. The main idea of fuzzy dual contrast decision is that the factors evaluated are compared. The comparison is a kind of fuzzy understanding, then quantizing this understanding, and using the fuzzy mathematics method to discharge the merits of the overall order. The main idea of the fuzzy opinion centralized decision is that using quantitative model to concentrate for the reasonable opinion from different opinions. Integrated application of these two methods can provide scientific evaluation for the issue of many qualitative quantitative solutions, it is very feasible and effective. The Influence Factors of the Claims Organization Construction The Scale of the Contracted Project For smaller business enterprises with small scale, less personnel and less amount of the contracted project can set up simple organization section and they donʹt need to build a particular organization department. They can make

13


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.