I. WHY WE DO WHAT WE DO With 30+ years of experience in the construction industry, our founding team understands what it takes to make a construction project a success. BuildBinder exists to help you better service your clients with transparency, through visibility, document control, accounting, profit control, and owner satisfaction. Our goal is to help your company generate more profits and deliver projects on time, by making information available, searchable and ultimately useful, to the internal and external stakeholders of your project. Modeled after the constructability workflow from Georgia Tech’s School of Building Construction, BuildBinder was built by construction experts, for construction experts. From needs assessment, to bidding analysis, to managing reports at your jobsite, BuildBinder is the cloud-based construction information management system that will help you manage projects your way, but better.
II. WHAT IS A CONSTRUCTION INFORMATION MANAGEMENT SYSTEM?
1.
A construction information management system should be easy to use— Your CIMS should be as easy to use, and as organized, as an Excel spreadsheet. The ability to document and find information easily is the prime reason construction information management systems exist.
2.
A construction information management system should require minimum training— A CIMS is only as valuable as the stakeholders who make use of it. Architects, accountants, and field managers alike should be able to learn the tool in 30 days or less.
3.
A construction information management system should easily integrate into existing applications— A good CIMS should add value to your construction project, not detract from it. You should feel confident that the tools you are currently using will integrate into your CIMS seamlessly. That includes your Excel spreadsheets!
III. BUILDBINDER AS YOUR CONSTRUCTION INFORMATION MANAGEMENT SYSTEM BuildBinder’s cloud-based platform puts information at your fingertips, anytime, and anywhere. You can set up your first project in an instant, and track progress in real time with Audit Trail. BuildBinder also provides: • Easy to use software and intuitively organized project management tools. • A calendar of daily reports and site pictures, so you spend more time steering project success.
• Access to documents, permits, contracts, drawings, etc., with neatly organized project dashboards. • Project-friendly chat tools for quick collaboration across teams. • Quick response to RFI’s and change orders. You can even review submittals to cities and municipalities in one-click. • Side-by-side comparison of bids, including bids from 3rd parties.
IV. SUCCESS WITH BUILDBINDER CASE STUDY: LORD CORPORATION KEY FACT
85% reduction on project-related travel expenses.
THE CHALLENGE
With revenues exceeding $880 million, LORD Corporation has more than ¬ 3,000 employees in 26 countries and operates 16 manufacturing facilities and 8 R&D centers worldwide. This client was building a distribution center for Latin America that presented a few challenges: •
Traveling to the site to oversee the construction required a significant investment of time, money and resources.
•
Collaboration and coordination among decision makers and vendors located in different cities would be challenging.
•
Ability to keep the construction in check to stay on time and budget.
THE SOLUTION
Our client, a general contractor, used BuildBinder to oversee the construction of LORD Corporation’s distribution center. Using this system, the Facilities department in Cleveland was able to coordinate the project remotely. They were able to get daily progress reports, including site pictures, comment and edit blueprints, manage RFIs, and give their input on the design. They were also able to coordinate with all the involved parties and keep stakeholders involved, facilitating the decision-making process. Finally, they were also able to control the budget since all expenses had to be approved online.
THE RESULTS
Using BuildBinder our client was able to: • • • •
Select the best contractors for the project. Reduce their travel expenses by 85%. Finish construction of the distribution center on time and on budget. No overruns. Expedite the decision-making process, keeping all parties coordinated and informed.
V. HOW DOES EACH STAKEHOLDER BENEFIT FROM BUILDBINDER? •
•
Contractors can manage all subs with just a glance, ensuring efficiency of time, better control of resources and maximum profits. Assign tasks to site workers and track their time for payroll or contract management, all within BuildBinder. Even developers will benefit from BuildBinder’s easy-to-use dashboards.
data, so project managers spend time on analysis, not data entry. Let owners and lenders know exactly what is happening and when, and use BuildBinder to deliver projects on time and on budget. •
Accountants can deploy robust financial tracking, with configurable work-flow for approvals and authorizations. No need to re-type anything, with BuildBinder, project financials are taken care of, from general conditions and internal expenditures, to subcontractor contract payments.
•
Executives gain visibility into all projects using BuildBinder’s Executive Overview dashboard. BuildBinder’s cloud-based software gives executives, owners and partners access to KPIs, schedule status and budgets vs actuals.
Managers can report on project status in an instant, anytime, anywhere. BuildBinder’s step-by-step virtual bid system makes setting up bids easy, and includes a full audit trail. Bidders input their own bid
VI. TECHNICAL SUPPORT BuildBinder is so easy to use that you can set up your first project in minutes, with our built-in onboarding checklist. You can opt to review the checklist from start to finish, or review topics as you need them. You’ll have the ability to pick up where you left off, if you need to step away, as well as skip ahead or review previous topics, without ever compromising current progress.
VII. MORE ABOUT BUILDBINDER Modeled after the constructability workflow from Georgia Tech’s School of Building Construction, BuildBinder is a cloud-based construction information management system (CIMS), built by construction experts, for construction experts. BuildBinder is easy to use, requires minimal training and integrates seamlessly with most applications, so there’s no need to worry about lengthy deployment times. Whether part of a small or large team, BuildBinder helps you efficiently manage the entire scope of construction projects, from initial design and funding, to close-out and hand-off. We understand how frustrating clunky software solutions can be and designed BuildBinder as the
collaborative, mobile-friendly, information hub that construction professionals need to be successful. Headquartered in San Francisco, CA, BuildBinder is immersed in the technology and innovation blooming within Silicon Valley. Our team boasts over 30+ years of experience and are ready to assist you through free demos, industry white papers, blog articles, and more, to help you standardize your construction management process. Visit our website at www.BuildBinder.com for resources that may be helpful to you and your team, as you consider BuildBinder as your construction information management solution.
ELIMINATE UNKNOWN BOTTLENECKS IN YOUR CONSTRUCTION PROCESS LEAN CONSTRUCTION ELIMINATE RE-WORK IMPROVE OUTPUT
VIII. HOW WE STACK UP AGAINST OUR COMPETITORS BuildBinder was created and designed based on the needs of lean construction estates. Your current and past projects are easily accessible in the intuitive cloud-based platform, and BuildBinder is so easy to use that you can set up your first project in minutes, using our built-in checklist.
Unlike competitor software, our checklist does not require completion in a sequential order. You’ll have the ability to pick up where you left off at any time, or skip ahead without compromising current progress. BuildBinder further sets itself apart by being the only solution so far that allows collaboration and responses/authorizations to RFI’s and submittals, with people not collaborating through BuildBinder.
TOP 5 FEATURES COMPARED COMPETITION: Build Binder RFI/Submittals
Project and task scheduling
Daily Log and reporting
Bidding system
Construction accounting
Source: https://reviews.financesonline.com/
Pro Core
Red Team
BuilderTrend
IX. BUILDBINDER SOFTWARE TOUR EASY TO USE DASHBOARDS, SO THAT YOU CAN MANAGE PROJECTS YOUR WAY, BUT BETTER. ABC Building Schedule
ABC Building
Invitation to participate in a project New Project
Hotel Greenleaf
Lechuga Express
Hill Valley Inc.
Century Construction
3
Active Projects (6)
ABC Building
Hotel Greenleaf
Lechuga Express
20 Pending Action
Horizon Hills Estates
Hill Valley Inc.
Century Construction
Start Date: Apr 05, 2017 End Date: Jun 20, 2019
Start Date: May 01, 2017 End Date: May 01, 2018
Start Date: Oct 15, 2017 End Date: Dec 01, 2017
1 Pending Action
Start Date: May 01, 2011 End Date: Jan 15, 2017
Start Date: Nov 28, 2016 End Date: Mar 31, 2018
58% 651-432-5954 Glass St. Dallas, TX 75230 United States
Map
Horizon Hills Estates
33% 718-212-5954 Greenwich Drive Pleasant Hill, CA 94523 United States
RFI
Start Date: Oct 20, 2016 End Date: Aug 31, 2017
Map
RFI
3% 805-561-9342 West Olsen Road Thousand Oaks, CA 91360 United States
Map
RFI
82% 212-789-0045 Forest Road Staten Island, NY 11221 United States
Map
RFI
85% 870-356-9800 Little Rock Way Little Rock, AR 70022 United States
Map
30% 718-212-5954 Mariner’s Point Seattle,WA 98101 United States
RFI
Map
RFI
This is main project gallery for BuildBinder. Each project has it’s own virtual dashboard, or binder. You can easily view all projects at a glance and determine which ones are on-track.
IX. BUILDBINDER SOFTWARE TOUR General Schedule
X
Project ABC Building Test of the Sign-Up
Month
Start
End
Duration Budget Spent
2011
2012
2013
BuildBinder Go ToMarket
(0%) Test of the Sign-up (10%) Horizon Hills Estates
Horizon Hills Estates
Quality beta 1.0
Budget Spent: 10%
TESTING PURPOSES ONLY
Work Progress: 2%
Financial Project Soils Lab
2015
(29%) ABC Building
Horizon Hills Estates Lyon Estates
2014
Year
(0%) Lyon Estates (0%) BuildBinder (13%) Quality bet
Jose Martin Wednesday April 5, 2017 Thursday June 20, 2019 807 days
North Star Lechuga Express Project Genesis Genesis
From the main project gallery, click “Schedule” to see an overview of all projects. The general schedule features a Gantt chart that displays one project per line item.
IX. BUILDBINDER SOFTWARE TOUR ABC Builder Overview
Preconstruction
Work Strategy
Construction
CONSTRUCTION PROGRESS
Closeout
Projects
ABC BUILDER
90
651-432-5954 Office@ABCBuilder.com October 20, 2016
Days to completion
August 31, 2017
FINANCIAL SUMMARY
Current Statement Baseline Estimate $925,000.00 Contracted Amount $1,062,463.00
Cash Flow Progress
Work Progress
Paid
$0.00
Balance to Pay
$1,062,463.00
Estimated Vs. Contracted
Completed to Date
$32,000.00
Balance to Finish
$1,030,463.00
Work Progress
3.01%
Project Diary November / 03 Soil is finally drying out with the sunny weather. Read More
Baseline Estimate
Overdrawn
Paid
Contracted Amount
Completed to Date
Once you select the project you want to view, you’ll land on a project overview page. The overview page is convenient for owners who want an update on a project without extensive details.
IX. BUILDBINDER SOFTWARE TOUR Horizon Hills Estates Overview
Preconstruction
Work Strategy
Construction
Closeout
Projects
OBJECTIVES MAINTAIN NO MORE THAN $90,000 VARIANCE ON BUDGET ESSENTIAL ELEMENTS
A/E DESIGN DOCUMENTS
A Client Profile
General Contractor Profile
Project Objectives
Project Profile
Participants
Project Requirements
Project Media Gallery
Disciplines
Bill of Quantities
A/E Estimate
Blueprints
Specs and Procedures
B
C
Take-offs
Import Data
$ Project Archives
STUDIES AND REPORTS
Description
PERMITS
Status
Description
Field Density Study
City of New York / Staten Island
Percolation Tests
LVWD applications-water and waste extension
Retention Pond
NEW YORK GAS SERVICE
Sieve Gradation and Proctor Curve Analysis Slope Stability Analysis - Retention Ponds Soil and Foundation Study
Each project also features a tab called “Pre-construction”. The pre-construction page lets architects and engineers upload blueprints, studies, permits, etc., quickly and easily.
Status
IX. BUILDBINDER SOFTWARE TOUR Horizon Hills Estates Overview
Preconstruction
Work Strategy
Construction
Closeout
Projects
STORM SEWER Edit
Delete
Add version
Edit
Delete
Add version
Edit
Delete
Add version
Edit
Delete
Add version
STORM SEWER DRAINAGE PLAN SANITARY SEWER SERVICE PLAN SEWER DETAILS
STORM SEWER DRAINAGE PLAN
C06-PRE-EXISTING D...
SANITARY SEWER SERVICE PLAN
C09-SANITARY SEWER..
SEWER NOTES AND ADDITIONAL DETAILS
C11-SEWER NOTES AND ADDITIONAL DETAILS
C10-SEWER DETAILS
C10-SEWER DETAILS P.. C11-SEWER NOTES A...
Delete
UTILITIES Delete
Add version
C12-WATER SERVICE PLAN
C12-WATER SERVICE PLAN
C12d-WATER SERVICE..
Edit
Delete
Add version
C13-WATER DETAILS-REV2
C13-WATER DETAILS-REV2
C13-WATER DETAILS R..
Edit
Delete
Add version
C14 WATER DETAILS 2OF3
C14 WATER DETAILS 2OF3
C14-WATER DETAILS...
Delete
Add version
C15-WATER DETAILS-REV
C15-WATER DETAILS-REV
C15-WATER DETAILS...
Add version
C16-WATER INSTALLATION NOTES
C16-WATER INSTALLATION NOTES
C16-WATER INSTALLAT..
Edit
Edit Edit
Delete
Blueprints can be added to your project as versions. Your team will only see the most current version of your blueprint, so things are never lost in communication. Administrators can conveniently view all versions.
IX. BUILDBINDER SOFTWARE TOUR ABC Building Overview
<
Preconstruction
Work Strategy
Construction
Closeout
Projects ABC Building Glass St. Dallas, TX 75230 United States
Work Strategy / Team Selection
Air conditioning
Detail
Bidders
Forum
Bid Analysis
Reference Bidder
Clarifications
Order By Lowest Bidder
Negotiations
Varaiance $
Percentage
%
%
One row description
Item
Description Material and labor for the installation of the tracker control system, including start-ups and tests
1
12.128
2
12.1267
3
12.126
Material and labor for the installation of a 10 zones zoning system, including mounting dampers, electric connection, controls and accessories.
4
12.125
Material and labor for the installation of a 12 zones zoning system, including mounting dampers, electric connection, controls and accessories.
5
12.124
Supply of Control Tracker System, model BMTK000 for sequential units of refrigeration, package includes Interconnection, programming and training of personnel
TRANE zoning system supply including control damper type module 10, damper bypass, static pressure 1 or speed sensor, zone 10 temperature sensor, central control panel, 110 to 24 volts transformers and accessories.
Export to Excel Restore Bidders
Allied Construction Company
Quantity Unit
Price
$25,000.09
Total
$25,000.09
Variance
1.0000
Lot
$16,095.12
1.0000
Piece $19,399.46 $19,399.46
$0.00
1.0000
Lot
$5,600.02
$5,600.02
1.0000
Lot
$6,080.01
$6,080.01
1.0000
Lot
$83,734.09 $83,734.09
Low
High
Joy Consruction Corp.
Price
$8,904.97
Total
Delete
X
Variance
Plaza Constuction Group
Price
Total
Variance
X
Supreme Building Co.
Price
Total
X Variance
$8,904.97
$0.00
$38,089.34
$38,089.34
$29,184.37
$14,885.48
$14,885.48
$5,980.51
$181,238.26
$181,238.26
$161,838.90
$73,562.00
$73,562.00
$54,162.54
$196,739.16
$196,793.16
$177,339.70
$0.00
$15,583.69
$15,583.69
$9,983.67
$58,596.00
$58,596.00
$52,995.98
$16,876.70
$16,876.60
$11,276.68
$0.00
$17,809.94
$17,809.94
$11,729.93
$65,285.00
$65,285.00
$59,204.99
$19,673.12
$19,673.12
$13,593.11
$0.00
$92,416.87
$92,416.87
$8,862.78
$190,908.94
$190,908.94
$107,174.85
$121,983.60
$121,983.60
$38,249.51
Within the â&#x20AC;&#x153;Work Strategyâ&#x20AC;? tab of a project, you can access your bid analysis page. Bidders upload their own data, and BuildBinder takes care of all mathematical calculations.
IX. BUILDBINDER SOFTWARE TOUR ABC Building Overview
< Use the
Preconstruction
Work Strategy
Construction
Closeout
Projects ABC Building Glass St. Dallas, TX 75230 United States
Work Strategy / Contracted
Contracts Summary CCA
Company
Amounts:
Button on the left of each new contract to authorize the amount and release it.
Contract
Amount Contracted
%
Advance Payment Amount
%
With decimals
Retention Amount
ACUTIWALLS INC Supply and installation of mobile walls Structure Total Acustiwalls Inc
$443,782.00
60.75%
$269,597.57
0.00%
$0.00
$100.00
5.00%
$5.00
5.00%
$5.00
$2,019,951.91
10.00%
$332,502.37
$443,882.00
ALUGLASS INDUSTRIES Frames Total Aluglass Industries
$3,325,023.72
Delete 0.00%
$3,325,023.72
BAIN CONSTRUCTION Bain (Asphalt, Earthwork, Lift Station, Storm Sewer, Water & Waste Water) Original CCO (+): Additive is applied due to the result of a project change. CCO (+): Additive is needed as a result of a project (design) change. CCO (+): Additive is required due to differences found in bill of quantities against real dimensions. CCO (-): Penalties and sanctions Original +/- CCO’S General Change Order Original CCO (-): Penalties and sanctions Original +/- CCO’S Total Bain Construcition
$3,925,044.00 $1,031.70
0.00%
$0.00
-
-
$2,172.40
0.00%
$0.00
-
-
$1,746.55
0.00%
$0.00
-
-
-$4,113.75 $3,925,880.89
2.45%
$0.00
10.00%
$392,588.09
$564,075.07 $52,244.94 $531,730.13
0.00%
$0.00
10.00%
$53,173.01
$4,457,611.02
Managing contracts is made easy with BuildBinder. You’ll find contract summaries and other sophisticated construction financials on the work strategy page, whenever and wherever you need them.
IX. BUILDBINDER SOFTWARE TOUR ABC Building Preconstruction
Work Strategy
Construction
Closeout
Projects
Go to previous version New RFI # 18
Refresh
Due Date
Assigned to me
Due Soon
Subject
05/04/2017 07:41
door color
Search Status
Responsible User
Resolved
John Matthesen John Matthesen
17
05/04/2017 07:35
What type of window glass?
New
16
04/11/2017 08:46
paint color for rain gutters?
Resolved
John Matthesen
15
03/15/2017 20:05
Concrete set time
Resolved
John Matthesen
14
03/15/2017 17:31
Door latch type?
New
John Matthesen
13
02/27/2017 17:24
Do we need a mount for the card key reader? In progress
12
02/21/2017 16:12
Pipe size for underground installation
11
01/29/2017 16:45
Load max for louvered windows?
Resolved
Ramesh Foreman
10
01/29/2017 14:20
What size engine for hydroponic drains?
In progress
Emmanuel Lemor
9
01/24/2017 11:18
Irrigation computer type?
In progress
John Matthesen
Description
Do we want on 110V or 220V?
Assigned to
Attachements
Official Attachment
Delete
John Matthesen
06/01/2017 12:08
We will use 220V. We have a breaker and outlet already installed.
Set as official response
Ramesh Foreman Emmanuel Lemor
Blueprints RFI #
Blueprints
Ramesh Foreman
Irrigation
Tags
Priority
John Matthesen
Resolved
Trade/discipline
<
Overview
9
01/23/2017 12:43
We need 220V for this installation
Set as official response
Within the â&#x20AC;&#x153; Constructionâ&#x20AC;? tab of a project, you can easily view the status and set priority for the latest requests for information. Here is a snapshot of the BuildBinder RFI system.
IX. BUILDBINDER SOFTWARE TOUR ABC Building
<
Preconstruction
Work Strategy
Construction
Closeout
Projects ABC Building Glass St. Dallas, TX 75230 United States
Construction / Process
Submittals
Go to previous version New Submittal
#
Cycle
8
1
7
1
6
1
Description
Refresh
Assigned to me
Progress
Due Soon
Code
Search
Due Date 05/09/2017 15:25
SEC38
Subject Door design approval
Creator user John Matthesen
05/02/2017 21:14
Roof Structural Truss spec
In progress
John Matthesen
04/23/2017 13:14
Security door lock spec
In progress
John Matthesen
Please provide us with specification for an electronic door lock Orders of Approvers
Patrick Neeson Fixed
05/26/2017 15:59
Tags
Cycle: 1
Priority
Blueprints
Attachments
I prefer a different SKU. I think better to use 730283C Greenhouse door 3p..
Cycle 1
Blueprints Attachment
Status New
Ramesh Foreman
blueprints version... (1) William Subone
05/26/2017 15:56
Cycle: 1
We have Kwiklok products in our warehouse. I will pull from there.
(2) Ramesh Foreman
Edit
(3) Patrick Neeson
x
William Subone 05/26/2017 15:52
Cycle: 1
I have attached the correct product and spec. Use Kwiklok SKU #730291A winsdow pistons 4.jpg
The Construction tab is also home to the BuildBinder Submittals System, which allows you to quickly add new items and sort by status, category or type of submittal.
<
Overview
IX. BUILDBINDER SOFTWARE TOUR Horizon Hills Estates Overview
Preconstruction
Work Strategy
Construction
Closeout
Projects
PROGRESS CONTROL CENTER
REPORT
A Schedule
Meeting Minutes
Project Objectives
Playbook
RFI
Submittals
Site Photos
Plan Views
Project Diary
Announcements
B
C
Quality Control
Weather
CURRENT STATEMENT By Design Contract
By Construction Contract
Estimated vs Contracted
Miscellaneous
Base Line Estimate (BE)
$171,600.00
Amount contracted (CA)
$426,684.89
100.00%
$8,465,142.91
0.00%
$1,235,741.38
0.00%
Completed to date (CD)
$425,304.89
99.68%
$7,193,147.18
84.97%
$622,720.68
50.39%
Paid (P)
$425,304.89
100.00%
$6,715,979.79
93.37%
$622,720.68
100.00%
Balance (B)
$0.00
0.00%
$477,167.39
6.63%
$0.00
0.00%
$9,605,070.00
Work Progress
$0.00
81.37% BE
OV
P
CA
Contracted Amount
Full page Gantt
SCHEDULE Day July 2014
Description
Responsible
Status
Critical
Duration
José Martin
678
Entire Site Clear & Grub
José Jaurrieta
12
Pond Rough Grading
José Jaurrieta
20
Street Designation & Grading
José Jaurrieta
14
Sanitary Sewer System
José Jaurrieta
29
Horizon Hills Estates
Completed to Date
Sun 6/22 - Sat 6/...
Sun 6/29 - Sat 7...
Sun 7/13 - Sat 7...
Week
Month
Year
August 2014 Sun 7/20 - Sat 7...
Sun 7/27 - Sat 8...
Sun 8/03 - Sat 8...
Sun 8/10 - Sat 8...
Sun 8/17 - Sat 8...
(100%) Park-Pond “A” Rough Grading (46%) Pond Rough Grading (53%) Street Designation & Grading (68%) Storm Sewer System (60%) Sanitary Sewer Pump Station (100%) (42%)
No one gets left behind when you’re using BuildBinder’s Construction Dashboard. It’s easy to use, and everyone working at your job site will gain access.
IX. BUILDBINDER SOFTWARE TOUR Horizon Hills Estates Overview
<
Preconstruction
Work Strategy
Construction / Progress
Sun
Mon
Closeout
Progress
Project Diary September
Construction
Site Photos
Plan Views
Project Diary
Announcements
Projects Horizon Hills Estates Forest Road Staten Island, NY 11221
Saturday September 19, 2015
2015
Tue
Wed
Thu
Fri
Sat
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
During the week: • Water, sewage and gas services were completed for the new lots in block 13. Electricity is still pending. • Awaiting for Post Office to install Mail boxes. Bain Construction: • Phase 3 paving. Another segment of Via Roja St. from intersection with Camino Cresta St. to Nonap St. • Continued preparation for paving the rest of the streets in Phase 3. • Worked on base for asphalt on Manzanita and Camino Cresta Streets • Water and sewage services were completed for the new lots in block 13 Gas Company: • Completed services for the new lots in block 13 Vertex: • Returned to the project and completed concrete slabs for the mailboxes all across the development Rock walls: • The rock wall contractor completed the retention wall in block 26, lots 5 to 8. • They are working on the single walls on block 1
At the end of the day, field supervisors can use the Construction Dashboard to enter their daily report. Everything is driven by the calendar, so you never lose track of project progress.
IX. BUILDBINDER SOFTWARE TOUR Horizon Hills Estates Overview
<
Preconstruction
Work Strategy
Construction / Progress
Sun
Mon
Closeout
Progress
Project Diary September
Construction
Site Photos
Plan Views
Project Diary
Announcements
Projects Horizon Hills Estates Forest Road Staten Island, NY 11221
Friday September 11, 2015
2015
Tue
Wed
Thu
Fri
Sat
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
You can view photos and plan views on the very same calendar. Daily reports and information are linked together by date, making the Construction Dashboard the source of truth, throughout the life of your project
Thanks for considering BuildBinder as your construction information management system. Please forward any additional questions to: info@buildbinder.com Tel: 1-844-311-5858